2020 02 11 PCPLANNING COMMISSION AGENDA 1 FEBRUARY 11, 2020
PLANNING COMMISSION
AGENDA
CITY HALL COUNCIL CHAMBER
78-495 Calle Tampico, La Quinta
REGULAR MEETING on TUESDAY, FEBRUARY 11, 2020 AT 5:00 P.M.
CALL TO ORDER
ROLL CALL: Commissioners Bettencourt, Currie, Libolt Varner, McCune, Nieto,
Proctor and Chairperson Caldwell
PLEDGE OF ALLEGIANCE
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA
At this time, members of the public may address the Planning Commission on
any matter not listed on the agenda. Please complete a "Request to Speak"
form and limit your comments to three minutes. The Planning Commission
values your comments; however, in accordance with State law, no action shall
be taken on any item not appearing on the agenda unless it is an emergency
item authorized by GC 54954.2(b).
CONFIRMATION OF AGENDA
ANNOUNCEMENTS, PRESENTATIONS AND WRITTEN
COMMUNICATIONS None
CONSENT CALENDAR
NOTE: Consent Calendar items are routine in nature and can be approved by
one motion.
1. APPROVE MINUTES OF JANUARY 28, 2020
BUSINESS SESSION – None
Planning Commission agendas and
staff reports are now available on the
City’s web page: www.laquintaca.gov
PLANNING COMMISSION AGENDA 2 FEBRUARY 11, 2020
STUDY SESSION - None
PUBLIC HEARINGS
Declarations regarding Public Contacts.
1. ADOPT A RESOLUTION TO APPROVE A TENTATIVE TRACT MAP 2019-0004
AND SITE DEVELOPMENT PERMIT 2019-0006 FOR 63 RESIDENTIAL LOTS
ON 27.60 ACRES WITHIN THE ANDALUSIA AT CORAL MOUNTAIN
SPECIFIC PLAN AREA AND FIND THE PROJECT CONSISTENT WITH
PREVIOUSLY APPROVED ENVIRONMENTAL ASSESSMENT 2003-483.
APPLICANT: SUNRISE LQ, LLC. CEQA: PREVIOUSLY ASSESSED IN
CONJUNCTION WITH ENVIRONMENTAL ASSESSMENT 2003-483.
LOCATION: SOUTH OF AVENUE 58, EAST OF MADISON STREET, AND
WEST OF MONROE STREET. [RESOLUTION 2020-003]
REPORTS AND INFORMATIONAL ITEMS - None
COMMISSIONERS’ ITEMS
STAFF ITEMS
1. REPORT ON JANUARY 2020 VILLAGE PARKING SURVEY
ADJOURNMENT
The next regular meeting of the Planning Commission will be held on February
25, 2020, commencing at 5:00 p.m. with the Call to Order, at the City Hall
Council Chamber, 78-495 Calle Tampico, La Quinta, California.
DECLARATION OF POSTING
I, Wanda Wise-Latta, Commission Secretary, do hereby declare that the
foregoing Agenda for the La Quinta Planning Commission meeting of February
11, 2020 was posted on the City’s website, near the entrance to the Council
Chamber at 78-495 Calle Tampico, and the bulletin boards at the Stater
Brothers Supermarket at 78-630 Highway 111, and the La Quinta Cove Post
Office at 51-321 Avenida Bermudas, on February 6, 2020.
DATED: February 6, 2020
WANDA WISE-LATTA, Commission Secretary
City of La Quinta, California
PLANNING COMMISSION AGENDA 3 FEBRUARY 11, 2020
Public Notices
The La Quinta City Council Chamber is handicapped accessible. If special equipment is needed for the hearing
impaired, please call the Planning Division of the Design and Development Department at 777-7118, twenty-
four (24) hours in advance of the meeting and accommodations will be made.
If special electronic equipment is needed to make presentations to the Commission, arrangements should be
made in advance by contacting the Planning Division of the Design and Development Department at 777-
7118. A one (1) week notice is required.
If background material is to be presented to the Commission during a Planning Commission meeting, please
be advised that ten (10) copies of all documents, exhibits, etc., must be supplied to the Executive Assistant
for distribution. It is requested that this take place prior to the beginning of the meeting.
Any writings or documents provided to a majority of the Commission regarding any item(s) on this agenda
will be made available for public inspection at the Design and Development Department’s counter at City Hall
located at 78-495 Calle Tampico, La Quinta, California, 92253, during normal business hours.
PLANNING COMMISSION AGENDA 4 FEBRUARY 11, 2020
PLANNING COMMISSION MINUTES 1 JANUARY 28, 2020
PLANNING COMMISSION
MINUTES
TUESDAY, JANUARY 28, 2020
CALL TO ORDER
A regular meeting of the La Quinta Planning Commission was called to order at
5:00 p.m. by Chairperson Caldwell.
PRESENT: Commissioners Bettencourt, Currie, Libolt Varner, McCune,
Nieto, and Chairperson Caldwell
ABSENT: Commissioner Proctor
STAFF PRESENT: Development Director Danny Castro, Planning Manager Cheri L.
Flores, Senior Planner Carlos Flores, Associate Planner Sijifredo
Fernandez, Commission Secretary Wanda Wise-Latta and
Administrative Assistant Mirta Lerma
PLEDGE OF ALLEGIANCE
Commissioner Bettencourt led the Planning Commission in the Pledge of Allegiance.
PUBLIC COMMENT ON MATTERS NOT ON THE AGENDA – None
CONFIRMATION OF AGENDA - Confirmed
ANNOUNCEMENTS, PRESENTATIONS AND WRITTEN COMMUNICATION -
None
CONSENT CALENDAR
1. APPROVAL OF MINUTES DATED JANUARY 14, 2020
MOTION – A motion was made and seconded by Commissioners Bettencourt/Nieto
to approve the Consent Calendar as submitted. AYES: Commissioners Bettencourt,
Currie, Libolt Varner, McCune, Nieto and Chairperson Caldwell. NOES: None.
ABSENT: Commissioner Proctor. ABSTAIN: None. Motion passed.
BUSINESS SESSION - None
STUDY SESSION
1. RECREATIONAL AND LARGE VEHICLE PARKING IN RESIDENTIAL AREAS
CONSENT CALENDAR ITEM NO. 1
PLANNING COMMISSION MINUTES 2 JANUARY 28, 2020
Senior Planner Carlos Flores and Associate Planner Sijifredo Fernandez presented
the staff report, which is on file in the Design and Development Department.
Staff responded to Planning Commissioners’ inquiries and clarified what is
designated as public right-of-way and the use of that public right-of-way; noted
that no part of a recreational vehicle (RV) can extend over a sidewalk, curb or
travel way; shared statistics provided by Code Compliance regarding RVs parked on
private property; clarified that RV parking is allowed in very low density residential,
low density residential and medium density residential areas; confirmed that RV
parking is allowed in the Cove in the front yard and without screening.
Members of the Planning Commission spoke about the variety of RVs in the Cove;
removing allowances for parking RVs in front yards; permitting; inhabiting parked
RVs; determining how many RVs are in the Cove, how many are out of compliance
and who will be impacted by RV parking restrictions;
Staff clarified corner lots and the area that is considered front yard and side yard
and where an RV can be parked on a corner lot.
Members of the Planning Commission commented on inadequate area zoning and
its impact on code enforcement; suggested the need to conduct a survey of Cove
residents and how RV parking restrictions might impact them.
PUBLIC SPEAKER: Ms. Evelyn Sloane, La Quinta – introduced herself and read a
letter dated January 24, 2020 regarding the number of RVs and oversized vehicles
parked on her neighbor’s property and supported parking restrictions for RVs.
PUBLIC SPEAKER: Mr. David Heckman, La Quinta – stated he is in support of Ms.
Sloane’s comments and is in favor of restricting recreational vehicle parking.
In response to a Commissioner, staff noted that they were unaware of any
requirement to use garage space before using other areas to park RVs similar to
restrictions that are implemented by homeowners associations and said that there
is no limit to the number of RVs that can be parked legally.
PUBLIC SPEAKER: Jeff Smith, La Quinta – stated that he resides in the La Quinta
Cove and suggests vigorously enforcing current codes regarding RV parking and
suggested a survey be conducted and expressed concern about banning RV parking
on private property.
Staff noted that based on the comments by the Commission, staff would gather
data by possibly conducting an audit of properties where RVs are parked or
infrastructure is in place for RV parking in front yards and conduct a survey of Cove
residents before a formal presentation be made to the Planning Commission.
In response to a Commissioner, staff explained what a permitting process might
involve.
PLANNING COMMISSION MINUTES 3 JANUARY 28, 2020
PUBLIC SPEAKER: Mr. David Heckman, La Quinta – spoke about regulations for
parking of recreational vehicles in North La Quinta.
PUBLIC HEARINGS - None
REPORTS AND INFORMATIONAL ITEMS
Director Castro reported that a follow up meeting about the American Express
concerts regarding traffic was held on January 13, 2020. Attendees included
representatives from the Riverside County Sheriff’s Department, PGA West HOA
personnel, security, event personnel and city staff. He noted that additional
meetings are planned as they continue review of the event.
COMMISSIONERS’ ITEMS
Commissioner Bettencourt shared his thoughts about The American Express event.
Chairperson Caldwell stated that she shared her thoughts about The American
Express concerts with the City Council and noted that Director Castro will keep the
Planning Commission apprised.
STAFF ITEMS - None
ADJOURNMENT
There being no further business, it was moved and seconded by Commissioners
Nieto/Bettencourt to adjourn this meeting at 6:11 p.m. Motion passed
unanimously.
Respectfully submitted,
WANDA WISE-LATTA, Commission Secretary
City of La Quinta, California
City of La Quinta
PLANNING COMMISSION MEETING: FEBRUARY 11, 2020
STAFF REPORT
AGENDA TITLE: ADOPT A RESOLUTION TO APPROVE SITE DEVELOPMENT
PERMIT 2019-0006 AND TENTATIVE TRACT MAP 2019-0004 FOR 63
RESIDENTIAL LOTS ON 27.60 ACRES AND FIND THE PROJECT CONSISTENT
WITH ENVIRONMENTAL ASSESSMENT 2003-483. LOCATION: WITHIN THE
ANDALUSIA SPECIFIC PLAN AREA.
PROJECT INFORMATION
PROJECT: ANDALUSIA COUNTRY CLUB
APPLICANT: SUNRISE LQ, LLC
OWNER: SUNRISE LQ, LLC
CEQA: THE DESIGN AND DEVELOPMENT DEPARTMENT HAS
DETERMINED THAT THE PROPOSED PROJECT WAS
PREVIOUSLY REVIEWED UNDER ENVIRONMENTAL
ASSESSMENT 2003-483. NO FURTHER ENVIRONMENTAL
REVIEW IS REQUIRED UNDER THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT.
LOCATION: SOUTH OF AVENUE 58, EAST OF MADISON STREET, WITHIN
THE ANDALUSIA AT CORAL MOUNTAIN DEVELOPMENT
APN 764-200-071
RECOMMENDATION
Adopt a resolution to approve a tentative tract map and site development
permit for 63 residential lots on 27.60 acres within the Andalusia at Coral
Mountain Specific Plan Area and find the project consistent with Environmental
Assessment 2003-483.
EXECUTIVE SUMMARY
• The proposed project consists of applications for Tentative Tract Map
2019-0004 (TTM 37790) to subdivide a 27-acre parcel into 63 residential
lots and four open space lots and a Site Development Permit (SDP) for
the architecture and landscaping of the units (Attachment 1).
BACKGROUND/ANALYSIS
PUBLIC HEARING ITEM NO. 1
The Andalusia at Coral Mountain project was originally approved by the City
Council on December 16, 2003 as General Plan Amendment 2003-093, Zone
Change 2003-116, Specific Plan 2003-067 (Coral Mountain Specific Plan
Amendment 2), and Environmental Assessment 2003-483. The development
plan included two golf courses and club amenities, 1,400 residential units and
supporting infrastructure. Coral Mountain Specific Plan Amendment No. 3 was
approved in 2013, which moved its golf clubhouse location northerly from its
original location in order to build a larger facility.
The City Council approved Specific Plan (SP) Amendment No. 4 along with a
SDP and Tentative Tract Map (TTM) on October 17, 2017 for the development
of 71 units within Planning Area II. Planning Area II is the location of the
current proposal (Attachment 2).
Tentative Tract Map
The applicant is proposing a different lot configuration with a new TTM, which
includes 63 residential lots with four open space lots, one lot for an existing
parking lot and associated neighboring tennis and swim facility and three
lettered lots for streets (Attachment 3). Residential lots will be a minimum of
7,699 square feet and an average of 10,012 square feet. The site design and
layout are consistent with the effective Specific Plan and did not require
amending of the Specific Plan. The existing parking lot and tennis and swim
facility are identified as Lot 64 on the TTM and were approved and constructed
through Site Development Permit 2013-927.
Site Development Permit
Site Design
The project is located in the center of the existing Andalusia development
within Planning Area II of the SP, immediately east and north of the swim and
tennis facility. The project takes access from a street named Marbella on the
north. The main roadway loops through the project site and connects with
Marbella again on the south. Common areas are located on the northern and
southern portions of the project.
Architecture
The units are proposed as single family units. The architectural styles proposed
are modern Mediterranean, desert contemporary and Spanish transitional,
which matches the style in the overall Andalusia development and proposes
seven separate floor plans with three elevation variations (Attachment 4). Wall
materials will consist of stucco, stone veneer, and brick with concrete “S” tile
roofs (Attachment 5). The proposed floor plans for all units consist of two-
bedroom suites with bathrooms, powder room, great room, casita, two-car
garage and golf cart garage, courtyard and covered patios. Units are proposed
to range from approximately 2,300 square feet to 5,100 square feet.
Landscaping
The landscaping for the project consists of desert and drought-tolerant plants.
The plant palette incorporates typical desert compatible species, such as Acacia
trees, along with shrubs such as Dwarf Bottlebrush and Blue Emu Bush. The
plans identify all trees as 36” box trees. Small hybrid Bermuda grass lawns
areas will be included in the front yard of each unit.
AGENCY AND PUBLIC REVIEW
Public Agency Review
This request was sent to all applicable City departments and affected public
agencies on November 4, 2019. All written comments received are on file and
available for review with the Design and Development Department. All
applicable comments have been adequately addressed and/or incorporated in
the recommended Conditions of Approval.
Public Notice
The public hearing notice was advertised in The Desert Sun newspaper on
January 31, 2020 and was sent to property owners and occupants within a 500-
foot radius of the project site. No comments have been received as of this
date.
ENVIRONMENTAL REVIEW
The Design and Development Department has determined that the proposed
project is consistent with the analysis previously approved for the project in
EA2003-483. No further environmental review is required under the CEQA.
Prepared by: Carlos Flores, Senior Planner
Approved by: Danny Castro, Design and Development Director
Attachments: 1. Project Information
2. Planning Area II Map
3. Tentative Tract Map 37790
4. Site Development Permit
5. Materials Board
PLANNING COMMISSION RESOLUTION 2020 -
A RESOLUTION OF THE PLANNING
COMMISSION OF THE CITY OF LA QUINTA,
CALIFORNIA, APPROVING A SITE
DEVELOPMENT PERMIT AND TENTATIVE TRACT
MAP FOR SIXTY THREE RESIDENTIAL UNITS
WITHIN THE ANDALUSIA DEVELOPMENT, AND
FINDING THE PROJECT CONSISTENT WITH
ENVIRONMENTAL ASSESSMENT 2003-483
CASE NUMBERS: TENTATIVE TRACT MAP 2019-0004 (TTM 37790)
SITE DEVELOPMENT PERMIT 2019-0006
APPLICANT: SUNRISE LQ, LLC
WHEREAS, the Planning Commission of the City of La Quinta,
California did, on the 11th day of February, 2020, hold a duly noticed Public
Hearing to consider a request by Sunrise LQ, LLC. for approval of the
Andalusia Country Club development, generally located south of Avenue 58,
east of Madison Street, within the Andalusia at Coral Mountain Specific Plan,
Planning Area II, more particularly described as:
A PORTION OF SECTION 27, T6S R7E, S.B.B.M. APN 764-200-071
WHEREAS, the Design and Development Department published a
public hearing notice in The Desert Sun newspaper on January 31, 2020 as
prescribed by the Municipal Code. Public hearing notices were also mailed to
all property owners within 500 feet of the site; and
Tentative Tract Map 2019-0004 (TTM 37790)
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
heard, the Planning Commission did make the following mandatory findings
to justify approval of said Tentative Tract Map:
1. Tentative Tract Map 37790 is consistent with the La Quinta General
Plan, and subject Specific Plan as proposed. The Tract Map is
consistent with the Low Density Residential land use designation as
set forth in the General Plan, and as set forth in Specific Plan 2003-
067 and subsequent amendments.
2. The design and improvement of Tentative Tract Map 37790 is
Planning Commission Resolution 2020 -
Site Development Permit 2019-0006
Tentative Tract Map 2019-0004
Andalusia Country Club
February 11, 2020
Page 2 of 5
consistent with the La Quinta General Plan, and Specific Plan 2003-
067 and subsequent amendments with the implementation of
recommended conditions of approval to ensure consistency for the
homes proposed on the lots created herein. The project density is
consistent with the La Quinta General Plan and Specific Plan 2003-
067 and subsequent amendment, and is comparable to surrounding
residential development.
3. The design of Tentative Tract Map 37790 and proposed
improvements are not likely to cause substantial environmental
damage, nor substantially and avoidably injure fish or wildlife or
their habitat. The Design and Development Director has determined
that this project has been accounted for in and is consistent with
Environmental Assessment 2003-483 and no further environmental
review is required.
4. The design of Tentative Tract Map 37790 and type of improvements
are not likely to cause serious public health problems, insofar as the
project will be required to comply with all laws, standards and
requirements associated with sanitary sewer collection, water
quality and other public health issues.
5. The design and improvements required for Tentative Tract Map
37790 will not conflict with easements, acquired by the public at
large, for access through or use of property within the proposed
subdivision. All roadway improvements, easements, if any and
surrounding improvements will be completed to City standards.
Site Development Permit 2019-0006
WHEREAS, at said Public Hearing, upon hearing and considering all
testimony and arguments, if any, of all interested persons desiring to be
heard, said City Council did make the following mandatory findings pursuant
to Section 9.210.010 of the Municipal Code to justify approval of said Site
Development Permit:
1. Consistency with General Plan
The proposed development is consistent with the General Plan land
use designation of Low Density Residential. The City’s General Plan
Planning Commission Resolution 2020 -
Site Development Permit 2019-0006
Tentative Tract Map 2019-0004
Andalusia Country Club
February 11, 2020
Page 3 of 5
policies relating to low density residential encourage a full range of
single-family residential units within the City, and the proposed use
maintains those policies.
2. Consistency with Zoning Code
The proposed development, as conditioned, is consistent with the
development standards of the City’s Zoning Code and Andalusia at
Coral Mountain Specific Plan in terms of architectural style and
landscaping.
3. Compliance with CEQA
The Design and Development Department has determined that this
project has been accounted for in and is consistent with
Environmental Assessment 2003-483 and no further environmental
review is required.
4. Architectural Design
The architecture and layout of the project is compatible with, and
not detrimental to, the existing surrounding commercial land uses,
and is consistent with the development standards in the Municipal
Code. The units are concluded to be appropriate for the proposed
locations, and supplemental design elements appropriately enhance
the architecture of the buildings. The architecture and layout of the
project is compatible with Specific Plan 2003-067 and subsequent
amendments.
5. Site Design
The site design of the project is compatible with surrounding
development and with the quality of design prevalent in the city.
6. Landscape Design
The proposed project is consistent with the landscaping standards
and plant palette and implements the standards for landscaping and
aesthetics established in the General Plan and Zoning Code. The
project landscaping for the proposed buildings, as conditioned, shall
unify and enhance visual continuity of the proposed residential units
with the surrounding development. Landscape improvements are
designed and sized to provide visual appeal. The permanent overall
Planning Commission Resolution 2020 -
Site Development Permit 2019-0006
Tentative Tract Map 2019-0004
Andalusia Country Club
February 11, 2020
Page 4 of 5
site landscaping utilizes various tree and shrub species to enhance
the building architecture.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission
of the City of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the Findings
of the Planning Commission in this case;
SECTION 2. That the above project be determined by the Planning
Commission to be consistent with Environmental Assessment 2003-483
SECTION 3. That it does hereby approve Tentative Tract Map 2019-0004 and
Site Development Permit 2019-0006 for the reasons set forth in this
Resolution and subject to the attached Conditions of Approval.
PASSED, APPROVED, and ADOPTED at a regular meeting of the
City of La Quinta Planning Commission, held on this the 11th day of
February, 2020, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
_________________________________
MARY CALDWELL, Chairperson
City of La Quinta, California
Planning Commission Resolution 2020 -
Site Development Permit 2019-0006
Tentative Tract Map 2019-0004
Andalusia Country Club
February 11, 2020
Page 5 of 5
ATTEST:
_______________________________________________
DANNY CASTRO, Design and Development Director
City of La Quinta, California
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
GENERAL
1. The applicant agrees to defend, indemnify and hold harmless the City of La
Quinta (“City”), its agents, officers and employees from any claim, action or
proceeding to attack, set aside, void, or annul the approval of this Site
Development Permit. The City shall have sole discretion in selecting its
defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding
and shall cooperate fully in the defense.
Site Development Permit 2019-0006 shall comply with all applicable
conditions and/or mitigation measures for the following related approval:
Tentative Parcel Map 37790
Specific Plan 2003-067 and subsequent amendments
Environmental Assessment 2003-483
2. In the event of any conflict(s) between approval conditions and/or provisions
of these approvals, the Design and Development Director shall adjudicate the
conflict by determining the precedence.
3. Prior to the issuance of any grading, construction, or building permit by the
City, the applicant shall obtain any necessary clearances and/or permits from
the following agencies, if required:
• Riverside County Fire Marshal
• La Quinta Public Works Department (Grading Permit, Green Sheet
(Public Works Clearance) for Building Permits, Water Quality
Management Plan(WQMP) Exemption Form – Whitewater River Region,
Improvement Permit)
• Design & Development Department
• Riverside Co. Environmental Health Department
• Coachella Valley Unified School District
• Coachella Valley Water District (CVWD)
• Imperial Irrigation District (IID)
• California Water Quality Control Board (CWQCB)
• State Water Resources Control Board
• SunLine Transit Agency
• SCAQMD Coachella Valley
The applicant is responsible for all requirements of the permits and/or
clearances from the above listed agencies. When these requirements include
approval of improvement plans, the applicant shall furnish proof of such
approvals when submitting those improvement plans for City approval.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
4. Coverage under the State of California Construction General Permit must be
obtained by the applicant, who then shall submit a copy of the Regional Water
Quality Control Board’s (“RWQCB”) acknowledgment of the applicant’s Notice
of Intent (“NOI”) and Waste Discharge Identification (WDID) number to the
City prior to the issuance of a grading or building permit.
5. The applicant shall comply with applicable provisions of the City’s NPDES
stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater
Management and Discharge Controls), and 13.24.170 (Clean Air/Clean
Water); Riverside County Ordinance No. 457; the California Regional Water
Quality Control Board – Colorado River Basin Region Board Order No. R7-
2013-0011 and the State Water Resources Control Board’s Order No. 2009-
0009-DWQ and Order No. 2012-0006-DWQ.
A. For construction activities including clearing, grading or excavation of
land that disturbs one (1) acre or more of land, or that disturbs less
than one (1) acre of land, but which is a part of a construction project
that encompasses more than one (1) acre of land, the Permitee shall be
required to submit a Storm Water Pollution Protection Plan (“SWPPP”) to
the State Water Resources Control Board.
The applicant or design professional can obtain the California
Stormwater Quality Association SWPPP template at
www.cabmphandbooks.com for use in their SWPPP preparation.
B. The applicant shall ensure that the required SWPPP is available for
inspection at the project site at all times through and including
acceptance of all improvements by the City.
C. The applicant’s SWPPP shall include provisions for all of the following
Best Management Practices (“BMPs”) (LQMC Section 8.70.020
(Definitions)):
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non-Storm Water Management.
6) Waste Management and Materials Pollution Control.
D. All erosion and sediment control BMPs on an Erosion Control Plan
proposed by the applicant shall be approved by the City Engineer prior
to any onsite or offsite grading, pursuant to this project.
E. The SWPPP and BMPs shall remain in effect for the entire duration of
project construction until all improvements are completed and accepted
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
by the City Council.
F. The inclusion in the Homeowners’ Association (HOA) Conditions,
Covenants, and Restrictions (CC&Rs), a requirement for the perpetual
maintenance and operation of all post-construction BMPs as required
and the applicant shall execute and record an agreement that provides
for the perpetual maintenance and operation of all post-construction
BMPs as required.
6. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual attorney’s fees incurred by the City Attorney
to review, negotiate and/or modify any documents or instruments required by
these conditions, if Developer requests that the City modify or revise any
documents or instruments prepared initially by the City to effect these
conditions. This obligation shall be paid in the time noted above without
deduction or offset and Developer’s failure to make such payment shall be a
material breach of the Conditions of Approval.
7. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual consultant’s fees incurred by the City for
engineering and/or surveying consultants to review and/or modify any
documents or instruments required by this project. This obligation shall be
paid in the time noted above without deduction or offset and Developer’s
failure to make such payment shall be a material breach of the Conditions of
Approval.
PROPERTY RIGHTS
8. Prior to issuance of any permit(s), the applicant shall acquire or confer
easements and other property rights necessary for the construction or proper
functioning of the proposed development. Conferred rights shall include
irrevocable offers to dedicate or grant access easements to the City for
emergency services and for maintenance, construction and reconstruction of
essential improvements.
9. Pursuant to the aforementioned condition, conferred rights shall include
approvals from the master developer or the HOA over easements and other
property rights necessary for construction and proper functioning of the
proposed development not limited to access rights over proposed and/or
existing private streets that access public streets and open space/drainage
facilities of the master development.
10. The applicant shall offer for dedication all public street rights-of-way in
conformance with the City's General Plan, Municipal Code, applicable specific
plans, and/or as required by the City Engineer.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
11. The applicant shall retain for private use all private street rights-of-way in
conformance with the City's General Plan, Municipal Code, applicable specific
plans, and/or as required by the City Engineer.
12. The private street rights-of-way to be retained for private use required for this
development include:
A. PRIVATE STREETS
1) Lots A, B, and C - Private Residential Streets shall have a 36-foot
travel width. The travel width may be reduced to 32 feet with
parking restricted to one side, and 28 feet if on-street parking is
prohibited, and provided there is adequate off-street parking for
residents and visitors, and the applicant establishes provisions for
ongoing enforcement of the parking restriction in the CC&R’s.
The CC&R’s shall be reviewed and approved by the Design and
Development Department prior to recordation.
Property line shall be placed at the back of curb similar to the lay out
shown on the (preliminary grading plan/tentative map) and the typical
street section shown in the tentative map. Use of smooth curves instead
of angular lines at property lines is recommended.
13. Right-of-way geometry for standard knuckles and property line corner
cut-backs at curb returns shall conform to Riverside County Standard
Drawings #801, and #805, respectively, unless otherwise approved by the
City Engineer.
14. When the City Engineer determines that access rights to the proposed street
rights-of-way shown on the approved Site Development Permit are necessary
prior to approval of the improvements dedicating such rights-of-way, the
applicant shall grant the necessary rights-of-way within 60 days of a written
request by the City.
15. The applicant shall offer for dedication those easements necessary for the
placement of, and access to, utility lines and structures, drainage basins,
mailbox clusters, park lands, and common areas.
16. The applicant shall furnish proof of easements, or written permission, as
appropriate, from those owners of all abutting properties on which grading,
retaining wall construction, permanent slopes, or other encroachments will
occur.
17. The applicant shall cause no easement to be granted, or recorded, over any
portion of the subject property after the date of approval of the Site
Development Permit unless such easement is approved by the City Engineer.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
STREET AND TRAFFIC IMPROVEMENTS
18. The applicant shall comply with the provisions of LQMC Sections 13.24.060
(Street Improvements), 13.24.070 (Street Design - Generally) & 13.24.100
(Access for Individual Properties and Development) for public streets; and
Section 13.24.080 (Street Design - Private Streets), where private streets are
proposed.
19. Streets shall have vertical curbs or other approved curb configurations that
will convey water without ponding, and provide lateral containment of dust
and residue during street sweeping operations. If a wedge or rolled curb
design is approved, the lip at the flowline shall be near vertical with a 1/8"
batter and a minimum height of 0.1'. Unused curb cuts on any lot shall be
restored to standard curb height prior to final inspection of permanent
building(s) on the lot.
20. The applicant shall construct the following street improvements:
A. PRIVATE STREETS
1) Lots A, B, and C - Private Residential Streets shall have a 36-foot
travel width. The travel width may be reduced to 32 feet with
parking restricted to one side, and 28 feet if on-street parking is
prohibited, and provided there is adequate off-street parking for
residents and visitors, and the applicant establishes provisions for
ongoing enforcement of the parking restriction in the CC&R’s.
The CC&R’s shall be reviewed and approved by the Design and
Development Department prior to recordation.
2) The location of driveways of corner lots shall not be located within
the curb return and away from the intersection when possible.
3) Construct retractable bollards or alternative as approved by the
City Engineer to restrict access at the Marbella cul-de-sac.
B. PRIVATE CUL DE SACS
1) Shall be constructed according to the lay-out shown on the
preliminary grading plan, except for minor revisions as may be
required by the City Engineer.
21. The applicant shall extend improvements beyond the subdivision boundaries
to ensure they safely integrate with existing improvements (e.g., grading;
traffic control devices and transitions in alignment, elevation or dimensions of
streets and sidewalks).
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
22. The applicant shall design street pavement sections using CalTrans' design
procedure for 20-year life pavement, and the site-specific data for soil
strength and anticipated traffic loading (including construction traffic).
Minimum structural sections shall be as follows:
Residential 3.0" a.c./4.5" c.a.b.
or the approved equivalents of alternate materials.
23. The applicant shall submit current mix designs (less than two years old at the
time of construction) for base, asphalt concrete and Portland cement concrete.
The submittal shall include test results for all specimens used in the mix
design procedure. For mix designs over six months old, the submittal shall
include recent (less than six months old at the time of construction) aggregate
gradation test results confirming that design gradations can be achieved in
current production. The applicant shall not schedule construction operations
until mix designs are approved.
24. Improvements shall include appurtenances such as traffic control signs,
markings and other devices, raised medians if required, street name signs and
sidewalks. Mid-block street lighting is not required.
25. Standard knuckles and corner cut-backs shall conform to Riverside County
Standard Drawings #801 and #805, respectively, unless otherwise approved
by the City Engineer.
26. Improvements shall be designed and constructed in accordance with City
adopted standards, supplemental drawings and specifications, or as approved
by the City Engineer. Improvement plans for streets, access gates and
parking areas shall be stamped and signed by engineers registered in
California.
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as
“engineer,” “surveyor,” and “architect,” refers to persons currently certified or
licensed to practice their respective professions in the State of California.
27. Improvement plans shall be prepared by or under the direct supervision of
qualified engineers and/or architects, as appropriate, and shall comply with
the provisions of LQMC Section 13.24.040 (Improvement Plans).
28. The following improvement plans shall be prepared and submitted for review
and approval by the Public Works Department. A separate set of plans for
each line item specified below shall be prepared. The plans shall utilize the
minimum scale specified, unless otherwise authorized by the City Engineer in
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
writing. Plans may be prepared at a larger scale if additional detail or plan
clarity is desired. Note, the applicant may be required to prepare other
improvement plans not listed here pursuant to improvements required by
other agencies and utility purveyors.
A. On-Site Street Improvements/Signing & Striping/Storm Drain Plan
1" = 40' Horizontal, 1"= 4' Vertical
B. PM-10 Plan 1” = 40’ Horizontal
C. Erosion Control Plan 1” = 40’ Horizontal
D. WQMP (Plan submitted in Report Form)
NOTE: A through C to be submitted concurrently
(Separate Storm Drain Plans if applicable)
E. On-Site Residential Precise Grading Plan 1" = 30' Horizontal
Other engineered improvement plans prepared for City approval that are not
listed above shall be prepared in formats approved by the City Engineer prior
to commencing plan preparation.
“On-Site Precise Grading” plan is required to be submitted for approval by the
Building Official, Planning Manager and the City Engineer.
All On-Site Signing & Striping Plans shall show, at a minimum; Stop Signs,
Limit Lines and Legends, No Parking Signs, Raised Pavement Markers
(including Blue RPMs at fire hydrants) and Street Name Signs per Public
Works Standard Plans and/or as approved by the City Engineer.
Grading plans shall normally include perimeter walls with Top Of Wall & Top Of
Footing elevations shown. All footings shall have a minimum of 1-foot of
cover, or sufficient cover to clear any adjacent obstructions.
“On-Site Precise Grading Plan” plans shall normally include all on-site surface
improvements including but not limited to finish grades for curbs & gutters,
building floor elevations, wall elevations, parking lot improvements and
accessible requirements.
29. The City maintains standard plans, detail sheets and/or construction notes for
elements of construction which can be accessed via the Public Works
Development “Plans, Notes and Design Guidance” section of the City website
(www.la-quinta.org). Please navigate to the Design and Development home
page and look for the Standard Drawings hyperlink.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
30. The applicant shall furnish a complete set of the mylars of all approved
improvement plans on a storage media acceptable to the City Engineer.
31. Upon completion of construction, and prior to final acceptance of the
improvements by the City, the applicant shall furnish the City with
reproducible record drawings of all improvement plans which were approved
by the City. Each sheet shall be clearly marked "Record Drawing" and shall be
stamped and signed by the engineer or surveyor certifying to the accuracy
and completeness of the drawings. The applicant shall have all approved
mylars previously submitted to the City, revised to reflect the as-built
conditions. The applicant shall employ or retain the Engineer of Record (EOR)
during the construction phase of the project so that the EOR can make site
visits in support of preparing "Record Drawing". However, if subsequent
approved revisions have been approved by the City Engineer and reflect said
"Record Drawing" conditions, the EOR may submit a letter attesting to said
fact to the City Engineer in lieu of mylar submittal.
IMPROVEMENT SECURITY AGREEMENTS
32. In the event the applicant fails to construct the improvements for the
development, or fails to satisfy its obligations for the development in a timely
manner, pursuant to the approved phasing plan, the City shall have the right
to halt issuance of all permits, and/or final inspections, withhold other
approvals related to the development of the project, or call upon the surety to
complete the improvements.
33. Depending on the timing of the development of this Site Development Permit,
and the status of the off-site improvements at the time, the applicant may be
required to:
A. Construct certain off-site improvements.
B. Construct additional off-site improvements, subject to the
reimbursement of its costs by others.
C. Reimburse others for those improvements previously constructed that
are considered to be an obligation of this site development permit.
D. Secure the costs for future improvements that are to be made by
others.
E. To agree to any combination of these actions, as the City may require.
Off-Site Improvements should be completed on a first priority basis. The
applicant shall complete Off-Site Improvements in the first phase of
construction or by the issuance of the 20% Building Permit.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
In the event that any of the improvements required for this development are
constructed by the City, the applicant shall, prior to the approval of the Final
Map, or the issuance of any permit related thereto, reimburse the City for the
costs of such improvements.
34. If the applicant elects to utilize the secured agreement alternative, the
applicant shall submit detailed construction cost estimates for all proposed on-
site and off-site improvements, including an estimate for the final survey
monumentation, for checking and approval by the City Engineer. Such
estimates shall conform to the unit cost schedule as approved by the City
Engineer.
Estimates for improvements under the jurisdiction of other agencies shall be
approved by those agencies and submitted to the City along with the
applicant’s detailed cost estimates.
35. Should the applicant fail to construct the improvements for the development,
or fail to satisfy its obligations for the development in a timely manner, the
City shall have the right to halt issuance of building permits, and/or final
building inspections, withhold other approvals related to the development of
the project, or call upon the surety to complete the improvements.
GRADING
36. The applicant shall comply with the provisions of LQMC Section 13.24.050
(Grading Improvements).
37. Prior to occupancy of the project site for any construction, or other purposes,
the applicant shall obtain a grading permit approved by the City Engineer.
38. To obtain an approved grading permit, the applicant shall submit and obtain
approval of all of the following:
A. A grading plan prepared by a civil engineer registered in the State of
California,
B. A preliminary geotechnical (“soils”) report prepared by a professional
registered in the State of California,
C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter
6.16, (Fugitive Dust Control), and
D. An Erosion Control Plan with Best Management Practices prepared in
accordance with LQMC Sections 8.70.010 and 13.24.170 (NPDES
Stormwater Discharge Permit and Storm Management and Discharge
Controls).
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
E. A Final WQMP prepared by an authorized professional registered in the
State of California.
All grading shall conform with the recommendations contained in the
Preliminary Soils Report, and shall be certified as being adequate by soils
engineer, or engineering geologist registered in the State of California.
The applicant shall furnish security, in a form acceptable to the City, and in an
amount sufficient to guarantee compliance with the approved Fugitive Dust
Control Plan provisions as submitted with its application for a grading permit.
Additionally, the applicant shall replenish said security if expended by the City
of La Quinta to comply with the Plan as required by the City Engineer.
39. The applicant shall maintain all open graded, undeveloped land in order to
prevent wind and/or water erosion of such land. All open graded,
undeveloped land shall either be planted with interim landscaping, or
stabilized with such other erosion control measures, as were approved in the
Fugitive Dust Control Plan.
40. Grading within the perimeter setback and parkway areas shall have undulating
terrain and shall conform with the requirements of LQMC Section 9.60.240(F)
except as otherwise modified by this condition. The maximum slope shall not
exceed 3:1 anywhere in the landscape setback area, except for the backslope
(i.e. the slope at the back of the landscape lot) which shall not exceed 2:1 if
fully planted with ground cover. The maximum slope in the first six (6) feet
adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is
within six feet (6’) of the curb, otherwise the maximum slope within the right
of way shall not exceed 3:1. All unpaved parkway areas adjacent to the curb
shall be depressed one and one-half inches (1.5") in the first eighteen inches
(18") behind the curb.
41. Building pad elevations on the rough grading plan submitted for City
Engineer’s approval shall conform with pad elevations shown on the
preliminary grading plan, unless the pad elevations have other requirements
imposed elsewhere in these Conditions of Approval.
42. The applicant shall minimize the differences in elevation between the adjoining
properties and the lots within this development.
Where compliance within the above stated limits is impractical, the City may
consider alternatives that are shown to minimize safety concerns,
maintenance difficulties and neighboring-owner dissatisfaction with the grade
differential.
43. Prior to any site grading or regrading that will raise or lower any portion of the
site by more than plus or minus half of a foot (0.5’) from the elevations shown
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
on the approved Site Development Permit Preliminary Grading Plan, the
applicant shall submit the proposed grading changes to the City Engineer for a
substantial conformance review.
44. Prior to the issuance of a building permit for any building lot, the applicant
shall provide a lot pad certification stamped and signed by a qualified engineer
or surveyor with applicable compaction tests and over excavation
documentation.
Each pad certification shall list the pad elevation as shown on the approved
grading plan, the actual pad elevation and the difference between the two, if
any. Such pad certification shall also list the relative compaction of the pad
soil. The data shall be organized by lot number, and listed cumulatively if
submitted at different times.
DRAINAGE
45. Stormwater handling shall conform with the approved hydrology and drainage
report for Andalusia, Tract Map 31681. Nuisance water shall be disposed of in
an approved manner.
46. The applicant shall comply with the provisions of LQMC Section 13.24.120
(Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 –
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements. More specifically, stormwater falling on site during the
100 year storm shall be retained within the development, unless otherwise
approved by the City Engineer. The design storm shall be either the 1 hour, 3
hour, 6 hour or 24 hour event producing the greatest total run off.
47. Nuisance water shall be retained on site. Nuisance water shall be disposed of
per approved methods contained in Engineering Bulletin No. 06-16 –
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements.
48. In design of retention facilities, the maximum percolation rate shall be two
inches per hour. The percolation rate will be considered to be zero unless the
applicant provides site specific data indicating otherwise and as approved by
the City Engineer.
49. The project shall be designed to accommodate purging and blowoff water
(through underground piping and/or retention facilities) from any on-site or
adjacent well sites granted or dedicated to the local water utility authority as a
requirement for development of this property.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
50. No fence or wall shall be constructed around any retention basin unless
approved by the Design and Development Director and the City Engineer.
51. For on-site above ground common retention basins, retention depth shall be
according to Engineering Bulletin No. 06-16 – Hydrology Report with
Preliminary Hydraulic Report Criteria for Storm Drain Systems. Side slopes
shall not exceed 3:1 and shall be planted with maintenance free ground cover.
Additionally, retention basin widths shall be not less than 20 feet at the
bottom of the basin.
52. Stormwater may not be retained in landscaped parkways or landscaped
setback lots. Only incidental storm water (precipitation which directly falls
onto the setback) will be permitted to be retained in the landscape setback
areas. The perimeter setback and parkway areas in the street right-of-way
shall be shaped with berms and mounds, pursuant to LQMC Section
9.100.040(B)(7).
53. The design of the development shall not cause any increase in flood
boundaries and levels in any area outside the development.
54. The development shall be graded to permit storm flow in excess of retention
capacity to flow out of the development through a designated overflow and
into the historic drainage relief route.
55. Storm drainage historically received from adjoining property shall be received
and retained or passed through into the historic downstream drainage relief
route.
56. The applicant shall comply with applicable provisions for post construction
runoff per the City’s NPDES stormwater discharge permit, LQMC Sections
8.70.010 et seq. (Stormwater Management and Discharge Controls), and
13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and
the California Regional Water Quality Control Board – Colorado River Basin
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 and the State Water
Resources Control Board’s Order No. 2009-0009-DWQ and Order No. 2010-
0014-DWQ.
A. For post-construction urban runoff from New Development and
Redevelopments Projects, the applicant shall implement requirements of
the NPDES permit for the design, construction and perpetual operation
and maintenance of BMPs per the approved Water Quality Management
Plan (WQMP) for the project as required by the California Regional
Water Quality Control Board – Colorado River Basin (CRWQCB-CRB)
Region Board Order No. R7-2013-0011.
B. The applicant shall implement the WQMP Design Standards per
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs
approved by the City Engineer. A project specific WQMP shall be
provided which incorporates Site Design and Treatment BMPs utilizing
first flush infiltration as a preferred method of NPDES Permit
Compliance for Whitewater River receiving water, as applicable.
C. The developer shall execute and record a Stormwater Management/BMP
Facilities Agreement that provides for the perpetual maintenance and
operation of stormwater BMPs.
UTILITIES
57. The applicant shall comply with the provisions of LQMC Section 13.24.110
(Utilities).
58. The applicant shall obtain the approval of the City Engineer for the location of
all utility lines within any right-of-way, and all above-ground utility structures
including, but not limited to, traffic signal cabinets, electric vaults, water
valves, and telephone stands, to ensure optimum placement for practical and
aesthetic purposes.
59. Existing overhead utility lines within, or adjacent to the proposed
development, and all proposed utilities shall be installed underground.
All existing utility lines attached to joint use 92 KV transmission power poles
are exempt from the requirement to be placed underground.
60. Underground utilities shall be installed prior to overlying hardscape. For
installation of utilities in existing improved streets, the applicant shall comply
with trench restoration requirements maintained, or required by the City
Engineer.
The applicant shall provide certified reports of all utility trench compaction for
approval by the City Engineer.
CONSTRUCTION
61. The City will conduct final inspections of habitable buildings only when the
buildings have improved street and (if required) sidewalk access to publicly-
maintained streets. The improvements shall include required traffic control
devices, pavement markings and street name signs. If on-site streets in
residential developments are initially constructed with partial pavement
thickness, the applicant shall complete the pavement prior to final inspections
of the last ten percent of homes within the development or when directed by
the City, whichever comes first.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
LANDSCAPE AND IRRIGATION
62. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping
Setbacks) & 13.24.140 (Landscaping Plans).
63. The applicant shall provide landscaping in the required setbacks, retention
basins, and common lots.
64. All new landscape areas shall have landscaping and permanent irrigation
improvements in compliance with the City’s Water Efficient Landscape
regulations contained in LQMC Section 8.13 (Water Efficient Landscape).
65. All trees shall consist of, at minimum, 36-inch box trees with double lodge
poles (two-inch diameter) used to brace and stake trees.
66. The applicant shall submit final landscape plans for review, processing and
approval to the Design and Development Department, in accordance with the
Final Landscape Plan application process. Design and Development Director
approval of the final landscape plans is required prior to issuance of the first
building permit unless the Director determines extenuating circumstances
exist which justify an alternative processing schedule.
NOTE: Plans are not approved for construction until signed by the appropriate
City official, including the Design and Development Director.
Prior to final approval of the installation of landscaping, the Landscape
Architect of record shall provide the Design and Development Department a
letter stating he/she has personally inspected the installation and that it
conforms with the final landscaping plans as approved by the City.
If staff determines during final landscaping inspection that adjustments are
required in order to meet the intent of the Planning Commission’s approval,
the Design and Development Director shall review and approve any such
revisions to the landscape plan.
MAINTENANCE
67. The applicant shall comply with the provisions of LQMC Section 13.24.160
(Maintenance).
68. The applicant shall make provisions for the continuous and perpetual
maintenance of common areas, perimeter landscaping up to the curb, access
drives, sidewalks, and stormwater BMPs.
FEES AND DEPOSITS
69. Permits issued under this approval shall be subject to the provisions of the
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2019-0006
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
Development Impact Fee and Transportation Uniform Mitigation Fee programs
in effect at the time of issuance of building permit(s).
70. The applicant shall comply with the provisions of LQMC Section 13.24.180
(Fees and Deposits). These fees include all deposits and fees required by the
City for plan checking and construction inspection. Deposits and fee amounts
shall be those in effect when the applicant makes application for plan check
and permits.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
GENERAL
1. The applicant agrees to defend, indemnify and hold harmless the City of La
Quinta (“City”), its agents, officers and employees from any claim, action or
proceeding to attack, set aside, void, or annul the approval of this Tentative
Tract Map, or any Final Map recorded thereunder. The City shall have sole
discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding
and shall cooperate fully in the defense.
2. This Tentative Tract Map, and any Final Map recorded thereunder, shall
comply with the requirements and standards of Government Code §§ 66410
through 66499.58 (the “Subdivision Map Act”), and Chapter 13 of the La
Quinta Municipal Code (“LQMC”).
The City of La Quinta’s Municipal Code can be accessed on the City’s Web Site
at www.laquintaca.gov.
3. The Tentative Tract Map shall expire on February 11, 2023 and shall become
null and void in accordance with La Quinta Municipal Code Section 13.12.150.
A time extension may be requested per LQMC Section 13.12.160.
4. Prior to the issuance of any grading, construction, or building permit by the
City, the applicant shall obtain any necessary clearances and/or permits from
the following agencies, if required:
• Riverside County Fire Marshal
• La Quinta Public Works Department (Grading Permit, Green Sheet
(Public Works Clearance) for Building Permits, Water Quality
Management Plan(WQMP) Exemption Form – Whitewater River Region,
Improvement Permit)
• Design & Development Department
• Riverside Co. Environmental Health Department
• Coachella Valley Unified School District
• Coachella Valley Water District (CVWD)
• Imperial Irrigation District (IID)
• California Water Quality Control Board (CWQCB)
• State Water Resources Control Board
• SunLine Transit Agency
• SCAQMD Coachella Valley
The applicant is responsible for all requirements of the permits and/or
clearances from the above listed agencies. When these requirements include
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
approval of improvement plans, the applicant shall furnish proof of such
approvals when submitting those improvement plans for City approval.
5. Coverage under the State of California Construction General Permit must be
obtained by the applicant, who then shall submit a copy of the Regional Water
Quality Control Board’s (“RWQCB”) acknowledgment of the applicant’s Notice
of Intent (“NOI”) and Waste Discharge Identification (WDID) number to the
City prior to the issuance of a grading or building permit.
6. The applicant shall comply with applicable provisions of the City’s NPDES
stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater
Management and Discharge Controls), and 13.24.170 (Clean Air/Clean
Water); Riverside County Ordinance No. 457; the California Regional Water
Quality Control Board – Colorado River Basin Region Board Order No. R7-
2013-0011 and the State Water Resources Control Board’s Order No. 2009-
0009-DWQ and Order No. 2012-0006-DWQ.
A. For construction activities including clearing, grading or excavation of
land that disturbs one (1) acre or more of land, or that disturbs less
than one (1) acre of land, but which is a part of a construction project
that encompasses more than one (1) acre of land, the Permitee shall be
required to submit a Storm Water Pollution Protection Plan (“SWPPP”) to
the State Water Resources Control Board.
The applicant or design professional can obtain the California
Stormwater Quality Association SWPPP template at
www.cabmphandbooks.com for use in their SWPPP preparation.
B. The applicant shall ensure that the required SWPPP is available for
inspection at the project site at all times through and including
acceptance of all improvements by the City.
C. The applicant’s SWPPP shall include provisions for all of the following
Best Management Practices (“BMPs”) (LQMC Section 8.70.020
(Definitions)):
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non-Storm Water Management.
6) Waste Management and Materials Pollution Control.
D. All erosion and sediment control BMPs on an Erosion Control Plan
proposed by the applicant shall be approved by the City Engineer prior
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
to any onsite or offsite grading, pursuant to this project.
E. The SWPPP and BMPs shall remain in effect for the entire duration of
project construction until all improvements are completed and accepted
by the City Council.
F. The inclusion in the Homeowners’ Association (HOA) Conditions,
Covenants, and Restrictions (CC&Rs), a requirement for the perpetual
maintenance and operation of all post-construction BMPs as required
and the applicant shall execute and record an agreement that provides
for the perpetual maintenance and operation of all post-construction
BMPs as required.
7. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual attorney’s fees incurred by the City Attorney
to review, negotiate and/or modify any documents or instruments required by
these conditions, if Developer requests that the City modify or revise any
documents or instruments prepared initially by the City to effect these
conditions. This obligation shall be paid in the time noted above without
deduction or offset and Developer’s failure to make such payment shall be a
material breach of the Conditions of Approval.
8. Developer shall reimburse the City, within thirty (30) days of presentment of
the invoice, all costs and actual consultant’s fees incurred by the City for
engineering and/or surveying consultants to review and/or modify any
documents or instruments required by this project. This obligation shall be
paid in the time noted above without deduction or offset and Developer’s
failure to make such payment shall be a material breach of the Conditions of
Approval.
PROPERTY RIGHTS
9. Prior to issuance of any permit(s), the applicant shall acquire or confer
easements and other property rights necessary for the construction or proper
functioning of the proposed development. Conferred rights shall include
irrevocable offers to dedicate or grant access easements to the City for
emergency services and for maintenance, construction and reconstruction of
essential improvements.
10. Pursuant to the aforementioned condition, conferred rights shall include
approvals from the master developer or the HOA over easements and other
property rights necessary for construction and proper functioning of the
proposed development not limited to access rights over proposed and/or
existing private streets that access public streets and open space/drainage
facilities of the master development.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
11. The applicant shall offer for dedication on the Final Map all public street rights-
of-way in conformance with the City's General Plan, Municipal Code, applicable
specific plans, and/or as required by the City Engineer.
12. The applicant shall retain for private use on the Final Map all private street
rights-of-way in conformance with the City's General Plan, Municipal Code,
applicable specific plans, and/or as required by the City Engineer.
13. The private street rights-of-way to be retained for private use required for this
development include:
A. PRIVATE STREETS
1) Lots A, B, and C - Private Residential Streets shall have a 36-foot
travel width. The travel width may be reduced to 32 feet with
parking restricted to one side, and 28 feet if on-street parking is
prohibited, and provided there is adequate off-street parking for
residents and visitors, and the applicant establishes provisions for
ongoing enforcement of the parking restriction in the CC&R’s.
The CC&R’s shall be reviewed and approved by the Design and
Development Department prior to recordation.
Property line shall be placed at the back of curb similar to the lay out
shown on the (preliminary grading plan/tentative map) and the typical
street section shown in the tentative map. Use of smooth curves instead
of angular lines at property lines is recommended.
14. Right-of-way geometry for standard knuckles and property line corner
cut-backs at curb returns shall conform to Riverside County Standard
Drawings #801, and #805, respectively, unless otherwise approved by the
City Engineer.
15. When the City Engineer determines that access rights to the proposed street
rights-of-way shown on the approved Tentative Tract Map are necessary prior
to approval of the Final Map dedicating such rights-of-way, the applicant shall
grant the necessary rights-of-way within 60 days of a written request by the
City.
16. The applicant shall offer for dedication on the Final Map a ten-foot wide public
utility easement contiguous with, and along both sides of all private streets.
Such easement may be reduced to five feet in width with the express written
approval of IID.
17. The applicant shall offer for dedication those easements necessary for the
placement of, and access to, utility lines and structures, drainage basins,
mailbox clusters, park lands, and common areas on the Final Map.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
18. The applicant shall furnish proof of easements, or written permission, as
appropriate, from those owners of all abutting properties on which grading,
retaining wall construction, permanent slopes, or other encroachments will
occur.
19. The applicant shall cause no easement to be granted, or recorded, over any
portion of the subject property between the date of approval of the Tentative
Tract Map and the date of recording of any Final Map, unless such easement is
approved by the City Engineer.
STREET AND TRAFFIC IMPROVEMENTS
20. The applicant shall comply with the provisions of LQMC Sections 13.24.060
(Street Improvements), 13.24.070 (Street Design - Generally) & 13.24.100
(Access for Individual Properties and Development) for public streets; and
Section 13.24.080 (Street Design - Private Streets), where private streets are
proposed.
21. Streets shall have vertical curbs or other approved curb configurations that
will convey water without ponding, and provide lateral containment of dust
and residue during street sweeping operations. If a wedge or rolled curb
design is approved, the lip at the flowline shall be near vertical with a 1/8"
batter and a minimum height of 0.1'. Unused curb cuts on any lot shall be
restored to standard curb height prior to final inspection of permanent
building(s) on the lot.
22. The applicant shall construct the following street improvements:
A. PRIVATE STREETS
1) Lots A, B, and C - Private Residential Streets shall have a 36-foot
travel width. The travel width may be reduced to 32 feet with
parking restricted to one side, and 28 feet if on-street parking is
prohibited, and provided there is adequate off-street parking for
residents and visitors, and the applicant establishes provisions for
ongoing enforcement of the parking restriction in the CC&R’s.
The CC&R’s shall be reviewed and approved by the Design and
Development Department prior to recordation.
2) The location of driveways of corner lots shall not be located within
the curb return and away from the intersection when possible.
3) Construct retractable bollards or alternative as approved by the
City Engineer to restrict access at the Marbella cul-de-sac.
B. PRIVATE CUL DE SACS
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
1) Shall be constructed according to the lay-out shown on the
tentative map, except for minor revisions as may be required by
the City Engineer.
23. The applicant shall extend improvements beyond the subdivision boundaries
to ensure they safely integrate with existing improvements (e.g., grading;
traffic control devices and transitions in alignment, elevation or dimensions of
streets and sidewalks).
24. The applicant shall design street pavement sections using CalTrans' design
procedure for 20-year life pavement, and the site-specific data for soil
strength and anticipated traffic loading (including construction traffic).
Minimum structural sections shall be as follows:
Residential 3.0" a.c./4.5" c.a.b.
or the approved equivalents of alternate materials.
25. The applicant shall submit current mix designs (less than two years old at the
time of construction) for base, asphalt concrete and Portland cement concrete.
The submittal shall include test results for all specimens used in the mix
design procedure. For mix designs over six months old, the submittal shall
include recent (less than six months old at the time of construction) aggregate
gradation test results confirming that design gradations can be achieved in
current production. The applicant shall not schedule construction operations
until mix designs are approved.
26. Improvements shall include appurtenances such as traffic control signs,
markings and other devices, raised medians if required, street name signs and
sidewalks. Mid-block street lighting is not required.
27. Standard knuckles and corner cut-backs shall conform to Riverside County
Standard Drawings #801 and #805, respectively, unless otherwise approved
by the City Engineer.
28. Improvements shall be designed and constructed in accordance with City
adopted standards, supplemental drawings and specifications, or as approved
by the City Engineer. Improvement plans for streets, access gates and
parking areas shall be stamped and signed by engineers registered in
California.
FINAL MAPS
29. Prior to the City’s approval of a Final Map, the applicant shall furnish accurate
mylars of the Final Map. The Final Map shall be 1” = 40’ scale.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as
“engineer,” “surveyor,” and “architect,” refers to persons currently certified or
licensed to practice their respective professions in the State of California.
30. Improvement plans shall be prepared by or under the direct supervision of
qualified engineers and/or architects, as appropriate, and shall comply with
the provisions of LQMC Section 13.24.040 (Improvement Plans).
31. The following improvement plans shall be prepared and submitted for review
and approval by the Public Works Department. A separate set of plans for
each line item specified below shall be prepared. The plans shall utilize the
minimum scale specified, unless otherwise authorized by the City Engineer in
writing. Plans may be prepared at a larger scale if additional detail or plan
clarity is desired. Note, the applicant may be required to prepare other
improvement plans not listed here pursuant to improvements required by
other agencies and utility purveyors.
A. On-Site Street Improvements/Signing & Striping/Storm Drain Plan
1" = 40' Horizontal, 1"= 4' Vertical
B. PM-10 Plan 1” = 40’ Horizontal
C. Erosion Control Plan 1” = 40’ Horizontal
D. WQMP (Plan submitted in Report Form)
NOTE: A through C to be submitted concurrently
(Separate Storm Drain Plans if applicable)
E. On-Site Residential Precise Grading Plan 1" = 30' Horizontal
Other engineered improvement plans prepared for City approval that are not
listed above shall be prepared in formats approved by the City Engineer prior
to commencing plan preparation.
“On-Site Precise Grading” plan is required to be submitted for approval by the
Building Official, Planning Manager and the City Engineer.
All On-Site Signing & Striping Plans shall show, at a minimum; Stop Signs,
Limit Lines and Legends, No Parking Signs, Raised Pavement Markers
(including Blue RPMs at fire hydrants) and Street Name Signs per Public
Works Standard Plans and/or as approved by the City Engineer.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
Grading plans shall normally include perimeter walls with Top Of Wall & Top Of
Footing elevations shown. All footings shall have a minimum of 1-foot of
cover, or sufficient cover to clear any adjacent obstructions.
“On-Site Precise Grading Plan” plans shall normally include all on-site surface
improvements including but not limited to finish grades for curbs & gutters,
building floor elevations, wall elevations, parking lot improvements and
accessible requirements.
32. The City maintains standard plans, detail sheets and/or construction notes for
elements of construction which can be accessed via the Public Works
Development “Plans, Notes and Design Guidance” section of the City website
(www.la-quinta.org). Please navigate to the Design and Development home
page and look for the Standard Drawings hyperlink.
33. The applicant shall furnish a complete set of the mylars of all approved
improvement plans on a storage media acceptable to the City Engineer.
34. Upon completion of construction, and prior to final acceptance of the
improvements by the City, the applicant shall furnish the City with
reproducible record drawings of all improvement plans which were approved
by the City. Each sheet shall be clearly marked "Record Drawing" and shall be
stamped and signed by the engineer or surveyor certifying to the accuracy
and completeness of the drawings. The applicant shall have all approved
mylars previously submitted to the City, revised to reflect the as-built
conditions. The applicant shall employ or retain the Engineer of Record (EOR)
during the construction phase of the project so that the EOR can make site
visits in support of preparing "Record Drawing". However, if subsequent
approved revisions have been approved by the City Engineer and reflect said
"Record Drawing" conditions, the EOR may submit a letter attesting to said
fact to the City Engineer in lieu of mylar submittal.
IMPROVEMENT SECURITY AGREEMENTS
35. Prior to approval of any Final Map, the applicant shall construct all on and off-
site improvements and satisfy its obligations for same, or shall furnish a fully
secured and executed Subdivision Improvement Agreement (“SIA”)
guaranteeing the construction of such improvements and the satisfaction of its
obligations for same, or shall agree to any combination thereof, as may be
required by the City.
36. Any Subdivision Improvement Agreement (“SIA”) entered into by and
between the applicant and the City of La Quinta, for the purpose of
guaranteeing the completion of any improvements related to this Tentative
Tract Map, shall comply with the provisions of LQMC Chapter 13.28
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
(Improvement Security).
37. Improvements to be made, or agreed to be made, shall include the removal of
any existing structures or other obstructions which are not a part of the
proposed improvements; and shall provide for the setting of the final survey
monumentation.
When improvements are phased through a “Phasing Plan,” or an
administrative approval (e.g., Site Development Permits), all off-site
improvements and common on-site improvements (e.g., backbone utilities,
retention basins, perimeter walls, landscaping and gates) shall be constructed,
or secured through a SIA, prior to the issuance of any permits in the first
phase of the development, or as otherwise approved by the City Engineer.
Improvements and obligations required of each subsequent phase shall either
be completed, or secured through a SIA, prior to the completion of homes or
the occupancy of permanent buildings within such latter phase, or as
otherwise approved by the City Engineer.
In the event the applicant fails to construct the improvements for the
development, or fails to satisfy its obligations for the development in a timely
manner, pursuant to the approved phasing plan, the City shall have the right
to halt issuance of all permits, and/or final inspections, withhold other
approvals related to the development of the project, or call upon the surety to
complete the improvements.
38. Depending on the timing of the development of this Tentative Tract Map, and
the status of the off-site improvements at the time, the applicant may be
required to:
A. Construct certain off-site improvements.
B. Construct additional off-site improvements, subject to the
reimbursement of its costs by others.
C. Reimburse others for those improvements previously constructed that
are considered to be an obligation of this tentative tract map.
D. Secure the costs for future improvements that are to be made by
others.
E. To agree to any combination of these actions, as the City may require.
Off-Site Improvements should be completed on a first priority basis. The
applicant shall complete Off-Site Improvements in the first phase of
construction or by the issuance of the 20% Building Permit.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
In the event that any of the improvements required for this development are
constructed by the City, the applicant shall, prior to the approval of the Final
Map, or the issuance of any permit related thereto, reimburse the City for the
costs of such improvements.
39. If the applicant elects to utilize the secured agreement alternative, the
applicant shall submit detailed construction cost estimates for all proposed on-
site and off-site improvements, including an estimate for the final survey
monumentation, for checking and approval by the City Engineer. Such
estimates shall conform to the unit cost schedule as approved by the City
Engineer.
At the time the applicant submits its detailed construction cost estimates for
conditional approval of the Final Map by the City Council, the applicant shall
also submit one copy each of an 8-1/2" x 11" reduction of each page of the
Final Map, along with a copy of an 8-1/2" x 11" Vicinity Map.
Estimates for improvements under the jurisdiction of other agencies shall be
approved by those agencies and submitted to the City along with the
applicant’s detailed cost estimates.
40. Should the applicant fail to construct the improvements for the development,
or fail to satisfy its obligations for the development in a timely manner, the
City shall have the right to halt issuance of building permits, and/or final
building inspections, withhold other approvals related to the development of
the project, or call upon the surety to complete the improvements.
GRADING
41. The applicant shall comply with the provisions of LQMC Section 13.24.050
(Grading Improvements).
42. Prior to occupancy of the project site for any construction, or other purposes,
the applicant shall obtain a grading permit approved by the City Engineer.
43. To obtain an approved grading permit, the applicant shall submit and obtain
approval of all of the following:
A. A grading plan prepared by a civil engineer registered in the State of
California,
B. A preliminary geotechnical (“soils”) report prepared by a professional
registered in the State of California,
C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter
6.16, (Fugitive Dust Control), and
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
D. An Erosion Control Plan with Best Management Practices prepared in
accordance with LQMC Sections 8.70.010 and 13.24.170 (NPDES
Stormwater Discharge Permit and Storm Management and Discharge
Controls).
E. A Final WQMP prepared by an authorized professional registered in the
State of California.
All grading shall conform with the recommendations contained in the
Preliminary Soils Report, and shall be certified as being adequate by soils
engineer, or engineering geologist registered in the State of California.
A statement shall appear on the Final Map that a soils report has been
prepared in accordance with the California Health & Safety Code § 17953.
The applicant shall furnish security, in a form acceptable to the City, and in an
amount sufficient to guarantee compliance with the approved Fugitive Dust
Control Plan provisions as submitted with its application for a grading permit.
Additionally, the applicant shall replenish said security if expended by the City
of La Quinta to comply with the Plan as required by the City Engineer.
44. The applicant shall maintain all open graded, undeveloped land in order to
prevent wind and/or water erosion of such land. All open graded,
undeveloped land shall either be planted with interim landscaping, or
stabilized with such other erosion control measures, as were approved in the
Fugitive Dust Control Plan.
45. Grading within the perimeter setback and parkway areas shall have undulating
terrain and shall conform with the requirements of LQMC Section 9.60.240(F)
except as otherwise modified by this condition. The maximum slope shall not
exceed 3:1 anywhere in the landscape setback area, except for the backslope
(i.e. the slope at the back of the landscape lot) which shall not exceed 2:1 if
fully planted with ground cover. The maximum slope in the first six (6) feet
adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is
within six feet (6’) of the curb, otherwise the maximum slope within the right
of way shall not exceed 3:1. All unpaved parkway areas adjacent to the curb
shall be depressed one and one-half inches (1.5") in the first eighteen inches
(18") behind the curb.
46. Building pad elevations on the rough grading plan submitted for City
Engineer’s approval shall conform with pad elevations shown on the tentative
map, unless the pad elevations have other requirements imposed elsewhere in
these Conditions of Approval.
47. The applicant shall minimize the differences in elevation between the adjoining
properties and the lots within this development.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
Where compliance within the above stated limits is impractical, the City may
consider alternatives that are shown to minimize safety concerns,
maintenance difficulties and neighboring-owner dissatisfaction with the grade
differential.
48. Prior to any site grading or regrading that will raise or lower any portion of the
site by more than plus or minus half of a foot (0.5’) from the elevations shown
on the approved Tentative Tract Map, the applicant shall submit the proposed
grading changes to the City Engineer for a substantial conformance review.
49. Prior to the issuance of a building permit for any building lot, the applicant
shall provide a lot pad certification stamped and signed by a qualified engineer
or surveyor with applicable compaction tests and over excavation
documentation.
Each pad certification shall list the pad elevation as shown on the approved
grading plan, the actual pad elevation and the difference between the two, if
any. Such pad certification shall also list the relative compaction of the pad
soil. The data shall be organized by lot number, and listed cumulatively if
submitted at different times.
DRAINAGE
50. Stormwater handling shall conform with the approved hydrology and drainage
report for Andalusia, Tract Map 31681. Nuisance water shall be disposed of in
an approved manner.
51. The applicant shall comply with the provisions of LQMC Section 13.24.120
(Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 –
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements. More specifically, stormwater falling on site during the
100 year storm shall be retained within the development, unless otherwise
approved by the City Engineer. The design storm shall be either the 1 hour, 3
hour, 6 hour or 24 hour event producing the greatest total run off.
52. Nuisance water shall be retained on site. Nuisance water shall be disposed of
per approved methods contained in Engineering Bulletin No. 06-16 –
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements.
53. In design of retention facilities, the maximum percolation rate shall be two
inches per hour. The percolation rate will be considered to be zero unless the
applicant provides site specific data indicating otherwise and as approved by
the City Engineer.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
54. The project shall be designed to accommodate purging and blowoff water
(through underground piping and/or retention facilities) from any on-site or
adjacent well sites granted or dedicated to the local water utility authority as a
requirement for development of this property.
55. No fence or wall shall be constructed around any retention basin unless
approved by the Design and Development Director and the City Engineer.
56. For on-site above ground common retention basins, retention depth shall be
according to Engineering Bulletin No. 06-16 – Hydrology Report with
Preliminary Hydraulic Report Criteria for Storm Drain Systems. Side slopes
shall not exceed 3:1 and shall be planted with maintenance free ground cover.
Additionally, retention basin widths shall be not less than 20 feet at the
bottom of the basin.
57. Stormwater may not be retained in landscaped parkways or landscaped
setback lots. Only incidental storm water (precipitation which directly falls
onto the setback) will be permitted to be retained in the landscape setback
areas. The perimeter setback and parkway areas in the street right-of-way
shall be shaped with berms and mounds, pursuant to LQMC Section
9.100.040(B)(7).
58. The design of the development shall not cause any increase in flood
boundaries and levels in any area outside the development.
59. The development shall be graded to permit storm flow in excess of retention
capacity to flow out of the development through a designated overflow and
into the historic drainage relief route.
60. Storm drainage historically received from adjoining property shall be received
and retained or passed through into the historic downstream drainage relief
route.
61. The applicant shall comply with applicable provisions for post construction
runoff per the City’s NPDES stormwater discharge permit, LQMC Sections
8.70.010 et seq. (Stormwater Management and Discharge Controls), and
13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457; and
the California Regional Water Quality Control Board – Colorado River Basin
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 and the State Water
Resources Control Board’s Order No. 2009-0009-DWQ and Order No. 2010-
0014-DWQ.
A. For post-construction urban runoff from New Development and
Redevelopments Projects, the applicant shall implement requirements of
the NPDES permit for the design, construction and perpetual operation
and maintenance of BMPs per the approved Water Quality Management
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
Plan (WQMP) for the project as required by the California Regional
Water Quality Control Board – Colorado River Basin (CRWQCB-CRB)
Region Board Order No. R7-2013-0011.
B. The applicant shall implement the WQMP Design Standards per
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs
approved by the City Engineer. A project specific WQMP shall be
provided which incorporates Site Design and Treatment BMPs utilizing
first flush infiltration as a preferred method of NPDES Permit
Compliance for Whitewater River receiving water, as applicable.
C. The developer shall execute and record a Stormwater Management/BMP
Facilities Agreement that provides for the perpetual maintenance and
operation of stormwater BMPs.
UTILITIES
62. The applicant shall comply with the provisions of LQMC Section 13.24.110
(Utilities).
63. The applicant shall obtain the approval of the City Engineer for the location of
all utility lines within any right-of-way, and all above-ground utility structures
including, but not limited to, traffic signal cabinets, electric vaults, water
valves, and telephone stands, to ensure optimum placement for practical and
aesthetic purposes.
64. Existing overhead utility lines within, or adjacent to the proposed
development, and all proposed utilities shall be installed underground.
All existing utility lines attached to joint use 92 KV transmission power poles
are exempt from the requirement to be placed underground.
65. Underground utilities shall be installed prior to overlying hardscape. For
installation of utilities in existing improved streets, the applicant shall comply
with trench restoration requirements maintained, or required by the City
Engineer.
The applicant shall provide certified reports of all utility trench compaction for
approval by the City Engineer.
CONSTRUCTION
66. The City will conduct final inspections of habitable buildings only when the
buildings have improved street and (if required) sidewalk access to publicly-
maintained streets. The improvements shall include required traffic control
devices, pavement markings and street name signs. If on-site streets in
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
residential developments are initially constructed with partial pavement
thickness, the applicant shall complete the pavement prior to final inspections
of the last ten percent of homes within the development or when directed by
the City, whichever comes first.
LANDSCAPE AND IRRIGATION
67. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping
Setbacks) & 13.24.140 (Landscaping Plans).
68. The applicant shall provide landscaping in the required setbacks, retention
basins, and common lots.
69. All new landscape areas shall have landscaping and permanent irrigation
improvements in compliance with the City’s Water Efficient Landscape
regulations contained in LQMC Section 8.13 (Water Efficient Landscape).
70. The applicant shall submit final landscape plans for review, processing and
approval to the Design and Development Department, in accordance with the
Final Landscape Plan application process. Design and Development Director
approval of the final landscape plans is required prior to issuance of the first
building permit unless the Director determines extenuating circumstances
exist which justify an alternative processing schedule.
NOTE: Plans are not approved for construction until signed by the appropriate
City official, including the Design and Development Director.
Prior to final approval of the installation of landscaping, the Landscape
Architect of record shall provide the Design and Development Department a
letter stating he/she has personally inspected the installation and that it
conforms with the final landscaping plans as approved by the City.
If staff determines during final landscaping inspection that adjustments are
required in order to meet the intent of the Planning Commission’s approval,
the Design and Development Director shall review and approve any such
revisions to the landscape plan.
MAINTENANCE
71. The applicant shall comply with the provisions of LQMC Section 13.24.160
(Maintenance).
72. The applicant shall make provisions for the continuous and perpetual
maintenance of common areas, perimeter landscaping up to the curb, access
drives, sidewalks, and stormwater BMPs.
PLANNING COMMISSION RESOLUTION 2020-
DRAFT CONDITIONS OF APPROVAL
TENTATIVE TRACT MAP 2019-0004
CLUB VILLA AT ANDALUSIA
ADOPTED: FEBRUARY 11, 2020
FEES AND DEPOSITS
73. Permits issued under this approval shall be subject to the provisions of the
Development Impact Fee and Transportation Uniform Mitigation Fee programs
in effect at the time of issuance of building permit(s).
74. The applicant shall comply with the provisions of LQMC Section 13.24.180
(Fees and Deposits). These fees include all deposits and fees required by the
City for plan checking and construction inspection. Deposits and fee amounts
shall be those in effect when the applicant makes application for plan check and
permits.
PROJECT INFORMATION
CASE NUMBERS: TENTATIVE TRACT MAP 2019-0004
SITE DEVELOPMENT PERMIT 2019-0006
RELATED CASES: SPECIFIC PLAN 2003-067
APPLICANT: SUNRISE LQ, LLC
PROPERTY OWNER: SUNRISE LQ, LLC
REQUESTS: APPROVE A TENTATIVE TRACT MAP AND SITE
DEVELOPMENT PERMIT FOR 63 RESIDENTIAL LOTS
ON 27.60 ACRES WITHIN ANDALUSIA AT CORAL
MOUNTAIN SPECIFIC PLAN
LOCATION: EAST OF MADISON STREET, SOUTH OF AVENUE 58,
WITHIN THE ANDALUSIA AT CORAL MOUNTAIN
SPECIFIC PLAN, PLANNING AREA 2
APN 764-200-071
GENERAL PLAN
DESIGNATION: LOW DENSITY RESIDENTIAL
ZONING
DESIGNATION: LOW DENSITY RESIDENTIAL
SURROUNDING
ZONING/LAND USES: NORTH: LOW DENSITY RESIDENTIAL
EXISTING RESIDENTIAL DEVELOPMENT
SOUTH: LOW DENSITY RESIDENTIAL
GOLF COURSE
EAST: LOW DENSITY RESIDENTIAL
EXISTING RESIDENTIAL DEVELOPMENT
WEST: LOW DENSITY RESIDENTIAL
TENNIS AND SWIM CLUB
ATTACHMENT 1
MONROE ST60TH AVE
58TH AVE
MADISON STAN
D
A
L
U
S
I
ATROON WAYJEREZARACENA
RONDA
SEVILLE
PRISM
D
R
CARMON
ASEMINOLE DRALMONTESHINNECOC
K
HI
L
L
S
TRILOGY PKWYBLACK DIAMONDCHANTICLEER DR
WEISKOPF
LEGENDS WAY
AVENUE 58
CALLE AZ
U
L
ALMERIAS VALLEY LNHERMITAGE
MARBE
L
L
A
COUPLES CT
CANTATA DRBARRISTO CIRIMPALA DR
LIVING STONE DRVISTA LAZORE
D
R
O
C
K
R
D
JUNIPER LNVIDA BELLA DR
WHITE SAGE DRSERENATA DR
DESERT ROSE DRSUN CACTUS LN
59TH AVEVIA SAN CLEMENTEVIA PUERTA AZUL
BRITTL
E
B
U
S
H L
N
CALLE CONCHITA
DANIEL DRMOUNTAIN VIEWPASEO DE LA PAZVIA ENCINI
T
A
S
BARREL CACTUS RD
DESERT SHADOWS DRWINGED FOOTMISSION PALMS DR
CA
R
B
O
N
E
R
A
S ARPEGGIO DRFIORI DEL DESERTO
MIJASHONEYSUCKLE STBALLYBUNIONALOE CIRANGORA CTCATHEDRAL HILLS AVESAN JUAN PLPOINSETTIA PLDELORES CIR
PRIC
K
L
Y
P
E
A
R
L
N
VIA BARRANCA
STONE CROP LN
CASANOVA ST
GOLD
E
N
B
A
R
R
E
L
W
A
Y RESIDENZA CTSTAGHORN DRLACE LEAF CTS
W
E
E
T
S
H
A
D
E
L
NKATIE CIRVALHALLA GATE
ANDERSON LN
MADISON STA
N
D
A
L
U
S
I
A
®City of La Quinta
Design and Development Department
Planning Division
Planning Area II
City Limit
Planning Area II Vicinity Map
$77$&+0(17
$77$&+0(17
$77$&+0(17
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201A
SPANISH TRANSITIONAL
ELEVATIONS
ROOF PLANREAR ELEVATION
FRONT ELEVATION
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO PARAPET
10. METAL GATE
5. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
13. CERAMIC TILE
6. CEMENT BARGE BOARD
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
15. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
14. 10' TALL ALUMINUM POCKET DOORS
8. METAL AWNING
4. STUCCO RECESS
Sheet No: 201-3
7. RECESSED WOOD BEAM
9. METAL STANDING SEAM ROOF
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201A
SPANISH TRANSITIONAL
ELEVATIONS
LEFT ELEVATION
RIGHT ELEVATION
Sheet No: 201-4
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO PARAPET
10. METAL GATE
5. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
13. CERAMIC TILE
6. CEMENT BARGE BOARD
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
15. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
14. 10' TALL ALUMINUM POCKET DOORS
8. METAL AWNING
4. STUCCO RECESS
7. RECESSED WOOD BEAM
9. METAL STANDING SEAM ROOF
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201A
SPANISH TRANSITIONAL
ELEVATIONS
COURTYARD ENTRY ELEVATION
COURTYARD PORTICO ELEVATION
Sheet No: 201-5
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO PARAPET
10. METAL GATE
5. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
13. CERAMIC TILE
6. CEMENT BARGE BOARD
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
15. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
14. 10' TALL ALUMINUM POCKET DOORS
8. METAL AWNING
4. STUCCO RECESS
7. RECESSED WOOD BEAM
9. METAL STANDING SEAM ROOF
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201B
MODERN MEDITERRANEAN
ELEVATIONS
ROOF PLAN
FRONT ELEVATION
REAR ELEVATION
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO EAVE
8. METAL BARN DOOR HARDWARE
9. METAL GATE
7. BRICK
4. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
6. STONE VENEER
5. WOOD SHUTTER
10. METAL CHIMNEY SHROUD W/ THIN BRICK
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
Sheet No: 201-7
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201B
MODERN MEDITERRANEAN
ELEVATIONS
LEFT ELEVATION
RIGHT ELEVATION
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO EAVE
8. METAL BARN DOOR HARDWARE
9. METAL GATE
7. BRICK
4. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
6. STONE VENEER
5. WOOD SHUTTER
10. METAL CHIMNEY SHROUD W/ THIN BRICK
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
Sheet No: 201-7
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201B
MODERN MEDITERRANEAN
ELEVATIONS
COURTYARD ENTRY ELEVATION
COURTYARD PORTICO ELEVATION
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO EAVE
8. METAL BARN DOOR HARDWARE
9. METAL GATE
7. BRICK
4. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
6. STONE VENEER
5. WOOD SHUTTER
10. METAL CHIMNEY SHROUD W/ THIN BRICK
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
Sheet No: 201-9
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201C
DESERT CONTEMPORARY
ELEVATIONS
ROOF PLAN
FRONT ELEVATION
REAR ELEVATION
2. SMOOTH STUCCO
1. CONCRETE FLAT TILE
3. STUCCO POTSHELF
9. METAL GATE
4. STUCCO AWNING
EXTERIOR MATERIALS
8. STONE VENEER
6. CEMENT BOARD FASCIA
10. METAL SCUPPER & DOWNSPOUT
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
14. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
15. 10' TALL ALUMINUM POCKET DOORS
7. CEMENT BOARD BARGE
5. STUCCO PARAPET
Sheet No: 201-11
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
13. METAL TRELLIS
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201C
DESERT CONTEMPORARY
ELEVATIONS
LEFT ELEVATION
RIGHT ELEVATION
Sheet No: 201-12
2. SMOOTH STUCCO
1. CONCRETE FLAT TILE
3. STUCCO POTSHELF
9. METAL GATE
4. STUCCO AWNING
EXTERIOR MATERIALS
8. STONE VENEER
6. CEMENT BOARD FASCIA
10. METAL SCUPPER & DOWNSPOUT
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
14. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
15. 10' TALL ALUMINUM POCKET DOORS
7. CEMENT BOARD BARGE
5. STUCCO PARAPET
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
13. METAL TRELLIS
17. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 201C
DESERT CONTEMPORARY
ELEVATIONS
COURTYARD ENTRY ELEVATION
COURTYARD PORTICO ELEVATION
Sheet No: 201-13
2. SMOOTH STUCCO
1. CONCRETE FLAT TILE
3. STUCCO POTSHELF
9. METAL GATE
4. STUCCO AWNING
EXTERIOR MATERIALS
8. STONE VENEER
6. CEMENT BOARD FASCIA
10. METAL SCUPPER & DOWNSPOUT
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
14. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
15. 10' TALL ALUMINUM POCKET DOORS
7. CEMENT BOARD BARGE
5. STUCCO PARAPET
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
13. METAL TRELLIS
17. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-18
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202A
SPANISH TRANSITIONAL
ELEVATIONS
REAR ELEVATION ROOF PLAN
FRONT ELEVATION
Sheet No: 202-3
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO PARAPET
10. METAL GATE
5. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
13. CERAMIC TILE
6. CEMENT BOARD BARGE
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
15. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
14. 10' TALL ALUMINUM POCKET DOORS
8. WOOD EYEBROW ROOF
4. STUCCO RECESS
7. RECESSED WOOD BEAM
9. METAL STANDING SEAM ROOF
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
17. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202A
SPANISH TRANSITIONAL
ELEVATIONS
LEFT ELEVATION
RIGHT ELEVATION
Sheet No: 202-4
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO PARAPET
10. METAL GATE
5. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
13. CERAMIC TILE
6. CEMENT BOARD BARGE
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
15. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
14. 10' TALL ALUMINUM POCKET DOORS
8. WOOD EYEBROW ROOF
4. STUCCO RECESS
7. RECESSED WOOD BEAM
9. METAL STANDING SEAM ROOF
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
17. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202A
SPANISH TRANSITIONAL
ELEVATIONS
COURTYARD ENTRY ELEVATION
COURTYARD PORTICO ELEVATION
Sheet No: 202-5
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO PARAPET
10. METAL GATE
5. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
13. CERAMIC TILE
6. CEMENT BOARD BARGE
11. METAL CHIMNEY SHROUD
12. METAL SECTIONAL GARAGE DOOR
15. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
14. 10' TALL ALUMINUM POCKET DOORS
8. WOOD EYEBROW ROOF
4. STUCCO RECESS
7. RECESSED WOOD BEAM
9. METAL STANDING SEAM ROOF
16. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
17. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER
ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202B
MODERN MEDITERRANEAN
ELEVATIONS
FRONT ELEVATION
REAR ELEVATION ROOF PLAN
Sheet No: 202-7
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO EAVE
8. METAL BARN DOOR HARDWARE
9. METAL GATE
7. BRICK
4. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
6. STONE VENEER
5. WOOD SHUTTER
10. METAL CHIMNEY SHROUD W/ THIN BRICK
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202B
MODERN MEDITERRANEAN
ELEVATIONS
LEFT ELEVATION
RIGHT ELEVATION
Sheet No: 202-8
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO EAVE
8. METAL BARN DOOR HARDWARE
9. METAL GATE
7. BRICK
4. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
6. STONE VENEER
5. WOOD SHUTTER
10. METAL CHIMNEY SHROUD W/ THIN BRICK
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202B
MODERN MEDITERRANEAN
ELEVATIONS
COURTYARD ENTRY ELEVATION
COURTYARD PORTICO ELEVATION
Sheet No: 202-9
2. SMOOTH STUCCO
1. CONCRETE "S" TILE
3. STUCCO EAVE
8. METAL BARN DOOR HARDWARE
9. METAL GATE
7. BRICK
4. CEMENT BOARD FASCIA
EXTERIOR MATERIALS
6. STONE VENEER
5. WOOD SHUTTER
10. METAL CHIMNEY SHROUD W/ THIN BRICK
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202C
DESERT CONTEMPORARY
ELEVATIONS
FRONT ELEVATION
REAR ELEVATION ROOF PLAN
2. SMOOTH STUCCO
1. CONCRETE FLAT TILE
3. STUCCO POTSHELF
9. METAL GATE
4. STUCCO AWNING
EXTERIOR MATERIALS
8. STONE VENEER (OPTIONAL AT REAR ELEVATION)
6. CEMENT BOARD FASCIA
10. METAL CHIMNEY SHROUD
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
7. CEMENT BOARD BARGE
5. STUCCO PARAPET
Sheet No: 202-11
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202C
DESERT CONTEMPORARY
ELEVATIONS
LEFT ELEVATION
RIGHT ELEVATION
Sheet No: 202-12
2. SMOOTH STUCCO
1. CONCRETE FLAT TILE
3. STUCCO POTSHELF
9. METAL GATE
4. STUCCO AWNING
EXTERIOR MATERIALS
8. STONE VENEER (OPTIONAL AT REAR ELEVATION)
6. CEMENT BOARD FASCIA
7. CEMENT BOARD BARGE
5. STUCCO PARAPET
10. METAL CHIMNEY SHROUD
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
CLUB VILLAS
#19-03LA QUINTA, CA
55' x 140' LOTS
PLAN 202C
DESERT CONTEMEPORARY
ELEVATIONS
COURTYARD ENTRY ELEVATION
COURTYARD PORTICO ELEVATION
Sheet No: 202-13
2. SMOOTH STUCCO
1. CONCRETE FLAT TILE
3. STUCCO POTSHELF
9. METAL GATE
4. STUCCO AWNING
EXTERIOR MATERIALS
8. STONE VENEER (OPTIONAL AT REAR ELEVATION)
6. CEMENT BOARD FASCIA
7. CEMENT BOARD BARGE
5. STUCCO PARAPET
10. METAL CHIMNEY SHROUD
11. METAL SECTIONAL GARAGE DOOR
12. ANDERSEN 100 SERIES FIBREX WINDOWS & DOORS
13. 10' TALL ALUMINUM POCKET DOORS
14. FIBERGLASS CONTEMPORARY DOOR BY THERMA-TRU
15. 6'-0" HIGH CONCRETE BLOCK WALL W/ STUCCO OVER ca, 92675
san juan capistrano
suite 300
(949) 487-2320
architecture planning
31411 camino capistrano
architects, inc.P E K A R E K10-7-19
$77$&+0(17
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #1
“A” ELEVATIONS
1. Concrete “S” Tile: Eagle Roofing Products, Capistrano Blend of 50% 8830
“Albuquerque Blend” & 50% 8402 “Santa Cruz Blend”
2. Metal Standing Seam Roof: Metal Roofing California, Western Lock
“Charcoal Gray”
3. Smooth Stucco/ Metal Chimney Shroud: Sherwin Williams Paint, SW 7757
“High Reflective White”
4. Cement Board Fascia/ Barge/ Wood Eyebrow/ Wood Beam: Sherwin
Williams Paint, SW 7672 “knitting Needles”
5. Metal Garage Door/ Metal Side Yard Gate/ Fiberglass Entry Door: Sherwin
Williams Paint, SW 7673 “Pewter Cast”
6. Metal Portico Gate/ Metal Awning: Sherwin Williams Paint, SW 6258
“Tricorn Black”
7. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
8. Decorative Ceramic Tile: Arto, Deco Collection SD-CADIZ-HD
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #2
“A” ELEVATIONS
1. Concrete “S” Tile: Eagle Roofing Products, Capistrano Blend of 50% 37646
“Desert Clay Blend” & 50% 3814 “San Pablo Blend”
2. Metal Standing Seam Roof: Metal Roofing California, Western Lock
“Dark Bronze”
3. Smooth Stucco/ Metal Chimney Shroud: Sherwin Williams Paint, SW 7566
“Westhighland White”
4. Cement Board Fascia/ Barge/ Wood Eyebrow/ Wood Beam: Sherwin
Williams Paint, SW 7508 “Tavern Taupe”
5. Metal Garage Door/ Metal Side Yard Gate/ Fiberglass Entry Door: Sherwin
Williams Paint, SW 7514 “foothills”
6. Metal Portico Gate/ Metal Awning: Sherwin Williams Paint, SW 6258
“Tricorn Black”
7. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
8. Decorative Ceramic Tile: Arto, Deco Collection SD-RABAT-HA
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #3
“A” ELEVATIONS
1. Concrete “S” Tile: Eagle Roofing Products, Capistrano Blend of 50% 3605
“San Benito Blend” & 50% 3773 “Walnut Creek Blend”
2. Metal Standing Seam Roof: Metal Roofing California, Western Lock
“Dark Bronze”
3. Smooth Stucco/ Metal Chimney Shroud: Sherwin Williams Paint, SW 6098
“Pacer White”
4. Cement Board Fascia/ Barge/ Wood Eyebrow/ Wood Beam: Sherwin
Williams Paint, SW 6082 “Cobble Brown”
5. Metal Garage Door/ Metal Side Yard Gate/ Fiberglass Entry Door: Sherwin
Williams Paint, SW 6083 “Sable”
6. Metal Portico Gate/ Metal Awning: Sherwin Williams Paint, SW 6258
“Tricorn Black”
7. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
8. Decorative Ceramic Tile: Arto, Deco Collection SD-FLORA-HA
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #4
“B” ELEVATIONS
1. Concrete “S” Tile: Eagle Roofing Products, Capistrano Blend of 50% 8806
“Tucson Blend” & 50% 3813 “San Mateo Blend”
2. Smooth Stucco/ Stucco o/Eave/ Metal Chimney Shroud: Sherwin Williams
Paint, SW 7005 “Pure White”
3. Stone Veneer: Creative Mines, Craft Orchard Limestone “Whitegold”
4. Thin Brick: McNear Brick, Old California Series “Melrose”
5. Cement Board Fascia/ Wood Shutters/ Fiberglass Entry Door: Sherwin
Williams Paint, SW 7509 “Tiki Hut”
6. Metal Garage Door/ Metal Side Yard Gate: Sherwin Williams Paint, SW
7502 “Dry Dock”
7. Metal Portico Gate/ Metal Shutter Hardware: Sherwin Williams Paint, SW
6990 “Caviar”
8. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #5
“B” ELEVATIONS
1. Concrete “S” Tile: Eagle Roofing Products, Capistrano Blend of 50% 8711
“Puesta Del Sol Blend” & 50% 8402 “Santa Cruz Blend”
2. Smooth Stucco/ Stucco o/Eave/ Metal Chimney Shroud: Sherwin Williams
Paint, SW 9180 “Aged White”
3. Stone Veneer: Creative Mines, Craft Orchard Limestone “Alpaca”
4. Thin Brick: McNear Brick, Sandmold Series “Berkshire”
4. Cement Board Fascia/ Wood Shutters/ Fiberglass Entry Door: Sherwin
Williams Paint, SW 7031 “Mega Greige”
5. Metal Garage Door/ Metal Side Yard Gate: Sherwin Williams Paint, SW
6073 “Perfect Greige”
7. Metal Portico Gate: Sherwin Williams Paint, SW 6990 “Caviar”
8. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #6
“B” ELEVATIONS
1. Concrete “S” Tile: Eagle Roofing Products, Capistrano Blend of 50% 8401
“San Miguell Blend” & 50% 8708 “Del Oro Blend”
2. Smooth Stucco/ Stucco o/Eave/ Metal Chimney Shroud: Sherwin Williams
Paint, SW 7569 “Stucco”
3. Stone Veneer: Creative Mines, Craft Orchard Limestone “Timberwolf”
4. Thin Brick: McNear Brick, Sandmold Series “Limehouse”
4. Cement Board Fascia/ Wood Shutters/ Fiberglass Entry Door: Sherwin
Williams Paint, SW 9091 “Half Calf”
5. Metal Garage Door/ Metal Side Yard Gate: Sherwin Williams Paint, SW
9090 “Caraibe”
7. Metal Portico Gate: Sherwin Williams Paint, SW 6990 “Caviar”
8. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #7
“C” ELEVATIONS
1. Concrete Flat Tile: Eagle Roofing Products, Bel Air Blend of 50% 47646
“Desert Clay Blend” & 50% 8708 “Del Oro Blend”
2. Smooth Stucco/ Stucco Potshelf/ Stucco Parapet: Sherwin Williams
Paint, SW 7103 “Whitetail”
3. Stone Veneer: Creative Mines, Craft Split Modular “Twine”
4. Cement Board Fascia/ Barge/ Stucco Awning/ Metal Trellis: Sherwin
Williams Paint, SW 2808 “Rockwood Dark Brown”
5. Metal Garage Door/ Metal Side Yard Gate: Sherwin
Williams Paint, SW 2806 “Rockwood Brown”
6. Fiberglass Entry Door: Sherwin Williams Pant, SW 2837 “Aurora Brown”
7. Metal Portico Gate: Sherwin Williams Paint, SW 6991 “Black Magic”
8. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #8
“C” ELEVATIONS
1. Concrete Flat Tile: Eagle Roofing Products, Bel Air Blend of 50% 8806
“Tucson Blend” & 50% 4636 “Piedmont Blend”
2. Smooth Stucco/ Stucco Potshelf/ Stucco Parapet: Sherwin Williams
Paint, SW 7101 “Futon”
3. Stone Veneer: Creative Mines, Craft Split Modular “Timberwolf”
4. Cement Board Fascia/ Barge/ Stucco Awning/ Metal Trellis: Sherwin
Williams Paint, SW 6076 “Turkish Coffee”
5. Metal Garage Door/ Metal Side Yard Gate: Sherwin
Williams Paint, SW 7525 “Tree Branch”
6. Fiberglass Entry Door: Sherwin Williams Pant, SW 3803 “Rockwood Terra
Cotta”
7. Metal Portico Gate: Sherwin Williams Paint, SW 6991 “Black Magic”
8. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
PEKAREK ARCHITECTS, INC.
architecture x planning
________________________________________________________
____________________________________________ __________________________________
31411 camino capistrano, suite 300 949/487-2320
san juan capistrano, ca 92675 fax 949/487-2321
ANDALUSIA COUNTRY CLUB - CLUB VILLAS
SUNRISE COMPANY
COLORS/ MATERIALS LIST
SCHEME #9
“C” ELEVATIONS
1. Concrete Flat Tile: Eagle Roofing Products, Bel Air Blend of 50% 47646
“Desert Clay Blend” & 50% 4814 “San Pablo Blend”
2. Smooth Stucco/ Stucco Potshelf/ Stucco Parapet: Sherwin Williams
Paint, SW 7555 “Patience”
3. Stone Veneer: Creative Mines, Craft Split Modular “Powder”
4. Cement Board Fascia/ Barge/ Stucco Awning/ Metal Trellis: Sherwin
Williams Paint, SW 9183 “Dark Clove”
5. Metal Garage Door/ Metal Side Yard Gate: Sherwin
Williams Paint, SW 7515 “Homestead Brown”
6. Fiberglass Entry Door: Sherwin Williams Pant, SW 2831 “Classical Gold”
7. Metal Portico Gate: Sherwin Williams Paint, SW 6991 “Black Magic”
8. Windows & Sliding Doors: Andersen Windows 100 Series “Black”
TO: Honorable Chair and Members of the Planning Commission
FROM: Sijifredo Fernandez, Associate Planner
DATE: February 11, 2020
SUBJECT: REPORT ON JANUARY 2020 VILLAGE PARKING
SURVEY
Efforts to improve the La Quinta Village as a destination for residents and
visitors are a City priority. The Village parking management program started
in 2016 and monitors parking demand by conducting parking surveys for on-
street and off-street parking occupancy in peak season (January) and off-peak
season (August). This report is intended to update the Planning Commission
on the January 2020 peak season survey (Survey) results.
There are 4,178 parking spaces available in the Village District (Attachment
1). Of these, 3,291 are off-street spaces, and 887 are on-street spaces.
Below are the results from the January 2020 survey compared with previous
surveys:
1The Village Core Zone is bounded by Avenida Navarro, Desert Club Drive, Calle Tampico, and Calle Estado
Total parking occupancy and peak occupancy times are comparable to
previous year’s parking counts. Overall the parking counts are similar from
previous years, although the village core zone peak occupancy increased by
8% on the weekend and decreased by 11% on the weekday. Even with these
changes, the parking occupancy results demonstrate that parking is sufficient
throughout the Village Core Area.
Attachments: 1.January 2020 Village Peak Parking Inventory
2.January 2020 Village Peak Season Survey results
Survey Date Total
Parking
Occupancy
Peak
Occupancy
Time
Village Core
Zone Peak
Occupancy1
January
2020
Saturday, January 25, 2020 13-32% 6:00 P.M. 80% - 6:00 P.M.
Thursday, January 23, 2020 18-32% 4:00 P.M. 58% - 6:00 P.M.
January
2019
Saturday, January 26, 2019 18-30% 6:00 P.M. 72% - 6:00 P.M.
Thursday, January 24, 2019 18-34% 4:00 P.M. 69% - 4:00 P.M.
August
2019
Saturday, August 25, 2019 14-19% 10:00 A.M. 39% - 8:00 P.M.
Wednesday, August 28, 2019 13-23% 12:00 P.M. 42% - 12:00 P.M.
January
2018
Saturday, January 27, 2018 17-29% 6:00 P.M. 63% - 6:00 P.M.
Wednesday, January 24, 2018 19-29% 12:00 P.M. 58% - 12:00 P.M.
January
2017
Saturday, January 28, 2017 18-31% 6:00 P.M. 66% - 6:00 P.M.
Wednesday, January 25, 2017 18-30% 12:00 P.M. 57% - 12:00 P.M.
Staff Item No. 1
119
120
AVENUE 52
CALLE TAMPICOEISENHOWER DRDESERT CLUB DRAVENIDA BERMUDAS®
ZONE 1
ZONE 2- WEST ZONE 3 CORE ZONE 4 EAST
ZONE 5
Saturday 6 PM January 25, 2020 Peak Parking Inventory
20%
14%80%4%
52%
ATTACHMENT 1
ATTACHMENT 1121
AVENUE 52
CALLE TAMPICOEISENHOWER DRDESERT CLUB DRAVENIDA BERMUDAS®
ZONE 1
ZONE 2- WEST ZONE 3 CORE ZONE 4 EAST
ZONE 5
Thursday 4 PM January 23, 2020 Peak Parking Inventory
22%
37%57%37%
28%122
Parking Occupa Thursday 23-Jan-20
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
1 Off-Street 163 241 227 212 159 77 61
On-Street 5 5 5 5 0 3 3
Off Supply 595
432 354 368 383 436 518 534
27.39%40.50%38.15%35.63%26.72%12.94%10.25%
On Supply 5
0 0 0 0 5 2 2
100.00%100.00%100.00%100.00%0.00%60.00%60.00%
Total Supply 600
432 354 368 383 441 520 536
28.00%41.00%38.67%36.17%26.50%13.33%10.67%
2 Off-Street 141 122 109 120 146 196 175
On-Street 22 11 11 17 0 2 5
Off Supply 572
431 450 463 452 426 376 397
24.65%21.33%19.06%20.98%25.52%34.27%30.59%
On Supply 41
19 30 30 24 41 39 36
53.66%26.83%26.83%41.46%0.00%4.88%12.20%
Total Supply 613
450 480 493 476 467 415 433
26.59%21.70%19.58%22.35%23.82%32.30%29.36%
3 Off-Street 44 73 60 78 73 32 18
On-Street 0 0 22 0 0 0 0
Off Supply 284
240 211 224 206 211 252 266
15.49%25.70%21.13%27.46%25.70%11.27%6.34%
On Supply 49
49 49 27 49 49 49 49
0.00%0.00%44.90%0.00%0.00%0.00%0.00%
Total Supply 333
289 260 251 255 260 301 315
13.21%21.92%24.62%23.42%21.92%9.61%5.41%
4 Off-Street 41 70 76 60 64 61 46
On-Street 0 0 0 0 0 0 0
Off Supply 466
425 396 390 406 402 405 420
8.80%15.02%16.31%12.88%13.73%13.09%9.87%
On Supply 0
0 0 0 0 0 0 0
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Total Supply 466
425 396 390 406 402 405 420
8.80%15.02%16.31%12.88%13.73%13.09%9.87%
5 Off-Street 21 30 29 36 30 25 22
On-Street 9 18 7 15 19 17 12
Off Supply 82
61 52 53 46 52 57 60
25.61%36.59%35.37%43.90%36.59%30.49%26.83%
On Supply 56
47 38 49 41 37 39 44
16.07%32.14%12.50%26.79%33.93%30.36%21.43%
Total Supply 138
108 90 102 87 89 96 104
21.74%34.78%26.09%36.96%35.51%30.43%24.64%
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
La Quinta Parking Occupancy Survey Thursday Results - 1-23-2020 Page 1 of 8
ATTACHMENT 2
123
Parking Occupa Thursday 23-Jan-20
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
6 Off-Street 11 15 13 5 15 8 14
On-Street 4 2 2 1 5 0 2
Off Supply 44
33 29 31 39 29 36 30
25.00%34.09%29.55%11.36%34.09%18.18%31.82%
On Supply 59
55 57 57 58 54 59 57
6.78%3.39%3.39%1.69%8.47%0.00%3.39%
Total Supply 103
88 86 88 97 83 95 87
14.56%16.50%14.56%5.83%19.42%7.77%15.53%
7 Off-Street 20 33 59 33 102 92 37
On-Street 6 9 9 6 4 1 0
Off Supply 154
134 121 95 121 52 62 117
12.99%21.43%38.31%21.43%66.23%59.74%24.03%
On Supply 32
26 23 23 26 28 31 32
18.75%28.13%28.13%18.75%12.50%3.13%0.00%
Total Supply 186
160 144 118 147 80 93 149
13.98%22.58%36.56%20.97%56.99%50.00%19.89%
8 Off-Street 58 83 109 124 121 126 91
On-Street 18 54 52 50 56 82 47
Off Supply 126
68 43 17 2 5 0 35
46.03%65.87%86.51%98.41%96.03%100.00%72.22%
On Supply 97
79 43 45 47 41 15 50
18.56%55.67%53.61%51.55%57.73%84.54%48.45%
Total Supply 223
147 86 62 49 46 15 85
34.08%61.43%72.20%78.03%79.37%93.27%61.88%
9 Off-Street 13 36 40 22 21 28 13
On-Street 9 2 15 22 8 14 8
Off Supply 40
27 4 0 18 19 12 27
32.50%90.00%100.00%55.00%52.50%70.00%32.50%
On Supply 69
60 67 54 47 61 55 61
13.04%2.90%21.74%31.88%11.59%20.29%11.59%
Total Supply 109
87 71 54 65 80 67 88
20.18%34.86%50.46%40.37%26.61%38.53%19.27%
10 Off-Street 21 69 64 51 69 22 4
On-Street 0 0 0 0 0 0 0
Off Supply 178
157 109 114 127 109 156 174
11.80%38.76%35.96%28.65%38.76%12.36%2.25%
On Supply 36
36 36 36 36 36 36 36
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Total Supply 214
193 145 150 163 145 192 210
9.81%32.24%29.91%23.83%32.24%10.28%1.87%
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
La Quinta Parking Occupancy Survey Thursday Results - 1-23-2020 Page 2 of 8
124
Parking Occupa Thursday 23-Jan-20
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
11 Off-Street 70 97 97 89 86 37 18
On-Street 0 0 0 0 0 0 0
Off Supply 166
96 69 69 77 80 129 148
42.17%58.43%58.43%53.61%51.81%22.29%10.84%
On Supply 33
33 33 33 33 33 33 33
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Total Supply 199
129 102 102 110 113 162 181
35.18%48.74%48.74%44.72%43.22%18.59%9.05%
12 Off-Street 0 0 0 0 0 0 0
On-Street 19 23 25 18 97 17 20
Off Supply 15
15 15 15 15 15 15 15
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
On Supply 188
169 165 163 170 91 171 168
10.11%12.23%13.30%9.57%51.60%9.04%10.64%
Total Supply 203
184 180 178 185 106 186 183
9.36%11.33%12.32%8.87%47.78%8.37%9.85%
13 Off-Street 5 4 11 3 10 11 3
On-Street 0 3 0 0 0 1 0
Off Supply 39
34 35 28 36 29 28 36
12.82%10.26%28.21%7.69%25.64%28.21%7.69%
On Supply 4
4 1 4 4 4 3 4
0.00%75.00%0.00%0.00%0.00%25.00%0.00%
Total Supply 43
38 36 32 40 33 31 40
11.63%16.28%25.58%6.98%23.26%27.91%6.98%
14 Off-Street 25 59 48 64 48 39 19
On-Street 15 31 38 38 41 50 27
Off Supply 105
80 46 57 41 57 66 86
23.81%56.19%45.71%60.95%45.71%37.14%18.10%
On Supply 58
43 27 20 20 17 8 31
25.86%53.45%65.52%65.52%70.69%86.21%46.55%
Total Supply 163
123 73 77 61 74 74 117
24.54%55.21%52.76%62.58%54.60%54.60%28.22%
15 Off-Street 7 3 2 0 10 0 0
On-Street 8 19 13 7 27 6 9
Off Supply 24
17 21 22 24 14 24 24
29.17%12.50%8.33%0.00%41.67%0.00%0.00%
On Supply 30
22 11 17 23 3 24 21
26.67%63.33%43.33%23.33%90.00%20.00%30.00%
Total Supply 54
39 32 39 47 17 48 45
27.78%40.74%27.78%12.96%68.52%11.11%16.67%
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
La Quinta Parking Occupancy Survey Thursday Results - 1-23-2020 Page 3 of 8
125
Parking Occupa Thursday 23-Jan-20
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
16 Off-Street 32 69 77 98 93 95 78
On-Street 6 3 5 4 8 6 4
Off Supply 249
217 180 172 151 156 154 171
12.85%27.71%30.92%39.36%37.35%38.15%31.33%
On Supply 117
111 114 112 113 109 111 113
5.13%2.56%4.27%3.42%6.84%5.13%3.42%
Total Supply 366
328 294 284 264 265 265 284
10.38%19.67%22.40%27.87%27.60%27.60%22.40%
17 Off-Street 5 7 9 11 42 79 46
On-Street 0 0 0 2 6 5 4
Off Supply 152
147 145 143 141 110 73 106
3.29%4.61%5.92%7.24%27.63%51.97%30.26%
On Supply 13
13 13 13 11 7 8 9
0.00%0.00%0.00%15.38%46.15%38.46%30.77%
Total Supply 165
160 158 156 152 117 81 115
3.03%4.24%5.45%7.88%29.09%50.91%30.30%
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
La Quinta Parking Occupancy Survey Thursday Results - 1-23-2020 Page 4 of 8
126
Parking Occupancy Data - Saturday, January 25, 2020
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
1 Off-Street 81 142 140 181 135 120 89
On-Street 4 4 5 5 3 4 3
Off Supply 595
514 453 455 414 460 475 506
13.61%23.87%23.53%30.42%22.69%20.17%14.96%
On Supply 5
1 1 0 0 2 1 2
80.00%80.00%100.00%100.00%60.00%80.00%60.00%
Total Supply 600
515 454 455 414 462 476 508
14.17%24.33%24.17%31.00%23.00%20.67%15.33%
2 Off-Street 145 150 129 142 126 185 187
On-Street 6 7 0 9 7 8 8
Off Supply 572
427 422 443 430 446 387 385
25.35%26.22%22.55%24.83%22.03%32.34%32.69%
On Supply 41
35 34 41 32 34 33 33
14.63%17.07%0.00%21.95%17.07%19.51%19.51%
Total Supply 613
462 456 484 462 480 420 418
24.63%25.61%21.04%24.63%21.70%31.48%31.81%
3 Off-Street 23 23 20 19 10 13 13
On-Street 0 0 0 0 0 0 0
Off Supply 284
261 261 264 265 274 271 271
8.10%8.10%7.04%6.69%3.52%4.58%4.58%
On Supply 49
49 49 49 49 49 49 49
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Total Supply 333
310 313 314 320 320
6.91%6.91%6.01%5.71%3.00%3.90%3.90%
4 Off-Street 33 47 49 36 40 63 38
On-Street 0 0 0 0 0 0 0
Off Supply 466
433 419 417 430 426 403 428
7.08%10.09%10.52%7.73%8.58%13.52%8.15%
On Supply 0
0 0 0 0 0 0 0
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Total Supply 466
433 419 417 430 426 403 428
7.08%10.09%10.52%7.73%8.58%13.52%8.15%
5 Off-Street 25 33 25 32 24 27 29
On-Street 23 23 16 9 9 13 11
Off Supply 82
57 49 57 50 58 55 53
30.49%40.24%30.49%39.02%29.27%32.93%35.37%
On Supply 56
33 33 40 47 47 43 45
41.07%41.07%28.57%16.07%16.07%23.21%19.64%
Total Supply 138
90 82 97 97 105 98 98
34.78%40.58%29.71%29.71%23.91%28.99%28.99%
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
La Quinta Parking Occupancy Survey Saturday Results - 1/25/2020 Page 5 of 8
127
Parking Occupancy Data - Saturday, January 25, 2020
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
6 Off-Street 8 10 12 10 19 16 14
On-Street 5 17 0 2 6 2 8
Off Supply 44
36 34 32 34 25 28 30
18.18%22.73%27.27%22.73%43.18%36.36%31.82%
On Supply 59
54 42 59 57 53 57 51
8.47%28.81%0.00%3.39%10.17%3.39%13.56%
Total Supply 103
90 76 91 91 78 85 81
12.62%26.21%11.65%11.65%24.27%17.48%21.36%
7 Off-Street 27 23 63 110 66 129 52
On-Street 0 1 4 3 2 2 1
Off Supply 154
127 131 91 44 88 25 102
17.53%14.94%40.91%71.43%42.86%83.77%33.77%
On Supply 32
32 31 28 29 30 30 31
0.00%3.13%12.50%9.38%6.25%6.25%3.13%
Total Supply 186
159 162 119 73 118 55 133
14.52%12.90%36.02%60.75%36.56%70.43%28.49%
8 Off-Street 31 94 101 126 126 126 109
On-Street 8 27 57 81 70 132 28
Off Supply 126
95 32 25 0 0 0 17
24.60%74.60%80.16%100.00%100.00%100.00%86.51%
On Supply 97
89 70 40 16 27 -35 69
8.25%27.84%58.76%83.51%72.16%136.08%28.87%
Total Supply 223
184 102 65 16 27 -35 86
17.49%54.26%70.85%92.83%87.89%115.70%61.43%
9 Off-Street 7 21 35 23 28 30 12
On-Street 0 0 5 4 7 17 10
Off Supply 40
33 19 5 17 12 10 28
17.50%52.50%87.50%57.50%70.00%75.00%30.00%
On Supply 69
69 69 64 65 62 52 59
0.00%0.00%7.25%5.80%10.14%24.64%14.49%
Total Supply 109
102 88 69 82 74 62 87
6.42%19.27%36.70%24.77%32.11%43.12%20.18%
10 Off-Street 8 25 46 31 35 10 0
On-Street 0 0 0 0 0 0 0
Off Supply 178
170 153 132 147 143 168 178
4.49%14.04%25.84%17.42%19.66%5.62%0.00%
On Supply 36
36 36 36 36 36 36 36
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Total Supply 214
206 189 168 183 179 204 214
3.74%11.68%21.50%14.49%16.36%4.67%0.00%
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
La Quinta Parking Occupancy Survey Saturday Results - 1/25/2020 Page 6 of 8
128
Parking Occupancy Data - Saturday, January 25, 2020
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
11 Off-Street 10 16 11 18 18 8 9
On-Street 0 0 0 0 0 0 0
Off Supply 166
156 150 155 148 148 158 157
6.02%9.64%6.63%10.84%10.84%4.82%5.42%
On Supply 33
33 33 33 33 33 33 33
0.00%0.00%0.00%0.00%0.00%0.00%0.00%
Total Supply 199
189 183 188 181 181 191 190
5.03%8.04%5.53%9.05%9.05%4.02%4.52%
12 Off-Street 0 7 6 0 0 3 0
On-Street 85 174 54 6 15 0 3
Off Supply 15
15 8 9 15 15 12 15
0.00%46.67%40.00%0.00%0.00%20.00%0.00%
On Supply 188
103 14 134 182 173 188 185
45.21%92.55%28.72%3.19%7.98%0.00%1.60%
Total Supply 203
118 22 143 197 188 200 200
41.87%89.16%29.56%2.96%7.39%1.48%1.48%
13 Off-Street 5 2 7 9 11 13 3
On-Street 0 1 2 2 1 0 0
Off Supply 39
34 37 32 30 28 26 36
12.82%5.13%17.95%23.08%28.21%33.33%7.69%
On Supply 4
4 3 2 2 3 4 4
0.00%25.00%50.00%50.00%25.00%0.00%0.00%
Total Supply 43
38 40 34 32 31 30 40
11.63%6.98%20.93%25.58%27.91%30.23%6.98%
14 Off-Street 5 26 32 19 33 79 28
On-Street 10 25 41 35 46 60 25
Off Supply 105
100 79 73 86 72 26 77
4.76%24.76%30.48%18.10%31.43%75.24%26.67%
On Supply 58
48 33 17 23 12 -2 33
17.24%43.10%70.69%60.34%79.31%103.45%43.10%
Total Supply 163
148 112 90 109 84 24 110
9.20%31.29%44.79%33.13%48.47%85.28%32.52%
15 Off-Street 0 8 14 1 15 9 0
On-Street 3 20 14 10 13 23 15
Off Supply 24
24 16 10 23 9 15 24
0.00%33.33%58.33%4.17%62.50%37.50%0.00%
On Supply 30
27 10 16 20 17 7 15
10.00%66.67%46.67%33.33%43.33%76.67%50.00%
Total Supply 54
51 26 26 43 26 22 39
5.56%51.85%51.85%20.37%51.85%59.26%27.78%
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
La Quinta Parking Occupancy Survey Saturday Results - 1/25/2020 Page 7 of 8
129
Parking Occupancy Data - Saturday, January 25, 2020
Block #Parking Type 8am 10am 12pm 2pm 4pm 6pm 8pm
16 Off-Street 11 36 55 45 60 150 106
On-Street 0 9 2 1 4 12 7
Off Supply 249
238 213 194 204 189 99 143
4.42%14.46%22.09%18.07%24.10%60.24%42.57%
On Supply 117
117 108 115 116 113 105 110
0.00%7.69%1.71%0.85%3.42%10.26%5.98%
Total Supply 366
355 321 309 320 302 204 253
3.01%12.30%15.57%12.57%17.49%44.26%30.87%
17 Off-Street 1 6 3 15 50 105 73
On-Street 0 0 0 3 7 9 7
Off Supply 152
151 146 149 137 102 47 79
0.66%3.95%1.97%9.87%32.89%69.08%48.03%
On Supply 13
13 13 13 10 6 4 6
0.00%0.00%0.00%23.08%53.85%69.23%53.85%
Total Supply 165
164 159 162 147 108 51 85
0.61%3.64%1.82%10.91%34.55%69.09%48.48%
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
Space Available
% Occupied
La Quinta Parking Occupancy Survey Saturday Results - 1/25/2020 Page 8 of 8
130
HANDOUT
PLANNING
COMMISSION
FEBRUARY 11, 2020
HANDOUT:PLANNING COMMISSION MEETINGFEBRUARY 11, 2020PUBLIC HEARING NO. 1
POWERPOINTS
PLANNING
COMMISSION
FEBRUARY 11, 2020