Loading...
Mirage (Plans 1-3) Revision 2 Title 24TI TLE 24' A Energy. Conservation t - :Compliance ,Report - - - Palo Verde Tract #32279 La Quinta,,California x x` _ Prepared For. STANDARD PACIFIC HOMES 15326 Alton Parkway Irvine, CA 92618-2338 ' } Phone: (949)789-1746 Fax: (949) 789-3310 y Date: July 31°, 2007 , - DEC 2 1-2007, -rt f, .,.• ' ,�, � �� `� 4' ' -; _ � • 7 W'W! N I d AIR CONDITIONING INC. 4 ' "Working As Team to Be -The Best In Our Industry" - r' Chinh Nguyen, Certified Energy Analyst . 1610 N. Maple Street Corona; CA92880-1760 _ (800) 700-0799 / (951) 739-9509 fax ' E-mail. chinh. nqu yen ft westpacair. com , ' Table of Contents -Cover Sheet -T-24 Summary report -Plan 1 - CF-1R Certificate of Compliance MF-1R Mandatory Measures Check List - Plan 1/Opt. Mud Room - CF-1R Certificate of Compliance - MF-1R Mandatory Measures Check List -, Plan 1/Opt. Suite , - CF-1R Certificate of Compliance - MF-IR Mandatory Measures Check List - Plan 2 CF-IR/ Certificate of Compliance - MF-IR Mandatory Measures Check List - Plan 2/Opt. Outdoor - CF-1R / Certificate of Compliance - , MF-IR Mandatory Measures Check List - Plan 3 - . CF-1R / Certificate of Compliance MF-1 R Mandatory Measures Check List - Plan 3/Opt. Exercise CF-IR/ Certificate of Compliance - MF-1R Mandatory Measures Check List TITLE -24 SUMMARY REPORT The Following is the minimum requirement to meet the 2005 Residential Energy Standards (California Code of Regulations, Title 24, Part 6 and the Administrative Regulations, Title 24, Part 1). 1. R-38 Roof Insulation. 2. R-19 Exterior Wall Insulation. 3. Low -e Vinyl Windows & Sliding Doors to be selected by Owner: -Operable Windows with U value of 0:34 & SHGC of 0.30 -Fixed Windows with U value of 0.34 & SHGC of 0.33 -Sliding Glasses Door with U value of 0.35 & SHGC of 0.31 -French Door with U value of 0.31 & SHGC of 0.22 4. R-4.2 Duct Insulation. 5. Gas Furnace with 80% AFUE . 6. Condenser 13.0 SEER With TXV & Min. EER of 11.0 7. 75 Gallons Water Heater to be selected by Owner. 8. Radiant Barrier Required. STANDARD PACIFIC HOMES PALO VERDE AT LA QUINTA Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56 Project Address.. ******* --------------------- La Quinta,' California *v7.10* Documentation Author... Chinh Nguyen ******* Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ----------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = ---------- - ------------------------ - Space ---------- Heating.......... 2.30 ---------- 2.04 0.26 = - Space Cooling.......... 71.41 57.12 14.29 = - Water Heating 7.61 8.66 -1.05 = = North Total 81.32 67.82 13.50 = = Space Heating.......... 2.30 2.01 0.29 = - Space Cooling.......... 71.41 57.67 13.74 = = Water Heating.......... 7.61 8.66 -1.05 = = East Total 81.32 68.34• 12.98 = = Space Heating.......... 2.30 2.29 0.01 = = Space Cooling.......... 71.41 57.38 14.03 = - Water Heating.......... 7.61 8.66 -1.05 = = South Total 81.32 68.33 12.99 = = Space Heating.......... 2.30 2.36 -0.06 _ = Space Cooling.......... 71.41 56.62 14.79 = = Water Heating.......... 7.61 8.66 -1.05 = = West Total 81.32 67.64 13.68 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance *** _ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------ Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56 MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3377 sf Building Type.............. Single Family Detached Construction Type New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type........:. FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC.....:. Average Ceiling Height..... Slab On,Grade 2 34054 cf 3377 sf 18 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type (sf) (cf) Units le ioned Type "(ft) (sf) Housewrap SLEEPING, Azm --- Tilt ---- --- Reference --------- Comments -------------- ------------ SLEEPING ----- ---- Residence 1325 13362 0.40 2.0 Yes Setback 2.O Standard No LIVING Wall Wood 563 0.074 19 0 180 90 Residence 2052 20692 0.60 3.0 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm --- Tilt ---- --- Reference --------- Comments -------------- ------------ SLEEPING ----- ---- ----- ----------- 1 Wall Wood 563 0.074 19 0 180 90 Yes IV A A5 SOUTH 3 Wall Wood 116 0.074 19. 0 270 90 Yes IV A A5 WEST 5 Wall Wood 386 0.074 19 0 0 90 Yes IV.9 A5 NORTH 7 Wall Wood 169 0.074 19 0 90 90 Yes IV A A5 EAST 9 Wall Wood 363 0.074 19 0 0 90 No IV.9 A5 GARAGE WALL 11 RoofRad Wood 1325 0.025 38 0 n/a 0 Yes IV A A18 Attic 14 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door LIVING 2 Wall Wood 120 0.074 19 0 180 90 Yes IV A A5 SOUTH 4 Wall Wood 416 0.074 19 0 270 90 Yes IV A A5 WEST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------ Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56 --------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES U- Appendix Sheath- Length Solar Appendix Solar IV Location/ Frame Area fact- Cavity ing Act Comments ---------------------- Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt No Reference Comments -------------- ------------ 6 Wall ----- Wood ---- 373 ----- 0.074 ----- 19 ----- 0 --- 0 ---- 90 --- Yes --------- IV.9 A5 NORTH 8 Wall Wood 457 0.074 19 0 90 90 Yes IV.9 A5 EAST 10 Wall Wood 182 0.074 19 0 0 90 No IV.9 A5 GARAGE WALL 12 Roof Rad Wood 2055 0.025 38 0. n/a 0 Yes IV.1 A18 Attic 13 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor -------- R-val ------- Gains ----- Reference --------- Comments ---------------------- ------------ SLEEPING ------ Orientation (sf) factor ----- 15 S1abEdge 144 0.900 R-0 No None To Outside 17 S1abEdge 38 0.550 R-0 No None TO GARAGE LIVING 1 Wind Back (S) 16.5 0.340 16 S1abEdge 176 0.900 R-0 No None To Outside 18 S1abEdge 18 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior. Area U- Act Shade Orientation (sf) factor ----- SHGC ----- Azm --- Tilt ---- Type -------- Location/Comments ------------------------ ------------------ SLEEPING ----- 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS7/Milgard Operable 8 Wind Back (S) 4.0 0.340 0.330 180 90 Standard SGLASS8/Milgard Fixed Wi 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 17 Wind Front (N) 11.0 0.340 0.330 0 90 Standard NGLASSI/Milgard Fixed Wi 18 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 25 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 26 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 27 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable LIVING 9 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS9/Milgard Operable CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ---------------------------------------------- Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56 MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- FENESTRATION SURFACES --------------------- Exterior Shade Type Location/Comments -------- ------------------------ Standard SGLASS10/Fr.Dr. Therma-T Standard SGLASSII/Milgard Operabl Standard WGLASS2/Milgard Operable Standard WGLASS3/Milgard Operable Standard WGLASS4/Milgard Operable Standard WGLASS5/Milgard Operable Standard NGLASS5/Milgard Operable Standard NGLASS6/Fr.Dr. Therma-Tr Standard NGLASS7/Milgard Operable Standard NGLASS8/Milgard Operable Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASS5/Fr.Dr. Therma-Tr Standard EGLASS6/Fr.Dr. Therma-Tr Standard EGLASS7/Milgard Fixed Wi Standard EGLASS8/Milgard Operable Standard EGLASS9/Milgard Fixed Wi Standard EGLASS10/Milgard Operabl Standard EGLASSII/Milgard Operabl ---Window--- ------------Overhang------------ Area U- Act Area Orientation (sf) factor SHGC Azm Tilt --- ---- ------------------ 10 Door Back (S) ----- 40.0 ----- 0.310 ----- 0.220 180 90 11 Wind Back (S) 11.0 0.340 0.300 180 90 13 Wind Right (W) 16.5 0.340 0.300 270 90 14 Wind Right (W) 16.5 0.340 0.300 270 90 15 Wind Right (W) 16.5 0.340 0.300 270 90 16 Wind Right (W) 16.5 0.340 0.300 270 90 21 Wind Front (N) 11.0 0.340 0.300 0 90 22 Door Front (N)' 40.0 0.310 0.220 0 90 23 Wind Front (N) 11.0 0.340 0.300 0 90 24 Wind Front (N) 9.0 0.340 0.300 0 90 28 Door Left (E) 40.0 0.310 0.220 90 90 29 Door Left (E) 40.0 0.310 0.220 90 90 30 Door Left (E) 40.0 0.310 0.220 90 90 31 Wind Left (E) 10.0 0.340 0.330 90 90 32 Wind Left (E) 15.0 0.340 0.300 90 90 33 Wind Left (E) 10.0 0.340 0.330 90 90 34 Wind Left (E) 16.5 0.340 0.300 90 90 35 Wind Left (E) 16.5 0.340 0.300 90 90 OVERHANGS Exterior Shade Type Location/Comments -------- ------------------------ Standard SGLASS10/Fr.Dr. Therma-T Standard SGLASSII/Milgard Operabl Standard WGLASS2/Milgard Operable Standard WGLASS3/Milgard Operable Standard WGLASS4/Milgard Operable Standard WGLASS5/Milgard Operable Standard NGLASS5/Milgard Operable Standard NGLASS6/Fr.Dr. Therma-Tr Standard NGLASS7/Milgard Operable Standard NGLASS8/Milgard Operable Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASS5/Fr.Dr. Therma-Tr Standard EGLASS6/Fr.Dr. Therma-Tr Standard EGLASS7/Milgard Fixed Wi Standard EGLASS8/Milgard Operable Standard EGLASS9/Milgard Fixed Wi Standard EGLASS10/Milgard Operabl Standard EGLASSII/Milgard Operabl SLAB SURFACES ------------- Area Slab Type (sf) ---------------- ------ SLEEPING Standard Slab 1325 LIVING Standard Slab 2052 ---Window--- ------------Overhang------------ Area � Left Right Surface (sf) Width ----- Height ------ Depth ----- Height ------ Extension --------- Extension --------- ----------- LIVING ----- 28 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 29 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 30 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a SLAB SURFACES ------------- Area Slab Type (sf) ---------------- ------ SLEEPING Standard Slab 1325 LIVING Standard Slab 2052 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56 MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run-Palo,Verde/Plan 1 ------------------------------------------------------------------------------- HVAC SYSTEMS. ------------ HVAC SIZING Verified Verified Verified System Total Verified Design Number Verified Heating Verified Verified Verified Maximum System of Minimum Capacity Refrig Charge Adequate Fan Watt Cooling Type ------------ Systems ------- Efficiency ----------- EER ----- . or TXV ------=------ Airflow -------- Draw -------- Capacity -------- SLEEPING n/a n/a ACSplit n/a 20870 25900 n/a Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING 46214 57352 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING DUCT SYSTEMS Verified Verified Verified System Total Sensible Design Maximum • Buried Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING Yes No No ACSplit Furnace 28453 n/a n/a n/a ACSplit n/a 20870 25900 n/a LIVING Furnace Attic R-4.2 Yes Furnace 36820 n/a n/a n/a ACSplit n/a, 25344 ---------- 31452 ---------- n/a ---------- ------------- Total ---------- 65273 46214 57352 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range ............... 34 F DUCT SYSTEMS Verified Verified Verified System Duct Duct Duct Surface • Buried Type Location ----------- R -value ------- Leakage ------- Area -------- Ducts --------- ------------- SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56 -------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- DUCT SYSTEMS WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ----------------, 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ------------ ----------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage -------------- Area -------- Ducts --------- ------------- ACSplit ----------- Attic R-4.2 Yes No No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ----------------, 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ------------ ----------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 Project Title . Palo Verde/Plan 1 Date..07/30/07 15:35:56 ------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387. User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- HERS REQUIRED VERIFICATION -------------------------- This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are,not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 Project Title . Palo Verde/Plan 1 Date..07/30/07 15:35:56 MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ---------- ---------- ----------------------------------------------------------- COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 9-9501 License. Signed.. Signed.. 3 Name.... Title... Agency.. Phone... Signed.. (date) (date) ENFORCEMENT AGENCY (date) N MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 1 Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56 Project Address.. ******* --------------------- La Quinta, California *v7.10*. Documentation Author... Chinh Nguyen *******I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 ----------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ----------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program-FORM MF-1R User#-MP2387 User-Westpac Air Conditioning, Run-Palo Verde/Plan 1 ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply n to exterior mass walls) G� *150(d): Minimum R-13 raised floor insulation in framed floors / or equivalent U -factor d 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox Y b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 l meets requirements specified in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality] standards. Indicate type.and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned / spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56 ------------------------------------------------------------------------------- ------------------------------------------------------------------------_------- �. MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints / and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance / with ASHRAE, SMACNA or ACOA 150(1): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing.the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water / pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to ` Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the% Solar Rating and Certification Corporation ✓ *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum ,installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56 ----------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used - _.,z 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause / reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed'with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material j 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no / electric resistance heating and no pilot light 1 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating / b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances % with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 ---------------------------------------==-------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------ ------ and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not.high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high / efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for.8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) STANDARD PACIFIC HOMES A' PALO VERDE AT LA QUINTA i PLAN -1 /OPT. MUD -ROOM Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 Project Address.. ******* --------------------- La Quinta, California *v7.10* Documentation Author:.. Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. .1 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 - --------------------- Compliance Method...... MICROPAS7 x7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------- ------------------------------------------------------------ ---------------------------- ---------------------------- MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = - Space Heating.......... 2.23 2.02 0.21 = - Space Cooling.......... 70.12 56.10 14.02 = = Water Heating.......... 7.33 8.34 -1.01 = = North Total 79.68 66.46 13.22 = - Space Heating.......... 2.23 1.94 0.29 = = Space Cooling.......... 70.12 56.91 13.21 = = Water Heating.......... 7.33 8.34 -1.01 = = East Total 79.68 67.19 12.49 = _ Space Heating.......... 2.23 2.15 0.08 = = Space Cooling.......... 70.12 56.59 13.53 = = Water Heating.......... 7.33 8.34 -1.01 = _ = South Total -------- 79.68 ---------------- 67.08 _ 12.60 _ = Space Heating.......... 2.23 2.26 -0.03 = I = Space Cooling.......... 70.12 56.12 14.00 = = Water Heating.......... 7.33 8.34 -1.01 = = West Total 79.68 66.72 12.96 = _ *** Building complies with Computer Performance _ ------------------------------------------------------------------- --------------------------------------------------------------- *** HERS Verification Required for Compliance i CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3506 sf Building Type .............. Single Family Detached Construction Type ......... New Fuel Type ................. NaturalGas Building Front Orientation.. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 35354 cf 3506 sf 17.6 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned ----- Type (ft) • (sf) Housewrap SLEEPING R-val R-val Azm Tilt -------- ----- ------- ---------- Residence 1325 13362 0.40 2.0 Yes Setback 2.0 Standard No LIVING -------------- 1 Wall Wood 563 0.074 19 0 Residence 2181 21992 0.60 3.0 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 563 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 3 Wall Wood 116 0.074 19 0 270, 90 Yes IV.9 A5 WEST 5 Wall Wood 375 0.074 19 0 0 90 Yes IV A A5 NORTH 7 Wall Wood 169 0.074 19 0 90 90 Yes IV.9 A5 EAST 9 Wall Wood 182 0.074 19 0 0 90 No IV A A5 GARAGE WALL 11 RoofRad Wood 1325 0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 2 Wall Wood 120 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 4 Wall Wood 416 0.074 19 0 270 90 Yes IV A A5 WEST 6 Wall Wood 494 0.074 19 0 0 90 Yes IV.9 A5 NORTH CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- OPAQUE SURFACES --------------- U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 8 Wall Wood 457 0.074 19 0 90 90 Yes IV.9 A5 EAST 10 Wall Wood 261 0.074 19 0 0 90 No IV.9 A5' GARAGE WALL 12 RoofRad Wood 2181 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 13 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door 14 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door PERIMETER LOSSES ---------------- Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ --------------------- -------------- ---------------------- SLEEPING 15 S1abEdge 144 0.900 R-0 No None To Outside 17 S1abEdge 18 0.550 R-0 No None TO GARAGE LIVING 16 S1abEdge 188 0.900 R-0 No None To Outside 18 S1abEdge 28 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation ------------------ (sf) ----- factor SHGC Azm Tilt Type Location/Comments SLEEPING ----- ----- --- ---- -------- ------------------------ 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Back (S) 16.5 0.340 0.300180 90 Standard SGLASS7/Milgard Operable 8 Wind Back (S) 4.0 0.340 0.330 180 90 Standard SGLASS8/Milgard Fixed Wi 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 17 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 18 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 25 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 26 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr'. Therma-Tr 27 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable 36 Wind Front (N) 11.0 0.340 0.330 0 90 Standard NGLASS9/Milgard Fixed Wi LIVING CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title....*....... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_lM Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- FENESTRATION SURFACES Exterior Shade Type Location/Comments -------- ------------------------ Standard SGLASS9/Milgard Operable Standard SGLASS10/Fr.Dr. Therma-T Standard SGLASSII/Milgard Operabl Standard WGLASS2/Milgard Operable Standard WGLASS3/Milgard Operable Standard WGLASS4/Milgard Operable Standard WGLASS5/Milgard Operable Standard NGLASS5/Milgard Operable Standard NGLASS6/Fr.Dr. Therma-Tr Standard NGLASS7/Milgard Operable Standard NGLASS8/Milgard Operable Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASSS/Fr.Dr. Therma-Tr Standard EGLASS6/Fr.Dr. Therma-Tr Standard EGLASS7/Milgard Operable Standard EGLASS8/Milgard Operable Standard EGLASS9/Milgard Operable Standard EGLASS10/Milgard Operabl Standard EGLASSII/Milgard Operabl ---Window--- ------------Overhang------------ Area U- Act Area Orientation (sf) factor SHGC Azm Tilt ------------------ 9 Wind Back (S) ----- 11.0 ----- 0.340 ----- 0.300 --- 180 ---- 90 10 Door Back (S) 40.0 0.310 0.220 180 90 11 Wind Back (S) 11.0 0.340 0.300 180 90 13 Wind Right (W) 16.5 0.340 0.300 270 90 14 Wind Right (W) 16.5 0.340 0.300 270 90 15 Wind Right (W) 16.5 0.340 0.300 270 90 16 Wind Right (W) 16.5 0.340 0.300 270 90 21 Wind Front (N) 11.0 0.340 0.300 0 90 22 Door Front (N) 40.0 0.310 0.220 0 90 23 Wind Front (N) 11.0 0.340 0.300 0 90 24 Wind Front (N) 9.0 0.340 0.300 0 90 28 Door Left (E) 40.0 0.310 0.220 90 90 29 Door Left (E) 40.0 0.310 0.220 90 90 30 Door Left (E) 40.0 0.310 0.220 90 90 31 Wind Left (E) 10.0 0.340 0.300 90 90 32 Wind Left (E) 15.0 0.340 0.300 90 90 33 Wind Left (E) 10.0 0.340 0.300 90 90 34 Wind Left (E) 16.5 0.340 0.300 90 90 35 Wind Left (E) 16.5.0.340 0.300 90 90 OVERHANGS Exterior Shade Type Location/Comments -------- ------------------------ Standard SGLASS9/Milgard Operable Standard SGLASS10/Fr.Dr. Therma-T Standard SGLASSII/Milgard Operabl Standard WGLASS2/Milgard Operable Standard WGLASS3/Milgard Operable Standard WGLASS4/Milgard Operable Standard WGLASS5/Milgard Operable Standard NGLASS5/Milgard Operable Standard NGLASS6/Fr.Dr. Therma-Tr Standard NGLASS7/Milgard Operable Standard NGLASS8/Milgard Operable Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASSS/Fr.Dr. Therma-Tr Standard EGLASS6/Fr.Dr. Therma-Tr Standard EGLASS7/Milgard Operable Standard EGLASS8/Milgard Operable Standard EGLASS9/Milgard Operable Standard EGLASS10/Milgard Operabl Standard EGLASSII/Milgard Operabl SLAB SURFACES ------------- Area Slab Type (sf) --------------- SLEEPING Standard Slab 1325 LIVING Standard Slab 2181 ---Window--- ------------Overhang------------ Area Left Right Surface (sf) Width Height Depth Height Extension Extension ----------- LIVING ----- ----- ------ ----- ------ --------- --------- 28 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 29 Door 40.0' 5.00 8.00 8.00 1.00 n/a n/a 30 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a SLAB SURFACES ------------- Area Slab Type (sf) --------------- SLEEPING Standard Slab 1325 LIVING Standard Slab 2181 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R - Page 5 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387, User -Westpac Air,Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- HVAC SYSTEMS ------------ Verified HVAC SIZING Number Verified Verified Verified Verified Maximum System of Minimum System Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 1,1 Yes No No No LIVING n/a n/a ACSplit n/a 27495 34122 n/a Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING Orientation of`Maximum ..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F Winter Inside Design........ 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range ............... 34 F DUCT SYSTEMS Verified Total Sensible Design Maximum System Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type ------------- (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING ---------- ---------- ---------- ---------- Furnace 26635 n/a n/a n/a ACSplit n/a 19420 24100 n/a LIVING Attic R-4'.2 Yes No No Furnace 40005 n/a n/a n/a ACSplit n/a 27495 34122 n/a ------------- Total ---------- 66640 ----------- 46915 ----- ----- 58222 ---------- n/a Orientation of`Maximum ..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F Winter Inside Design........ 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range ............... 34 F DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4'.2 Yes No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- DUCT SYSTEMS WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------=------------ -------------- ------ ---------- 1 Storage Gas Standard 1 10.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage . Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts ------------- ACSplit ------------------------- Attic R-4.2 Yes -------- No --------- No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------=------------ -------------- ------ ---------- 1 Storage Gas Standard 1 10.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage . Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. a CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ---------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- HERS REQUIRED VERIFICATION This building incorporates HERS verified EER. This building incorporates HERS verified Duct•Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above .the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are,not installed, then HERS verification is not necessary. REMARKS F ~ ~ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with.Title-24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design' responsibility. DESIGNER or OWNER DOCUMENTATION.AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 9-9501 License. Signed.. Signed.. Name.... Title... Agency.. Phone... Signed.. (date) (date) ENFORCEMENT AGENCY MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 Project Address.... ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. --------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling Liao 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors / or equivalent U-factory 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(g): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality] standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 Project Title.......... Palo Verde/Plan 1/MUdRm Date..07/31/07 09:18:12 - ------------------------------------ MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints / and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A -.,/ 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space j 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of,UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title ........... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ------------------------------------------ MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program-FORM MF-1R User#-MP2387 User-Westpac Air Conditioning, Run-Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch,'the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause / reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or-automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers / 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant / and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non-electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12 ---------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- and have an output frequency no less than 20 kHz 150(k)1: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires; provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires / 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply j with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) STANDARD PACIFIC HOMES PALO VERDE AT LA QUINTA t PLAN -1/OPT. SUITE Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501'1 (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:3.1 Project Address.... ******* ---------------=----- La Quinta, California *v7.10* I I Documentation Author... Chinh Nguyen . ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. I Plan Check / Date Corona, CA 92880 (951) 739-9501 I Field Check/ Date Climate Zone........... 15 --------------------- - Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- = MICROPAS7 ENERGY USE SUMMARY = ---------------- = Energy Use ------------- Standard _ Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = = Space Heating.......... 2.23 1.95 0.28 = = Space Cooling .......... 70.35 56.31 14.04 _ Water Heating.......... 7.34 8.36 -1.02 - = North Total 79.92 66.62 13.30 = = Space Heating.......... 2.23 1.94 0.29 = = Space Cooling.......... 70.35 57.09 13.26 _ - Water Heating........... 7.34 8.36 -1.02 = East Total 79.92 67.39 12.53 = = Space Heating.......... 2.23 2,.21 0.02 - - Space,Cooling.......... 70.35 56.45 13.90 = - Water Heating........... 7.34 8.36 -1.02 = = South Total 79.92 67.02 12.90 = = Space Heating.......... 2.23 2.26 -0.03 - = Space Cooling.......... 70.35 56.02 14.33 = = Water Heating.......... 7.34 8.36 -1.02 = = West Total 79.92 66.64 13.28 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance,*** _ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 --------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3499 sf Building Type .............. Single Family Detached Construction Type .......... New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Slab On Grade Number of Building Zones... 2 Conditioned Volume......... 35282 cf Slab -On -Grade Area......... 3499 sf Glazing Percentage......... 17.8 % of floor area Average Glazing U -factor... 0.33 Btu/hr-sf-F Average Glazing SHGC....... 0.27 Average Ceiling Height..... 10.1 ft BUILDING ZONE INFORMATION ------------------------- Floor # of. # of Cond- Thermo- Vent Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type (sf) (cf) Units le ioned Type (ft) (sf) Housewrap SLEEPING Residence 1444 14560 0.40 2.0 Yes Setback 2.0 Standard No LIVING Residence 2055 20722 0.60 3.0 Yes Setback 2.0 Standard No OPAQUE SURFACES --------------- U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 546 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 3 Wall Wood 116 0.074 19 0 270 90 Yes IV.9 A5 WEST 5 Wall Wood 466 0.074 19 0 0 .90 Yes IV A A5 NORTH 7 Wall Wood 169 0.074 19 0 90 90 Yes IV.9 A5 EAST 9 Wall Wood 281 0.074 19 0 0 90 No IV.9 A5 GARAGE WALL 11 RoofRad Wood 1444 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 14 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door LIVING 2 Wall Wood 120 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 4 Wall Wood 416 0.074 19 0 270 90 Yes IV.9 A5 WEST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 ---------------------------------------------- MICROPAS7 0.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES U- Appendix Sheath- Length Solar Appendix Solar IV Location/ Frame Area fact- Cavity ing Act Comments Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt No Reference Comments ------------ 6 Wall ----- Wood ---- 373 ----- 0.074 ----- 19 ----- 0 --- 0 ---- 90 --- Yes --------- IV.9 A5 -------------- NORTH 8 Wall Wood 457 0.074 19 0 90 90 Yes IV.9 A5 EAST 10 Wall Wood 182 0.074 19 0 0 90 No IV.9 A5 GARAGE WALL 12 RoofRad Wood 2055 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 13 Door Other 24 0.500 0 0 270 90 Yes IV.S A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface ------------ (ft) Factor. R-val Gains Reference Comments SLEEPING ------ -------- ------- ----- --------- ---------------------- 15 S1abEdge 152 0.900 R-0 No None To Outside 17 S1abEdge 30 0.550 R-0 No None TO GARAGE LIVING Wind Back (S) 16.5 0.340 0.300 16 S1abEdge 176 0.900 R-0 No None To Outside 18 S1abEdge 18 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES 0 Exterior Area U- Act Shade Orientation ------------------ (sf) ----- factor SHGC Azm Tilt Type Location/Comments SLEEPING ----- ----- --- ---- -------- ------------------------ 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASSS/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS7/Milgard Operable 8 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS8/Milgard Operable 9 Wind Back (S) 4.0 0.340 0.330 180' 90 Standard SGLASS9/Milgard Fixed Wi 13 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 18 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 21 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 26 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 27 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 28 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable LIVING. 0 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 ---------------------------------=--------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite --------------------------------- --------------------------------------------- FENESTRATION SURFACES OVERHANGS ---Window---------------Overhang------------ * Left Right Surface ----------- Exterior Width Height Depth Height Extension Area U- ----- Act ------ Shade ------ Orientation ------------------ --------- (sf) ----------- factor SHGC Azm Tilt Type Location/Comments 10 Wind -Back (S) 11.0 0.340 ----- 0.300 --- 180 ---- 90 -------- Standard ------------------------ SGLASS10/Milgard Operabl 11 Door Back (S) 40.0 0.310 0.220 180 90 .Standard SGLASSII/Fr.Dr. Therma-T 12 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASSI2/Milgard Operabl 14 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS2/Milgard Operable 15 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 16 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS4/Milgard Operable 17 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS5/Milgard Operable 22 Wind Front (N) 11.0 0.340 0.300 0 90 _ Standard NGLASS5/Milgard Operable 23 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 24 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASS7/Milgard Operable 25 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 29 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 30 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS5/Fr.Dr. Therma-Tr 31 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS6/Fr.Dr. Therma-Tr 32 Wind Left (E) 10.0 0.340 0.300 90 90 Standard EGLASS7/Milgard Operable 33 Wind Left (E) 15.0 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable 34 Wind Left (E) 10.0 0.340 0.300 90 90 Standard EGLASS9/Milgard Operable 35 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS10/Milgard Operabl 36 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASSII/Milgard Operabl OVERHANGS ---Window---------------Overhang------------ SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1444 LIVING Standard Slab 2055 Area Left Right Surface ----------- (sf) Width Height Depth Height Extension Extension LIVING ----- ----- ------ ----- ------ --------- --------- 29 Door 40.0 5.00 8:00 8.00 -1.00 n/a n/a 30 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 31 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a, SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1444 LIVING Standard Slab 2055 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 --------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite -------------------------------------------------------------------------------- HVAC SYSTEMS ------------ Verified HVAC SIZING Number Verified Verified Verified Verified Maximum System of Minimum Surface Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity SLEEPING (Btu/hr) SLEEPING R-4.2 ---------- ---------- ---------- Furnace Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING n/a n/a ACSplit . n/a 25326' 31429 n/a Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING Orientation of Maximum..... Sizing Location............. Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range ............... Front Facing 270 deg (W) LA QUINTA 26'F 70 F 111 F 75 F 34 F DUCT SYSTEMS Verified Verified Verified Total Sensible Design Maximum Surface Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type ------------- (Btu/hr) ---------- (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING R-4.2 ---------- ---------- ---------- Furnace 29604 n/a n/a n/a ACSplit n/a 21712 26944 n/a LIVING Furnace Attic R-4".2 Furnace 36834 n/a n/a n/a ACSplit . n/a 25326' 31429 n/a Total 66438 47037 58373 n/a Orientation of Maximum..... Sizing Location............. Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range ............... Front Facing 270 deg (W) LA QUINTA 26'F 70 F 111 F 75 F 34 F DUCT SYSTEMS r Verified Verified Verified System Duct Duct Duct Surface Buried Type ------------- Location R -value Leakage Area Ducts SLEEPING ----------- ------- ------- -------- -- ------ Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4".2 Yes No No r CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS --------------------=-------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate..*** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts ------------- ACSplit ------------------------- Attic R-4.2 Yes -------- No --------- No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS --------------------=-------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate..*** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title......:... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 ------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- HERS REQUIRED VERIFICATION -------------------------- This building incorporates -HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite 'Date..07/31/07 09:18:31 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditionind, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- COMPLIANCE STATEMENT -------------- This certificate of'compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla. Name.... Chinh Nguyen Company. Standard Pacific Homes Company: Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 7 -9501 License. Signed.. Signed.. (date) (bate) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 Project Address.. ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* Westpac Air Conditioning, Inc. 1610 N. Maple St. Corona, CA 92880 (951) 739-9501 Building Permit # Plan Check / Date Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the6Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling �v 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) /7-4f *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(g): Vapor barriers mandatory in Climate Zones 14,16 only �L 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form —Z 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage — 2. Fenestration products (except field -fabricated) have —Z- MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification / 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation / having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150 or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water / pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage, including that clue to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic / and either mesh or tape shall be used ✓ 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and •support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts ✓ 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers / 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no / electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating / b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances / with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan*l/Suite Date..07/31/07 09:18:31 ---------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ---------------------------------------------------------7--------------------- and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires `. 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option _ L 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) STANDARD PAC IFIC HOMES PALO VERDE AT LA QUINTA Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509, CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 --------------------------------=---------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 Project Address.. ******* --------------------- La Quinta, California *v7.10* I I Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. I 1610 N. Maple St. I Plan Check / Date Corona, CA 92880 (951) 739-9501 I Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air. Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- ---------------------------- ---------------------------- MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = (kTDV/sf-yr) Design Design Margin = Space Heating.......... 2.32 2.31 0.01 = = Space Cooling.......... 70.96 55.84 15.12 = = Water Heating.......... 7.23 8.23 -1.00 = = North Total 80.51 66.38 14.13 = _ Space Heating.......... 2.32 2.07 0.25 = = Space Cooling.......... 70.96 57.25 13.71 - = Water Heating........... 7.23 8.23 -1.00 = = East Total 80.51 67.55 12.96 = = Space Heating.......... 2.32 2.20 0.12 - = Space Cooling.......... 70.96 57.40 13.56 = = Water Heating.......... 7.23 8.23 -1.00 = = South Total 80.51 67.83 12.68 = = Space Heating.......... 2.32 2.45 -0.13 = = Space Cooling.......... 70.96 56.96 = Water Heating.......... 7.23 8.23 -1.00 = = West Total 80.51 67.64 12.87 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance *** _ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......:.. Required Conditioned Floor Area..... 3555 sf Building Type .............. Single Family Detached Construction Type New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area.......:. Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 35850 cf 3555 sf 17.6 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor '# of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned Type (ft) (sf) Housewrap SLEEPING R-val R-val Azm Tilt ----- -------- ----- ------- ---------- Residence 1596 16094 0.45 2.7 Yes Setback 2.0 Standard No LIVING 1 Wall Wood 468 0.074 19 0 180 Residence 1959 19756 0.55 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES r U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 468 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 3 Wall Wood 206 0.074 19 0 270 90 Yes IV.9 A5 WEST 5 Wall Wood 733 0.074 19 0 0 90 Yes IV.9 A5 NORTH 7 Wall Wood 140 0.074 19 0 90 90 Yes IV.9 A5 EAST 10 Roof Rad Wood 1596 0.025 38 0 n/a 0 Yes IV.1'A18 Attic LIVING 2 Wall Wood 407 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 4 Wall Wood 416 0.074 19 0 270 90 Yes IV.9 A5 WEST 6 Wall Wood 239 0.074 19 0 0 90 Yes IV.9 A5 NORTH 8 Wall Wood 476 0.074 19 0 90 90 Yes IV.9 A5 EAST r CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES U- Appendix Sheath- Length Solar Appendix Solar IV Location/ Frame Area fact- Cavity ing Act Comments Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt No Reference Comments ------------ 9 Wall ----- Wood ---- 291 ----- 0.074 ----- 19 ----- 0 --- 0 ---- 90 --- No --------- IV A A5 -------------- GARAGE WALL 11 Roof Rad Wood 1941 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 12 Door Other 28 0.500 0 0 270 90 Yes IV.5 A4 Wood Door 13 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface ------------ (ft) Factor R-val Gains Reference Comments SLEEPING ------ -------- ------- ----- --------- ---------------------- 14 S1abEdge 182 0.900 R-0 No None To Outside LIVING ----- --- ---- -------- ------------------------ 15 S1abEdge 191 .0.900 R-0 No None To Outside 16 S1abEdge 31 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation ------------------ (sf) ----- factor SHGC ----- Azm Tilt Type Location/Comments SLEEPING ----- --- ---- -------- ------------------------ 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 15.0 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 15.0 0.340 0.300 180 '90 Standard SGLASS3/Milgard Operable 4 Door Back (S) 40.0 0.310 0.22.0 180. 90 Standard SGLASS4/Fr.Dr. Therma-Tr 5 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASSS/Milgard Operable 6 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 10 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 16 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 17 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 18 Wind Front (N) 9.0 0..340 0.300 0 90 Standard NGLASS3/Milgard Operable 19 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 20 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASSS/Milgard Operable 21 Wind Front (N) 16.5 0.340 0.300 0 -90 Standard NGLASS6/Milgard Operable 22 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASS7/Milgard Operable 23 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 24 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS9/Milgard Operable 29 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 30 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 31 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable LIVING CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- FENESTRATION SURFACES OVERHANGS ---Window--- ------------Overhang------------ ' Exterior Left Area U- (sf) Act Height Shade Height Orientation ------------------ Extension (sf) ----- factor SHGC ----- Azm Tilt Type Location/Comments 7 Wind Back (S) 9.0 0.340 ----- 0.300 --- 180 ---- 90 -------- Standard ------------------------ SGLASS9/Milgard Operable 8 Door Back (S) 9.0 0.310 0.220 180 90 Standard SGLASSI0/Fr.Dr. Therma-T 9 Wind Back (S) 9.0 0.340 0.300 180 90 Standard SGLASSII/Milgard Operabl 11 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS2/Fr.Dr. Therma-Tr 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 13 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS4/Milgard Operable 14 Wind Right (W) 2.5 0.340 0.330 270 90 Standard WGLASS5/Milgard Fixed Wi 15 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable 25 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASSI0/Milgard Operabl .26 Wind Front (N) 16.5 0.340 0.300' 0 90 Standard NGLASSII/Milgard Operabl 127 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASSI2/Milgard Operabl 28 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASSI3/Milgard Operabl 32 Door Left (E) 24.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 33 Wind Left (E) 27.5 0.340 0.330 90 90 Standard EGLASS5/Milgard Fixed Wi 34 Door Left (E) 24.0 0.310 0.220 90 90 Standard EGLASS6./Fr.Dr. Therma-Tr 35 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr 36 Wind Left (E) 15.0 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable 37 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS9/Fr.Dr. Therma-Tr OVERHANGS ---Window--- ------------Overhang------------ Area Left Right Surface ----------- (sf) Width Height Depth Height Extension Extension SLEEPING ----- ----- ------ ----- ------ --------- --------- 1 Window 16.5 - 3.00 5.50 6.00 1.00 n/a n/a 5 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 6 Window 6.0 2.00 3.00 6.00 1.00 n/a_ n/a LIVING 11 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 12 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 13 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 25 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 27 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 28 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 32 Door 24.0 3.00 8.00 6.00 1.00 n/a n/a 33 Window 27.5 5.00 5.50 6.00 1.00 n/a n/a 34 Door 24.0 3.00 8.00 6.00 1.00 n/a n/a CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 ----------------------------------------------- MICROPAS7 x7.10 File-LAQ53_2. Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- Orientation of Maximum..... Sizing Location............ Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range.., ............. Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1596 LIVING Standard Slab 1959 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type ------------ Systems Efficiency EER or TXV Airflow Draw Capacity SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 14 13.00 SEER 11 Yes No No No LIVING Furnace 1 0.800 AFUE n/a' n/a n/a n/a n/a ACSplit 1 .13.00 SEER X11 Yes No No No HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling -System Load Load Capacity Capacity Type ------------- -(Btu/hr) ---------- (Btu/hr) (Btu/hr) ---------- (Btu/hr) SLEEPING ---------- - ---------- Furnace 31396 n/a n/a n/a ACSplit n/a 22633 28087 n/a LIVING Furnace 38281 n/a n/a n/a ACSplit ------------- n/a 24667 30612 n/a Total ---------- 69677 -------------------- 47300 58699 ---------- n/a Orientation of Maximum..... Sizing Location............ Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range.., ............. Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F 0 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 -----------------------------------------------------------------=------------- SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant,Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a . cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER This building incorporates HERS verified Duct Leakage. b This is a multiple orientation building—This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. a HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS --------------------- Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value - ------------------------ 1 Storage Gas ------------------- Standard ------ 1 -------- 0.51 ------ ---------- 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant,Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a . cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER This building incorporates HERS verified Duct Leakage. b This is a multiple orientation building—This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. a HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 HERS REQUIRED VERIFICATION -------------------------- *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 8 ---------------------------------------------------_---------------------------- ------------------------------------------------------------------------------- Project Title...:...... Palo Verde/ Plan 2 Date..07/31/07 09:11:55 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program-FORM CF-1R User#-MP2387 User-Westpac Air Conditioning, Run-Palo Verde/Plan 2 ------------------------------------------------ -------------------------- ----- COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to- comply with Title-24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 9- 501 License. Signed.. Signed.. D (date) date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) 0 MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ---------------------------------------=--------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 Project Address.. ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* Building Permit # Westpac Air Conditioning; Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date's Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) n *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire ✓ opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch / 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned,and unconditioned / spaces designed to limit air leakage J 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 --------------------------------------------------------- 7 ---------- .------------- label with certified U -factor, certified Solar Heat Gain / Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or cooling systems / 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation / having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150- /B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and, entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi,. meet requirements of Table 123-A / 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind ` J 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed „ sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of - R -4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R ------------------------------------------------------------------------------- Page 3 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 ------------------------------------------------------------------------------- 09:11:55 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan ------------------------------------------------------------------------------- 2 UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal ' openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause/ reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers / 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(i): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R ------------------------------------------------------------------------------- Page 4 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast , 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controllingthe high / efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets. less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(.k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the'same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply j with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 1461 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) STANDARD PACIFIC HOMES PALO VERDE AT LA QUINTA PLAN -2/OPT. OUTDOOR Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE:.RESIDENTIAL COMPUTER METHOD CF -1R Page 1 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 Project Address.... ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ' ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 ------------------------------------------------------------------------------- User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr = MICROPAS7 ENERGY USE SUMMARY = = Energy Use ---------------------------- Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = = Space Heating.......... 2.34 2.30 0.04. - = Space Cooling.......... 71.27 56.66 14.61 - = Water Heating.......... 7.26 8.27 -1.0.1 = = North Total 80.87 67.23 13.64 = = Space Heating.......... 2.34 2.08 0.26 - = Space Cooling.......... 71.27 57.67 13.60 = = Water _ Heating.......... 7.26 8.27 -1.01 = = -------- i East Total 80.87 -------- 68.02 -------- - 12.85 = = Space Heating.......... 2.34 2.17 0.17 = - Space Cooling.......... . 71.27 58.04 13.23 = = Water Heating.......... 7.26 8.27 -1.01 = = South Total 80.87 68.48 12.39 = = Space Heating.......... 2.34 2.38, -0.04 - = Space Cooling.......... 71.27 57.66 13.61 = = Water Heating.......... 7.26 8.27 -1.01 = = West Total 80.87 68.31 12.56 = _ *** Building complies with'Computer Performance _ *** HERS Verification Required for Compliance *** _ a CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_20 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification..:....... Required Conditioned Floor Area..... 3537 sf Building Type .............. Single Family Detached Construction Type New Fuel Type NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type........... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 35668 cf 3537 sf 17.7 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned ----- Type -------- (ft) (sf) Housewrap SLEEPING R-val R-val Azm Tilt Reference ----- ------- ---------- Residence 1596 16094 0.45 2.7 Yes Setback 2.0' Standard No LIVING -------------- 1 Wall Wood 468 0.074 19 0 Residence 1941 19574 0.55 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 468 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 3 Wall Wood 206 0.074 19 0 270 90 Yes IV.9 A5 WEST 5 Wall Wood 733 0.074 19 0 0 90 Yes IV.9 A5 NORTH 7 Wall Wood 140 0.074 19 0 90 90 Yes IV A A5 EAST 10 Roof Rad Wood 1596 0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 2 Wall Wood 407 0.074 19 0 180 90 Yes IV A A5 SOUTH 4 Wall Wood 505 0.074 19 0 270 90 Yes IV A A5 WEST 6 Wall Wood 239 0.074 19 0. 0 90 Yes IV A A5 NORTH 8 Wall Wood 476 0.074 19 0 90 90 Yes IV.9 A5 EAST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ---------------------------------------=--------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES U- Sheath- Solar Appendix Insul Solar IV Frame Area fact- Cavity ing Act Reference Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt R-0 Reference Comments ------------ 9 Wall ----- Wood ---- 202 ----- 0.074 ----- 19 ----- 0 --- 0 ---- 90 --- No --------- IV.9 A5 -------------- GARAGE WALL 11 RoofRad Wood 1941 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 12 Door Other 28 0.500 0 0 270 90 Yes IV.S A4 Wood Door 13 Door Other 22 0.500 0 0 270 90 Yes IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ SLEEPING ------ -------- ------- ----- --------- ---------------------- 14 S1abEdge 182 0.900 R-0 No None To Outside LIVING ----- --- , ---- -------- ------------------------ 15 S1abEdge 202 0.900 R-0 No None To Outside 16 S1abEdge 20 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation ------------------ (sf) ----- factor ----- SHGC Azm Tilt Type' Location/Comments SLEEPING ----- --- , ---- -------- ------------------------ 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 15.0 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 15.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Door Back (S) 40.0 0.310 0.220 180 90 Standard SGLASS4/Fr.Dr. Therma-Tr 5 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 10 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 16 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 17 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 18 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 19 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 20 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS5/Milgard Operable 21 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS6/Milgard Operable 22 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASS7/Milgard Operable 23 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 24 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS9/Milgard Operable 29 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 30 Door Left (E) 40.0 0.310 0.220 90 90 Standard SGLASS2/Fr.Dr. Therma-Tr 31 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable LIVING CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_20 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr -------------------------------=----------------------------------------------- FENESTRATION SURFACES --------------------- Exterior Shade Type Location/Comments Standard SGLASS9/Milgard Operable Standard SGLASS10/Fr.Dr. Therma-T Standard SGLASSII/Milgard Operabl Standard WGLASS2/Fr.Dr. Therma-Tr Standard WGLASS3/Milgard Operable Standard WGLASS4/Milgard Operable Standard WGLASS5/Milgard Fixed Wi Standard WGLASS6/Milgard Operable Standard NGLASS10/Milgard Operabl Standard NGLASSII/Milgard Operabl Standard NGLASSI2/Milgard Operabl Standard NGLASSI3/Milgard Operabl Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASS5/Milgard Operable Standard EGLASS6/Fr.Dr. Therma-Tr Standard EGLASS7/Fr.Dr. Therma-Tr Standard EGLASS8/Milgard Operable Standard EGLASS9/Fr.Dr. Therma-Tr Area U- Act Orientation (sf) factor SHGC Azm Tilt 7 Wind Back (S) 9.0 0.340 0.300 180 90 8 Door Back (S) 9.0 0.310 0.220 180 90 9 Wind Back (S) 9.0 0.340 0.300 180 90 11 Door Right (W) 40.0 0.310 0.220 270 90 12 Wind Right (W) 16.5 0.340 0.300 270 90 13 Wind Right (W) 16.5 0.340 0.300 270 90 14 Wind Right (W) 2.5 0.340 0.330 270 90 15 Wind Right (W) 16.5 0.340 0.300 270 90 25 Wind Front (N) 16.5 0.340 0.300 0 90 26 Wind Front (N) 16.5 0.340 0.300 0 90 27 Wind Front (N) 6.0 0.340 0.300 0 90 28 Wind Front (N) 6.0 0.340 0.300 0 90 32 Door Left (E) 24.0 0.310 0.220 90 90 33 Wind Left (E) 27.5 0.340 0.300 90 90 34 Door Left (E) 24.0 0.310 0.220 90 90 35 Door Left (E) 40.0 0.310 0.220 90 90 36 Wind Left (E) 15.0 0.340 0.300 90. 90 37 Door Left (E) 40.0 0.310 0.220 90 90 Exterior Shade Type Location/Comments Standard SGLASS9/Milgard Operable Standard SGLASS10/Fr.Dr. Therma-T Standard SGLASSII/Milgard Operabl Standard WGLASS2/Fr.Dr. Therma-Tr Standard WGLASS3/Milgard Operable Standard WGLASS4/Milgard Operable Standard WGLASS5/Milgard Fixed Wi Standard WGLASS6/Milgard Operable Standard NGLASS10/Milgard Operabl Standard NGLASSII/Milgard Operabl Standard NGLASSI2/Milgard Operabl Standard NGLASSI3/Milgard Operabl Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASS5/Milgard Operable Standard EGLASS6/Fr.Dr. Therma-Tr Standard EGLASS7/Fr.Dr. Therma-Tr Standard EGLASS8/Milgard Operable Standard EGLASS9/Fr.Dr. Therma-Tr OVERHANGS ---Window--- ------------Overhang-----------,- Area Left Right Surface ----------- (sf) Width Height Depth Height Extension Extension SLEEPING ----- ----- ------ ----- ------ --------- --------- 1 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 5 Window 6.0 2.00 3.00 6.00 1.00 n/a. n/a' 6 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a LIVING 11 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 12 Window 16.5 3.00 .5.50 6.00 1.00 n/a n/a 13 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 25 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 27 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 28 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 32 Door 24.0 3.00 8.00 6.00 1.00 n/a n/a 33 Window 27.5 5.00 5.50 6.00 1.00 n/a n/a 34 Door 24.0 3.00 8.00 6.00 1.00 n/a n/a CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 Project Title........... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------ MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr SLAB SURFACES r ------------- Area Slab Type (sf) SLEEPING Standard Slab, 1596 LIVING Standard Slab 1941 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig-Charge Adequate Fan Watt Cooling Type ------------ Systems Efficiency EER or TXV Airflow Draw Capacity SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace . 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1' 13.00 SEER 11 Yes No No No HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling, Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) ' SLEEPING Furnace 31396 �- n/a n/a n/a ACSplit n/a 22633 28087 n/a LIVING Furnace 38401 n/a- n/a n/a ACSplit n/a, 23867 29619 n/a Total 69798 46500 57707 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA ' Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F ' Summer Inside Design....... 75 F Summer Range: .............. 34 F CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OUtDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air ------------------------------------------------------------------------------- Conditioning, Run -Palo Verde/Plan 2/OutDr DUCT SYSTEMS ------------ Verified Verified Verified System Duct•. Duct Duct Surface Buried Type Location R -value Leakage Area Ducts SLEEPING Furnace Attic R-4.2 Yes- No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS -------------------7--------------------- *** Items in this section should be documented'on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front_. facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** 4 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ---------------------------------------------------------------------=--------- HERS REQUIRED VERIFICATION -------------------------- *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 ----------------------------------------=-------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- COMPLIANCE STATEMENT --------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts l and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed'by .the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951)/719-9501 License. Signed.. Signed.. (date) (date ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) a MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 Project Address.... ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- Note: Lowrise -residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling �J 150(b): Loose fill insulation manufacturer's labeled R=Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply nn �� to exterior mass walls) r *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual IX 150(g): Vapor barriers mandatory in Climate Zones 14,16 only T 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch / 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have I MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints / and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance / with ASHRAE, SMACNA or ACCA 150(i): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely / in conditioned space c/ 7. Solar water -heating systems/collectors are certified by the/ Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ---------- -------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------= ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used•to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause , reductions in the cross-sectional area of the ducts —+/- 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually / operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating•that is water retardant and provides shielding from solar radiation that can cause / 'degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor,pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts,or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R ------------------------------------------------------------------------------- Page 4 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- and have an output frequency no less than 20 kHz / 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires _ 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option_ 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to j comply with Section 119(d) ✓ STANDARD PACIFIC HOMES PALO VERDE AT LA QUINTA Chinh Nguyen, Certified Energy Analyst ♦ (951),739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 Project Address.. ******* --------------------- La Quinta, California *v7.10* I - I Documentation Author... Chinh Nguyen ******* I Building•Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. I Plan Check / Date Corona, CA 92880 (951) 739-9501 I Field Check/ Date Climate Zone........... 15 ----------=---------- Compliance Method...... MICROPAS7 v7.10 for 2005 ------------------------------------------------------------------------------- Standards by Enercomp, Inc. ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 ------------------------------------------------------------------------------- User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ----------------------------------------------------------------- ----------------------------------------------------------------- = MICROPAS7 ENERGY USE.SUMMARY = = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) ------------------------ Design Design Margin = - = Space -------------------- Heating........... 1.78 1.87 ---------- -0.09 = = Space Cooling....,...... 62.56 50.71 11.85 = = Water Heating.......... 6.66 7.58 -0.92 = = North Total 71.00 60.16 - 10.84 = = Space Heating.......... 1.78 1.52 0.26 - = Space Cooling.......... 62.56 50.37 12.19 = = Water Heating............ 6.66 7.58 -0.92 = _ East Total 71.00 59.47 11.53 = = Space Heating........... 1.78 1.57 0.21 = = Space Cooling........... 62.56 52.31 10.25 = = Water Heating.......... 6.66 7.58 -0.92 = = South Total 71.00 61.46 9.54 = = Space Heating.......... 1.78 1.81 -0.03 = = Space Cooling.......... 62.56 49.95 12.61 _ = Water Heating.......... 6.66 7.58 -0.92 - = West Total 71.00 59.34 11.66 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance *** _ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3858 sf Building Type.............. Single Family Detached Construction Type ......... New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Slab On Grade Number of Building Zones... 2 Conditioned Volume......... 38902 cf Slab -On -Grade Area......... 3858 sf Glazing Percentage......... 15.2 % of floor area Average Glazing U -factor... 0.33 Btu/hr-sf-F Average Glazing SHGC....... 0.26 Average Ceiling Height..... 10.1 ft BUILDING ZONE INFORMATION ------------------------- Floor # of # of Cond- Thermo- Vent Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type --------------- (sf) (cf) Units le ioned ----- ------ ----- ----- ----- Type (ft) (sf) Housewrap -------- SLEEPING ----- ------- ---------- Residence 1345 13562 0.35 1.8 Yes Setback 2.0 Standard No LIVING Residence 2513 25340 0.65 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES --------------- U- Sheath- Solar Appendix Frame Area fact- Cavity.ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- ------------ -------------- 1 Wall Wood 452 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 2 Wall Wood 165 0.074 19 0 270 90 Yes IV.9 A5 WEST 4 Wall Wood 288 0.074 19 0 0 90 Yes IV.9 A5 NORTH 6 Wall Wood 213 0.074 19 0 90 90 Yes IV.9 A5, EAST 8 Wall Wood 122 0.074 19 0 0 90 No IV A A5 GARAGE WALL 10 Roof Rad Wood 1342 0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 3 Wall Wood 318 0.074 19 0 270 90 Yes IV A A5 WEST 5 Wall Wood 393 0.074 19 0 0 90 Yes IV A A5 NORTH 7 Wall Wood 446 0.074 19 0 90 90 Yes IV.9 A5 EAST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 x7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 �. ------------------------------------------------------------------------------- OPAQUE SURFACES --------------- U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-vAl R-val Azm Tilt Reference Comments ------------ ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 9 Wall Wood 383 0.074 19 0 0 90 No IV A A5 GARAGE WALL 11 RoofRad Wood 2513 0.025 38 0 n/a 0 Yes IV A A18 Attic 12 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door 13 Door Other 22 0.500 0 0 -0 90 No IV.5 A4 Wood Door PERIMETER LOSSES ---------------- Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ --------------------- -------------- ---------------------- SLEEPING 14 SlabEdge 136 0.900 R-0 No None To Outside 16 SlabEdge 12 0.550 R-0 No None TO GARAGE LIVING 15 SlabEdge 150 0.900 R-0 No None To Outside 17 SlabEdge 40 0,.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior , Area U- Act Shade Orientation ------------------ (sf) ----- factor SHGC Azm Tilt Type Location/Comments SLEEPING ----- ----- --- ---- -------- ------------------------ 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Right (W) 3.8 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 8 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS2/Milgard Operable 9 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 13 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 14 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 15 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 16 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 21 Wind Left (E) 40.00.340 0.30b 90 90 Standard EGLASSI/Milgard Operable 22 Wind Left (E) 9.0 0.340-0.300 90 90 Standard EGLASS2/Milgard Operable 23 Wind Left (E) 11.0 0.340 0.300 90 90 Standard SGLASS3/Milgard Operable 24 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 25 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASS5/Milgard Operable LIVING ' CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title......'.... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 -------------- FENESTRATION SURFACES Exterior Area U- Act. Shade Orientation (sf) factor SHGC Azm Tilt- Type Location/Comments ------------------ ----- ----- ----- --- ------------ ------------------------ 10 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS4/Fr.Dr. Therma-Tr 11 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS5/Fr.Dr. Therma-Tr 12 Wind Right (W) 22.0 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable 17 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS5/Fr.Dr. Therma-Tr 18 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 19 Door Front (N) 40.0 0.310 0.220 0 90 'Standard NGLASS7/Fr.Dr. Therma-Tr 20 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 26 Wind Left (E) 25.0 0.340 0.330 90 90 Standard EGLASS6/Milgard Fixed Wi 27 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr 28 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable 29 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS9/Milgard Operable SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1345 LIVING Standard Slab 2513 HVAC SYSTEMS Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate.Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ ------- ----------- -------------------------- - ------ -------- SLEEPING Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2381 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------'------------------------------------------------- Orientation of Maximum.... Sizing Location........... Winter Outside Design..... Winter Inside Design..:.. Summer Outside Design..... Summer Inside Design...... Summer Range .............. Front Facing 270 deg (W) LA QUINTA 26 F . 70 F 111 F 75 F 34 F HVAC SIZING ------------ Verified Verified Verified Total Sensible Design Maximum Surface Heating Cooling Cooling, Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING R-4.2 Yes No No Furnace 25902 n/a n/a n/a ACSplit n/a 18302 22712 n/a LIVING Furnace Attic R-4.2 Furnace 38783 n/a n/a n/a ACSplit n/a 35378 43904 n/a ------------- Total ---------- 64686 ---------- 53680 ---------- 66616 ---------- n/a Orientation of Maximum.... Sizing Location........... Winter Outside Design..... Winter Inside Design..:.. Summer Outside Design..... Summer Inside Design...... Summer Range .............. Front Facing 270 deg (W) LA QUINTA 26 F . 70 F 111 F 75 F 34 F DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS --------------------- Number Tank External Heater in Energy Size Insulation Tank Type Type ---------------- Distribution Type System Factor (gal) R -value -=------ 1 Storage Gas ------------------- Standard ------ 1 -------- 0.51 ------ ---------- 75 R-12 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. s CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 ------------------------------------------------------------------------------- ----------------------_--------------------------------------------------------- Project Title.......... Palo Verde./Plan 3 Date..07/31/07 09:24:16 ---------------------------------------------------------------_--------------_-- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 - --------------------------------=-------------------------------------------- s REMARKS COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. • DESIGNER or OWNER Name.... Salim Rahemtulla Company. Standard Pacific Homes Address. 15326 Alton Parkway Irvine, CA 92618-2338 Phone... (949) 789-1746 License. Signed.. (date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) DOCUMENTATION AUTHOR Name.... Chinh Nguyen Company. Westpac Air Conditioning, Inc. Address. 1610 N. Maple St. Corona, CA 92880 Phone... (951) 9- 501 4 0 Signed.. (date) MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 Project Address.... ******* --------------------- • La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance.approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceilingir-J✓ 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors I or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox f/ b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual s/ 150(8): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, / water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality ' standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification f/ 3. Exterior doors and windows weatherstripped; all joints / and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er menti 110-113: HVAC equipment, water heaters, showerheads and / faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance , with ASHRAE, SMACNA or ACCA 150(i): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation / having an installed thermal resistance of R12 or greater ✓ 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value / 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A - 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind / 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space / 7. Solar water -heating systems/collectors are certified by th Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723." If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause / degradation of the material JL 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no / electric resistance heating and no pilot light / 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning _ pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R ------------------------------------------------------------------------------- Page 4 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) i! i! STANDARD PACIFIC HOME PALO VERDE AT LA S QUINTA PLAN -3/OPT. EXERCISE Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 A CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 Project Title.......... Palo Verde/Plan 3/Exer. ========= Date..07/31/07 09:32:55 Project Address........ ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501�FieldCheck/Date� Climate Zone...... . 15--------------------- - - - - Compliance Method...... MICROPAS7 v7.10 for 2005 ------------------------------------------------------------------------------- Standards by Enercomp, Inc. ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15SO5 Program -FORM CF -1R User#-MP2387 -------------------------------=----------------------------------------------- User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exe.r. = MICROPAS7 ENERGY USE SUMMARY = ---------------------------- = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = = Space Heating........... 1.72 1.74 -0.02 = = Space Cooling.......... 61.66 50.33 11.33 - = Water Heating........... 6.41 7.30 -0.89 = = North Total 69.79 59.37 10.42 = = Space Heating.......... 1.72 1.44 0.28 = = Space Cooling.......... 61.66 50.23 11.43 = = Water Heating.......... 6.41 7.30 -0.89 - = East Total 69.79 58.97 10.82 = = Space Heating.......... 1.72 1.54 0.18 = = Space Cooling.......... 61.66 51.51 10.15 = = Water Heating.......... 6.41 7.30 -0.89 = = South Total 69.79 60.35 9.44 = = Space Heating........r.. 1.72 1.72 0.00 - = Space Cooling.......... 61.66 49.57 12.09 - = Water Heating.......... 6.41 7.30 -0.89 = = West Total 69.79 58.59 11.20 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance *** _ CERTIFICATE ------------------------------------------------------------------------------- OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, ------------------------------------------------------------------------------- Run -Palo Verde/Plan 3/Exer. GENERAL.INFORMATION ------------------- HERS Verification.......... Required Conditioned Floor Area..... 4006 sf Building Type.............. Single Family Detached Construction Type ......... New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Slab On Grade Number of Building Zones... 2 Conditioned Volume......... 40394 cf Slab -On -Grade Area......... 4006 sf. Glazing Percentage......... 15.1 % of floor area Average Glazing U -factor... 0.33 Btu/hr-sf-F Average Glazing SHGC....... 0.26 Average Ceiling Height..... 10.1 ft BUILDING ZONE INFORMATION ------------------------- Floor # of # of Cond- Thermo- Vent Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) (cf) Units le ----- ------ ----- ----- ioned Type (ft) (sf) Housewrap ------------- SLEEPING ----- ------- ---------- Residence 1493 15054 0.35 1.8 Yes Setback 2.0 Standard No LIVING Residence 2513 25340 0.65 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES --------------- U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 568 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 2 Wall Wood 165 0.074 19 0 270 90 Yes IV.9 A5 WEST 4 Wall Wood 288 0.074 19 0 0 90 Yes IV.9 A5 NORTH 6 Wall Wood 213 0.074 19 0 90 90 Yes'IV.9 A5 EAST 8 Wall Wood 122 0.074 19 0 0 90 No IV.9 A5 GARAGE WALL 10 RoofRad Wood 1493 0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 3 Wall Wood 318 0.074 19 0 270 90 Yes IV A A5 WEST 5 Wall Wood 393 0.074 19 0 0 90 Yes IV A A5 NORTH 7 Wall Wood 446 0.074 19 0 90 90 Yes IV.9 A5 EAST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICR0PAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES Wind Back (S) U- Appendix Sheath- 180 Length Solar Appendix Solar IV Location/ Frame Area fact- Cavity ing Act Comments Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt No Reference Comments ------------ 9 Wall ----- Wood ---- 251 ----- 0.074 ----- 19 ----- 0 --- 0 ---- 90 --- No --------- IV.9 A5 -------------- GARAGE WALL 11 RoofRad Wood 2513 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 12 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door 13 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Exterior Area U- Act Shade Orientation (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ ----- ----- ----- --- ------------ ------------------------ CT.T.'L'DTTT(`_ 1 Wind Back (S) 16.5 Appendix 0.300 180 Length F2 Insul Solar IV Location/ Surface ------------ (ft) Factor R-val Gains Reference Comments SLEEPING ------ -------- ------- ----- --------- ---------------------- 14 SlabEdge 149 0.900 R-0 No None To Outside 16 SlabEdge 12 0.550 R-0 No None TO GARAGE LIVING 180 90 6 Wind Back (S) 15 SlabEdge 150 0.900 R-0 No None To Outside 17 SlabEdge 27 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ ----- ----- ----- --- ------------ ------------------------ CT.T.'L'DTTT(`_ 1 Wind Back (S) 16.5 0.340 0.300 180 90 2 Wind Back (S) 16.5 0.340 0.300 180 90 3 Wind Back (S) 6.0 0.340 0.300 180 90 4 Wind Back (S) 11..0 0.340 0.300 180 90 5 Wind Back (S) 11.0 0.340 0.300 180 90 6 Wind Back (S) 11.0 0.340 0.300 180 90 7 Wind Right (W) 3.8 0.340 0.300 270 90 8 Wind Right (W) 16.5 0.340 0.300 270 90 9 Wind Right (W) 16.5 0.340 0.300 270 90 13 Wind Front (N) 9.0 0.340 0.300 0 90 14 Wind Front (N) 9.0 0.340 0.300 0 90 15 Wind Front (N) 9.0 0.340 0.300 0 90 16 Wind Front (N) 9.0 0.340 0.300 0 90 21 Wind Left (E) 40.0 0.340 0.300 90 90 22 Wind Left (E) 9.0 0.340 0.300 90 90 23 Wind Left (E) 11.0 0.340 0.300 90 90 24 Door Left (E) 40.0 0.310 0.220 90 90 25 Wind Left (E) 11.0 0.340 0.300 90 90 30 Wind Back (S). 16.5 0.340 0.330 180 90 Standard SGLASSI/Milgard Operable Standard SGLASS2/Milgard Operable Standard SGLASS3/Milgard Operable Standard SGLASS4/Milgard Operable Standard SGLASS5/Milgard Operable Standard SGLASS6/Milgard Operable Standard WGLASSI/Milgard Operable Standard WGLASS2/Milgard Operable Standard WGLASS3/Milgard Operable Standard NGLASSI/Milgard Operable Standard NGLASS2/Milgard Operable Standard NGLASS3/Milgard Operable Standard NGLASS4/Milgard Operable Standard EGLASSI/Milgard Operable Standard EGLASS2/Milgard Operable Standard SGLASS3/Milgard Operable Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASSS/Milgard Operable Standard SGLASS7/Milgard Fixed Wi CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 ------------------------------------=------------------------------------------ ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ---------------------------------------------------------------------------=--- FENESTRATION SURFACES Area Slab Type (sf) ---------------- ------ SLEEPING Standard Slab 1493 LIVING Standard Slab 2513 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Exterior Refrig Charge Adequate Fan Watt Cooling Area U- Efficiency Act or TXV Shade Draw Orientation ------------ SLEEPING (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ LIVING 1 0.800 AFUE ----- ----- ----- --- ---- -------- ------------------------ 10 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS4/Fr.Dr. Therma-Tr 11 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS5/Fr.Dr. Therma-Tr 12 Wind Right (W) 22.0 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable 17 Door Front (N) 40.0 0.310 0.220 0, 90 Standard NGLASSS/Fr.Dr. Therma-Tr 18 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 19 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS7/Fr.Dr. Therma-Tr 20 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 26 Wind Left (E) 25.0 0.340 0.330 90 90 Standard EGLASS6/Milgard Fixed Wi 27 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr 28 Wind Left (E) 16.5 0.340 0.300 9090 Standard EGLASS8/Milgard Operable 29 Wind Left (E) 16.5 0.340 0.300 .90 90 Standard EGLASS9/Milgard Operable SLAB ------------- SURFACES Area Slab Type (sf) ---------------- ------ SLEEPING Standard Slab 1493 LIVING Standard Slab 2513 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 -----------------------------------------=------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- HVAC SIZING Orientation of Maximum..... Sizing Location........... Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range ............... Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F DUCT SYSTEMS Verified Total Sensible Design Maximum System Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type ------------- (Btu/hr) ---------- (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING Attic ---------- .---------- No ---------- Furnace 28334 n/a n/a n/a ACSplit n/a 20045 24875 n/a LIVING Attic R-4.2 Yes No No Furnace 37805 n/a n/a n/a ACSplit n/a 34648 42998 n/a ------------- Total ---------- 66139 ---------- 54693 ---------- 67874 ---------- n/a Orientation of Maximum..... Sizing Location........... Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range ............... Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1- 0.51 75 R-12 DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type ------------- Location R -value Leakage Area Ducts SLEEPING ----------- -------------- -------- --------- Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1- 0.51 75 R-12 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ----------------------------------------------------------------------------- SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV): If a cooling system is not installed, then.HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. i CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 ------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. -------------------------------------------------------------------'------------ REMARKS COMPLIANCE STATEMENT ----------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 739-9501 License. 2 Signed.. Signed.. /� D (date) (date) ENFORCEMENT AGENCY / Name.... Title... Agency.. Phone... Signed.. MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 Project Address.... ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ----------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed -ceiling or equivalent U -factor in metal frame.ceiling p 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire j opening of the firebox r/ b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 �L meets requirements specified in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate Zones 14,16 only / 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, / water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality / standards. Indicate type and include CF -6R form I/ 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 ---------------------------------------=--------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC),, and infiltration certification ✓ 3. Exterior doors and windows weatherstripped; all joints / and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor . less than 0.58 must be externally wrapped with insulation / having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external / insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and, entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage,including that ue to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or'is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55 ------------------------------ MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic .and either mesh or tape shall be used - z 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause/ reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands ' 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause / degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating.and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 ------------------------------------------------------------------------------- 09:32:55 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------- and have an output frequency no less than 20 kHz ----- 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always•on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119('d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.O CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d)