Loading...
Mirage (Plans 1-3) Title 24/T E 24 Energy Conservation , Standards Compliance -Report .~ Palo', Verde',. Y - ^La :Quinta, California CITY OF LA.QUINTA, • BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION • °„ • DA s BY - _ Prepared For. D( STANDARD PACIFIC HOMES ' Coachella Valley Division...r K 15326 Alton Parkway w r ' - Irvine, -CA 92618-2338 Phone: (949) 789-1746 , Date: July 07, 2006 E�TI�AC o 6 AIR CONDITIONING '• V�-`, 2 2�� :X INC. J ' y , Working As A Team To Be The Best In Our Industry . Chinh Nguyen;` Certified Energy Analyst ' 1610 N..Maple Street ...-'Corona, CA 92880-1760 - = r ,'(800)'700-07991(951)- 739-9509,(Fax) E-mail: chinh. nguyen@wr.estpacaicom Table of Contents -Cover Sheet J-24 Summary report -Plan 1 Standard CF -1R Certificate of Compliance - MF -1R Mandatory Measures Checklist -Plan 1/Opt. Mud Room 6 . - CF -IR Certificate of Compliance - MF -IR Mandatory Measures Checklist -Plan 1/Opt. Suite - CF -1 R Certificate of Compliance - MF -1R Mandatory Measures Checklist -Plan 2 - CF -IR Certificate of Compliance - MF -1R Mandatory Measures Checklist -Plan 2/Opt. Outdoor Living - CF -1R Certificate of Compliance - MF -IR Mandatory Measures Checklist -Plan 3 - CF -IR Certificate of Compliance MF -1R Mandatory Measures Checklist -Plan 3/Opt. Exercise - CF -1R Certificate of Compliance - MF -IR Mandatory Measures Checklist' CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE BY j4 1 TITLE -24 SUMMARY REPORT The Following is the minimum requirement to meet the 2005 Residential Energy Standards (California Code of Regulations, Title 24, Part 6 and the Administrative Regulations, Title 24, Part 1). 1. R-38 Roof Insulation. 2. R-19 Exterior Wall Insulation. 3. Low -e Vinyl Windows & Sliding Doors to be selected by Owner: -.Operable Windows with U value of 0.34 & SHGC of 0.30 -Fixed Windows with U value of 0.34 & SHGC of 0.33 -Sliding Glasses Door with U value of 0.35 & SHGC of 0.31 -French Door with U value of 0.31 & SHGC of 0.22 4. R-4.2 Duct Insulation. 5. Gas Furnace with 80% AFUE . . 6. Condenser 13.0 SEER With TXV &. Min. EER of 11.0 7. 75 Gallons Water,.Heater to be selected by Owner. 8. Ducts Tested Required. 9. Radiant Barrier Required.. Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 -------------- Project Title.......... Palo Verde/Plan 1 - Date..07/05/06 14:04:52 Project Address.... ******* ------------ --------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. I- 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739•-9501 Field Check/ Date Climate Zone........... 15 -------- ------------ Compliance Method...... MICROPA87 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15805 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------ =------------------------------------------------ MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = - Space Heating.......... 2.27 2.24 0.03 = = Space Cooling ........... 70.47 57.31 13.16 = - Water Heating.......... 7.60 8.65 -1.05 = = North Total 80.34 68.20 12.14 = - Space Heating.......... 2.27 2.26 0.01 = = Space Cooling.......... 70.47 57.82 12.65 = = Water Heating.......... 7.60 8.65 -1.05 = = East Total 80.34 68.73 11.61 = - Space Heating........... 2.27 2.48 -0.21 _ = Space Cooling.......... 70.47 57.28 13.19 _ = Water Heating 7.60 8.65 -1.05 = = South Total 80.34 68.41 11.93 = = Space Heating.......... 2.21 2.51. -0.24 = = Space Cooling.......... 70.47 57.06 13.41 = = Water Heating.......... 7.60 8.65 = West Total 80.34 68.22 12.12 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance *** _ CERTIFICATE OF,COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1 Date..07/:05/06 14:04:52 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ----------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area.:... 3380 sf Building Type .............. Single Family Detached Construction Type ......... New Fuel Type........ ** ' ******' NaturalGas Building Front Orietation.Cardinal N,E,S,W Number of Dwelling Units... 1 Number of Building Stories.. 1 Weather Data Type.......... .FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 34084 cf 3380 sf ' 17.4 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned ----- Type (ft) (sf) Housewrap SLEEPING R-val R-val Azm Tilt -------- ----- ------- ---------- Residence 1325 13362 0.40 2.0 Yes Setback 2.0 Standard No LIVING -------------- 1 Wall Wood 561 0.074 19 0 Residence 2055 20722 0.60 3.0 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- -------- --- --------- -------------- 1 Wall Wood 561 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 3 Wall Wood 116 0.102 13 0 270 90 Yes IV.9 A3 WEST 5 Wall Wood 386 0.074 19 0 0 90 Yes IV.9 A5 NORTH 7 Wall Wood 169 0.074 19 0 90 90 Yes IV A A5 EAST 9 Wall Wood 363 0.102 13 0 0 90 No IV A A3 GARAGE WALL 11 Roof Rad Wood 1325 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 14 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door LIVING 2 Wall Wood 120 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 4 Wall Wood 416 0.074 19 0 270 50 Yes IV.9 A5 WEST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1 Date..07;/05/06 14:04:52 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES U- Sheath- Solar Appendix Insul Solar IV Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val ---------------------- Azm Tilt 0.900 Reference Comments ------------ 6 Wall ----- Wood ---- 373 ----- 0.074 ----- ----- 19 0 --- 0 ---- 90 --= Yes --------- IV.9 A5 -------------- NORTH 8 Wall Wood 479 0.074 19 0 90 90 Yes IV.9 A5 EAST 10 Wall Wood 182 0.102 13 0 0 90 No IV.9 A3 GARAGE WALL 12 Roof Rad Wood 2055 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 13 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ SLEEPING ------ -------- ------- ----- --------- ---------------------- 15 S1abEdge 144 0.900 R-0 No None To Outside 17 S1abEdge 38 0.550 R-0 No None TO GARAGE LIVING ------------------------ 1 Wind Back (S) 16 S1abEdge 176 0.900 R-0 No None To Outside 18 S1abEdge 18 0.550 R-0 No None TO GARAGE . FENESTRATION SURFACES Exterior Area U- Act Shade Orientation ------------------ (sf) ----- factor ----- SHGC ----- Azm --- Tilt ---- Type Location/Comments SLEEPING -------- ------------------------ 1 Wind Back (S) 16..5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back ('S) 6.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS7/Milgard Operable 8 Wind Back (S) 6.0 0.340 '0.300 180 90 Standard SGLASS8/Milgard Operable 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 17 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 18 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 25 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 26 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 27 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable LIVING 9 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS9/Milgard Operable 1 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ----------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1 Date..07/05/06 14:04:52 ------------ ------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R. User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------ ------------------------------------------ FENESTRATION SURFACES OVERHANGS ---Window--- ------------Overhang------------ Area Left Exterior Surface ----------- (sf) ----- Width ----- Height Depth ------ ----- Height Extension ------ --------- Area U- Act Shade Orientation 40.0 (sf) factor SHGC Azm Tilt Type Location/Comments 10 Door Back (S) 40.0 0.310 0.220 180 90 Standard SGLASS10/Fr.Dr. Therma-T 11 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASSII/Milgard Operabl 13 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS2/Milgard Operable 14 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 15 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS4/Milgard Operable 16 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS5/Milgard Operable 21 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASSS/Milgard Operable 22 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 23 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASS7/Milgard Operable, 24 Wind Front.(N) 9.0 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 28 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr.-Therma-Tr 29 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS5/Fr.Dr. Therma-Tr 30 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS6/Fr.Dr. Therma-Tr 31 Wind Left (E) 13.5 0.340 0.300 90 90 Standard EGLASS7/Milgard Operable 32 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable 33 Wind Left (E) 16.5 0.340 0..300 90 90 Standard EGLASS9/Milgard Operable OVERHANGS ---Window--- ------------Overhang------------ Area Left Right Surface ----------- (sf) ----- Width ----- Height Depth ------ ----- Height Extension ------ --------- Extension --------- LIVING 28 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 29 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 30 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1325 LIVING Standard Slab 2055 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 Project Title.......... Palo Verde/Plan 1 Date..07,/05/06 14:04:52 -------------------------------------------------------=----------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program-FORM'CF-1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- HVAC SYSTEMS ------------ Verified HVAC SIZING Number Verified Verified Verified Verified Maximum System of Minimum Surface Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING n/a n/a ACSplit n/a 25352 31462 n/a Furnace 1 0.800 AFUE n/a n/a n/a' n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING Orientation of Maximum..... Sizing Location............ Winter Outside Design...... Winter Inside Design........ Summer Outside Design...... Summer Inside Design....... Summer Range ............... Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F DUCT SYSTEMS Verified Verified Verified Total Sensible Design Maximum Surface Heating Cooling Cooling Cooling System Load Load Capacity Capacity .Type ------------- (Btu/hr) ---------- (Btu/hr) ---------- (Btu/hr) ---------- (Btu/hr) ---------- SLEEPING R-4.2 Yes No No Furnace 29309 n/a n/a n/a. ACSplit n/a 21862 27131 n/a LIVING Furnace Attic R-4.2 Furnace 36868 n/a n/a n/a ACSplit n/a 25352 31462 n/a Total 66177 47214 58593 n/a Orientation of Maximum..... Sizing Location............ Winter Outside Design...... Winter Inside Design........ Summer Outside Design...... Summer Inside Design....... Summer Range ............... Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F DUCT SYSTEMS Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts ------------- SLEEPING ----------- ------- ------- -------- --------- Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 Project Title .. Palo Verde/Plan 1 Date..07/05/06 14:04:52 ---------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 --------------------------------------------=---------------------------------- DUCT SYSTEMS WATER.HEATING SYSTEMS Number ITank `External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ --------=- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building. incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a.multiple orientation building. This printout is.for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. ; HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. Verified Verified Verified System Duct Duct Duct Surface Buried Type Location-' R -value Leakage -------------- Area -------- Ducts., --------- ------------- ACSplit ----------- Attic R-4.2 Yes No No WATER.HEATING SYSTEMS Number ITank `External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ --------=- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building. incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a.multiple orientation building. This printout is.for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. ; HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 ------------------------------------------------=------------------------------ ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1 Date..07/05/06 14:04:52 MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run-Palo.Verde/Plan 1 HERS REQUIRED VERIFICATION -------------------------- This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 Project Title.......... Palo Verde/Plan 1 Date..07/05/06 14:04:52 ------------------------ MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 739-9501 License. Signed.. Signed.. (date) (date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) { MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 --------------------- Project Title.......... Palo Verde/Plan 1 Date..07/05/06 14:04:52 Project Address.. ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit Westpac Air Conditioning, Inc. 1610 N. Maple St.. Plan Check / Date. Corona, CA 92880 (951) 739-9501�FieldCheck/ - - Date Climate Zone........... 15--------------------- - - Compliance Method...:.. MICRO'PAS7 v7.10 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject -to the -Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum .component performance specifications for the mandatory measures whether they are shown elsewhere in the documentsor on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or ). equivalent U -factor in metal frame ceiling IL '6 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood.framed walls or equivalent U -factor in metal frame walls (does not apply f f� to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor ✓ 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire j opening of the firebox J b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151_ meets requirements specified in ACM Residential Manual .150(g): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration Exfiltration Controls 1. Doors and'windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 Project Title.......... Palo Verde/Plan 1 Date..07/05/06 14:04:52 MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R •User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ----------------------------------------------------7-------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints ✓ and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance ✓ with ASHRAE, SMACNA or ACCA 150(i): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation / having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the / exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness:. 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water / pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to. Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15psis meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind - -Z 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely / in conditioned space ./ 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of. UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 Project Title.......... Palo Verde/Plan 1 Date..07/05/06 14:04:52 MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic / and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4.. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause / degradation of the material 7. Flexible ducts cannot have porous in cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light / 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) I J 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1 Date..07/05:/06 ------------------------------------------------------------------------------- 14:04:52 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1 ------------------------------------------------------------------------------- and have an output frequency no less than 20 kHz 150(k)1: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall -7— be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that / does not turn on automatically or have an always on option �✓ 150(k)4: Permanently installed luminaires located other than . in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically / or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air / tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall j have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) 0 STANDARD PACIFIC PALO VERDE PLAN -1/0PT. MUDROOM Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL.COMPUTER METHOD CF -1R Page 1 Project Title.......... Palo Verde/Plan 1/MudRm Date..07/;05/06 14:19:34 Project Address.. ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan'Check / Date, Corona, CA 92880 1 (951) 739-9501 Field Check% Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by-Enercomp, Inc. MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm -----------------=------------------------------------------------------------- = MICROPAS7 ENERGY USE SUMMARY = = Energy ---------------------------- Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = = Space Heating.......... 2.20 2.18 0.02 = = Space Cooling.......... 69.26 56.26 13.00 = = Water Heating......... . 7.33 8.34 -1.01 = = North Total 78.79 66.78 12.01 = - Space Heating.......... 2.20 2.14 0.06 = - Space Cooling........... 69.26 57.03 12.23 = = Water Heating.......... 7.33 8.34 -1.01 = = East Total• 78.79 67.51 11.28 = - Space Heating.........: 2.20 2.29 -0.09 = = Space Cooling.....: ..... 69.26 56.49 12.77 = = Water Heating.......... 7.33 8.34 -1.01 = = South Total 78.79 67.12 11.67 _ = Space Heating.......... 2.20 .2.38 -0.18 - = Space Cooling..'......... 69.26 56.50 12.76 - = Water Heating.......... 7.33 8.34 -1.01 = = West Total 78.79 67.-22 11.57 = _ *** Building complies with Computer.Performance _ *** HERS Verification Required ----------------------------------------------------------------- for Compliance CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 Project Title.......... Palo Verde/Plan 1/MudRm Date..07/05/06 14:19:34 ----------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3506 sf Building Type .............. Single Family Detached Construction Type New Fuel Type ........... NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area.......... Glazing Percentage.......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 35354 cf 3506 sf 17.1 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned ----- Type -------- (ft) ----- .(sf) Housewrap ------- ---------- SLEEPING R-val R-val Azm Tilt Reference Comments. SLEEPING Residence 1325 13362 0.40 2.0 Yes Setback 2.0 Standard No LIVING 1 Wall Wood 561 0.074 19 0 Residence 2181 21992 0.60 3.0 Yes Setback 2.O Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact—Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments. SLEEPING 1 Wall Wood 561 0.074 19 0 180 90 Yes IV:9 A5 SOUTH 3 Wall Wood 116 0.102 13, 0 270 90 Yes IV A A3 WEST 5 Wall Wood 386 0.074 19 0 0 90 Yes IV.9 A5 NORTH 7 Wall Wood 169 0.074 19 0. 90 90 Yes IV.9 A5 EAST 9 Wall Wood 182 0.102 13 0 0 90 No IV A A3 GARAGE WALL 11 RoofRad Wood 1325 0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 2 Wall Wood 120 0.074 19 0 180 90 Yes IV A A5 SOUTH 4,Wall Wood 416 0.074 19 0 270 90 Yes IV.9 A5 WEST 6 Wall Wood 483 0.074 19 0 0 90 Yes IV.9 A5 NORTH CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 Project Title. .... Palo Verde/Plan 1/MudRm Date..07:/05/06 14:19:34 MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES U= Appendix Sheath- Solar Appendix Insul Solar IV Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ 8 Wall ----- Wood ---- 479 ----- 0.074 ----- 19 ----- 0 --- 90 ---- --- 90 Yes --------- IV A A5 -------------- EAST 10 Wall Wood 261 0.102 13 0 0 90 No IV A A3 GARAGE WALL 12 RoofRad Wood 2181 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 13 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door 14 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor -------- R-val ------- Gains ----- Reference --------- Comments ---------------------- ------------ SLEEPING ------ Orientation (sf) factor 15 S1abEdge 144 0.900 R-0 No None To Outside 17 S1abEdge 18 0.550 R-0 No None TO GARAGE LIVING 1 Wind Back (S) 16.5 0.340-0.300 16 S1abEdge 188 0.900 R-0 No None To Outside 18 S1abEdge 28 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation (sf) factor SHGC Azm Tilt Type Location/Comments ------------------------ ------------------ SLEEPING ----- ----- ----- --- ---- -------- 1 Wind Back (S) 16.5 0.340-0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4.Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0-0.340 0.300 180 90 Standard SGLASSS/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS7/Milgard Operable 8 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS8/Milgard Operable 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 17 Wind.Front (N) 11.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 18 Wind Front (N) 9.0'0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 25 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 26 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 27 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable LIVING 9 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS9/Milgard Operable CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 Project Title. ...... Palo Verde/Plan 1/MudRm Date..07/05/06 14:19:34 MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- FENESTRATION SURFACES OVERHANGS ---Window--- ------------Overhang------------ Area Exterior _ Left Right Area U- Width•Height Act Depth Shade Extension --------- Orientation ----------- LIVING (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ 10 Door Back (S) ----- 40.0 ----- 0.310 ----- 0.220 --- 180 ---- 90 -------- Standard ------------------------ SGLASS10/Fr.Dr. Therma-T 11 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASSII/Milgard Operabl 13 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS2/Milgard Operable 14 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 15 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS4/Milgard Operable 16 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS5/Milgard Operable 21 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASS5/Milgard Operable 22 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 23 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASS7/Milgard Operable 24 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 28 Door Left (E) 40.0 0:310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 29 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS5/Fr.Dr. Therma-Tr 30 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS6/Fr.Dr..Therma-Tr. 31 Wind Left (E) 13.5 0.340 0.300 90 90 Standard EGLASS7/Milgard Operable 32 Wind Left (E) 16.5 0.340 0.300 90- 90 Standard EGLASS8/Milgard Operable 33 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS9/Milgard Operable 34 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASSII/Milgard Operabl OVERHANGS SLAB SURFACES ------------- Area Slab Type (sf)' SLEEPING Standard Slab 1325 LIVING Standard Slab 2181 ---Window--- ------------Overhang------------ Area Left Right Surface (sf) Width•Height Depth Height Extension --------- Extension --------- ----------- LIVING ----- ----- ------ ----- ------ 28 Door 40.0 5.00 8.00 8.00 1.00 n/.a n/a 29 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 30 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a SLAB SURFACES ------------- Area Slab Type (sf)' SLEEPING Standard Slab 1325 LIVING Standard Slab 2181 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 Project Title.......... Palo Verde/Plan 1/MudRm Date..07/05/06 14:19:34 -------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- HVAC SYSTEMS ------------ Verified HVAC SIZING Number Verified Verified Verified Verified Maximum System of Minimum Buried Refrig.Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow -------- Draw Capacity ------------ SLEEPING ------- ----------- ----- ------------- No -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a •n/a n/a ACSplit 1 13.00 SEER .11 Yes No No No LIVING n/a n/a ACSplit n/a 28120 34897 n/a Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING DUCT SYSTEMS Verified Verified Verified System Total Sensible Design Maximum Buried Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type ----------------------- (Btu/hr) (Btu/hr) ---------- (Btu/hr) ---------- (Btu/hr) ---------- SLEEPING Yes No No ACSplit Furnace 27033 n/a n/a n/a ACSplit n/a 19575 24292 n/a LIVING Furnace Attic ..R-4.2 Yes Furnace 40319 n/a n/a n/a ACSplit n/a 28120 34897 n/a ------------- Total ---------- 67353 ---------- 47695 ---------- 59190 ---------- n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range.. ............. 34 F DUCT SYSTEMS Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic ..R-4.2 Yes No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 Project Title.......... Palo Verde/Plan 1/MudRm Date..07/05/06 14:19:34 MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- DUCT SYSTEMS Verified Verified Verified System Duct• Duct Duct Surface Buried Type Location R -value Leakage Area Ducts ------------------------------------------------------- ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS --------------------- Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection.- This nspection. This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates'HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than'0.58. HERS REQUIRED VERIFICATION ***.Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD- CF -1R Page 7, Project Title.......... Palo Verde/Plan l/MudRm Date..07/05/06 14:19:34 ---------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- HERS REQUIRED VERIFICATION -------------------------- This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 Project Title.......... Palo Verde/Plan 1/MudRm Date..07/05/06 14:19:34. MICROPAS7 v7 10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California .Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address.• 1610 N. Maple St.. Irvine, CA 92618-2338 -Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 739-9501 License. 6 /J Signed.. Signed.. (date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) n i MANDATORY MEASURES CHECKLIST RESIDENTIAL MF -1R Page 1 --------------------------------------- --------------------------------------- Project Title.......... Palo Verde/Plan Project Address........ La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* ---------------------------------------- ---------------------------------------- 1/MudRm Date..07/05/06 14:19:34 Westpac Air Conditioning, Inc. 1610 N. .Maple St. Corona, CA 92880 (951) 739-9501 --------------------- I I Building Permit # Plan Check / Date Field Check/ Date - Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 .Standards by Enercomp, Inc. -----=------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors / or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in'ACM Residential Manual 150(g): Vapor barriers mandatory in Climate Zones 14,16 only f 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality / standards. Indicate type and include CF -6R form d 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls / 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage „// 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 Project Title.......... Palo Verde/Plan 1/MudRm Date..07/0.5/06 14:19:34 MICROPAS7 v7..10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification _ 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance / with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to / Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A .111, 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind __z 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the - Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/MudRm Date..07/05/06 14:19:34 ----------------=-------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/MudRm ------------------7------------------------------------------------------------ UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause / reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with / mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause j degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a'medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 Project Title. ...... Palo Verde/Plan 1/MudRm Date..07/0.5/06 14:19:34 MICROPAS7 v7.10 File-LAQ53_1M Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air'Conditioning, Run -Palo Verde/Plan 1/MudRm --------------------------------------------=---------------------- -- and have an output frequency no less than 20 kHz � 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high. / efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high ' efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that j does not turn on automatically or have an always on option J 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies - with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) STANDARD PACIFIC PALO VERDE PLAN -1/OPT. SUITE Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 Project Title Palo Verde/Plan 1/Suite Date..07y/05/06 14:26:39 Project Address.. ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen *******I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 ---------------------. Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp,•Inc. MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite -------------------------------------------------------------------------------- ---------------------------- ---------------------------- MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = Ch = (kTDV/sf-yr) Design Design Margin = - Space Heating.......... 2.19 2.11 0.08 = - Space Cooling.......... 69.22 56.33 12.89 = - Water Heating.......... 7.34 8.36 -1.02 _ = North Total 78.75 66.80 11.95 = = Space -Heating ......... 2.19 2.15 0.04 = = Space Cooling.......... 69.22 57.03 12.19 = _ Water Heating..:....... 7.34 .8.36 -1.02 = = East Total 78.75 67.54 11.21 = = Space Heating.......... 2.19 2.36 =0.17 = = Space Cooling.......... 69.22 56.30 12.92 = = Water Heating........... 7.34. '8.36 -1.02 = = South Total 78.75 67.02 11.73 = = Space Heating.......... 2:19 2.38 -0.19 = = Space Cooling.......... 69.22 56.29 12.93 = = Water Heating........... 7.34 8.36 -1.02 _ = West Total_• 78.75 67.03 11.72 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance *** _ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..0.7/05/06 14:26:39 MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ---------------------=--------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3499 sf Building Type .............. Single Family Detached Construction Type ......... New . Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear• Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage:........ Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On. Grade 2 35282 cf 3499 sf 17.1 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type (sf) (cf) Units""le Location/ ioned Type (ft) (sf) Housewrap -------------- SLEEPING ----- ------ ----- ----- ----- -------- ----- ------- ---------- Residence 1444 14560 0.40 2.0 Yes Setback 2.0 Standard No LIVING 1 Wall Wood 550 0.074 19 0 180 Residence 2055 20722 0.60 3.0 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 550 0.074 19 0 180 90 Yes IV A A5 SOUTH 3 Wall Wood 116 0.102 13 0 270 90 Yes IV A A3 WEST 5 Wall Wood 466 0.074 19 0 0 90 Yes IV A A5 NORTH 7 Wall Wood 169 0.074 19 0 90 90 Yes IV.9 A5 EAST 9 Wall Wood 281 0.102 13 0 0 90 No IV.9 A3 GARAGE WALL 11 Roof Rad Wood 1444 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 14 Door Other. 22 0.500 0 0 0 90 No IV.5 A4 Wood Door LIVING 2 Wall Wood 120 0.074 19 0 180 90 Yes IV A A5 SOUTH 4 Wall Wood 416 0.074 19 0 270 90 Yes IV.9 A5 WEST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 Project Title ... Palo Verde/Plan 1/Suite Date...07/05/06 14:26:39 MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 6 Wall Wood 373 0.074 19 0 0 90 Yes IV.9 A5 NORTH 8 Wall Wood 479 0.074 19 0 90 90 Yes IV A A5 EAST 10 Wall Wood 182 0.102 13 0 0 90 No IV.9 A3 GARAGE WALL 12 RoofRad Wood 2055 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 13 Door Other 24 0.500 0 •0 270 90 Yes IV.5 A4 Wood Door PERIMETER LOSSES ---------------- Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ --------------------- -------------- ---------------------- SLEEPING 15 S1abEdge 152 0.900 R-0 No None To Outside 17 S1abEdge 30 0.550 R-0 No None TO GARAGE LIVING 16 S1abEdge 176 0.900 R-0 No None To Outside 18 S1abEdge 18 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation (sf) factor SHGC Azm Tilt Type Location/Comments ------------------------ ------------------ SLEEPING ----- ----- ----- --- ---- -------- 1 Wind Back (S) 16.5 0.340 0.300'180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 6.0 0.340 0._300 180 90 Standard SGLASS3/Milgard Operable 4 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS7/Milgard Operable 8 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS8/Milgard Operable 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 17 Wind Front (N) 11.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 18 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 25 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 26 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 27 Wind Left (E) 16.5 0.340 0.300 90 90 Standard SGLASS3/Milgard Operable LIVING 9 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS9/Milgard Operable CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 MICROPAS7 v7 10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- FENESTRATION SURFACES OVERHANGS ---Window--- ------------Overhang------------ Area Exterior. Left Right Area U- Width Act Depth ----- Shade Extension --------- Orientation ----------- LIVING ----- (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ 10 Door Back (S) ----- 40.0 ----- 0.310 ----- 0.220 --- 180 ---- 90 -------- Standard ------------------------ SGLASS10/Fr.Dr. Therma-T 11 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASSII/Milgard Operabl 13 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS2/Milgard Operable 14 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 15 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS4/Milgard Operable 16 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS5/Milgard Operable 21 Wind Front (N) 11.0 0.34'0 0.300 0 90 Standard NGLASS5/Milgard Operable 22 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 23 Wind Front (N) 11.,0 0.340 0.300 0 90 Standard NGLASS7/Milgard Operable 24 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 28 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 29 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS5/Fr.Dr. Therma-Tr 30 Door Left (E) 40.0 0.310 0.220 90. 90 Standard EGLASS6/Fr.Dr. Therma-Tr 31 Wind Left (E) 13.5 0.340 0.300 90 90 Standard EGLASS7/Milgard Operable 32 Wind Left (E) 16.5 0.340.0.300 90 90 Standard EGLASS8/Milgard Operable 33 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS9/Milgard Operable OVERHANGS SLAB SURFACES ------------- Area Slab Type (sf) ---------------- ------ SLEEPING Standard Slab 1444 LIVING Standard Slab 2055 ---Window--- ------------Overhang------------ Area Left Right Surface (sf) Width Height Depth ----- Height ------ Extension --------- Extension --------- ----------- LIVING ----- ----- ------ 28 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 29 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 30 Door 30 40.0 5.00 8.00 8.00 1.00 n/a n/a SLAB SURFACES ------------- Area Slab Type (sf) ---------------- ------ SLEEPING Standard Slab 1444 LIVING Standard Slab 2055 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- HVAC SYSTEMS ------------ HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr). (Btu/hr) ----------------------------------------------------- SLEEPING Furnace 30240 n/a n/a n/a ACSplit n/a 22322 27702 n/a LIVING Furnace 36868 n/a n/a n/a ACSplit n/a 25352 31462 n/a ----------------------------------------------------- Total 67107 47674 59164 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F Winter Inside Design....... 70 F' Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range............... 34 F DUCT SYSTEMS Verified Verified Number Verified Duct Verified Verified Verified Maximum System of Minimum Ducts Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity SLEEPING No No LIVING Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr). (Btu/hr) ----------------------------------------------------- SLEEPING Furnace 30240 n/a n/a n/a ACSplit n/a 22322 27702 n/a LIVING Furnace 36868 n/a n/a n/a ACSplit n/a 25352 31462 n/a ----------------------------------------------------- Total 67107 47674 59164 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F Winter Inside Design....... 70 F' Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range............... 34 F DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts ------------- SLEEPING ----------- -------------- -------- --------- Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------ Project Title.......,... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/ Plan 1/Suite ------------------------------------------------------------------------------- DUCT SYSTEMS WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- =------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage -------------- Area -------- Ducts --------- ------------- ACSplit ----------- Attic R-4.2 Yes No No . WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- =------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 --------------------------=-------------------=-------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- HERS REQUIRED VERIFICATION This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 Project Title.......... Palo Verde/Plan 1/Suite Date..07/05!06 14:26:39 MICR0PAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate.has been signed by.the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 739-9501 License. Signed.. Signed.. (date) (date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ------------------------------------------------------------------------------= ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 Project Address....... ******* --------------------- La Quinta, California *v7.10*_ Documentation Author... Chinh Nguyen ******* Building Permit # Westpac Air Conditioning, Inc.. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 r (951) 739-9501 Field Check/ Date Climate Zone........... 15 Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. -------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist -is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or'on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- . n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's.labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor ✓ 150(e): Installation of Fireplaces, Decorative.Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 / meets requirements specified in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, / water vapor permeance rate no greater than 2.0 perm/inch r/ 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows.weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation / having an installed thermal resistance of R12 or greater ✓ 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 -------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 -------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan -------------------------------------------------------------------------------- 1/Suite UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 11" 2. Building cavities, support platforms for air handlers, and plenums defined 'or constructed with materials other than .sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the .ducts / 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless. such tapeis used in combination with / mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually ` operated dampers J 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause / degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a.. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances / with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria_ RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater.are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 1/Suite Date..07/05/06 14:26:39 ---------------=--------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_1S Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 1/Suite ------------------------------------------------------------------------------- and have an output frequency no less than'20 kHz 150(k)1: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 15d(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires / 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on.option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply / with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8. Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) STANDARD PACIFIC PALO VERDE PLAN -2 Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 Project Title.......... Palo Verde/Plan 2 Date..07.105/06 15:11:07 Project Address.. ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen *******I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method..:... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. -------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- ---------------------------- ---------------------------- MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design •Design Margin = - Space Heating.......... 2.34 2.45 -0.11 = - Space Cooling.......... 71.37 56.90 14.47 = - Water Heating........... 7.26 8.27 -1.01 = = North Total 80.97 67.62 13.35 = - Space Heating......,... 2.34 2.22 0.12 = = Space Cooling.......... 71.37 58.21 13.16 = = Water Heating.......... 7.26 8.27 = East Total 80.97 68.70 12.27 = - Space Heating.......... 2.34 2.35 -0.01 = - Space Cooling.......... 71.37 58.35 13.02 = - Water Heating 7.26 8.27 -1.01 = = South Total 80.97 68.97 12.00 = - Space Heating.......... 2.34 2.57 -0.23 = - Space Cooling.......... 71.37 58.01 13.36 = Water Heating.......... 7.26 8.27 -1.01 = = West Total 80.97 68.85 12.12 = _ *** Building complies with Computer Performance *** _ ----------------------------------------------------------------- ----------------------------------------------------------------- *** HERS Verification Required for Compliance CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 Project Title.......... Palo Verde/Plan 2 - Date..07,/05/06 15:11:07 --------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ---------------------------------------------------------=--------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3537 sf Building Type .............. Single Family Detached Construction Type ......... New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling'Height..... Slab On Grade 2 35668 cf 3537 sf 17.8 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of. # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type (sf) (cf) Units ----- le ----- ioned ----- Type -------- (ft) ----- (sf) Housewrap ------- ---------- -------------- SLEEPING ----- ------ Azm Tilt Reference Comments ------------ SLEEPING Residence 1596 16094 0.45 2.7 Yes Setback 2.0 Standard No LIVING -------------- 1 Wall Wood 468 0.074 19 0 Residence 1941 19574 -0.55 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 468 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 3 Wall Wood 206 0.102 13 0 270 90 Yes IV A A3 WEST 5 Wall Wood 733 0.074 19 0 0 90 Yes IV A A5 NORTH 7 Wall Wood 140 0.074 19 0 90 90 Yes IV A A5 EAST 10 Roof Rad Wood 1596 0.025 38 0 n/a 0 Yes IV A A18 Attic LIVING 2 Wall Wood 403 0.074 19 0 180 90 Yes IV A A5 SOUTH 4 Wall Wood 416 0.074 19 0 270 90 Yes IV A A5 WEST 6 Wall Wood 239 0.074 19 0 0 90 Yes IV A A5 NORTH 8 Wall Wood 477 0.074 19 0 90 ' 90 Yes IV A A5 EAST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page.3 ----------- Project Title.......... Palo Verde/Plan 2 Date..07/95/06 15:11:07 ----------------------------------------------------- - MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES U- Sheath- Solar.Appendix Length F2 Insul Solar Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val --------- Azm Tilt Reference Comments 9 Wall Wood 291 0.102 13 0 0 90 No IV A A3 GARAGE WALL 11 RoofRad Wood 1941 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 12 Door Other 28 0.500 0 0 270 90 Yes IV.5 A4 Wood Door 13 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ---------------------- ------------ SLEEPING ------ -------- ------- ----- --------- factor 14 S1abEdge 182 0.900 R-0 No None To Outside LIVING ----- ----- --- ---- -------- ------------------------ 15 S1abEdge 191 0.900 R-0 No None To Outside 16 S1abEdge 31 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade . Orientation (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ SLEEPING ----- ----- ----- --- ---- -------- ------------------------ 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 15.0 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 15.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Door Back (S) 40.0 0.310 0.220 180 90 Standard SGLASS4/Fr.Dr. Therma-Tr 5 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 18 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 21 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 22 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS5/Milgard Operable 23 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS6/Milgard Operable 24 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASS7/Milgard Operable 25 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 26 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS9/Milgard Operable 31 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 32 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 33 Wind Left (E) 11.0 0.340 0.300 90 90 Standard SGLASS3/Milgard Operable LIVING CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 Project Title ... Palo Verde/Plan 2 - Date..07/05/06 15:11:07. ------------------------------------------------------------ MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- FENESTRATION SURFACES OVERHANGS ---Window--- ------------Overhang------------ Exterior Area Area U- Surface Act Width Shade Depth Orientation Extension --------- (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ 7 Wind Back (S) ----- 2.0 ----- 0.340 ----- 0.330 --- 180 ---- 90 -------- Standard ------------------------ SGLASS7/Milgard Fixed Wi 8 Wind Back (S) 2.0 0.340 0.330 180 90 Standard SGLASS8/Milgard Fixed Wi 9 Wind Back (S) 9.0 0.340 0.300 180 90 Standard SGLASS9/Milgard Operable 10 Door Back (S) 9.0 0.310 0.220 180 90 Standard SGLASS10/Fr.Dr. Therma-T 11 Wind Back (S) 9.0 0.340 0.300 180 90 Standard SGLASSII/Milgard Operabl 13 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS2/Fr•.Dr. Therma-Tr 14 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 15 Wind Right•(W) n/a 16.5 0.340 0.300 270 90 Standard WGLASS4/Milgard Operable 16 Wind Right (W) 2.5 0.340 0.330 270 90 Standard WGLASS5/Milgard Fixed Wi 17 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable 27 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS10/Milgard Operabl 28 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASSII/Milgard Operabl 29 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASSI2/Milgard Operabl 30 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASSI3/Milgard Operabl 34 Door Left (E) 24.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 35 Wind Left (E) 27.5 0.340 0.330 90 90 Standard EGLASS5/Milgard Fixed Wi 36 Door Left (E) 24.0 0.310 0.220 90 90 Standard EGLASS6/Fr.Dr. Therma-Tr 37 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr 38 Wind Left (E) 13.5 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable 39 Door Left (E) 40.0.0.310 0.220 90 90 Standard EGLASS9/Fr.Dr. Therma-Tr OVERHANGS ---Window--- ------------Overhang------------ Area Left Right Surface (sf) Width Height Depth Height Extension --------- Extension --------- ----------- SLEEPING ----- ----- ------ ----- ------ 1 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 5 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 6 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a LIVING 13 Door 40.0 5.00 8.00 8.00 1.00 n/a n/a 14 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 15 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 27 Window 16.5 3:00 5.50 6.00 1.00 n/a n/a 29 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 30 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 34 Door 24.0 3.00 8.00 6.00 1.00 n/a n/a 35 Window 27.5 5.00 5.50 6.00 1.00 n/a n/a 36 Door 24.0 3.00 8.00 6.00 1.00 n/a n/a CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 ---------------------- Project Title.......... Palo Verde/Plan 2 - Date..07/05/06 15:11:07 MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1596 LIVING Standard Slab 1941 HVAC SYSTEMS ------------ Verified r Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING Furnace 1 0.800 AFUE n/a n/a n/a n/a,. n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING Verified Total Sensible Design Maximum Heating. Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING Furnace 31753 n/a n/a n/a ACSplit n/a 22848 28354 n/a LIVING Furnace 38738 n/a n/a n/a ACSplit n/a 25434 31564 n/a Total 70491 48282 59918 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F , Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range....... ...... 34 F r CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R- Page 6 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 - Date..07/05/06 15:11:07 ------------------------------------------------------------------=------------ ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- WATER HEATING SYSTEMS Number Tank External Heater in Energy' Size 'Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS -------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts ------------- SLEEPING ----------- ---------'----- -------- --------- Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS Number Tank External Heater in Energy' Size 'Insulation Tank Type Type Distribution Type System Factor (gal) R -value ---------------- -------- ------------------- -------------- ------ ---------- 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS -------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page_ 7 ------------------------------------------------------------------------------- Project Title....,...... Palo Verde/Plan 2 - Date..07/05,/06 15:11:07 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- HERS REQUIRED VERIFICATION -------------------------- *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS.verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 8 -------------------- Project'Title........... Palo Verde/Plan 2 Date..07/05'/06 15:11:07 MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 •and 6 of the California Code of Regulations, and the' administrative regulations to implement them. This certificate has beensigned by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 739-9501 License. Signed.. Signed.. A L (date) (d e) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 Project Title.......... Palo Verde/•Plan 2 Date..07/05/06 15:11:07 Project Address...... ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 �. (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ----------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force= n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling �7 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U-factor.in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors i or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue J, damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified 'in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate•Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 ------------------------------------------------------------------------------- --------------------------------------------_----------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/05/06 15:11:07 ------------------------------------------------------------------=------------ ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints / and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110 -113: -HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(i): Setback thermostat on all applicable heating and/or / cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation / having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the /. exterior of the tank showing the R -value JL 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A _ 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A ^� 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 - Date..07/05/06 15:11:07 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating , b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2 Date..07/05/06 ------------=------------------------------------------------------------------ 15:11:07 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2 ------------------------------------------------------------------------------- and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled,by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to .other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to / comply with Section 119(d) �/ STANDARD PACIFIC PALO VERDE PLAN -2/OPT. O UTDR L VG. Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 Project Address..... ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. --------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- ---------------------------- ---------------------------- MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = = Space Heating.......... 2.37 2.35 0.02 = = Space Cooling..........` 72.24 57.39 14.85 = = Water _ Heating........... 7.26 8.27 -1.01 - North-Total Total -------- 81.87 ---------------- 68.01 -------North 13.86 _ = Space Heating.......... 2.37 2.16 0.21 = - Space Cooling........... 72.24 58.19 14.05 = = Water _ Heating.......... 7.26 8.27 -1.01 = = East Total -------- 81.87 ---------------- 68.62 - 13.25 = = Space Heating.......... 2.37 2.23 0.14 - = Space Cooling.......... 72.24 58.61 13.63 - = Water Heating.......... . 7.26 8.27 -1.01 = = South Total 81.87 69.11 12.76 = = Space Heating.......... 2.37 2.40 -0.03 - = Space Cooling.......... 72.24 58.28 13.96 - = Water Heating.......... 7.26 8.27 -1.01 - = West Total 81.87 68.95 12.92 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance *** _ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 ----------------------------- MICROPAS7 x7.10 File-LAQ53_20 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan.2/OutDr GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3537 sf Building Type. ............. Single Family Detached Construction Type New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of Building Zones.... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 35668 cf 3537 sf 18.4 % of floor area 0.33 Btu/hr-sf-F 0.27 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Appendix Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned- Type (ft) (sf) Housewrap SLEEPING Azm Tilt Reference ----- -------- ----- ------- ---------- Residence 1596 16094 0.45 2.7. Yes Setback 2.0 Standard No LIVING Wall Wood 468 0.074 19 0 180 90 Residence' 1941 19574 0.55 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface ------------ Type ----- (sf) or R-val R-val Azm Tilt Reference Comments SLEEPING ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 468 0.074 19 0 180 90 Yes IV A A5 SOUTH 3 Wall Wood 206 0.102 13 0 270 90 Yes IV A A3 WEST 5 Wall Wood 733 0.074 19 0 0 90 Yes IV A A5 NORTH 7 Wall Wood 140 0.074 19 0 90 90 Yes',IV.9 A5 EAST 10 Roof Rad Wood 1596 0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 2 Wall Wood 403 0.074 19 0 180 90 Yes IV A A5 SOUTH 4 Wall Wood 506 0.074 19 0 270 90 Yes IV A A5 WEST 6 Wall Wood 239 0.074 19 0 0 90 Yes IV A A5 NORTH 8 Wall Wood 477 0.074 19 0 90 90 Yes IV A A5 EAST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- PERIMETER LOSSES OPAQUE SURFACES Appendix Length F2 U- --------------- Sheath- IV Solar Appendix (ft) Factor Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt --- Reference Comments ------------ 9 Wall ----- Wood ---- 202 ----- 0.102 ----- ----- 13 0 --- 0 ---- 90 No --------- IV.9 A3 -------------- GARAGE WALL 11 Roof Rad Wood 1941 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 12 Door Other 28 0.500 0 0 270 , 90, Yes IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ SLEEPING ------ -------- ------- ----- --------- ---------------------- 13 S1abEdge 182 0.900 R-0 No None To.Outside LIVING ----- ----- --- ---- -------- ------------------------ 14 S1abEdge 202 0.900 R-0 No None To Outside 15 S1abEdge 20 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation ------------------ (sf) factor SHGC Azm Tilt Type Location/Comments SLEEPING ----- ----- ----- --- ---- -------- ------------------------ 1 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 15.0 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 15.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Door Back (S) 40.0 0.310 0.220 180 90 Standard SGLASS4/Fr.Dr. Therma-Tr 5 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASSS/Milgard Operable 6 Wind Back .(S) 6.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 12 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 18 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 19 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 20 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 21 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS4/Milgard Operable 22 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASSS/Milgard Operable 23 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS6/Milgard Operable 24 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASSI,/Milgard Operable 25 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS8/Milgard Operable 26 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS9/Milgard Operable 31 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 32 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS2/Fr.Dr. Therma-Tr 33 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable LIVING 7 Wind Back (S) 2.0 0.340 0.330 180 90 Standard SGLASS7/Milgard Fixed Wi CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/Out-Dr Date..07/05/06 15:24:27 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- FENESTRATION SURFACES OVERHANGS ---Window--- ------------Overhang------------ Exterior Left Area U- (sf) Act Height Shade Height ------ Orientation ------------------ Extension (sf) factor SHGC ----- Azm Tilt ---- Type Location/Comments 8 Wind Back (S) ----- 2.0 ----- 0.340 0.330 --- 180 90 -------- Standard ------------------------ SGLASS8/Milgard Fixed Wi 9 Wind Back (S) 9.0 0.340 0.300 180 90 Standard SGLASS9/Milgard Operable 10 Door Back (S) 9.0 0.310 0.220 180 90 Standard SGLASS10/Fr.Dr. Therma-T 11 Wind Back (S) 9.0 0.340 0.300 180 90 Standard SGLASSII/Milgard Operabl 13 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS2/Fr.Dr. Therma-Tr 14 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 15 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS4/Milgard Operable 16 Wind Right (W) 2.5 0.340 0.330 270 90 Standard WGLASSS/Milgard Fixed Wi 17 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable 27 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASS10/Milgard Operabl 28 Wind Front (N) 16.5 0.340 0.300 0 90 Standard NGLASSII/Milgard Operabl 29 Wind Front (N) 6.0 0.340 0.300 0 90 Standard NGLASSI2/Milgard Operabl 30 Wind Front (N) 6.0 0.1340 0.300 0 90 Standard NGLASSI3/Milgard Operabl 34 Door Left (E) 24.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 35 Wind Left (E) 27.5 0.340 0.300 90 90 Standard EGLASS5/Milgard Operable 36 Door Left (E) 24.0 0.310 0.220 90 90 Standard EGLASS6/Fr.Dr. Therma-Tr 37 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr 38 Wind Left (E) 13.5 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable 39 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS9/Fr.Dr. Therma-Tr 40 Door Right (W) 20.0 0.310 0.220 270 90 Standard WGLASS7/Fr.Dr. Therma-Tr OVERHANGS ---Window--- ------------Overhang------------ Area Left Right Surface ----------- (sf) Width Height Depth Height ------ Extension Extension SLEEPING ----- ----- ------ ----- --------- --------- 1 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 5 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 6 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a LIVING 13 Door 40.0• 5.00 8.00 8.00 1.00 n/a n/a 14 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 15 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 27 Window 16.5 3.00 5.50 6.00 1.00 n/a n/a 29 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 30 Window 6.0 2.00 3.00 6.00 1.00 n/a n/a 34 Door 24.0 3.00 8.00 6.00 -1.00 n/a n/a 35 Window 27.5 5.00 5.50 6.00 1.00 n/a n/a 36 Door 24.0 3.00 8.00 6.00 1.00 n/a n/a CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R .Page 5 Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05./06 15:24:27 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan'2/OutDr ------------------------------------------------------------------------------- SLAB SURFACES ` Area Slab Type (sf) ---------------- ------ SLEEPING Standard Slab 1596 LIVING Standard Slab 1941 t. HVAC SYSTEMS ------------ HVAC SIZING Verified Total Verified Design Number Verified Heating Verified Verified Verified Maximum System of Minimum 1 , Refrig Charge Adequate Fan Watt Cooling. Type Systems Efficiency EER or TXV Airflow Draw Capacity- SLEEPING n/a n/a ACSplit n/a 22848 28354 n/a Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING ---------- 47326 ---------- 58732 ---------- n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type ------------- (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING ---------- .---------- ---------- ---------- Furnace 31753 n/a n/a n/a ACSplit n/a 22848 28354 n/a LIVING Furnace 38555 n/a n/a n/a. ACSplit n/a 24479 30378 n/a ------------- Total ---------- 70308 ---------- 47326 ---------- 58732 ---------- n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location. ......... LA QUINTA Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range ............... 34 F CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/Outar Date..07/05/06 15:24:27 MICROPAS7 v7.10 File-LAQ53_20 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning,Run-Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** ***,verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type ------------- Location ----------- R -value Leakage -------------- Area -------- Ducts --------- SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value 1 Storage Gas Standard 1 0.51 75 R-12 SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** ***,verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 ---------- 7 ------ Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 MICROPAS7 v7..10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- HERS REQUIRED VERIFICATION ------------------------- *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing.•If ducts are not installed, then HERS verification is not necessary. REMARKS CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page ------------------------------------------------------------------------------ Project Title.......... Palo Verde/Plan 2/Out7Dr Date..07/05/06 15:24:2 ------------------------------------------------------------------------------ ------------------------------------------------------------------------------ MICROPAS7 v7.10 File-LAQ53_2O. Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them.. This certificate has been signed by the individual •with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 739-9501 License. Signed.. Signed.. (date) (date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 ------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 Project Address........ ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the.permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent .U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire ✓ opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed �L 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate Zones.14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form . _74—/ 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 --------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or / cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A _ 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind_ 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 --------------=---------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts LL 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with / mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually j operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause ` degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating / b. Cover for outdoor pools or outdoor spas. J. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 2/OutDr Date..07/05/06 15:24:27 ---------------------------------------------------------------=--------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_2O Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 2/OutDr ------------------------------------------------------------------------------- and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) �L STANDARD PACIFIC PALO VERDE Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 d CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 ------------------------------------------------------------------------------- Project Title........... Palo Verde/Plan 3 - Date:.07/05/06 15:39:49 Project Address........ ******* --------------------- La Quinta, California *v7.10* I I Documentation Author... Chinh Nguyen ******* I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. I Plan Check / Date.I Corona, CA 92880 I. I (951) 739-9501 I Field Check/ Date I Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------ ------------------ MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ---------------------------------------------------------------------------- ----------------------------------------------------------------- ----------------------------------------------------------------- = MICROPAS7 ENERGY USE SUMMARY = ---------------------------- = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = = Space Heating........... 1.77 2.06 -0.29 _ = Space Cooling.......... 62.06 51.16 10.90 = = Water Heating.......... 6.66 7.59 -0.93 = = North Total ..70.49 60.81 9.68 - = Space Heating.......... 1.77 1.72 0.05 = - Space Cooling.......... 62.06 50.75 11.31 = = Water Heating............ 6.66 7.59 -0.93 = = East Total 70.49 60.06 10.43 = = Space Heating........... 1.77 1.72 0.05 = = Space Cooling.......... 62.06 52.59 9.47 = = Water Heating.......... 6.66 7.59 -0.93 = = South Total 70.49 61.90 8.59, _ = Space Heating.......... 1.77 1.95 -0.18 = = Space Cooling.......... 62.06 50.56 11.50 = = Water Heating.......... 6.66 7.59 -0.93 = = West Total 70.49 60.10 10.39 = _ *** Building complies with Computer Performance _ -----------------------------------=----------------------------= *** HERS Verification Required for Compliance CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3855 sf Building Type ............... Single Family Detached Construction:Type ......... New Fuel Type NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type........... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U -factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 38872 cf 3855 sf 14.9 % of floor area 0.33 Btu/hr-sf-F 0.26 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor ' # of. # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type (sf) (cf) Units le ioned •Type (ft) (sf) Housewrap -------------- SLEEPING ----- ------ ----- ----------- -------- ----- ------- ---------- Residence 1342 13532 0.35 1.8 Yes Setback 2.0 Standard No LIVING -------------- 1 Wall Wood 452 0.074 19 0 Residence 2513 25340 0.65 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 452 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 2 Wall Wood 165 0.102 13 0 270 90 Yes IV A A3 WEST 4 Wall Wood 288 0.074 19 0 0 90 Yes IV.9 A5 NORTH 6 Wall Wood 213 0.074 19 0 90 90 Yes IV.9 A5 EAST 8 Wall Wood 122 0.102 13 0 0 90 No IV.9 A3 GARAGE WALL 10 RoofRad Wood. 1342.0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 3 Wall Wood 318 0.074 19 0 270 90 Yes IV A A5 WEST 5 Wall Wood 393 0.074 19 0 0 90 Yes IV.9 A5 NORTH 7 Wall Wood 460 0.074 15 0 90 90 Yes IV.9 A5 EAST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ---------- 7 ---- Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------=------ OPAQUE SURFACES PERIMETER LOSSES U- I Sheath- Solar Appendix Insul Solar IV Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ 9 Wall ----- Wood ---- 383 ----- 0.102 ----- 13 ----- 0 --- 0 ---- --- 90 No --------- IV.9 A3 -------------- GARAGE WALL 11 RoofRad Wood 2513 0..025 38 0 n/a 0 Yes IV.1 A18 Attic 12 Door Other 24 0.500 0 0 270 90 Yes IV.5 A4 Wood Door 13 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ SLEEPING ------ -------- ------- ----- --------- ---------------------- 14 SlabEdge 136 0.900 R-0 No None To Outside 16 SlabEdge 12 0.550 R-0 No None TO GARAGE LIVING ------------------------ 1 Wind.Back (S) 15 SlabEdge 150 0.900 R-0 No None To Outside 17 SlabEdge 40 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation ------------------ (sf) ----- factor SHGC Azm Tilt Type Location/Comments SLEEPING ----- ----- --- ---- -------- ------------------------ 1 Wind.Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable 2 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASS2/Milgard Operable 3 Wind Back (S) 6.0 0.340 0.300 180 90 Standard SGLASS3/Milgard Operable 4 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS4/Milgard Operable 5 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS5/Milgard Operable 6 Wind Back (S) 11.0 0.340 0.300 180 90 Standard SGLASS6/Milgard Operable 7 Wind Right (W) 3.8 0.340 0.300 270 90 Standard WGLASSI/Milgard Operable 8 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS2/Milgard Operable 9 Wind Right (W) 16.5 0.340 0.300 270 90 Standard WGLASS3/Milgard Operable 13 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASSI/Milgard Operable 14 Wind Front �(N) 9.0'0.340 0.300 0 90 Standard NGLASS2/Milgard Operable 15 Wind Front (N) 9.0 0.340 0.300 0 90 Standard NGLASS3/Milgard Operable 16 Wind Front (N) 9.0 0:340 0'.300 0 90 Standard NGLASS4/Milgard Operable 21 Wind Left (E) 40.0 0.340 0.300 90 90 Standard EGLASSI/Milgard Operable 22 Wind Left (E) 9.0 0.340 0.300 90 90 Standard EGLASS2/Milgard Operable 23 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASS3/Milgard Operable 24 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS4/Fr.Dr. Therma-Tr 25 Wind Left (E) 11.0 0.340 0.300 90 90 Standard EGLASS5/Milgard Operable LIVING CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- FENESTRATION SURFACES SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1342 LIVING Standard Slab .2513 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Exterior Refrig Charge Adequate Fan Watt Cooling Area U- Efficiency Act or TXV Shade Draw Orientation ------------ SLEEPING (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ 10 Door Right (W) ----- 40.0 ----- 0.310 ----- 0.220 --- 270 ---- 90 -------- Standard ------------------------ WGLASS4/Fr.Dr. Therma-Tr 11 Door Right (W) 40.0 0.310 0.220.270 90 Standard WGLASS5/Fr.Dr. Therma-Tr 12 Wind Right (W) 22.0 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable 17 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS5/Fr.Dr. Therma-Tr 18 Door.Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 19 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS7/Fr.Dr. Therma-Tr 20 Wind Front (N) 11.0 0.340 0:300 0 90 Standard NGLASS8/Milgard Operable 26 Wind Left (E) 11.3 0.340 0.300 90 90 Standard EGLASS6/Milgard Operable 27 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr 28 Wind Left (E) 16.5 0.340 0.300 90. 90 Standard EGLASS8/Milgard Operable 29 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS9/Milgard Operable SLAB SURFACES ------------- Area Slab Type (sf) SLEEPING Standard Slab 1342 LIVING Standard Slab .2513 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No LIVING Furnace 1 0.800 AFUE• n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 ------=------------------------------------------------------------------------ ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -.Westpac Air Conditioning, Run -Palo Verde/Plan 3 ---------------------------------------------------- -------------------------- HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) ----------------------------------------------------- SLEEPING Furnace 26388 n/a n/a n/a ACSplit n/a 18751 23270 n/a LIVING Furnace 39268 n/a n/a n/a ACSplit n/a 35836 44472 n/a Total 65655 54587 67743 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ LA QUINTA Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design....... 111 F Summer Inside Design....... 75 F Summer Range ............... 34 F DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R -value Leakage Area Ducts ------------------------------------------------------- SLEEPING Furnace Attic. R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS --------------------- Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value 1 Storage Gas Standard- 1 0.51 75 R-12 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 -------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION -------------------------- *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a"CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic.Expansion Valve (TXV). If a cooling system is not installed, then HERS.verification'is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing. If ducts are not installed, then HERS verification is not necessary. CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD -CF-1R Page 7 Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air.Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------ REMARKS COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER -or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 739-9501 License. Signed.. Signed. (date) /- (dat ENFORCEMENT AGENCY Name.... a Title... Agency.. Phone... Signed.. - (date) MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 1 Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 Project Address........ ******* --------------------- La Quinta, California *v7.10* Documentation Author... Chin" Nguyen ******* Building Permit # Westpac Air Conditioning, 1610 N. Maple St.. Corona, CA 92880 (951) 739-9501 Inc. Plan Check / Date Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method....... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------ ------------------------------------------ Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate -Zones -14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings.no greater than 0.3%, / water vapor permeance*rate no greater than 2.0 perm/inch J 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF -6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 2 Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 --------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and / faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or / cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value +/ 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to / Table 150-B and Equation 150-A J 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A _;L 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space _Z 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ---------------------------------------------=--------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3 Date..07/05/06 15:39:49 ---------------------------------------------------------------=--------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used _¢ 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with / mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores T 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System.is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating i b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances / with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria ,� RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 Project Title.......... Palo Verde/Plan 3 Date..07/05/06 ------------- 15:39:49 ------------------------------------ MICROPAS7 v7.10 File-LAQ53_3 Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3 ------------------------------------------------------------------ ---- f and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on.automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically / or have an always on option 150(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air / tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply / with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. 'Lighting.for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) �L STANDARD PACIFIC PALO VERDE Chinh Nguyen, Certified Energy Analyst ♦ (951) 739-9501 / (951) 739-9509 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 1 Project Title.......... Palo Verde/Plan 3/Exer. Date..07/05/06 15:50:06 Project Address........ ******* ------ -------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen *******I Building Permit # Westpac Air Conditioning, Inc. 1610 N. Maple St. Plan Check / Date Corona, CA 92880 (951) 739-9501 Field Check/ Date Climate Zone........... 15 Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- ---------------------------- ---------------------------- MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed Compliance = _ (kTDV/sf-yr) ----------------------- Design Design Margin = - = Space Heating.......... ----- -.---- 1.71 ---------- 1.87 ---------- _ -0.16 - = Space Cooling.......... 61.15 50.57 10.58 = = Water Heating.......... 6.41 7.30 -0.89 - = North Total 69.27 59.74 9.53 = = Space Heating.......... 1.71 1.61 0.10 - = Space Cooling........... 61.15 50.38 10.77 = = Water Heating.......... 6.41 7.30 -0.89 = = East Total 69.27 59.29 9.98 = = Space Heating........... 1.71 1.65 0.06 = = Space Cooling.......... 61.15 51.61 9.54 = = Water Heating.......... 6.41 7.30 -0.89 - = South Total 69.27 60.56 8.71 = = Space Heating.......... 1.71 1.82 -0.11 = = Space Cooling.......... 61.15 49.97 11.18 = = Water Heating.......... 6.41 7.30 -0.89 = = West Total 69.27 59.09 10.18 = _ *** Building complies with Computer Performance _ *** HERS Verification Required.for Compliance *** _ CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/.05/06 15:50:06 ---------- ---------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 4006 sf Building Type ............. Single Family Detached Construction Type New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Slab On Grade Number of Building Zones... 2 Conditioned Volume......... 40394 cf Slab -On -Grade Area......... 4006 sf Glazing Percentage..:...... 14.7 % of floor area Average Glazing U -factor... 0.33 Btu/hr-sf-F Average Glazing SHGC....... 0.26 Average Ceiling Height..... 10.1 ft BUILDING ZONE INFORMATION OPAQUE SURFACES Floor # of # of Cond- Thermo- Vent Vent Verified Solar Area Volume Dwell Peop- it- stat Height Area Leakage or Zone Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned Type (ft) (sf) Housewrap SLEEPING R-val R-val Azm Tilt ----- -------- ----- ------- ---------- Residence 1493 15054 0.35 1.8 Yes Setback 2.0 Standard No LIVING -------------- 1 Wall Wood 568 0.074 19 0 Residence 2513 25340 0.65 3.3 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ SLEEPING ----- ---- ----- ----- ----- --- ---- --- --------- -------------- 1 Wall Wood 568 0.074 19 0 180 90 Yes IV.9 A5 SOUTH 2 Wall Wood 165 0.102 13 0 270 90 Yes IV.9 A3 WEST 4 Wall Wood 288 0.074 19 0 0 90 Yes IV.9 A5 NORTH 6 Wall Wood 213 0.074 19 0 190 90 Yes IV.9 A5 EAST 8 Wall Wood 122 0.102 13 0 0 90 No IV.9 A3 GARAGE WALL 10 Roof Rad Wood 1493 0.025 38 0 n/a 0 Yes IV.1 A18 Attic LIVING 3 Wall Wood 318 0.074 19 0 270 90 Yes IV.9 A5 WEST 5 Wall Wood 393 0.074 19 0 0 90 Yes IV A A5 NORTH 7 Wall Wood 460 0.074 19 0 90 90 Yes IV A A5 EAST CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 3 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/05/06 15:50:06 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- OPAQUE SURFACES PERIMETER LOSSES Wind Back (S) U- Sheath- 0.300 180 Solar Appendix Insul Solar IV Frame Area fact- Cavity ing Act Reference Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt R-0 Reference Comments ------------ 9 Wall ----- Wood ---- 251 ----- 0.102 ----- 13 ----- 0 --- 0 ---- 90 --- No --------- IV A A3 -------------- GARAGE WALL 11 Roof Rad Wood 2513 0.025 38 0 n/a 0 Yes IV.1 A18 Attic 12 Door Other 24 0.500 0 0 . 270 90 Yes IV.5 A4 Wood Door 13 Door Other 22 0.500 0 0 0 90 No IV.5 A4 Wood Door PERIMETER LOSSES FENESTRATION SURFACES Exterior Area U- Act Shade Orientation (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ ----- ----- ----- --- ------------ ------------------------ 4ZT.WVDTTT(1 1 Wind Back (S) 16.5 Appendix 0.300 180 Length F2 Insul Solar IV Location/ Surface ------------ (ft) Factor R-val Gains Reference Comments SLEEPING ------ -------- ------- ----- --------- ---------------------- 14 S1abEdge 149 0.900 R-0 No None To Outside 16 S1abEdge 12 0.550 R-0 No None TO GARAGE LIVING 180 90• 6 Wind Back (S) 15 S1abEdge 150 0.900 R-0 No None To Outside 17 S1abEdge .27 0.550 R-0 No None TO GARAGE FENESTRATION SURFACES Exterior Area U- Act Shade Orientation (sf) factor SHGC Azm Tilt Type Location/Comments ------------------ ----- ----- ----- --- ------------ ------------------------ 4ZT.WVDTTT(1 1 Wind Back (S) 16.5 0.340 0.300 180 90 2 Wind Back (S) 16.5 0.340 0.300 180 90 3 Wind Back (S) 6.0 0.340 0.300 180 90 4 Wind Back (S) 11.0.0.340 0.300 180 90 5 Wind Back (S) 11.0 0.340 0.300 180 90• 6 Wind Back (S) 11.0 0.340 0.300 180 90 7 Wind Right (W) 3.8 0.340 0.300 270 90 8 Wind Right (W) 116.5 0.340 0.300 270 90 9 Wind Right (W) 16.5 0.340 0.300 270 90 13 Wind Front (N) 9.0 0.340 0.300 0 90 14 Wind Front (N) 9.0 0.340 0.300 0 90 15 Wind Front (N) 9.0 0.340 0.300 0 90 16 Wind Front (N) 9.0 0.340 0.300 0 90 21 Wind Left (E) 40.0 0.340 0.300 90 90 22 Wind Left (E) 9.0 0.340 0.300 90 90 23 Wind Left (E) 11.0 0.340 0.300 90 90 24 Door Left (E) 40.0 0.310 0.220 90 90 25 Wind Left (E) 11.0 0.340 0.300 90 90 30 Wind Back (S) 16.5 0.340 0.300 180 90 Standard SGLASSI/Milgard Operable Standard SGLASS2/Milgard Operable Standard SGLASS3/Milgard Operable Standard SGLASS4/Milgard Operable Standard SGLASSS/Milgard Operable Standard SGLASS6/Milgard Operable Standard WGLASSI/Milgard Operable Standard WGLASS2/Milgard Operable Standard WGLASS3/Milgard Operable Standard NGLASSI/Milgard Operable Standard NGLASS2/Milgard Operable Standard NGLASS3/Milgard Operable Standard NGLASS4/Milgard Operable Standard EGLASSI/Milgard Operable Standard EGLASS2/Milgard Operable Standard EGLASS3/Milgard Operable Standard EGLASS4/Fr.Dr. Therma-Tr Standard EGLASS5/Milgard Operable Standard SGLASS7/Milgard Operable CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exe-r. Date..07/05/06 15:50:06. ------------------------------------------------------------=------------------ ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- FENESTRATION SURFACES HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Exterior Refrig Charge Adequate Fan Watt Cooling Area U- Efficiency Act or TXV Shade Draw Orientation ------------ SLEEPING (sf) factor SHGC Azm Tilt Type Location/Comments LIVING 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 10 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS4/Fr.Dr. Therma-Tr 11 Door Right (W) 40.0 0.310 0.220 270 90 Standard WGLASS5/Fr.Dr. Therma-Tr 12 Wind Right (W) 22.0 0.340 0.300 270 90 Standard WGLASS6/Milgard Operable 17 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS5/Fr.Dr. Therma-Tr 18 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS6/Fr.Dr. Therma-Tr 19 Door Front (N) 40.0 0.310 0.220 0 90 Standard NGLASS7/Fr.Dr. Therma-Tr 20 Wind Front (N) 11.0 0.340.0.300 0 90 Standard NGLASS8/Milgard Operable 26 Wind Left (E) 11.3 0.340 0.300 90 90 Standard EGLASS6/Milgard Operable 27 Door Left (E) 40.0 0.310 0.220 90 90 Standard EGLASS7/Fr.Dr. Therma-Tr 28 Wind Left (E) 16.5 0.340 0.300 90 90 Standard EGLASS8/Milgard Operable 29 Wind Left (E) 16.5.0.340 0.300 90 90 Standard EGLASS9/Milgard Operable SLAB SURFACES ------------- Area Slab Type (sf)- SLEEPING Standard Slab 1493 LIVING Standard Slab 2513 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ SLEEPING ------- ----------- ----- ------------- -------- -------- -------- Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 ,Yes No No No LIVING Furnace 1 0.800 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER 11 Yes No No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 5 Project Title.......... Palo Verde/Plan 3/Exer. Date..07/05/06 15:50:06 ------------------------------ MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- HVAC SIZING Orientation of Maximum..... Sizing Location............ Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range.............. Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F DUCT SYSTEMS Verified Total Sensible Design Maximum System Heating Cooling Cooling Cooling System Load Load Capacity Capacity. Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr) SLEEPING Attic R-4.2 Yes No No Furnace 28833 n/a n/a n/a ACSplit n/a 20447 25375 n/a LIVING Attic R-4.2 Yes No No Furnace 38060 n/a n/a n/a ACSplit ------------- n/a 34830 43224 n/a Total ---------- 66893 ---------- 55277 ---------- 68599 ---------- n/a Orientation of Maximum..... Sizing Location............ Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range.............. Front Facing 270 deg (W) LA QUINTA 26 F 70 F 111 F 75 F 34 F WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value 1 Storage Gas Standard 1 0.51 75 R-12 DUCT SYSTEMS ------------ Verified Verified Verified System Duct Duct Duct Surface Buried Type ------------- Location R -value Leakage Area Ducts SLEEPING ----------- -------------- -------- --------- Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No' No LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation Tank Type Type Distribution Type System Factor (gal) R -value 1 Storage Gas Standard 1 0.51 75 R-12 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 6 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan.3/Exec. Date..07/05/06 15:50:06 ----------------------------------------------------------------=-------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section -should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test or a HERS verified Thermostatic Expansion Valve (TXV). If a cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front facing North. This building incorporates a Radiant Barrier. Mandatory Measures require a R-12 or greater external blanket on Gas Storage Water Heaters with Energy Factors less than 0.58. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF -4R installation certificate. *** This building incorporates a HERS verified Refrigerant Charge -test or a HERS verified Thermostatic Expansion Valve (TXV). If a' cooling system is not installed, then HERS verification is not necessary. This building incorporates HERS verified EER. This building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF -4R. If the measured CFM is above the target, then corrective action must be taken to reduce the duct leakage and then must be retested. Alternatively, the compliance calculations could be redone without duct testing: If ducts are not installed, then HERS verification is not necessary. y CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF -1R Page 7 Project Title.......... Palo Verde/Plan 3/Exer. Date..07/05/06 15:50:06 --------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM CF -1R User#-MP2387 User -Westpac Air -Conditioning, Run -Palo Verde/Plan 3/Exer. ---------------------------------------------------------=--------------------- REMARKS COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to .comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Salim Rahemtulla Name.... Chinh Nguyen Company. Standard Pacific Homes Company. Westpac Air Conditioning, Inc. Address. 15326 Alton Parkway Address. 1610 N. Maple St. Irvine, CA 92618-2338 Corona, CA 92880 Phone... (949) 789-1746 Phone... (951) 7 9-9501 License. Signed... Signed... (date) / ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) MANDATORY MEASURES.CHECKLIST ---------------------------- ---------------------------- Project Title.......... Palo Project Address........ RESIDENTIAL MF -1R Page 1 -------------------------------------------------- -------------------------------------------------- Verde/Plan 3/Exer. Date..07/05/06 15:50:06 *.****** --------------------- La Quinta, California *v7.10* Documentation Author... Chinh Nguyen ******* Westpac Air Conditioning, Inc. 1610 N. Maple St. Corona, CA 92880 (951) 739-9501 Building Permit # Plan Check / Date Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp,.Inc. ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- Note: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance requirements from the Certificate of Compliance supersede the items marked with an asterisk (*). When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as minimum component. performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES De- En- sign- force n/a er ment *150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U -factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R -Value *150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -factor in metal frame walls (does not apply to exterior mass walls) *150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U -factor . 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire / opening of the firebox ✓ b. Outside air intake with damper and control, flue damper and control 2. No 'continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(8): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, / water vapor permeance rate'no greater than 2.0 perm/inch ✓ 118: Insulation specified or installed meets insulation quality i standards. Indicate type and include CF -6R form V 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -'1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- Project Title:.......... Palo Verde/Plan 3/Exer. Date.:07/:05/06 15:50:06 ----------------------------------------------------------------=-------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------------- label with certified U -factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and j faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(1): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation j having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R -value 'z 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to, water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150E 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation•150-A 4. Steam hydronic heating systems or hot water systems >15 psi meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction, piping includes a vapor retardant or is enclosed entirely in conditioned space ✓ 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation *150(m): Ducts and.Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 3 ------------------------------------------------------------------------------- Project Title.......... Palo Verde/Plan 3/Exer. Date..07/05/06 15:50:06 MICROPAS7 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. -------------------------------------------------------------------------------- UL 181A; or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic / and either mesh or tape shall.be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause j reductions in the cross-sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands / 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores �L 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on-off switch mounted outside of the heater, weatherproof operating instructions,no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas-fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(1): Cool Roof material meets specified criteria _ RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF -1R Page 4 Project Title.......... Palo Verde/Plan 3/Exer. Date..07/05/06 15:50:06 MICROPA87 v7.10 File-LAQ53_3E Wth-CTZ15S05 Program -FORM MF -1R User#-MP2387 User -Westpac Air Conditioning, Run -Palo Verde/Plan 3/Exer. ------------------------------------------------------------------------ and have an output frequency no less than 20 kHz 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as.outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires 150(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by 'a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically / or have an always on option 150(k)5: Luminaires that are recessed into 'insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283'and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals 150(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for.parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings.with four or more dwelling units shall be high efficacy luminaires OR are controlled by an -occupant sensor(s) certified to comply with Section 119(d) - ✓