Mirage (Plans 1-3) Revision 2 Title 24TI TLE 24'
A Energy. Conservation
t - :Compliance ,Report - -
- Palo Verde
Tract #32279
La Quinta,,California x
x`
_ Prepared For.
STANDARD PACIFIC HOMES
15326 Alton Parkway
Irvine, CA 92618-2338 '
} Phone: (949)789-1746
Fax: (949) 789-3310
y Date: July 31°, 2007 ,
-
DEC 2 1-2007, -rt f, .,.• ' ,�, � �� `� 4' ' -; _ � •
7 W'W! N I d
AIR CONDITIONING INC. 4
' "Working As Team to Be -The Best In Our Industry" -
r' Chinh Nguyen, Certified Energy Analyst
. 1610 N. Maple Street
Corona; CA92880-1760 _
(800) 700-0799 / (951) 739-9509 fax
' E-mail. chinh. nqu yen ft westpacair. com , '
Table of Contents
-Cover Sheet
-T-24 Summary report
-Plan 1
- CF-1R Certificate of Compliance
MF-1R Mandatory Measures Check List
- Plan 1/Opt. Mud Room
- CF-1R Certificate of Compliance
- MF-1R Mandatory Measures Check List
-, Plan 1/Opt. Suite ,
- CF-1R Certificate of Compliance
- MF-IR Mandatory Measures Check List
- Plan 2
CF-IR/ Certificate of Compliance
-
MF-IR Mandatory Measures Check List
- Plan 2/Opt. Outdoor
- CF-1R / Certificate of Compliance
- , MF-IR Mandatory Measures Check List
- Plan 3
- . CF-1R / Certificate of Compliance
MF-1 R Mandatory Measures Check List
- Plan 3/Opt. Exercise
CF-IR/ Certificate of Compliance
- MF-1R Mandatory Measures Check List
TITLE -24 SUMMARY REPORT
The Following is the minimum requirement to meet the 2005 Residential
Energy Standards (California Code of Regulations, Title 24, Part 6 and the
Administrative Regulations, Title 24, Part 1).
1. R-38 Roof Insulation.
2. R-19 Exterior Wall Insulation.
3. Low -e Vinyl Windows & Sliding Doors to be selected by Owner:
-Operable Windows with U value of 0:34 & SHGC of 0.30
-Fixed Windows with U value of 0.34 & SHGC of 0.33
-Sliding Glasses Door with U value of 0.35 & SHGC of 0.31
-French Door with U value of 0.31 & SHGC of 0.22
4. R-4.2 Duct Insulation.
5. Gas Furnace with 80% AFUE .
6. Condenser 13.0 SEER With TXV & Min. EER of 11.0
7. 75 Gallons Water Heater to be selected by Owner.
8. Radiant Barrier Required.
STANDARD PACIFIC HOMES
PALO VERDE AT LA QUINTA
Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1
Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56
Project Address.. ******* ---------------------
La Quinta,' California *v7.10*
Documentation Author... Chinh Nguyen ******* Building Permit #
Westpac Air Conditioning, Inc.
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-----------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
MICROPAS7 ENERGY USE SUMMARY
= Energy Use
Standard
Proposed
Compliance =
_ (kTDV/sf-yr)
Design
Design
Margin =
---------- -
------------------------
- Space
----------
Heating..........
2.30
----------
2.04
0.26 =
- Space
Cooling..........
71.41
57.12
14.29 =
- Water
Heating
7.61
8.66
-1.05 =
=
North Total
81.32
67.82
13.50 =
= Space
Heating..........
2.30
2.01
0.29 =
- Space
Cooling..........
71.41
57.67
13.74 =
= Water
Heating..........
7.61
8.66
-1.05 =
=
East Total
81.32
68.34•
12.98 =
= Space
Heating..........
2.30
2.29
0.01 =
= Space
Cooling..........
71.41
57.38
14.03 =
- Water
Heating..........
7.61
8.66
-1.05 =
=
South Total
81.32
68.33
12.99 =
= Space
Heating..........
2.30
2.36
-0.06 _
= Space
Cooling..........
71.41
56.62
14.79 =
= Water
Heating..........
7.61
8.66
-1.05 =
=
West Total
81.32
67.64
13.68 =
_ ***
Building complies
with Computer Performance
_
*** HERS Verification Required
for Compliance *** _
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2
------------------------------------------
Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
-------------------------------------------------------------------------------
GENERAL INFORMATION
HERS Verification.......... Required
Conditioned Floor Area..... 3377 sf
Building Type.............. Single Family Detached
Construction Type New
Fuel Type ................. NaturalGas
Building Front Orientation. Cardinal N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type........:. FullYear
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing U -factor...
Average Glazing SHGC.....:.
Average Ceiling Height.....
Slab On,Grade
2
34054 cf
3377 sf
18 % of floor area
0.33 Btu/hr-sf-F
0.27
10.1 ft
BUILDING ZONE INFORMATION
OPAQUE SURFACES
Floor
# of
# of
Cond-
Thermo-
Vent
Vent Verified
Solar
Area
Volume
Dwell
Peop-
it-
stat
Height
Area Leakage or
Zone Type
(sf)
(cf)
Units
le
ioned
Type
"(ft)
(sf) Housewrap
SLEEPING,
Azm
---
Tilt
----
---
Reference
---------
Comments
--------------
------------
SLEEPING
-----
----
Residence
1325
13362
0.40
2.0
Yes
Setback
2.O
Standard No
LIVING
Wall
Wood
563
0.074
19
0
180
90
Residence
2052
20692
0.60
3.0
Yes
Setback
2.0
Standard No
OPAQUE SURFACES
U-
Sheath-
Solar
Appendix
Frame
Area
fact-
Cavity ing
Act
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
---
Tilt
----
---
Reference
---------
Comments
--------------
------------
SLEEPING
-----
----
-----
-----------
1
Wall
Wood
563
0.074
19
0
180
90
Yes
IV A
A5
SOUTH
3
Wall
Wood
116
0.074
19.
0
270
90
Yes
IV A
A5
WEST
5
Wall
Wood
386
0.074
19
0
0
90
Yes
IV.9
A5
NORTH
7
Wall
Wood
169
0.074
19
0
90
90
Yes
IV A
A5
EAST
9
Wall
Wood
363
0.074
19
0
0
90
No
IV.9
A5
GARAGE WALL
11
RoofRad
Wood
1325
0.025
38
0
n/a
0
Yes
IV A
A18
Attic
14
Door
Other
22
0.500
0
0
0
90
No
IV.5
A4
Wood Door
LIVING
2
Wall
Wood
120
0.074
19
0
180
90
Yes
IV A
A5
SOUTH
4
Wall
Wood
416
0.074
19
0
270
90
Yes
IV A
A5
WEST
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3
------------------------------------------
Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56
---------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
-------------------------------------------------------------------------------
OPAQUE SURFACES
PERIMETER LOSSES
U-
Appendix
Sheath-
Length
Solar
Appendix
Solar
IV
Location/
Frame
Area
fact-
Cavity
ing
Act
Comments
----------------------
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
No
Reference
Comments
--------------
------------
6
Wall
-----
Wood
----
373
-----
0.074
-----
19
-----
0
---
0
----
90
---
Yes
---------
IV.9 A5
NORTH
8
Wall
Wood
457
0.074
19
0
90
90
Yes
IV.9 A5
EAST
10
Wall
Wood
182
0.074
19
0
0
90
No
IV.9 A5
GARAGE WALL
12
Roof Rad
Wood
2055
0.025
38
0.
n/a
0
Yes
IV.1 A18
Attic
13
Door
Other
24
0.500
0
0
270
90
Yes
IV.5 A4
Wood Door
PERIMETER LOSSES
FENESTRATION SURFACES
Appendix
Length
F2
Insul
Solar
IV
Location/
Surface
(ft)
Factor
--------
R-val
-------
Gains
-----
Reference
---------
Comments
----------------------
------------
SLEEPING
------
Orientation
(sf)
factor
-----
15 S1abEdge
144
0.900
R-0
No
None
To Outside
17 S1abEdge
38
0.550
R-0
No
None
TO GARAGE
LIVING
1
Wind
Back
(S)
16.5
0.340
16 S1abEdge
176
0.900
R-0
No
None
To Outside
18 S1abEdge
18
0.550
R-0
No
None
TO GARAGE
FENESTRATION SURFACES
Exterior.
Area
U-
Act
Shade
Orientation
(sf)
factor
-----
SHGC
-----
Azm
---
Tilt
----
Type
--------
Location/Comments
------------------------
------------------
SLEEPING
-----
1
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASSI/Milgard
Operable
2
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASS2/Milgard
Operable
3
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASS3/Milgard
Operable
4
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS4/Milgard
Operable
5
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS5/Milgard
Operable
6
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS6/Milgard
Operable
7
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASS7/Milgard
Operable
8
Wind
Back
(S)
4.0
0.340
0.330
180
90
Standard
SGLASS8/Milgard
Fixed Wi
12
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASSI/Milgard
Operable
17
Wind
Front
(N)
11.0
0.340
0.330
0
90
Standard
NGLASSI/Milgard
Fixed Wi
18
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS2/Milgard
Operable
19
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS3/Milgard
Operable
20
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS4/Milgard
Operable
25
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASSI/Milgard
Operable
26
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS2/Fr.Dr. Therma-Tr
27
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASS3/Milgard
Operable
LIVING
9
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS9/Milgard
Operable
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4
----------------------------------------------
Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
-------------------------------------------------------------------------------
FENESTRATION SURFACES
---------------------
Exterior
Shade
Type Location/Comments
-------- ------------------------
Standard SGLASS10/Fr.Dr. Therma-T
Standard SGLASSII/Milgard Operabl
Standard WGLASS2/Milgard Operable
Standard WGLASS3/Milgard Operable
Standard WGLASS4/Milgard Operable
Standard WGLASS5/Milgard Operable
Standard NGLASS5/Milgard Operable
Standard NGLASS6/Fr.Dr. Therma-Tr
Standard NGLASS7/Milgard Operable
Standard NGLASS8/Milgard Operable
Standard EGLASS4/Fr.Dr. Therma-Tr
Standard EGLASS5/Fr.Dr. Therma-Tr
Standard EGLASS6/Fr.Dr. Therma-Tr
Standard EGLASS7/Milgard Fixed Wi
Standard EGLASS8/Milgard Operable
Standard EGLASS9/Milgard Fixed Wi
Standard EGLASS10/Milgard Operabl
Standard EGLASSII/Milgard Operabl
---Window---
------------Overhang------------
Area
U-
Act
Area
Orientation
(sf)
factor
SHGC
Azm Tilt
--- ----
------------------
10
Door
Back
(S)
-----
40.0
-----
0.310
-----
0.220
180
90
11
Wind
Back
(S)
11.0
0.340
0.300
180
90
13
Wind
Right
(W)
16.5
0.340
0.300
270
90
14
Wind
Right
(W)
16.5
0.340
0.300
270
90
15
Wind
Right
(W)
16.5
0.340
0.300
270
90
16
Wind
Right
(W)
16.5
0.340
0.300
270
90
21
Wind
Front
(N)
11.0
0.340
0.300
0
90
22
Door
Front
(N)'
40.0
0.310
0.220
0
90
23
Wind
Front
(N)
11.0
0.340
0.300
0
90
24
Wind
Front
(N)
9.0
0.340
0.300
0
90
28
Door
Left
(E)
40.0
0.310
0.220
90
90
29
Door
Left
(E)
40.0
0.310
0.220
90
90
30
Door
Left
(E)
40.0
0.310
0.220
90
90
31
Wind
Left
(E)
10.0
0.340
0.330
90
90
32
Wind
Left
(E)
15.0
0.340
0.300
90
90
33
Wind
Left
(E)
10.0
0.340
0.330
90
90
34
Wind
Left
(E)
16.5
0.340
0.300
90
90
35
Wind
Left
(E)
16.5
0.340
0.300
90
90
OVERHANGS
Exterior
Shade
Type Location/Comments
-------- ------------------------
Standard SGLASS10/Fr.Dr. Therma-T
Standard SGLASSII/Milgard Operabl
Standard WGLASS2/Milgard Operable
Standard WGLASS3/Milgard Operable
Standard WGLASS4/Milgard Operable
Standard WGLASS5/Milgard Operable
Standard NGLASS5/Milgard Operable
Standard NGLASS6/Fr.Dr. Therma-Tr
Standard NGLASS7/Milgard Operable
Standard NGLASS8/Milgard Operable
Standard EGLASS4/Fr.Dr. Therma-Tr
Standard EGLASS5/Fr.Dr. Therma-Tr
Standard EGLASS6/Fr.Dr. Therma-Tr
Standard EGLASS7/Milgard Fixed Wi
Standard EGLASS8/Milgard Operable
Standard EGLASS9/Milgard Fixed Wi
Standard EGLASS10/Milgard Operabl
Standard EGLASSII/Milgard Operabl
SLAB SURFACES
-------------
Area
Slab Type (sf)
---------------- ------
SLEEPING
Standard Slab 1325
LIVING
Standard Slab 2052
---Window---
------------Overhang------------
Area
� Left
Right
Surface
(sf)
Width
-----
Height
------
Depth
-----
Height
------
Extension
---------
Extension
---------
-----------
LIVING
-----
28 Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
29 Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
30 Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
SLAB SURFACES
-------------
Area
Slab Type (sf)
---------------- ------
SLEEPING
Standard Slab 1325
LIVING
Standard Slab 2052
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5
Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run-Palo,Verde/Plan 1
-------------------------------------------------------------------------------
HVAC SYSTEMS.
------------
HVAC SIZING
Verified
Verified
Verified
System
Total
Verified
Design
Number
Verified
Heating
Verified
Verified
Verified
Maximum
System
of
Minimum
Capacity
Refrig Charge
Adequate
Fan Watt
Cooling
Type
------------
Systems
-------
Efficiency
-----------
EER
-----
. or TXV
------=------
Airflow
--------
Draw
--------
Capacity
--------
SLEEPING
n/a
n/a
ACSplit
n/a
20870
25900
n/a
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
11
Yes
No
No
No
LIVING
46214
57352
n/a
Orientation of
Maximum.....
Front Facing 270 deg (W)
Sizing
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
11
Yes
No
No
No
HVAC SIZING
DUCT SYSTEMS
Verified
Verified
Verified
System
Total
Sensible
Design
Maximum
• Buried
Heating
Cooling
Cooling
Cooling
System
Load
Load
Capacity
Capacity
Type
(Btu/hr)
(Btu/hr)
(Btu/hr)
(Btu/hr)
SLEEPING
Yes
No
No
ACSplit
Furnace
28453
n/a
n/a
n/a
ACSplit
n/a
20870
25900
n/a
LIVING
Furnace
Attic
R-4.2
Yes
Furnace
36820
n/a
n/a
n/a
ACSplit
n/a,
25344
----------
31452
----------
n/a
----------
-------------
Total
----------
65273
46214
57352
n/a
Orientation of
Maximum.....
Front Facing 270 deg (W)
Sizing
Location............
LA QUINTA
Winter
Outside
Design......
26 F
Winter
Inside Design.......
70 F
Summer
Outside
Design......
111 F
Summer
Inside Design.......
75 F
Summer
Range ...............
34 F
DUCT SYSTEMS
Verified
Verified
Verified
System
Duct
Duct
Duct
Surface
• Buried
Type
Location
-----------
R -value
-------
Leakage
-------
Area
--------
Ducts
---------
-------------
SLEEPING
Furnace
Attic
R-4.2
Yes
No
No
ACSplit
Attic
R-4.2
Yes
No
No
LIVING
Furnace
Attic
R-4.2
Yes
No
No
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6
Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56
--------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
-------------------------------------------------------------------------------
DUCT SYSTEMS
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------------------- -------------- ----------------,
1 Storage Gas Standard 1 0.51 75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
------------ -----------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
Verified
Verified
Verified
System
Duct Duct Duct
Surface
Buried
Type
Location R -value Leakage
--------------
Area
--------
Ducts
---------
-------------
ACSplit
-----------
Attic R-4.2 Yes
No
No
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------------------- -------------- ----------------,
1 Storage Gas Standard 1 0.51 75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
------------ -----------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7
Project Title . Palo Verde/Plan 1 Date..07/30/07 15:35:56
-------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387. User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
-------------------------------------------------------------------------------
HERS REQUIRED VERIFICATION
--------------------------
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage. Target leakage is
calculated and documented on the CF -4R. If the measured CFM is above the
target, then corrective action must be taken to reduce the duct leakage and
then must be retested. Alternatively, the compliance calculations could be
redone without duct testing. If ducts are,not installed, then HERS
verification is not necessary.
REMARKS
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8
Project Title . Palo Verde/Plan 1 Date..07/30/07 15:35:56
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
---------- ---------- -----------------------------------------------------------
COMPLIANCE STATEMENT
--------------------
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility.
DESIGNER or OWNER DOCUMENTATION AUTHOR
Name.... Salim Rahemtulla Name.... Chinh Nguyen
Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc.
Address. 15326 Alton Parkway Address. 1610 N. Maple St.
Irvine, CA 92618-2338 Corona, CA 92880
Phone... (949) 789-1746 Phone... (951) 9-9501
License.
Signed.. Signed.. 3
Name....
Title...
Agency..
Phone...
Signed..
(date) (date)
ENFORCEMENT AGENCY
(date)
N
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 1
Project Title Palo Verde/Plan 1 Date..07/30/07 15:35:56
Project Address.. ******* ---------------------
La Quinta, California *v7.10*.
Documentation Author... Chinh Nguyen *******I Building Permit #
Westpac Air Conditioning, Inc.
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date
Climate Zone........... 15 -----------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-----------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program-FORM MF-1R
User#-MP2387 User-Westpac Air Conditioning, Run-Palo Verde/Plan 1
-------------------------------------------------------------------------------
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. More stringent compliance
requirements from the Certificate of Compliance supersede the items marked with
an asterisk (*). When this checklist is incorporated into the permit documents,
the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown
elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
De- En-
sign- force-
n/a
er ment
*150(a): Minimum R-19 insulation in wood framed ceiling or
equivalent U -factor in metal frame ceiling
150(b): Loose fill insulation manufacturer's labeled R -Value
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
n
to exterior mass walls)
G�
*150(d): Minimum R-13 raised floor insulation in framed floors
/
or equivalent U -factor d
150(e): Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door covering the entire
opening of the firebox
Y
b. Outside air intake with damper and control, flue
damper and control
2. No continuous burning gas pilot lights allowed
150(f): Air retarding wrap installed to comply with Sec. 151
l
meets requirements specified in ACM Residential Manual
150(8): Vapor barriers mandatory in Climate Zones 14,16 only
150(1): Slab edge insulation - water absorption rate for the
insulation material without facings no greater than 0.3%,
water vapor permeance rate no greater than 2.0 perm/inch
118: Insulation specified or installed meets insulation quality]
standards. Indicate type.and include CF -6R form
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned and unconditioned
/
spaces designed to limit air leakage
2. Fenestration products (except field -fabricated) have
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2
Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56
-------------------------------------------------------------------------------
------------------------------------------------------------------------_-------
�. MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
-------------------------------------------------------------------------------
label with certified U -factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification
3. Exterior doors and windows weatherstripped; all joints /
and penetrations caulked and sealed
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En-
sign- force
n/a er ment
110-113: HVAC equipment, water heaters, showerheads and
faucets certified by the Energy Commission
150(h): Heating and/or cooling loads calculated in accordance /
with ASHRAE, SMACNA or ACOA
150(1): Setback thermostat on all applicable heating and/or
cooling systems
150(j): Water system pipe and tank insulation and cooling
systems line insulation
1. Storage gas water heaters rated with an Energy Factor
less than 0.58 must be externally wrapped with insulation
having an installed thermal resistance of R12 or greater
2. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 internal and indicated on the
exterior of the tank showing.the R -value
3. The following piping is insulated according to Table 150-A/B
or Equation 150-A Insulation Thickness:
1. First 5 feet of hot and cold water pipes closest to
water heater tank, non -recirculating systems, and
entire length of recirculating sections of hot water /
pipes shall be insulated to Table 150B
2. Cooling system piping (suction, chilled water, or
brine lines), piping insulated between heating source
and indirect hot water tank shall be insulated to `
Table 150-B and Equation 150-A
4. Steam hydronic heating systems or hot water systems >15 psi,
meet requirements of Table 123-A
5. Insulation must be protected from damage, including that due
to sunlight, moisture, equipment maintenance and wind
6. Insulation for chilled water piping and refrigerant suction
piping includes a vapor retardant or is enclosed entirely
in conditioned space
7. Solar water -heating systems/collectors are certified by the%
Solar Rating and Certification Corporation ✓
*150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to
meet the requirements of the CMC Sections 601, 602, 603,
604, 605 and Standard 6-5; supply -air and return -air ducts
and plenums are insulated to a minimum ,installed level of
R-4.2 or enclosed entirely in conditioned space. Openings
shall be sealed with mastic, tape, or other duct -closure
system that meets the applicable requirements of UL 181,
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
Page 3
Project Title.......... Palo Verde/Plan 1 Date..07/30/07
15:35:56
-----------------------------
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan
1
-------------------------------------------------------------------------------
UL 181A, or UL 181B or aerosol sealant that meets the
requirements of UL 723. If mastic or tape is used to seal
openings greater than 1/4 inch, the combination of mastic
and either mesh or tape shall be used -
_.,z
2. Building cavities, support platforms for air handlers, and
plenums defined or constructed with materials other than
sealed sheet metal, duct board or flexible duct shall not
be used for conveying conditioned air. Building cavities and
support platforms may contain ducts. Ducts installed in
cavities and support platforms shall not be compressed to cause
/
reductions in the cross-sectional area of the ducts
3. Joints and seams of duct systems and their components
shall not be sealed'with cloth backed rubber adhesive
duct tapes unless such tape is used in combination with
mastic and draw bands
4. Exhaust fan systems have back draft or automatic dampers
5. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers
6. Protection of Insulation. Insulation shall be protected
from damage due to sunlight, moisture, equipment mainten-
ance and wind. Cellular foam insulation shall be protected
as above or painted with a coating that is water retardant
and provides shielding from solar radiation that can cause
degradation of the material
j
7. Flexible ducts cannot have porous inner cores
114: Pool and Spa Heating Systems and Equipment
1. A thermal efficiency that complies with the Appliance
Efficiency Regulations, on-off switch mounted outside of
the heater, weatherproof operating instructions, no /
electric resistance heating and no pilot light 1
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating /
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation
pump time switch
115: Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning
pilot light (Exception: Non -electrical cooking appliances %
with pilot < 150 Btu/hr)
118(1): Cool Roof material meets specified criteria
RESIDENTIAL LIGHTING MEASURES
De- En-
sign- force
n/a er ment
150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:
contain only high efficacy lamps as outlined in Table
150-C, and do not contain a medium screw base socket
(E24/E26). Ballast for lamps 13 watts or greater are electronic
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
Page 4
---------------------------------------==--------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1 Date..07/30/07 15:35:56
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1
------------------------------------------------------------------
------
and have an output frequency no less than 20 kHz
150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain
only high efficacy lamps as outlined in Table 150-C,
luminaire has factory installed HID ballast
150(k)2: Permanently installed luminaires in kitchens shall
be high efficacy luminaires. Up to 50 percent of the wattage,
as determined in Sec. 130(c), of permanently installed luminaires
in kitchens may be in luminaires that are not.high efficacy
luminaires, provided that these luminaires are controlled
by switches separate from those controlling the high
/
efficacy luminaires
150(k)3: Permanently installed luminaires in bathrooms,
garages, laundry rooms, utility rooms shall be high
efficacy luminaires OR are controlled by an occupant
sensor(s) certified to comply with Section 119(d) that
does not turn on automatically or have an always on option
150(k)4: Permanently installed luminaires located other than
in kitchens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets
less than 70 ft2), OR are controlled by a dimmer switch
OR are controlled by an occupant sensor(s) that complies
with Section 119(d) that does not turn on automatically
or have an always on option
150(k)5: Luminaires that are recessed into insulated ceilings
are approved for zero clearance insulation cover (IC) and
are certified air tight to ASTM E283 and labeled as air
tight (AT) to less than 2.0 CFM at 75 Pascals
150(k)6: Luminaires providing outdoor lighting and permanently
mounted to a residential building or to other buildings on
the same lot shall be high efficacy luminaires (not in-
cluding lighting around swimming pools/water features or
other Article 680 locations) OR are controlled by occupant
sensors with integral photo control certified to comply
with Section 119(d)
150(k)7: Lighting for parking lots for.8 or more vehicles shall
have lighting that complies with Sec. 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall
have lighting that complies with Sec. 130, 131, and 146
150(k)8: Permanently installed lighting in the enclosed, non -
dwelling spaces of low-rise residential buildings with four
or more dwelling units shall be high efficacy luminaires OR
are controlled by an occupant sensor(s) certified to
comply with Section 119(d)
STANDARD PACIFIC HOMES
A'
PALO VERDE AT LA QUINTA
i
PLAN -1 /OPT. MUD -ROOM
Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
Project Address.. ******* ---------------------
La Quinta, California *v7.10*
Documentation Author:.. Chinh Nguyen ******* I Building Permit #
Westpac Air Conditioning, Inc. .1
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date
Climate Zone........... 15 - ---------------------
Compliance Method...... MICROPAS7 x7.10 for 2005 Standards by Enercomp, Inc.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
------------------- ------------------------------------------------------------
----------------------------
----------------------------
MICROPAS7 ENERGY USE SUMMARY
= Energy Use
Standard
Proposed Compliance =
_ (kTDV/sf-yr)
Design
Design
Margin =
- Space
Heating..........
2.23
2.02
0.21 =
- Space
Cooling..........
70.12
56.10
14.02 =
= Water
Heating..........
7.33
8.34
-1.01 =
=
North Total
79.68
66.46
13.22 =
- Space
Heating..........
2.23
1.94
0.29 =
= Space
Cooling..........
70.12
56.91
13.21 =
= Water
Heating..........
7.33
8.34
-1.01 =
=
East Total
79.68
67.19
12.49 =
_ Space
Heating..........
2.23
2.15
0.08 =
= Space
Cooling..........
70.12
56.59
13.53 =
= Water
Heating..........
7.33
8.34
-1.01 =
_
=
South Total
--------
79.68
----------------
67.08
_
12.60 _
= Space
Heating..........
2.23
2.26
-0.03 =
I
= Space
Cooling..........
70.12
56.12
14.00 =
= Water
Heating..........
7.33
8.34
-1.01 =
=
West Total
79.68
66.72
12.96 =
_ ***
Building complies
with Computer Performance
_
-------------------------------------------------------------------
---------------------------------------------------------------
*** HERS Verification
Required
for Compliance
i
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
GENERAL INFORMATION
HERS Verification.......... Required
Conditioned Floor Area..... 3506 sf
Building Type .............. Single Family Detached
Construction Type ......... New
Fuel Type ................. NaturalGas
Building Front Orientation.. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type.......... FullYear
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing U -factor...
Average Glazing SHGC.......
Average Ceiling Height.....
Slab On Grade
2
35354 cf
3506 sf
17.6 % of floor area
0.33 Btu/hr-sf-F
0.27
10.1 ft
BUILDING ZONE INFORMATION
OPAQUE SURFACES
Floor
# of
# of
Cond-
Thermo-
Vent
Vent Verified
Solar
Area
Volume
Dwell
Peop-
it-
stat
Height
Area Leakage or
Zone Type
--------------
(sf)
-----
(cf)
------
Units
-----
le
-----
ioned
-----
Type
(ft)
• (sf) Housewrap
SLEEPING
R-val
R-val
Azm
Tilt
--------
-----
------- ----------
Residence
1325
13362
0.40
2.0
Yes
Setback
2.0
Standard No
LIVING
--------------
1
Wall
Wood
563
0.074
19
0
Residence
2181
21992
0.60
3.0
Yes
Setback
2.0
Standard No
OPAQUE SURFACES
U-
Sheath-
Solar
Appendix
Frame
Area
fact-
Cavity
ing
Act
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
Reference
Comments
------------
SLEEPING
-----
----
-----
-----
-----
---
----
---
---------
--------------
1
Wall
Wood
563
0.074
19
0
180
90
Yes
IV.9
A5
SOUTH
3
Wall
Wood
116
0.074
19
0
270,
90
Yes
IV.9
A5
WEST
5
Wall
Wood
375
0.074
19
0
0
90
Yes
IV A
A5
NORTH
7
Wall
Wood
169
0.074
19
0
90
90
Yes
IV.9
A5
EAST
9
Wall
Wood
182
0.074
19
0
0
90
No
IV A
A5
GARAGE WALL
11
RoofRad
Wood
1325
0.025
38
0
n/a
0
Yes
IV.1
A18
Attic
LIVING
2
Wall
Wood
120
0.074
19
0
180
90
Yes
IV.9
A5
SOUTH
4
Wall
Wood
416
0.074
19
0
270
90
Yes
IV A
A5
WEST
6
Wall
Wood
494
0.074
19
0
0
90
Yes
IV.9
A5
NORTH
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
OPAQUE SURFACES
---------------
U- Sheath- Solar Appendix
Frame Area fact- Cavity ing Act Gains IV Location/
Surface Type (sf) or R-val R-val Azm Tilt Reference Comments
------------ ----- ---- ----- ----- ----- --- ---- --- --------- --------------
8 Wall Wood 457 0.074 19 0 90 90 Yes IV.9 A5 EAST
10 Wall Wood 261 0.074 19 0 0 90 No IV.9 A5' GARAGE WALL
12 RoofRad Wood 2181 0.025 38 0 n/a 0 Yes IV.1 A18 Attic
13 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door
14 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door
PERIMETER LOSSES
----------------
Appendix
Length F2 Insul Solar IV Location/
Surface (ft) Factor R-val Gains Reference Comments
------------ --------------------- -------------- ----------------------
SLEEPING
15 S1abEdge 144 0.900 R-0 No None To Outside
17 S1abEdge 18 0.550 R-0 No None TO GARAGE
LIVING
16 S1abEdge 188 0.900 R-0 No None To Outside
18 S1abEdge 28 0.550 R-0 No None TO GARAGE
FENESTRATION SURFACES
Exterior
Area
U-
Act
Shade
Orientation
------------------
(sf)
-----
factor SHGC
Azm
Tilt
Type
Location/Comments
SLEEPING
-----
-----
---
----
--------
------------------------
1
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASSI/Milgard
Operable
2
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASS2/Milgard
Operable
3
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASS3/Milgard
Operable
4
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS4/Milgard
Operable
5
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS5/Milgard
Operable
6
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS6/Milgard
Operable
7
Wind
Back
(S)
16.5
0.340
0.300180
90
Standard
SGLASS7/Milgard
Operable
8
Wind
Back
(S)
4.0
0.340
0.330
180
90
Standard
SGLASS8/Milgard
Fixed Wi
12
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASSI/Milgard
Operable
17
Wind
Front
(N)
11.0
0.340
0.300
0
90
Standard
NGLASSI/Milgard
Operable
18
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS2/Milgard
Operable
19
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS3/Milgard
Operable
20
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS4/Milgard
Operable
25
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASSI/Milgard
Operable
26
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS2/Fr.Dr'. Therma-Tr
27
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASS3/Milgard
Operable
36
Wind
Front
(N)
11.0
0.340
0.330
0
90
Standard
NGLASS9/Milgard
Fixed Wi
LIVING
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title....*....... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_lM Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
FENESTRATION SURFACES
Exterior
Shade
Type Location/Comments
-------- ------------------------
Standard SGLASS9/Milgard Operable
Standard SGLASS10/Fr.Dr. Therma-T
Standard SGLASSII/Milgard Operabl
Standard WGLASS2/Milgard Operable
Standard WGLASS3/Milgard Operable
Standard WGLASS4/Milgard Operable
Standard WGLASS5/Milgard Operable
Standard NGLASS5/Milgard Operable
Standard NGLASS6/Fr.Dr. Therma-Tr
Standard NGLASS7/Milgard Operable
Standard NGLASS8/Milgard Operable
Standard EGLASS4/Fr.Dr. Therma-Tr
Standard EGLASSS/Fr.Dr. Therma-Tr
Standard EGLASS6/Fr.Dr. Therma-Tr
Standard EGLASS7/Milgard Operable
Standard EGLASS8/Milgard Operable
Standard EGLASS9/Milgard Operable
Standard EGLASS10/Milgard Operabl
Standard EGLASSII/Milgard Operabl
---Window---
------------Overhang------------
Area
U-
Act
Area
Orientation
(sf)
factor
SHGC
Azm
Tilt
------------------
9
Wind
Back
(S)
-----
11.0
-----
0.340
-----
0.300
---
180
----
90
10
Door
Back
(S)
40.0
0.310
0.220
180
90
11
Wind
Back
(S)
11.0
0.340
0.300
180
90
13
Wind
Right
(W)
16.5
0.340
0.300
270
90
14
Wind
Right
(W)
16.5
0.340
0.300
270
90
15
Wind
Right
(W)
16.5
0.340
0.300
270
90
16
Wind
Right
(W)
16.5
0.340
0.300
270
90
21
Wind
Front
(N)
11.0
0.340
0.300
0
90
22
Door
Front
(N)
40.0
0.310
0.220
0
90
23
Wind
Front
(N)
11.0
0.340
0.300
0
90
24
Wind
Front
(N)
9.0
0.340
0.300
0
90
28
Door
Left
(E)
40.0
0.310
0.220
90
90
29
Door
Left
(E)
40.0
0.310
0.220
90
90
30
Door
Left
(E)
40.0
0.310
0.220
90
90
31
Wind
Left
(E)
10.0
0.340
0.300
90
90
32
Wind
Left
(E)
15.0
0.340
0.300
90
90
33
Wind
Left
(E)
10.0
0.340
0.300
90
90
34
Wind
Left
(E)
16.5
0.340
0.300
90
90
35
Wind
Left
(E)
16.5.0.340
0.300
90
90
OVERHANGS
Exterior
Shade
Type Location/Comments
-------- ------------------------
Standard SGLASS9/Milgard Operable
Standard SGLASS10/Fr.Dr. Therma-T
Standard SGLASSII/Milgard Operabl
Standard WGLASS2/Milgard Operable
Standard WGLASS3/Milgard Operable
Standard WGLASS4/Milgard Operable
Standard WGLASS5/Milgard Operable
Standard NGLASS5/Milgard Operable
Standard NGLASS6/Fr.Dr. Therma-Tr
Standard NGLASS7/Milgard Operable
Standard NGLASS8/Milgard Operable
Standard EGLASS4/Fr.Dr. Therma-Tr
Standard EGLASSS/Fr.Dr. Therma-Tr
Standard EGLASS6/Fr.Dr. Therma-Tr
Standard EGLASS7/Milgard Operable
Standard EGLASS8/Milgard Operable
Standard EGLASS9/Milgard Operable
Standard EGLASS10/Milgard Operabl
Standard EGLASSII/Milgard Operabl
SLAB SURFACES
-------------
Area
Slab Type (sf)
---------------
SLEEPING
Standard Slab 1325
LIVING
Standard Slab 2181
---Window---
------------Overhang------------
Area
Left
Right
Surface
(sf)
Width
Height
Depth
Height
Extension
Extension
-----------
LIVING
-----
-----
------
-----
------
---------
---------
28 Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
29 Door
40.0'
5.00
8.00
8.00
1.00
n/a
n/a
30 Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
SLAB SURFACES
-------------
Area
Slab Type (sf)
---------------
SLEEPING
Standard Slab 1325
LIVING
Standard Slab 2181
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R - Page 5
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387, User -Westpac Air,Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
HVAC SYSTEMS
------------
Verified
HVAC SIZING
Number
Verified
Verified
Verified
Verified
Maximum
System
of
Minimum
System
Refrig Charge
Adequate
Fan Watt
Cooling
Type
Systems
Efficiency
EER
or TXV
Airflow
Draw
Capacity
------------
SLEEPING
-------
-----------
-----
-------------
--------
--------
--------
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
1,1
Yes
No
No
No
LIVING
n/a
n/a
ACSplit
n/a
27495
34122
n/a
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
11
Yes
No
No
No
HVAC SIZING
Orientation of`Maximum ..... Front Facing 270 deg (W)
Sizing Location............ LA QUINTA
Winter Outside Design...... 26 F
Winter Inside Design........ 70 F
Summer Outside Design...... 111 F
Summer Inside Design....... 75 F
Summer Range ............... 34 F
DUCT SYSTEMS
Verified
Total
Sensible
Design
Maximum
System
Heating
Cooling
Cooling
Cooling
System
Load
Load
Capacity
Capacity
Type
-------------
(Btu/hr)
(Btu/hr)
(Btu/hr)
(Btu/hr)
SLEEPING
----------
----------
----------
----------
Furnace
26635
n/a
n/a
n/a
ACSplit
n/a
19420
24100
n/a
LIVING
Attic
R-4'.2 Yes
No
No
Furnace
40005
n/a
n/a
n/a
ACSplit
n/a
27495
34122
n/a
-------------
Total
----------
66640
-----------
46915
----- -----
58222
----------
n/a
Orientation of`Maximum ..... Front Facing 270 deg (W)
Sizing Location............ LA QUINTA
Winter Outside Design...... 26 F
Winter Inside Design........ 70 F
Summer Outside Design...... 111 F
Summer Inside Design....... 75 F
Summer Range ............... 34 F
DUCT SYSTEMS
------------
Verified
Verified
Verified
System
Duct
Duct Duct
Surface
Buried
Type
Location
R -value Leakage
Area
Ducts
SLEEPING
Furnace
Attic
R-4.2 Yes
No
No
ACSplit
Attic
R-4.2 Yes
No
No
LIVING
Furnace
Attic
R-4'.2 Yes
No
No
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
DUCT SYSTEMS
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------=------------ -------------- ------ ----------
1 Storage Gas Standard 1 10.51 75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage .
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
Verified
Verified
Verified
System
Duct Duct Duct
Surface
Buried
Type
Location R -value Leakage
Area
Ducts
-------------
ACSplit
-------------------------
Attic R-4.2 Yes
--------
No
---------
No
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------=------------ -------------- ------ ----------
1 Storage Gas Standard 1 10.51 75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage .
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
a
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
----------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
HERS REQUIRED VERIFICATION
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct•Leakage. Target leakage is
calculated and documented on the CF -4R. If the measured CFM is above .the
target, then corrective action must be taken to reduce the duct leakage and
then must be retested. Alternatively, the compliance calculations could be
redone without duct testing. If ducts are,not installed, then HERS
verification is not necessary.
REMARKS
F ~ ~
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
COMPLIANCE STATEMENT
This certificate of compliance lists the building features and performance
specifications needed to comply with.Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design' responsibility.
DESIGNER or OWNER DOCUMENTATION.AUTHOR
Name.... Salim Rahemtulla Name.... Chinh Nguyen
Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc.
Address. 15326 Alton Parkway Address. 1610 N. Maple St.
Irvine, CA 92618-2338 Corona, CA 92880
Phone... (949) 789-1746 Phone... (951) 9-9501
License.
Signed.. Signed..
Name....
Title...
Agency..
Phone...
Signed..
(date) (date)
ENFORCEMENT AGENCY
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
Project Address.... ******* ---------------------
La Quinta, California *v7.10*
Documentation Author... Chinh Nguyen ******* Building Permit #
Westpac Air Conditioning, Inc.
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
---------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. More stringent compliance
requirements from the Certificate of Compliance supersede the items marked with
an asterisk (*). When this checklist is incorporated into the permit documents,
the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown
elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
De- En-
sign- force-
n/a
er ment
*150(a): Minimum R-19 insulation in wood framed ceiling or
equivalent U -factor in metal frame ceiling
Liao
150(b): Loose fill insulation manufacturer's labeled R -Value
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
to exterior mass walls)
*150(d): Minimum R-13 raised floor insulation in framed floors
/
or equivalent U-factory
150(e): Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door covering the entire
opening of the firebox
b. Outside air intake with damper and control, flue
damper and control
2. No continuous burning gas pilot lights allowed
150(f): Air retarding wrap installed to comply with Sec. 151
meets requirements specified in ACM Residential Manual
150(g): Vapor barriers mandatory in Climate Zones 14,16 only
150(1): Slab edge insulation - water absorption rate for the
insulation material without facings no greater than 0.3%,
water vapor permeance rate no greater than 2.0 perm/inch
118: Insulation specified or installed meets insulation quality]
standards. Indicate type and include CF -6R form
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage
2. Fenestration products (except field -fabricated) have
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2
Project Title.......... Palo Verde/Plan 1/MUdRm Date..07/31/07 09:18:12
- ------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
label with certified U -factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification
3. Exterior doors and windows weatherstripped; all joints /
and penetrations caulked and sealed
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
De- En-
sign- force
n/a
er ment
110-113: HVAC equipment, water heaters, showerheads and
faucets certified by the Energy Commission
150(h): Heating and/or cooling loads calculated in accordance
with ASHRAE, SMACNA or ACCA
150(1): Setback thermostat on all applicable heating and/or
cooling systems
150(j): Water system pipe and tank insulation and cooling
systems line insulation
1. Storage gas water heaters rated with an Energy Factor
less than 0.58 must be externally wrapped with insulation
having an installed thermal resistance of R12 or greater
2. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 internal and indicated on the
exterior of the tank showing the R -value
3. The following piping is insulated according to Table 150-A/B
or Equation 150-A Insulation Thickness:
1. First 5 feet of hot and cold water pipes closest to
water heater tank, non -recirculating systems, and
entire length of recirculating sections of hot water
pipes shall be insulated to Table 150B
2. Cooling system piping (suction, chilled water, or
brine lines), piping insulated between heating source
and indirect hot water tank shall be insulated to
Table 150-B and Equation 150-A
-.,/
4. Steam hydronic heating systems or hot water systems >15 psi,
meet requirements of Table 123-A
5. Insulation must be protected from damage, including that due
to sunlight, moisture, equipment maintenance and wind
6. Insulation for chilled water piping and refrigerant suction
piping includes a vapor retardant or is enclosed entirely
in conditioned space
j
7. Solar water -heating systems/collectors are certified by the
Solar Rating and Certification Corporation
*150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to
meet the requirements of the CMC Sections 601, 602, 603,
604, 605 and Standard 6-5; supply -air and return -air ducts
and plenums are insulated to a minimum installed level of
R-4.2 or enclosed entirely in conditioned space. Openings
shall be sealed with mastic, tape, or other duct -closure
system that meets the applicable requirements of,UL 181,
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 3
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title ........... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program-FORM MF-1R
User#-MP2387 User-Westpac Air Conditioning, Run-Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
UL 181A, or UL 181B or aerosol sealant that meets the
requirements of UL 723. If mastic or tape is used to seal
openings greater than 1/4 inch,'the combination of mastic
and either mesh or tape shall be used
2. Building cavities, support platforms for air handlers, and
plenums defined or constructed with materials other than
sealed sheet metal, duct board or flexible duct shall not
be used for conveying conditioned air. Building cavities and
support platforms may contain ducts. Ducts installed in
cavities and support platforms shall not be compressed to cause /
reductions in the cross-sectional area of the ducts
3. Joints and seams of duct systems and their components
shall not be sealed with cloth backed rubber adhesive
duct tapes unless such tape is used in combination with
mastic and draw bands
4. Exhaust fan systems have back draft or-automatic dampers
5. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers
/
6. Protection of Insulation. Insulation shall be protected
from damage due to sunlight, moisture, equipment mainten-
ance and wind. Cellular foam insulation shall be protected
as above or painted with a coating that is water retardant
/
and provides shielding from solar radiation that can cause
degradation of the material
7. Flexible ducts cannot have porous inner cores
114: Pool and Spa Heating Systems and Equipment
1. A thermal efficiency that complies with the Appliance
Efficiency Regulations, on-off switch mounted outside of
the heater, weatherproof operating instructions, no
electric resistance heating and no pilot light
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation
pump time switch
115: Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning
pilot light (Exception: Non-electrical cooking appliances
with pilot < 150 Btu/hr)
118(1): Cool Roof material meets specified criteria
RESIDENTIAL LIGHTING MEASURES De- En-
sign- force
n/a er ment
150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:
contain only high efficacy lamps as outlined in Table
150-C, and do not contain a medium screw base socket
(E24/E26). Ballast for lamps 13 watts or greater are electronic
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
Page 4
Project Title.......... Palo Verde/Plan 1/MudRm Date..07/31/07 09:18:12
----------------------------------------
MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm
-------------------------------------------------------------------------------
and have an output frequency no less than 20 kHz
150(k)1: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain
only high efficacy lamps as outlined in Table 150-C,
luminaire has factory installed HID ballast
150(k)2: Permanently installed luminaires in kitchens shall
be high efficacy luminaires. Up to 50 percent of the wattage,
as determined in Sec. 130(c), of permanently installed luminaires
in kitchens may be in luminaires that are not high efficacy
luminaires; provided that these luminaires are controlled
by switches separate from those controlling the high
efficacy luminaires
/
150(k)3: Permanently installed luminaires in bathrooms,
garages, laundry rooms, utility rooms shall be high
efficacy luminaires OR are controlled by an occupant
sensor(s) certified to comply with Section 119(d) that
does not turn on automatically or have an always on option
150(k)4: Permanently installed luminaires located other than
in kitchens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets
less than 70 ft2), OR are controlled by a dimmer switch
OR are controlled by an occupant sensor(s) that complies
with Section 119(d) that does not turn on automatically
or have an always on option
150(k)5: Luminaires that are recessed into insulated ceilings
are approved for zero clearance insulation cover (IC) and
are certified air tight to ASTM E283 and labeled as air
tight (AT) to less than 2.0 CFM at 75 Pascals
150(k)6: Luminaires providing outdoor lighting and permanently
mounted to a residential building or to other buildings on
the same lot shall be high efficacy luminaires (not in-
cluding lighting around swimming pools/water features or
other Article 680 locations) OR are controlled by occupant
sensors with integral photo control certified to comply
j
with Section 119(d)
150(k)7: Lighting for parking lots for 8 or more vehicles shall
have lighting that complies with Sec. 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall
have lighting that complies with Sec. 130, 131, and 146
150(k)8: Permanently installed lighting in the enclosed, non -
dwelling spaces of low-rise residential buildings with four
or more dwelling units shall be high efficacy luminaires OR
are controlled by an occupant sensor(s) certified to
comply with Section 119(d)
STANDARD PACIFIC HOMES
PALO VERDE AT LA QUINTA
t
PLAN -1/OPT. SUITE
Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501'1 (951) 739-9509
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:3.1
Project Address.... ******* ---------------=-----
La Quinta, California *v7.10* I I
Documentation Author... Chinh Nguyen . ******* I Building Permit #
Westpac Air Conditioning, Inc.
1610 N. Maple St. I Plan Check / Date
Corona, CA 92880
(951) 739-9501 I Field Check/ Date
Climate Zone........... 15 --------------------- -
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
=
MICROPAS7
ENERGY USE
SUMMARY
=
----------------
= Energy Use
-------------
Standard
_
Proposed Compliance =
_ (kTDV/sf-yr)
Design
Design
Margin =
= Space
Heating..........
2.23
1.95
0.28 =
= Space
Cooling ..........
70.35
56.31
14.04 _
Water
Heating..........
7.34
8.36
-1.02 -
=
North Total
79.92
66.62
13.30 =
= Space
Heating..........
2.23
1.94
0.29 =
= Space
Cooling..........
70.35
57.09
13.26 _
- Water
Heating...........
7.34
8.36
-1.02 =
East Total
79.92
67.39
12.53 =
= Space
Heating..........
2.23
2,.21
0.02 -
- Space,Cooling..........
70.35
56.45
13.90 =
- Water
Heating...........
7.34
8.36
-1.02 =
=
South Total
79.92
67.02
12.90 =
= Space
Heating..........
2.23
2.26
-0.03 -
= Space
Cooling..........
70.35
56.02
14.33 =
= Water
Heating..........
7.34
8.36
-1.02 =
=
West Total
79.92
66.64
13.28 =
_ ***
Building complies
with Computer
Performance
_
*** HERS Verification
Required
for Compliance,***
_
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
---------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
GENERAL INFORMATION
HERS Verification..........
Required
Conditioned Floor Area.....
3499 sf
Building Type ..............
Single Family
Detached
Construction Type ..........
New
Fuel Type .................
NaturalGas
Building Front Orientation.
Cardinal - N,E,S,W
Number of Dwelling Units...
1
Number of Building Stories.
1
Weather Data Type..........
FullYear
Floor Construction Type....
Slab On Grade
Number of Building Zones...
2
Conditioned Volume.........
35282 cf
Slab -On -Grade Area.........
3499 sf
Glazing Percentage.........
17.8 % of floor
area
Average Glazing U -factor...
0.33 Btu/hr-sf-F
Average Glazing SHGC.......
0.27
Average Ceiling Height.....
10.1 ft
BUILDING ZONE
INFORMATION
-------------------------
Floor # of. # of
Cond- Thermo-
Vent Vent Verified
Area Volume Dwell Peop-
it- stat
Height Area Leakage or
Zone Type
(sf) (cf) Units le
ioned Type
(ft) (sf) Housewrap
SLEEPING
Residence
1444 14560 0.40 2.0
Yes Setback
2.0 Standard No
LIVING
Residence
2055 20722 0.60 3.0
Yes Setback
2.0 Standard No
OPAQUE SURFACES
---------------
U- Sheath-
Solar
Appendix
Frame Area fact- Cavity ing
Act Gains
IV
Location/
Surface
Type (sf) or R-val R-val
Azm Tilt
Reference
Comments
------------
SLEEPING
----- ---- ----- ----- -----
--- ---- ---
---------
--------------
1 Wall
Wood 546 0.074 19 0
180 90 Yes
IV.9 A5
SOUTH
3 Wall
Wood 116 0.074 19 0
270 90 Yes
IV.9 A5
WEST
5 Wall
Wood 466 0.074 19 0
0 .90 Yes
IV A A5
NORTH
7 Wall
Wood 169 0.074 19 0
90 90 Yes
IV.9 A5
EAST
9 Wall
Wood 281 0.074 19 0
0 90 No
IV.9 A5
GARAGE WALL
11 RoofRad
Wood 1444 0.025 38 0
n/a 0 Yes
IV.1 A18
Attic
14 Door
Other 22 0.500 0 0
0 90 No
IV.5 A4
Wood Door
LIVING
2 Wall
Wood 120 0.074 19 0
180 90 Yes
IV.9 A5
SOUTH
4 Wall
Wood 416 0.074 19 0
270 90 Yes
IV.9 A5
WEST
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
----------------------------------------------
MICROPAS7 0.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
OPAQUE SURFACES
PERIMETER LOSSES
U-
Appendix
Sheath-
Length
Solar
Appendix
Solar
IV
Location/
Frame
Area
fact-
Cavity
ing
Act
Comments
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
No
Reference
Comments
------------
6
Wall
-----
Wood
----
373
-----
0.074
-----
19
-----
0
---
0
----
90
---
Yes
---------
IV.9 A5
--------------
NORTH
8
Wall
Wood
457
0.074
19
0
90
90
Yes
IV.9 A5
EAST
10
Wall
Wood
182
0.074
19
0
0
90
No
IV.9 A5
GARAGE WALL
12
RoofRad
Wood
2055
0.025
38
0
n/a
0
Yes
IV.1 A18
Attic
13
Door
Other
24
0.500
0
0
270
90
Yes
IV.S A4
Wood Door
PERIMETER LOSSES
FENESTRATION SURFACES
Appendix
Length
F2
Insul
Solar
IV
Location/
Surface
------------
(ft)
Factor.
R-val
Gains
Reference
Comments
SLEEPING
------
--------
-------
-----
---------
----------------------
15 S1abEdge
152
0.900
R-0
No
None
To Outside
17 S1abEdge
30
0.550
R-0
No
None
TO GARAGE
LIVING
Wind
Back
(S)
16.5
0.340
0.300
16 S1abEdge
176
0.900
R-0
No
None
To Outside
18 S1abEdge
18
0.550
R-0
No
None
TO GARAGE
FENESTRATION SURFACES
0
Exterior
Area
U-
Act
Shade
Orientation
------------------
(sf)
-----
factor SHGC
Azm
Tilt
Type
Location/Comments
SLEEPING
-----
-----
---
----
--------
------------------------
1
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASSI/Milgard
Operable
2
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASS2/Milgard
Operable
3
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASS3/Milgard
Operable
4
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS4/Milgard
Operable
5
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASSS/Milgard
Operable
6
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS6/Milgard
Operable
7
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASS7/Milgard
Operable
8
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASS8/Milgard
Operable
9
Wind
Back
(S)
4.0
0.340
0.330
180'
90
Standard
SGLASS9/Milgard
Fixed Wi
13
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASSI/Milgard
Operable
18
Wind
Front
(N)
11.0
0.340
0.300
0
90
Standard
NGLASSI/Milgard
Operable
19
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS2/Milgard
Operable
20
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS3/Milgard
Operable
21
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS4/Milgard
Operable
26
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASSI/Milgard
Operable
27
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS2/Fr.Dr. Therma-Tr
28
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASS3/Milgard
Operable
LIVING.
0
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
---------------------------------=---------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
--------------------------------- ---------------------------------------------
FENESTRATION SURFACES
OVERHANGS
---Window---------------Overhang------------
*
Left
Right
Surface
-----------
Exterior
Width
Height
Depth
Height
Extension
Area
U-
-----
Act
------
Shade
------
Orientation
------------------
---------
(sf)
-----------
factor SHGC
Azm
Tilt
Type
Location/Comments
10
Wind -Back
(S)
11.0
0.340
-----
0.300
---
180
----
90
--------
Standard
------------------------
SGLASS10/Milgard Operabl
11
Door
Back
(S)
40.0
0.310
0.220
180
90
.Standard
SGLASSII/Fr.Dr. Therma-T
12
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASSI2/Milgard Operabl
14
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS2/Milgard Operable
15
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS3/Milgard Operable
16
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS4/Milgard Operable
17
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS5/Milgard Operable
22
Wind
Front
(N)
11.0
0.340
0.300
0
90
_ Standard
NGLASS5/Milgard Operable
23
Door
Front
(N)
40.0
0.310
0.220
0
90
Standard
NGLASS6/Fr.Dr. Therma-Tr
24
Wind
Front
(N)
11.0
0.340
0.300
0
90
Standard
NGLASS7/Milgard Operable
25
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS8/Milgard Operable
29
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS4/Fr.Dr. Therma-Tr
30
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS5/Fr.Dr. Therma-Tr
31
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS6/Fr.Dr. Therma-Tr
32
Wind
Left
(E)
10.0
0.340
0.300
90
90
Standard
EGLASS7/Milgard Operable
33
Wind
Left
(E)
15.0
0.340
0.300
90
90
Standard
EGLASS8/Milgard Operable
34
Wind
Left
(E)
10.0
0.340
0.300
90
90
Standard
EGLASS9/Milgard Operable
35
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASS10/Milgard Operabl
36
Wind
Left
(E)
16.5
0.340
0.300
90
90
Standard
EGLASSII/Milgard Operabl
OVERHANGS
---Window---------------Overhang------------
SLAB SURFACES
-------------
Area
Slab Type (sf)
SLEEPING
Standard Slab 1444
LIVING
Standard Slab 2055
Area
Left
Right
Surface
-----------
(sf)
Width
Height
Depth
Height
Extension
Extension
LIVING
-----
-----
------
-----
------
---------
---------
29 Door
40.0
5.00
8:00
8.00
-1.00
n/a
n/a
30 Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
31 Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a,
SLAB SURFACES
-------------
Area
Slab Type (sf)
SLEEPING
Standard Slab 1444
LIVING
Standard Slab 2055
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
---------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
--------------------------------------------------------------------------------
HVAC SYSTEMS
------------
Verified
HVAC SIZING
Number
Verified
Verified
Verified
Verified
Maximum
System
of
Minimum
Surface
Refrig Charge
Adequate
Fan Watt
Cooling
Type
Systems
Efficiency
EER
or TXV
Airflow
Draw
Capacity
SLEEPING
(Btu/hr)
SLEEPING
R-4.2
----------
----------
----------
Furnace
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
11
Yes
No
No
No
LIVING
n/a
n/a
ACSplit
. n/a
25326'
31429
n/a
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
11
Yes
No
No
No
HVAC SIZING
Orientation of Maximum.....
Sizing Location.............
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range ...............
Front Facing 270 deg (W)
LA QUINTA
26'F
70 F
111 F
75 F
34 F
DUCT SYSTEMS
Verified
Verified
Verified
Total
Sensible
Design
Maximum
Surface
Heating
Cooling
Cooling
Cooling
System
Load
Load
Capacity
Capacity
Type
-------------
(Btu/hr)
----------
(Btu/hr)
(Btu/hr)
(Btu/hr)
SLEEPING
R-4.2
----------
----------
----------
Furnace
29604
n/a
n/a
n/a
ACSplit
n/a
21712
26944
n/a
LIVING
Furnace
Attic
R-4".2
Furnace
36834
n/a
n/a
n/a
ACSplit
. n/a
25326'
31429
n/a
Total
66438
47037
58373
n/a
Orientation of Maximum.....
Sizing Location.............
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range ...............
Front Facing 270 deg (W)
LA QUINTA
26'F
70 F
111 F
75 F
34 F
DUCT SYSTEMS
r
Verified
Verified
Verified
System
Duct
Duct
Duct
Surface
Buried
Type
-------------
Location
R -value
Leakage
Area
Ducts
SLEEPING
-----------
-------
-------
--------
-- ------
Furnace
Attic
R-4.2
Yes
No
No
ACSplit
Attic
R-4.2
Yes
No
No
LIVING
Furnace
Attic
R-4".2
Yes
No
No
r
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------------------- -------------- ------ ----------
1 Storage Gas Standard 1 0.51 75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
--------------------=--------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate..***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
DUCT SYSTEMS
------------
Verified
Verified
Verified
System
Duct Duct Duct
Surface
Buried
Type
Location R -value Leakage
Area
Ducts
-------------
ACSplit
-------------------------
Attic R-4.2 Yes
--------
No
---------
No
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------------------- -------------- ------ ----------
1 Storage Gas Standard 1 0.51 75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
--------------------=--------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate..***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title......:... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
-------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
HERS REQUIRED VERIFICATION
--------------------------
This building incorporates -HERS verified EER.
This building incorporates HERS verified Duct Leakage. Target leakage is
calculated and documented on the CF -4R. If the measured CFM is above the
target, then corrective action must be taken to reduce the duct leakage and
then must be retested. Alternatively, the compliance calculations could be
redone without duct testing. If ducts are not installed, then HERS
verification is not necessary.
REMARKS
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite 'Date..07/31/07 09:18:31
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditionind, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
COMPLIANCE STATEMENT
--------------
This certificate of'compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility.
DESIGNER or OWNER DOCUMENTATION AUTHOR
Name.... Salim Rahemtulla. Name.... Chinh Nguyen
Company. Standard Pacific Homes Company: Westpac Air Conditioning, Inc.
Address. 15326 Alton Parkway Address. 1610 N. Maple St.
Irvine, CA 92618-2338 Corona, CA 92880
Phone... (949) 789-1746 Phone... (951) 7 -9501
License.
Signed.. Signed..
(date) (bate)
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
Project Address.. ******* ---------------------
La Quinta, California *v7.10*
Documentation Author... Chinh Nguyen *******
Westpac Air Conditioning, Inc.
1610 N. Maple St.
Corona, CA 92880
(951) 739-9501
Building Permit #
Plan Check / Date
Field Check/ Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. More stringent compliance
requirements from the6Certificate of Compliance supersede the items marked with
an asterisk (*). When this checklist is incorporated into the permit documents,
the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown
elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
De- En-
sign- force-
n/a
er ment
*150(a): Minimum R-19 insulation in wood framed ceiling or
equivalent U -factor in metal frame ceiling
�v
150(b): Loose fill insulation manufacturer's labeled R -Value
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
to exterior mass walls)
/7-4f
*150(d): Minimum R-13 raised floor insulation in framed floors
or equivalent U -factor
150(e): Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door covering the entire
opening of the firebox
b. Outside air intake with damper and control, flue
damper and control
2. No continuous burning gas pilot lights allowed
150(f): Air retarding wrap installed to comply with Sec. 151
meets requirements specified in ACM Residential Manual
150(g): Vapor barriers mandatory in Climate Zones 14,16 only
�L
150(1): Slab edge insulation - water absorption rate for the
insulation material without facings no greater than 0.3%,
water vapor permeance rate no greater than 2.0 perm/inch
118: Insulation specified or installed meets insulation quality
standards. Indicate type and include CF -6R form —Z
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage —
2. Fenestration products (except field -fabricated) have
—Z-
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
label with certified U -factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification /
3. Exterior doors and windows weatherstripped; all joints
and penetrations caulked and sealed
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
De- En-
sign- force
n/a
er ment
110-113: HVAC equipment, water heaters, showerheads and
faucets certified by the Energy Commission
150(h): Heating and/or cooling loads calculated in accordance
with ASHRAE, SMACNA or ACCA
150(1): Setback thermostat on all applicable heating and/or
cooling systems
150(j): Water system pipe and tank insulation and cooling
systems line insulation
1. Storage gas water heaters rated with an Energy Factor
less than 0.58 must be externally wrapped with insulation
/
having an installed thermal resistance of R12 or greater
2. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 internal and indicated on the
exterior of the tank showing the R -value
3. The following piping is insulated according to Table 150
or Equation 150-A Insulation Thickness:
1. First 5 feet of hot and cold water pipes closest to
water heater tank, non -recirculating systems, and
entire length of recirculating sections of hot water
/
pipes shall be insulated to Table 150B
2. Cooling system piping (suction, chilled water, or
brine lines), piping insulated between heating source
and indirect hot water tank shall be insulated to
Table 150-B and Equation 150-A
4. Steam hydronic heating systems or hot water systems >15 psi,
meet requirements of Table 123-A
5. Insulation must be protected from damage, including that clue
to sunlight, moisture, equipment maintenance and wind
6. Insulation for chilled water piping and refrigerant suction
piping includes a vapor retardant or is enclosed entirely
in conditioned space
7. Solar water -heating systems/collectors are certified by the
Solar Rating and Certification Corporation
*150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to
meet the requirements of the CMC Sections 601, 602, 603,
604, 605 and Standard 6-5; supply -air and return -air ducts
and plenums are insulated to a minimum installed level of
R-4.2 or enclosed entirely in conditioned space. Openings
shall be sealed with mastic, tape, or other duct -closure
system that meets the applicable requirements of UL 181,
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 1/Suite Date..07/31/07 09:18:31
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite
-------------------------------------------------------------------------------
UL 181A, or UL 181B or aerosol sealant that meets the
requirements of UL 723. If mastic or tape is used to seal
openings greater than 1/4 inch, the combination of mastic
/
and either mesh or tape shall be used
✓
2.
Building cavities, support platforms for air handlers, and
plenums defined or constructed with materials other than
sealed sheet metal, duct board or flexible duct shall not
be used for conveying conditioned air. Building cavities and
•support platforms may contain ducts. Ducts installed in
cavities and support platforms shall not be compressed to cause
reductions in the cross-sectional area of the ducts
✓
3.
Joints and seams of duct systems and their components
shall not be sealed with cloth backed rubber adhesive
duct tapes unless such tape is used in combination with
mastic and draw bands
4.
Exhaust fan systems have back draft or automatic dampers
/
5.
Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers
6.
Protection of Insulation. Insulation shall be protected
from damage due to sunlight, moisture, equipment mainten-
ance and wind. Cellular foam insulation shall be protected
as above or painted with a coating that is water retardant
and provides shielding from solar radiation that can cause
degradation of the material
7.
Flexible ducts cannot have porous inner cores
114:
Pool and Spa Heating Systems and Equipment
1.
A thermal efficiency that complies with the Appliance
Efficiency Regulations, on-off switch mounted outside of
the heater, weatherproof operating instructions, no /
electric resistance heating and no pilot light
2.
System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating /
b. Cover for outdoor pools or outdoor spas.
3.
Pool system has directional inlets and a circulation
pump time switch
115:
Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning
pilot
light (Exception: Non -electrical cooking appliances /
with
pilot < 150 Btu/hr)
118(1):
Cool Roof material meets specified criteria
RESIDENTIAL LIGHTING MEASURES
De- En-
sign- force
n/a er ment
150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:
contain only high efficacy lamps as outlined in Table
150-C, and do not contain a medium screw base socket
(E24/E26). Ballast for lamps 13 watts or greater are electronic
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
Page 4
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan*l/Suite Date..07/31/07
09:18:31
----------------------------------
MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF
-1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan
1/Suite
---------------------------------------------------------7---------------------
and have an output frequency no less than 20 kHz
150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain
only high efficacy lamps as outlined in Table 150-C,
luminaire has factory installed HID ballast
150(k)2: Permanently installed luminaires in kitchens shall
be high efficacy luminaires. Up to 50 percent of the wattage,
as determined in Sec. 130(c), of permanently installed luminaires
in kitchens may be in luminaires that are not high efficacy
luminaires, provided that these luminaires are controlled
by switches separate from those controlling the high
efficacy luminaires
`.
150(k)3: Permanently installed luminaires in bathrooms,
garages, laundry rooms, utility rooms shall be high
efficacy luminaires OR are controlled by an occupant
sensor(s) certified to comply with Section 119(d) that
does not turn on automatically or have an always on option
150(k)4: Permanently installed luminaires located other than
in kitchens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets
less than 70 ft2), OR are controlled by a dimmer switch
OR are controlled by an occupant sensor(s) that complies
with Section 119(d) that does not turn on automatically
or have an always on option
_ L
150(k)5: Luminaires that are recessed into insulated ceilings
are approved for zero clearance insulation cover (IC) and
are certified air tight to ASTM E283 and labeled as air
tight (AT) to less than 2.0 CFM at 75 Pascals
150(k)6: Luminaires providing outdoor lighting and permanently
mounted to a residential building or to other buildings on
the same lot shall be high efficacy luminaires (not in-
cluding lighting around swimming pools/water features or
other Article 680 locations) OR are controlled by occupant
sensors with integral photo control certified to comply
with Section 119(d)
150(k)7: Lighting for parking lots for 8 or more vehicles shall
have lighting that complies with Sec. 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall
have lighting that complies with Sec. 130, 131, and 146
150(k)8: Permanently installed lighting in the enclosed, non -
dwelling spaces of low-rise residential buildings with four
or more dwelling units shall be high efficacy luminaires OR
are controlled by an occupant sensor(s) certified to
comply with Section 119(d)
STANDARD PAC
IFIC HOMES
PALO VERDE AT LA QUINTA
Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509,
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1
--------------------------------=----------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
Project Address.. ******* ---------------------
La Quinta, California *v7.10* I I
Documentation Author... Chinh Nguyen ******* I Building Permit #
Westpac Air Conditioning, Inc. I
1610 N. Maple St. I Plan Check / Date
Corona, CA 92880
(951) 739-9501 I Field Check/ Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air. Conditioning, Run -Palo Verde/Plan 2
-------------------------------------------------------------------------------
----------------------------
----------------------------
MICROPAS7 ENERGY USE SUMMARY
= Energy Use
Standard
Proposed Compliance =
(kTDV/sf-yr)
Design
Design
Margin =
Space
Heating..........
2.32
2.31
0.01 =
= Space
Cooling..........
70.96
55.84
15.12 =
= Water
Heating..........
7.23
8.23
-1.00 =
=
North Total
80.51
66.38
14.13 =
_ Space
Heating..........
2.32
2.07
0.25 =
= Space
Cooling..........
70.96
57.25
13.71 -
= Water
Heating...........
7.23
8.23
-1.00 =
=
East Total
80.51
67.55
12.96 =
= Space
Heating..........
2.32
2.20
0.12 -
= Space
Cooling..........
70.96
57.40
13.56 =
= Water
Heating..........
7.23
8.23
-1.00 =
=
South Total
80.51
67.83
12.68 =
= Space
Heating..........
2.32
2.45
-0.13 =
= Space
Cooling..........
70.96
56.96
= Water
Heating..........
7.23
8.23
-1.00 =
=
West Total
80.51
67.64
12.87 =
_ *** Building complies
with Computer Performance
_ *** HERS Verification
Required
for Compliance
*** _
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
-------------------------------------------------------------------------------
GENERAL INFORMATION
HERS Verification.......:.. Required
Conditioned Floor Area..... 3555 sf
Building Type .............. Single Family Detached
Construction Type New
Fuel Type ................. NaturalGas
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type.......... FullYear
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade Area.......:.
Glazing Percentage.........
Average Glazing U -factor...
Average Glazing SHGC.......
Average Ceiling Height.....
Slab On Grade
2
35850 cf
3555 sf
17.6 % of floor area
0.33 Btu/hr-sf-F
0.27
10.1 ft
BUILDING ZONE INFORMATION
OPAQUE SURFACES
Floor
'# of
# of
Cond-
Thermo-
Vent
Vent Verified
Solar
Area
Volume
Dwell
Peop-
it-
stat
Height
Area Leakage or
Zone Type
--------------
(sf)
-----
(cf)
------
Units
-----
le
-----
ioned
Type
(ft)
(sf) Housewrap
SLEEPING
R-val
R-val
Azm
Tilt
-----
--------
-----
------- ----------
Residence
1596
16094
0.45
2.7
Yes
Setback
2.0
Standard No
LIVING
1
Wall
Wood
468
0.074
19
0
180
Residence
1959
19756
0.55
3.3
Yes
Setback
2.0
Standard No
OPAQUE SURFACES
r
U-
Sheath-
Solar
Appendix
Frame
Area
fact-
Cavity
ing
Act
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
Reference
Comments
------------
SLEEPING
-----
----
-----
-----
-----
---
----
---
---------
--------------
1
Wall
Wood
468
0.074
19
0
180
90
Yes
IV.9 A5
SOUTH
3
Wall
Wood
206
0.074
19
0
270
90
Yes
IV.9 A5
WEST
5
Wall
Wood
733
0.074
19
0
0
90
Yes
IV.9 A5
NORTH
7
Wall
Wood
140
0.074
19
0
90
90
Yes
IV.9 A5
EAST
10
Roof Rad
Wood
1596
0.025
38
0
n/a
0
Yes
IV.1'A18
Attic
LIVING
2
Wall
Wood
407
0.074
19
0
180
90
Yes
IV.9 A5
SOUTH
4
Wall
Wood
416
0.074
19
0
270
90
Yes
IV.9 A5
WEST
6
Wall
Wood
239
0.074
19
0
0
90
Yes
IV.9 A5
NORTH
8
Wall
Wood
476
0.074
19
0
90
90
Yes
IV.9 A5
EAST
r
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
-------------------------------------------------------------------------------
OPAQUE SURFACES
PERIMETER LOSSES
U-
Appendix
Sheath-
Length
Solar
Appendix
Solar
IV
Location/
Frame
Area
fact-
Cavity
ing
Act
Comments
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
No
Reference
Comments
------------
9
Wall
-----
Wood
----
291
-----
0.074
-----
19
-----
0
---
0
----
90
---
No
---------
IV A A5
--------------
GARAGE WALL
11
Roof Rad
Wood
1941
0.025
38
0
n/a
0
Yes
IV.1 A18
Attic
12
Door
Other
28
0.500
0
0
270
90
Yes
IV.5 A4
Wood Door
13
Door
Other
22
0.500
0
0
0
90
No
IV.5 A4
Wood Door
PERIMETER LOSSES
FENESTRATION SURFACES
Appendix
Length
F2
Insul
Solar
IV
Location/
Surface
------------
(ft)
Factor
R-val
Gains
Reference
Comments
SLEEPING
------
--------
-------
-----
---------
----------------------
14 S1abEdge
182
0.900
R-0
No
None
To Outside
LIVING
-----
---
----
--------
------------------------
15 S1abEdge
191
.0.900
R-0
No
None
To Outside
16 S1abEdge
31
0.550
R-0
No
None
TO GARAGE
FENESTRATION SURFACES
Exterior
Area
U-
Act
Shade
Orientation
------------------
(sf)
-----
factor SHGC
-----
Azm
Tilt
Type
Location/Comments
SLEEPING
-----
---
----
--------
------------------------
1
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASSI/Milgard
Operable
2
Wind
Back
(S)
15.0
0.340
0.300
180
90
Standard
SGLASS2/Milgard
Operable
3
Wind
Back
(S)
15.0
0.340
0.300
180
'90
Standard
SGLASS3/Milgard
Operable
4
Door
Back
(S)
40.0
0.310
0.22.0
180.
90
Standard
SGLASS4/Fr.Dr. Therma-Tr
5
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASSS/Milgard
Operable
6
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASS6/Milgard
Operable
10
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASSI/Milgard
Operable
16
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASSI/Milgard
Operable
17
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS2/Milgard
Operable
18
Wind
Front
(N)
9.0
0..340
0.300
0
90
Standard
NGLASS3/Milgard
Operable
19
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS4/Milgard
Operable
20
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASSS/Milgard
Operable
21
Wind
Front
(N)
16.5
0.340
0.300
0
-90
Standard
NGLASS6/Milgard
Operable
22
Wind
Front
(N)
6.0
0.340
0.300
0
90
Standard
NGLASS7/Milgard
Operable
23
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS8/Milgard
Operable
24
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS9/Milgard
Operable
29
Wind
Left
(E)
11.0
0.340
0.300
90
90
Standard
EGLASSI/Milgard
Operable
30
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS2/Fr.Dr. Therma-Tr
31
Wind
Left
(E)
11.0
0.340
0.300
90
90
Standard
EGLASS3/Milgard
Operable
LIVING
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
-------------------------------------------------------------------------------
FENESTRATION SURFACES
OVERHANGS
---Window---
------------Overhang------------
'
Exterior
Left
Area
U-
(sf)
Act
Height
Shade
Height
Orientation
------------------
Extension
(sf)
-----
factor SHGC
-----
Azm
Tilt
Type
Location/Comments
7
Wind
Back
(S)
9.0
0.340
-----
0.300
---
180
----
90
--------
Standard
------------------------
SGLASS9/Milgard Operable
8
Door
Back
(S)
9.0
0.310
0.220
180
90
Standard
SGLASSI0/Fr.Dr. Therma-T
9
Wind
Back
(S)
9.0
0.340
0.300
180
90
Standard
SGLASSII/Milgard Operabl
11
Door
Right
(W)
40.0
0.310
0.220
270
90
Standard
WGLASS2/Fr.Dr. Therma-Tr
12
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS3/Milgard Operable
13
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS4/Milgard Operable
14
Wind
Right
(W)
2.5
0.340
0.330
270
90
Standard
WGLASS5/Milgard Fixed Wi
15
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS6/Milgard Operable
25
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASSI0/Milgard Operabl
.26
Wind
Front
(N)
16.5
0.340
0.300'
0
90
Standard
NGLASSII/Milgard Operabl
127
Wind
Front
(N)
6.0
0.340
0.300
0
90
Standard
NGLASSI2/Milgard Operabl
28
Wind
Front
(N)
6.0
0.340
0.300
0
90
Standard
NGLASSI3/Milgard Operabl
32
Door
Left
(E)
24.0
0.310
0.220
90
90
Standard
EGLASS4/Fr.Dr. Therma-Tr
33
Wind
Left
(E)
27.5
0.340
0.330
90
90
Standard
EGLASS5/Milgard Fixed Wi
34
Door
Left
(E)
24.0
0.310
0.220
90
90
Standard
EGLASS6./Fr.Dr. Therma-Tr
35
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS7/Fr.Dr. Therma-Tr
36
Wind
Left
(E)
15.0
0.340
0.300
90
90
Standard
EGLASS8/Milgard Operable
37
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS9/Fr.Dr. Therma-Tr
OVERHANGS
---Window---
------------Overhang------------
Area
Left
Right
Surface
-----------
(sf)
Width
Height
Depth
Height
Extension
Extension
SLEEPING
-----
-----
------
-----
------
---------
---------
1
Window
16.5
- 3.00
5.50
6.00
1.00
n/a
n/a
5
Window
6.0
2.00
3.00
6.00
1.00
n/a
n/a
6
Window
6.0
2.00
3.00
6.00
1.00
n/a_
n/a
LIVING
11
Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
12
Window
16.5
3.00
5.50
6.00
1.00
n/a
n/a
13
Window
16.5
3.00
5.50
6.00
1.00
n/a
n/a
25
Window
16.5
3.00
5.50
6.00
1.00
n/a
n/a
27
Window
6.0
2.00
3.00
6.00
1.00
n/a
n/a
28
Window
6.0
2.00
3.00
6.00
1.00
n/a
n/a
32
Door
24.0
3.00
8.00
6.00
1.00
n/a
n/a
33
Window
27.5
5.00
5.50
6.00
1.00
n/a
n/a
34
Door
24.0
3.00
8.00
6.00
1.00
n/a
n/a
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
-----------------------------------------------
MICROPAS7 x7.10 File-LAQ53_2. Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
-------------------------------------------------------------------------------
Orientation of Maximum.....
Sizing Location............
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range.., .............
Front Facing 270 deg (W)
LA QUINTA
26 F
70 F
111 F
75 F
34 F
SLAB SURFACES
-------------
Area
Slab
Type (sf)
SLEEPING
Standard Slab 1596
LIVING
Standard Slab 1959
HVAC SYSTEMS
------------
Verified
Number
Verified Verified Verified Verified
Maximum
System
of
Minimum
Refrig Charge Adequate Fan Watt
Cooling
Type
------------
Systems
Efficiency
EER or TXV Airflow Draw
Capacity
SLEEPING
-------
-----------
----- ------------- --------
--------
--------
Furnace
1
0.800 AFUE
n/a n/a
n/a n/a
n/a
ACSplit
14
13.00 SEER
11 Yes
No No
No
LIVING
Furnace
1
0.800 AFUE
n/a' n/a
n/a n/a
n/a
ACSplit
1
.13.00 SEER
X11 Yes
No No
No
HVAC SIZING
Verified
Total
Sensible Design
Maximum
Heating
Cooling Cooling
Cooling
-System
Load
Load Capacity
Capacity
Type
-------------
-(Btu/hr)
----------
(Btu/hr) (Btu/hr)
----------
(Btu/hr)
SLEEPING
----------
-
----------
Furnace
31396
n/a n/a
n/a
ACSplit
n/a
22633 28087
n/a
LIVING
Furnace
38281
n/a n/a
n/a
ACSplit
-------------
n/a
24667 30612
n/a
Total
----------
69677
--------------------
47300 58699
----------
n/a
Orientation of Maximum.....
Sizing Location............
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range.., .............
Front Facing 270 deg (W)
LA QUINTA
26 F
70 F
111 F
75 F
34 F
0
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
-----------------------------------------------------------------=-------------
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant,Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a .
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER
This building incorporates HERS verified Duct Leakage.
b
This is a multiple orientation building—This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
a HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
DUCT SYSTEMS
------------
Verified Verified
Verified
System
Duct
Duct
Duct
Surface
Buried
Type
Location
R -value
Leakage
Area
Ducts
SLEEPING
Furnace
Attic
R-4.2
Yes
No
No
ACSplit
Attic
R-4.2
Yes
No
No
LIVING
Furnace
Attic
R-4.2
Yes
No
No
ACSplit
Attic
R-4.2
Yes
No
No
WATER
HEATING
SYSTEMS
---------------------
Number
Tank External
Heater
in
Energy
Size Insulation
Tank Type Type
Distribution
Type
System
Factor
(gal) R -value -
------------------------
1 Storage Gas
-------------------
Standard
------
1
--------
0.51
------ ----------
75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant,Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a .
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER
This building incorporates HERS verified Duct Leakage.
b
This is a multiple orientation building—This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
a HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
HERS REQUIRED VERIFICATION
--------------------------
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage. Target leakage is
calculated and documented on the CF -4R. If the measured CFM is above the
target, then corrective action must be taken to reduce the duct leakage and
then must be retested. Alternatively, the compliance calculations could be
redone without duct testing. If ducts are not installed, then HERS
verification is not necessary.
REMARKS
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 8
---------------------------------------------------_----------------------------
-------------------------------------------------------------------------------
Project Title...:...... Palo Verde/ Plan 2 Date..07/31/07 09:11:55
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program-FORM CF-1R
User#-MP2387 User-Westpac Air Conditioning, Run-Palo Verde/Plan 2
------------------------------------------------ -------------------------- -----
COMPLIANCE STATEMENT
--------------------
This certificate of compliance lists the building features and performance
specifications needed to- comply with Title-24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility.
DESIGNER or OWNER DOCUMENTATION AUTHOR
Name.... Salim Rahemtulla Name.... Chinh Nguyen
Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc.
Address. 15326 Alton Parkway Address. 1610 N. Maple St.
Irvine, CA 92618-2338 Corona, CA 92880
Phone... (949) 789-1746 Phone... (951) 9- 501
License.
Signed.. Signed.. D
(date) date)
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
0
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1
---------------------------------------=---------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
Project Address.. ******* ---------------------
La Quinta, California *v7.10*
Documentation Author... Chinh Nguyen ******* Building Permit #
Westpac Air Conditioning; Inc.
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date's
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
-------------------------------------------------------------------------------
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. More stringent compliance
requirements from the Certificate of Compliance supersede the items marked with
an asterisk (*). When this checklist is incorporated into the permit documents,
the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown
elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
De- En-
sign- force-
n/a er ment
*150(a): Minimum R-19 insulation in wood framed ceiling or
equivalent U -factor in metal frame ceiling
150(b): Loose fill insulation manufacturer's labeled R -Value
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
to exterior mass walls)
n
*150(d): Minimum R-13 raised floor insulation in framed floors
or equivalent U -factor
150(e): Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door covering the entire
✓
opening of the firebox
b. Outside air intake with damper and control, flue
damper and control
2. No continuous burning gas pilot lights allowed
150(f): Air retarding wrap installed to comply with Sec. 151
meets requirements specified in ACM Residential Manual
150(8): Vapor barriers mandatory in Climate Zones 14,16 only
150(1): Slab edge insulation - water absorption rate for the
insulation material without facings no greater than 0.3%,
water vapor permeance rate no greater than 2.0 perm/inch /
118: Insulation specified or installed meets insulation quality
standards. Indicate type and include CF -6R form
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned,and unconditioned
/
spaces designed to limit air leakage
J
2. Fenestration products (except field -fabricated) have
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07 09:11:55
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2
--------------------------------------------------------- 7 ---------- .-------------
label with certified U -factor, certified Solar Heat Gain /
Coefficient (SHGC), and infiltration certification
3. Exterior doors and windows weatherstripped; all joints
and penetrations caulked and sealed
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
De- En-
sign- force
n/a
er ment
110-113: HVAC equipment, water heaters, showerheads and
faucets certified by the Energy Commission
150(h): Heating and/or cooling loads calculated in accordance
with ASHRAE, SMACNA or ACCA
150(1): Setback thermostat on all applicable heating and/or
cooling systems
/
150(j): Water system pipe and tank insulation and cooling
systems line insulation
1. Storage gas water heaters rated with an Energy Factor
less than 0.58 must be externally wrapped with insulation
/
having an installed thermal resistance of R12 or greater
2. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 internal and indicated on the
exterior of the tank showing the R -value
3. The following piping is insulated according to Table 150- /B
or Equation 150-A Insulation Thickness:
1. First 5 feet of hot and cold water pipes closest to
water heater tank, non -recirculating systems, and,
entire length of recirculating sections of hot water
pipes shall be insulated to Table 150B
2. Cooling system piping (suction, chilled water, or
brine lines), piping insulated between heating source
and indirect hot water tank shall be insulated to
Table 150-B and Equation 150-A
4. Steam hydronic heating systems or hot water systems >15 psi,.
meet requirements of Table 123-A /
5. Insulation must be protected from damage, including that due
to sunlight, moisture, equipment maintenance and wind
`
J
6. Insulation for chilled water piping and refrigerant suction
piping includes a vapor retardant or is enclosed entirely
in conditioned space
7. Solar water -heating systems/collectors are certified by the
Solar Rating and Certification Corporation
*150(m): Ducts and Fans
1. All ducts and plenums installed „ sealed and insulated to
meet the requirements of the CMC Sections 601, 602, 603,
604, 605 and Standard 6-5; supply -air and return -air ducts
and plenums are insulated to a minimum installed level of -
R -4.2 or enclosed entirely in conditioned space. Openings
shall be sealed with mastic, tape, or other duct -closure
system that meets the applicable requirements of UL 181,
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
-------------------------------------------------------------------------------
Page 3
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07
-------------------------------------------------------------------------------
09:11:55
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan
-------------------------------------------------------------------------------
2
UL 181A, or UL 181B or aerosol sealant that meets the
requirements of UL 723. If mastic or tape is used to seal
'
openings greater than 1/4 inch, the combination of mastic
and either mesh or tape shall be used
2. Building cavities, support platforms for air handlers, and
plenums defined or constructed with materials other than
sealed sheet metal, duct board or flexible duct shall not
be used for conveying conditioned air. Building cavities and
support platforms may contain ducts. Ducts installed in
cavities and support platforms shall not be compressed to cause/
reductions in the cross-sectional area of the ducts
3. Joints and seams of duct systems and their components
shall not be sealed with cloth backed rubber adhesive
duct tapes unless such tape is used in combination with
mastic and draw bands
4. Exhaust fan systems have back draft or automatic dampers
5. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers
/
6. Protection of Insulation. Insulation shall be protected
from damage due to sunlight, moisture, equipment mainten-
ance and wind. Cellular foam insulation shall be protected
as above or painted with a coating that is water retardant
and provides shielding from solar radiation that can cause
degradation of the material
7. Flexible ducts cannot have porous inner cores
114: Pool and Spa Heating Systems and Equipment
1. A thermal efficiency that complies with the Appliance
Efficiency Regulations, on-off switch mounted outside of
the heater, weatherproof operating instructions, no
electric resistance heating and no pilot light
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation
pump time switch
115: Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning
pilot light (Exception: Non -electrical cooking appliances
with pilot < 150 Btu/hr)
118(i): Cool Roof material meets specified criteria
RESIDENTIAL LIGHTING MEASURES
De- En-
sign- force
n/a er ment
150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:
contain only high efficacy lamps as outlined in Table
150-C, and do not contain a medium screw base socket
(E24/E26). Ballast for lamps 13 watts or greater are electronic
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
-------------------------------------------------------------------------------
Page 4
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2 Date..07/31/07
09:11:55
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan
2
-------------------------------------------------------------------------------
and have an output frequency no less than 20 kHz
150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain
only high efficacy lamps as outlined in Table 150-C,
luminaire has factory installed HID ballast
,
150(k)2: Permanently installed luminaires in kitchens shall
be high efficacy luminaires. Up to 50 percent of the wattage,
as determined in Sec. 130(c), of permanently installed luminaires
in kitchens may be in luminaires that are not high efficacy
luminaires, provided that these luminaires are controlled
by switches separate from those controllingthe high
/
efficacy luminaires
150(k)3: Permanently installed luminaires in bathrooms,
garages, laundry rooms, utility rooms shall be high
efficacy luminaires OR are controlled by an occupant
sensor(s) certified to comply with Section 119(d) that
does not turn on automatically or have an always on option
150(k)4: Permanently installed luminaires located other than
in kitchens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets.
less than 70 ft2), OR are controlled by a dimmer switch
OR are controlled by an occupant sensor(s) that complies
with Section 119(d) that does not turn on automatically
or have an always on option
150(.k)5: Luminaires that are recessed into insulated ceilings
are approved for zero clearance insulation cover (IC) and
are certified air tight to ASTM E283 and labeled as air
tight (AT) to less than 2.0 CFM at 75 Pascals
150(k)6: Luminaires providing outdoor lighting and permanently
mounted to a residential building or to other buildings on
the'same lot shall be high efficacy luminaires (not in-
cluding lighting around swimming pools/water features or
other Article 680 locations) OR are controlled by occupant
sensors with integral photo control certified to comply
j
with Section 119(d)
150(k)7: Lighting for parking lots for 8 or more vehicles shall
have lighting that complies with Sec. 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall
have lighting that complies with Sec. 130, 131, and 1461
150(k)8: Permanently installed lighting in the enclosed, non -
dwelling spaces of low-rise residential buildings with four
or more dwelling units shall be high efficacy luminaires OR
are controlled by an occupant sensor(s) certified to
comply with Section 119(d)
STANDARD PACIFIC HOMES
PALO VERDE AT LA QUINTA
PLAN -2/OPT. OUTDOOR
Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509
CERTIFICATE OF COMPLIANCE:.RESIDENTIAL COMPUTER
METHOD
CF -1R Page 1
-------------------------------------------------------------------------------
Project Title..........
Palo Verde/Plan 2/OutDr
Date..07/31/07
09:14:45
Project Address....
*******
---------------------
La Quinta, California
*v7.10*
Documentation Author...
Chinh Nguyen
*******
I Building Permit #
Westpac Air Conditioning,
Inc.
1610 N. Maple St.
Plan Check / Date
Corona, CA 92880
(951) 739-9501
Field Check/ Date
Climate Zone...........
15
---------------------
Compliance Method......
MICROPAS7 v7.10 for 2005
Standards
by Enercomp, Inc. '
-------------------------------------------------------------------------------
MICROPAS7
v7.10
File-LAQ53_2O Wth-CTZ15S05
Program
-FORM CF -1R
User#-MP2387
-------------------------------------------------------------------------------
User -Westpac Air Conditioning,
Run -Palo
Verde/Plan 2/OutDr
=
MICROPAS7 ENERGY USE SUMMARY
=
= Energy Use
----------------------------
Standard
Proposed
Compliance =
_ (kTDV/sf-yr)
Design
Design
Margin =
= Space
Heating..........
2.34
2.30
0.04. -
= Space
Cooling..........
71.27
56.66
14.61 -
= Water
Heating..........
7.26
8.27
-1.0.1 =
=
North Total 80.87
67.23
13.64 =
= Space
Heating..........
2.34
2.08
0.26 -
= Space
Cooling..........
71.27
57.67
13.60 =
= Water
_
Heating..........
7.26
8.27
-1.01 =
=
--------
i
East Total 80.87
--------
68.02
-------- -
12.85 =
= Space
Heating..........
2.34
2.17
0.17 =
- Space
Cooling..........
. 71.27
58.04
13.23 =
= Water
Heating..........
7.26
8.27
-1.01 =
=
South Total 80.87
68.48
12.39 =
= Space
Heating..........
2.34
2.38,
-0.04 -
= Space
Cooling..........
71.27
57.66
13.61 =
= Water
Heating..........
7.26
8.27
-1.01 =
=
West Total 80.87
68.31
12.56 =
_ *** Building complies with'Computer
Performance
_ *** HERS
Verification Required for
Compliance
*** _
a
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_20 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------------------------------------------------------
GENERAL INFORMATION
HERS Verification..:....... Required
Conditioned Floor Area..... 3537 sf
Building Type .............. Single Family Detached
Construction Type New
Fuel Type NaturalGas
Building Front Orientation. Cardinal - N,E,S,W
Number of Dwelling Units... 1
Number of Building Stories. 1
Weather Data Type........... FullYear
Floor Construction Type....
Number of Building Zones...
Conditioned Volume.........
Slab -On -Grade Area.........
Glazing Percentage.........
Average Glazing U -factor...
Average Glazing SHGC.......
Average Ceiling Height.....
Slab On Grade
2
35668 cf
3537 sf
17.7 % of floor area
0.33 Btu/hr-sf-F
0.27
10.1 ft
BUILDING ZONE INFORMATION
OPAQUE SURFACES
Floor
# of
# of
Cond-
Thermo-
Vent
Vent Verified
Solar
Area
Volume
Dwell
Peop-
it-
stat
Height
Area Leakage or
Zone Type
--------------
(sf)
-----
(cf)
------
Units
-----
le
-----
ioned
-----
Type
--------
(ft)
(sf) Housewrap
SLEEPING
R-val
R-val
Azm
Tilt
Reference
-----
------- ----------
Residence
1596
16094
0.45
2.7
Yes
Setback
2.0'
Standard No
LIVING
--------------
1
Wall
Wood
468
0.074
19
0
Residence
1941
19574
0.55
3.3
Yes
Setback
2.0
Standard No
OPAQUE SURFACES
U-
Sheath-
Solar
Appendix
Frame
Area
fact-
Cavity
ing
Act
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
Reference
Comments
------------
SLEEPING
-----
----
-----
-----
-----
---
----
---
---------
--------------
1
Wall
Wood
468
0.074
19
0
180
90
Yes
IV.9
A5
SOUTH
3
Wall
Wood
206
0.074
19
0
270
90
Yes
IV.9
A5
WEST
5
Wall
Wood
733
0.074
19
0
0
90
Yes
IV.9
A5
NORTH
7
Wall
Wood
140
0.074
19
0
90
90
Yes
IV A
A5
EAST
10
Roof Rad
Wood
1596
0.025
38
0
n/a
0
Yes
IV.1
A18
Attic
LIVING
2
Wall
Wood
407
0.074
19
0
180
90
Yes
IV A
A5
SOUTH
4
Wall
Wood
505
0.074
19
0
270
90
Yes
IV A
A5
WEST
6
Wall
Wood
239
0.074
19
0.
0
90
Yes
IV A
A5
NORTH
8
Wall
Wood
476
0.074
19
0
90
90
Yes
IV.9
A5
EAST
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
---------------------------------------=---------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------------------------------------------------------
OPAQUE SURFACES
PERIMETER LOSSES
U-
Sheath-
Solar
Appendix
Insul
Solar
IV
Frame
Area
fact-
Cavity
ing
Act
Reference
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
R-0
Reference
Comments
------------
9
Wall
-----
Wood
----
202
-----
0.074
-----
19
-----
0
---
0
----
90
---
No
---------
IV.9 A5
--------------
GARAGE WALL
11
RoofRad
Wood
1941
0.025
38
0
n/a
0
Yes
IV.1 A18
Attic
12
Door
Other
28
0.500
0
0
270
90
Yes
IV.S A4
Wood Door
13
Door
Other
22
0.500
0
0
270
90
Yes
IV.5 A4
Wood Door
PERIMETER LOSSES
FENESTRATION SURFACES
Appendix
Length
F2
Insul
Solar
IV
Location/
Surface
(ft)
Factor
R-val
Gains
Reference
Comments
------------
SLEEPING
------
--------
-------
-----
---------
----------------------
14 S1abEdge
182
0.900
R-0
No
None
To Outside
LIVING
-----
---
,
----
--------
------------------------
15 S1abEdge
202
0.900
R-0
No
None
To Outside
16 S1abEdge
20
0.550
R-0
No
None
TO GARAGE
FENESTRATION SURFACES
Exterior
Area
U-
Act
Shade
Orientation
------------------
(sf)
-----
factor
-----
SHGC
Azm
Tilt
Type'
Location/Comments
SLEEPING
-----
---
,
----
--------
------------------------
1
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASSI/Milgard
Operable
2
Wind
Back
(S)
15.0
0.340
0.300
180
90
Standard
SGLASS2/Milgard
Operable
3
Wind
Back
(S)
15.0
0.340
0.300
180
90
Standard
SGLASS3/Milgard
Operable
4
Door
Back
(S)
40.0
0.310
0.220
180
90
Standard
SGLASS4/Fr.Dr. Therma-Tr
5
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASS5/Milgard
Operable
6
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASS6/Milgard
Operable
10
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASSI/Milgard
Operable
16
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASSI/Milgard
Operable
17
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS2/Milgard
Operable
18
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS3/Milgard
Operable
19
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS4/Milgard
Operable
20
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS5/Milgard
Operable
21
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS6/Milgard
Operable
22
Wind
Front
(N)
6.0
0.340
0.300
0
90
Standard
NGLASS7/Milgard
Operable
23
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS8/Milgard
Operable
24
Wind
Front
(N)
16.5
0.340
0.300
0
90
Standard
NGLASS9/Milgard
Operable
29
Wind
Left
(E)
11.0
0.340
0.300
90
90
Standard
EGLASSI/Milgard
Operable
30
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
SGLASS2/Fr.Dr. Therma-Tr
31
Wind
Left
(E)
11.0
0.340
0.300
90
90
Standard
EGLASS3/Milgard
Operable
LIVING
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_20 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------=-----------------------------------------------
FENESTRATION SURFACES
---------------------
Exterior
Shade
Type Location/Comments
Standard SGLASS9/Milgard Operable
Standard SGLASS10/Fr.Dr. Therma-T
Standard SGLASSII/Milgard Operabl
Standard WGLASS2/Fr.Dr. Therma-Tr
Standard WGLASS3/Milgard Operable
Standard WGLASS4/Milgard Operable
Standard WGLASS5/Milgard Fixed Wi
Standard WGLASS6/Milgard Operable
Standard NGLASS10/Milgard Operabl
Standard NGLASSII/Milgard Operabl
Standard NGLASSI2/Milgard Operabl
Standard NGLASSI3/Milgard Operabl
Standard EGLASS4/Fr.Dr. Therma-Tr
Standard EGLASS5/Milgard Operable
Standard EGLASS6/Fr.Dr. Therma-Tr
Standard EGLASS7/Fr.Dr. Therma-Tr
Standard EGLASS8/Milgard Operable
Standard EGLASS9/Fr.Dr. Therma-Tr
Area
U-
Act
Orientation
(sf)
factor SHGC
Azm
Tilt
7
Wind
Back
(S)
9.0
0.340
0.300
180
90
8
Door
Back
(S)
9.0
0.310
0.220
180
90
9
Wind
Back
(S)
9.0
0.340
0.300
180
90
11
Door
Right
(W)
40.0
0.310
0.220
270
90
12
Wind
Right
(W)
16.5
0.340
0.300
270
90
13
Wind
Right
(W)
16.5
0.340
0.300
270
90
14
Wind
Right
(W)
2.5
0.340
0.330
270
90
15
Wind
Right
(W)
16.5
0.340
0.300
270
90
25
Wind
Front
(N)
16.5
0.340
0.300
0
90
26
Wind
Front
(N)
16.5
0.340
0.300
0
90
27
Wind
Front
(N)
6.0
0.340
0.300
0
90
28
Wind
Front
(N)
6.0
0.340
0.300
0
90
32
Door
Left
(E)
24.0
0.310
0.220
90
90
33
Wind
Left
(E)
27.5
0.340
0.300
90
90
34
Door
Left
(E)
24.0
0.310
0.220
90
90
35
Door
Left
(E)
40.0
0.310
0.220
90
90
36
Wind
Left
(E)
15.0
0.340
0.300
90.
90
37
Door
Left
(E)
40.0
0.310
0.220
90
90
Exterior
Shade
Type Location/Comments
Standard SGLASS9/Milgard Operable
Standard SGLASS10/Fr.Dr. Therma-T
Standard SGLASSII/Milgard Operabl
Standard WGLASS2/Fr.Dr. Therma-Tr
Standard WGLASS3/Milgard Operable
Standard WGLASS4/Milgard Operable
Standard WGLASS5/Milgard Fixed Wi
Standard WGLASS6/Milgard Operable
Standard NGLASS10/Milgard Operabl
Standard NGLASSII/Milgard Operabl
Standard NGLASSI2/Milgard Operabl
Standard NGLASSI3/Milgard Operabl
Standard EGLASS4/Fr.Dr. Therma-Tr
Standard EGLASS5/Milgard Operable
Standard EGLASS6/Fr.Dr. Therma-Tr
Standard EGLASS7/Fr.Dr. Therma-Tr
Standard EGLASS8/Milgard Operable
Standard EGLASS9/Fr.Dr. Therma-Tr
OVERHANGS
---Window---
------------Overhang-----------,-
Area
Left
Right
Surface
-----------
(sf)
Width
Height
Depth
Height
Extension
Extension
SLEEPING
-----
-----
------
-----
------
---------
---------
1
Window
16.5
3.00
5.50
6.00
1.00
n/a
n/a
5
Window
6.0
2.00
3.00
6.00
1.00
n/a.
n/a'
6
Window
6.0
2.00
3.00
6.00
1.00
n/a
n/a
LIVING
11
Door
40.0
5.00
8.00
8.00
1.00
n/a
n/a
12
Window
16.5
3.00
.5.50
6.00
1.00
n/a
n/a
13
Window
16.5
3.00
5.50
6.00
1.00
n/a
n/a
25
Window
16.5
3.00
5.50
6.00
1.00
n/a
n/a
27
Window
6.0
2.00
3.00
6.00
1.00
n/a
n/a
28
Window
6.0
2.00
3.00
6.00
1.00
n/a
n/a
32
Door
24.0
3.00
8.00
6.00
1.00
n/a
n/a
33
Window
27.5
5.00
5.50
6.00
1.00
n/a
n/a
34
Door
24.0
3.00
8.00
6.00
1.00
n/a
n/a
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5
Project Title........... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
SLAB SURFACES r
-------------
Area
Slab Type (sf)
SLEEPING
Standard Slab, 1596
LIVING
Standard Slab 1941
HVAC SYSTEMS
------------
Verified
Number Verified Verified Verified Verified
Maximum
System
of Minimum Refrig-Charge Adequate Fan Watt
Cooling
Type
------------
Systems Efficiency EER or TXV Airflow Draw
Capacity
SLEEPING
------- ----------- ----- ------------- --------
--------
--------
Furnace
.
1 0.800 AFUE n/a n/a
n/a n/a
n/a
ACSplit
1 13.00 SEER 11 Yes
No No
No
LIVING
Furnace
1 0.800 AFUE n/a n/a
n/a n/a
n/a
ACSplit
1' 13.00 SEER 11 Yes
No No
No
HVAC SIZING
Verified
Total Sensible Design
Maximum
Heating Cooling, Cooling
Cooling
System Load Load Capacity
Capacity
Type (Btu/hr) (Btu/hr) (Btu/hr)
(Btu/hr)
'
SLEEPING
Furnace 31396 �- n/a n/a
n/a
ACSplit n/a 22633 28087
n/a
LIVING
Furnace 38401 n/a- n/a
n/a
ACSplit n/a, 23867 29619
n/a
Total 69798 46500 57707
n/a
Orientation of Maximum..... Front Facing 270 deg (W)
Sizing Location............ LA QUINTA
'
Winter Outside Design...... 26 F
Winter Inside Design....... 70 F
Summer Outside Design...... 111 F
' Summer Inside Design....... 75 F
Summer Range: .............. 34 F
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD
CF -1R Page 6
-------------------------------------------------------------------------------
Project Title..........
Palo Verde/Plan 2/OUtDr
Date..07/31/07
09:14:45
-------------------------------------------------------------------------------
MICROPAS7 v7.10
File-LAQ53_2O
Wth-CTZ15S05
Program -FORM
CF -1R
User#-MP2387 User -Westpac Air
-------------------------------------------------------------------------------
Conditioning, Run -Palo Verde/Plan 2/OutDr
DUCT SYSTEMS
------------
Verified
Verified
Verified
System
Duct•.
Duct Duct
Surface
Buried
Type
Location
R -value Leakage
Area
Ducts
SLEEPING
Furnace
Attic
R-4.2 Yes-
No
No
ACSplit
Attic
R-4.2 Yes
No
No
LIVING
Furnace
Attic
R-4.2 Yes
No
No
ACSplit
Attic
R-4.2 Yes
No
No
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------------------- -------------- ------ ----------
1 Storage Gas Standard 1 0.51 75 R-12
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-------------------7---------------------
*** Items in this section should be documented'on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front_.
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
4
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
---------------------------------------------------------------------=---------
HERS REQUIRED VERIFICATION
--------------------------
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage. Target leakage is
calculated and documented on the CF -4R. If the measured CFM is above the
target, then corrective action must be taken to reduce the duct leakage and
then must be retested. Alternatively, the compliance calculations could be
redone without duct testing. If ducts are not installed, then HERS
verification is not necessary.
REMARKS
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8
----------------------------------------=--------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------------------------------------------------------
COMPLIANCE STATEMENT
---------------
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts l and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed'by .the individual with
overall design responsibility.
DESIGNER or OWNER DOCUMENTATION AUTHOR
Name.... Salim Rahemtulla Name.... Chinh Nguyen
Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc.
Address. 15326 Alton Parkway Address. 1610 N. Maple St.
Irvine, CA 92618-2338 Corona, CA 92880
Phone... (949) 789-1746 Phone... (951)/719-9501
License.
Signed.. Signed..
(date) (date
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
a
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
Project Address.... ******* ---------------------
La Quinta, California *v7.10*
Documentation Author... Chinh Nguyen ******* Building Permit #
Westpac Air Conditioning, Inc.
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------------------------------------------------------
Note: Lowrise -residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. More stringent compliance
requirements from the Certificate of Compliance supersede the items marked with
an asterisk (*). When this checklist is incorporated into the permit documents,
the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown
elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
De- En-
sign- force-
n/a er ment
*150(a): Minimum R-19 insulation in wood framed ceiling or
equivalent U -factor in metal frame ceiling
�J
150(b): Loose fill insulation manufacturer's labeled R=Value
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
nn
��
to exterior mass walls)
r
*150(d): Minimum R-13 raised floor insulation in framed floors
or equivalent U -factor
150(e): Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door covering the entire
opening of the firebox
b. Outside air intake with damper and control, flue
damper and control
2. No continuous burning gas pilot lights allowed
150(f): Air retarding wrap installed to comply with Sec. 151
meets requirements specified in ACM Residential Manual
IX
150(g): Vapor barriers mandatory in Climate Zones 14,16 only
T
150(1): Slab edge insulation - water absorption rate for the
insulation material without facings no greater than 0.3%,
water vapor permeance rate no greater than 2.0 perm/inch /
118: Insulation specified or installed meets insulation quality
standards. Indicate type and include CF -6R form
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage
2. Fenestration products (except field -fabricated) have
I
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------------------------------------------------------
label with certified U -factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification
3. Exterior doors and windows weatherstripped; all joints /
and penetrations caulked and sealed
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
De- En-
sign- force
n/a
er ment
110-113: HVAC equipment, water heaters, showerheads and
faucets certified by the Energy Commission
150(h): Heating and/or cooling loads calculated in accordance
/
with ASHRAE, SMACNA or ACCA
150(i): Setback thermostat on all applicable heating and/or
cooling systems
150(j): Water system pipe and tank insulation and cooling
systems line insulation
1. Storage gas water heaters rated with an Energy Factor
less than 0.58 must be externally wrapped with insulation
having an installed thermal resistance of R12 or greater
2. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 internal and indicated on the
exterior of the tank showing the R -value
3. The following piping is insulated according to Table 150-A/B
or Equation 150-A Insulation Thickness:
1. First 5 feet of hot and cold water pipes closest to
water heater tank, non -recirculating systems, and
entire length of recirculating sections of hot water
pipes shall be insulated to Table 150B
2. Cooling system piping (suction, chilled water, or
brine lines), piping insulated between heating source
and indirect hot water tank shall be insulated to
Table 150-B and Equation 150-A
4. Steam hydronic heating systems or hot water systems >15 psi,
meet requirements of Table 123-A
5. Insulation must be protected from damage, including that due
to sunlight, moisture, equipment maintenance and wind
6. Insulation for chilled water piping and refrigerant suction
piping includes a vapor retardant or is enclosed entirely
/
in conditioned space
c/
7. Solar water -heating systems/collectors are certified by the/
Solar Rating and Certification Corporation
*150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to
meet the requirements of the CMC Sections 601, 602, 603,
604, 605 and Standard 6-5; supply -air and return -air ducts
and plenums are insulated to a minimum installed level of
R-4.2 or enclosed entirely in conditioned space. Openings
shall be sealed with mastic, tape, or other duct -closure
system that meets the applicable requirements of UL 181,
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3
---------- --------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
------------------------------------------------------------------------------=
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------------------------------------------------------
UL 181A, or UL 181B or aerosol sealant that meets the
requirements of UL 723. If mastic or tape is used•to seal
openings greater than 1/4 inch, the combination of mastic
and either mesh or tape shall be used
2. Building cavities, support platforms for air handlers, and
plenums defined or constructed with materials other than
sealed sheet metal, duct board or flexible duct shall not
be used for conveying conditioned air. Building cavities and
support platforms may contain ducts. Ducts installed in
cavities and support platforms shall not be compressed to cause ,
reductions in the cross-sectional area of the ducts —+/-
3. Joints and seams of duct systems and their components
shall not be sealed with cloth backed rubber adhesive
duct tapes unless such tape is used in combination with
mastic and draw bands
4. Exhaust fan systems have back draft or automatic dampers
5. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually /
operated dampers
6. Protection of Insulation. Insulation shall be protected
from damage due to sunlight, moisture, equipment mainten-
ance and wind. Cellular foam insulation shall be protected
as above or painted with a coating•that is water retardant
and provides shielding from solar radiation that can cause /
'degradation of the material
7. Flexible ducts cannot have porous inner cores
114: Pool and Spa Heating Systems and Equipment
1. A thermal efficiency that complies with the Appliance
Efficiency Regulations, on-off switch mounted outside of
the heater, weatherproof operating instructions, no
electric resistance heating and no pilot light
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating
b. Cover for outdoor,pools or outdoor spas.
3. Pool system has directional inlets and a circulation
pump time switch
115: Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning
pilot light (Exception: Non -electrical cooking appliances
with pilot < 150 Btu/hr)
118(1): Cool Roof material meets specified criteria
RESIDENTIAL LIGHTING MEASURES
De- En-
sign- force
n/a er ment
150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:
contain only high efficacy lamps as outlined in Table
150-C, and do not contain a medium screw base socket
(E24/E26). Ballast for lamps 13 watts,or greater are electronic
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
-------------------------------------------------------------------------------
Page 4
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 2/OutDr Date..07/31/07 09:14:45
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr
-------------------------------------------------------------------------------
and have an output frequency no less than 20 kHz
/
150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain
only high efficacy lamps as outlined in Table 150-C,
luminaire has factory installed HID ballast
150(k)2: Permanently installed luminaires in kitchens shall
be high efficacy luminaires. Up to 50 percent of the wattage,
as determined in Sec. 130(c), of permanently installed luminaires
in kitchens may be in luminaires that are not high efficacy
luminaires, provided that these luminaires are controlled
by switches separate from those controlling the high
efficacy luminaires
_
150(k)3: Permanently installed luminaires in bathrooms,
garages, laundry rooms, utility rooms shall be high
efficacy luminaires OR are controlled by an occupant
sensor(s) certified to comply with Section 119(d) that
does not turn on automatically or have an always on option_
150(k)4: Permanently installed luminaires located other than
in kitchens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets
less than 70 ft2), OR are controlled by a dimmer switch
OR are controlled by an occupant sensor(s) that complies
with Section 119(d) that does not turn on automatically
or have an always on option
150(k)5: Luminaires that are recessed into insulated ceilings
are approved for zero clearance insulation cover (IC) and
are certified air tight to ASTM E283 and labeled as air
tight (AT) to less than 2.0 CFM at 75 Pascals
150(k)6: Luminaires providing outdoor lighting and permanently
mounted to a residential building or to other buildings on
the same lot shall be high efficacy luminaires (not in-
cluding lighting around swimming pools/water features or
other Article 680 locations) OR are controlled by occupant
sensors with integral photo control certified to comply
with Section 119(d)
150(k)7: Lighting for parking lots for 8 or more vehicles shall
have lighting that complies with Sec. 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall
have lighting that complies with Sec. 130, 131, and 146
150(k)8: Permanently installed lighting in the enclosed, non -
dwelling spaces of low-rise residential buildings with four
or more dwelling units shall be high efficacy luminaires OR
are controlled by an occupant sensor(s) certified to j
comply with Section 119(d) ✓
STANDARD PACIFIC HOMES
PALO VERDE AT LA QUINTA
Chinh Nguyen, Certified Energy Analyst ♦ (951),739-9501 / (951) 739-9509
CERTIFICATE OF
COMPLIANCE: RESIDENTIAL COMPUTER METHOD
CF -1R Page 1
-------------------------------------------------------------------------------
Project Title..........
Palo Verde/Plan 3
Date..07/31/07
09:24:16
Project Address..
*******
---------------------
La Quinta, California
*v7.10*
I - I
Documentation Author... Chinh Nguyen
*******
I Building•Permit #
Westpac Air Conditioning,
Inc.
1610 N. Maple St.
I Plan Check / Date
Corona, CA 92880
(951) 739-9501
I Field Check/ Date
Climate Zone...........
15
----------=----------
Compliance Method...... MICROPAS7 v7.10 for 2005
-------------------------------------------------------------------------------
Standards
by Enercomp, Inc.
-------------------------------------------------------------------------------
MICROPAS7
v7.10 File-LAQ53_3 Wth-CTZ15S05
Program
-FORM CF -1R
User#-MP2387
-------------------------------------------------------------------------------
User -Westpac Air Conditioning, Run -Palo
Verde/Plan 3
-----------------------------------------------------------------
-----------------------------------------------------------------
=
MICROPAS7 ENERGY USE.SUMMARY
=
= Energy Use Standard Proposed
Compliance =
_ (kTDV/sf-yr)
------------------------
Design
Design
Margin =
-
= Space
--------------------
Heating........... 1.78
1.87
----------
-0.09 =
= Space
Cooling....,...... 62.56
50.71
11.85 =
= Water
Heating.......... 6.66
7.58
-0.92 =
=
North Total 71.00
60.16 -
10.84 =
= Space
Heating.......... 1.78
1.52
0.26 -
= Space
Cooling.......... 62.56
50.37
12.19 =
= Water
Heating............ 6.66
7.58
-0.92 =
_
East Total 71.00
59.47
11.53 =
= Space
Heating........... 1.78
1.57
0.21 =
= Space
Cooling........... 62.56
52.31
10.25 =
= Water
Heating.......... 6.66
7.58
-0.92 =
=
South Total 71.00
61.46
9.54 =
= Space
Heating.......... 1.78
1.81
-0.03 =
= Space
Cooling.......... 62.56
49.95
12.61 _
= Water
Heating.......... 6.66
7.58
-0.92 -
=
West Total 71.00
59.34
11.66 =
_ ***
Building complies with Computer
Performance
_
*** HERS Verification Required for
Compliance *** _
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
-------------------------------------------------------------------------------
GENERAL INFORMATION
HERS Verification..........
Required
Conditioned Floor Area.....
3858 sf
Building Type..............
Single Family Detached
Construction Type .........
New
Fuel Type .................
NaturalGas
Building Front Orientation.
Cardinal - N,E,S,W
Number of Dwelling Units...
1
Number of Building Stories.
1
Weather Data Type..........
FullYear
Floor Construction Type....
Slab On Grade
Number of Building Zones...
2
Conditioned Volume.........
38902 cf
Slab -On -Grade Area.........
3858 sf
Glazing Percentage.........
15.2 % of floor area
Average Glazing U -factor...
0.33 Btu/hr-sf-F
Average Glazing SHGC.......
0.26
Average Ceiling Height.....
10.1 ft
BUILDING ZONE
INFORMATION
-------------------------
Floor # of # of Cond-
Thermo- Vent Vent Verified
Area Volume Dwell Peop-
it- stat Height Area Leakage or
Zone Type
---------------
(sf) (cf) Units le ioned
----- ------ ----- ----- -----
Type (ft) (sf) Housewrap
--------
SLEEPING
----- -------
----------
Residence
1345 13562 0.35 1.8
Yes Setback 2.0 Standard No
LIVING
Residence
2513 25340 0.65 3.3
Yes Setback 2.0 Standard No
OPAQUE SURFACES
---------------
U- Sheath-
Solar Appendix
Frame Area fact- Cavity.ing
Act Gains IV
Location/
Surface
Type (sf) or R-val R-val
Azm Tilt Reference
Comments
------------
SLEEPING
----- ---- ----- ----- -----
--- ---- ------------
--------------
1 Wall
Wood 452 0.074 19 0
180 90 Yes IV.9 A5
SOUTH
2 Wall
Wood 165 0.074 19 0
270 90 Yes IV.9 A5
WEST
4 Wall
Wood 288 0.074 19 0
0 90 Yes IV.9 A5
NORTH
6 Wall
Wood 213 0.074 19 0
90 90 Yes IV.9 A5,
EAST
8 Wall
Wood 122 0.074 19 0
0 90 No IV A A5
GARAGE WALL
10 Roof Rad
Wood 1342 0.025 38 0
n/a 0 Yes IV.1 A18
Attic
LIVING
3 Wall
Wood 318 0.074 19 0
270 90 Yes IV A A5
WEST
5 Wall
Wood 393 0.074 19 0
0 90 Yes IV A A5
NORTH
7 Wall
Wood 446 0.074 19 0
90 90 Yes IV.9 A5
EAST
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 x7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 �.
-------------------------------------------------------------------------------
OPAQUE SURFACES
---------------
U- Sheath- Solar Appendix
Frame Area fact- Cavity ing Act Gains IV Location/
Surface Type (sf) or R-vAl R-val Azm Tilt Reference Comments
------------ ----- ---- ----- ----- ----- --- ---- --- --------- --------------
9 Wall Wood 383 0.074 19 0 0 90 No IV A A5 GARAGE WALL
11 RoofRad Wood 2513 0.025 38 0 n/a 0 Yes IV A A18 Attic
12 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door
13 Door Other 22 0.500 0 0 -0 90 No IV.5 A4 Wood Door
PERIMETER LOSSES
----------------
Appendix
Length F2 Insul Solar IV Location/
Surface (ft) Factor R-val Gains Reference Comments
------------ --------------------- -------------- ----------------------
SLEEPING
14 SlabEdge 136 0.900 R-0 No None To Outside
16 SlabEdge 12 0.550 R-0 No None TO GARAGE
LIVING
15 SlabEdge 150 0.900 R-0 No None To Outside
17 SlabEdge 40 0,.550 R-0 No None TO GARAGE
FENESTRATION SURFACES
Exterior
,
Area
U-
Act
Shade
Orientation
------------------
(sf)
-----
factor
SHGC
Azm
Tilt
Type
Location/Comments
SLEEPING
-----
-----
---
----
--------
------------------------
1
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASSI/Milgard
Operable
2
Wind
Back
(S)
16.5
0.340
0.300
180
90
Standard
SGLASS2/Milgard
Operable
3
Wind
Back
(S)
6.0
0.340
0.300
180
90
Standard
SGLASS3/Milgard
Operable
4
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS4/Milgard
Operable
5
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS5/Milgard
Operable
6
Wind
Back
(S)
11.0
0.340
0.300
180
90
Standard
SGLASS6/Milgard
Operable
7
Wind
Right
(W)
3.8
0.340
0.300
270
90
Standard
WGLASSI/Milgard
Operable
8
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS2/Milgard
Operable
9
Wind
Right
(W)
16.5
0.340
0.300
270
90
Standard
WGLASS3/Milgard
Operable
13
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASSI/Milgard
Operable
14
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS2/Milgard
Operable
15
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS3/Milgard
Operable
16
Wind
Front
(N)
9.0
0.340
0.300
0
90
Standard
NGLASS4/Milgard
Operable
21
Wind
Left
(E)
40.00.340
0.30b
90
90
Standard
EGLASSI/Milgard
Operable
22
Wind
Left
(E)
9.0
0.340-0.300
90
90
Standard
EGLASS2/Milgard
Operable
23
Wind
Left
(E)
11.0
0.340
0.300
90
90
Standard
SGLASS3/Milgard
Operable
24
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS4/Fr.Dr. Therma-Tr
25
Wind
Left
(E)
11.0
0.340
0.300
90
90
Standard
EGLASS5/Milgard
Operable
LIVING
'
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title......'.... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
--------------
FENESTRATION SURFACES
Exterior
Area U- Act. Shade
Orientation (sf) factor SHGC Azm Tilt- Type Location/Comments
------------------ ----- ----- ----- --- ------------ ------------------------
10 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS4/Fr.Dr. Therma-Tr
11 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS5/Fr.Dr. Therma-Tr
12 Wind Right (W) 22.0 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable
17 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS5/Fr.Dr. Therma-Tr
18 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr
19 Door Front (N) 40.0 0.310 0.220 0 90 'Standard NGLASS7/Fr.Dr. Therma-Tr
20 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable
26 Wind Left (E) 25.0 0.340 0.330 90 90 Standard EGLASS6/Milgard Fixed Wi
27 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr
28 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable
29 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS9/Milgard Operable
SLAB SURFACES
-------------
Area
Slab Type (sf)
SLEEPING
Standard Slab 1345
LIVING
Standard Slab 2513
HVAC SYSTEMS
Verified
Number Verified Verified Verified Verified Maximum
System of Minimum Refrig Charge Adequate.Fan Watt Cooling
Type Systems Efficiency EER or TXV Airflow Draw Capacity
------------ ------- ----------- -------------------------- - ------ --------
SLEEPING
Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a
ACSplit 1 13.00 SEER 11 Yes No No No
LIVING
Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a
ACSplit 1 13.00 SEER 11 Yes No No No
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2381 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
------------------------------'-------------------------------------------------
Orientation of Maximum....
Sizing Location...........
Winter Outside Design.....
Winter Inside Design..:..
Summer Outside Design.....
Summer Inside Design......
Summer Range ..............
Front Facing 270 deg (W)
LA QUINTA
26 F .
70 F
111 F
75 F
34 F
HVAC SIZING
------------
Verified
Verified
Verified
Total
Sensible
Design
Maximum
Surface
Heating
Cooling
Cooling,
Cooling
System
Load
Load
Capacity
Capacity
Type
(Btu/hr)
(Btu/hr)
(Btu/hr)
(Btu/hr)
SLEEPING
R-4.2
Yes
No
No
Furnace
25902
n/a
n/a
n/a
ACSplit
n/a
18302
22712
n/a
LIVING
Furnace
Attic
R-4.2
Furnace
38783
n/a
n/a
n/a
ACSplit
n/a
35378
43904
n/a
-------------
Total
----------
64686
----------
53680
----------
66616
----------
n/a
Orientation of Maximum....
Sizing Location...........
Winter Outside Design.....
Winter Inside Design..:..
Summer Outside Design.....
Summer Inside Design......
Summer Range ..............
Front Facing 270 deg (W)
LA QUINTA
26 F .
70 F
111 F
75 F
34 F
DUCT SYSTEMS
------------
Verified
Verified
Verified
System
Duct
Duct
Duct
Surface
Buried
Type
Location
R -value
Leakage
Area
Ducts
SLEEPING
Furnace
Attic
R-4.2
Yes
No
No
ACSplit
Attic
R-4.2
Yes
No
No
LIVING
Furnace
Attic
R-4.2
Yes
No
No
ACSplit
Attic
R-4.2
Yes
No
No
WATER
HEATING
SYSTEMS
---------------------
Number
Tank External
Heater
in
Energy
Size Insulation
Tank Type Type
----------------
Distribution
Type
System
Factor
(gal) R -value
-=------
1 Storage Gas
-------------------
Standard
------
1
--------
0.51
------ ----------
75 R-12
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
-------------------------------------------------------------------------------
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage. Target leakage is
calculated and documented on the CF -4R. If the measured CFM is above the
target, then corrective action must be taken to reduce the duct leakage and
then must be retested. Alternatively, the compliance calculations could be
redone without duct testing. If ducts are not installed, then HERS
verification is not necessary.
s
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7
-------------------------------------------------------------------------------
----------------------_---------------------------------------------------------
Project Title.......... Palo Verde./Plan 3 Date..07/31/07 09:24:16
---------------------------------------------------------------_--------------_--
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
-
--------------------------------=--------------------------------------------
s
REMARKS
COMPLIANCE STATEMENT
--------------------
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility. •
DESIGNER or OWNER
Name.... Salim Rahemtulla
Company. Standard Pacific Homes
Address. 15326 Alton Parkway
Irvine, CA 92618-2338
Phone... (949) 789-1746
License.
Signed..
(date)
ENFORCEMENT AGENCY
Name....
Title...
Agency..
Phone...
Signed..
(date)
DOCUMENTATION AUTHOR
Name.... Chinh Nguyen
Company. Westpac Air Conditioning, Inc.
Address. 1610 N. Maple St.
Corona, CA 92880
Phone... (951) 9- 501
4 0
Signed..
(date)
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
Project Address.... ******* ---------------------
• La Quinta, California *v7.10*
Documentation Author... Chinh Nguyen ******* I Building Permit #
Westpac Air Conditioning, Inc.
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
-------------------------------------------------------------------------------
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance.approach used. More stringent compliance
requirements from the Certificate of Compliance supersede the items marked with
an asterisk (*). When this checklist is incorporated into the permit documents,
the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown
elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
De- En-
sign- force-
n/a er ment
*150(a): Minimum R-19 insulation in wood framed ceiling or
equivalent U -factor in metal frame ceilingir-J✓
150(b): Loose fill insulation manufacturer's labeled R -Value
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
to exterior mass walls)
*150(d): Minimum R-13 raised floor insulation in framed floors
I
or equivalent U -factor
150(e): Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door covering the entire
opening of the firebox
f/
b. Outside air intake with damper and control, flue
damper and control
2. No continuous burning gas pilot lights allowed
150(f): Air retarding wrap installed to comply with Sec. 151
meets requirements specified in ACM Residential Manual
s/
150(8): Vapor barriers mandatory in Climate Zones 14,16 only
150(1): Slab edge insulation - water absorption rate for the
insulation material without facings no greater than 0.3%, /
water vapor permeance rate no greater than 2.0 perm/inch
118: Insulation specified or installed meets insulation quality '
standards. Indicate type and include CF -6R form
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage
2. Fenestration products (except field -fabricated) have
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
-------------------------------------------------------------------------------
label with certified U -factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification f/
3. Exterior doors and windows weatherstripped; all joints /
and penetrations caulked and sealed
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
De- En-
sign- force
n/a
er menti
110-113: HVAC equipment, water heaters, showerheads and
/
faucets certified by the Energy Commission
150(h): Heating and/or cooling loads calculated in accordance
,
with ASHRAE, SMACNA or ACCA
150(i): Setback thermostat on all applicable heating and/or
cooling systems
150(j): Water system pipe and tank insulation and cooling
systems line insulation
1. Storage gas water heaters rated with an Energy Factor
less than 0.58 must be externally wrapped with insulation
/
having an installed thermal resistance of R12 or greater
✓
2. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external
insulation or R-16 internal and indicated on the
exterior of the tank showing the R -value /
3. The following piping is insulated according to Table 150-A/B
or Equation 150-A Insulation Thickness:
1. First 5 feet of hot and cold water pipes closest to
water heater tank, non -recirculating systems, and
entire length of recirculating sections of hot water
pipes shall be insulated to Table 150B
2. Cooling system piping (suction, chilled water, or
brine lines), piping insulated between heating source
and indirect hot water tank shall be insulated to
Table 150-B and Equation 150-A
4. Steam hydronic heating systems or hot water systems >15 psi,
meet requirements of Table 123-A
-
5. Insulation must be protected from damage, including that due
to sunlight, moisture, equipment maintenance and wind
/
6. Insulation for chilled water piping and refrigerant suction
piping includes a vapor retardant or is enclosed entirely
in conditioned space
/
7. Solar water -heating systems/collectors are certified by th
Solar Rating and Certification Corporation
*150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to
meet the requirements of the CMC Sections 601, 602, 603,
604, 605 and Standard 6-5; supply -air and return -air ducts
and plenums are insulated to a minimum installed level of
R-4.2 or enclosed entirely in conditioned space. Openings
shall be sealed with mastic, tape, or other duct -closure
system that meets the applicable requirements of UL 181,
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3
-------------------------------------------------------------------------------
UL 181A, or UL 181B or aerosol sealant that meets the
requirements of UL 723." If mastic or tape is used to seal
openings greater than 1/4 inch, the combination of mastic
and either mesh or tape shall be used
2. Building cavities, support platforms for air handlers, and
plenums defined or constructed with materials other than
sealed sheet metal, duct board or flexible duct shall not
be used for conveying conditioned air. Building cavities and
support platforms may contain ducts. Ducts installed in
cavities and support platforms shall not be compressed to cause
reductions in the cross-sectional area of the ducts
3. Joints and seams of duct systems and their components
shall not be sealed with cloth backed rubber adhesive
duct tapes unless such tape is used in combination with
mastic and draw bands
4. Exhaust fan systems have back draft or automatic dampers
5. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers
6. Protection of Insulation. Insulation shall be protected
from damage due to sunlight, moisture, equipment mainten-
ance and wind. Cellular foam insulation shall be protected
as above or painted with a coating that is water retardant
and provides shielding from solar radiation that can cause /
degradation of the material JL
7. Flexible ducts cannot have porous inner cores
114: Pool and Spa Heating Systems and Equipment
1. A thermal efficiency that complies with the Appliance
Efficiency Regulations, on-off switch mounted outside of
the heater, weatherproof operating instructions, no /
electric resistance heating and no pilot light /
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation
pump time switch
115: Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning _
pilot light (Exception: Non -electrical cooking appliances
with pilot < 150 Btu/hr)
118(1): Cool Roof material meets specified criteria
RESIDENTIAL LIGHTING MEASURES De- En-
sign- force
n/a er ment
150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:
contain only high efficacy lamps as outlined in Table
150-C, and do not contain a medium screw base socket
(E24/E26). Ballast for lamps 13 watts or greater are electronic
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R
-------------------------------------------------------------------------------
Page 4
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3 Date..07/31/07 09:24:16
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan
3
-------------------------------------------------------------------------------
and have an output frequency no less than 20 kHz
150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain
only high efficacy lamps as outlined in Table 150-C,
luminaire has factory installed HID ballast
150(k)2: Permanently installed luminaires in kitchens shall
be high efficacy luminaires. Up to 50 percent of the wattage,
as determined in Sec. 130(c), of permanently installed luminaires
in kitchens may be in luminaires that are not high efficacy
luminaires, provided that these luminaires are controlled
by switches separate from those controlling the high
efficacy luminaires
150(k)3: Permanently installed luminaires in bathrooms,
garages, laundry rooms, utility rooms shall be high
efficacy luminaires OR are controlled by an occupant
sensor(s) certified to comply with Section 119(d) that
does not turn on automatically or have an always on option
150(k)4: Permanently installed luminaires located other than
in kitchens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets
less than 70 ft2), OR are controlled by a dimmer switch
OR are controlled by an occupant sensor(s) that complies
with Section 119(d) that does not turn on automatically
or have an always on option
150(k)5: Luminaires that are recessed into insulated ceilings
are approved for zero clearance insulation cover (IC) and
are certified air tight to ASTM E283 and labeled as air
tight (AT) to less than 2.0 CFM at 75 Pascals
150(k)6: Luminaires providing outdoor lighting and permanently
mounted to a residential building or to other buildings on
the same lot shall be high efficacy luminaires (not in-
cluding lighting around swimming pools/water features or
other Article 680 locations) OR are controlled by occupant
sensors with integral photo control certified to comply
with Section 119(d)
150(k)7: Lighting for parking lots for 8 or more vehicles shall
have lighting that complies with Sec. 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall
have lighting that complies with Sec. 130, 131, and 146
150(k)8: Permanently installed lighting in the enclosed, non -
dwelling spaces of low-rise residential buildings with four
or more dwelling units shall be high efficacy luminaires OR
are controlled by an occupant sensor(s) certified to
comply with Section 119(d)
i!
i!
STANDARD PACIFIC HOME
PALO VERDE AT LA
S
QUINTA
PLAN -3/OPT. EXERCISE
Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509
A
CERTIFICATE OF
COMPLIANCE: RESIDENTIAL COMPUTER
METHOD
CF -1R Page 1
Project Title..........
Palo Verde/Plan 3/Exer.
=========
Date..07/31/07 09:32:55
Project Address........
*******
---------------------
La Quinta, California
*v7.10*
Documentation Author... Chinh Nguyen
*******
I Building Permit #
Westpac Air Conditioning,
Inc.
1610 N. Maple St.
Plan Check / Date
Corona, CA 92880
(951) 739-9501�FieldCheck/Date�
Climate Zone......
. 15---------------------
- - - -
Compliance Method...... MICROPAS7 v7.10 for 2005
-------------------------------------------------------------------------------
Standards
by Enercomp, Inc.
-------------------------------------------------------------------------------
MICROPAS7
v7.10 File-LAQ53_3E Wth-CTZ15SO5
Program
-FORM CF -1R
User#-MP2387
-------------------------------=-----------------------------------------------
User -Westpac Air Conditioning,
Run -Palo
Verde/Plan 3/Exe.r.
=
MICROPAS7 ENERGY USE SUMMARY
=
----------------------------
= Energy Use Standard
Proposed
Compliance =
_ (kTDV/sf-yr)
Design
Design
Margin =
= Space
Heating........... 1.72
1.74
-0.02 =
= Space
Cooling.......... 61.66
50.33
11.33 -
= Water
Heating........... 6.41
7.30
-0.89 =
=
North Total 69.79
59.37
10.42 =
= Space
Heating.......... 1.72
1.44
0.28 =
= Space
Cooling.......... 61.66
50.23
11.43 =
= Water
Heating.......... 6.41
7.30
-0.89 -
=
East Total 69.79
58.97
10.82 =
= Space
Heating.......... 1.72
1.54
0.18 =
= Space
Cooling.......... 61.66
51.51
10.15 =
= Water
Heating.......... 6.41
7.30
-0.89 =
=
South Total 69.79
60.35
9.44 =
= Space
Heating........r.. 1.72
1.72
0.00 -
= Space
Cooling.......... 61.66
49.57
12.09 -
= Water
Heating.......... 6.41
7.30
-0.89 =
=
West Total 69.79
58.59
11.20 =
_ ***
Building complies with Computer
Performance
_
*** HERS Verification Required for
Compliance
*** _
CERTIFICATE
-------------------------------------------------------------------------------
OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan
3/Exer. Date..07/31/07 09:32:55
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05
Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning,
-------------------------------------------------------------------------------
Run -Palo Verde/Plan 3/Exer.
GENERAL.INFORMATION
-------------------
HERS Verification..........
Required
Conditioned Floor Area.....
4006 sf
Building Type..............
Single Family Detached
Construction Type .........
New
Fuel Type .................
NaturalGas
Building Front Orientation.
Cardinal - N,E,S,W
Number of Dwelling Units...
1
Number of Building Stories.
1
Weather Data Type..........
FullYear
Floor Construction Type....
Slab On Grade
Number of Building Zones...
2
Conditioned Volume.........
40394 cf
Slab -On -Grade Area.........
4006 sf.
Glazing Percentage.........
15.1 % of floor area
Average Glazing U -factor...
0.33 Btu/hr-sf-F
Average Glazing SHGC.......
0.26
Average Ceiling Height.....
10.1 ft
BUILDING ZONE
INFORMATION
-------------------------
Floor # of # of
Cond- Thermo- Vent Vent Verified
Area Volume Dwell Peop-
it- stat Height Area Leakage or
Zone Type
--------------
(sf) (cf) Units le
----- ------ ----- -----
ioned Type (ft) (sf) Housewrap
-------------
SLEEPING
----- ------- ----------
Residence
1493 15054 0.35 1.8
Yes Setback 2.0 Standard No
LIVING
Residence
2513 25340 0.65 3.3
Yes Setback 2.0 Standard No
OPAQUE SURFACES
---------------
U- Sheath- Solar Appendix
Frame Area fact- Cavity ing
Act Gains IV Location/
Surface
Type (sf) or R-val R-val
Azm Tilt Reference Comments
------------
SLEEPING
----- ---- ----- ----- -----
--- ---- --- --------- --------------
1 Wall
Wood 568 0.074 19 0
180 90 Yes IV.9 A5 SOUTH
2 Wall
Wood 165 0.074 19 0
270 90 Yes IV.9 A5 WEST
4 Wall
Wood 288 0.074 19 0
0 90 Yes IV.9 A5 NORTH
6 Wall
Wood 213 0.074 19 0
90 90 Yes'IV.9 A5 EAST
8 Wall
Wood 122 0.074 19 0
0 90 No IV.9 A5 GARAGE WALL
10 RoofRad
Wood 1493 0.025 38 0
n/a 0 Yes IV.1 A18 Attic
LIVING
3 Wall
Wood 318 0.074 19 0
270 90 Yes IV A A5 WEST
5 Wall
Wood 393 0.074 19 0
0 90 Yes IV A A5 NORTH
7 Wall
Wood 446 0.074 19 0
90 90 Yes IV.9 A5 EAST
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICR0PAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
-------------------------------------------------------------------------------
OPAQUE SURFACES
PERIMETER LOSSES
Wind
Back
(S)
U-
Appendix
Sheath-
180
Length
Solar
Appendix
Solar
IV
Location/
Frame
Area
fact-
Cavity
ing
Act
Comments
Gains
IV
Location/
Surface
Type
(sf)
or
R-val
R-val
Azm
Tilt
No
Reference
Comments
------------
9
Wall
-----
Wood
----
251
-----
0.074
-----
19
-----
0
---
0
----
90
---
No
---------
IV.9 A5
--------------
GARAGE WALL
11
RoofRad
Wood
2513
0.025
38
0
n/a
0
Yes
IV.1 A18
Attic
12
Door
Other
24
0.500
0
0
270
90
Yes
IV.5 A4
Wood Door
13
Door
Other
22
0.500
0
0
0
90
No
IV.5 A4
Wood Door
PERIMETER LOSSES
FENESTRATION SURFACES
Exterior
Area U- Act Shade
Orientation (sf) factor SHGC Azm Tilt Type Location/Comments
------------------ ----- ----- ----- --- ------------ ------------------------
CT.T.'L'DTTT(`_
1
Wind
Back
(S)
16.5
Appendix
0.300
180
Length
F2
Insul
Solar
IV
Location/
Surface
------------
(ft)
Factor
R-val
Gains
Reference
Comments
SLEEPING
------
--------
-------
-----
---------
----------------------
14 SlabEdge
149
0.900
R-0
No
None
To Outside
16 SlabEdge
12
0.550
R-0
No
None
TO GARAGE
LIVING
180
90
6
Wind
Back
(S)
15 SlabEdge
150
0.900
R-0
No
None
To Outside
17 SlabEdge
27
0.550
R-0
No
None
TO GARAGE
FENESTRATION SURFACES
Exterior
Area U- Act Shade
Orientation (sf) factor SHGC Azm Tilt Type Location/Comments
------------------ ----- ----- ----- --- ------------ ------------------------
CT.T.'L'DTTT(`_
1
Wind
Back
(S)
16.5
0.340
0.300
180
90
2
Wind
Back
(S)
16.5
0.340
0.300
180
90
3
Wind
Back
(S)
6.0
0.340
0.300
180
90
4
Wind
Back
(S)
11..0
0.340
0.300
180
90
5
Wind
Back
(S)
11.0
0.340
0.300
180
90
6
Wind
Back
(S)
11.0
0.340
0.300
180
90
7
Wind
Right
(W)
3.8
0.340
0.300
270
90
8
Wind
Right
(W)
16.5
0.340
0.300
270
90
9
Wind
Right
(W)
16.5
0.340
0.300
270
90
13
Wind
Front
(N)
9.0
0.340
0.300
0
90
14
Wind
Front
(N)
9.0
0.340
0.300
0
90
15
Wind
Front
(N)
9.0
0.340
0.300
0
90
16
Wind
Front
(N)
9.0
0.340
0.300
0
90
21
Wind
Left
(E)
40.0
0.340
0.300
90
90
22
Wind
Left
(E)
9.0
0.340
0.300
90
90
23
Wind
Left
(E)
11.0
0.340
0.300
90
90
24
Door
Left
(E)
40.0
0.310
0.220
90
90
25
Wind
Left
(E)
11.0
0.340
0.300
90
90
30
Wind
Back
(S).
16.5
0.340
0.330
180
90
Standard SGLASSI/Milgard Operable
Standard SGLASS2/Milgard Operable
Standard SGLASS3/Milgard Operable
Standard SGLASS4/Milgard Operable
Standard SGLASS5/Milgard Operable
Standard SGLASS6/Milgard Operable
Standard WGLASSI/Milgard Operable
Standard WGLASS2/Milgard Operable
Standard WGLASS3/Milgard Operable
Standard NGLASSI/Milgard Operable
Standard NGLASS2/Milgard Operable
Standard NGLASS3/Milgard Operable
Standard NGLASS4/Milgard Operable
Standard EGLASSI/Milgard Operable
Standard EGLASS2/Milgard Operable
Standard SGLASS3/Milgard Operable
Standard EGLASS4/Fr.Dr. Therma-Tr
Standard EGLASSS/Milgard Operable
Standard SGLASS7/Milgard Fixed Wi
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
------------------------------------=------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
---------------------------------------------------------------------------=---
FENESTRATION SURFACES
Area
Slab Type (sf)
---------------- ------
SLEEPING
Standard Slab 1493
LIVING
Standard Slab 2513
HVAC SYSTEMS
------------
Verified
Number
Verified
Verified
Verified
Verified
Maximum
System
of
Exterior
Refrig Charge
Adequate
Fan Watt
Cooling
Area
U-
Efficiency
Act
or TXV
Shade
Draw
Orientation
------------
SLEEPING
(sf)
factor
SHGC
Azm
Tilt
Type
Location/Comments
------------------
LIVING
1
0.800 AFUE
-----
-----
-----
---
----
--------
------------------------
10
Door
Right
(W)
40.0
0.310
0.220
270
90
Standard
WGLASS4/Fr.Dr. Therma-Tr
11
Door
Right
(W)
40.0
0.310
0.220
270
90
Standard
WGLASS5/Fr.Dr. Therma-Tr
12
Wind
Right
(W)
22.0
0.340
0.300
270
90
Standard
WGLASS6/Milgard Operable
17
Door
Front
(N)
40.0
0.310
0.220
0,
90
Standard
NGLASSS/Fr.Dr. Therma-Tr
18
Door
Front
(N)
40.0
0.310
0.220
0
90
Standard
NGLASS6/Fr.Dr. Therma-Tr
19
Door
Front
(N)
40.0
0.310
0.220
0
90
Standard
NGLASS7/Fr.Dr. Therma-Tr
20
Wind
Front
(N)
11.0
0.340
0.300
0
90
Standard
NGLASS8/Milgard Operable
26
Wind
Left
(E)
25.0
0.340
0.330
90
90
Standard
EGLASS6/Milgard Fixed Wi
27
Door
Left
(E)
40.0
0.310
0.220
90
90
Standard
EGLASS7/Fr.Dr. Therma-Tr
28
Wind
Left
(E)
16.5
0.340
0.300
9090
Standard
EGLASS8/Milgard Operable
29
Wind
Left
(E)
16.5
0.340
0.300
.90
90
Standard
EGLASS9/Milgard Operable
SLAB
-------------
SURFACES
Area
Slab Type (sf)
---------------- ------
SLEEPING
Standard Slab 1493
LIVING
Standard Slab 2513
HVAC SYSTEMS
------------
Verified
Number
Verified
Verified
Verified
Verified
Maximum
System
of
Minimum
Refrig Charge
Adequate
Fan Watt
Cooling
Type
Systems
Efficiency
EER
or TXV
Airflow
Draw
Capacity
------------
SLEEPING
-------
-----------
-----
-------------
--------
--------
--------
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
11
Yes
No
No
No
LIVING
Furnace
1
0.800 AFUE
n/a
n/a
n/a
n/a
n/a
ACSplit
1
13.00 SEER
11
Yes
No
No
No
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
-----------------------------------------=-------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
-------------------------------------------------------------------------------
HVAC SIZING
Orientation of Maximum.....
Sizing Location...........
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range ...............
Front Facing 270 deg (W)
LA QUINTA
26 F
70 F
111 F
75 F
34 F
DUCT SYSTEMS
Verified
Total
Sensible
Design
Maximum
System
Heating
Cooling
Cooling
Cooling
System
Load
Load
Capacity
Capacity
Type
-------------
(Btu/hr)
----------
(Btu/hr)
(Btu/hr)
(Btu/hr)
SLEEPING
Attic
---------- .----------
No
----------
Furnace
28334
n/a
n/a
n/a
ACSplit
n/a
20045
24875
n/a
LIVING
Attic
R-4.2 Yes
No
No
Furnace
37805
n/a
n/a
n/a
ACSplit
n/a
34648
42998
n/a
-------------
Total
----------
66139
----------
54693
----------
67874
----------
n/a
Orientation of Maximum.....
Sizing Location...........
Winter Outside Design......
Winter Inside Design.......
Summer Outside Design......
Summer Inside Design.......
Summer Range ...............
Front Facing 270 deg (W)
LA QUINTA
26 F
70 F
111 F
75 F
34 F
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------------------- -------------- ------ ----------
1 Storage Gas Standard 1- 0.51 75 R-12
DUCT SYSTEMS
------------
Verified
Verified
Verified
System
Duct
Duct Duct
Surface
Buried
Type
-------------
Location
R -value Leakage
Area
Ducts
SLEEPING
-----------
--------------
--------
---------
Furnace
Attic
R-4.2 Yes
No
No
ACSplit
Attic
R-4.2 Yes
No
No
LIVING
Furnace
Attic
R-4.2 Yes
No
No
ACSplit
Attic
R-4.2 Yes
No
No
WATER HEATING SYSTEMS
Number Tank External
Heater in Energy Size Insulation
Tank Type Type Distribution Type System Factor (gal) R -value
---------------- -------- ------------------- -------------- ------ ----------
1 Storage Gas Standard 1- 0.51 75 R-12
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
-----------------------------------------------------------------------------
SPECIAL FEATURES AND MODELING ASSUMPTIONS
-----------------------------------------
*** Items in this section should be documented on the plans, ***
*** installed to manufacturer and CEC specifications, and ***
*** verified during plan check and field inspection. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV). If a
cooling system is not installed, then HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage.
This is a multiple orientation building. This printout is for the front
facing North.
This building incorporates a Radiant Barrier.
Mandatory Measures require a R-12 or greater external blanket on Gas Storage
Water Heaters with Energy Factors less than 0.58.
HERS REQUIRED VERIFICATION
*** Items in this section require field testing and/or ***
*** verification by a certified home energy rater under ***
*** the supervision of a CEC-approved HERS provider using ***
*** CEC approved testing and/or verification methods and ***
*** must be reported on the CF -4R installation certificate. ***
This building incorporates a HERS verified Refrigerant Charge test
or a HERS verified Thermostatic Expansion Valve (TXV): If a
cooling system is not installed, then.HERS verification is not necessary.
This building incorporates HERS verified EER.
This building incorporates HERS verified Duct Leakage. Target leakage is
calculated and documented on the CF -4R. If the measured CFM is above the
target, then corrective action must be taken to reduce the duct leakage and
then must be retested. Alternatively, the compliance calculations could be
redone without duct testing. If ducts are not installed, then HERS
verification is not necessary.
i
CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
-------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
-------------------------------------------------------------------'------------
REMARKS
COMPLIANCE STATEMENT
-----------------
This certificate of compliance lists the building features and performance
specifications needed to comply with Title -24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to
implement them. This certificate has been signed by the individual with
overall design responsibility.
DESIGNER or OWNER DOCUMENTATION AUTHOR
Name.... Salim Rahemtulla Name.... Chinh Nguyen
Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc.
Address. 15326 Alton Parkway Address. 1610 N. Maple St.
Irvine, CA 92618-2338 Corona, CA 92880
Phone... (949) 789-1746 Phone... (951) 739-9501
License. 2
Signed.. Signed.. /� D
(date) (date)
ENFORCEMENT AGENCY /
Name....
Title...
Agency..
Phone...
Signed..
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
Project Address.... ******* ---------------------
La Quinta, California *v7.10*
Documentation Author... Chinh Nguyen ******* I Building Permit #
Westpac Air Conditioning, Inc.
1610 N. Maple St. Plan Check / Date
Corona, CA 92880
(951) 739-9501 Field Check/ Date
Climate Zone........... 15 ---------------------
Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc.
-----------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
-------------------------------------------------------------------------------
Note: Lowrise residential buildings subject to the Standards must contain these
measures regardless of the compliance approach used. More stringent compliance
requirements from the Certificate of Compliance supersede the items marked with
an asterisk (*). When this checklist is incorporated into the permit documents,
the features noted shall be considered by all parties as minimum component
performance specifications for the mandatory measures whether they are shown
elsewhere in the documents or on this checklist only.
BUILDING ENVELOPE MEASURES
De- En-
sign- force-
n/a
er ment
*150(a): Minimum R-19 insulation in wood framed -ceiling or
equivalent U -factor in metal frame.ceiling
p
150(b): Loose fill insulation manufacturer's labeled R -Value
*150(c): Minimum R-13 wall insulation in wood framed walls or
equivalent U -factor in metal frame walls (does not apply
to exterior mass walls)
*150(d): Minimum R-13 raised floor insulation in framed floors
or equivalent U -factor
150(e): Installation of Fireplaces, Decorative Gas Appliances
and Gas Logs
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door covering the entire
j
opening of the firebox
r/
b. Outside air intake with damper and control, flue
damper and control
2. No continuous burning gas pilot lights allowed
150(f): Air retarding wrap installed to comply with Sec. 151
�L
meets requirements specified in ACM Residential Manual
150(8): Vapor barriers mandatory in Climate Zones 14,16 only /
150(1): Slab edge insulation - water absorption rate for the
insulation material without facings no greater than 0.3%, /
water vapor permeance rate no greater than 2.0 perm/inch
118: Insulation specified or installed meets insulation quality /
standards. Indicate type and include CF -6R form I/
116-17: Fenestration Products, Exterior Doors and Infiltration/
Exfiltration Controls
1. Doors and windows between conditioned and unconditioned
spaces designed to limit air leakage
2. Fenestration products (except field -fabricated) have
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
---------------------------------------=---------------------------------------
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
label with certified U -factor, certified Solar Heat Gain
Coefficient (SHGC),, and infiltration certification ✓
3. Exterior doors and windows weatherstripped; all joints /
and penetrations caulked and sealed
SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES
De- En-
sign- force
n/a
er ment
110-113: HVAC equipment, water heaters, showerheads and
faucets certified by the Energy Commission
150(h): Heating and/or cooling loads calculated in accordance
with ASHRAE, SMACNA or ACCA
150(1): Setback thermostat on all applicable heating and/or
cooling systems
150(j): Water system pipe and tank insulation and cooling
systems line insulation
1. Storage gas water heaters rated with an Energy Factor .
less than 0.58 must be externally wrapped with insulation
/
having an installed thermal resistance of R12 or greater
2. Back-up tanks for solar system, unfired storage tanks, or
other indirect hot water tanks have R-12 external /
insulation or R-16 internal and indicated on the
exterior of the tank showing the R -value
3. The following piping is insulated according to Table 150-A/B
or Equation 150-A Insulation Thickness:
1. First 5 feet of hot and cold water pipes closest to
water heater tank, non -recirculating systems, and,
entire length of recirculating sections of hot water
pipes shall be insulated to Table 150B
2. Cooling system piping (suction, chilled water, or
brine lines), piping insulated between heating source
and indirect hot water tank shall be insulated to
Table 150-B and Equation 150-A
4. Steam hydronic heating systems or hot water systems >15 psi,
meet requirements of Table 123-A
5. Insulation must be protected from damage,including that ue
to sunlight, moisture, equipment maintenance and wind
6. Insulation for chilled water piping and refrigerant suction
piping includes a vapor retardant or'is enclosed entirely
in conditioned space
7. Solar water -heating systems/collectors are certified by the
Solar Rating and Certification Corporation
*150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to
meet the requirements of the CMC Sections 601, 602, 603,
604, 605 and Standard 6-5; supply -air and return -air ducts
and plenums are insulated to a minimum installed level of
R-4.2 or enclosed entirely in conditioned space. Openings
shall be sealed with mastic, tape, or other duct -closure
system that meets the applicable requirements of UL 181,
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07 09:32:55
------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
-------------------------------------------------------------------------------
UL 181A, or UL 181B or aerosol sealant that meets the
requirements of UL 723. If mastic or tape is used to seal
openings greater than 1/4 inch, the combination of mastic
.and either mesh or tape shall be used - z
2. Building cavities, support platforms for air handlers, and
plenums defined or constructed with materials other than
sealed sheet metal, duct board or flexible duct shall not
be used for conveying conditioned air. Building cavities and
support platforms may contain ducts. Ducts installed in
cavities and support platforms shall not be compressed to cause/
reductions in the cross-sectional area of the ducts
3. Joints and seams of duct systems and their components
shall not be sealed with cloth backed rubber adhesive
duct tapes unless such tape is used in combination with
mastic and draw bands '
4. Exhaust fan systems have back draft or automatic dampers
5. Gravity ventilating systems serving conditioned space have
either automatic or readily accessible, manually
operated dampers
6. Protection of Insulation. Insulation shall be protected
from damage due to sunlight, moisture, equipment mainten-
ance and wind. Cellular foam insulation shall be protected
as above or painted with a coating that is water retardant
and provides shielding from solar radiation that can cause /
degradation of the material
7. Flexible ducts cannot have porous inner cores
114: Pool and Spa Heating Systems and Equipment
1. A thermal efficiency that complies with the Appliance
Efficiency Regulations, on-off switch mounted outside of
the heater, weatherproof operating instructions, no
electric resistance heating.and no pilot light
2. System is installed with:
a. At least 36 inches of pipe between filter and heater
for future solar heating
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation
pump time switch
115: Gas-fired central furnaces, pool heaters, spa heaters or
household cooking appliances have no continuously burning
pilot light (Exception: Non -electrical cooking appliances
with pilot < 150 Btu/hr)
118(1): Cool Roof material meets specified criteria
RESIDENTIAL LIGHTING MEASURES De- En-
sign- force
n/a er ment
150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID:
contain only high efficacy lamps as outlined in Table
150-C, and do not contain a medium screw base socket
(E24/E26). Ballast for lamps 13 watts or greater are electronic
MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
Project Title.......... Palo Verde/Plan 3/Exer. Date..07/31/07
-------------------------------------------------------------------------------
09:32:55
-------------------------------------------------------------------------------
MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF
-1R
User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer.
-------------------------------------------------------------------
and have an output frequency no less than 20 kHz
-----
150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain
only high efficacy lamps as outlined in Table 150-C,
luminaire has factory installed HID ballast
150(k)2: Permanently installed luminaires in kitchens shall
be high efficacy luminaires. Up to 50 percent of the wattage,
as determined in Sec. 130(c), of permanently installed luminaires
in kitchens may be in luminaires that are not high efficacy
luminaires, provided that these luminaires are controlled
by switches separate from those controlling the high
efficacy luminaires
150(k)3: Permanently installed luminaires in bathrooms,
garages, laundry rooms, utility rooms shall be high
efficacy luminaires OR are controlled by an occupant
sensor(s) certified to comply with Section 119(d) that
does not turn on automatically or have an always•on option
150(k)4: Permanently installed luminaires located other than
in kitchens, bathrooms, garages, laundry rooms, and utility
rooms shall be high efficacy luminaires (except closets
less than 70 ft2), OR are controlled by a dimmer switch
OR are controlled by an occupant sensor(s) that complies
with Section 119('d) that does not turn on automatically
or have an always on option
150(k)5: Luminaires that are recessed into insulated ceilings
are approved for zero clearance insulation cover (IC) and
are certified air tight to ASTM E283 and labeled as air
tight (AT) to less than 2.O CFM at 75 Pascals
150(k)6: Luminaires providing outdoor lighting and permanently
mounted to a residential building or to other buildings on
the same lot shall be high efficacy luminaires (not in-
cluding lighting around swimming pools/water features or
other Article 680 locations) OR are controlled by occupant
sensors with integral photo control certified to comply
with Section 119(d)
150(k)7: Lighting for parking lots for 8 or more vehicles shall
have lighting that complies with Sec. 130, 132, and 147.
Lighting for parking garages for 8 or more vehicles shall
have lighting that complies with Sec. 130, 131, and 146
150(k)8: Permanently installed lighting in the enclosed, non -
dwelling spaces of low-rise residential buildings with four
or more dwelling units shall be high efficacy luminaires OR
are controlled by an occupant sensor(s) certified to
comply with Section 119(d)