Loading...
0301-379 (BLDG)Tjl4f aF 4Wcv w. m 0 m m 10y n��? i1 - xv E w °:-0 m W `<° y m m ? m a m.' O E �°�w _ O vmw�.�m �z w mm o m v W .-.vmw 00 a 0 V1°-�mp O y y c ' mD m CCD o m N 3wNCD c o 3 m g ao Q� o w Im m vm�M O�amNov .• v r CL - om as 0Q' � o Ci. m� vi a 'c Clm -,0 m `G 3 U p y �• m o m m m m °.wt .yC-. O ? W. 0-m 00 m p wa N m n C)5 �' m-3 a3 m�7-0� = QCD o a 7 7 N-0 0 0 y m o w `G yam �C co (n i cov o w •� _ vs Q q CD _ �- o m C° 0 0 O m m --.. Ch �� N O o m m a _!n (w O O. o crm 3 m o _ m m CD m CD rn m 3 OL O 0 o r co Fy m 0° m OC it 3 N 7 p< 3' � y E D), (D f0 vm, � y m P. m m a } _ O O O 0 C a w 0 O ID 3 0 0 m 7 w n m v 3 c p y vv 4-i c moaomcm pa Qo �' w o m 3 0 O v m 0 7= 7 t0 N O n a m ST =;: (, `G O Al 3 m to '< P.O. BOX 1504 TEL 760-777-7012 78-495 CALLE TAMPICO INSPECTION REQUESTS LA QUINTA, CALIFORNIA 92253 760-777-7153 O w v, rj,�a' -_� Saw y R� Q EAR -z3 m - �_ m m `m w_ 0- 0 to y 0 c: ~5 N O N (D gw �°7 s° m :': - m 3 3 v o c m�_rrm O m m 3 0SD O° a �o3o dig C n .< m > p :3'< m 07 (D o m° .0> 0 0 •v 'p m �3 c 3 o w m m v o m n -o 3 i in �� �mn °i <-0(n 3 CL y M j 0 0 U _ m °:. w w o a w _ _ CD O O p .< o �. W 3 m o 3 3 m cd- ww3wvm� m (p m° N. w 3 ID ovmoca 3 CL 7 p< o en o 9D'w 0 Q. C O <• 0CD 0 .@ m o 3 0 CL ""= < • �. S0 7 ID O m Q .ws m a W CL °' t o 3 m O'N m -CD ffl O g vi Cc m o 0 m �� o c o O'•py 3a n Fj 00 m(D ( p wO r 0 p m V w w O c O -.m 0 33CD � CD 7 O. m m a -cn vo m m o 0 3-m CD -0 - (D _ � m yom�Q%m m o ..a N p w o? 7 ria Q^r m , a3 ((DD Q. oW'3 0 3 m isw o w < a a m 0 m w 7 in C7 o' a� w o m w n (gym?��^-v v, m m SD m n o o c �S�� 3o� 0 zy a m vi V O W iDo m o o 0 N m m 3 a O C= cn m ' W 5 c m Qui ° m - C- '-O 0ovw, ro �Dm t,:p C D n w p 0 N 0 0 N v w �a �m 0 mm'< mints w _CLD -m �- 3 m m w=°w_v-ym 3 o m - m mo 00 0 - *0 O m m c O c ° w- s a � -iQ �0yaomm m r 0 cci � CD fA m m . m m <°�•w 0 n nEt o moR°00 O ay v v��m o m o�� w y v fD < m v p N z o o y a° v c mU)3wm� 0 03 - CD °: R� v c O O -a {n Af<D m N m 0 < ai N X o0o m 3 c O o �• •p m gip-' � n O p 0�n 3 N v a v cL 0 W m O N n O O (n - � o m n m m o � a n C.c w m o 0 fn O. O- N f/1 O z m C F a m O m n r a O z w co w;, W 4v -0 C�- r o s m m y m N N I0 �w w n3 3 ° c r CL CD SD n CL m a(0m(n 3i•�m c: n 0cnoO 7 O' D N m r �s 4 `:2 a o3:Onc ow N o o - w Z3 M CD <-0 CD CL O j a m O m M W m � o CL m3 a z xx m m C mCD ri) cn m O w v'+ 2 O c m 2 �� v m m.' _ Onm iTs fi ". !}3�: m Ci. wa .. 7-j= a �C a 4 m _ �- --.. Ch �� c _ 7 z o 0 z Z m r'n_ X21' -• o m CADrrt qo ., v z n r~ c m U. a i?; x`LL_' hT n p m T `� W :13 .t7 - RTi mIo z ti W nj 1. z _ k7 z m S• z v f. =+ w � m n> r, r;4 a > iO r1 INSPECTION RECORD OPERATION DATE INSPECTOR OPERATION DATE INSPECTOR BUILDING APPROVALS MECHANICAL APPROVALS Set Backs Underground Ducts Forms & Footings Ducts Slab Grade Return Air Steel Combustion Air Roof Deck Exhaust Fans O.K. to Wrap F.A.U. Framing Compressor Insulation Vents _ Fireplace P.L. Grills Fireplace T.O. Fans & Controls Party Wall Insulation Condensate Limes Party Wall Firewall Exterior Lath Drywall - Int. Lath Final, Final POOLS - SPAS BLOCKWALL APPROVALS Steel Set Backs Electric Bond Footings Main Drain Bond Beam Approval to Cover Equipment Location Underground Elsctric Underground Plbg. Test Final Gas Piping PLUMBING APPROVALS Gas Test Electric Final Waste i ines 'neater Final j Water Piping Plumbing Final _ _ Plumbing Top Out Equipment Enclosure Shawver Pans _4 Q.K. for Finish Plaster Sewer Lateral �y Pool Cover - Sewer Connection Encapsulation Gas Piping Gas Test Appliances Final �- COMMEN S: Final Utility Notice (Gas) ELECTRICAL APPROVALS Temp. Power Pole Underground Conduit Rough Wiring Low Votage Wiring Fixtures Main Service Sub Panels Exterior Receptacles G.F.I. Smoke Detectors Temp. Use of Power Final Utility Notice (Perm) REQUEST FOR PROPOSAL INSTALL POLYURETHANE FOAM ROOF SYSTEM 8 BUILDINGS (30 UNITS) =% I Units Bldg Type 4 5M LOCATIONS- (Listed in Rri}oritvl 17M 4 5M 4 9M 5 " 1 Numbers.. Street Phase 4 55-485, 467,.449, 431 Southern Hills 17B (0 0 ` 26 80-575,587,599,611 Cherry Hills 1111 54-6.55;639,623, 607 Riviera 31B f aj '—' 4 55-682,670,658,646 Riviera 35A "Q 55-070,660 Riviera 37A 55-270, 251r,-246, 234 Shoal Creek 14A �-% 54-732, 720, 708, 696 Shoal Creek 18A Z-4—�8 54-516,504,492,480 Shoal Creek 20A =% I Units Bldg Type 4 5M 4 17M 4 5M 4 9M 2 27M 4 9M 4 9M 4 1.W SCOPE OF WORK Furnish all labor, materials, equipment and services necessary for completion of all roofing and related work as specified in this document. POLYURETHANE FOAM ROOFING WITH ACRYLIC AND GRANULES 1) All loose gravel, dust and residue shall be removed using power vacuum equipment, power sweeper, . air blowing or other suitable means: 2) Grind allloose paint from Z -bar metal, solvent wipe and prime with metal primer before application of foam roofing. Install new Z -bar metal (will be identified at job walls) as needed and solvent wipe and prime with metal primer before application of foam roofing. 3) Remove two (2) courses of tile and cut 3" water blocks where slope meets flat roof areas. 4) All surfaces shall be primed with neoprime primer at the rate of not less than % llaroris. 100 square feet prior to foam application ga 5) Urethane foam shall be sprayed - applied to a minimum thickness of 1.5". Additional foam,shall be applied in ponding areas to help disperse the standing water. 6) Coating shall be applied in a minimum of two (2).separate coats. Acrylic coating to be 55% solids. a) The base coat shall be applied at a rate of 2.0 gallons per 100 square feet. b) The topcoat shall be applied at the rate of 2.0 gallons per 100 square f thickness of 32 total dry mils. Ceramic 9 eet, with a combined coating is wet granules shall be embedded into the final coat while the PGA WEST Residential Association; Inc. 2012 Foam Roofing RFp