Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Griffin Ranch - Belmont Collection TR 32879 BRES2015-0266 (Series I; Plan 1CY) Title 24
u1clK AAUUIfIQ TITLE 24, INC. 7544 SADDLEHILL TRAIL, ORANGE, CA 92869 - (714) 771-1507 - FAX (714) 771-2939 • T-24@socal.rr.com Owner: Lennar Homes/Corona 980 Montecito Drive, Suite #302 Corona, CA 92879 Designer: The McKinley Associates, Inc. 1818 First Avenue San Diego, CA 92101 Project: "Belmont Collection" (Series 1) Plan 1 CY La Quinta, California Job No. 12-13 May 28, 2015 RECEIVED AUG 2 12015 CITY OF LA QUINTA IMUNITY DEVELOPMENT CITY 0 BUILDING & sA QV t NTA oPPR0V DSpr R CONcr�e.._ED These Calculations contain all the building features and performance r q d for compliance by the California Code of Regulations Title 24, Part 1, Requirements; Part 6, Building Energy Efficiency Standards; and portUions o Title 20, Appliance Efficiency Standards. When these features are incorporated into the architectural plans the design will be in compliance with the 2013 Energy Efficiency Standards as they apply in the specified Climate Zone for residential buildings using EnergyPro, a California Energy Commission approved computer performance method program. r r^ CA BED California Association of Building Energy Consultants [4N=-4111171=D7=017YHAFeAigIAI W&-'ir Rick Maurer R08-90-243 & NROB-90-527 Prepared By: Rick Maurer Energy Plans Examiner Certificate No. R08-88-1601 and NR08-88-3583 California State License No. 502290 C20 ** SUMMARY SHEET ** Project: Lennar Homes -- La Quints, CA Zone: 15 "Belmont Collection" (Series 1) Plan 1 CY Wall Insulation: R-15 in 2x4 Exterior Walls R-21 in 2x6 or Greater Exterior Walls and Attic Knee Walls Ceiling Insulation: R-38 Typical Radiant Foil Barrier: Required @ Roof o/Conditioned Space & Attic Gable Ends (Requires an Emittance of 0.05 or less) Cool Roof (CRRC): Required with .16 Min. Aged Reflectance and .89 Min. Emissivity Raised Floor Insulation: N/A Slab Edge Insulation: None Glazing Type: All glass is DUAL PANE with High Performance Low-E Glass. (See Notes) Hard Surface Flooring: None Required Minimum Furnace AFUE: 80% AFUE Minimum Heating Capacity: 34,509 BTUH Minimum A/C SEER: 14.0 SEER/11.7 EER Adequate Cooling Coil Airflow to be Rater Verified Fan Watt Draw to be Rater Verified Refrigerant Charge Test to be Rater Verified A/C Tonnage: Min.Sens.= 41,434 @ 115' (A/C Size By Mechanical Contractor) Duct Insulation: R-8.0 For Ducts & Plenums in Unconditioned Spaces (Duct Leakage Test Required) Note(s): 1) All hot water lines will be insulated with a minimum of 1 inch insulation. This is in addition to the insulation required by the mandatory requirements per Sec. 150.00)2. 2) The water heater for this house will have a hot water demand type recirculating system with manual control. 3) This house will have a tankless water heater with an energy factor of .82 or greater and sized per the owner's specifications. 4) All windows and glass doors will have non-metal frames with high performance Low-E (Max) glass and the following maximum NFRC values: U-factor SHGC Operable .31 .23 Fixed .29 .25 Glass Door .29 .23 Large Glass Door .32 .23 BUILDING ENERGY_ ANALYSIS REPORT PROJECT: Lennar Homes - Plan #1 CY Belmont Collection La Quinta, CA Project Designer: Lennar Homes 980 Montecito Drive, #302 Corona, CA 92879 951-817-3600 Report Prepared by: Rick Maurer Rick Maurer Title 24 7544 E. Saddlehill Trail Orange, CA 92869 714-771-1507 Job Number: Date: 5/27/2015 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC—www.energysoft.com. TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form CF-1 R-PRF-01 -E Certificate of Compliance 3 HVAC System Heating and Cooling Loads Summary 14 16ergyPro 6.5 by EnergySoft. Job Number: ID: User Number: 1686 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #iCY Calculation DaterTlme: 17:29, Wed, May 27, 2015 Calculation Description: Title 24 Analysis Input File Name: Lenn201.xm1 CF1R-PRF-W Page 1 of 11 GENERAL INFORMATION 01 Project Name Belmont Collection - Plan #iCY 02 Calculation Description Title 24 Analysis 03 Project Location .Belmont Collection 04 City La Quinla 0s Standards Version Compliance2015 06 Zip Code 07 Compllance Manager Version BEMCnipMgr 2013-3c"(710) 08 Climate Zone CZ15 09 ` Software Version EnergyPrD 6.5 10 Building Type Single Family tt Front Orientation (degiCardinal) Cardinal 12 Project Scope Newly Constructed 13 Number of Dwelling Units' 4 14 Total Cond. Floor Area (FT2j 2913 15 Number of Zones 1 16 Slab Area (FT2j 2913 17 Number ofStoriesy 18 E20 - - Addition Cand. Floor Area N/A 19 Natural Gas Available Yes Z Addition Slab Area (kT:,) N/A 21 Glazing Percentage (%) 24.7% COMPLIANCE RESULTS `. 01 Building Complies withCtxljputgtPOrf4trkance 02 This building Intorporatea,fieatun3 ctltai rLg`Ultefietd to S g.aaktiifrveril 0 (N g•rztr0liB¢ HERS (.0111und- ih4 6-41) �sioW WCEC-approved HERS provider; 03 This building inoorpoMte bbe ormora patio{ Feature shiSl4ntieiaw 'FT Registration Number: 215-N0141497A.000000000-0000 Registration Date/Fime: 201&05-2812:13:36 HERS Provider: CaICERTS Inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-05-2717:30:15 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #1 CY Calculation Datefrlme: 17:29. Wed, May 27, 2015 Calculation Description: Title 24 Analysis Input File Name: Lennr201.xm1 CF1R-PRF-01 Page 2 of 11 ENERGY USE SUMMARY - Energy Use Standard Proposed Compliance Percent (kTDVA?-yr) Design Design Margin Improvement Space Heating 1.44 1.78 -0.34 -23.6% Space Cooling 100.17 90.96 9.21 92% IAO Ventilation 0.91 0.91 0.00 0.0% Water Heating 8.81 6.05 2.76 31.3% PV Credit a 0.00 0.00 - North Facing Compliance Total 111.33 99.T0 11.63 10A% Space Heating 1.44 1.00 -0.46 .31.9% Space Cooling 100.17 97.02 3.15 3.1% IAQ Ventilation 0.91 0.91 0.00 0.0% Water Healing 8.81 6 D5 2.76 31.3% PV Credit: ''« -- 0.00 0.00 East Facing Compliance Total 7 111.33 105.06 5.45 49% Space Heating .;t - 1A47 2.26 -OA2 56.9% Space Cooling t ° �, ' '� 100«i 2'r11WftC 8.08 B.0% IAQ Ventilation �1 CERT0G, 51 0.00 0.0% Water Hearing881 6 2.76 31.3% PV Credit - l H P R 0.00 1 ' D E 5'S 0.00 - South Facing Compliance Total 1l11 10Y33 10.00 9.0% Space Healing 1.44 2.00 -0.56 38.9% Space Cooling 100.17 9522 4.95 4.9% IAQ Ventilation 0.91 0.91 0.00 0.0% Water Heating 8.81 6.05 2.76 31.3% PV Credit - 0.00 0.00 - West Facing Compliance Total 111.33 104.18 7.15 6A% Registration Number: 216-010141487A-0MD000110-000o Registration Date/nme: 2015-05.28 12:13:36 HERS Provider: C910ERTS Inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2025-05-2717:3015 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection -Plan #1 CY Calculation Date/Time: 17:29, Wed, May 27. 2015 Calculation Description: Title 24 Analysis Input File Name: Lennr201.xm1 REWRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis Non-4tandard roof reflectance- • Window overhangs andfori ns CFIR-PRF-01 Page 3 of 11 HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail Is provided in the building components tables below. Bulldtng4ovet Vertficatlons: • IAQ mechanical ventilation Cooling System VerMcatlons: • WrilmumAir low- • Refrigerant Charge • Fan Efficacy WattsfCFM HVAC Distribution System Verifications: • Duct Sealing • Low4eakage Air Handling Unit 14 Domestic Hot Water System VertRcaliona _ - ,� • —None— ,�:�.--7iy _. ENERGY DESIGN RATING dt7( 1i.. PP y Tld@ is the sum of the annual TDV ensfgY sumpi1- for iiergyltee COM non in uded1n � ps)fofmance comPO h appfrjai t toy 1 Standard Design Building (Energy Budget) and the annual TDV energy consumption for lighting and oamponc r u ulutadljF l�lo d IP l6`(sudti 4Wd 67 tic pplYa anG onsumnrelenc9n { )'3t`'t iaa�unling for the annual TOV energy offset by an ort4lto renewable energy system. > # rt •• t Reference Energy Use , a=nargy Ddsign Rahn@. t ` Margin Percent Improvement Total Energy (kTDVff2•y►)• 159.37 '. '6 + 147 92.: �.' __ ` ` 5.45 3.6% ,. • includes calculated Appliances and Miscellaneous Energy Use (AMEU) BUILDING -FEATURES INFORMATION 01 02 03 04 OS 06 07 Project Name Conditioned Floor Area (ft2) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Belmont Collection - Plan #ICY 2913 1 18 . 1 F0 1 ZONE INFORMATION 01 02 03 _ 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (tt2) Avg. Gelling Helght Water Heating System 1 Watei Healingrsyptom 2 House CondWoned HVAC1 2913 10 DHW Sys Registration Number: 21M0l41487A-=0D00D0-00D0 Registration Date/nme: 2015.05-28 12:13:36 HERS Provider: CaiCERTS Inc. CA Building Energy Efficiency Standards . 2013 Residential Compliance Report Version - CFIR-02272015-710 Report Generated at: 2015-05-2717:30AS CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #1 CY Calculation Date/Time: 17:29, Wed, May 27, 2015 Calculation Description: Title 24 Analysis Input File Name: Lennr201.xm1 CF1R-PRF-01 Page 4 of 11 OPAQUE SURFACES Ot 02 03 04 05 06 07 08 Name _ Zone Construction Azimuth Orientation Gross Area (W) Window A Door Area (ft) Tlit (deg) Front 2x6 Wag House R-21 Wall 0 Front 495 206 90 Left 2x6 Wall House R 21 Wall 90 _ Left 539 144 90 Back 2x6 Wall House R-21 Wall ` 180 Back 857 347.5 90 Right 2x6 Wall House R-21 Wall 270 Right 1 600 52 90 Ceiling Below Attic House R38 Attic 10# Radiant 2913 Front 2x6 Garage Wall House»_Garage R-21 Wag HouselGarage 300 Left Garage Wall House»_Garage_, R-15 Wall House/Garage 110 Knee Wall House -A1gc House R-21 Knee Wall 163 FG Wall _Garage_ R-0 Wag 0 Front 300 170 90 LG Wall _Garage__; R-0 Well 90 Left 230 90 RG Wag __ R-0 Wall 270 Right 120 90 Garage Ceiling �Gerage_ v rgyGa sAti- 'tiq 634 Arne i #� Ot 02 03 04 05 06 07 08 Name Construction Type Roof Rise Roof Reflectance Roof EmIttance Radiant Bernier Cool Roof Attic Garage Attic Garage Roof Cone Ventilated 3 0.16 0.89 Yes No Attic House Attic RootHouse Ventilated 3 0.16 0.89 Yes No Registration Number: 216d40141487A-000000000.0000 Registration Date/tlme: 20154)5.28 12:13:36 HERS Provider: CaICERTS ftm CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CFIR-02272015-710 Report Generated at: 2015-05-2717:30:15 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #ICY Calculation Description: Title 24 Analysis Calculation Daterrime: 17:29, Wed, May 27, 2015 Input File Name: Lennr201.xml CFIR-PRF-01 Page 5 of 11 WINDOWS 01 02 03 - _ 04 05 06 07 08 09 10 Name _ Type Surface (Orlentauon4Wmuth) Width (ft) Height (ft) Multipll ar Area (ttt) U4actor SHGC Exterior Shading Front Openable Window Front 2x6 Wall (Front-0) - - 1 36.0 0.30 0.23 insect Screen (default) Large Front Glass Door Window Front 2x6 Wall (Front-0) 14.0 10.0 1 140.0 0.32 0.23 Insect Screen (default) Left Openable Window Left 2x6 Wall (Left-90) ---- -- 1 36.0 0.30 023 Insect Screen (default) Large Left Glass Door Window Left 2x6 Wall (Left-90) 9.0 10.0 1 00.0 0.32 0.23 Insed Screen (default) Left Openable 2 Window Left 2x6 Wall (Left-00) 3.0 6.0 1 18.0 0.30 023 Insect Screen (default) Back Openable Window Back 2x6 Wall (Back-180) 6.0 6.0 1 36.0 0.30 023 Insect Screen (default) Back Fixed Window Back 2x6 Wall (Back-180) 6.0 1.5 1 9.0 0.26 0.25 Insect Screen (default) Large Back Glass Door Window Batik 2x6 Well (8adk-180) 14.0 10.0 1 140.0 0.32 0.23 Insect Screen (default) Batik Openable 2 Window Back 2x6 Wall (Bads-180) - -- 1 42.0 0.30 0.23 Insect Screen (default) Back Fixed 2 Window-4,, Ba*..2xo Wall (8adi=180) - 1 026 0.25 insect Screen (default) Large Back Glass Door 2Window A Beck ztk6 Wa11,(9dt 86yr #( 10 0 8.0 s.3 [25.5 0.0 0.32 0.23 Insed Screen (default)Balk Fixed 3 Window Qcq �8aclk 21f� 4V811,(&sk1)1(0ik5 1 0.26 0.25 Insed Screen (default)Rtghl ppenable Window t+gM2iktnWall (IIghj 0 «� i t 9s<2.0 0.30 0.23 Insect Screen (default) DOORS - 01 _ 02 03 04 Name Side of Building Area M Udactor Front Door Front 2x6 Well 24.0 0.50 Front Garage Door Front 2x6 Garage Wall 21.0 0.50 Car Door FG Wall 170.0 0.50 Registration Number: 215-NO141487A-000000000-0000 Registration Date/nme: 2015-06-28 12:13:36 HERS Provider: CeICERTS Inc. CA Building Energy Efficiency Standards -2013Residential Compliance Report Version -CF1R-02272015-710 Report Generated at: 2015-05-27 17:30:15 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #1CY Calculation DatefTime: 17:29, Wed, May 27. 2015 Calculation Description: Title 24 Analysis Input File Name: Lennr201.xm1 CF1R-PRF-01 Page 6 of 11 OVERHANGS AND FINS - - 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Overhang Left Fin Right Fin Window Depth Dist Up ..Left Extent Right Extent Flap Ht. Depth - - Top Up : DlstL _ sot Up_ - Depth - - Top Up Dist R `. BM Up Large Front Glass Door 11.7 ' 1 2 2 0 0" 0 0 0 0 0 0 0 Large Left Glass Door 11.7 1 2 2 0 0 0 0 0 0 0 0 0 Left Openable 2 11.7 1 2 2 0 0 0 0 0 0 0 0 0 Back Openable 14.8 3 2 2 0 0 0 0 0 0 _ 0 0 0 Back Fixed 14.8_- 1 2 2 0 0 0 0 0 0 0 0 0 Large Back Glass Door 14.8 1 2 2 0 0 0 0 0 0 0 0 0 Large Back Glass Door 2._ 14.81 3 2 2 0 0 0 0 0 0. 0 0 0 Back Fixed 3 14 8`-= 1 2 2 0 0 0 0 0 0 0 0 0 " ._..T ,_..,.a..,_. .. 3at 'ERT, S, �nc, Pam., Registration Number: 215-N11141487Adt10000000.0000 Registration Date/Time: 2015.05-28 12:13:36 HERS Provider: CaiCERT61nc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF111-02272015-710 Report Generated at: 2015-05-2717:30:15 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection -Plan #1 CY Calculation Daterrime: 17:29, Wed, May 27, 2015 Calculation Description: Title 24 Analysis Input File Name: Lennr201.xm1 CF1R-PRF-01 Page 7 of 11 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 0s as 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing Rwalue U-value Assembly Layers Ceilings (below - - �- Inside Finish: Gypsum Board R-0 Garage Attic attic) Wood Framed Calling 2x4 @ 24 In. O.C. none 0.481 CavityI Frame., no insul. /2x4 ? Inside Finish: Gypsum Board Cavity/Fame: noinsul./2x4 Exterior Finish: Wood R-0 Wall Exterior Walls Wood Framed Wall 2x4 @ 16 in. O.C. none 0.302 Siding/sheathing/decking " - Cavity/Fame: no 1nsul. / 2x4 Top Chid • Roof Deck Wood Siding/shealhing/decking 2x4 Top Chord of Roof Truss @ 24 Tile Gap: present Attic Garage Roof Cons Attic Roofs Wood Framed Ceiling in. O.C. none 0.400 Roofing: 10 PSF (RooMI a) _. • - Cavity/Frame: no lnsul. / 2x4 Top Chid Roof Deck., Wood Sidingisheafhing/decking 20 Top Chord of Roof Truss @ 24 Tile Gap: present Attic Roofliouse _ /{Wc FtOo(s Wood, Framed Ceiling In. O.C. none 0.400 Roofing: 10 PSF (RooMi a) CoilIngw(bo _ tow' - ` �._�'� - - Inside Finish: Gypsum Boats — Cavity Cavi /Frame: R-9.1 /2x4 R-38 Attic 101f Radiant attic)' _ Woad framed Ceitfrtg} �Q 241r�,O. R 38 rk A0425: Over FloorJoisfs: R-28.9 insul. ; r+ u _ '� Inside Finish: Gypsum Board Cav7ry / F-rame: R 21 / 2x6 1Ls � SrfedorFinish:Wood R-21 Well Exterior Walls Wood FtGmed Wa1�(saarr 16 in. C_ R Ti° P R2 0. us Siding/sheafhing/decking Inside Finish: Gypsum Board Cavity/Fame: R-21 /2x6 R-21 Wall House/Garage Interior Walls Wood Framed Wall 2x6 @ 16 In. O.C. R 21 0.064 Other Side Finish: Gypsum Board Inside Finish: Gypsum Board Cavity/Fame: R-15/2x4 R-15 Wall House/Garage Interior Walls Wood Framed Wall 20 @ 16 in. O.C. R 1S 0.086 Other Side Finish: Gypsum Board Inside Finish: Gypsum Board • Cavity/Frame: R-21 /2x6 R-21 Knee Wall Interior Walls Wood framed Wail 2x6 @ 16 in. O.C. R 21 0.064 Other Side Finish: Gypsum Board SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (112) Perimeter (f1) Edge Insul. Raialue 8 Depth Carpeted Fraction Heated Slabron-Grade House 2913 229 None _ 0:8 No Garage Slab _Garage_ 634 65 None 0 No Registration Number: 21"0141487A.000000000-0000 Registration Date/Time: 20/545-2812:13:3s HERS Provider: CaICERTS Inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272015-710 Report Generated at: 2015-05-2717:30:15 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #ICY Calculation Date/Time: 17:29, Wed, May 27, 2015 Calculation Description: Title 24 Analysis Input File Name: Lenn2O1.xml CF1R-PRF-01 Page 8 of 11 BUILDING ENVELOPE - HERS VERIFICATION _ 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage ACH @ 50 Pa Not Required Not Required Not Required WATER HEATING SYSTEMS 01 02 _ 03 _ 04 05 06 Name System Type -I Distribution Type Water Heater Number. of Heatan5 IDHW Solar Fraction (%) Sys 1-III DHW Recirculation, Demand Control Push Button DHW Healer 1 1 0% WATER HEATERS 01 02 - 03 04 05 06 07 08 Name _ riaterEfeitient;Type: Tank,Type Tank Volume (gal) Energy Factor or Efficiency Input Rating Tank Exterior Insulation R-value Standby Loss (Fraction) DHW Heater 1 --:Natural Gas _- ".Smtt11 inslat�taltoousa, - ,,,, F 0.82 y 199900 BtuRv 0 0 is —? rrmvmpm(z WATER HEATING -HERS VERIFiCAT1ON . - �. ` A kr a 4. 0 01 5 OB 07 - _ Name - Pipe Insulation Parallel Piping Compact Distribution Point -of Use Reclreulatlon Control Central DHW Distribution DHW Sys t - III _ SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name Cooling Component 1:Heatiug Component 1A1r DistilbuWn System 1:HVAC Fan 1:1 Other Heating and Cooling System Heating Component 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 HVAC - HEATING UNIT TYPES - .tit 02 03 Name Type Efficiency Heating Component 1 CntriFumaca - Fuel -fired central furnace 80 AFUE Registration Number. 215•No141487A-0000000 teo000 Registration Date/Time: 2015-05-28 12:13:36 HERS Provider: COCERTS Inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CFIR-02272015-710 Report Generated at 2015-05-2717:30:15 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #1 CY Calculation Daterrime: 17:29, Wed, May 27, 2015 Calculation Description: Title 24 Analysis Input File Name: Lenn201.xm1 CF1R-PRF-01 Page 9 of 11 HVAC - COOLING UNIT TYPES 01 02 03 04 05 08 07 Name System Type EfRclency EER SEER Zonally Controlled Multi -speed Compressor HERS Verification Cooling Component 1 SplitAirCond 11.7 14 Not Zones Single Speed Cooling Component 1-lerscool HVAC COOLING -HERS VERIFICATION at 02 - 03 04 05 06 Name VerNled Alrflow Alrfiow, Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component lfierscool Required 350 Not Required Not Required Required HVAC - DISTRIBUTION SYSTEMS jilfl 01 ;' 0Z 03 04 OS 06 07 Name`f - +ZType ` Dud•Leakage Insulation R-value Dud Location Bypass Duct HERS Verification Air Distribution System 1 UudaAttic . $ _pacified Lawor):� R � 8 e Air Distribution on System Q �afii stUO lfiers-diet _ HVAC DISTRIBUTION - HERS VERIFICATION" 01 02 ,-1 CO3 04�'S ti„ 7 V 05 a iiO4 07 08 Name Duct Leakage Verification Dud Leakage Targets%) Verified Dud Location Verified Dud Design Buried Duds Deeply Buried Ducts Low -leakage Air Handier Air Distribution System lfier"Ist Required 6.0 Not Required Not Required Not Required Not Required . ' . Required HVAC-FAN SYSTEMS 01 02 03 _ 04 Name Type Fan Power (WattsICFM) HERS Variffeation HVAC Fan 1 Single Speed PSC Fumace Fan 0.58 HVAC Fan 1fiers4an HVAC FAN SYSTEMS - HERS VERIFICATION -- -�- 01 02 03 - Name Verified Fan Waft Draw Required Fan Efficiency (WattslCFM) HVAC Fan 1-hers-fan Required 0.58 Registration Number: 215-NO141487AQW0001100,0000 Registration Date/nme: 2016.0&28 12:13:36 HERS Provider: CeICERTS Inc. CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CF1R-02272025-710 Report Generated at: 2015-05-2717:30AS CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #1 CY Calculation Oate/Time: 17:29, Wed, May 27, 2015 Calculation Description: Title 24 Analysis Input File Name: Lenn201.xml CF1R-PRF-01 Page 10 of 11 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 00 Dwelling Unit IAQ CFM IAQ WattelCFM IAQ Fan Type IAQ Recovery EffectNeness1%) HERS Verification SFam IAQVentRpt 59.13 0.25 Default 0 Required ,.; LtRTS',. HSRS PROVIDER Registration Number: 215-010141487A-0000D0000-0000 Registration Date/Time: 201545-2812:13:36 HERS Provider: COCERTS [M- CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CFiR-02272015-710 Report Generated at: 2015-05-2717:30:15 CERTIFICATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE METHOD Project Name: Belmont Collection - Plan #1 CY Calculation Description: Title 24 Analysis Calculation DatelTime: 17:29, Wed, May 27, 2015 Input File Name: Lennr201.xm1 CFIR-PRF-01 Page 11 of 11 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and completer Documentation Author Name: - - - Documentation Author Signature: _. Rick Maurer Company: - Signature Date: - Rick Maurer Title 24, Inc. 2015-05-28 12:11:59�� r Address: CEA/HERS Certification Identification (If applicable): 7544 Saddlehill Trail R13-90-10024 City/State/Zp: _ Phone: Orange, CA 92869 714-771-1507 RESPONSIBLE PERSON'S DECLARATION STATEMENT `I certify the following under penalty of peilury, under the.laws of the State of California: 1. 1 am eligible under Division 3 of tho Busiq&,s and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performilnca specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. _ 3. The building design features bt eystem design featuresidenbfied.onthis Certificate.of Comptianca. are consistent with Ore Information provided on other applicable compliance documents, worksheets, calculations, plans and-specaffcatfons subn itiwCyipf appra l W91h fhis building Perot application. �- Responsible Designer Name: r. � )isjiotl�hloaff Sf James Jenike a Company: c; i- Data..Slotted, y y Lennar Homes - Southern CA 2015=02812a3;36� Address: License: 980 Montecito Drive, Suite 302 City/State/Zip: Phone: Corona, CA 92879 951-817-3500 Digitally signed by catcERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration Provider responsibility for the accuracy of the information. Registration Number: 215-N0141487A-000000000-0000 Registration Date/Time: 2015-05-28 12.13:36 HERS Provider: CaICERTS Inc - CA Building Energy Efficiency Standards - 2013 Residential Compliance Report Version - CFIR-02272015-710 Report Generated at: 2015-05-2717:30:15 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name - Lennar Homes - Plan #1CY Date 5/27/2015__ System Name HVAC Floor Area _ 2,91.3 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 COIL COOLING PEAK CFM. Sensible Total Room Loads 1 1,790 37,146 Return Vented Lighting 0 Return Air Ducts 2,144 Return Fan 0 Ventilation o 0 Supply Fan 0 Supply Air Ducts 2,144 TOTAL SYSTEM LOAD 1 41,434" COIL HTG. Latent CFM . 3,492 806 01 0 3.492 PEAK Heating System Sensible Output per System 64,000 31,420 Total Output -Btuh 128,000 Output 8tuh/s ft 43.9 1.544 Cooling System 0 Output per System 48,000 0 Total O" ut Btuh 96,000 0 Total Output(Tons) 8•0 1,544 Total Output Btuh/s ft 33.0 Total Output s ftrron 364•1 L::�j,:50:9 Air System CFM per S tern 2,000 HVAC EQUIPMENT SELECTION Airflow(cfm) 4,000 HVAC Equipment Selection & Sizing by Others 63,016 18,117 128,000 Airflow cf n/ ft 1.37 128,000 Jan 1 AM Airflow cfm/Ton 500.0 Outside Air.(OA) 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 63,016 18,117 Outside Air cfm/ ft 0.00 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF Outside Air 0 cfrn 68 OF 68 OF 105 OF 105 OF i Heating Coll Supply Fan 4,000 cfm TT 105 °F ROOM 68 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 112178OF Outside Air 0 cfm 76162 OF 76/62°F 55/54°F 55/54°F Cooling Coil Supply Fan 56 / 54 OF 4,000 cfm 47.1 % ROOM 75 ! 62 OF EnergyPro 6.5 by Energ Soft User Number. 1686 RunCode. 2015-05-27T17.30.57 ID: Page 14 of 14 AlIN AREA W T-, 3 x 19-efl 3x = 3(40CLi PLAW.s I �� M.0/4. 5�1 YY� , 6,tJ. ?K O/N. 3 x / 6 = 4.5 F, SKYLIGIATSt 01". 'Lx I (o(L!f' C> 12JN, z x = 216-) y, nm, 3 x l b_ q CL) F. /Zm • 3 x co -- 3 6 C.•/ ►2rn - I Ll 4 o Pio trPy n� . 6AO,3 3x(0=3 �(40 �yy 51, l o Fo L4P J. , ron. (o = 3Co�L/ GA2Ac�E ToT,A,,L- L� N N,�2. }-4O.M�S Bl_I7R"SQEGD. WATER HEAR +4MAT1NC, A f c. , tG�A�a �uR1�1A�r� AFUE' (,MIN.) El;,Tta . i i`1 fpu r g�T'U OUTPU" GFM FkN WATT -DRAW. coc&wtt4G Got:L .T�cV • VERI�`1E�17 AIf��Lt7V� i$TV I-1 .t1PS..t► tam. Pk.AN I 1 .j 9- - . l2r-EmC tp!a TANkt_Ess .-- . L 2001000 + 60 c—, s HY►G.PVT * NtG:tAT '-' A.GK T��1�MosTA•T R.EQVtR. � • W VS.Rl FY Sc7vtvt� oQD1NANG� (1 F A�1Y� ' 1t�LZ TV Af G s�T• UICE AAUUEUTITLE 24, INC. 7544 SADDLEHILL TRAIL, ORANGE, CA 92869 • (714) 771-1507 - FAX (714) 771-2939 • T-24@socal.rr.com May 28, 2015 Owner: Lennar Homes/Corona 980 Montecito Drive, Suite #302 Corona, CA 92879 Designer: The McKinley Associates, Inc. 1818 First Avenue San Diego, CA 92101 Project: "Belmont Collection" (Series 1) Plan 1 CY La Quinta, California Job No. 12-13 VENTILATION FOR INDOOR AIR QUALITY The following calculations are in compliance with section 150.0(o) & 150.2(a) of the 2013 Building Energy Efficiency Standards for low-rise residential buildings. The ventilation fan selection has a certified airflow rating that meets or exceeds the required minimum airflow when measured @ .25" w.c. for continuous operation. The minimum duct size specified must meet the requirements of Table 4-16 in the Residential Energy Manual. In addition, other mandatory requirements for indoor air quality are listed on the following pages. r r C,A-BEC California Association of Building Energy Consultants CERTIFIED ENERGY . . Rick Maurer R08-90-243 & NR08-90-627 Prepared By: Rick Maurer Energy Plans Examiner Certificate No. R08-88-1601 and NR08-88-3583 California State License No. 502290 C20 Continuous Ventilation Calculation Each whole building ventilation system must meet the minimum CFM required and field verified with diagnostic testing of airflow performance. In addition, the fan must be certified with a maximum sone rating of 1.0 or less. CFA -100 + 7.5 W of Bedrooms +1) = Ventilation Rate (Min. CFM @ .25" W.C.) Plan 1CY 2913 = 100 + 7.5 (3 + 1) = 29.13 + 30.0 = 59.13 Min. CFM For Energy Features that require HERS field verification, registered copies of the following checked CF3R verification and diagnostic testing certificates shall be posted or made available to the enforcement agency. Prior to final inspection a copy of the following checked CF211 installation certificates shall be posted or made available to the enforcement agency. Verification Installation Certificate Certificate Document Category Document CF3R HERS CF2R Category Description Descri Lion Envelope - X ENV-01 Non HERS Fenestration/Glazing Envelope X ENV-02 Non HERS Envelope Air Sealing Joints & Openings Envelope X ENV-03 Non HERS Insulation Installation Envelope Roofing X ENV-04 Non HERS Cool Roof - Radiant Barrier Envelope Building Envelope Air Leakage - ENV-20H HERS Blower Door Test ENV- Envelope 21 H-24H HERS Quality Insulation Installation Qll Lighting X LTG-01 Non HERS Single Family. Lihtin Lighting LTG-02 Non HERS _ Multi -Family Lighting Mechanical HVAC Systems & Ducts X MCH-01 Non HERS Return Air Filter Labeling Mechanical MCH-02 Non HERS Whole House Fan Mechanical Duct Leakage Test X X MCH-20H HERS Low_ Leakage Air Handler LLAH Mechanical Duct Location MCH-21 H HERS Conditioned Space Mechanical Fan Watt Draw Efficacy (FWD) X X MCH-22H HERS .58 Watts/CFM Mechanical Cooling Coil Airflow (CCA) X X MCH-23H HERS 350 CFM/Ton Building Envelope Air Leakage MCH-24H Mechanical Blower Door Test HERS w/Ducts in Conditioned Space Mechanical . X X MCH-25H HERS Refrigerant Charge Verification Mechanical MCH-26H HERS SEER & EER Verification Mechanical Indoor Air Quality & Mechanical Ventilation X X MCH-27H HERS ASHRAE 62.2 Continuous Fan Mechanical Return Duct & Filter Grille Sizing MCH-28H HERS Alternate to FWD & CCA Mechanical Supply Duct Surface Area, MCH-29H HERS -R-Value & Buried Ducts Plumbing PLB-01 Non HERS PLB-21 H HERS Multi -Family Hot Water Distribution System Plumbing X PLB-02 Non HERS PLB-22H HERS Single Family Hot Water Distribution System - SUPERINTENDENTS Please coordinate with you subcontractors and HERS rater the importance of having the above checked certificates filled out on time to prevent any hold-ups during final inspection. Keep in mind that some of these items need to be inspected by the HERS rater prior to drvwall. i -- wrightsoftm Load Short Form LIVING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Belmont, Lennar 1 980 Montecito Dr. Suite #302, Corona, CA Htg Clg Outside db (OF) 34 109 Inside db (OF) 68 75 Design TD (OF) 34 34 Daily range - H Inside humidity (%) 50 50 Moisture difference (gr/lb) 28 -3 HEATING EQUIPMENT Make Allied Air Enterprises Trade AIRE-FLO,ADVANCE COMFORT SYSTE... Model 80AF1 UH110P20CL * AHRI ref 4514549 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 110000 Btuh 89000 Btuh 52 OF 1550 cfm 0.086 cfm/Btuh 0.50 in H2O Infiltration Method Construction quality Fireplaces 015 Mechanical Simplified Tight 1 (Tight) COOLING EQUIPMENT Make Aire -Flo Trade ADP Cond 4AC14*48P-4, -5 Coil PL60H210P19(6,9)++TD AHRI ref 6885341 Efficiency 12.0 EER, 14.5 SEER Sensible cooling 32550 Btuh Latent cooling 13950 Btuh Total cooling 46500 Btuh Actual air flow 1550 cfm Air flow factor 0.060 cfm/Btuh Static pressure 0.50 in H2O Load sensible heat ratio 1.00 ROOM NAME Area (ft2) Htg load (Btuh) Clg load (Btuh) Htg AVF (cfm) Clg AVF (cfm) KITCHEN 280 1893 1359 163 81 GREAT ROOM 560 9012 17890 774 1069 DINING ROOM 210 4108 3822 353 228 ENTRY 77 1191 954 102 57 DEN 182 1525 1410 131 84 HALLWAY 244 0 0 0 0 LAUNDRY 88 187 299 16 18 D\nmD 4Li 4 77 7nA „ 411 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. ` 2015-Jul-27 10:46:52 �. wrightSOW Right -Suite® Universal 2013 13.0.09 RSU05227 Page 2 ACCA ...(Series 1)\JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N LIVING f - 1677 18043 25939 1550 1550 Other equip loads 0 0 Equip. @ 1.14 RSM 29545 Latent cooling 89 TnTA1 C ! 9 a77 4 QnA 4 4 ccn , ccn Calculations approved byACCA to meet all requirements of Manual J 8th Ed. 2015Jul-27 10:46:52 wrightSOft° Right -Suite® Universal 2013 13.0.09 RSU05227 Page 3 ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N r wrightsoft® Load Short Form SLEEPING True Air Mechanical 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Job: Belmont Date: Jul 23, 2015 By: True Air Mechanical Plan: 1 CY Htg Clg Infiltration Outside db (OF) 34 109 Method Simplified Inside db (OF) 68 75 Construction quality Tight Design TD (OF) 34 34 Fireplaces 1 (Tight) Daily range - H Inside humidity (%) 50 50 Moisture difference (gr/lb) 28 -3 HEATING EQUIPMENT Make Allied Air Enterprises Trade AIRE-FLO,ADVANCE COMFORT SYSTE. Model 80AF1 UH090P16BL-* AHRI ref 4514553 Efficiency Heating input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 88000 Btuh 71000 Btuh 57 OF 1133 cfm 0.087 cfm/Btuh 0.50 in H2O COOLING EQUIPMENT Make Aire -Flo Trade ADP Cond 4AC14*36P-2,-3 Coil PL36H210P29(6,9)++TD AHRI ref 5723053 Efficiency 12.0 EER, 14.5 SEER Sensible cooling 23800 Btuh Latent cooling 10200 Btuh Total cooling 34000 Btuh Actual air flow 1133 cfm Air flow factor 0.072 cfm/Btuh Static pressure 0.50 in H2O Load sensible heat ratio 1.00 ROOM NAME Area Htg load Clg load Htg AVF Clg AVF (ft2) (Btuh) (Btuh) (cfm) (cfm) MASTER ZONE 765 7672 10880 666 783 SLEEPING ZONE 555 5380 5365 467 386 SLEEPING 1320 13053 15049 1133 1133 Other equip loads 0 0 Equip. @ 1.14 RSM 17141 Latent cooling 50 TnTAIC 44nC4 474 nn 4444 4474 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015Jul-27 10:46:52 ^. + wrightsoft° Right-Suke® Universal 2013 13.0.09 RSU05227 Page 4 ACCA ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rap Calc = W8 Front Door faces: N * wrightsoft° 4 Faraday, Irvine, CA 92618 Load Multizone Summary Report True Air Mechanical Job: Belmont Date: Jul 23, 2015 By: True Air Mechanical Plan: 1 CY Heating Cooling ZONE NAME Volume ACH AVF HTM Volume ACH AVF HTM ft3 cfm Btuh/ft' ftcfm Btuht t' LIVING 13416 0.10 23 0.9 13416 0.06 13 0.5 MASTER ZONE 6120 0.12 12 0.9 6120 0.07 7 0.5 SLEEPING ZONE 4440 0.12 9 0.9' 4440 0.06 5 0.5 Entire House 23976 0.11 44 0.9 23976 0.06 24 0.5 ROOM NAME Area ft2 Htg load Btuh Clg load Btuh Htg AVF cfm Clg AVF cfm KITCHEN 280 1893 1359 163 81 GREAT ROOM 560 9012 17890 774 1069 DINING ROOM 210 4108 3822 353 228 ENTRY 77 1191 954 102 57 DEN 182 1525 1410 131 84 HALLWAY 244 0 0 0 0 LAUNDRY 88 187 299 16 18 PWDR 36 127 204 11 12 LIVING 1677 18043 25939 1550 1550 M WIC 150 1127 848 98 61 MASTER BEDROOM 360 2697 5661 234 407 MASTER BATH 225 3811 4296 331 309 M PWDR 30 39 74 3 5 MASTER ZONE 765 7672 10880 666 783 BEDROOM 3 208 1716 1682 149 121 BEDROOM 2 245 1223 1991 106 143 BATH 3 36 687 564 60 41 BATH 2 66 1754 1128 152 81 SLEEPING ZONE 555 5380 5365 467 386 Entire House 2997 31096 41013 2683 2718 wrightSOW Right-Suke® Universal 2013 13.0.09 RSU05227 ACA:k ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N 2015-Jul-27 10:46:52 Page 1 Building Analysis Job: Belmont u +- wrightsoft° g Date: Jul 23, 20115 Entire House By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 Project Information For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (°F) 34 Daily range °F) - Wet - Wind speed (mph) 15.0 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (% Heating 68 34 50 Cooling 75 34 50 Cooling 109 30 (H ) 73 7.5 Moisture difference gr/lb) Infiltration: Method Construction quality Fireplaces 27.7 Simplified Ti r 1 ?Tight) -2.8 Component Btuh/ft2 Btuh % of load Walls 2.9 3942 12.7 Glazing 10.2 4310 13.9 Doors 13.2 277 0.9 Ceilings 0.9 2634 8.5 Floors 2.5 7521 24.2 Infiltration 0.9 1641 5.3 Ducts 10771 34.6 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 1310961 100.0 Component Btuh/ft2 Btuh % of load Walls 2.9 3877 9.5 Glazing 34.7 14677 35.8 Doors 15.7 330 0.8 Ceilings 1.4 4188 10.2 Floors 0 0 0 Infiltration 0.5 898 2.2 Ducts 17042 41.6 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 1 410131 100.0 Latent Cooling Load = 140 Btuh Overall U-value = 0.071 Btuh/ft2-°F Data entries checked. &% P + wrightsoft' Right-Suke® Universal 2013 13.0.09 RSU05227 2015 Jul 27 1 age 1 Page 1 j0M ...(Series I)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Building Analysis Job: Belmont wrightsoft® g y Date: Jul 23, 2015 LIVING By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (°F) 34 Daily range °F) - Wet - Wind speed (mph) 15.0 Indoor: Heating Cooling Indoor temperature (°F) 68 75 Design TD (°F) 34 34 Relative humidity (% 50 50 Cooling Moisture difference (gr/lb) 27.7 -2.8 109 Infiltration: 30 (H ) Method Simplified 73 Construction quality Ti ht 7.5 Fireplaces 1 ?Tight) Component Btuh/ft2 Btuh % of load Walls 2.9 1832 10.2 Glazing 10.2 2999 16.6 Doors 13.2 277 1.5 Ceilings 0.9 1474 8.2 Floors 2.4 3945 21.9 Infiltration 0.9 861 4.8 Ducts 6656 36.9 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1180431 100.0 Component Btuh/ft2 Btuh % of load Walls 2.9 1802 6.9 Glazing 36.0 10541 40.6 Doors 15.7 330 1.3 Ceilings 1.4 2344 9.0 Floors 0 0 0 Infiltration 0.5 471 1.8 Ducts 10452 40.3 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 25939 100.0 Latent Cooling Load = 89 Btuh Overall U-value = 0.072 Btuh/ft2-°F Data entries checked. wri htsoft* 2015-Jul-2710:46:52 g Right -Suite® Universal 2013 13.0.09 RSU05227 Page 2 ACCh ...(Series I)\JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Buildin Analysis Job: Belmont - wrightsoft® g Date: Jul 23, 2015 SLEEPING By: True air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (°F) 34 Daily range, °F) - Wet bulb (° - Wind speed (mph) 15.0 Indoor: Heating Cooling Indoor temperature (°F) 68 75 Design TD (°F) 34 34 Relative humidity (% 50 50 Cooling Moisture difference gr/lb) 27.7 -2.8 109 Infiltration: 30 (H ) Method Simplified 73 Construction quality Ti ht 7.5 Fireplaces 1 ?Tight) Component Btuh/ft' Btuh % of load Walls 2.9 2109 16.2 Glazing 10.1 1311 10.0 Doors 0 0 0 Ceilings 0.9 1160 8.9 Floors 2.7 3577 27.4 Infiltration 0.9 781 6.0 Ducts 4115 31.5 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1130531 100.0 Cooling Component Btuh/ft2 Btuh % of load Walls 2.9 2075 13.8 Glazing 31.7 4137 27.5 Doors 0 0 0 Ceilings 1.4 1845 12.3 Floors 0 0 0 Infiltration 0.5 427 2.8 Ducts 6566 43.6 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 1 150491 100.0 Latent Cooling Load = 50 Btuh Overall U-value = 0.069 Btuh/ft2-°F Data entries checked. 2015Jul-27 10:46:52 wrightsoft' Right-Suke® Universal 2013 13.0.09 RSU05227 Page 3 ACCK ...(Series 1)\JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N +�- wrightsoft° 4 Faraday, Irvine, CA 92618 Building Analysis MASTER ZONE True Air Mechanical Job: Belmont Date: Jul 23,2015 By: True Air Mechanical Plan: 1 CY Project• • For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Design Conditions Location: Indoor: Heating Cooling Palm Springs Thermal AP, CA, US Indoor temperature (°F) 68 75 Elevation: -118 ft Design TD (°F) 34 34 Latitude: 34°N Relative humidity (% 50 50 Outdoor: Heating Cooling Moisture difference (gr/lb) 27.7 -2.8 Dry bulb (°F) 34 109 Infiltration: Daily range °F) - 30 (H ) Method Simplified Wet bulb (°F - 73 Construction quality Ti ht Wind speed (mph) 15.0 7.5 Fireplaces 1 ?Tight) Component Btuh/ftz Btuh % of load Walls 2.9 1247 16.3 Glazing 10.3 769 10.0 Doors 0 0 0 Ceilings 0.9 672 8.8 Floors 2.8 2106 27.4 Infiltration 0.9 460 6.0 Ducts 2419 31.5 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 176721 100.0 Component Btuh/ftz Btuh % of load Walls 2.9 1227 11.3 Glazing 47.8 3586 33.0 Doors 0 0 0 Ceilings 1.4 1069 9.8 Floors 0 0 0 Infiltration 0.5 251 2.3 Ducts 4747 43.6 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 1 108801 100.0 Latent Cooling Load = 29 Btuh Overall U-value = 0.070 Btuh/ftz-°F Data entries checked. 2015-Jul-27 10:46:52 .� 9 wrightSOft' Right -Suite® Universal 2013 13.0.09 RSU05227 Page 4 19 ,4M ...(Series I)WD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Building Analysis Job: Belmont - wrightsoft0 9 Date: Jul 23, 2015 SLEEPING ZONE By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 Project Information For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (°F) 34 Daily range °F) - A - Wind speed (mph) 15.0 Indoor: Heating Cooling Indoor temperature (°F) 68 75 Design TD (°F) 34 34 Relative humidity (% 50 50 Cooling Moisture difference gr/lb) 27.7 -2.8 109 Infiltration: 30 (H ) Method Simplified 73 Construction quality Tight 7.5 Fireplaces 1 Tight) Component Btuh/ftz Btuh % of load Walls 2.9 862 16.0 Glazing 9.8 542 10.1 Doors 0 0 0 Ceilings 0.9 488 9.1 Floors 2.7 1471 27.3 Infiltration 0.9 321 6.0 Ducts 1696 31.5 Piping 0 0 Humidification 0 0 Ventilation 0 0 Adjustments 0 Total 1 153801 100.0 Component Btuh/ftz Btuh % of load Walls 2.9 848 15.8 Glazing 22.1 1225 22.8 Doors 0 0 0 Ceilings 1.4 776 14.5 Floors 0 0 0 Infiltration 0.5 176 3.3 Ducts 2341 43.6 Ventilation 0 0 Internal gains 0 0 Blower 0 0 Adjustments 0 Total 1 1 53651 100.0 Latent Cooling Load = 21 Btuh Overall U-value = 0.068 Btuh/ftz-°F Data entries checked. !4 ft + wrightso46 ' Right -Suite® Universal 2013 13.0.09 RSU05227 2015 Jul-27 10:Page ge 5 5 ,4F& ...(Series I)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Component Constructions Job: Belmont C -�d- wrightsoft® Date: Jul 23, 2015 Entire House By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (OF) 34 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Heating Cooling Indoor temperature (OF) 68 75 Design TD (OF) 34 34 Relative humidity (%) 50 50 Cooling Moisture difference (gr/lb) 27.7 -2.8 109 Infiltration: 30 (H ) Method Simplified 73 Construction quality Tight 7.5 Fireplaces 1 (Tight) Construction descriptions Walls 12D-Osw: Frm wall, stucco ext, r-15 cav ins, 5/8" gypsum board int fnsh, 2"x4" wood frm Partitions (none) Or Area U-value Insul R Htg HTM Loss Clg HTM Gain fF Bh&M--°F ft2-°F/I3kAi MOM BkM BUM Btuh n 425 0.086 15.0 2.91 1234 2.86 1214 e 278 0.086 15.0 2.91 809 2.86 796 s 336 0.086 15.0 2.91 977 2.86 961 w 317 0.086 15.0 2.91 921 2.86 906 all 1356 0.086 15.0 2.91 3942 2.86 3877 Windows 4A5-2ow: 2 glazing, clr low-e outr, air gas, wd frm mat, clr innr, 1/4" n gap, 1/8" thk; NFRC rated (SHGC=0.25); 1 ft overhang (4 ft window ht, a 4 ft sep.) s w all 4A5-2ow: 2 glazing, clr low-e outr, air gas, wd frm mat, cir innr, 1/4" w gap, 1/8" thk; NFRC rated (SHGC=0.25); 1 ft overhang (5 ft window ht, 4 ft sep.) 4A5-2ow: 2 glazing, clr low-e outr, air gas, wd frm mat, clr innr, 1/4" w gap, 1/8" thk; NFRC rated (SHGC=0.23) w all Doors 11 DO: Door, wd sc type Ceilings 16CR-38ad: Attic ceiling, asphalt shingles roof mat, r-38 cell ins, 5/8" gypsum board int fnsh Floors 22A-wpl: Bg floor, light dry soil, on grade depth, hrd wd fir fnsh 39 0.290 0 9.80 386 14.9 588 61 0.290 0 9.80 595 33.8 2048 40 0.290 0 9.80 392 18.0 722 16 0.290 0 9.80 157 33.8 540 156 0.290 0 9.80 1529 25.0 3897 25 0.290 0 9.80 245 33.8 844 50 0.310 0 10.5 524 32.5 1626 192 0.310 0 10.5 2012 32.5 6243 242 0.310 0 10.5 2536 32.5 7869 e 21 0.390 0 2997 0.026 38.0 225 0.989 0 13.2 277 15.7 330 0.88 2634 1.40 4188 33.4 7521 0 0 2015-Jul-27 10:46:53 wrightsoft" Right-Sufte® Universal 2013 13.0.09 RSU05227 Page 1 ,4M ...(Series 1)\JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N Com onent Constructions Job: Belmont wrightsoft® p Date: Jul 23, 2015 LIVING By: True Air Mechanical True Air Mechanical Plan: 1 CY 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (OF) 34 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Indoor temperature (OF) Design TD (OF) Relative humidity (%) Cooling Moisture difference (gr/lb) 109 Infiltration: 30 (H ) Method 73 Construction quality 7.5 Fireplaces Heating Cooling 68 75 34 34 50 50 27.7 -2.8 Simplified Tight 1 (Tight) Construction descriptions Or Area U-value Insul R Htg HTM Loss Clg HTM Gain ft2 Bkdff--°F ft'-°F/Btuh Bbk& Btuh Btuhlf' Btuh Walls 12D-Osw: Frm wall, stucco ext, r-15 cav ins, 5/8" gypsum board int n 24 0.086 15.0 2.91 70 2.86 69 fnsh, 2"x4" wood frm a 182 0.086 15.0 2.91 530 2.86 521 s 296 0.086 15.0 2.91 860 2.86 846 w 128 0.086 15.0 2.91 372 2.86 366 all 630 0.086 15.0 2.91 1832 2.86 1802 Partitions (none) Windows 4A5-2ow: 2 glazing, Or low-e outr, air gas, wd frm mat, clr innr, 1/4" e gap, 1/8" thk; NFRC rated (SHGC=0.25); 1 ft overhang (4 ft window ht, s 4 ft sep.) w all 4A5-2owd: 2 glazing, clr low-e outr, air gas, wd frm mat, clr innr, 1/4" w gap, 1/8" thk; NFRC rated (SHGC=0.23) Doors 11 DO: Door, wd sc type e Ceilings 16CR-38ad: Attic ceiling, asphalt shingles roof mat, r-38 coil ins, 518" gypsum board int fnsh Floors 22A-wpl: Bg floor, light dry soil, on grade depth, hrd wd fir fnsh 45 0.290 0 9.80 438 33.8 1508 40 0.290 0 9.80 392 18.0 722 16 0.290 0 9.80 157 33.8 540 101 0.290 0 9.80 987 27.5 2770 192 0.310 0 10.5 2012 32.5 6243 21 0.390 0 13.2 277 15.7 330 1677 0.026 38.0 118 0.989 0 0.88 1474 1.40 2344 33.4 3945 0 0 2015-Jul-27 10:46:53 /� wrightsoft Right -Suites Universal 2013 13.0.09 RSU05227 Page 2 /4M ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N Component Constructions Job: Belmont wrightsOft® p Date: Jul 23, 2015 SLEEPING By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 e-roject intormation For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (°F) 34 Daily range (°F) - Wet bulb (°F) - Wind speed (mph) 15.0 Indoor: Indoor temperature (°F) Design TD (°F) Relative humidity (%) Cooling Moisture difference (gr/lb) 109 Infiltration: 30 (H ) Method 73 Construction quality 7.5 Fireplaces Heating Cooling 68 75 34 34 50 50 27.7 -2.8 Simplified Tight 1 (Tight) Construction descriptions Or Area U-value Insul R Htg HTM Loss CIg HTM Gain ft2 Btuhlft'--°F W.-Ill" BbjW Btuh BhAff Bluh Walls 12D-Osw: Frm wall, stucco ext, r-15 cav ins, 5/8" gypsum board int n 401 0.086 15.0 2.91 1165 2.86 1146 fnsh, 2"x4" wood firm a 96 0.086 15.0 2.91 279 2.86 275 s 40 0.086 15.0 2.91 116 2.86 114 w 189 0.086 15.0 2.91 549 2.86 540 all 726 0.086 15.0 2.91 2109 2.86 2075 Partitions (none) Windows 4A5-2ow: 2 glazing, clr low-e cutr, air gas, wd firm mat, clr innr, 1/4" n gap, 1/8" thk; NFRC rated (SHGC=0.25); 1 ft overhang (4 ft window ht, e 4 ft sep.) all 4A5-2ow: 2 glazing, clr low-e outr, air gas, wd frm mat, clr innr, 1/4" w gap, 1/8" thk; NFRC rated (SHGC=0.25); 1 ft overhang (5 ft window ht, 4 ft sep.) 4A5-2ow: 2 glazing, clr low-e outr, air gas, wd firm mat, cir innr, 1/4" w gap, 1/8" thk; NFRC rated (SHGC=0.23) Doors (none) Ceilings 16CR-38ad: Attic ceiling, asphalt shingles roof mat, r-38 ceil ins, 5/8" gypsum board int fish Floors 22A-wpl: Bg floor, light dry soil, on grade depth, hrd wd fir fish 39 0.290 0 9.80 386 14.9 588 16 0.290 0 9.80 157 33.8 540 55 0.290 0 9.80 542 20.4 1128 25 0.290 0 9.80 245 33.8 844 50 0.310 0 10.5 524 32.5 1626 1320 0.026 38.0 107 0.989 0 0.88 1160 1.40 1845 33.4 3577 0 0 2015-Jul-27 10:46:53 wrightsOit° Right -Suite® Universal 2013 13.0.09 RSU05227 Page 3 ...(Series I)\JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N t S ec Pro Summary Job: Belmont wrightsoft® ry Date: Jul 23, 2015 LIVING By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Notes: Design Information Weather: Winter Design Conditions Outside db 34 OF Inside db 68 OF Design TD 34 OF Heating Summary Structure 11387 Btuh Ducts 6656 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Piping 0 Btuh Equipment load 18043 Btuh Infiltration Palm Springs Thermal AP, CA, US Method Simplified Construction quality Tight Fireplaces 1 (Tight) Heating Cooling Area (ftz 1677 1677 Volume (ft3) 13416 13416 Air changes/hour 0.10 0.06 Equiv. AVF (cfm) 23 13 Heating Equipment Summary Make Allied Air Enterprises Trade AIRE-FLO,ADVANCE COMFORT SYSTE Model 80AF1 UH110P20CL-' AHRI ref 4514549 Efficiency Heating Input Heating output Temperature rise Actual air flow Air flow factor Static pressure Space thermostat 80 AFUE 110000 Btuh 89000 Btuh 52 °F 1550 cfm 0.086 cfm/Btuh 0.50 in H2O Summer Design Conditions Outside db 109 OF Inside db 75 OF Design TD 34 OF Daily range H Relative humidity 50 % Moisture difference -3 gr/lb Sensible Cooling Equipment Load Sizing Structure 15487 Btuh Ducts 10452 Btuh Central vent (0 cfm) 0 Btuh Blower 0 Btuh Use manufacturer's data n Rate/swing multiplier 1.14 Equipment sensible load 29545 Btuh Latent Cooling Equipment Load Sizing Structure -24 Btuh Ducts 113 Btuh Central vent (0 cfm) 0 Btuh Equipment latent load 89 Btuh Equipment total load 29634 Btuh Req. total capacity at 0.70 SHR 3.5 ton Cooling Equipment Summary Make Aire -Flo Trade ADP Cond 4AC14'48P-4, -5 Coil PL60H210P19(6,9)++TD AHRI ref 6885341 Efficiency 12.0 EER, 14.5 SEER Sensible cooling Latent cooling Total cooling Actual air flow Air flow factor Static pressure Load sensible heat ratio 32550 Btuh 13950 Btuh 46500 Btuh 1550 cfm 0.060 cfm/Btuh 0.50 in H2O 1.00 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Jul-27 10:46:53 wrightsoft' Right -Suite® Universal 2013 13.0.09 RSU06227 Page 2 ..(Series 1)\JDBS\Plan 1 CY\13elmont Plan 1 CY.rup Calc = W8 Front Door faces: N Project Summary Job: Belmont wrightsoft® Date: Jul 23, 2015 SLEEPING By: True Air Mechanical True Air Mechanical Plan: 1 CY 4 Faraday, Irvine, CA 92618 Project Information For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Notes: Design Information Weather: Palm Springs Thermal AP, CA, US Winter Design Conditions Summer Design Conditions Outside db 34 OF Outside db 109 OF Inside db 68 OF Inside db 75 OF Design TD 34 OF Design TD 34 OF Daily range H Relative humidity 50 % Moisture difference -3 gr/lb Heating Summary Sensible Cooling Equipment Load Sizing Structure 8938 Btuh Structure 8483 Btuh Ducts 4115 Btuh Ducts 6566 Btuh Central vent (0 cfm) 0 Btuh Central vent (0 cfm) 0 Btuh Humidification 0 Btuh Blower 0 Btuh Piping 0 Btuh Equipment load 13053 Btuh Use manufacturer's data n Rate/swing multiplier 1.14 Infiltration Equipment sensible load 17141 Btuh Method Simplified Latent Cooling Equipment Load Sizing Construction quality Tight Fireplaces 1 (Tight) Structure -21 Btuh Ducts 72 Btuh Heating Cooling Central vent (0 cfm) 0 Btuh Area (f:2) 1320 1320 Equipment latent load 50 Btuh Volume ft3) 10560 10560 Air changes/hour 0.12 0.06 Equipment total load 17192 Btuh Equiv. AVF (cfm) 21 11 Req. total capacity at 0.70 SHR 2.0 ton Heating Equipment Summary Cooling Equipment Summary Make Allied Air Enterprises Make Aire -Flo Trade AIRE-FLO,ADVANCE COMFORT SYSTE... Trade ADP Model 80AF1 UH090P16BL-* Cond 4AC14*36P-2,-3 AHRI ref 4514553 Coil PL36H210P29(6,9)++TD AHRI ref 5723053 Efficiency 80 AFUE Efficiency 12.0 EER, 14.5 SEER Heating Input 88000 Btuh Sensible cooling 23800 Btuh Heating output 71000 Btuh Latent cooling 10200 Btuh Temperature rise 57 OF Total cooling 34000 Btuh Actual air flow 1133 cfm Actual air flow 1133 cfm Air flow factor 0.087 cfm/Btuh Air flow factor 0.072 cfm/Btuh Static pressure 0.50 in H2O Static pressure 0.50 in H2O Space thermostat Load sensible heat ratio 1.00 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Jul-27 10:46:53 wrightsoft" Right -Suites Universal 2013 13.0.09 RSU05227 Page 3 /CCA ...(Series 1)\JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N - AED Assessment Job: Belmont - wrightsoftm Date: Jul 23, 2015 LIVING By: True Air Mechanical Plan: ICY - True Air Mechanical 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (OF) 34 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Heating Cooling Indoor temperature (OF) 68 75 Design TD (OF) 34 34 Relative humidity (%) 50 50 Cooling Moisture difference (gr/lb) 27.7 -2.8 109 Infiltration: 30 (H ) 73 7.5 Hourly Glazing Load H-d C" . �.�. Maximum hourly glazing load exceeds average by 49.3%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 1528 Btuh (PFG-1.3*AFG) 2015-1ul-27 10:46:53 ^C wrightsoft' RightSuite® Universal 2013 13.0.09 RSU05227 Page 2 /4CC� ...(Series 1)%JDSS\Plan 1 CY0elmont Plan 1 CY.rup Calc = W8 Front Door faces: N 9 ® AED Assessment Job: Belmont WCI i1iSi�ft Date: Jul 23, 2015 SLEEPING By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Location: Palm Springs Thermal AP, CA, US Elevation: -118 ft Latitude: 34 ON Outdoor: Heating Dry bulb (OF) 34 Daily range (OF) - Wet bulb (OF) - Wind speed (mph) 15.0 Indoor: Heating Cooling Indoor temperature (OF) 68 75 Design TD (OF) 34 34 Relative humidity (%) 50 50 Cooling Moisture difference (gr/lb) 27.7 -2.8 109 Infiltration: 30 (H ) 73 7.5 Hourly Glazing Load Hw of Day / H-.y / Avvap. Am Fa Maximum hourly glazing load exceeds average by 47.1%. Zone does not have adequate exposure diversity (AED), based on AED limit of 30%. AED excursion: 539 Btuh (PFG-1.3*AFG) 2015-Jul-27 10:46:53 :� wrightSOW Right-Sufte® Universal 2013 13.0.09 RSU05227 Page 3 IM ...(Series I)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N wrightsoft• Right-M Worksheet Entire House True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 Byy: True Air Mechanical Pfan: 1 CY 1 Room name Entire House LIVING 2 Exposed wall 225.0 ft 118.0 ft 3 Room height 8.0 ft 8.0 ft 4 Room dimensions 5 Room area 2997.0 ft' 1677.0 ft2 TY Construction U-value Or HTM Area (f:2) Load Area (ft') Load number (Btuh/ft'-°F) (Btuh/ftj or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 VLC12D-0sw 0.086 n 2.91 2.86 464 425 1234 1214 24 24 70 69 4A5-2ow 0.290 n 9.80 14.94 39 0 386 588 0 0 0 0 12D-0sw 0.086 a 2.91 2.86 360 278 809 796 248 182 530 521 4A5-2ow 0.290 a 9.80 33.75 61 0 595 2048 45 0 438 1508 11 11 DO 0.390 a 13.18 15.70 21 21 277 330 21 21 277 330 V►! 12D-0sw 0.086 s 2.91 2.86 376 336 977 961 336 296 860 846 T-C 4A5-2ow 0.290 s 9.80 18.05 40 0 392 722 40 0 392 722 12D-0sw 0.086 w 2.91 2.86 600 317 921 906 336 128 372 366 4A5-2ow 0.290 w 9.80 33.75 16 0 157 540 16 0 157 540 4A5-2ow 0.290 w 9.80 33.75 25 0 245 844 0 0 0 0 4A5-2ow 0.310 w 10.48 32.52 50 0 524 1626 0 0 0 0 C 4A5-2owd 16CR-38ad 0.310 0.026 w - 10.48 0.88 32.52 1.40 192 2997 0 2997 2012 2634 6243 4188 192 1677 0 1677 2012 1474 6243 2344 F 22A-wpl 0.989 - 33.43 0.00 2997 225 7521 0 1677 118 3945 0 6 c)AED excursion 2068 1528 Envelope loss/gain 18683 23073 10526 15016 12 a) Infiltration 1641 898 861 471 b) Room ventilation 0 01 01 0 13 Internal gains: Occupants Qa 230 0 0 0 0 Appliancestother 0 0 Subtotal (lines 6 to 13) 20325 23971 11387 15487 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 20325 23971 11387 15487 15 Duct loads 53% 72% 10771 17042 58% 67% 6656 10452 otal room load FTA 31096 41013 1 18043 25939 irrequired (cfm) 2683 2718 1550 1550 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. wri htsoft" 2015-Jul-2710:46:53 ,4C~�A 9 Right-Suke® Universal 2013 13.0.09 RSU05227 Page 1 ..(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N wrightsoft, Right-J® Worksheet Job: Belmont Entire House Date: Jul 23, 2015 By: True Air Mechanical True Air Mechanical Pfan: 1 CY 4 Faraday, Irvine, CA 92618 1 Room name SLEEPING 2 Exposed wall 107.0 ft 3 Room height 8.0 ft 4 Room dimensions 5 Room area 1320.0 ft2 Ty Construction U-value Or HTM Area (W) Load Area Load number (Btuh/ft2 °F) (Btuh/ft') or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V,V 1213-0sw 0.086 n 2.91 2.86 440 401 1165 1146 �C 4A5-2ow 0.290 n 9.80 14.94 39 0 386 588 12D-0sw 0.086 a 2.91 2.86 112 96 279 275 4A5-2ow 0.290 a 9.80 33.75 16 0 157 540 11 11 DO 0.390 a 13.18 15.70 0 0 0 0 1213-0sw 0.086 s 2.91 2.86 40 40 116 114 4A5-2ow 0.290 s 9.80 18.05 0 0 0 0 12D-0sw 0.086 w 2.91 2.86 264 189 549 540 4A5-2ow 0.290 w 9.80 33.75 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 25 0 245 844 4A5-2ow 0.310 w 10.48 32.52 50 0 524 1626 4A5-2owd 0.310 w 10.48 32.52 0 0 0 0 C 16CR-38ad 0.026 - 0.88 1.40 1320 1320 1160 1845 F 22A-wpl 0.989 - 33.43 0.00 1320 107 3577 0 6 c)AED excursion 539 Envelope loss/gain 8158 8056 12 a) Infiltration 781 427 b) Room ventilation 0 0 13 Internal gains: Occupants Q 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13) 8938 8483 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 8938 8483 15 Duct loads 46% 81% 4115 6566 Total room load 1 13053 15049 I I Air required (cfm) 1 1133 1133 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htSOft' 2015-Jul-2710:46:53 9 Right -Suite® Universal 2013 13.0.09 RSU05227 Page 2 '`C;C'P` ...(Series I)\JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N wrightsoft' Right-J® Worksheet LIVING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 By: True Air Mechanical Plan: 1 CY 1 Room name LIVING KITCHEN 2 Exposed wall 118.0 ft 14.0 ft 3 Room height 8.0 ft 8.0 ft heat/cool 4 5 Room dimensions Room area 1677.0 ft2 14.0 x 20.0 ft 280.0 ft' Ty Construction U-value Or HTM Area 2 (ft Load Area (W) Load number ( Btuh/ft'-°F Btuh/ft' ( ) or perimeter (ft) t (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 y✓ 12D-0sw 0.086 n 2.91 2.86 24 24 70 69 0 0 0 0 �G 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 a 2.91 2.86 248 182 530 521 0 0 0 0 4A5-2ow 0.290 a 9.80 33.75 45 0 438 1508 0 0 0 0 11 11 D0 0.390 a 13.18 15.70 21 21 277 330 0 0 0 0 VJ✓ 12D-0sw 0.086 s 2.91 2.86 336 296 860 846 0 0 0 0 T-C 4A5-2ow 0.290 s 9.80 18.05 40 0 392 722 0 0 0 0 12D-0sw 0.086 w 2.91 2.86 336 128 372 366 112 112 326 320 4A5-2ow 0.290 w 9.80 33.75 16 0 157 540 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2owd 16CR-38ad 0.310 0.026 w - 10.48 0.88 32.52 1.40 192 1677 0 1677 2012 1474 6243 2344 0 280 0 280 0 246 0 391 C F 22A-wpl 0.989 - 33.43 0.00 1677 118 3945 0 280 14 468 0 6 c)AED excursion 1528 36 Envelope loss/gain 10526 15016 1040 676 12 a) Infiltration 861 471 102 56 b) Room ventilation 0 01 01 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 11387 15487 1142 732 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 53 80 14 Subtotal 11387 15487 1194 812 15 Duct loads 58% 67%1 6656 10452 58% 67% 698 548 Total room load 18043 25939 1893 1359 Air required (cfm) 1550 1550 163 81 Calculations approved bYACCA to meet all requirements of Manual J 8th Ed. wrigFtitsoft` Right -Suited Universal 2013 13.0.09 RSU05227 2015-Jul-27 10:46:53 '4CA=k ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N Page 3 wrightsoft, Right-J® Worksheet LIVING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 LTrue Byy: Air Mechanical : 1 CY 1 Room name GREAT ROOM DINING ROOM 2 Exposed wall 55.0 ft 32.0 ft 3 Room height 8.0 ft heat/cool 8.0 ft heat/cool 4 Room dimensions 28.0 x 20.0 ft 15.0 x 14.0 ft 5 Room area 560.0 ft' 210.0 ft' Ty Construction U-value Or HTM Area (W) Load Area (ft) Load number (Btuh/ft2 °F) (Btuh/ft') or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 VN 12D-0sw 0.086 n 2.91 2.86 0 0 0 0 24 24 70 69 �C 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 a 2.91 2.86 56 40 115 113 120 92 266 262 4A5-2ow 0.290 a 9.80 33.75 16 0 160 551 28 0 278 956 11 11 DO 0.390 a 13.18 15.70 0 0 0 0 0 0 0 0 yJ 12D-0sw 0.086 s 2.91 2.86 160 160 465 458 112 88 256 252 t---G 4A5-2ow 0.290 s 9.80 18.05 0 0 0 0 24 0 235 433 12D-0sw 0.086 w 2.91 2.86 224 16 47 46 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 16 0 157 540 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2owd 0.310 w 10.48 32.52 192 0 2012 6243 0 0 0 0 C 16CR-38ad 0.026 - 0.88 1.40 560 560 492 783 210 210 185 293 F 22A-wpl 0.989 - 33.43 0.00 560 55 1839 0 210 32 1070 0 6 c)AED excursion 1729 -111 Envelope loss/gain 5286 10462 2359 2154 12 a) Infiltration 401 219 233 128 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants Q 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 5687 10682 2593 2282 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 5687 10682 2593 2282 15 Duct loads 58% 67% 3325 7209 58% 67% 1516 1540 Total room load 9012 17890 4108 3822 Air required (cfm) 774 1069 353 228 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015-Ju1-27 10:46:53 wrightsoft- Right -Suite® Universal 2013 13.0.09 RSU05227 Page 4 ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N -�- wrightsoft, Right-J® Worksheet LIVING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 Byy: True Air Mechanical Pran: 1 CY 1 Room name ENTRY DEN 2 Exposed wall 7.0 ft 10.0 ft 3 Room height 8.0 ft heat/cool 8.0 ft heat/cool 4 Room dimensions 7.0 x 11.0 ft 13.0 x 14.0 ft 5 Room area 77.0 ft2 182.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat7 Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 VN 12D-0sw 0.086 n 2.91 2.86 0 0 0 0 0 0 0 0 �--G 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 a 2.91 2.86 56 35 102 100 16 16 47 46 4A5-2ow 0.290 a 9.80 33.75 0 0 0 0 0 0 0 0 11 11 DO 0.390 a 13.18 15.70 21 21 277 330 0 0 0 0 12D-0sw 0.086 s 2.91 2.86 0 0 0 0 64 48 140 137 4A5-2ow 0.290 s 9.80 18.05 0 0 0 0 16 0 157 289 12D-0sw 0.086 w 2.91 2.86 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 0 0 O 0 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2owd 0.310 w 10.48 32.52 0 0 0 0 0 0 0 0 C 16CR-38ad 0.026 - 0.88 1.40 77 77 68 108 182 182 160 254 F 22A-wpl 0.989 - 33.43 0.00 77 7 234 0 182 10 334 0 6 c)AED excursion -26 -4 Envelope loss/gain 680 511 837 722 12 a) Infiltration 51 28 73 40 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 731 539 910 762 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 20 31 53 80 14 Subtotal 752 570 963 842 15 Duct loads 58% 67% 439 384 58% 67% 563 568 Total room load 1191 954 1525 1410 Air required (cfm) 102 57 131 84 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightSoft' Right -Suite® Universal 2013 13.0.09 RSU05227 2015-Jul-27 10:46:53 ...(Series I)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Page 5 wrightsoft, Right-J® Worksheet LIVING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 Byy: True Air Mechanical Pran: 1 CY 1 Room name HALLWAY LAUNDRY 2 Exposed wall O ft O ft 3 Room height 8.0 ft heat/cool 8.0 ft heat/cool 4 5 Room dimensions Room area 1.0 x 244.0 ft 244.0 ft2 1.0 x 88.0 ft 88.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (f:2) Load number (Btuh/ft;°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 yJ 12D-0sw 0.086 n 2.91 2.86 0 0 0 0 0 0 0 0 �C 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 V)I 12D-0sw 0.086 a 2.91 2.86 0 0 0 0 0 0 0 0 4A5-2ow 0.290 a 9.80 33.75 0 0 0 0 0 0 0 0 Lam_-_Gp 11 11130 0.390 a 13.18 15.70 0 0 0 0 0 0 0 0 12D-0sw 0.086 s 2.91 2.86 0 0 0 0 0 0 0 0 4A5-2ow 0.290 s 9.80 18.05 0 0 0 0 0 0 0 0 1213-0sw 0.086 w 2.91 2.86 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2owd 0.310 w 10.48 32.52 0 0 0 0 0 0 0 0 C 16CR-38ad 0.026 - 0.88 1.40 244 244 214 341 88 88 77 123 F 22A-wpl 0.989 - 33.43 0.00 244 0 0 0 88 0 0 0 6 c)AED excursion -16 -6 Envelope losstgain 214 325 77 117 12 a) Infiltration 0 0 0 0 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 214 325 77 117 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution -214 -325 40 61 14 Subtotal 0 0 118 179 15 Duct loads 58% 67% 0 0 58% 67% 69 121 Total room load 0 0 187 299 Air required (cfm) 0 0 16 18 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 2015Jul-27 10:46:53 wright540ft- Right -Suite® Universal 2013 13.0.09 RSU05227 '�� ...(Series 1)\JDBS\Plan 1 CY\Belmont Plan 1 CYrup Calc = W8 Front Door faces: N Page 6 wrightsoft Right-J® Worksheet LIVING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 By: Plan: True Air Mechanical 1 CY 1 Room name PWDR 2 Exposed wall 0 ft 3 Room height 8.0 ft heat/cool 4 Room dimensions 6.0 x 6.0 ft 5 Room area 36.0 ft' Ty Construction U-value Or HTM Area (ft2) Load Area Load number (Btuh/ft=°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 1AJ 12D-0sw 0.086 n 2.91 2.86 0 0 0 0 �G 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 12D-0sw 0.086 a 2.91 2.86 0 0 0 0 4A5-2ow 0.290 a 9.80 33.75 0 0 0 0 11 11 DO 0.390 a 13.18 15.70 0 0 0 0 yJ 12D-0sw 0.086 s 2.91 2.86 0 0 0 0 4A5-2ow 0.290 s 9.80 18.05 0 0 0 0 -a 12D-0sw 0.086 w 2.91 2.86 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 4A5-2owd 16CR-38ad 0.310 0.026 w - 10.48 0.88 32.52 1.40 0 36 0 36 0 32 0 50 C F 22A-wpl 0.989 - 33.43 0.00 36 0 0 0 6 c)AED excursion -2 Envelope loss/gain 32 48 12 a) Infiltration 0 0 b) Room ventilation 0 0 13 Internal gains: Occupants Q 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13) 32 48 Less external load 0 0 Less transfer 0 0 Redistribution 49 74 14 Subtotal 80 122 15 Duct loads 58% 67% 47 82 Total room load 127 204 Air required (cfm) 11 12 Calculations approved bvACCA to meet all requirements of Manual J 8th Ed. 'rk wrilght5oft" Right -Suite® Universal 2013 13.0.09 RSU05227 2015-Jul-27 10:46:53 '4CA=k ...(Series I)WDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Page 7 wrightsoft' Right-J® Worksheet SLEEPING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 By: True Air Mechanical Plan: 1 CY 1 Room name SLEEPING MASTER ZONE 2 Exposed wall 107.0 ft 63.0 ft 3 Room height 8.0 ft 8.0 ft 4 Room dimensions 5 Room area 1320.0 ft' 765.0 W Ty Construction U-value Or HTM Area (ftj Load Area (W) Load number (Btuh/ft' °F) (Btuh/ft') or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 VLC12D-0sw 0.086 n 2.91 2.86 440 401 1165 1146 200 200 581 572 4A5-2ow 0.290 n 9.80 14.94 39 0 386 588 0 0 0 0 tl 12D-0sw 0.086 a 2.91 2.86 112 96 279 275 0 0 0 0 4A5-2ow 0.290 a 9.80 33.75 16 0 157 540 0 0 0 0 11 11 DO 0.390 a 0.00 0.00 0 0 0 0 0 0 0 0 y/ 12D-0sw 0.086 s 2.91 2.86 40 40 116 114 40 40 116 114 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 -a 12D-0sw 0.086 w 2.91 2.86 264 189 549 540 264 189 549 540 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 25 0 245 844 25 0 245 844 4A5-2ow 0.310 w 10.48 32.52 50 0 524 1626 50 0 524 1626 4A5-2owd 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16CR-38ad 0.026 - 0.88 1.40 1320 1320 1160 1845 765 765 672 1069 F 22A-wpl 0.989 - 33.43 0.00 1320 107 3577 0 765 63 2106 0 6 c)AED excursion 539 1117 Envelope loss/gain 8158 8056 4794 5882 12 a) Infiltration 781 427 460 251 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliancesiother 0 0 Subtotal (lines 6 to 13) 8938 8483 5254 6133 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 8938 8483 5254 6133 15 Duct loads 46% 81% 4115 6566 46% 77% 2419 4747 otal room load rA 13053 15049 1 7672 10880 ir required (cfm) 1133 1133 666 783 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. 2015-Jul-27 10:46:53 wrightSaft' Right -Suite® Universal 2013 13.0.09 RSU05227 Page 8 .4CA=k ...(Series I)%JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N wrightsoft, Right-J® Worksheet SLEEPING True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 Byy: True Air Mechanical Pian: 1 CY 1 Room name SLEEPING ZONE 2 Exposed wall 44.0 ft 3 Room height 8.0 ft 4 Room dimensions 5 Room area 555.0 ft' Ty Construction U-value Or HTM Area (f:2) Load Area Load number (Btuh/ftk*F) (Btuh/ft') or perimeter (ft) (Btuh) or perimeter Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 W/ 120-0sw 0.086 n 2.91 2.86 240 201 583 574 L-C 4A5-2ow 0.290 n 9.80 14.94 39 0 386 588 12D-0sw 0.086 a 2.91 2.86 112 96 279 275 4A5-2ow 0.290 a 9.80 33.75 16 0 157 540 11 11 DO 0.390 a 0.00 0.00 0 0 0 0 yJ 12D-0sw 0.086 s 2.91 2.86 0 0 0 0 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 -a 12D-0sw 0.086 w 2.91 2.86 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 0 0 0 0 4A5-2ow 0.310 w 10.48 32.52 0 0 0 0 4A5-2owd 16CR-38ad 0.310 0.026 w 0.00 0.88 0.00 1.40 0 555 0 555 0 488 0 776 C F 22A-wpl 0.989 - 33.43 0.00 555 44 1471 0 6 c)AED excursion 97 Envelope loss/gain 3363 2849 12 a) Infiltration 321 176 b) Room ventilation 0 0 13 Internal gains: Occupants @ 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13) 3684 3024 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 3684 3024 15 Duct loads 46% 77% 1696 2341 Total room load T5380 -T 5365 Air required (cfm) 467 386 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft, 2015-Jul-2710:46:53 9 Right-Sulte�l Universal 2013 13.0.09 RSU05227 '400K ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Page 9 d- wrightsoft5 Right-J® Worksheet MASTER ZONE True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 By: True Air Mechanical Plan: 1 CY 1 Room name MASTER ZONE M WIC 2 Exposed wall 63.0 ft 10.0 ft 3 Room height 8.0 ft 8.0 ft heat/cool 4 5 Room dimensions Room area 765.0 ft2 15.0 x 10.0 ft 150.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 yJ 12D-0sw 0.086 n 2.91 2.86 200 200 581 572 80 80 233 229 �C 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 a 0.00 0.00 0 0 0 0 0 0 0 0 T 4A5-2ow 0.290 a 0.00 0.00 0 0 0 0 0 0 0 0 �_G 11 11 DO 0.390 a 0.00 0.00 0 0 0 0 0 0 0 0 yJ 12D-0sw 0.086 s 2.91 2.86 40 40 116 114 0 0 0 0 T-C 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 w 2.91 2.86 264 189 549 540 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 25 0 245 844 0 0 0 0 4A5-2ow 0.310 w 10.48 32.52 50 0 524 1626 0 0 0 0 4A5-2owd 16CR-38ad 0.310 0.026 w 0.00 0.88 0.00 1.40 0 765 0 765 0 672 0 1069 0 150 0 150 0 132 0 210 C F 22A-wpl 0.989 33.43 0.00 765 63 2106 0 150 10 334 0 6 c)AED excursion 1117 0 Envelope loss/gain 4794 5882 699 438 12 a) Infiltration 460 251 73 40 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 5254 6133 772 478 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 5254 6133 772 478 15 Duct loads 46% 77% 2419 4747 46% 77% 355 370 Total room load 7672 10880 1127 848 Air required (cfm) 666 783 98 61 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. WI1 ht50#'t' 2015-Jul-2710:46:53 9 Right-Sufte® Universal 2013 13.0.09 RSU05227 Page 10 '4CA=k ...(Series I)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N � - wrightsoft' Right-JO Worksheet MASTER ZONE True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 Byy: True Air Mechanical PI"an: 1 CY 1 Room name MASTER BEDROOM MASTER BATH 2 Exposed wall 18.0 ft 35.0 ft 3 Room height 8.0 ft heat/cool 8.0 ft heat/cool 4 Room dimensions 18.0 x 20.0 ft 15.0 x 15.0 ft 5 Room area 360.0 ft2 225.0 ft2 Ty Construction number U-value (Btuh/ft2-°F) Or HTM (Btuh/ft2) Area (ft2) or perimeter (ft) Load (Btuh) Area (ft2) or perimeter (ft) Load (Btuh) H..t7 Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 YLG12D-0sw 0.086 n 2.91 2.86 0 0 0 0 120 120 349 343 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 a 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 a 0.00 0.00 0 0 0 0 0 0 0 0 11 11 DO 0.390 a 0.00 0.00 0 0 0 0 0 0 0 0 y/ 12D-0sw 0.086 s 2.91 2.86 0 0 0 0 40 40 116 114 T-C 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 w 2.91 2.86 144 94 273 269 120 95 276 272 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 9.80 33.75 0 0 0 0 25 0 245 844 4A5-2ow 0.310 w 10.48 32.52 50 0 524 1626 0 0 0 0 4A5-2owd 16CR-38ad 0.310 0.026 w - 0.00 0.88 0.00 1.40 0 360 0 360 0 316 0 503 0 225 0 225 0 198 0 314 C F 22A-wpl 0.989 - 33.43 0.00 360 18 602 0 225 35 1170 0 6 c)AED excursion 722 395 Envelope loss/gain 1715 3120 2354 2282 12 a) Infiltration 131 72 255 140 b) Room ventilation 0 01 01 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 1847 3191 2609 2422 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 1847 3191 2609 2422 15 Duct loads 46% 77%1 850 2470 46% 77% 1201 1874 Total room load 2697 5661 3811 4296 Air required (cfm) 234 407 331 309 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. 411- 1 wrightSof ' Right -Suite® Universal 2013 13.0.09 RSU05227 2015 Jul 27 10:46: '��` ...(Series I)\JD&&Plan 1 CY%Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N Page 1 wrightsoft° Right-J® Worksheet MASTER ZONE True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 Byy: True Air Mechanical Pfan: 1 CY 1 Room name M PWDR 2 Exposed wall 0 ft 3 Room height 8.0 ft heat/cool 4 5 Room dimensions Room area 5.0 x 6.0 ft 30.0 ft2 Ty Construction U-value Or HTM Area (f:2) Load Area Load number (Btuh/ft'--°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter Het7 Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 VN 12D-0sw 0.086 n 2.91 2.86 0 0 0 0 �G 4A5-2ow 0.290 n 0.00 0.00 0 0 0 0 12D-0sw 0.086 a 0.00 0.00 0 0 0 0 11 T 4A5-2ow 11 DO 0.290 0.390 a a 0.00 0.00 0.00 0.00 0 0 0 0 0 0 0 0 -Gp V,V 12D-0sw 0.086 s 2.91 2.86 0 0 0 0 �-G 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 12D-0sw 0.086 w 2.91 2.86 0 0 0 0 4A5-2ow 4A5-2ow 0.290 0.290 w w 0.00 9.80 0.00 33.75 0 0 0 0 0 0 0 0 4A5-2ow 4A5-2owd 0.310 0.310 w w 10.48 0.00 32.52 0.00 0 0 0 0 0 0 0 0 C 16CR-38ad 0.026 0.88 1.40 30 30 26 42 F 22A-wpl 0.989 33.43 0.00 30 0 0 0 6 c)AED excursion 0 Envelope loss/gain 26 42 12 a) Infiltration 0 0 b) Room ventilation 0 0 13 Internal gains: Occupants Q 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13) 26 42 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 26 42 15 Duct loads 46% 77% 12 32 Total room load 39 74 Air required (cfm) 3 5 Calculations approved byACCA to meet all requirements of Manual J 8th Ed. 2015-Jul-27 10:46:53 wrilghtsoft' Right -Suite® Universal 2013 13.0.09 RSU05227 '� ...(Series I)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = WO Front Door faces: N Page 12 wrightsoft, Right-J® Worksheet SLEEPING ZONE True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 LTrue Air Mechanical Byy: : 1 CY 1 Room name SLEEPING ZONE BEDROOM 3 2 Exposed wall 44.0 ft 13.0 ft 3 Room height 8.0 ft 8.0 ft heat/coot 4 5 Room dimensions Room area 555.0 ft2 16.0 x 13.0 ft 208.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area (ft2) Load number (Btuh/ft2-°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 Y-C 1213-0sw 0.086 n 2.91 2.86 240 201 583 574 104 81 234 231 4A5-2ow 0.290 n 9.80 14.94 39 0 386 588 23 0 229 349 12D-0sw 0.086 a 2.91 2.86 112 96 279 275 0 0 0 0 4A5-2ow 0.290 a 9.80 33.75 16 0 157 540 0 0 0 0 11 11 DO 0.390 a 0.00 0.00 0 0 0 0 0 0 0 0 V1J 12D-0sw 0.086 s 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 -a 12D-0sw 0.086 w 0.00 0.00 0 0 0 0 0 0 0 O 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2owd 16CR-38ad 0.310 0.026 w - 0.00 0.88 0.00 1.40 0 555 0 555 0 488 0 776 0 208 0 208 0 183 0 291 C F 22A-wpl 0.989 - 33.43 0.00 555 44 1471 0 208 13 435 0 6 c)AED excursion 97 26 Envelope loss/gain 3363 2849 1081 896 12 a) Infiltration 321 176 95 52 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants @ 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 3684 3024 1175 948 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 3684 3024 1175 948 15 Duct loads 46% 77% 1696 2341 46% 77% 541 734 FF Total room load 5380 5365 1716 1682 Air required (cfm) 1 467 386 149 121 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. arvri httsOft' 2015Jul-2710:46:53 9 Right-SuReQil Universal 2013 13.0.09 RSU05227 '4CX:;k ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Page 13 wrightsoft° Right-JO Worksheet SLEEPING ZONE True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 Byy: True Air Mechanical Pfan: 1 CY 1 Room name BEDROOM 2 BATH 3 2 Exposed wall 8.0 ft 6.0 ft 3 Room height 8.0 ft heat/cool 8.0 ft heat/cool 4 5 Room dimensions Room area 1.0 x 245.0 ft 245.0 ft' 6.0 x 6.0 ft 36.0 ft' Ty Construction U-value Or HTM Area (ftj Load Area (ft2) Load number (Btuh/ft'--°F) (Btuh/ft� or perimeter (ft) (Btuh) or perimeter (ft) (Btuh) Heat Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 V1J 12D-0sw 0.086 n 2.91 2.86 0 0 0 0 48 40 116 114 L-� 4A5-2ow 0.290 n 9.80 14.94 0 0 0 0 8 0 78 120 v)I �L_(p 12D-0sw 0.086 a 2.91 2.86 64 48 140 137 0 0 0 0 4A5-2ow 0.290 a 9.80 33.75 16 0 157 540 0 0 0 0 11 11 DO 0.390 a 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 s 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 0 0 0 0 12D-0sw 0.086 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 4A5-2owd 0.310 w 0.00 0.00 0 0 0 0 0 0 0 0 C 16CR-38ad 0.026 0.88 1.40 245 245 215 342 36 36 32 50 F 22A-wpl 0.989 - 33.43 0.00 245 8 267 0 36 6 201 0 6 c)AED excursion 71 9 Envelope loss/gain 779 1091 427 294 12 a) Infiltration 58 32 44 24 b) Room ventilation 0 0 0 0 13 Internal gains: Occupants Q 230 0 0 0 0 Appliances/other 0 0 Subtotal (lines 6 to 13) 837 1123 471 318 Less external load 0 0 0 0 Less transfer 0 0 0 0 Redistribution 0 0 0 0 14 Subtotal 837 1123 471 318 15 Duct loads 46% 77% 386 869 46% 77% 217 246 Total room load 1223 1991 687 564 Air required (cfm) 106 143F 60 41 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wri htsoft- 2015-Jul-2710:46:53 9 Right -Suite® Universal 2013 13.0.09 RSU05227 Page 14 ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N wrightsoft Right-M Worksheet SLEEPING ZONE True Air Mechanical 4 Faraday, Irvine, CA 92618 Job: Belmont Date: Jul 23, 2015 By: True Air Mechanical Plan: 1 CY 1 Room name BATH 2 2 Exposed wall 17.0 ft 3 Room height 8.0 ft heat/cool 4 Room dimensions 6.0 x 11.0 ft 5 Room area 66.0 ft2 Ty Construction U-value Or HTM Area (ft2) Load Area Load number (Btuh/ft2--°F) (Btuh/ft2) or perimeter (ft) (Btuh) or perimeter Heat7 Cool Gross N/P/S Heat Cool Gross N/P/S Heat Cool 6 yJ 12D-0sw 0.086 n 2.91 2.86 88 80 233 229 �G 4A5-2ow 0.290 n 9.80 14.94 8 0 78 120 12D-0sw 0.086 a 2.91 2.86 48 48 140 137 4A5-2ow 0.290 a 9.80 33.75 0 0 0 0 11 11 DO 0.390 a 0.00 0.00 0 0 0 0 y✓ 12D-0sw 0.086 s 0.00 0.00 0 0 0 0 4A5-2ow 0.290 s 0.00 0.00 0 0 0 0 _G 1213-0sw 0.086 w 0.00 0.00 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 4A5-2ow 0.290 w 0.00 0.00 0 0 0 0 4A5-2ow 0.310 w 0.00 0.00 0 0 0 0 4A5-2owd 0.310 w 0.00 0.00 0 0 0 0 C 16CR-38ad 0.026 - 0.88 1.40 66 66 58 92 F 22A-wpi 0.989 - 33.43 0.00 66 17 568 0 6 c)AED excursion -10 Envelope loss/gain 1077 568 12 a) Infiltration 124 68 b) Room ventilation 0 0 13 Internal gains: Occupants @ 230 0 0 Appliances/other 0 Subtotal (lines 6 to 13) 1201 636 Less external load 0 0 Less transfer 0 0 Redistribution 0 0 14 Subtotal 1201 636 15 Duct loads 46% 77% 5531 492 Total room load 1754 1128 Air required (cfm) 152 81 Calculations approved by ACCA to meet all requirements of Manual J 8th Ed. wrightsoft' Right -Suited Universal 2013 13.0.09 RSU05227 2015-Jul-27 10:46:53 '4CAC;k ...(Series I)UD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N Page 15 Levu 1 Job #: Belmont True Air Mechanical Scale: 1 : 125 Performed by True Air Mechanical for: Page 1 Belmont 4 Faraday Right -Suite® Universal 2013 980 Montecito Dr. Suite #302 Irvine, CA 92618 13.0.09 RSU05227 Corona, CA 92879 2015-Jul-27 10:47:34 ...\Plan 1 CY\Belmont Plan 1 CY.rup - - wrightsoftm Duct System Summary LIVING True Air Mechanical 4 Faraday, Irvine, CA 92618 For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 Job: Belmont Date: Jul 23, 2015 By: True Air Mechanical Plan: 1 CY Heating Cooling External static pressure 0.50 in H2O 0.50 in H2O Pressure losses 0 in H2O 0 in H2O Available static pressure 0.50 in H2O 0.50 in H2O Supply / return available pressure 0.332 / 0.168 in H2O 0.332 / 0.168 in H2O Lowest friction rate 0.184 in/100ft 0.184 in/100ft Actual air flow 1550 cfm 1550 cfm Total effective length (TEL) 272 ft Supply Branch Detail Table Name Design (Btu h) Htg (cfm) Clg (cfm) Design FIR Diam (in) H x W (in) Duct Matl Actual Ln (ft) Ftg.Egv Ln (ft) Trunk DEN h 1525 131 84 0.263 &0 Ox 0 VIFx 16.1 110.0 st4 DINING ROOM h 2054 176 114 0.216 &0 Ox 0 VIFx 28.9 125.0 st9 DINING ROOM -A h 2054 176 114 0.219 &0 Ox 0 VIFx 26.4 125.0 st9 ENTRY h 1191 102 57 0.261 6.0 Ox 0 VIFx 17.1 110.0 st3 GREAT ROOM c 4473 194 267 0.184 &0 Ox0 VIFx 40.3 140.0 st8 GREAT ROOM -A c 4473 194 267 0.217 &0 Ox0 VIFx 27.9 125.0 st7 GREAT ROOM-B c 4473 194 267 0.249 &0 Ox0 VIFx 23.4 110.0 st2 GREAT ROOM-C C 4473 194 267 0.191 &0 Ox0 VIFx 34.0 140.0 st8 KITCHEN h 946 81 41 0.260 &0 Ox0 VIFx 17.7 110.0 st1 KITCHEN -A h 946 81 41 0.272 &0 Ox0 VIFx 11.8 110.0 st1 LAUNDRY c 299 16 18 0.224 5.0 Ox0 VIFx 23.0 125.0 st10 PWDR c 204 11 12 0.238 5.0 Ox0 VIFx 1 14.3 1 125.0 WO Name Trunk Type Htg (cfm) Clg (cfm) Design FIR Veloc (fpm) Diam (in) H x W (in) Duct Material Trunk st9 Peak AVF 353 228 0.216 647 10.0 0 x 0 VinlFlx st3 st3 Peak AVF 455 285 0.216 580 12.0 0 x 0 VinlFlx st10 Peak AVF 27 30 0.224 153 &0 0 x 0 VinlFlx st4 st4 Peak AVF 158 114 0.224 358 9.0 0 x 0 VinlFlx st1 Peak AVF 163 81 0.260 298 10.0 0 x 0 VinlFlx st8 Peak AVF 387 535 0.184 980 10.0 0 x 0 VinlFlx st7 st7 Peak AVF 581 802 0.184 1021 12.0 0 x 0 VinlFlx st2 st2 Peak AVF 774 1069 0.184 1000 14.0 0 x 0 VinlFlx Boldlitalic values have been manually overridden , k + wrightSOW Right -Suite® Universal 2013 13.0.09 RSU05227 2015Ju1-27 10:46:55Page 1 XCA ...(Series 1)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N Return Branch Detail Table Grill Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size (in) (cfm) (cfm) (ft) FIR (fpm) (in) (in) Opening (in) Matl Trunk rb4 Ox0 1032 1224 91.4 0.184 1558 12.0 0x 0 VIFx rb6 Ox0 518 326 67.1 0.251 237 20.0 Ox 0 VIFx Bold/italic values have been manually overridden „gc�- ++ wrightsaft° Right -Suite® Universal 2013 13.0.09 RSU05227 /CCK ...(Series 1)%JDBS\Plan 1 CY\Belmont Plan 1 CY.rup Calc = W8 Front Door faces: N 2015-Jul-27 10:46:55 Page 2 a e Duct System Summary Job: Belmont wrightsoft Date: Jul 23, 2015 SLEEPING By: True Air Mechanical True Air Mechanical Plan: ICY 4 Faraday, Irvine, CA 92618 Project For: Belmont, Lennar 980 Montecito Dr. Suite #302, Corona, CA 92879 External static pressure Pressure losses Available static pressure Supply / return available pressure Lowest friction rate Actual air flow Total effective length (TEL) Heating 0.50 in H2O 0 in H2O 0.50 in H2O 0.350 / 0.150 in H2O 0.203 in/100ft 1133 cfm Cooling 0.50 in H2O 0 in H2O 0.50 in H2O 0.350 / 0.150 in H2O 0.203 in/100ft 1133 cfm 246 ft Supply Branch Detail Table Name Design (Btuh) Htg (cfm) Clg (cfm) Design FIR Diam (in) H x W (in) Duct Mat[ Actual Ln (ft) Ftg.Egv Ln (ft) Trunk BATH 2 h 1754 152 81 0.203 7.0 Ox0 VIFx 32.3 140.0 st15 BATH 3 h 687 60 41 0.204 5.0 Ox0 VIFx 31.5 140.0 st15 BEDROOM 2 c 1991 106 143 0.218 8.0 Ox 0 VIFx 35.6 125.0 SO 4 BEDROOM 3 h 1716 149 121 0.268 7.0 Ox 0 VIFx 20.6 110.0 st6 M PWDR c 74 3 5 0.244 5.0 Ox 0 VIFx 18.8 125.0 st12 Mwlc h 1127 98 61 0.214 6.0 Ox0 VIFx 23.8 140.0 st13 MASTER BATH h 3811 331 309 0.217 9.0 Ox0 VIFx 21.2 140.0 st13 MASTER BEDROOM c 2831 117 204 0.245 9.0 Ox 0 VIFx 17.8 125.0 st11 MASTER BEDROOM -A c 2831 117 204 0.253 9.0 Ox 0 VIFx 1 13.2 125.0 st11 Name Trunk Type Htg (cfm) Clg (cfm) Design FIR Veloc (fpm) Diam (in) H x W (in) Duct Material Trunk st15 Peak AVF 212 122 0.203 607 8.0 0 x 0 VinlFlx st14 st14 Peak AVF 318 265 0.203 583 10.0 0 x 0 VinlFlx st6 st6 Peak AVF 467 386 0.203 595 12.0 0 x 0 VinlFlx st11 Peak AVF 234 407 0.245 518 12.0 0 x 0 VinlFlx st5 st13 Peak AVF 429 370 0.214 786 10.0 0 x 0 VinlFlx st12 st12 Peak AVF 432 375 0.214 792 10.0 0 x 0 VinlFlx st5 st5 Peak AVF 666 783 1 0.214 561 1 16.0 0 x 0 VinlFlx Bold/ltallc values have been manually overridden 2015-Jul-27 10:46:55 wrightSOW Right -Suite® Universal 2013 13.0.09 RSU05227 Page 3 ACM ...(Series I)\JD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N Return Branch Detail Table Grill Htg Clg TEL Design Veloc Diam H x W Stud/Joist Duct Name Size (in) (cfm) (cfm) (ft) FIR (fpm) (in) (in) Opening (in) Matl Trunk rb8 Ox 0 467 386 73.6 0.203 437 14.0 0x 0 VIFx rb7 Ox 0 666 783 65.1 0.230 732 14.0 Ox 0 VIFx Bold/italic values have been manually overridden 2015-Jul-27 10:46:55 wrightsoft4 Right -Suite® Universal 2013 13.0.09 RSU05227 Page 4 ACCA ...(Series I)WD&S\Plan 1 CY\Belmont Plan 1 CY.rup Calc = MJ8 Front Door faces: N