Traffic Impact Analysis 2019-09-061 Nichole Romane From:John Kain <jkain@urbanxroads.com> Sent:Friday, September 6, 2019 1:28 PM To:Cheri Flores; Janette Cachola; Steve Libring; Bryan McKinney Cc:Vann, Nicole; Garrett Simon; Rowe, Mike; Marlie Whiteman; Haseeb Qureshi Subject:RE: Wave at Coral Mountain TIA Scope ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening  attachments, clicking links or responding to requests for information. **    Cheri – We will proceed, and the draft report is anticipated to be completed within approximately 4 weeks.    John Kain  (949) 375‐2435    From: Cheri Flores <clflores@laquintaca.gov>   Sent: Friday, September 6, 2019 12:55 PM  To: Janette Cachola <JCachola@urbanxroads.com>; Steve Libring <SLibring@willdan.com>; Bryan McKinney  <Bmckinney@laquintaca.gov>  Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Rowe, Mike  <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie Whiteman  <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>  Subject: RE: Wave at Coral Mountain TIA Scope  Hi Janette— Looks like you have incorporated all the revisions we asked for and we have no further comments. Please go ahead and proceed with preparing the study. If you have any other questions, just let us know!     Cheri L. Flores | Planning Manager City of La Quinta 78495 Calle Tampico La Quinta, CA 92253 Ph. 760-777-7067 Website | Map hwy111LQ.com   From: Janette Cachola <JCachola@urbanxroads.com>   Sent: Wednesday, September 04, 2019 5:41 PM  To: Steve Libring <SLibring@willdan.com>; Cheri Flores <clflores@laquintaca.gov>; Bryan McKinney  <Bmckinney@laquintaca.gov>  Cc: Vann, Nicole <nvann@msaconsultinginc.com>; Garrett Simon <gsimon@meriwetherco.com>; Rowe, Mike  <mrowe@msaconsultinginc.com>; John Kain <jkain@urbanxroads.com>; Marlie Whiteman  <mwhiteman@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>  Subject: RE: Wave at Coral Mountain TIA Scope  ** EXTERNAL: This message originated outside of the City of La Quinta. Please use proper judgement and caution when opening  attachments, clicking links or responding to requests for information. **  2   Pursuant to comments received on August 26th, the attached Wave at Coral Mountain TIA Scope has been revised.  A  word doc of the text in track changes mode is also attached so that edits can be more easily reviewed.    Exhibits 2, 3, 5, and 6 have been modified to include 3 additional intersections, as requested.  Table 3 and Exhibit 7 have  also been updated to reflect adjustments to the Cumulative Project list.    Please review and approve or send additional comments as soon as possible.  If you have any questions, don’t hesitate  to contact John Kain (949.336.5990), Marlie Whiteman (949.336.5991), or myself (949.336.5989).      Sincerely,    JANETTE CACHOLA   Analyst    (949) 336‐5989 Direct  urbanxroads.com    Ofc: 1001 Dove St., #260, Newport Beach CA 92660  Main: 260 E. Baker St., #200, Costa Mesa CA 92626    From: Steve Libring [mailto:SLibring@willdan.com] Sent: Monday, August 26, 2019 3:34 PM To: Vann, Nicole Cc: John Kain; Marlie Whiteman; Cheri Flores; Bryan McKinney Subject: Fw: Wave at Coral Mountain TIA Scope Nicole here are our comments on the scoping and some related issues    From: Cheri Flores <clflores@laquintaca.gov>  Sent: Monday, August 26, 2019 9:41 AM  To: Steve Libring <SLibring@willdan.com>; Bryan McKinney <Bmckinney@laquintaca.gov>  Subject: RE: Wave at Coral Mountain TIA Scope Cheri's notes regarding the cumulative projects is in the attached pdf.    ******************************************    I saw possible bust in distribution pattern where 15% WB on Ave 54 becomes 5% w/o Jefferson ( which is a cul‐de‐sac ). I  think with 25 % or so headed toward the roundabout and Jefferson/Ave 50, we should add those 3 intersections along  Jefferson to the list ( Jefferson / 52, Jefferson / Pomello, and Jefferson / 50 )      They also make a statement that all CIP, DIF & TUMF improvement projects are assumed to be in place by opening year.  I suspect we have little or none in the way of improvements in the coming years in that area, so don't know if you are  3 doing capacity analysis and LOS, if you are assuming the existing roadway configurations and lanes, or some future  planned roadway configurations?      The project should be widening the Avenue 58 frontage, widen the EB Avenue 58 to add a 2nd EB left turn lane, and  paying for a signal or portion of signal as appropriate.     From: Janette Cachola <JCachola@urbanxroads.com>  Sent: Tuesday, August 13, 2019 6:02 PM  To: Steve Libring <SLibring@willdan.com>  Cc: Bryan McKinney <bmckinney@laquintaca.gov>; Rowe, Mike <mrowe@msaconsultinginc.com>; Vann, Nicole  <nvann@msaconsultinginc.com>; Herrera‐Cortes, Jesus <jherrera‐cortes@msaconsultinginc.com>; Depalatis, Paul  <pdepalatis@msaconsultinginc.com>; Rowe, Allison <arowe@msaconsultinginc.com>; Garrett Simon  <gsimon@meriwetherco.com>; Marlie Whiteman <mwhiteman@urbanxroads.com>; John Kain  <jkain@urbanxroads.com>; Haseeb Qureshi <hqureshi@urbanxroads.com>  Subject: Wave at Coral Mountain TIA Scope      The scoping agreement for the Wave at Coral Mountain traffic impact analysis is attached for your  review/approval.      Please also provide the signal timing worksheets for existing signal locations within the study area, which  include the following intersections:      Madison St. / Airport Blvd.   Monroe St. / 50th Avenue      Please don’t hesitate to contact us with any questions or concerns.        JANETTE CACHOLA   Analyst    (949) 336‐5989 Direct  urbanxroads.com     Ofc: 1001 Dove St., #260, Newport Beach CA 92660  Main: 260 E. Baker St., #200, Costa Mesa CA 92626