Andalusia TR 31681 (75 Series; Plans 4-6) Title 24REVISED
Title 24 Energy Conservation
Standards Compliance Report
ANDALUSIA AT CORAL MOUNTAIN
75 SERIES ■PLANS
LA QUINTA
4-5-6
I CITY OF LA QUINTA
November 10, 2004 Y Job Nu, MOP2e4§f B-7Y DEPT.
! FOR CONSAJCTION
ROVED
Prepared F,or'A°
CORAL OPTION I—, C
P.O. BOX 1716
LA QUINTA, CA 92253
(760) 777-7747
Madlin '
s
enterptises
Catherine M. Madlin, Certified Energy Analyst
Post Office Box 1443 • Palm Springs, CA 92263
760-322-5004 / 323-3644 (fax)
E-mail: CMadlin@aol.com
Ma
1d1in s
enterpfises
Catherine M. Madlin, Certified Energy Analyst . 760-322-5004 / 323-3644 (fax) .......
Title 24 Energy Conservation Standards
Compliance Report
This proposed project has been reviewed for compliance with the 2001 State of California
Energy Conservation Standards, Title 24, by Madlin's Enterprises. The building design
described in this compliance portfolio is in conformance with the standards as outlined in
the attached compliance forms and documentation.
r
Date: November 10, 2004
Job Number: 24575B
Owner's Name: Coral Option I, LLC.
Project Designer: Pekarek-Crandell, Inc.
Project Name: Andalusia at Coral Mountain - 75 Series
Project Location: La Quinta
Method of Compliance: Micropas V6.1 Certified Computer Program
i
V` Post Office Box 1443 • Palm Springs, Ca 92263 v
Y
Madlin
ente fises
Catherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax) ...... .
CNC;::<C��P��IET�T`'.>;:
i:i':' :C
..........:.:...;L�11�i�:E::RE..�,iTitEME�I'I'�'.::>:::::<
Job Name
Andalusia at Coral Mountain - 75 Series
Job No. / File No.
24575B
Method of Compliance
Micropas V6.1 Computer Simulation
Insulation: Roof / Ceiling
R-38 Batts
Roof Radiant Barrier
Required
Insulation: Walls
R-19 Batts + V EPS R-3.9 or Better
R-19 Batts - Firewall House to Garage or Utility
R-13 Batts - 2x4 Walls - Firewall
Insulation: Floor - Slab on Grade
Not Required `
Insulation: H.V.A.C. Ducts/Location/Testing
R-4.2 / Attic / No Duct Testing
Glazing U Value / Type: Fixed, Operable, DH, Case
Glazing Solar Heat Gain Coefficient ,
0.38, Dual Pane, Low E2, Any Frame Type
0.35 SHGC (NFRC Tested Values)
Glazing U-Value / Type: French Drs or Std Patio Drs
Glazing Solar Heat Gain Coefficient
0.38, Dual Pane, Low E2, Any Frame Type
0.35 SHGC (NFRC Tested Values)
Glazing U-Value / Type: Large Patio Doors
Glazing Solar Heat Gain Coefficient
0.40, Dual Pane, Low E2, Any Frame Type
0.40 SHGC (NFRC Tested Values)
Glazing U-Value / Type: Entry Doors
Glazing Solar Heat Gain Coefficient
0.50, Dual Pane, Low E2, Any Frame Type
0.50 SHGC (NFRC Tested Values)
Glazing U-Value / Type: Skylights or Solar Tubes
1.72 Single Domed, Clear (CEC Default Value)
Glazing Exterior Shading
Overhangs as Shown on Plans
Thermal Mass Square Footage & %
Not Required
H.V.A.C. System Type
Gas Heating / Electric Cooling Units
HVAC System Efficiencies (heating/cooling)
78% AFUE / 12.0 SEER with TX Valve
Domestic Hot Water Heater
(1) 75 Gallon Gas - All Models
+ (1) 30 Gallon Gas In Designated Guest Suites
Energy Factor / Eff. / Standby Loss
0.78 RE or Better - 75 Gallon Units
0.58 EF or Better - 30 Gallon Units
R12 Blanket on Tank
Not Required
Recirculating Pump for DHW
Yes - 75 Gallon Systems
Other Requirements
Applicable Mandatory Measures
• Post Office Box 1443 v Palm Springs, Ca 92263 v
Madlin s
enterprises
Catherine M. Madlin, Certified Energy Analyst • 760-322-5004 / 323-3644 (fax) ... .
o a
o n o
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst . 760-322-5004 / 323-3644 (fax) ... v ..
Andalusia at Coral Mountain
Series 75 - flan 4
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF-1R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13.54:57
Project Address........ PLAN 4 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
E Climate Zone. ..... 15-------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM CF-1R
! I User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
------------------------------------------------------------------------------I
!
GENERAL INFORMATION
Conditioned Floor
-------------------
Area.....
3933 sf
i
Building Type ..............
Single Family Detached
Construction Type
.........
New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units...
1
Number of Stories..
.......
1
Floor Construction Type....
Slab On Grade'
'
Glazing
Percentage.........
19.4 % of floor
area
Average
Glazing U-factor...
0.4 Btu/hr-sf-F
Average
Glazing SHGC.......
0.38
Average
Ceiling Height.....
10.9 ft
T
BUILDING
SHELL INSULATION
Component
Frame
-------------------------
Cavity
Sheathing Total Assembly
! Type
Type
---------
R-value
--------
R-value R-value U-factor
Location/Comments
Wall
Wood
R-17.8
---------------------- ------------------------
R-3.9 R-21.7 0.051
i Wall
Wood
R-17.8
R-0
R-17.8 0.064
Door
None
R-0
R-0
R-0 0.330
RoofRadiant Wood
R-11
R-27
R-38 0.025
S1abEdge
None
R-0
R-0
F2=0.760
SlabEdge
i.
None
R-0
R-0
F2=0.510
FENESTRATION
------------
Area
U-
Interior
Exterior
Over-
hang/
Orientation
----------
(sf)
Factor
SHGC Shading
Shading
Fins
Window
Back (S)
----- ------
48.0
0.380
---------------------
0.350 Standard
--------------
Standard
-----
Yes
Door
Right (W)
48.0
0.380
0.350 Standard
Standard
.Yes
Door
Back (S)
240.0
0.400
0.400 Standard
Standard
Yes
Door
Back (S)
48.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
48.0
0.380
0.350 Standard
Standard
Yes
Window
Right (W)
4.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
4.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
9.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
13.5
0.380
0.350 Standard
Standard
None
Window
Right (W)
9.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
9.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
4.5
0.380
0.350 Standard
Standard
None
Window
Right (W)
4:5
0.380
0.350 Standard
Standard
None
Window
Right. (W)
4.5
0.380
0.350 Standard
Standard
None.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF-1R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
-----MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
-----------------------------------------------------------------------
FENESTRATION
------------
Over-
Area
U-
Interior
Exterior
hang/
Orientation
---------
(sf)
-----
Factor
SHGC
Shading
Shading
Fins
-
Window
Front
(N)
15.0
------
0.380
------
0.350
---------------
Standard
--------------
Standard
-----
None
Door
Left
(E)
48.0
0.380
0.350
Standard
Standard
None
Window
Front
(N)
4.5
0.380
0.350
Standard
Standard
None
Window
Front
(N)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
i Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
! Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Window
Back
(S)
12.5
0.380
0.350
Standard
Standard
None
Window
Back
(S)
12.5
0.380
0.350
Standard
Standard
None
Door
Back
(S)
24.0
0.380
0.350
Standard
Standard
None
i Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
23.4
0.380
0.350
Standard
Standard
None
Window
Front
(N)
4.5
0.380
0.350
Standard
Standard
None
Door
Front
(N)
48.0
0.500
0.500
Standard
Standard
None
Window
Left
(E)
4.5
0..380
0.350
Standard
Standard
None
Window
Left
(E)
20.0
0.380
0.350
Standard
Standard
None
Equipment
Type
Furnace
ACSplitTXV
Furnace
ACSplitTXV
Minimum
Efficiency
0.780 AFUE
12.00 SEER
0.780 AFUE
12.00 SEER
SLAB SURFACES
Area
Slab Type (sf)
Standard Slab 3429
Standard Slab 504
HVAC SYSTEMS
------------
Refrigerant
Tested
ACCA
Charge and Duct
Duct
Duct
Manual
Airflow Location
R-value
Leakage
D
-----------------
n/a Attic
-------
R-4.2
-------
No
------
No
Yes Attic
R-4.2
No
No
n/a Attic
R-4.2
No
No
Yes Attic
R-4.2
No
No
Thermostat
Type
Setback
Setback
Setback
Setback
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF.-1R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
-----MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM CF-lR
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------------------------------------------------------
WATER HEATING SYSTEMS
! Number Tank External
in Energy Size Insulation
Tank Type Heater Type Distribution Type System Factor (gal) R-value
------------------------------------------ -------------- ------ ----------
DHW 1
Large Gas Recirc/TimeTemp 1 n/a' 75 R-0
DHW 2
z Storage. Gas Standard 1 0.58 30 R- n/a
t WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
System - Efficiency Input Fraction R-value Light
------------------
---------------
DHW1----------------------
Large 0.78 n/a 0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
( This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet.attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
! or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF-1R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
-MICROPAS6v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
----- -
---------------------------------------------------------------
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF-1R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13.54.57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM CF-1R
-------_User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
------------------------------------ --------------------
-------
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations. to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
.-Name.*..
Company. CORAL OPTION 1, LLC
Address. P.O. BOX 1716
LA QUINTA, CA 92253.
Phone... 760-777-7747
License.
Signed.. 1j
( at )
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
1
DOCUMENTATION AUTHOR
Name.... CATHERINE M. MADLIN
Company. Madlin's Enterprises
Address. P.O. Box 1443
Palm Springs, CA 92262
Phone... 760-322-5004
Signed..
( ate)
Certified Energy Analyst
Catherine M. Madlin
NR 98-90-544
r r rr R 98-90-144
CADEC
California Association of Building Energy Consultants
COMPUTER METHOD SUMMARY Page 1 C-2R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13.54.57
Project Address........ PLAN 4 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
-----------------------------------------------------------
=
MICROPAS6
ENERGY USE
SUMMARY
=
-------------------------P--
= Energy Use
Standard
Proposed
Compliance =
_ (kBtu/sf-yr)
------------------------
Design
----------
Design
Margin =
= Space
Heating.........
4.32
----------
3.87
---------- _
0.45 =
= Space
Cooling..........
38.81
32.73
6.08 =
= Water
Heating..........
7.25
9.74
-2.49 =
North Total
50.38
46.34
4.04 =
= Space
Heating..........
4.32
4.33
-0.01 =
= Space
Cooling..........
38.81
33.06
5.75 =
= Water
Heating..........
7.25
9.74
-2.49 =
East Total
--------
50.38
--------
47.13
--------
3.25
= Space
Heating..........
4.32
4.48
-0.16 =
= Space
Cooling..........
38.81
32.79
6.02 =
= Water
Heating..........
7.25
9.74
-2.49 =
South Total
--------
50.38
--------
47.01
--------
3.37
= Space
Heating..........
4.32
3.82
0.50 =
= Space
Cooling..........
38.81
33.60
521 =
= Water
-
Heating...... ..
7.25
9.74
-2..49 =
=
West Total
--------
50.38
--------
47.16
-------- _
3.22 =
_ *** Building complies
----------------
with Computer
Performance
GENERAL INFORMATION
Conditioned Floor Area..... 3933 sf
Building Type .............. Single Family Detached
Construction Type ......... New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type.......... FullYear
Floor Construction Type.... Slab On Grade
Number of Building Zones... 2
COMPUTER METHOD SUMMARY
Page 2 C-2R
Project Title.......... ANDALUSIA.PLAN.4
_______________________________________________________
Date..11/09/04 13:54:57
MICROPAS6 v6.01
File-24575B1
Wth-CTZ15S92 Program -FORM C-2R
--------User#-MP0207
------------------------------------------------------------
User-Madlin's
Enterprises Run -REVISED PERMIT CALC
Conditioned Volume.........
42912 cf
Slab -On -Grade
Area.........
3933 sf
Glazing
Percentage.........
19.4 % of floor area
Average
Glazing
U-factor...
0.4 Btu/hr-sf-F
Average
Glazing
SHGC.......
0.38
Average
Ceiling
Height.....
10.9 ft
BUILDING ZONE
INFORMATION
Floor
----------------------
# of
Vent Vent Air
Area
Volume
Dwell Cond- Thermostat Height Area Leakage
C-
Zone Type (sf)
-------------- -----
(cf)
Units itioned Type (ft) (sf) Credit
1
1.ZONE
-------
------------
-------------------
-Residence 3429
37872
0.87 Yes
Setback 2:0 Standard No
2.ZONE
Residence 504
5040
0.13 Yes
Setback 2.O Standard No
OPAQUE SURFACES
Area
U-
---------------
Insul Act
Solar Form 3 Location/
Surface (sf)
---------------
factor
-----
R-val Azm Tilt Gains Reference Comments
1.ZONE
----- --- ----
-
----------------- ----------------
`.
1 Wall 414
0.051
21.7 0
90 Yes W.17.8.PW2X6
+
2 Wall 1075
0.051
21.7 90
90 Yes W.17.8.PW2X6
3 Wall 408
-0.051
21.7 180
90 Yes W.17.8.PW2X6
5 Wall 1023
0.051
21.7 270
90 Yes W.17.8.PW2X6
'
7 Wall 305
0.064
17.8 0
90 No W.19.2X6FIRE
9 Wall 115
0.064
17.8 0
90 No W.19.2X6FIRE
13 Door 24
0.330
0 0
90 No None
14 RoofRadiant 3427
0.025
38 n/a
0 Yes R.38.2X4.24
2.ZONE
4 Wall 106
0.051
21.7 180
90 Yes W.17.8.PW2X6
6 wall 170
0.051
21.7 270
90 Yes W.17.8.PW2X6
8 Wall 508
0.064
17.8 0
90 No W.19.2X6FIRE
10 Wall 13
0.051
21.7 135
90 Yes W.17.8.PW2X6
11 Wall 120
0.051
21.7 225
90 Yes W.17.8.PW2X6
12 Wall 13
0.051
21.7 315
90 Yes W.17.8.PW2X6
15 RoofRadiant 504
0.025
38 n/a
0 Yes R.38.2X4.24
PERIMETER
LOSSES
Length
----------------
F2 Insul
Solar
Surface (ft)
------------ ------
Factor R-val
Gains Location/Comments
1
1.ZONE
--------
-------
----- ----------------------
16 S1abEdge
270
0.760 R-0
No
18 S1abEdge
33
0.510 R-0
No
2.ZONE
17 S1abEdge
50
0.760 R-0
No
. 19 S1abEdge
51
0.510 R-0
No
COMPUTER METHOD SUMMARY Page 3 C-2R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM C-2R
User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------
------------------------------------------------------------
Orientation
----------------------
1.ZONE
1 Window Back (S)
2 Door Right (W)
3 Door Back (S)
4 Door Back (S)
5 Door Back (S)
6 Window Right (W)
7 Window Right (W)
8 Window Right (W)
9 Window Right (W)
10 Window Right (W)
11 Window Right (W)
12 Window Right (W)
13 Window Right (W)
14 Window Right (W)
15 Window Front (N)
16 Door Left (E)
17 Window Front (N)
18 Window Front (N)
19 Window Right (W)
20 Window Right (W)
21 Window Left (E)
22 Window Left (E)
23 Window Left (E)
24 Window Left (E)
25 Skylight Horz
26 Skylight Horz
32 Window Front (N)
33 Door Front (N)
34 Window Left (E)
35 Window Left (E)
2.ZONE
27 Window Back (S)
28 Window Back (S)
29 Door Back (S)
30 Window Right (W)
31 Window Right (W)
FENESTRATIO
N
Act Exterior Shade Interior Shade
Azm Tilt Type/SHGC Type/SHGC
--- --------------------------------
48.0
0.380
0.350
180
90
48.0
0.380
0.350
270
90
240.0
0.400
0.400
180
90
48.0
0.380
0.350
180
90
48.0
0.380
0.350
180
90
4.0
0.380
0.350
270
90
4.0
0.380
0.350
270
90
9.0
0.380
0.350
270
90
13.5
0.380
0.350
270
90
9.0
0.380
0.350
270
90
9.0
0.380
0.350
270
90
4.5
0.380
0.350
270
90
4.5
0.380
0.350
270
90
4.5
0.380
0.350
270
90
15.0
0.380
0.350
0
90
48.0
0.380
0.350
90
90
4.5
0.380
0.350
0
90
4.5
0.380
0.350
0
90
12.5
0.380
0.350
270
90
12.5
0.380
0.350
270
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
1.0
1.720
0.830
0
0
1.0
1.720
0.830
0
0
4.5
0.380
0.350
0
90
48.0
0.500
0.500
0
90
4.5
0.380
0.350
90
90
20.0
0.380
0.350
90
90
12.5
0.380
0.350
180
90
12.5
0.380
0.350
180
90
24.0
0.380
0.350
180
90
4.5
0.380
0.350
270
90
23.4
0.380
0.350
270
90
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
None/1
None/1
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
OVERHANGS AND SIDE FINS
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
None/1
None/1
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
---Window--
------Overhang-----
---Left Fin---
---Right
Fin --
Area
Left
Rght
Surface
(sf)
-----
Wdth
-----
Hgth
-----
Dpth
----
Hght
Ext
Ext
Ext
Dpth
Hght
Ext
Dpth
Hght
1.ZONE
----
----
----
----
----
----
_
____
1
Window
48.0
8
6
1
0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
2
Door
48.0
6
8
25.5
6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
3
Door
240.0
20
12
16.5
2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
4
Door
48.0
6
8
11
2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5
Door
48.0
6
8
11
2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
COMPUTER METHOD SUMMARY Page 4 C-2R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------------------------------------------------------------------------------
SLAB SURFACES
Area
Slab Type (sf)
---------------- ------
1.ZONE
Standard Slab 3429
2.ZONE
' Standard Slab 504
HVAC SYSTEMS
I------------
Refrigerant Tested ACCA
System Minimum Charge and Duct Duct Duct Manual Duct
Type Efficiency Airflow Location R-value Leakage D Eff
-------------------------------------------------------------------- ----
1.ZONE
Furnace 0.780 AFUE n/a Attic R-4.2 No No 0.743
ACSplitTXV 12.00 SEER Yes Attic R-4.2 No No 0.637
t 2.ZONE
Furnace 0.780 AFUE n/a Attic R-4.2 No No 0.743
ACSplitTXV 12.00 SEER Yes Attic R-4.2 No' No 0.637
WATER HEATING SYSTEMS
---------------------
Number Tank External
in Energy Size Insulation
Tank Type Heater Type Distribution Type System Factor (gal) R-value
------------------------------------------ -------------- ----------------
DHW 1
1 Large Gas Recirc/TimeTemp 1 n/a 75 R-0
DHW 2
2 Storage Gas Standard 1 0.58 30 R- n/a
{ WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
System Efficiency Input Fraction R-value Light
--------------------------------------------------------------------
DHW 1
1 Large 0.78 n/a 0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed -to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
1
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
COMPUTER METHOD SUMMARY Page 5 C-2R
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
-----MICROPAS6v601--File-24575B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
-
---------------- ------------- ------- -----
-------
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
--------------------------
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
This revised calculation reflects updates/changes to glazing
j areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
Catherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax)
Madlin-'s
enterprises
TVTTTVV
Andalusia at Coral Mountain
Series 75
Plan 4 with Dining boom Option
• CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1
CF-1R
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04
13.56.10
Project Address......... PLAN 4 w DINING RM OPT ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box '1443 Plan Check
Date
Palm Springs, CA 92262
760-322-5004 Field C ec
Climate Zone ...........15
Date
i Compliance Method ...... -MICROPAS6 v6.01 for 2001 Standards by Enercomp,
Inc.
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------
$ --------------------------------------------------------------------
GENERAL INFORMATION
4
-------------------
' Conditioned Floor -Area ..... 3907 sf
Building Type .............. Single Family Detached
Construction Type ......... -New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Stories.. ....... 1
Floor Construction Type.... Slab On Grade
Glazing Percentage......... 20.2 % of floor afea
Average Glazing U-factor... 0.4 Btu/hr-sf-F
1 Average Glazing SHGC....... 0.38
Average Ceiling Height..... 11 ft
BUILDING SHELL INSULATION
f. Component
Frame
Cavity
Sheathing Total Assembly
Type
Type
----------
R-value
--------
R-value R-value U-factor
Location/Comments
Wall
Wood
R-17.8
----------------------
R-3.9' R-21.7 0.051
------------------------
1 Wall
Wood
R-17.8
R-0
R-17.8 0.064
Door
None
R=O-
R-0
R-0 0.330
RoofRadiant Wood'
R-11
R-27
R-38 0.025
SlabEdge
None
R-0
R-0
F2=0.760
SlabEdge
None
R-0
R-0
F2=0.'510
FENESTRATION
------------
F
Over- .
Orientation
Area
(sf)
U-
Factor
SHGC
Interior
Shading
Exterior
Shading
hang/
Fins
--------------------
-----
------
Window
Back (S)
48.0 '0.380
------
0.350
---------------
Standard
----------
Standard
-----
Yes
Door
Right (W),
48.0
0.380
0.350
Standard
Standard -
Yes
i Door
Back (S)
240.0
0.400
0.400
Standard
Standard
Yes
Door
Back (S)
48.0
0.380
0.350
Standard
Standard
Yes
Door
'
Back (S)
48.0
0.380
0.350
Standard
Standard
Yes
Window
Right (W)
4.0
0.380
0.350
Standard
Standard
None
Window
Right (W)
4.0
0.380
0.350
Standard
Standard
None_
Window
Right (W)
9.0
0.380
0.350
Standard
Standard
None
Window
Right' (W)
13.5
0.380
0.350
Standard
Standard
None
Window
Right (W)
9.0
0.380
0.350
Standard
Standard -
None
Window
Right (W)
9.0
0.380
0.350
Standard
Standard
None
Window
Right (W)
4.5
0.380
0.350
Standard
Standard
None
Window •
Right. (W)
4.5
0.380
0.350
Standard
Standard
None'
Window
Right (W)-
4.5
0.380
0.350
Standard
Standard
None
f
I
}
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF-1R
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM CF-1R
-User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
--------------------------------------------------------------
FENESTRATION
Orientation
Area
(sf)
U-
Factor
Interior
Exterior
Over -
hang/
-- --------
-----
SHGC
Shading
Shading
Fins
Window
Front
(N)
15.0
------
0.380
------
0.350
---------------
Standard
--------------
Standard
---
None
Door
Window
Left
(E)
48.0
0.380
0.350
Standard
Standard
None
Window
Front
Front
(N)
(N)
4.5
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
Door
Right
(W)
24.0
0.380
0.350
Standard
Standard
None
None
Door
Window
Right
Left
(W)
(E)
24.0
4.5
0.380
0.380
0.350
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
Standard
Standard.
None
None
Window
Window
Left
Left,
(E)
(E)
4.5
4.5
0.380
0.380
0.350
0.350
Standard
Standard
None
Skylight
Horz
1.0
1.720
0.830
Standard
None
Standard
None
None
None
Skylight
Window
Horz
Back
(S)
1.0
12.5
1.720
0.380
0.830
0.350
None
Standard
None
Standard
None
Window
Back
(S)
12.5
0.380
0.350
Standard
Standard
None
None
Door
Window
Back
Right
(S)
(W)
24.0
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
None
Window
Right
(W)
23.4
0.380
0.350
Standard
Standard
Standard
None
None
Window
Front'(N)
4.5
0.380
0.350
Standard
Standard
None
Door
Window
Front
Left
(N)
(E)
48.0
4.5
0.500
0.380
0.500
0.350
Standard
Standard
Standard
None
Window
Left
(E)
20.0
0.380
0.350
Standard
Standard
Standard
None
None
SLAB SURFACES
-------------
Area.
Slab Type
(sf)
Standard
Slab
3403
Standard
Slab
504
HVAC SYSTEMS
Equipment
Minimum
------------
Refrigerant
Charge and
Duct
Duct
Tested ACCA
Duct Manual
Thermostat
---Type-
Efficiency
Airflow
---------------
-----------
Location R-value
Leakage D
Type,
Furnace
0.780
AFUE.
n/a Attic
-------
R-4.2
------- ------
No No
-------
Setback
ACSplitTXV
12.00
SEER
Yes Attic
R-4.2
No No
Setback
Furnace
0.780
AFUE
n/a Attic
R-4.2
No No
Setback
ACSplitTXV
12.00
SEER
Yes Attic
R-4.2
No No
Setback
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF-1R
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13.56.10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM CF-1R
--------User#_MP0207 User-Madlin's Enterprises Run=REVISED PERMIT CALC
---------------------------------=----------------------
-------
WATER HEATING SYSTEMS
Number
Tank
External
Tank Type
Heater Type
---------
Distribution
-------------------
in
Type System
Energy
Factor
Size
(gal)
Insulation
R-value
DHW 1
------
--------
------
----------
Large
Gas
Recirc/TimeTemp 1
n/a
75
R-0
DHW 2
` Storage
Gas
Standard
1
0.58
30
R- n/a
'
WATER HEATING
SYSTEMS DETAIL
r----------------------------
Standby
Internal
Tank `
Recovery
Rated
Loss
Insulation
Pilot
System
Efficiency
-----------
Input
------------
Fraction
R-value
Light
.DHW 1
-------------------------
------- -
Large
0.78
n/a
0.03
R-n/a
0
F SPECIAL FEATURES AND MODELING ASSUMPTIONS
---------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building with no orientation restrictions
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
}., an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
r and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
--------------------------
** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF-lR
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
-----------------------------------------------------------------------
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
i
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is,responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
.with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
' The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
N
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF-lR
------------------------------
_________________________________
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13.56.10
-MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM CF-lR I
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
----------------------------------------------------------------------
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
-Name....
Company. CORAL OPTION 1, LLC
Address. P.O. BOX 1716
LA QUINTA, CA 92253
Phone... 760-777-7747
License.
Signed.. fi
at
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
DOCUMENTATION AUTHOR
Name.... CATHERINE M. MADLIN
Company. Madlin's Enterprises
Address. P.O. Box 1443
Palm Springs, CA 92262
Phone... 760-322-5004
Certified Energy Analyst
Catherine M. Madlin
NR 98-90-544
r r rr R 98-90-144
CADEC
California Association of Building Energy Consultants
COMPUTER METHOD SUMMARY. Page 1 C-2R
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13.56.10
Project Address........ PLAN 4 w DINING RM OPT ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author..: CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------
--------------------------------------------------------------------
= MICROPAS6
-
--------------------------------
ENERGY USE SUMMARY
=
-------------------------P--
' = Energy Use
Standard Proposed Compliance =
_ (kBtu/sf-yr)
---------
Design
-----_----
Design
Margin =
= Space Heating..........
-------
4.34
-----�----
3.90
0.44
= Space Cooling..........
38.92
33.34
5.58 =
= Water Heating..........
7.29
9.80
-2.51 =
= North Total
----------------
50.55
--------
47.04
_
3.51 -
= Space Heating..........
4.34
4.40
-0.06 =
= Space Cooling..........
38.92
33.45
5.47 =
= Water Heating..........
7.29
9.80
-2.51 =
East Total
-------- --------
50.55
--------
47.65
2.90
= Space Heating..........
4.34
4.50
-0.16 =
= Space Cooling..........
38.92
33.42
5.50 =
= Water Heating..........
7.29
9.80
-2.51 =
South Total
-------- --------
50.55
--------
47.72
2.83
= Space Heating..........
4.34
3.77
0.57 =
= Space Cooling..........
38.92
34.17
4.75 =
= Water Heating..........
7.29
9.80
-2.51 =
= West Total
----------------
50.55
--------
47.74
_
2.81 =
_ *** Building complies
with Computer
Performance***
_
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 3907 sf
Building Type ..............
Single
Family Detached
Construction Type .........
New
Building Front Orientation.
Cardinal
- N,E,S,W
Number of Dwelling Units...
1
Number of Building Stories.
1
Weather Data Type..........
FullYear
Floor Construction Type.... Slab On Grade
Number of Building Zones... 2
COMPUTER METHOD SUMMARY Page 2 C-2R
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
------------------------------------------------------------------
Conditioned Volume......... 42912 cf
Slab -On -Grade Area......... 3907 sf
Glazing Percentage......... 20.2 % of floor area
Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height..... 11 ft
BUILDING ZONE INFORMATION
Floor
# of
Vent
Vent
Air
Area
Volume
Dwell
Cond-
Thermostat
Height
Area
Leakage
Zone Type
--------------
(sf)
-----
(cf)
-------
Units
itioned
Type
(ft)
(sf)
Credit
1.ZONE
-----
-------
-----------
-----
--------
---------
Residence
3403
37872
0.87
Yes
Setback
2.0
Standard
No
2.ZONE
Residence
504
5040
0.13
Yes
Setback
2.0
Standard
No
Surface
1.ZONE
1 Wall
2 Wall
3 Wall
5 Wall
7 Wall
9 Wall
13 Door
14 RoofRadiant
2.ZONE
4 Wall
6 Wall
8 Wall
10 Wall
11 Wall
12 Wall
15 RoofRadiant
OPAQUE
SURFACES
Area
U-
---------------
Insul
Act
Solar
Form 3 Location/
(sf)
-----
factor
-----
R-val
-----
Azm
---
Tilt
----
Gains
-----
Reference Comments
------------ ----------------
414
0.051
21.7
0
90
Yes
W.17.8.PW2X6
1075
0.051
21.7
90
90
Yes
W.17.8.PW2X6
408
0.051
21.7
180
90
Yes
W.17.8.PW2X6
1000
0.051
21.7
270
90
Yes
W.17.8.PW2X6
303
0.064
17.8
0
90
No
W.19.2X6FIRE
115
0.064
17.8
0
90
No
W.19.2X6FIRE
24
0.330
0
0
90
No
None
3401
0.025
38
n/a
0
Yes
R.38.2X4.24
106
0.051
21.7
180
90
Yes
W.17.8.PW2X6
170
0.051
21.7
270
90
Yes
W.17.8.PW2X6
508
0.064
17.8
0
90
No
W.19.2X6FIRE
13
0.051
21.7
135
90
Yes
W.17.8.PW2X6
120
0.051
21.7
225
90
Yes
W.17.8.PW2X6
13
0.051
21.7
315
90
Yes
W.17.8.PW2X6
504
0.025
38
n/a
0
Yes
R.38.2X4.24
Length
Surface (ft)
1.ZONE
16 SlabEdge 270
18 SlabEdge 33
2.ZONE
17 SlabEdge 50
19 SlabEdge 51
PERIMETER LOSSES
----------------
F2 Insul Solar
Factor R-val Gains Location/Comments
--------------- ---------------------------
0.760
R-0
No
0.510
R-0
No
0.760
R-0
No
0.510
R-0
No
COMPUTER METHOD SUMMARY Page 3 C-2R
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
------------
-MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
------------------------------------------------------------------
Orientation
----------------------
1.ZONE
1 Window Back (S)
2 Door Right (W)
3 Door Back (S)
4 Door Back (S)
5 Door Back (S)
6 Window Right (W)
7 Window Right (W)
8 Window Right (W)
9 Window Right (W)
10 Window Right (W)
11 Window Right (W)
12 Window Right (W)
13 Window Right (W)
14 Window Right (W)
15 Window Front (N)
16 Door Left (E)
17 Window Front (N)
18 window Front (N)
19 Door Right (W)
20 Door Right (W)
21 Window Left (E)
22 Window Left (E)
23 Window Left (E)
24 Window Left (E)
25 Skylight Horz
26 Skylight Horz
32 Window Front (N)
33 Door Front (N)
34 Window Left (E)
35 Window Left (E)
2.ZONE
27 Window Back (S)
28 Window Back (S)
29 Door Back (S)
30 Window Right (W)
31 Window Right (W)
FENESTRATION SURFACES
---------------------
Area U- Act Exterior Shade Interior Shade
(sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC
----- ----- ----- --- --------------------------------
48.0
0.380
0.350
180
90
48.0
0.380
0.350
270
90
240.0
0.400
0.400
180
90
48.0
0.380
0.350
180
90
48.0
0.380
0.350
180
90
4.0
0.380
0.350
270
90
4.0
0.380
0.350
270
90
9.0
0.380
0.350
270
90
13.5
0.380
0.350
270
90
9.0
0.380
0.350
270
90
9.0
0.380
0.350
270
90
4.5
0.380
0.350
270
90
4.5
0.380
0.350
270
90
4.5
0.380
0.350
270
90
15.0
0.380
0.350
0
90
48.0
0.380
0.350
90
90
4.5
0.380
0.350
0
90
4.5
0.380
0.350
0
90
24.0
0.380
0.350
270
90
24.0
0.380
0.350
270
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
1.0
1.720
0.830
0
0
1.0
1.720
0.830
0
0
4.5
0.380
0.350
0
90
48.0
0.500
0.500
0
90
4.5
0.380
0.350
90
90
20.0
0.380
0.350
90
90
12.5
0.380
0.350
180
90
12.5
0.380
0.350
180
90
24.0
0.380
0.350
180
90
4.5
0.380
0.350
270
90
23.4
0.380
0.350
270
90
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
None/1
None/1
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
None/1
None/1
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
OVERHANGS AND SIDE FINS
-----------------------
---Window-- ------Overhang----- ---Left Fin--- ---Right Fin --
Area Left Rght
Surface
-(sf)
Wdth
-----
Hgth
-----
Dpth
----
Hght
----
Ext
Ext
Ext
Dpth
Hght
Ext
Dpth
Hght
1.ZONE
----
----
----
----
----
----
-
1 Window
48.0
8
6
1
0
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
2 Door
48.0
6
8
25.5
6
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
3 Door
240.0
20
12
16.5
2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
4 Door
48.0
6
8
11
2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5 Door
48.0
6
8
11
2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
COMPUTER METHOD SUMMARY Page 4 C-2R
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13.56.10
-----MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----------------------------------------------------------------------
SLAB SURFACES
Area
Slab Type
------
(sf)
--------
------
Standard Slab
3403
2.ZONE
Standard Slab
504
HVAC SYSTEMS
------------
Refrigerant
Tested
ACCA
System
Minimum
Charge and Duct
Duct
Duct
Manual
Duct
Type
Efficiency
----------
Airflow Location
R-value
Leakage
D
Eff
1.ZONE
--------------------
-------
---------
--------
----
Furnace
0.780 AFUE
n/a Attic
R-4.2
No
No
0.743
ACSplitTXV
12.00 SEER
Yes Attic
R-4.2
No
No
0.637
2.ZONE
Furnace
0.780 AFUE
n/a Attic
R-4.2
No
No
0.743
ACSplitTXV
12.00 SEER
Yes Attic
R-4.2
No
No
0.637
WATER HEATING SYSTEMS
Number
Tank
External
Tank Type
Heater Type
----------
Distribution
-------------------
in
Type System
Energy
Factor .(gal)
Size
Insulation
R-value
DHW 1
------
--------
------
1 Large
Gas
Recirc/TimeTemp 1
n/a
75
R-0
DHW 2
' 2 Storage
Gas
Standard
1
0.58
30
R- n/a
WATER HEATING
----------------------------
SYSTEMS DETAIL
Standby
Internal
Tank
Recovery
Rated
Loss
Insulation
Pilot
System
------------
Efficiency
------------
Input
------------
Fraction
R-value
Light
DHW 1
-------------------------
-------
1 Large
0.78
n/a
0.03
R-n/a
0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building with no orientation restrictions.
' This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
COMPUTER METHOD SUMMARY Page 5 C-2R
° Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
----------------------------------------------------
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
f
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
-------------------------
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
( REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
.Conservation Standards. The owner may (at his/her option) install
'better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
i equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
r load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
+ fixtures.
Madlin-'s
enterprises
Catherine M. Madlua, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax) .
Andalusia at Coral Mountain
Series 75 - Plan 5
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF-1R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
Project Address........ PLAN 5 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building -Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM CF-1R
-------User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC I
---------------------------------------------------------
GENERAL INFORMATION
-------------------
Conditioned Floor
Area..... 4314 sf
.
Building Type ..............
Single Family Detached
Construction Type
.........
New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units...
1
Number of Stories..
......
1
Floor Construction Type....
Slab On Grade
Glazing
Percentage.........
17.8 % of floor
area
Average
Glazing U-factor...
0.4 Btu/hr-sf-F
Average
Glazing SHGC.......
0.38
Average
Ceiling Height.....
10.8 ft
BUILDING
SHELL INSULATION
Component
Frame
-------------------------
Cavity
Sheathing Total Assembly
Type
-----
Type
----
R-value
--------
R-value R-value U-factor
Location/Comments
Wall
Wood
R-17.8
---------------------- ------------------------
R-3.9 R-21.7 0.051
Wall
Wood
R'-17.8
R-0
R-17.8 0.064
Wall
Wood
R-13
R-0
R-13 0.088 2x4 Studs
Door
None
R-0
R-0
R-0 0.330
RoofRadiant Wood
R-11
R-27
R-38 0.025
SlabEdge
None
R-0
R-0
F2=0.760
S1abEdge
None
R-0
R-0
F2=0.510
FENESTRATION
------------
Area
U-
Interior
Exterior
Over-
hang/
Orientation --------
(sf)
----- ------
Factor
SHGC Shading
Shading
Fins
Door
Back (S)
24.0
------
0.380
---------------
0.350 Standard
--------------
Standard
-----
Yes
Door
Back (S)
24.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
24.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
24.0
0.380
.0.350 Standard
Standard
Yes
Door
Back (S)
48.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
24.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
240.0
0.400
0.400 Standard
Standard
Yes
Window
Right (W)
3.8
0.380
0.350 Standard
Standard
None
Window
Right (W)
3.8
0.380
0.350 Standard
Standard
None
Window
Right (W)
3.8
0.380
0.350 Standard
Standard
None
Window
Front (N)
4.5
0.380
0.350 Standard
Standard
None
Window
Front (N)
12.5
0.380
0.350 Standard
Standard
None
Window
Front (N)
4.5
0.380
0.350 Standard
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF-1R
Project Title.......... ANDALUSIA.PLAN.S Date..11/09/04 13:57:27
-----MICROPAS6-v601- File-24580B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------------------------------------
-------
FENESTRATION
------------
Over-
Orientation
----------
Area
(sf)
-----
U-
Factor
------
SHGC
Interior
Shading
Exterior
Shading
hang/
Fins
Window
Front
(N)
7.5
0.380
------
0.350
---------------
Standard
--------------
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
7.5
0.380
0.350
Standard
Standard.
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
7.5
0.380
0.350
Standard
Standard
None
Window
Front
(N)
5.0
0.380
0.35.0
Standard
Standard
None
Window
Right
(W)
20.0
0.380
0.350
Standard
Standard
None
Window
Front
(N)
20.0
0.380
0.350
Standard
Standard
None
Window
Window
Back
Right
(S)
(W)
4.5
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Window
Front
Left
(N)
(E)
23.4
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None,
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
None
i Window
Window
Left
Left
(E)
(E)
25.0
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
Standard
None
None
Window
Window
Left
Left
(E)
(E)
4.5
12.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
Window
Left
(E)
12.5
0.380
0.350
Standard
Standard
None
None
Window
Window
Left
Left
(E).
(E)
4.5
4.0
0.380
0.380
0.350
0.350
Standard
Standard
Standard
None
Window
Left
(E)
4.0
0.380
0.350
Standard
Standard
Standard
None
None
'Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Window
Window
Back
Left
(S)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
(SE)
10.0
10.0
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
None
Window
Back
(S)
10.0
0.380
0.350
Standard
Standard
None
Window
Right.(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5.
0.380
0.350
Standard
Standard
None
Window
Right
(W)
25.0
0.380
0.350
Standard
Standard
None
Window
Front
(N)
4.5
0.380
0.350
Standard
Standard
None
Door
Front
(N)
48.0
0.500
0.500
Standard
Standard
None
SLAB SURFACES
-------------
Area
Slab Type
(sf)
Standard
Slab
3827
Standard
Slab
487
n
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF-1R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM CF-lR
--------User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----------------------------------------------------------------
HVAC SYSTEMS
Equipment
Refrigerant Tested ACCA
Minimum Charge and Duct Duct Duct Manual Thermostat
---Type-
Efficiency Airflow Location R-value Leakage D
--------------------------
Type
Furnace
-------------- ------
0.780 AFUE n/a Attic R-4.2 No No
----------
Setback
ACSplitTXV
'12.00 SEER Yes Attic R-4.2 No No
Setback
i HPSplit
'
6.80 HSPF n/a Attic R-4.2 No No
Setback
HPSplit
i
10.00 SEER No Attic R-4.2 No No
Setback
WATER HEATING SYSTEMS
---------------------
Number Tank
External
Tank Type
in Energy Size
Heater Type Distribution Type System Factor (gal)
-----------
Insulation
R-value
DHW 1
------------------- -------------- ------
----------
.Large
Gas Recirc/TimeTemp 1 n/a 75
R-0
i DHW 2
Storage
Gas Standard 1 0.58 30
R- n/a
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation
Pilot
System -----
Efficiency Input Fraction R-value,
------------------------
Light
DHW 1
-------------------------
-------
Large
0.78 n/a 0.03 R-n/a
0
+,
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------
***
------------------------
Items in this section should be documented on the plans,
***
***
installed to manufacturer and CEC specifications, and
***
***
verified during plan check and field inspection.
***
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
t an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
f
'This building incorporates non-standard Water Heating System
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF-1R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
------MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------------------------------------------------------
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
** CEC approved testing and/or verification methods.and ***
i
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
:' system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
1 equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
a this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and.
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
i with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
i
fixtures.
,
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF-1R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.57.27
------MICROPAS6v6- 01-File-24580B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-
------------------------ ------------- ------- -----
-------
COMPLIANCE STATEMENT
--------------------
This certificate of compliance lists the building features and performance
specifications needed to comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special,Features
Modeling Assumptions section.
i DESIGNER or OWNER ,
DOCUMENTATION AUTHOR
Name... .
Company. CORAL OPTION 1, LLC
Address. P.O. BOX 1716
LA QUINTA, CA 92253
Phone... 760-777-7747
LicenseCna:4(
Signed.i p
te)
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
Name.... CATHERINE M. MADLIN
Company. Madlin's Enterprises
Address. P.O. Box 1443
Palm Springs, CA 92262
Phone... 760-322-5004
Signed..
(date)
Certified Energy Analyst
Catherine M. Madiin "
NR 98-90-544
r,/\ nrrrl R 98-90-144
CAB EC I
COUOM10 Anodonon of Building Energy 'ConsulraM
COMPUTER METHOD SUMMARY Page 1 C-2R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
Project Address........ PLAN 5 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
-----------------------------------------------------------------------
= MICROPAS6
--------------------------------
ENERGY USE SUMMARY
=
------------------------P--
_ Energy Use
Standard Proposed Compliance =
_ (kBtu/sf-yr)
--------
Design Design
----------
Margin =
= Space Heating..........
----------
4.64
----------
4.23
0.41
= Space Cooling..........
37.70
32.61
5.09 =
= Water Heating..........
6.61
8.88
-2.27 =
North Total
-------- --------
48.95
--------
45.72
3.23
= Space Heating..........
4.64
4.25
0.39 =
= Space Cooling..........
37.70
33.58
4.12 =
= Water Heating..........
6.61
8.88
-2.27 =
East Total
-------- --------
48.95
--------
46.71
2.24
= Space Heating..........
4.64
4.35
0.29 =
= Space Cooling..........
37.70
33.35
4.35 =
= Water Heating.. .......
6.61
8.88
-2.27 =
South Total
-------- --------
48.95
--------
46.58
2.37
= Space Heating.. ......
4.64
4.08
0.56 =
= Space Cooling..........
37.70
33.77
3.93 =
= Water Heating..........
6.61
8.88
-2.27 =
West Total
-------- --------
48.95
--------
46.73
2.22
_ *** Building complies
----------------
with Computer
Performance
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 4314 sf
Building Type ..............
Single Family
Detached
Construction Type
.. New
Building Front Orientation. Cardinal
- N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type..........
FullYear
Floor Construction -Type.... Slab On Grade
Number of Building Zones... 2
COMPUTER METHOD SUMMARY Page 2 C-2R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.57.27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------------------------------------------------------------------------------
Conditioned Volume......... 46404 cf
Slab -On -Grade Area......... 4314 sf
Glazing Percentage......... 17.8 % of floor area
k Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height..... 10.8 ft
BUILDING ZONE INFORMATION
-------------------------
• Floor # of
Vent Vent Air
Area Volume Dwell Cond- Thermostat Height Area Leakage
Zone Type (sf) (cf) Units itioned Type (ft) (sf) Credit
-------------- ------------ ----------------------- ----------------------
1.ZONE
Residence 3827 41534` 0.89 Yes Setback 2.0 Standard No,
2.ZONE
Residence 487 4870 0.11 Yes Setback 2.0 Standard No
OPAQUE SURFACES
---------------
Area U- Insul Act Solar Form 3 Location/
Surface (sf) factor R-val Azm Tilt Gains Reference Comments
-------------- ------ ----- ----- --- ---- ----------------- ----------------
' 1.ZONE
1 Wall 486 0.051 21.7 0 90 Yes W.17.8.PW2X6
{ 3 Wall 931 0.051 21.7 90- 90 Yes W.17.8.PW2X6
5 Wall 407 0.051 21.7 180 90 Yes W.17.8.PW2X6
7 Wall 961 0.051 21.7 270 90 Yes W.17.8.PW2X6
9 Wall 174 0.064 17.8 0 90 No W.19.2X6FIRE
11 Wall 83 0.088 13 0 90 No W.13.2X4.16 2x4 Studs
13 Door 24 0.330 0 0 90 No None
15 RoofRadiant 3823 0.025 38 n/a 0 Yes R.38.2X4.24
{ 2.ZONE
2 Wall 66 0.051 21.7 0 90 Yes W.17.8.PW2X6
4 Wall 356 0.051 21.7 90 90 Yes W.17.8.PW2X6
6 Wall 133 0.051 21.7 180 90 Yes W.17.8.PW2X6
8 Wall 219 0.051 21.7 270 90 Yes W.17.8.PW2X6
10 Wall 283 0.064 17.8 0 90 No W.19.2X6FIRE
12 Wall 78 0.088 13 0 90 No W.13.2X4.16 2x4 Studs
14 Door 24 0.330 0 0 90 No None
16 RoofRadiant 487 0.025 38 n/a 0 Yes R.38.2X4.24
i
PERIMETER LOSSES
----------------
Length F2 Insul Solar
Surface (ft) Factor R-val Gains Location/Comments
------------ --------------------- ----- ----------------------
1.ZONE
17 SlabEdge 304 0.760 R-0 No
19 SlabEdge 20 0.510 R-0 No
2.ZONE
18 SlabEdge 94 0.760 R-0 No
20 SlabEdge 28 0.510 R-0 No
COMPUTER METHOD SUMMARY Page 3 C-2R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.57.27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------
--------------------------------------------------------------------
Orientation
1.ZONE
1 Door
2 Door
3 Door
4 Door
5 Door
6 Door
7 Door
8 Window
9 Window
10 Window
11 Window
12 Window
13 Window
14 Window
15 Window
16 Window
17 Window
18 Window
19 Window
20 Window
21 Window
22 Window
23 Window
24 Window
25 Window
26 Window
27 Window
28 Window
29 Window
30 Window
31 Window
32 Window
33 Window
34 Window
35 Window
36 Window
37 Window
38 Skylight
39 Skylight
40 Skylight
41 Skylight
50 Door
2.ZONE
42 Window
43 Window
44 Window
45 Window
46 Window
47 Window
48 Window
FENESTRATION SURFACES
---------------------
Area U- Act Exterior Shade Interior Shade
(sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC
----- ----- ----- --- ---- -------------- --------------
Back
(S)
24.0
0.380
0.350
180
90
Back
(S)
24.0
0.380
0.350
180
90
Back
(S)
24.0
0.380
0.350
180
90
Back
(S)
24.0
0.380
0.350
180
90
Back
(S)
48.0
0.380
0.350
180
90
Back
(S)
24.0
0.380
0.350
180
90
Back
(S)
240.0
0.400
0.400
180
90
Right
(W)
3.8
0.380
0.350
270
90
Right
(W)
3.8
0.380
0.350
27.0
90
Right
(W)
3.8
0.380
0.350
270
90
Front
(N)
4.5
0.380
0.350
0
90
Front
(N)
12.5
0.380
0.350
0
90
Front
(N)
4.5
0.380
0.350
0
90
Front
(N)
7.5
0.380
0.350
0
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
7.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
7.5
0.380
0.350
270
90
Front
(N)
5.0
0.380
0.350
0
90
Right
(W)
20.0
0.380
0.350
270
90
Front
(N)
20.0
0.380
0.350
0
90
Back
(S)
4.5
0.380
0.350
180
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Front
(N)
23.4
0.380
0.350
0
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
25.0
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
12.5
0.380
0.350
90
90
Left
(E)
12.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.0
0.380
0.350
90
90
Left
(E)
4.0
0.380
0.350
90
90
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Front
(N)
48.0
0.500
0.500
0
90
Back
(S)
4.5
0.380
0.350
180
90
Left
(E)
10.0
0.380
0.350
90
90
Left
(SE)
10.0
0.380
0.350
135
90
Back
(S)
10.0
0.380
0.350
180
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
25.0
0.380
0.350
270
90
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
None/l
None/1
None/1
None/1
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
None/1
None/1
None/1
None/l
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
\ -
COMPUTER METHOD SUMMARY Page 4 C-2R
Project Title.......... ANDALUSIA.PLAN.S Date..11/09/04 13.57.27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM C-2R
--------User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
------------------- ------------ ------------- ------- -----
-------
FENESTRATION SURFACES
---------------------
Area U- Act Exterior Shade Interior Shade
Orientation (sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC
------------ ----- ----- ----- --- --------------------------------
49 Window Front (N) 4.5 0.380 0.350 0 90 Standard/0.76 Standard/0.68
OVERHANGS AND SIDE FINS
---Window-- ------Overhang-----
---Left Fin---
---Right
Fin --
Area
Left
Rght
Surface
(sf)
- -----
Wdth
-----
Hgth
Dpth Hght
Ext
Ext
Ext
Dpth
Hght
Ext
Dpth
Hght
1.ZONE
-----
----
----
----
----
----
1
Door
24.0
3
8
10 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
2
Door
24.0
3
8
10 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
3
Door
24.0
3
8
10 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
4
Door
24.0
3
8
11.5 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5
Door
48.0
6
8
11.5 2.
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
*6
Door
24.0
3
8
11.5 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
7
Door
240.0
20
12
16.5 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SLAB SURFACES
-------------
Area
Slab Type
-----------
(sf)
1.ZONE
------
Standard
Slab
3827
2.ZONE
Standard
Slab
487
HVAC SYSTEMS
Refrigerant
Tested
ACCA
System
Minimum
Charge and Duct
Duct
Duct
Manual
Duct
Type
---
Efficiency
-----------
Airflow Location
R-value
Leakage
D
Eff
1.ZONE
--------------------
-------
---------
--------
----
Furnace
0.780 AFUE
n/a Attic
R-4.2
No
No
0.743
ACSplitTXV
12.00 SEER
Yes Attic
R-4.2
No
No
0.637
2.ZONE
HPSplit
6.80 HSPF
n/a Attic
R-4.2
No
No
0.772
HPSplit
10.00 SEER
No Attic
R-4.2
No
No
0.637
Tank Type Heater Type
--------
DHW 1
1 Large Gas
DHW 2
2 Storage Gas
WATER HEATING SYSTEMS
Number
Tank
External
in
Energy
Size
Insulation
Distribution Type System
Factor
(gal)
R-value
Recirc/TimeTemp 1
n/a
75
R-0
Standard 1
0.58
30
R- n/a
COMPUTER METHOD SUMMARY Page 5 C-2R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------
--------------------------------------------------------------------
System
------------
DHW 1
1 Large
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
Efficiency Input Fraction R-value Light
-----------------------------------------------------
0.78 n/a
0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection., ***
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
I '
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
COMPUTER METHOD SUMMARY Page 6 C-2R
Project Title.......... ANDALUSIA.PLAN.S Date..11/09/04 13:57:27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
---------------------------------------------
REMARKS
accordance with industry standards. The load calculation in
4 this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
t load must be adjusted for additional design conditions and
r system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
i
j A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
i
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax) v v v v v v
Andalusia at Coral Mountain
Series 75
Plan 5 - Lot H . - Detached G.H.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF-1R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58:45
Project Address........ LOT 11 - PLAN 5 DET.GH ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan C ec Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
+ Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
_______________
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM CF-1R
•.� ------User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
----------------------------------------------------------------
----
GENERAL INFORMATION
Conditioned Floor Area..... 4314 sf
Building Type .............. Single Family Detached
Construction Type ......... New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units-. 1 ,
Number of Stories.. ........ 1
Floor Construction Type Slab On Grade
Glazing Percentage......... 17.9 % of floor area'
Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height..... 10.8 ft
BUILDING SHELL INSULATION
Component
Frame
Cavity
Sheathing Total Assembly
Type
Type
--
R-value
R-value R-value U-factor
Location/Comments
Wall
-------
Wood
--------
R-17.8
----------------------
R-3.9 R-21.7 0.051
------------------------
Wall
Wood
R-17.8
R-0
R-17.8 0.064
Wall
Wood
R-13
R-0
R-13 0.088
2x4 Studs
Door
None
R-0
R-0
R-0 0.330
Roof Radiant Wood
R-11
R-27
R-38 0.025
S1abEdge
None
R-0
R-0
F2=0.760
SlabEdge
None
R-0
R-0
F2=0.510
FENESTRATION
------------
t
'
Over -
Area
U-
Interior
Exterior
hang/
Orientation
f--------------------
(sf)
-----
Factor
------
SHGC Shading
Shading
Fins
Door
Back (S)
24.0
0.380
---------------------
0.350 Standard
------- -----
Standard
--
Yes
Door
Back (S)
24.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
24.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
24.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
48.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
24.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
240.0
0.400
0.400 Standard
Standard
Yes
}' Window
Right (W)
3.8
0.380
0.350 Standard
Standard
None
Window
Right (W)
3.8
0.380
0.350 Standard
Standard
None
Window
Right (W)
3.8
0.380
0.350 Standard
Standard
None
Window
Front (N)
4.5
0.380
0.350 Standard
Standard
None -
Window
Front (N)
12.5
0.380
0.350 Standard
Standard
None
Window 'Front
(N)
4.5
0.380
0.350 Standard
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF-1R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
-------------------------------------------------------------------------------
FENESTRATION
------------
Over-
Area
U-
Interior
Exterior
hang/
Orientation
--------------------
(sf)
Factor
SHGC
Shading
Shading
Fins
window
Front
(N)
-----
7.5
------
0.380
------
0.350
---------------
Standard
--------------
Standard
-----
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
7.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
i Window
Right
(W)
7.5
0.380
0.350
Standard
Standard
None
Window
Front
(N)
5.0
0.380
0.350
Standard
Standard
None
Window
Right
(W)
20.0
0.380
0.350
Standard
Standard
None
i Window
Front
(N)
20.0
0.380
0.350
Standard
Standard
None
Window
Back
(S)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Front
(N)
23.4
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
' Window
Left
(E)
25.0
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
i Window
Left
(E)
12.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
12.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.0
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.0
0.380
0.350
Standard
Standard
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None'
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Window
Back
(S)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
10.0
0.380
0.350
Standard
Standard
None
Window
Left
(SE)
10.0
0.380
0.350
Standard
Standard
None
Window
Back
(S)
10.0
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
25.0
0.380
0.350
Standard
Standard
None
Window
Front
(N)
4.5
0.380
0.350
Standard
Standard
None
Door
Front
(N)
48.0
0.500
0.500
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
SLAB SURFACES
-------------
Area
Slab Type
----------------
(sf)
------
Standard Slab 3827
Standard Slab 487
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF-lR
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58:45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
------
-----------------------------------=----------------------------------
HVAC SYSTEMS
Refrigerant Tested ACCA
Equipment Minimum Charge and Duct Duct Duct Manual Thermostat
Type Efficiency Airflow Location R-value Leakage D Type
-------------------------------------------------------- ----------------
Furnace 0.780 AFUE n/a Attic R-4.2 No No Setback
ACSplitTXV 12.00 SEER Yes Attic R-4.2 No No Setback
HPSplit 6.80 HSPF n/a Attic R-4.2 No No Setback
HPSplit 10.00 SEER No Attic R-4.2 No No Setback
WATER HEATING SYSTEMS
---------------------
Number Tank External
in EnerSize
Tank Type Heater Type Distribution Type System Factor (gal) Rnvalueion
------------------------------------------ -------------- ----------------
DHW 1,
Large Gas Recirc/TimeTemp 1 n/a 75 R-0
DHW 2
Storage Gas Standard 1 0.58 30 R- n/a
Y WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
System Efficiency Input Fraction R-value Light
--------------------------------------------------------------------
DHW 1
Large 0.78 n/a 0.03 R-n/a 0
i SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items,in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. *`**
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF-lR
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58:45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
-------------------------------------------------------------------------------
F
HERS REQUIRED VERIFICATION
--------------------------
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
i *** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
F The values and materials used in this compliance portfolio are
�. the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor.
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF-1R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM CF-1R
------User#_MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC I
--------------------- ------------ --------- ------- ------- ----- ------
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to.
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
Name....
Company. CORAL OPTION 1, LLC
Address. P.O. BOX 1716
LA QUINTA, CA 92253
Phone... 760-777-7747
License.
Signed.. YV p
( a e)
ENFORCEMENT AGENCY
Name..
i Title...
Agency..
t
Phone...
Signed..
(date)
DOCUMENTATION AUTHOR
Name.... CATHERINE M. MADLIN
Company. Madlin's Enterprises
Address. P.O. Box 1443
Palm Springs, CA 92262
Phone... 760-322-5004
Signed..
(date)
Certified Energy Anagyst
Catherine M. Madlin
NR 98.90-544
r r rr R 98-90-144
CAB EC
California Association of Building Energy Consult4nrs
COMPUTER METHOD
SUMMARY
Page 1 C-2R
Project Title..........
ANDALUSIA.PLAN.5
Date..11/09/04 13.58.45
Project Address........
LOT 11 - PLAN 5 DET.GH
*******
---------------------
ANDALUSIA, LA QUINTA
*v6.01*
Documentation Author...
CATHERINE M. MADLIN
*******
Building Permit
Madlin's Enterprises
P.O. Box 1443
Plan Check Date
Palm Springs, CA 92262
760-322-5004
Field C ec Date
Climate Zone...........
15
---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001
Standards
by Enercomp, Inc.
MICROPAS6
v6.01 File-24581B1 Wth-CTZ15S92
------------------
Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises
-------------------------------------------------------------------------------
Run -LOT 11
REV PERMIT CALC
=
MICROPAS6 ENERGY USE
SUMMARY
=
---------------------
= Energy Use Standard
Proposed
_
Compliance =
_ (kBtu/sf-yr) Design
----------------------------------
Design
Margin =
= Space
Heating...,....... 4.64
----------
4.23
---------- _
0.41 -
- Space
Cooling.......... 37.71
32.69
5.02 _
= Water
Heating.......... 6.61
8.88
-2.27 =
_
--------
North Total 48.96
--------
45.80
--------
3.16
= Space
Heating.......... 4.64
4.24
0.40 =
- Space
Cooling.......... 37.71
33.65
4.06 =
= Water
Heating.......... 6.61
8.88
-2.27 =
=
------
East Total 48.96
--------
46.77
-------- -
2.19 =
= Space
Heating.......... 4.64
4.36
0.28 =
- Space
Cooling.......... 37.71
33.43
4.28 =
= Water
Heating.......... 6.61
8.88
-2.27 =
--------
South Total 48.96
--------
46.67
--------
2.29
= Space
Heating.......... 4.64
4.09
0.55 -
= Space
Cooling.......... 37.71
33.81
3.90 =
= Water
Heating.......... 6.61
8.88
-2.27 =
=
--------
West Total 48.96
--------
46.78
-------- _
2.18 =
_ *** Building complies with Computer Performance
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 4314 sf
Building Type .............. Single Family Detached
Construction Type ......... New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type.......... FullYear
Floor Construction Type.... Slab On Grade
Number of Building Zones... 2
COMPUTER METHOD SUMMARY Page 2 C-2R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
-------------------------------------------------------------------------------
Conditioned Volume......... 46404 cf
Slab -On -Grade Area......... 4314 sf
Glazing Percentage......... 17.9 % of floor area
Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height..... 10.8 ft
! BUILDING ZONE INFORMATION
-------------------------
Floor # of Vent Vent Air
Area Volume Dwell Cond- 'Thermostat Height Area Leakage
Zone Type (sf) (cf) Units itioned Type (ft) (sf) Credit
-------------- ------------ ----------------------- ----------------------
1.ZONE
Residence 3827 41534 0.89 Yes Setback 2.0 Standard No
2.ZONE
Residence 487 4870 0.11 Yes Setback 2.0 Standard No
OPAQUE SURFACES
---------------
Area U- Insul Act Solar Form 3 Location/
Surface (sf) factor R-val Azm Tilt Gains Reference Comments
-------------- ------ ----- ----- --- ---- ------------------------------
1.ZONE
1 Wall 486 0.051 21.7 0 90 Yes W.17.8.PW2X6
3 Wall 931 0.051 21.7 90 90 Yes .W.17.8.PW2X6
5 Wall 407 0.051 21.7 180 90 Yes W.17.8.PW2X6
7 Wall 961 0.051 21.7 270 90 Yes W.17.8.PW2X6
9 Wall 174 0.064 17.8 0 90 No W.19.2X6FIRE
11 Wall 83 0.088 13 0 90 No W.13.2X4.16 2x4 Studs
13 Door 24 0.330 0 0 90 No None
15 RoofRadiant 3823 0.025 38 n/a 0 Yes R.38.2X4.24
2.ZONE
2 Wall 66 0.051 21.7 0 90 Yes W.17.8.PW2X6
4 Wall 352 0.051 21.7 90 90 Yes W.17.8.PW2X6
6 Wall 133 0.051 21.7 180 90 Yes W.17.8.PW2X6
8 Wall 219 0.051 21.7 270 90 Yes W.17.8.PW2X6
10 Wall 283 0.064 17.8 0 90 No W.19.2X6FIRE
12 Wall 78 0.088 13 0 90 No W.13.2X4.16 2x4 Studs
14 Door 24 0.330 0 0 90 No None
16 RoofRadiant 487 0.025 38 n/a 0 Yes R.38.2X4.24
PERIMETER LOSSES
----------------
Length F2 Insul Solar
Surface (ft) Factor R-val Gains Location/Comments
------------ --------------------- ----- ---------------------
1.ZONE
17 SlabEdge 304 0.760 R-0 No
19 SlabEdge 20 0.510 R-0 No
2.ZONE
18 SlabEdge 94 0.760 R-0 No
20 SlabEdge 28 0.510 R-0 No
COMPUTER METHOD SUMMARY Page 3 C-2R
-------------------------_________
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
-------------------------------------------------------------------------------
Orientation
1.ZONE
1 Door
2 Door
3 Door
4 Door
5 Door
6 Door
7 Door
8 Window
9 Window
10 Window
11 Window
12 Window
13 Window
14 Window
15 Window
16 Window
17 Window
18 Window
19 Window
20 Window
21 Window
22 Window
23 Window
24 Window
25 Window
26 Window
27 Window
28 Window
29 Window
30 Window
31 Window
32 Window
33 Window
34 Window
35 Window
36 Window
37 Window
38 Skylight
39 Skylight
40 Skylight
41 Skylight
50 Door
51 Window
2.ZONE
42 Window
43 Window
44 Window
45 Window
46 Window
47 Window
Area
(sf)
FENESTRATION SURFACES
---------------------
U- Act Exterior Shade Interior Shade
factor SHGC Azm Tilt Type/SHGC Type/SHGC
Back (S) 24.0 0.380 0.350 180 90
Back (S) 24.0 0.380 0.350 180 90
Back (S) 24.0 0.380 0.350 180 90
Back
(S)
24.0
0.380
0.350
180
90
Back
(S)
48.0
0.380
0.350
180
90
Back
(S)
24.0
0.380
0.350
180
90
Back
(S)
240.0
0.400
0.400
180
90
Right
(W)
3.8
0.380
0.350
270
90
Right
(W)
3.8
0.380
0.350
270
90
Right
(W)
3.8
0.380
0.350
270
90
Front
(N)
4.5
0.380
0.350
0
90
Front
(N)
12.5
0.380
0.350
0
90
Front
(N)
4.5
0.380
0.350
0
90
Front
(N)
7.5
0.380
0.350
0
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
7.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
7.5
0.380
0.350
270
90
Front
(N)
5.0
0.380
0.350
0
90
Right
(W)
20.0
0.380
0.350
270
90
Front
(N)
20.0
0.380
0.350
0
90
Back
(S)
4.5
0.380
0.350
180
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Front
(N)
23.4
0.380
0.350
0
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
25.0
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
12.5
0.380
0.350
90
90
Left
(E)
12.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.0
0.380
0.350
90
90
Left
(E)
4.0
0.380
0.350
90
90
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Front
(N)
48.0
0.500
0.500
0
90
Left
(E)
4.5
0.380
0.350
90
90
Back
(S)
4.5
0.380
0.350
180
90
Left
(E)
10.0
0.380
0.350
90
90
Left
(SE)
10.0
0.380
0.350
135
90
Back
(S)
10.0
0.380
0.350
180
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
None/1
None/1
None/l
None/1
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
None/1
None/1
None/l
None/1
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
COMPUTER METHOD SUMMARY Page 4 C-2R
---------------------------------------------------------
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58:45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
-------------------------------------------------------------------------------
FENESTRATION SURFACES
Area U- Act Exterior Shade Interior Shade
Orientation (sf) factor SHGC Azm Tilt Type/SHGC T ype/SHGC
---------------------- ----- ----- ----- --- --------------------------------
48 Window Right (W) 25.0 0.380 0.350 270 90 Standard/0.76 Standard/0.68
49 Window Front (N) 4.5 0.380 0.350 0 90 Standard/0.76 Standard/0.68
OVERHANGS AND SIDE FINS
---Window-- ------Overhang-----
---Left Fin---
---Right
Fin --
Area
Left
Rght
Surface
-----------
(sf)
-----
Wdth
-----
Hgth
-----
Dpth Hght
---- ----
Ext
Ext
Ext
Dpth
Hght
Ext
Dpth
Hght
1.ZONE
----
----
----
----
----
----
----
----
1
Door
24.0
3
8
10 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
2
Door
24.0
3
8
10 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
3
Door
24.0
3
8
10 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
4
Door
24.0
3
8
11.5 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
5
Door
48.0
6
8
11.5 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
6
Door
24.0
3
8
11.5 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
7
Door
240.0
20
12
16.5 2
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
SLAB SURFACES
-------------
Area
Slab Type
----------------
(sf)
1.ZONE
------
Standard
Slab
3827
2.ZONE
Standard
Slab
487
HVAC SYSTEMS
Refrigerant
Tested
ACCA
System
Minimum
Charge and Duct
Duct
Duct
Manual
Duct
Type
-------------
Efficiency
-----------
Airflow Location
R-value
Leakage
D
Eff
I.ZONE
--------------------
-------
---------
--------
----
Furnace
0.780 AFUE
n/a Attic
R-4.2
No
No
0.743
ACSplitTXV
12.00 SEER
Yes Attic
R-4.2
No
No
0.637
2.ZONE
HPSplit
6.80 HSPF
n/a Attic
R-4.2
No
No
0.772
HPSplit
10.00 SEER
No Attic
R-4.2
No
No
0.637
WATER HEATING SYSTEMS
Number
Tank
External
Tank Type
------------
in
Heater Type Distribution Type System
-----------
Energy
Factor
Size
(gal)
Insulation
R-value
DHW 1
------------------- I ------
--------
------
----------
1 Large
Gas Recirc/TimeTemp 1
n/a
75
R-0
DHW 2
2 Storage
Gas. Standard 1
0.58
30
R- n/a
COMPUTER METHOD SUMMARY Page 5 C-2R
Project Title.......... ANDALUSIA.PLAN.S Date..11/09/04 13.58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
-------------------------------------------------------------------------------
WATER HEATING SYSTEMS DETAIL
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
System Efficiency Input Fraction R-value Light
------------=-------------------------------------------------------
DHW 1
1 Large 0.78 n/a 0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
' or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
COMPUTER METHOD SUMMARY Page 6 C-2R
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin s Enterprises Run -LOT 11 REV PERMIT CALC
------
--------------------------------------------------------------------
REMARKS
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
1
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax) ....
VVV
Andalusia at Coral Mountain
series 75 - Plan 6
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
Project Address........ PLAN 6 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
__________________________
-----MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Conditioned Floor Area.....
5089 sf
Building Type ..............
Single Family Detached
Construction Type .........
New
Building Front Orientation.
Cardinal - N,E,S,W
Number of Dwelling Units...
1
Number of Stories.. ........
1
Floor Construction Type
Slab On Grade
Glazing Percentage.........
18.5 % of floor area
Average Glazing U-factor...
0.4 Btu/hr-sf-F
Average Glazing SHGC.......
0.38
Average Ceiling Height.....
10.7 ft
BUILDING SHELL INSULATION
Component
Frame
Cavity
Sheathing
Total
Assembly
Type
-
Type
-------
R-value
--------
R-value
R-value
U-factor Location/Comments
Wall
Wood
R-17.8
--------
R-3.9
-------
R-21.7
------ ------------------
0.051
Wall
Wood
R-17.8
R-0
R-17.8
0.064
Wall
Wood
R-13
R-0
R-13
0.088 2x4 Studs
Door
None
R-0
R-0
R-0
0.330 '
RoofRadiant
Wood
R-11
R-27
R-38
0.025
S1abEdge
None
R-0
R-0
F2=0.760
SlabEdge
None
R-0
R-0
F2=0.510
FENESTRATION
Orientation
----------
Area
(sf)-
U-
Factor
SHGC-
Interior
Shading--------
Exterior
Shading
Over -
hang/
Fins
Window
Back
(S)
48.0
------
0.380
-----
0.350
Standard
--------------
Standard
-----
Yes
Door
Right
(W)
48.0
0.380
0.350
Standard
Standard
Yes
Door
Back
(S)
240.0
0.400
0.400
Standard
Standard
Yes
Door
Right
(W)
120.0
0.400
0.400
Standard
Standard
Yes
Door
Window
Back
Back
(S)
(S)
48.0
15.0
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
Yes
Window
Window
Right
Right
(W)
4.0
4.0
0.380
0.350
Standard
Standard
None
None
Window
Right
(W)
(W)
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
None
Window
Window
Right
Right
(W)
(W)
13.5
13.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
Standard
None
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17.04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM CF-lR
--------User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----------------------------------------------------------
FENESTRATION
Over -
Area
U-
Interior
Exterior
hang/
Orientation
-------
(sf)
-----
Factor
SHGC
Shading
Shading
Fins
Window
Right
(W)
9.0
------
0.380
------
0.350
---------------
Standard
--------------
Standard
-----
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
15.0
0.380
0.350
Standard
Standard
None
Door
Left
(E)
48.0
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Front
(N)
4.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
17.5
0.380
0.350
Standard
Standard
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
Window
Back
(S)
12.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
23.4
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
15.0
0.380
0.350
Standard
Standard
None
Window
Left
(E)
15.0
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
13.5
0.380
0.350
Standard
Standard
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None,
None
Door
Window
Front
Left
(N)
(E)
48.0
4.5
0.500
0.380
0.500
0.350
Standard
Standard
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
None
.SLAB SURFACES
-------------
Area
Slab Type
(sf)
Standard
Slab
4526
Standard
Slab
563
HVAC SYSTEMS
Refrigerant g
Tested ACCA
Equipment
Minimum Charge and
Duct
Duct
Duct Manual
Thermostat
---Type-----
Efficiency
Airflow
---------------------------
Location
R-value
Leakage D
Type
Furnace
0.780
AFUE
n/a Attic
-------
R-4.2
------- ------
No No
----------
Setback
ACSplitTXV
12.00
SEER
Yes Attic
R-4.2
No No
Setback
Furnace
0.780
AFUE
n/a Attic
R-4.2
No No
Setback
ACSplitTXV
12.00
SEER
Yes Attic
R-4.2
No No
Setback
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
-----MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
---------------------------------------------------------------------
WATER HEATING SYSTEMS
Number
Tank
External
Tank Type
------------
in
Heater Type Distribution Type System
------------------------------
Energy
Factor
Size
(gal)
Insulation
R-value
DHW 1
------
--------
------
----------
Large
Gas Recirc/TimeTemp 1
n/a
75
R-0
DHW 2
Storage
Gas Standard 1
0.58
30
R- n/a
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby
Internal
Tank
Recovery Rated Loss Insulation Pilot
System Efficiency Input Fraction---R_value----- Light,
-----------------------------------------
DHW 1
Large 0.78 n/a 0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
----------------------------------
*** Items in -this -section -should -be -documented -on -the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
'This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification,
is not necessary for the RCA or TXV.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17.04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM CF-1R
-User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
-----------------------------------------------------------------
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report.
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures. I
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM CF-1R
--------User#_MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
---------------- ------------ ------------- ------- -----
-------
COMPLIANCE STATEMENT
--------------------
This certificate of compliance lists the building features and performance
specifications needed to comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
DOCUMENTATION AUTHOR
Name....
Company.
Name....
Company.
CATHERINE M. MADLIN
Madlin's Enterprises
CORAL OPTION 1, LLC
Address.
P.O. BOX 1716
Address.
P.O. Box 1443
LA QUINTA, CA 92253
Palm Springs, CA 92262
Phone...
760-777 747
Phone...
760-322-5004*
License.
Signed
W 0
Signed,
4��
ate )
( ate)
ENFORCEMENT AGENCY
`.
Name....
Title...
t Agency..
Phone...
' Signed..
' ,(date)
0
I
Certified Energy Analyst
Catherine K Madiin
NR 98-00=044
r r rr R 99.90=144
CADEC
Colifornio As dation.oj Building Energy Consultants
COMPUTER METHOD SUMMARY Page 1 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
Project Address........ PLAN 6
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
----------------
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM C-2R
-User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
----_--
--------------------------------------------------------------=--
= MICROPAS6
_
---------------------------------
ENERGY USE SUMMARY
_
----------------------------
° = Energy Use
-
Standard Proposed Compliance =
_ (kBtu/sf-yr)
-------------
Design
-----�----
Design
Margin =
= Space Heating..........
----------
4.11
--------
=
_ Space Cooling..........
36.91
31.74
5.17 =
= Water Heating..........
5.60
7.53
-1.93 =
North Total
-------- --------
46.62
--------
43.24
3.38
= Space Heating..........
4.11
3.95
0.16 =
Space Cooling..........
36.91
31.63
5.28 =
= Water Heating..........
5.60
7.53
-1.93 =
East Total
-------- --------
46.62
--------
43.11
3.51
= Space Heating..........
4.11
3.94
0.17 =
= Space"Cooling..........
36.91
32.32
4.59 =
= Water Heating..........
5.60
7.53
-1.93 =
= South Total
----------------
46.62
--------
43.79
2.83
= Space Heating..........
4.11
3.75
0.36 =
= Space Cooling..........
36.91
31.38
5.53 =
= Water Heating..........
5.60
7.53
-1.93 =
West Total
-------- --------
46.62
--------
42.66
3.96
_ *** Building complies
with Computer
Performance
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 5089 sf
Building Type ..............
Single Family Detached
Construction Type .........
New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type..........
FullYear
Floor Construction Type.... Slab On Grade
Number of Building Zones... 2
COMPUTER METHOD SUMMARY Page 2 C-2R
----------------------------------------
-----------------
-----------------------------------------------
----------
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM C-2R
-User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
-------------------------------- -------------------------
Conditioned Volume......... 54507 cf
Slab -On -Grade Area......... 5089 sf
Glazing Percentage......... 18.5 % of floor area
Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height..... 10.7 ft
BUILDING ZONE INFORMATION
Floor
Area
Volume
# of
Dwell
Cond-
Thermostat.
Vent
Height
_ Vent
Area
Air
Leakage
Zone Type ----
'----------
(sf)
(cf)
Units
itioned
Type
(ft)
(sf)
Credit
1.ZONE
-----
--------
---------
Residence
2.ZONE
4526
48877
0.89
Yes
Setback
"2.0
Standard
No
Residence
563
5630
0.11
Yes
Setback
2.0
Standard
No
OPAQUE SURFACES
Surface
Area
(sf)
U-
factor
Insul
R-val
Act
Azm Tilt
Solar
Gains
Form 3 Location/
Reference
-------
------
-----
-----
Comments
1.ZONE
-------
-----
------------ ----------------
.1
3
Wall
401
0.051
21.7
0
90
Yes
W.17.8.PW2X6
Wall
1353
0.051
21.7
90
90
Yes
W.17.8.PW2X6
5
Wall
601
0.051
21.7
180
90
Yes
W.17.8.PW2X6
7
9
Wall
1054
0.051
21.7
270
90
Yes
W.17.8.PW2X6
11
Wall
Wall
331
0.064
17.8•
0
90
No
W.19.2X6FIRE
13
Door
90
24
0.088
0.330
13
0
0 .90
0
No
W.13.2X4.16 2x4 Studs
y
14
RoofRadiant
4521
0.025
38
n/a
90
0
No
Yes
None
R.38.2X4.24
2.ZONE
2
Wall
180
0.051
21.7
0
90
Yes
W.17.8.PW2X6
4
Wall
302
0.051
21.7
90
90
Yes
W.17.8.PW2X6
. 6
8
Wall
35
0.051
21.7
180
90
Yes
W.17.8.PW2X6
10
Wall
Wall
330
0.051
21.7
270
90
Yes
W.17.8.PW2X6
12
Door
65
24
0.064
0.330
17.8
0
0
135
90
90
No
W.19.2X6FIRE
15
RoofRadiant 563
0.025
38
n/a
0
Yes
Yes
None
R.38.2X4.24
PERIMETER
LOSSES.
Length
----------------
F2
Insul
Solar
Surface (ft) Factor
------------
R-val
Gains
Location/Comments
1.ZONE
--------
-------
16
SlabEdge
357
0.760
R-0
No
18
SlabEdge
35
0.510
R-0
No
2.ZONE
17
SlabEdge
97
0.760
R-0'
No
19
SlabEdge
7
0.510
R-0
No
a
COMPUTER METHOD SUMMARY Page 3 C-2R
Project Title.......... ANDALUSIA.PLAN.6
Date..11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM C-2R
-User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
---------------------------------------------------
Orientation
----------------------
-.ZONE
1 Window Back (S)
2 Door Right (W)
3 Door Back (S)
4 Door Right (W)
5 Door Back (S)
6 Window Back (S)
7 Window Right (W)
8 Window Right (W)
9 Window Right (W)
10 Window Right (W)
11 Window Right (W)
19 Window Left (E)
20 Window Front (N)
21 Window Right (W)
22 Door Front (N)
23 Door Front (N)
24 Door Front (N)
25 Window Right (W)
26 Window Right (W)
27 Window Right (W)
28 Window Back (S)
29 Window Left (E)
30 Window Left (E)
31 Window Left (E)
32 Window Left (E)
33 Window Left (E)
34 Window Left (E)
35 Window Left (E)
36 Skylight Horz
37 Skylight Horz
38 Skylight Horz
39 Skylight Horz
40 Skylight Horz
41 Door Front (N)
2.ZONE
12 Window Right (W)
13 Window Right (W)
14 Window Right (W)
15 Window Right (W)
16 Window Right (W)
17 Window Left (E)
18 Door Left (E)
42 Window Left (E)
43 Window Left (E)
FENESTRATION SURFACES
---------------------
Area U- Act Exterior Shade Interior Shade
(sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC
48.0
0.380
0.350
180
90
48.0
0.380
0.350
270
90
240.0
0.400
0.400
180
90
120.0
0.400
0.400
270
90
48.0
0.380
0.350
180
90
15.0
0.380
0.350
180
90
4.0
0.380
0.350
270
90
4.0
0.380
0.350
270
90
4.5
0.380
0.350
270
90
13.5
0.380
0.350
270
90
13.5
0.380
0.350
270
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
0
90
17.5
0.380
0.350
270
90
24.0
0.380
0.350
0
90
24.0
0.380
0.350
0
90
24.0
0.380
0.350
0
90
12.5
0.380
0.350
270
90
12.5
0.380
0.350
270
90
12.5
0.380
0.350
270
90
12.5
0.380
0.350
180
90
23.4
0.380
0.350
90
90
4�.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
15.0
0.380
0.350
90
90
15.0
0.380
0.350
90
90
4.5
0.380
0.350
90
90
13.5
0.380
0.350
90
90
1.0
1.720
0.830
0
0
1.0
1.720
0.830
0
0
1.0
1.720
0.830
0
0
1.0
1.720
0.830
0
0
1.0
1.720
0.830
0
0
48.0
0.500
0.500
0
90
4.5
0.380
0.350
270
90
4.5
0.380
0.350
270
90
9.0
0.380
0.350
270
90
4.5
0.380
0.350
270
90
4.5
0.380
0.350
270
90
15.0
0.380
0.350
90
90
48.0
0.380
0.350
90
90
4.5
0.380
0.350
90
90
4.5
0.380
0.350
90
90
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
None/1
None/1
None/1
None/1
None/1
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
None/1
None/1
None/1
None/1
None/l
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
COMPUTER METHOD SUMMARY Page 4 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10.17:64
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM C-2R
-User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
---------------------------------------------=---------
OVERHANGS AND SIDE FINS
-----------------------
---Window
-- ------Overhang----- ---Left Fin--- ---Right
Fin--
Left
Rght
Surface
-
-Area
(sf) Wdth
-----
Hgth Dpth Hght Ext
----
----- ----
Ext Ext Dpth Hght Ext Dpth Hght
1.ZONE
----
---- -------- ---- ---- ----
----
1 Window
2
48.0 8
6 .1.67 0 n/a
n/a n/a n/a n/a n/a n/a
n/a
Door
3
48.0 6
8 30 6 n/a
n/a n/a n/a n/a n/a. n/a
n/a
Door
4
240.0 22
12 17 2 n/a
n/a n/a n/a n/a n/a n/a
n/a
!' Door
5
120.0 12
12 13 2 n/a
n/a n/a n/a n/a n/a n/a
n/a
Door
48.0 6
8 28 6 n/a
n/a n/a n/a n/a n/a n/a
n/a
SLAB SURFACES
-------------
Area
Slab Type
-----------
(sf)
1.ZONE
------
Standard Slab
4526
2.ZONE
Standard Slab
563
HVAC SYSTEMS
i.
System
------------
Refrigerant
Minimum Charge and Duct
Tested ACCA
Duct Duct Manual
Duct
---Type------
Efficiency Airflow Location
R-value Leakage D
Eff
-------------
-
Furnace
,ACSplitTXV
0.780
12.00
AFUE n/a Attic
SEER Yes Attic
R-4.2 No No
0.743
2.ZONE
R-4.2 No No
0.637
Furnace
ACSplitTXV
0.780
12.00
AFUE n/a Attic
SEER Yes Attic
R-4.2 No No
0.743
R-4.2 No No.
0.637
WATER HEATING SYSTEMS
---------------------
Number Tank External
Tank Type
Heater
-----------
Type Distribution Type
-------------------
in Energy Size Insulation
System Factor (gal) R-value
DHW 1
------ ----:---- ------
1 Large
Gas
Recirc/TimeTemp
1 n/a 75 R-0
DHW 2
2 Storage
Gas
Standard,
1 0.58 30 R-
n/a
COMPUTER METHOD SUMMARY Page 5 C-2R
---------------------=------------- ------------------------------------------------------------------
Project -----------
Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------------------- --------------- -----------
- ------------- ------- -----
-------
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
System -Efficiency Input Fraction R-value Light
----------------------------
DHW 1---------------
1 Large 0.78 n/a 0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
--------------------------
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
COMPUTER METHOD SUMMARY Page 6 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------
REMARKS
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required'CF7.6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
t
Madlin's
enteypfises
Catherine M. Madlin, Certified Eneero Analyst v 760-322-5004 / 323-3644 (fax) . ... e
Andalusia
Plan 6 - Lots I
at Coral Mountain
Series 75
& 10. - Detached G.H.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL
Page 1
CF-lR
Project
Title.......... ANDALUSIA.PLAN.6
Date..11/09/04
14:01:27
Project
Address........ LOTS 1 & 10 PLAN 6 *******
---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN *******
Building Permit
Madlin's Enterprises
P.O. Box 1443
Plan Check
Date
Palm Springs, CA 92262
Climate
Zone...........
760-322-5004
15
---------------------
Field C ec
Date
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp,
Inc.
MICROPAS6
v6.01
File-24586B1 Wth-CTZ15S92 Program -FORM CF-1R
------User#_MP0207
--------------------------=---------------------------------------
User-Madlin's Enterprises Run -LOTS
1 & 10 REV. PERMIT
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 5099 sf
Building Type .............. Single Family Detached
Construction Type ......... New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Stories.. ..... 1
'
Floor Construction Type.... Slab On Grade
Glazing
Percentage......... 18.6 % of floor
Average
Glazing U-factor... 0.4 Btu/hr-sf-F
,area
Average
Glazing SHGC....... 0:38
Average
Ceiling Height..... 16.7 ft
BUILDING SHELL INSULATION
t Component
Frame
-----------------------
Cavity--Sheathing--Total--Assembly
Total Assembly
Type
Type
R-value R-value R-value U-factor
Location/Comments
z------------
-------
----------------------- ------
-
Wall
Wood
------------------
R-17.8 R-3.9 R-21.7 0.051
,.: Wall
Wood
R-17.8 R-0 R-17.8 0.064
Wall
Wood
R-13 R-0 R-13 0.088 2x4 Studs
Door
None
R-0 R-0 R-0 0.330
RoofRadiant Wood
R-11 R-27 R-38 0.025
SlabEdge
None
R-0 R-0 F2=0.760
SlabEdge
None
R-0 R-0 F2=0.510
FENESTRATION
------------
Over-
Orientation
-----------
Area U- Interior
(sf) Factor SHGC Shading
Exterior
Shading
hang/
Fins
Window
Back (S)
----- ------ ---------------------
48.0 0.380 0.350 Standard
--------------
Standard
-----
Yes
Door
Right (W)
48.0 0.380 0.350 Standard
Standard
Yes
Door
Back (S)
240.0 0.400 0.400 Standard
Standard
Yes
Door
Right (W)
120.0 0.400 0.400 Standard
Standard
Yes
Door
Back (S)
48.0 0.380 0.350 Standard
Standard
Yes
Window
Back (S)
15.0 0.380 0.350 Standard
Standard
None
Window
Right (W)
4.0 0.380 0.350 Standard
Standard
None
Window
Right (W)
4.0 0.380 0.350 Standard
Standard
None
Window
Right (W)
4.5 0.380 0.350 Standard
Standard
None
Window
Right (W)
13.5 0.380 0.350 Standard
Standard
None
Window
Right (W)
13.5 0.380 0.350 Standard
Standard
None -
Window
Right (W)
4.5 0.380 0.350 Standard
Standard
None
Window
Right (W)
4.5 0.380 0.350 Standard
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
-----
--------------------------------------------------------------------
FENESTRATION
------------
Over-
Orientation
---------
--
Area
(sf)
U-
Factor
SHGC
Interior
Shading
Exterior
Shading
hang/
Fins
Window
Window
Right
Right
(W)
-----
9.0
4.5
------
0.380
------
0.350
---------------
Standard
--------------
Standard
--
None
f Window
Right
(W)
(W)
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
Window
Left
(E)
15.0
0.380
0.350
Standard
Standard
None
None
Door
Window
Left
Left
(E)
(E)
48.0
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
None
Window
Front
(N)
4.5
0.380
0.350
Standard
Standard
Standard
None
None
j Window
Right
(W)
17.5
0.380
0.350
Standard
Standard
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Door
Window
Front
Right
(N)
24.0
12.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
(W)
12.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
None
Window
Window
Right
Back
(W)
(S)
12.5
12.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
None
' Window
Left
(E)
23.4
0.380
0.350
Standard
Standard
Standard
None
None
Window
Window
Left
Left
(E)
(E)
4.5
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
Window
Left
(E)
15.0
0.380
0.350
Standard
Standard
None
None
Window
Window
Left
Left
(E)
(E)
15.0
4.5
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
Window
Left
(E)
13.5
0.380
0.350
Standard
Standard
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Door
Window
Front
Left
(N)
(E)
48.0
4.5
0.500
0.380
0.500
0.350
Standard
Standard
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
None
Window
Window
Front
(N)
3.8
0.380
0.350
Standard
Standard
None
Window
Front
Front
(N)
(N)
3.8
3.8
0.380
0.380
0.350
0.350
Standard
Standard
Standard
Standard
None
None
r
SLAB SURFACES
-------------
Area
Slab Type
----------------
(sf)
Standard Slab
------
4546
Standard Slab
553
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF-lR
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM CF-1R
User#_MP0207 User-Madlin's Enterprises Run-LOTS-1 & 10 REV. PERMIT
------
HVAC SYSTEMS
Refrigerant Tested ACCA
Equipment Minimum Charge and Duct Duct Duct Manual Thermostat
Type Efficiency Airflow Location R-value Leakage D ' Type
-------------------------------------------------------- ------ ----------
Furnace 0.780 AFUE n/a Attic R-4.2 No No Setback
ACSp1itTXV 12.00 SEER Yes Attic R-4.2 No No Setback
Furnace 0.780 AFUE n/a Attic R-4.2 No No Setback
ACSplitTXV 12.00 SEER Yes Attic R-4.2 No No Setback
r `
WATER HEATING SYSTEMS
I---------------------
Number Tank External
+' in Energy Size Insulation
Tank Type Heater Type Distribution Type System Factor (gal) R-value
------------------------------ ---------------------- ----------
DHW 1
Large Gas Recirc/TimeTemp 1 n/a 75 R-0
DHW 2
Storage Gas Standard 1 0.58 30 R- n/a
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal.Tank
Recovery Rated Loss Insulation Pilot
System Efficiency Input Fraction R-value Light
------------------------
----------------------
t DHW 1-----------------------
Large 0.78 n/a 0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
t ***verified during plan check and field inspection. ***
i
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM CF-1R
------User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
HERS REQUIRED VERIFICATION
------------------------
*** Items in this section require - field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***:
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV. ,
i
REMARKS
This revised calculation reflects updates/changes to glazing
-areas and types.
The values and materials used in this'compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
! The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF=6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R li"sting
the water heater model number(s) and certified plumbing
fixtures.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM CF-lR
User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
----------------------------------------------------------------------
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations . to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,
r any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
Name....
Company. CORAL OPTION 1, LLC
Address. P.O. BOX 1716
LA QUINTA CA 92253
Phone... 760-7.77- 7 7
License.
Signed.. //[ Q
( too
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
r
1
DOCUMENTATION AUTHOR
Name.... CATHERINE M. MADLIN
Company. Madlin's Enterprises
Address. P.O. Box 1443
Palm Springs, CA 92262
Phone... 760-322-5004
Signed..
(date)
Certified Energy Analyst
Catherine M. Madlin .
NR 98.90.544 ,
r r R 98.90.144
LC
r
CAA
Ccalifomio Assodafion of Building Energy C wlwa
COMPUTER METHOD SUMMARY
Page 1
C-2R
Project Title..........
ANDALUSIA.PLAN.6
Date..11/09/04
14:01:27
Project Address........
LOTS 1 & 10 PLAN 6
******* ---------------------
ANDALUSIA, LA QUINTA
*v6.01*
Documentation Author...
CATHERINE M. MADLIN
*******
Building Permit
Madlin's Enterprises
P.O. Box 1443
Plan Check
Date
Palm Springs, CA 92262
Climate Zone. .....
760-322-5004
15
Field C ec
---------------------
Date
Compliance Method......
MICROPAS6 v6.01 for 2001
Standards by Enercomp,
Inc.
MICROPAS6 v6.01
File-24586B1 Wth-CTZ15S92
Program -FORM C-2R
-User#-MP0207 User-Madlin
-----
s Enterprises Run
-LOTS 1 & 10 REV. PERMIT
= MICROPAS6
ENERGY USE SUMMARY
=
------------------------P--
= Energy Use
Standard Proposed Compliance _
_ (kBtu/sf-yr)
------------------
Design
Design
Margin =
= Space Heating..........
---------
4.26
-------
4 .15
--- _
0.11 =
= Space Cooling..........
37.50
32.32
5.18 =
= Water Heating..........
5.59
7.51
-1.92 _
_ North Total
----------------
47.35
--------
43.98
_
3.37 =
= Space Heating..........
4.26
4.12
0.14 =
_ Space Cooling..........
37.50
32.36
5.14 _
= Water Heating..........
5.59
7.51
-1.92, _
East Total
-------- --------
47.35
--------
43.99
3.36
= Space Heating..........
4.26
4.08
0.18 =
= Space Cooling..........
37.50
32.96
.4.54 =
= Water Heating..........
5.59
7.51
-1.92 =
South Total
-------- --------
47.35
--------
44.55
2.80
= Space Heating..........
4.26
3.92
0.34 =
= Space Cooling..........
37.50
32.09
5.41 =
= Water Heating...........
5.59
7.51
-1.92 =
= West Total
----------------
47.35
--------
43.52
_
3.83 =
_ *** Building complies
---------------
with Computer
Performance
• GENERAL INFORMATION
------------------
Conditioned Floor -Area .....
5099 sf
Building Type ..............
Single
Family Detached
Construction Type .........
New
Building Front Orientation.
Cardinal
- N,E,S,W
Number of Dwelling Units...
1
0
Number of Building Stories.
1
Weather Data Type..........
FullYear
Floor Construction Type....
Slab On
Grade
Number,of Building Zones...
2
COMPUTER METHOD SUMMARY Page 2 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.01.27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
-----
-------------=------------------------------------------------------
Conditioned Volume......... 54407 cf
Slab -On -Grade Area......... 5099 sf
Glazing Percentage......... 18.6 % of floor area
Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height..... 10.7 ft
Zone Type
i 1. ZONE
Residence
S 2.ZONE
Residence
BUILDING ZONE INFORMATION
-------------------------
Floor # of Vent Vent Air
Area Volume Dwell Cond- Thermostat Height Area Leakage
(sf) (cf) Units itioned Type (ft) (sf) Credit
------------ ----------------------- ----------------------
4546 48877 0.89 Yes Setback 2.0 Standard ' No
553 5530 0.11 Yes Setback 2.0 Standard No
OPAQUE
SURFACES
Area
U-
---------------
Insul
Act
Solar
Form 3
Surface
--------------
(sf)
factor
R-val
Azm
Tilt
Gains
Reference
1.ZONE
------
-----
-----
---
----
-----
N
------------
1
Wall
510
0.051
21.7
0
90
Yes
W.17.8.PW2X6
3
Wall
1353
0.051
21.7
90
90
Yes
W.17.8.PW2X6
5
Wall
601
0.051
21.7
180
90
Yes
W.17.8.PW2X6
7
Wall
1054
0.051
21.7
270
90
Yes
W.17.8.PW2X6
9
Wall
331
0.064
17.8
0
90
No
W.19.2X6FIRE
11
Wall
90
0.088
13
0
90
No
W.13.2X4.16
13
Door
24
0.330
0
0
90
No
None
14
RoofRadiant
4541
0.025
38
n/a
0
Yes
R.38.2X4.24
2.ZONE
2
Wall
180
0.051
21.7
0
90
Yes
W.17.8.PW2X6
4
Wall
302
0.051
21.7
90
90
Yes
W.17.8.PW2X6
6
Wall
155
0.051
21.7
180
90
Yes
W.17.8.PW2X6
8
Wall
330
0.051
21.7
270
90
Yes
W.17.8.PW2X6
10
Wall
65
0.064
17.8
0
90
No
W.19.2X6FIRE
12
Door
24
0.330
0
135
90
Yes
None
15
RoofRadiant
553
0.025
38
n/a
0
Yes
R.38.2X4.24
PERIMETER LOSSES
Location/
Comments
----------------
2x4 Studs
Length
F2
Insul
Solar
Surface
------------
(ft)
------
Factor
R-val
Gains Location/Comments
1.ZONE
--------
-------
----- ----------------------
16 SlabEdge
369
0.760
R-0
No
18 SlabEdge
35
0.510
R-0
No
2.ZONE
17 SlabEdge
109
0.760
R-0
No
19 SlabEdge
7
0.510
R-0
No
COMPUTER METHOD SUMMARY Page 3 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM C-2R
-User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
-----
------------------------------------------------------------------
FENESTRATION SURFACES
---------------------
Area U- Act
Orientation (sf) factor SHGC Azm Tilt
---------------------- ----- ----- ----- --- ----
1. ZONE
1 Window
2 Door
3 Door
4 Door
5 Door
6 Window
7 Window
8 Window
9 Window
10 Window
11 Window
19 Window
20 Window
21 Window
22 Door
23 Door
24 Door
25 Window
26 Window
27 Window
28 Window
29 Window
30 Window
31 Window
32 Window
33 Window
34 Window
35 Window
36 Skylight
37 Skylight
38 Skylight
39 Skylight
40 Skylight
41 Door
44 Window
45 Window
46 Window
2.ZONE
12 Window
13 Window
14 Window
15 Window
16 Window
17 Window
18 Door
42 Window
43 Window
Back
(S)
48.0
0.380
0.350
180
90
Right
(W)
48.0
0.380
0.350
270
90
Back
(S)
240.0
0.400
0.400
180
90
Right
(W)
120.0
0.400
0.400
270
90
Back
(S)
48.0
0.380
0.350
180
90
Back
(S)
15.0
0.380
0.350
180
90
Right
(W)
4.0
0.380
0.350
270
90
Right
(W)
4.0
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
13.5
0.380
0.350
270
90
Right
(W)
13.5
0.380
0.350
270
90
Left
(E)
4.5
0.380
0.350
90
90
Front
(N)
4.5
0.380
0.350
0
90
Right
(W)
17.5
0.380
0.350
270
90
Front
(N)
24.0
0.380
0.350
0
90
Front
(N)
24.0
0.380
0.350
0
90
Front
(N)
24.0
0.380
0.350
0
90
Right
(W)
12.5
0.380
0.350
270
90
Right
(W)
12.5
0.380
0.350
270
90
Right
(W)
12.5
0.380
0.350
270
90
Back
(S)
12.5
0.380
0.350
180
90
Left
(E)
23.4
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
15.0
0.380
0.350
90
90
Left
(E)
15.0
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
13.5
0.380
0.350
90
90
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Horz
1.0
1.720
0.830
0
0
Front
(N)
48.0
0.500
0.500
0
90
Front
(N)
3.8
0.380
0.350
0
90
Front
(N)
3.8
0.380
0.350
0
90
Front
(N)
3.8
0.380
0.350
0
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
9.0
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Right
(W)
4.5
0.380
0.350
270
90
Left
(E)
15.0
0.380
0.350
90
90
Left
(E)
48.0
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Left
(E)
4.5
0.380
0.350
90
90
Exterior Shade Interior Shade
Type/SHGC Type/SHGC
----------------------------
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
None/l
None/l
None/l
None/l
None/l
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.76
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
None/l
None/l
None/1
None/l
None/l
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
Standard/0.68
COMPUTER METHOD SUMMARY Page 4 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM C-2R
User#_MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
------
---------------------------------------------------------------
OVERHANGS AND SIDE FINS
---Window--------Overhan -Left Fin--- ---Right
Fin--
�
Area
Left
Rght
Surface
---
(sf) Wdth Hgth Dpth Hght Ext
----- -----
Ext Ext Dpth Hght Ext Dpth Hght
1.ZONE
---- ---- ---- ---- ----
1 Window
2
48.0 8
6 1.67 0 n/a
n/a n/a n/a n/a n/a n/a
n/a
Door
48.0 6
8 30 6 n/a
n/a n/a n/a n/a n/a n/a
n/a
3'Door
240.0 22
12 17 2 n/a
n/a n/a n/a n/a n/a n/a
n/a
4 Door
120.0 12
12 13 2 n/a
n/a n/a n/a n/a n/a n/a
n/a
5 Door
48.0 6
8 28 6 n/a
n/a n/a n/a n/a n/a n/a
n/a
SLAB SURFACES
-------------Area
Slab Type
(sf)
--------
1.ZONE
------
Standard Slab'
4546
2.ZONE
Standard Slab
553
HVAC SYSTEMS
,
' System
------------
Refrigerant
Minimum Charge and Duct
Tested ACCA
Duct Duct Manual
Duct
Efficiency Airflow Location
R-value Leakage D
Eff
---Type
-------
1.ZONE
-----------
--------------------
------------------------
----
Furnace
ACSplitTXV
0.780
12.00
AFUE n/a Attic
SEER Yes Attic
R-4.2 No No
R-4.2 No' No
0.743
0.637
2.ZONE
Furnace
0.780
AFUE n/a Attic
R-4.2 No' No
0.743
ACSplitTXV
12.00
SEER Yes Attic
R-4.2 No No
0.637
WATER HEATING SYSTEMS
---------------------
Number Tank External
Tank Type
Heater
----------
Type Distribution Type
in Energy Size Insulation
System Factor (gal) R-value
DHW 1
-------------------
-------------- ----------------
1 Large
Gas
Recirc/TimeTemp
1 n/a 75 R-0
DHW 2
2 Storage
Gas
Standard
1 0.58 30' R-
n/a'
j
•
1
COMPUTER METHOD SUMMARY Page 5 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM C-2R
------User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
----------------------------------------------------------------------
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
System Efficiency Input Fraction R-value Light
------------------------------------------------------------- -------
DHW 1
1 Large 0.78 n/a 0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
f----------------------------------------- ***
*** Items in this section should be documented on the plans,
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
'The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
s
I
f
COMPUTER METHOD SUMMARY Page 6 C-2R
------------------------ ______ _g_ _
--------------------------------------
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program -FORM C-2R
-User#-MP0207 User-Madlin s Enterprises Run -LOTS 1 & 10 REV. PERMIT
-----
----------------------------------------------------------------
REMARKS
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
?eople and a fixed latent heat gain percentage. This basic
Load must be adjusted for additional design conditions and
system/equipment performance.
Che installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
k night setback thermostat is required to be installed with the
iVAC system.
Che installed plumber shall provide the required CF-6R listing
:he water heater model number(s) and certified plumbing
:ixtures.
Madlin -s
enteyprzses
Catherine M. Madlin, Cerlified Energy Analyst . 760-322-5004 / 323-3644 (fax) .... V S V
Andalusia at Coral Mountain
Series 75
Plan 6 - Lot 4 - NVo Guest House
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
Project Address........ LOT 4 PLAN 6 w/o GH ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
_________________________
-----MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
----------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 4526 sf
Building Type .............. Single Family Detached
Construction Type ......... New
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Stories.......... 1
Floor Construction Type.... Slab On Grade
Glazing Percentage......... 18.8 % of floor area
Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height...... 10.8 ft
BUILDING SHELL INSULATION
Component
Frame
Cavity
Sheathing Total Assembly
Type
Type
----------
R-value
--------
R-value R-value U-factor
Location/Comments
Wall
Wood
'Wood
R-17.8
----------------------
R-3.9 R-21.7 0.051
------------------------
Wall
R-17.8
R-0
R-17.8 0.064
Wall
Wood
R-13
R-0
R-13 0.088 2x4 Studs
' Door
None
R-0
R-0
R-0 0.330
RoofRadiant Wood
R-11
R-27
R-38 0.025
' SlabEdge
None
R-0
R-0
F2=0.760
SlabEdge
None
R-0
R-0
F2=0.510
FENESTRATION
------------
Area
U-
Interior
Exterior
Over-
hang/
Orientation
----------
(sf)
-----
Factor
SHGC Shading
Shading
Fins
Window
Back (S)
------
48.0
0.380
---------------------
0.350 Standard
--------------
Standard
----
Yes
Door
Right (W)
48.0
0.380
0.350 Standard
Standard
Yes
Door
Back (S)
240.0
0.400
0.400 Standard
Standard
Yes
Door
Right (W)
120.0
0.400
0.400 Standard
Standard
Yes .
Door
Back (S)
48.0
0.380
0.350 Standard
Standard
Yes
Window
Back (S)
15.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
4.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
4.0
0.380
0.350 Standard
Standard
None
Window
Right (W)
4.5
0.380
0.350 Standard
Standard
None
Window
Right (W)
13.5
0.380
0.350 Standard
Standard
None
Window
Right (W)
13.5
0.380
0.350 Standard
Standard
None
Window
Left (E)
4.5
0.380
0.350 Standard
Standard
None
Window
Front (N)
4.5
0.380
0.350 Standard
Standard
None
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM CF-1R
User#_MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
------
-----------------------------------------------------------------
FENESTRATION
Over -
Area
U-
Interior
Exterior
hang/
Orientation
-----------
(sf)
Factor
SHGC
Shading
Shading
Fins
Window
Right
(W)
-----
17.5
------
0.380
------
0.350
---------------
Standard
--------------
Standard
-----
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Door
Front
(N)
24.0
0.380
0.350
Standard
Standard
None
Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
Window
Right
(W)
12.5
0.380
0.350
Standard
Standard
None
Window
Back
(S)
12.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
23.4
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
15.0
0.380
0.350
Standard
Standard
None
Window
Left
(E)
15.0
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
13.5
0.380
0.350
Standard
Standard
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Skylight
Horz
1.0
1.720
0.830
None
None
None
Door
Front
(N)
48.0
0.500
0.500
Standard
Standard
None
Window
'
Front
(N)
4.5
0.380
0.350
Standard
Standard
None
Window
Left
(E)
4.5
0.380
0.350
Standard
Standard
None
SLAB SURFACES
-------------
Area
Slab Type
----------------
(sf)
Standard
Slab
------
4526
HVAC SYSTEMS
------------
Refrigerant
Tested ACCA
Equipment
Minimum Charge and
Duct
Duct
Duct Manual
Thermostat
---Type-----
Efficiency
-----------
Airflow
------------------
Location
R-value
Leakage D
Type
Furnace
0.780
AFUE
n/a Attic
-------
R-4.2
------- ------
No No
----------
Setback
ACSplitTXV
12.00
SEER
Yes Attic
R-4.2
No No
Setback
WATER HEATING
---------------------
SYSTEMS
Number
Tank
External
Tank Type
------------
-Heater
-----------
Type Distribution
in
Type System
Energy Size
Factor (gal)
Insulation
R-value
DHW 1 .
-------------------
--------------
------
----------
Large
Gas
Recirc/TimeTemp
1
n/a 75.
R-0
DHW 2
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 3 CF-lR
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6v6�01--File-24587B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
----- -
-------------------------------------------------------
WATER HEATING SYSTEMS
Number Tank External
in Energy Size Insulation
Tank Type Heater Type Distribution Type System Factor (gal) R-value
------------------------------ -------------- ------ ----------
Storage Gas Standard 1 0.58 30 R- n/a
System
DHW 1
Large
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation Pilot
Efficiency Input Fraction R-value Light
----------------------------------------------------------
0.78 n/a
0.03 R-n/a 0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This is a multiple orientation building with no orientation restrictions..
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
i system(s).
This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
--------------------------
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
Lot 4 does .not have a guest house.
This revised calculation reflects updates/changes to glazing
areas and types:
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 4 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
REMARKS
.The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and
equipment selection(s). The HVAC design shall be done in
accordance with industry standards. The load calculation in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
l The installing hvac contractor shall provide the required CF-6R
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
} HVAC system.
The installed plumber shall provide the required CF-6R listing
the water heater model number(s) and certified plumbing
fixtures.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 5 CF-1R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.02:27
-----MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM CF-1R
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
---------------------------------------------------=-----------
---- --
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. When this certificate of compliance is
submitted for a single building plan to be built in multiple orientations,'
any shading feature that is varied is indicated in the Special Features
Modeling Assumptions section.
DESIGNER or OWNER
Name....
Company. CORAL OPTION 1, LLC
Address. P.O. BOX 1716
LA QUINTA, CA 92253
Phone... 760-77 7747
License.
Signed.. Z11?, Q
a e)
Name....
Title...
Agency..
Phone...
Signed..
ENFORCEMENT AGENCY
F
(date)
DOCUMENTATION AUTHOR
Name.... CATHERINE M. MADLIN
Company. Madlin's Enterprises
Address. P.O. Box 1443
Palm Springs, CA 92262
Phone... 760-322-5004
Signed..
(date)
!/ jp'ae-
Certified Energy Analyst
Catherine M. Madlin
NR 98.90-544
r r rr R 98-90-144
C A D E C
California Association of Building Energy Consultants
i
i
COMPUTER METHOD SUMMARY Page 1 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
Project Address........ LOT 4 PLAN 6 w/o GH ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Bui ing Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone.......... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM C-2R
------User#-MP0207 User-Madlin s Enterprises Run -LOT 4 REV PERMIT CALC
------------ --------------- ------------ --------- ------ ------- ------------
_ MICROPAS6
-----------------------------------
ENERGY USE
SUMMARY
=
------------------------P--
= Energy Use
Standard
=_
Proposed'Compliance
_ (kBtu/sf-yr) .
-------------
Design
----------
Design
Margin =
= Space Heating..........
3.81
------
3.68
---- -
0.13 =
_ Space Cooling..........
36.14
30.48
5.66 =
= Water Heating..........
6.30
8.46
-2.16 =
= North Total
--------
46.25
----------------
42.62
_
3.63 =
= Space Heating..........
3.81
3.76
0.05 =
= Space Cooling..........
36.14
30.91
5.23 =
= Water Heating..........
6.30
8.46
-2.16 =
East Total
--------
46.25
-------- --------
43.13
3.12
= Space Heating..........
3.81
3.59
0.22 =
_. Space Cooling..........
36.14
31.22
4.92 =
= Water Heating..........
6.30
8.46
-2.16 =
= South Total
--------
46.25
----------------
43.27
_
2.98
_ Space Heating..........
3.81
3.36
0.45 =
= Space Cooling..........
36.14
31.01
5.13 =
= Water Heating..........
6.30
8.46
-2.16 =
West Total
--------
46.25
-------- --------
42.83
3.42
_ *** Building complies
with Computer Performance
GENERAL INFORMATION
-------------------
Conditioned Floor Area..... 4526
sf
Building Type ..............
Single Family Detached
Construction Type .........
New
Building Front Orientation.
Cardinal - N,E,S,W
Number of Dwelling Units...
1
Number of Building Stories.
1
.Weather Data Type..........
FullYear
Floor Construction Type...'.
Slab
On Grade
Number of Building Zones...,
1
r
COMPUTER METHOD SUMMARY Page 2 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.02.27
-----MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
-----------------------------------------------------
Conditioned Volume......... 48877 cf
Slab -On -Grade Area......... 4526 sf
Glazing Percentage......... 18.8 % of floor area
Average Glazing U-factor... 0.4 Btu/hr-sf-F
Average Glazing SHGC....... 0.38
Average Ceiling Height..... 10.8 ft
BUILDING ZONE INFORMATION
Floor
# of
I Vent Vent
Air.
Area Volume
Dwell Cond- Thermostat
Height Area
Leakage
Zone Type (sf) (cf)
-------------- ------------
Units itioned Type
(ft) (sf)
Credit,
1.ZONE
-----------------------
Residence 4526 48877
1.00 Yes Setback
2.O Standard
No
OPAQUE SURFACES
Area
' U-
Insul
Act
Solar
Form 3 Location/
Surface
i--------------
(sf)
------
factor
-----
R-val
Azm
Tilt
Gains
Reference Comments
1.ZONE
-----
---
----
-----
------------ ----------------
1
Wall
517
0.051
21.7
0
90
Yes
W.17.8.PW2X6
2
Wall
1349
0.051
21.7
90
90
Yes
W.17.8.PW2X6
3
Wall
601
0.051
21.7
180
90
Yes
W.17.8.PW2X6
4
Wall
1054
0.051
21.7
270
90
Yes
W.17.8.PW2X6
5
Wall
331
0.064
17.8
0
90
No
W.19.2X6FIRE
6
Wall
90
0.088
13
0
90
No
W.13.2X4.16 2x4 Studs
7
Door
24
0.330
0
0
90
No
None
8
RoofRadiant
4521
0.025
38
n/a
0
Yes
R.38.2X4.24
Length
Surface (ft)
--- ------
1.ZONE
9 S1abEdge 369
10 SlabEdge 35
PERIMETER LOSSES
----------------
F2 Insul Solar
Factor R-val Gains Location/Comments
-------------- ---------------------------
0.760 R-0 No
0.510 R-0 No
FENESTRATION SURFACES
Area U- Act Exterior Shade Interior Shade
Orientation -(sf) factor SHGC Azm Tilt Type/SHGC Type/SHGC
------------ -- ----- ----- --- ------------------ --------------
1.ZONE
1 Window Back (S) 48.0 0.380 0.350 180 90 Standard/0.76 Standard/0.68
2 Door Right (W) 48.0 0.380 0.350 270 90 Standard/0.76 Standard/0.68
3 Door Back (S) 240.0 0.400 0.400 180 90 Standard/0.76 Standard/0.68
4 Door Right (W) 120.0 0.400 0.400 270 90 Standard/0.76 Standard/0.68
5 Door Back (S) 48.0 0.380 0.350 180 90 Standard/0.76 Standard/0.68
6 Window Back (S) 15.0 0.380 0.350 180 90 Standard/0.76 Standard/0.68
7 Window Right (W) 4.0 0.380 0.350 270 90 Standard/0.76 Standard/0.68
8 Window Right (W) 4.0 0.380 0.350 270 90 Standard/0.76 Standard/0.68
9 Window Right (W) 4.5 0.380 0.350 270 90 Standard/0.76 Standard/0.68
10 Window Right (W) 13.5 0.380 0.350 270 90 Standard/0.76 Standard/0.68
COMPUTER METHOD SUMMARY Page 3 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin s Enterprises Run -LOT 4 REV PERMIT CALC
------
-------------------------------------------------------------------------
FENESTRATION SURFACES
Orientation
------------
Area
(sf)
-----
U-
factor SHGC
-----
Act
Azm
Tilt
Exterior Shade
Type/SHGC
Interior Shade
Type/SHGC
11
Window
Right
(W)
13.5
0.380
-----
0.350
---
270
----
90
--------------
Standard/0.76
--------------
Standard/0.68
12
Window
Left
(E)
4.5
0.380
0.350
90
90
Standard/0.76
Standard/0.68
13
Window
Front
(N)
4.5
0.380
0.350
0
90
Standard/0.76
Standard/0.68
14
Window
Right
(W)-
17.5
0.380
0.350
270
90
Standard/0.76
Standard/0.68
15
! 16
Door
Front
(N)
24.0
0.380
0.350
0
90
Standard/0.76
Standard/0.68
Door
Front
(N)
24.0
0.380
0.350
0
90
Standard/0.76
Standard/0.68
17
Door
Front
(N)
24.0
0.380
0.350
0
90
Standard/0.76
Standard/0.68
18
Window
Right
(W)
12.5
0.380
0.350
270
90
Standard/0.76
Standard/0.68
19
Window
Right
(W)
12.5
0.380
0.350
270
90
Standard/0.76
Standard/0.68
20
Window
Right
(W)
12.5
0.380
0.350
270
90
Standard/0.76
Standard/0.68
21
Window
Back
(S)
12.5
0.380
0.350
180
90
Standard/0.76
Standard/0.68
22
Window
Left
(E)
23.4
0.380
0.350
90
90
Standard/0.76
Standard/0.68
23
Window
Left
(E)
4.5
0.380
0.350
90
90
Standard/0.76
Standard/0.68
24
Window
Left
(E)
4.5
0.380
0.350
90
90
Standard/0.76
Standard/0.68
25
Window
Left
(E)
15.0
0.380
0.350
90
90
Standard/0.76
Standard/0.68
26
Window
Left
(E)
15.0
0.380
0.350
90
90
Standard/0.76
Standard/0.68
27
Window
Left
(E)
4.5
0.380
0.350
90
90
Standard/0.76
Standard/0.68
28
Window
Left
(E)
13.5
0.380
0.350
90
90
Standard/0.76
Standard/0.68
29
Skylight
Horz
1.0
1.720
0.830
0
0
None/1
None/1
30
Skylight
Horz
1.0
1.720
0.830
0
0
None/1
None/1
31
Skylight
Horz
1.0
1.720
0.830
0
0
None/1
None/1
32
Skylight
Horz
1.0
1.720
0.830
0
0
None/1
None/1
i 33
Skylight
Horz
1.0
1.720
0.830
0
0
None/1
None/1
34
Door
Front
(N)
48.0
0.500
0.500
0
90
Standard/0:76
Standard/0.68
35
Window
Front
(N)
4.5
0.380
0.350
0
90
Standard/0.76
Standard/0.68
36
Window
Left
(E)
4.5
0.380
0.350
90
90
Standard/0.76
Standard/0.68
OVERHANGS AND SIDE FINS
---Window--
-----------------------
------Overhang-----
---Left Fin---
---Right Fin --
Area
Left
Rght
Surface
-
(sf)
-----
Wdth
-----
Hgth
-----
Dpth
Hght Ext
Ext
Ext Dpth Hght
Ext Dpth Hght
1.ZONE
----
---- ---- ----
----
1
Window
48.0
8
6
1.67
0 n/a
n/a
n/a n/a n/a
n/a n/a n/a
2
Door
48.0
6
8
30
6 n/a
n/a
n/a n/a n/a
n/a n/a n/a
3
Door
240.0
22
12
17 -
2 n/a
n/a
n/a n/a n/a
n/a n/a n/a
E 4
Door
120.0
12
12
13,
2 n/a
n/a
n/a n/a n/a
n/a n/a n/a
5
Door
48.0
6
8
28
6 n/a
n/a
n/a n/a n/a
n/a n/a n/a
SLAB
-------------
SURFACES
Area
Slab Type
(sf)
1.ZONE
-------
------
Standard
Slab
4526
COMPUTER METHOD SUMMARY Page 4 C-2R
__________________________
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6 v6.01--File-24587B1 Wth-CTZ15S92 Program -FORM C-2R
------User#_MP0207 User-Madlin s Enterprises Run_LOT-4- REV -PERMIT CALC
--------------- ----------------------
HVAC SYSTEMS
------------
Refrigerant Tested
ACCA
System
Minimum Charge and Duct Duct Duct
Manual Duct
Type
Efficiency Airflow Location R-value Leakage
-----------
D- Eff
1.ZONE
-------------------------------------=------
----
Furnace
0.780 AFUE n/a Attic R-4.2 No
No 0.743
ACSplitTXV 12.00 SEER Yes Attic R-4.2 No
i
No 0.637
WATER HEATING SYSTEMS
---------------------
Number Tank
External
Tank Type
------------
in Energy Size
Heater Type Distribution Type System Factor (gal)
------------------------------
Insulation
R-value
DHW 1
---------------------
----------
! 1 Large
Gas Recirc/TimeTemp 1 n/a 75
R-0
DHW 2
2 Storage Gas Standard 1 0.58 30
R- n/a
WATER HEATING SYSTEMS DETAIL
----------------------------
Standby Internal Tank
Recovery Rated Loss Insulation
Pilot
System
Efficiency Input Fraction R-value
Light
DHW 1
+ 1 Large
0.78 n/a 0.03 R-n/a-
0
SPECIAL FEATURES AND MODELING ASSUMPTIONS
***
Items in this section should be documented on the plans,'***
***
installed to manufacturer and CEC specifications, and
***
i ***
verified during plan check and field inspection.
***
This is a multiple orientation building with no orientation restrictions.
This printout is for the front facing North.
This building incorporates a Radiant Barrier. The radiant barrier must have
an emissivity less than or equal to 0.05, must be installed to cover the'
roof trusses, rafters, gable end walls and other vertical attic surfaces,
and must meet attic ventilation criteria.
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning',
system(s).
' This building incorporates non-standard Water Heating System
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***'
*** the supervision of a CEC-approved HERS provider.using ***
COMPUTER METHOD SUMMARY Page 5 C-2R
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.02.27
------MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program -FORM C-2R
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
--------------------------------------------------------------------
HERS REQUIRED VERIFICATION
--------------------------
*** CEC approved testing and/or verification methods.and ***
*** must be reported on the CF-6R installation certificate. ***
This building incorporates either Tested Refrigerant Charge and Airflow (RCA)
or a Thermostatic Expansion Valve (TXV) on the specified air conditioning
system(s). If a cooling system is not installed, then HERS verification
is not necessary for the RCA or TXV.
REMARKS
Lot 4 does not have a guest house.
This revised calculation reflects updates/changes to glazing
areas and types.
The values and materials used in this compliance portfolio are
the minimum required to show compliance with Title 24 Energy
Conservation Standards. The owner may (at his/her option) install
better materials without additional compliance calculations.
The HVAC load calculations included in this compliance report
are for permit purposes only. The installing HVAC contractor
is responsible for determining the HVAC design loads and .
equipment selection(s)'. The HVAC design shall be done in
accordance with industry standards. The load calculation,in
this report considers ambient temperature loads, solar gain,
people and a fixed latent heat gain percentage. This basic
load must be adjusted for additional design conditions and
system/equipment performance.
The installing hvac contractor shall provide the required CF-6R '
with the installed hvac equipment model numbers.
A night setback thermostat is required to be installed with the
HVAC system.
The installed plumber shall provide the required CF-6R listing
the,water heater model number(s) and certified plumbing
fixtures.
,M i
ain s
enterpfises
Catherine M. Madlin, Certified EyzeiV Analyst v 760-322-5004 / 323-3644 (fax) V ... V V,.
a
a
a
v
e °
0
°
H. V.A. C. Load Calculation
Madlin-'s
enterprises
Catherine M. Madlin, Certified Enemy Analyst • 760-322-5004 / 323-3644 (fax) ..' .. t v .
Andalusia at Coral Mountain
Series 75 - Plan 4
HVAC SIZING
Page 1 HVAC
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
Project Address........ PLAN 4 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M.-MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
________________________
-----MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
----------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area .................
Volume..
3933 sf
...........
Front Orientation..........
42912 cf
Front Facing
0 deg (N)
Sizing Location............
INDIO
Latitude ...................
Winter Outside Design......
33.7 degrees
29 F
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range.. .. .. .....
Interior Shading Used......
30 F
No
Exterior Shading Used......
No
Overhang Shading Used......
No
' Latent Load Fraction.......
0.20
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
----------------------
25382
9445
Glazing Conduction ...............
12459
10332
Glazing Solar ....................
Infiltration
n/a
14869
.....................
Internal Gain
25304
14996
....................
Ducts.
n/a
3051
....................
Sensible Load ....................
6314
69459
5269
57963
Latent Load ......................
n/a
11593
Minimum Total Load
----------------------
69459
69555
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 2 HVAC
_______________________----------------- -----------------
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13.54:57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
--------User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area.. ................... 3429 sf
Volume ........................... 37872 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20045
-----------
7674
Glazing Conduction ...............
11262
9339
Glazing Solar... .................
Infiltration
n/a
13366
.....................
Internal Gain
22332
13234
....................
Ducts
n/a
2915
............................
5364
4653
Sensible Load ....................
59002
51181
Latent Load .....................
n/a
10236
Minimum Zone Load
-----------
59002
-----------
61417
ZONE 12.ZONE''
Floor Area..... ..................
Volume............................
504 sf
5040 cf
Heating
Cooling
Description
---------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5337
-----------
1771
Glazing Conduction ...............
1197
993,
Glazing Solar..... .............
Infiltration
n/a
1503
.....................
Internal Gain.......
2972
1761
.............
Ducts............................
n/a
137
951
616
Sensible Load....................
10457
6781
Latent Load ......................
n/a
1356
-
Minimum Zone Load
-----------
10457
-----------
8138
HVAC SIZING Page 3 HVAC
Project Title.......... ANDALUSIA.PLAN A Date..11/09/04 13:54:57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
GENERAL INFORMATION
-------------------
FloorArea ................. 3933
Volume.. .... 42912
Front Orientation.......... Front
Sizing Location.,........... INDIO
Latitude... ....... 33.7
Winter Out,
Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range.. ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
sf
cf
Facing 90 deg (E)
degrees
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25382
-----------
9445
Glazing Conduction ...............
12459
10332
Glazing Solar ....................
Infiltration
n/a
19725
.....................
Internal Gain......
25304
14996
..............
Ducts.
n/a
3051
....................
Sensible Load
6314
5755
....................
Latent Load
69459
63304
......................
n/a
12661
Minimum Total Load
-----------
69459
-----------
75964
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
----------------------------- Page 4 HVAC
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
--------User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------------------------------------------------------------------
HEATING AND COOLING LOAD
----------------------------------------
SUMMARY BY
ZONE
ZONE '1.ZONE'
Floor Area.......................
3429 sf
Volume ...........................
37872 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20045
-----------
7674
Glazing Conduction ...............
11262
9339
Glazing Solar....................
Infiltration
n/a
18057
.....................
Internal Gain ....................
22332
13234
Ducts
n/a
2915
............................
5364
5122
Sensible Load ....................
59002
56341
Latent Load ......................
"n/a
11268
Minimum Zone Load
-----------
59002
-----------
67610
ZONE 12.ZONE'
Floor Area ....................
Volume.......... ...
504 sf
.........
5040 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5337
-----------
1771
Glazing Conduction ...............
1197
993
Glazing Solar ....................
Infiltration
n/a
1667
.....................
Internal Gain
2972
1761
....................
Ducts............................
n/a
137
951
633
Sensible Load ....................
10457
6962
Latent Load ......................
n/a
1392
Minimum Zone Load
-----------
10457
-----------
8355
HVAC SIZING Page 5 HVAC
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13.54.57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
-User#-MP0207 User=Madlin's Enterprises Run -REVISED PERMIT CALC
-------
------------------------------------------------------------------
GENERAL INFORMATION
Floor Area ................. 3933 sf
Volume.. .... ........... 42912 cf
Front Orientation.......... Front Facing
Sizing Location............ INDIO
Latitude .............. 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range. ..... ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating
Description
---------------------------------
(Btuh)
Opaque Conduction and Solar......
-----------
25382
Glazing Conduction ...............
12459
Glazing Solar ....................
n/a
Infiltration .....................
25304
Internal Gain
....................
Ducts.
n/a
....................
Sensible Load
6314
69459
....................
Latent Load ........:.............
n/a
Minimum Total Load
69459
180 deg (S)
Cooling
(Btuh)
9445
10332
12242
14996
3051
5007
55073
11015
66088
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
Page 6 HVAC
Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
MICROPAS6v601--File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
----- -
----------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area ............... 3429 sf
Volume ........................... 37872 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20045
-----------
7674
Glazing Conduction ...............
11262
9339
Glazing Solar ...................
Infiltration
n/a
11087
.....................
Internal Gain
22332
13234
....................
Ducts.
n/a
2915
..........................
5364
4425
Sensible Load ....................
59002
48674
Latent Load ......................
n/a
9735
-----------
Minimum Zone Load
59002
-----------
58409
ZONE 12.ZONE'
Floor Area...___________ rnn �.9
- --- - - - - - ' ' . . . . . . . . . . . . .
Volume...........................
✓ V J 1
5040 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5337
-----------
1771
Glazing Conduction ...............
1197
Glazing Solar ....................
n/a
.993
1155
Infiltration .....................
Internal Gain
2972
1761
....................
Ducts.......
n/a
137
...................
951
582
Sensible Load............ ......
10457
6399-
Latent Load ......................
n/a
1280
Minimum Zone Load
-----------
10457
-----------
7679
HVAC SIZING Page 7 HVAC
Project Title.......... ANDALUSIA.PLAN A Date..11/09/04 13:54:57
-----MICROPAS6v6- 01-File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
-
-------------------- ------------- ------- -----
-------
GENERAL INFORMATION
Floor Area................. 3933 sf
Volume.. .... ........... 42912 cf
Front Orientation.......... Front Facing
Sizing Location............ INDIO
Latitude .............. 33.7 degrees
Winter Outside Design...., 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range. ..... ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating
Description
---------------------------------
(Btuh)
Opaque Conduction and Solar......
-----------
25382
Glazing Conduction ...............
12459
Glazing Solar ....................
Infiltration
n/a
.....................
Internal Gain
25304
....................
Ducts.
n/a
.... ...................
Sensible Load
6314
....................
LatentLoad......
69459
. ............
n/a
Minimum Total Load
69459
270 deg (W)
Cooling
(Btuh)
9445
10332
20238
14996
3051
5806
63868
12774
76642
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 8 HVAC
---------------------------------------- Project Title.......... ANDALUSIA.PLAN.4 Date..11/09/04 13:54:57
MICROPAS6 v6.01 File-24575B1 Wth-CTZ15S92 Program-HVAC SIZING
--------User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
----------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area ....................... 3429 sf
Volume ........................... 37872 cf
Description
Heating
Cooling
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20045
-----------
7674
Glazing Conduction...............
Glazing Solar
11262
9339
....................
Infiltration.........
n/a
18373
... ......
Internal Gain ....................
22332
13234
Ducts
n/a
2915
............................
5364
5154
Sensible Load ....................
59002
56689
Latent Load ......................
n/a
11338
-----------
Minimum Zone Load
59002
-----------
68026
ZONE '2.ZONE'
Floor Area .................... 504 sf
Volume........................... 5040 cf
Heating
Cooling
Description
----------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar...:..
-----------
5337
-----------
1771
Glazing Conduction ...............
Glazing Solar
1197
993
....................
Infiltration
n/a
1865
.....................
Internal Gain
2972
1761
....................
Ducts..
n/a
137
........................ _
951
653
Sensible Load ....................
10457
7180
Latent Load ......................
n/a
1436
-----------
Minimum Zone Load
10457
-----------
8616
Madlin-'s
enterprises
Catherine M. Madlin, Certified Enemy Analyst v 760-322-5004 / 323-3644 (fax) . V V . V . S
Andalusia at Coral Mountain
Series 75
Plan 4 with Dining Room Option
HVAC SIZING Page 1 HVAC
Project Title.......:.. ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
Project Address........ PLAN 4 w DINING RM OPT ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
-User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
------------------------------------------------------------------=--
GENERAL INFORMATION
-------------------
Floor Area .................
Volume..
3907 sf
,
...........
Front Orientation..........
42912 cf
Front Facing
0 deg (Ni
Sizing Location............
INDIO
Latitude.. .
' Winter Outside Design
33.7 degrees
29 F
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range. ..... .....
30 F
i Interior Shading Used......
No
j Exterior Shading Used......
No
Overhang Shading Used......
No
S
Latent Load Fraction.......
0.20
HEATING AND COOLING
-------- -----------------------
LOAD SUMMARY
!
Description
---------------------------------
(Btuh)g
(Btuh)g
Opaque Conduction and Solar......
----------------------
25303
9389
Glazing Conduction ...............
12818
10629
Glazing Solar ....................
Infiltration
n/a
15570
.....................
Internal Gain ....................
25304
n/a
14996
3051
Ducts ...... ....... .........
6342
5363
Sensible Load ..
69766
58998
Latent Load ......................
n/a
11800
Minimum Total Load
----------------------
69766
70798
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
.factors when selecting the HVAC equipment.
HVAC SIZING Page 2 HVAC
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13.56.10
-----MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
--User#-MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
---------------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area ....................... 3403 sf
Volume ........................... 37872 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
19966
-----------
7618
Glazing Conduction ...............
11620
9636
Glazing Solar ....................
Infiltration
n/a
14067
.....................
Internal Gain
22332
13234
....................
Ducts
n/a
2915
............................
5392
4747
Sensible Load ....................
59309
52217
Latent Load .................
n/a
10443
Minimum Zone Load
i
-----------
59309
-----------
62660
ZONE 12.ZONE'
Floor Area .......................
Volume.......
504 sf
..................
5040 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5337
-----------
1771
Glazing Conduction ...............
1197
993
Glazing Solar ....................
n/a
1503
Infiltration .....................
2972
1761
Internal Gain ....................
n/a
137
Ducts..... .....................
951
616
Sensible Load ....................
10457
6781
Latent Load ......................
n/a
1356
Minimum Zone Load
-----------
10457
-----------
8138
HVAC SIZING Page 3 HVAC
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
------_User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area.................
3907 sf
Volume.. .... ...........
42912 cf
Front Orientation..........
Front Facing
90 deg (E)
Sizing Location............
INDIO
Latitude............
Winter Outside Design......
33.7 degrees
29 F
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range.. ..... .....
30 F
Interior Shading Used......
No
Exterior Shading Used......
No
Overhang Shading Used......
No
Latent Load Fraction.......
0.20
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling
Description
---------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
----------------------
25303
9389
GlazingConduction ....
12818
10629
Glazing Solar ....................
Infiltration
n/a
19869
.....................
Internal Gain ....................
25304
n/a
14996
3051
Ducts ............................
6342
5793
Sensible Load ....................
69766
63727
Latent Load ......................
n/a
12745
Minimum Total Load
----------------------
69766
76472
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered.' It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 4 HVAC
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
HEATING AND COOLING LOAD SUMMARY BY ZONE
ZONE '1.ZONE'
i Floor Area .......................
3403 sf
Volume ...........................
37872 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
19966
-----------
7618
Glazing Conduction ...............
11620
9636
Glazing Solar ....................
Infiltration
n/a
18201
.....................
Internal Gain
22332
13234
....................
Ducts
n/a
2915
............................
5392
5160
Sensible Load ....................
59309
56765
Latent Load ......................
n/a
11353
Minimum Zone Load
-----------
59309
-----------
68118
ZONE 12.ZONE'
Floor Area........ ...............
Volume
504 sf
...........................
5040 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5337
-----------
1771
Glazing Conduction ...............
1197
993
Glazing Solar ....................
Infiltration
n/a
1667
.....................
Internal Gain
2972
1761
....................
Ducts
n/a
137
............................
951
633
Sensible Load....................
10457
6962
Latent Load.... ..................
n/a
1392
Minimum Zone Load
-----------
10457
-----------
8355
HVAC SIZING Page 5 HVAC
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT--------Date__11/09/04 13:56.10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
--------User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area ................. 3907 sf
Volume.. ........... 42912 cf
Front Orientation.......... Front Facing
Sizing Location............ INDIO
Latitude ............... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range. ...... ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating
Description.
---------------------------------
(Btuh)
Opaque Conduction and Solar......
-----------
25303
Glazing Conduction ...............
12818
Glazing Solar..... ...............
Infiltration
n/a
.....................
Internal Gain
25304
n/a
....................
Ducts.
..... ...................
Sensible Load ....................
6342
69766
Latent Load ......................
n/a
Minimum Total Load
69766
180 deg (S)
Cooling
(Btuh)
9389
10629
12943
14996
3051
5101
56109
11222
67331
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, -etc., must also be
considered. it is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 6 HVAC
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------------------------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY, ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area .........................
Volume
3403 sf
...........................
37872 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
19966
-----------
7618
Glazing Conduction ...............
11620
9636
Glazing Solar.. ................
Infiltration
n/a
11788
.....................
Internal Gain
22332
13234
....................
Ducts
n/a
2915
............................
5392
4519
Sensible Load ....................
59309
49710
Latent Load ......................
n/a
9942
Minimum Zone Load
-----------
59309
-----------
59652
ZONE 12.ZONE'
Floor Area .......................
Volume...........................
504 sf
5040 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5337
-----------
1771
Glazing Conduction............
1197
993
Glazing Solar ....................
n/a
1155
Infiltration.. ..................
2972
1761
Internal Gain. ...................
n/a
137
Ducts............................
951
582
Sensible Load ....................
10457
6399
Latent Load ......................
n/a
1280
Minimum Zone Load
-----------
10457
-----------
7679
HVAC SIZING Page 7 HVAC
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13:56:10
MICROPAS6 v6.01 File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------------------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area ................. 3907 sf
Volume.......
. 42912 cf
..
Front Orientation.......... Front Facing 270 deg (W)
Sizing Location............ INDIO
Latitude ................ 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
SummerRange........ ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY-
--------------------------------
Description
--------------------
Opaque Conduction and Solar......
Glazing Conduction ...............
Glazing Solar ....................
Infiltration .....................
InternalGain ....................
Ducts. ... ...................
Sensible Load ....................
LatentLoad ......................
Heating
(Btuh)
25303
12818
n/a
25304
n/a
6342
69766
n/a
Cooling
(Btuh)
9389
10629
20545
14996
3051
5861
64471
12894
----------------------
Minimum Total Load 69766 77365
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other. relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
Page 8 HVAC
--------------------------------------
___________________________________________________________
Project Title.......... ANDALUSIA.PLAN4.wDR.OPT Date..11/09/04 13.56.10
------MICROPAS6v601- File-24576B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-
---------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area.. ..................... 3403 sf
Volume ........................... 37872 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
19966
-----------
7618
Glazing Conduction ...............
11620
9636
Glazing Solar ....................
Infiltration
n/a
18680
.....................
Internal Gain
22332
13234
....................
Ducts...
n/a
2915
.......................
5392
5208
Sensible Load ....................
59309
57291
Latent Load ......................
n/a
11458
Minimum Zone Load
-----------
59309
----- ------
68750
ZONE 12.ZONE'
Floor Area .......................
Volume
504 sf
...........................
5040 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5337
-----------
1771
Glazing Conduction ...............
Glazing Solar
1197
993
...................
Infiltration
n/a
1865
.....................
Internal Gain
2972
1761
....................
Ducts.......
n/a
137
.....................
951
653
Sensible Load ....................
10457
7180
Latent Load ......................
n/a
1436
Minimum Zone Load
-----------
10457
-----------
8616
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax)
Andalusia at Coral Mountain
Series 75 - Plan 5
HVAC SIZING Pa e'l HVAC
------------------------------
------------------------------------
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
Project Address........ PLAN 5 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
-----MICROPAS6v6- 01-File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-
----------------- ------------- ------- -----
-------
GENERAL INFORMATION
-------------------
Floor Area ................. 4314 sf
Volume.. .. ........... 46404 cf
Front Orientation.......... Front Facing 0 deg (N)
Sizing Location............ INDIO
Latitude....... .... 33.7 degrees
Winter Outside Design 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range. .. .. ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
--------------------------------
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
27570
-----------
9839
Glazing Conduction. ..............
12628
10472
Glazing Solar ....................
Infiltration
n/a
13989
.....................
Internal Gain
27363
16216
....................
Ducts.
n/a
3097
....................
Sensible Load
6756
5361
....................
Latent Load
74316
58973
......................
n/a
11795
-----------
Minimum Total Load
74316
-----------
70768
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 2 HVAC
--------------------------------------------------------
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
--------User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------- ------------ ------------- ------- -----
-------
HEATING AND COOLING LOAD SUMMARY BY ZONE
-------------------------------------
ZONE '1.ZONE'
Floor Area .......................
Volume...........................
3827 sf
41534 cf
Heating
Cooling
Description
-------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20611
-----------
7486
Glazing Conduction....:..........
11490
9528
Glazing Solar ....................
Infiltration
n/a
12167
.....................
Internal Gain
24491
14514 -
....................
Ducts
n/a
2982
............................
5659
4668
Sensible Load....................
62252
51345
Latent Load ......................
n/a
10269
Minimum Zone Load
-----------
62252
-----------
61614
i ZONE 12.ZONE'
Floor Area .......................
Volume
487 sf
...........................
4870 cf
'
r
Heating
Cooling
Description
---------------------------------
.(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6959
-- -------
2353
Glazing Conduction ...............
1137
943
Glazing Solar...... ............
Infiltration
n/a
1821
.....................
Internal Gain..
2872
1702
r Ducts
n/a
116
............................
1097
693
Sensible Load....................
12065
7628
Latent Load... .................
n/a
1526
Minimum Zone Load
-----------
12065
-----------
9153
HVAC SIZING Page 3 HVAC
---------------------------------------------------------------
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area .................
Volume..
4314 sf
.... ...........
Front Orientation..........
46404 cf
Front Facing
90 deg (E)
Sizing Location............
INDIO
Latitude ...............
Winter Outside Design......
33.7 degrees
29 F
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range............
30 F
Interior Shading Used......
No
Exterior Shading Used......
No
Overhang Shading Used......
No
Latent Load Fraction.......
0.20
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling
Description
----------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
----------------------
27570
9839
Glazing Conduction ...............
12628
10472
Glazing Solar ....................
Infiltration
n/a
21411
.....................
Internal Gain
27363
16216
....................
Ducts.
n/a
3097
....................
Sensible Load
6756
6103
....................
Latent Load ......................
74316
n/a
67137
13427
Minimum Total Load
----------------------
74316
80565
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 4 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.57:27
-----MICROPAS6v601--File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-
------------------ ------------- ------- -----
-------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area....................... 3827 sf
Volume ........................... 41534 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20611
-----------
7486
Glazing Conduction ...............
11490
9528
Glazing Solar.. ................
Infiltration
n/a
20227
.....................
Internal Gain
24491
14514
....................
Ducts
n/a
2982
............................
5659
5474
Sensible Load ....................
62252
60210
Latent Load ......................
n/a
12042.
-----------
Minimum Zone Load
62252
-----------
72253
ZONE '2.ZONE'
Floor Area ....................... 487 sf
Volume. ..... 4870 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6959
-----------
2353.
Glazing Conduction ...............
1137
943
Glazing Solar ....................
Infiltration
n/a
1184
.....................
InternalGain
2872
1702
....................
Ducts
n/a
116
............................
1097
630
Sensible Load.... ..............
12065
6927
Latent Load ......................
n/a
1385
Minimum Zone Load
-----------
12065
-----------
8312
HVAC SIZING Page 5 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
------------------------------------------------------------------------
GENERAL INFORMATION
Floor Area ................. 4314 sf
Volume.. .... ........... 46404 cf
Front Orientation.......... Front Facing
Sizing Location............ INDIO
Latitude ............... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range. .. .. ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating
Description
---------------------------------
(Btuh)
Opaque Conduction and Solar......
-----------
27570
Glazing Conduction ...............
12628
Glazing Solar ....................
n/a
Infiltration .....................
Internal Gain ....................
27363
n/a
Ducts..'
.. ...................
Sensible Load ....................
6756
74316
Latent Load ......................
n/a
-----------
Minimum Total Load
74316
180 deg (S)
Cooling
(Btuh),
9839
10472
11724
16216
3097
5135
56482
11296
67779
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 6 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.57.27
-_---MICROPAS6-v6.01 File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area .............. 3827 sf
Volume ........................... 41534 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20611
-----------
7486
Glazing Conduction ...............
11490
9528
Glazing Solar ....................
Infiltration
n/a
10033
.....................
Internal Gain...
24491
14514
.................
Ducts
n/a
2982
............................
5659
4454
Sensible Load ....................
62252
48997
Latent Load ......................
n/a
9799
-----------
Minimum Zone Load
62252
-----------
58796
ZONE '2.ZONE'
Floor Area ............... ....... 487 sf
Volume ........................... 4870 cf
Heating Cooling
Description (Btuh) (Btuh)
-------------------------------------------------------
Opaque Conduction and Solar...... 6959 2353
Glazing Conduction ............... 1137 943
Glazing Solar .................... n/a 1692
Infiltration ..................... 2872 1702
Internal Gain .................... n/a 116
Ducts ............................ 1097 680
Sensible Load.... .............. 12065 7485
Latent Load ...................... n/a 1497
----------------------
Minimum Zone Load 12065 8983
HVAC SIZING Page 7 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
MICROPAS6 v6.01 File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
-------User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
--------------------------------=------------------------------------
GENERAL INFORMATION
Floor Area................. 4314 sf
Volume.. ............ 46404 cf
Front Orientation.......... Front Facing 270 deg (W)
Sizing Location............ INDIO
Latitude ............. 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range... ..... ..... 30 F
Interior Shading Used...... No
Exterior Shading Used ...... .No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling
Description
--------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
27570
-----------
9839
Glazing Conduction ...............
12628
10472
Glazing Solar ....................
Infiltration
n/a
21407
.....................
Internal Gain...........
27363
16216
.......
Ducts.
n/a
3097
...................
Sensible Load
6756
6103
....................
Latent Load
74316
67134
......................
n/a
13427
Minimum Total Load
-----------
74316
--- --------
80560
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 8 HVAC
--------------------------------------- _______ ________ __HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:57:27
-MICROPAS6v6-01File-24580B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
----- -
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area ......................
Volume
3827 sf
...........................
41534 cf
Heating
Cooling
Description
---------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20611
-----------
7486
Glazing Conduction ...............
Glazing Solar
11490
9528
....................
Infiltration
n/a
29528
....................
Internal Gain
24491
14514
....................
Ducts
n/a
2982
............................
5659
5462
Sensible Load.........
62252
60084
Latent Load ......................
n/a
12017
Minimum Zone Load
-----------
62252
-----------
72100
ZONE 12.ZONE'
Floor Area ...................
487 sf
f Volume............. ............
4870 cf
Heating
Cooling
Description
------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6959
-----------
2353
Glazing Conduction ...............
Glazing Solar..........
1137
943
........
Infiltration.....................
n/a
1296
Internal -Gain
2872
1702
....................
Ducts
n/a
116
............................
1097
641
Sensible Load ....................
12065
7050
Latent Load............. .......
n/a
1410
Minimum Zone Load
12065
. 8460
Madlin-'s
enterprises
Catherine M. Madlin, Certified Enemy Analyst . 760-322-5004 / 323-3644 (fax) ... v v
vv
Andalusia at Coral Mountain
Series 75
Plan 5 - Lot 11 - Detached G.H.
HVAC SIZING
Page 1 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13.58:45
Project Address........ LOT 11 - PLAN 5 DET.GH___ _____________
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
----MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises. Run -LOT 11 REV PERMIT CALC
-
--------------------------------------------=----------------------
GENERAL INFORMATION
-------------------
FloorArea .................
Volume.. .. ............
Front Orientation..........
Sizing Location............
Latitude... .......
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range..... .....
Interior Shading Used......
Exterior Shading Used......
Overhang Shading Used......
Latent Load Fraction.......
4314 sf
46404 cf
Front Facing 0 deg (N)
INDIO
33.7 degrees
29 F
70 F
112 F
78 F
30 F
No
No
No
0.20
HEATING AND COOLING LOAD SUMMARY
--------------------------------
Heating Cooling
Description (Btuh) (Btuh)
Opaque Conduction and Solar......
27562
9832
Glazing Conduction ...............
12698
10530
Glazing Solar ....................
Infiltration
n/a
14126
.....................
Internal Gain
27363
16216
....................
Ducts.
n/a
3097
.............................
Sensible Load
6762
5380
....................
Latent Load
74384
59180
......................
n/a
11836
-----------
Minimum Total Load
74384
-----------
71017
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
Page 2 HVAC
Project Title.......... ANDALUSIA.PLAN.5
Date..11/09/04 13.58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program-HVAC
SIZING
-User#_MP0207 User-Madlin's Enterprises Run -LOT
----- -------------------------------------------------------------
11 REV PERMIT CALC
HEATING AND COOLING LOAD
----------------------------------------
SUMMARY BY
ZONE
ZONE '1.ZONE'
Floor Area .......................
Volume
3827 sf
.........................
41534 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
-----------
Opaque Conduction and Solar......
-----------
20611
7486
Glazing Conduction ...............
11560
9587
Glazing Solar ....................
Infiltration
n/a
12305
.....................
Internal Gain ....................
24491
n/a
14514
2982
Ducts ..............................
5666
4687
Sensible Load........... .......
62329
51560
Latent Load ......................
n/a
10312
Minimum Zone Load
-----------
62329
-----------
61872
ZONE 12.ZONE'
Floor Area .......................
Volume
487 sf
...........................
4870 cf.
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque_Conduction and Solar......
-----------
6951
-----------
2346
Glazing Conduction ...............
1137
943
Glazing Solar ....................
Infiltration
n/a
1821
..................
Internal Gain ....................
2872
n/a
1702
116
Ducts ............................
1096
693
Sensible Load.... ...... .......
12055
7621
Latent Load ......................
Minimum Zone Load
n/a 1524
----------------------
12055 9145
HVAC SIZING Page 3 HVAC
Project Title.......... ANDALUSIA.PLAN.S Date..11/09/04 13.58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program-HVAC SIZING
User#_MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
------
-------------------------------------------------------------
GENERAL INFORMATION
Floor Area ................. 4314 sf
Volume.. ... ........... 46404 cf
Front Orientation.......... Front Facing 90 deg (E)
Sizing Location............ INDIO
Latitude ................ 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range. ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
27562
-----------
9832
Glazing Conduction ...............
12698
10530
Glazing Solar ....................
Infiltration
n/a
21471
.....................
27363
16216
Internal Gain ....................
n/a
3097
Ducts ............................
Sensible Load
6762
6115
....................
74384
67260
Latent Load ......................
n/a
13452
-----------
Minimum'Total Load
74384
-----------
80712
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 4 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58:45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program-HVAC SIZING
User#_MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
-----
-----------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
i
ZONE '1.ZONE'
Floor Area ....................... 3827 sf
Volume........................... 41534 cf
Description
---------------------------------
Opaque Conduction and Solar......
Glazing Conduction ...............
Glazing Solar ....................
Infiltration .....................
InternalGain ....................
Ducts............................
Sensible Load ....................
Heating Cooling
(Btuh)
---------
(Btuh)
20611
-----------
7486
11560
9587
n/a
20287
24491
14514
n/a
2982
5666
5486
62329 60341
Latent Load ...................... n/a 12068
----------------------
Minimum Zone Load 62329 72409
ZONE '2.ZONE'
Floor Area ....................... 487 sf
Volume ........................... 4870 cf
Description
---------------------------------
Opaque Conduction and Solar......
Glazing Conduction ...............
Glazing Solar ....................
Infiltration .....................
InternalGain ....................
Ducts............................
Sensible Load ....................
Heating
Cooling
(Btuh)
-----------
(Btuh)
6951
-----------
2346
1137
943
n/a
1184
2872
1702
n/a
116
1096
629
12055 6920
Latent Load ...................... n/a 1384
----------------------
Minimum Zone Load . 12055 8304
HVAC SIZING Page 5 HVAC
Project Title.......... ANDALUSIA.PLAN.S Date..11/09/04 13:58.45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -LOT 11 REV PERMIT CALC
------
--------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area ................. 4314 sf
Volume. 46404 cf
Front Orientation.......... Front Facing 180 deg (S)
Sizing Location............ INDIO
Latitude .................. 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range.. ..... ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating Cooling
s Description. (Btuh) (Btuh)
-------------------------------------------------------
Opaque Conduction and Solar...... 27562 9832
Glazing Conduction ............... 12698 .10530
Glazing Solar .................... n/a 11862
Infiltration ..................... 27363 16216
Internal Gain .................... n/a 3097
Ducts. .................... 6762 5154
Sensible Load .................... 74384 56690
Latent Load... n/a 11338
----------------------
Minimum Total Load 74384 68028
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design 'temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
r,
HVAC SIZING
Page 6 HVAC
Project Title.......... ANDALUSIA.PLAN.5
Date..11/09/04 13:58:45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program-HVAC
SIZING
------User#_MP0207 User-Madlin's Enterprises Run -LOT
-------------------------------------------------------------
11 REV PERMIT CALC
HEATING AND COOLING LOAD
----------------------------------------
SUMMARY BY
ZONE
ZONE '1.ZONE'
Floor Area .......................
Volume
3827 sf
...........................
41,534 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20611
-----------
7486
Glazing Conduction........... ..
11560
9587
Glazing Solar ....................
Infiltration
n/a
10170
.....................
Internal Gain ....................
24491
n/a
14514
2982
Ducts ............................
5666
4474
Sensible Load......
62329
49212
Latent Load ......................
n/a
9842
Minimum Zone Load
-----------
62329
-----------
59054
ZONE 12.ZONE'
Floor Area .......................
Volume
487 sf
...........................
4870 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6951
-----------
2346
Glazing Conduction ...............
1137
943
Glazing Solar ....................
Infiltration
n/a
1692
.....................
Internal Gain ....................
2872
n/a
1702
116
Ducts ............................
1096
680
Sensible Load ....................
12055
7478
Latent Load ......................
n/a
1496
Minimum Zone Load
-----------
12055
-----------
8974
HVAC SIZING Page 7 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58:45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin s Enterprises Run -LOT 11 REV PERMIT CALC
------
----------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area... ....... 4314 sf
Volume.. .......46404 cf
Front Orientation.......... Front Facing 270 deg (W)
Sizing Location............ INDIO
Latitude ............... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range.. .. .. ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
--------------------------------
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
27562
-----------
9832
Glazing Conduction ...............
12698
10530
Glazing Solar ....................
Infiltration
n/a
21436
.....................
Internal Gain ....................
27363
n/a
16216
3097
Ducts. ...................
6762
6111
Sensible�Load ....................
74384
67221
Latent Load ......................
n/a
13444
- -----------
Minimum Total Load
74384
-----------
80666
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also 'be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
Page 8 HVAC
Project Title.......... ANDALUSIA.PLAN.5 Date..11/09/04 13:58:45
MICROPAS6 v6.01 File-24581B1 Wth-CTZ15S92 Pro ram-HVAC SIZING
-User#-MP0207 User-Madlin s Enterprises Run -LOT 11 REV PERMIT CALC
-----
----------------------------------------------------------------
HEATING AND ,COOLING LOAD
----------------------------------------
SUMMARY BY
ZONE
ZONE '1.ZONE'
Floor Area.......... ... .....
Volume
3827 sf
...........................
41534 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
20611
-----------
7486
Glazing Conduction ...............
11560
9587
Glazing Solar ....................
Infiltration
n/a
20140
.....................
Internal Gain
24491
14514
....................
Ducts
n/a
2982
............................
5666
5471
Sensible Load ....................
62329
60179
Latent Load ......................
n/a
12036
Minimum Zone Load
-----------
62329
-----------
72214
ZONE 12.ZONE'
Floor Area .....................
Volume
487 sf
...........................
4870 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6951
-----------
2346
Glazing Conduction ...............
Glazing Solar
1137
943
....................
Infiltration..
n/a
1296
.................
Internal Gain..
2872
1702
..................
Ducts
n/a
116
.............................
1096
640
Sensible Load ....................
12055
7043
Latent Load ......................
n/a
1409
Minimum Zone Load
-----------
12055
-----------
8451
Madlin-'s
enterprises
Catherine M. Madlin, Certified Energy Analyst • 760-322-5004 / 323-3644 (fax) ... v . v .
s
Andalusia at Coral Mountain
Series 75 - flan 6
HVAC SIZING Page 1 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
Project Address........ PLAN 6 ******* ---------------------
ANDALUSIA, LA QUINTA *v6.01*
Documentation Author... CATHERINE M. MADLIN ******* Building Permit
Madlin's Enterprises
P.O. Box 1443 Plan Check Date
Palm Springs, CA 92262
760-322-5004 Field C ec Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS6 v6.01 for 2001 Standards by Enercomp, Inc.
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
-----------------------------------------------------------------
GENERAL INFORMATION
Floor Area.................
5089 sf
Volume.. .. ....... ..
Front Orientation..........
54507 cf
Front Facing
0 deg (N)
Sizing Location............
INDIO
Latitude ....... ........
Winter Outside Design
33.7 degrees
29 F
` Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range. .. .. .....
30 F
Interior Shading Used......
No
Exterior Shading Used......
No
• Overhang Shading Used......
No
Latent Load Fraction.......
0.20
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling'
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
----------------------
31000
11269
Glazing Conduction ...............
15441
12805
Y Glazing Solar ....................
Infiltration
n/a
21096
.....................
Internal Gain
32141
19048
....................
Ducts
n/a
3097
-6731
............................
Sensible Load ....................
7858
86440
74046
Latent Load ......................
n/a
14809
Minimum Total Load
----------------------
86440
88855
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc.., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
Page 2 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area ....................... 4526 sf
Volume ........................... 48877 cf
Heating
Cooling
Description
-------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25012
-----------
9183
Glazing Conduction ...............
13899
11526
Glazing Solar ....................
Infiltration
n/a
18079
.....................
Internal Gain
28821
17080
....................
Ducts
n/a
2982
............................
6773
5885
Sensible Load ....................
74505
64734
Latent Load ......................
n/a
12947
Minimum Zone Load
-----------
74505
-----------
77681
ZONE 12.ZONE'
Floor Area .......................
Volume
563 sf
...........................
5630 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5988
-----------
2087
Glazing Conduction ...............
1542
1279
Glazing Solar ....................
Infiltration
n/a
3016
.....................
Internal Gain
3320
1967
....................
Ducts
n/a
116
............................
1085
847
Sensible Load... ...............
11936
9312
Latent Load ......................
n/a
1862
Minimum Zone Load
-----------
11936
-----------
11174
HVAC SIZING Page 3 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10:17:04
MICROPAS6v6-01File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
----- -
---------------------------------------------------------
GENERAL INFORMATION
Floor Area ................ 5089 sf
Volume. ......54507 cf
Front Orientation.......... Front Facing 90 deg (E)
Sizing Location............ INDIO
Latitude......... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range. ..... 30 F
Interior Shading.Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating Cooling
Description Btuh Btuh
----------------------------------------------
Opaque Conduction and Solar...... 31000 11269
Glazing Conduction.. .............. 15441 12805
Glazing Solar .................... n/a 21307
Infiltration.......... ......... 32141 19048
Internal Gain ......... .:.......... n/a 3097
Ducts. .7858 6753
SensibleLoad...... 86440 74279
Latent Load......... ............. n/a 14856
----------------------
Minimum Total Load 86440 .89135
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
9
HVAC SIZING Page 4 HVAC
---------------------------------------
__________________________
Project Title.......... ANDALUSIA.PLAN.6-------Date__11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
-User#_MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-------
-------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area.. .............4526 sf
Volume ........................... 48877 cf
Heating
Cooling
Description
-----------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25012
-----------
9183
Glazing Conduction ...............
Glazing Solar......
13899
11526
..............
Infiltration
n/a
20177
.....................
Internal Gain....... ....................
28821
17080
Ducts
n/a
2982
................ ..........
6773
6095
Sensible Load ....................
74505
67041
Latent Load......... .............
n/a
13408
Minimum Zone Load
-----------
74505
-----------
80450
ZONE 12.ZONE'
Floor Area ...................
Volume...........................
563 sf
5630 cf
Heating
Cooling
Description
-----------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5988
-----------
2087
Glazing Conduction ...............
Glazing Solar
1542
1279
....................
Infiltration......................
n/a
1131
Internal Gain ....................
3320
1967
Ducts......
n/a
116
.. .............
1085
658
Sensible Load ....................
11936
7237
Latent Load ......................
n/a
1447
Minimum Zone Load
-----------
11936
-----------
8685
HVAC SIZING Page 5 HVAC
-------------------------------
Project Title.......... ANDALUSIA.PLAN.6---_------Date..11/10/04 10:17:04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
-User#-MP0207 User-Madlin s Enterprises Run -REVISED PERMIT CALC
-------
-------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area ................. 5089 sf
Volume.. 54507 cf
Front Orientation.......... Front Facing 180 deg (S)
Sizing Location............ INDIO
Latitude......... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range.. ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING
LOAD SUMMARY
--------------
Heating
Cooling
Description
----------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
31000
-----------
11269
Glazing Conduction ...............
15441
12805
Glazing Solar ....................
Infiltration
n/a
19303
....................
Internal Gain ....................
32141
0 1948
Ducts............................
n41
048
97
Sensible Load
7858
6552
....................
Latent Load ......................
86440
.72074
n/a
14415
Minimum Total Load
-----------
86440
-----------
86488
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 6 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10.17:04
------MICROPAS6-v601 File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
---------------------.-------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
.............. s
Floor Area.........4526 f
Volume..... .. 48877 cf
Heating Cooling
Description (Btuh) (Btuh)
----------------------------------- -----------
Opaque Conduction and Solar...... 25012 9183
Glazing Conduction ............... 13899 11526
Glazing Solar .................... n/a 16286
Infiltration ..................... 28821 17080
Internal Gain .................... n/a 2982
Ducts ............................ 6773 5706
Sensible Load.................... 74505 62762
Latent Load ...................... n/a 12552
----------------------
Minimum Zone Load 74505 75314
ZONE 12.ZONE'
Floor Area ................... 563 sf
Volume........................... 5630 cf
Heating Cooling
Description (Btuh) (Btuh)
---------------------------------------------
Opaque Conduction and Solar...... 5988 2087
Glazing Conduction ............... 1542 1279
Glazing Solar .................... n/a 3016
Infiltration ..................... 3320 1967
Internal Gain .................... n/a 116
Ducts ............................ 1085 847
Sensible Load .................... 11936 9312
Latent Load ...................... n/a 1862
----------------------
Minimum Zone Load 11936 11174
Heating Cooling
Description (Btuh) (Btuh)
---------------------------------------------
Opaque Conduction and Solar...... 5988 2087
Glazing Conduction ............... 1542 1279
Glazing Solar .................... n/a 3016
Infiltration ..................... 3320 1967
Internal Gain .................... n/a 116
Ducts ............................ 1085 847
Sensible Load .................... 11936 9312
Latent Load ...................... n/a 1862
----------------------
Minimum Zone Load 11936 11174
HVAC SIZING Page 7 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10.17.04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
--------User#_MP0207 User-Madlin's Enterprises .Run -REVISED PERMIT CALC
-----------------------------------------------------------
GENERAL INFORMATION
Floor Area ................. 5089 sf
Volume.. .... ............ 54507 cf
Front Orientation.......... Front Facing
Sizing Location............ INDIO
Latitude ............. 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range.. .. . 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
Heating
Description
---------------------------------
(Btuh)
Opaque Conduction and Solar......
-----------
31000
Glazing Conduction ...............
15441
Glazing Solar ....................
Infiltration
n/a
.....................
Internal Gain
32141
....................
Ducts.
n/a
....................
Sensible Load ....................
7858
86440
Latent Load ......................
n/a
Minimum Total Load
86440
270 deg (W)
Cooling
(Btuh)
11269
12805
22370
19048
3097
6859
75448
15090
90538
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 8 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/10/04 10.17.04
MICROPAS6 v6.01 File-24585B2 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -REVISED PERMIT CALC
-----
--------------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area............ .........
4526 sf
Volume.. .......................
48877 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25012
-----------
9183
Glazing Conduction ...............
13899
11526
Glazing Solar ....................
Infiltration
n/a
21559
.....................
Internal Gain..
28821
17080
..................
Ducts
n/a
2982
............................
6773
6233
Sensible Load ....................
74505
68562
Latent Load ......................
n/a
13712
Minimum Zone Load
-----------
74505
-----------
82274
ZONE 12.ZONE'
Floor Area .......................
Volume
563 sf
...........................
5630 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
5988
-----------
2087
Glazing Conduction ...............
1542
1279
Glazing Solar ....................
Infiltration
n/a
811
.....................
Internal Gain ....................
3320
1967
Ducts
n/a
116
............................
1085
626
Sensible Load .................... 11936 6886
Latent Load..... ............... n/a 1377
----------------------
Minimum Zone Load 11936 8263
Madlin 's
enterprises
Catherine M. Ma.dlin, Certified EnerV Analyst v 760-322-5004 / 323-3644 (fax) . V . T T V T
Andalusia at Coral Mountain
Series 75
Plan 6 Lots I & 10 - Detached G.H.
HVAC SIZING
Page 1
HVAC
Project Title..........
ANDALUSIA.PLAN.6
Date..11/09/04
14:01:27
Project Address........
LOTS 1 & 10 PLAN 6
******* ---------------------
ANDALUSIA, LA QUINTA
*v6.01*
Documentation Author...
CATHERINE M. MADLIN
*******
Building Permit
Madlin's Enterprises
P.O. Box 1443
Plan Check
Date
Palm Springs, CA 92262
Climate Zone...........
760-322-5004
15
Field C ec
Date
Compliance Method......
MICROPAS6 v6.01 for 2001
Standards by Enercomp,
Inc.
MICROPAS6 v6.01
File-24586B1 Wth-CTZ15S92
Program-HVAC SIZING
User#-MP0207 User-Madlin's
----- -----------------------------------------------------------------------
Enterprises Run
-LOTS 1 & 10 REV. PERMIT
GENERAL INFORMATION
-------------------
Floor Area ................. 5099 sf
Volume.. .. 54407 cf
Front Orientation.......... Front Facing 0 deg (N)
Sizing Location.........:.. INDIO
Latitude... .... ....... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range.. ... ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
i HEATING AND COOLING LOAD SUMMARY
--------------------------------
Heating
Description (Btuh)
--------------------------------------------
Opaque Conduction and Solar...... 32233
Glazing Conduction ............... 15616
Glazing Solar ................... n/a
Infiltration ..................... 32082
Internal Gain .................... n/a
Ducts............................ 7993
Sensible Load .................... 87924
LatentLoad ...................... n/a
Minimum Total Load 87924
Cooling
(Btuh)
11653
12950
21166
19013
3097
6788
74666
14933
89600
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
Page 2 HVAC
Project Title.......... ANDALUSIA.PLAN.6
Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -LOTS
----- ----------------------------------------------------------------------
1 & 10 REV. PERMIT
HEATING AND COOLING LOAD
----------------------------------------
SUMMARY BY
ZONE
ZONE '1.ZONE'
FloorArea .......................
Volume
4546 sf
...........................
48877 cf
Heating
Cooling
l Description
---------------------------------
(Btuh)
(Btuh)
; Opaque Conduction and Solar......
-----------
25632
-----------
9374
Glazing Conduction ...............
14074
11671
Glazing Solar ....................
Infiltration
n/a
18150
..................
Internal Gain ....................
28821
n/a
17080
2982
Ducts ............................
6853
5926
Sensible Load ....................
75379
65182
Latent Load ......................
n/a
13036
Minimum Zone Load
-----------
75379
-----------
78219
ZONE 12.ZONE'
t
Floor Area.. ............. .......
Volume....
553 sf
........ ...........
5530 cf
Heating
Cooling
Description
--------------------
(Btuh)
(Btuh).
Opaque Conduction and Solar......
-----------
6601
-----------
2279
Glazing Conduction ...............
1542
1279
Glazing Solar ....................
Infiltration..........
n/a
'3016
.........
Internal Gain ....................
3261
n/a
1932
116
Ducts .............................
1140
862
Sensible Load ....................
12545
9484
Latent Load., ......................
n/a
1897
Minimum Zone Load
-----------
12545
-----------
11381
HVAC SIZING Page 3 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.01.27
MICROPAS6v6�01--File-24586B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin s Enterprises Run -LOTS 1 & 10 REV. PERMIT
----- -
--------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area .................
Volume..
5099 sf
.... ...........
Front Orientation..........
54407 cf
Front Facing
90 deg (E)
Sizing Location............
INDIO
Latitude............
Winter Outside Design......
33.7 degrees
29 F
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range. ..... .....
Interior Shading Used......
30 F
No
Exterior Shading Used......
No
Overhang Shading Used......
No
Latent Load Fraction.......
0.20
HEATING AND COOLING
--------------------------------
LOAD SUMMARY
Heating
Cooling
Description
----------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
----------------------
32233
11653
Glazing Conduction ...............
Glazing Solar
15616
12950
....................
Infiltration
n/a
21650
.....................
Internal Gain
32082
19013
....................
Ducts.
n/a
3097
....................
Sensible Load.
7993
6836
....................
Latent Load
87924
75199
......................
n/a
15040
Minimum Total Load
----------------------
87924
90239
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 4 HVAC
--------------------------------------- ------------------------------------
________________________________
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.01.27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program-HVAC SIZING
-User#-MP0207 User-Madlin s Enterprises Run -LOTS 1 & 10 REV. PERMIT
-----
-----------------------------------------------------
HEATING AND COOLING LOAD
----------------------------------------
SUMMARY BY
ZONE
ZONE '1.ZONE'
Floor Area .......................
Volume
4546 sf
...........................
48877 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25632
-----------
9374
Glazing Conduction ...............
Glazing Solar
14074
11671
....................
Infiltration
n/a
20519
..................
Internal Gain
28821
17080
....................
Ducts
n/a
2982
............................
6853
6163
Sensible Load ... ................
75379
67789
Latent Load ......................
n/a
13558
Minimum Zone Load
-----------
75379
-----------
81347
ZONE 12.ZONE'
Floor Area .....................
Volume...........................
553 sf
5530 cf
Heating
Cooling
Description
---------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6601
-----------
2279
Glazing Conduction...............
Glazing Solar.....
1542
1279
.............
Infiltration
n/a
1131
.....................
Internal Gain........
3261
1932
..........
Ducts
n/a
116
............................
1140
674
Sensible Load ....................
12545
7410
Latent Load ......................
n/a
1482
Minimum Zone Load
-----------
12545
-----------
8892
HVAC SIZING Page 5 HVAC
------------------------------------------
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
----- I
--------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area .................
Volume..
5099 sf
.... ...........
Front Orientation..........
54407 cf
Front Facing
180 deg (S)
Sizing Location............
INDIO
Latitude....... .....
Winter Outside Design
33.7 degrees
29 F
......
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range.. ..... .....
30 F
Interior Shading Used......
No
Exterior Shading Used......
No
Overhang Shading Used......
No
Latent Load Fraction........
0.20
HEATING AND COOLING
LOAD SUMMARY
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
----------------------
32233
11653
Glazing Conduction ...............
Glazing Solar
15616
12950
....................
Infiltration
n/a
19453
.....................
Internal Gain
32082
19013
....................
Ducts.
n/a
3097
....................
+ Sensible Load
7993
6617
....................
Latent Load
87924
72782
......................
n/a
14556
Minimum Total Load
----------------------
87924
87338
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. - It is the HVAC designer's responsibility to consider all
factors when selecting.the HVAC equipment.
i
HVAC SIZING Page 6 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14.01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
---------------------------------------------------------------
HEATING AND COOLING LOAD
----------------------------------------
SUMMARY BY
ZONE
ZONE '1.ZONE'
FloorArea .......................
Volume
4546 sf
...........................
48877 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25632
-----------
9374
Glazing Conduction ...............
Glazing Solar
14074
11671
....................
Infiltration
n/a
16436
....................
Internal Gain
28821
17080
....................
Ducts
n/a
2982
............................
6853
5754
Sensible Load ....................
75379
63298
Latent Load ......................
n/a
12660
Minimum Zone Load
-----------
75379
-----------
75957
ZONE 12.ZONE'
Floor Area ......................
Volume
553 sf
...........................
5530 cf
Heating
Cooling
Description
------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6601
-----------
2279
Glazing Conduction.. .............
Glazing Solar
1542
1279
....................
Infiltration
n/a
3016
.....................
Internal Gain
3261
1932
....................
Ducts
n/a
116
116
............................
1140
862
Sensible Load ....................
12545
9484
Latent Load ......................
n/a
1897
Minimum Zone Load
-----------
12545
-----------
11381
HVAC SIZING Page 7 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
----------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area ................. 5099 sf
Volume.. .... ........... 54407 cf
Front Orientation.......... Front Facing 270 deg (W)
Sizing Location............ INDIO
Latitude... .... ....... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range.. .. ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
--------------------------------
Description
---------------------------------
Opaque Conduction and Solar......
Glazing Conduction...........
Glazing Solar ....................
Infiltration .....................
Internal Gain ....................
Ducts. ... ...................
Sensible Load ....................
Latent Load ......................
Heating
(Btuh)
32233
15616
n/a
32082
n/a
7993
87924
n/a
Cooling
(Btuh)
11653
12950
22713
19013
3097
6943
76368
15274
----------------------
Minimum Total Load 87924 91642
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 8 HVAC
--------------------------------------- Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:01:27
MICROPAS6 v6.01 File-24586B1 Wth-CTZ15S92 Program-HVAC SIZING
-User#-MP0207 User-Madlin's Enterprises Run -LOTS 1 & 10 REV. PERMIT
-----
--------------------------------------------------------------
HEATING AND COOLING LOAD SUMMARY BY ZONE
----------------------------------------
ZONE '1.ZONE'
Floor Area ..................... 4546 sf
Volume ........................... 48877 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25632
-----------
9374
Glazing Conduction ...............
14074
11671
Glazing Solar ....................
Infiltration
n/a
21902
.....................
Internal Gain
28821
17080
....................
Ducts
n/a
2982
.............. .......... .
6853
6301
Sensible Load.................... 75379 69309
Latent Load ...................... n/a 13862
----------------------
Minimum Zone Load 75379 83171
ZONE 12.ZONE'
Floor Area.. .................. 553 sf
Volume........................... 5530 cf
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
6601
-----------
2279
Glazing Conduction ...............
1542
1279
Glazing Solar ....................
n/a
811
Infiltration .....................
Internal Gain
3261
1932
.................... .
Ducts
n/a
116
............................
114.0
642
Sensible Load .................... 12545 7059
Latent Load ...................... n/a 1412
----------------------
Minimum Zone Load 12545 8470
Madlin -s
enterprzses
Calherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax) ..... v .
Andalusia at Coral Mountain
Series 75
Plan 6 - Lot 4 - No Guest House
HVAC SIZING
Page 1
HVAC
Project Title..........
ANDALUSIA.PLAN.6
Date..11/09/04
14:02:27
Project Address........
LOT 4 PLAN 6 w/o GH
*******_____________________
ANDALUSIA, LA QUINTA
*v6.01*
Documentation Author...
CATHERINE M. MADLIN
*******
Building Permit
Madlin's Enterprises
P.O. Box 1443
Plan Check
Date
Palm Springs, CA 92262
Climate Zone..... .....
760-322-5004
15
_____________
Field C ec
Date
--------
Compliance Method......
MICROPAS6 v6.01 for 2001
Standards by Enercom
Inc
---------------------------------------------------------------------Pl--------
--------------------------------------------------------------
-----------
-----MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
F------------------------------------------------------------------------
GENERAL INFORMATION
--------------
Floor Area .................
Volume. .... ...........
Front Orientation..........
Sizing Location............
Latitude... .... ........
Winter Outside Design ......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range.. .. .....
Interior Shading Used......
Exterior Shading Used......
Overhang Shading Used......
Latent Load Fraction.......
4526 sf
48877 cf
Front Facing 0 deg (N)
INDIO
33.7 degrees
29 F
70 F
112 F
78 F
30 F
No
No
No
0.20
HEATING AND COOLING LOAD SUMMARY
--------------------------------
Heating
1 Description (Btuh)
--------------------------------------------
1 Opaque Conduction and Solar......
i Glazing Conduction ................
Glazing Solar ....................
Infiltration ..................
Internal Gain..
Ducts. ...................
Sensible Load ....................
LatentLoad......................
i
Minimum Total Load
25618
14039
n/a
28821
n/a
6848
75325
n/a
Cooling
(Btuh)
9367
11642
18245
17080
3350
5968
65652
13130
75325 78783
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil `sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING
Page 2 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program-HVAC SIZING
------User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
---------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area ................. 4526 sf
Volume.. ........... 48877 cf
Front Orientation.......... Front Facing 90 deg (E)
Sizing Location............ INDIO
Latitude ............. 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
Summer Inside Design....... 78 F
Summer Range........ ..... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No
Overhang Shading Used...... No
Latent Load.Fraction....... 0.20
HEATING AND COOLING LOAD SUMMARY
--------------------------------
Description
---------------------------------
Opaque Conduction and Solar......
Glazing Conduction ..............
Glazing Solar ....................
Infiltration .....................
Internal Gain ....................
Ducts. ...................
Sensible Load............ ......
Latent Load ......................
Heating
(Btuh)
25618
14039
n/a
28821
n/a
6848
75325
n/a
Cooling
(Btuh)
9367
11642
20374
17080
3350
6181
67995
13599
----------------------
Minimum Total Load 75325 81594
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 3 HVAC
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program-HVAC SIZING
User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
-----
--------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area ................. 4526 sf
Volume.. .. ............ 48877 cf
Front Orientation.......... Front Facing 180 deg (S)
Sizing Location............ INDIO
Latitude.... 33.7 degrees
Winter Outside Design...... 29 F
Winter Inside Design....... 70 F
Summer Outside Design...... 112 F
! Summer Inside Design....... 78 F
Summer Range. ... 30 F
Interior Shading Used...... No
Exterior Shading Used...... No '
Overhang Shading Used...... No
Latent Load Fraction....... 0.20
t HEATING AND COOLING LOAD SUMMARY
--------------------------------
Heating Cooling
Description (Btuh) (Btuh)
----------- --------------------------------------------
Opaque Conduction and Solar...... 25618 9367
G Glazing Conduction ............... 14039 11642
Glazing Solar .................... n/a 16483
Infiltration ..................... 28821 17080
Internal Gain.. n/a 3350
. r. Ducts 6848 5792
Sensible Load .................... 75325 63715
Latent Load ............... n/a 12743
- - - - - - - - - - - - - - - - - - - -
Minimum Total Load 75325 76458
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
HVAC SIZING Page 4 HVAC
---------------------- -------------------------------------
----------------------------------------
Project Title.......... ANDALUSIA.PLAN.6 Date..11/09/04 14:02:27
MICROPAS6 v6.01 File-24587B1 Wth-CTZ15S92 Program-HVAC SIZING
------User#-MP0207 User-Madlin's Enterprises Run -LOT 4 REV PERMIT CALC
--------------------------------------------------------------------
GENERAL INFORMATION
-------------------
Floor Area. ........ ........
4526
sf
Volume.. .... ... .......
Front Orientation..........
48877
Front
cf
Facing
Sizing Location............
INDIO
Latitude............
Winter Outside Design......
33.7
29 F
degrees
Winter Inside Design.......
70 F
Summer Outside Design......
112 F
Summer Inside Design.......
78 F
Summer Range...... .....
30 F
Interior Shading Used......
No
Exterior Shading Used......
No
Overhang Shading Used......
No
Latent Load Fraction.......
0.20
HEATING AND COOLING LOAD SUMMARY
270 deg (W)
Heating
Cooling
Description
---------------------------------
(Btuh)
(Btuh)
Opaque Conduction and Solar......
-----------
25618
-----------
9367
Glazing Conduction ...............
14039
11642
Glazing Solar ....................
Infiltration
n/a
21724
.....................
Internal Gain
28821
17080
....................
Ducts
n/a
3350
............................
Sensible Load.........
6848
6316
.........
Latent Load
75325
69480
......................
n/a
13896
-----------
Minimum Total Load
75325
-----------
83376
Note: The loads shown are only one of the criteria affecting the selection
of HVAC equipment. Other relevant design factors such as air flow
requirements, outside air, outdoor design temperatures, coil sizing,
availability of equipment, oversizing safety margin, etc., must also be
considered. It is the HVAC designer's responsibility to consider all
factors when selecting the HVAC equipment.
�l
a d1in s
9
en terpmes
Catherine M. Madlin, Certified Energy Analyst v 760-322-5004 / 323-3644 (fax) .... .
e
V
G
0
0
a
Addendums and Notes
v
0
a
Madlin s
en terprises
Catherine M. Madlin, Certified Energy Analyst • 760-322-5004 / 323-3644 (fax) .......
Title 24 Building Energy Efficiency Standards Residential Manual Excerpt
RADIANT BARRIERS
Introduction
A radiant barri
heat. Aluminui
Installation of
although they
of radiant
material.
season,
The Commission has approved an energy credit for radiant barriers meeting specific eligibility
and installation -criteria.
The radiant barrier energy credit is an adjustment to the ceiling U-value when the ceiling is
adjacent to an attic with a radiant barrier. The credit is automatically applied by modeling a.
radiant barrier in an approved computer program with this optional capability.
Construction
Below are the parameters for receiving credit for a radiant barrier, including criteria for the,'
installation, ventilation and material, all of which contribute to the performance of the radiant
barrier.
Installation
Installation must be in conformance with ASTM C-1158-97 (Standard Practice for Use and
Installation of Radiant Barrier Systems (RBS) in Building Construction.), ASTM C-727-
90(1996)e1 (Standard Practice for Installation and Use of Reflective Insulation in Building
ConstrluctiorT.), ASTM CT313-975 (Standard Specification for Sheet radiant Barriers for
Building `Construction Appli g ations), and ASTM C-1224-99 (Standard Specification for
Reflective Insuja$i�yfor Buiidinq Applications and the radiant barrier must be securely i stalled
in a perm
Radiarht I
memoos,
t "i d t a is oo /�
rs (op c o ds ny - ov rig
1. Draped over the truss/rafter ( the top chord) before the upper roof deck is installed.
2. Spanning between the truss/rafters (top chords) and secured (stapled) to each side.
3. Secured (stapled) to the bottom surface of the truss/rafter (top chord). A minimum air
space must be maintained between the top surface of the radiant barrier and roof decking
of not less than 1.5 inches at the center of the truss/rafter span.
• P.O. Box 1443 v Palm Springs, Ca 92263-1443 • E-mail. Cmadlin@aol.com •
Madlin's Enterprises — Addendums & Notes
4. Attached [laminated] directly to the underside of the roof decking. The radiant barrier must
be laminated and perforated by the manufacturer to allow moisture/vapor transfer through
the roof deck.
The radiant barrier must be installed to cover all gable end walls and other vertical surfaces in
the attic. ,
Ventilation
'The attic must be eE ntila ed to:
/ AJJ U
1. Conform to m ufa�tOrer ssi t'str ictiorTs-
2. Provide a rrJi im �n freg entilatior� area o n t less tha ne square foot f ent area for
each 150 sp are eetlaf atticfloor'arEa� U
3. Provide no less than 30 percent upper vents. (Ridge vents or gable end vents are
recommended to achieve the best performance. The material should be cut to allow for full
air flow to the venting.)
The radiant barrier (except for radiant barriers laminated directly to the roq.deck) must be
installed to:
1. Have a minimum gap of 3.5 inches between the bottom of the radiant barrier and the top of
the ceiling insulation to allow ventilation air to flow between the roof decking and the top -
surface of the radiant barrier.
2. Have a minimum of six (6) inches (measured horizontally) left at the roof peak to allow hot
air to escape from the air space between the roof decking and the top surface of the radiant
barrier.
When installed in enclosed rafter spaces where ceilings are applied directly to the underside of
roof rafiterrs,—�a minimum air space of 1 inch must be provided between the radiant barrier and
the top f the ceiling insulaation, and ventilation must be provided'for each rafter space. Vents
must qe proved at b h the 'Upp er-andjov ncisof-t a E nclosed-rafter-space-
Emissivi
�J
The emissivity of the radiant barrier must bp less than or equal to 0.05as tested in
accordance with ASTM C-1371-98 or AST JE408-7(1996)e1.
• The product must meet all requirements for California certified insulation material [radiant
barriers] of the Department of Consumer Affairs, Bureau of Home Furnishings and
Thermal Insulation.
y
.� Madlin's Enterprises Addendums & Notes
v . Note: Aluminum will deteriorate or corrode in the presence of alkaline materials. Unless the
aluminum foil is protected by waterproofed paper or plastic coating, keep it from coming into
direct contact with anything alkaline, such as masonry surfaces.
Inspection
If a radiant barrier was used for compliance credit, check the installation guidelines provided
above for the builder. Especially'critical are the ventilation and air space requirements that
enable the radiant barrier to perform as expected.
,
Iv-CCEC Title 24 Fesiden gal Pesig anuI I 001 ol at
v
Figure 3-2: Methods ' or n§tallat'o for R iant Barr,%r's } ' }
j
_.r . r .:fir s,_, • � ' r
t
�J.
+[ n
f
t
I•
'V
- �
_ '
• is
`y
JL
Madlin's
enterprises
Catherine M. Madlin, Certified Energy Analyst . 760-322-5004 / 323-3644 (fax) .......
Title 24 Building Energy Efficiency Standards Residential Manual Excerpt
THERMOSTATIC EXPANSION VALVES
Thermostatic expansion valves (TXVs) or an equivalent alternative approved by the
Commission are required for split system central air conditioners in some compliance methods
and calculations. I,,f TXVs, are required for compliance flgld verification (usual confirmation) by a
certified HERS rater i's;lr)equired.
j, i 'i %( 1, V /...-....y 4 /r•__-'\,l i ,.-.... I-_"�..wti\ f
HERS Raters
Approved HERS-faters conduct -the -fie ldwerification diaghostic testing and inspections, and
provide Certificate of Field Verification and Diagnostic Testing (CF-4R) forms or notification that
corrective actions are needed. HERS raters must be independent of both the builder and sub-
contractor who installed the duct systems being field verified, and can have no financial interest
in making corrections to the systems. As special inspectors HERS raters can not be employed
by subcontractors or parties, other than the builder, whose work they are evaluating.
Building Departments
Building departments consider approved HERS raters to be special inspectors. HERS raters
must demonstrate competence, to the satisfaction of the building official, for the visual
inspections and diagnostic testing. The building department, at its discretion, may require field
verification testing and inspection to be conducted in conjunction with the building department's
required inspections, and/or observe installer diagnostic testing and HERS rater verification in
conjunction with the building department's required inspections to corroborate the results
documented in installer certifications, and in the Certificate of Field Verification and Diagnostic
Testing (CF-4R).
I
3 I i r it ��'r, W 1' j i r ''f `r✓ / \(\\
LJ
4
i
• P.O. Box 1443 • Palm Springs, Ca 92263-1443 v E-mail: Cmadlin@aol.com v
Madlin s
9
en terprises
Catherine M. Madlin, Certified Energy Analyst . 760-322-5004 / 323-3644 (fax) ....' ...
o e
� 9
p �
'
O
Manufacturer's Specifications
Resistance Factor ( ) of
CO2,rnpon Esuifding Materials, ,sir Spaces and Films
L
2uiL4' inq Bnaed
rm-value
Gypsum Board
1/2"
0.45
5/8"
0.56
Plywood
1/4"
0.31
„
3/8"
0.47
1/2"
0.62
3/4"
0.94
Hardboard, Underlayment
1/4"
0.31
1"
1.24
► u-iiding Paper
Permeable Felt, 151b.
0.06
Plastic Film
Neg
Concrete blocks, three oval cores
Cinder aggregate
4"thick
1.11
12" thick
1.89
8" thick
1.72
Sand and Gravel Aggregate
8" thick
1.11
Lightweight Aggregate
8" thick
2.00
4° thick
1.50
Gypsum Mortar or Plaster
1/4"
0.05.
1/2"
0.10
1"
0.20
Gypsum Plaster (Perlite)
1"
0.64
Gypsum Plaster (Vermiculite)
1°
0.59
Brick, per inch
0.20
Fake brick, per inch
0.11
Stucco, per inch
0.20
Roofing Viateariais
Asbestos Cement Shingles
0.21
Asphalt Roll Roofing
0.15
Asphalt Shingles
0.44
Built Up Roofing
3/8'
0.33
Wood Shingles
0.94
.Siding tNlaterials -
Asbestos Cement, 1/4" thick lapped
0.21
Asphalt
0.15
Wood Shingle, 16"x7.5' Exposure
0.87
Double with 12" Exposure
1.19
Wood Drop Siding, 1 °x8"
0.77
Wood Bevel Siding, .5"x8" (lapped)
0.81
Wood Bevel Siding, .3/4"x10° (lapped)
1.05
Wood Plywood, .3/8" (lapped)
0.59
Structural Glass
0.10
Insulation Materia.s
�i-valeae
Insulation Board -
FALCON FOAM, @ Type 1/75-F
3.90
FALCON FOAM, @ Type VIII/75•F
4. 0
FALCON FOAM, @ Type I1/75"F
4.40
FALCON FOAM, @ Type IX/75"F
4.40
Extruded Polystyrene @ 75"F
5.00
Polyurethane/Polyisocyanurate
Aged @ 75•F
5.60
Insulation batts:blankets
Mineral Wool Per Inch/75•F
3.66
Insulation Loose Fill
FALCON FOAM,
3.40
Cellulosic/Inch
3.1-3.7
Perlite, Expanded/Inch
2.2-2.9
Vermiculite, exfoliated/inch
2.1-2.3
Air S.p2cec (214'j
.
Heat Flow Up
Non -reflective
0.75 (Summer)
0.87 (Winter)
Reflective, one surface
2.22 (Summer)
2.21 (Winter)
Heat Flow Down
Non -reflective
0.85 (Summer)
1.02 (Winter)
Reflective, one surface
3.29 (Summer)
3.59 (Winter)
Heat Flow Horizontal
Non -reflective
0.84 (Summer)
1.01 (Winter)
Reflective, one surface
3.24 (Summer)
3.46 (Winter)
Surface Air t~iir-ss, Inside (Still Air) .
Heat Flow Up
(through a horizontal surface)
Non -reflective
0.61
Reflective
1.32
Heat Flow Down
(through a horizontal surface)
Non -reflective
0.92
Reflective
4.55
Heat Flow Horizontal
(through a vertical surface)
Non -reflective
0.68
F;Aaving Air Surfaces
Any Position or Direction
15 MPH Wind (Winter)
0.17
7.5 MPH Wind (Summer)
0.25
� c.
L ` Falcon Foamy Y
Andersen®
Center of Glass Performance Data
Dual -Pane Glass
Visible
{
+
°
Inside
Surface
(Air filled
Li t
I SC'
SHGC'
RHG`
Fading
I Tuvs Tdw°
I
j %HR Glass
I_ U-Factor';@center` j Temp9
Casement/Awning, Tilt•Wash,
_
--
Woodwright, Nan•oline° Transom
-- -
83°h
r 0.92 j
0.79 J
191
62% I
°
64/0
0.50
I
41%
°
45 F
Fixed (Picture Windows)_
82%
0.90 j
0.77
-
187
I 57% I
60%
j 0 49
j 41%
46°F
Circle Top'"
---- p--
83%
---
0.92 1
0.79
191
I --.o
62% I
65%
0.49
; 41%
°_
I 45 F
Perma•Shield°
-
Narroline° Gliding Patio Door
Fleldhame° Arch To S
82%
0.87
0.75�
181
i 54% I
r '---7
58%
I 0.49
' -----
j 42%
j 46°F
n
Pr P ngline'"
L 80°6
0.82
0.71
172
1 47% 1
53%
! 0.48
42%
-_.
46°F
High -Performance"
Low-E Glass
(Dual -pane, Low-E, argon blend filled)
Casement, Awning, Tik-Wash,
Woodwright;"Transom
Picture, Awning
Double -Hung Picture
trsible
Light'
73%
SC' SHGC= RHG`
I0._50_ 0.43I 104
_
0.49 0.43 I 102
j 0.50 ( 0.43 1 104
-' i'-'-' --
0.50 j 0.43 I 104 I
-
0.49 0.42 101 j
0.49 j 0 4242 101 j
0.47 0.41 98
0.49 0.43 j 102 j
-
0.49 0.42 1 SO1
Fading
Tuve Tdwa
17/I 3-4_%_.
T
! 16% I 33%
; 17°k 34% I
17% 1 34%
15°"b 32% _
15% 32°�
14°� 31%
16% 1 3_3% ,
_
2%_25% t
U-Factor'I@center`
I %uHR
Inside
Surface
Glass
I Temp'
I0.28
0.28
0.28_ j
0.28 I
_ 0.27 I
0.28%
I60% -i
j 60%
60% ?
_ 60% I
60°h
60% j
55°FCasement
73.
I_56°F
56°F
Gliding Windows (400 Series)
Circle Top, Elli�ltical_ Top, Circle, Oval
73%
73% 1
72% I
Perma-Shield° Patio Door,
Narroline° Gliding Patio Door
56°F
56°F
Frenchwood° Hinged, Outsw_ing, Gliding
FlexiframemArch Windows, Sprirlgline'"
72°,6
71% 1
56°F
0.27
_
61%
60% _
60% 1
56°F
56°F
Roof Window VSlrylights (tempered)
Laminated (all products)
7373%I
0 28
0.28 I
71°�
56° F
High -Performance Sun-
I
Inside
Low-E Glass
(Dual -pane, tinted argon blend filled)
Visible
Light'
SC=
SHGC'
RHG`
Fading
Tuva Tdwe
%HR
JU-Factor'ocentera
Surface
Glass
Casement, Awning, Tik-Wash,
g, rift -Wash,
1
�
j
Temps
Woodwright; Transom _ _
Picture Units: CA NL DHP
40% i
40%
0.36
0.35
_ 0.31 I
I
76
1(3%_ i
24%
0.31 1
58%
1 54°F_
Gliding Windows -_ _- _.-�
40%
0.36
0.30 j
0.31
74 i
75
15% j
---'
16%
23%
24°�
1 0.30 1
- -
0.30
57%
57%
' S4°F
_.�__
j 54°F
Circle Top'; Oil 0! al Top, Circle, Oval
_40% I
0.36
_
0.31
75 !
16°k j
24%
0.30
57%
54°F
Perma-Shield° Patio Door
Frenchwood° Hinged, Gliding
----- g r
39% j
39°h
0.34
0.35_
0.30
0.30
-
73 1
-
14%
22%
- -
1 0.30 1
58%
54°F
_g
Flexiframe° Arch Windows, Springline_"
_
38°�
0.33
_
0.29
73 I
71 I
14°G
13�
22_%
21%
j 0.30 j
j 0.30 j
58%
--
54°F
j
_Roof Windows/Skylights (tempered)
-
39%
0.34
0.30 I
73 1
14% I
22%
I
58%
55°F
I
--
Laminated (all products)
- - - -
39% 1
0.35
0.30_
�-
73 1
2%
16%
0.30
- -
j 0.30 j
58%
- _o
54°F
- ,
--
58 fi
I 55 F
This data is accurate as of August 12, 2003. Due to ongoing product changes, updated test results,
or new industry standards,
this data may change over rime.
Canadian Product Performance Ratings
Tested to: CAN/CSA A440-M90
The mullion was tested and the deflection was within the maximum allowable of L/175 at Dositive and nPoativa Innrie of )rnn o°
Units
Tested
CW16
P6050 _ _
AP421V
A3535
TW3862
NL3862
DHP5662 _
G65_ _
9ir/00 3048
ET8- - -
Air
Tightness
Waterstance
Tightnesslow-out
dload
Land
I R
A-3
Fixed
_ B-7
j 8-7
B-4
B-3
j B-3.LC-3
B 3
B-3
B-3
B-7
B-7
I _ C-4
C-4
No
-Not
Not
Not
- A-3
G2
C-i�l
- A-2
A-3
_ Fixed
C-2
C-3
A-3
C 3
Fixed
C-5
Fixed
C-5
Not
esistance
to forced
entry
tApplicable
Units
Tested
?ass
FX-12050
AF-608
Pass
SP-802
Pass
FWH6080AP
Pass
9080SASR
Pass
FW06080AP
Applicable
3180
Pass
FWG8080
Applicable
160611
Applicable
PSG8080
238 ---
'High-Performance'(HP Low-E) and
'High -Performance Sun' (HP Sun) are
Andersen trademarks for "Low-E" glass.
Based on NFRC testing/simulation conditions
using Windows 4.1 and NFRC validated spectral
data. o°F outside temperature, 70°F inside temper.
ature and a 15 mph wind.
1 Visible Transmittance (VT) measures how much
light comes through the glass. The higher the
value, from 0 to 1, the more daylight the glass
lets in. Visible Transmittance is measured over
the 380 to 760 nanometer portion of the
solar spectrum.
2 Shading Coefficient defines the amount of
heat gain through the glass compared to a
single lite of clear 1/8' (3 MM) glass.
3 Solar Heat Gain Coefficient (SHGC) defines
the fraction of solar radiation admitted
through the glass both directly transmitted
and absorbed and subsequently released
inward. The lower the value, the less heat is
transmitted through the glass.
4 Relative Heat Gain Is calculated under a
different set of assumptions than thermal
Performance.
5 Transmission Ultra -Violet Energy (TUV). The
transmission of short wave energy in the 300-
380 nanometer portion of the solar spectrum.
The energy can cause fabric fading.
6 Transmission Damage Function (TDW). The
transmission o1 short wave energy in the 300-
600 nanometer portion of the solar spectrum.
The value includes both the UV and visible
light energy that can cause fabric fading.
This rating has also been referred to as the
Krochmann Damage Function. This rating
better predicts fading potential than UV
transmission alone. The lower the Damage
Function rating, the less transmission of
short wave energy through the glass that can
Potentially cause fabric fading. Fabric type Is
also a key component of fading potential.
7 U-Factor is a measure of the heat loss
through the total unit In BTU/hr deg.F sq. ft.
8 Percent relative humidity before condensation
occurs at the center of glass, taken using
center of glass temperature.
9 Inside glass surface temperatures are taken
at the center of glass.
Air
Tightness
Water
Tightness
Wmilload
Resistance
and blow-out
Resistant
to forced
entry
Fixed
Fixed
_-Fixed
--- AA-3
I 8_-7
B-7
B-7
B-2
C-5
_N_otApplical
Not ��licaI
NotApplicat
Pass
C-5
_ C-5
C-3 -
_. A_3
- A-3 _
A-3 _
A
--- 3
A 3
B-2
B-4
B-4
E73
B-2
- C-3
_ C-3
C-3
_7�__
Pass_
Not Applicat
Not Applicak
Pass
PassA-3
B-2
Pass
e
Performance Data
Andersen' NFRC Certified Total Unit Performance
Andersen windows and patio doors meet or exceed the following standards: WDMA,-I.S: 2, W.D.M.A A.S. (WDMA license No. 129). Hallmark certified. Independent testing laboratories have performed all required tests on selected sizes.
Compliance with these standards is confirmed by ongoing testing in Andersen Laboratories. These products are covered by one or more o1 the following patents: 4,999,950; 5,595,409; 5,775,749; 6,055,786; 5,544.450; 5,566,507;
5.582,445; 5.097,629; 5,740,632; 5,199,234; D312,565; D397,604; and D417,831. Other patents pending.
Without Grilles
400 Series Windows
HP HP Sun
HP HP Sun
Andersen' Product Type
Low-E I
Low-E
Low-E ! Low-E
Casement
U-Factor'
0.33
0.35
0.34 i
0.36
24" x 48" size
SHGC'
0.33
0.24
0.30
0.22
VP
0.53
0.29
0.48
0.26
Awning
U-Factor'
0.33
0.35
0.34
0.36
48" x 24" size
SHGC'
0.32 !
_0.24_
0.30
0.22
VP
0.52
0.28
0.47 1
0.26
Casement/Awning
U-Factor'
0.30 1
0.32_ j
0.34
Picture Window
SHGC'
0.36
_0.32
0.26
0.33
0.24
48" x 48" size
VP
0.59
0.32
0.53 I
0.29
Woodwright'"
U-Factor'
0.33 I
0.35
0.34
0.36
Double -Hung
SHGC'
0.32
0.24
_0.29 j
0.22
36" x 60" size
VP
0.51
0.28
0.46 I
0.25
Woodwright"
U-Factor'
_0.30 1
0.32
0.3_2 i
0.34
Picture Window
SHGC'
0.33 I
0.24
0.31 1
0.22
48" x 48" size
VP
0.54
0.29
0.48 I
0.26
Woodwright"
U-Factor'
0.30 1
0.32
0.32 i
0.34
Transom
SHGC'
0.35
0.25
0.32 i
0.23
48" x 48" size
VP
0.57
0.31
0.51 i
0.28
Tilt -Wash
U-Factor'
0.34
_0.36
0.35 1
0.35_
Double -Hung
SHGC'
0.32 i
0.24
0.29
0.22
36" x 60" size
VP
0.51 i
0.28
0.45
0.25
Tilt -Wash
U-Factor'
0.33 i
0.3_5__
0.35
0.37
Double -Hung Picture
SHGC'
0.35 i
0.25
0.32 j
0.24
48" x 48" size
VP
0.56 ;
0.30
0.50
0.27
Tilt -Wash
U-Factor'
0.33
0.35
0.34 I
0.36
Double -Hung Transom
SHGC'
0.35 1
0.25
0.32
0.23_
48" x 48" size
VP
0.56
0.31
0.50 i
0.27
Gliding Window
U-Factor'
0.36 1
0.38
0.38 i
0.39
60" x 36" size
SHGC'
0.30
0.23
0.28
_0.21
VP
0.46 I
0.25
0.41 !
0.22
Elliptical Window
U-Factor'
0.30
0.32
0.32
0.34
48" x 48" size
SHGC'
0.36 I
0.26 _
0.33 J
0.24
VP
0.59 ;
0.32
0.53 1
0.29
Circle Top"
U-Factor'
0.30 !
_0.32_
0.32 ;
0.34_
Casement
SHGC'
0.36 i
0.26
0.33 I
0.24
0.53 i
0.29
48" x 48" size
VP 0.59 0.32
Circle/Oval
U-Factor'
_0.30
0.32
0.32 i
0.34
48" x 48" size
SHGC'
0.36
0.26
_ 0.33
0.24
VP
0.59 !
0.32
0.53 !
0.29
Arch Windows
U-Factor'
0.31
0.33
0.32 !
0.3_4
48" x 48" size
SHGC'
0.36
0.26
I
0.24
VP
0.59 1
0.32
_0.33
0.53
0.29
Flexiframe°
U-Factor'
0.30
0.32
0.32
0.34
48" x 48" size
SHGC'
0.36
__0.26
L 0.33 -
0.24
VP
0.59
0.32
0.53 1
0.29
Springline' Window
U-Factor'
0.34
0.36
0.36
0.38
48" x 48" size
SHGC'
0.35
0.26
0.32
0.24
VP
0.55
0.30
0.50
0.27
Tempered
Skylight
U-Factor'
0.44
0.46
0.44
0.46
48" x 48" size
SHGC'
6.42 _
0.31
_ 0.42
0.31
VP
0.67
0.37
0.65 !
0.36
Venting
U-Factor'
0.42
0.44
0.42
0.44
Roof Window
SHGC'
0.40
0.29
0.39
0.29
48" x 48" size _
VP
0.62
0.34
0.60 0.33_ V
Stationary _
U-factor'
0.42
? 0.44
0.42
0.44
Roof Window
SHGC'
0.40
0.30
1 0.39
0.29
48" x 48" size
VP
0.64
0.35
1 0.60 I
0.33
400 Series Doors
Andersen' Product Type
Without Grilles
HP i HP Sun
Low-E I Low-E
HP
Low-E 1
HP Sun
Low-E
Frenchwood'
Gliding Patio Door
72" x 82" size
U-Factor'
SHGC'
VP
0.33 j
0.29 j
0.44
0.35
0.21
0.24
0.35
- 0.26
0.36
0.20
0.21
0.39
Frenchwood'
Hinged Patio Door
38" x 82" size
U-Factor'
SHGC'
VP
0.33
0.27 i
0.41
0.34
0.20
0.22 --0.367
0.34
0.36
0.19
0.20
0.25
Frenchwood'
Outswing Patio Door
38" x 82" size
U-Factor'
SHGC'
VP
0,34
0.27 i
0.41 1
0.36
0.20
0.22
0.36 I
0.25
0.36 !
0.37
0_19
0.20
Frenchwood'
Patio Door Sidelight
16" x 82" size
U-Factor'
SHGC'
VP
0.35
0.20 1
0.27
0.36
0.15
0.15
0.35
0.36
_ 0.15
0.14
0.19 i
0.26
Frenchwood°
Patio Door Transom
38" x 14' size
U-Factor'
SHGC'
VP
0.34 i
0.16 _
0.20
0.35
0.13
0.11
0.34 I
0.35
0.12
0.10
0.15 I
-.�
0 1?
200 Series Windows & Doors
Andersen' Product Type
Without Grilles_
-Clear
Dual -Pane: Low-E
Clear
Dual -Pane
Low-E
Casement
24" x 48" size
U-Factor'
SHGC'
VP
0.48
_ 0.57
0.59
! -
j a _
1 -
0.49
0.52
-
0.54
Awning
48" x 24" size
U-Factor'
SHGC'
VP
0.48
0.56
0.58
1 =
i -_
-
0.49
1 =
=
! -
0.52
0.53
Tilt -Wash
Double -Hung
36" x 60" size
U-Factor
SHGC'
VP
0.49
0.56
0.58
0.34
___0.33
1 0.51
0.50
0.35
0.51
0.30
i 0.46
0.52
Narroline°
Double -Hung
36" x 60" size
U-Factor'
SHGC'
VP
0.50
0.58
0.60
0.35
i 0.33
1 0.53-
0.50
1 0.36
0.52
! 0.31
--0-5-37
_
0.47
Narroline° Transom
48" x 48" size
U-Factor'
SHGC'
VP
0.47
0.59
0.62
0.31
0.34�
! 0,55
0.48
1 0.33
0.54
1 0.31
0.56
1 0.49
Gliding Window
60" x 36" size
U-Factor'
SHGC'
VP
0.50
0.57
0.58
1 0.35
1 0.33
1 0.52
0.50
1 0.35
0.51
1 0.30
0.52
1 0.46
Fixed, Transom,
Circle Top"
48" x 48" size
U-Factor'
SHGC'
VP
0.47
0.60
0.62
0.31
! 0.34 -
1 0.55
0.48
1 0.33
0.54
0.32
0.56
1 0.49
Narroline°
Gliding Patio Door
72" x 82" size
U-Factor'
SHGC'
VP
0.49
6.60
0.62
; 0.32
0.35
--0.55
0.50_
0.35
0.54 "
0.32
0.56;0.49
Perna -Shield'
Gliding Patio Door
72" x 82" size
U-Factor'
SHGC'
VP
0.47
0.60
0.62
1 0.3_1
_ 0.34
; 0.56
0.48'11
0.33
0-5 7
0.32
0.56
0.50
Grilles-Flnelight or Full Divided light.
'High -Performance" (HP Low-E) and -High-Performance Sun" (HP Sun) are Andersen trademarks lot -t.ow-E' glass.
1 U-Factor defines the amount of heat loss through the total unit in BTU/hr sq. h•.°F.
The lower the value, the less heat is lost through the entire product.
2 Solar Heat Gain Coefficient (SHGC) defines the fraction of solar rradiotion admitted through
tMe glass both directly transmitted and absorbed and subsequently released inward.
The lower the value, the less heat is transmitted through the product
3 Visible Transmittance (Vr) measures how much light comes through a product 1@ass and frame).
The higher the value, from 0 to 1, the more daylight the product lets In over the preduci s total unit area.
Visible Transmittance is measured over the 380 to 760 nanometer portion of the solar spectrum.
This data is accurate as of August 12, 2GO3. Due to ongoing product changes, updated test results,
or new industry standards, this data may change over time. .
239
Andersen®
400 Series Air Infiltration, Testing and Light Transmittance
Sound
AAMA/WDMA
Certified I Trans.
i
Andersen' Product
Performance
Rating
101/ I.S. 2/NAFS-02
standard
Air Infiltration
crm/W
I class
fin, nr m'
r 400 Series CasementWindowt -
DP 40
C-C 40 36 x 72
1 0.03
(.54)
. 25
22
1.400 Senl s Awning WindooWt DP 35
AP-C 35 65 x 28
j 0.04
(.73)
j 26
I 22
400 Senes Casement
;
1
I
kand Awning Ptcture Windowst� f, • i DP 60
F-C 60 72 x 60
<.01
(.18)
I 30
I 25
4MSeries Woodwng!T
Double Hung>T� ,, "-i, DP 30
sr
400 Series Woodwnghf
0.14
(2.52)
j
j 27 23
H-LC 30 46 x 77
Dbuble'Hung Picture Window
DP 65
F-C 65 67 x 77
<.01
l
I
1
400 Senes WoodwnghCt
I
(.18)
28 _
23
,
Double Hung»Transom Wlridow T DP 65
400 SenesTill:W8hxDouble--Hgngt
(vritlt.SlandaNsillSmp-)sdtv�q': ' DP 30
I TR-LC 65 75 x 27
I <.01
I
0.10
(.18)
(1.80)
I _ 28
27
i 22
I
I 23
H-R 30 46 x 72
400 Serves At Wash Double Hung'
52 (1321mmj Height and Under t'
DP 50
H-R 50 38 x 65
0.24
(4.39)
27
j 23
400 SenesTtt Wash Double Nun g `
PicUlre�Windowt
DP 50
F-R 50 67 x 77
I <.OS
(.18)
26
-
400 Sends Tilt Wash Double Hun g,.
Transom Windowt
DP 30
**
0.05
(.91)
27
I 23
HS-C 30 72 x 60
400 Serves Gliding Window DP 30
0.02
(.36)
25
21
400 Serves Roof Wind nary
i
DP 40 DP
* *
I
_ _ .
0.01
(.18)
30
24
i400 Serves Roof Windfifiow (VeWg) .,
DP 25
* *
I 0.01
0.02
(.18)
(.36)
34
30
28
I 24
40,0 SenesSkylightt»$i
DP 65
SKG-C 65 56 x 56
400 Se�C�ircle op and '
�E11ipUplVJindowst
DP 65
**
I <.01
I <,Ol
<.01-
<.01
(.18)
(.18)
32 -
25 -
-
400 Serves Circle and Oval Wlndowt)
DP 65
**
-0ek eneseAich Wlndow,t �} :;
DP 65
DP 65
**
4QO Serves Flexrh'ame;Wmdowt'.:
400�Se6es Sodnglme. Wmdowt-,
DP 65
F-HC 65 96 x 72
(-<.01
(.18)
-
-
S.j;.
406 Series Frenctiwoo& Gtidi g Pabo Doorsti;''-{
16080
DP 35
SGD-LC 35 189�x 96
0.05
0.05
(.91)
(.91)
31 i
I 31
26
26
160611 SRD DP 25
REINFORCED
SGD-LC 25 189 x 82
DP 40
SGD-LC 40 189 x 82
0.05
(.91)
31
26
SGD-LC 30 189 x 80
16068 _
DP 30
0.06
(1.10)
31
I 26
SGD-LC 50 96 x 96 10.03
_8080, 6080
DP 50
(.54)
31
26
SGD-LC 60 96 x 82 10.08
60611, 8068, 80611, 6080 DP 60
(1.46)
31
26
6080 AP/PA
DP 40
HGD-R 40 71 x 96
0.02
(.36)
32
26
9080 SASR
_DP 40
HGD-R 40�107 x 966
_0.01
(.18)
32
26
_6080 SA
3180 S
DP 40 1
DP 60
HGD-R 40 71 x 96 j
HGD-R 60 36 x 96
0.01
0.02
(.18)
(.36)_
P32
26
26
90611 SASR
DP 50
HGD-R 50 107 x 82
0.01
(.18)
32
I 26
HGD-R 40 71 x 82 I
60611 AP/PA
DP 40
0.02
(.36)
2
I 26
HGD-R 50 71 x 82
60611 SA
DP 50
0.01
(.18)
32
26
HGD-R 60 36 x 82
31611 A DP 60
0.01
CIE
32
26
400 Series Frenchwood'_Outsw ng.PaUo Doors
fill
>`
3180
DP 50
6080 AP/PA DP 40
400 Serves Frenchwood' Sidelights, DP 77
400 Serves FrenchwoodroTransoms DP 77
HGD.R 50 36 x 95
HGD-R 40 71 x 95
SL-LC 77 19 x 96
TR-LC 77 96 x 82
0.02 (.18) 31 26
0.02 (.18) 31 26
<.01 (.18) - • - -
t Available with Stormwatch' Protection - including design pressure upgrades.
For a copy of the Andersen Coastal Product Guide, contact your Andersen supplier.
• Applicable only when DP upgrade kit is installed with factory prefinished
white interior units (with prefinished interior trim stop option).
•' Did not meet minimum sae requirements for NAFS-02 testing.
^ STC and ORC ratings given are for individual units based on independent
tests and represent the entire unit. Higher STC and OITC values may be
available with other glazings. Contact Andersen for more information.
This data is accurate as of August 12, 2003. Due to ongoing product changes,
updated test results, or new industry standards, this data may change over
rime. Call your Andersen representative for current performance information
or upgrade options.
236