Loading...
Griffin Ranch TR 32879 BTCP2017-0012 (Plans 2 & 5) 2016 Code Update Revision 3SINCE 196L, A TRUSTED PARTNER IN INNOVAT ION, QUALITY $ SERVICE January 19, 2018 Re: Griffin Ranch (Series 1) GECG Job No.: 64305 - 508 Revision List - Delta 6 Revision Date: January 08, 2018 Description: Frame walk revisions (Plan 2 and 5) The following items are Delta 6 Revision List which have been incorporated into the construction documents. Item Sheet No. Revision I S-2.2, S-5.2 Recalculate header size at right of master bathroom for the 6x6 header If you should have any questions, please contact our office. Regards, GOUVIS ENGINEERING CONSULTING GROUP, INC. Daniel T Tanuwidjaja Director of Residential 949.752.1612 15 Studebaker Irvine, CA 92618 www.gouvisgroup.com jT 7;,701'5 -0040' l CITY OF LA QUINTA BUILDING & SAF�T�®PT, APPRO FOR CONSTRUCTION S BY IF Palm Springs, CA Pleasanton, CA Ho Chi Minh City, Vietnam