Loading...
13-1586 (ELEC)P.O. BOX 1504 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Application Number: 13-00001586 Property Address: 79125 HIGHWAY 111 APN: 649-030-078-2 -28525 Application description: ELECTRICAL Property Zoning: REGIONAL COMMERCIAL Application valuation: 2000 'T�e d*4t 4 �-4 Applicant: Architect or Engineer: AJ BUILDING & SAFETY DEPARTMENT BUILDING PERMIT LICENSED CONT ACTOR'S DECLARATION I hereby affirm under penalty of perjury that I am license rider provi . ns of Chapter 9 (commencing with . Section 7000) of Division 3 of the Business and Pr a ionals Cod and my License is in full force and effect. Li�ce�nseCla s: C10 Lice No.: 794758 Crate: Contracto OWNER•BUILDER DECLARATION I hereby affirm under penalty of perjury that I am exempt from the Contractor's State License Law for the following reason (Sec. 7031 .5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State License Law (Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code) or that he or she is exempt therefrom and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500)•: 1 _) I, as owner of the property, or my employees with wages as their sole compensation, will do the work, and the structure is not intended or offered for sale (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who does the work himself or herself through his or her own employees, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he or she did not build or improve for the purpose of sale.). l _ 1 1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who builds or improves thereon, and who contracts for the projects with a contractor(s),licensed pursuant to the Contractors' State License Law.). (_) I am exempt under Sec. , B.&P.C. for this reason Date: Owner: CONSTRUCTION LENDING AGENCY I hereby affirm under penalty of perjury that there is a construction lending agency for the performance of the work for which this permit is issued (Sec. 3097, Civ. C.)• Lender's Name: Lender's Address: �J Owner: LATORRE ROBERT N C/O TOM KELLY 83368 HIGHWAY 111 INDIO, .CA 92201 Contractor: D ADOBE ELECTRIC 36665 BANKSIDE DR, STE F CATHEDRAL CITY, CA 92234 (760)202-0300 Lic. No.: 794758 VOICE (760) 777-7012 FAX (760) 777-7011` INSPECTIONS (760) 777-7153 Date`. 12 /24 / 13 L>ti DEC 2 4 2013 ZIT p LA QUINTA FINANCE DEPT- WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury one of the following declarations: _ I have and will maintain a certificate of consent to self -insure for workers' compensation, as provided rI rbySection 3700 of the Labor Code, for the performance of the work for which this permit is sued.e and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. My workers' compensation insurance carrier and policy number are: - Carrier EUMPT Policy Number ' EXEMPT I certify that, in the performance of the work f whichthis p mit is issued, I shall not employ any person in any manner so as to become s ' ct to the ers' compensation laws f,California, and agree that, ' I should become sub' to the wo rs' compensation prov' ' ns of Section �ININGYIII'LUR`E 700 of the bor Code, 1 shallfo i om Iy those rovision D Applicant:-�W. TO SECUR RKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN -EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS (S100,000). IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. APPLICANT ACKNOWLEDGEMENT IMPORTANT Application is hereby made to the Director of Building and Safety for a permit subject to the conditions and restrictions set forth on this application. 1. Each person upon whose behalf this application is made, each person at whose request and for whose benefit work is performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents and employees for any act or omission related to the work being performed under or following issuance of this permit. 2. Any permit issued as a result of this application becomes null and void if work is not commenced within 180 days from date of issuance of such permit, or cessation of work for 180 days will subject permit to cancellation. 1 certify that I have read this application and state that the above i r tion is co t. I agree to comply with all city and county ordinances a state laws relating to building co t tion, an eby authorize representatives of t' coun y to enter up the above -mentioned pro for ction pu as. Date: ignature (Applic LQPERMIT Application Number . . . . . 13-00001586 Permit . . . ELECTRICAL 2013 Additional desc . Permit Fee . . 23.83 Plan Check Fee .00 Issue Date . . . . Valuation . . . . 0 Expiration Date 6/22/14 Qty Unit Charge Per Extension 1.00 23.8300 EA ELEC POWER APPARATUS 23.83 ------------------------------------------------------------------ Special Notes and Comments ---------- ELECTRICAL - INSTALL (1) 480 VOLT/80 AMP CHARGING STATION FOR ELECTRICAL VEHICLES PER APPROVED PLAN. 2010 CALIFORNIA BUILDING CODES. Other Fees . . . . . . . . PLAN CHECK, ELECTRICAL 23.83 PERMIT ISSUANCE M/P/E 90.57 Fee summary. Charged Paid Credited Due --------------------------------------------------------- Permit Fee Total 23.83 .00 .00 23.83 Plan Check Total .00 .00 .00 .00 Other Fee Total 114.40 .00 .00 114.40 Grand Total 138.23 .00 .00 138.23 I" LQPERMIT Dry. All. K B . in.#. City of La Quinta V, -Building &r'Safety Division DEC 09 2013 P.O. Box 1504, 78-495 Calle Tampico CZry XF La Quinta, CA 92253 - (760) 777-7012 C0MMUVzrY1A !;�JZNU Building Permit Application and Tracking Sheet DkVa0PJ4 Permit # 9P Project Address: '7 1 Owner's Name: 04"q oJ J 4.1 A. P. Number: Address: Legal Description: City, ST, Zip:. Contractor: 1) o ge- e,4,,,-. 2ffc, =Telepho. 76 a) 7 77 —e�f Address: F>,0,, 1(lr-cA4 0 y- Project Description: -"VV-Q City, ST, Zip: COA" "r-L. C,� (2<- Iz a 3PJ447� GV- aldi^t- C6VW­' 41t 0 Telephone6bo-) U,2--03,,0 3 el, (A�- -Rd L)k( A -State Lic. # City Lic. d\_: -me. 42-' Q A 3 -C&V-d- Arch., Engr., Designer: 2- M4641 k-Okk r4+ Address: 2- O'N-p- Avi AspVc City., ST, Zip: im Telephone: 11stru Co ction Type: Occupancy: Project type (circle one): New Add'n Alter Repair Demo Sq. Ft.-. # Stories: #Units: State d1c#: _.....X. ......... Name of Contact Person: Ll t-, 9 Telephone #,of Contact Person: 76 4 -'7 2'- oly_ Estimated Value of ProJI—OTP00 APPLICANT: DO NOT WRITE BELOW THIS LINE 11 Submittal Req'd Rec1d TRACKING PERMIT FEES, Plan Sets Plan Check submitted Item Amount Structural CaIcs. Reviewed, ready for corrections Plan Check Deposit Truss Calcs. Called Contact Person Plan Check Balance. Title 24 CaIcs. Plans picked up Construction Flood plain plan Plans resubmitted Mechanical Grading plan 2" Review, ready for corrections/issue Electrical Subcontactor List Called Contact Person Plumbing Grant Deed Plans picked up S.M.I. H.O.A. Approval Plans resubmitted Grading IN HOUSE:- Review, ready for correctionstissue Developer Impact Fee Planning Approval Called Contact Person A.I.P.P. Pub. Wks. Appr Date of permit issue School Fees Total Permit Fees �A] 71 d, orl.— 8o -3 06- UJ;tee ¢i�wc� , �t►�) t NN . 3 u CITY OF LA TA a' 3 ` L.&n L. _` BUILDING & SAF_ EST. APPR DATE BY ADA Compliance Nissan DC Quick Charger. The intent.of this drawing is to provide guidance for Dealerships installing Electric Vehicle Charging Stations, Americans with Disability Act (ADA) is administered by the Department of Justice and enforced in varying degrees by local Municipalities. C of ntractor and/or Municipality for actual compliance requirements 3' Cle nce Required Fo ervicing W Sidewalk -1 `i s'mm �Z PO ei Cn - 0 [M t :� C Bollard® Li N L1 a •L c `) - 9' 9P 18' Preferred Layout 9' 9' 18' Alternate Layout Nissan Quick Charger Step 1- Installation Preparation Nissan Quick Charger Layout' Use template to align bolts and conduits prior a to concrete pour T,,-,,u, ,,, Cof'i .pit kyles --Est A P011 Kole `� t j r p I 'o i FfC:i lei' i {G� PITS' 4F LA QUINTA BUILDING & SAFETY DEPT. APPROVED DATE-1 Z Z FAY V��f/ f'�Nff• � ' �,u.• ..�J� � � W:aw.. ....�.wecxi:ar��W,.::c•—...^ •` 3'�. �� �'•a-fix• .....� _.__... '. ., o ww _ ..._ ..>uoa _. —_r— nos.... r� Kccr•c -- x m�a �. :_�-^' .. �=�, r,,r �,• .e� � � lei. - .._._�, TT �,�� 1-f-• i ti� t� C i - pq ! ,, a ELECTRIC VEHICLE QUICK CHARGER OWNER'S MANUAL NSOC442D NSOC442E For saf+>ty, road carefully. IMPORTANT SAFETY INSTRUCTIONS SAVE THESE INSTRUCTIONS - This manual contains important instructions and safety information for Nissan's Quick Charger Models NSQC442D and NSQC442E that shall be followed during installation, operation, and maintenance of the unit. - IMPORTANT — Check The Service Manual provided by manufacturer before servicing. - The (D symbol marked on a rating label is an alternative for the word "Phase". - The Quick Charger (QC) is designed to be operated in a maximum indoor/outdoor environmental temperature of 104°F/40°C - Use 2AWG, 90-C copper wire as input wire. - Equipment shall be connected to the Star -connection (also known as Wye -connection) -The screws of the field wiring terminal block should be tightened to a torque 'range of 135-150[in-Ib]/l 5-17[Nm]. - Use the crimping tool below for the crimping terminals of field wiring. Manufacturer: JST Model: YPT-60N, BCT-860N, BCT-8150 m To avoid risk of fire, connect only to a circuit provided with 80 amperes maximum branch circuit over current protection in accordance with the National Electrical Code, ANSI/NFPA 70. GROUNDING INSTRUCTIONS - This unit must be electrically grounded for two reasons: 1)To avoid risk of electric shock and electrocution which can cause injury or death, a grounding conductor must be run with the power feed conductors l�WaRTJING in accordance with the National Electrical Code. That grounding conductor shall be connected to the unit's equipment grounding terminal. 2)For compliance with Federal Communications Commission regulations concerning electromagnetic radiation, the unit must be connected to a ground rod as described in this manual. The unit shall be connected to the ground rod using 2 AWG or larger wire, no more than one meter in length. A permanent metal structure, such as a building frame or drain pipe, that is permitted for grounding electrode in the National Electoric Code is an acceptable substitute for a ground rod. Grounding methods must comply with all local codes and ordinances and must employ only copper conductors and terminal lugs. WAThe Q Ruuick Charger must be installed on a concrete foundation to provide a �: stable base, to guard against water build-up and to avoid risk of fire, electric shock and electrocution which can cause injury or death. The Quick Charger employs parts that may produce arcs and sparks and WARNlNQ therefore the foundation must be 2[inches] minimum above the floor to avoid risk of explosion and ignition due to flammable gases or vapors which can cause injury or death. NOTE - The height of the foundation shall be 6[inches] maximum from the finish floor drgroppd in accordance with American with Disabilities Act regulations..: Refer to the installation manual provided by the installation vendor for details. - 1 - rvv 1,0 (Mar.27.2013) Notes on installation of Nissan Quick Charger (NSQC442) Installation must comply with local and national electrical codes. 1. Ground Rod Installation The ground rod is installed for EMC grounding purposes only. WARNING To avoid risk of electric shock and electrocution which can cause injury or death, an input wire is used as a ground cable for safety ground. 1.1 Ground rod installation Refer to Appendix 1 for ground rod location (example). 291 PLATE -BASE FRAME MTG Front rn M X O Filter Box Ipw�r Beds Ground rod ` location 1.2 Ground resistance The resistance to ground for a ground rod must comply with the National Electric Code. I i ;�� 2. Quick Charger (QC) installation 2.1 Removing the front cover (See Service Manual) This work must be performed by 2 persons to avoid personal injury. WARnfInfG The front cover weights approximately 55lbs (251(g). When removing and installing the front cover, be careful not to pinch your CAUTION finger(s) and/or foot. In order to prevent injury, do not touch the edges of the exposed portion. r .- rer :.eYI��;l�1. 143 3 _ re .4 (Mar.27.20I3 2.2 Installing the Quick Charger (QC) on the foundation (1) Remove the 4 bolts securing the QC to the shipping pallet. (2) Lift and place the QC on the foundation. When lifting and moving the QC unit body, use proper tools for the weight of the unit. The QC weights approximately 595lbs (270K9). Example crane Lifting bar Failure to lift the QC unit properly may result in personal injury or damage to 4& RN1NG the equipment. (3) Attach QC to foundation The QC unit body is anchored in 4 locations. Fix the PLATE -BASE FRAME MTG together with the QC in 4 places. PLATE -BASE FF2AME MTG ?/'?T�ZZ -4- Ir ,ONax27.20 2.3 Connection of Ground rod and QC. Remove the two bolts (M12-15) attached to the left and right rear terminals of the PLATE -BASE FRAME MTG. Fasten the side of the solder less terminal of WIRE ASSY BRAID, EARTH together with the braided line protruding from the left and right of the charger lower portion ([1]). Trim the length of the WIRE ASSY BRAID, EARTH to be as short as possible to reach the ground rod clamp (If it is with a solder less terminal, cut the terminal and then use). Connect the WIRE ASSY BRAID, EARTH to the ground rod clamp ([2]). Refer to Appendix 2 for another example_ WIRE ASSY BRAID, EARTH x 2 (Accessory parts) PLATE -BASE FRAME MTG Filter Box lower Front L _ , rn R Bladed line protruding from the left and right of the charger back lower portion P - ------------- Back WIRE ASSY- BRAID,EARTHs rrr.rrrrrrwsrr 1] Ground rod emerge point [2] ! i� �.A FA �A F Y DE PT. t 2.4 Primary Power Wiring Please follow proper installation procedures In order to prevent water and CAUTION 1 dust Intrusion into the QC. Wires should be routed underground and in metal conduit wherever there is l ®CAUTION `- - pedestrian traffic. Instructions to connect the primary power to the QC unit are as per the following: (1) Cover all cables (3 phase power cable 1-1/1-2/1-3 and ground cable) using the Flex tube Primary power QC - Flex tube recommendation Brand: Sankei P/N: KUU54 (UL360) Inner diameter 2.02in (51.3mm) - Flex tube assembly L IN 1 _`.A.F: ETY D PT. k - 6 - e4� V. .0 (Mar.27.2 Y3) (2) Insert power cables through reactors. NOTE — the ground cable does NOT pass through the reactors (3) Assemble power cables and crimp terminals. (4) Attach crimp terminals onto unit terminal. Confirm power of each phase (R, S, T). (5) Insert ground cable (6) Strip ground cable insulation approximately 25mm-26mm (0.98 inches-1.02 inches). (7) Fasten Lock Nut to 17Nm (12.5 lb-ft) (8) Secure flex tube to knock -out part to prevent water intrusion. (9) Apply cable dressing to opposite end of flex tube. It VWW - Ground cable(s) wire connection procedure is as per Appendix 3 - R38-10, Use attached crimp terminals - Confirm power phase: R: red S: white T. black - Power Gables should be routed through reactors - The grounding straps (octopus) cable. - Ground cable should NOT be routed through reactors Picture shown is without the grounding strap wires so the Reactor and ground cable routing can be Mewed eas�ilY 7 - rev. .0 (Mar.27.2013) 2.5 Items to check after connecting the primary power cable (1) Confirm that the tolerance of the primary power supply voltage between the measured value and the LCD display value is within 5%. If it is not, perform calibration operation on Printed Wiring Board1 (PWB1). (See Service Manual) (2) Confirm that each line connection of the three -phases (R, S, and T) is correctly installed. (Use the phase indicator and check that the three-phase rotation is clockwise.) The primary power supply voltage shall be within 480Vt15% AC. The primary power voltage unbalance shall be within 3%. CITY OF- LA QUINTA BUIL-DINIG & SAFETY DEPT. APPROVED 2.6 Operation check after installation (1/2) Initial state: (1) After the wiring from the breaker to the primary side has been checked, the voltage check needs to be verified so that there are no problems. (2) The power wiring has been connected and the Side Panel, Cover-Supt clamp, Plate Assy Back (Upper), Plate Assy Back (Lower) and heat sink cover have been removed. Check 1: Check that the primary power supply voltage is within AC480Vt15% by voltage tester, and the voltage unbalance of three-phase AC is within 3%. No Contact service person Yes Check 2: Check that each line connection of the three phases (R, S, and T) is correct by using the indicator. No Fix the connection Yes Check 3: Check that the tolerance of the primary power supply voltage between the measured value and the display value is within 5%. J No Calibrate PWB1. Yes 1(See Service Manual) I Turn ON ELC131 and ELCB2. I Check 4: Check that the READY, CHARGE, and ALARM lamps all illuminated and then that all turn off after 3 seconds. (With LCD model, check that the LCD panel illuminates and the "Quick charger for..." screen is displayed.) I Contact service person Yes Press the emergency stop SW. Check 5: Check that the ALARM lamp illuminates. (With LCD model, check that 'The EMERGENCY button was pressed..." is displayed on the LCD panel.) No Contact service person Yes Release emergency stop SW. X Refer to recovery procedure in Service Manual Press and hold the STOP SW (3 seconds or longer). Check 6: Check that the ALARM lamp turns off. (With LCD model, check that the "Quick charger for..." screen is displayed.) No Contact service person Yes Check 7: Check that the fans listed below are operating as prescribed. - 3 boost fans: Operate after power ON. No Contact service person Yes Turn OFF ELC131 and ELC132. 1 next section ELCB1 ELCB2 u SAF ncv strob I= rev. 1. 27.2g13) ' . J 2.7 Installing the Front Cover See Service Manual. When installing the Cover-Supt Clamp, jointly fasten 2 grounding wires of the charger cable. Jointly fasten to the right side of strain relief bracket (Grounding wire from charger cable electrically -conductive cl Jointly fasten to the left side of strain relief bracket. (Grounding wire from charger cable lock nut) i r� �� 1 vt6 _ 10 _ III �% r A (Mar2MC 2.8 Operation check after installation (2/2) I Remove the ELCB cover. I Turn ON ELCB1 and ELCB2. I Check 1: Check that the fans listed below are operating as prescribed - 3 heat sink fans: Operate after power ON. - 2 exhaust fans: Operate after power ON - Transformer cooling fan Operate after power ON. No Contact service person Yes Re -tighten all screws that you installed again. Check 2: ■ Check that all rear panel screws have been tightened and are free of gaps, and check that there are no gaps in the mounting surfaces. (Check visually that the spring washers are compressed.) No Contact service person Yes Install ELCB cover. Check 3: Check that there is no gap between the ELCB cover and the unit. Check that there is no gap between the breaker window and the unit. (Check visually.) Contact service person Yes I ' Press the panel START SW. Check 4: Check that the ALARM lamp is lit. (With LCD model, check that "Please check that the charge connector is connected ..." is displayed on the LCD panel. No �ontactserviceerson Yes I Press and hold the panel STOP SW (3 sec. or longer). I Check 5: Check that the ALARM lamp turns off. (With LCD model, check that "Quick charger for..." screen is displayed.) Contact service person Yes Fonect charger connector to electric vehicle (or EV lator). ake sure that charger connector is locked correctly. Press START SW Check 6: Confirm that charging starts. (Check that the panel screen displays the charging status.) N❑ Contact service person Yes I After 5 minutes, press the STOP SW. I Check 7: Confirm that CHARGE lamp turns off. Contact service person Yes Disconnect the charger connector from the electric vehicle (or EV simulator). The operation check is completed. 2 ELCB cover NISSAN installation Manual Appendix 1 — Example of ground rod location w Ground rod emerge 1 1 I I - ' i I BACK � � 1 ,1 1 rlC%4 r y 1 R 84" Bolt Circle I � r I ` FRONT w � 1 1 1 21' - ►- _ I JiA ;F OVED -15 - 12 - rev.1.0 (Mar.27.2013) Pppendix 2 —Another example of ground rod connection The grounding method depicted in the following diagram is also acceptable. Use acorn clamps to install (2) #2 bare Cu wire from ground rod to first rear anchor bolt and then to other rear anchor bolt as shown on diagram. (4) Anchor Bolts 1 /2" x 12" J Hooks Extend Thread 1" To 1 1 /2" Above Concrete Back 0 Charg_e 1 r I I i i I � � `J Concrete Foundation (See Drwg. S1-3) Front Of Charger *Only Rear Anchor Bolts To Be Connected To Ground Rod (2) #2 Bare Cu (3) Acorn Clamps Ground Rod Embedd In Concrete Foundat tea LAQi+�INTA &_ SWETY DEPT.FJOVEL I - 13 - rev.1.0 (Mar.27.2013) Appendix 3 - Instructions for Connecting Conductor ■ Structure Customer purchase parts Knock -out parts (Provided) ■ Assembly sequence Parts assembly should be as follows End cap Peaking Washer Hexagon cap nut Lock nut Sheet packing Packing Washer Hexagon cap nut r Main part End cap 1. Set end cap to the edge of flex tube. 2. Set all parts to edge. 3. Set end caps. 4. Set hexagon cap nut by twisting. 5. Tighten hexagon cap nut by tool. it CIF �i►d�� PIDROVE s Tr � r l -14- rev.1.0 (Mar.27.2013) Power Cage Clamp Rail -mounted Terminal Blocks for 35mm2 Side -entry Item No: 285-135,134,137 ■ Rated Wire Size: 6-35mm2/AWG8-2* Rated voltage: 1000V (600V UL) Terminal block width: 16mm (0.63inches) Rated surge voltage: 8kV Rated current: 125A (115A UL) Pollution degree: 3 * There are some cases where a wire cannot be inserted to a terminal block because of a thick insulation or a special kind of conductor. ■ Structure Part name and structure of terminal block Jumper slot Marker slot r n L J h r L_J I Removal hook � I ■ Tools Customer purchase parts 210.621TR Supplier: WAGO Corporation Info.us@wago.com Part#: 210-621 TR Operating slot Locking button (Color: orange) Wire hole ■ Stripping of Wire Strip the conductor's strip length according figure below. Frayed, twisted or bent wires area prohibited.' Strip Length 25mm-26mm Max external dia. 010mm E i Y DEPT. ED Strip Length twisted - 15 - rev.1.0 (Mar.27.2013) Wire connection Please follow the instructions otherwise the product CAUTION could be damaged. Note1 ). Note1 ) Do not rotate when a 210-621TR blade is not inserted correctly. U U Note2 ) Do not rotate clockwisel 1. Rotate counter clockwise using a 210-621 TR blade. 2. Hold the clamp in the open position and push an orange button. Place stripped wire into the clamping unit up to the stop and hold it in position. 1. Slightly rotate counter clockwise to release the latch. 2. Rotate the 210-621 TR blade clockwise until it stops. CITY OF LA QUINTq kiUILDtNG & SAFETY DEPT APPROVED . E ATE -16- rev 1.0 (Mar.27.2013)