003270 (SFD) Geotechnical Reportrl OBuena Engineers, Inc. WN W7 AN EARTH SYSTEMS, INC. COMPANY 79-811 COUNTRY CLUB DRIVE, SUITE #4 • BERMUDA DUNES, CALIFORNIA 92201 • (619) 345-1588 November 4, 1987 T.C. Yaru Construction 72-935 Amber Palm Desert, CA 92260 Project: #7 kR8i51710jS_aguaroir La Quinta, CA. Subject: Report of Field Densities Single Family Residences 87-0172-P1 87-11-701 RECEIVED NOV 0 9 1987 CITY OF LA QUINTA PUNNING & DEVELOPMENT DEPT. On September 14, 1987, a representative of our firm performed density tests in the fill for the building pads on the above referenced project. Tests were performed at random locations i n accordance with ASTM D 2922-81 and ASTM D 3017-78 Nuclear Density Test Procedure. Testing was performed as per authorization of T.0 Yaru. The estimated location of the test are presented on the attached plan with their results being summarized on the attached test report sheet. A total of four (4) density test were performed. Tests results indicate that a minimum of ninety (90) percent relative compaction has been obtained within the areas tested. The maximum density -optimum moisture were determined in the laboratory in accordance with ASTM D 1557-78, Method A or C. Test results are as follows: Soil Description USCS MaximumDensity-ODtimumMoisture Gray slightly silty very fine to fine sand with traces of gravel SM VENTURA (805) 642-6727 109.2 pcf 12.9% LANCASTER (805) 948-7538 BAKERSFIELD SANTA BARBARA BERMUDA DUNES SAN LUIS OBISPO (805) 327-5150 (805) 966-9912 (619) 345-1588 (805) 544-6187 November 4, 1987 -2- 87=0172-P 1 87-11-701 1. The two lots are located at 78-685 and 78-570 Saquaro in the City of La Quinta, California. 2. Prior to our arrival at the sites, the fill had been placed and compacted. 3. The purpose of testing was to observe compliance with the minimum requirements of the city of La Quinta, California. Limitations This firm did not perform a soils investigation, did not conduct any tests to determine the general condition, adequacy or stability of soils on the property, nor did it observe the backfilling or compacting operations which were already completed at the itme our personnel were called to the site. The only services performed were the specififc moisture and density tests summarized in this report. These test results provide only limited information about the surface materials observed at the locations and depths tested and cannot be relied upon for information about subsurface conditions or compaction, or to determine the appropriateness of any design or construction of improvements on the site. No inspection was made of the contractor's work and no guarantee or warranty of that work in backfilling or compaction of the soils on the site is made or implied. If there are any questions, please do not hesitate to contact this office. Respectfully submitted, BUENA EN61 NEE S, INC. 1 Phillip D. Clanton Sr. Technician PDC/JRV/mea Reviewed and G7 RU W Joseph R. Menu Civil Engineer Copies: 2 - T. C. Yaru Construction 2 - City of La Quinta 1 -P. S. 2 - VTA file BUENA ENGINEERS, INC. Q-jpF ESS101V apNDp(,- F� No. C 041210 a EV. C IVI . r\F CAV\i CONTRACTOR: ADDRESS: REPORT OF RELATIVE COMPACTIONS Job No. B7 -0172-P 1 DATE: November 4, 1987 Report No. 87-11-701 JOB & LOCATION: La Qulnla, CA TEST NO. DATE TESTED DESCRIPTION 78-685 Saquaro %MOISTURE IN PLACE DRY DENSITY IN PLACE RELATIVE COMPACTION MA%INIUM DENSITY 1 9-14-87 Per Plan FG 12.9 103.4 95 109.2 2 9-14-87 Per Plan 1.0 BFG 10.4 103.4 95 109.2 78-570 Saquaro 3 9-14-871 Per Plan 1.0 BFG 9.3 104.9 96 109.2 4 9-14-871 Per Plan FG 13.7 103.5 95 109.2 FG - Finish Grade BFG - Below Finish Grade i I WE CERTIFY THAT THESE TESTS WERE PERFORMED IN CONFORMANCE WITH COPIES: BUENA ENGINEERS, INC. ,5aquo,y-o