Loading...
BRES2014-1114 Geotechnical Reports and Investigation&Fff 45 go: In Englneerlhg e 45090 Golf Center Parkway, Suite F, Indio, CA. 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite C, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemet, CA 92543 (951) 766-8777 Fax (951) 766-8778 September 8, 2014 T -Star III, Inc. c/o Hayer Architecture 445 Marine View Avenue, Suite 280 Del Mar, California 92014 Project: 81-266 Peary Place Lot 70A - The Madison Club La Quinta, California Subject: Soluble Sulfate Content Project No. 544-14198 14-09-344 Ref: Geotechnical Update prepared by Sladden. Engineering dated August 7, 2014; Project No. 54414198, Report No. 14-08-303 As requested, we have sampled the surface soil on the subject lot located at 81-266 Peary Place within the Madison Club development to determine the soluble sulfate content as it relates to selecting appropriate concrete mix designs. Laboratory testing indicated soluble sulfate content of 100 ppm (0.010 percent) that corresponds with the "negligible" exposure category in accordance with Table 3 of ACI 318-08 Chapter 9. In accordance with ACI 318-08, special sulfate resistant concrete mix designs will not be required for structural concrete on this project. Test results are attached. If you have questions regarding this letter or the referenced report, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEEI SRE17 L. ` ANDERSON Brett L. AnCI� trS011— r4o. C4$389 9130114 Principal Engineer =' iENGINEERING Letter/gvm=`G' p Copies: 4 / T -Star III, Inc. c/o Hayer Architecture ArPtRVE1D FOR CON DATE -IME BY Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621, (714) 523-0952 Fax (714) 523-1369 45090 Golf Center Pkwy, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 Date: September 5, 2014 1i Account No.: 544-14198 Customer: T -Star III, Inc Location: Madison Club, Lot 70A, 81-266 Peary Place, La Quinta Sulfate Series Analytical Report Soluble Sulfates Soluble Chloride per CA 417 per CA 422 ppm ppm 100 100 r 'TABLE 19-.A-2—REQUIREMENTS FOR SPECIAL EXPOSURE CONDITIONS TABLE 19-A-3—REQUIREMENTS; FOR CONCRETE EXPOSED TO SULFITE-CONTAINING.SOLU 2Seawatcs. ' "ours or rrclm=g and thawing (•Fable 19-A-2). - - - -- - r ------ ?Porzolan that has been dctmnincd by test orservice rccond to i taining TYpc V [cmcnt mprove aulFatc resistrrrec when us4d in concrete con - SULFATE EXPOSURE WATER-40LUBLE SUt_=ATE ((Soiii,l�� �t SOII, PERGEHTAGE BY WE1GliT . SULFATE (SO4) IN WATER, ppm CEMEATTYPE T10NS NORMAL -WEIGHT AGGREGATE EHT AGG EGATE CONCRETE - btaxlmum;Weler- CamentItloue MdtnHeltiRatlo;by:, • Wal' ht, •i NormOveight A9pmpati Concreto 1"Normal- -Valpht•and Uphtwelphl' -AODN,pate Concrethe polt , x D.ODS89'fer MPa Negligible 0.000,100-150 ModctatcZ• 0.10 20 150-1,500 II, Ip(MS), is (MS) •0.50• 4,0D0 Scvecc D.20-2.00 Very acvctL Ovcr1-D0 - . tAlowcrwater-ccmrntitiotr�„a, 1,500-Ib,000 V 0.45 • 4,500 4,500 Ovcr I0,000V plus . pozzolan3 0.45 . 2Seawatcs. ' "ours or rrclm=g and thawing (•Fable 19-A-2). - - - -- - r ------ ?Porzolan that has been dctmnincd by test orservice rccond to i taining TYpc V [cmcnt mprove aulFatc resistrrrec when us4d in concrete con - .: Sladden 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fac (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemet, CA. 92543 (951) 766-8777 Fax (951) 766-8778 August 7, 2014 T -Star I'll, Inc. c/o Hayer Architecture 445 Marine View Avenue, Suite 280 Del Mar, California 9201.4 Subject: Geotechnical Update Project: 81-266 Peary Place Lot 70A The Madison Club La Quinta, California Project No. 544-14198 14-08-303 CITY OF LA QUINTA. BUILDING& SAFETY DEPT. APPROVED FOR CONSTRUCTION Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated January 28, 2005; Project No. 544-4810, Report No. 05-01-101 Report of Testing and Observation During Rough Grading prepared by Sladden Engineering dated March 2, 2006; Project No. 522-4810; Report No. 06-02-120 As requested, we have reviewed the above referenced geotechnical reports as they relate to the design and construction of the proposed custom residence proposed for the subject lot located at 81-266 Peary Place (Lot 70A) widen the Madison Club development in the City of La Quinta, California. It our understanding that the proposed residential structure will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The subject lot was previously graded during the rough grading of the Madison Club project site. The rough grading included over -excavation and recompaction of the native surface soil along with the placement of engineered fill material to construct the building pad. The site grading is summarized in the referenced report of Testing and Observation During Rough Grading along with the compaction test results. Because the lot has been previously rough graded, the remedial grading required at this time should be minimal provided that the building area that falls within the previously assumed building envelope. The building areas should be cleared of surface vegetation, scarified and moisture conditioned prior to precise grading. The exposed surface should be compacted to a minimum of 90 percent relative compaction prior to fill placement. The previously removed soil and any fill material should be placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. August 7, 2014 -2- Project No. 544-14198 li 14-08-303 The referenced reports include recommendations pertaining to the construction of residential structure foundations. The previous reports also address the potential for liquefaction, subsidence and differential settlement. Based upon our review of the referenced reports, it is our opinion that the structural values included in these reports remain applicable for the design and construction of the proposed residential structure foundations. The allowable bearing pressures recommended in the referenced Geotechnical Investigation report remain applicable. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressures of 1500 psf and 2000 psf, respectively. Allowable increases of 300 psf for each additional 1 foot of width and 300 psf for each additional 6 inches of depth may be utilized, if desired. The maximum allowable bearing pressure should be 3000 psf. Tile recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. Lateral forces may be resisted by friction along the base of the foundations and passive resistance along the sides of the footings. A friction coefficient of 0.48 times the normal dead load forces is recommended for use in design. Passive resistance may be estimated using an equivalent fluid weight of. 300 pcf. If used in combination with the passive resistance, the frictional resistance should be reduced by one third to 0.33 times the normal dead load forces. The bearing soil is generally non -expansive and falls within the "very low" expansion category in accordance with the 2013 (CBC) classification criteria. Pertinent 2013 CBC Seismic Design parameters are summarized on the following page. Sladden has reviewed the 2013 California Building Code (CBC) and summarized the current seismic design parameters for the proposed structure. The seismic design category for a structure may be determined in accordance with Section 1613 of the 2013 CBC or ASCE7. According to the 2013 CBC, Site Class D may be used to estimate design seismic loading for the proposed structures. The 2013 CBC Seismic Design Parameters are summarized below. Risk Category (Table 1.5-1):1/11/111 Site Class (Table 1613.3.2): D Ss (Figure 1613.3.1): 1:511g S1 (Figure 1613.3.1): 0.705g Fa (Table 1613.3.3(1)):1.0 Fv (Table 1613.5.3(2)):1.5 Sms (Equation 16-37 (Fa X Ssj):1.511.g Sm1 (Equation 16-38 {Fv X Si]): 1.917g SDS (Equation 16-39 (2/3 X Sms)): 1.007g SDI (Equation 16-40 (2/3 X Sm])): 0.611- Seismic Design Category: D .4latMen &mineerinQ I k August 7, 2014 -3- Project No. 544-14198 ► 14-08-303 We appreciate the opportunity to provide service to you on this project, if you have any questions regarding this letter or the referenced reports, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING ANDERSON 1,10. 015389 Brett L. Anderso - 130114 Principal Engineer �;; clvi p g SG145EERiNG V Q SER/dfe 'Foy L A� Copies: 4/ T -Star 111, Inc. c/o Hayer Architecture Slnrlrlen Dwineerinf, LA JUIN T A lz1-0K-<3o3 Please verify that soils reports contain all of the above information. In addition, to assure continuity between'the investig atjon/re porting stage and the execution stage, please use the following checklist to verify that the conclusions and recommendations in the report cover all the required -elements. Only then. can we be assured that the construction documents address all of the site soil conditions. La Quinta Geotechnical Report Checklist Does the "Conclusions and Recommendations" section of the report address each of the following criteria? "Address" means; (a) the criterion is considered significant and mitigation measure(s) noted, or; (b) the criterion is considered insignificant and explicitly.so stated. Yds No Criterion `��'A ® Foundation criteria based upon bearing capacity of natural or compacted soil. Q Foundation criteria to mitigate the effects of expansive soils. Q Foundation criteria based upon bearing capacity -of natural or --compacted soil. Q Foundation criteria to mitigate the effects of liquefaction. Q Foundation criteria. to mitigate the effacts of seismically induced differential l V settleme.-it. ® Foundation criteria to mitigate the effects of long-term differential settlement. ® Foundation criteria to mitigate the effects of varying soil strength. Q Foundat°on criteria to mitigate expected total and differential settlement. Any "No" answers to the -above checklist should be noted as specific required coYrections. 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite A, Buena Park CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemet, CA. 92543 (951) 766-8777 Fax (951) 766-8778 August 7, 2014 Project No. 544-14198 (Revised) 14-08-303 T -Star III, Inc. c/o Hayer Architecture 445 Marine View Avenue, Suite 280 Del Mar, California 92014 Subject: Geotechnical Update Project: 81-266 Peary Place Lot 70A - The Madison Club La Quinta, California Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated January 28, 2005; Project No. 544-4810, Report No. 05-01-101 Report of Testing and Observation During Rough Grading prepared by Sladden Engineering dated March 2,2006; Project No. 522-4810; Report No. 06-02-120 As requested, we have reviewed the above referenced geotechnical reports as they relate to the design and construction of the proposed custom residence proposed for the subject lot located at 81-266 Peary Place (Lot 70A) within the Madison Club development in the City of La Quinta, California. It is our understanding that the proposed residential structure will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The subject lot was previously graded during the rough grading of the Madison Club project site. The rough grading included over -excavation and recompaction of the native surface soil along with the placement of engineered fill material to construct the building pad. The site grading is summarized in the referenced report of Testing and Observation During Rough Grading along with the compaction test results. Because the lot has been previously rough graded, the remedial grading required at this time should be minimal provided that the building area that falls within the previously assumed building envelope. The building areas should be cleared of surface vegetation, scarified and moisture conditioned prior to precise grading. The exposed surface should be compacted to a minimum of 90 percent relative compaction prior to fill placement. The previously removed soil and any fill material should be placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. August 7, 2014 -2- Project No. 544-14198 (Revised) 14-08-303 The referenced reports include recommendations pertaining to the construction of residential structure foundations. The previous reports also address the potential for liquefaction, subsidence and differential settlement. Based upon our review of the referenced reports, it is our opinion that the structural values included in these reports remain applicable for the design and construction of the proposed residential structure foundations. The allowable bearing pressures recommended in the referenced Geotechnical Investigation report remain applicable. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressures of 1500 psf and 2000 psf, respectively. Allowable increases of 300 psf for each additional 1 foot of width and 300 psf for each additional 6 inches of depth may be utilized, if desired. The maximum allowable bearing pressure should be 3000 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. Lateral forces may be resisted by friction along the base of the foundations and passive resistance along the sides of the footings. A friction coefficient of 0.48 times the normal dead load forces is recommended for use in design. Passive resistance may be estimated using an equivalent fluid weight of 300 pcf. If used in combination with the passive resistance, the frictional resistance should be reduced by one third to 0.33 times the normal dead load forces. The bearing soil is generally non -expansive and falls within the "very low" expansion category in accordance with the 2013 (CBC) classification criteria. Pertinent 2013 CBC Seismic Design parameters are summarized on the following page. Sladden has reviewed the 2013 California Building Code (CBC) and summarized the current seismic design parameters for the proposed structure. The seismic design category for a structure may be determined in accordance with Section 1613 of the 2013 CBC or ASCE7. According to the 2013 CBC, Site Class D may be used to estimate design seismic loading for the proposed structures. The 2013 CBC Seismic Design Parameters are summarized below. Risk Category (Table 1.5-1): I/I1/III Site Class (Table 1613.3.2): D Ss (Figure 1613.3.1):1.511g S1 (Figure 1613.3.1): 0.705g Fa (Table 1613.3.3(1)):1.0 Fv (Table 1613.5.3(2)):1.5 Sms (Equation 16-37 (Fa X Ss)): 1.511g Sml (Equation 16-38 (Fv X Si)): 1.917g SDs (Equation 16-39 12/3 X Sms)): 1.0078 SM (Equation 16-40 12/3 X Sm1)): 0.611g Seismic Design Category: D Sladden Engineering 1 r ' r August 7, 2014 -3- Project No. 544-14198 (Revised) 14-08-303 In addition, we have sampled the surface soil on the subject lot to determine the soluble sulfate content as it relates to selecting appropriate concrete mix designs. Testing indicates that the site soil is generally considered non- corrosive with respect to concrete. The testing indicated soluble sulfate content of 100 ppm (0.010 percent) that corresponds with the "negligible" exposure category in accordance with ACI 318-08, Table 3. Based upon this, the use of sulfate resistance concrete mixes is not required. We appreciate the opportunity to provide service to you on this project, if you have any questions regarding this letter or the referenced reports, please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING Brett L. Anders5i� Principal Engineer SER/dfe Copies: 4/ T -Star III, Inc. c/o Hayer Architecture Sludden Engineering Sladde'n Engineering 6782 Stanton Ave:, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) -772-3893 Fax (760) 772-3895 March 2, 2006 East of Madison, LLC 80-349 Via Mirasol La Quinta, California 92253 CITY OF LA QUINTA BUILDING& SAFETY DEPT. APPROVED FOR CONSTRUCTION Project No. 5224810 06-02-120 DATE i' Project: Madison Club - Tract 33076 NWC Avenue 54 and Monroe Street La Quinta California SEP 18 2014 CITY OF Lq Subject: Report of Observations and Testing During Rough Grading LININ pE Q ��p A . � MEN7 Ref: Geotechnical investigation Report prepared by Sladden Engineering dated January 28, 2005, Project No. 544-4810; Report No. 05-01-101 Summarized in this report are the results of in-place density tests performed at the subject site during the rough grading of the building pads along with pertinent observations. The subject site is located on the northwest corner of Avenue 54 and Monroe Street in the City of La Quinta, California. Rough grading was performed by Nuevo Engineering using conventional heavy equipment. The building pad areas were overexcavated to a depth of at least 3 feet below existing grade or 4 feet below pad grade, whichever was deeper. Deep removals up to '10 feet in depth were performed in areas where substantial roots were encountered. The previously removed native soils and native soils obtained from cut areas of the site were placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. The overexcavation generally extended laterally at least 5 feet beyond the previously approved building setbacks as indicated on the rough grading plans prepared by RCE, The remedial grading including overexcavation of the surface soil was performed as recommended within the above referenced Geotechnical Investigation report. Observations and field testing was performed from April 22, 2005 through January 4, 2006. Testing indicates that after reworking areas of low density, a minimum of 90 percent relative compaction was attained in the areas tested, The passing test results indicate compliance with the project specifications at the tested locations and depths but are no guarantee or warranty of the contractors work. March 2, 2006 2- Project. No. 522-4810 06-02-120 Field Tests: In-place moisture/density tests. were performed using a nuclear density gauge in accordance with test methods ASTM D 2922 and ASTM D 3017. A total of 2355 density tests were performed by Sladden Engineering personnel during rough grading. The approximate test locations are indicated by lot number and on the attached plans and test results are summarized on the attached data sheets. Laboratory Tests: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with test method ASTM D 1557-91. Allowable Bearing Pressures.' The structural values recommended in the referenced. Geotechnical Investigation report prepared by Sladden Engineering remain applicable for use in foundation design. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressures of 1.500 psf and 1800 psf, respectively. The allowable bearing pressures are for dead and frequently applied live loads and may be increased by 1/3 to resist wind, seismic or other transient loading. The recommended allowable bearing pressures may be increased by one- third for wind and seismic loading. The bearing soils are non -expansive and fall within the "very low" expansion category in accordance with Uniform Building Code (UBC) classification criteria. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. Respectfully submitted SLADDEN ENGINEEI ,..AND IE Fy ki ki O Brett L. B n m tic C as389 n, Principal Engineer a Exp. 9130106 Grading/1h sp CIO- OFC IO-OFC. Copies 4/East of Madison, LLC TEST RESULTS PROJECT NAME. Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Te,,st No: I Date T,--Acd I Location ElcvationI Dry Density % Moisture Relative I Maximum In Place In Place mpaction CoDensity 1 2 3 4 5 6 7 8 9 10 11. 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 0422-05 04-22-05 04-22-05 04-22-05 0422-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-22-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 04-25-05 0425-05 04-25-05 04-25-05 04-25-05 04-25-05 0425-05 04-25-05 DATE: March 2, 2006 Building Pads Lot 8A back half Lot 8A back half Lot 8A front half Lot 8A front half Lot 9A back half Lot 9A back half Lot 9A front half Lot 9A front half Lot 10A back half Lot 10A back half Lot 10A front half Lot 10A front half Lot 14A front half Lot 14A front ha If Lot 14A back half Lot 14A back half Lot 1.2A back half Lot 12A back half Lot 12A front half Lot 12A front half Lot 11A back half Lot 11A back half Lot 11A front half Lot 11A front half Lot 15A back half Lot 15A back half Lot 15A front half Trot 1.5A front half Lot 13A back half Lot 13A back half Lot 13A front half Lot 13A' front half Lot 1211 front half Lot 12A front half 992 994 992 994 992 994 992 994 991 992 993 995 988 990 995 993 996 998 1000.5 98.5 991 993 991 993 991 993 992 994 996 998 992 994 1002.5 1004.5 109.2 104.4 106.6 105.6 109.2 101.7 109.0 104.1 100.1 106.6 1.06.3 98.7 105.4 106.1 106.3 103.4 98.9 107.9 101.6 108.9 98.6 100.0 103.6 98.4 105.3 1.09.1 104.2 104.0 109.6 103.9 109.9 107.2 109.7 98.9 10.2 8.0 9.7 12.4 11.0 8.5 10.3 10.6 1.9.3 13.2 15.0 12.0 10..4 8.6 9.4 12.0 10.3 13.0 12.0 11.3 8.0 12.3 10.1 8.2 9.6 8.9 9.7 7.6 7.3 7.6 12.2 13.7 12.5 8.9 99 95 97 96 99 92 99 95 91. 97 97 90 96 96 92 94 90 98 92 99 90 91 94 90 96 99 95 95 99 94 99 98 99 90 110.0 110.0 1.10.0 110.0 1.10.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110,0 110.0 110.0 110.0 120.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 Sladden Enizineerinx TEST RESULTS PROTECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative Maximum ____ ___ In Place In Place I Compaction I Density DATE: March 2, 2006 Sladden Engineering Over -excavation 35 04-26-05 Lot 15A back half 995 109.7 11.1 99 110.0 36 04-26-05 Lot 15A back half 997 109.4 4.8 99 110.0 37 04-26-05 Lot 14A back half 999 109.4 11.9 99 110.0 38 04-26-05 Lot 14A back half 1001 105.8 12.0 96 110.0 39 04-26-05 Lot 13A back half 1000 107.3 13.5 97 110.0 40 04-26-05 Lot 13A back half 1002 103.3 7.6 94 110.0 4.1. 04-26-05 Lot 12A back half 1000 109.5 7.3 99 110.0 42 04-26-05 Lot 12A back half 1000 109.6 6.1 99 110.0 43 04-26-05 Lot 11A back half 995 104.7 9.6 95 1100 44 04-26-05 Lot 11A back half 997 108.9 9.3 99 110.0 45 04-26-05 Lot 10A back half 995 109.6 13.0 99 110.0 46 04-26-05 Lot 10A back half. 997 107.5 14.4 98 110.0 47 i 04-26-05 Lot 9A back half 996 109.1 9.4 99 110.0 48 04-26-05 Lot 9A back half 998 108.9 7.8 99 110.0 49 04-26-05 f Lot 8A back half 996 109.9 13.8 I 99 11.0.0 50 04-26-05 Lot 8A back half 998 106.9 11.7 97 110.0 51 04-26-05 Lot 8 B 993.3 99.0 21.2 90 1.1.0.0 52 04-26-05 Lot 8 8 994.3 103.6 10.9 94 110.0 53 04-26-05 Lot 6 0 994.6 99.9 14.3 91 110,0 54 04-26-05 Lot 6 B 996.6 108.0 9.5 98 ; 110.0 55 I 04-26-05 Lot 6 B 994.0 99.2 12.9 90 110.0 56 04-26-05 Lot 6 B 996.0 103.9 13.7 94 110.0 57 04-26-05 I Lot 4 B 995.3 90.3 9.3 82* 110.0 58 04-26-05 Lot 4. B 995.3 103.4 11.3 94 110.0 59 04-26-05 ! Lot 5 B 996.3 99.2 I 15.8 90 110.0 60 04-26-05 i Lot 5 B 994.0 105.3 12.0 96 110.0 61 04-26-05 Lot 8 A front half 996 109.6 8.2 99 110.0 62 04-26-05 Lot 8 A front half 998 109.3 8.6 99 110.0 63 04-26-05 Lot 9 A front half 996 107.7 I 9.7 97 110.0 64 I 04-26-05 Lot 9 A front half 998 102.1 8.4 93 1.10.0 65 04-27-05 Lot 13 A front half 994 103.9 8.8 94 1 110.0 66 04-27-05 Lot 13 A front half 996 105.4 10.1 96 i 1.1.0.0 67. .04-27-05 Lot 13 A front half 990 101.8 9.3 93 j 110.0 68 04-27-05 Lot 13 A front half 992 106.9 11.4 97 110.0 69 04-27-05 Lot 13 A front half 994 104.5 8.3 95 1.10.0 70 04-27-05 Lot 13 A front half 996 105.8 13.1 96 110.0 71 04-27-05 Lot 13 A front half 997 108.1 11.4 98 110.0 72 04-27-05 Lot 13 A front half 998 106.8 10.9 97 110.0 73 04-27-05 Lot 13 A front half 99.4. 1.06.1. 9.8 96 120.0 74 04-27-05 Lot 13 A front half 995 103.8 8.6 94 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, Califomia PROJECT NO; 522-4810 REPORT NO: 06-02-120 Test No. Date TestedI Locatirn� Elevation I Dry Dcrwity In Place % Moisture In Place ! Relative ` Compaction Maximum' i Density 75 04-27-05 Lot 1.7 A front half 993.5 106.1 9.8 % 11.0.0 76 04-27-05 Lot 26 A front half 988 103.0 6.9 94 110.0 77 04-27-05 Lot 26 A front half 990 1.05.6 7.2 96 110.0 78 04-27-05 Lot 25 A front half 988 101.5 8.1 92 110.0 79 04-27-05 Lot 25 A front half 990 102.8 7.9 93 110.0 80 04-27-05 Lot 24 A front half 988 100.3 9.1 91 110.0 81 04-27-05 Lot 24 A --Front half 990 102.5 8.0 93 110.0 82 04-27-05 Lot 8 A Back half 994.5 106.9 10.5 97 110.0 83 04-27-05 Lot 8 A Back half 996.5 104.7 12.5 95 110.0 84. 04-27-05 Lot 9 A Black half 494 107.0 11.6 97 t 10.0 85 04-27-05 Lot 9 A Blick half 996 105.3 13.4 96 110.0 86 04-28-05 Lot 24 A back half 989 103.0 9.6 94 110.0 87 04.-28-05 Trot 24 A tpack half 991 104.4 12.9 95 11.0.0 88 04-28-05 Lot 25 A back half 993 99.6 10.3 91 110.0 89 04-28-05 Lot 25 A ,=)ack half 995 105.3 7.4 96 110.0 90 04-28-05 i Lot 26 A back half 993 98.7 6.7 i 90 110.0 91 04-28-05 Lot 26 A back half 995 106.6 11.6 97 110.0 92 04-28-05 Lot 24 A :tont half 992 102.5 13.3 93 110.0 93 04.-28-05 Lot 24 A 'runt half 994 I 110.3 10.8 91 110.0 94 04-28-05 Lot 25 A _ront half 992 ; 103.6 11.5 94 110.0 95 04-28-05 Lot 25 A Tont half 994 i 100.5 10.3 92 110.0 96 04-28-05 Lot 20 A front half 992 j 108.6 9.1 99 110.0 97 04-28-05 Lot 20 A front half 994 i 109.6 6.4 99 110.0 98 ! 04-28-05 Lot 21 A front half 992 108.7 7.1 99 .110.0 99 04-28-05 Lot 21 A front half 994. i 102.8 5.5 I 93 110.0 100 04-28-05 Lot 22 A tront half 992 107.2 5.1 I 97 110.0 101 04-28-05 Lot 22 A front half 994 1100.6 11.5 I 91 110.0 102 04-28-05 Lot 26 A iront half 992 109.1 9.5 j 99 110.0 103 i . 04.-28-05 ! Lot 26 A tront half 994 107.7 ! 7.8 ! 98 110.0 104 , 04-28-05 Lot 24 A lack half 993 101.7 9.8 I 97 , 110.0 105 ' 04-28-05 Lot 24 A lack half 995 105.4 9.8 j 96 ; 110.0 106 0428-05 'Lot 25 A (lack half 996 106.8 11.3 97 i 110.0 107 04-28-05 Lot 25 A ]lack half 998 101.3 6.7 92 1 110.0 108 0428-05 Lot 26 A Back half 996 105.5 6.3 96 110.0 1.09 04-28-05 Lot 26 A Back half 998 100.9 7.3 92 110.0 110 04-29-05 Lot 16 A. Back half 994.5 102.4 8.3 93 110.0 11.1. 04-29-05 Lot 16 A Sack half 996 100.1 7.6 91 110.0 112 04-29-05 Lot 15 A Back half 996 97.0 10.8 88* 110.0 113 04-29-05 Lot 14 A Sack half .999 1.0.4.5 12.9 95 110.0 114 04-29-05 Lot 13 A Sack half 999 101.8 9.0 1 93 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.j Date Tested I I Location Elevation Dry Density % Moisture I Relative Maximum In Place In Place I Commaction I Densitv 115 04-29-05 Lot 21 A Back half 116 04-29-05 Lot 21 A Back half 117 04-29-05 Lot 20 A Back half 118 04-29-05 Lot 20 A Back half 119 04-29-05 i Lot 1.8 A Back half, 120 04-29-05 I Retest l 57 121 04-29-05 i Lot 4 B Back half 122 I 05-02-05 Lot 21 A Back Half 123 05-02-05 Lot 21 A Back Half 124 i 05=02-05 Lot 23 A Back Half 125 .i 05-02-05 Lot 23 A Back Half 126 05-02-05 Lot 21 A Front Half 127 05-02-05 Lot 21 A Front Half 128 05-02-05 Lot 24 A Back Half 1.29 05-02-05 Lot 24 A Back Half 130. 05-02-05 Lot 24 A Back Half 131 05-02-05 Lot 24 A Back Half 132 05-02-05. Lot 24 A Center 1.33 05-02-05 Lot 25 A Center. 134 05-02-05 i Lot 26 A Center 135 05-02-05 I Lot 24 A Front Half 136 05-02-05 Lot 25 A Front Half 137 05-02-05 i Lot 26 A Front Half 138 05-02-05 1 Lot 23 A Front Half 1.39 05-02-05 l,ot 23 A Front Half 140 05-02-05 Lot 22 A Front Half 141 05-02-05 Lot 22 A Front Half i 142 05-03-05 Lot 20 A Front Half 143 05-03-05 I Lot 20 A tack Half 144. ! 05-03-05 1 o 20 A Back Half 145: 05-03-05 Lot 25 A Back Half 146 I 05-03-05 Lot 25 A Back Half 147 05-03-05. Lot 25 A Front Half 148 05-03-05 Lot 25 A Front Half 149 05-03-05 Lot 24 A Front Half 1.50 I 05-03-05 Lot 24 A Front Half 151 05-03-05 Lot 23 A Front Half 1.52 05-03-05 Lot 23 A Front Half 153 05-03-05 Lot 22 A Back Half 154 ( 05-03-05 Lot 22 A Back Half 992.2 994 993.2 994.5 995.6 997 995 996.5 .993 995 996 997.5 996 997.5 998.5 999.5 994 993 994 995.5 995.5 996 994 996 995.5 996.5 996 996 997.5 999 1000 997 999 997 999 998 1000 997 999 99.6 99.1 103.2 102.4 94.1 106.0 107.5 102.9 101.5 108.1 103.2 107.6 103.7 106.3 100.9 104.6 101.9 106,3 105.1 105.8 101.8 106.6 105.0 106.3 100.9 104,6 101.9 95.4 107,1 104.7 103.5 101..3 99.9 108.2 99.5 99.2 106.4 101.0 1.04.9 109.4 10.8 11.1 8.8 10,1 12.8 9.1 12.2 17.4 9,8 7.4 13.1 9.5 6.9 14.0 12.8 15.1 13.2 14.1 12.2 13.5 10.4 13.0 11.9 14.0 12.8 1.5.1. 13.2 25.1 8.8 11.4 16.9 1.7.4 17.1 7.7 16.0 20.1 14.6 15.2 14.9 11.7 91 90 94 93 86* 96"" 98 93 92 98 96 98 94 97 92 95 93 97 96 96 93 97 95 97 92 95 93 81* 97 95 94 92 90 98 90 90 97 92 95 99 110.0 110.0 110.0 110.0 1.10.0 110.0 110,0 110.0 110.0 110,0 110.0 11,0.0 110.0 11.0.0 110.0 110.0 110,0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 Sladden Engineering . TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-481.0 REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation Dny Density I % Moisture I Relative I Maximum In Place in Place Compaction Densitv 155 05-03-05 Lot 23 A Back Half 156 05-03-05 Lot 23 A Back Half 157 05-03-05 Retest # 142 158 05-03-05 Lot 20 A Center 1.59 05-03-05 Lot 21 A Center 160 05-03-05 Lot 21 A Center 161 05-03-05 Lot 22 A Center' 162 05-03-05 Lot 22 A Center 163 05-03-05 Lot 23 A Center 164 I 05-03-05 Lot 24 A Center 165 05-04-05 Lot 54 A Center 166 05-04-05 Lot 54 A Center 167 05-04-05 Lot 53 A Center 168 05-04.-05 Lot 53 A Center 169 I 05-04-05 Lot 54 A 'Front Half 170 05-04-05 Lot 54 A Front Half 171 05-04-05 Lot 53 A Front Half 172 05-04-05 Lot 2 A Back Half 173 I 05-04.-05 Lot 1 A Back Half 174 i 05-04-05 I Lot 1 A Back Half 175 05-04-05 Lot 1 A Center 176 05-04-05 Lott A Center 177 i 05-04-05 Lot 2 A Center 178 05-04-05 Lot 2 A Center 1.79 1 05-04-05 Lot 2 A Front Half 180 05-04-05 Lot 2 A Front Half 181 05-04.-05 1 Lot 1. A Front Half 1.82 1 I 05-04-05 Trot 1 A Front Half 183 I 05-05-05- Lot 2 A Front Half 184 ; 05-05-05- Lot 2 A Front Half 185 05-05-05- Lot 1 A Front Half 1.86 05-05-05- I Lot 1 A Front Half 187 05-05-05- Lot 1 B Back Half 1.88 05-05-05- i Lot 1 B Back Half 189 05-05-05 f Lot 1 B Center 1.90 j 05-05-05 ; Lot 1 B Center 191 05-05-05 j Lot 2 B Center 192 05-05-05 Lot 2 B Center 193 05-05-05 3 8 Front Half 194 05-05-05 3 B Front Half DATE: March 2, 2006 996 102.9 16.8 93 110.0 998 100.6 12.9 91 110.0 101.4 9,5 92** 1.1.0.0 998 103.9 12.2 94 110.0 996 99,9 13.6 91 I 110.0 997.5 109.7 11.3 99 110.0 995 106.3 14.1 96 110.0. 997 107.1 15.0 97 110.0 996 I 108.7 11.3 99 110.0 998 109.1 14.2 99 110.0 988.7 I 107.7 1 6.9 98 110.0 990 99.1 1 14.8 90 11.0.0 988.3 105.8 I 6.7 96 110.0 9905 1.02.5 I 7.8 93 110.0 990 1 105.4 i 6.8 96 1.1.0.0 992 101.7 10.0 92 110.0 987.5 105.4 8.7 96 110.0 993 106.0 8.2 96 110.0 993.5 108.1 7.8 98 110.0 995 101.3 6.6 92 110.0 993.5 108.4 7.6 98 110.0 995 99.8 11.5 90 110.0 991 106.4 5.8 97 110.0 992.5 98.9. 9.4 90 110.0 992.5 109.6 8.3 99 I 11.0.0 994 104.0 6.1 94 ; 110.0 992 108.9 i 7.7 99 j 1.10.0 993.5 105.9 i 5.9 96 ; 110.0 992.5 109.6 8.3 94 I 110.0 994,5 704,0 4.3 94 110.0 992 108.0 7.7 99 110.0 994 105.9 4.4 96 I 110.0 999 104.6 1.3.6 I 95 110.0 1001 99.3 14.5 90 110.0 1000 101.9 11.1 93 110.0 1002 102.2 12.9 1 93 110.0 997 105.9 I 13.8 96 110.0 999 100.5 11.4 91 110.0 998 109.6 11.5 99 110.0 1000 107.2 5.9 97 1 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation I Dry Density % Moisture I Relative I Maximum In Place In Place Comoaction I Density 195 05-05-05 Lot 2 B Front Half 196 05-05-05 Lot 2 B Back Half 197 05-05-05 Lot 2 B Back Half 198 05-05-05 Lot 3 8 Back Half 199 05-05-05 Lot 2 A Back Half 200 05-05-05 Lot 1. A Back Half 201 05-05-05 Lot 1 A Back Half 202 05-05-05 Lot 1 A Center 203 05-05-05 Lot 1 A Center 204 05-05-05 Lot 2 A Center 205 05-05-05 Lot 2 A Center 206 05=06-05 Lot 54 A Front Half 207 05-06-05 Lot 53 A Front Half 208 05-06-05 Lot 52 A Front Half 209 I 05-06-05 Lot 51 A Front Half 210 05-06-05 Lot 54 A Front Ha If 211 05-06-05 Lot 54 A Back Half 212 05-06-05 Lot 53 A Back Half 213 i 05-06-05 Lot 53 A Back Half 214 05-06-05 Lot 52 A Back Half 215 05-06-05 Lot 52 A Back Half 216 05-06-05 Lot 51 A Back i-ialf 217 + i 05-06-05 Lot 51 A Back Half 218 05-09-05 Lot 18 A Front 219 i 05-09-05 Lot 18 A Front 220 ; 05-09-05 Retest # 119 221 i 05-09-05 Lot 18 A Back 222 05-09-05 Lot 1.9 A Front 223 05-09-05 Lot 19 A Front 224 i 05-09-05 Lot 19 A Back 225 05-09-05 Lot 19 A Back 226 05-09-05 Lot 21 Front 227 05-09-05 Lot 21. Front 228 05-09-05 Lot 21Back 229 05-09-05 Lot 21 Back 230 05-09-05 Lot'4 B Back 231 05-09-05 Lot 4 B Back 232 05-09-05 Lot 4 B Front 233 05-09-05 Lot 4 B Front 234 05-09-05 j Lot 7 B Back DATE: March 2, 2006 997 100.1. 8.8 1000 103.1 11A 1002 102.8 12.1 999 104,5 10.2 993 106.0 8.2 993.5 10911 7,8 995 101.3 5.4 .993 108.4 7,6 995.2 99.8 11.52 991 106.4 4.5 993 98.9 9.4 993 .109.1 9.1 991.5 1 107.9 12.6 992 I 100.9 17.4 991 s 103.5 8.8 991 104.9 13.6 992.5 98.6 12.0 988.5 104.3 1.3.6 990 1.01..0 15.8 988.5 105.3 16.1 990 107.5 1.0:0 990.5 105.9 I 17:1 992 107.6 16.9 994 108.9 16.1 996 106.1 12.5 109.7. 11.5 999 107.9 13.8 996.5 106.1 8.5 997.5 102.8 8.6 991 104.9 14.1 997 106.4 14.8 998.5 106.1 1.3.3 999.5 105.7 12.9 998 99.1 6.1 1000 98.8 5.2 997 99.0 9.7 999 104.5 5.6 997 105.6 7.7 999 105.1 7.8 996 104.1 1 9.0 91. 110.01 99 110.0 93 110.0 95 1.1.0.0 96 110.0 99 11.0.0 92 110.0 98 110.0 90 110:0 97 110.0 90 110.0 99 I 110.0 98 110.0 92 I 110.0 94 110.0 95 I 110.0 90 110.0. 95 I 110.0 92 110.0 96 110.0 98 110.0 96 11.0.0 98 110.0 99 110.0 96 110.0 99** 110.0 98 110.0 96 110.0 93 110.0 95 ; 110.0 97 ; 11.0.0 96 i 110.0 96 I 110.0 90 ' 110.0 90 110.0 90 110.0 95 110.0 96 110.0 95 110.0 95 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moi&turc Relative Maximum In Place In Place Compaction Density 235 236 237 238 239 05-09-05 05-09-05 05-09-05 05-09-05 OS -09-05 Lot 7 B Back Lot 7 B Front Lot 7 B Front Lot 8 B Front Lot 8 B Front 240 1 05-10-05 Lot 44 A Front 241 05-10-05 Lot -4.5 A Front 242 05-10-05 Lot 46 A Front 243 05-10-05 Lot 51 A Front 244 05-10-05 Lot 51 A Front 245 05-10-05 Lot 52 A Front 246 05-10-05 Lot 52 A Front 247 05-10-05 Lot 53 A Front 248 05-10-05 Lot 53 A Front 249 j 05-10-05 ; Lot 54 A Front 250 05-10-05 I_.ot 54 A Front 251 05-10-05 Lot 54 A Back 252 05-1:0-05 Lot 54 A Back 253 05-10-05 Lot53 A Back 254 05-10-05 Lot 53 A Back 255 05-10-05 Lot52 A Back 256 1 05-10-05 Lot 52 A Back 257 1 0540-05 Lot 89 B Back 258 I 05-10-05 Lot 8913 Hack 259 05-10-05 Lot 90 B Back 260 05-10-05 Lot 901313ack 261 05-10-05 Lot 91 B Back 262 05-10-05 Lot 91 B Back 263 05-10-05 Lot 4 8 Back 264 05-10-05 Lot 3 B Front I 265 05-11-05 ; Lot 4 B Front 266 I 05-11-05 1 Lot 4 B Front 267.105-11-05 1,ot 413 Front 268 I 05-11-05 Lot 3 B Front 269. 05-11-05 Lot 3 B Front 270 I 05-11-05 Lot 3 B Front 271 i 05-11-05 Lot 4 B Back 272 4 05-11-05 Lot 4 B Back 273 05-11-05 Lot 4 B Back 274 05-11-05 Lot 3 B Back DATE: March 2, 2006 994 103.9 996 107.7 994 103.2 994 98.9. 996 1.03.6 991 1.04 .6 991.5 I 100.5 991.5 i 94.1 993 i 101.1 995 99.6 994 104.5 996 103.5 993.5 108.8 995 108.0 993.5 109.2 995 108.9 993.5 108.7 995 108.4 993 102.7 995 99.1. 994 I 108.0 995.5 1.08.1 984.5 100.5 986 104.4 985 1.04.5 987 i 109.7 982 1.04.6 984 1.08.1 1003 98.9 1001 107.3 1003 104.3 1004 109.5 1.005 i 103.2 1003.5 i 106.5 1004.2 109.5 1005.5 108.0 1004 107.7 1005.5 109.8 1007 104.4 1003 106.6 8.6 13.7 5.3 7.6 8.3 11.9 13.8 1.3.5 16.9 11.2 16.5 1.0.6 14.8 :13.3 1.7.0 13.0 17.2 16.0 11.9 8.5 13.2 11.3 14.3 13.1 14.8 6.3 12.8 11.3 12.7 6.8 9.9 4.0 13.9 16.1 11,6 7.0 7.3 5.4 5.8 ].1..4 94 110.0 98 110.0 99 110.0 91 110.0 94 110.0 95 110.0 91 110.0 86* 110.0 92 110.0 90 110.0 95 i 110.0 94 110.0 99 '11.0.0 98 110.0 99 110.0 99 1.10.0 99 110.0 99 1 110.0 93 110:0 90 110.0 98 110.0 98 110.0 91. 110.0 95 110.0 95 110.0 99 110.0 95 110.0 98 110.0 .90 11.0.0 97 110.0 95 110.0 99 110.0 96 110.0 97 11.0.0 98 1 110.0 96 110.0 98 110.0 99 110.0 95 110.0 97 110.0 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date TestedI Location Elevation Dry Density % Moisture Relative I Maximum In Place In Place Compaction Density 275 05-11-05 Lot 3 B Back 1004 108.3 9.1 98 110;0 276 05-11-05 Lot 3 B Back 1005.5 107.9 7.0 98 110.0 277 05-11-05 Lot 46 A Front 993 100.9 6.3 92 110.0 278 05-11-05 Lot 49 A Back 898 107.1 10.2 97 110.0 279 05-11-05 Lot 49 A Back 991 108.1 8.5 98 j 110.0 280 05-11-05 Lot 50 A. Back . 989.5 1.01..5 16.3 ' 92 110.0 281 i 05-11-05 Lot 50 A Back 991 107.4 7.4 98 110.0 282 05-11-05 Lot 5:1. A Back 991 1.09.6 9.8 99 110.0 283 05-11-05 Lot 51 A Back 993 101.6 9.3 92 110.0 284 05-11-05 Lot 44 A Back 991 103.9 13.0 94 110.0 285 05-11-05 Lot 48 A Front 991 105.1 11.4 96 110.0 286 05-11-05 Lot 48 A Front 992 100.9 10.2 92 110.0 287 05-11-05 Lot 49 A Front 991 102.8 9.9 93 110.0 288 05-11-05 Lot 49 A Front 992 101.0 I 10.4 92 110.0 289 05-11-05 Lot 50 A Front 992 I 101.8 11.0 93 110.0 290 05-11-05 Lot 50 A Front 993 j 100.5 8.7 91 110.0 291 05-1.1-05 I Retest # 242 991.5 1 101.4 9.0 92"" 110.0 292 05-1.2-05 Lot 50 A Back 993 107.6 12.5 98 1 110.0 293 05-12-05 Lot 50 A Back 994.5 109.2 9.1 99 ( 110.0 294 05-12-05 Lot 49 A Back 991 105.1 13.1 95 110.0 295 05-12-05 i Lot 49 A Back 993 104.4 13.9 ' 95 I 110.0 296 05-12-05 Lot 51 A Front 997 108.9 10.5 j 99 1.1.0.0 297 I 05-12-05 1 Lot 51 A Front 999 105.9 1.0.6 96 110.0 298 05-12-05 ! Lot 54 A Front 997.5 104.0 i 14.1 95 I 110.0 299 05-12-05 1 Lot 54 A Front 999.5 100.5 I 5.1 92 110.0 300 05-12-05 Lot 53 A Front 997 106.4 14.8 97 110.0 301 05-12-05 Lot 53 A Front 999 98.9 j 11.2 I 90 '110.0 302 I 05-12-05 ' Lot 53 A Back 994.5 107.6 12.7 j 98 110,0 303 '; 05-12-05 I Lot 53 A Back 996.5 106.5 i _ 13.4 97 110.0 304 ! 05-1.2-05 Lot 54 A Back 997 "108.3 8.7 98 110.0 305 05-12-05 Lot 54 A Back 998.5 I 99.3 12.5 90 110.0 306 i 05-12-05 Lot 1 A Back 996 100.8 1 10.4 92 110.0 307 05-12-05 Lot 2 A Back 995 101.3 i 11.2 92 110.0 308 05-12-05 Lot 2 A Front 996 99.5 9.0 99 110.0 309 I 05-12-05 Lot 52 A Front 996 . I 106.1 1.4.3 96 110.0 310 I 05-12-05 Lot 49 A Front 992.5 105.3 12.5 96 110.0 311 I 05-12-05 Lot 50 A Front 994 ` 103.8 10.9 94 110.0 312 05-12-05 Lot 31 A Front 991.5 I 1.00.3 1.0.6 91. 110.0 313 05-12-05 1.ot 31 A Front 992.5 103.5 10.4 94 110.0 314 05-12-05 Lot 30 A Front 991 1.02.1. 8.7 93 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tit No. Date Tested I Location Elevation Dry Density % Moisture Relative Maximum In Place I In Place Compaction Dcnsity 315 05-13-05 Lot 2 B Front 1001 I 100.4 14.6 316 05-13-05 Lot 2 B Center 1001 104.5 12.1 317 05-1.3-05 Lot 2 B Front 1003 j 100.0 13.2 318 05-13-05 Lot 1 B Front 1001.5 105.9 16.4 319 05-13-05 Lot 1 13 Front 1003 10115 11.2 320 05-13-05 Lot 1 B Center 1001 103.2 13.0 321 05-1.3-05 :Lot 1 B Back 1003.5 101.5 14.3 322 1 05-13-05 Lot 1 B Back 1005 99.2 12.9 323 05-13-05 Lot 1 8 Center I 1003 104.5 11,3 324 05-13-05 Lot 2 B Back 1002 102.0 11.6 325 05-1.3-05 foot 2 8 back I 1003.5. 104.6 8.1 326 05-13-05 Lot 2 B Center 1003 104.1 9.5 327 05-13-05 I Lot 17 A Back 998 103.7 7.7 328 05-13-05 Lot 17 A Back 1000 98.7 9.4 329 05-13-05 Lot 17 A Center 998 1.06.5 10.1. 330 I 05-1.3-05 Lot 33 A Front 999 ' i 101.8 14.3 331 05-13-05 Lot 32 A Center 990 ! 108.6 8.9 332 I 05-13-05 Lot 32 A Center 990 I 100.8 10.5 333 05-13-05 Lot 14 A Back 998 95.1 18.1 334 I 05-13-05 Lot 13 A Back 998 i I 104.4 11.0 i 335 05-16-05 Retest # 112 109.5 10.9 336 05-16-05 Lot 15 A Back 998.5 106.8 10.3 337 05-16-05 Retest 9 333 99.2. 17.4 338 05-16-05 Lot 14 A Back 1002.5 102.3 1 11.9 339 05-1.6-05 Lot 14 A Center 1001 104.6 10.2 340 05-16-05 Lot 13 A Back 1001 104.1 17.9 341 05-16-05 Lot 13 A Back 1003 100.4 8.5 342 05-16-05 Lot 13 A Center 1001.5 i 103.1 10.5 343 I 05-16-05 Lot 15 A front 998 108.7 13.2 344 05-16-05 I Lot 15 A .Front 1000 99.3 9.4 345 i 05-16 -- Lot 15 A Center. 998.5 1 106.0 10.1 346 05-16-05 Lot 14 A Front 1001.5 103.8 18.0 347 j 05-16-05 Lot 14 A Front 1003.5 101.9 '15.4 348 05-16-05 Lot 15 A Center 1001 104.4 11.3 349 I 05-16-05 Lot 13 A Front 1000 101.0 16.7 350 05-16-05 Lot 13 A Front 1.002 104.9 '12.1 351 05-16-05 Lot 13 A Front 1000 106.8 10.9 352 05-17-05 Lot 17 A Center 999 109.1. 10.9 353 05-17-05 Lot 1.6 A Back 1002 107.5 12.0 354 05-17-05 Lot 15 A Back 1000 � 103.0 10.6 DATE: March 2, 2006 91 110.0 95 110.0 91 110.0. 96 110.0 92 110.0' 94 110.0 92 1.1.0.0 90 110.0 95 1.1.0.0 93 110.0 95 1.1.0.0 95 110.0 94 11.0.0 90 110.0 97 110.0 93 110.0 99 110.0 92 710.0 86* 110.0 95 110.0 99** 110.0 97 110.0 90** 1.10.0 93 110.0 95 110.0 95 110.0 91 110.0 94 110.0 99 110.0 90 110.0 96 110.0 94 110.0 93 110.0 95 110.0 92 110.0 95 '110.0 97 110.0 99 110.0 98 110.0 94 110.0 Sladden .Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date TestedI I Location Elevation Dry Density % Moisture Relative I Maximum In Place In Place Comnaction Densitv 355 05-17-05 Lot 15 A Front 1000 106.4 9.5 97 110.0 356 05-17-05 Lot 1.6 A Front 999 105.3 1.1..7 96 110.0 357 05-17-05 Lot 10 A Back 999 108.1 12.4 98 110.0 358 05-17-05 Lot 10 A Back 1001 I 106.7 13.0 I 97 i 110.0 359 05-17-05 Lot 11 A Back 999 105.9 7.1 96 110.0 360 05-1.7-05 Lot 11 A Back 1001 107.8 11.4 98 110.0 361 05-17-05 Lot 9 A Front 999 107.7 8,1 98 .110.0 362 05-17-05 Lot 10 A Front 998.5 105.7 13.4 96 110.0 363 05-17=05 i Lot 37 A Back 990 102.3 1.4.3 93 110.0 364 05-17-05 I Lot 37 A Front 990 103.3 11.6 94 110.0 365 05-17-05 Lot 37 A 'Front 992 1.04.1. 1.0.9 95 1 110.0 366 j 05-17-05 Lot 8 A Back 998.5 104.7 15.8 95 11.0.0 367 j 05-17-05 j Lot 8 A Back 1000.5 106.5 11.3 97 110.0 368 i 05-17-05 I Lot 9 A Back 998 104.1 13.8 I 95 110.0 369 1 05-17-05 Lot 9 A Back 1000 102.0 12.0 ' 93 110.0 370 ! 05-17-05 Lot 36 A Front 990.5 j 100.6 12.1 91 1.10.0 371 05-17-05 Lot 36 A Front 991.5 1 101.4 11.3 92 110.0 372 05-17-05 Lot 35 A Front 990 102.5 10.6 93 110.0 373 05-17-05 Lot 35 A Front 991 103.8 10.4 94 I 110.0 374 ' 05-17-05 Lot 16 A Center 1000 105.0 12.5 95 110.0 375. 05-17-05 Lot 15 A Center 999.5 104.4 13.2 95 i 110.0 376 05-17-05 Lot 17 A Center 1000 106.3 13.8 97 110.0 1 377 05-18-05 Lot 18 A Center 99.5 1.07.9 8.0 98 110.0 378 ': 05-18-05 Lot 18 A Center 1000 98.5 12.7 ! 90 110.0 379 05-18-05 Lot 19 A Front 998.5 108.7 9.7 1 90 110.0 380 05-18-05 Lot 19 A Front 1000 105.3 13.1 i 96 110.0 381 05-18-05 Lot 20 A Front 998 1 103.6 9.3 j 96 1.10.0 382 05-1.8-05 Lot 20 A Front 1000 � 106.6 10.8 96 110.0 383 05-18-05 Lot 14 A Front 999 i 107.2 14.6 97 110.0 384 05-18-05 1 Lot 14 A Front 1001 109.0 10.6 99 110.0 385 05-1.8-05 Lot 1.1. A Front 997.5 105.6 11.3 96 110.0 386 05-18-05 Lot 11 A Front 999 107.0 10.6 97 110,0 387 05-18-05 1 Lot 17 A Back 998.5 104.06 I 9.9 95 110.0 388 05-18-05 j Lot 17 A Back 1000.5 104.4 16.3 95 110.0 389 05-18-05 Lot 18 A Back 999.0 106.6 8.0 97 110.0 390 05-18-05 ! Lot 18 A Back 999.5 100.6 16.4 94 110.0 391 05-18-05 ; Lot 19 A Back 997.5 103.6 15.3 94 110.0 392 05-18-05 I Lot 1.9 A Back 999.5 101.1 15.0 92 110.0 393 05-18-05 Lot 20 A Back 998.0 107.2 1.1.9 97 110.0 39.4 05-18-05 Lot 20 A Back 1000 107.5. 9.7 98 110.0 395 05-18-05 Lot. 17 A Front 997.5 1.06.4 14A 97 I 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative Maximum 05-18-05 Lot 8 A Front 399 I In Place In PlaceI Compaction] � Density Lot 1 A Front 401. 05-19-05 Lot 105 Back II I 05-19-05 I Lot 104 Back 396 05-18-05 Lot 17 A Front 397 05-18-05 Lot 8 A Front 398 05-18-05 Lot 8 A Front 399 05-19-05 Lott A Front 400 05-19-05 Lot 1 A Front 401. 05-19-05 Lot 105 Back 402 05-19-05 I Lot 104 Back 403 05-19-05 Lot 103 Back 404 05-19-05 I Lot 105 Center 405 ; 05-19-05 ; Lot 104 Center 406 i 05-19-05 Lot 103 Center 407 05-19-05 Lott A Front 408 05-19-05 Lott A Front 409 05-20-05 l,ot 22 A Back 410 i 05-20-05 Lot 23 A Back 411 05-20-05 Lot 18 A Front 412 I 05-20-05 Lot 22 A Front 413 i 05-20-05 1 Lot 22 A Front 414 05-20-05 Lot 23 A Front 415 j 05-20-05 Lot 25 A Back 416 05-20-05 Lot 26 A,Back 417 05-20-05 Lot 22 Center 418 05-20-05 Lot 23 Center 419 420 421 422 423 424 425 .4.26 427 428 429 430 431 432 433 434 DATE: 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 March.2, 200 Lot 102 B Back Lot 103 B Back Lot 104 B Back Lot 105 B.Back Lot 54 A Front Lot 54 A Front Lot 54 A Back Lot 54 A Back Lot 53 A Back Lot 53 A Back Lot 54 A Front Lot 54 A Front Lot 53 A Front Lot 53 A Front Lot 52 A Front Lot 52 A Front 999.5 997 998.5 996 998 983 982 982 983 982 982 997 998.5 1.001 1001 998 998.5 1001 1001 1001 1001.5 995.5 1000 983 984 984 984 1001 1002 1000.5 1001.5 998.5 1000.5 1000 1001.5 1000 1001.5 998 1000 102.4 105.4 103.9 104.7 1.0.4.8 104.1 105.0 105.7 1.03.2 102.9 104,1 105.4 104.0 106.8 105.1 107.7 104.5 94.1 95.3 97.2 96.5 102.4 103.6 101.5 105.6 106.1 102.7 108.1 104.0 103.3 104.5 104.1 102,9 109.7 101.9 102.5 101.0 108.1 100.3 11.8 14.0 13.3 15.9 1.1..6 16.9 8.9 13.0 11.8 10.1 10.8 16.9 14.2 15.2 13.7 9.6 14.5 20.1 1 19.4 j 21,4 18.4 '106.2 I 15.6 14.8 13.4 12.3 20.4 13.9 12.8 14,1 13,2 11.6 12,0 7.5 11.0 16.6 12.9 13.2 11.6 93 96 94 95 95 95 95 95 95 94 95 96 95 97 95 98 95 86* 87* 88* 80* 93 94 92 96 96 93 98 94 94 95 95 93 93 91 91 90 96 90 110.0 110.0 110.0 110.0 11ob 110.0 110.0 110.0 110.0 j 110.0 ' 110.0 110.0 1.1.0.0 110.0 110,0 110.0 110.0 110.0 1'10.0 110.0 i 110.0 110.0 i 110.0 '110.0 110.0 110.0 110.0 110.0 110.0 1.1.0.0 1.10.0 110.0 110.0 112.0 112.0 110.0 112.0 112.0 112.0 Slalden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Tcst No. Date Testes! Location Elevation I Dry Density % Moisture Relative Maximum In Place In Place I Compaction Density 435 436 437 438 439 440 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 Retest # 413 Lot 22 A Front Retest # 414 1,ot 23 A Front Retest # 415 Lot 25 A back 441 05-24-05 Lot 52 A Back 442 05-24-05 Lot 51 A Back 443 • 05-24-05 Lot 52 A Center 444 05-24-05 Lot 51 A Center 445 05-24-05 I Lot 104 B Front 446 05-24-05 j Lot 103 B Front 447 05-24-05 i Lot 103 B Front 448 05-24-05 Lot 102 B Front 449 05-24-05 Lot 102 B Front 450 05-24-05 I Lot 101 B Front 451 05-24-05 Lot 101 B Front 452 05-24-05 Lot 103 B Ccntcr 453 05-24-05 Lot 1.02 8 Ccntcr 454 i 05-24-05 Lot 101 B Center i 455: 05-25-05 Lot 50 A Front 456 05-25-05 1 Lot 50 A Front 457 05-25-05 { Lot 51 A Front 458 1 05-25-05 j Lot 51 A Front 459 i 05-25-05 Retest # 416 .460 05-25-05 1.,ot 26 A Front 461. 05-25-05 i Lot 27 A Front 462 05-25-05 Lot 27 A Front 463 05-25-05 Lot 1 B Back 464 ! 05-25-05 I Lotl B Back 465 j 05-25-05 I Lot 1 B Front 466 05-25-05 j Lot 2 B Front 467 I 05-25-05 a Lot 2 B Back 468 I 05-25-05 Lot 51 A Front 469 05-25-05 Lot 51 A Center 470 05-25-05 Lot 50 A Front 471 05-25-05 Lot 50 A Front 472 05-25-05 Lot 49 A Front 473 05-25-05 Lot 49 A Front 474.1 05-25-05 Lot 51 A Back 112.0 1'12.0 112.0 1.12.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 1:1.0.0 112.0 11.0.0 110.0 110.0 112,0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 '110.0 112.0 112.0 112.0 112.0 110.0 110.0 112.0 110.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 . .Sladdep .En�la�etin,� 104.7 14.2 93** 1003 106.3 24.0 95 101.9 17.2 91** 1003 103.9 18.0 93 108.5 7.8 1 97** 1001. ! 1.00.9 22.1. I 90 997.5 109.3 9.5 98 995 108.7 8.8 97 997 105.1 1 9.9 94 995 103.8 10.6 93 983 1.03.9 11...4 93 983 106.2 1 .8.1 96 984.5 1.08.3 7.7 97 982 100.8 11.9 92 983.5 101.9 13.1 93 981.5 i 99.9 16.5 91 983 106.1 8.1 95 984 103.3 9.4 92 984 I 105.8 10.1 94 982.5 I 102.4 8.8 93 996 j 100.4 16.8 91 997 �. 102.5 13.3 93 1000 1.04.4 1.4..8 95 1000.5 106.1 12.9 i 96 94.3 22.1* 1 86** 999.5 95.6 18.4* 82* 996 101.3 16.6 1 92 998 ; 103.1 14.0 94 1005 106.2 1.0.9 95 1007 107.6 7.0 96 1.005 105.1 13.4 i 94 1005.5 i 105.9 16.9 95 1005 102.0 17.1 93 1001 100.2 1.6.3 91 1001.5 108.7 6.4 97 996 107.8 9.7 98 998 103.2 13.0 94 994.5 105.1 13.2 95 996.5 104.5 12.1 95 997 101.0 15.1 92 112.0 1'12.0 112.0 1.12.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 1:1.0.0 112.0 11.0.0 110.0 110.0 112,0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 '110.0 112.0 112.0 112.0 112.0 110.0 110.0 112.0 110.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 . .Sladdep .En�la�etin,� PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested I Location 475 476 477 .4.78 479 480 481 482 483 484 485 486 487 488 489 490 491 05-25-05 05-25-05. 05-25-05 05-25-05 05-25-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 05-26-05 Lot 51 A Back Lot 27 A Back Lot 27 A Back Lot 28 A Back Lot 28 A Front Lot 2 A Back Lott A Back Lot -1 A Back I,ot 1 A Back Lot 47 A Back Lot 48 A Back Lot 49 A Back Lot 50 A Back Lot 47 Center Lot 48 Center Lot 49 Center Lot 50 Center 492 05-27-05 i Lot 31. A Back 493 05-27-05 ; Lot 34 A Front 494 05-27-05 Lot 33 A Front 495 05-27-05 Lot 32 A Front 496 05-27-05 Lot 31 A Front 497 05-27-05 Lot 31 A Center 498 05-27-05 Lot 32 A Center 499 05-27-05 Lot 33 A Ccnter 500 05-27-05 Lot 34 A Center i 501. I 05-31-05 Lot 34 A Back 502 1 05-31-05 Lot 34 A Back 503 05-31-05 Lot 32 A Back 504 I 05-31-05 Lot 32 A Back 505 05-31-05 Lot 31 A Back 506 05-31-05 Lot 31 A Back 507 05-31-05 Lot 29 A Back 508 05-31-05 Lot 29 A Back 509 05-31-05 Lot 10 Front 510 05-31-05 Lot 1 B Back 511 05-31-05 Lot 5 B ,Back 512 05-31-05 Lot 5 B Back 513 05-31-05 Lot 33 A Center DATE: March 2, 2006 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 ElevationI Dry Density % Moisture I Relative Maximum In Place In Place Compaction Density 999 998.5 990 988 992 102.6 107,1 102.1 106.9 100.1 997 106.5 999 101.3 998 109.1 1000 1.04.2 991.5 104.0 995 106.2 995 108.9 -996.5 109.4 992 ; 103.7 994.5 1 102.9 99.4 1.06.1. 995.5 I 104.0 994 993 993 992.5 994.5 992.5 992 993 993 995 997 994.5 996.5 996 997 996 997 1.007 1007 997.5 999 994.5 100.7 109.4 1.07.6 103.9 101.3 102A 105.5 107.2 104.4 108.3 104.1 103.6 101.9 104.1 105.3 104.9 103.0 105.4 102.1 104.8 101.6 108.4 12.1 6.8 11.9 7.1 7.4 16.4 12.4 9.8 12.1 10.6 6.3 13.0 12.3 11.2 8.9 10.1 9.3 10.0 6.2 11.8 8.3 9.1 7.9 10.3 9.0 11.4 8.9 9.3 8.4 10.1. 9.0 '11.1 10.5 8.7 13.3 16.5 14.1 10.9 8.6 93 110.0 96 112.0 93 110.0 95 112.0 91 110.0 95 112.0 90 112.0 97 1012.0 93 112.0 93 112,0 95 112.0 97 112.0 98 112.0 93 1.12.0 92 112.0 95 112.0 93 112.0 90 j 1.12.0 98 112.0 96 f 112.0 93 I 112.0 90 112.0 91 1.12.0 94 I 112.0 96 I 112.0 93 I 112.0 97 112.0 93 I 112.0- 93 12.093 112.0 91 112.0 93 112.0 94 112.0 94 112.0 92 i 112.0 94 11:2.0 91 112.0 94 112.0 93 I 112.0 97 112.0 Sladden Engineering. TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California. PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested I Location Elevation l Dry Density J In Place j % Moisture I In Place Relative Compaction Maximum Dcn%ity 514 05-311-05 Lot 33 A Center 996 105.5 7.1 94 112,0 515 05-31-05 Lot 32 A Center 994 106,2 8,5 95 112.0 516 05-31-05 Lot 32 A Center 996 106.6 9.0 95 112.0 517 05-31-05 Lot 33 A Back 992 107.2 6,7 96 112.0 518 05-31-05 Lot 30 A Back 994 107.5 11.2 96 112.0 519 05-31-05 Lot 30 A Back 996 107.0 14.4 96 112.0 520 05-31-05 Lot 31 Center 994.5 103.8 10.5 93 112.0 521 05-31-05 Lot 2 H Back 1007 100.1. 1.6.8 91 110.0 522 05-31-05 Lot 2 B Front. 1007 105.7 13.7 94 1 1.1.2.0 523 i 05-31-051 Lot 6 B Back 998 107.6 5.3 96 112.0 524 I 05-31-05 I I Lot 6 B Back I 1000 ; 105.9 8.7. 95 1.1.2.0 525 i 06-01-05 Lot 34 A Back 991 103.3 8.5 92 112.0 526 i 06-01-05 I Lot 33 A Back 991 102.4 8.1 1 91 112.0 527 06-01-05 Lot 32 A Back 990.5 104.1 9.01 93 1.12.0 528 06-01-05 Lot 34 A Back 993 100.6 9.1 90 112.0 529 i 06-01.-05 Lot 34. A Hack 994 1.02.1. 8.3 91 112.0 530 06-01-05 Lot 33 A Back 993.5 103.7 10.6 93 112,0 531. 06-01-05 Lot 33 A Back 99.4,5 101.0 8.8 90 112.0 532 06-01-05 Lot 32 A Back 993 101.9 10.1. 91 112.0 533 06-01-05 Lot 32 A Back 994.5 106.8 9.0 90 112.0 5:14 06-01-05 Lot 48 A Back 997 1 106.5 7.4 95 112.0 535 06-01-05 Lot 48 A Back 999 105.6 5.9 94 112.0 536 06-01-05 Lot 48 A Front 992 108.5 8.1, 97 I 112.0 537 06-01-05 Lot 50 A Front 994 1 102,5 8,7 92 i 112.0 538 06-01-05 Lot 33 A Center 993.5 I 102.9 9.9 i 92 ; 112,0 539 06-01-05 l..ot 31 A Center 994 f 104.6 11,4 I 93 112.0 540 06-01-05 Lot 34 A Center 994 103.3 10.0 ; 92 f 112.0 541 06-02-05 Lot 34. A Front 995 108.1 I i 14.8 97 I 112.0 542 I 06-02-05 j Lot 34 A Front 996.5 108.4 1 12.7 97 112.0 543 06-02-05 I T,ot 31. A Front 996.5 105.1 I 12.0 I 94 I 11.2.0 544 06-02-05 i Lot 31 A Front 998 101..1 I .1.3.2 j 90 112.0 545 06-02-05 Lot 33 A Back 996.5 106.3 11.5 1 95 112.0 546 06-02-05 Lot 33 A Back 998. 102.8 13.1 92 112.0 547 06-02-05 i Lot 31 A Back 998 107.6 I 12.8 96 112.0 548 06-02-05 Lot 31 A Back 999.5 108.2 j 13.0 97 112.0 549 06-02-05 I Lot 33 A Front 993 109.9 ! 10.7 98 112.0 550 06-02-05 Lot 33 A Front 995 103.3 11A 92 112.0 551 06-02-05 Lot 32 A Front 994 101.4 j 15.7 91 112,0 552 06-02-05 Lot 32 A Front 996 106.5 ! 6.8 95 112.0 553 06-02-05 Lot 32 A Back 997.5 106.0 j 12.2 95 i 112.0 DATE: March 21 2006 $1adden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested Location 554 06-02-05 555 06-02-05 556 06-02-05 557 06-03-05 558 06-03-05 559 06-03-05 560 06-03-05 561 06-03-05 562 06-03-05 563 06-03-05 564 06-03-05 565 06-03-05 566 06-03-05 567 06-03-05 568 06-03-05 569 06-03-05 570 06-03-05 571 i 06-03-05 572 06-03705 573 06-03-05 574 06-03-05 575 06-13-05 576 06-03-05 577 06-06-05 578 06-06-05 579 I 06-06-05 580 06-06-05 581 06-06-05 582 i 06-06-05 583 I 06-06-05 5134 06-06-05 585 06-06-05 586: 06-06-05 587 i 06-06-05 588 1 06-06-05 589 06-06-05 590 i 06-06-05 591 ' 06-06-05 592 06-06-05 593 06-06-05 DATE: March 2, 20C Lot 32 A Back Lot 34 A Back Lot 34 A Back Lot 47 A Back Lot 47.A Front Lot 46 A Front Lot 4.6 A Back Lot 45 A Back Lot 45 A Front Lot 42 A Front Lot 42 A Front Lot 41. A Front Lot 42 A Back Lot 43 Back Lot 44 A Back Lot 44 A Front Lot 41 A Front Lot 42 A Front Lot 41. A Back Lot 42 A Back Lot 43 A Back Lot 44 A Back Lot 44 A Front Lot 41 Front Lot 41 Front Lot 41 Center Lot 43 Front Lot 43 Front Lot 43 Center Lot 44 Front Lot 44 Front Lot 44 Center Lot 43 Back Lot 43 Center Lot 41 Back Lot 41 Back Lot 41 Center Lot 42 A Front Lot 42 A Front Lot 42 A Center TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry Density % Moisture Relative In Place I In Place I Comr)actic 999 997 998 991 991 991.5 992 991.5 991.5 992 993 989 991 992 993 992 991 994 992 993 993.5 994 993.5 107.3 1.06.5 104.0 106.6 104.5 103.8 101.6 105.1 102.6 106.6 103.0 102.2 108.4 101.6 106.3 108.0 101.3 102.1 1.05.1 100.5 104.5 103.8 106.0 993 105.1 995 , 107.1 992.5 103.5 991. 1.03.6 993 101.0 991.5 i 106.3 995 101.3 996 j 105.9 994 ' 104.0 995 1.05.2 994.5 107.2 994 109.0 996 101.5 994 103.3 993.5 108.4 994.5 103.0 994 101.4 10.6 13.6 10.5 9.9 11.3 10.1 13.9 8.3 12.2 10.5 9.1 6.3 9.7 16.5 6.7 6.0 17.0 14.8 14.5 1.6.0 17.1 15.9 15.3 14.9 12.6 11.8 1.7.6 17.2 12.7 18.3 14.2 13.1 1.5.5 12.6 13.9 14.2 10.9 15.8 14.4 16.6 96 95 93 95 93 93 91 94 92 95 92 91 97 91 95 96 90 91 94 90 93 93 95 94 96 92 93 90 95 90 95 93 94 96 97 91 92 97 92 91 Maximum 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 i 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 112,0 112.0 112.0 1.12.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club - The Hideaway LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation I Dry Density o o MoistureI Relative I Maximum In Place In Place Comnaction J Density 594 595 596 597 598 599 06-16-05 06-06-05 06-06-05 06-06-05q 06-06-05 06-06-05 Lot 44 A Back Lot 44 A Back Lot 44 A Center Lot 42 A Back Lot 42 A Back Lot 42 A Center 600 1 06-07-05 Lot 38 A Front 601 I 06-07-05 Lot 39 A Back 602 06-07-05 Lot 39 A Front 603 06-07-05 Lot 39 A Back 604 06-07-05 Lot 40 A Front, 605 06-07-05 Lot 40 A Back 606 06-07-05 Lot 40 A Front. 607 06-07-05 Lot 40 A Back 608 06-07-05 i No Test 609 j 06-07-05 No Test 610 06-07-05 I Lot 40 A Back 611 06-07-05 Lot 40 A Back 612 06-07-05 Lot39 A Back 613 06-07-05 i Lot 39 A Back 614 06-07-05 i Lot 38 A Back 615 06-07-05 Lot 38 A Back 616 06-07-05 Lot 37 A Back 617 06-07-05 Lot 37 A Back 618 ; 06-07-05 j Lot 36 A Back 619 j 06-07-05 I Lot 36 A Back 620 06-07-05 i Lot 36 A Front 621 06-07-05 Lot 36 A Front 622 ' 06-07-05 Lot 36 A Center 623 j 06-07-05 i Lot 37 A Front 624 06-07-05 i Lot 37 A Center 625 06-07-05 Lot 38 A Front 626 06-07-05 i Lot 38 A Frant 627 06-07-05 i Lot 38 A Center 628 06-07-05 Lot 39 A Front 629 06-07-05 Lot 39 A Front 630 06-07-05 Lot 39 A Center 631 06-07-05 Lot 40 Front 632 633 06-08-05 06-08-05 DATE: March 2, 2006 Retest # 611 Retest u 631 994.5 995.5 995 993.5 994.5 994 991 991 990.5 991. .991 990.5 992.5 992 994 995 993.5 994.5 993. 994 993 994 993.5 994.5 993.5 995 993.5 994 993' 992.5 994 994 993 994.5 994 994 101.8 103.7 106.6 106.3 102.7 104.6 103.4 105.3 101.4 1.04.0 106.7 102.2 105.4- 105.1 05.4105.1 109.4 94.8 106.9 98.0 97.6 96.2 98.4 95.0 93.2 96.7 96.5 96.1 102.4 90.8 94.0 104.8 106.1 102.9 95.1 94.3 83.7 97.8 103.1 105.3 15.3 91 11.2.0 10.9 93 112.0 11.7 95 112.0 14.5 95 112.0 10.9 92 112.0 11.3 93 11.2.0 11.1 92 1.1.2.0 10.6 94 112.0 12.9 91 71"0 1.1..8 93 112.0 13.1 95 11.2.0 10.2 1 91 112.0 9.3 94 112.0 10.0 94 112.0 11.4 .98 112.0 15.2 85* 112.0 13.8 90 112.0 1.6.0 88* 112.0 20.1 80* 11.2.0 18.9 86* 112.0 21.9 88" 22.6 85* 112.0 2'1.5 83" 112.0 20.3 86* i 11.2.0 23.2 86" I 112.0 21.3 86" 112.0 16.6 91 112.0 24.7 .81" 1.12.0 21.8 84* 112.0 15.5 94 112.0 14.0 95 '11.2.0 16.2 92 112.0 19.9 85* 112.0 22.0 84* 112.0 21.2 84* 112.0 20.5 87* 112.0 17.5 92** 112.0 14.0 94`* , 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT N006-02-120 'rest'No.I I Date Tested Location Elevation Dry Density %o Moisture Relative Maximum In Place In Place Comnaction Density 634 06-08-05 Retest # 613 101.2 16.9 90** 112.0 635 06-08-05 Retest # 628 104.1 1.5.3 93*w 112.0 636 06-08-05 Retest # 629 103.3 12.9 92** 112.0 637 06-08-05 Retest # 630 106.0 14.8 95** 112.0 638 06-08-05 Retest # 614 i 107.1 14.2 96*.* 11.2.0 639 06-08-05 Retest # 615 103.6 13.9 93** 112.0 640 06-08-05 Retest # 616 I 105.2 16.2 94*" 112.0 641 06-08-05 Retest # 617 97.6 18.6 87* 112.0 642 06-08-05 Retest # 618 101.4 17.2 91 ** 1.1.2.0 643 06-08-05 Rctcst # 61.9 97.0 24.2 87* 112.0 644 06-08-05 Retest # 623 103.4 16.8 92*" 112.0 645 06-08-05 I Retest # 624 102.2 18.0 ' 91*-� 112.0 646 06-08-05 Retest # 620 100,9 17.0 90"* 112.0 647 06-08-05 Retest # 621 101.6 16.5 I 91** 112.0 648 i 06-08-05 Lot 7 B A Front 998 1.09.1. 1.3.5 I 97 112.0 649 06-08-05 I Lot 7 B A Front 1000 1()2,0 18.1 j 91 I 112.0 650 06-08-05 I Lot 6 B Back 998 103.2 14.4 92 I 112.0 651 I 06-08-05 j Lot 6 B Back 1000 100.8 12.1 90 1 1.12.0 652 ! 06-08-05 Lot 5 8 front 1001 99.6 12.7 91 I 110.0 653 I 06-08-05 ! Lot 5 B Front 1003 99.8 17.6 91 110.0 65.4 06-08-05 Lot 6 B Front 1002 1.01.3 1.1..0 90 112.0 655 I 06-08-05 Lot 6 B Front 1003 104.9 13.1 94 112,0 656 I 06-08-05 Lot 7 B Back 998 I 102.2 16.091 112.0 657 06-08-05 i Lot 7 B Back 999 i 102.8 14.7 92 112.0 658 06-08-05 ' Lot 5 B Back 999.5 101.4 12.9 91 112.0 659 j I 06-08-05 Lot 5 B Back 1000.5 i 1.00.1. 1.4.4 91. 110.0 660 I 06-09-05 Lot 35 A Front 993 ! 99.0 1.0.9 90 110.0 661 06-09-05 Lot 35 A Front 995 � 1.02.9 15.1 92 112.0 662 06-09-05 Lot 33 A Front 997 108.7 13.2 97 � 112.0 663 ! 06-09-05 Lot 32 A Front 998 j 107.3 10.3 96 ( 112.0 664: 06-09-05 Lot 30 A Front 993 i 1.01.2 15.2 92 110.0 665 06-09-05 Lot 30 A Front 995 1 102.7 16.6 92 j 112.0 666 i 06-09-05 Lot 30 A Front 997 102.8 18.2 92 11.2.0 667 06-09-05 Lot 35 A Back 990 103.4 9.6 92 112.0 668 ! 06-09-05 Lot 35 A Back 992 108.9 11.7 97 172.0 669 j 06-09-05 Lot 35 A Back 994 106.3 114.4 95 112.0 670 06-09-05 Lot 45 A Back 993.5 1 109.6 16.3 98 112.0 671 I 06-09-05 Lot 45 A Back 995.5 102.8 13.8 92 112.0 672 06-09-05 Lot 46 A Back 995 I 105.4 6.9 94 112.0 673 06-09-05 I Lot 46 A Back 997 101.6 14.1 91 112.0 674 06-09-05 Lot 47 A Back 993 I 103.5 9.1 92 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO; 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. ( Date Tested I Location Elevation I Dry Density 1 1n Place I % Moisture In Place I Relative f Compaction Maximum Density 675 06-09-05 Lot 47 A Back, 995 101.8 11.6 91 112.0 676 06-09-05 Lot 47 A Back 997 99.0 13.6 90 110.0 677 06-09-05 j Lot 31 A Front 999 104.5 13.8 93. I 112.0 678 j 06-09-05 Lot 30 A Back 998 108.0 12.9 96 112.0 679 06-09-05 I Lot 30 A Back 1000 105.5 13.1 94 '112.0 680 06-09-05 Lot 50 A Back PG 106.1 13.4 95 112.0 681 j 06-09-05 Lot 50'A Back PG 102.9 11.3 94 110.0 682 I 06-10-05 Lot 44 A Hack 996.5 ! 102.3 9.9 93 110.0 683 I 06-10-05 Lot 45 A Back 993.5 101.6 12.6 I 92 110.0 684 i 06-10-05 Lot 45 A Back 9951.5 109.3 i 17.9 i 94 110.0 685 06-10-05 Lot 46 A Back -995 107.4 14.6. 97 110.0 686 06-10-05 1'..ot 46 A Back 997 104.2 15.3 94 110.0 687 06-10-05 Lot 47 A Back 993 105.1 13.7 95 110.0 688 06-10-05 Lot 47 A Back 995 1.03.6 1.5.6 94 110.0 689 I 06-10-05 Lot 47 A Back 997 1()2.4 16.2 93 110.0 690 ; 06-10-05 Lot 49 A Back 997 103.9 8.6 94 110.0 691 06=10-05 Lot 49 A Back 999 107.7 13.7 98 1.1.0.0 692 06-10-05 Lot 51 A Back 100]. 109.2 9.2 99 110.0 693 06-10-05 Lot 52 A Back 999 105.6 11.9 96 110.0 694 j 06-10-05 Lot 52 A Back 1001 104.7 13.3 95 110.0 695 ; 06-10-05 Lot 53 A Back 1002.5 109.3 I 12.9 I 99 110.0 696 ' 06-10-05 Lot 54 A Back 1003.5 103.6 , 14.8 94 110.0 697 06-10-05 I Lot 3 A Back 998 I 107.9 13.1 98 1.10.0 698 06-10-05 Lot 36 A Back 996 103.2 8.9' 93 110.0 699 06-1.0-05 i 1,ot 45 A Front 993.5 99.5 14.9 i 90 110.0 700 i 06-10-05 I Lot 45 A Front 995.5 I 105.7 20.0 96 110.0 701 j 06-10-05 Lot 46 A Front 993.5 j 1.02.3 1.7..4 93 110.0 702 .06-10-05 Lot 46 A Front 996.5 i 99.5 i 1.9.3 i 90 110.0 703 , 06-10-05 ': Lot 47 A Front 993 j 105.4 12.9 j 95 110.0 704 06-10-05 ! I.ot 47 A Front 995 107.1 1 14.6 97 110.0 705 06-10-05 Lot 47 A Front 997 1.01.6 1.3.9 i 92 110.0 706 06-10-05 Lot 48 A Front 994 ; 109.3 ; 15.0 99 110.0 707 ! 06-10-05 { Lot 48 A Front 996 ' 105.4 1 11.4 96 110.0 708 06-10-05 Lot 48 A Front 998 101.6 I 10.2 92 110.0 709 06-10-05 ! Lot 49 A Front 998.5 .103.0 16.1 93 110.0 710 i 06-10-05 ; Lot 50 A Front 996 106.9' 14.0 i 97 110.0 711 06-10-05 Lot 50 A Front 998 106.1 13.5 96 110.0 712 06-10=05 1 Lot 50 A Front 1.000 103.7 15.1 1 94 110.0 713 06-10-05 Lot 52-A Front 1002 106.3 15.3 96 110.0 714 06-10-05 j Lot 53 A Front 1003.5 109.4 ! 16.3 99 110.0 715 I 06-10-05 Lot 41 Front PG 103.3 I 9.9 92 110.0 DATE: March 2, 2006 SYadden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPOR'C NO: 06-02-120 Test No. I Date 'Tested Location Elevation Dry Density I % MoistureI Relative Maximum In Place in Place Comoaction I Density 716 06-10-05 Lot 41 Center PG 102.7 9.1 93 110.0 717 06-10-05 Lot 41 Back PG 104,5 16.5 95 110.0 718 06-10-05 Lot 42 Front PG 105.3 16.1 95 110.0 719 I 06-10-05 Lot 42 Center PG 104.3 16.6 94 110,0 720 06-10-05 Lot 42 Back PG 103.4 11.1 94 110.0 721 06-10-05 Lot 43 Front I'G 106.6 14.1 97 11010 722 I 06-10-05 Lot 43 Center PG 103.0 12.5 93 110.0 723 06-10-05 Lot 43 Back PG 107.9 10.9 98 1.10.0 724 06-10-05 I,ot 44 Front PG 103.1 1.3.3 93 110.0 725 06-10-05 Lot 44 Center PG 104.7 16.1 95 110.0 726 I 06-10-05 Lot 44. Back PG 101.3 10.7 92 110.0 727 06-13-05 Lot 21. A Front 1001.5 107.9 13.2 98 110.0 728 06-13-05 Lot 24 A Front 1001 104.0 17.0 94 110.0 729 06-13-05 Lot 24. A Front 1003 104.8 14.1 95 110.0 730 06-13-05 Lot 25 A Front 1001 106,9 11.3 97 110,0 731 06-13-05 Lot 25 A Front 1003 105.3 16.1 95 110.0 732 06-13-05 Lot 26 A Front 1001 108.0 15.5 98 110.0 733 06-13-05 Lot 26 A Front 1003 109.7 16.0 99 110.0 734 06-1.3-05 Lot 27 A Front 1000 109.0 13.8 99 110.0 735 06-13-05 Lot 27 A Front 1002 108.6 15.1 99 110.0 736 06-13-05 Lot 28 A Front 994 102.0 1.2.0 93 110.0 737 06-13-05. Lot 28 A Front 996 106.8 18.3 97 110.0 738 06-13-05 Lot 29 A Front 998 103.0 16.0 94 110.0 739 06-13-05 Lot 38 A Front 993 107.1 9.6 97 110.0 740 06-13-05 I Lot 38 A Front 995, 106.3 15.7 96 110.0 741 I 06-13-05 I Lot 40 A Front 996 108.6 17.1 99 110.0 742 j 06-13-05 Lot 4.3 A Front 995 103.0 I 9.5 94 110.0 743 06-13-05 1 Lot 54 A Front 1003.5 100.6 18.8 91 110.0 744. 06-13-05 Lot 49 A Center 998.5 101.0 14.7 92 ! 1.1.0.0 745 i 06-13-05 I Lot 23 A Back 1003 104.6 14.6 I 95 110.0 746 i 06-13-05 Lot 24 A Back 999.3 109.3 15.4 99 I 110.0 747 06-13-05 Lot 24 A Back 1001.5 108.1 9.3 98 1.1.0.0 748 06-13-05 Lot 24 A Back 7.003.5 101.4 9.9 I 92 I 110.0 749 06-13-15 Lot 25 A Back 1003 109.7 14.1 99 110.0 750 06=13-05 Lot 26 A Back 1003 107.8 17.7 I 98 110.0 751 06-13-05 Lot 27 A Back 992 102.7 11.8 93 110.0 752 06-13-05 Lot 27 A Back 994 107.0 11.3. 97 110.0 753 06-13-05 Lot 27 A Back 996 106.1 13.6 96 110.0 754 I 06-13-05 Lot 28 A Back 990 1.02.5 13.3 93 110.0 755 ` 06-13-05 Lot 28 A Back 992 106.6 11.2 97 1.10.0 756 06-13-05 Lot 28 A Back 994 103.6 12.8 94 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location ElevationI Dry Density I % Moisture I Relative Maximum In Place In Place Compaction Density 757 I 06-13-05 Lot 29 A Back 999 758 06-13-05 Lot 29 A Back 1001 759 I 06-14-05 Lot 50 A Back 998,5 760 06-14-05 Lot 50 A Back 100.0 761 06-14-05 Lot 27 A Back 998 762 06-14-05 Lot 27 A Back 100.0 763 06-14-05 Lot 28 A Back 996 76.4 06-14-05 Lot 28 A Back 998 765 06-14-05 i .Lot 28 A Back 1000 766 06-14.-05 Lot 28 A Front 998 767 06-14-05 Lot 30 A Front 999 768 06-14-05 Lot 54 A Front PG 769 06-1405 Lot 54 A Center PC 770 06-14-05 Lot 54 A Back PG 771 06-14-05 Lot 53 A Front PG 772 i 06-14-05 Lot 53 A Center PG 773 06-14-05 Lot 53 A Back PG 774 06-14-05 Lot 52 A Front PC 775 06-14-05 Lot 52 A Center PG 776 06-14-05 Lot52 A.Back PG 777 ' 06-14-05 Lot 51 A Front PG 778 ' 06-14-05 Lot 51 A Center .PG 779 06-14-05 Lot 51 A Back PG 780 06-14-05 Lot 50 A Front PC 781 06-14-05 Lot 50 A Center PG 782 i 06-14-05 i Lot 50 A Back PG 783 06-14-05 Lot 99 A Front PG 784 06-14-05 I Lot 99 A Back PG 785 06-14-05 Lot 99 A Center PC 786 06-14-05 Lot 98 A Front PG 787 06-14-05 Lot 98 A Back PG 788 06-14-05 Lot 98 A Center FG I 789 ! 06-15-05 Retest # 780 790 ! 06-15-05 Retest # 782 791 i 06-15-05 Retest # 781 792 ' 06-15-05 Lot 47 A Front PG 793 ! 06-15-05 Lot 47 A Back PG 794 06-15-05 Lot 47 A Center PC 795 06-15-05 I Lot 46 A Front PG 796 j 06-15-05 1. Lot 46 A Back PG DATE: March 2, 2006 102.5 9.7 108.3 14,8 104.4 { 13.3 102.8 12.6 105.0 20.0 104.2 16.7 101.5 11.2 108.7 15.0 105.4 14.2 105.3 17,1 102.1 13.3 99.2. 11.5 100.5 8.3 105.9 9,4 105.5 10.3 106.1 7.7 99.1 9.3 103.0 13.7 1.09.3 12.8 104.4 11.1 101.4 12.3 100,2 9.5 101.6 10.3 91.4 10.2 92.8 9.5 94.4 8.8 101.2 9,3 103.3 12,2 102.6 11.6 99.6 8.6- 103.1. 11.2 107.0 I 10.5 98.9 {� 1.2.9 100.2 12.5 101.9 10.4 102.1 9.1 99.7 8.8 103.6 9.2 100.0 9.1 102.8 10.7 93 110.0 98 110.0 94 110.0 97 110.0 95 110.0 95 110.0 92 110.0 99 110.0 96 110.0 95 110.0 93 1.10.0 90 110.0 91 1.10.0 96 110.0 96 110.0 96 110.0 90 110.0 94 110.0 99 110.0 95 110.0 92 110.0 91 110.0 92 110.0 83* 110.0 84.* 110.0 86* j 110,0 92 I 110.0 94. 110.0 93 110.0 90 110.0 93 110.0 97 110,0 90'x* 110.0 91** 1.1.0.0 92" 110.0 93 110.0 91 110.0 94 110.0 91 110,0 93 '110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No.i Date Tested Location Elevation f Dry Density l % Moisture I Relative I Maximum In Place I In Place Compaction Densitv 797 06-15-05 Lot 46 A Center PG 105.4 8.9 96 798 06-15-05 Lot 45 A Front 'PG 1.09.2 12.2 99 799 06-15-05 Lot 45 A Back PG 104.1 11.1 95 800 06-15-05 Lot 45 A Center PC 106.8 11.3 97 801 06-15-05 Lot 41 A Front PG 101,3 12.1 92 802 06-15-05, Lot 41 A Back PG 106.2 13.3 96 803 06-15-05 Lot 41 A Center PG 102,9 17.1 93 804 06-16-05 Lot 25 A Front PG 107,9 13,4 98 805 06-16-05 Lot 25 A Center PG 102.8 11.5 93 806 06-16-05 Lot 25 A Back PG 1.07.1 13.2 97 807 06-16-05 Lot 26 A Front PG 100.3 18.1 91 808 06-1.6-05 Lot 26 A Center PG 100.4 12.4 91 809 06-16-05 Lot 26 A Back PG 108.3 12,5 I 98 810 06-1.6-05 i Lot 27 A Front PG 106.4 16.9 97 811 06-16-05 Lot 27 A .Center PG 1.01.2 13.9 92 812 I 06-16-05 Lot 27 A Back PG 99.4 1 11.2 90 813 I 06-17-05 Lot 28 A Front PG 103.3 13,7 94 814 06-17-05 ' Lot 28 A Center PG 1 103.7 18.1 94 815 06-17-05 Lot 28 A Back PG i 102.5 12.9 93 816 06-17-05 Lot 29 A Front PG 103.7 10.4 94 817 06-1.7-05 Lot 29'A Center PC 104.2 15.1 95 818 06-17-05 i Lot 29 A Back PG 100.0 10,9 91 819 06-17-05 ! Lot 30 A Front PG 107.2 13.9 97 820 06-1.7-05 Lot 30 A Center PG 109.9 10.7 99 821 06-17-05 I Lot 30 A Back PG 108.5 12.1. 98 822 I 06-17-05 i Lot 31 A Front PC 106.4 11.1 96 823 , 06-17-05 Lot 31 A Center PC 109.31 15.0 99 824 ! 06-17-05 Lot 31 A Back PC 106.9 9.1 97 825 06-17-05 Lot 55 A Back 989 100.1 8.8 91 826 i 06-17-05 Lot 56 A Back 988 99.5 9.0 90 827 06-17-05 Lot 57 A Back 989 99.0 11.2 90 828 06-17-05 Lot 58 A Back 989.5 102.8 7.9 93 829 i 06-17-05 Lot 55 A Front 989 103.0 17.1 94 830 j 06-17-05 Lot 56 A Front 988 104.1 9.4 95 821 06-17-05 Lot 57 A Front 989 94.1 12.9 85" 832 I 06-17-05 Lot 58 A Front 989.5 105.6 7.8 96 833 06-17-05 Lot 59 A Front 990 93.1 11.5 85"' 834 06-20-05 Lot 55 A Front 991 102.8 13.1 92 835 06-20-05 Lot 55 A Front 993 103.9 8.6 93 DATE: March 2, 2006 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 J.10.0 110.0 110.0 110.0 9.10.0 110.0 110.0 110.0 110.0 110.0 130.0 110.0 110.0 110.0 110.0 110.0 71 U,U 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 Sladdea Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative Maximum In Place . In Place I Compaction I Densitv 836 06-20-05 I Lot 56 A Front 837 06-20-05 Lot 56 A Front 838 06-20-05 Retest # 821 & $33 839 06-20-05 Lot 57 A Front 840 06-20-05 I Lot 55 A Back 841 06-20-05 Lot 55 A Back 842 06-20-05 Lot 56 A Back 843 06-20-05 j Lot 56 A Back 844 06-20-05 Lot 57 A Back 845 06-20-05 I Lot 57 A Back 846 06-20-05 i Lot 32 A Front 847 06-20-05 Lot 32 A Center 848 06-20-05 Lot 32 A Back 849 06-20-05 Lot 33 A Front 850 I 06-20-05 I Lot 33 A Center 851 i 06-20-05 Wt 33 A Back 852 06-20-05 Lot 55 A Center 853 i 06-20-05 Lot 56 A Center 854 06-20-05 Lot 57 A Center 855 06-21.-05 Lot 13 A Front 856 I 06-21-05 Lot 13 A Front 857 06-21-05 Lot 13 A Back 858. 06-21-05 Lot 13 A Back 859 i 06-21-05 Lot 13 A Center 860 06-21-05 Lot 1.3 A Center. 861 06-21-05 Lot 12 A Front 862 06-21-05 I,ot 12 A Front 863 06-21-05 Lot 12 A Back 864 06-21-05 Lot 12 A Back 865 i 06-21-05 I Lot 56 A Back 866 06-21-05 Lot 58 A Back $67 06-21-05 I Lot 34 A Front 868 ; 06-21.-05 Lot 34 A Center 869 I 06-21-05 Lot 34 A Back 870 I 06-21-05 Lot 35 A Front 871 06-21-05 Lot 35 A Back 872 I 06-21-05 Lot 35 A Center 873 06-21-05 Lot 36 A Front 874 i 06-21-05 Lot 36 A Back 875 06-21-05 Lot 36 A Center 876 06-21-05 I,ot 55 A Back DATE: March 2, 2006 990 101.4 9.3 91 1.1.2.0 991.5 100.8 10.3 90 112.0 104.3 14.1 93** 112.0 992.5 101.5 11.0 91 112.0 991 104.3 10.9 93 112.0 992 105.1 8.8 94 112.0 990 103.0 15.0 92 112.0 991.5 102.4 9.8 91 112,0 991 105.3 11.4 j 94 112:0 992.5 102.2 9.2 91 112.0 PG 103.8 8.8 93 112.0 PG 109.3 10.0 98 112:0 PC 106.3 11.2 95 112.0 PG 107.8 11.5 96 112.0 PC 108.6 12.0 97 i 112.0 PG 107.1 9.8 96 112.0 991 104.4 10.9 93 112.0 990 102.0 11.5 91 112.0 991 105.1 9.4 94 112,0 1004.5 100.9 12.1 92 110.0 1006 104.3 • 1 10.9 95 1.10.0 1004.5 102.8 11.0 i 93 110.0 1006 103.4 I 9.1 94 110.0 1004.5 105.9 9.3 I 96 110.0 1006 101.4 12.5 92 110.0 1006.5 101.1 7.6 I 92 1.1.0.0 1.008 94.4. 9.9 86" 110.0 1006.5 100.1 10.2 i 91 110.0 1008 103.3 8.7 94 110.0 993.5 104.7 15.2 I 93 1.12.0 991.5 106.4 14.4 1 95. 112.0 PG 107.0 8.5 I 96 1.12.0 PC 105.3 9.6 94 112.0 PG 108.4 8.9 97 112.0 PC 99.$ 10.7 91 110.0 PC 106.7 9.0 95 112.0 PG 104.5 9.9 93 112.0 PG 100.6 9.1 91 110.0 PG 105.3 10.7 94 112.0 PG 102.4 8.0 91 112.0 994 103.5 13.3 92 117.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. I Date Tested I Location Elevation Dry Density I % Moisture Relative I Maximum In Placc in Place Compaction Densitv 877 06-21-05 878 06-21-05 879 06-21-05 880 06-22-05 881 06-22-05 882 06-22-05 883 06-22-05 884 06-22-05 885 , 06-22-05 886 06-22-05 887 06-22-05 888 06-22-05 889 06-22-05 890 06-23-05 891 06-23-05 892 I 06-23-05 893 06-23-05 894 I 06-23-05 895 06-23-05 896 06-23-05 897 06-23-05 898 1 06-23-05 899 I 06-23-05 900 06-23-05 901 I 06-23-05 902 i 06-23-05 903 06-23-05 904 06-23-05 905 06-23-05 906 ; 06-23-05 907 06-23-05 908 I 06-23-05 909 06-23-05 910 06-23-05 911 06-23-05 Lot 57 A Back Lot 55 A. -Center Lot 57 A Center Lot 60 A. Front Lot 60 A Front Lot 59 A Front Lot 58 A Front Lot 57 A Front Lot 57 A Front Lot 56 h Front Lot 56 A Front Lot 55 A Front Lot 55 A Front Lot 60A Center Lot 59 A Center Lot 57 f. Center Lot 56 A Front Lot 56 A Front Lot 55 A Front Lot 55 A Front Lot 55 A Back Lot 55 A Back Lot 56 A Back Lot 56 A Back Lot 56 A Center Lot 55 A Center Lot 37 A Front Lot 37 a Back Lot 37 A Center Lot 38 A Front Lot 38 A Back Lot 38 A Center Lot 39 A Front Lot 39 +1 Back Lot 39 A Center 994.5 993.5 994 101.4 105.0 103.1 990.5 93.7 992 103.1. 990.5 102.1 991.5 100.6 994 104.5 995 1.04.1 990 106.2 991.5 102.7 991 103.8 992.5 103.1. 993 104.1 991.5 106.9 994 103.0 993 101.8 994.5 101.4 994 104.8 995 102.0 995 107.1 996 104.4 994.5 1 106.0 996 I 103.2 994 107.3 995 104.5 PG 105.1 PG 102.2 PG 103.6 PG 103.9 I'G 106.5 PG 104.7 PG 101..9 PC 105.3 PG , 104.0 10.9 8.7 7.9 8.4 10.6 11.3 7.1 8.8 8.2 10.1 7.9 9.0 7.8 13.4 11.8 14.0 1:0.5 1.0.1. 14.0 11.9 10.4 8.7 1.1..5 11.1 8.8 9.0 8.3 9.4 9.1 8.5 10.4 9.9 10.6 10.2 7.9 92 94 92 85* 94 93 91 95 95 97 93 94 94 93 95 92 91 91 94 91 96 93 95 92 96 93 94 91 93 93 95 93 91 94 93 110.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 :1.10.0 110.0 110.0 110.0 11.2.0 112.0 112.0 112.0 110.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 1.1.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 912 06-24-05 Lot 30 B Center 989.5 102.6 8.3 93 110.0 913 06-24-05 Lot 30 B Center 991 I 101.41 9.9 92 1.1.0.0 914 06-24-05 Lot 31 B Front 989.5 I 94.9 10.1 93 102.0 915 06-24-05 Lot 31 B Front 991 ; 103.5 11.3 j 94 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation Dry Density In Place % Moisture In Place I Relative I Compaction I Maximum I Deni 916 06-24.-05 Lot 3213 Front 990 96.2 8.3 94 102.0 917 II 06-24-05 Lot 32 B Front 991.5 104.1 10.6 95 110.0 918 f 06-24-05 Lot 33 B Front 989 101.8 12.1 93 110.0 919 I 06-24-05 Lot 33 B Front 991 104,7 9.0 95 110.0 920 i 06-24-05 Lot 34 B Front .988 100.8 10.3. 92 110,0 921 06-24-05 Lot 34 B Front 989 10511 8.1 96 110.0 922 1 06-24-05 Lot 30 B Back 990 100.5 9.5 91 110.0 923 06-24-05 s Lot 30 B Back 991 101.6 8.3 92 110.0 924 06-24-05 Lot 31 B Back 990 97.3 10.1 95 1.02.0 925 06-24-05 I Lot 32 B Back 990 1.01...4.. :1.1.5 92 110.0 926 06-24-05 I Lot 33 B Back 990 96.2 8.9 94 102.0 927 06-24-05 j Lot 3013 Center 991,5 103.6 1 10.4 94 110.0 928 06-24-05 Lot 31 B Center 990.5 106.7 1 12.9 97 .110.0 929 06-24-05 ( Lot 32 8 Center 991.5 1.04.4 I 1.7..3 � 95 110.0 930 06-24-05 Lot 33 B Center 992 107.1 9.9 1 97 1.1.0.0 931 06-24-05 I Lot 34 B Center 991 103.3 10.4 t 97 110,0 932 06-27-05 Lot 33 B Back 991.5 I 100.2 11.2 91 11.0.0 933 06-27-05 Lot 33 8 Back 993 93.1 12.8 91 102.0 934 06-27-05 Lot 55 A Front 997 1062 16.7 95 112.0 935 06-27-05 Lot 55 A Front 999 99.2 13.9 90 1.1.0.0 936 06-27-05 l.ot 56 A Front 997 1.02.4 1.0.5 93 110.0 937 06-27-05 Lot 56 A Front 999 102.0 13.7 93 1.10.0 938 06-27-05 I Lot 57 A Front 995 100.9 15.3 92 110.0 939 06-27-05 Lot 57 A Front 996 99.2 1 9.6 90 1.10.0 940 06-27-05 Lot 58 A Front 991 i 105.5 1 10.1 94 i 112.0 941 06-27-05 Lot 59 A Front 991,5 106,1 11,3 95 112.0 942 06-27-05 Lot 55 A Back 997 99.6 16.8 91 110.0 9.43 06-27-05 Lot 55 A Back 999 99.2 9.3 90 1.1.0.0 944 06-27-05 j Lot 56 A Back 997 1.06.4 11.7 95 112.0 945 06-27-05 Lot 57 A Back 992 109.5 15.8 98 112.0 946 I 06-27-05 Lot 57 A Back 994 104.8 16.0 94 11.2.0 947 06-27-05 j Lot 59 A Back 991.5 103.0 9.7 94 110.0 948 06-27-05 Lot 59 A Back 993.5 102.4 15.9 93 110.0 949 06-27-.05 Lot 31 B Back 991,5 106.3 11.4 97 1.10.0 950 06-27-05 Lot 31 B Back 993 102.9 9.9 92 112.0 951 06-27-05 Lot 32 8 Back 991.5 96.8 12.8 .95 102,0 952 06-27-05 Lot 32 B Back 993 99.2 8.7 90 110.0 953 06-27-05 Retest # 880 101.5 7.6 92"' 110.0 954 06-27-05 Lot 60 A Front 990.5 101.0 8.3 92 110.0 955 06-27-05 Lot 58 A Back 992.5 104.8 13.1 94 112.0 956 06-27-05 Lot 58 A Back 994 106.1 11.6 95 112.0 DATE: March 2, 2006 Sla"en Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 'fest No.I Date Tested { Location Elevation I Dry Density % Moisture Relative I Maximum In Place In Place Compaction Densitv 957 06-27-05 Lot 60 A Back 990 103.4 9.9 92 112.0 . 958 I 06-27-05 Lot 60 A Back 992 102.2 10.4 91 112.0 959 06-28-05 Lot 58 A Front 993 103.7 15.1 94 11.0.0 960 06-28-05 Lot 58 A Front 994.5 102.6 12.3 93 110.0 961 06-28-05 Lot 55 A Back 1001 100.9 9.3 i i 92 110.0 962 I 06-28-05 Lot 55 A Back 1002 I 101.5 10.6 93 110.0 963 ' 06-28-05 Lot 55 A Front 1000 i 104.7 13.8 95 .110.0 964 I 06-28-05 Lot 55 A Front 1001 104.1 12.7 95 110.0 965 06-28-05 Lot 56 A Front 1000 106.8 1.4.5 97 110.0 966 ! 06-28-05 Lot 56 A Front 1001 103.4 11.9 94 110.0 967 06-28-05 Lot 56 A Back 999 105.5 '15.3 96 110.0 968 I 06-28-05 Lot 56 A Back 1000.5 102.9 13.1 94 , 110.0 969 06-28-05 Retest # 862 103.4 i 9.8 94"'0 110.0 970 06-28-05 Lot 15 A Front 1002 1.06.1. 1.0.5 96 i 110.0 971 06-28-05 Lot 15 A Back 1002 104.3 11.6 95 j 110,0 972 I 06-28-05 Lot 16 A Front 1001. 1.05.5 8.3 96 j 110.0 973 06-28-05 Lot 57 A Front 998 101,9 13.1 95 1 11.0.0 974 I 06-28-05 Lot 57 A Front 999.5 103.0 10.2 94 I 110.0 975 06-28-05 Lot 57 A Back 996 103.9 11..4 94 110.0 976 06-28-05 Lot 57 A Back 997.5 105.4 I 9.9 96 I 110.0 977 06-28-05 Lot 58 A Front 993 106.6 10.7 97 I 110.0 978 ! 06-28-05 I,ot 58 A Front 995 104.0 8.4 95 1.1.0.0 979 06-28-05 Lot 58 A Back 996 101.3 9.9 92 I 110.0 980 1 06-28-05 Lot 58 A Back 997.5 100.9 '10.3 92 1.1.0.0 981 06-28-05 Lot 59 A Front 993.5 107.1 10.5 96 1.12.0 982 I 06-28-05 I Lot 59 A Front 995 105.6 8.8 94 112.0 983 06-28-05 Lot 59 A Back 995 102.2 I 13.1 93 ' 110.0 984 06-28-05 Lot 59 A Back 996.5 103.4 11.4 94 I 110.0 985 ! 06-29-05 Lot 55 A Front 1002 102.0 16.3 j 93 I 110.0 986 06-29-05 ' Lot 55 A Front 1003.5 101.2 16.5 92 110.0 987 06-29-05 I Lot 56 A Front 1001.5 103.1. 11..9 I 94 110.0 988 06-29-05 Lot 56 A Front 10025 104.4 11.4 95 110.0 989 i 06-29-05 Lot 55 A. Back 1002.5 106.1 1.0.2 95 112.0 990 06-29-05 Lot 55 A Back 1.003.5 1.03.4 1.3..4. I 94 110.0 991 06-29-05 Lot 56 A Back 1001.5 103.6 9.1 94 110.0 992 06-29-05 Lot 56 A Back 1.002.5 1.05.5 1 8.4 96 11.0.0 993 06-29-05 Lot 57 A Front 1000.5 107.4 13.4 96 112.0 994 06-29-05 Lot 57 A Front 1001.5 106.2 14.5 95 112.0 995 06-29-05 1 Lot 57 A hack 999 99.1 17.1 90 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative Maximum In Place In Place I Comoaction Density 996 06-29-05 Lot 57 A Back 1.000.5 1.01.3 11..8 92 110.0 997 06-29-05 Lot 58 A Front 996.5 105.2 13.4 96 110.0 998 06-29-05 Lot 58 A Front 998 106.6 10.8 97 110.0 999 06-29-05 Lot 58 A Back 998.5 107.3 12.5 98 110.0 1000 06-29-05 Lot 58 A Back 999.5 1.04.2 14.0 95 110.0 1001 06-29-05 Lot 59 A Front 996 104.1 11.6 95 110.0 1002. 06-29-05 Lot 60 A Front 992.5 105.5 8.0 96 110.0 1003 06-29-05 Lot 60 A Font 994.5 99.8 12.1 91 1.10.0 1004 06-29-05 Lot 61 Front 992.5 108.4 10.9 99 110.0 1005 06-29-15 Lot 61 Front 994.5 103.1 10.3 94 1.10.0 1006 06-29-05 Lot 12 A Front PC 99.2 10.6 90 110.0 1007 06-29-05 Lot 1.2 A Center PC 99.8 8.3 91. 110.0 1008 06-29-05 Lot 12 A Back PC 102.4 9.6 93 110.0 1009 06-29-05 Lot 1.3 A Front PG 101.1 1.5.4 92 110.0 1010 06-29-05 Lot 13 A Center PC 103.5 9.9 94 { 110.0 1011 06-29-05 Lot 13 A Back PC 100.4 12.1 94 j 110.0 1012 06-29-05 Lot 14 A Front PG 99.0 9.2 90 I 110.0 1013 06-29-05 Lot 14 A Back PC 101.4 8.3 92 110.0 1014 06-29-05 Lot 14 A Center PG 102.4 10.4 93 110.0 1015 06-29-05 Lot 15 A Front PG 102.0. 1.6.1 93 1.1.0.0 1016 06-29-05 Lot 15 A Center PC 100.6 I 15.8 91 110.0 . 1.01.7 06-29-05 Lot 15 A Back PC 106.3 16.4 97 110.0 1018 06-30-05 Lot 68 Front 989 ; 100.6 15.5 91 110.0 1.019. 06-30-05 Lot 68 Front 991 I 102.2 10.2 93 1.10.0 1020! 06-30-05 Lot 67 Front 989 10.1.0 13.4 I 92 110.0 1021; 06-30-05 Lot 67 Front 991 1.03.1 ( 11.1 1 94 110.0 1022; 06-30-05 Lot 66 Front 989 ( 104.5 I 14.2 95 110.0 102306-30-05 Lot 66 Front 991 j 102.5 1 12.3 i 93 110.0 1024 06-30-05 Lot 65 Front 990 I 102.3 I1 10.8 93 110.0 1025 06-30-05 Lot 64 Front 990 I 104.1. ! 11.4 I 95 110.0 1026 06-30-05. Lot 69 Front 993 106.3 ; 9.0 I 97 I 110.0 1027 06-30-05 ; Lot 69 Front 99.4.5 I 1.03.9 10.1 94 110.0 1028 06-30-05 I Lot 62 Front 990.5 I 105.4 8.8 96 110.0 1029 06-30-05 Lot 62 Front 992.5 102.9 11.4 94 110.0 1030 06-30-05 Lot 63 Back 990.5 I 1.04.4 11.8 95 110.0 1031 06-30-05 Lot 63 Back 992.3 104.1 10.2 95 110.0 1032 06-30-05 Lot 62 Back 990 101.8 13.1 93 110.0 1033 06-30-05 Lot 62 Back 992 I 106.3 9.9 97 110.0 1034 06-30-05 Lot 63 Front 990 103.4 12.7 94 110.0 1035E 06-30-05 Lot 63 Front 992 100.8 11.0 92 110.0 1036 � 06-30-05 Lot 69 Front 989 103.3 1'1.8 94 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I Date Tested Location Elevation I Dry Density % Moisture Im Relative j Maximum In Place in Place Copaction I Densitv 1037 06-30-05 Lot 69 Front 1038 06-30-052 Lot 68 Front 1039 06-30-05 Lot 68 Front 1.040 06-30-05 Lot 67 Front 1041 06-30-052 Lot 67 Front 1042 06-30-05 Lot 66 Front 1043 06-30-05 Lot 66 Front 1044 06-30-05 Lot 65 Front 1.045 06-30-05 Lot 65 Front 1046 06-30-05. Lot 64 Front 1047 j 07-01-05 Lot 69 A Front 1048 07-01-05 Lot 69 A Front 1049 07-01-05 Lot 68 A Front 1050 07-01-05 Lot 68 A Front 1051 107-01-05 11.0.0 Lot 67 A Front 1052. 07-01-05 Lot 67 A Front 1053 I 07-01.-05 Lot 62 A Front 1054 07-01-05 Lot 62 A Front 1055 07-01-05 i Lot 63 A Front 1056 07-01-05 Lot 63 A Front 1057! 07-01.-05 i Lot 66 A Front 1058 i 07-01-05 Lot 66 A Front 10591 07-01.-05 Lot 65 A Front 10601 07-01-05 Lot 65 A Front 1061.1 07-01-05 I loot 64 A Front 10621 07-01-05 Lot 64 A Front 1MI 07-01-05 Lot 24 A Front 1064: 07-01-05 Lot 24 A Center 1065,! 07-01-05 Lot 24 A Back 1066; 07-01-05 Lot 23 A Front 10671' 07-01-05 Lot 23 A Center 10681 07-01-05 Lot 23 A Back 1069 07-01-05 Lot 22 A Front 10701 07-01-05 Lot 22 A Center 1071 07-01-05 Lot 22 A Back 1072 I 07-01-05 Lot 21 A Front 1073 I 07-01-05 Lot 21 A Center 1074 i 07-01-05 Lot 21 A Back I 10751 07-05-05 ' Lot 69 A Front 10761 07-05-05 Lot 69'A Front DATE: March 2, 2006 991 105.0 10.1 95 U0.0 993 101.6 9.9 920 110.0 994.5 104.5 11.3 95 110,0 993 + 103.3 1 14.4 94 110.0 995 105.0 1.0.6 95 1.1.0.0 993 100.8 13.5 92 110.0 994.5 10715 1.1..7 92 j 110.0 992 104.7 8.3 95 110.0 "4' 107.1. 8.9 97 110.0 992 102.2 12.4 93 110.0 996 101.4 11.3 92 11.0.0 997.5 1.01..6 10.7 92 110.0 996 104.3 9.8 95 '110.0 997.5 1.02.6 12.5 93 110.0 996 i 103.4 10.0 94 110.0 997.5 100.8 j. 11.3 92 110.0 993 105.1 14.1 96 110.0 994.5 104.6 13.2 95 110.0 993 102.5 12.9 93 110.0 994.5 101.4 14.6 92 110.0 996 103.4 1.2.6 94 110.0 997 103.0 11.8 94 170.0 995 101.4 13.5 I 92 110.0 996.5 100.8 12.0 92 110.0 994 106.0 1.0.7 96 1 110.0 995.5 104.2 11.9 I 95 110.0 PG 104.6 11.1 I 95 110.0 I)C 104.2 15.6 j 95 110.0 PC 107.8 8.4 98 110.0 PG 99.7 10.0 90 110.0 PC 106.9 9.3 95 112.0 PG 107.4 8.4 96 112.0 PC 106.5 1.1.1 95 112.0 PG 104.6 7.7 93 112.0 PG 107.1 8.6 96 112.0 PG 105.9 6.8 96 1.12.0 PG 100.5 7.7 91 110.0 PG 103.7 6.5 94 110.0 998.5 102.4 9.9 91 112.0 1000 104.0 7.1..1 93 112.0 Sladden Engtneerwv TEST RESULTS PROJECT NAME: Madison Club LOCA'T'ION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I RelativeMaximum In Place In Place I Comnaction I Density 1.077 07-05-05 Lot 68 A Front 998.5 104.5 10.7 93 112.0 1078 07-05-05 Lot 68 A Front 1000.5 101.3 8.6 90 112,0 1.079 07-05-05 Lot 67 A Front 998.5 706.1. 12,4 95 112.0 1080 07-05-05 Lot 67 A Front 1.000 102.7 9.0 92 112,0 1081 07-05-05 Lot 62 A Front 995.5 100.8 12.8 90 112.0 10821 07-05-05 Lot 62 A Front 997 103.4 10.2 i 94 1.1.0.0 1083 i 07-05-05 Lot 63 A Front 995.5 1.05.7 � 11.4 I 94 112.0 1084 07-05-05 Lot 63 A Front 997 102.0 9.1 91 1 112.0 1085 07-05-05 Lot 60 A Front 996 107.1 9.3 96 112,0 1086 07-05-05 Lot 60 A Front 997 104.4 13.5 93 112.0 1087 07-05-05 Lot 61 A Front 995,5 1.03.8 13.1 93 172,0 1088 07-05-05 Lot 61 A Front 997 105.1 14.3 94 112.0 1089 07-05-05 Lot 60 A Back 994 101..8 11.4 ' 91 1.12,0 1090 07-05-05 Lot 60 A Back 995.5 100.6 1.4.1 91 110.0 1091 07-05-05 Lot 61 A Back 994. 104.8 10.3 94 112.0 1092 07-05-05 Lot 61 A Back 996 1.02.6 8.9 93 1 770.0 10931 07-05-05 i Lot 63 A Back 994 1 101.1 10.5 92 ' 110.0 1094! 07-05-05 Lot 63 A Back 996 101,5 8.4. 92 110.0 1095 07-05-05 Lot 62 A Back 994 103.0 12.9 94 110.0 1096 I 07-05-05 Lot 62 A Back 996 102.4 10.8 1 93 110.0 1097' 07-06-05 Lot 44 B Front 984 102.2 9.5 93 110.0 1098 07-06-05 Lot 45 B Front 984 100.4 15 .6, 91 110.0 1.099 07-06-05 Lot 45 B Front 986 102,5 I 15. 3 93 110.0 11001 07-06-05 Lot 45 8 Back 985 104.6 9.0 95 I 110.0 1101' 07-06-05 ! Lot 45 B Back 987 105.9 13.3 96 110.0 11021 07-06-05 Lot 1.06 B Back 980.5 100.7 17.2 90 112.0 11031 07-06-05 1 Lot 107 B Back 979.5 r 101.4 16.9 92 112.0 1104' 07-06-05 i Lot 106 B Back 982 ' 96.4 5.1* I 86* 112.0 11051 07-06-05 i Lot 107 B Back 981.5 94.2 3.8* 84* 112.0 1106 07-06-05 I Lot 108 B Front 978 99,8 8.7 I 91 110.0 1107 07-06-05 1 Lot 708 6 Back 978 101.4 9.2 ! 92 110.0 1.1.08 07-06-05 Lot 44 B Back 985 105.1 9.8 94 112.0 1109 07-06-05 'Lot 44 B Back 987 102.4 I 10.3 91 112.0 1110 07-06-05 Lot 46 B Back 985 101.3 i 11.4 90 112.0 1111 07-06-05 Lot 46 B Back 987 103.0 8.6 92 112.0 1112 07-06-05 Lot 106 8 Front 981 i 106.3 10.4 95 112.0 1113 07-06-05 Lot 106 B Front 982.5 1 102.5 8.1 92 112.0 1114 07-06-05 Lot 107 B Front 9795 I 104,4 11,6 93 I 112.0 1115 07-06-05 Lot 107 B Front 981.5 96.0 5.3* 86* 112.0 11161 07-07-05 j Lot 45 B Back 989 j 107.1 j 12.8 1 96 1 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No, Date Tested Location Elevation .I Dry Density I % MoistureI Relative I Maximum In Place In Place Compaction Dcn,%ity 1117 07-07-05 Lot 45 B Back 991 1083 1.4.1 97 112.0 1118 07-07-05 Lot 44 B Back 989 101.9 10.4 91 1.1.2.0 1119 07-07-05 Lot 44 B Back 991 101.1 14.5 90 112.0 1120 07-07-05 Lot 43 B Back 984 100.8 -8.2 90 112.0 1121 07-07-05 Lot 43 8 back 986 101.8 11.0 91 112.0 1122 07-07-05 Lot 45 B Front 988 109.5 14.8 98 112.0 1123 07-07-05 Lot 45 8 Front 990 104.6 9.1 93 112.0 1124 07-07-05 Lot 44 B Front -986 103.4 10.7 92 ; 112.0 1125! 07-07-05 'Lot 44 B Front 988 102.3 11.5 91 112.0 1126 1 07-07-05 Lot 43 B Front 984 10.3 16.6 92 112.0 1127 07-07-05 Lot 4313 Front 986 104.0 12.7 93 112,0 1128 07-07-05 Lot 42 B Front 984.5 108.7 10,5 97 112.0 11291 07-07-05 Lot 42 8 Front 986.5 100.6 15.2 90 112.0 1130 07-07-05 . Lot 41 B Front 984.5 101.4 , 11.5 91 112.0 1.1.31.' 07-07-05 I Lot 4113 Front 986.5 105.5 9.0 94 1.12.0 11.32! 1 07-07-05 ! Lot 43 B Center 986 1 106.8 11.3 90 11.2.0 1133 07-07-05 Lot 42 B Center 985.5 1 103.6 9.4 1 93 112.0 1134 07-07-05 I Lot 41 B Center 986 102.0 13.2 91 112,0 1135;. 07-08-05 Lot 46 B Front 985 103.6 8.8 93 112.0 1136 . 07-08-05 I Lot 46 B Front 987 101.9 8.2 91 112.0 1137 07-08-05 I Lot 45 B Front 992 105.5 1.0.7 94 112.0 1138: 07-08-05 Lot 45 B Front 993.5 104.0 11.5 93 112.0 1139 07-08-05 I Lot 44 B Front 990 1.01..4. 1 9.9 92 110.0 1140 07-08-05 Lot 44 E Front 991.5 105.7 I 13.4 94� 112.0 1141 07-08-05 Lot 43 B Front 988 1 106.2 � 12.6 95 112.0 1142 07-08-05 Lot 43 B Front 989.5 I 102.8 11.3 93 110.0 1.1.43 07-08-05 Lot 42 B Front 988.5 i 104.1 8.7 93 112.0 1144 07-08-05 Lot 42 B Front 990 101.3 10.5 92 11.0.0 1145 07-08-05 Lot 41 B Front 988.5 101.4 11.5 91 112.0 1146I 07-08-05 Lot 41 B 'Front 990 1.05.0 9.0 94 I 112.0 13.47; 07-08-05 ' Lot 46 B Back 989 102.8 10.6 92 112.0 11481 07-08-05 1 Lot 46 B Back 991 106.3 8.8 i 95 112.0 11491 07-08-05 1 Wt 45 B Back 992 1.04.0 12.4 I 93 I 112.0 11501 07-08-05 1 Lot 45 B Back 993.5 103.3 11.1 92 112.0 1.151. i 07-08-05 Lot 44 B Back 992 101.4 9.3 91 112.0 10521 07-08-05 Lot 44 B Back 993 101.8 10.2 91 112.0 1153 ! 07-08-05 Lot 43 B Back 988 107.3 8.6 96 112.0 1154 I 07-08-05 Lot 43 B Back 989.5 103.1 9.9 92 112.0 11551 07-08-05 Lot 42 B Back 985 102.4 10.5 91 112.0 1.156! 07-08-05 Lot 4213 Back 986.5 100.6 13.4 90 112.0 11571 07-08-05 Lot 41 B Back 984.5 104.4 9.2 93 112.0 DATE: March 2, 2006 .Sladden ,6ngineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation I Dry Density % Moisture Relative I Maximum In Place In Place Compaction I Density 11581 07-08-05 Lot 41 B Back 986.5 104.1 11.3 93 I 112.0 11591 07-11-05 Lot 109 B Back 11601 07-11-05 Lot 109 B back 11611 07-11-05 Lot 110 B Back 11621 07-11-05 Lot 110 8 Back 1163, 07-11-05 Lot 110 B Front 1164; 07-11-05 I Lot 110 B Front 11651 07-11-05 Lot 109 B Front 1166 07-11-05 'Lot 109 B Front 1167 07-11-05 , Lot 70 A Back 11681 .07-11-05 Lot 70 A Back 1169 07-11-05 I Lot 69 A Back 1.1701 07-11.-05 Lot 69 A Back 11711 07-11-05 I Lot 68 A Back 1172 07-11-05 Lot 68 A Back '1173 07-11-05 Lot 67 A Back 1174 07-11-05 Lot 67 A Back 1175 07-11-05 Lot 66 A Back 1176. 07-11-05 Lot 66 A Back 1177 07-11-05 Lot 65 A Back 1178 07-11-05 Lot 65 A Back 1179 07-11-05 Lot 70 A Back 1180 07-11-05 Lot 69 A Back 1181 07-1.1.-05 Lot 68 A Back 1182 07-11-05 Lot 67 A Back 1183, 07-11.-05 , Lot 66 A Back 1184 1185 1186 1187 1188 1189 1190 1191 1192 1193 1194 1195 1196 1197 07-12-05 07-12-05 07-12-05 07-12-05 07-12-052 07-12-05 07-12-05 07-12-05 07-12-05 07-12-05 07-1.2-05 07-12-05 07-12-05 07-12-05 Lot 7 B Back Lot 7 B Back Lot 8 B Back Lot 8 B Back Lot 8 B Front Lot 8 B Front Lot 7 B Front Lot 7 B Front Lot 9 A Front Lot 10 A Front Lot 10 A Front Lot11 A Front Lot 11 A Front Lot 11 A Back 977 978.5 997 979 977 978.5 977 978.5 990.5 992.5 990 992 990 992 989 991 990. 992 990.5 992.5 994.5 994 994 993- 994 9399.4. 1001 1003 1002.5 1004.5 1.000.5 1002.5 1.002 1004 1001 1000.5 1002.5 1001 1003 1003 99.3 1.06.2 102.2 101.4 99.8 99.3 106.7 102.8 103.5 100.8 102.0 108.5 100.0 105.9 1.08.5 107.0 102.2 107.3 104.4 105.3 1.01.1. 103.6 1.07.2 105.5 1.03.2 101.5 108.4 99.2 102.1 1.01.6 104.1 103.6 108.9 108.0 107.8 102.0 101.4 1.02.6 99.7 9.2 1.0.0 9.1 10.8 13.0 16.7 10.0 9.2 16.8 14.2 17.1 13.3 1.6.6 9.0 16.5 16.8 15.9 13.6 10.8 12.7 1.1.0 9.9 12.4 10.6 1.3.3 17.3 13.5 14.8 9.6 1.0.7 13.6 16.9 12.1 16.6 16.2 7.4 9.2 14.1 8.5 90 96 93 92 91 90 97 93 94 92 91 97 91 95 97 96 93 96 95 96 92 94 96 94 94. 92 97 90 93 92 95 94 99 96 96 93 92 93 91 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 112.0 11.0.0 1.12.0 112.0 112.0 110.0 112.0 110.0 110.0 110.0 j 1.10.0 1 112.0 112.0 110.0 110.0 1.12.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 112.0 110.0 110.0 1,10.0 110.0 DATE: March 2, 2006 .Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested{ Location Elevation I Dry Density % Moisture I I Relative Maximum 1n Place In Place Comuaction Density 1198 07-12-05 Lot 11 A Back 1199 07-12-05 Lot 10 A Back I 1200 07-12-05 Lot 10 A Back 1201 07-12-05 tot A Back 1202! 07-13-05 Lot 111 B Front 1.203 07-1.3-05 Lot 111 B Front 1204 07-13-05 Lot 112 B Front 1205 07-1.3-05 Lot 112 B Front 1206 07-13-05 Lot 113 B Front 1207 07-13-05 Lot 113 B Front 1.208 07-13-05 Lot 112 B Back 1209 07-13-05 j Lot 112 B Back 1.21.0 07-13-05 Lot 111 13 Back 1211 07-13-05 ' Lot 111 B Back 12121 07-13-05 I Lot 70 B Back 1 90 I 110.0 1213 07-13-05 Lot 70 B Back 12141 07-13-05 Lot 69 B Back 1215! 07-13-05 Lot 69 B Back 1216 07-13-05 Lot 68 B back 1217 ; i 07-13-05 Lot 68 B Back I 1218 07-14-05 Lot 57 A Front 1219 + 07-14-05 Lot 57 A Center 1220 . 07-14-05 Lot 57 A Back 1221 07-14-05 Lot 98 B Back 1222- 07-14-05 'Lot 97 B Back 1223 07-14-05 Lot 98 B Front 1224 I 07-14-05 Lot 98 B Front 1225 07-14-05 Lot 97 B Front 1226 I 07-14-05 Lot 97 B Front 12271 07-14-05 Lot 98 8 Center 15.8 93 110.0 1.228 07-14-05 Lot 98 B Center 1229 07-14-05 Lot 97 B Center 1230. 07-14-05 Lot 97 8 Center 1005 1003 1005 1002 987 980 977,5 979 975 977 977.5 979 978 979.5 996.5 998.5 996 998 996 998 PG PC PC 975 976.5 975 977 976.5 978.5 975 976 976 977 104.5 103.0 109.1 1.06.3 102.4 104.5 99.5 102.2 98.8 98.9 99.7 103.1 104.7 99.1 99.0 98.7 104.0 105.0 1.02.5 102.9 108,3 108.6 106.7 103.2 104.8 105.2 99.7 91.0 94.3 104.1 102.2 1.01.3 102.9 7.0 95 110,0 14.5 94 110.0 9.4 97 112.0 10.7 95 112.0 8.6 93 110.0 12.1 95 110.0 16.6 90 110.0 17.4 93 110.0 , 16.3 90 110,0 15,4 90 110:0 12.5 91 1.10.0 14.6 94 110.0 14.3 95 110.0 13.3 90 110.0 13.8 94 112.0 17.0 90 I 110.0 14.1 91 110,0 17,3 95 110.0 14.2 95 110.0 11.5 93 110.0 12.9 94 110.0 10.5 97 112.0 9.3 + 97 112.0 12.6 95 I 112.0 17.2 94 110.0 11.2 95 i 110.0 14.0 j 96 i 110.0 19.9 89" 112.0 20.5 I 83* i 110.0 18.8 86* 110,0 16.5 95 110.0 15.8 93 110.0 16.7 92 110.0 14.8 94 110.0 1231 07-18-05 Lot 90 B Back 978.5 108.1 13.9 97 112.0 1232 07-18-05 Lot 90 B'Back '980 102.4 8.9 91 112.0 1233 07-18-05 Lot 89 B Back .9.78 90.1 7.2 80* 112.0 1234 07-1.8-05 Trot 90 B Front 978 103.5 j 1.0.6 92 112.0 1235 07-18-05 Lot 90 B Front 980 105.2 I 13.8 94 112.0 1236 07-18-05 Lot 91 B Front 977 96.3 1 6.2 86* 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elcvation Dry Density % Moisture Relative Maximum I In Place I in Place ComvaCtion I Density 1237 07-18=05 Lot 92 B Front 977 101.4 8.3 91 112.0 1238 07-18-05 Retest # 1.236 977 103.0 9.9 92"" 112.0 1239 07-18-05 Lot 91 B Front 979 1.04.5 11.4 93 112.0 1240 07-18-05 ; Retest # 1.233 102.2 10.3 91'°" 112.0 1241 07-18-05 Lot 89 B Back 98(1 106.1 12.1 95 11.2.0 1242 I 07-18-05 tot 89 B Centcr 978 103.4 11.0 92 112.0 1243 J 07-18-05 Lot 89 B Center 980 103.7 11.5 93 112.0 1244!:07-1.8-05 Lot 90 8 Center 978.5 101.9 1.0.1 91 112.0. 12451 07-18-05 Lot 90 B Center 980.5 104.5 12.4 93 112:0 12461 07-18-05 Lot 91 B Center 977.5 100.9 9.3 90 112*0 1247 07-18-05 Lot 90 B Center 979.5 105.0 13.6 94 112.0 1.2.48 07-18-05 Lot 90 B Front 978,2 102.3 8.8 91 112.0 1249 07-18-05 Lot 89'B Front 980.5 102.9 10.7 92 112.0 12501 07-18-05 Lot 90 B Back 979 106.6 9.2 95 112.0 1251 I 07-18-05 Lot 90 8 Back 981 103.0 10.5 92 112.0 1252 07-19-05 Lot 84 B Front 981,5 1.03.3 8.8 . 92 112.0 1253 07-19-05 Lot 89BFront 982.5 104.6 9.3 93 112.0 1254 07-19-05 Lot 89 B Back 981.5 99.8 16.8 91 110.0 12551 07-19-05 Lot 89 B Back 982.5 1.01.3 11.6 92 110.0 1256 07-19-05 Lot 90 B Front 981 105.4 7.1 94 112.0 1257 07-19-05 Lot 90 B Front 982 101.4 9.7 92 110.0 1258! 07-19-05 Lot 91 13 Back 977 99.3 ! 11.2 i 90 110.0 1259 07-19-05 Lot 91 B Back 979 107.2 1 12.7 96 112,0 1260; 07-1.9-05 Lot 92 B Back 979.5 105.9 13.6 95 112.0 1261' 07-19-05 Lot 92 B Back 981.5 108.0- 15.3 96 '1.12.0 1262 07-19-05 Lot 91 B Front 980 ! 104.4 9.9 93 112.0 1263 07-19-05 1 of 91. 8 Front 981.5 I 102.9 8.7 92 112.0 1264, 07-19-05 Lot 92 B Front 979 106.1 11.5 95 112.0 1265:i 07-19-05 1 Lot 92 B Front 981 101.1 10.8 90 ; 112.0 1266; 07-20-05 Lot 58 A Front PG 104.3 10.1 i 93 I 112.0 1267 07-20-05 Lot 58 A Center PG 109.8 7.7 98 I 112.0 1268 i 07-20-05 Lot 58 A Back PC 106.3 8.5 95 112.0 1269 07-20-05 Lot 59 A Front PG 103.9 9.2 1 93 112.0 1270 07-20-05 Lot 59 A Center PG 106.5 8.6 I 95 112.0 1271 07-20-05 Lot 59 A Back PC 105.1 9.1 94 112,0 1272 07-20-05 Lot 60 A Front PG ; 109.1 10.1 97 112.0 1273 07-20-05 Lot 60 A Ccntcr PC ! 108.7 11.3 97 112.0 1274 07-20-05 Lot 60 A Back PG 105.2 8.8 94 112.0 1275 ()7-20-05 Lot 64 A Back 994 101.9 10.5 91 112.0 1276 07-20-05 Lot 64. A Back 996 103.3 12.4 92 12.0 DATE: March 2, 2006 ,Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.I bate Tested I Location Elevation Dry Density I % Moisture keladve I Maximum in Place • to Place I Comnaction Densitv 1277 07-20-05 Lot 65 A Back 994.5 107.2 9.1 96 11.2.0 1278 07-20-05 Lot 65 A Back 996 104.3 13.4 93 112.0 1279 07-20-025 Lot 66 A Back 995.5 101.8 11.3 91 112.0 1280 07-20-05 Lot 66 A Back 996.5 105.0 12.0 94 112.0 1281 07-20-05 Lot 67 A Back 995 106.9 i 8.5 95 112.0 1282 07-20-05 Lot 67 A Back ' 996.5 103.3 10.2 92 112.0 1283 07-20-05 Lot 64 A Back 997.5 100.9 14.0 90 112.0 1284 07-20-05 Lot 65 A Back 998 1 103.8 11.2 93 1.12.0 1285 07-20-05 1 Lot 65 A Back 1000 : ' 100.4 14,3 90 . 112.0 1286 07-20-05 Lot64 a Back 999 101.6 15.1 91 112.0 1287! 07-20-05 Lot 64 A Back 1001 104.7 13.6 93 112.0 12881 07-20-05 1 Lot 66 A hack 998 108.1 12.9 97 112.0 12891 07-20-05 1 Lot .66 A Back 1000 109,0 i 14.5 I 97 112.0 1290, 07-20-05 ; Lot 67 A Back 998 105.8 13.2 ! 94 112.0 1291 i 07-20-05 Lot 67 A Back 1.000 1.01..5 9.8 91 112.0 1292 07-21.-05 Lot 89 B Front 984.5 1 103.1 9.8 92 112.0 1293 07-21-05 Lot 89 B Front 986.5 ! 99.2 1.4.8 90 110.0 1294 07-21-05 Lot 89 B Back 984 105.3 11,9 94 i 112.0 12951 07-21-05. Lvt 89 B Back 986 102.8 13.0 92 112.0 1296 07-21-05 Lot 90 B Front 984 106.6 9.8 I 95 112.0 1297 07-21-05 Lot 90 B Front 985.5 100.3 15.7 91 110.0 1298 07-21=05 Lot 90 B Back 983 104.7 1 12.5 i 93 112.0 1299 07-21.-05 Lot 90 B Back 985 101.8 12.7 ; 91 112.0 1300 I 07-21-05 Lot 91 B Front 984 105:1 13.5 I 94 112,0 13011 07-21-05. Lot 91 B Front 986 105.3 11,6 94 112.0 1302 07-21-05 Lot 91 B Back 981 I 103.1 9.9 92 112.0 1303 07-21-05 Lot 91 B Back 983 107.2 14.0 96 112.0 1304; 07-21-05 ! Lot 92 B Front 983 104.6 13.4 93 112.0' 1305; 07-21-05 ' Lot 92 B Front 984.5 101.0 12.1 90 1.12.0 1306' 07-21-05 Lot 92 B Back 983 107.8 17.5 96 112.0 1307' 07-21-05 Lot 92 B Back 984.5 104.4 1218 93 112.0 1308; 07-21-05 Lot 93 8 Front 980 1.05.1. 9.4 94 112.0 1309 C 07-21-05 Lot 93 B Front 981.5 108.3 I 8.5 97 112.0 1310 07-21.-05 slot 93 B Back 980 103.3 I 10.1 92 I 112,0 1311 07-21-05 Lot 93 B Back 981.5 104.0 1 11.3 93 i 112.0 1312 07-21-05 Lot 93 8 Front 982.5 104.3 9.1 93 112.0 1313 07-21-05 Lot 93 B Front 984 103.4 13.0 92 112.0 1314 07-21-05 Lot 93 B Back 983 100.8 15.5 90 I 112.0 1315 07-21-05 Lot 93 B Back 984 102.4 10.8 91 i 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. bate Tested - Location Elevation Dry Density I % Moisture I Relative1 Maximum In Place In Place mp Coaction Density DATE: March 2, 2006 Sladden Engineering 1 13161 07-22-05 Lot 71 A Front PG 102.9 11.8 93 110.0 1317 -07-22-05 Lot 71 A Center PG 104.5 11.9 95 110.0 13181 .07-22-05 Lot 71 A Back PG 102.2 8.7 93 110,0 1319 07-22-05 Lot 70 A Front PG I 101.4 9.7 91 112.0 1320 07-22-05 Lot 70 A Center PG 104.4 9.6 93 112.0 1321 07-22-05 Lot 70 A Back PC 106.9 10.1 95 112.0 1322 07-22-05 Lot 69 A Front PG 105.5 14.1 94 112.0 1323 07-22-05 Lot 69 A Center PG 99.7 15.2 91 110.0 1324. 07-22-05 Lot 69 A Back PCT 102.7 13.5 93. 1.10.0 1325; 07-22-05 Lot 68 A Front PG 104.6 8.2 93 112.0 1326 07-22-05 Lot 68 A Center PCT 108.9 10.1 97 112.0 1327 07-22-05 Lot 68 A Back PG 707,6 9.5 96 112.0 1328 07-22-05 Lot 67 A Front PC 101.6 12.5 J 91 112.0 1329 07-22-05 Lot 67 A Center PG 102.1 8.4 I 91 112.0 '1330 07;-22-05 Lot 67 A Back PG 1.06.6 7.5 95 112.0 1331 07-22-05 Lot 66 A Front PC 105.4 10.3 94 112.0 1332 07-22-05 Lot 66 A Center PG 106.6 1.1..8 95 112.0 1333 07-22-05 Lot 66 A Back PC 107.2 8.3 96 112.0 1334 07-22-05 Lot 65 A Front PG 1.08.5 10.6 f 97 11.2.0 1335 07-22-05 Lot 65 A Center PG 104.1 1 9.5 93 112.0 1336 4 07-22-05 1; Lot 65 A Back .PC 101.8 7.7 91 112.0 13371 07-22-05 Lot 64 A Front PG 105.0 13.5 94 1.12.0 1338 07-22-05 Lot 64 A Center PC 107.5 11.0 96 112.0 1339 07-22-05 Lot 64 A Back PCT 106.4 9.6 95 1.12.0 1340 ` 07-22-05 Lot 63 A Front PG 107.6 9.2 96 1 112.0 13411 07-22-05 LOT 63 A Center 1'C 106.3 9.4 95 112.0 1342:' 07-22-05 j Lot 63 A Back PG 1.03.2 i 10.1 92 112.0 13431 07-22-05 i Lot 62 A Front PG .109.'] ' 7.8 97 112.0 1344 07-22-05 Lot 62 A Center PC 107.3 I 8.8 96 1.12.0 7345 07-22=05 Lot 62 A Back PG 108.6 9.2 93 112.0 1346 07-22-052 Lot 61 A Front PG 1.04.5 11.5 93 112.0 13471. 07-22-05 Lot 61 A Center PG 109.3 10.4 98 12.0 1348 j 07-22-05 Lot 61. A Flack PG j 109.2 11.6 98 112.0 1349 07-25-05 Retest # 1224 103.3 16.7 92** 112.0 1350 07-25-05 Lot 98 B Front 979 .105.1 14.5 94 112.0. 1351 07-25-05 Lot 98 B Back 977 101.6 17.0 91 1.12.0 1352 07-25-05 I Lot 98 B Back 979 104.4 15.1 93 112.0 1353 07-25-05 Retest # 1225 102.2 16.0 91** 112.0 1354 07-25-05 Retest # 1226 101.8 13.6 91** 112.0 1355 07-25-05 Lot 97 B Back 978.5 105.3 13.9 , 94 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO; 522-4810 REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation ` Dry Density In Place % Moisture In Place Relative Compaction Maximum Denslt 1356 07-25-05 .r Lot 97 8 Back 980.5 103.4 14.7 92 112.0 1357 07-25-05 Lot 9813 Front 981 106.6 12.9 95 1.12.0 1358 07-25-05 Lot 98 B Front 983 103.5 12.4 92 112.0 1359 07-25-05 Lot 9813 Back 981 1 1.02.1 1.3.6 91 112.0 1360 07-25-05 Lot 98 B Back 983 102.9 17.0 92 112.0 1361 07-25-05 Lot 97 B Front 980.5 100.9 15.5 90 112.0 1.362 07-25-05 Lot 97 B Front 987.5 105.0 11.6 94 1.1.2.0 1363 07-25-05 Lot 97 B Back 981.5 106.6 13.3 95 112.0 1.364 07-25-05 Lot 97 B Back 983 104.8 11.2 94 1.1.2.0 1365 07-26-05 Lot 114 B, Front 977,5 105.1 8.3 94 112.0 1366 07-26-05 Lot 114 B. Front 979.5 103.7 17.5 93 112.0 1367 07-26-05 Lot 114 B Back 977,5 102,5 8.9 92 112.0 1368 07-26-05 Lot 114 B Back 979.5 101.1 14.5 90 112.0 1369 07-26-05 Lot 115 B Front 977 106.0 '9.6 95 112.0 1370 07-26-05 Lot 115 8 Front 978.5 105.1 12.4 1 94 112.0 1371 07-26-05 Lot 115 B Back 977 100.8 10.0 90 112.0 1372 07-26-05 Lot 115 B Back 978.5 107.1 17.2 96 112.0 1373 07-26-05 Lot 1.1.6 B Front 975.5 103.8 10.3 93 112.0 1374 07-26-05 Lot 116 B Front 977 i 103.6 I 11.2 93 112.0 1375 07-26-05 Lot 1.1.6 13 Back 975.5 , 105.3 15,7 94 1.12.0 13761 07-26-05 Lot 116 B Back 977 104.0 16.9 93 1 112.0 1377 07-26-05 Lot 114 B Front 981 1.03.1 1.0.0 92 112.0 1378 07-26-05 I 1 o 1141313ack 981 106.3 11.4 95 112.0 1379 07-26-05 I Lot 115 B Front 980.5 107.0 16.8 96 112.0 13801 07-26-05 Lot 115 B Back 980 106.7 17.1 95 I 11.2.0 f 13811 07-27-05 Lot 39 B Front 984.5 101.4 9.3 91 112.0 1382 07-27-05 I Lot 39 B Front 986.5 105.0 10.8 94 112.0 13831 07-27-05 Lot 38 B Front 984 1.06.8 1.2.5 95 112.0 13841 07-27-05 Lot 38 B Front 986 104.3 11.1 93 112.0 1385 07-27-05 Lot 37 B Front 984.5 103.1. 8.8 92 j 112.0 1386 07-27-05 Lot 37 B Front 986.5 103.9 10.4 93 j 112.0 1387 07-27-05 Lot 39 B Front 988.5 107.5 11.3 96 i 112.0 1388 07-27-05 Lot 39 B Front 990.5 105.6 13.3 94 I 112,0 1389 07-27-05 Lot 38 B Front 788 101.8 14.8 91. 112.0 1390 07-27-05 Lot 38 B Front 989.5 100.9 12.2 90 112.0 1391. 07-27-05 Lot 37 B Front 988.5 108.1 1.3.5 97 112.0 1392 07-27-05 Lot 37 B Front 990 106.3 12.6 95 112.0 1393 07-27-05 Lot 39 -B Back 984.5 103.9 '14.4 93 11210 1394 07-27-05 Lot 39 8 tack 986 103.2 12.0 92 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO; 06-02-120 Test No. j Date Tested I Location Elevation Dry Density % Moisture Relative Maximum In Place In Place Comnaction Density 1395 07-27-05 Lot 38 B Back 984 107.0 9.9 96 112.0 1396 07-27-05 Lot 38 8 Back 986 104.5 10.7 I 93 112.0 1397 07-27-05 Lot 37 B Back 984.5 102.9 15.1 92 112.0 1398 07-27-05 Lot 37 8 Back 986.5 101.0 11.0 90 112.0 1399 07-27-05 Lot 39 B Back 988 108.0 12.2 96 ; 112.0 14001 07-27-05 Lot 39 9 Back 989.5 105.1 15.1 94 I 11.2.0 14011 07-27-05 Lot 38 B Back 988 102.0 9.6 91 112.0 14021 07-27-05 Lot 38 B Back 989.5 105.7 13.2 94 1.12.0 1403 07-27-05 Lot 37 B Back 988.5 101.5 11.3 91 112.0 1404 07-27-05 Lot 37 B Back 990 106.0 8.7 95 112.0 1405;; 07-28-05 Lot 39 B Back 991.5 I 1.08.4 14.1 97 112.0 1406: 07-28-05 Lot 39 B Back 992.5 103.7 10.7 92. 1.12.0 1407; 07-28-05 j Lot 38 B Back -991 109.6 12.4 98 112.0 1408. 07-28-05 Lot 38 B Back992.5 103.7 12.6 93 j 112.0 14091 07-28-05 Lot 37 B Back 991 104.2 16.7 93 I 112,0 1.41.0 07-28-05 Lot 37 B Back 992.5 108.6 12.9 97 112.0 1411 07-28-05 Lot 39B. Front 991.5 102.5 12.4 92 112.0 14121 07-28705 Lot 39 B Front 992.5 1.01.0 17.6 90 112.0 1.413 i 07-28-05 Lot 38 B Front 991 102.9 12.1 92 112.0 14141 07-28-05 Lot 38 B Front 992.5 i 105.8 10.7 I 94 112.0 1415: 07-28-05 Lot 37 B Front 991 107.3 16.6 96 112.0 i 14161 i 07-28-05 Lot 37 3 Front 992.5 1 108.5 i 15.1 97 112.0 1417! 07-29-05 I Lot 37 B Front 993.5 99.9 ! 15.6 I 91 110.0 14181 07-29-05 I Lot 37 5 Back 993.5 105.2 10.8 94 I 112.0 14191 07-29-05 Lot 38 B Front 993.5 I 99.7 10.8 i 91 ! 110.0 1420; 07-29-05 f Lot 38 B Back 993.5 1.0:1.5 11.2' 91 ! 112.0 1421 07-29-05 + Lot 39 B Front 994 1.03.3 � 16.3 i 92 112.0 1422 i 07-29-05 1 Lot 39 B Back 994 100.1 11.291 110.0 1423 07-29-05 Lot 98 B Front 985 93.1 7.1r 85" j 11.0.0 1424 07-29-05 I Lot 98 B Front 986 92.4 6.6"' I 84.~ I 110.0 1425 07-29-05 Lot 98 B Back 985 102.8 10.9 j 93 ' 110.0 1426 07-29-05 Lot 98 B Back 986 104.4 13.6 95 110.0 1.4.27 07-29-05 Lot 97 B Front 984 106.3 14.1 95 112.0 1428 07-29-05 Lot 97 B Front 985.5 105.8 12.9 94 112.0 1.429 07-29-05 Lot 97 B Back 984.5 104.0 11.8 93 112.0 1430 07-29-05 Lot 97 B Back 985.5 101.6 .10.7 91 112.0 1.431. 07-29-05 Lot 88 B .Front 976 107.6 14.5 96 112.0 1432 07-29-05 Lot 88 B Back 975.5 104.9 12.3 94 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Tit No. Datc Tcstcd Location Elevation Dry Density % Moisture Relative I Maximum In Place In Place Compaction Density 1433 08-01-05 ! Lot 52 B Front 1434 08-01-05 I Lot 52 B Back 1435 08-01-05 Lot 53 B Front 1436 08-01-05 Lot 53 8 Back 1437 08-01-05 Lot 54 B Front 1438 08-01-05 Lot 54 B Back 1439 08-01-05 Lot 55 B Front '1440 08-01-05 Lot 55 8 Back 1441 08-01-05 Lot 56 B Front 1.442 08-01.-05 Lot 56 B Back 1443 08-01-05 Lot 57 B Front 1444! i 08-01-05 Lot 57 B Back lA 08-01-05 Club House 2A i 08-01-05 Club House. 3A 08-01-05 Club House 4A 08-01-05 I Club House 5A 08-01-05 j Club House 6A 08-01-05 ! Club House 7A 08-01-05 Club House 8A i 08-01-05 1 Club House 9A 1 08-01-05 ! Club House 10A I 08-02-05 11A 08-02-05 12A 08-02-05 13A 08-02-05 14A ; 08-02-05 14451 08-02-05 1446! 08-02-05 14471 08-02-05 1448 08-02-05 14491 08-02-05 1.4501 08-02-05 1451 08-02-05 1452, 08-02-05 14531 08-02-05 1454 08-02-05 1455 08-02-05 1456 08-02-05 DATE: March 2, 2006 Club House Club House Club House Club House Club House Per Plan Per Plan Per Plan Per Plan Per Plan Per plan Per Plan Per Plan Per Plan Per Pian Per Plan Per Plan 979 978.5 978 978.5 977.5 977 977.5 977.5 977 976.5 976.5 977 966.0 968.0 966.0 961..0 963.0 967.0 969.0 965.0 967.0 969.0 971.0 970.0 971.0 973.0 979.5 980.5 979.5 981. 978.5 979.5 979.5 981.5 980 981.5 980 981.5 104.1 102.4 101.8 105.9 106.6 101.0 103.4 103.8 107.3 104.4 101.3 102.7 99.3 102.0 99.7 100.9 1.03,5 100.1 102.9 102.3 98.6 104.0 100.1 101.2 102.7 102.4 100.8 101.9 104.3 1.01..5 102.7 100.9 104.8 104.6 '108.1 105.4 106.3 103.9 11.9 93 112.0 9.7 91 112.0 12.5 91 i 112.0 10.6 95 112.0 12.3 95 1.1:2.0 1.4:9 90 112.0 9.8 92 112.0 13.2 93 112,0 13.9 96 112.0 11.0 96 112,0 8.9 90 112.0 12.1 92 11.2.0 17.2 90 I 1.10.0 18.7 94 ! 110.0 19.2 91 110.0 1.9.9 92 110.0 20.9 95 110.0 191 I 91 110.0 14.9 94 11.0.0 175 93 110.0 12.7 90 110.0 17.0 95 110.0 16.4 91 110.0 18.7 92 110.0 19.4 1 94 110.0 20.5 i 93 110.o 16.6 i 92 I 110.0 10.8 93 110.0 11.9 i 95 110.0 9.4 92 1 110.0 12.5 ! 92 112.0 8:8 92 110.0 10.2 94 112.0 10.9 93 I 112,0 13.3 97 1 112.0 11.6 94 ! 112,0 11.0 95 112.0 12.5 93 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry h' Densi % Moisture Relative ' Maximum In Place I In Place Compaction i Density 1457 08-03-05 Lot 89 B Front 988.5 105.1 13.3 94 1.1.2.0 1458 I 08-03-05 Lot 89 B Front 990.5 104.2 11.6 93 112.0 1459 08-03-05 Lot 89 B Back 988, 107.9 9,9 96 112.0 1460 . 08-03-05 Lot 89 B Back 990: 103.8 12.0 93 112.0 1.461.1 08-03-05 i Lot 90 B Front 978.5 106.6 . 10.5 95 112.0 14621 08-03-05 Lot 90 B Front 98915 106.1 11.3 95 112.0 1.4631 08-03-05 Lot 90 B Back 987 102.5 14.5 92 112.0' 1464 08-03-05 Lot 90 B Back 989 102.8 13.4 92 112,0 1465 08-03-05 Lot 91 B Front 988 108.1 10.7 97 112.0 1466 08-03-05 Lot 91 B Back 985 105.3 13.8 94 112.0 1467 08-03-05 Lot 91 B Back 987 101,6 10.0 91 112.0 1468 08-03-05 Lot 92 B Front 986.5 103.7 9.2 93. 112.0 1469 08-03-05 Lot 92 B Back 986.5 103.5 1.2.4 92 112.0 1470 08-03-05 Lot 9313 Front 985.5 107.8 11.0 96 112.0 1471 08-03-05 Lot 93 B Back 985 104.4 14.1 93 112.0 A 08-03-05 ( Lot 60 Front 975 102,4 1.6.0 93 110.0 B I 08-03-05 I Lot 60 Back 975 101.1 10.1. 92 110.0 C 0&03-05 j Lot 59 Back 975 103,7 19.3 95 110.0 D 08-03-05 Lot 59 Front 975 100.2 10.2 91 110.0 E 08-03-05 Lot 58 Front 976 103.1 15.9 94 110,0 F I 08-03-05 Lot 58 Back 976 101.8 l 17.5 93 110.0 1472. I j 08-04-05 Lot 94 B Front 980 1.01.8 10.9 91 112.0 1.473. 08-04-05 Lot 94 B Back 979.5 103.3 13.5 92 I 112.0 1474 ; 08-04-05 Lot 95 A Front 979 1.07.5 11.0 i 96 112.0 14751 08-04-05 I Lot 95 B Back 797 104.4 8.8 93 1.1.2.0 14761 08-04-05 Lot 46 B Front 978 102.9 12.6 I 92 112,0 1477 08-04-05 Lot 46 B Back 978.5 105.1 11.7 94 112.0 1478 08-04-05 Lot 94 B Front 982 I 108.2 14.1 I 97 112.0 1479 08-04-05 Lot 94 B Front 983.5 106.1 12.5 95 112.0 1480 08-04-05 Lot 95 B Front 981 I 104.5 10.8 93 112.0 1481 08-04-05 Lot 95 B Front 983 102.4 13.0 91 1.1.2.0 1482 08-04-05 Lot 96 8 Front 980 103.9 11.4 93 112.0 1483 08-04-05 Lot 96 8 Front 982 105.5 14.5 94 112.0 1484 08-04-05 Lot 94 B Back 981.5 101.2 9.6 90 1.12.0 1.485 08-04-05 j Lot 94 B Back 983.5 103.1 10.3 92 112.0 1486 08-04-05. Lot 95 B Back 981 107.4 13.2 96 112.0 1487 08-04-05 I Lot 95 8 Back 983 104.6 11.4 93 112.0 1488 08-04-05 Lot 96 B Back 980.5 104.8 10.2 94 112.0 1489 08-()4-05 Lot 96 8 Back 982 101.6 127 91 112.0 1490 08-04-05 Retest ti 1423 101.3 8.6 90-- 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION; La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density in Place % Moisture In Place I Relative Compaction I Maximum Densi 1491 08-04-05 Retest # 1424 103.5 9.0 92** 112.0 1.492 08-04-05 Lot 98 B Back 986 104.4 8.5 93 112.0 1493 08-04-05 Lot 97 B Front 987.5 102.0 11.3 94 112.0 . 1494 08-04-05 Lot 97 U Rack 987.5 105.1 10.5 94 112.0 1495 08-04-05 Lot 96 B Front 984 103.3 13.9 93 112.0 1496 08-04-05 Lot 9613 Back 984 107.6 12.7 96 112.0 1497 08-05-05 Lot 89 B Front PG 108.3 10.4 97 112.0 1498 08-05-05 Lot 89 B Center PG, 1.05.5 :1.1..6 94 I 112.0 14.99 08-05-05 I,ot 89 B Back PG 108.4 10.9 97 172.0 1500 08-05-05 Lot 90 B Front PC 103.8 ; 1.3.8 I 93 ' 112.0 1501 08-05-05 Lot 90 B Back PG 105.9 12.1 95 112.0 1502 08-05-05 Lot 90 B Center PG 102.6 12.9 92 112.0 1503 08-05-05 Contour Between 981 I 104.7 14.8 93 1.12.0 1504 08-05-05 Meriwether & 98115 10210 13.2 91 112.0 1505 08-05-05 Humboldt 981 108.9 15.3 97 112.0 1506 08-05-05 Per Plan 982 106.1 12.8 95 11.2.0 1.507 08-05-05 Per Plan 980.5 103.6 10.7 93 112.0 1508 08-05-05 Per Plan 980.5 105.5 15.5 94 112.0 1509 08-05-05 Per Plan 981 109.1 13.3 97 112.0 1510 08-05-05 Per Plan 982 1.06.4 11.8 95 112.0 1511 08-05-05 Per Plan 981.5 104.5 1.2.5 93 112.0 1B I 08-05-05 Club House 975.0 1.01..8 17.8 93 110.0 2B I 08-05-05 Club House 975.0 100.1 8.9 91 110.0 3B 08-05-05 Club House 975.0 1.04.0 15.8 96 110.0. 4B' I 08-05-05 Club House 975.0 108.8 9.4 99 110.0 5B I 08-05-05 Club House 975.0 99.2 10.1 90 110.0 6B 08-05-05 Club House 972.0 107.6 9.5 98 110.0 7B I 08-05-05 Club House 974.0 100.4 9.7 91 110.0 8B 08-05-05 Club House 975.0 102.5 12.4 94 110.0 9B OM5-05 Club House 977.0 101.3 10.9 92 1.1.0.0 10B 08-05-05 Club House 977.0 105.2 8.9 95 110.0 11B -08-05-05 Club House .4.79.0 1.00.3 13.1 91 1.1.0.0. 126 08-05-05 Club House 975.0 103.2 10.8 94 110.0 13B 08-05-05 Club House 977.0 101.4 10.1 92 110.0 14B 08-05-05 Club House 975.0 108.2 1.5.9 98 110.0 15B 08-05-05 Club House 977.0 106.8 18.1 97 110.0 1.613 08-05-05 Club House 977.0 105.6 16.2 96 110.0 I� 17B 08-05-05 Club House 977.0 101.0 13.9 92 110.0 18B 08-05-05 Club House 977.0 104.4 19.2 95 110.0 DATE: March 2, 2006 ,Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tc,st No, Datc Tc%tedI I-o6tion Elevation I Dry Density I % Moisturc Relative Maximum In Place In Place Compaction Densitv 19B I 08-05-05 20B ! 08-05-15 1512 1513 1514 1515 1.516 1517 1518 1519 1520 1521 1522 1523 1524 1525 1526 1527 1528 1529 1530 1.531. 1532 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-05 08-08-5 08-08-05 08-08-05 08-08-05 08-08-05 Club House Club House Lot 91 B Front Lot 91 8 Center Lot 91 B Back Lot 92 B Front Lot 92 B Center Lot 92 S Back Trot 93 B Front Lot 93 B Center Lot 93 B, Back Lot 94 13Front Lot 94 B Center Lot 94 BBack Lot 9513 Front Lot 95 B Center Lot 95 B Back Lot 8813'Front Lot 88 B Back Lot 88 B Front Lot 88 B Back Lot 88 B Front Lot 88 B Back 1C I 08-08-05 ' Club Horse 2C j 08-08-05 Club House 3C 08-08-05 Club Hasse 4C i 0"&05 Club Howse 5C 1 08-08-05 Club House 6C I 08-08-05 1 Club House 7C 08-08-05 1 Club Ho-jse 8C 08-08-05 Club Ho -,use 9C 08-08-05 ': Club House 10C 08-08-05 I Club House 11C 08-08-05 Club House 12C 08-08-05 Club House 1533 1534 1535 08-09-05 08-09-05 08-09-05 DATE: March 2, 2006 Lot 12 B Sack Lot 12 B 3ack Lot 63 B Sack 977.0 977.0 PG PG PG PG PG PG PG PC PG PG pG PG PG PG PG 997.5 977.5 979.5 979:5 981 981 979.0 981.0 979.0 981.0 979.0 981.0 979.0 981.0 979.0 981.0 979.0 981.0 975.5 976.5 975 105.6 106.3 108.3 105.1 106.5 103.8 102.9 104.7 101.3 107.2 104,4 108.5 1.05.6 1.03.0 103.9 107.2 104.6 102.2 104.0 101.6 105.0 103.6 103.8 106.4 106.2 104.5 105.3 103.8 1.02.1 104.9 107.3 104.1 105.9 108.0 101.2 100.8 101.3 1.01..2 10.2 12.8 9.0 11.4 10.7 12.6 1.1..1 13.3 9.9 11.7 13.8 10.7 8.8 12.4 10.0 8.3 11..5 9.6 8.1 12.7 9.0 :1.3.2 12.1 15.7 10.2 12.4 11.2 12.3 9.8 12.2 1.3.4. 13.9 12.6 15.8 16.2 22.4* 18.5* 12.7 95 96 97 94 95 93 92 93 90 96 93 97 94 92 93 96 93 91 93 91. 94 93 93 96 96 95 95 95 93 95 97 95 96 98 92 85* 85* 90 110.0 110.0 112.0 112.0 112.0 112.0 112.0 1.1.2.0 112.0 112.0 112.0 112.0 112.0 112,0 112.0 112.0 112.0 1.12.0 112.0 I 112.0 11.2.0 112.0 112.0 110.0 110.0 110.0 11.0.0 110.0 110.0' 110.0 110.0 110.0 110.0 110.0 1.10.0 119.0 119.0 :1.1.2.0 . gladden .Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested I Location 1536 08-09-05 Lot 63 B Back 1537 08-09-05 , Lot 64 B Back 1538 08-09-05 Lot 64 B Back 1539 08-09-05 Lot 65 B Back 1540 08-09-05 Lot 65 B Back 1541 08-09-05 Lot 66 B Back 1542' 08-09-05 Lot 66 8 Back 1D 08-09-05 Club House 2D I 08-09-05 CIub House 3D 08-09-05 Club House 4D 08-09-05 Club House 5D 08-09-05 Club House 6D 08-09-05 Club House 7D 08-09-05 Club House 8D 08-09-05 Club House 9D 1 08-09-05 Club House 10D 08-09-05 Club House 11D i 08-09-05 Club House 12D ; 08-09-05 Club House 1543 08-10-05 i 62 B Front 15441 08-10-05 .Lot Lot 62 B Front 1545! 08-10-05 Lot 63 B .Front 1546 08-10-05 Lot 64 B Front 1547 08-10-05 Lot 65 B Front 1548 08-10-05 Lot 66 B Front 1549; 08-10-05 1 Lot 67 B Front 15501 08-10-05 1 Retest # 1.533 & 1.534. 1551 08-10-05 Lot 63 B Back 1552 08-10-05 Lot 64 B Back 1553 08-10-05 ` Retest # 1538 1554 08-10-05 Retest # 1539 & 1.540 1555 08-10-05 Retest # 1541 1556 08-10-05 Lot 67 B Back A 08-10-05 Lot 47 B 08-10-05 Lot 47 C 08-10-05 Lot 48 D 08-10-05 Lot 48 DATE: March 2, 2006 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation I Dry DensityI % Moisture I Rcleliv.c + Maximum In Place In Place Comnaction I Density 976 974.5 975.5 975 976 976 977 983.0 985.0 983.0 985. 983.0 985.0 983.0 985.0 983.0 985.0 983.0 985.0 975.5 9763.5 976.5 978 975 977 973 976 974.5 975 976 972 983 985 983 985 103.6 106.4 102.3 97.1 95.6 99.5 103.4 103.6 100,1 105.4 1.01..5 102.5 100.7 1.08.1. 103.4 103.8 101.7 107.2 105.1 109.4 108.3 104.5 1.06.6 103.9 105.5 104.1 104.5 101.3 103.4 105.3 103.1 104.7 100.8 104.1 102.9 105.2 101.4 17.8* 19.4* 20.2* 14.3 13.1 20.1* 18.2* 13.8 10.3 14.7 15.3 14.5 12.4 13.6 10.5 1..7.9 18.6 16.8 15.2 16.5 13.7 11.0 14.8 16.2 15.3 13.0 14.8 17.1 1.6.0 15.6 14.0 16.3 11.4 13.9 12,7 14.6 113.4 93 90 86* 87* 85* 89* 92 95 91 95 -93 94 92 98 94 95 93 97 95 92 91 93 95 93 94 93 93** 90 92 94 92** 93** 90 95 94 94 92 1 112,0 112.0 1.1.9.0 112.0 112.0 112,0 112.0 110.0 110,0 110.0 11.0.0 110.0 1.10.0 11.0.0 110.0 110.0 110.0 110.0 110.0 119.0 119.0 112.0 11.2.0 112.0 112.0 112.0 112 112.0 112,0 112.0 11.2.0 112.0 112.0 110.0 110.0 110.0 110.0 $ladders Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture IRelativeMaximum In PlaCc In Place Compaction I Density 1E 08-10-05 Club House 987.0 1.01..9 14.8 93 110.0 2E 08-10-05 Club House 989.0 104.8 13.9 95 110.0 3E 08-10-05 i Club House 987.0 1.00.2 i 18.1. 91 110.0 4E ; 08-10-05 Club House 989.0 100.3 14.4 91 11.0.0 5E 08-10-05 Club House 987.0 104.0 16.1 95 110.0 6E 08-10-05 Club House 989.0 1.01.4 13.2. 94 110.0 7E 08-10-05 Club House .987.0 102.9 17.8 94 110,0 8E 08-10-05 Club House 989,0 100,2 1.6.5 91 110.0 9E 08-10-05 Club House 987.0 101.8 18.2 93 110.0 10E 08-10-05 Club House 989.0 104.2 11.7 95 110.0 11E 08-10-05 Club House 987.0 103.1 15.1 94 110.0 12E 08-10-05 Club House 989.0 102.4 15.7 93 110.0 1557 08-11-05 Lot 88 B Front 982.5 103.9 i 10.6 93 112.0 15581 08-11-05 I Lot 88 B Back 983 101.6 11.5 91. 112.0 1559 08-11-05 Lot 8813 Front 984 105.8 9.6 94 112.0 15601 08-11705 Lot 88 B Back 984.5 107.7 9.2 96 112.0 1561 08-11-05 i Lot 96 B Front PC 106.0 8.8 95 1.12.0 15621 08-11-05 ± Lot 96 B Center PC 104.4 12.4 93 ! 112.0- 12.0-1563! 1563 08-11-05 Lot 96 B Back PG 108.1 9.2 97 ; 112.0 156.408-1.1-05 , i Lot 97 B Front PC 102.3 10.6 91 112.0 1565 08-11-05 Lot 97 B Back PC 105.1 13.0 94 112.0 15661 08-1.1-05 Lot 97 B Center PC I 107.4 11.8 96 1.12.0 1567; 08-11-05 Lot 98 B Front PC i 108.8 9.0 1 97 112.0 1568 08-11-05 Lot 98 B Center PC 105.3 I 13.1 94 112.0 1569 08-11-05 Lot 98 8 Back PC i 104.7 10.4 1 93 112.0 15701 08-11-05 Lot 68 B Front 971 93.5 I 17.1 83" 112.0 15711 08-1I-05 Lot 68 B Back 970,5 94.3 I 1.8.9 84" 112.0 15721 08-11-05 I.,ot 69 B Front 972 96.5 j 19.4 86* 112.0 1573 08-11-05 Lot 69 B Back 971.5 1 95.1 ! 18.5 85* 112.0 A 08-11.-05 Lot 47 B Back 987,0 99,6 10.9 91 110.0 B ; 08-11-05 i Lot 47 B Back 989.0 100.7 ' 13.1 ' 92 110.0 C I 08-11-05 j Lot 48 B Back 989.0 102.3 14.7 93 110.0 D 08-11-05 Lot 48 B Back 989.0 105.1 12.8 95 110.0 1 F 08-11-05 I Club House 991.0 105.3 13.7 95 110.0 2F 08-11-05 Club House 991.0 1.05.9 18.5 96 110.0 3F 08-11-05 Club House 991.0 104.5 13.5 95 110.0 4F 08-11-05 Club House 991.0 1.02,1 1.0.9- 93 110.0 5F 08-11-05 Club House 991.0 103.4 11.7 94 110.0 6F 08-11-05 Club I -louse 991.0 100.7 1.3.4 92 11.0.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: 'La Quinta, California REPORT NO: 06-02-1.20 Test No.'Date Date Tested Location Elevation Dry Density % Moisture Relative Maximum I I In Place Compaction I Density 1C i 08-12-05 Club House 2G 08-12-05 Club House 1 3C 08-12-05 Club House 4G 08-12-05 Club House 5G 08-12-05 Club House 1H 08-13-05 Club House 2H 08-13-05 Club House 3i -i 08-13-05 Club House 4H 08-13-05 Club House 5H I 08-13-05 Club House 6H b8-1.3-05 Club House 7H 08-13-05 Club House A 08-15-05 Lot 48 B Back B 08-15-05 Lot 48 B Back C 08-15-05 Lot 47 B Back D 08-15-05 Lot 47 B Back E 08-15-05 Lot 72 F 08-15-05 Lot 72 G 08-15-05 I Lot 71 ` H 08-15-05 i Lot 71 1 08-1.5-05 ; Lot 70 J 08-15-05 Lot 70 K 08-1.5-05 ! trot 69 L 08-15-05 Lot 69 M I 08-15-05 Lot 68 N 08-15-05 Lot 68 i AA 08-16-05 Lot 60 Front 1313 08-16-05 Lot 59 Front CC 08-16-05 ', Lot 58 Front DD 08-16-05 Lot 57 Front EE 08-16-05 Lot 56 Front FF 08-16-05 Lot 55 Front GG 08-16-05 Lot 54 Front HH 08-16-05 Lot 54 Back Il 08-16-05 Lot 54 Back i j 08-1.6-05 Lot 56 Sack KK 08-16-05 I Lot 57 Back LL I 08-16-05 Lot 58 Back DATE: March 2, 2006 993.0 105.3 14.0 95 110.0 995,0 103.2 13.2 94 110.0 993.0 103.9 13.8 95 110.0 995.0 101,7 12.7 93 , 110.0 993.0 107.9 11.3 98 110.0 993.0 103.1 I 10.2 94 110.0 995.0 105.2 12.1 95 110.0 993.0 105.4 13.8 95 110.0 995.0 103.6 12.1 95 110.0 993.0 103.1 15.2 94 1.1.0.0 995.0 101..9 13.7 93 110.0 995.0 104.4 17.1 95 11.0.0 991.0 I 102.5 12.1 93 110,0 993.0 ± 104.6 11.9 95 110.0 991.0 106.2 152 96 110.0 993.0 105.9 14.6 95 1.10.0 990.0 108.1 17.8 98 11.0.0 972.0 105.2 15.1 95 I 110.0 970.0 104.5 20.5 95 110.0 972.0 105.1 18.2 94 110.0 970.0 100.4 22.1. i 91 110.0 972.0 105.7 19.8 I 95 1.1.0.0 971.0 100.9 1.6.9 1 92 1 110.0 973.0 102.3 17.2 I 93 I 11.0.0 971.0 1082 20.1 98 110.0 973.0 106.4 15.9 i 96 I 110.0 977 99.6 I 15.7 91 110.0 977 1.05.6 1.5.8 ; 96 110.0 977 104.3 11.9 95 110.0 979 101.8 16.3 93 110.0 974 108.8 14.7 99 110.0 979 152.4 20.'1 93 1.10.0 979 102.9 17.2 94 110.0 979 103.6 16.1 95 110.0 979 105.2 1.5.5 95 110.0 979 102.1 17.3 93 . 110.0 979. 101.2 92 110.0 977 99.3 13.4 90 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. ! Date Tested Location Elevation Dry Density % Moisturc Rclativc I Maximum I Tn Place In Place Compaction Density MM 08-16-05 Lot 59 Back 977 105.1 11.9 95 110.0 NN 08-16-05 Lot 60 Back 977 103.2 15.2 94 110.0 00 08-1.6-05 I Lot 47 Back 995 102.1 13.6 93 110.0 PP 08-16-05 Lot 48 Back 995 104.3 12.9 95 110.0 QQ 08-17-05 Lot 68 Back 974 108.3. 11.2 98 110.0 RR 08-17-25 Lot 68 Back 976 103.2 14.4 94 11.0.0 SS 08-17-05 Lot 70 Back 975 100.8 13.2 92 110.0 TT 08-17-05 Lot 70 Back 977 101.7 15.7 93 71.0.0 UU 08-17-05 Lot 72 Back 975 102.1 16.3 j 93 110.0 VV 08-17-05 Lot 72 Back 933 105.9 15.2 1 96 110.0 W W 08-17-05 Lot 74 Back 975 104.2 I 18.1 95 110.0 XX 08-17-05 Lot 74 Back 977 102.0 17.4 I 93 1 110.0 YY 08-17-05 Lot -75 Back 974 103.5 15.7 95 110.0 ZZ 08-17-05 Lot 75 track 976.0 100.4 13.2 91 110.0 AAA! 08-17-05 I Lot 76 Back 973.0 105.2 I 16.7 95 1.1.0.0 BBB 1 08-17-05 i Lot 76 Back 975.0 1.02.1 14.8 93 110.0 CCC 08-19-05 Lot 83 Back 971.0 100.5 17.5 92 110.0 DDD 08-19=05 Lot 84 Back 972.0 101.6 1.8.5 93 110.0 EEE 08-19-05 Lot 85 Back 972.0 ! 103.2 19.2 94 11.0.0 FFF 08-1.9-05 Lot 86 Back 972.0 104.0 20.4 95 110,0 GGG 08-19-05 Lot 87 Back 973.0 102.4 16.9 93 ' 110.0 HHH! 08-19-05 Lot 75 A 965.0 94.4 18.7 90 ' 110.0 111 08-19-05 j Lot 75 A 967.0 1.01.7 I 17.2 � 93 i 110.0 JJJ 08-19-05 Lot 75 A 965.0 106.3 18.4 , 96 110.0 KKK; .08-19-05 ' Lot 75 A 967.0 700.8 22.1. 92 110.0 LLL I 08-19-05 Lot 80 B 971.5 100.7 1 1.9.5 92 110.0 MMA 08-19-05 Lot 88 B 973.5 102.3 - 19.2 93 110.0 NNN 1 08-19-05 Lot 81 B 971.5 101.3 20.1 92 i 110.0 Owl 08-19-05 I Lot 816 973.5 104.6 1 17.8 95 ! 110.0 PPP 08-19-05 Lot 82 B 971.0 102.9 19.2 94 110.0 QQQ , 08-19-05 Lot 828 973.0 100.1 I 20.4 91 110.0 RRR 08-20-05 Lot 75 A 969 102.6 7.493 110.0 SSS 08-20-05 Lot 75 A 969 104.0 7.7 95 110.0 . 'I'l-'r - 08-20-05 Lot 75 A PG 105.1 1 6.9 96 110.0 UUU 08-20-05 Lot 75 A PG 102.8 7.3 93 1 110.0 A 08-22-05 Lot 83 B Back 973.0 108.2 13.2 98 110.0 B 08-22-05 Lot 84 B Back 974.0 1.14.3 19.3 95 i 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: Ira Quinta, California PROJECT NO: 522-4810 REPORT NO: 0"2-120 Test No. I Date Tested I Location Elevation Dry Density In Place % Moisture I In Place Relative I Compaction I Maximum I Dewit C 08-22-052 Lot 85 B Back 974.0 102.9 17.7 94 110.0 D 08-22-05 Lot 86 B Back 974.0 105.2 16.9 95 110.0 E 08-22-05 Lot 87 B Back 975.0 100.9 18.2 92 110.0 1574 08-23-05 Lot 35 13Front 989 I 103.4 8.8 94 j 110.0 1575 08-23-05 Lot 35 B Front 991 101.5 9.9 92 ! 110.0 1576 08-23-05 i Lot 36 B Front 990 101..4 12.5 92 110.0 1577 08-23-05 Lot 36 B Front 992 105.0 10.7 95 110:0 1578 08-23-45 1 Lot 35 B Back 984 ! 1.0.4.3 1.0.2 95 110.0 1579 08-23-05 Lot 35 B Back 986 102.2 11.7 93 110.0 1580 08-23-05 Lot 36 B Back 984 100.8 9.1 92 110.0 1581 08-23-05 Lot 36 8 Back 986 i 104.5 8.4 95 110,0 1582 08-23-05 Lot 35 B Front 993 106.7 8.9 97 110.0 1583 08-23-05 Lot 3511 Front 995 103.3 10.4 94 110.0 1584 08-23-05 Lot 36 B Front 994 101.0 7.9 92 110.0 1585 08-23-05 Lot 36 B Front 996 105.4 9.2 96 110.0 1586 08-23-05 Lot 35 B Back. 988 104.6 .11.8 95 110.0 1587 08-23-05 Lot 35 B Back 990 100.9 10.6 93 110.0 1588 08-23-05 Lot 36 B Back 988 102.3 10,4 93 1.10.0 1589 08-23-05 Lot 36 B Back 990 101.7 i 9.0 92 110.0 A 08-23-05 Lot 77 B Back 966.0 107.1 .12.6 I 97 110.0 B 08-23-05 Lot 77 B Back 968.0 105.4 16.2 95 1.10.0 C 08-23-05 Lot 75 B Back967.5 98.1 22.9 j 89* 110.0 D 08-23-05 Lot 75 B Back 967.5 98.1 ; 22.9 89" 110.0 E ! 08-23-05 Lot 76 B Back 967.0 107.8 i 18.2 ! 97 110.0 F 08-23-05 Lot 76 B Back 969.0 101.2 j 16.7 92 110.0 C 08-23-05 Lot 7711 Back 966.0 -105.9 17.2 I 95 I 110.0 H 08-23-05 Lot 77 B Back 968.0 103.1 15.1 94 110.0 15901 08-24-05 I Lot 34 B Front 992 103.3 8.6 94 110.0 1591; 08-24-05 i Lot 34 B Front 993.5 102.1 10.5 93 110.0 1592; 08-24-05 Lot 34 B Back 985 1.06.0 9.4 96 `� .17.0.0 1593108-24-05 Lot 34 B Back 987 103.9 8.8 94 I 110.0 1594 08-24-05 Lot 35 B Front 996 105.5 12.1 96 17 0.0 15951 08-24-05 'Lot 35 B Front 997 104.4 11.3 95 I 110.0 15961 08-24-05 Lot 36 B Back 992 106.9 10.0 97 110.0 3.597 08-24-05 Lot 36 B Back 994 102.8 13.5 93 110.0 1598 08-24-05 ! Lot 34 B Back 988.5 100.7 11.0 92 110.0 1599 08-24-05 I Lot 34 B Back 990.5 102.5 9.5 93 110.0 1600 08-24-05 I Lot 34 8 Back 992 105.8 8.7 96 110.0 1601 08-24-05 Lot 34 B Back 993 104.0 10.4 95 110.0 DATE: March 2, 2006 Sladden Engineering TEST. RESULTS PROJECT NAME: Madison Club LOCATION: La Quints, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No.I + Date Tested I Location Elevation I Dry Density I % Moisture I Relative Maximum In Place in Place Compaction Density 1602 08-25-05 Lot 3413 Front 1603 08-25-05 Lot 34 B Back 1604 08-25-052 Lot 35 B Front 1605 08-25-05 Lot 35 B Back 1606 08725-05 Lot 36 B Front 1607 08-25-05 Lot 36 b Back 1608 08-25-05 Lot 35 B Back A 08-25-05 . Lot 66 B Back B 08-25-05 Lot 66 B Back C 08-25-05 Lot 64-B Back D 08-25-05 Lot 64 B Back E 08-25-05 Lot 65 B Back F 08=25-05 Lot 6513 Back G 08-25-05 Lot 64 B Back H 08-25-05 Lot 64 B Back 1 I 08-25-05 Lot 66 B Back J 08-25-05 Lot 66 B Back K 08-25-05 ! Lot 65 8 Back L 08-25-05 Lot 65 B Back M. 08-25-05 Lot 67 B Back N 08-25-05 Lot 67 BBack O 08-25-05 j Lot 67 B Back P 08-25-05 Lot 67 B Back 995 994.5 998 992 997.5 996 99.4 997.0 999.0 978.0 980.0 977.0 979.0 978.0 980.0 977.0 979.0 979.0 979.0 976.0 978.0 976.0 978.0 1609 ! 08-26-05 Lot 33 B Center 992 1610 08-26.05 Lot 3413 Center 99.4. 1611 08-26-05 i Lot 35 B Center 994 1612: 08-26-05 Lot 36 B Center 995 1613i -26-05 Lot 34 B Back 995.5 16141 08-26-05 Lot 35 B Back 995.5 1615; 08-26-05 Lot 35 B Back 997 1616! 08-26-05 Lot 36 B Front 998.5 16171 08-26-05 Lot 36 B Back 997.5 1618i 08-26-05 Lot 75 B Front 966 1619' 08-26-05 Lot 75 B Front 968 1620 08-26-05 Lot 76 B Front 966 1.621 I 08-26.05 Lot 76 B Front 968 1622 1623 1624 08-29-05 08-29-05 08-29-05 DATE: Marcb 2, 2006 I.,ot 55 B Flack Lot 55 B Back Lot 58 B Back 1.00..4. 102.3 105.1 103.6 107.1 104.0 105.5 104.1 1.01..2 106.3 102.9 103.7 104.2 109.0 101.4 '103.9 106.2 101.3 105.3 105.1 102.4 104.7 101.8 101.1 102.5 105.3 101.7 '103.6 100.1 101.8 106.1. 104.0 101.3 94.5 103.3 102.0 9.1 13.7 11..0 9.0 8.6 10.4 12.6 13.2 14.9 15.6 12.9 13.9 15.2 13.9 17.2 19.5 14.7 17.0 1.3..4 13.9 13.0 13.6 11.9 11.3 14.1 12.4 11.3 10.0 8.3 13.4 13.2 12.5 16.9 20.4 15.5 14.3 981.0 108.2 15.5 983 102.5 14.9 979.5 105.4 19.2 91. 110.0 93 110.0 96 110.0 94 110.0 97 110.0 95 110.0 96 110.0 95 11.0.0 92 110.0 96 110.0 94 110.0 93 110.0 95 i 110.0 99 { 11.0.0 92 ! 110,0 95 110.0 96 110.0 92 110.0 95 110:0 95 1.10.0 93 110.0 95 110.0 93. 110.0 92 110.0 93 116.0 96 11.0.0 92 11.0.0 94 110.0 91 110.0 93 I 1.1.0.0 96 110.0 95 I 110.0 90 I 112.0 84* ' 112.0 92 112.0 91 11.2.0 91 11.9.0 92 112.0 94 112.0 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club LOCATION: La Quinta, California PROJECT NO: 5221810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry DensityI 1n Place % Moisture in ?lace Relative CO action Maximum Density 1625 08-29-05 Lot 58 B Back 981.5 105.6 16.7 94 112.0 1626 08-29-05 Lot 54 B Back 981 103.8 16.0 93 112.0 16271 08-29-05 Lot 54 B Back 983 103.4 15.3 92 112.0 16281 08-29-05 Lot 53 11 Front 980 106.5 14.7 93. 112.0 1629! 08-29-05 Lot 53 Front 982.0 102:3 17.3 91 112.0 16301 08-29-05 Lot 56 B Front 981 108.9 .16.5 92 1.19.0 1631; 08-29-05 Lot 56 B Front 983 107.6 13.2 ' 96 112.0 16321 08-29-05 Lot 57 B Front 981 1.0.4.8 15.1 I 94 112.0 1633 08-29-05 Lot 57 B Front 983 103.4 12.0 i 92 112.0 16341 08-29-05 Lot 54 B Front 781 107.2 i 11.6 96 1.12.0 16351 08-29-05 Lot 54 B Front 983 105.6 13.1 I 94 112.0 1636 i 08-29-05 Lot 55 B Front 981. 104.0 13.8 93 1.12.0 16371 08-29-05 Lot 55 B Front 983 105.3 12.6 94 112.0 1638! 08-29-05 Lot 58 B Front 980 103.3 10.9 92 112.0 16391 08-29-05 ' Lot 58 B Front 982 ( 101.5 1.2.4 91 112.0 1.6.40; 08-29-05 I Lot 56 B Back 981 i 108.0 11.3 93 112.0 1641 08-29-05, Lot 56 B Back 983 106.1 1.5.0 95 112.0 1642 ` 08-29-05 ' Lot 57 B Back 980 105.5 14.4 94 112.0 16431 08-29-05 Lot 57 B Back 982 104.7 11.9 93 i 112.0 1644 08-30-05 Lot 53 B Back 984 105.9 16.6 96 110.0 1645 08-30-05 Lot 54 B Back 985 106.5 12.5 96 ! 110.0 1646 08-30-051 Lot 55 8 Back 985 108.9 9.8 99 i 110.0 1647: 08-30-05 Lot 56 B Back 984.5 102.3 15.2 93 110.0 1648' 08-30-05 Lot 57 8 Back 984.0 104.2 13.9 95i 110.0 1649 08-30-05 Lot 58 B Back 983.0 107.3 17.1 97 ; 110.0 1650 08-30-05 Lot 59 B Back 979.0 i 1.03.1 16.4 94 110.0 1651 08-30-05 Lot 59 B Back .981.0 100.8 11.9 92 110.0- 10.0-1.652 1.652! 08-30-05 Lot 60 B Back 979.0 105.2 13.7 95 110.0 1653; 08-30-05 Lot 60 B Back 981.0 , 103.4 15.5 94 110.0 1654 08-30-05 Lot 35 B Front 999 ( 104.1 14.3 93 112.0 1655 08-30-05 Lot 36 B Front 999.5 f 106.8 15.2 95 1.12.0 16561 08-30-05 Lot 35 B Back 998 102.2 13.1 I 91 112.0 1657 08-30-05 Lot 35 B Back 999 i 101.3 11.8 90 112.0 1658 08-30-05 Lot 36 B flack 998.5 105.1 13.3 I 91 112.0 1659 08-30-05 Lot 36 B Back 1000 I 103.0 14.7 92 112.0 1660 08-31-05 Lot 59 B Front 982.0 103.2 12.8 94 110.0 1661 08-31-05 Lot 59 B Front 984.0 102.3 15.5 93 110.0 1662 08-31-05 Lot 60-B Front 982.0 106.8 10.9 95 110.0 1663 08-31-05' Lot 60 B Front 984.0 102.4 11.2 93 i 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation Dry Density i % Moisture I Relative I Maximum In Place I In Place Comnaction I Densitv 1664 1665 1666 1667 1668 1669 1670 1671 1672 1673 1674 1675 1676 1677 1678 1679 1680 1681 1682 16831 1.6841 1685, 16861 1687; 16881 1689 16901 16911 1692 1.693 1694 1695 1696 1697 1698 1699 1700 1701 1.702 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31.-05 08-31-05 08-31-05 08-31-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 09-01-05 69-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-65 09-07-05 09-07-05 09-07-05 DATE: March 2, 2006 Lot 64 B Center Lot 61. 8 Center Lot 61 B Center Lot 59 B Back Lot 59 B Back Lot 60 8 Back Lot 60 B Back Lot 31 8 Front Lot 31 B Back Lot 32 li Front Lot 32 B Back 975.0 977.0 979.0 982.0 984.0 982.0 984.0 993 995 993.5 995 104.9 103.2 106.4 102.2 105.6 104.3 106.8 101.3 100.4 102.5 101.8 Lot 60 B Front 985.0 102.7 Lot 61 B Front 981.0 99.1 Lot 61 B Front 983.0 107.6 Lot 62 B Front 978.0 100.4 Lot 62 B Front 980.0 103.3 Lot 63 B Front 979.0 1.00.2 Lot 63 B Front 981.0 104.2 Lot 64 B Front 981..0 165.4 Lot 64 B Front 983.0 106.9 Lot 64 B Back 980.0 103.7 Lot 64 B Back 982 103.2 Lot 63 B Back 979 I 101.4 Lot 63 B Back 981.0 1.07.2 Lot 62 B Back 979.0 I 100.2 Lot 62 B Back 981.0 I 105.8 Lot 61 B Back 981.0 103.6 Lot 61 B Back 985.0 i 102.9 Lot 103 B Front PC I 107.1 Lot 103 B Center PC ' 105.4 Lot 103 B Back PC 104.3 Lot 104 B Front PC 106.0 Lot 1.04 8 Center PC 103.3 Lot 104 B Back PC 104.5 Lot 60 B Front 986 107.3 Lot 60 B ;Back 985.5 1.03.5 Lot 60 B Center 986 103.7 Lot 61 B Front 986 104.5 Lot 61 B Back 985.5 101.3 13.8 15,2 14.7 15.8 11.9 14.3 113.6 8.1 7.6 9.3 8.4 15.4 17.7 14.6 12.8 17.4 1.3.7 13.3 15.2 16.3 14.4- 15.2 13.9 16.3 15.4 14.6 15.9 15.3 8.8 10.2 9.7 10.5 8.7 8.1 9.9 12.5 13.4 11.2 1.4.1. 95 94 96 93 96 95 97 92 91 93 93 94 90 98 91 94 91 95 95 97 95 94 92 97 91 96 95 94 96 94 93 95 92 93 96 92 93 93 90 110.0 110.0 110.0 .1.1.0.0 110.0 :10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club PROJECT NO; 5224810 LOCATION: La'Quinta, Califciniia REPORT NO: 06-02-120 Test No.Date Tested Location Elevation' Dry Density I % Moisture I Relative + Maximum In Place In Place Comnaction I Ilensiry 1703 09-07-05 Lot 613 Center 1704 09-07-05 Lot 62 6 Front 1705 09-07-05 Lot 62 B Back 1706 09-08-05 Retest # 1104 1707 09-08-05 Retest # 1.1:15 1708 09-08-05 Retest # 1105 1709 09-08-05 Lot 108 B Front 1710 09-08-05 Lot 108 is Back 171.1' 09-08-05 I Lot 112 5 Front 104.3 983 I 17121 .09-08-05 Lot 112 9 Back 1713; 09-08-05 Lot 113 B Front 17141 09-08-05 I Lot 113I Front 1715 09-08-05 Lot 113 B Back 1716 09-08-05 Lot 113 B Back 1717 09-08-05 Lot 114 B Front 1.718 09-08-05 Lot 114 E Back 1719 09-08-05 Lot 116 F Front 1720 09-08-05 Lot 116 E Back 1721 09-08-05 Lot 106 E. Front 1722 09-08-05 Lot 106 k. Center 1723 09-08-05 Lot 1061? Back. . '1724 09-08-05 1 Lot 107 B Front 1725! 09-08-05 Lot 107 B Back 1726; 09-08-05 Lot 108 9 Front 1727! 09-08-05 I Lot 108 1] flack 1728 09-08-05 I Lot 108 B Center 1729 09-08-05 i Lot 109 B Front 1730 09-08-05 ': Lot 109 S Back 1731 09-08-05 I Lot 110 B Front 1732 09-08-05 Lot 110 t3 Back 1733 09-08-05 Lot 113 B Front 1734 09-08-05 Lot 113 B Back 1735 I 09.08-05 Lot 113 B Center 1 Contour Grading 17361 09-12-05 Per Plan 17371 09-12-05 Per Plan 17381 09-1.2-05 Per Plan 17391 09-12-05 Per Plan 17401 09-12-05 Per Plan DATE: March 2, 2006 985.5 1 103.5 983 105.5 983.5 101.0 103.4 104.6 101..9 980 100.8 980 102.6 981 105.5 981 105.2 979 104,3 981 103.1 979.5 1.00.6 981.5 1.06.1 983 104.3 983 104.1 979 96.3 979 95.1 PG I 107,2 PC i 105.3 PG 106.5 PG 104.1 PC 102.6 PG ( 101.4 PC 105.5 PG 103.7 PG 103.4 PC 106.6 PG 107.7 PCS 106.3 PC 1.08.5 PC 105.3 PC 106.9 980 980 979.5 980 979.5 100.4 108.1 95.7 96.3 103.5 12.6 11.2 10.7 9.0 10.3 8..7 8.5 10.6 1.1..3 9.4 12.2 11.0 13.3 8.3 12.7 1.0.9 5.4* 4.63* 8.1 11.4 9.9 8.8 7.9 10.7 13.0 :1.1..8 10.9 9.4 7.8 8.4 89 10.5 9.8 12.3 9.6 10.3 12.8 1'1.1 92 94 90 92 93 91 90 92 94 94 93 92 90 95 93 93 86* 85* 96 94 95 93 92 91 94 93 92 95 96 95 97 94 95 90 97 85* 86* 93 112,0 112.0 1.12.0 112.0 112.0 112,0 112.0 11.2.0 { 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 I 11.2.0 112,0 112.0 112.0 112.0- 112.0 112.0 112.0 112.0 112.0 112.0 112,0 112.0 112.0 112.0 112.0 112.0 .112.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation I Dry Density I % MoistureI Relative Maximum In Place In Place Comvaction Densitv 1741 1.742 1743 1744 1745 1746 1747 1748 1.749 1750 1751 1752 1753 1754 1755 1756 1757 1758 1759 1760 1761 1762 1763 1.764 1765 1766 1767 17681 1.7691 17701 17711 1772! 1.773 1774 1775 1776 1777 1778 1779 09-12-05 09-12-05 09-12-05 09-12-05 09-12-05 09-12-05 09-12-05 09-13-05 U9-13-05 09-13-05 09-1.3-05 09-13-05 09-13-05 09-1.3-05 09-13-05 U9-13-05 09-13-05 09-13-05 09-13-05 09-13-05 i 09-13-05. i 09-13-05 09-13-05 09-13-05 09-13=05 09-13-05 09-13-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 09-14-05 Per Plan Retest # 1719 Retest #1720 Lot 116 B Front Lot 11613 Back Lot 116 B Center Lot 50 B Front Lot 50 5 Front Lot 49 B Back Lot 4913 Back Lot 50 B Back Lot 50 B Back Lot 49 B Front Lot 4613 Front Lot 87 B Front Lot 87 B Back Lot 86 8 Front Lot 86 B Back Lot 85 B Front Lot 85 B Back Lot 84 B Front Lot 84 B.Back T-ot 83 B Front Lot 83 B Back Lot 82 B Front Lot 81 B Front Lot 80 8 Front Retest N 1738 Retest # 1739 Per Plan Per Plan'; Per Plan Per Plan Per Plan Per Plan Per Plan Per Plan' Per Plan Per Plan 980.5 104.0 10.2 93 1.03.2 8.4 I 92** 101.5 8.9 i 91 PC 106.3 1.1.4 95 PG 104.7 13.5 93 PC 104.1 12.6 93 985 104.6 9.8 93 987 104.8 12.3 94 986 106.3 10.5 95 988 1035 13.2 92 985 107.1 11.3 96 987 102.9 14.0 92 982.5 105.7 13.4 94 987.5 103.5 11.1 92 PG 102.8 9.3 92 PG 104.0 8.8 93 PG 106.4 10.5 95 PG 105.5 9.1 94 PC 103.3 12.1 92 PG 107.1 8.7. 96 PC 101.8 8.5 91 PG 104.6' 10.4 I 93 PG 100.8 9.3 90 PC 101..4 I 9.9 91 PG 96.5 ! 12.2 i 83* PG 97.1 i VIA 89' PG 95.4 1.0.2 85" i 104.1 14.4 93 101.5 11.5 91 981.5 101.6 12.4 91 982 105.5 12.9 94 982 103.7 10.7 93 983 100.9 ` 15.1 90 983.5 105.4 14.2 94 983.5 102.7 10.7 92 984. 107.1 12.0 96 983.5 105.3 1.4.1 94 984 104.0 16.7 93 983.5 102.3 12.5 91 1.12.0 112.0 112.0 112.0- 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.30 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 . 1.1.2.0 112.0 DATE, March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522.4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elcvation Dry Density In Place % Moisture In Place Relative compaction Maximum Dcnsity 1780 09-15-05 Lot 77 B Front 969 103.4 11.5 92 112.0 1781 09=15-05 Lot 77 B Back 969 105.1 9.6 94 112.0 1782 09-15-05 Lot 76 B Front 970 101.8 1 13.5 91 112.0 1783 09-15-05 Lot 76 B Back _ 969.5 102,1 i 10.7 91 1.1.2.0 1784 09-15-05 Retest # 104.3 15.1 93 112.0 1785 09-15-05 Lot 75 B Front 970 100,9 i 14.0 90 11.2.0 1786; 09-15-05 Retest # D 8/23/05 103.3 12.8 92 112.0 17871 09-15-05 Retest# D 8/23/05 1.05.5 I 16.5 94 112.0 1788 i 09-15-05 Lot 75 B Back 969.5 107.2 11.8 96 112.0 17891 09-15-05 Lot 74 B Front 970.5 1.03.4 14.9 92 112.0 1.790 i 09-15-05 Lot 74 B Back 970.5 101.1 12.8 90 112.0 1791; 09-15-05 Lot 73 B Front 971.5 106.6 1.3.3 95 112.0 1792; 09-15-05 Lot 73 8 Back 971.5 104.0 10.6 93 112,0 17931 09-15-05 Lot 72 B Front 973.5 108.1 11.3. 97 112.0 17941 09-15-05 Lot 72 B Back 973.5 106.2 9.7 95 112.0 1795 09-15-05 Lot 77 B Front PG 10.8 125.0 93 112.0 17961 09-15-05 Lot 77 B Back ['C 1.06.9 10.7 95 1.12.0 179711 09-15-05 Lot 77 B Center PG 102.6 11.1 92 112.0 '1798 09-16-05 Lot 70 B Back ['G 113.0 11.5 95 119.0 1799, 09-16-05 Lot 70 B Center PG 113.4 9.9 95 119.0 1800 09-16-05 Lot 71 B Back PG 116.3 9.4 i 98 119.0 1801 09-16-05 Lot. 71 Center PC 1.12.8 12,3 95 119.0 1802 09-16-05 Lot 71 B Front PG 116.1 10.2 98 119.0 18031, 09-16-05 Lot 72 B Front PC 111.8 8.7 94 119.0 18041 09-1.6-05 1.ot 72 B Center PG 107.1 10.6 90 112.0 18051 09-16-05 Lot 72 B Back PC 114.0 8.8 ; 96 I 119.0 1806 j . 09-16-05 Lot 73 B Back PC 106.3 1.3.4 95 112.0 .1.807' 09-16-05 Lot 73 13 Center PG 115.9 11.0 97 19.0 1808 I 09-16-05 Lot 73 B Front PG 117.3 12,7 99 11.9.0 1809 09-16-05 Lot 74 B PC 112.6 9.8 95 119,0 1810 09-16-05 Lot 74 B PC 11.2.2 14,0 94 119,0 1811 I 09-16-05 Lot 74 B PC 108,1 11.1 97 112.0 1812 09-16-05 1,ot 75 B PG 107.2 8.4 96 1 112.0 1813 09-16-05 Lot 75 B PG 116.6 10.7 98 119.0 1.814 09-16-05 Lot 75 0PC 116.1. 12.4 98 ; 119,0 1815 09-16-05 Lot 76 B PG 108.3 9.6 97 112.0 1816 09-16-05 Lot 76 B PG 117.7 8.3 99 119.0 1817 09-16-05 Lot 76 B PC 114.4 10.5 96 119.0 1818 09-16-05 I Lot 21 B Front 990 100.8 11.0 90 112.0 1819 09-16-05 Lot 67 B Front PG 109.1. 9.4 92 119.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California - PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation Dry Density In Place % Moisture In Place Relative Compaction Maximum DCn City 1820 09-16-05 Lot 67 B Back PG 108.4 10.1 97 112.0 1.821. 09-16-05 Lot 6713 Center PG 107.0 9.2 96 112.0 1822 09-16-05 Lot 68 B Front PG 111.5 10.9 , 94 1.1.9.0 1823 09-16-05 Lot 68 B Center PC 113.4 8.8 95 119.0 1824 09-16-05. Lot 68 B Back PG 110.9 8.5 93 119.0 1825 09-16-05 Lot 69 B Back PG 115.1 13.1 97 119.0 1826 09-16-05 Lot 69 B Center PG 116.3 11.5 98 119.0 1827 09-16-05 Lot 69 B Front PG 113.8 12.6 96 119.0 1828 09-16-05 Lot 70 B Front PG 114.3 10.0 96 119.0 1829 09-16-05 Lot 21 B Back 898.5 102.1 13.4 91 112.0 1830 i 09-1.6-05 Lot 20 13 Front 989 1.05.3 10.6. 94 112.0 1831 09-16-05 Lot 20 B Back 989 I 101.5 11.3 91 1.1.2.0 1.832 09-16-05 Lot 19 6N Front 988.5 1.00.9 9.3 90 112.0 1833 09-16-05 Lot 19,B Back 988.5 101.4 10.7 91 1.12.0 1834 09-16-05 Lot 18 B Front 989 103.3 11.8 1� 1 92 112,0 .1835 09-16-05 Lot 18 B Back 988.5 102.2 14..1 I 91 112.0 1836 09-19-05 Lot 21 B Front 991 103.1 10.0 92 112;0 1837 09-19-05 Lot 21 B Back 991 101.6 9.6 91 i 112.0 1838 09-19-05 Lot 20 B Front 990.5 105.3 11.4 94 1.12.0 '1839 09-19-05 Lot 20 B Back 991 104.4 9.3 93 112.0 1840 09-19-05 Lot 19 B Front 990.5 101.3 12.4 90 112.0 18.41 09-1.9-05 Lot 19 8 Back 990 1.02.7 11.8 92 [ 112.0 1842 09-19-05 Lot 21 B Front 992.5 106.1 1.3.1. 95 I 112.0 1843 09-19-05 I Lot 21 B Back 992 j 103.3 10.9 92 I 112.0 .1844 09-19-05 Lot 20 8 Front 992 1.04.4 8.8. .93 1 112.0 1845 09-19-05 1 Lot 20 B Back 992.5 100.8 11.3 90 I 112.0 1846 09-19-05 Lot 19 B Front 992.5 102.0 12.9 91 i 112.0 1847 09-1905 I I Lot 19 8 Back 992 ; 104,1 12.5 93 112.0 09-20-05 Lot 21 B Front 993.5 100.5 8.1 i18481 90 112,0 18491 09-20-05 ' Lot 21 B Back 993 94.3 4.2" 84" i 112.0 1850 09-20-05 Lot 20 B Front 993 1 93.6 3.3* 84* 112.0 1851 09-20-05 Lot 20 B Back 993.5 99,1 2.9* 88* 112.0 1852 09-20-05 Lot 19 B Front 994 95.3 4.0* 85* 112.0 1853 09-20-05 Lot 19 B Back 993.5 97.1 3.6* 87* 112.0 1854 09-20-05 Lot 22 B Front 990 101.4 9.1 92 ! 1.1.0.0 1855 09-20-05 Lot 22 B Back 990 101.1 8.3 92 110.0 1856 09-20-05 Lot 23 B Front 986 103.3 10.0 94 1 110.0 1857 09-20-05 Lot 23 B Back 988 102.7 9.6 93 110.0 1.858 09-20-05 Lot 22 B Front 9915 104.1 8.0 95 1 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I I Date Tested Lgc:ation Elevation Dry Density % Moisture Relative Maximum In Place In Place I CompactionDensity 1859 1860 1861 09-20-05 09-20-05 09-20-05 Lot 22 B Back, Lot 23 B Front Lot 23 B Back 1862 09-21-05 Retest # 1863 09-21-05 Retest# 1864 09-21-05 Retest# 1865 09-21-05 Retest # 1866 09-21-05 Retest # 1867 09-21-05 Lot 21 B Front 1868 09-21-05 I Lot 21 B Back 1869 09-21-05 Lot 20 B Front 1.870 09-21-05 � Lot 20 B Back 18711 09-21-05 Lot 19 B Front 1872 09-21-05 Lot 19 B Back 1873 09-21-05 l,ot 1.7 8 Front 18741 09-21-05 Lot 17 B Back 1875, 09-21-05 T-ot 16 B Front 1876, 09-21-05 Lot 16 B Back 1877! 09-22-05 Lot 30 B Front 1878 09-22-05 Lot 30 B Front 1879. 09-22-05 Lot 30 B Back 1880 09-22-05 I Lot 30 B Back 18811 09-22-05 i Lot 31 B Front 1882 09-22-05 I Lot 31 B Front 1883, 09-22-05 Lot 31 B Back 1884 I 09-22-05 Lot 31 B Back 1885.i 09-22-05 I I..ot 30 8 Back 1.886 09-22-05 Lot 30 B Back 1887! 09-22-05 Lot 18 B Front 18881 09-22-05 Lot 18 B Back 1889 09-22-05 Lot 17 B Front 1890 09-22-05 Lot 17 B Back 1891 09-22-05 Lot 16 B Front 1892 09-22-05 Lot 16 B Back 1893 1894 1895 1896 09-23-05 09-23-05 09-23-05 09-23-05 Lot 17 Front Lot 17 Front Lot 18 Front Lot 18 Back 991 987.5 989 994.5 995 995 994.5 995 995 989 989.5 989.5 990 993 995 990 992 995 996.5 997 . '998 994 996 990.5 990 990 99,0.5 990.5 991 989.6 990.0 991.5 995.4 101.6 94.0 94.1 102.6 105.3 104.7 100.8 143.0 95.1 96.5 94.1 97.2 93.1 97.3 103.1 100.6 101.5 102.0 101.4 103.0 104.5 104.1 100.4 106.3 102.7 102.5 105.25 106.8 100.3 101.3 102.5 99.1 99.4. 101.0 99.9 99.2 101.2 99.5 11.3 4.5* 3.3 12.5 14.8 15.7 11.3 9.9 13.3 15.1 12.4 11.8 1.4..7 10.9 8.7 12.1 9.6 13.4 10.3 1.4.1. 13.6 12.2 8.8 11.4 15.6 14.3 1.2.1. 16.3 9.2 10.4 8.7 9.5 8.1 10.7 13.6 1.4.74 12.9 13.1 92 110.0 85* 110.0 86* 110.0 92 112.0 94 112.0 93 112,0 90 I 112.0 92 112.0 93 102.0 95 102.0 92 102.0 95 102.0 91 102.0 95 102.0 94 110.0 91 110.0 92 110.0 93 110.0 91 112.0 92 112.0 93 112.0 93 112.0 90 112.0 95 112.0 92 112.0 92 112.0 94 112.0 95 112.0 91 110.0 92 110.0 93 110.0 90 110.0 90 110.0 92 1.1.0.0 91 110.0 90 110.0 92 110.0 90 110.0 DATE: March 2, 2006. Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Tcst No, Date Testedf Location Elevation I Dry Density I % Moisture Relative Maximum In Place In Place I Comuaction I Density 1897 1898 1899 1900 1901 1902 1903 1904 1905 1906 1907 1908 1909 1910 1911 1912 1913 191.4 1915 1916 1917 1918 1919 1920 1921 1922 1923 1924 1925 1926 1927 1928 1929 1930 1931 1932 1933 1.934 09-23-05 09-23-05 09-23-05 09-23-05 09-23-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-26-05 09-27=05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 09-27-05 Lot 23 Front Lot 23 Back Lot 24 Front Lot 24 Back Lot 23 Front Lot 29 B Front Lot 29 B Front Lot 28 5 Front Lot 28 B Front Lot 29 8 Back Lot 29 B Back Lot 28 8 Back Lot 28 B Back Lot 25 B Front Lot 25 8 front Lot 25 B Back Lot 25 -B Back Lot 2613 Front Lot 26 B Front Lot 26 B Back Lot 27 B Front Lot 27:B Back Lot 9 B Front Lot 9 B Front Lot 9 B Back Lot 9 B Back Lot 10 B front Lot 10 B Front Lot 10 B Back Lot 1.0 B Flack Lot 11 B Front Lot 11 B Front Lot 11 B Back Lot '11 B Back Lot 12 B Front Lot 12 B Front Lot 12 B Back Lot 12 B Back 996.5 99 989.5 101.7 989.5 99.6 986.5 49.9 989.5 100.4 990.5 1.01.6 992 103.8. 991 104.0 992.5 100.8 990.5 1.00.4 992.5 102.0 990 i 104.3 992 101.2 . 989 101.8 991 1.03.4. 990 105.5 992 102.7 989.5 101.0 991.5 106.3 991 100.4 991.5 103.3 991 102.5 995 101.3 997 100.9 995 102.04 997 102.6 994.5 103.5 996.5 100.3 994.5 99.4 996 104.1 994.5 101.8 996 100.6 994 103.9 996 103.5 994.5 1.00.4 996.5 99.3 994.5 104.4 996 102.7 18.1 13.2 12.1 15.6 15.9 9.9 11.1 8.6 10.7 12.5 10.3 9.5 13.41 16.6 17.1 13.6 14.8 12.6 10.8 16.0 12.9 11.1 8.4 9.1 11.8 10.7 8.1 12.6 11.0 8.9 10.5 13.1 11.4 14.3 10.7 101.1 9.2 12.1 90 92 91 91 91 92 94 95 92 91 93 95 .92 93 92 96 93 92 97 91 94 93 92 92 93 93 94 91 90 95 93 91 94 94 91 90 .95 93 110.0 110.0 1.1.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 .112.0 110.0 110.0 .110.0 110.0 110.0 110.0 11.0.0 110,0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1'10.0 110.0 110.0 110.0 DATE: March 21 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tett No. I Date'I'ested Location Elevation I Dry Density % Moisture Relative I Maximum In Place In Place Comnaction rk„1;,., 1935 09-28-05 j Lot B Front 999 1936 09-28-05 I Lot 9 B Back 999 1937 09-28-05 i Lot 10 B Front 998 1938 09-28-05 Lot 10 B Back 998.5 1939 09-28-05 Lot 11 B Front 998 1940 09-28-05 Lot 11 B Back 997.5 1.9.4.1. 09-28-05 Lot 12 B Front 998 1942 1 09-28-05 Lot 12 B Back 998.5 1943: 09-28-05 Lot 25 B Front 993 1944: 09-28-05 Lot 25 B Back 994 1945': 09-28-05 Lot 26 B -Front 993.5 1946' 09-28-05 Lot 26 B Back 993 19471 09-28-05 Lot 27 B Front 993.5 19481 09-28-05 Lot 27 B Back 993 19491 09-28-05 Lot 23 B Front 990.5 1950 09-28-05 Lot 23 B Back 991.5 1951 09-28-05 Lot 24 B Front 98915 1952 09-28-05 Lot 24 B Back 988.5 1953 09-28-05 j Lot 23 B 'Front 992.5 1954. 09-28-05 Lot 23 B Back 993.5 19551 09-28-05 Lot 2411 Front 991.5 1956 09-28-05 I Lot 24 B Back 990.5 19571 09-28-05 I Lot 24 B Front 993.5 1958; 09-28-05 Lot 24 B Back 992.5 1.959 09-29-05 Lot 9 B Front 1000.5 19601 09-29-05 Lot 9 B Back 1000.5 1961 09-29-05 Lot 10 B Front, .1.000 1962 09-29-05 Lot 10 8 Back 1000 19631 09-29-05 1 Lot 11 B Front 999.5 1964: 09-29-05 I Lot 11 8 Hack 999 1965 !� 09-29-05 Lot 12 B Front 1000 1966' 09-29-05 Lot 12 B Back 999.5 1967 09-29-05 Lot 13 B Front 995 1968 09-29-05 ! Lot 13 B Back 994.5 1969 1970 1971 1972 1973 10-03-05 Lot 9 B Front 10-13-05 i Lot 9 B Back 10-03-05 Lot 10 B Front 10-03-05 ; Lot 10 B Back 10-03-05 ; Lot 116 Front DATE: March 2, 2006 1002.5 1002.5 1002 1001.5 1001 100.2 100.6 104.1 102,0 102.8 105.1 103.3 101.4 104'.3 103.0 100.6 1.01..1. 105.6 102.5 1.02.8 100.5 1.0.4..4. 101.5 106.1 105.6 102.9 104.1 100.5 102.6 105.3 102.6 1.00.3 1.03.1. 101.5 101.8 IOOS 106.6 103.9 99.4 106.1 108.2 104.7 104.3 107.5 8.1. 11.6 10.5 1.4.1. 12.7 1.1.0 9.7 1.2.5 10.6 14.4 12.7 11.1 13.6 15.1 13.8 10.9 13.6 11.3 14.5 12.7 11.8 12.8 10.0 11.9 13.1 15.7 15.4 12.8 16.3 14.0 16.8 13.0 11.7 15.9 11.0 9.8 10.6 10.4 9.5 91 91 95 93 93 96 94 92 95 94 91 92 96 93 93 91 95 92 96 96 94 95 91 93 96 93 91 94 92 93 91 97 94 90 95 97 93 93 96 110.0 110.0. 11.0.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110; 0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 .LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Dcnsity % MoistureRelative Maximum In Place In Place I Compaction I' Density 1974 10-03-05 Lot 11 B Back 1001.5 103.4 13.1 92 1.10.0 1975 .10-03-05 Lot 13 B Front 996 { 101.8 12.3 91 112.0 1976 10-03-05 Lot 13 B Back 996 � 103.9 11.2 93 112.0 1977 10-03-05 Lot 23 B Front 994.5 1.00.3 8.8 91 110.0 1.978 10-03-05 Lot 23 B Back 995.5 { 102.7 11.5 93 110.0 1979 10-03-05 Lot 24 B Front 995.5 103.8 13.7 94 110.0 1980 10-03-05 Lot 24 B Back 994.5 i 100.4 12.6 91 110.0 1981 10-03-05 Lot 25 B Front 995 99.5 14.1 90 110.0 1982 10-03-05 Lot 25 B Back 996 104.4 10.2 95 110.0 1983 10-04-05 Lot 3 A Back 993 104.3 17.1 95 110.0 1984. 10-04-05 Lot 3 A Back 994.5 100.4 12.6 91 1 110.0 19851 1.0-04-05 Lot 4 A Back 993 96.1 21.3* 87* 1 110.0 1986 10-04-05 Lot 4 A Back 995 98.4 15.1 89* 110.0 19871 10-04-05 Lot 5 A Back 995 98.1 20.6; 88* I 110.0 1988! 10-04-05 Lot 5 A Back 996 101.3 14.4 92 1 110.0 19891 10-0.4-05 Lot 6 A Back 993.5 101.6 9.1 92 � 110.0 1.990 10-04-05 Lot 6 A Back 995.5 102.9 13.4 94 i 110.0 1991 10-04-05 Lot 17 B Front 991.5 103.6 1.0.5 94. 1.1.0.0 1992 10-04-05 Lot 17 B Back 992 103.8 12.7 94 110.0 19931 10-04-05 Lot 16 B Front 992.5 19.5* 87* 110.0 19941 10-04-05 Lot 16 B Back 993 101.3 13.3 92 i 110.0 1995 10-04-05 Lot 15 8 Front 990 100.4 11.2 91 110.0 19961 10-04-05 Lot 15 B Back 990 104.1 1 12.3 I 95 ! 110.0 1997 10-05-05 Lot 3 A Back 996 96.1 I 23.4 87* 1 110.0 1998 10-05-05 Lot 3 A Back 997 97,4 17.8 84* 110.0 1999 10-05-05 Retest # 1985 100,2 I 20.1 91 1 110.0 2000 10-05-05 Retest # 1986 102.3 ! 12.9 93 110.0 2001 10-05-05 Retest # 1987 , 95.2 20.7"' 87- 110.0 2002i 10-05-05 Lot 5 A Back 996 i 96.9 1 13.5 1 88* 110.0 2003 10-05-05 I Lot 6 A Back 996.5 1 102.4 15.2 ; 93 110.0 2004 10-05-05 ; Lot 6 A Back 997.5 ; 103.5 14.3 1 94 110.0 2005 10-05-05 Lot 6 A Front 994 101.1 10.6 92 110.0 2006 10.05-05 I Lot 6 A Front 996 104.5 -9.3 1 95 110.0 2007 10-05-05 Lot 7 A Front 994 100.8 11.4 92 110.0 2008 10-05-05 Lot 7 A Front 996 96.2 9.3 87* 11.0.0 20091 10-05-05 Lot 3 A Front 994 104.4 14.4 95 110.0 20101 10-05-05 Lot 3 A Front 996 1.03.8 13.0 94 ; 110.0 2011 10-05-05 Lot 4 A Front 993.5 102.7 15.3 93 ; 110.0 2012 10-05-05 Lot 4 A Front 995.5 98.1 11.6 89* J 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-.120 Test No.I Date Tested I Location Elevation I Dry Density % Moisture I Relative I Maximum In Place In Place Compaction Dengih, 2013 10-05-05 Lot 5 A Front 994.5 104.4 14.8 2014 10-05-05 Lot 5 A Front 996.5 101.0 12.3 2015 10-06-05 Rctest 9 1997 101.8 10.3 2016 10-06-05 Retest # 1998 108.3 14.6 2017 10-06-05 Lot 4 A Back 996.5 101.4 15.1 2018 10-06-05 Lot 4 A Back 998.5 102.8 14.0 2019 10-06-05 Retest # 2001 99.5 16.1 2020 10-06-05Retest # 2002 100.3 14.3 2021 10-06-05 Lot 6 A Back 998.5 103.1 10.4 2022 10-06-05 Lot 6 A Back 1000 102.0 11,6 2023 10-06-05 Lot 7 A Back 996 104.4 13.1 2024 10-06-05 Lot 7 A Back 998 101,7 9.6 2025 10-06-05 Retest # 2012 106.9 8.8 2026 10-06-05 Lot 4 A Front 997.5 103.7 12.6 2027 10-06-05 Lot 5 A Front 997.5 103.5 11.3 2028 10-06-05 Lot 5 A Front • 998 100.1 15.4 2029 10-06-05 ! Lot'6 A Front 9975 105.2 10.7 2030 10-06-05 Lot 6 A Front 999 101.6 14.4 2031 10-06-05 i Retest # 2008 99.6 13.3 2032 1.0-06-05 Lot 7 A front 998 100.8 16.0 2033 10-07-05 Lot 3 A Back 999 101.3 8.6 2034 10-07-05 Lot 3 A Back 1001 102.4 11.5 I 2035 10-07-05 ` Lot 4 A Back 1000 99.3 10.0 2036 10-07-05 Lot 4 A Back 10011.5 I 99.2 91 2037 10-07-05 i Lot 5 A Back 998 103.6 8.9 2038 10-07-05 ( Lot 5 A Back 1000 102.8 10.7 20391 10-07-05 i Lot 6 A Back 1001.5 I 102.5 12.8 2040 10-07-05 Lot 6 A Back 1003 104.1 1110 2041 10-07-05 • Lot 7 A Back 1.000 100.6 9,9 2042 10-07-05 Lot 7 A [lack 1002 103.4: 13.0 2043 10-07-05 Lot 4 A Front 999.5 106.5 8.4 2044 10-07-05 Lot 4 A Front 1001 104.0 12.5 2045. 10-07-05 Lot 5 A Front 1000 I 104.8 11.3 2046 10-07-05 Lot 5 A Front 1001.5 101.5 13.4 2047 1.0-07-05 Lot 6 A Front 1000.5 102.6 9.7 2048 10-07-05 Lot 6 A Front 1002 100.2 9,5 2049 1.0-07-05 Lot 7 A Front 1000 I 102.4 11.1 2050 10-07-05 Lot 7 A Front 1001.5 I 99.6 10.3 DATE: March 2, 2006 95 110.0 92 110.0 93** 110.0 98** 110.0 92 110.0 93 110.0 90** 1 110.0 911t* i 110.0 94 110.0 93 110.0 95 110.0 92 110.0 97** 110.0 94 110.0 94 11.0.0 91 110.0 96 10.0 92 110.0 91** 110.0 92 110.0 92 110.0 93 110.0 90 I 110.0 90 1.1.0.0 94 110.0 93 110.0 93 110.0 95 1.10.0 91 110.0 94 110.0 97 110.0 95 110.0 95 110.0 92 110.0 93 110.0 91 110.0 93 110,0 91 11.0.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California. REPORT NO; 06-02-120 Test No. Date Tested Location Elevation ' Dry Dcnsity I % MoistureRelative Maximum In Place In Place I I Compaction Drnaity 2051 10-10-05 2052 10-10-05 2053 10-10-05 2054 10-10-05 2055 I 10-10-05 2056 10-10-05 2057 10-10-05 2058 10-11-05 2059 10-11-05 20601 10-11-05 20611 10-11-05 20621 10-11-05 2063 10-11-05 2064! 10-11-05 2065: 10-11-05 20661 10-11-05 2067E 10-11-05 2%8' 10-11-05 2069' 10-11-05 2070' 10-11-05 20711 10-11-05 2072 10-11-05 2073, 10-11-05 2074 10-11-05 2075 10-11-05 13.5 1002.5 20761 10-11-05 2077! 10-11-05 20781 1.0-12-05 2079: 10-12-05 2080 10-12-05 20811 10-12-05 2082'. 10-12-05 2083 10-12-05 20841 10-12-05 2085 10-12-05 2086i 10-13-052 20871 10-13-05 2088 10-13-05 DA'Z'E: March 2, 2006 Lot A Back Lot A Back Lot5 A Back Lot 117,B Front Lot 117 B Back Lot 11.8 8 Front Lot 118 B Back Lot 3 A Back Lot 4 A Back Lot 5 A Back Lot 4 A Front Lot 3 A Front Lot A Back Lot? A Back Lot A Front Lot 6 A Front Lot 7 A Front Lot 3 A Front Lot 4 A Front Lot 5 A Front Lot A Front Lot 7 A Front Lot 3 A Back Lot 4 A Back Lot 5 A Back Lot 6 A Back Lot 7 A ,Back Parking Lot Parking'T.ot Parking Lot Parking Lot Parking Lot Parking Lot Parking Lot Parking Lot Lot A Lot B Lot C 1002 104.5 11.9 1002.5 1.01..6 14.8 1001.5 101.8 15.3 974 92.3 17.1* 974 93.4 18.9* 973.5 91.8 20.4* 973 i 95.0 21.3* 1004 115.9 12.0 1004.5 103.8 13.1 1005 101.4 14.6 1004.5 100.1 11.8 1004 106.0 11.4 1005.2 109.7 8.8 1004.5 104.1 12.9 1005 105.3 10.6 1005.5 j 103.4 14.1 1004.5 j' 103.8 13.5 1002.5 I 105.4 , 13.5 1003 102.6 ' 11.8 1003 106.3 14.1 1004 100.2 12.0 1003 99.4 10.7 1002.5 103.5 12.8 1003.5 101.4 15.6 1002 104.0 11.1 1004 101.8 9.9 1003 102.5 13.3 988 1.07..3 9.1 988 I 103.6 8.2 989 99.3 10.3 988.5 105.4 13.1 990 j 102.0 11.8 990 101.3 12.9 991 104.1 10.7 990.5 102.8 13.5 982.5 102,1 11,4 983 105A 10.0 985 , 100.3 13.5 95 110.0 92 110.0 93 110.0 84* j 110.0 85"' 110.0 83* 110.0 86* 110.0 97 119.0 94 110.0 92 110.0 91 1.1.0.0 96 I 110.0 92 119.0 95 1.1.0.0 96 110.0 94 110.0 94 .110.0 96- 110.0 93 110.0 97 110.0 91 11.0.0 90 110.0 94 110.0 92 I 110.0 95 1 110.0 93 110.0 93 I 110.0 92 1 110.0 94 I 100.0 90 110.0 96 110.0 93 110.0 92 1.10.0 95 110.0 93 110.0 93 1.10.0 96 110.0 91 110.0 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No, I Date Tested I Location 2089 2090 2091 2092 2093 2094 2095 209 209' 209 209, 2101 210 21.0: 210. 210, 2101, 2106 2107 2108 2109 2110 2111 2112 2113 2114 2115 2116 2117 2118 2119 2120 2121 2122 2123 2124 2125 2126 1.0-13-05 10-13-05 1.0-13-05 10-13-05 1.0-13-05 10-13-05 10-13-05 10-14-05 1014-05 10-14-05 10-14-05 10-14-05 10-14-05 10-14-05 10-14-05 10-14-05 10-14-05 1.0-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-24-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 Lot D Lot E Lot F Lot G Lot H Lot Lot J Lot A Lot B Lot C Lot D Lot E Lot F Lot G Lot H Lot I Lott Lot 8 A Front Lot A Front Lot 9 A Front' Lot 9 A Front Lot 10 A Front Lot 10 A Front Lot 1.1. A Front Lot 11 A Front Lot 8 A Back. Lot 8 A Back Lot 9 A Back Lot 9 A Back Lot 10 A Back Lot11 A Back Lot 17 B Front Lot 17 B Front Lot 18 B Front Lot 18 B Front Lot 19 B Front Lot 20 B Front Lot 20 B Front TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry DensityI % Moisture I Relative Maximum In Place In Place Compaction I Density 985.5 985 987 987.5 987` 988 988.5 987 987.5 989.5 990 989.5 991.5 991 989.5 991 992 1000.5 1002.5 1003 1005 1002.5 1004.5 1005 1006 1002.5 1004.5 1.004 1005.5 1006 1006.5 993.5 995.5 993.5 995.5 997 997 999 106.1 103.5 101.6 101.2 104.3 107.1 103.1 101.1 101.6 103.9 102.8 99.3 104..5 100.8 104.1 103.9 102.5 102.9 105.8 103.5 1.01..4 100.8 1.0.4.7 99.5 103.0 106.1 105.3 101.9 103.4 103.9 101.3 104.5 102.6 100.3 101.6 105.4 101.8 101.3 9.6 8.9 12A 12.9 14.1 8.9 10.2 9.3 1 J..8 12.4 1.0.2 9.6 11.2 1.3.8 11.0 10.7 12.4 13.2 11.0 14.5 12.6 10.7 10.4 14.1 12.7 11.0 15.1 13.4 10.5 10.7 1.2.1. 9.9 11.4 8.6 10.0 102.8 11.1 8.7 96 94 92 92 95 97 94 92 92 94 93 90 95 92 95 94 93 94 96 94 92 92 95 90 94 96 96 93 94 94 92 95 93 91 92 96 93 92 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 t 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Datc TestcdLocation Elevation Dry Density % Moisture Relative Maximwn I In Mace I In Place I Comuaction I riensity 2127 10-26-05 Lot 21 B Front 998.5 106.6 13..4 97 110.0 2128 10-26-05 Lot 21 B Front 1000 103.9 13.0 94 110.0 2129 10-26-05 Lot 22 B Front 993.5 100.6 10.1 91. 110.0 2130 10-26-05 Lot 22 a Front 995.5 102.2 14.3 93 110.0 2131 10-26-05 Lot 23 B Front 996.5 102.9 12.6 96 110.0 2132 10-26-05 Lot 23 B Front 998.5 1 105.3 11.8 96 110.0 2133 10-26-05 Lot 22 B Front 997.5 103.0 13.2 94 110.0 2134 10-26-05 Lot 22 B Front 999 ' 106.1 1.0.7 96 1.10.0 2135 10-26-205 Sales Center 989.5 103.9 12.5 94 110.0 2136 10-26-05 Sales Center 989.5 101.1 10.6 92 1.1.0.0 2137 10-27-05 Lot 17 B Back 994 102.2 8.8 . 93 110.0 2138 10-27-05 Lot 17 B Back 996 I 1.00.4 10.9 91. 110.0 2139 10-27-05 Lot 18 B Back 997.5 104.1 1 11.6 95 110.0 2140 10-27-05 Lot 19 B Back 997 I 103.0 i 9.3 94 110.0 2141 10-27-05 Lot 20 B Back 996.5 106.1 13.2 96 110.0 2142 10-27-05 Lot 20. B Back 998 I 104.5 1 12.1 95 110.0 2143 10-27-05 Lot 2113 E3ack 997 101.1 1 14.0 92 110.0 21.44 10-27-05 Lot 21 B Back 999 100.3 I 11.4 91 110.0 2145 j 10-27-05 Lot 22 B Back 993 105.1 I 13.2 96 110.0 2146' 10-27-05 Lot 22 B Back 995 102.8 13.2 93 1.10.0 2147 i 10-27-05 Uot 2213 Hack 997 101.5 10.3 92 110.0 2i481 10-27-05 Lot 22 B Back 999 101.9 14.1 93 110.0 2149'1 10-27-05 Cate House 992 I 99.1 7.1 90 110.0 2150: 10-27-05 Gate House 994 I 100.6 I 8.3 91 110.0 2151' 10-28-05 Lot 1 A Front 996 101.6 I 13.1 92 110.0 2152' 10-28-05 ; Lot 1 A Front 998 101.9 11.5 93 110.0 2153: 10-28-05 Lot 2 A Front 998 I 1.0.4.7 i 14.3 95 11.0.0 2154!: 10-28-05 Lot 2 A Front 1000 102.8 1 12.6 93 110.0 2155' 10-28-05 Lot'l A Front 1000. 103.4 12.1 94 110.0 2156 10-28-05 Lot 1 A Front 1002 100.2 15.1. 91 110.0 21,57110-28-05 Lot 2 A Front 1002 105.3 13.0 96 110.0 2158, 1.0-28-05 Lot 2 A Front 1003.5 101.2 ; 11.6 92 110.0 2159' 10-28-05 Lot 2 A Back 1003.5 103.1 10.7 94 110.0 21601 10-28-05 Lot 11 A Front PG 107.2, 9.6 97 j 110.0 2161 1.0-28-05 ? Lot 11 A Back PG 103.8 11.1 94 110.0 2162 10-28-05 Lot 11 A Center PG j 104.3 10.8 95 i 110.0 2163 10-28-05 Lot 10 A Front PG 101.5 12.6 92 110.0 2164 10-28-05 Lot 10 A Back PG 100.1 8.7 I 91 1.1.0.0 2165 10-28-05 Lot 10 A Center PG 102.6 11.0 93 110.0 2166; 10-28-05 Lot 9 A Front PG 105.4 9.3 j 96 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.I Date Tested 1 Location Elevation Dry Density %Moisture Relative Maximum .1 ___ i I In Place I In Place I Compaction I Densitv 2167 21.68 2169 21701 21711 21721 21731' 2174, 2175 21761 2177 2178 2179 2180 2181 2182 2183 2184 2185 2186 2187 2188 2189 2190 2191 21921 2193 2194 2195 21961 2197 2198 2199' 22001 2201 10-28-05 1.0-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01.-05 11-01-05 11-01-05 11-01-05 11-01-05 22021' 11-02-05 2203 11-02-05 2204 11-02-05 2205 11-02-05 DATE: March 2, 2006 Lot 9 A Back Lot 9 A Center Lot A Front Lot A Back Lot 7 A'Front Lot.7 A Back Lot A Front Lot 6 A Back Lot 6 A Center Lot A Front Lot 5 A Back I..ot 4 A Front Lot 4 A Back Lot 4 A Center Lot 3 A Front Lot 3 A Back Lot 2 A Front Lot 2 A Back Lot 1 A Front Lott A Back Lot 10 B Back Lot 10 B Front Lot 13 B Front Lot 13 B Back Lot 14 B Front Lot 14 8 Back Lot 1.5 B Front Lot 15 B Front Lot 15 B Back Lot 15 B Back Retest # Lot 16 B Front Lot 16 B Back 1,ot 15 B Front Lot 15 B Back Lot 23 B Back Lot 23 B Back Lot 24 B Front Lot 24 B Front PC PC PCS PC PC, PC PC PC PC PG PC PC PC PC PC PC PC, PC PC 1003 1002 998 998 997 997 992 994 992 994 994..5 995 996 996 997.5 999.5 997.5 999.5 103.7 11.0 94 106.6 9.2 97 102.4 12.5 93' 102.7 13.0 93 104.7 13.1 95 108.1 11.0 98 106.3 11.4 97 103.4 14.1 94 105.3 10.9 96 100.9 14.5 92 102.6 12.0 93 104.4 9.8 95 107.1 11..0 97 105.4 12.6 96 103.2 8.8 94 1.03.5 10,4 94 106.6 11.8 97 1.02.4 12.4 93 99.3 9"90 100.7 9.6 1 92 1.04.0 9.3 95 102.0 10.7 I 93 100.4 11.6 91 103.3 13.1 94. 105.1 9.8 96 101.4 11.0 92 100.1 10.7 91 100.6 10.2 91 103.7 '12.6 94 104.8 10.1 95 99.3 8.7 90 102.5 12.3 95 105.6 13.4 96 103.4 10.8 94 106.8 9.5 97 104.9 1.1..8 95 102.6 10.1 93 106.7 13.4 97 103.5 9.6 94 1.1.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 11.0.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 Sladden Engineering. TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. hate Tested Location Elevation Dry .Density % Moisture Impaction Relative I Maximum In Place In Place CoDcnsitv 2206 11-02-05 Lot 24 B Back 996.5 100.3 2207 11-02-05 Lot 29 B Back 998.5 104.1 2208 11-02-05 Lot 25 8 Front 997 101.1 2209 . 11-02-05 Lot 25 B Front 999 101.4 2210 11-02-05 Lot 25 B Back 998 1.0.4.4 2211 11-02-05 Lot 25 B Back 1000 ' 103.6 2212 11-02-05 I Lot 26 B Front 995.5 1 106.0 2213 11-02-05 ; Lot 26 B Front 997.5 ' 102.5 2214 11-02-05 1 Lot 26 B Back 995 I 101.8 2215. 11-02-05 Lot 26 8 Back 997 103.7 2216 11-03-05 Lot 9 B Front PG 105.1 2217 11-03-05 Lot 9 B Back PG 102.8 2218 11-03-05 Lot 10 B Front PG 102.5 22191 11-03-05 ; Lot 10 B Back PG 104.0 2220 11-03-05 Lot 11 B Front PG 1.00.5 2221 11-03-05 Lot 11 B Back PG 100.8 2222 11-03-05 Lot 12 B Front PG 103.1 2223 1.1-03-05 Lot 1213 Back PG 105.7 22241 11-03-05 Lot 13 B Front PG 106.9 2225 i 11-03-05 Lot 13 B Back PC 104.4 22261 11-03-05 i Lot 14.13 Front PG i 101.7 2227 11-03-05 i Lot 14 B Back PC j 1.02.1 2228; 11-03-05 Lot 1.5 6 Front PG 105.5 22291 11-03-05 I Lot 15 B Back PC 103.3 2230; 11-03-05 Lot 1.6 5 Front PG 107.1 2231 11-03-05 I Lot 16 B Back PG I 104.2 i 22321 11-04-05 Lot 17 B Front 997.5 ! 103.6 22331 11-04-05 Lot 17 B Back 998 105.4 2234 11-04-05 Lot 18 B Front 997.5 101.0 2235 11-04-05 Lot 18 B Back 998 100.6 2236 11-04-05 Lot 19 B Front 999 104.3 22371 1.1.-04.05 Lot 19 B Back 999 104.1 2238 11-04-05 Lot 20 B Back 1.000 1.02.8 2239 11-04-05 Lot 21 B Front 1001.5 107.3 2240 11-04-05 Lot 21 B Back 1001 1.05.0 2241 11-04-05 Lot 22 B Front 1001 103.3 2242 11-04-05 Lot 22 B Back 1001 104.6 22431 11-07-05 1 Lot 17 B Front PC 1 103.3 DATE: March 2, 2006 i r i 11.1 91 10.0 95 12.4 92 14.1 92 9.7 95 8.8 94 11.4 96 9.9 93 12.9 93 13.4 94 9.5 96 11..0 93 10.4 93 12.3 95 11.1 91 9.3 92 12.8 94 12.1 96 9.7 97 9.2 95 1.0.0 93 10.5 93 12.6 96 13.1 94q 8.8 97 10.7 95 10.1 94 11.5 96 12.5 92 9.8 91 14.6 95 12.9 95 13.6 93 11.4 98 11.9 95 15.1 94 13.0 95 9.0 1 94 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 1'10.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 1.1.0.0 110.0 110.0 110.0 SIadden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LAXATION: La Quinta, California REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation DryDensity % Moisture Relative I Maximum In Place In Place Comnaction Density 2244 11-07-05 2245 11-07-05 2246 11-07-05 2247 11.-07-05 2248 11-07-05 2249 11-07-05 2250 11-07-05 2251 11-07-05 2252 11-07-05 2253 11-07-05 2254 11-07-05 2255 11-08-05 2256 11-08-05 2257 11-08-05 2258 11-08-05 2259 11-08-05 2260 2261 2262 2263 2264 2265 2266 2267 2268 2269 2270 2271 2272 2273 2274 2275 2276 2277 2278 2279 2280 2281 DATE: 11,09-05 11-09-05 11-09-05 11-09-05 1.1-09-05 11-09-05 11-09-05 11-09-05 11-09-05 11-09-05 11-09-05 1.1-09-05 11-09-05 11-09-05 11-09-05 11-09-05 11-09-05 1.1.-09-05 11-09-05 11.09-05 11-09-05 11-10-05 March 2, 2(C Lot 1.7 B Back Lot 17 B Center Lot 18 B Front Lot 18 B Back Lot 18 B Center Lot 1913 Front Lot 19 B Back Lot 1.9 8 Center Lot 20 B Front Lot 20 B Back Lot 20 B Center Lot 118 B Lot 119 B Lot 120 B Lot 121 B Lot 122 B Lot 25 B Lot 25 B Lot 25 B Lot 26 B Lot 26 B Lot 26 B Lot 27 B Lot 27 B Lot 27 B Lot 21 B Lot 21 B Lot 21 B Lot 22 B Lot 22 B Lot 22 B Lot 23 B Lot 23 B Lot 23 B Lot 24 B Lot 24 B Lot 24 B Lot 117 B PG PG PC PG PG PG PG PG PG PG PG 3.0 BPG 3.6 BPG 3.0 BPC 3.0 BPG 3.0 BPG 101.4 104.6 100.5 102.8 104.9 106.1 103.5 105.3 101.8 101.4 104.0 110.2 1.10.2 104.3 104.9 101..8 PG I 106.5 PG 99.9 PG 104.4 PG j 106.8 PG ! 101.2 PG 102.7 PG 101.8 PG 103.2 PG 104.1 PG 99.6 PG 99.9 PG 108.5 PG 99.0 PG 107.5 PG 103.8 PG 101.0 PG 104.6 PG 104.6 PG 101.0 PC 103.7 PG 100.5 PG 1.03.4 8.1 11.5 7.9 10.7 9.3 11.4 8.8 12.4 11.0 9.9 10.7 8.4 12.5 14.7 14.7 11.8 13.2 7.1 6.8 12.2 5.0 7.0 7.9 9.2 11.6 11.1 1.1.6 9.5 5.9 8.4 15.1 9.6 5.7 10.4 9.9 12.8 10.4 Vp) 92' 95 91. 93 95 96 94 96 93 92 95 98 98 93 94 91 97 91 95 97 92 93 92 94 95 91 .91 99 90 98 94 92 95 95 92 94 91 94 110.0 110.0 110.0 110.0 110.0 1.1.0.0 110.0 110.0 • 110.0 110.0 110.0 112.0 112.0 112.0 ►. 112.0 1 112.0 110.0 110.0 1'10.0 110.0 110.0 110.0 '11.0.0 110.0 11.0,0 1.10.0 110.0 110.0 110.0 110.0 110.0 1.1.0.0 710.0 110.0 110.0 110.0 110.0 1 110.0 Sladden ,'ngeneering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, Califomia REPORT NO: 06-02-120 Test No. Date Tested Location ElevationI Dry Density % Moisture Relative I Maximum In Place In Place Comz)action Density 2282 11-10-05 Lot 117 B PG 105.3 11.8 96 110,0 2283 11-10-05 Lot 118 8 PC 108.8 9,8 99 110.0 2284 1.1.-1.0-05 i Lot 118 B I'G 103.4 9.6 93 1.1.0.0 2285 I 11-10-05 Lot 1.1.9 13 PC 105.3 10.2 96 110.0 2286 11-10-05 Lot 119 B PG 109.1 11.7 99 110.0 2287 11-10-05 Lot 4.0 8 PC 108.3 9.8 98 110.0 2288 11-10-05 Lot 40 B PG 109.1 11.5 99 110.0 2289 11-10-05 Lot 11813 1.0 BPG 99.9 12.2 91 110.0 2290 11-10-05 Lot 119 B 1,0 BPG 100.6 11.9 92 110.0 2291 11-10-05 Lot 120 8 1.0 BPC 1.00.0 12,6 91 110.0 2292 11-10-05' Lot 121 B 1,0 BPG 99.8 14.4 91 110.0 22931 11-10-05 Lot 1.22 8 1.0 BPC 102.0 1.1..4 93 110.0 2.294 1 11-10-05 Lot 29 B PG 109.2 I 9.5 99 110.0 2295; 11-10-05 Lot 29 B PC 107.9 1 7.7 98 110.0 2296 11-10-05 Lot 29 0 PC 108.2 13.1. 99 11010 2297 11-10-05 1 L6t 28 B PC 108.9 14.6 99 110.0 2298 11-10-05 i Lot 28 B PC 108,9 8.3 99 110.0 2299 11-10-05 Lot 28B PC I 109.1 11.4 99 110.0 2300 11-10-05 Lot 30 B PC 1 105.0 15.1 95 110.0 2301 I1-10-05 Lot 30 B PC 1.0.4.0 15,2 i� 95 110.0 23021 11-10-05 Lot 30 B PG 105.9 14.2 I 96 110.0 2303 11-14-05 1,ot 31 B PC 108.5 7.5 99 1 110.0 2304: 11-14-05 Lot 31 B PG 108.0 6.2 I 98 110.0 23051 11-14-05 Lot 32 B PG 108.8 7.1 99 I 110.0 23061 1.1-14-05- Lot 32 B PG 104.5 7.4 95 110.0 23071 11-14-05 1 Lot 36 B PC 107.5 I 11..7 98 110.0 23081: 11-14-05 ! Lot 36 B PC 100.4 6.4 91 110.0 23091 11-14-05 Lot 35 B PC 102.5 j 11.2 I 93 110.0 23101 11.-1.4-05 i Lot 35 B PG 103.3 15.1 94 i 1.10.0 2311. 11-15-05 Lot 39 B PG 109.0 8.1 99 2312 11-15-05 Lot 39 8 PC 108.7 6,0 99 110.0 2313 11-15-05 Lot 38 B PC 103.1 15.1. 94 110.0 2314 1 11715-05 Loft 38 8 PC 108.6 9.5 99 110.0 23151 11-15-05 Lot 37 B PG 108.4 11.9 98 110.0 23161 11-15-05 Lot 37 B PG 104.7 7.3 I 95 110.0 2317 11-15-05 Lot 33 B PC 108.2 7.5 98 110.0 2318 11-15-05 J Lot 33 B PG 101.7 10.8 93 1.1.0.0 2319 11-15-05 Lot 34 B I PG 103.1 8.3 94 110.0 2320 11-15-05 Lot 34 B 100.1 61 92 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club t. LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tcst No. Date Tested Location Elevation I Dry Density I % Moi;cturc Relative Maximum In Place j In Place Comnertion I Demiry 2321 2322 2323 2324 2325 2326 2327 2328 2329 2330 2331 2332 11-17-05 11-17-05 11-17-05 1.1-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 11-17-05 Lot 120 B Lot 120 B Lot 121 B Lot 121 B Lot 122 B Lot 122 B 1;ot 82 8 Lot 82 B Lot 8'1 a Lot 81 B Lot 8013 Lot 80 B 2333 11-21-05 Lot 43 B 2334 11-21-05 Lot 43 B 2335 11-21.-05 Lot 4213 2336 11-21-05 Lot 42 B 2337 11-21-05 Lot 416 2338 11-21-05 Lot 41 8 2339. 11-21-05 Lot 48 B 2340: 11.-21-05 Lot 48 B 2341;' 11-21-05 Lot 47 B 2342: 11-21-05 Lot 47 B 23431 1.1-21-05 i Lot 46 B 23441 11-21-05 j Lot 46 B 2345 11-21.-05 ' Lot 45 B 2346 11-21-05 Lot 45 B 2347 11-21-05 Lot 44 B 2348 11-21-05 Lot 44 B PG 106.8 13.1 23491 11-28-05 Lot 63 B 2350 1.1-28-05 Lot 63 B 2351:1 01.-04-06 Sales Office 2352 01-04-06 Sales Office 2353 01-04-06 Sales Office 2354 01-04-06 Sales Office PG 1 109.1. 6.1 2355 01-04-06 Sales Office DATE: March 2, 2006 PC 109.1 9.9 PG 103.5 16.5 PC 105.2 11.1 PG 109.0 1.3.7 PC 105.1 11.4 PG 106.7 13.3 PC 103.1 8.9 PG 108.1 8.9 PG 104.4 13.6 PG 105.9 12.8 PG 103.1 11.9 PG 99.9 10.6 PG 1.09.1 11.4 11C; 1.08.1 13.1 PG 109.1 12.4 PG i 1.08.9 11.9 PG 106.8 13.1 PC 109.1 11.6 PG 1.07.3 � 7.4 PG 108.7 7.0 PC 106.7 6.1 PG 105.9 7.1 PC. 108.8 6.5 PG 1 109.1. 6.1 PC ; 108.7 7.1 PC 107.7 6.5 PC 107.8 10.2 PG 106.7 9.4 PC 107.9 10.2 PG 106.2 j 10.4 5.0 BSC 101.9 9.7 4.0 BSG 99.9 8.3 2.0 8SG 99.8 9.6 5.0 BSC 98.1 10.6 3.0 BSG 99.9 15.4 99 110.0 94 110.0 96 110.0 99 110.0 96 110.0 97 110.0 94 110.0 94 110.0 95 110.0 '96 110.0 94 110.0 91 110,0 99 110,0 98 110.0 99 110.0 99 110.0 97 110.0 99 11.0.0 97 110,0 99 110.0 97 110.0 96 .110.0 99 110.0 99 110.0 99 110.0 98 1.1.0.0 98 110.0 97 110.0. 98 110.0 97. 110.0 93 109.0 92 109.0 92 109.0 90 109.0 92 109.0 Sladden Engineering m GEOTECHNICAL INVESTIGATION PROPOSED MADISON CLUB GOLF CLUB AND RESIDENTIAL DEVELOPMENT NEC AVENUE 54 AND MADISON STREET LA QUINTA, CALIFORNIA -Prepared By- Sladden Engineering 39-725 Garand Lane, Suite G Palm Desert, California 92211 (760)772-3893 CITY OF LA QUINTA BUILDING & SAFETY DEPT, APPROVED FOR CONSTRUCTION DATEJ&gy f f m GEOTECHNICAL INVESTIGATION PROPOSED MADISON CLUB GOLF CLUB AND RESIDENTIAL DEVELOPMENT NEC AVENUE 54 AND MADISON STREET LA QUINTA, CALIFORNIA -Prepared By- Sladden Engineering 39-725 Garand Lane, Suite G Palm Desert, California 92211 (760)772-3893 CITY OF LA QUINTA BUILDING & SAFETY DEPT, APPROVED FOR CONSTRUCTION DATEJ&gy (W Sladde�n Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 January 28, 2005 East of Madison, LLC 81-100 Avenue 53 La Quinta, California 92253 Attention: Mr, John Gamlin Project: Madison Club Tentative Tract Map 33076 NEC Avenue 54 and. Madison Street La Quinta, California Subject: Geotechnical Investigation Project No. 544-4810 05-01-101 Presented herewith is the report of our Geotechnical Investigation conducted for the construction of the proposed golf club and residential development to be located on the northeast comer of Avenue 54 and Madison Street in the City of La Quinta, California, The investigation was performed in order to provide recommendations for site preparation and to assist in foundation design for the proposed residential structures and the related site improvements. This report presents the results of our field investigation and laboratory testing along with conclusions and recommendations for foundation design and site preparation. This report completes our original scope of services as outlined within our proposal dated December 13, 2004. We appreciate the opportunity to provide service to you on this project. if you have any questions regarding this report, please contact the undersigned Respectfully submitted, SLADDE ENGINEERING Brett L. Anderson Principal Engineer SER/pc Copies: 6/East of Madison, LLC LU IVO' C �P. 8 30/06 x �F �ml GEOTECHNICAL INVESTIGATION PROPOSED MADISON CLUB NEC AVENUE 54 & MADISON STREET LA QUINTA, CALIFORNIA January 28, 2005 TABLE OF CONTENTS INTRODUCTION............................................................................................................................ 1. SCOPEOF WORK .................................................... ............................................................................ 1 PROJECTDESCRIPTION................................................................................... .......................... 1 GEOLOGYAND SEISMICITY.......................................................................................................... 2 SUBSURFACECONDITIONS......................................................................................................... 3 LIQUEFACTION......_.......................................................................................................................3 CONCLUSIONS AND RECOMMENDATIONS............................................................................ 3 FoundationDesign ........................................................................................................................ 4 Settlements........._...... ........................................................................................................ 5 LateralDesign.... _......................................................................................................................... 5 RetainingWalls.._ ............................................... I .......................................................... ................ 5 ExpansiveSoil .... _........................................................................................................................ 5 ConcreteSlabs-or--Grade............................................................................................................. 5 SolubleSulfates.._..............................................................................:................:....................... 6 TentativePavement Design.......................................................................................................... 6 Shrinkageand Subsidence..................................................................................................... 6 GeneralSite Grading............................................................... .......................................................... 6 1. Site Clearir.g...................................................................................................................... 6 •2. Preparation of Building and Foundation Areas ................... 3. Placement •:)f Compacted Fill...................................................................................... 7 4. Preparation of Slab and Pavement Areas........................................................................... 7 5. Testing and Inspection..................................................................................................... 7 GENERAL.................................................................................................................................. 8 REFERENCES.................................................................................................................................... 9 APPENDIX A - %te Plan and Boring Logs Held Exploration APPENDDC B - Laboratory Testing Laboratory Test Results APPENDIX C - 21001 California Building Code with 1997 UBC Seismic Design Criteria January 28, 2005 -1- Project No. 544-4810 05-01-101 INTRODUCTION This report presents the results of our Geotechnical Investigation performed in order to provide recommendations for site preparation and to assist in the design and construction of the foundations for the single-family residences proposed for the Madison Club golf course and residential development. The project site is located on the northeast comer of Avenue 54 and Madison Street in the City of La Quinta, California. The preliminary plans indicate that the proposed project will include an 18 -hole golf course, clubhouse, and approximately 200 single-family residences along with various associated site improvements. The associated site improvements are expected to include paved roadways, concrete driveways and patios, underground utilities, and landscape areas. SCOPE OF WORK The purpose of our investigation was to determine certain engineering characteristics of the near surface soil on the site in order to develop recommendations for foundation design and site preparation. Our investigation included field exploration, laboratory testing, literature review, engineering analysis and the preparation of this report. Evaluation of hazardous materials or other environmental concerns was not within the scope of services provided. Our investigation was performed in accordance with contemporary geotechnical engineering principles and practice. We do not make other warranty, either express or implied. PROJECT DESCRIPTION The project site is located on the northeast corner of Avenue 54 and Madison Street in the City of La Quinta, California. It is our understanding that the project will consist of an 18 -hole golf course, clubhouse, and approximately 200 single-family residences along with various associated site improvements. It is our understanding that the proposed residences and clubhouse will be of relatively lightweight wood -frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The associated improvements will include paved roadways, concrete walkways, patios, driveways, landscape areas and various underground utilities. The majority of the subject site is presently vacant. The site includes several agricultural parcels as well as undeveloped desert land. Large tamarisk trees exist along the majority of the property lines within the southeastern portion of the site. The majority of the eastern portions of the property have been previously used for agricultural purposes. The property is level throughout and is near the elevation of the adjacent properties and roadways. A horse ranch occupies the southeast comer of the site. The ranch contains several residential structures and various outbuildings. Fenced pastures occupy most of the ranch. Several other residences and structures exist at locations throughout the site. Avenue 54. forms the southern site boundary, Monroe Street forms the eastern site boundary, and Madison Street forms the western site boundary. The Hideaway development is located just west of the site. Sladden Englneedng January 28, 2005 -2- Project No. 544-4810 05-01-101 Based upon our previous experience with lightweight residential structures, we expect that isolated column loads will be less than 30 kips and wall loading will be less than to 2.0 kips per linear foot. Grading is expected to include minor cuts and fills to match the nearby elevations and to Construct slightly elevated building pads to accommodate site drainage. Extensive cuts are proposed for several of the golf holes with the preliminary plans indicating cuts in excess of 40 feet within some of the golf holes. . This does not include removal and recompaction of the bearing soil within the building areas. If the anticipated foundation loading or site grading varies substantially from that assumed the recommendations included in this report should be reevaluated, GEOLOGY AND SEISMICITY The project site is located within the central Coachella Valley that is part of the broader Salton Trough geomorphic province. The Salton Trough is a northwest trending depression that extends from the Gulf of California to the Banning Pass. Structurally the Salton Trough is dominated by several northwest trending faults, most notable of that is the San Andreas system. . A relatively thick sequence of sedimentary rocks have been deposited in the Coachella Valley portion of the Salton Trough from Miocene to present times. These sediments are predominately terrestrial in nature with some lacustrian and minor marine deposits. The mountains surrounding the Coachella Valley are composed primarily, of Precambrian'metamorphic and Mesozoic granitic rock. The Coachella Vallev is situated in one of the more seismically active areas of California. The San Andreas fault zone is considered capable of generating a maximum credible earthquake of magnitude 8.0 and because of its proximity to the project site the distance of approximately 9.2 kilometers should be considered in design fault for the project. Seismic activity along the nearby faults continues to affect the area and the Coachella Valley is considered one of the more seismically active regions in California. A computer program and pertinent geologic literature were utilized to compile data related to earthquake fault zones in the region and previous seismic activity that may have affected the site. E.Q. Fault Version 3.00 (Blake) provides a compilation of data related to earthquake faults in the region. The program searches available databases and provides both distances to causitive faults and the corresponding accelerations that may be experienced on the site because of earthquake activity along these faults. The attenuation relationship utilised for this project was based upon Joyner & Boore (2001) attenuation curves. The information generated was utilized in our liquefaction evaluation The site is not located in any Earthquake Fault zones as designated by the State but is mapped in the County's Liquefaction and Ground Shaking .Hazard Zone V. Several significant seismic events have occurred within the Coachella Valley during the past 50 years. The events include Desert Hot Springs - 1948 (6.5 Magnitude), Palm Springs - 1986 (5.9 Magnitude), Desert Hot Springs - 1992 (6.1 Magnitude), Landers - 1992 (7.5 Magnitude) and Big Bear -1992 (6.6 Magnitude). Sladden EnRineerink January 28, 2005 -3- Project No. 5.44-4810 05-01.-101 SUBSURFACE CONDITIONS The soil underlying the site consists primarily of fine-grained silty sands with scattered prominent sandy clay and sandy silt layers. As is typical for the area, the silty sand and sandy silt layers are inconsistently interbedded and vary in thickness. Silty sands were the most prominent soil within our exploratory, borings but several prominent sandy silt and clayey silt layers were also encountered. The silty sands encountered near the existing ground surface appeared somewhat loose but the deeper silty sand and sandy silt layers appeared relatively firm. Relatively undisturbed samples indicated dry density varying from 84 to 121 pcf. Sampler penetration resistance (as measured by field blowcounts) indicates that density generally increases with depth. The site soil was dry on the surface and moist below a depth of approximately 5 feet but some silty layers were typically wet. Laboratory testing indicated moisture content varying from 1 to 33 percent. Laboratory testing indicates that the surface soil within the upper 5 feet consist primarily of silty sands. Expansion testing indicates that the surface silty sands are generally non -expansive and are classified as "very low' expansion category soil in accordance with Table 3.8-1-8 of. the 1997 Uniform Building Code. Groundwater was encountered within our borings at depths of approximately 51 to 79 feet below the existing ground surface. Groundwater should be considered in design and construction. LIQUEFACTION Liquefaction occurs with sudden loss of soil strength because of rapid increases in pore pressures within cohesionless soil as a result of repeated cyclic loading during seismic events. Several conditions must be present for liquefaction to occur including; the presence of relatively shallow groundwater, generally loose soil conditions, the susceptibility of soil to liquefaction based upon grain -size characteristics and the generation of significant and repeated seismically induced ground accelerations. Liquefaction affects primarily loose, uniform grained cohesionless sands with low relative densities. In the case of this project site, several of the factors required for liquefaction to occur are not present. As previously indicated, groundwater was encountered within our borings at depths of approximately 51 to 79 feet below the existing ground surface on the site. Because of the depth to groundwater, the potential for liquefaction affecting the site is considered negligible. CONCLUSIONS AND RECOMMENDATIONS Based upon our field investigation and laboratory testing, it is our opinion that the proposed golf course, clubhouse, and residential development is feasible from a soil mechanic's standpoint provided that the recommendations included in this report are considered in building foundation design and site preparation. Because of the somewhat loose condition of the near surface soil, remedial grading is recommended for the building areas. We recommend that remedial grading within the proposed building areas include the overexcavation and recompaction of the primary foundation bearing soil. Specific recommendations for site preparation are presented in the Site Grading section of this report. Sladden Engineering January 28, 2005 -4- Project No. 54.4481.0 05-01-101 Based upon the depth to groundwater and the generally firm condition of the deeper sand layers, it is our opinion that the potential for liquefaction affecting the site is negligible. The remedial grading recommended for building areas will result in the construction of a uniform compacted soil mat beneath all footings. In our opinion, liquefaction related mitigation measures in additionto the site grading and foundation design recommendations included in this report should not be necessary. The site is located in one of the more seismically active areas in California. Design professionals should be aware of the site setting and the potential for earthquake activity during the anticipated life of the structure should be acknowledged. The'accelerations that may be experienced on the site (as previously discussed) should be considered in design. The seismic provisions included in the Uniform Building Code for Seismic Zone 4 should be considered the minimum design criteria. Pertinent 1997 UBC Seismic Design Criteria is summarized in Appendix C, Caving did occur within our borings and the potential for caving should be expected within deeper excavations. All excavations should be constructed in accordance with the normal CaIOSHA excavation criteria. On the basis of our observations of the materials encountered, we anticipate that the near surface silty sands will be classified by CalOSHA as Type C. Soil conditions should be verified in the field by a "Competent person" employed by the Contractor. The near surface soil encountered during our investigation was found to be non -expansive. Laboratory testing indicated an Expansion Index of 0 for the surface silty sands that corresponds with the "very low" expansion category in accordance with UBC Table 18 -I -B. The following recommendations present more detailed design criteria which have been developed on the basis of our field and laboratory investigation. The recommendations are based upon non -expansive soil criteria. Foundation Design- The results of our investigation indicate that either conventional shallow continuous footings or isolated pad footings that are supported upon properly compacted soil, may be expected to provide adequate support for the proposed structure foundations. Building pad grading should be performed as described in the Site Grading Section of this report to provide for uniform and firm bearing conditions for the structure foundations. Footings should extend at least 12 inches beneath lowest adjacent grade, Isolated square or rectangular footings should be at least two feet square and continuous footings should be at least 12 inches wide. Continuous footings may be designed using an allowable bearing value of 1500 pounds per square foot (psf) and isolated pad footings may be designed using an allowable bearing pressure of 1800 psf. Allowable increases of 250 psf for each additional 1 foot of width and 250 psf for.each additional 6 inches of depth may be utilized if desired. The maximum allowable bearing pressure should be 2500 psf. The allowable bearing pressures are applicable to dead and frequently applied live loads. The allowable bearing pressures may be increased by 1/3 to resist wind and seismic loading. Care should be taken to see that bearing or subgrade soil is not allowed to become saturated from the ponding of rainwater or irrigation. Drainage from the building area should be rapid and complete. Sladden Engineering January 28; 2005 -5- Project No. 544.4.8.10 05-01-101 The recommendations provided in the preceding paragraph are based on the assumption that all footings will be supported upon properly compacted engineered fill soil. All grading should be performed under the testing and inspection of the Soil Engineer or his representative. Prior to the placement of concrete, we recommend that the footing excavations be inspected in order to verify that they extend into compacted soil and are free of loose and disturbed materials. Settlements: Settlements resulting from the anticipated foundation loads should be minimal provided that the recommendations included in this report are considered in foundation design and construction. The estimated ultimate settlements are calculated to be approximately one inch when using the recommended bearing values. As a practical matter, differential settlements between footings can be assumed as one-half of the total settlement. Lateral Design: Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient, of friction of 0.40 between soil and concrete may be used with consideration to dead load forces only. A passive earth pressure of 250 pounds per square foot, per foot of depth, may be used for the sides of footings that are poured against properly compacted native or approved non -expansive import soil. Passive earth pressure should be ignored within the upper 1 foot except where confined (such as beneath a floor slab). Retaining Walls: Retaining walls may be necessary to accomplish the proposed construction. Lateral pressures for use in retaining wall design can be estimated using an equivalent fluid weight of 35 pcf for level free -draining native backfill conditions. For walls that are to be restrained at the top, the equivalent fluid weight should be increased to 55 pef for level free - draining native backfill conditions. Backdrains should be provided for the full height of the walls. Expansive Soil: Because of the prominence of "very low" expansion category soil near the surface, the expansion potential of the foundation bearing soil should not be a controlling factor in foundation or floor slab design. Expansion potential should be reevaluated subsequent to grading. Concrete Slabs -on -Grade: All surfaces to receive concrete slabs -on -grade should be underlain by a minimum compacted non -expansive fill thickness of 24 inches, placed as described in the Site Grading Section of this report. Where slabs are to receive moisture sensitive floor coverings or where dampness of the floor slab is not desired, we recommend the use of an appropriate vapor barrier or an adequate capillary break. Vapor barriers should be protected by sand in order, to reduce the possibility of puncture and to aid in obtaining uniform concrete curing. Reinforcement of slabs -on -grade in order to resist expansive soil pressures should not be necessary, However, reinforcement will have a beneficial effect in containing cracking because of concrete shrinkage. Temperature and shrinkage related cracking should be anticipated in all concrete slabs -on -grade. Slab reinforcement and the spacing of control joints should be determined by the Structural Engineer. Sladden Engineering January 28, 2005 -6-,Project No. 5444810 05-01-1.01 Soluble Sulfates: The soluble sulfate concentrations of the surface soil have not yet been determined but native soil in the area has been known to be potentially corrosive with respect to concrete. The use of Type V cement and specialized sulfate resistant concrete mix designs may be necessary for concrete in contact with the native soil. Tentative Pavement Design: All paving should be underlain by a minimum compacted fill thickness of 12 inches (excluding aggregate base). This may be performed as described in the Site Grading Section, of this report. R -Value testing was not conducted during our investigation but based upon the sandy nature of the surface soil, an R -Value of approximately 50 appears appropriate for preliminary pavement design. The following preliminary onsite pavement section is based upon a design R=Value of 50. Onsite Pavement (Traffic Index = 5.0) Use 3.0 inches of asphalt on 4.5 inches of Class 2 base material Aggregate base should conform to the requirements for Class 2 Aggregate base in Section 26 of CalTrans Standard Specifications, January 1992. Asphaltic concrete should conform to Section 39 of the CalTrans Standard Specifications. The recommended sections should be provided with a uniformly compacted subgrade and precise control of thickness and elevations during placement. Pavement and slab designs are tentative and should be confirmed at the completion of site grading when the subgrade soil is in-place. This will include sampling and testing of the actual subgrade soil and an analysis based upon the specific traffic information Shrinkage and Subsidence: Volumetric shrinkage of the material that is excavated and replaced as controlled compacted fill should be anticipated. We estimate that this shrinkage could vary from 20 to 25 percent. Subsidence of the surfaces that are scarified and compacted should be between 1 and 3 tenths of a foot. This will vary depending upon the type of equipment used, the moisture content of the soil at the time of grading and the actual degree of compaction attained. These values for shrinkage and subsidence are exclusive of losses that will occur because of the stripping of the organic material from the site and the removal of oversize material. The shrinkage losses are suspected to be somewhat less within areas where deeper cuts (more than 20 feet in depth) are planned. General Site Grading: All grading should be performed in accordance with the grading ordinance of the City of La Quinta, California. The following recommendations have been developed on the basis of our field and laboratory testing and are intended to provide a uniform compacted mat of soil beneath the building slabs and foundations. 1. Site CIearing: Proper site clearing will be very important. Any existing vegetation, slabs, foundations, abandoned underground utilities or irrigation lines should be removed from the proposed building areas and the resulting excavations should be properly backfilled. Soil that is disturbed during site clearing should be removed and replaced as controlled compacted fill under the direction of the Soil Engineer. Sladden ,'ngineering January 28, 2005 -7- Project No. 544-4810 05-01-101 2. Preparation of Building and Foundation Areas: In order to provide adequate and uniform bearing conditions, we recommend overexcavation throughout the proposed residential building areas. The building areas should be overexcavated to a depth of at least 3 feet below existing grade or 3 feet below the bottom of the footings, whichever is deeper. ,The exposed soil should then be scarified to a depth of 1 -foot, moisture conditioned and recompacted to at least 90 percent relative compaction: The excavated material may then be replaced as engineered fill material as recommended below. 3. Placement of Compacted Fill: Within the building pad areas, fill materials should be spread in thin lifts, and compacted at near optimum moisture content to a minimum of 90 percent relative compaction. Imported fill material shall have an Expansion Index not exceeding 20. The contractor shall notify the Soil Engineer at least 48 hours in advance of importing soil in order to provide sufficient time for the evaluation of proposed import materials. The contractor shall be responsible for delivering material to the site that complies with the project specifications. Approval by the Soil Engineer will be based upon material delivered to the site and not the preliminary evaluation of import sources. Our observations of the materials encountered during our investigation indicate that compaction within the native soil will be most readily obtained by means of heavy rubber tired equipment and/or sheepsfoot compactors. The moisture content of the near surface soils was somewhat inconsistent within our borings. In general, the sandy soils are dry and well below optimum. moisture content but some of the deeper silt layers were wet. It is likely that wet silt/clay layers will be encountered during grading particularly in irrigated areas where deep cuts are planned. A uniform and near optimum moisture content should be maintained during fill placement and compaction. 4. Preparation of Slab and Paving Areas: All surfaces to receive asphalt concrete paving or exterior concrete slabs -on -grade, should be underlain by a minimum compacted fill thickness of 12 inches. This may be accomplished by a combination of overexcavation, scarification and recompaction of the surface, and replacement of the excavated material as controlled compacted fill. Compaction of the slab and pavement areas should be to a minimum of 90 percent relative compaction. 5. Testing and Inspection: During grading tests and observations should be performed by, the Soil Engineer or his representative in order to verify that the grading is being performed in accordance with the project specifications. Field density testing shall -be performed in accordance with applicable ASTM test standards. The minimum acceptable degree of compaction shall be 90 percent of the maximum dry density as obtained by the ASTM D1557-91 test method. Where testing indicates insufficient density, additional compactive effort shall be applied until retesting indicates satisfactory compaction. Sladden Engineering . January 28, 2005 -8 Project No. 544-4810 05-01-101 GENERAL The findings and recommendations presented in this report are based upon an interpolation of the soil conditions between boring locations and extrapolation of these conditions throughout the proposed building area. Should conditions encountered during grading appear different than those indicated in this report, this office should be notified. This report is considered to be applicable for use by East of Madison, LLC, for the specific site and project described herein. The use of this report by other parties or for other projects is not authorized. The recommendations 'of this report are contingent upon monitoring of the grading operations by a representative of Sladden Engineering. All recommendations are considered to be tentative pending our review of the grading operations and additional testing, if indicated. If others are employed to perform any soil testing, this office should be notified prior to such testing in order to coordinate any required site visits by our representative and to assure indemnification of Sladden Engineering. We recommend that a pre -job conference be held on the site prior to the initiation of site grading. The purpose of this meeting will be to assure a complete understanding of -the recommendations presented in this report as they apply to the actual grading performed. Sladden Engineering January 28, 2005 -9- Project No. 5444810 05-01-101 REFERENCES ASCE journal of Geotechnical Engineering Division, April 1974. Boore, Joyner and Fumal (1994) Estimation of Response Spectra mid Peak Accelerations from North American: Earthquakes, U. S. Geological Survey, Open File Reports 94-127 and 93-509. Finn, W. E. Liam, (1996) Evaluation of Liquefaction Potential for Different Earthquake Magnitudes and Site Conditions, National Center for Earthquake Engineering Research Committee. Joyner and Boore, (1988) Measurements, Characterization and Prediction of Strong Ground Motion, ASCE Journal of Geotechnical Engineering, Special Publication No. 20. Lee & Albaisa (1974) "Earthquake Induced Settlements in Saturated Sands". Seed and l.driss (1982) Ground Motions and Soil Liquefaction During Earthquakes, Earthquake Engineering Research Institute Monograph. Seed, Tokimatsu, Harder and Chung, (1985), Influence of SPT Procedures in Soil Liquefactum Resistance Evaluations, ASCE Journal of Geotechnical Engineering, Volume 111, No. 12, December. Rogers, Thomas H., Geologic Map of. California, Santa Ana Map Sheet, Riverside County,1984, Se pnic Safizty Element of the Riverside County General Plan Sladden Engineering APPENDIX A Site Plan Boring Logs APPENDIX A FIELD EXPLORATION For our field investigation, 29 exploratory borings were excavated between December 13 and December 23, 2004 using a truck mounted hollow stem auger rig (Mobile B-61) in the approximate locations indicated on the site plan included in this appendix. Continuous log of the materials encountered were prepared on the site by a representative of Sladden Engineering. Boring logs are included in this appendix. Representative undisturbed samples were obtained within our boring by driving a thin-walled steel penetration sampler (California split spoon sampler) or a Standard Penetration Test (SPT)• sampler with a 140 pound hammer, dropping approximately 30 inches (ASTM D1586), The number of blows required to drive the samplers 18 inches was recorded (generally in 6 inch increments). Blowcounts are indicated on the boring log. The California samplers are 3.0 inches in diameter, carrying brass sample rings having inner diameters of 2.5 inches. The standard penetration samplers are 2.0 inches in'diameter with an inner diameter of 1.5 inches. Undisturbed samples were removed from the sampler and placed in moisture scaled containers in order to preserve the natural soil moisture content. Bulk samples were obtained from the excavation spoils and samples were then transported to our laboratory for further observations and testing. Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date. 12/13/2004 Boring No. I Job Number; U Description Rmarks 0 10 20 25 6/4/6 Sand- fine to Moditan Grained and Sandy Silt Layer — 2" SP Native Soil rey in color 5/6/7 Clayey Silt ML 6 64 Grey in color '35 9/13)10 Sand-FinetDModium Grained Layer —9" and S=dy Silt SP 2 10 Gruy in color 40 10/10/8 Silty Sand: Fine Grained sm 2 14 Grgy in color 45 9/10/8 Silt and Clay' Intabalded Thin Lenm ML 6 Grey in color so Jill 11/16/21 Sand; Finc to Medium Grained sp I I IrTw in color .. q P." ..InAd , IR.ncrine.p.14na 55 8/9/11 Sand: Fine to Medium Grained and Sandy Silt Layer 2" SP 4 6 Brownish Grcy in color 60 3/3/4 Clayey Silt ML 27 77 Grey in color 65JL 10/7/8 Sand: Fine; to Medium Grained Layer --9" and Sandy Silt SP 23 Grey in color' 70 11/13/16 Silry Sand: Fine Grained SM 26 22 ark Grcy in color 75 JL 7/9/12 Silt and Clay: Interbedded Thin Lenses ML 33 72 Dark Grey in color -Groundwater 44 —78 Feet 80 5/7/8 Clayey Silt ' ML 32 70 Brownish Grey in color 85 6/10/10 Sample Not Recovered 90 -Note. The stratification lines - represent the approximate 95 boundarim bdwccn tic soil _ ; the transition may be gradual. -Total Depth = 90 Fcd 100 Groundwater encountered ck not encountered QlaAAnn Ano;npo"no Madison Club-The Hideaway NEC ,Avenue 54 & Madison Street, La Quinta Date: 12/18/2004. Boring No. 2 Job Number: 544-4810 e o N a 3 5 W B U Description Rcrnarks 0 Native Soil 5 • 3/3/3 Silty Sand: Finc Grained $M 2 -•- Light Grcy in color 10 5/6/7 Silty Sand: Finc Graincd SM I Light Brown in color 15 3/4/6 Silt ML 9 97 fan in color 20 415/7 Sandy Silt and Silt L.aym ML 11 81 Tan in color 255/6/7 - ir Silty Sand: Fine Grained SM 2 24 Grtyish Brown in color 30 3/5/9 Sandy Silt and Sih Layers ML 5 64 Light Brown in color 35 4/5/7 Sandy Silt ML 6 56 Greyish Brown in color 40 6/8/13 Silty Sand: Fine Grained SM 2 -•• Brownish Grey in color 45 JL 5/7/7 Sandy Silt ML 10 51 nywnish Grey in calor 50 SAW 1 Silty Sand: Finc Graincd and Silt Luys --l" SM 3 18 Irrownish Grey in color Claridp.n F.nvinpPrinv eraaa.-, F....;......;.... 55 4/6/8 Claycy Silt ML 22 77 rown in color 60 4/718 I Sandy Silt with Train of Clay ML 17 67 Brown in color 65 5/8/9 Sandy Silt ML 22 77[Town in color 70 7/8/18 Sand and Silt Laycra SM 12 34 Brown in coW 75 3/3/6 Claycy Silt ML 31 83 Brown in color ' Groundwater Q - 79 Feet 80 4/6n Clayey Silt ML 27 88 Brown in color 85 6/14/17 Claycy Silt ML 26 63 Brown in color 90 11315 Silty Sand: Fins Grained SM 28 10 Brown in color pote: The stratification lines -represent the approximate 95 I /7/I 6 Silty Sand: pine Grained SM 28 16 boundafics between the soil _types; the transition may be ual. - otal Dcpth = 101.5 Fod 100 5/6/12 Claycy Sand SM 19 47 roundwater tneountered -Bedrock not encountered eraaa.-, F....;......;.... Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/18/2004 Boring No. 3 Job Number: 544,4810 a 0 rn V pq Description in R RempAs 0 Native Soil 5 10 15 20 25 5/9/12 Silty Sand: Fine Grained and Silt Laycr —3" SM 5 20 Greyish Brown in color 30 4/6/8 Silty Sand: Fine Grained and Silt Laycr —l" SM 3 21 Greyish Brown in color 35 8/11/16 Silty Sand: Finc Grainc d SM 2 14 BTownish Grey in color 40 3 . 6!9/14 Silty Sand: Fine Grained SM 3 16 Brownish Grey in color 45 5/517 Sandy Silt ML 25 84 Brown in color 5 33/4/8 Silt ML 22 56 Brown in color ClattilPn �.f1o1nPPTIMO Cloiiilon Fnninoorinn 55 9/10/17 Sand: Fine to Medium Grained SP 26 9 Brownish Grey in calor Groundwater n@ .. 56 Feet 60 4/6/7 Silt ML 27 66 Brown In color 65 6/13/10 2/5/14 Silty Sand: Fine Grained Sandy Silt SM 24 14 BTownisb Grey in color 70 JL ML 24 52 Brown in color 75 5/12/22 Silty Sand: Fine Grained SM 27 30 Brown in color 80 6/21/34 Clayey Sand SM 16 26 Brown in color $ 85 t_ Sand: Finc to Medium Grained 11/2=6 SP 18 5 Brown in color 90 10/16/31 Sand: Coarse Grainod and Sandy Silt SP 28 --- Brown in cc>Ipr ote: The stratification lines represent the approximate boundaries bctwom the soil 95 7/15/21 Silty Sand: Fine Grained SM 19 ___ - types; the transition may be -gradual. TOW Depth =101.5 Feet Groundwater encountered 5/8/17 Sand: Coarse Grained St' l7 — -Bedrock not encountered Cloiiilon Fnninoorinn Madison Club -The Hideaway NEC Avenue 54 & Madison Stree La Quinta Date: 12/20/2004 Borlug No. 4 Yob Number: 544-4810 _ J,. Cg pq Description CA a cma&s 0 Nativc Soil - Silty Sank Fine to Medium Grained 5 t0 IS 20 25 214/6 Clayey Silt ML 11 78 Grey in color 30 518/9 Silty Sand: Fine Grained and Clay Lays —5" SM 6 --- Grcy in color 357/8/12 Sand: Fine Grainod in color 40 5/8113 Sand: Fine Grained SP 2 9 Cray in color 45 2/3/6 Clayey Silt Laycr — 8" and Silty Clay Layer— 8" ML 31 87 Grcy in color 50 E 516/11 lSilty Sand: Finc Grained SM 22 1 19 revndwater ®.-51 Feet ClnrlrlPn F.nainrrrino Cloititnn Fnoinmwnno 55 9/18/31 Sand: Fine Grained SP 22 11 ark Grcy in color 60 6/8/16 Sandy Silt ML 24 61 Dark Grcy in color 65 3/4/7 Clay CL 23 91 Bruwnish Gr y in color 70 's 75 ': $0 85 90 • - 95 _ -Total 100 .i= s -Bedrock 9/13/16 9/15/17 12/16/23 6/9/13 6/10/15 17/2629 8/17/29 Sand: Fine to Coarrx Grainer/ Sand: Fine to ComcGmincd Sand: Foie to Coarse Grained and Gravel Sand_ Fine to Coarse Grained and Silty Clay Laycr — 4" Sand: Fine to Coarse Grained Sand: Fine to Coarse Grained Sand: Fine to Coarse Grained SP SP SP SP SP SP Sl' 25 23 23 23 28 27 30 10 11 8 11 7 8 Grcy in calor' Grey in color Grey in color Grey in color Grey in color ote: The stratification lines cpromt the approxinu to boundaries between tho soil ; the hartsition may be gradual. Depth = 101.5 Feet Groundwater encountered not'encountered Cloititnn Fnoinmwnno Madison Club -The Hideaway NEC Avenue 54 & Madison Street La Quints Date: 12/20/2004 Boring No. 5 Job Number: 544-4810 -A Desai tion .t CD C11 Renwks 0 Native Soil 5 5 snlio Sandy Silt ML 96 14 77 Greyish Brown in OOIOT 10 3/5/9 Silty Sand: Fine Grainod sm 110 5 16 Grey in color 15 519l10 clayey Silt and sandy Silt ML 108 3 74 Brownish Grey in color 20 4/8/13 Sand; Fine Grained _F M 114 1 11 rey in color 25 30California Split -spoon Sample Total Depth —21' IBedrock not encountered 5Standard Unrccovcrcd sample Groundwater not encountered - Penetration Test Sample 35 40 Notir The strs fication lines represent the approximate - boundaries between the soil types. the transition may be gradual. 45 50 q6AAm Rnoirte;&nno Madison Club -The Hldcaway NEC Avenue 54 & Madison Street, La Qulnta Date: 12/20/2004 Bo'BorkC No. 6 Job Number: 5444810 en o V ° pa DCri tionRemarks W o e o o 0 ativc Soil 5 5/9/11. Sand: Fine Grained and Claycy Silt SP 114 2 --- nY in color 1 U 9/10/10 Sand: Fine Gmincd and Silty Sand: Fine Grained SP 107 2 11 Grcy in color 15 4/6/10 Sand: Fine Grained and Sandy Silt SP 101 23 —Grey ill color 20 5/10/17 Sand: Fine Grained SP 91 20 7 rcy in color 25 1' 30 Califomia Split -spoon Sample Total Depth —21' - I edr+ock not encountered - UnreoDw ed Sample I Groundwater not encountered _ - Standard Penetration Test Sample 35 i40 Notc: The stratification lines represent the approximate boundaries between the soil types; the transition may be gradual. 45 50 Madison Club-The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/20/2004 Baring No. 7 Job Number: 5444810 y \ N A rn °c U Description ° o markq 0 .i Native Soil 5 4/5/8 Silty Sand: Fine Gruined SM 102 3 21 Brownish Grcy in color - 10 4/4/8 4/6/11 t Clay and Silty Sand: Fine Grained Sand: Fine to Coarse Grained and Sandy Silt SM 84 22 16 Brownish Grey in color 15 SP 103 5 10 OTW in color 20' 5/9/13 ISandySilt, ML 110 6 77 Grey in color 25 30 i California SI lit-swon Sample Total Depth • 2 P edmck not encountered - Unrec;overrd Semple roundwater not encountered - Standard Penetration Tcst Samplc 35 40 Note: The stratification lints rcpresart the approximate' boundaries bctwcrn the soil types; the t=sition may be gradual. 45 u 50 CI.AA.N Pna;nA..4 fI Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/20/2004 Boring No. 8 Job Number: 544-4810 p ri U pq Des tion rn° -.R Rernarks 0 ative Soil 5 4/7/11 Sandy Silt and Silty Clay ML 104 2 67 Grey in color 10 7/9/9 Silty Clay and Silty Sand: hint Grainad ML 107 8 80 Grey in color 15 10/16/24 Sand: Fine Grained SP 118 6 9 Grey in color 20 8/12/18 Silty Sand: Fine Grained and Sandy Silt SM IL... 7 -i-11 Grey in color .17 30 California Spli&brK in Sample Total Dcpth —21' - IBedrock not encountered - Unrecovered Samplc I Gtoundwater not encountered - - I Standard Penetration Test Sample 35 40 Note: The stratification lines topnscnt the approximate boundaries between the soil types. the transition may be _ gradual. - 45 d r, L50!J 9151rifien F.nvirtrtrino Madison Club -The 1411denway NEC Avenue 54 & Madison Stree4 La Quinta Date: 12/20/2004 Boring No. 9 Job Number: 544-4810 e o A vi C� Desai tion Remarks p alive Soil 5 4/5/9 Sand: Fine Grained SP 101 3 7 Grey in color 10 5/9/15 Sandy Silt ML 90 22 75 Grey in color 15 4/9/15 Silty Sand; '-ine Grained SM 102 14 1.5 Grey in color 20 8/16/20 ISandFinoGmincd SP 98 18 11Grey in color 25 30California Split -spoon S4mple Total Depth —21' - IBedrock net encountered - Unrecovered Sample Groundwater not encountered - Standard Penetration "Gest Sample 35 40 Note: The stratification lines represent the approximate _ boundari"ctwcen the soil types; the transition may be - gradual. 45 50 creaa--, V—:..--., -- Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/21/2004 During No. 10 Job Number: 5444810 � \ o o C rn 0 U 0 pq Desch tion •o 0 � 'o � Remarks 0 Nativo Soil 5 12/15/23 Sand: Fine Grained and Sandy Silt SP loo 2 9 Grey in color to 23/35/31 Sand: Fine Grained and Clayey Silt SP 108 3 9 Brownish Grey in color 15 16/21/38 Sand: Fina Grained SP 99 6 7 rownish Grey in color 20 23/50 5 Sand: Fig Grained SP 106 3 7reyish Brown in color 25 30 California Si lit -spoon Sample otal Depth o--2 1' Bedrock not encountered Unrecovered Sample I Groundwater not encountered _ - Standard Penctration fest Samplc 35 40 Now The stratification lines represent the approximate - houndares between the soil types; the transition may be gradual. 45 50 Claririn.. F.+a:tirrrino Madison Club -The Elideaway NEC Avenue 54 & Madison Street, La uinta Date: 12/21/2004 During No, 11 Job Number: 5444810 A�' G� Description va R \° o c N � � erratics 0Native Soil 5 10/14/19 Sand: Fine Grained SP 114 2 12 Tey in calor 10 8/11/15 Sand: Finc Grained SP 115 3 11 Brownish Grey in color 15 9/13/16 Sandy Silt and Sand: Pine Grained ML 121 2 72 Greyish Brown in color 20 8/11/15 Sand: Finc Grained SP 113 2 12 Grey in color 25 30California Split -spoon Samplc Total Dcpth—21' - IBedrock not cnoounttxod - Unrccovcred Sample I Groundwater not encountered - Standard Penetration Test Sample 35 40 Note: The stratification linty mprc unt the appmximatG - boundaries between the soil types; the transition may be _ gradual. 45 50 MOAAnn F.nainnrrina Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/21/2004 Boring No. 12 Job Number: 5444810 V o 0 N a � � ❑ CA U Description W � oRemarks 0Native Soil _ i 4 5 j 8/11/13 Sand: Fine Grained SP 113 2 8 Brownish Grey in color 10 , _ 619/13 Sand: Fine Grained SP 109 1 9 Grey in color 15 9/12/14 Silty Sand: Fine Grained SM 114 2 17 Grey,in color 20 9/12/22 SiltySand: zinc GTaincd SM 112 4 16 Grey in color 25 30 California Split-spoon'Sample Total Depth x-21' - I edrock not cneountaW - Unr000vcrod Sample Groundwater not encountered - Standard Penetration Test Sample 35 40 Notc: Tho stratification lines represent the approximatc i' boundaries between the soil types; the transition may be _ gradual, a 45 .i ii 50 - CIotltlon YnMnArrinv Madison Club-The Hideaway NEC Avenue 54 & Madison Street, La Quanta Date- 12/2U2004 Boring No. 13 Job Number: $44-4810 1?. p N pIm 5 n, c o �; •p •� 'o � U M Dmri tion Rernuks 0 alive Soil 5 4/6/6 Sand: Fine Grained SP 115 1 10 Grey in Color 10 . 6n1l I Sand: Fine Grained SP 103 1 8 Grcy in color 15 9/14/15 Silty Sand: Fine Grained SM 110 1 18 Grcy in color - California Split-spoon Sample TOW Depth = 16' IBedrock not encountered 20 _ Unrecovered Sample 1 Groundwater not arncountenod - Standard Penetration Test Sample 25 - Note: The stratification lines represent the approximate boundaries bCtwwn the coil types; the transition may be _ gradual. U . 30 35 II i !! 40 45 50 Rlathipm Anpinrtminp Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/21/2004 Boring No. 14 Job Number: 5444810 Description y FL e CD N � ema&, 0 5 7/10/14 Clayey Silt and Silty Sand: Rine Grained ML 104 11 77 Nativc Soil Grey in color 10 8/12/16 Sand: Fine Grained SP 99 6 R Brownish Grey in color 15 20 - Milli" 6/10/11 5/8/11 Clayey Silt Clayey Silt and Sandy Silt ML ML 93 93 24 27 83 80 Browniult Grey in color Grey in color 25 30 - 35 40 . 45 so California Split -spoon Sample 1 Unrecovered Sample Standard Pcnctration Tart Sample . Note: The stratification lints rcprescnt the approximate boundarics bctwcm the soil types; the transition may be gradual Total Dcpth x..211 Bodrock not encountered Groundwater not encountered Clarlrlrn RnainrrnnO Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quints Date: 12/21/2004 Bering No. 15 Job Number; 544-4810 4.o o rV R N Op U° Description Z Remarks Native Soil 5 inn Sand: Fine Grained SP 3 10 Greyinoolor Ill 2/2/3 Silty Sand: Fine Grained SM 8 13 my in color 15 3/5x1 Silty Sand: Fine Grained SM 3 15 Brownincolor 20 617x1 Silty Sand: Fine Grained and Clay Layer -3" SM 6 16 Brown in color 25 3/3/4 Clay Layer -7" and Clayey Silt Layer -4" rown in color 30 Califomia Split -spawn Sample I Total Depth —26' -I Bedrock not encountered - Unrmovaed Sample I Groundwater not cncwuntcrcd _ - Standard Penetration Test Sample 35 40 Note: The stratification lines rcpn;R nt the approximate _ boundariai between the soil types; the transition may be gradual. 45 so Cindfien Fnoineerino Madison Cluh-The Hideaway NEC avenue 54 & Madison Street, La QuintA Date: 12/21/2004 Boring No. 16 Job Number: 544-4810 s Uoq Description v, � \ o c � oRemarks 0 Native Soil 5 : 10/11/14 Silty Sand: Fine Grained and Clayey Silt SM 103 6 16 Grey in color 10 6/9/13 Sand' Finc Gtainai SP 110 2 7 Orcy in color 15 ' 7/11/12 Sand: Fine Grained SP 109 2 d Grey in color 20 7/13/20 Sandy Silt and Silty Sand: Fine Grained ML 99 7 60. Grey in color 25 30 Califbmia Split -spoon Sample Total Dcpth x-21' 1 Wrock not encountcrcd - Unrecovered Sample I GTOundwater not cnwuntrred _ - I Standard Penetration Test Sample '35 40 Notc: The stratification lints rcprescnt the approximate boundaries bctwam the soil types; the transition may be _ gradual. 45 50 C1o�Lt� Fnoinnnrino Madison Club -The. Hideaway NEC Avenue 54 & Madison Street, La uinta Date: 12/21/2004 Boring No. 17 Job Number: 5444810 � \ o rn � v o Description 'o Remarks 0 Native Soil 5 6/10/16 Clayey Silt ML 109 1 76 Grey in color 10 12/14/22 Clayey Silt ML 108 8 71 Grey in color 156/9/12 Silty Sand: Fine Grained SM 107 2 16 Grey in color - California Split -spoon Sample Total Depth =-16' -1 Bedrock not encountered 20 Unrecovered Sample Groundwater not Encountered -Standard Pmctration Test Sample 25 - Note: The stratification lines represent the approximate _ boundaries between the soil types; the transition may be - gradual, 30 35 40 45 so Sladden Eneinnerina Madison Club -Tile Hideaway NEC Avenue 54 & Madison Street, Iia Quinta Date: 12/21/2004 Boring No. 18 Job Number: 544-4810 . \ o o rn U 3 – Desai tion 69 a «. 15 Rcrnuks 0 Native Soil 5 6/8/15 Silty Sand: Fine Grained SM 103 1 17 Grey in color 10 12/14/19 Sand: Fine Grained SP 112 0 7 Brownish Grey in color 15 9110/13 Sand: Fine Grained SP 104 1 5 Brownish Grey in color - California Split.spoon Sample Total Depth —16' •Bedrock not encountenxl 20 Unrecovcrod Sample Groundwater not cncountercd - I Standard Penetration Test Sample 25 - Nota: The stratification lines represent the approximate _ boundaries between the coil types; the transition may be • gradual. 30 35 i �4U i- f 45 50 Sla den •F.noineerina Madison Gluh-The Hideaway NEC Avenue 54 & Madison Stree La Quinta Date: 12/21/2004 Bering No. 19 Job Number: 544-4810 Dcs tion a e 0 `�'Remarks N 0 Native Soil 5 10/14/18 Silty Sand: Fine Grained SM 103 1 14 Grey in color 10 ''? 4/7/9 Sand: Fine Grained SP 104 2 10 Grcyincolor 15 5/711 U SiltySand: Finc Grained SM 111 4 18 Grey in color 20 7/11/20 Sand: Fine Grainod SP 109 1 4 8 ray in color 25 30California Split-spoon Sample Total Depth —21' Iedrock not cneountered Unrecowrad Sample I Groundwater' not encountered 5Stundard' _ Penetration Test Sample 35 40 Now The stratification lines rcprescnt the approximate _ boundaries between the soil types; the transition may be gradual. 45 50 Gladden Rnaineerine Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La Quints Date: 11./21/2004 Boring No. 20 Job Number. 544-4810 0 U Description �0 � e emarlcs 0• alive Soil 5 8/9/12 Sand: Fine Grained SP 113 1 8 Grey in color ]0 9/13/14 Sand: Fine Grained i SP 109 5 — Grey in color 15 6/9/13 Sand: Fine Grained SP 109 1 8 Grey in color 20 8/14/27 Sand: Fine Grained SP 112 4 10 Grcyincolor 25 30 J California SI lit-�xxm Sample Total Depth �-2V edrock not encountered - Unrocovcred Sample Groundwater not encountered - Standard Penetration Test Sample 35 1 40 Note_ The shutifYcation lines represent the approximate boundaries between the soil types; the transition may be _ gradual. 45 50 Ct�ltffP.M i.',M01�P.P.YiMb Madison Club-The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/23/2004 Boring No. 21 Job Number: 544-4810 A di 0 U r _ Deseti tion v, o Remarks 0 n Native Soil 5 5/10/21 Sand: Finc Grainod SP 1 9 Grey in color - lU : 8/10/10 t Sand: Finc Grained SP 5 10 Greyincolor `15 JL 3/4/8 Silty Clay and Clay Layer —3" ML 11 75 Brownish Grey in color 20 3/6/11 Silt and Clay_ Thin Interbedded Lenses CL 10 Bmwnitih Grvy in calor 25 r 30California Split-spoon Sample Total Depth x-21' - I edrock not enmuntoW - Unrecovered Samplc I Groundwater not encountered - - Standard Penetration Test Sample 35 40 Note: 71re stratification lines represent the approximate boundaries between the soil types; the transition may be _ gradual., 45 50 Clarlii�n Fnainr .Ai W Madison Club -The hideaway NEC Avenue 54 & Madison Street, Ea Quinta Date: 12/23/2004 El2ft No. 22 Job Number: 5444810 A U° Description U) a, W a o z�z emarks 0 Native Soil 5 4/4/10 Clay and Sandy Silt Layer --6" ML 7 57 Brownish Grey in color 10 5/8/11 Silty Clay and Silty Sand: Fine Grained Laycr –2" 9 CL 13 86 Grey in color 15 6/9/14 Silty Sand: Finc Grained and Silty Clay Layer –7" SM 18 --- Grey in color 20 5/8/11 Sand: Fine Grained SP 1 14 Brownish Grey in color 25 3nlio Iciayeysiit ML 3 81 rownish Grey in calor 30 California Split -spoon Samph; Total Depth —25.5' - I edrock not mcountered - Urtr000vcred Samp1C I Groundwater not encountered - Standard Penetration Teat Sample 35 ' 40 Note: The stratification lines represent the approximate boundaries betwom the soil types; the transition may be gradual. 45 50 Sladden Enixineerine Madiron Club-The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/23/2004 Boring No. 23 Job Number: 5444810 (5 3 o Description 3 o N � a Remarks pGrass Pasture 5 4/6/8 Sand: ]cine Gmincd SP I 10 Grey in color 0 3/5/11 Sand: Fine Grained SP 7 10 Grcy in color 15 3/6/8 Clayey Silt and Sandy Silt Layer –7" ML 8 68 Brownish Grcy in color 20J'J. 3/3/5 Clay and Sandy Silty, Layer --6" ML 20 71 rownish Grcy in color 25 30 California Split-spoor Sample Total Depth —20.5' . - I Bedrock not cnoountered - Unrecovered Sample I Groundwater not encountered _ - Standard penetration Tcst Sample. 35 40 Notc: Ile stratification lines reprasmt the approximate boundaries between the soil types; the transition may be _ gradual_ 45 50 Sladden Eneineerine Madison Club-The Hideaway NEC Avenue 54 & Madison Stree La Quinta Date: 12/23/2004 Boring No. 24 Job Number: 544-4810 rn o� V Gq Dcscri tion •e y c o 0 cmark,4 0 Native Soil 5 5/20/20 Clayey Silt ML Light Gmy 10 6/7/10 Sand: Fine Grained SP 2 9 Grey in color 15 516110 Silty Sand: Finc Grained SM 2 12 Grey in color 20 5n18 Silry Sand: Finc Grained SM I 12rey in color 25 30 California Split-spoon Sample Total Depth —20.5' Iodrock not encountered • Unrecovered Sample I Groundwittur not encountered " Standard Penclration Tett Sample 35 •40 Note: The stratification lines represent the approximate boundaries between the soil types; the transition may be _ gradual. 45 50 Ctnrtrtrr� F'101rfrY.Vitfb Madison Club -The Hideaway NEC Avenue 54 &. Madison. Street, La Quinta Date: 12/23/2004 Boring No. 25 Job Number. 544-4810 �i U Mw c U � c pq D=ri tion � .o v, p CA a 9Z Remarks 0 alive Soil 5 10/20/20 Sand: Fine Grained SP 1 9 Grey in color 10 '- 6/9/18 Sand: Fine Grained SP 1 I I Grey in color is JIL 6/10/15 Clayey Silt NIL 3 77 Brown in color 20 8/10/14 Sandy Silt and Clayey Silt Lays -3" ML . 3 72 Brown in calor 25 30 California Split -spoon Sample Total Depth —20.5' - ( odroa not cricountemd - Unrmovcmd Sample roundwatcr not cnoount.ered - - I Standard Penetration Test Sample 35 40 Note: The stratification lints Tgm2 mt the approximate boundaries between the soil types; the transition may be _ gadual. r 45 50 C1Adrlen Rtnoineerine Madison Club -The Hideaway NEC Avenue 54 & Madison Street, Lfi!2ulnta Date: 12/23/2004 Boring No. 26 Job Number: $444910 0 in U G4Description g cmarks 0 Native Soil 316110 Silty Clay Layer 4" and Sand: Fine Grained ML 18 81 Grey in color 0 5/6/8 Sand: Fine Grained SP 8 10 GreyincoloT 314/6 Sand- Fine Grained Layer -3" and Clayey Silt SP 8 my in color California Split -spoon Swnplc Toral Depth —15.5' Bedrock not cncountcrcd 20 Unrecovered Sample Croundwater not encountcrcd Standiad Penetration Test Sample 25 - Note: The stratification lines represent the approximate boundaries between the soil types-, the transition may be gradual. 30 35 40 45 50 RIsAfIrn Rnorineerrine Madison Club -The Hideaway NEC Avenue 54 & Madison Street, La uinta Date: 12/23/2004 Bodm No. 27 Job Number: 544-4810 CDP e Description v°, Ta aRemarks 0 Nativc Soil 5 617/9 Sand: Finc Grained SP 4 9 Grey in color 10 3/4/5 Claycy Silt INI 2 84 5Townish Grey in color is 4/5/5 Sandy Silt and Claycy Silt --3" ML 12 71 Brownish Grey in color 20 , 5/5/8 Sand:1•inc to MWium Grained SP 6 10 Town in color 25 30 California Split -spoon Sample Total Dcpth --x20.5' 1 edrock not cneountered - Unrecovarod Sample I Groundwater not encountcrcd - Standard Penetration Tcst Sample 35 40 Notc: T'he stratification lines rcpr omt the approximate - boundaries be tween the soil types; the transition may be gradual. 45 50 Cloililo� Fnoitw-.ina Madison Club-The Hideaway NEC Avenue 54 & Madison Street, La Quinta Date: 12/23/2004 Bo No. 28 Job Number: 5444810 o � q U pq Descri tionV5 � ° oRemarks 0 Native Soil 5 4n19 Sandy Silt, ML 3 61 Grey in color 10 JE 3/3/6 Clay Laycr –7" and Sandy Silt ML 10 74 Grey in color 15 2/2/3 Clay GL 12 90 Brownish Grey in color - California Split-spoon Sample Total Depth —15.5' - IBedrock not encountcrcd 20 Unrecovered Sample ,' roundwater not encountered _ I Standard Pcadration TvA Sample 25 Note: The stratification lines represent the approximato _ boundaries between the soil typrs; the transition may be gradual. 30 35 _ 40 C 45 L 50 CInAApn F.noinparinn Madison Club -'.Ile Hideaway NEC Avenue 54 & Madison Stree4 La Quinta Date; 12/23/2004 During No. 29 Job Number: 544-4810 � \ o o VJ U Description RenmrPs Native Soil 5 6/9/14 Silty Sand: Finn Graincd SM 1 17 Orey in color 10JIE 617/8 Sand: Pinc Grainctl SP 2 11 GTcy in Color 15 3/4/7 Sand: FinCGraincd SP 4 10 Grcy in wfor - California Si lit -spoon �vplc otal Depth —15.5' Bedrock not encountered 20 Utn000vcrad Samplc Groundwator not cneountered Standard Penetration Test Sample 25 - Notc: The stratification lincs, rcp[rsmt the approximatc boundarie7 between the soil tyres; the transition may be _ gradual. 30 35 40 45 50 ClaAAl n Rnoinww-rino APPENDIX B 'Laboratory Testing Laboratory Test Results APPENDIX B LABORATORY TESTING Representative bulk and relatively undisturbed soil samples were obtained in the field and .returned to our laboratory for additional observations and testing. Laboratory testing was generally performed in two phases. The first phase consisted of testing in order to determine the compaction of the existing natural soil and the general engineering classifications of the soil underlying the site. This testing was performed in order to estimate the engineering characteristics of the soil and to serve as a basis for selecting samples for the second phase of testing. The second phase consisted of soil mechanics testing. This testing including consolidation, shear strength and expansion testing was performed in order to provide a means of developing specific design recommendations based on the mechanical properties of the soil. CLASSIFICATION AND COMPACTION TES'T'ING Unit Weight and Moisture Content Determinations: Each undisturbed sample was weighed and measured in order to determine its unit weight. A small portion of each sample was then subjected to testing in order to determine its moisture content_ This was used in order to determine the dry density of the soil in its natural condition. The results of this testing are shown on the Boring Log. Maximum Density -Optimum Moisture Determinations: Representative soil types were selected for maximum density determinations. This testing was performed in accordance with the ASTM Standard D1557-41, Test Method A. The results of this testing are presented graphically in this appendix. The maximum densities are compared to the field densities of the soil in order to determine the existing relative compaction to the soil. This is shown on the Boring Log, and is useful in estimating the strength and compressibility of the soil.. Classification Testing : Soil samples were selected for classification testing. This testing consists of mechanical grain size analyses and Atterberg Limits determinations. These provide information for developing classifications for the soil in accordance with the Unified Classification System. This classification system categorizes the soil into groups having similar engineering characteristics. The results of this test are very useful for detecting variations in the soil and in selecting samples for further testing. SOIL MECHANIC'S TESTING Direct Shear Testing: One bulk sample was selected for Direct Shear Testing. This testing measures the shear strength of the soil under various normal pressures and is used in developing parameters for foundation design and lateral design. Testing was performed using recompacted test specimens, which were saturated prior to testing. Testing was performed using a strain controlled test apparatus -with normal pressures ranging from 800 to 2300 pounds per square foot. Expansion Testing: One bulk sample was selected for Expansion testing. Expansion testing was performed in accordance with the UBC Standard 18-2. This testing consists of remolding, 4 -inch diameter by 1 -inch thick test specimens to a moisture content and dry density corresponding to approximately 50 percent saturation. The samples are subjected to a surcharge of 144 pounds per square foot and allowed to reach equilibrium. At that point the specimens are inundated with distilled water. The linear expansion is then measured until complete. Consolidation Testing relatively undisturbed samples were selected for consolidation testing. For this testing one -inch thick test specim are subjected to vertical loads varying from 575 psf to 11520 psf applied progressively. The consolidation at each oad increment was recorded prior to placement of each subsequent load. The specimens were saturated at the 575 sf or 720 psf load increment. APPENDIX C 2001 California Building Code with 1997 UBC Seismic Design Criteria Project No. 544-4810 05-01-101 2001 CALIFORNIA BUILDING CODE SEISMIC DESIGN INFORMATION The California Code of Regulations, Title 24 (2001 California Building Code) and 1997 Uniform Building Code, Chapter 16 of this code, contain substantial revisions and additions to earthquake engineering design criteria. Concepts contained in the code that will be relevant to construction of the proposed structures are summarized below. Ground shaking is expected to be the primary hazard most likely to affect the site, based upon proximity to significant faults capable of generating large earthquakes. Major fault zones considered to be most likely to create strong ground shaking at the site are listed below. Fault Zone Approximate Distance From Site Fault Type (1997 UBC) San Andreas 8.9 km A San Jacinto30.9 km A Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is Sv, generally described as stiff or dense soil. The site is located within UBC Seismic Zone 4. The following table presents additional coefficients and factors relevant to seismic mitigation for new construction upon adoption of the 1997 code. Sladden ,Engineering Near -Source Near -Source Seismic Seismic Seismic Acceleration Velocity Coefficient Coefficient Source Factor, Na Factor, Nx Ca Cll San Andreas 1.04 1,29 0.44Na 0.64N,. San Jacinto 1.0 1.0 0.44N. 0.64N- Sladden ,Engineering