Andalusia TR 31681 BTCP2017-0003 (Plans 24-26) 2016 Code UpdateProject Details PROJECT NUMBER
City of La Qu i nta
BTCP2017-0003
O F Tt�"
Description: ANDALUSIA/2016 CODE UPDATE - 24, 25, 26
Status: ARCHIVED
Type: TRACT RESIDENTIAL CONSTRUCTION PLAN
Status Date: 7/14/2017
Subtype: CODE UPDATE
Applied: 3/6/2017
Address: 59000 MADISON ST
Approved: 7/28/2017
City, State, Zip: LA QUINTA,CA92253
Closed: 7/28/2017
Project Manager: JAKE FUSON
Expired:
Details: ANDALUSIA / 2016 CODE UPDATE. SFII - PLANS 24, 25, & 26.
[VB/RES-3/CLASS A-FR/13D] 2016 CALIFORNIA BUILDING CODES.
PLAN 24 - 4,184 S.F.
PLAN 25 - 4,502 S.F.
PLAN 26 - 5,131 S.F.
DAYS
REVIEWS 6
ACTIONS 8
INSPECTIONS
CONDITIONS
CASE OPEN
OPEN
COMPLETED
CHRONOLOGY TYPE
STAFF NAME
ACTION DATE
COMPLETION DATE
NOTES
1ST PC ROUTED TO OUTSIDE
STEPHANIE SWANSTROM
3/6/2017
3/7/2017
PC
1ST PC SUBMITTAL
STEPHANIE SWANSTROM
3/6/2017
3/7/2017
RECEIVED
NOTE
STEPHANIE SWANSTROM
3/21/2017
3/21/2017
NOT APPROVED
NOTIFIED NOLAN SPARKS THAT PLAN REVIEW WAS
PHONE CALL
JAKE FUSON
3/28/2017
3/28/2017
COMPLETE, REVISIONS WERE REQUIRED, AND PLANS AND
DOCS WERE READY FOR PICKUP.
1ST PC PICKED UP
STEPHANIE SWANSTROM
3/29/2017
3/29/2017
NOLAN SPARKS
NOTE
STEPHANIE SWANSTROM
6/16/2017
6/19/2017
RECEIVED FROM YOUNG, APPROVABLE WITH CONDITIONS.
3RD PC SUBMITTAL
MARY FASANO
7/14/2017
7/17/2017
PER BURT I SET A REVIEW FOR PLANNING
RECEIVED
Printed: Monday, March 20, 2023 9:27:26 AM 1 of 6 CENTRALSQUARE
Project Details PROJECT NUMBER
City of La Quinta BTCP2017-0003
O F Tt�"
PHONE CALL I JAKE FUSON 1 7/28/2017
7/28/2017 (NOTIFIED NOLAN SPARKS THAT PLANS WERE APPROVED AND
PROJECT FEES WERE REDY TO BE PAID IN ORDER TO ISSUE.
NAME TYPE
NAME
ADDRESS(
LITY
ATE
ZIP
PHONE
FAX
EMAIL
APPLICANT
TD DESERT DEV
81570 CARBONERAS
LA QUINTA
CA
92253
(949)487-2320
ARCHITECT
PEKAREK-CRANDELL INC.
31411 CAMINO
CAPISTRANO
SAN JUAN
CAPISTRANO
CA
92675
(949)487-2320
CONTRACTOR
T D DESERT DEVELOPMENT LIMITED
PARTNERSH
81570 CARBONERAS
LA QUINTA
CA
92253
(949)487-2320
NSPARKS@RANCHOLA
QUINTA.COM
DEVELOPER
T D DESERT DEVELOPMENT LIMITED
PARTNERSH
81570 CARBONERAS
LA QUINTA
CA
92253
(949)487-2320
NSPARKS@RANCHOLA
QUINTA.COM
ENGINEER
GOUVIS ENGR CONSULT GROUP INC
OUTSIDE CITY LIMITS
(949)487-2320
OWNER
T D DESERT DEV
81570 CARBONERAS
LA QUINTA
CA
0
(949)487-2320
PRIMARY
CONTACT
NOLAN SPARKS - T D DESERT
DEVELOPMENT LIMITED PARTNERSH I
81570 CARBONERAS
LA QUINTA
CA
92253
(949)487-2320
NSPARKS@RANCHOLA
QUINTA.COM
DESCRIPTION
ACCOUNT
QTY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
CLTD
BY
101-0000-42600
($10.00)
($10.00)
3/28/17
OFFSET
OFFSET
JFU
101-0000-42600
($1,205.00)
($1,205.00)
3/28/17
OFFSET
OFFSET
JFU
101-0000-42600
($285.00)
($285.00)
3/28/17
OFFSET
OFFSET
JFU
HOURLY CHARGE - CITY
BUILDING STAFF
101-0000-42600
9
$1,205.00
$1,205.00
3/28/17
DEPOSIT
DEPOSIT
JFU
HOURLY CHARGE - CITY
BUILDING STAFF
101-0000-42600
0
$163.00
$163.00
7/28/17
R26831
00013771
CHECK
T D DESERT DEV
MFA
HOURLY CHARGE - CITY
BUILDING STAFF
101-0000-42600
4
$608.00
$608.00
7/28/17
R26831
00013771
CHECK
T D DESERT DEV
MFA
Printed: Monday, March 20, 2023 9:27:26 AM 2 of 6 CENTRALSQUARE
°5 Project Details PROJECT NUMBER
ows� City of La Quinta BTCP2017-0003
OFT'
CLTD
DESCRIPTION
ACCOUNT
CITY
AMOUNT
PAID
PAID DATE
RECEIPT #
CHECK #
METHOD
PAID BY
BY
HOURLY CHARGE - CITY
101-0000-42600
1
$152.00
$152.00
7/28/17
R26831
00013771
CHECK
T D DESERT DEV
MFA
BUILDING STAFF
HOURLY CHARGE - YES
101-0000-42600
0.25
$10.00
$10.00
3/28/17
DEPOSIT
DEPOSIT
JFU
ADMINISTRATIVE STAFF
HOURLY CHARGE - YES
101-0000-42600
0.25
$10.00
$10.00
7/28/17
R26831
00013771
CHECK
T D DESERT DEV
MFA
ADMINISTRATIVE STAFF
HOURLY CHARGE - YES
STRUCTURAL PLAN
101-0000-42600
3
$285.00
$285.00
3/28/17
DEPOSIT
DEPOSIT
JFU
REVIEW ENGINEER
HOURLY CHARGE - YES
STRUCTURAL PLAN
101-0000-42600
1
$95.00
$95.00
7/28/17
R26831
00013771
CHECK
T D DESERT DEV
MFA
REVIEW ENGINEER
Total Paid for BUILDING STAFF - PER HOUR: $1,028.00 $1,028.00
BUILDING TRACT
RESIDENTIAL
101-0000-42600
1
$1,500.00
$1,500.00
3/6/17
R22793
00013193
CHECK
TD DESERT DEV
SKH
CONSTRUCTION PLAN
DEPOSIT
Total Paid for BUILDING TRACT RESIDENTIAL
$1,500.00 $1,500.00
CONSTRUCTION PLAN DEPOSIT:
INSPECTION TYPE
INSPECTOR
SCHEDULED
DATE
I COMPLETED
DATE
RESULT REMARKS
NOTES
RETURNED
REVIEW TYPE
REVIEWER
SENT DATE
DUE DATE
STATUS
REMARKS
NOTES
DATE
1ST BLDG NS (3WK)
JAKE FUSON
3/7/2017
3/28/2017
3/28/2017
REVISIONS REQUIRED
1ST BLDG STR (2WK)
YOUNG
3/7/2017
3/21/2017
3/21/2017
REVISIONS REQUIRED
ENGINEERING
Printed: Monday, March 20, 2023 9:27:26 AM 3 of 6 CENTRALSQUARE
Project Details PROJECT NUMBER
City of La Quinta
BTCP2017-0003
1ST PLANNING
CHERI FLORES
7/14/2017
7/28/2017
7/24/2017
READY FOR APPROVAL
(2WK)
SEE 2ND REVIEW - NON-STRUCTURAL
2ND BLDG NS (2WK)
JAKE FUSON
6/8/2017
6/22/2017
6/22/2017
REVISIONS REQUIRED
CORRECTION LISTS FOR PLANS 24/25 & 26.
STRUCTURAL APPROVAL EXCEPTIONS
INCORPORATED INTO THESE CORRECTION LISTS.
2ND BLDG STR
YOUNG
6/8/2017
6/22/2017
6/16/2017
APPROVED-
(2WK)
ENGINEERING
CONDITIONS
3RD BLDG NS (2WK)
JAKE FUSON
7/14/2017
7/28/2017
7/28/2017
APPROVED
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
BTCP2017-0003 2ND
BTCP2017-0003 2ND
DOC
6/9/2017
ARMANDO MAGALLON
WASTE MANAGEMENT
WASTE MANAGEMENT
0
(PLAN 24).pdf
(PLAN 24).pdf
BTCP2017-0003 2ND
BTCP2017-0003 2ND
DOC
6/9/2017
ARMANDO MAGALLON
WASTE MANAGEMENT
WASTE MANAGEMENT
0
(PLAN 25).pdf
(PLAN 25).pdf
BTCP2017-0003 2ND
BTCP2017-0003 2ND
DOC
6/9/2017
ARMANDO MAGALLON
WASTE MANAGEMENT
WASTE MANAGEMENT
0
(PLAN 26).pdf
(PLAN 26).pdf
BTCP2017-0003 2ND
BTCP2017-0003 2ND
DOC
6/9/2017
ARMANDO MAGALLON
CORRCTIONS LIST AND
CORRCTIONS LIST AND
0
RESPONSES (2).pdf
RESPONSES (2).pdf
BTCP2017-0003 2ND
BTCP2017-0003 2ND
DOC
6/9/2017
ARMANDO MAGALLON
CORRCTIONS LIST AND
CORRCTIONS LIST AND
0
RESPONSES.pdf
RESPONSES.pdf
BTCP2017-0003 2ND
BTCP2017-0003 2ND
DOC
6/9/2017
ARMANDO MAGALLON
MECHANICAL AND
MECHANICAL AND
0
ENERGY RESPONSES.pdf
ENERGY RESPONSES.pdf
Printed: Monday, March 20, 2023 9:27:26 AM 4 of 6 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0003
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
1ST CHECK -
1ST CHECK -
DOC
3/21/2017
BRONZ YOUNG
STRUCTURAL
STRUCTURAL
0
TRANSMITTAL.pdf
TRANSMITTAL.pdf
1ST CHECK -
1ST CHECK -
DOC
3/21/2017
BRONZ YOUNG
STRUCTURAL
STRUCTURAL
0
COMMENTS.doc
COMMENTS.doc
2ND CHECK -
2ND CHECK -
DOC
6/16/2017
BRONZ YOUNG
STRUCTURAL
STRUCTURAL
0
TRANSMITTAL.pdf
TRANSMITTAL.pdf
BTCP2017-0003 - 1ST
1ST REVIEW - NOW
REVIEW - NOW
DOC
3/28/2017
JAKEFUSON
STRUCTURAL
STRUCTURAL
1
CORRECTION LIST -
CORRECTION LIST -
PLAN 24 and 25 ONLY
PLAN 24 and 25
ONLY.pdf
BTCP2017-0003 - 1ST
1ST REVIEW - NOW
REVIEW - NON-
DOC
3/28/2017
JAKEFUSON
STRUCTURAL
STRUCTURAL
1
CORRECTION LIST -
CORRECTION LIST -
PLAN 26 ONLY
PLAN 26 ONLY.pdf
2ND REVIEW - NOW
2ND REVIEW - NOW
DOC
6/22/2017
JAKEFUSON
STRUCTURAL
STRUCTURAL
1
CORRECTION LIST -
CORRECTION LIST -
PLAN 26 ONLY
PLAN 26 ONLY.pdf
2ND REVIEW - NOW
2ND REVIEW - NOW
DOC
6/22/2017
JAKEFUSON
STRUCTURAL
STRUCTURAL
1
CORRECTION LIST -
CORRECTION LIST -
PLAN 24 and 25
PLAN 24 and 25X.pdf
Printed: Monday, March 20, 2023 9:27:26 AM 5 of 6 CENTRALSQUARE
Project Details PROJECT NUMBER
-ows� City of La Quinta BTCP2017-0003
Attachment Type
CREATED
OWNER
DESCRIPTION
PATHNAME
SUBDIR
ETRAKIT ENABLED
BTCP2017-0003 - 3RD
3RD SUBMITTAL NOW
SUBMITTAL NON-
DOC
7/17/2017
1AKE FUSON
STRUCTURAL
STRUCTURAL
1
CORRECTION
CORRECTION
RESPONSES
RESPONSES.pdf
BTCP2017-0003 - PLAN
DOC
5/2/2018
JAKE FUSON
PLAN 26 - REVISED FAU
26 - REVISED FAU
1
LOCATION
LOCATION.pdf
DOC
8/9/2018
MARY FASANO
ANDALUSIA APPROVED
andalusia 04169.pdf
1
PLANS PLAN SET 04169
Printed: Monday, March 20, 2023 9:27:26 AM 6 of 6 CENTRALSQUARE
ao/b CODE PDATE
BIn.#
Cjty. of La Qulnta
Building ar Safety Division
P.O. Box 1504, "78-495 Calle Tampico
U.Qulnta, CA 92253 - (760) 777-7012
Building Permit Application and Tracking Sheet
Permit #
ProjectAdd.ress:
Owner's Name: t D. PeScr � Dej a0a: y*-L-4-,-C P
A P. N.umber.
Address: 8 ( S [O
Legal Description: tti c 3 (o - 3 moo( '
City, ST, Zip: 22S 3
r
Contractor. , _ ��e(� �ev �o A( Ph t �- r P •
Telephone: ?(p® "Z q `Z
Address: 83(E I O/ (� oti e!` $
Project Description:
city, sT, Zip: Late (/.� t.L ,� it Q CA .C? 2Zs 3
� Z � ; � � � q 5 r
Telephone:i60 '111 Icon I>>�
ZS 4-So.Z Sr
State Lie. #: 7�, 2 q t -7
City Lie'. #•: 1119 7-
Zip S (3 ( S T
r
Arch, Engr., Designer. IC C C Cif
Address.;5(c(<p--o
City., ST, Zip: ✓ a y cP �i .-..,o
Telephone: �r�(g $ L pj' •ZO Y `:a
State Lie. #: C v/ f �% , . ;' ,
Name of Contact Person: e 4 ,1 • s a 5
Construction Type: Occupancy:
Project type (circle one): Add'n Alter Repair Demo
Sq. Ft.:
# Stories: # Units:
Telephone # of Contact Person: 71 b o 4 o !6 o (o
Estimated Value of Project:
APPLICANT: DO NOT WRITE BELOW THIS LINE
#
Submittal
Req'd
Reed
TRACENG
PERMIT FEES
Plan Sets
Plan Check submitted
Item Amount
Structural Calks.
Reviewed, ready for corrections
Plan Check Deposit
Truss Calcs.
Called Contact Person
Plan Check Balance.
Title 24 Calcs
Plans picked up
Construction
Flood plain plan
Plans resubmitted
Mechanical
Grading plan
2'! Review, ready for corrections/issue
Electrical
Subeontactor List
Called Contact Person
Plumbing
Grant Deed
Plans picked up
S.M.L
H.O.A- Approval
Plans resubmitted
Grading
IN HOUSE:-
'^' Review, ready for correcdons/issae
Developer Impact Fee
Planning Approval
Called Contact Person
Pub. Nyks. Appr
Date of permit Issue
School Fees
Total Permit Fees
Md
Building Permit Number..-
O 1
Project Description: 8FR _
Exempt: 0
M1 •"''�� (Materials may contain hazardous wastes and
are�not subjectto racycl[ng provisions)
OF,T Construction'Debris Management Plan
Plan Submittal Data 5/5/2017
Job Site Address 69000 Madlson St (Plan 24)'
Owner's'Name
Numl ei r, Street, oryPO Box
City, State. postal Code
Owner's Phone Numbei
Cwnees.E-Mall Address
Project Manager's Name
Project Manager's Phone Number'
Project Managors E-mail Address
Builder/ Contractor
Number, Street -or PO bdx
Cdy, State,: Postal Code
T.D. Desert Development LP
81570 Carboneres
La Quinta, CA.'92253'
760-777-1001,
Jim Reisinger
049487: 2320
irelehinert@lnskarekcrandeil:co
T:D.,Desert'Development LP
81570 Carboneras
,La Qulnta,,CA.•92253
Project square Footagel Approx. 5,318 square feet.
City Approval By Renedo bouldlock-DEC/BuntecWaste
a Date of city Approval 051cns 6 7' -
Materials ToBe Discarded:
Product
Tons.
Trash
22.50 Notrecydable
Product
Tons
Asphalt !
40.00 Recyclable
Masonry (broken)
0.00 Recyclable
'Brick/Block
_,0.00 Recyclable
Plaster
6.00 Recyclable'.
Cardboard ! .
W.00 Recyclable
Scrap Metal
0.00 Recyclable
Commingled f ,
0.00 Recyclable
Tile (floor)
- 0;50 Recyclable
Concrete
26.00 Recyclable
' Tile (roof)
0.75 Recyclable
'Drywall
2.75 Recyclable
Wood
7.75 Recyclable
Donated/ Reuse* '
- 0.00 Recyciable
Landscape Debris
0.00 Recyclable
'Describe.ltems
T.
Totals: Recycle Trash" ' Projected Diversion.
43.8 22:5 66.04%'
Iunderstand It is the.property owners responsibility to submit copies of weight tickets or receipts to:the District
Environmental Coordinator as those hauls occur: I hereby certify that completion; Implementation and adherence of the .
Debris Management Plan (DMP) for the above named project shall guarantee that at least 65% of the jobsite waste is
diverted fromlandfllling. The remaining material will be recycled orreused.'I will divert, for recycling ogre -use, remaining
materials generated from the first day of the project through the completion of the projecldm accordance with this plan. This
DMP is issued in the name of the property owner(s) : and shall remain their property throughout the construction and/or
demolitiomprojecd. A contractor serving as agent of the owner may obtaima DMP for the owner. However, the DMP Is still
Issued, in the name of the property owner(s) anflhe owner retains legelresponsibility for ensuring that the provisions of the
DMP are adhered to. The property owner(s) and general contractor shall be kept informed of the diversion progress through
bi-monthly reports. If self -hauling, all refuse material from this project site must betaken to an approved recycler or transfer
Owner / Developer /'Project Manager / Superintendent Date
r
Building Permit Number.: ,
Project Deiscdp#on: SFR
Exempt: 0
(Materials may contain -hazardous wastes and
are not subject to recycling pnivialons)
Construction Debris Management Plan
Ian Submittal.. Date . 515/2017
�ownees n
6Buffdericont ma
kwnb&. Street or PO a
City, State,. Postal Cog
Project Square Footal
59000. Madison St (Plan 25)
T.D., Desert:Development LP
•81:570 Car6oneras,
is Quirita, CA: 92253
ZW-777-1001
Jim
94&487-2320Reisinger
.
� Iretelnaerc�oekarekcrandeg.com.
T:D.. Desert Development LP
81570 Carbon- -
La Quints, CA. 92253
Approx. 5,410 square feet
City Approval. By Rsnad'o Qouldlock-DECMuntec Waste
Date :of City Approval
tak. To Be Discarded: ,
Product Tons
Trash
Asphalt
Brick181ock
Cardboard
Commingled.
Concrete
Drywall
Donated /Reuse-
23,25
Nottmcycipble Product
Recyclable Masonry (broken),
Recyclable Plaster
;Recyolable Scrag luCetei
Recyclable Tile (floor.)
fieryclable Tile (roof)
Recyclable Wood
;Recyclable Landscape Debris
000
000
000
0.00
26:25
:E 2:81.
M00
Describe: Items _
Recycle Trash.
44.6 23.3 '
t understand It is the property owner's responsibigly to submit copies of weight tickets or recelptsto the District
Environmental Coordinator as these hauls occur. I hereby certify that completion, implementation and adherence of the
Debris Management Plan (DMP) for the above named project shag guarantee that at least 65% of the jobsge waste is
dhrerted,ftin tandnigng. The remaining material will' be recycled or reused. I will divert, for recycling or re -use, remaining
materials generated from the first day of the project through the completion of the project in accordance with this plan. This
DMP Is issued in the name of the property owner(s) and shall remaln.thelr property throughout the construction and/or
demolition pmjacL A contractor serving as agent of the owner may obtain a DMP for the owner. However, the DMP is still
issued in the name of the property owners) and the owner retains legal responsibility for ensuring, that the provisions of the
DMP are adhered to. The property owner(s) and general contractor shag be kept informed of the diversion progress through
bknonthly reports. if self -hauling, all refuse material from this project site must be taken to an approved recycler or transfer
Owner / Developer / Project Manager / Superintendent Date
Building, Permit Number.
Project, Description: 16FR
Exempt: 0
(MaW613 may contain hazardous wastes and
are not subject to recycling provisions)
Construction Debris Management. Plan
Plan,Submittal Da l 5/8/2017
Job Sfte Addiessl 59000 Madison St (Plan 26)
'. Owners Name
Number, Str eat, or PO Box
City, Shft. Postal code
Owners Phone Nur6ar
Owners E-Mall Address
Project Managers
Protect Managers Phone N
Project Managers E-mallAi
Builder / Contra
Number, Street or PO
City,. State, Postar c
Project square
City Approval By
T.D. Desert Development LP
81570 Carbarieras
La Quints, CA 92253
760-77.7-1001
Jim Reisinger
849 4 -2320
lieisirtoer(8loekarekcxandeltcom
T.D. Desert Development LP
81570, Carboneras
La Quints, CA. 92253
Approx. 5,956 square feet
Renedo Gouldlock-DEC/Buntec Waste isbww
Date of City Approval
To Be Discarded:
Product
Trash
Asphalt.
Brick/Block
Cardboard
Commingled
Concrete
Drywall
Donated /Reuse
Tons
bib Product
Tons
Masonry (broken)
0:00
Plaster
6.76
Scrap Metal
0E00
The (floor)
065
The (oof)
• 'm
Wood
8.75
Landscape Debris
0:00
I ,Describe Items
Totals: Rec cie Trash Projected Diversion:
47.0 24.3 65:96'!0
I understand It is the property owners responobtitty to suk copies of weight tickets or receipts to the Dlstrict
Environmental Coordinator as.these hauls occur. I hereby cectity that completion, Implementation and adherence of the
Debris Management Plan (DMP) for the above named project shall guarantee that at least 65% of the. Jobsite waste is
diverted from landfilling. The remaining material will be recycledi or reused. I wiltdivert, for recycling or re -use, remaining
materials generated from the first day of the project through the completion of the project In accordance with this plan. This
DMP Is issued in the name of the property owner(s) and shall remain their property throughout the construction and/or
demolition project A contractor serving as agent of the owner may obtain a DMP for the owner. However, the DMP is still
Issued in the name of the property owner(s) and the owner retains Iegal responsibility for ensuring. that the provisions of the
DMP are adhered to. The property owner(s) and general contractor shall be kept informed of the diversion progress through
bi-monthly reports. If self hauMg, all refuse material from this project site must'be taken to an approved rerycier or transfer
Owner / Developer / Project Manager / Superintendant Date
YOUNG
.
Ek - IkF R[1VG
' 4,Letter of Transmittal
To: City of La Quinta Today's.Date:
6j15-17
r '-78-495 Calle Tampico City Due Date:
6-22-17
La Quinta, CA 92253 s Project Address: Andalusia Coral Mountain 2016 Code Update
R
Plans 24, 25 & 26
- Attn: MARY Plan Check #: 1
BTCP2017-0A84-
Submittal: 0 1st
❑, 4th Y
❑ 2nd
❑ 5�
f
' ❑ 3rd
0 Other:
We are forwarding: ❑ By Messenger ❑ By
Mail (Fed Ex or UPS) _ r ❑ Your Pickup.
' +
Includes: - Descriptions: +Includes: # Of,, Descriptions:
,
Copies: F
,
❑ • ' Structural Plans.
❑ `� ` ... Revised Struct. Plans
❑ , Structural Calculations
❑ }" ' }. } Revised Struct. Calcs
r
❑ Truss Calcs
❑`' :,Revised Truss Calcs
❑ Soils Report - Update �:
❑ 1 Revised Soils Report
Structural P/C Responses.
� Approved Structural Plans
1 / Comments-' '-
2 +. _ s
+• ,
' ❑ a1 Redlined Structural Plans i. ' '.
❑ 3 Approved Structural Calcsa
Ef Redlined Structural Calcs
O 1 •' .-, Approved Truss'Calcs-
•t•T
❑ Redlined Truss Calcs •, ;�
❑ `+ - Approved Soils Report,
❑ Redlined Soils'Reports
O .. Other: -
Comments: Structural content is approvable with the following conditions
1. Need letter from soils engineer, foundation plans are in conformance with soils report. • 1
1
2. Replace framing plans on Plan 25; cannot read structural notes(Doubl_e printed). City could review these minor corrections. l
Transit Per Diem=
, •
;
Admin Time = 0.25 hrs.
Structural Engineer/Principal Review Time = 0.0 hrs.
Plan Review Engineer Time = ' 1.0. hrs.
..
This" Material Sent for.
❑ d Your Files
❑ Per Your Request
❑ Your Review
❑ Approval
' ❑ Checking n
❑ + ',At the request of:' -
Other: ❑
1; 3
By: Joe Venuti
Office : 0 (760) 772-5107
µ
-
Other: ❑ • LQPC@VALUENGR.COM
L
, ' .
17
Earth Systems
Southwest 79-811B Country Club Drive
0
Bermuda Dunes, CA 92203
(760)345-1588
(800)924-7015
FAX (760) 345-7315
July 10, 2017
T D Desert Development, LP
81-570 Carboneras
La Quinta, California 92253
Attention: Mr. Nolan Sparks
Projects: Andalusia @ Coral Mountain (Tract Map 31681)
Southeast Corner of Madison Street and Avenue 58
La Quinta, California
Subject: Structural Plan Review for Residential Lots
File No.: 09305-31
Doc. No.: 17-07-701
As requested, Earth Systems Southwest [Earth Systems] is providing this structural plan review
submitted to Earth Systems via dropbox from Gouvis Engineering. Earth Systems downloaded the
six sets of drawings on Friday, June'30, 2017'. Our review was performed from a geotechnical
perspective. Our conclusions are provided below.
Background
Earth Systems performed a structural plan review (Gouvis, Plan 21 to 26) for the subject project,
and had several comments that were sent to Gouvis Engieering on Monday, July 3, 2017. On
Wednesday, July 5, 2017, Earth Systems received the revised plans from Gouvis Engineering
addressing and completing the Earth Systems' redline comments list. Earth Systems' comments
and the structural plans are based on some lots requiring ground modifications as stated in the
recent report updates (Earth Systems Southwest, 2017, Geotechnical Engineering Report Update
(Revised, Document No.: 17-05-708R)) and (Earth Systems Southwest; 2017; Geotechnical
Engineering Report Update, Document No.: 17-05-719). At the time of preparation of this
conformance letter, ground modifications to the lots identified within the update reports have
not been completed; therefore, geotechnical review of conformance for lots requiring ground.
modification will be required as per the geotechnical report updates. Figure 1 in this letter
indicates the lots requiring ground modifications and listed below; however the actual update
report should be referred to for specific information and locations:
1.
Lot 175 at Pod N
2.
Lots 36 to 42 at Pod, I;
3.
Lots 21 to 24 at Pod J
4.
Lots 140 to 148 at Pod Q
5.
Lots 51 to 54 at Pod S
6.
Lots 57 to 74 at Pod T
en,9;017 -000 3
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVE®
FOR CONSTRUCTION
DATE% 10 BY
1 Gouvis Engineering, "Code Updates — Plans 21-26"; Message to. Earth Systems; June 30, 2017; E-mail.
July 10, 2017 2 File No.: 09305-31
Doc. No.: 17-07-701
ray' O-l'"`
KK
ki
fi � - - a�'��° �• �"�,� ` aft
h�,� •�•' ��� �� •ram �rI"„ `� ��� �'
- -- - -- -
Figure 1 Lots with Required Ground Modification
As indicated in the Earth Systems report updates, these lots require ground modifications to
reduce the potential for excessive lateral spreading (greater than 1 foot displacements)..
Conclusion
Earth Systems comments have been addressed, and it is our professional opinion than, from a
geotechnical standpoint, the revised plans incorporating our comments were prepared in
substantial conformance with the intent of the recommendations in the referenced pr..oject soil
reports except for the lots identified in the above where further review is required. Additionally,
it is our opinion that the recommendations provided in the project soils report, including updates,
remain applicable to the proposed project and should be followed.
Proper geotechnical observation and testing during construction is imperative to allow the
geotechnical engineer the opportunity to verify assumptions made during the design pr-Dcess and
to verify that our geotechnical recommendations have been properly interpreted and
implemented during construction, and is required by the 2016 California Building Code.
Observation of grading and fill placement by the Geotechnical Engineer of Record should be in
conformance with Section 17 of the 2016 California Building Code. California Builcing Code
requires full time observation by the geotechnical consultant durine site grading (fill placement)
and in accordance with the requirements of the project plans. Therefore, we recommend that
Earth Systems be retained during the construction of the proposed improvements to observe
compliance with the geotechnical recommendations, and to allow design changes in the event
EARTH SYSTEMS SOUTHWEST
July 10, 2017 3 File No.: 09305-31
Doc. No.: 17-07-701
that subsurface conditions or methods of construction differ from those assumed while
completing our study. Please review the limitations presented below as they are vital to the
understanding of this letter.
Limitations
Conclusions contained in this letter are based on our previously documented field observations
and subsurface explorations, laboratory tests, and our present knowledge of the proposed
construction. Variations in soil or groundwater conditions could exist between and beyond the
exploration points. The nature and extent of these variations may not become evident until
construction. Variations in soil or groundwater may require additional studies, consultation, and
possible revisions to our recommendations. If during construction, soil conditions are
encountered which differ from those described, we should be notified immediately in order that
a review may be made and any supplemental recommendations provided.
If the scope of the proposed construction changes from that described in this report, the
conclusions and recommendations contained in this report are not considered valid unless the
changes are reviewed, and the conclusions of this report are modified or approved in writing by
Earth Systems. Additionally, this letter should be included with the project geotechnical (soils)
report and specification documents. This report is issued with the understanding that the owner
or the owner's representative has the responsibility to bring the information and
recommendations contained herein to the attention of the architect and engineers for the
project. The recommendations presented within are predicated upon the recommendations
presented in the referenced project soils reports. Information and recommendations presented
in this supplement should not be extrapolated to other areas or be used for other projects
without our prior review and response.
If Earth Systems is not retained to provide grading observation and testing during construction,
we can assume no responsibility for misinterpretation or the applicability of our
recommendations. The above services can be provided in accordance with our current Fee
Schedule. The geotechnical engineering firm providing tests and observations shall assume the
responsibility of Geotechnical Engineer of Record.
Earth Systems has striven to provide our services in accordance with generally accepted
geotechnical engineering practices in this locality at this time. No warranty or guarantee express
or implied is made. Please note that it is not within our scope of work to check the reviewed
documents for conformance to codes or other client and government requirements. As Earth
Systems does not practice architectural or structural design, we make no representation as to
the accuracy of dimensions, measurements, calculations, or any portion of the design.
EARTH SYSTEMS SOUTHWEST
July 10, 2017 4 File No.: 09305-31
Doc. No.: 17-07-701
We appreciate the opportunity to provide our professional services. Please do not hesitate to
contact our office if there are any questions or comments concerning this report or its
conclusions.
Respectfully Submitted,
EARTH SYSTEMS SOUTJWA6-XXgi -,
No. 8Q302,
Anthony Colarossi a Ev' 3v /$
Project Engineer Ar
CE 60302 CNtI.�P
,-
LTR/ac/klp/mss/mr
Distribution: E-mail/Mr. Nolan Sparks: NSparks@rancholaquinta.com
E-mail/Mr. Chris King: kingchris1962@yahoo.com
1/BD File
EARTH SYSTEMS SOUTHWEST
• July 10, 2017
References
5 File No.: 09305-31
Doc. No.: 17-07-701
Earth Systems Southwest, 2017, Geotechnical Engineering Report Update (Revised),.
Andalusia @ Coral Mountain (Tract Map 31681), Lots 98, 99, 100, 101, 102, 175, 180, and
187, La Quinta, Riverside Country, California, File No.: 09305-31, Document No.: 17-05-
708R, dated May 30, 2017.
Earth Systems Southwest; 2017; Geotechnical Engineering Report Update, Andalusia @
Coral Mountain (Tract Map 31681); Remaining Lots Minus Lots 98 through 102, 175, 180, .
and 187; La Quinta; Riverside Country; California; File No.: 09305-31; Document No.: 17-
05-719, dated May 31, 2017.
Gouvis Engineering, 2017, Structural Plans; Andalusia at Coral Mountain, Plan 21; Project
Number 64322; 19 sheets SN-1 through S-1.4; Revised Plot Date: 07/05/2017.
Gouvis Engineering, 2017, Structural Plans; Andalusia at Coral Mountain, Plan 22, Project
Number, 64322; 19 sheets SN-1 through S-2.4 Plot Date: 07/05/2017.
Gouvis Engineering, 2017, Structural Plans; Andalusia at Coral Mountain, Plan 23, Project.
Number 64322; 19 sheets SN-1 through S-3.4; Plot Date: 07/05/2017.
Gouvis Engineering, 2017, Structural Plans; Andalusia at Coral Mountain, Plan 24; Project
Number 64322; 19 sheets SN-1 through S-1.4; Plot Date: 07/05/2017.
Gouvis Engineering, 2017, Structural Plans; Andalusia at Coral Mountain, Plan 25, Project
Number 64322; 19 sheets SN-1 through S-2.4; Plot Date: 07/05/2017.
Gouvis Engineering, 2017, Structural Plans; Andalusia at Coral Mountain, Plan 26, Project
Number 64322; 19 sheets SN-1 through S-4.4; Plot Date: 07/05/2017.
EARTH SYSTEMS SOUTHWEST