Loading...
PGA West - Monterra TR 32742 (Plans 1-4) Geotechnical UpdateSladden Engineering 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0727 6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743, Fax (951) 845-8863 800.E. Florida -Avenue, Hemet, CA,92543 (951) 766-8777,Fax (95 1) 766-8778 -January 3, 2014 Project No. 522-4326 13-12-563 Monterra Properties 55075 Monroe Street RECEIVED La Quinta, California 92253 Attn: Mr. Mark Ladeda APR 5 Z014 LA QUINTA Project: Monterra — Tract 32742 CITY OF. DEVELOPMENT 5 : 5-101 Monroe S I treet COMMUNITY. La Quinta, California Subject: Report of Observations and Testing During Rough Grading Ref: Geotechnical Update prepared by Sladden Engineering dated July 10, 2013; Project No. 544-4326, Report No. 13-07-337 Geotechnical Investigation report prepared'by Sladden Engineering dated June 30 2004; Project No. 544-4326, Report No. 04-06-442 This rep6rt provides a.summary of our field observations along with the results of in -place density tests performed at the subject site during the rough grading of the building pads for the -proposed residential subdivision. The project.site is, located at 55-101 Monroe Street in the City of La Quinta, California. Rough grading: included remedial removals performed to create a' uniforril thickness of engineered fill -under the proposed, residentia sfMctuTes—.A-l4-ai;. 'and native low density* I -r\,r , near surface soil was removed to,'competent narliveUil. ReQ7464N'U�e , ;qTAp of at least 3 feet below existing grade* or 3 feet below the !"s eeper. The soil exposed -during over -excavation was sca ified, eqiSMr-&— _d1tio ed aiid com acted to at least 90, percent relative compaction. The pre iouslJF,­e Qy and som import soil ON -in thin lifts at near optimum m tA to'at Was placed oi lure, co'nt ly(vat lea t 90 percent relative ' c ' ompaction. Remedial grading extend f ['ox* 5 feet beyond the pre- established building setback lines indicated ran---s vore by Hacker Engineering. Field testing was performed from July 23, 2013 through January 2, 2014. Testing indicates that a .minimum of 90.,percent relative compaction was attained, in the areas tested. The passing test results indicate compliance with the project specifications at the tested locations and depths but are no guarantee or warranty of the contractors work. January 3, 2013 -2- Project No. 522-4326 13-12-563 Field Tests: In -place moisture/density tests were performed using a nuclear density gauge in accordance with ASTM Test Method D 6938-08. A total of 121 field density tests were performed. Test results are summarized on the attached data sheets. The approximate test locations are indicated, on the attached Rough Grading Plans. Laboratory Tests: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with ASTM Test Method D 1557-91. Conventional spread footings may . be utilized for the support of the proposed residential structures. All footings should be founded upon properly compacted engineered fill soil and should have a. minimum embedment depth of 12 inches measured from the lowest adjacent finished grade. Continuous and isolated footings should have minimum widths of 12 inches and 24 inches, respectively. Continuous and isolated footings may be designed using allowable (net) bearing pressures of 1500 and 1800 pounds per square foot. (psf), respectively. Allowable increases of 200 psf for each additional 1 foot of width and 250 psf for each additional 6 inches of• depth may be used for.larger footings. The maximum allowable bearing pressure should be 2500 psf. The allowable bearing pressures apply to combined dead and sustained live loads. The allowable bearing pressures may be increased by one-third when considering transient live loads, including seismic and'wind forces. All footings should be reinforced in accordance_ with the project structuralengineer's recommendations. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. Respectfully submitted SLADDEN ENGINE ING cY�a��ss,%ti Brett L. Anderso k` Principal Engineer NF� ANDERSO. N G� o. Cas3ss z Y CIVIL ENGITVEERING Grading/gvm. Copies 4 / Monterra Properties Sladden Eneineerine TEST RESULTS Project Name: Monterra - Tract 32742 Location: 55-101 Monroe Street, La Quinta California PROJECT NO: 522-4326 REPORT NO: 13-12-563 Test No. Date Tested Location Elevation Dry Density in place % Moisture in place Relative Compaction Maximum Density Building Pads 1 7/23/2013 Lot 14 463.0 103.5 15.2 92 112.5 2 7/23/2013 Lot 15 463.0 105.0 - 12.9 93 112.5 .3 7/23/2013 Lot 16 463.0 103.6 14.3 92 112.5 4 7/24/2013 Lot 16 465.0 105.8 13.4 93 113.5 5 7/24/2013 Lot 15 465.0 105.2 16.0 93 113.5 6 7/24/2013 Lot 14 466.0 105.0 14.7 93 113.5 7 7/24/2013 Lot 12 462.0 106.4 12.8 94 113.5. 8 7/24/2013 Lot 22 461.0 102.7 13.1 90 113.5 9 7/24/2013 Lot 11 464.0 101.9 . 15.7 90 113.5 10 7/24/2013 Lot 13 464.0 101.8 13.0 90 113.5 11 7/24/2013 Lot 12 462.0 105.8 11.7 93 113.5 12 7/25/2013 Lot 20 462.0 103.9 13.2 92 113.5 13 7/25/2013 Lot 18 462.0 105.6 14.9 93 113.5 14 7/25/2013. Lot 21 462.0 105.9 12.7 93 113.5 15 7/25/2013 _ Lot 19 460.0 110.0 15.6 97 113.5 16 7/25/2013 Lot 11 465.0 . 107.3 13.8 95 113.5 17 7/25/2013 Lot 12 463.0 106.6 12.1 94 113.5 18 7/25/2013 Lot 26 - 460:0 108.8 14.7 96 1135 19 7/26/2013 Lot 23 462.0 102.0 13.6 90 113.5 20 7/26/2013 Lot 23 464.0 105.5 15.1 93 113.5 21 7/26/2013 Lot 24 462.0 103.6 15.3 91 113.5 22 . 7/26/2013 Lot 24 464.0 104.2 10.7 92 113.5 23 7/26/2013 Lot 25 462.0 101.6 13.0 90 113.5 24 7/26/2013 Lot 25 464.0 104.8 14.5 92 113.5 25 7/26/2013 Lot 26 462.0 105.1 14.8 93 113.5 26 7/26/2013 - Lot 26 464.0 103.5 14.2 91 113.5 27 7/29/2013 Lot 33 460.0 109.7 10.1 97 113.5 28 7/29/2013 Lot 33 462.0 106.7 10.7 94 113.5 29 7/29/2013 Lot 31 ' 461.0 109.6 11.4 97 113.5 30 7/29/20.13 Lot 31 463.0 107.3 9.8 95 113.5 31 7/29/2013 Lot 30 461.0 107.4 10.9 95 113.5 32 7/29/2013 Lot 30 463.0 109.3 9.9 96 113.5 33 7/29/2013 Lot 29 461.0 111.2 12.4 98 113.5 34. 7/29/2013 Lot 29 463.0 109.3 11.5 96 113.5 35 7/29/2013 Lot 28 460.0 115.1 10.6 99 113.5 36 7/29/2013 Lot 28 462.0 112.4 11.1 99 113.5 37 7/29/2013 Lot 32 460.0 105.1 10.3 93 113.5 38 7/29/2013 Lot 32� 462.0 104.5 11.6 92 113.5 39 7/29/2013 Lot 27 460.0 111.3 12.4 98 113.5 40 7/29/2013 Lot 27 462.0 1 108.2 9.8 95 113.5 Slodden Enoineerina TEST RESULTS Project Name: Monterra - Tract 32742 Location: 55-101 Monroe Street, La Quinta California PROJECT NO: 522-4326 REPORT NO: 13-12-563 Test No. Date Tested Location Elevation Dry Density in place % Moisture in place Relative Compaction Maximum Density Building Pads 41 7/31/2013 Lot 11, 466.1 105.6 10.8 93 113.5 42 7/31/2013 Lot 12 466.2 110.1 9.3. 97 113.5 43 7/31/2013 Lot 13 .466.7 103.2 11.7 91 113.5 44 7/31/2013 ` Lot 14 467.2 104:7 12.0 92 113.5 45 7/31/2013 Lot 15 467.5, 104.7 11.4 92 113.5 46 7/31/2013 Lot 16. 467.5 102.9 14.6 91 113.5 47 7/31/2013 Lot 17 . 467.4 106.3 10.6 94- 113.5 48 7/31/2013 Lot 18 467.2 104.7 13.5 92 113.5 49 7/31/2013 Lot 19 466.7 101.9 17.1 91 112.5 .50 7/31/2013 Lot 20 464.9 103.4 12.9 .91 113.5 51 7/31/2013 Lot 22 465.5 107.4 10.6 95 113.5 52 7/31/2013 Lot 24 465.7 - 102.0 8.4 90 113.5 53 7/31/2013 Lot 25 .465.5 106.5 11.3 94 113.5 54 7/31/2013 Lot 23 465.3 106.1 9.9 93 113.5 55 7/31/2013 Lot 26 464.9 103.5 9.7 91 113.5 56 7/31/2013 Lot 27 463.3 107.7 13.6 95'. 113.5' 57 7/31/2013 Lot 28 463,4 105.6 12.1 93 113.5 58 7/31/2013 Lot 29 464.1 104.0 .10.4 92 113.5 . 59 7/31/2013 Lot 30 464.2 102.1 11.0 90 113.5 60 7/31/2013 Lot 31 464.1 101.7 10.6 90 113.5 61 12/3/2013 Lot 1 459.0 111.6 10.2 98. 114.0 62 12/3/2013 Lot 3 459.0 110.4 , 9.3 97 114.0 63 12/3/2013 Lot 5 459.0 109.6 10.3 96 ' 114.0 64 12/3/2013 Lot 7 461.0 106.8 9.8 94 114.0 65 12/3/2013 Lot 9 461.0 105.3 10.4 92 : 114.0 66 12/4/2013 Lot 10 462.0 105.1 11.3 92 114.0 67 12/4/2013 Lot 8 ' 462.0 108.3 .11.4 95 114.0 68 .12/4/2013 Lot 6 460.5 104.9 10.6 92 114.0. 69 12/4/2013 Lot 4 460.5 107.7 12.9 94 114.0 70 12/4/2013 Lot 2 460.5 108.1 10.9 95. 114.0 71 12/4/2013 Lot 10 463.5 105.2 12.6 92 114.0 72 12/4/2013 Lot 8 463.5 110.1 8.9 97 114.0 73 12/5/2013 Lot 9 464.5 106.4 10.3 93 114.0 74 12/5/2013 Lot 7 464.5 108.3 11.4 95 114.0 75 .12/5/2013 Lot 5 462.0 110.2 10.9 97"- 114.0 . 76 12/5/2013 Lot 3 462.0 105.6 12.1 93 114.0 77 12/5/2013 Lot 1 461.0 107.9 10.7 .95 114.0 78 12/10/2013 Lot 1 461.6 110.2 9.2 97 114.0 79 12/10/2013 Lot 2 162.1 107.5 10.3 94 114.0 80 12/10/2013 Lot 3 462.4 106.8 11.2' 94 114.0 81 12/10/2013 Lot 4 1 462.8 109.5 1 11.4 96 114.0 aaden Enatneenna TEST RESULTS Project Name: Montgrra - Tract 32742 Location: 55-101 Monroe Street, La Quinta California PROJECT NO: 522-4326 REPORT NO: 13-12-563 Test No. Date Tested Location Elevation Dry Density in place % Moisture in place Relative Compaction Maximum Density Building Pads 82 12/10/2013 Lot 5 463.1 107.3 10.3 94 114.0 83 12/10/2013 Lot 6 463.6 108.4 11.7 95 114.0 84 12/10/2013 Lot 7 464.0 107.2 10.5 94 114.0 95 12/10/2013 Lot.8 464.4 109.6 11.4 96 114.0 86 12/10/2013 Lot 9 464.8 107.2 10.8 94 .114.0 87 12/10/2013 tot 10 465.3 102.4 10.4 90 114.0 88 12/11/2013 Lot 5 463.6 107.6 10.3 94 114.0 89 12/11/2013 Lot 5 ` 463.6 108.4 9.9 95 114.0 '90 12/11/2013 Lot 4 463.3 107.4 11.1 94 114.0 .91 12/11/2013 Lot 4 461.3 107.1 10.6 94 114.0 92 12/11/2013 Lot 3 462.9 110.3 11.4 97 114.0 93 12/11/2013 Lot 3 462.9 109.6 10.7 96 114.0 94 12/11/2013 Lot 2 462.5 - 111.4 9.5 98 114.0 95 12/11/2013 Lot 2 462.5 108.3 11.2 95 114.0- 96.' 12/11/2013 Lot 1 462.1 109.3 10.4 96 114.0 97 12/11/2013 Lot 1 462.1 110.1 10.9 97 114.0 98 12/11/2013 Lot 10 465.8 '109.6 10.1 .96 114.0 99 12/11/2013 Lot 10 465.8 108.3 12.3 95 114.0 100 12/11/2013 Lot 9 465.3 111.4 11.5 98 114.0 . 101 12/11/2013 Lot9- 465.3 -109.7 10.0 96 114.0 102 12/11/2013 Lot 8 464.9 110.4 11.2 97 114.0 103 12/11/2013 Lot 8 464.9 107.4 9.8 94 114.0 104 12/11/2013 Lot 7 464.5 109.6 10.5 96 114.0 105 12/11/2013 Lot 7 464.5 110.1 10.9 97' 114.0 106 12/11/2013 Lot 6 464.1 107.9 9.9 95 ) 114.0 107 12/11/20-13 Lot 6 464.1 108.3 10.7 95 114.0 108 1/2/2014 Lot 34 458.5 104.1 19.5 91 114.0 109 1/2/2014 Lot 35 461.5 103.1 7.9 90 114.0 110 1/2/2014 Lot 36 460.3 112.9 13.0 99 114.0 111 1/2/2014 Lot 37. 462.0. 105.5 12.8 93 114.0 112 1/2/2014 Lot 38 460.5 105.4 14.1 92 114.0 113 1/2/2014 Lot 34 461.7 104.3 ; 11.4 91 114.0 114 1/2/2014 Lot 35 463.0 107.2 10.2 94 114.0 115 1/2/2014 Lot 36 463.3 105.8 10.9 93 114.0 116 1/2/2014 Lot 37 463.5 106.4 11.1 93 114.0 117 1/2/2014 Lot 38 463.5 105.7 10.1 93 .114.0 118 1/2/2014 Lot 39 461.1 105.6 12.3 93 114.0 119 1/2/2014 Lot 39 463.1 104.4 10.3 92 114.0 120 1/2/2014 Lot 40 461.5 103.9 12.5 91 114.0 121- 1/2/2014 Lot 40 , 462.5. 105.9 10.6 93 114.0 Slodden Engineering L- S1 . .� ineerin • 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemet, CA. 92543 (951) 766-8777 Fax (951) 766-8778 July 10, 2013 Project No. 544-4326 13-07-337 Monterra Properties 55075 Monroe Street La Quinta, California 92253 Attn: Mr. Mark Ladeda Project: Four Seasons — Tract 32742 55-101 Monroe Street La Quinta, California Subject: Geotechnical Update APR 15 Z014 CITY- OF LA QUINTA COMMUNITY DEVELOPMENT Ref: Geotechnical Engineering Report prepared by Sladden Engineering dated June 30, 2004, Project No. 544-4326, Report No. 04-06-442. Geotechnical. Update report prepared by Sladden Engineering dated March 21, 2007; Project No. 544 ;4326, Report No. 07-03-222 As requested, we have reviewed the above referenced geotechnical reports as they relate to the design and construction of the proposed residential subdivision. The project site located at 55- 101 Monroe Street in the City of La Quinta, California. It is our understanding that the proposed residential development will consist of relatively lightweight woodframe structures supported by conventional shallow spread footings and concrete slabs on grade. In order to provide uniform foundation support, we recommend overexcavation throughout the proposed building areas. The building areas should be overexcavated to a depth of least 3 feet. below, existing grade or 3 feet below the bottom of the footings,. whichever is deeper. The exposed soils should than be scarified to a depth of 1 foot, moisture conditioned and recompacted to at least-90 percent relative compaction. The excavated material may then be replaced as engineered fill material as recommended below. The referenced report includes recommendations pertaining to the construction of residential structure foundations. Based upon our review of the referenced reports, it is our opinion that the structural values included in the referenced report remain applicable for the design and construction of the proposed residential structure foundations. This report also addresses potential geologic and seismic hazards that may impact the site. The analyses suggest the potential for significant liquefaction and seismic settlements may impact the site. However, based upon the depth to groundwater as well as the generally uniform surface soil conditions, the potential for damaging differential settlement to individual residences is. expected to' be minimal. Differential settlements are expected to occur over distances of several hundred feet. Specific structural mitigation should not be necessary. 1 ' July 10, 2013 -2- Project No..544-4326 13-07-337 It is our opinion that the allowable bearing pressures' recommended in the referenced report remain applicable. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should beat least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings 'and isolated pad footings should, be designed utilizing allowable bearing pressures of 1500 psf and 1800 psf. An allowable increase of 200 psf for each additional 1 foot of width and 250 psf for each additional 6 inches of depth.may be utilized if desired. The maximum . allowable bearing pressure should be 2500 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. The bearing soils are non -expansive and fall within the "very low" expansion category in accordance with California Building Code (CBC) classification criteria Pertinent 2001 CBC Seismic Design parameters are summarized on the attached data sheet. Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is So, generally described as stiff soil. The site is located within UBC Seismic Zone 4. The additional coefficients and factors relevant to seismic mitigation for new construction in accordance with the 2010 California Building Code (CBC) are provided in this report. The seismic design category for a structure may be, determined in accordance with Section 1613 of ,the 2010 CBC or ASCE7. According to the 2010 CBC, Site Class D may be. used to estimate design seismic loading for the proposed structures. The 2010 CBC Seismic Design Parameters are summarized below. Occupancy Category (Table 1604.5): II r Site Class (Table 1613.5.2): D Ss (Figure 1613.5.1):1.500g Si (Figure 1613.5.1): 0.600g Fa (Table 1613.5.3(1)): 1.0 Fv�(Table 1613.5.3(2)): L5 Sms (Equation 16-36 (Fa X Ssl): 1.500g Sine (Equation 16-37 (Fv X Sil): 0.900g SDS (Equation 16-38 (2/3 X Sms)): 1.000g SDI (Equation 16-39 12/3 X.Sml)): 0.600g Seismic. Design Category: D The City of La Quinta Geotechnical Report Checklist has been reviewed and completed as part of this update. A copy is attached to this report. Sladden-EngiKeering r July 10, 2013 -3-. Project No. 544-4326 13-07-337 We appreciate the opportunity to provide service to you on this project, if you have any questions regarding this letter or the referenced report please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING FESS/0��( , Q BRETT L. F Brett L. Anderso ANDERSON 2� Principal Engineer W Exp.913089 z a CIVIL ENGINEERING SER/gvm lF OF C Copies: 4/Monterra Properties Please verify that soils reports contain all of the above information. In addition, to assure continuity between the investigation/reporting stage and the execution stage, please use the following checklist to verify that the conclusions and recommendations in the report coverall the required elements. Only then can we be assured that the construction documents address all of the site soil conditions. 'La Quinta Geotechnical Report`Checklist , Does the "Conclusions and Recommendations" section of the report address each of the following criteria? "Address". means: (a) the criterion is considered significant and mitigation measure(s). noted, -or; (b) the criterion is considered insignificant and explicitly so stated. :Yes No Criterion ® Foundation criteria based upon bearing capacity of natural or compacted soil. ® Foundation criteria to mitigate the effects of expansive .soils. Foundation criteria based upon bearing capacity -of natural or -compacted soil. Foundation criteria to mitigate the effects of liquefaction. ® Foundation criteria• to mitigate the effects "of seismically induced differential settlement. U. Foundation criteria to mitigate the effects of long-term differential settlement. ` ® Foundation, criteria to mitigate the effect' of varying soil strength. ® Foundation criteria to mitigate expected total and differential settlement. Any "No" answers to the -above checklist should be noted as specific* required corrections. y AI EP'St)N C453II9 z ' EXP• 9/30/14 m CIVIL ENGINEERING