2020 Bengal Engineering Amendment 9 - Dune Palms Bridge Project 2011-05Revised May 2017 M E M O R A N D U M TO: Jon McMillen, City Manager FROM: Julie Mignogna, Management Analyst DATE: April 22, 2020 RE: Amendment No. 9 to Professional Services Agreement with Bengal Engineering in the amount of $53,310 to include additional engineering services related to design accommodations for connector trails and artistic CV Link Project components, design of CVWD access accommodations and additional project management for the Dune Palms Road Bridge Project (2011-05). Attached for your signature is the Amendment referenced above. Please sign the attached agreement(s) and return to the City Clerk for processing and distribution. Requesting department shall check and attach the items below as appropriate: X Contract payments will be charged to account number: 401-0000-60185-D X Amount of Agreement, Amendment, Change Order, etc.: $53,310.00 N/A A Conflict of Interest Form 700 Statement of Economic Interests from Consultant(s) is attached with ____ no reportable interests in LQ or ____ reportable interests ___ A Conflict of Interest Form 700 Statement of Economic Interests is not required because this Consultant does not meet the definition in FPPC regulation 18701(2). Authority to execute this agreement is based upon: X Approved by the City Council on April 21, 2020 ___ City Manager’s signature authority provided under Resolution No. 2018-014 for budgeted expenditures of $50,000 or less. This expenditure is $____________and authorized by _________[Council, Director, etc] ___ Initial to certify that 3 written informal bids or proposals were received and considered in selection The following required documents are attached to the agreement: X Insurance certificates as required by the agreement (approved by Risk Manager on _____________ date) ___ Performance bonds as required by the agreement (originals) X City of La Quinta Business License number LIC-0100872 Exp. 6/30/20 X A requisition for a Purchase Order has been prepared (amounts over $5,000) X A copy of this Cover Memo has been emailed to Finance (Claudia) AMENDMENT NO. 9 TO PROFESSIONAL SERVICES AGREEMENT WITH BENGAL ENGINEERING, INC. This Amendment No. 9 to Professional Services Agreement with Bengal Engineering ("Amendment No. 9") is made and entered into as of the 22nd day of April 2020 ("Effective Date") by and between the CITY OF LA QUINTA ("City"), a California municipal corporation and Bengal Engineering, Inc., a California corporation (“Consultant”). RECITALS WHEREAS, on or about July 1, 2014, the City and Consultant entered into a Professional Services Agreement to provide those services related to the Dune Palms Road Low Water Crossing Replacement at the Coachella Valley Storm Water Channel, Project No. 2011-05. The term of the Agreement expires on July 31, 2021; and WHEREAS, Amendment 1, executed on or about March 24, 2015, previously amended Scope of Services, and Contract Sum to include additional Utility Pothole, Data Collection, and Noise Modeling work and to remove Section 7 Consultation Work Objective, resulting in a net contract sum decrease in the amount of ($2,233.00); and WHEREAS, Amendment 2, executed on or about December 1, 2015, previously amended Scope of Services and Contract Sum to include additional Cultural and Architectural Survey, resulting in a net contract sum increase in the amount of $7,800.00; and WHEREAS, Amendment 3, executed on or about 0DUFK , 2016, previously amended Scope of Services and Contract Sum to revise the Traffic Technical Memorandum and Noise Study and to prepare and process an Air Quality Report, resulting in a net contract sum increase in the amount of $31,678.00; and WHEREAS, Amendment 4, executed on or about July , 2016, previously amended Scope of Services and Contract Sum to include the development of Three Conceptual Grade Control Structure Alternatives, resulting in a net contract sum increase in the amount of $16,100.00; and WHEREAS, Amendment 5 executed on or about June 13, 2016, previously amended Scope of Services and Contract Sum to include additional Hydrology and Hydraulic Study to address concerns expressed by the Coachella Valley Water District, resulting in a net contract sum increase in the amount of $19,900.00; and WHEREAS, Amendment 6, executed on or about October 27, 2016, previously amended Scope of Services and Contract Sum to include an Extended Archeological Phase I Work Plan (XP1) as directed by Caltrans Environmental, resulting in a net contract sum increase in the amount of $9,583.00; and WHEREAS, Amendment 7, executed on or about April 20, 2017, previously amended Scope of Services and Contract Sum to include the Field Work for the Extended Archeological Phase I Work Plan required by Caltrans, resulting in a net contract sum increase in the amount of $96,449.00; and WHEREAS, Amendment 8 executed on or about October 16, 2018 previously amended Scope of Services, Contract Sum, and Agreement Term to include additional engineering services related to Coachella Valley Water District Equilibrium Slope and Scour Determination, Environmental Permitting, Right of Way Acquisition, and preparation of Water, Sewer and Landscape Plans; and WHEREAS, Amendment 9 will amend the Scope of Services to include additional engineering services related to design accommodations for connector trails and artistic CV Link Project components, design of CVWD access accommodations and additional project management; and WHEREAS, the Contract Sum of the Agreement is being amended by $53,310 for the additional services being provided; NOW THEREFORE, in consideration of the mutual covenant herein contained, the parties agree as follows: AMENDMENT In consideration of the foregoing Recitals and the covenants and promises hereinafter contained, and for good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties hereto agree as follows: 1.Section 1.1 – Scope of Services is amended to read as follows: For the services rendered pursuant to this Agreement, Consultant shall provide additional services outlined in Exhibit “A”, dated, 0DUFKattached hereto and made apart hereof. 2.Section 2.1 – Contract Sum is amended to read as follows: For the Services rendered pursuant to this Agreement, Consultant shall be compensated in accordance with “Exhibit B” (the “Schedule of Compensation”) in a total amount up to but shall not exceed One Million Four Hundred Ninety-Nine Thousand Two Hundred and Forty Three Dollars ($1,499,243) (the “Contract Sum”) for the life of the Agreement encompassing initial terms and Amendments 1 through 9, except as provided in Section 1.6. Exhibit B –Budget is amended as attached in “Exhibit B”, attached hereto and made apart hereof. In all other respects, the Original Agreement shall remain in effect DunePalmsLowͲWaterCrossing(Replace): CityProject2011Ͳ05;FederalAidProj.#BRLKSͲ5433(014) AdditionalWorkRequest#9 BengalEngineering,Inc. ExhibitA”: ScopeofServices, AdditionalWorkRequest#9 Thefollowingisthescopeofworkfortheadditionaldesign,outsideoftheapprovedcurrentscopeof work. Task1AccommodationsforConnectorTrailandArtisticComponentsRequestedfortheCVLink Project Consultantwillperformthefollowing: x MeetingsandcoordinationwithCVAGandtheCVLinkdesignteamontheCVLinkelements integratedintotheBridgedesign; x Designmeans/pointsofattachmentforsoffitfixture; x Design/Draftlayoutofpaint/letteronsoffit/exteriorgirders; x Provideapointofconnection,ductsandpullropeforproposedsoffitlightingpower; x SecondarytrailconnectorsfrommainCVLinktrailtoDunePalmsRoad,botheastandwest side;and x AccommodateCVLinkͲstylerailingalongsecondarytrailstreetconnectors Task2DesignofCVWDAccessaccommodations:NorthBank Consultantwillperformthefollowing: x CoordinationwithCVWDontheAccessRampdetails; x DesignofCVWDAccessRampsusingcriteriaprovided; x Designofretainingwallstosupporttheaccessramps;and x Modificationtobridgeplanstoaccommodateaccess. Task3AdditionalProjectManagement:ProjectTeamMeetings Consultantwillperformthefollowing: x Prepare,attendandprovidepostmeetingfollowͲupforuptoeight(8)PDTmeetings betweenApril2020andJuly2021.ThisitemwillbeinvoicedonaperͲmeetingbasisas showninExhibitB. Exhibit B Budget With the exception of compensation, Additional Services provided for in Section 2.3 of this Agreement, the maximum total compensation to be paid to Consultant under Amendment 9 to this Agreement is Fifty-Three Thousand, Three Hundred and Ten Dollars ($53,310.00) (“Contract Sum”). The Contract Sum shall be paid to Consultant in conformance with Section 2.4 of the Agreement. The following represents the revised contract total of One Million, Four Hundred Ninety-Nine Thousand, Two Hundred Forty-Three Dollars ($1,499,243.00) after the consideration of Amendments 1 through 9. Base Contract Amount: $ 1,176,781.00 Amendment No. 1: ($2,233.00) Amendment No. 2: $7,800.00 Amendment No. 3: $31,678.00 Amendment No. 4: $16,100.00 Amendment No. 5: $19,900.00 Amendment No. 6: $9,583.00 Amendment No. 7: $ 96,449.00 Amendment No. 8: $89,875.00 Amendment No. 9:$53,310.00 Revised Contract Total: $ 1,499,243.00 Estimated Hrs & Fee for AWR #9 mod, Project No.: 2011-05 1 Title: Dune Palms Road Low -Water Crossing Replacement at Coachella Valley Water Channel " Client: City of La Quinta SO Date: March 25, 2020 T&M Bengal Engineering 360 S. Hope Ave., Suite C-110 Santa Barbara, CA 93105 (805) 563-0788 t ��,�ti.6��.r,4�'`r� 4; H� , EIN = MSA CONTRACT NO.: Item Descriptions HOURS LABOR COST SPEC. CONSULT. PROJECT MANAGER BRIDGE ENG CIVIL ENG TECH/ DRAFTER GEOTECH ENG ENG CLERICAL GEOLOGIST TOTAL HOURS Task 1: Accommodations for Connector Trail and Artistic Components Requested for the CV Link Project Meetings & Coordination on CV Link elements 10 15 10 35 4600 Design / Draft layout of paint / letter on soffit / exterior girders 0 Provide point of connection, ducts and pull rope for proposed soffit lighting power 8 2 8 18 2180 Secondary trail connectors from main CV Link trail to Dune Palms, both east and west sides 30 30 4500 Accommodate CV Link -style railing along secondary trail street connectors 4 4 600 Task 2: Design of Additional CVWD Access accommodations: North Bank Coordination with CVWD on Access Ramp details 7 7 1050 Design of CVWD Access Ramps using criteria provided 14 14 2100 Design of retaining walls to support the access ramps 40 4 40 84 10000 Modification to bridge plans to accommodate access 40 0 40 80 9400 Task 3: Additional Project Management: Project Team Meetings Preparation, attenance & post meeting coordination, up to 8 meetings. 32 88 16 136 18880 Meetings will be charged "each" : total labor cost divided by 8 meetings: $2,360 Each =Heptagon Seven Effort TOTALS - - 130 164 98 - - 16 - - - - - - 408 53310 Classification Rate/Hr. Expenses Units Unit Cost Billing Reimbursables Consultant special uoosultant 175.00 Factor Project Manager 150.00 Geotech Exploration (Budget figure) 1.15 Bridge Engineer 150.00 Laboratory Testing (Budget figure) 1.15 Senior Engineer 150.00 0 1.15 Structural Design 150.00 1.15 Civil Engineer 150.00 Surveyor 0 1.15 Engineering Geologist 150.00 BW - Size D 0 1.15 Drafter/Technician 85.00 Color- Size D 0 1.15 Geotech Engr 150.00 Mylar- Size D 0 0 1.15 Eng. Geologist 150.00 Color Photocopies -Budget 0 25 1.15 Clerical 55.00 BW Photocopies Budget 0 25 1.15 Mail -Budget 0 25 1.15 Average Rate: 130.66 Grand Total = $53,310.00 CONSENT CALENDAR ITEM NO. 8 City of La Quinta CITY COUNCIL MEETING April 21, 2020 STAFF REPORT AGENDA TIT' - APPROVE AMENDMENT NO. 9 TO PROFESSIONAL SERVICES AGREEMENT WITH BENGAL ENGINEERING, INC. FOR THE DUNE PALMS ROAD BRIDGE IMPROVEMENT PROJECT NO. 2011-05 RECOMMENDATION Approve Amendment No. 9 to the Professional Services Agreement with Bengal Engineering, Inc., in the amount of $53,310, for the Dune Palms Road Bridge Improvement Project No. 2011-05; and authorize the City Manager to execute the amendment. EXECUTIVE SUMMAR` • The proposed improvements will replace the existing low water crossing with an all-weather access bridge on Dune Palms Road at the Coachella Valley Storm Water Channel (Attachment 1). • Amendment No. 9 to the Professional Services Agreement (PSA) with Bengal Engineering, Inc., (Bengal) authorizes additional engineering services related to design accommodations for connector trails and artistic CV Link Project components, design of CVWD access accommodations and additional project management for the Dune Palms Road Bridge Project (Project). FISCAL IMPACT The Project has an approved budget of $17,510,000. This project is funded through a combination of Federal Surface Transportation Funds through the state's Highway Bridge Program. Federal funds will provide up to $15,501,603 of the total project cost. The Coachella Valley Association of Governments (CVAG) will fund up to $1,506,750, and the City will fund the remaining $502,250. Sufficient funds are available for this amendment; the design budget is $1,500,000. Base Contract Amount: Amendment No. 1: Amendment No. 2: Amendment No. 3: Amendment No. 4: $ 1,176,781.00 ($2,233.00) $7,800.00 $31,678.00 $16,100.00 53 Amendment No. 5: Amendment No. 6: Amendment No. 7: Amendment No. 8: Amendment No. 9: Revised Contract Total: BACKGROUND/ANALYSIS $19,900.00 $9,583.00 $ 96,449.00 $89,875.00 $53,310.00 $ 1,499,243.00 In June 2014, Council approved a PSA with Bengal to provide professional engineering and environmental services for an all-weather bridge. The project is currently in the right of way acquisition, utility clearance and final design phase. This amendment will allow Bengal to: • Prepare design accommodations for connector trails and artistic CV Link Project components. It is anticipated that these costs will be fully reimbursed by CVAG; • Design of CVWD access accommodations for the north bank; • Provide additional project management for Project Team Meetings during the completion of the PS&E package. ALTERNATIVES Staff does not recommend an alternative. The work contemplated by Amendment No. 9 is required to complete the improvements. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, Public Works Director/City Engineer Attachments: 1. Vicinity Map 2. Bengal Engineering Inc. Amendment No. 9 54 ATTACHMENT 1 Dune Palms Bridge N.T.S. Vicinity Map NIL amps .. ■47•■n■ A 111 �414fi•4flg i\livom ing, rim -Ji111111�1111W1 IIII �$I4With #IINI �■ �"_ :�I.611411116"■�� �dlllllll 114:11i1141111■1� �� • .: n. L II II 411 I 411 J �1 ' • ��� IL' � �IIIIIIIIAAIII llllli ■ 1111111� i1 '�'u':; TTITTrfCr-CT�_I � �. � j= • � • 424 • I. �1 �1 Yi IYYIi id. d ■ i. .. if- �1L r NNN i N ■F` fIf p _.0 ■•lit ■ ■■ ■■ . 111 * 1-1 f .1 , r ■nno =mom iibniliifl .;. �1 fl + 3 11■11111 Illlrlltr i :II,",�..1y 11 i - ■11111 11N11■1 _. . "-FIVI,. • r■ - ■IIN 1111Fl,��1PF 1 ii iH.. j` Iaiia:y1.6 I 55