Loading...
PGA West - Monterra TR 32742 BTCP2017-0005 (Plans 1-4) 2016 Code UpdateProject Details PROJECT NUMBER owsw lit"of La Qu i nta BTCP2017-0005 O F Tt�" Description: PGA MONTERRA / 2016 CODE UPDATE SFD X 4 Status: ARCHIVED Type: TRACT RESIDENTIAL CONSTRUCTION PLAN Status Date: 9/8/2017 DAYS REVIEWS 10 ACTIONS 10 INSPECTIONS Subtype: STANDARD Applied: 5/12/2017 Address: 55101 MONROE ST Approved: 8/8/2017 City, State, Zip: LA QUINTA,CA92253 Closed: 8/10/2017 Project Manager: JAKE FUSON Expired: Details: MONTERRA AT PGA WEST - 2016 CODE UPDATE. PLANS 1, 2, 3, & 4. THIS PERMIT DOES NOT INCLUDE SALES OFFICE, POOLS/SPAS, BLOCK WALLS, DRIVEWAY APPROACH, FIRE PITS, BBQ, WATER FEATURES OR SOLAR PANELS. 2016 CONDITIONS CALIFORNIA BUILDING CODES. REVISION 1- ATTIC ASSEMBLIES OF ALL PLAN TYPES CHANGED FROM ;l UNVENTILATED TO VENTILATED ATTIC ASSEMBLIES. RFI 7 - BALLOON FRAMING OF ENTRY TOWERS, THIS REVISION WILL BE PERFORMED THROUGHOUT ALL PHASES AND ALL MODELS WHERE IT APPLIES. CASE OPEN OPEN COMPLETED ��� • CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES NOTE STEPHANIE SWANSTROM 5/25/2017 5/25/2017 STRUCTURAL APPROVED 1ST PC COMPLETE/READY PICKED UP FROM ARMANDO (STATED BY BOB RICHARDS, FOR PICK UP STEPHANIE SWANSTROM 6/9/2017 6/9/2017 MONTERRA). 2ND PC SUBMITTAL STEPHANIE SWANSTROM 7/7/2017 7/7/2017 RECEIVED NOTIFIED BOB RICHARDS W/ WOODBRIDGE PACIFIC 2ND PC COMPLETE/READY JAKE FUSON 7/19/2017 7/19/2017 CONSTRUCTION THAT PLAN REVIEW WAS COMPLETE AND FOR PICK UP REVISIONS WERE REQUIRED. 2ND PC PICKED UP STEPHANIE SWANSTROM 7/19/2017 7/19/2017 3RD PC SUBMITTAL STEPHANIE SWANSTROM 7/25/2017 7/25/2017 RECEIVED Printed: Monday, March 20, 2023 9:38:49 AM 1 of 6 CENTRALSQUARE °5 Project Details PROJECT NUMBER ows� City of La Quinta BTCP2017-0005 FIL SPOKE W/ BOB RICHARDS AT THE COUNTER AND NOTIFIED HIM THAT PLANS WERE APPROVED, AND PER MARY, THE COUNTER VISIT JAKE FUSON 8/8/2017 8/8/2017 PERMITS THAT HAVE BEEN PAID FOR IN ADVANCE WILL BE READY FOR PICKUP AND ISSUANCE IN THE MORNING (8/9/2017). NOTE ARMANDO MAGALLON 9/8/2017 9/12/2017 REVISION 1 RECEIVED - ATTIC VENTS PLANS 1, 2, AND 3. NOTE MARY FASANO 9/11/2017 9/11/2017 PROCESSED FOR ARMANDO NOTIFIED BOB RICHARDS THAT REVISON 1 PLANS WERE PHONE CALL JAKE FUSON 9/21/2017 9/21/2017 APPROVED AND FEES WERE READY TO BE PAID IN ORDER TO ISSUE THE REVISION. NAME TYPE NAME ADDRESSI CITY STATE ZIP PHONE FAX EMAIL APPLICANT WOODBRIDGE PACIFIC GROUP LLC 27271 LAS RAMBLAS MISSION VIEJO CA 92691 (949)348-8162 rrichards@woodbridge SUITE #100 pacific.com CONTRACTOR WOODBRIDGE PACIFIC GROUP LLC 27271 LAS RAMBLAS MISSION VIEJO CA 92691 (949)348-8162 rrichards@woodbridge SUITE #100 pacific.com OWNER MONTERRA PROP 55075 MONROE ST LA QUINTA CA 0 (949)348-8162 CLTD DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY 101-0000-42600 ($420.00) ($420.00) 6/9/17 OFFSET OFFSET JFU 101-0000-42600 ($1,080.00) ($1,080.00) 6/9/17 OFFSET OFFSET JFU HOURLY CHARGE - CITY 101-0000-42600 8 $1,080.00 $1,080.00 6/9/17 DEPOSIT DEPOSIT JFU BUILDING STAFF HOURLY CHARGE - CITY 101-0000-42600 0 $136.00 $136.00 8/10/17 R27180 12393 CHECK LA QUINTA HOUSING MFA BUILDING STAFF I I 11 LLC HOURLY CHARGE - CITY 101-0000-42600 2 $304.00 $304.00 8/10/17 R27180 12393 CHECK LA QUINTA HOUSING MFA BUILDING STAFF 1 LLC Printed: Monday, March 20, 2023 9:38:49 AM 2 of 6 CENTRALSQUARE Project Details PROJECT NUMBER -ows� City of La Quinta BTCP2017-0005 pm CLTD DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY HOURLY CHARGE - CITY 101-0000-42600 1.5 $228.00 $228.00 8/10/17 R27180 12393 CHECK LA QUINTA HOUSING MFA BUILDING STAFF 1 LLC HOURLY CHARGE - CITY 101-0000-42600 1.25 $190.00 $190.00 10/4/17 R28309 12452 CHECK LA QUINTA HOUSING AMA BUILDING STAFF I I I I I I I I 11 LLC HOURLY CHARGE - 101-0000-42600 4 $420.00 $420.00 6/9/17 DEPOSIT DEPOSIT JFU ESGIL CIVIL ENGINEER Total Paid for BUILDING STAFF - PER HOUR: $858.00 $858.00 BUILDING TRACT RESIDENTIAL 101-0000-42600 1 $1,500.00 $1,500.00 5/12/17 R24834 12126 CHECK LA QUINTA HOUSING MFA CONSTRUCTION PLAN LLC DEPOSIT Total Paid for BUILDING TRACT RESIDENTIAL $1,500.00 $1,500.00 CONSTRUCTION PLAN DEPOSIT: INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED RESULT DATE REMARKS NOTES RETURNED REVIEW TYPE REVIEWER SENT DATE DUE DATE STATUS REMARKS NOTES DATE RFI 7 - BALLOON FRAMING OF ENTRY TOWERS, THIS REVISION WILL BE PERFORMED 1ST BLDG (1WK) AJ ORTEGA 10/20/2017 10/25/2017 10/20/2017 APPROVED RFI 7 - BALLOON THROUGHOUT ALL PHASES AND ALL MODELS FRAMING WHERE IT APPLIES, SEE APPROVED DETAILING ATTACHED REVISION 1 - ATTIC ASSEMBLIES OF ALL PLAN 1ST BLDG (2WK) JAKE FUSON 9/8/2017 9/22/2017 9/21/2017 APPROVED REVISION 1 TYPES CHANGED FROM UNVENTILATED TO VENTILATED ATTIC ASSEMBLIES. 1ST BLDG NS (3WK) JAKE FUSON 5/12/2017 6/5/2017 6/9/2017 REVISIONS REQUIRED SEE 1ST REVIEW - NON-SRUCTURAL CORRECTION LIST Printed: Monday, March 20, 2023 9:38:49 AM 3 of 6 CENTRALSQUARE Project Details PROJECT NUMBER City of La Quinta BTCP2017-0005 1ST BLDG STR (2WK) KURT CULVER 5/12/2017 5/26/2017 5/23/2017 READY FOR APPROVAL 1ST FIRE (1WK) RONALD 5/12/2017 5/19/2017 5/18/2017 NOT REQUIRED GRIESINGER LOCATION OF MECHANICAL EQUIPMENT IS NOT CONSISTENT WITH APPROVED GRADING PLAN. APPLICANT MUST RECEIVE APPROVAL FOR 1ST PLANNING CARLOS 5/22/2017 6/5/2017 6/5/2017 REVISIONS REQUIRED AMENDED GRADING PLAN SHOWING NEW (2WK) FLORES LOCATION OF MECHANICAL EQUIPMENT THAT COMPLIES WITH SECTION 9.60.075 BEFORE ISSUANCE OF BTCP2017-0005. 2ND BLDG NS (2WK) JAKE FUSON 7/7/2017 7/17/2017 7/18/2017 REVISIONS REQUIRED SEE 2ND REVIEW - NON-STRUCTURAL CORRECTION LIST 2ND PLANNING CARLOS 7/7/2017 7/17/2017 7/12/2017 REVISIONS REQUIRED PENDING SUBMITTAL AND APPROVAL OF (2WK) FLORES REVISED GRADING PLAN 3RD BLDG NS (2WK) JAKE FUSON 7/25/2017 8/8/2017 8/8/2017 APPROVED A/C UNITS FOR PLAN 3 SHALL MATCH PRECISE GRADING PLAN. NOTE ON SITE PLANS AND MECHANICAL PLANS FOR PLAN 3 SHALL INCLUDE INFORMATION ON MATCHING GRADING PLAN. SHEETS SHALL ALSO INCLUDE ALTERNATIVE LOCATION FOR LOTS 7 AND 9 AND GIVE CLARITY 3RD PLANNING CARLOS 7/25/2017 8/8/2017 8/8/2017 READY FOR APPROVAL ON WHEN SIDE YARD A/C UNITS SHALL APPLY. (2WK) FLORES SIDE YARD A/C UNITS SHALL ONLY BE USED WHEN 5' SETBACK CLEARANCE IS MET. REVIEWED REVISED SHEETS SUBMITTED ON 8/3. PLANNING HAS NOW APPROVED OF REVISIONS. A/C UNIT LOCATION SHALL MATCH PRECISE GRADING PLAN. Printed: Monday, March 20, 2023 9:38:49 AM 4 of 6 CENTRALSQUARE Project Details PROJECT NUMBER -ows� City of La Quinta BTCP2017-0005 Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED BTCP2017-0005 - 1ST DOC 5/23/2017 AJ ORTEGA 1ST REVIEW REVIEW STRUCTURAL 0 STRUCTURAL FEE SHEET FEE SHEET.pdf 1ST REVIEW BTCP2017-0005 - 1ST DOC 5/23/2017 AJ ORTEGA STRUCTURAL REVIEW STRUCTURAL 0 CORRECTIONS CORRECTIONS.pdf RFI 7 (BALLOON BTCP2017-0005 - RFI 7 DOC 10/20/2017 AJ ORTEGA FRAMING AT ENTRY (BALLOON FRAMING AT 0 TOWERS) ENTRY TOWERS).pdf BTCP2017-0005 - 1ST 1ST REVIEW - NOW DOC 6/9/2017 JAKE FUSON STRUCTURAL REVIEW - NON- 1 STRUCTURAL CORRECTION LIST CORRECTION LIST.pdf BTCP2017-0005 - 2ND 2ND REVIEW - NON- DOC 7/19/2017 JAKE FUSON STRUCTURAL REVIEW - NOW 1 STRUCTURAL CORRECTION LIST CORRECTION LIST.pdf DOC 9/11/2017 JAKE FUSON FORM CERTIFICATION - FORM 1 LOTS 6-10 CERTIFICATION.pdf STRUCTURAL STRUCTURAL DOC 9/11/2017 JAKE FUSON OBSERVATION REPORT - OBSERVATION REPORT - 1 PHASE 3 - PLAN 3 PHASE 3 - PLAN 3.pdf STRUCTURAL STRUCTURAL DOC 9/15/2017 JAKE FUSON OBSERVATION REPORT - OBSERVATION REPORT - 1 PHASE 3 - PLAN 1 and PHASE 3 - PLAN 1 and 2 2.pdf STRUCTURAL DOC 6/25/2018 JAKE FUSON OBSERVATION REPORT - BTCP20- LOT 11 5 1 PLAN -PLAN 3.pdf LOT 11 - PLAN 3 Printed: Monday, March 20, 2023 9:38:49 AM 5 of 6 CENTRALSQUARE Project Details PROJECT NUMBER -ows� City of La Quinta BTCP2017-0005 Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED BTCP2017-0005 - STRUCTURAL STRUCTURAL DOC 7/19/2018 1AKE FUSON OBSERVATION REPORT - OBSERVATION REPORT - 1 LOTS 13 and 16 - PLANS LOTS 13 and 16 - PLANS 2 and 1 2 and 1.pdf DEBRIS MANAGEMENT DOC 7/25/2017 STEPHANIE DEBRIS MANAGEMENT PLAN 7-25-17 0 SWANSTROM PLAN 7-25-17 MONTERRA.pdf 3RD SUBMITTAL 3RD SUBMITTAL DOC 7/25/2017 STEPHANIE CORRECTION LIST AND CORRECTION LIST AND 0 SWANSTROM COMMENTS 7-25-17 COMMENTS 7-25-17 BTCP2017-0005.pdf Printed: Monday, March 20, 2023 9:38:49 AM 6 of 6 CENTRALSQUARE Building Address 3 _ /O/ 6 .� a P.O. BOX 1504 78-495 CALLE TAMPICO Q; LA QUINTA, CALIFORNIA 92253 4" a/ -J "s ') Mailing Address 2-7Z.%� LtrS �•✓1J✓raS fs�%• �U6 City . ,/ Zip Tel. Contractor 7.✓ooG4511419f- %/cific. &--OL4 Address - ?_ -7 Z- -7 4 L/ c;wz S 11 S�AITG /00 City Zip Tel. State Lic. & Classif. I esyy 7 City Lic. #n/� Z .3 Arch., Engr., Designer '% �v✓O:,dG aZ Address Tel; zU? s'v S.r,JAC,�ciy S/.I 5 !1,' ZO—ZOV City // ✓ -,!Po � !3e"Wt Zip z�60 State ,/ Lic. #G 2-sgi7 LICENSED CONTRACTOR'S DECLARATION I hereby affirm that I am licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and my license is in full force and effect. SIGNATURE DATE OWNER -BUILDER DECLARATION I hereby affirm that I am exempt from the Contractor's License Law for the following reason: (Sec. 7031.5, Business and Professions Code: Any city or county which requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance also requires the applicant for such permit to file a signed statement that he is licensed pursuant to the provisions of the Contrac- tor's License Law, Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, or that he is exempt therefrom, and the basis for the alleged exemption. Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars (S500). ❑ I, as owner of the property, or my employees with wages as their sole compensation, will do 'the work, and the structure is not intended or offered for sale. (Sec. 7044, Business and Profes- sions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon and who does such work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the owner -builder will have the burden of proving that he did not build or improve for the purpose of sale). ❑ I, as owner of the property, am exclusively contracting with licensed contractors to construct the project. (Sec. 7044, Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who contracts for such projects with a contractor(s) licensed pursuant to the Contractor's License Law.) ❑ 1 am exempt under Sec. B. & P.C. for this reason Date Owner WORKER'S COMPENSATION DECLARATION hereby affirm that I have a certificate of consent to self -insure, or a certificate of Worker's Compensation Insurance, or a certified copy thereof. (Sec. 3800, Labor Code.) Policy yo. � Company Copy is filed with the city. ❑Certified copy is hereby furnished. CERTIFICATE OF EXEMPTION FROM WORKERS' COMPENSATION INSURANCE (This section need not be completed if the permit is for one hundred dollars ($100) valuation or less). I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become subject to Workers' Compensation Laws of California. Date Owner NOTICE TO APPLICANT. If, after making this Certificate of Exemption you should become subject to the Workers' Compensation provisions of the Labor Code, you must forthwith comply with such provisions or this permit shall be deemed revoked. CONSTRUCTION LENDING AGENCY I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued. (Sec. 3097, Civil Code.) Lender's Name Lender's Address This is a building permit when properly filled out, signed and validated, and is subject to expiration if work thereunder is suspended for 180 days. I certify that I have read this application and state that the above information is correct. I agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter the above -mentioned property for inspection purposes. Signature of applicant Date Mailing Address City, State, Zip IWHITE = BUILDING DEPARTMENT APPLICATION ONLY BUILDING: TYPE CONST. S ° /' OCC. GGRP. A.P. Number d 7 S—XG- Q v Legal Description < c- i 7 1/Z- Project pDescription / 5,.�4�,. �'`"^^' ��Ae2le f7 / b t/ni1Qi �Ii & !� r - Sq. Ft. No. No. DIN. Size Stories Units New ❑ Add ❑ Alter ❑ Repair ❑ Demolition ❑ Estimated Valuation PERMIT Plan Chk. Dep. Plan Chk. Bal. Const. Mech. Electrical Plumbing S.M.I. Driveway Enc. Infrastructure TOTAL CONTACT INFORMATION NAME: PHONE: AMOUNT ZONE: BY: Minimum Setback Distances: Front Setback from Center Line — Rear Setback from Rear Prop. Line Side Street Setback from Center Line Side Setback from Property Line — FINAL DATE INSPECTOR Issued by: Validated by: Validation: YELLOW = APPLICANT Date PINK = FINANCE Building Permit Number. Project Description: IFour (4) SFR Exempt 0 (Materials may contain hazardous wastes and are not subject to recycling provisions) Construction Debris Management Plan Plan Submittal Job Site owners Name Number, Street, or PO Box City, State, Postal Code owner's Phone Numbei Owners E-Mafl Address 1116/2014 55-140 Autumn Valley La Quinta Housing 1 LLC 27285 Las Rambles #230 Mission Viejo, Ca. 92691 do 949-6894388 Project Managers Name Mark Bradshaw Pw1W Managers Phone Number 760-276-6891 Project Managers E-mail Address szabaleAwcodbridaeoaafic corn Sunder / Contri Number, Street or PO CRY, State. Postal Project Square City Approval By Woodbridge Pacific Group 27285 las Rambles #230 Mission Viejo, Ca. 92691 Avg. 3,372 sq feet per home (Total 13,490 sq ft) . c if' _ D50- , Date of City Approval I I / 0 (o / ) + To Be Discardel Product Trash Asphalt BricdBlock Cardboard Commingled Concrete Drywall Donated I Reuse' Tons )le Product Masonry (broken) Plaster Strap Metal Tile (floor) Tile (roof) Wood Landscape Debris I 'Describe Items I I Totals: Recycle Trash Projected Diversion: 1-1 —3-51 1 understand It Is the property owner's responsibility to submit copies of weight tickets or receipts to the District Environmental Coordinator as these hauls occur. I hereby certify that completion, Implementation and adherence of the Debris Management Plan (DMP) for the above named project shall guarantee that at least 50% of the Jobsite waste is diverted from landfilling. The remaining material will be recycled or reused. I will divert, for recycling or re -use, remaining materials generated from the first day of the project through the completion of the project in accordance with this plan. This DMP is issued in the name of the property owner(s) and shall remain their property throughout the construction and/or demolition project. A contractor serving as agent of the owner may obtain a DMP for the owner. However, the DMP is still issued in the name of the property owner(s) and the owner retains legal responsibility for ensuring that the provisions of the DMP are adhered to. The property owners) and general contractor shall be kept informed of the diversion progress through bl-monthly ports. if self -hauling, an refuse mater1w from this project site must be taken to an approved recycler or transfer Qvrmsr / Developer / roJ alter / Superintendent Date El JUL 25 .2017 CITY OF LA QUINTA PLANNING DFPARTNF-- DATE: May 23, 2017 JURISDICTION: La Quinta EsGil Corporation In Partnership with Government for Building Safety % l PLAN CHECK NO.: BTCP2017-0005 SET: I PROJECT ADDRESS: Monterra Subdivision PROJECT NAME: Monterra Subdivision (Update to 2016 Codes) 0 APPLICANT . 1".1tiMISgh,.. ❑ PLAN`i EVIEWER 0 FILE The plans transmitted herewith have been corrected where necessary and subsii tantially comply with the jurisdiction's building codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at EsGil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ❑ r, The applicant's copy of the check list has been sent to: ® EsGil Corporation staff did not advise the applicant that the plan check has been completed. EsGil Corporation staff did advise the, applicant that the plan check has been completed. Person contacted: r--� Telephone #: Date contacted: .� () Email: Mail Telephone Fax In Person ❑ REMARKS: By: Abe Doliente Enclosures: EsGil Corporation El GA ❑ EJ ❑ MB ❑ PC 5/16/17 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax (858) 560-1576 AHEITEC C O N S U L T 1 N G WO# 051107 July 25, 2017 City of La Quinta Community Development Dept. 78495 Calle Tampico La Quinta, CA 92253 Attn: Building Division Re: Tract 32742 Dear Sir or Madam: I hereby certify that the pad & contour elevations are in substantial conformance with the approved Rough Grading Plan. LOT # 6 DESIGN PAD ACTUAL PAD 464.1 464.1 7 464.5 464.5 8 464.9 464.9 9 465.3 465.3 10 465.8 465.8 Sincerely, Michael D. Hacker, PE Q40F ESS/pD. No. 55606 srgrF oF' cat`�`�� 777 E. Tahquitz Canyon Way • Suite 200-50 Palm Springs, CA 92262 www.heitecinc.com • 760.969.5033 PRECISION ENGINEERING DUIGN CORP. 1`100 E. 6ARRY AVE. SUITE 104 SANTA ANA, CA. 92705 PFIONE (949) 55"b98 EMAIL: MIKE@ 1PREGISION.60M PAGE 1 OF I I STRUCTURAL OBSERVATION REPORT FORM I THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: June 18, 2018 PROJECT "Monlerra" - SFH ( Lot # 1 1 3 B) AJ ENGINEERING J N. LOCATION l a Ouinta, CA BLDG. PERMIT NUMBER OWNER Woo ri qe Pacific Grow. LLC LOCATION/DIVISION ; ARCHITECT Hannouche Architects ARCHITECT N. STRUCT. OBS. OF RECORD Maichel Y. Berhe, P.E. LIC. OR REGISTRATION No. ; OBSERVED STRUCTURAL ELEMENTS & THEIR CONNECTIONS; PE2014-062 na C-76445 Interior and Exterior General Framing; i.e., roof framing, roof sheathing, shear wall elements, shear wall holdowns, beams headers, general hardwares, connections. ORSERVLD DEFICIENCIN The deficiencies noted during the observation visit have been corrected and/or installed by a collabrated effort of the foreman and project superintendent. Construction Stage. ❑ HVAC ❑ Electrical 0 Plumbing Note: When box is checked, it indicates that construction stage is in progress, and it has not yet been completed at the time of observation was conducted ® STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE & MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE I DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF 1. 1 AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION. 2. 1, OR ANOTHER QUALIFIED -CHARGE OBSERVER WHO I HAVE DESIGNATED ABOVE AND IS UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. 3. ALL DEFICIENCIES, WHICH I DOCUMENTED, HAVE BEEN CORRECTED UNLESS OTHERWISE INDICATED ABOVE. 4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE BUILDING DEPARTMENT. 5. THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM, 6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE SF,AOC RECOMMENDED GUIDELINES FOR THE PRACTICE OF STRUCTURAL ENGINEERING IN CALIFORNIA. SIGNED BY: June 18, 2018 a , RE. STRUCTURAL OBSERVATION DOES NOT WAIVE THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING INSPECTORS. ALL WORK MUST COMPLY WITH THE APPROVED PLANS AND APPLICABLE STATE & LOCAL CODES. PRECISION ENGINEERING D=GN CORP. r100 E. OARRY AVE. WITE 104 5ANTA ANA, GA. 92T05 PHONE (949) 55"61b EMAIL: MIKE@1PRWI51ONLOM PAGE 1 OF STRUCTURAL OBSERVATION REPORT FORM THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: September 6, 2017 PROJECT "Monterra" - SFH - Plan 2AR & I A (lots 21 & 221 LOCATION ; La Quinta, CA OWNER ; Woodbridge Pacific Group, LLC ARCHITECT Hannouche Architect, STRUCT. OBS OF RECORD ; Maichel Y. Bencc, P.E. OBSERVED STRUCTl1RA1, ELEMENTS & TIIFIR CONNa-LIONS: AJ ENGINEERING J- N ; PE2017-08 BLDG, PERMIT NUMBER LOCATION/DIVISION ARCHITECT J.N. ; na LIC. OR REGISTRATION No. ; C: -76445 Interior And Exterior General Framing; i.e., roof framing, roof sheathing, shear wall elements, shear wall holdowns, beams headers, general hardwares, connections. OBSERVED DEFICIENCIE, The deficiencies noted during the observation visit have been corrected and/or installed by a collabrated effort of the foreman and project superintendent. Construction Stage: ❑ HVAC Electrical ❑✓ Plumbing Note: When box is checked, it indicates that construction stage is in progress, and it has not yet been completed at the time of observation was conducted ® STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE & MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE I DECLARE THAT THE FOLLOWING STATEMENTS ARF TRUF TOTHE BEST OF N1Y KNOWI EDGE AN 1) BFI IFF 1. 1 AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION. 2. 1, OR ANOTHER QUALIFIED -CHARGE OBSERVER WHO 1 HAVE DESIGNATED ABOVE AND IS UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IFTHE STRUCTURE IS IN GENERAL CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. 3. ALL DEFICIENCIES, WHICH I DOCUMENTED, HAVE BEEN CORRECTED UNLESS OTHERWISE INDICATED ABOVE. 4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE BUILDING DEPARTMENT. 5. THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM. 6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE SEAOC RECOMMENDED GUIDELINES FOR THE PRACTICE OF STRUCTURAL ENGINEERING IN CALIFORNIA. SIGNED BY: September 6, 2017 _MaichrrY. Berne, P.E. �pFCSS STRUCTURAL OBSERVATION DOES NOT WAIVE THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING INSPECTORS ALL WORK MUST COMPLY WITH THE APPROVED PLANS AND APPLICABLE STATE & LOCAL CODES. PRECISION ENGINEERING DI MGN CORP. MOO E. 6ARRY AVE. SUITE 104 SANTA ANA, CA. g2FOS PHONE (q4q) 5-0"&q8 EMAIL: MIKEe 1PR C1510NLOM PAGE 1 OF STRUCTURAL, OBSERVATION REPORT FORM THIS REPORT INCLUDES ALL CONSTRUCTION WORK THROUGH THE: September 6, 2017 PROJECT "Monterra" - SFH - Plan 3B Lot 7 AJ ENGINEERING J. N. LOCATION La utnta CA BLDG. PERMIT NUMBER OWNER W(x)dbfidge Pacific Group. LLC LOCATION/DIVISION ARCHITECT Hannouche Architects ARCHITECTJ,N. STRUCT OBS OF RECORD Maichel Y. Berhe, P.E. LIC, OR REGISTRATION No. OBSERVLD STRUC I I IRAL ELEMENTS die THEIR CONNECTIONS: PE2017-08 na C-76445 Interior and Exterior l:eneral Framine; i.e., roof framing, roof sheathing, shear wall elements, shear wall holdowns, beams headers, general hardwares, connections. SERVED DEFICIENCIL The deficiencies noted during the observation visit have been corrected and/or installed by a col labrated effort of the foreman and project superintendent. Construction ❑ HVAC ❑✓ Electrical Q✓ Plumbing Stage: Note: When box is checked, it indicates that construction stage is in progress, and it has not yet been completed at the time of observation was conducted ® STRUCTURAL SYSTEM WAS VISUALLY OBSERVED TO BE IN GENERAL CONFORMANCE WITH THE APPROVED PLANS STRUCTURAL DEFICIENCIES ARE OF A MINOR NATURE & MAY BE REVIEWED BY CITY BLDG INSPECTOR FOR COMPLIANCE 1 DECLARE THAT THE FOLLOWING STATEMENTS ARE TRUE TO THE BEST OF MY KNOWLEDGE AND BELIEF 1. I AM THE REGISTERED ENGINEER WHO HAS RESPONSIBLE CHARGE FOR THE STRUCTURAL OBSERVATION. 2. 1, OR ANOTHER QUALIFIED -CHARGE OBSERVER WHO 1 HAVE DESIGNATED ABOVE AND 1S UNDER MY RESPONSIBLE CHARGE, HAS PERFORMED THE REQUIRED SITE VISITS AT EACH SIGNIFICANT CONSTRUCTION STAGE TO VERIFY IF THE STRUCTURE IS IN GENERAL CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS. 3. ALL DEFICIENCIES, WHICH 1 DOCUMENTED, HAVE BEEN CORRECTED UNLESS OTHERWISE INDICATED ABOVE. 4. ALL OBSERVED DEFICIENCIES SHALL BE CORRECTED AND APPROVED BY THE OBSERVER PRIOR TO FINAL ACCEPTANCE OF THE STRUCTURAL SYSTEMS BY THE BUILDING DEPARTMENT. 5, THIS REPORT IS PROVIDED TO THE OWNER AS A PART OF THE OWNERS OVERALL CONSTRUCTION QUALITY CONTROL PROGRAM. 6. OPTION ONE HAS PROVIDED STRUCTURAL OBSERVATION IN ACCORDANCE WITH THE SEAOC RECOMMENDED GUIDELINES FOR THE PRACTICE OF STRUCTURAL ENGINEERING IN CALIFORNIA. A SIGNED BY: September 6, 2017 —MaichUrY. Eserne, V.t. STRUCTURAL OBSERVATION DOES NOT WAIVE THE REQUIREMENTS FOR INSPECTIONS BY CITY BUILDING INSPECTORS ALL WORK MUST COMPLY WITH THE APPROVED PLANS AND APPLICABLE STATE & LOCAL CODES.