Loading...
BRES2019-0143 Revision 1PERMIT # — G.E NI aj,b,-!, Fa L R F —� PLAN LOCATION: Project Address: '� �� f/D O /4 r-AZ' c) L� Project Description: Pool, Remodel, Add't, Elect, Plumb, Mech APN #: 61AAA-4ei_ � i Zt � Applicant Name: r,�lFt�._� 6 DLI, r i ��,AyI� , Address: City, ST, Zip: �%Aht H6 AI RW_ CA � Telephone: -7 Email: �RrAikq I,�I ji r� �M/�,ll, ��Z Valuation of Project $ Contractor Name: ���Ul�k (�-`pi, - New SFD Construction: Address: �0, 6pu ( 7/ Conditioned Space SF City, St, Zip RXWA-t1iQAke. Garage _SF Telephone: 9 7� l Patio/Porch _ SF Email: / Fire Sprinklers SF [State:L�ic: City Bus Lic: Arch/Eng Name: Address: City, St, Zip Telephone: Email: State Lic City Bus Lic: Property Owner's Name: A46,5,61W Address: City, ST, Zip AAA1(-0u NWI A64 6A . Telephone: 9 7 9 . Sbb q 1-71 Email: Construction Type: Grading: Occupancy: Bedrooms: Stories: # Units: New Commercial / Tenant Improvements: Total Building SF Construction Type: Occupancy: 78495 CALLE TAMPICO LA QUINTA, CA 92253 760-777-7000 t W0"Kra PERMIT#F i,,,h,I t:, IIKF- PLAN LOCATION: Project Address: 7 APN #: Applicant Name: Address: City, ST, Zip: Telephone: Email Project Description: Pool, Remodel, Add't, Elect, Plumb Valuation of Projec nj DESIGN AND Contractor Name: -�� New SFD Construction: Address: Conditioned Space SF City, St, Zip Garage SF Telephone: ' '� v _ C� Patio/Porch SF Email: Fire Sprinklers SF State Lic: City Bus Lic: Arch/Eng Name: Construction Type: Occupancy: Address: Grading: City, St, Zip Telephone: Bedrooms: Stories: # Units: Email: State Lic: City Bus Lic: Property Owner's Name: New Commercial / Tenant Improvements: Address: Total Building SF City, ST, Zip Construction Type: Occupancy Telephone: Email 78495 CALLE TAMPICO LA QUINTA, CA 92253 760-777-7000 BUILDING ENERGY ANALYSIS REPORT PROJECT: Custom Residence 79-540 Tom Fazio Lane, North La Quinta, CA 92253 Project Designer: ARC -ID Corporation 5015 Birch Street Newport Beach, CA 92660 (949) 261-9000 Report Prepared by: Jon d. Scott Scott Design and Title 24, Inc, RE, VISION 74818 Velie Way Suite 8 Palm Desert, CA 92260 GCS?-�lcl _ 01443 (760) 200-4780 CITY OF LA QUID A BU:LDINu 0'. ,...'ON REVIEWED FOR CODE n2;pv LIANCE nA7 Job Number: Date: 10/24/2019 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards. This program developed by EnergySoft Software — www.energysoft.com. TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Form CF-1 R-PRF-01-E Certificate of Compliance 3 Form RMS-1 Residential Measures Summary 13 Form MF-1 R Mandatory Measures Summary 14 HVAC System Heating and Cooling Loads Summary 18 Zone Load Summary 21 Room Load Summary 24 Room Heating Peak Loads 27 Room Cooling Peak Loads 30 CERI'; kTE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE 'HOD Project Name: Lot 6, Quarry Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Calculation Description: Title 24 Analysis Input File Name: Quarry Lot 6-LQ-Frase-19.ribdl6x Cl PRF-01 Page 1 of 10 GENERAL INFORMATION 01 Project Name Lot 6, Quarry 02 I Calculation Description Title 24 Analysis 03 Project Location 79-540 Tom Fazio Lane. North 04 City La Quinta 05 Standards Version Compliance 2017 06 Zip Code 92253 07 Compliance Manager Version BEMCmpMgr 2016.3.1 (1149) 08 Climate Zone CZ15 09 Software Version EnergyPro 7.2 10 Building Type Single Family 11 Front Orientation (deg/Cardinal) 180 12 Project Scope Newly Constructed 13 Number of Dwelling Units 1 14 Total Cond. Floor Area (ftZ) 3500 15 Number of Zones 3 16 Slab Area (ft) 3500 17 Number of Stories 1 18 Addition Cond. Floor Area(ft2) n/a 19 Natural Gas Available Yes 20 Addition Slab Area (ftZ) n/a 21 Glazing Percentage (%) 33.8% COMPLIANCE RESULTS 01 Building Complies with Computer Performance 02 This building incorporates features that require field testing and/or verification by a certified HERS rater under the supervision of a CEC-approved HERS provider. 03 This building incorporates one or more Special Features shown below ENERGY USE SUMMARY 04 05 06 07 08 Energy Use (kTDV/ftZ-yr) Standard Design Proposed Design Compliance Margin Percent Improvement Space Heating 1.36 9.02 -7.66 -563.2% Space Cooling 83.07 74.91 8.16 9.8% IAQ Ventilation 0.95 0.95 0.00 0.0% Water Heating 4.07 3.51 0.56 13.8% Photovoltaic Offset ---- 0.00 0.00 --- Compliance Energy Total 89.45 1 88.39 1.06 1.2% Registration Number: 219-Po10059547B-000-000-0000000-0000 Registration DateMme: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT( JE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE' 'HOD Cl bRF-01 Project Name: Lot 6, Quarry Calculation Description: Title 24 Analysis Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Input File Name: Quarry Lot 6-LQ-Frase-19.ribd16x Page 2 of 10 ENERGY DESIGN RATING Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system where 100 represents the energy performance of the Residential Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with California modeling assumptions. A score of zero represents the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out" its TDV energy. Because EDR includes consideration of components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics), it is not used to show compliance with Part 6 but may instead be used by local jurisdictions pursuing local ordinances under Title 24, Part 11 (CALGreen). As a Standard Design building under the 2016 Building Energy Efficiency Standards is significantly more efficient than the baseline EDR building, the EDR of the Standard Design building is provided for Information. Similarly, the EDR score of the Proposed Design is provided separately from the EDR value of installed PV so that the effects of efficiency and renewable energy can both be seen EDR of Standard Efficiency EDR of Proposed Efficiency EDR Value of Proposed PV + Battery Final Proposed EDR 51.9 51.4 0.0 51.4 ❑ Design meets Tier 1 requirement of 15% or greater code compliance margin (CALGreen A4.203.1.2.1) and QII verification prerequisite. ❑ Design meets Tier 2 requirement of 30% or greater code compliance margin (CALGreen A4.203.1.2.2) and QII verification prerequisite. ❑ Design meets Zero Net Energy (ZNE) Design Designation requirement for Single Family in climate zone CZ15 (CALGreen A4.203.1.2.3) including on -site photovoltaic (PV) renewable energy generation sufficient to achieve a Final Energy Design Rating (EDR) of zero or less. The PV System and QII must be verified. Notes: • Excess PV Generation EDR Credit: Bypassing PV size limit may violate Net Energy Metering (NEM) rules REQUIRED SPECIAL FEATURES The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis. • Cool roof • Window overhangs and/or fins HERS FEATURE SUMMARY The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is provided in the building components tables below. Building -level Verifications: • High quality insulation installation (QII) • IAQ mechanical ventilation Cooling System Verifications: • Minimum Airflow • Verified EER • Verified SEER • Verified Refrigerant Charge • Fan Efficacy Watts/CFM HVAC Distribution System Verifications: • Duct Sealing • Low -leakage Air Handling Unit Domestic Hot Water System Verifications: • -- None -- Registration Number: 219-Po10059547B-000-000-0000000-0000 Registration Date[Time: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT( JE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE Project Name: Lot 6, Quarry Calculation Description: Title 24 Analysis 'HOD Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Input File Name: Quarry Lot 6-LQ-Frase-19.ribd16x Cl, ?RF-01 Page 3 of 10 BUILDING - FEATURES INFORMATION 01 02 03 04 05 06 07 Project Name Conditioned Floor Area (ft) Number of Dwelling Units Number of Bedrooms Number of Zones Number of Ventilation Cooling Systems Number of Water Heating Systems Lot 6, Quarry 3500 1 4 3 0 1 ZONE INFORMATION 01 02 03 04 05 06 07 Zone Name Zone Type HVAC System Name Zone Floor Area (ft2) Avg. Ceiling Height Water Heating System 1 Water Heating System 2 Master Suite Conditioned AC 11 796 10.5 DHW Sys 1 n/a Great/Kitchen Conditioned AC 22 1406 14 DHW Sys 1 n/a Bdrm 2, 3 & 4 Conditioned AC 33 1298 10.5 DHW Sys 1 n/a OPAQUE SURFACES 01 02 03 04 05 06 07 08 Name Zone Construction Azimuth Orientation Gross Area (ft) Window & Door Area (ft) Tilt (deg) N Wall Master Suite R-21 Wall 0 Back 160 0 90 E Wall Master Suite R-21 Wall 90 Right 465 32 90 150d Wall Master Suite R-21 Wall 150 - specify - 135 72 90 250d Wall Master Suite R-21 Wall 250 - specify - 125 72 90 W Wall Master Suite R-21 Wall 270 Left 75 0 90 Interior Surface -Master Master Suite»Great/Kitchen R-0 Interior Wall n/a n/a 390 0 n/a Roof 2 Master Suite R-38 Roof + R-12 n/a n/a 796 n/a n/a N Wall 2 Great/Kitchen R-21 Wall 0 Back 456 300 90 S Wall Great/Kitchen R-21 Wall 180 Front 616 561.7 90 Interior Surface -Master 2 Great/Kitchen»Master Suite R-0 Interior Wall n/a n/a 390 0 n/a Interior Surface-Bdrms Great/Kitchen»Bdrm 2, 3 & 4 R-0 Interior Wall n/a n/a 340 0 n/a N Wall 3 Bdrm 2, 3 & 4 R-21 Wall 0 Back 250 48 90 E Wall 2 Bdrm 2, 3 & 4 R-21 Wall 90 Right 160 0 90 S Wall 2 Bdrm 2, 3 & 4 R-21 Wall 180 Front 210 0 90 W Wall 2 Bdrm 2, 3 & 4 R-21 Wall 270 Left 520 96 90 Interior Surface-Bdrms 2 Bdrm 2, 3 & 4»Great/Kitchen R-0 Interior Wall n/a n/a 340 0 n/a Roof 3 Bdrm 2, 3 & 4 R-38 Roof + R-12 n/a n/a 1298 n/a n/a Registration Number: 219-P010059547B-000-000-0000000-0000 Registration Dateffime: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT[ 1TE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE Project Name: Lot 6, Quarry Calculation Description: Title 24 Analysis HOD Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Input File Name: Quarry Lot 6-LQ-Frase-19.ribdl6x CF AF-01 Page 4 of 10 OPAQUE SURFACES - Cathedral Ceilings 01 02 03 04 05 06 07 08 09 10 Name Zone Type Orientation Area (ft) Skylight Area (ft2) Roof Rise (x in 12) Roof Reflectance Roof Emittance Cool Roof Roof Great/Kitchen R-38 Roof + R-12 Cath Left 1406 0 1 0.61 0.86 Yes ATTIC 01 02 03 04 05 06 07 08 Name Construction Type Roof Rise Roof Reflectance Roof Emittance Radiant Barrier Cool Roof Attic Master Suite Attic RoofMaster Suite Unventilated 1 0.61 0.86 No Yes Attic Bdrm 2, 3 & 4 Attic RoofBdrm 2, 3 & 4 Unventilated 1 0.61 0.86 No Yes FENESTRATION / GLAZING 01 02 03 04 05 06 07 08 09 10 Name Type Surface (Orientation -Azimuth) Width (ft) Height (ft) Multiplier Area (ft) U-factor SHGC Exterior Shading 6 Window E Wall (Right-90) 8.0 2.0 1 16.0 0.51 0.32 Insect Screen (default) 5 Window E Wall (Right-90) 8.0 2.0 1 16.0 0.51 0.32 1 Insect Screen (default) 103 Window 150d Wall (- specify -150) 8.0 9.0 1 72.0 0.56 0.25 Insect Screen (default) 102 Window 250d Wall (- specify -250) 8.0 9.0 1 72.0 0.56 0.25 Insect Screen (default) 104 Window N Wall 2 (Back-0) 30.0 10.0 1 300.0 0.56 0.25 Insect Screen (default) 101 Window S Wall (Front-180) 35.0 10.0 1 350.0 0.56 0.25 Insect Screen (default) 4 Window S Wall (Front-180) 35.0 3.7 1 129.5 0.51 0.32 Insect Screen (default) 100 Window S Wall (Front-180) 4.0 10.0 1 40.0 0.56 0.25 Insect Screen (default) 1 Window S Wall (Front-180) 1.0 10.0 1 10.0 0.51 0.32 Insect Screen (default) 2 Window S Wall (Front-180) 1.0 10.0 1 10.0 0.51 0.32 Insect Screen (default) 3 Window S Wall (Front-180) 6.0 3.7 1 22.2 0.51 0.32 Insect Screen (default) 105 Window N Wall 3 (Back-0) 1 48.0 0.56 0.25 Insect Screen (default) 107 Window W Wall 2 (Left-270) 6.0 8.0 1 48.0 0.56 0.25 Insect Screen (default) 106 Window W Wall 2 (Left-270) 1 6.0 8.0 1 48.0 0.56 0.25 Insect Screen (default) Registration Number: 219-Po10059547B-000-000-0000000-0000 Registration Date[Time: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT(^ 1TE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE'. ^ 'HOD Project Name: Lot 6, Quarry Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Calculation Description: Title 24 Analysis Input File Name: Quarry Lot 6-LQ-Frase-19.ribdl6x CI i'RF-01 Page 5 of 10 OVERHANGS AND FINS 01 02 03 04 05 06 07 08 09 10 11 12 13 14 Overhang Left Fin Right Fin Window Depth Dist Up Left Extent Right Extent Flap Ht. Depth Top Up Dist L Bot Up Depth Top Up Dist R Bot Up 6 4 0.1 4 4 0 0 0 0 0 0 0 0 0 5 4 0.1 4 4 0 0 0 0 0 0 0 0 0 103 10 0.1 10 10 0 0 0 0 0 0 0 0 0 102 10 0.1 10 10 0 0 0 0 0 0 0 0 0 104 11 0.1 11 11 0 0 0 0 0 0 0 0 0 101 8 0.1 8 8 0 0 0 0 0 0 0 0 0 4 8 0.1 8 8 0 0 0 0 0 1 0 0 0 0 100 8 0.1 8 8 0 0 0 0 0 0 0 0 0 1 8 0.1 8 8 0 0 0 0 0 0 0 0 0 2 8 0.1 8 8 0 0 0 0 0 0 0 0 0 3 8 0.1 8 8 0 0 0 1 0 0 0 0 0 0 107 10 0.1 10 10 0 0 0 0 0 0 0 0 0 106 10 0.1 10 10 0 0 0 0 0 0 0 0 0 Registration Number: 219-PO10059547B-000-000-0000000-0000 Registration Dateffime: 2019-10-24 08:38:33 HERS Provider: CaiCERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERTI 1TE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE Project Name: Lot 6, Quarry Calculation Description: Title 24 Analysis ,'HOD Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Input File Name: Quarry Lot 6-LQ-Frase-19.ribd16x CF kF-01 Page 6 of 10 OPAQUE SURFACE CONSTRUCTIONS 01 02 03 04 05 06 07 Total Cavity Winter Design Construction Name Surface Type Construction Type Framing R-value U-factor Assembly Layers Cavity/Frame: no insul. /2x4 Top Chrd 2x4 Top Chord of Roof Truss @ 24 Roof Deck., Wood Siding/sheathing/decking Attic RoofMaster Suite Attic Roofs Wood Framed Ceiling in. O.C. none 0.644 Roofing: Light Roof (Asphalt Shingle) Inside Finish: Gypsum Board Ceilings (below Cavity/Frame: R-9.1 /2x4 R-38 Roof + R-12 attic) Wood Framed Ceiling 2x4 @ 16 in. O.C. R 38 0.025 Over Ceiling Joists: R-28.9 insul. • Inside Finish: Gypsum Board • Cavity/Frame: R-21 /2x6 • Sheathing/Insulation: R5Sheathing R-21 Wall Exterior Walls Wood Framed Wall 2x6 @ 16 in. O.C. R 21 0.048 Exterior Finish: 3 Coat Stucco • Inside Finish: Gypsum Board • Cavity/Frame: no insul. /2x4 R-0 Interior Wall Interior Walls Wood Framed Wall 2x4 @ 16 in. O.C. none 0.277 Other Side Finish: Gypsum Board • Inside Finish: Gypsum Board • Cavity/Frame: R-38/2x12 • Roof Deck: Wood Siding/sheathing/decking • Above Deck Insulation: R12 Sheathing R-38 Roof + R-12 Cath. Cathedral Ceilings Wood Framed Ceiling 2x12 @ 16 in. O.C. R 38 0.021 Roofing: Light Roof (Asphalt Shingle) • Cavity/Frame: no insul. /2x4 Top Chrd 7W,,dmed 2x4 Top Chord of Roof Truss @ 24 Roof Deck: Wood Siding/sheathing/decking Attic RoofBdrm 2, 3 & 4 Attic Roofs Ceiling in. O.C. none 0.644 • Roofing: Light Roof (Asphalt Shingle) SLAB FLOORS 01 02 03 04 05 06 07 Name Zone Area (ft2) Perimeter (ft) Edge Insul. R-value & Depth Carpeted Fraction Heated Slab -on -Grade Master Suite 796 97 None 0.8 No Slab -on -Grade 2 Great/Kitchen 1406 76 None 0.8 No Slab -on -Grade 3 Bdrm 2, 3 & 4 1298 113 None 0.8 No BUILDING ENVELOPE - HERS VERIFICATION 01 02 03 04 Quality Insulation Installation (QII) Quality Installation of Spray Foam Insulation Building Envelope Air Leakage CFM50 Required Not Required Not Required n/a Registration Number: 219-Po10059547B-000-000-0000000-0000 Registration Datel7ime: 2019-10-24 08:38:33 HERS Provider: CaiCERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT( ATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE Project Name: Lot 6, Quarry Calculation Description: Title 24 Analysis HOD Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Input File Name: Quarry Lot 6-LQ-Frase-19.ribdl6x CF ,'RF-01 Page 7 of 10 WATER HEATING SYSTEMS 01 02 03 04 05 06 Name System Type Distribution Type Water Heater Number of Heaters Solar Fraction (%) DHW Sys 1 DHW Standard DHW Heater 1 (2) 2 .0% WATER HEATERS 01 02 03 04 05 06 07 08 09 10 11 12 Input Rating / Tank Standby Heater Tank Uniform Energy Pilot / Insulation Loss / First Hour NEEA Heat Pump Tank Location Element Number Volume Factor I Energy Thermal R-value Recovery Rating / Brand / Model / or Ambient Name Type Tank Type of Units (gal) Factor / Efficiency Efficiency (Int/Ext) Eff Flow Rate Other Condition DHW Heater 1 Gas Small 2 0 0.95 EF <= 200 kBtu/hr R-0/R-0 0 n/a n/a n/a Instantaneous SPACE CONDITIONING SYSTEMS 01 02 03 04 05 06 SC Sys Name System Type Heating Unit Name Cooling Unit Name Fan Name Distribution Name AC 11 Other Heating and Cooling System Heating Component 1 Cooling Component 1 HVAC Fan 1 Air Distribution System 1 AC 22 Other Heating and Cooling System Heating Component 2 Cooling Component 2 HVAC Fan 2 Air Distribution System 2 AC 33 Other Heating and Cooling System Heating Component 3 Cooling Component 3 HVAC Fan 3 Air Distribution System 3 HVAC - HEATING UNIT TYPES 01 02 03 04 Name System Type Number of Units Efficiency Heating Component 1 CntrlFurnace 1 80 AFUE Heating Component 2 CntrlFurnace 1 80 AFUE Heating Component 3 CntrlFurnace 1 80 AFUE Registration Number: 219-Po10059547B-000-000-0000000-0000 Registration Date/Tme: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT(T ATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE HOD Project Name: Lot 6, Quarry Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Calculation Description: Title 24 Analysis Input File Name: Quarry Lot 6-LQ-Frase-19.ribdl6x CF ''RF-01 Page 8 of 10 HVAC - COOLING UNIT TYPES 01 02 03 04 05 06 07 08 Efficiency Name System Type Number of Units EER SEER Zonally Controlled Compressor Type HERS Verification Cooling Component 1 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 1-hers-cool Cooling Component 2 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 2-hers-cool Cooling Component 3 SplitAirCond 1 13 16 Not Zonal Single Speed Cooling Component 3-hers-cool HVAC COOLING - HERS VERIFICATION 01 02 03 04 05 06 Name Verified Airflow Airflow Target Verified EER Verified SEER Verified Refrigerant Charge Cooling Component 1-hers-cool Required 350 Required Required Required Cooling Component 2-hers-cool Required 350 Required Required Required Cooling Component 3-hers-cool Required 350 Required Required Required HVAC - DISTRIBUTION SYSTEMS 01 02 03 04 05 06 07 Name Type Duct Leakage Insulation R-value Duct Location Bypass Duct HERS Verification Air Distribution System 1 DuctsAttic Specified Lower Leakage 8 Attic None Air Distribution System Target 1-hers-dist Air Distribution System 2 DuctsAttic Specified Lower Leakage 8 Attic None Air Distribution System Target 2-hers-dist Air Distribution System 3 DuctsAttic Specified Lower Leakage 8 Attic None Air Distribution System Target 3-hers-dist HVAC DISTRIBUTION - HERS VERIFICATION 01 02 03 04 05 06 07 08 Name Duct Leakage Verification Duct Leakage Target (%) Verified Duct Location Verified Duct Design Buried Ducts Deeply Buried Ducts Low -leakage Air Handler Air Distribution System 1-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Air Distribution System 2-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Air Distribution System 3-hers-dist Required 5.0 Not Required Not Required Not Required Not Required Required Registration Number: 219-Po10059547B-000-000-0000000-0000 Registration Date/Time: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT( ►TE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE HOD Project Name: Lot 6, Quarry Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Calculation Description: Title 24 Analysis Input File Name: Quarry Lot 6-LQ-Frase-1 9. ribd 1 6x CF. F-01 Page 9 of 10 HVAC -FAN SYSTEMS 01 02 03 04 Name Type Fan Power (Watts/CFM) HERS Verification HVAC Fan 1 Single Speed PSC Furnace Fan 0.52 HVAC Fan 1-hers-fan HVAC Fan 2 Single Speed PSC Furnace Fan 0.52 HVAC Fan 2-hers-fan HVAC Fan 3 Single Speed PSC Furnace Fan 0.52 HVAC Fan 3-hers-fan HVAC FAN SYSTEMS - HERS VERIFICATION 01 02 03 Name Verified Fan Watt Draw Required Fan Efficiency (Watts/CFM) HVAC Fan 1-hers-fan Required 0.52 HVAC Fan 2-hers-fan Required 0.52 HVAC Fan 3-hers-fan Required 0.52 IAQ (Indoor Air Quality) FANS 01 02 03 04 05 06 Dwelling Unit IAQ CFM IAQ Watts/CFM IAQ Fan Type IAQ Recovery Effectiveness(%) HERS Verification SFam IAQVentRpt 73 0.25 Default 0 Required Registration Number: 219-Po10059547B-000-000-0000000-0000 Registration Date/Time: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 CERT(^ ATE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE ^ ,HOD Project Name: Lot 6, Quarry Calculation Description: Title 24 Analysis Calculation Date/Time: 08:33, Thu, Oct 24, 2019 Input File Name: Quarry Lot 6-LQ-Frase-19.ribdl6x Cl ,ORF-01 Page 10 of 10 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT 1. 1 certify that this Certificate of Compliance documentation is accurate and complete. Documentation Author Name: Documentation Author Signature: TT;W1-'5�?r Tim Scott Company: Signature Date: Scott Design and Title 24, Inc. 2019-10-24 08:38:33 Address: CEA/HERS Certification Identification (If applicable): 77085 Michigan Drive City/State/Zip: Phone: Palm Desert, CA 92211 760-200-4780 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design identified on this Certificate of Compliance. 2. 1 certify that the energy features and performance specifications identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 3. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designer Signature cww. Tim Scott Company: Date Signed: Scott Design and Title 24, Inc. 2019-10-24 08:38:33 Address: License: 77085 Michigan Drive NA City/State/Zip: Phone: Palm Desert, CA 92211 760-200-4780 Digitally signed by Ca10ERTS. This digital signature is provided in order to secure the content of this registered document and in noway implies Registration Provider responsibility for the accuracy of the information. Easy to Verify at CaICERTS.com Registration Number: 219-P010059547B-000-000-0000000-0000 Registration Date/Time: 2019-10-24 08:38:33 HERS Provider: CaICERTS inc. CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-01162019-1149 Report Generated at: 2019-10-24 08:33:34 RESIDENTIAL MEASURES SUMMARY RMS-1 Project Name Custom Residence Building Type 10 Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 1012412019 Project Address 79-540 Tom Fazio Lane, North La Quinta` California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 3,500 Addition n/a # of Units 1 INSULATION Construction Type Area Cavity (ft) Special Features Status Roof Wood Framed Attic R 38 2,094 Cool Roof New Wall Wood Framed R 21 1,990 Add=R-5.0 New Slab Unheated Slab -on -Grade - no insulation 3,500 Perim = 286' New Demising Wood Framed - no insulation 1,460 New Roof Wood Framed Rafter R 38 1,406 Add=R-12.0 Cool Roof New FENESTRATION Orientation Area(ft) Total Area: 1,182 Glazing Percents e: 3a8% New/Altered Average U-Factor: 0.55 U-Fac SHGC Overhang Sidefins Exterior Shades Status Right (E) 32.0 0.510 0.32 4.0 none Bug Screen New Front (SE) 72.0 0.560 0.25 10.0 none Bug Screen New Left (Kq 72.0 0.560 0.25 10.0 none Bug Screen New Rear (N) 300.0 Front (S) 390.0 0.560 0.560 0.25 11.0 0.25 8.0 none Bug Screen New none Bug Screen New Front (S) 171.7 0.510 0.32 8.0 none Bug Screen New Rear (N) 48.0 0.560 0.25 none none Bug Screen New Left (M 96.0 0.560 0.25 10.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 16.0 SEER Setback New HVAC DISTRIBUTION Location Heating Duct Cooling Duct Location R-Value Status AC 1 Ducted Ducted Attic 8.0 New AC 2 Ducted Ducted Attic 8.0 New AC 3 Ducted Ducted Attic 8.0 New WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 2 Small Instantaneous Gas 0 0.95 Standard New FnPMVPro 7 9 by FnBrnVSnff Llcer Numher• 13719 ID Pace 13 ofA322 2016 Low -Rise Residential Mandatory Measures Summary NOTE: Low-rise residential buildings subject to the Energy Standards must comply with all applicable mandatory measures, regardless of the compliance approach used. Review the respective section for more information. "Exceptions may apply. (Revised 0412017) Building Envelope Measures: § 110.6(a)l: Air Leakage. Manufactured fenestration, exterior doors, and exterior pet doors must limit air leakage to 0.3 cfm/ftx or less when tested per NFRC-400 or ASTM E283 or AAMA/WDMA/CSA 10111.S.2/A440-2011.' § 110.6(a)5: Labeling. Fenestration products must have a label meeting the requirements of § 10-111(a). § 110.6(b): Field fabricated exterior doors and fenestration products must use U-factors and solar heat gain coefficient (SHGC) values from TABLES 110.E-A and 110.E-B for compliance and must be caulked and/or weatherstri ed.' § 110.7: Air Leakage. All joints, penetrations, and other openings in the building envelope that are potential sources of air leakage must be caulked, asketed or weather stri ed. § 110.8(a): Insulation Certification by Manufacturers. Insulation specified or installed must meet Standards for Insulating Material. § 110.8(g): Insulation Requirements for Heated Slab Floors. Heated slab floors must be insulated per the requirements of § 110.8(g). § 110.8(i); Roofing Products Solar Reflectance and Thermal Emittance. The thermal emittance and aged solar reflectance values of the roofing material must meet the requirements of 6 110.8i when the installation of a cool roof is specified on the CF1 R. § 110.80): Radiant Barrier. A radiant barrier must have an emittance of 0.05 or less and be certified to the Department of Consumer Affairs. Ceiling and Rafter Roof Insulation. Minimum R-22 insulation in wood -frame ceiling; or the weighted average U-factor must not exceed 0.043. Minimum R-19 or weighted average U-factor of 0.054 or less in a rafter roof alteration. Attic access doors must have permanently attached § 150.0(a): insulation using adhesive or mechanical fasteners. The attic access must be gasketed to prevent air leakage. Insulation must be installed in direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration as specified in § 110.7, including but not limited to placing insulation either above or below the roof deck or on top of a drywall ceiling.* § 150.0(b): Loose -fill Insulation. Loose fill insulation must meet the manufacturer's required density for the labeled R-value. Above Grade Wall Insulation. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U-factor of 0.102 or less (R-19 in 2x6 or U- § 150.0(c): factor of 0.074 or less). Opaque non -framed assemblies must have an overall assembly U-factor not exceeding 0,102, equivalent to an installed value of R-13 in a wood framed assembly.* § 150.0(d): Raised -floor Insulation. Minimum R-19 insulation in raised wood framed floor or 0.037 maximum U-factor.' § 150.0(f): Slab Edge Insulation. Slab edge insulation must meet all of the following: have a water absorption rate, for the insulation material alone without facings, no greater than 0.3%; have a water vapor permeance no greater than 2.0 perm/inch; be protected from physical damage and UV light deterioration; and when installed as part of a heated slab floor, meet the requirements of 110.8(g). § 150.0(g)l: Vapor Retarder. In Climate Zones 1-16, the earth floor of unvented crawl space must be covered with a Class I or Class II vapor retarder. This requirement also applies to controlled ventilation crawls ace for buildings com I in with the exception to q 150.0(d). § 150.0(g)2: Vapor Retarder. In Climate Zones 14 and 16, a Class I or Class 11 vapor retarder must be installed on the conditioned space side of all insulation in all exterior walls, vented attics, and unvented attics with air -permeable Insulation. 150.0 § (q)' Fenestration Products. Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors must have a maximum U-factor of 0.58; or the weighted average U-factor of all fenestration must not exceed 0.58.' Fireplaces, Decorative Gas Appliances, and Gas Log Measures: § 150.0(e)lA: Closable Doors. Masonry or factory -built fireplaces must have a closable metal or glass door covering the entire opening of the firebox. § 150.0(e)1 B: Combustion Intake. Masonry or factory -built fireplaces must have a combustion outside air intake, which is at least six square inches in area and is equipped with a readily accessible, operable, and tight -fitting damper or combustion -air control device.' § 150.0(e)lC: Flue Damper. Masonry or factory -built fireplaces must have a flue damper with a readily accessible control.' § 150.0(e)2: Pilot Light. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, Water Heating, and Plumbing System Measures: § 110.0-§ 110.3: Certification. Heating, ventilation and air conditioning (HVAC) equipment, water heaters, showerheads, faucets, and all other regulated appliances must be certified by the manufacturer to the Energy Commission.' § 110.2(a): HVAC Efficiency. Equipment must meet the applicable efficiency requirements in TABLE 110.2-A through TABLE 110.2-K.' Controls for Heat Pumps with Supplementary Electric Resistance Heaters. Heat pumps with supplementary electric resistance heaters § 110.2(b): must have controls that prevent supplementary heater operation when the heating load can be met by the heat pump alone; and in which the cut -on temperature for compression heating is higher than the cut -on temperature for supplementary heating, and the cut-off temperature for compression heating is higher than the cut-off temperature for supplementary heating.* § 110.2(c). Thermostats. All unitary heating or cooling systems not controlled by a central energy management control system (EMCS) must have a setback thermostat.' Water Heating Recirculation Loops Serving Multiple Dwelling Units. Water heating recirculation loops serving multiple dwelling units must § 110.3(c)5: meet the air release valve, backflow prevention, pump priming, pump isolation valve, and recirculation loop connection requirements of § 110.3(c)5. § 110.3(c)7: Isolation Valves. Instantaneous water heaters with an input rating greater than 6.8 kBTU/hr (2 kW) must have isolation valves with hose bibbs or other fittings on both cold water and hot water lines of water heating systems to allow for water tank flushing when the valves are closed. § 110.5: Pilot Lights. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces; household cooking appliances (appli- ances without an electrical supply voltage connection with pilot lights that consume less than 150 Blulhr are exem and pool ands a heaters.' Building Cooling and Heating Loads. Heating and/or cooling loads are calculated in accordance with ASHRAE Handbook, Equipment § 150.0(h)l: Volume, Applications Volume, and Fundamentals Volume; SMACNA Residential Comfort System Installation Standards Manual; orACCA Manual J using desE n conditions specified in 150.0(h)2. 2016 Low -Rise Residential Mandatory Measures Summary § 150.0(h)3A: Clearances. Installed air conditioner and heat pump outdoor condensing units must have a clearance of at least 5 feet from the outlet of any dryer vent. § 150.0(h)3B: Liquid Line Drier. Installed air conditioner and heat pump systems must be equipped with liquid line filter driers if required, as specified by manufacturer's instructions. § 150.00)1: Storage Tank Insulation. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, must have R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank. Water piping and cooling system line insulation. For domestic hot water system piping, whether buried or unburied, all of the following must be insulated according to the requirements of TABLE 120.3-A: the first 5 feet of hot and cold water pipes from the storage tank; all piping with a § 150.00)2A: nominal diameter of 314 inch or larger; all piping associated with a domestic hot water recirculation system regardless of the pipe diameter; piping from the heating source to storage tank or between tanks; piping buried below grade; and all hot water pipes from the heating source to kitchen fixtures.' § 150.00)2B: Water piping and cooling system line insulation. All domestic hot water pipes that are buried below grade must be installed in a water proof and non -crushable casing or sleeve.' § 150.00)2C: Water piping and cooling system line insulation. Pipe for cooling system lines must be insulated as specified in § 150.00)2A. Distribution piping for steam and h dronic heating systems or hot waters stems must meet the requirements in TABLE 120.3-A.' § 150.00)3: Insulation Protection. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Insulation Protection. Insulation exposed to weather must be installed with a cover suitable for outdoor service. For example, protected by § 150.00)3A: aluminum, sheet metal, painted canvas, or plastic cover. The cover must be water retardant and provide shielding from solar radiation that can cause degradation of the material. § 150.00)3B: Insulation Protection. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space must have a Class I or Class I I vapor retarder. Gas or Propane Systems. Systems using gas or propane water heaters to serve individual dwelling units must include all of the following: a § 150.0(n)1: 120V electrical receptacle within 3 feet of the water heater; a Category III or IV vent, or a Type B vent with straight pipe between the outside termination and the space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the water heater, and allows natural draining without pump assistance: and a as supply line with a capacity of at least 200,000 Btu/hr. § 150.0(n)2: Recirculating Loops. Recirculating loops serving multiple dwelling units must meet the requirements of § 110.3(c)5. § 150.0(n)3: Solar Water -heating Systems. Solar water -heating systems and collectors must be certified and rated by the Solar Rating and Certification Corporation (SRCC) or by a listing agency that is approved by the Executive Director. Ducts and Fans Measures: § 110.8(d)3: Ducts. Insulation installed on an existing space -conditioning duct must comply with § 604.0 of the California Mechanical Code (CMC). If a contractor installs the insulation, the contractor must certifv to the customer, in writing, that the insulation meets this requirement. CMC Compliance. All air -distribution system ducts and plenums must be installed, sealed, and insulated to meet the requirements of CMC §§ 601.0, 602.0, 603.0, 604.0, 605.0 and ANSIISMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Portions of supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 (or higher if required by CMC § 605.0) or a minimum installed level of R-4.2 when entirely in conditioned space as confirmed through field verification and diagnostic testing § 150.0(m)1. (RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts must be mechanically fastened. Openings must be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than'/, inch, the combination of mastic and either mesh or tape must be used. Building cavities, support platforms for air handlers, and plenums designed or constructed with materials other than sealed sheet metal, duct board or flexible duct must not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms must not be compressed to cause reductions in the cross -sectional area of the ducts: Factory -Fabricated Duct Systems. Factory -fabricated duct systems must comply with applicable requirements for duct construction, § 150.0(m)2: connections, and closures; joints and seams of duct systems and their components must not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. § 150.0(m)3: Field -Fabricated Duct Systems. Field -fabricated duct systems must comply with applicable requirements for: pressure -sensitive tapes, mastics, sealants, and other requirements specified for duct construction. § 150.0(m)7 Backdraft Dampers. All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or automatic dampers. § 150.0(m)8: Gravity Ventilation Dampers. Gravity ventilating systems serving conditioned space must have either automatic or readily accessible, manually operated dampers in all openings to the outside, except combustion inlet and outlet air openings and elevator shaft vents. Protection of Insulation. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and § 150.0(m)9: wind. Insulation exposed to weather must be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam insulation must be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation. § 150.0(m)10: Porous Inner Core Flex Duct. Porous inner core flex duct must have a non -porous layer between the inner core and outer vapor barrier. Duct System Sealing and Leakage Test. When space conditioning systems use forced air duct systems to supply conditioned air to an § 150.0(m)11: occupiable space, the ducts must be sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in accordance with § 150.0(m)11 and Reference Residential Appendix RA3. Air Filtration. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal § 150.0(m)12: conditioning component, except evaporative coolers, must be provided with air filter devices that meet the design, installation, efficiency, pressure droD. and labelino reouirements of S 150.0(m)12. 2016 Low -Rise Residential Mandatory Measures Summary Duct System Sizing and Air Filter Grille Sizing. Space conditioning systems that use forced air ducts to supply cooling to an occupiable space must have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the § 150.0(m)13: supply plenum. The space conditioning system must also demonstrate airflow �_ 350 CFM per ton of nominal cooling capacity through the return grilles, and an air -handling unit fan efficacy:5 0.58 WICFM as confirmed by field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3.3. This applies to both single zone central forced air systems and every zone for zonally controlled central forced airs stems.' Ventilation for Indoor Air Quality. All dwelling units must meet the requirements of ASHRAE Standard 62.2. Neither window operation nor §150.0(o): continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of providing whole -building ventilation. § 150.0(o)1A: Field Verification and Diagnostic Testing. Whole -building ventilation airflow must be confirmed through field verification and diagnostic testing, in accordance with Reference Residential Appendix RA3.7. Pool and Spa Systems and Equipment Measures: Certification by Manufacturers. Any pool or spa heating system or equipment must be certified to have all of the following: a thermal efficiency § 110.4(a): that complies with the Appliance Efficiency Regulations; an on -off switch mounted outside of the heater that allows shutting off the heater without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and must not use electric resistance heating.' § 110.4(b)1: _ Piping. Any pool or spa heating equipment must be installed with at least 36 inches of pipe between the filter and the heater, or dedicated suction and return lines, or built-in or built-up connections to allow for future solar heating. § 110.4(b)2: Covers. Outdoor pools or spas that have a heat pump or gas heater must have a cover, § 110.4(b)3: Directional inlets and time switches for pools. Pools must have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only during off-peak electric demand periods. § 110.5: Pilot Light. Natural gas pool and spa heaters must not have a continuously burning pilot light. 150.0 § (p)' Pool Systems and Equipment Installation. Residential pool systems or equipment must meet the specified requirements for pump sizing, flow rate, piping, , filters, and valves.' Lighting Measures: § 110.9: Lighting Controls and Components. All lighting control devices and systems, ballasts, and luminaires must meet the applicable requirements of § 110.9.' § 110.9(e): JA8 High Efficacy Light Sources. To qualify as a JA8 high efficacy light source for compliance with § 150.0(k), a residential light source must be certified to the Enegy Commission according to Reference Joint Appendix JA8. § 150.0(k)1A: Luminaire Efficacy. All installed luminaires must be high efficacy in accordance with TABLE 150.0-A. Blank Electrical Boxes. The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or § 150.0(k)1 B: other device must be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or fan spqed control. Recessed Downlight Luminaires in Ceilings. Luminaires recessed into ceilings must meet all of the requirements for: insulation contact (IC) § 150.0(k)1 C: labeling; air leakage; sealing; maintenance; and socket and light source as described in § 150.0(k)1 C. A JA8-2016-E light source rated for elevated temperature must be installed by final inspection in all recessed downli ht luminaires in ceilings. § 150.0(k)1 D: Electronic Ballasts. Ballasts for fluorescent lamps rated 13 watts or greater must be electronic and must have an output frequency no less than 20 kHz. Night Lights. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans must be rated to consume no § 150.0(k)1 E: more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § 130.0(c). Night lights do not need to be controlled by vacancy sensors. § 150.0(k)1 F: Lighting Integral to Exhaust Fans. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods) must meet the applicable requirements of § 150.0(k).* Screw based luminaires. Screw based luminaires must not be recessed downlight luminaires in ceilings and must contain lamps that comply § 150.0(k)1G: with Reference Joint Appendix JA8. Installed lamps must be marked with "JA8-2016" or "JA8-2016-E" as specified in Reference Joint Appendix JA8.' § 150.0(k)1 H: Enclosed Luminaires. Light sources installed in enclosed luminaires must be JA8 compliant and must be marked with "JA8-2016-E." § 150.0(k)2A: Interior Switches and Controls. All forward phase cut dimmers used with LED light sources must comply with NEMA SSL 7A. § 150.0(k)2B: Interior Switches and Controls. Exhaust fans must be switched separately from lighting systems.' § 150.0(k)2C: Interior Switches and Controls. Luminaires must be switched with readily accessible controls that permit the luminaires to be manually switched ON and OFF. § 150.0(k)2D: Interior Switches and Controls. Controls and equipment must be installed in accordance with manufacturer's instructions. § 150.0(k)2E: Interior Switches and Controls. No control must bypass a dimmer or vacancy sensor function if the control is installed to comply with 150.0(k). § 150.0(k)2F: Interior Switches and Controls. Lighting controls must comply with the applicable requirements of § 110.9. Interior Switches and Controls. An energy management control system (EMCS) may be used to comply with dimmer requirements if it: § 150.0(k)2G: functions as a dimmer according to § 110.9; meets the Installation Certificate requirements of § 130.4; meets the EMCS requirements of § 130.5 ; and meets all other requirements in § 150.0(k)2. Interior Switches and Controls. An EMCS may be used to comply with vacancy sensor requirements in § 150 (k) if it meets all of the § 150.0(k)2H: following: it functions as a vacancy sensor according to § 110.9; the Installation Certificate requirements of § 130.4; the EMCS requirements of § 130.5 ; and all other requirements in § 150.0(k)2. § 150.0(k)21: Interior Switches and Controls. A multiscene programmable controller may be used to comply with dimmer requirements in § 150.0(k) if it provides the functionality of a dimmer according to § 110.9, and complies with all other applicable requirements in § 150,0 k 2. 2016 Low -Rise Residential Mandatory Measures Summary § 150.0(k)2J: Interior Switches and Controls. In bathrooms, garages, laundry rooms, and utility rooms, at least one luminaire in each of these spaces must be controlled by a vacancy sensor. § 150.0(k)2K: Interior Switches and Controls. Dimmers or vacancy sensors must control all luminaires required to have light sources compliant with Reference Joint Appendix JAB, except luminaires in closets less than 70 square feet and luminaires in hallways.' § 150.0(k)2L: Interior Switches and Controls. Undercabinet lighting must be switched separately from other lighting systems. Residential Outdoor Lighting. For single-family residential buildings, outdoor lighting permanently mounted to a residential building, or to other § 150.0(k)3A: buildings on the same lot, must meet the requirement in item § 150.0(k)3Ai (ON and OFF switch) and the requirements in either item § 150.0(k)3Aii (photocell and motion sensor) or item § 150.0(k)3Aiii (photo control and automatic time switch control, astronomical time clock, or EMCS. Residential Outdoor Lighting. For low-rise multifamily residential buildings, outdoor lighting for private patios, entrances, balconies, § 150.0(k)3B: and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site must comply with either § 150.0(k)3A or with the applicable requirements in §§ 110.9, 130.0, 130.2, 130.4. 140.7 and 141.0. § 150.0(k)3C: Residential Outdoor Lighting. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by 150.0(k)3B or § 150.0(k)3D must comply with the applicable requirements in §§ 110.9. 130.0. 130.2. 130.4. 140.7 and 141.0. § 150.0(k)3D: Residential Outdoor Lighting. Outdoor lighting for residential parking lots and residential carports with a total of eight or more vehicles per site must comply with the applicable requirements in §§ 110.9, 130.0, 130.2, 130.4, 140.7, and 141.0. § 150.0(k)4: Internally illuminated address signs. Internally illuminated address signs must comply with § 140.8; or must consume no more than 5 watts of ower as determined according to § 130.0(c). § 150.0(k)5: Residential Garages for Eight or More Vehicles. Lighting for residential parking garages for eight or more vehicles must comply with the applicable requirements for nonresidential garages es in §§ 110.9. 130.0. 130.1. 130.4, 140.6, and 141.0. Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior § 150.0(k)6A: common area in a single building equals 20 percent or less of the floor area, permanently installed lighting for the interior common areas in that building must be high efficacy luminaires and controlled by an occupant sensor. Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building must: § 150.0(k)6B: i. Comply with the applicable requirements in §§ 110.9, 130.0, 130.1, 140.6 and 141.0; and J. Lighting installed in corridors and stairwells must be controlled by occupant sensors that reduce the lighting power in each space by at least 50 percent. The occupant sensors must be capable of turning the li ht fullv on and off from all designed 2aths of ingress and egress. Solar Ready Buildings: Single Family Residences. Single family residences located in subdivisions with ten or more single family residences and where the § 110.10(a)1: application for a tentative subdivision map for the residences has been deemed complete by the enforcement agency must comply with the requirements of J 110.1G b throw h § 110.10 e . § 110.10(a)2: Low-rise Multi -family Buildings. Low-rise multi -family buildings must comply with the requirements of § 110.10(b) through § 110.10(d), Minimum Area. The solar zone must have a minimum total area as described below. The solar zone must comply with access, pathway, smoke ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local jurisdiction. The solar zone total area must be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas § 110.10(b)1: greater than 10,000 square feet. For single family residences the solar zone must be located on the roof or overhang of the building and have a total area no less than 250 square feet. For low-rise multi -family buildings the solar zone must be located on the roof or overhang of the building, or on the roof or overhang of another structure located within 250 feet of the building, or on covered parking installed with the building project, and have a total area no less than 15 percent of the total roof area of the building excludIng any skylight area. § 110.10(b)2: Orientation. All sections of the solar zone located on steep -sloped roofs must be oriented between 110 degrees and 270 degrees of true north. § 110.10(b)3A: Shading. The solar zone must not contain any obstructions, including but not limited to: vents, chimneys, architectural features, and roof mounted uioment.' Shading. Any obstruction located on the roof or any other part of the building that projects above a solar zone must be located at least twice the § 110.10(b)3B: distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of the nearest point of the solar zone, measured in the vertical plane.' § 110.10(b)4: Structural Design Loads on Construction Documents. For areas of the roof designated as solar zone, the structural design loads for roof dead load and roof live load must be clearly indicated on the construction documents. Interconnection Pathways. The construction documents must indicate: a location for inverters and metering equipment and a pathway for § 110.10(c): routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of interconnection will be the main service panel); and a pathway for routing of plumbing from the solar zone to the water -heating system. § 110.10(d): Documentation. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through § 110.10(c) must be provided to the occupant. § 110.10(e)1: Main Electrical Service Panel. The main electrical service panel must have a minimum busbar rating of 200 amps. Main Electrical Service Panel. The main electrical service panel must have a reserved space to allow for the installation of a double pole circuit § 110.10(e)2: breaker for a future solar electric installation. The reserved space must be: positioned at the opposite (load) end from the input feeder location or main circuit location: and oermanently marked as "For Future Solar Electric" HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Custom Residence System Name AC 1 Date 10/24/2019 Floor Area 796 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 486 Return Vented Lighting Return Air Ducts Return Fan Ventilation 1 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 51,000 9,515 1.066 316 11,998 Total Output Btuh 51,000 0 Output Btuh/s ft 64.1 549 590 Cooling System 0 0 Output perSystem 35,400 0 0 0 0 Total Output Btuh 35,400 1,489 L 549 12,103 1,066 -1,489 Total Output Tons 3.0 590 Total Output Btuh/s ft 44.5 Total Output s ft/Ton 269.8 11,688 Air System CFM perSystem 1,200 HVAC EQUIPMENT SELECTION Airflow cfm 1,200 24ACP736/58CVX070 26,469 3,442 51,000 Airflow cfm/s ft 1.51 Airflow cfm/Ton 406.8 Outside Air % 0.0% Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 26,469 3,442 51,000 Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions Aug 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF Outside Air 0 cfm Ar 70 OF 70 OF 105 OF 106 IF 0--I M- Heating Coil Supply Fan 1,200 cfm -- o 106 F ROOM 70 OF COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak 112/78IF Outside Air Ar 0 cfm 75 / 62 OF 75/62OF 55/54OF 56/54OF - Cooling Coil Supply Fan 1,200 cfm 57 / 55 OF 47.1% ROOM 75 / 62 IF HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name _Custom Residence System Name AC 2 Date 10/24/2019 Floor Area 1,406 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 1,276 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output perSystem 71,000 25,956 1,883 783 28,486 Total Output Btuh 71,000 0 Output Btuh/s ft 50.5 1,498 1,400 Cooling System 0 0 Output perSystem 49,000 0 0 0 0 Total Output Btuh 49,000 0 1,883 0 Total Output Tons 4.1 1,498 1,400 Total Output Btuh/s ft 34.9 Total Output s ft/Ton 344.3 1 28,952 31,286 Air System CFM perSystem 1,600 HVAC EQUIPMENT SELECTION Airflow cfm 1.600 Carrier 24ANB748/58CVX090 37,206 4.346 71,000 Airflow cfm1s ft 1.14 Airflow cfmfTon 391.8 Outside Air % 0•0% Total Adjusted System Output 37,206 4.346 71,000 (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK Aug 3 PM Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF Outside Air 0 cfm 69 OF 69 OF 105 OF 105 OF a Heating Coil Supply Fan 1,600 cfm 104 o F ROOM -- 70 OF COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak 112/78OF Outside Air 0 cfm 76 / 62 OF 76/62OF 55/54OF 55/54OF O Cooling Coil Supply Fan 56 / 54 OF 1,600 cfm 47.4% ROOM I - + 75 / 62 OF HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Custom Residence Date 10/24/2019 System Name AC 3 Floor Area 1,298 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 577 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HT_ G. PEAK Heating System I Sensible Latent CFM I Sensible Output perSystem 71,000 12,022 1,738 382 14,067 Total Output Btuh 71,000 0 Output Btuh/s ft 54.7 694 691 Cooling System 0 0 Output perSystem 49,000 0 0 0 0 Total Output Btuh 49,000 0 694 17738 0 Total Output Tons 4•1 691 Total Output Btuh/s ft 37.8 Total Output s ft/Ton 317.9 13,411 15,450 Air System CFM perSstem 1,600 HVAC EQUIPMENT SELECTION Airflow cfm 1,600 Carrier 24ANB748/58CVX090 36,760 4,684 71,000 Airflow cfm/s ft 1.23; Airflow cfm/Ton 391.8; Outside Air % 0.0%- Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 36,760 4,684 71,000 Jan 1 AM Outside Air cfm/s ft 0,0Ci Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS {Airstream Temperatures at Time of Heating Peak 26 OF Outside Air Ar 0 cfm 70 OF 70 OF 105 OF 105 OF Heating Coil Supply Fan 1,600 cfm ��1 f 105 °F ROOM -M 70 OF COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak) 112/78OF Outside Air 0 cfm 75/62°F 75/62°F 55/54°F 55/54°F __ Cooling Coil Supply Fan 1,600 cfm 55 / 54 OF 47 4% ROOMIRM 75/62°F ZONE LOAD SUMMARY Project Name Custom Residence Date 1012412019 System Name AC 1 Floor Area 796 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible Latent CFM Sensible Master Suite 1.0 0 Aug 3 PM 486 9,515 1,066 316 11,998 TOTALS 0 0 0 0 Aug 3 PM 9,515 1,066 11,998 (BLOCK LOAD) ZONE LOAD SUMMARY Project Name Custom Residence System Name AC 2 Date 1012412019 Floor Area 1,406 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible Latent CFM Sensible Great/Kitchen 1.0 0 Aug 3 PM 1,276 25,956 1,883 783 28,486 TOTALS 1 0 0 0 0 Aug 3 PM 25,956 1,8831 28,486 BLOCK LOAD) ZONE LOAD SUMMARY Project Name Custom Residence System Name AC 3 Date 1012412019 Floor Area 1,298 ZONE LOAD SUMMARY ZONAL SYSTEM COOLING PEAK HEATING PEAK ZONE NAME SYSTEM NAME Mult. CFM Sensible Latent Heating OA CFM Peak Hr CFM Sensible Latent CFM Sensible Bdmr 2, 3 & 4 1.0 0 Aug 3 PM 577 I Z 022 1,738 382 14,067 TOTALS 0 0 0 0 Aug 3 PM 1 Z 022 1,738 14,067 (BLOCK LOAD ROOM LOAD SUMMARY Custom Residence AC 1 LOAD SUMMARY 1012412019 796 ROOM COOLING PEAK I COIL COOLING PEAK I COIL HTG. PEAK Zone Name Room Name Mult. CFM I Sensible I Latent I CFM Sensible Latent I CFM Sensible Master Suite I Master I 1 1 4861 9,5151 1,0661 4861 9,5151 1,0661 3161 11,998 PAGE TOTAL TOTAL* I ' Total includes ventilation load for zonal 486 9,575 1,065 316 11.998 4869,515 1,066 316 11.9,98 ROOM LOAD SUMMARY I'roject Name Date Custom Residence 1012412019 System Name Floor Area AC 2 1,406 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK I COIL HTG. PEAK Zone Name Room Name Mult. CFM I Sensible Latent CFM I Sensible I Latent I CFM Sensible Greawitchen GreaWitchen 1 1,2761 25,9561 1,883 1,2761 25,9561 1,8831 783j 28,486 PAGE TOTAL TOTAL* I * Total includes ventilation load for zonal 1,276 25,956 1,883 783 28,486 1,276 25,956 1,883 783 28,486 ROOM LOAD SUMMARY Project Name Date Custom Residence 1012412019 System Name Floor Area AC 3 1,298 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK Zone Name I Room Name Mult. I CFM Sensible Latent CFM Sensible Latent CFM Sensible Bdrm 2, 3 & 4 Bdrm 2, 3 & 4 1 577' 12,022 1,738 577 12,022 1,735' 3821 14,067 PAGE TOTAL TOTAL* Total includes ventilation load for zonal systems. 577 12,022 1,738 382 14,057 577 12,022 1,738 382 14,057 ROOM HEATING PEAK LOADS Project Name Custom Residence Date 1012412019 ROOM INFORMATION DESIGN CONDITIONS Room Name Master Floor Area 796.00 ft2 Indoor Dry Bulb Temperature 70 °F Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction I ! Area U-Value 796.0 X 0.0260 784.0 X 0.0513 32.0 X 0.5100 144.0 X 0.5600 perm = 97.0 X 0.7300 390.0 X 0.3560 X X X X X X X X X x x x x x x x x x x x x x x x x through an interior surface to another room X 796 X 10.50 X 0.297 Area Ceiling Height ACH X X X X X X X X X X X X X X X x x x x x x x x x x x x x x x x AT OF = = = = = = = = = = = = = 44 Btu/hr R-38 Roof+ R-12 44 911 R-21 Wall 44 1,770 .51.32 44 718 56-25 44 3,548 Slab -On -Grade 44 3,115 'R-0 Interior Wall 0 0 Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction Page Total / 60 ] X AT 10,062 = 1,936 TOTAL HOURLY HEAT LOSS FOR ROOM 11,998 ROOM HEATING PEAK LOADS Project Name Date Custom Residence 1012412019 ROOM INFORMATION DESIGN CONDITIONS Room Name Great/Kitchen Floor Area 1,406.00 ft2 Indoor Dry Bulb Temperature 70 °F Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X X X X X X X X X X x x x x x x x x x x x x x to Coiling U-Value OT °F X 44 X 44 X 44 X 44 X 44 X ] 0 X X X X X X X X X X X X x x x x x x x xi x x x1 x� x� Page Total / 60 ] X AT = = = = = = = = = = = = = = = = = = = = = = = = = = = = = _ _ 44 Btu/hr R-38 Roof +R-12 Cath. 1,406.0 0.0210 1,297 R-21 Wall 210.3 0.0513 475 -56-25 690.0 0.5600 17,002 -51.32 171.7 0.5100 3,853 slab-Qn-Grade perim = 76.0 0.7300 2,441 'R-0 Interior Wall 730.0 0.3560 0 Items shown with an asterisk (') denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction through an interior surface X 1,406 X Area another room 14.00 X 0.223 Height ACH 25,067 = 3,419 TOTAL HOURLY HEAT LOSS FOR ROOM 28,486 ROOM HEATING PEAK LOADS Project Name Custom Residence Date 1012412019 ROOM INFORMATION DESIGN CONDITIONS Room Name Bdrm 2,3 & 4 Floor Area 1,298.00 ftZ Indoor Dry Bulb Temperature 70 OF Time of Peak Jan 1 AM Outdoor Dry Bulb Temperature 26 OF Conduction Area X X X X X X X X X x x x x x x x x x x x x x x x x x x x x x x to Ceiling U-Value X X X X X X X �X X ix x x x x x AT °F 44 = 44 = 44 = 44 = 0 = = = = = = = = = = = = = = = = = = = = = = = Page Total / 60 ] X 44 Btu/hr R-38 Roof+R-12 1,298.0 0.0260 1,485 R-21 Wall 996.0 0.0513 2.248 .56.25 144.0 0.5600 3,548 Slab -On -Grade perim = 113.0 0.7300 3,630 'R-0 Interior wall 340.0 0.3560 0 x x ix x x x x x x x x x x x x x another room 10.50 X 0.297 Height ACH Items shown with an asterisk (*) denote conduction Infiltration:[ 1.00 X 1.064 Schedule Air Sensible Fraction through an interior surface X 1,298 X Area 10,911 3,156 TOTAL HOURLY HEAT LOSS FOR ROOM 14.067 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date Custom Residence 1012412019 ROOM INFORMATION DESIGN CONDITIONS Room Name Master Outdoor Dry Bulb Temperature 0 112 Floor Area 796.00 ft' Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 OF Outdoor DaiIX Range: 34 OF -Opaque Surfaces Orientation Area U-Factor CLTD' Btu/hr R-38 Roof + R-12 (W) 796.0 X 0.0260 X 56.0 = 1,159 R-21 Wall (N) 160.0 X 0.0513 X 23.0 = 189 R-21 Wall (E) 433.0 X 0.0513 X 33.0 733 R-21 Wall (SE) 63.0 X 0.0513 X 29.3 = 95 R 21 Wall 53.0 X 0.0513 X 32.1 = 87 R-21 Wall 75.0 X 0.0513 X 33.0, c 127 'R-0 Interior Wall 390.0 X 0.3560 X 0.0, = 0 X X = X X = Page Total 2,390 Items shown with an asterisk (') denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Shaded Unshaded Fenestration Orientation Area GLF Area GLF Btu/hr 6 (E) 16.0 X 22.1 + 0.0 X 41.1 = 353 5 (E) 16.0 X 22.1 + 0.0 X 41.1 = 353 103 (SE) 72.0 X 20.5 + 0.0 X 24.3 = 1,474 102 (lM 72.0 X 20.5 + 0.0 X 34.2' = 1.474 X + X = X + X = X + X = i X + X = X + X = Page Total 3.655 Internal Gain Btu/hr OGcu ants Occupants X 245 El Btuh/occ. = 586 Equipment Floor Area X _ 0.50 w/sgft Infiltration: 1.064 X 0.89 X 43.43 X 37 = 1,526 Air Sensible C:FM ELA AT TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 9,515 Latent Gain Btuihr Occupants 2 4 Occupants X [ 155 Btuh/occ. = 371 Infiltration: 4,771 X 0.89 X - 43.43 X 0.00376 = 695 Alr Latent CFM f LA AW TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 371 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date Custom Residence 1012412019 ROOM INFORMATION DESIGN CONDITIONS Room Name GreatlKitchen Outdoor Dry Bulb Temperature 112 OF Floor Area 1,406.00 ftZ Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 OF Outdoor Daily Range: 34 OF Opaque Surfaces Orientation Area U-Factor CLTD' Btu/hr R 38 Roof + R-12 Cath, X 0.02101 X 56.0 = 1,650 R-21 Wall (N) X 0.0513 X 23.0 = 184 R-21 Wall (S) X 0.0513X 26.0 154.3 = 72 "R-0 interior Wall X 0.3560 X 0.0 = 0 x x = x x = x x = x x = x x = Page Total 1,907 Items shown with an asterisk (') denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Shaded Unshaded Fenestration Orientation Area GLF Area GLF Btu/hr 104 (N) 0.0 X 20.5 + 300.0 X 20.5 = 6,143 101 (S) 350.0 X 20.5 + 0.0 X 20.5 = 7,167 4 (S) 129.5 X 22.1 + 0.0 X 22.1 = 2 859 100 (S) 40.0 X 20.5 + 0.0 X 20.5 = 819 1 (S) 10.0' X 22.1 + 0.0 X 22.1 = 221 2 (S) 10.0- X 22.1 + 0.0 X 22.1 221 3 (S) 22.2 X 22.1 + 0.0 X 22.1 = 490 X + X = X + X = Page Total 17,919 Internal Gain Btulhr Occupants 4.2 Occupants X 245 Btuh/occ. = 1,034 Equipment 1,406 Floor Area X 0.50 W/sgft 2,399 Infiltration: 1.064 X 0.89 X 76.72 X J 37 Air Sensible CFM ELA AT TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 25,956: Latent Gain Btu/hr Occupants 4.2 Occupants X 1551 Btuh/occ. = 654 Infiltration: 4,771 X 0.89 X 76.72 X 0.00376 = 1,226 Air Latent CFM ELA AW TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 654 RESIDENTIAL ROOM COOLING LOAD SUMMARY Project Name Date Custom Residence 1 1012412019 ROOM INFORMATION DESIGN CONDITIONS Room Name Bdrm 2,3 & 4 Outdoor Dry Bulb Temperature 112 °F Floor Area 1,298.00 ft2 Outdoor Wet Bulb Temperature 78 OF Indoor Dry Bulb Temperature 75 OF I Outdoor Daily Range. 34 OF Opaque Surfaces Orientation Area U-Factor CLTD' Btu/hr R-38 Roof + R-12 (W) 1,298.0 X 0.0260 X 56.0' = 1.690 R-21 Wall (N) 202.0 X 0.0513 X 23.0 = 236 R-21 Wall (E) 160.0 X 0.0513 X 33.0 = 271 R-21 Wall (S) 210.0 X 0.0513 X 26.0- = 230 R-21 Wall (W) 424.0 X 0.0513 X 33.0' = 778 {R-0 Interior wall 340.0 X 0.3560 X 0.0' = 0 X X = X X = X X = Page Total 3,397 Items shown with an asterisk (') denote conduction through an interior surface to another room. 1. Cooling Load Temperature Difference (CLTD) Shaded Unshaded Fenestration Orientation Area GLF Area GLF Btulhr 105 (N) 0.0 X 20.5 + 48.0 X 20.5 = 983 107 (W) 47.4 X 20.5 + 0.6 X 35.3 = 992 106 (W) 47.4 X 20.5 + 0.6 X 35.3 = 992 X + X = X + X = X + X = X + X = X + X = X + X - Page Total 2,966 Internal Gain Btu/hr Occupants 3.9 _ Occupants X 2451 Btuh/occ. = 955 Equipment 1,298 Floor Area X 0.501 ,N/sgft Infiltration: 1.064 X 0.89 X 70.82 X 37 = 2r489 Air Sensible CFM ELA AT TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 12,022 Latent Gain Btulhr Occupants 3 9 Occupants X 155 Btuh/occ. = 60 Infiltration: 4,771 X 0.89 X 70.82 X 0.00376 = 1,134 Air Latent CFM ELA AW TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 604