Loading...
Griffin Ranch TR 32879 BTCP2017-0009 (Plans 1-8) 2016 Code Update Revision 1ADDITIONAL SITES CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES 1ST PC SUBMITTAL RECEIVED ARMANDO MAGALLON 9/19/2017 10/13/2017 REVISION 1 RECEIVED ON 9/15/2017 AS AN INCOMPLETE SUBMITTAL; STRUCTURAL CALCS WERE MISSING. I LET THEM KNOW THAT I COULD TAKE PLANS IN BUT THEY WOULD NOT BE PROCESSED UNTILL CALCS WERE RECEIVED AND THEY AGREED. THEY MAILED STRUCTURAL CALCS AND WE RECEIVED 9/18/2017 IN THE AFTERNOON. I PROCESSED THE PLANS 9/19/2017 AND SENT THEM OUT FOR A RECHECK. NOTE ARMANDO MAGALLON 9/20/2017 9/20/2017 BOTH A 1 WEEK AND A 2 WEEK FIRE REVIEW WERE AUTOMATICALLY POPULATED. I LEFT THE TWO WEEK REVIEW FOR FIRE. PHONE CALL BURT HANADA 10/6/2017 10/6/2017 LEFT VOICEMAIL FOR SHELLY JORDAN THAT CORRECTIONS ARE READY FOR PICKUP. EMAIL BURT HANADA 10/6/2017 10/6/2017 EMAILED CORRECTION LIST TO SHELLY JORDAN. Description: GRIFFIN RANCH / SFD X 9 REVISIONS Status: ARCHIVED Type: TRACT RESIDENTIAL CONSTRUCTION PLAN Status Date: 10/12/2017 Subtype: REVISION Applied: 9/18/2017 Address: 81181 MERV GRIFFIN WY Approved: 10/20/2017 City, State, Zip: LA QUINTA,CA92253 Closed: Project Manager: Expired: Details: REVISION NO.1 - 2016 CODE UPDATE. PLANS 1THROUGH 8. REVISION NO. 1 PLANS (ARCHITECTURAL, MECHANICAL ELECTRICAL PLUMBING, GREEN CODE, ENERGY & STRUCTURAL) REPLACES ORIGINAL APPROVED 2016 CODE UPDATE PLANS. Printed: Monday, March 20, 2023 9:59:36 AM 1 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0009 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT LENNAR HOMES - SHELLY JORDAN 980 MONTECITO CORONA CA 92879 shelly.jordan@lennar.c om CONTRACTOR LENNAR HOMES OF CALIFORNIA INC 25 ENTERPRISE ALISO VIEJO CA 92656 lennar@lennar.com DEVELOPER LENNAR HOMES OF CALIFORNIA INC 25 ENTERPRISE ALISO VIEJO CA 92656 lennar@lennar.com ENGINEER GOUVIS ENGR CONSULT GROUP INC OUTSIDE CITY LIMITS OWNER IOTA GRIFFIN 4675 MACARTHUR CT NO 1550 NEWPORT BEACH CA 0 PRIMARY CONTACT LENNAR HOMES - SHELLY JORDAN 980 MONTECITO CORONA CA 92879 shelly.jordan@lennar.c om PROJECT MANAGER LENNAR HOMES - SHELLY JORDAN 980 MONTECITO CORONA CA 92879 shelly.jordan@lennar.c om 2ND PC SUBMITTAL RECEIVED MARY FASANO 10/12/2017 10/12/2017 PHONE CALL BURT HANADA 10/19/2017 10/19/2017 NOTIFIED SHELLY JORDAN THAT PLANS ARE APPROVABLE. NOTE MIRTA LERMA 8/13/2018 8/13/2018 DEPOSIT REFUNDED. 101-0000-22811 CLOSED. COUNCIL APPROVED A FLAT FEE STRUCTURE FOR FIRE INSPECTION AUGUST 2017. CONDITIONS FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 4 $624.00 $624.00 10/24/17 R28904 14035 CHECK LENNAR COMMUNITIES INC.AMA HOURLY CHARGE - YES ADMINISTRATIVE STAFF 101-0000-42600 0.25 $10.00 $10.00 10/24/17 R28904 14035 CHECK LENNAR COMMUNITIES INC.AMA Printed: Monday, March 20, 2023 9:59:36 AM 2 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0009 INSPECTIONS INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES REVIEWS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY HOURLY CHARGE - YES STRUCTURAL PLAN REVIEW ENGINEER 101-0000-42600 1.5 $142.50 $142.50 10/24/17 R28904 14035 CHECK LENNAR COMMUNITIES INC.AMA Total Paid for BUILDING STAFF - PER HOUR: $776.50 $776.50 BUILDING TRACT RESIDENTIAL CONSTRUCTION PLAN DEPOSIT 101-0000-42600 1 $500.00 $0.00 Total Paid for BUILDING TRACT RESIDENTIAL CONSTRUCTION PLAN DEPOSIT: $500.00 $0.00 FIRE NEW RESIDENTIAL - TRACT 101-0000-22811 1 $1,056.00 $1,056.00 10/24/17 R28904 14035 CHECK LENNAR COMMUNITIES INC.AMA Total Paid for FIRE NEW RESIDENTIAL - TRACT: $1,056.00 $1,056.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 10/24/17 R28904 14035 CHECK LENNAR COMMUNITIES INC.AMA Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$2,337.50 $1,837.50 REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST BLDG (2WK)BURT HANADA 9/18/2017 10/2/2017 10/6/2017 REVISIONS REQUIRED 1ST BLDG STR (2WK)YOUNG ENGINEERING 9/18/2017 10/2/2017 10/2/2017 READY FOR APPROVAL REV 1 1ST FIRE (2WK)RONALD GRIESINGER 9/18/2017 9/28/2017 9/22/2017 READY FOR APPROVAL Printed: Monday, March 20, 2023 9:59:36 AM 3 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0009 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 10/6/2017 BURT HANADA 1ST REVIEW CORRECTION LIST GRIFFIN RANCH 2016 CODE UPDATE REV. 1.docx 0 DOC 10/6/2017 BURT HANADA EMAIL TO APPLICANT BTCP2017-0009 81181 MERV GRIFFIN WY.pdf 0 DOC 10/2/2017 BRONZ YOUNG 1ST CHECK - STRUCTURAL TRANSMITTAL.pdf 1ST CHECK - STRUCTURAL TRANSMITTAL.pdf 0 BOND INFORMATION 2ND BLDG NS (2WK)BURT HANADA 10/12/2017 10/19/2017 10/19/2017 APPROVED Printed: Monday, March 20, 2023 9:59:36 AM 4 of 4 Project Details City of La Quinta PROJECT NUMBER BTCP2017-0009 LENNAIT- TRANSMITTAL TO: City of La Quinta 78-495 Calle Tampico La Quinta, CA 92253 CO: Building & Safety Department FROM: Shelly Jordan Project Manager 951-817-3526 shelly.iordan _lennar. com . RE: Griffin Ranch, Tract 32879, Model Delta Plan revisions DATE: . September 14, 2017 Attached hereto being submitted to Building and Safety for review and approval of Griffin Ranch 2017 Model Delta revisions: 3 sets. Architectural Plans and written narrative of Delta changes 3 sets Structural Plans and written narrative of Delta changes 3 sets Mechanical and Plumbing Plans and written narrative of Delta changes 3 sets Title 24 and written narrative of Delta changes Should any additional information or documents be required or needed, please. do not hesitate to contact me direct at 951-817-3526. SEP 19 2016 CI' F LA QUINTA COMMUNITY DEVELOPMENT Lennar Inland Empire Division 980 Montecito Drive, Suite 302, Corona, CA 92879 • Phone: 951-817-3600 • Fax: 951-817-3650 L E=-MF*JtQ� A.C® THE McKINLEY ASSOCIATES,. INC. September 12, 2017 Griffin 2017 Plan 1 and 1X: Revise fireplace to Heatilator Crave Series. Revise rolling door system and great room to a multi -slide. Increase wall to 2x8. Add cabinet at powder room. Add optional fireplace. Delete soffit at kitchen cabinets. Plan 2 Revise master bath tub and shower. Revise fireplace to Heatilator Crave Series. Delete portion of cabinets at laundry. Revise rolling door system at great room to a multi -slide. Increase wall to 2x8. Add optional beverage center at kitchen pass -through. Delete double door to bedroom and add single door. Add soap recess to all secondary baths. At master bedroom French door is standard, window is option. Revise slider and bonus room to French doors add bar option. Plan 3 Add cabinet at powder room. Delete soffits above cabinets and kitchens. Revise rolling door system at great room to a multi -slide. Increase wall to 2x8. Revise fireplace to Heatilator Crave Series. Revise outdoor fireplace to Heatilator Ion Series. Add 5 shelves at laundry at guest suite. ARCHITECTURE & LAND PLANNING T 619-238-1134 F 619-238-6038 . 1818 FIRST AVENUE . SAN DIEGO, CALIFORNIA 92101 • Page 2 Plan 4 September 13, 2017 Add optional fireplace at mater bath. Add upper cabinet and master bath linen. Add soap niche at all secondary baths. Revise layout of storage room at den. Revise fireplace to Heatilator Crave Series. Delete wall at powder room between toilet and lavatory. Revise rolling doors at master bedroom, flex room, and great room to multi -slide.. Increase wall to 2x8. Delete closet at bedroom and add coffee bar. Add flex room option. Plan 5 Revise master bath tub and shower. Revise fireplace to Heatilator Crave Series. Delete portion of cabinets at laundry room. Revise rolling door system at great room at kitchen pass -through. Add soap niche typical all secondary baths. Add fireplace option at master bathroom. Revise opening into bonus room. Revise slider at bonus room to 8 ft. Add den option at bonus room. Plan 6 and 8 Add sink at kitchen. Add cabinet at powder room. Revise fireplace to Heatilator Crave Series. Revise outdoor fireplace to Heatilator Ion Series. Revise rolling door system at great room to multi -slide. Increase wall to 2x8 Add options at game room. Plan 7 Add fireplace option at master bath. Revise rolling door system at master bedroom, great room, flex room, and master bedroom 2 to a multi -slide. Increase wall to 2x8. . Revise fireplace to Heatilator Crave Series. Delete wall at powder room between toilet and lavatory. Revise bedroom 3 closet door. Add soap niche to all secondary baths. •. Page 3 September 13, 2017 Delete portion of cabinets at laundry. Add game room option. Delete 4060 SH windows at master bedroom 2. Add windows at flex room. hTRU-_,T PNRT IFR IN ifvov-,0.}ICI, QfJALIT� SER'�`!�E September 12, 2017 Re: Griffin Ranch (Series I) GECG Job NO•-. 64305 - 505 Revision List -Delta 4 2017 Se tember 12, Revision Date. P ents. Client Revision' construction.ncorgdocum pescription: orated into the List which have been ems are Delta 4 Revision evisi n The following it rear of great room Item Sheet NO- - Pad footing was added @ @rear of great room I S-I.1 S_►.IX _Beam 2 was changedleft of great room $-1.2, S-1X•2 _Beam size was changed @ left of great room 2 was changed @ an of 2967B _Beam location artial framing i real of bonus -Delta mark was added @ p 6x6 beams were added @ .Beam I was removed and (2) 3 S-2.2 room. front of great room. -Size of beam 4 was changed @ were revised. ri ht of master bathroom -Beams g teat room, removed @rear of g _pad was rem rear of great room• 4 S-3.1 -Pad size was changed @ Options were added. Wine room and Plex room p of bedroom 4• size was changed @rear 5 S-4.2 _Beam left of master bedroom _Size of beam I was changed @ left °{ master bedroom. -Span of shear panel was changed t removed @right of entry• _Beam was rem great room, removed @rear of -Beam was rem left of master bedroom l / bedroom 5 -Beam was removed @ rear of super bonus room S-5.2 _Size of beam 1 was changed @ aster bathroom 2 right of m -Beams were revised @ rear room was revised. front of g was revised. _Size of beam 5 @rear of great room _Size of beam 2 @ lace options were added. Firep rear of great room• _Kitchenette and were changed @ S-5.3 .pad size and locations changed @ front of courtyard 8 5-6.1 _type of shear panel was teat room was revised. room• 9 S-6.2 _Beam 8 @ rear of g as changed @ left of dining --type of shear panel w were added. I _Game room #I and #2 options w �. I� S-6.3 949.752.1612 4400 Campus Drive Newport Beach, CA s N, CA 92660 roup.com Palm Spring WW.gOuvisg Pleasanton, CA Ho Cht Minh City' Vietnam Griffin Ranch (Series 1) GECG Job No.: 64305 - 505 Revision List - Delta 4 Revision Date: September 12, 2017 Description: Client Revision. . Page 2 September 12, 2017 I I 5-7.1 -Wine room option was added. 12 S-7.2 -Wine room option was added. -Location of beam was changed @ rear of master bedroom 2. -Size of beam 3 @ left of great room was revised. -Beams were added @ left of flex room. 13 5-8.1' -Pad size and locations were changed @ rear of great room. •14 5-8.2 -Beam 8 @ rear of great room was revised. -California framing was changed @ left of dinning room. -Beam was removed @ rear of bathroom 2. 15 S-8.3 -Game room #1 and #2 options were added. -Bearing condition of GT#3 was revised. If you should have any questions, please contact our office. Regards, GOUVIS ENGINEERING CONSULTING GROUP, INC. i SII`ICE 19 U6'� 14.4. A TRUSTED PARTNER IN INNOVATION, -QUALITY & SERVICE August 24, 2017 Re: Griffin Ranch (Series 1) GECG Job No.: 64305 Revision List Revision Date: August 24, 2017 Description: Client Revision - Mechanical The following items are Revision List which have been incorporated into the commirrinn rinri impntc Item Sheet No. Revision I M-3.1 FAU 36 has been changed to FAU 48 and FAU 30 has been changed to FAU 36. Condensing units have been changed accordingly. Duct routings and air distribution have been changed on plan I. 2 M-3.2 FAU 36 has been changed to FAU 48 and FAU 30 has been changed to FAU 36. Condensing units have been changed accordingly. Duct routings and air distribution have been changed on plan IX. 3 M-3.3 Another FAU (48) and CU (48) have been added on plan. FAU 60 has been changed to FAU 48 and condensing unit has been changed to CU 48 accordingly. Duct routings and air distribution have been changed on plan 2. 4 M-3.4 FAU 48 has been changed to FAU.60 and FAU 36 has been changed to FAU 48. Condensing units have been changed accordingly. FAU 24 and CU 24 have been added on plan for the guest suite. Duct.routings and air distribution have been changed on plan 3. 5 M-3.5 FAU 48 has been changed to FAU 60 and FAU 42 has been changed to FAU 48. Condensing units have been changed accordingly. Duct routings and air distribution have been changed on plan 4. 6 M-3.6 Both FAUs have been changed to FAUs 60. Condensing units have been changed accordingly. Duct routings and air distribution have been changed on plan S. 7 M-3.7 Both FAUs, have been changed to FAUs 60. Condensing units have been changed accordingly. FC 18 and HP 18 have been added on plan for the Casita. Duct routings and air distribution have been changed on plan 6. 8 M-3.8 FAU 48 has been changed to FAU 60. Condensing unit has been changed accordingly. Duct routings and air distribution have been changed on plan 7. 9 M-3.9 FAU 42 has been changed to FAU 60. Condensing unit has been changed accordingly. Duct routings and air distribution have been changed on plan 7. 949.752.1612 4400 Campus Drive Newport Beach, CA 92660 www.gouvisgroup.com Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam �1 ote 19 A TRUSTED PARTNER IN i INNOVATION. DUALITY &SERVICE August 24, 2017 Re: Griffin Ranch (Series 1) GECG Job No.: 64305 Revision List Revision Date: August 24, 2017 Revision List for Plumbing Plans Item Sheet No. Revision I P=1.3, P-2.1-P-2.9 Due to changes in gas demand of FAUs in mechanical plans, the gas diagrams (sheet P-2.1 to P-2.9) have been updated and pipes resized. The changes have been applied to the gas calculation tables on sheet P-1.3. 949.752.1612 4400 Campus Drive Newport Beach, CA 92660 www.gouvisgroup.com Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam �Icr AtAUUU-UTITLE 24, INC. 7544 SADDLEHILL TRAIL, ORANGE, CA 92869 • (714) 771-1507 • FAX (714) 771-2939 • T-24@socal.rr.com September 12, 2017 Lennar Homes/Corona 980 Montecito Drive, Suite #302 Corona, CA 92879 (951) 712-8300 Attention: Anthony Anderson (Tony.Anderson(-Lennar.com) RE: Title 24 Energy Calculations (Revised for Glass Changes — Delta 1) For "Griffin Ranch 2017", Plans 1, 1x, 2, 3, 4, 5, 6, 7, & 8 La Quinta, California Tony, Here is a list of changes that affected the Title 24 energy calculations: All Plans 1., Change folding glass doors to stacking glass doors. Plan 2: 1. Bonus folding glass door changed to two (2) 2'-8"x8'-0" French doors. Plan 3 Plan 4 Plan 5 Plan 6 Plan 7 1. Bath 4 window now 3'-0"x2'-0". 1. Bath 3 window is now a 3'-0"x2'-0". 2. Remove right side bedroom 4 glass. 3. M. bedroom glass door now 12'-0" wide. 1. Bonus glass door now 8'-0" wide. . 2. M. bath 2 now has two (2) 2'-0"x4'-0" windows. 3. M. bath 2 now has one (1) 2'-0"x1'-4" window. 4. M. bedroom 1 now has two (2) 3'-0'x6'4' windows. 5. M. bedroom 1 now has two (2) 3'-0"x1'-4" windows. 1. Great room glass door now 24'-0"x10'-0". 2. Remove fixed window above great room door. 1. Remove three (3) 4'-0"x6'-0" side m. bedroom windows. Sincerely, Rick Maurer To: Attn: MARY Plan Check #: BTCP2017-0009 Submittal: 0 1sl ❑ 4th ❑ 2nd ❑ 5lh ❑ 3rd ❑ Other: We are forwarding: 0 By Messenger ❑ By Mail (Fed Ex or UPS) ❑ Your Pickup Includes: Descriptions: Includes: # Of Descriptions: Copies: 0 1 Structural Plans ❑ Revised Struct. Plans 0 1 Structural Calculations ❑ Revised Struct. Calcs ❑ Truss Calcs ❑ Revised Truss Calcs ❑ Soils Report - Update ❑ Revised Soils Report ❑ Structural P/C Responses O Approved Structural Plans / Comments 1 ❑ Redlined Structural Plans 0 1 Approved Structural Calcs ❑ Redlined Structural Calcs 0 1 Approved Truss Calcs ❑ Redlined Truss Calcs ❑ Approved Soils Report ❑ Redlined Soils Reports ❑ Other: Comments: Structural content is approvable. Transit Per Diem= Admin Time = 0.25 hrs. Structural Engineer/Principal Review Time = 0.0 hrs. Plan Review Engineer Time = 1.5 hrs. This Material Sent for: ❑ Your Files Per Your Request ❑ Your Review ❑ Approval ❑ Checking ❑ At the request of: Other: ❑ By: Joe Venuti Office: (760) 772-5107 Other: LQPCla7VALUENGR.COM