07-2849 (HOSP) Revision 2pc-� *�- - Dt"r. 5
#
Qty of La Quinta
BUIlding &r Safety Division
Permit #
P.O. Box 1504, 78-495 Calle Tampico
La Quinta, CA 92253 - (760) 777-7012
Building Permit Application and Tracking Sheet
Project Address: 4 S - 2 8 0 Seeley Drive Owner'sNarne: Eisenhower Medical Center
A -P -Number: 604-094 &
604-040-09S Address: 39000 Bob Hope Drive
Legal Description: Core and
Shell City,STZip: Rancho Mirage, CA 92270
Contractor: WDL Construction Telephone. 760.773.1273
Address: 74075 El Paseo, Ste B3
Project Descr iption: Core and Shell for
City,ST,Zip: Palm Desert, CA 92260
a three story approx. 92,591 sf
Telephone: 760.674.95S 3
0.
RE:
me dical office building.
State Lic. # : 7 4 113.7
City Lie. # 4966
Z57 -
Arch., Engr., Designer: Boulder Associate's
Address: 1426 Pearl Street, Ste 300
City,ST,Zip: Boulder, CO 80302
Telephone: 303.499.779S
nstructionType: II- 1hr Occupancy: B
State Lie. #: C-20140
—)
Project type (circl I -W
on
-le Add'n Alter Repair Demo
Narne of Contact Person: James Lenhart
±)N,
Sq. Ft.: 9 2 , 5 91 Stories: 3 # Units: N/A
Telephone # of Contact Person: 3 0 3 4 9 9 . 7 7 9 5
Estimated Value of Project: no changes made
APPLICANT: DO NOT WRITE BELOW THIS LINE
9
Submittal
Reqld
RcC'd
TRACMG
PERMIT FEES
Plan Sets
Plan Check submitted
Item
Amount'
Structural Coles.
Reviewed, ready for corrections
Plan Check Deposit
Truss Cgics.
Called Contact Person
Plan Check Balance
Construction
Title 24 Coles.
Plains picked up
Flood plain plan
Plans resubmitted UP
Mechantcal
Grading plan
2" Review, ready for torrection su 711D
Electrical
Subcontactor List
Called Contact Person
Plumbing
GrantDeed
Plans picked up
S.M.I.
H.O.A. Approval
Plans resubmitted
Grading
rN 1101USE:-
Review, ready for corrections/issue
Developer Impact Fee
PlanningApproval
Called Com act Person
A.I.P.P.
Pub. Wks. Appr
Date of permit Issue
School Fees
52�
I-T*!!jPcrmit FEE 3
42 ED.
TO: FJYOUNG
TODAY'S DATE:
PROJECT ADDRESS:
APPLICANT NAME:
I
P.O. Box 1504
LA QUINTA, CALIFORNIA 92247-1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
4Q,w" S
awwwas-0
—
BUILDING & SAFETY -DEPARTMENT
(760) 777-7012
FAX (760) 777-7011
TRANSMITTAL
gee"
SGIL ATTENTION:
DUE DATE:
SUBMITTAL: F-12 ND
BIN NUMBER:Lj
INCLU
.2ED HEREWITH-.
ANS REDLINED PLANS
TRUCT*OREDLINED STRUCT
FITRUSS EIREDLINED TRUSS
nSOILS nREDLINED SOILS
FIENERGY FIREVISED ENERGY
FICORRECTION LIST
fe H E R
03 RD 1:14 TH 1:15TH
PERMIT NUMBER-
E]REVISED PLANS []APPROVED PLANS
E:IREVISED STRUCT
[:]REVISED TRUSS
[-]REVISED SOILS
[]APPROVED STRUCT
EJAPPROVED TRUSS
FIAPPROVED SOILS
nCUSTOMER RESPONSES
6
-BUILDING DEPARTMENT USE ONLY -
GREEN SHEET TO: FICDD [I(w/Plans) []PUBLIC WORKS EICOVE CHECK (w/Application)
LOCATION ON BOARD: LEFT MIDDLE RIGHT
SENT TO: SY Sv SH '8TRUCTINON-STRUCT
s — T,
ASSIGN NON-STRUCTURAL TO:
COMMENTS:
November 11, 2008
WDL Construction
Attn: Don Wilcox
Eisenhower Ambulatory Care Center Project #51122
74075 El Paseo, Ste B3
Palm Desert, CA 92260-4118
RE: Core and Shell — 100% CD — Delta 5
Mr. Wilcox:
Robert G. Owens, III, AIA
Craig D. Mulford, AIA
Nicholas J. Rehnberg, AIA
Timothy C. Boers, AIA
Curtis Chong, AIA
Below is a list of changes included in the Core and Shell Delta 5 set. All changes are clouded and tagged with the
associated RFI, ASI and/or PR number as applicable.
The Delta 5 set includes changes per RFI's up to No. 489, with the exception of 478, 481, 371.1, 478.1 and 475,
changes per FIR'S 1-13.1, with the exception of 9 and 10, and changes per ASI's 1-12.
SPEC REVISIONS
0 08211 —Wood Doors
0 08213 — Stile and Rail Doors
0 08329 — Integrated Door Assemblies
0 08346 — Radiation Shielding Swing Door
0 14240 — Hydraulic Elevators
0 08110 — Hollow Metal Doors and Frames
0 08710 — Door Hardware
DRAWING REVISIONS
CIVIL
1 OF 13 PRECISE GRADING AND PAVING PLANS
0 Revised sheet index.
2 OF 13 PRECISE GRADING AND PAVING PLANS
0 Added and revised construction notes with quantities
4 OF 13 PRECISE GRADING AND PAVING PLANS
Boulder Associates, Inc.
1426 Pearl Street I Suite 300 1 Boulder, CO 80302 1 303.499.7795 1 F303.499.7767
BOULDER - SACRAMENTO - ORANGE COUNTY I www.boulderassociates.com
• Revised retaining wall.
• Revised drain pipe with area drain inlets.
• Added construction notes.
• Revised curb ramp and location of curb face.
5 OF 13 PRECISE GRADING AND PAVING PLANS
0 Revised curb ramp and location of curb face.
6 OF 13 PRECISE GRADING AND PAVING PLANS
• Added construction note.
• Added employee eating area with garden wall.
• Added garden wall detail.
8 OF 13 PRECISE GRADING AND PAVING PLANS
• Revised storm drain laterals.
• Updated line data table.
9 OF 13 PRECISE GRADING AND PAVING PLANS
• Added storm gate, weir chamber & CIDS units.
• Revised storm drain laterals
• Added construction notes.
• Revised line & curve data table.
9A OF 13 PRECISE GRADING AND PAVING PLANS — New Sheet
LANDSCAPE
L101 IRRIGATION PLAN
0 Revised irrigation at retaining wall.
Ll 02 IRRIGATION PLAN
Revised irrigation at main entrance and fountain.
Ll 03 IRRIGATION PLAN
0 Revised irrigation at retaining wall.
L105 PLANTING PLAN
0 Revised planting plan at retaining wall.
Ll 06 PLANTING PLAN
0 Revised planting plan at main entrance and fountain.
L107 PLANTING PLAN
0 Revised planting plan at retaining wall.
Ll 08 PLANTING PLAN
0 Revised plant legend.
L502 PLANTING DETAILS
0 Added typical planting limits section.
ARCHITECTURE
AM SITE PLAN AND DETAILS
• Security cameras added throughout.
• Revised landscaping and canopy at entrance.
• Revisions to fountain.
A1.2 ARCHITECTURAL SITE PLAN DETAILS
• Revised landscaping and canopy at entrance.
• Revisions to fountain.
A1.3 ARCHITECTURAL SITE PLAN DETAILS
0 Revised note in detail 1.
A1.4 ARCHITECTURAL SITE PLAN DETIALS
* Revised notes in detail 11.
A1.6 ARCHITECTURAL SITE PLAN DETAILS
• Added details.
• Revisions to notes in details 6, 7 & 8.
• Revised dimensions in details 7 & 8.
A1.7 ARCHITECTURAL SITE PLAN DETAILS
0 Added details.
A1.8 ARCHITECTURAL SITE PLAN DETAILS
• Completely revised sections 13 & 18.
• Added details.
• Added and revised notes in details 4, 5 & 10.
• Revised dimensions in details 4 & 5.
A1.9 RETAIN I NG WALL E LE VAT[ON — New Sheet
A2.0 LIFE SAFETY PLAN
9 Revised A-3 Occupancy.
A2 -1 FIRST FLOOR PLAN
•
Addition of card key's, intercoms and MHO's.
•
Revised dimensions throughout.
•
Revised door and door location in Electrical 115.
•
Revised door A100A.
•
Revised electrical in Building Lobby.
•
Slopes to floor drains added.
•
Added section and detail tags-
•
Volume control added to Building Lobby desk station.
•
Revised low voltage operator.
•
Stair 102 stairs and landing dims. revised.
•
Electrical roams 107 & 115 layouts revised to match electrical.
•
Standpipe added within Stair 102.
•
Sink in Storage 127 to be future.
•
Revised Vestibule 100: fire control & area of refuge panels added.
•
Columns at Pharmacy Drive Through & near Stair 120 revised to match structural.
A2.2 SECOND FLOOR PLAN
•
Complete revision of Women's and Men's room area and Janitor's Closet.
•
Revised dimensions throughout.
•
Revised fire rating for west wall of Multipurpose E200.
•
Area of refuge added to Stair 202 & Stair 220.
•
Stair 202 stair and landing dimensions revised.
•
Card key's added.
•
Revised fire rating of doors 203A & 203B.
•
Slopes to floor drains added.
•
Standpipe added within Stair 202.
•
Stair 202 doors and door location revised.
•
Additional columns added for folding partition.
•
Windows revised on south side of Multipurpose E200.
A2.3 THIRD
FLOOR PLAN
•
Revised dimensions throughout.
•
Area of refuge added to Stair 302 & 320.
•
Card key's added.
•
Slopes to floor drains added.
•
Stair 302 stair and landing dimensions revised.
•
Fire rated wall in Fan Room 309.
•
Revisions to door and windows at Balcony 312.
•
Revised mech. equip. in Fan Room 309.
•
Standpipe added within Stair 302.
•
Stair 303 doors and door location revised.
A2.4 ROOF PLAN
• Revised dimensions throughout.
• Revised RD & ORD.
• Added grout joints in the precast caps.
A2.5 ENLARGED TOILET ROOM PLANS AND SCHEDULES
• Wall finish and tile revisions.
• Revision to second floor toilet room plan.
• Added and revised elevations.
• Revision to accessory & equipment schedule (wall protection and crash rail).
A2.6 LIGHT MONITOR PLANS AND DETAILS
• Revised third floor toilet room plan.
• Added elevations for Women's toilet 205.
A2.7 CANOPY PLAN AND DETAILS
0 Entire sheet has been updated.
A2.8 FIRST FLOOR EDGE OF SLAB PLAN
• Slopes to floor drains added.
• Revised dimensions.
A2.9 SECOND FLOOR EDGE OF SLAB PLAN
• Slopes to floor drains added.
• Revised dimensions.
A2.10 THIRD FLOOR EDGE OF SLAB PLAN
• Slopes to floor drains added.
• Revised dimensions.
A2.11 ROOF EDGE OF SLAB PLAN
0 Revised dimensions.
A2.12 ENLARGED PLAN
• Added detail of enlarged plan at Linear Accelerator.
• Revised dimension at Vestibule 127
A213 AREAS OF REFUGE — New Sheet
AM EXTERIOR ELEVATIONS
0 Revised windows and exterior doors.
A3.2 EXTERIOR ELEVATIONS
• Revised window locations.
• Revised windows and exterior doors.
• Added section cut.
AM STAIR SECTIONS
• Revision to landing and stair dimensions-
• Revisions to handrail, guardrail. and glass panels.
• Revision made to detail at light monitor (131A5.2).
A4.2 STAIR SECTIONS
a Revision to wall rating.
A4,3 ELEVATOR SECTIONS
• Revision to beam locabors.
• Dimension revisions.
• Added wall at gridline 8 to enclose beams.
MA WALL SECTION
• Revisions to floor slab.
• Added door plan detail
• Complete revision of door elevation
• Revisions and additions to wall section 3/A4-4
A4.5 WALL SECTION
0 Revisions to floor slab.
A4.6 WALL SECTIONS
0 Revised dimensions at 1/A4.6
A4.8 WALL SECTIONS
0 Revised dimensions.
A4.9 WALL SECTIONS
5
• Revised dimensions.
• Steel support for sunscreen shown for clarity.
• Revision to first floor of section 1 /A4.9.
A4.10 WALL SECTIONS
• Revisions to guardrail and glass panels.
• Revisions to third floor balcony.
• Revised dimensions,
A4.12 WALL SECTIONS
0 Revised dimensions.
A4.13 WALL SECTIONS
0 Revised dimensions.
A4.14 WALL SECTIONS
• Revised dimensions.
• Revisions to shading device detail (1 1/A8.6)
A4.15 WALL SECTIONS
• Added sun screen support details.
• Revised dimensions.
• Revisions to shading device detail (1 1/A8.6).
• Revised handrail and guardrail.
A4.19 WALL SECTiONS
Revised dimensions.
Beam added to 1 /A4 19 to match structural.
Revisions made to details 31A4. 19 and 41A4. 19
Added perforated aluminum panel and composite metal panel to section VA4, 19,
Steel support for sunscreen shown for clarity on section SIA4.1 9.
Section 31A4.19 added.
A4-20 WALL SECTIONS
. Added elevation at second floor guardrail -
A5.1 DETAILS
• Metal deck added to details 4 & 5.
• Revisions made to seismic roof joint (7/A5.1).
A5.2 DETAILS
0 Revisions to 13/A5.2.
A63 DETAILS
• Added and revised details.
• Revised dimension to BIA5.3,
A5.4 DETAILS — New Sheet
0 Conduit details in Linear Accelerator.
A7.1 PARTITION TYPES AND DETAILS
• Added Perimeter Fire Containment detail (10JA7,1),
• Revision to 51A7A,
6
A7.5 UL DETAILS — New Sheet
A8.1 DOOR SCHEDULE AND HARDWARE SCHEDULE
• Added and revised hardware.
• Revised door schedule.
• Revisions to door types K and D & door frame type 3.
• Revision to 2/A8.1 & 3/A8.1.
A8.2 WINDOW SCHEDULE
• Revised dimensions.
• Complete revision of aluminum storefronts A, B5 & S
• Complete revision of curtain walls F3 & F4
A8.3 WINDOW SCHEDULE
• Revised dimensions.
• Complete revision of aluminum storefront YY.
A8.4 DOOR AND WINDOW DETAILS
• Revised dimensions.
• Revised notes.
A8.5 DOOR AND WINDOW DETAILS
• Revised dimensions.
• Revised and added details.
A8.6 WINDOW SHADING DEVICE DETAILS
• Revised dimensions.
• Revised note at detail 11.
A9.1 FIRST FLOOR RCP
• Revised dimensions at stair 102.
• Revised lighting layout in Women's 105 and Men's 106.
• Speakers added throughout.
• Security cameras added throughout.
• Revised room number for Elec. (from 106 to 107).
• Revised wall rating at Bldg. Serv./Fan Room 111 & Electrical 115.
• Revised lighting layout in Mechanical 114.
• Diffuser locations revised near caf6.
A9.2 SECOND FLOOR RCP
• Complete revision of toilet rooms and drinking fountain area.
• Revised dimensions and layout at Stair 202.
• Speakers added throughout.
• Access hatch added in Men's 206.
• Revision to lighting in Stair 220.
A9.3 THIRD FLOOR RCP
• Revised dimensions and layout at Stair 302.
• Revised lighting layout in Women's 305 and Men's 306.
• Speakers added throughout.
A9.5 CEILING DETAILS
• Speakers added throughout.
• Lighting layout revisions.
• Security cameras added throughout.
• Diffuser locations revised near caf6.
• Revision at Receptionist.
INTERIOR DESIGN
ID4.02 SECOND FLOOR FINISH PLAN
0 Revisions to public toilet room area.
ID5.01 FIRST FLOOR WALL FINISH PLAN — WDL requested current sheet
0 Wall finishes added to revised vestibule.
ID5.02 SECOND FLOOR WALL FINISH PLAN
9 Revisions to public toilet room area.
0 Revisions to finishes at Health & Wellness Center 203 entry.
ID6.02 SECOND FLOOR RCP FINISH & LIGHTING PLAN
• Revisions to public toilet room area.
• Lighting revisions.
ID7.02 INTERIOR ELEVATIONS — WDL requested current sheet
0 Revised lobby elevation.
ID8.01 INTERIOR DESIGN DETAILS — WDL requested current sheet
• Revised reception desk elevations.
• Revised notes.
ID8.04 INTERIOR DESIGN DETAILS — WDL requested current sheet
0 Revised details.
ID9,01 FIRST FLOOR FURNITURE PLAN — WDL requested current sheet
STRUCTURAL
�all Delta 5's not tagged with a RFI, ASI, or PR number are associated with the metal studs.
SO.01 TYPICAL NOTES
* Revised structural steel grades.
SO.03 TYPICAL METAL DECKING DETAILS
•
Added metal deck detail.
•
Added contractor's alternate for plan of deck parallel to WIF Col.
•
Revised Head Beam Schedule.
S1.01 FOUNDATION PLAN
•
Added and revised detail callouts.
•
Added notes.
•
Note revisions at drive through overhang.
•
Revisions at elevators.'
•
Added dimensions.
a
S1 �G2 SECOND FLOOR FRAMING PLAN
• Added and revised detail callouts.
• Beam revisions-
• Added notes.
• Colurnn-Bearn connection revisions.
• Added dimensions.
S-1.03 THIRD FLOOR FRAMING PLAN
• Added and revised detail callouts-
• Sunshade revisions.
• Beam revisions.
• Added notes-
• Added dimensions.
S1,04 ROOF FRAMING PLAN
• Added and revised detail callouts.
• Sunshade revisions.
• Added notes.
• Added dimensions
S1.05 ENLARGED PLAN
• Added height for top of HSS-
• Slab revision in Detail 1.
• Revised enlarged foundation plan.
• Detail 2 revised.
• Baffle Detail 5 revised.
S1.06 CANOPY PLANS, SECTIONS. & DETAILS
• Added note and revised dimension at canopy section.
• Revised Detail D,
Sl -07 MECHANICAL ENCLOSURE, PLAN & DETAILS
a Added notes to Detail J.
S1.08 AIRFOIL PLANS AND DETAILS — New Sheet
S1.09 AIRFOIL PLANS AND DETAILS — New Sheet
S2.02 FRAME ELEVATIONS, NOTES & DETAILS
0 Added note to SSDA Beam Slot Connecfion details.
S5,01 FOUNDATION DETAILS
Revised Detail B.
Added note to Detail C.
Added details to Detail E.
Revised note at Detail H -
S5,02 FOUNDATION DETAILS
• Revised note at Details 0 & D-
• Revised Detail F -
S5,20 TYPICAL STEEL DETAILS
9
• Added notes to Details A, B. & C.
• Added note to schedule.
• Revised Detail E.
• Added net.. and dimensions W Detail L.
• Added wnthquator's altenmt. to Detail P.
SS.21 TYPICAL STEEL DETAILS
• Revised Detail A.
• Added note to Demil B.
• Plate in lab emitted "m Detail E.
• Beam sUffemua,.moed at Debit K.
• Added dimension and note to Detail J.
• Revised notes at Detail K.
• Added slope to Detail L.
SS.22 STEEL DETAILS - Nevi Sheet
$5.30 FLOOR FRAMING DETAILS
. Revised notes at details CO & L.
$5.31 FLOOR FRAMING DETAILS
• Added note W Detail A.
• Added dimension to Detail C.
• Revised Detail D.
• Added details.
S5.40 ROOF FRAMING DETAILS
• ReAsed sunshade supports.
• Added notes to Detail 0.
• Added detail.
• Revised connection details throughout
• Added conractors option 0 Debut G.
S5.41 ROOF FRAMING DETAILS
• Revised connection at spliced HSS beam.
• Added TOS elevation note to Detall A.
• Added deall tha section C -C.
• Revised condition at moment tame.
• Added face of HSS to Detail K.
• Added Detail L.
S5.42 ROOF FRAMING DETAILS
• Revised anclul, bolls at Detail A.
• Added not" to Detail C.
• Revised Detail E.
• Gontractor's aftemate, note added to Detail L.
S5.43 ROOF FRAMING DETAILS
• Added detail 0 Detail A.
• Added detail and connection note to Detail C.
• Revised Detail E.
• Added details.
MECHANICAL
MO.0 LEGEND, SCHEDULES 8 GENERAL NOTES
• Added note to general notes.
• Rexised fan schedule.
MO.1 EQUIPMENT SCHEDULES AND NOTES
• Revised AH -3 In air handling unit schedule.
• Revised variable frequency drive schedule.
• Revised Supply Air Type 'E'
• Revised diffuser/return note 1.
M0.2 EQUIPMENT SCHEDULES AND NOTES
Revised Terminal Unit Schedule.
Ni AUTO. TEMP. CONTROLSIEMCS WIRING DIAGRAMS
• Removed space sensor from Tyip. Cooling Fan Coll Unit.
• Removed FC�Ztfmm Elec/Elev. Mach. Room Fan Coll Unit
MO.4 AUTO. TEMP. CONTROLS/EMCS WIRING DIAGRAMS
• Removed delails.
• Added Ref -3 and AH -3 0 Typ. Constant Volume Air Handling System.
• Added AH�6 to Air Handling Unit CDC Panel.
hi AUTO. TEMP. CONTROLSIEMCS WRING DIAGRAMS
• Added and raxised notes.
• Revised wiringin Refrigerant Leak Monitoringsystem.
• Added temp. sensmsmansmittems W Chilled Watm/Condenser Water DDC Panel.
• Revised tealps. at Chilled Water Platelf'rame Heart Exchanger Control,
MOS AUTO. TEMP. CONTROLSIEMCS WIRING DIAGRAMS
. Added detail.
M2.1 MECHANICAL FIRST OVERALL PLAN
•
Revised duct sizes.
•
Revised mechanical layout.
•
Revised notes.
M2.2 MECHANICAL SECOND OVERALL PLAN
•
Revised duct $I.".
•
Revised mechanical layout.
•
Revised Future Medical Offices note.
•
Removed notes from plan.
•
Revised notes I & 10.
•
Added note 21.
M2.3 MECHANICAL THIRD OVERALL PLAN
•
Revised duct sizes.
•
Revised mectutrilcal layout.
•
Added notes 19 & 20.
•
Revised VAV.
•
Removed notes from plan.
•
Revised notes.
M2.4 MECHANICAL OVERALL ROOF PLAN
Revised notes -
M3,0 ENLARGED LEVEL ONE CHILLER ROOM FLOOR PLAN
0 Revised duct layout in Level 1 Mech, Room.
M3.1 MECHANICAL YARD
0 Resized lines feeding PF -1.
M3.2 MECHANICAL SECTIONS
0 Revised duct sizing in Section F
M4- 2 CHILLED WATER FLOW DIAGRAM
9 Added temperature sensor.
M5-1 MECHANICAL DETAILS
0 Revised Fire Damper Mounting Detail.
M5.3 MECHANICAL DETAILS
6 Added note to Detail 4 -
PLUMBING
P1'0 PLUMBING SITE PLAN
4 Revised notes.
P2,0 PLUMBING FOUNDATION PLAN
• Added notes 15-18-
• Added and removed plumbing lines.
P2.1 PLUMBING FIRST FLOOR PLAN
0 Revised notes.
4 Added notes to plan-
t Revised plumbing line layout.
0 Added and removed plumbing lines�
P2-2 PLUMBING SECOND FLOOR PLAN
* Added and revised roof drains.
* Added plumbing lines-
* Revised above grade S.D. and C.S.D.
P2,3 PLUMBING THIRD FLOOR PLAN
• Added note 10,
• Revised roof drains.
• Revised above grade S.D. and O-S.D.
• Added I.C.W.
P2.4 PLUMBING ROOF PLAN
4 Revised roof drains at Balcony.
P3-0 PLUMBING ENLARGED PLANS
• Added note 17�
• Added and revised notes to plan,
12
Revised plumbing layout in Level 1 Chiller Room
P3-1 PLUMBING ENLARGED PLANS
• Revised notes.
• Added notes 31-33-
• Revised plumbing at first floor and second floor toilet room areas.
• Revised plumbing at foundation floor and added note,
P3-2 PLUMBING ENLARGED PLANS
• Revised notes.
• Removed vents,
• Revised H -13-
P4 �O PLUMBING RISER DIAGRAMS
0 Revised riser diagrams at first and second Poor.
P4-1 WATER HEATER FLOW DIAGRAM
9 Revised note in Gas Piping Flow Diagram
P5,0 PLUMBING DETAILS
• Revised Fire Sprinkler Drain Detail-
• Revised Sump Pit Detail.
ELECTRICAL
EO,O SHEET INDEX AND FIXTURE SCHEDULE
* Revised fixture schedule.
EO, 1 ELECTRICAL LEGEND AND GENERAL NOTES
0 Revised electrical legend.
EO,2 ELECTRICAL DETAILS
• Revised and added notes.
• Revised Grounding Electrode Detail
• Added deltails-
E1,0 ELECTRICAL SITE PLAN
• Revised and added notes-
• Added notice-
• Revised ighting for site plan -
E211 ELECTRICAL FIRST FLOOR PLAN - LIGHTING
a Lighting revised throughout first floor.
E2.2 ELECTRICAL SECOND FLOOR PLAN - LIGHTING
a Lighting revised throughout second Poor.
E2,3 ELECTRICAL THIRD FLOOR PLAN - LIGHTING
* Lighting revised throughout third floor.
E 3.1 ELECTRICAL FIRST FLOOR PLAN - POWER
13
• Added notes.
• Revised power in I.T. Room 108.
• Provided power layout in Vault 122.
• Added card reader connections.
• Junction boxes added.
E3.2 ELECTRICAL SECOND FLOOR PLAN - POWER
• Added notes.
• Revised power along corridor.
• Junction boxes added.
E3.3 ELECTRICAL TH I RD FLOOR PLAN - POWER
• Added and revised notes.
• Junction boxes added.
• Added card reader connections.
• Revised power layout in Electrical 307.
E4.1 ELECTRICAL FIRST FLOOR PLAN - AUXILIARY
•
Revised notes.
•
Added smoke detectors.
•
Added door holders.
•
Added telephoneldata outlets.
•
Added duct detectors.
•
Moved fire alarm chime strobe in Corridor 112.
•
Moved fire alarm strobe in Corridor 117.
•
Changed fire alarm chime strobe in Corridor 109.
•
Added fire alarm strobes.
E4.2 ELECTRICAL SECOND FLOOR PLAN - AUXILIARY
•
Revised notes.
•
Added smoke detectors.
•
Added door holders
•
Added duct detectors.
•
Added fire alarm strobes.
•
Moved fire alarm chime strobes in Lobby 201.
•
Moved fire alarm chime strobe in Corridor 210.
E4.3 ELECTRICAL THIRD FLOOR PLAN - AUXILIARY
• Revised notes.
• Added smoke detectors.
• Added door holders
• Added duct detectors.
E5.0 SINGLE LINE DIAGRAM COVER SHEET
• Revised equipment schedule.
• Revised load calculations.
• Added to short circuit calculations summary.
E5.1 SINGLE LINE DIAGRAM
0 Revised single line diagram at first floor.
E6.0 ELECTRICAL PARTIAL PLANS
• Revised power in level 1 Equipment Room.
• Revised Electrical Room all three levels.
• Removed equipment in level 1 Chiller Room.
EGA MECHANICAL YARD
a Rev�sed electrical at Mechanical Yard/Trash Enclosure.
E7.0 PANEL SCHEDULES
. Revised panels: H1A, H2A, H3A. HM1, HM2. L1A, L1AS, L2A, L3A, LMCPD. HMCPC. HMCPD_
E7_1 LIGHTING CONTROL PANELS —New Sheet
E8.0 ELECTRICAL TITLE 24 COMPLIANCE FORMS
0 Revised indoor lighting schedule.
Please contact me if you have any additional questions.
Sincerely,
BOULDER ASSOCIATES, INC.
James Lenhart, AIA
Senior Associate
is
P.O. Box 1504
LA QUINTA, CALIFORNIA 92247-1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
A, __ A
BUILDING & SAFETY DEPARTMENT
(760) 777-7012
FAX (760) 777-7011
2007 NON RESIDENTIAL PLAN CHECK CORRECTION LIST (os)
DATE: March 25,2009 ADDRESS: 45-280 SEELEY DR.
STATUS: First Review DESCRIPTION: Revisions Under Constr.
PLAN CHECKED BY: Burt Hanada APPLICANT.James L�nhart
TELEPHONE NUMBER: 760-777-7023 PLAN CHE&(. OJ7-28 9,8-907,8-1560
This submittal has been checked for compliance with the 2007 California Building, Mechanical, Electrical,
Plumbing, Energy Codes and the City of La Quinta Municipal Code.
APPLICANT: BUILDING DEPARTMENT STAFF:
The following items are being returned to you for
correction: DO NOT accept any resubmittal unless ALL of the
2 Sets — Plans (Core & Shell) following items are included:
2 Sets — Plans (First Floor T.I.)* 2 Sets — Revised Plans (Core & Shell)
2 Sets — Plans (2 nd & 3 d Floor T.I.)* 2 Sets — Revised Plans (First Floor T.I.)
This Correction List 2 Sets — Revised Plans (2 nd & 3 rd Floor T.I.)
This Correction List with written responses
The plans are being held at the Building & Safety
Dept.
INSTRUCTIONS TO APPLICANT:
1) Provide a written response to each comment on the following pages, noting specifically where the correction
can be found. Responses such as, "Sheet A-3," or, "Handrails shall be per CBC Section 1003," are not
acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses
such as, "Added note 16 on sheet A-3" are appropriate and will help expedite your back check.
2) Corrections may not be made by handwriting on existing drawiDgs. Revise originals and reprint Plans and/or
Calculations as necessary.
3) Return all red -marked Plans and/or Calculations with your resubmittal.
4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer's name and telephone number
and shall be wet -signed by the preparer. If the preparer is a licensed architect or engineer, all documents
prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and
Professions Code 15536. Resubmittals will not be accepted with signatures missing.
5) Return this list, your written responses, and all documents listed above with your resubmittal.
Non Residential Plan Check Correction List (os) Page I of 3
City of La Quinta
SECTION A - GENERAL
08-907 FIRST FLOOR T.I. — DELTA 3 & 4
1) Provide sheet AO. I — Cover & Sheet Index.
Provided
2) Structural sheets are listed in the Delta 3 list; are these different than the previously approved structural
drawings regarding the x-ray and linear accelerator? If they need to be approved, submit two sets for review.
The structural sheets listed in the Delta 3 narrative are the same ones previously approved
regarding the x-ray and linear accelerator.
3) Provide the Enlarged Plans sheets A2.4, A2.5, A2.6 & A2.7 listed in Delta 4.
Provided. A 2.6 no longer part of scope. See "Other" comments at end.
08-1560 SECOND & THIRD FLOOR T.I. — DELTA 3
4) Provide sheet AO. I — Cover & Sheet Index.
Provided
5) Provide sheet A5.2 — Plan Detail
Provided
6) Provide sheets A9.2a & 2b, A9.3a, 3b, 3c & 3d— Reflected Ceiling Plans
Provided
7) Provide sheets A9.4. Ceiling Details.
Provided
07-2849 CORE & SHELL
8) Provide sheet Al.l. —Site Plan.
Provided
9) Provide sheet A3.1 & 3.2 — Exterior Elevations (to verify window changes with Planning Dept.)
Provided
10) Provide sheet A5.1 & %.2 — Details
Provided
11) Provide sheets A8.2, 8.3 8.4 A8.6 — Window Schedule & Details
Provided
12) Provide sheets A9.1, (.2 & 9.3 — Reflected Ceiling Plans
Provided
13) Sheet A2.0 was revised to show that the "Health & Wellness Center" area is now designated an A-3
Occupancy. There is a discrepancy between the occupant load calculations (affecting the required exit width,
i.e. stairway) on sheets A2.0 (Delta 5) sheet A2.2 (Approved 2 "d & #rd Floor T.I. and sheet AO. I (Sheet Index)
Provide a clarification of areas for each type of occupancy as sheet A2.0 (delta 5) does not seem to utilize the
area (1754 sf) of the "Health & Wellness" Center in the A-3 occupant load calculations thus affecting the
Non Residential Plan Check Correction List Page 2 of 3
City of La Quinta
required exit width. Please correct all affected sheets.
Part of the A-3 space is office space and was calculated using 100 gross square feet per person. A
line designating the separation between office and multipurpose space is now shown on 21A2.0. Life
safety information was clarified on sheet A2. 0 (core and shell) and A2.2 (2 nd and P Floor Tl). All
sheets AO. I remain unchanged.
14) Sheet A2.1 — The added standpipe encroaches into the stairway landing. Relocate out of this area and justify
location with calculations to show the "new" stairway dimensions. (CBC Appendix Chapter 1, § 106. 1. 1)
The standpipe was moved out of the stairway landing. See A2.1 & 19IA2.13.
15) Sheet A2.5 — Show 60 inch diameter circle in the sanitary room (in addition to the toilet compartment) at the
Second Floor Men & Women Toilet Room. CBC 11 15B.3.
60" diameter circle added. See 241A2.5.
16) A 4 -foot clear dimension is required for a wheelchair path around an obstacle such as the wall to the left of the
sink at the Men's Toilet Rm. on sheet A2.5. CBC Fig. I I B — 5E.
4�-O" minimum is provided at the Men's Toilet Room. Dimension added for clarity. See 241A2.5.
END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required.
Other:
Pharmacy T/ was taken out of the scope of work for now. Drawings were updated to show this space as
being shelled out. Drawings affected and resubmitted include A2. 1, A2. If, A9.1 and A9. If A2.6 is no
longer part of the set.
Non Residential Plan Check Correction List Page 3 of 3
EsGil Corporation
in (Partnership with Governmentfor (Building Safety
DATE: MAR. 19, 2009 _D-ARP11CANT
C —Q—JU-RJa--1
JURISDICTION: LA QUINTA LI PLAN REVIEWER
L) FILE
PLAN CHECK NO.: 07-2849 (REV. # 4) SET: I
PROJECT ADDRESS: 45-280 SEELEY DRIVE
PROJECT NAME: EISENHOWER AMBULATORY CARE CENTER
The plans transmitted herewith have been corrected where necessary and substantially comply
with the jurisdiction's building codes.
F-1 The plans transmitted herewith will substantially comply with the jurisdiction's building codes
when minor deficiencies identified in the attached list are resolved and checked by building
department staff.
The plans transmitted herewith have significant deficiencies identified on the enclosed check list
and should be corrected and resubmitted for a complete recheck.
E The plans are being held at Esgil Corporation until corrected plans are submitted for recheck.
El The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant
contact person.
F-1 The applicant's copy of the check list has been sent to:
Z Esgil corporation staff did not advise the applicant that the plan check has been completed.
1-1 Esgil Corporation staff did advise the applicant that the plan check has been completed.
Person contacted:
Date contacted:
Mail Telephone
(by:
Fax In Person
Telephone #:
Fax #:
F�l REMARKS: Structural revisions to approved plans. Delta # 4 is under this plan submittal.
VN
Selected sheets of plans have been modified.
By: ALI SADRE Enclosures:
Esgil Corporation
GA 0 MB F-1 EJ F� PC 3/16 trnsmti.dot
9320 Chesapeake Drive, Suite 208 * San Diego, California 92123 * (858) 560-1468 * Fax (858) 560-1576
[DO NOT PAY— THIS IS NOTAN INVOICE]
VALUATION AND PLAN CHECK FEE
JURISDICTION: LA QUINTA PLAN CHECK NO.: 07-2849
(REV. # 4)
PREPARED BY: ALI SADRE DATE: MAR. 19, 2009
BUILDING ADDRESS: 45-280 SEELEY DRIVE
BUILDING OCCUPANCY: B/1 -1.2/A TYPE OF CONSTRUCTION: III-lHr./SPR.
BUILDING
PORTION
F11
AREA Valuation Reg. VALUE
(Sq. Ft.) Multiplier Mod.
11 1 1
structural
revisions to plans
Air Conditioning
Fire Sprinklers
TOTAL VALUE
judisdiction Code jManuai Input_
Bldg. Permit Fee by Ordinancle
P [an Check Fee by Ordi na n ce
Type of Review: F� Complete Review Structural Only
Repetirive Fee Ll Other
Repeats y 4 Hrs @
EsG11 Fee $98.00
Based on hourly rate
Comments:
Sheet 1 of 1
maevalue.doc +
$490.001
F --7$ 3 =92, 0 0]
Titf 4 4 Qumro
P.O. Box 1504
78-495 CALLE TAMPICO
LA QUINTA, CALIFORNIA 92253
BUILDING & SAFETY DEPARTMENT
(7 60) 777-7012
FAX (760) 777-7011
Finance Department, Please Collect The Following Fees For The Services Rendered
HTE PERMIT #07-2849
PROJECT: Eisenhower Ambulatory Care Ctr — SHELL BLDG (07-2849) (UNDER
CONSTRUCTION)
ADDRESS: 45-280 Seeley Drive
CUSTOMER: James Lenhart
SERVICES RENDERED: REVISION #2 - DELTA 5: LIFE SAFETY, STRUCTURAL,
ARCHITECTURAL, ELECTRICAL, MECHANICAL AND
PLUMBING REVISIONS TO SHELL BLDG.2007 CODES.2007
CBC. (To previously issued Permit 07-2849)
Fees:
Structural Review (4.0 Hrs X 98/HR) ............... .................................... $ 392.00
Non Structural Review & Administration ($35/Hr x 4.5) ... ........................ $ 157.50
TOTAL FEES NOW DUE: ................................. $
Date: —April 20, 2009
Initials: 74
549.50