Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
06-2055 (OFC) Title 24
I TITLE 24 REPORT I Title 24 Report for: Corporate Centre Professional Plaza -Bldg 2 79-245 Corporate Centre Drive La Quinta, Ca 92253 Project Designer: CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE 6 , /1� .06 gy a7 Robert Pitchford, Architect ©Mer. 74-835 Fox Hills Palm Desert, Ca 92260 (760) 346-8776 Report Prepared By: Tim Scott Scott Design & Title 24 77085 Michigan Dr. Palm Desert, CA 92211 (760) 200-4780 Job Number: Date: 5/15/2006 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.1 by EnergySoft Job Number: User Number: 6712 TABLE OF CONTENTS I Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -MM Envelope Mandatory Measures Form LTG -7-C Room Cavity Ratio Worksheet Form OLTG-1-C Certificate of Compliance Form OLTG-2-C Lighting Compliance Summary Form OLTG-3-C Illuminated Area Calculation Worksheet Form LTG -MM Lighting Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary Room Load Summary Room Heating Peak Loads Room Cooling Peak Loads Room Cooling Coil Loads 1 2 3 17 18 19 21 23 25 26 28 34 40 46 52 EnergyPro 4.1 by EnergySoft Job Number: User Number: 6712 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 IPROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 ?ROJECT ADDRESS 79-245 Corporate Centre Drive La Quinta PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Building Permit # Robert Pitchford, Architect (760) 346-8776 DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Scott Desiqn & Title 24 (760) 20 14780 Fnfnrroman{ pnonry GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is acturate an complete. DOCUMENTATION AUTHOR DATE OF PLANS DAT Tim Scott BUILDING CONDITIONED FLOOR AREA 5,614 Sq.Ft. The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION F-] ADDITION F-] EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is acturate an complete. DOCUMENTATION AUTHOR SIGNAQV DAT Tim Scott `s(vv0 B f The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. F] F] F-1 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. 7 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document' because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Reqre or - PRINCIPAL ENVELOPE DESIGNER - NAME SI LIC. NO. DATE Robert Pitchford Architect Gt'231 E5 -!(p-c& LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures TGRe d Fo -1 -2 LTG PRINCIPAL.LIGHTING DESIGNSI fit LN �W44��ORD Fr-&(t:5 6�(� [;Two LV MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ECH-1, MECH-2 MECH-3 MECH-5 Required orms "RINCIPAL MECHANICAL DESIGNER - NAME SIG E LIC. NO. DA Scott Design and Title 24 ! �1 m.� EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Parae:3 of 57 1 l PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 ECT NAME Centre Professional Plaza -Bldg 2 ENERGY COMPONENT Standard Design sqft. sqft. sqft. sqft. sqft. sqft. Proposed Design Glazing sqft. sqft. sqft. sqft. sqft. sqft. Compliance Margin Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process 0.46 1.12 -0.66 353.50 379.71 -26.21 70.81 83.67 -12.86 0.00 0.00 0.00 0.00 0.00 0.00 56.84 57.61 -0.77 165.26 70.59 94.67 82.18 82.18 0.00 0.00 1 0.00 0.00 TOTALS: 729.05 674.88 54.17 Percent better than Standard: 7.4% ( 7.4% excl Building Orientation (N)Odeg Conditioned Floor Area 5,614 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 6 Conditioned Footprint Area 5,614 sqft. Number of Zones 6 Fuel Type Natural Gas Orientation Front Elevation (N) Left Elevation (E) Rear Elevation (s) Right Elevation (w) Total Roof Gross Area sqft. sqft. sqft. sqft. sqft. sqft. Glazing Area Glazing sqft. sqft. sqft. sqft. sqft. sqft. Ratio 1,265 549 43.4% 485 78 16.1% 1,265 0 0.0% 485 781 16.1% 3,5001 705 20.1% 5,614 E:� 0.0% Standard Proposed Lighting Power Density 1.500 wisgft. 0.641 w/sqft. Prescriptive Env. Heat Loss 903 Btu/h 1,022 Btu/h Prescriptive Env. Heat Gain 92,561 Btu/h-F 100,482 Btu/h-F Remarks: EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:4 of 57 1PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 INFORMATION System Name Zone Name ...... .............. Floor Inst. °"Ctrl., Area LPD Credits (W Occupancy Type (sgft.) SW (W/sf)2 ..................... _ Allowed LPD ... _............. Proc.: Loads (W/sf) Area Tailored. W/s 3 W/s 4 HVAC -1 Zone 1 Comp Bldg Retail and Wholesale 655 0.75 HVAC -2 Zone 2 Comp Bldg Retail and Wholesale 1,006 0.74 HVAC -3 Zone 3 Comp Bldg Retail and Wholesale 1,006 0.37 HVAC -4 Zone 4 Comp Bldg Retail and Wholesale 1,006 0.74 HVAC -5 Zone 5 Comp Bldg Retail and Wholesale 1,006 0.74 HVAC -6 Zone 6 Comp Bldg Retail and Wholesale 935 0.53 Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C 4. See LTG -6-C Items above require special documentation - (items marked with asterisk, see LTG -2 -C by others) (by others) EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. IThe HVAC System "Carrier 50JX0425" is designated as 3 Phase, or is Exempted from the NAECA 13 SEER reouirement. The exceptional features listed In this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stam Run Initiation Time: 05/15/06 11:15:33 Run Code: 1147716933 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Paae:5 of 57 CERTIFICATE OF COMPLIANCE ENV -7-C PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 (OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond. Status Joint Appendix IV Reference Location / Comments 1 Roof 655 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 2 Wall 96 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 1 3 Wall 135 0.074 R-19 R-0.0 180 90 New 09-A5 Zone 1 4 Wall 4071 0.074 R-19 R-0.0 270 90 New 09-A5 Zone 1 5 IRoof 1,006 0.036 R-30 R-0.01 0 0 New 02-A9 Zone 2 6 Wall 72 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 2 7 Wall 210 0.074 R-19 R-0.0 180 90 New 09-A5 Zone 2 8 Roof 1,006 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 3 9 Wall 132 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 3 10 Wall 210 0.074 R-19 R-0.0 180 90 New 09-A5 Zone 3 11 Roof 1,006 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 4 12 Wall 132 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 4 13 Wall 210 0.074 R-19 R-0.0 180 90 New 09-A5 Zone 4 14 Roof 1,006 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 5 15 Wall 132 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 5 16 Wall 210 0.074 R-19 R-0.0 180 90 New 09-A5 Zone 5 17 Roof 935 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 6 18 Wall 152 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 6 19 Wall 407 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 6 20 Wall 290 0.074 R-19 R-0.01 180 90 1 New 09-A5 Zone 6 ` N, E, A, R (New, Existing, Altered, Removed) FENESTRATION SURFACES More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors Droiect office durino construction and in the buildino manaoees office after constn,rtinn # Type Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazing Type Location/ Comments 1 Window Front N 39 0.8701 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 1 2 Window Right (W) 39 0.870 NFRC 0.59 NFRC 270 New Double Metal Tinted Default Zone 1 3 Window Right (W) 39 0.8701 NFRC 0.59 NFRC 270 New Double Metal Tinted Default Zone 1 4 lWindow Front N 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 2 5 Window Front N 42 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 2 6 Window Front (N) 18 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 2 7 Window Front (N) 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 2 8 Window Front N 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 3 9 Window Front N 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 3 10 Window Front (N) 39 0.8701 NFRC1 0.59 NFRC 0 New I Double Metal Tinted Default Zone 4 11 Window Front (N) 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 4 12 Window Front N 39 0.870 NFRC 0.59 NFRC1 0 New Double Metal Tinted Default Zone 5 13 Window Front (N) 39 0.870 NFRC 0.59 JNFRC 1 0 New Double Metal Tinted Default I Zone 5 (1 U -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. (2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. Hat. 1 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 2 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 3 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 4 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 5 None 0.76 7.0 6.0 8.0 0.1 8.0 8.0 6 None 0.76 3.0 6.0 8.0 0.1 8.0 8.0 7 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 8 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 9 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 10 None 1 0.76 6.0 6.5 8.0 0.1 8.0 8.0 11 None 0.76 1 6.0 6.5 8.0 0.1 8.0 8.0 12 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 13 11N6ne 0.76 6.0 6.5 1 8.0 0.1 8.0 8.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 15 feet and a LPD for general lighting of at least 0.5 Wlsq.ft. If this box is checked, ENV4-C must be filled out when submitting under the Prescriptive Compliance Approach. EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:6 of 57 1 CERTIFICATE OF COMPLIANCE ENV -1 -C PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 OPAQUE SURFACES # Surface Tvpe Area Insulation U -Fac. Cay. Cont. Act. Am. Tilt Cond: Status Joint Appendix IV Reference Location / Comments Act. Am. Cond. Stat. Glazing Type Location/ Comments 14 Window Front N 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 15 Window Front (N) 42 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 16 Window Front (N) 18 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 17 lWindow Front N 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 18 Window Left E 39 0.870 NFRC 0.59 NFRC 90 New Double Metal Tinted Default Zone 6 19 Window Left (E) 39 0.870 NFRC 0.59 NFRC 90 New Double Metal Tinted Default Zone 6 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES N, E, A. R More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default Ll -factors from Cfanrfanle T.H. 11A -A and R r`arl rafa shall ha fil.. in fhe rnnfrarin/e nr-. riRre .1-- --a I_ ,he -ea --------�� ..w:......a... ......-............ # Type Area U -Fac' SHGC1 Act. Am. Cond. Stat. Glazing Type Location/ Comments 14 Window Front N 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 15 Window Front (N) 42 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 16 Window Front (N) 18 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 17 lWindow Front N 39 0.870 NFRC 0.59 NFRC 0 New Double Metal Tinted Default Zone 6 18 Window Left E 39 0.870 NFRC 0.59 NFRC 90 New Double Metal Tinted Default Zone 6 19 Window Left (E) 39 0.870 NFRC 0.59 NFRC 90 New Double Metal Tinted Default Zone 6 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES I -raaor 1 ype: i io-A vetaun I aDle rrom btanoaras, I abie NI -1 uetaun I able from the AGM Manual Appendix, NFRG Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LEARExt. Dist. Len. H t. Dist. Len. H t. 14 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 15 None 0.76 7.0 6.0 8.0 0.1 8.0 8.0 16 None 0.76 3.0 6.0 8.0 0.1 8.0 8.0 17 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 18 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 19 None 0.76 6.0 6.5 8.0 0.1 8.0 8.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES ,.� p,upvsea uullumy wmams an encloses space wlcn noor area greater tnan zo,uuu sq.rt, a ceding height greater than 15 feet and a LPD for general lighting of at least 0.5 Wlsa.ft. If thls box Is checked, ENV -4-C must be filled out when submitting under the Prescriptive Compliance Approach. Run Initiation Time: 05/15/06 11:15:33 Run Code: 1147716933 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page•7 of 57 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1-C 'PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 1 [INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES INSTALLED ❑ COMPLETE BUILDING METHOD (From LTG -5-C) WATTS ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 3,596 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 3,596 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 3,596 ALTERNATE COMPLIANCE ❑X PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROLTYPE (Auto Time Switch, Dimming, etc.) Check if SPACE CONTROLLED Daylighting NOTE TO FIELD '` CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1-C PROJECT NAME Corporate Centre Professional Plaza-Bldg 2 DATE 5/15/2006 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG-1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. Test Description Test Performed By: ❑ LTG-2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing ❑ LTG-3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Pape:9 of 57 1 CERTIFICATE OF COMPLIANCE MECH-1-C ROJECT NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-1-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates, and operatino and maintenance information meet the reouirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ] MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 tt2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btu/hr. -Water-loop Heat Pump Controls Applies to all new watedoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment requiring acceptance testing EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:10 of 57 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C 'PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 INSTALLED LIGHTING POWER FOR CONDITIONED SPACES Luminaire Lamps/Ballasts Installed Watts C D E F G H I J Description -03 c =.yam d m m � 3�� a N cdZ =1 a0 dim ° c3.-. 3��_ 5 m N m � dm � (� •J r 3 Z 5'03 Lu. — NName 0 XMv _ v N CL (2) 4 ft Fluorescent T8 Elec F32T8 2 32 1.0 62.0 X 4 248 (4) 4 ft Fluorescent T8 Elec 4 32 2.0 124.0 X 27 3.348 PAGE TOTAL 3 596 BUILDING TOTAL (sum of all pages) 3, 596 PORTABLE LIGHTING (From LTG -3-C) O CONTROL CREDIT (From LTG -4-C) D ADJUSTED ACTUAL WATTS 3 596 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Paoe:11 of 57 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 ISYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS, Central or Single Zone HVAC -1 HVAC -2 HVAC -3 1 1 1 Reference on Plans or Specification 1 112(a) 7.20 HSPF 7.20 HSPF 7.20 HSPF 112(a) 12.0 SEER / 10.5 EER 12.0 SEER / 9.6 EER 12.0 SEER / 9.6 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121(b) 98 cfm 151 cfm 151 cfm 121 c No No No 121(c) No No No 121(c), 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 Auto Auto Auto 122() n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 144 a & b n/a n/a n/a 144 a & b 25,607 btuh 35,601 btuh 35,601 btuh 144 a & b n/a n/a n/a 144 a & b 25,908 btuh 37,381 btuh 37,319 btuh 144 c Constant Volume Constant Volume Constant Volume 144 (c) 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144(f) Constant Temp Constant Temp Constant Temp 144 (k) No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. Kun Initiation I ime: U5/15/U6 11:15:33 Run Code: 1147716933 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 12 of 57 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C 'PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 (SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS, Central or Single Zone HVAC -4 HVAC -5 HVAC -6 1 1 1 Reference on Plans or Specification 1 112(a) 7.20 HSPF 7.20 HSPF 7.20 HSPF 112(a) 12.0 SEER / 9.6 EER 12.0 SEER / 9.6 EER 12.0 SEER / 9.6 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) Yes Yes Yes 121(b) 151 cfm 151 cfm 140 cfm 121 c No No No 121(c) No No No 121 c 122(e) Pro rammable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 Auto Auto Auto 122(g) n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 144 a & b n/a n/a n/a 144 a & b 35,601 btuh 35,601 btuh 35,601 btuh 144 a & b n/a n/a n/a 144 a & b 37,339 btuh 37,339 btuh 37,560 btuh 144 c Constant Volume Constant Volume Constant Volume 144 (c) 144 c Yes Yes Yes 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Ternp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 (k) No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:13 of 57 1 WATER SIDE SYSTEM REQUIREMENTS Part 2 of 2 MECH-2-C 'PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 SYSTEM FEATURES 2 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specification Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Water Heater Certification 113 (a) Water Heater Efficiency 113 (b) Service Water Heating Installation 113 (c) Pool and Spa Efficiency and Control 114 (a) Pool and Spa Installation 114 b) Pool Heater - No Pilot Light 115 (c) Spa Heater - No Pilot Light 115 d Service Hot Water, Pool Heating DHW Heater 11 2 d . J I Reference on Plans or Specification AO SMITH ELJF-06' 99% n/a n/a n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 14 of 57 MECHANICAL VENTILATION MECH-3-C QROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 PRESCRIPTIVE REHEAT LIMITATION (Section 144(d)) MECHANICAL VENTILATION Section 121 (b)2) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM yD3 via >v N ion -n o o W,Q3 nm� " °' 3 Z m3 °_`�° 0 t7 ro o -0 CD p,3 ' TAT 3 _ CdA Dov < nam 3°Yic D N o c�mo Eco y n -nm�3 3W �� A ;K w3o�i �yc T=� m �3 c3 .'.' D —1 y D 1 Zone 1 655 0.22 144 144 981 46 HVAC -1 Total 144 98 Zone 2 1,006 0.22 221 221 151 70 HVAC -2 Total 221 151 Zone 3 1,006 0.22 221 221 151 70 HVAC -3 Total 221 151 Zone 4 1,006 0.22 221 221 151 70 HVAC -4 Total 221 151 Zone 5 1,006 0.22 221 221 151 70 HVAC -5 Total 221 151 ?one 6 935 0.221 206 206 140 65 HVAC -6 Total 206 140 C te per Section 121 Table 121 -A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G . I Must be greater than orequal to H or use Transfer Air column N to make up the difference. J Design fan supply cfm Fan CFM x 30%; or K Condition area ft. s x 04 cfmtft. sq.; or L Maximum of Columns H, J. K, or 300 cfm M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Air (column M), column H - M. Ener Pro 4.1 by Ener Soft User Number: 6712 Job Number: Page: 15 of 57 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 TANK INSUL. DATE 5/15/2006 CHILLER AND TOWER SUMMARY Distribution Type Qty Efficiency Tons Condition Status PUMPS O SMITH ELJF-06* Small Elec. Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control New No Economizer CARRIER 50JX0605 Packaged DX 5 57,000 0.0 7.20 HSPF 60,000 12.0 SEER / 9.6 EER New No Economizer MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water P mp Hot Water Piping Len th ft Control # HP Type In Plenum Outside Buried Add 1/2" Insulation DHW / BOILER SUMMARY CENTRAL SYSTEM RATINGS Energy Factor or RE Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input Vol. (Gals.) Condition Status Ext. R -Val. O SMITH ELJF-06* Small Elec. Point of Use 2 5,120 6 New 0.95 n/a n/a 12.0 SEER / 10.5 EER New No Economizer CARRIER 50JX0605 Packaged DX 5 57,000 0.0 7.20 HSPF 60,000 12.0 SEER / 9.6 EER New No Economizer MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water P mp Hot Water Piping Len th ft Control # HP Type In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS Fan Type HEATING COOLING BHP System Name S stem T e Qtv Outout Aux. kW Eff. Outout Efficiency Condition Status Economizer Type Carrier 50JX0425 Packaged DX 1 41,000 0.0 7.20 HSPF 41,500 12.0 SEER / 10.5 EER New No Economizer CARRIER 50JX0605 Packaged DX 5 57,000 0.0 7.20 HSPF 60,000 12.0 SEER / 9.6 EER New No Economizer CI 1001 V CA Ll I I er .—. —L. System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. Carrier 50JX0425 Constant Volume Draw -Through 1,400 0.50 76.0% 100.0% none CARRIER 50JX0605 Constant Volume Draw -Through 2,000 0.75 77.0%.100.0% none I EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 16 of 57 1 ENVELOPE MANDATORY MEASURES ENV -MM NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 DESCRIPTION Designer Enforcement ❑X §118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. X❑ § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. X] §117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gas keted,. weatherstri pped or otherwise sealed. X] § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). X❑ § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. ❑ §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro By EnergySoft User Number: User Job Number: Page: 17 of 57 BROOM CAVITY RATIO WORKSHEET (RCR>=3.5) LTG -7-C PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 FRENFARCEM NT��Et�cuSEryoN�v )OCUMENTATION AUTHOR DATE 5115/2006 PtN CkiECK Bl' D RECTANGULAR SPACES A B C D E F Room Name Task/Activity Description Room Length (L) (ft) Room Width (W) (ft) Room Cavity Height (H) (ft) Room Cay. Ratio 5xHx(L+W) /(LxW) CERTIFICATE OF COMPLIANCE (Part 1 of 2) OLTG-1-C "IROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 PROJECT ADDRESS - 79-245 Corporate Centre Drive La Quinta PRINCIPAL DESIGNER - LIGHTING TELEPHONE Building Permit # DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Scott Design & Title 24 (760) 200-4780 1 Enforcement Agency Use GENERAL INFORMATION DATE OF PLANS OUTDOOR LIGHTING ZONE LZ1 LZ2 a LZ3 LZ4 FUNCTION TYPE 0 OUTDOOR LIGHTING ❑ OUTDOOR SIGNS F� INDOOR SIGNS PHASE OF CONSTRUCTION ® NEW CONSTRUCTION F-� ADDITION ❑ ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the outdoor lighting system specifications need to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurat and complete. DOCUMENTATION AUTHOR SIG�NATMRrrlDAT Tim Scott The Principal Lighting Designer hereby certifies that the proposed outdoor lighting and signs design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146,and 149 of Title 24, Part 6. Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. DATE LIC # PRINCIPA IGHTING DESIGN - NAME TftLa ROMORT YIMP VORD5-1(V •b 01231 . LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included ®OLTG-1-C: Certificate of Compliance. Required on plans for all submittals for outdoor lighting. Part 2 of 2 maybe incorporated in schedules on the p Either LTG -1 -C or OLTG-I-C may be used for signs as follows: 1. Use LTG -1 -C if the project consists solely of indoor signs. 2. Use LTG -1 -C if the project consists of indoor lighting, outdoor or indoor signs, but no other outdoor lighting. 3. Use OLTG-1-C if the project consists solely of outdoor signs. 4. Use OLTG-I-C if the project consists of outdoor lighting, outdoor or indoor signs, but no other indoor lighting. [x OLTG-2-C: LIGHTING COMPLIANCE SUMMARY. Applicable parts required for ALL outdoor lighting allowances (Except Signs). XIOLTG-3-C: AREA CALCULATIONS WORKSHEET. Applicable parts required for all outdoor area calculations. ®OLTG-4-C: SIGN LIGHTING COMPLIANCE. Required for all internally and externally illuminated signs, for both indoor and outdoor signs. EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 19 of 57 ans. CERTIFICATE OF COMPLIANCE (Part 2 of 2) OLTG-1-C PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 _]_5/15/2006 Liahting Schedules on Plans Show that Outdoor Lighting Meets Allowed Lighting Power ❑X Lighting power allowance for general site illumination on OLTG-2-C Part 1 of 4 Not Applicable ❑X Lighting power allowance for local ordinances or for security multipliers on OLTG-2-C Part 2 of 4 Not Applicable RX ❑ Lighting power allowances for specific applications, other than vehicle service stations with canopies on OLTG-2-C Part 3 of 4 Not Applicable ❑ ❑X Lighting power allowances for vehicle service station canopies on OLTG-2-C part 4 of 4 Not Applicable RX R Sign lighting compliance on OLTG-4-C Not Applicable IMandatory Measures on Plans Show that Outdoor Liahtina MeetsOutdoor Liahtina Controls And E ui e t X❑ Installed lighting power has been determined in accordance with Section 130(c)1 Not Applicable X❑ All permanently installed luminaires with lamps rated 100 Watts either have a lamp efficacy of at least 60 lumins per Waft or are controlled by a motion sensor per Section 132(a) Not Applicable FX All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements of Section 132(b) Not Applicable ❑X All permanently installed outdoor lighting meets the control requirements of Section 132(c)1 Not Applicable ❑X Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements of Section 132(c Not Applicable MANDATORY INTERIOR AND DAYLIGHTING AUTOMATIC CONTROLS NOTE TO' FIELD . CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) SPACE CONTROLLED Check if Dayiighting EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:20 of 57 LIGHTING COMPLIANCE SUMMARY (Part 1 of 4) OLTG-2-C Name Corporate Centre Professional Plaza-Blda 2 Date 5/15/2006 LIGHTING POWER ALLOWANCES - GENERAL SITE ILLUMINATION - Table 147-A Allotted Watts Luminaire Lam s/Ballasts Installed Watts A B C D E F G H I i K L M N 1 O Lighting Application Category (Table 147-A) r D mo°; a � D rN° m -P r $ o xd� n ° n a Description, v �� �; o r im '03 m 'o 33 �y o oris 3 -o -o c d 3m 3w a) c 3°' 5 ".•a m n m n p m r c �.3 �a °'• `�° y o ai d �— xa z Parking Lot Lighting 10,41 E 0.15 1,563 A 400w High Pressure Sodium X HPS400 1 4001 1.0 469.01 X 3 1,40 Total Allotted Watts 1,563 Total Installed Watts 1,40 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page21 of 57 LIGHTING COMPLIANCE SUMMARY (Part 3 of 4) OLTG-2-C 'project Name Date Corporate Centre Professional Plaza -Bldg 2 5/15/2006 LIGHTING POWER ALLOWANCE FOR SPECIFIC APPLICATIONS Table 147-B - Other than Vehicle Station without Cano 'es Allotted Watts Luminaire Lam s/Ballasts; Desi n Watts A B C D E F G H I J K L M I N O P Lighting Application Category (Table 147-B) r D �oIMS 0 a -rn 00 rw CL m. r ° p OD�o xd,g c1bK, 0 v ° o a A Description v pec oo ?; �r m a3 v c� 3 7N a) 'm M cri°' 3F�n vv cm 3— �� L".a � c01 3 7 d. -o m' m n v r 3c 3 �� y o r + xm y Z i m a 3D °m va o d 199 Bldg Fasade 3,024 0.35 1,058 D (2) 22w Compact Fluorescent X 2 22 2.0 54.0 X 37 37 Quad 2 Pin EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Paae22 of 57 1 ILLUMINATED AREA CALCULATION WORKSHEET (Part 1 of 5) OLTG-3-C (PROJECT NAME DATE Corporate Centre Professional Plaza-Blda 2 1 5/15/2006 - Method A. Hardscape for automotive vehicular use, including parking lots, driveways and site roads. A B C I D E I F I G H Lighting Application (Table 147-B) Actual Paved Area+ 5' perimeter of adjacent unpaved land. Includes planters and land. Includes planters and landscaped areas less than 10' wide that are enclosed by hardscape on at least 3 sides. Actual Paved Area + 5' of unpaved land on either side of path of travel. Shall include all contiguous paved area before including adjacent grounds. Areas (SF) to Subtract from within the Illuminated Area the Illuminated Area Illuminated Area (B - G) Area between poles or luminaires that are > 6 times theareas mounting height distance (If Applicable) Overlapping of another application or luminaire Building Areas Areas obstructed by signs or other structures Sub total of areas to subtract (C + D + E + F) Parking Lot Lighting 10,418 0 0 0 0 0 10,418 B. Hardscape for pedestian use, including plazas, sidewalks, walkways and bikeways A B C D I E F I G H Lighting Application (Table 147-B) Actual Paved Area + 5' of unpaved land on either side of path of travel. Shall include all contiguous paved area before including adjacent grounds. Areas (SF) to Subtract from within the Illuminated Area Illuminated Area (B - G) Area between poles or luminaires that are > 6 times the mounting height distance (If Applicable) Overlapping areas of another application or luminaire Building Areas Areas obstructed by signs or other structures Sub total of areas to subtract (C + D + E + F) Checklist ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ❑ Section 147 (c)1 A - General Illumination areas includes only those illuminated areas that are in the bounds of the Application and are within a square pattern around a luminaire that is six times the luminaire mounting height, with the luminaire in the middle of the patttern, less any areas that are within buildings, under canopies, beyond property lines, or obstructed by signs or other structures. EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 23 of 57 ILLUMINATED AREA CALCULATION WORKSHEET (Part 3 of 5) OLTG-3-C IPROJECT NAME I DATE Corporate Centre Professional Plaza -Bldg 2 k. Outdoor Sales Lot Frontage and Sales Lot Area 5/15/2006 A B I C I D E I F G H Gross Illuminated Area (sq. ft.) If an Outdoor Sales Frontage Allotment was used, subtract that area from the Gross Illuminated Area Overlapping Areas of Another Application Sales Lot Area (A - F - G) Mounting height of Sales Frontage Luminaires (feet) 3 x B Distance (In plan view) from the frontagge luminaire to fron edge of Sales Lot Sales Lot Frontage Length (feet) Sales Frontage Area (C - D) x E (sq. ft.) ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ❑ Section 147 (c)2 B - Measured in plan view, only illuminated sections of outdoor sales frontage areas that are immediately adjacent to the principle viewing location and unobstructed viewing length, and are within 3 mounting heights of the frontage have been used. Luminaires qualifying for this allowance are located in plan view between the principle viewing location and the frontage sales. 113. Building Facade Area A B C D E F G H Designated Name and Orientation Length Height Gross Area (B x C) Areas (SF) to Subtract from within the Illuminated Area Net Area Available for Facade Ligghting (D - G) Areas covered by signs Area for which Illumination is Obstructed by Other Objects and Area Not Illuminated Sub total (E + F) Bldg Fasade 168 18 3,024 0 0 3,024 Checklist ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ❑ Section 147 (c)2 A - Only facades areas that are illuminated without obstruction or interference, by one or more luminaires, have been used. I EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:24 of 57 1 LIGHTING MANDATORY MEASURES LTG - NAME Corporate Centre Professional P DATE 5/15/2006 DESCRIPTION Designer Enforcement X❑ §131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X] §131 (d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. X] §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. X] §111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. 0 §132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. X] §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - ceiling walls. 0 §131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:25 of 57 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM '>ROJECT NAME Centre Professional Plaza -B DATE 5/15/2006 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies 0 §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. F§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: X❑ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or § 122(e)1B An occupancy sensor to control the operating period of the system; or F] § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. 0 § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. ❑ § 122(8) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. ❑ § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: Page:26 of 57 MECHANICAL MANDATORY MEASURES Part2 of 2 MECH-MM NAME Corporate Centre Professional Plaza -BI DATE 5/15/2006 Description Designer Enforcement Ventilation 0 § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. ❑ § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. X❑ § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. X❑ § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or FX§ 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or 1A I § 121(f)4 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. X❑ § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro By EnergySoft User Number: User Job Number: Page:27 of 57 (HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY (PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 SYSTEM NAME FLOOR AREA I HVAC -1 655 Outside Air (%) 7.0 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS (Airsi Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,104 16,335 2,996 893 12,623 0 817 631 0 0 98 3,560 1014 F 98 4,556 0 0 817 1 631 21,529 4,010 Carrier 50JX0425 25,908 11,957 Total Adjusted System Output 25,so8 11,957 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 5 pm 18,441 25,607 25,607 Jan 12 am 26.0 of 66.5 of 83.70 83.7 of 310 Supply Air Ducts Outside Air 98 cfm o Heating Coil Supply Fan 83.3 F 1400 cfm ROOMS 69.6 of 70.0 of Return Air Ducts I DOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) 108.6/77.0OF Outside Air 98 cfm 74.5/64.5 of 76.9 / 65.6 of M 59.5/58.60F Cooling Coil 59.5 / 58.6 of — 4, Supply Air Ducts Supply Fan 60.1 / 58.8 of 1400 cfm 59.7% R.H. ROOMS 74.0/64.3OF Return Air Ducts EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 28 of 57 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 SYSTEM NAME FLOOR AREA I HVAC -2 1.006 Outside Air (%) 7.5 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRI 26.0 of 66.4 of Outside Air 151 cfm 69.7 of TEM Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,28 18,870 4,592 958 13,069 0 944 653 0 0 15 6,031 1,474 151 7,017 0 0 9441 1 653 26 789 6,066 21,392 CARRIER 50JX0605 37,381 16,638 35,601 Total Adjusted System Output 37,381 16,638 35,601 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am Heating Coil Supply Fan 2000 cfm 83.1 of —� Supply Air Ducts 82.8 of ROOMS 70.0 of �% Return Air Ducts 4 (COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) 112.0 / 77.9 of Outside Air 151 cfm 74.4/64.6 of 77.3 / 65.8 of 0 59.7 / 58.8 of Cooling Coil Supply Fan 2000 cfm 59.7 / 58.8 of —� Supply Air Ducts 60.2/59 . 0 of 60.2% R.H. ROOMS 74.0 / 64.5 of h Return Air Ducts '4 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 29 of 57 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 SYSTEM NAME FLOOR AREA HVAC -3 1,006 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sqft) 56.7 Cooling System Output per System 60,000 Total Output (Btuh) 60,000 Total Output (Tons) 5.0 Total Output (Btuh/sqft) 59.6 Total Output (sgft/Ton) 201.2 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.99 Airflow (cfm/Ton) 400.0 Outside Air (%) 7.5 Outside Air (cfmisgft) 0.15 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM Sensible 1,004 14,944 4,592 798 10,967 0 747 548 0 0 15 6,046 1,488 151 7,025 0 0 747 548 22,492 6,080 CARRIER 50JX0605 37,319 16,656 Total Adjusted System Output 37,319 16,656 (Adjusted for Peak Design Conditions) Note: values above given at ARI conditions L— EATING SYSTEM PSYCHROMETRICS (Airstream Tei 26.0 of 66.4 of 83.2 of I Outside Air 151 cfm Heating Coil 69.7 of TIME OF SYSTEM PEAK I Jul 3 pm Supply Fan 2000 cfm 35,601 35,601 Jan 12 am 83.2 of —� Supply Air Ducts 82.9 of ROOMS 70.0 of h Return Air Ducts '4 (COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) 112.0 / 77.9 of Outside Air 151 cfm 74.4 / 64.5 of 77.2 / 65.8 of . 59.7 / 58.8 of Cooling Coil Supply Fan 2000 cfm 59.7 / 58.8 of -,j Supply Air Ducts 60.0/58 . 9 of 60.1% R.H. ROOMS 74.0 / 64.4 of h Return Air Ducts `i EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 30 of 57 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 SYSTEM NAME FLOOR AREA HVAC -4 1,006 Outside Air (%) 7.5 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS (Aird 26.0 of 66.4 of Outside Air 151 cfm 69.7 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,093 16,212 4,592 798 10,967 0 811 548 0 0 15 6,041 1,483 151 7,025 0 0 811 548 23 882 6-077 CARRIER 50JX0605 37,339 16,650 Total Adjusted System Output 37,339 16,650 (Adjusted for Peak Design Conditions) Heating Coil TIME OF SYSTEM PEAK I Jul 3 pm m 83.2 of 19,089 35,601 35,601 Jan 12 am 83.2 of Supply Air Ducts Supply Fan 82.9 of 2000 cfm ROOMS 70.0 of Return Air Ducts ' ICOOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) 112.0 / 77.9 of Outside Air 151 cfm 74.4/64.6 of 77.2 / 65.8 of 59.7 / 58.8 of 59.7 / 58.8 of Supply Air Ducts Fi Cooling Coil Supply Fan 2000 cfm h Return Air Ducts '*I 60.1 / 58.9 of 60.2% R.H. ROOMS 74.0 / 64.4 of EnergyPro 1.1 by EnergySoft User Number: 6712 Job Number: Page:31 of 57 (HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY (PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 SYSTEM NAME FLOOR AREA HVAC -5 1.006 Outside Air (%) 7.5 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS (Airs1 26.0 OF 66.4 OF Outside Air 151 cfm 69.7 of COOLING S 112.0 / 77.9 of Outside Air 151 cfm 74.4/64.6 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,093 16,212 4,592 798 10,967 0 811 548 0 0 15 6,041 1,483 151 7,025 0 0 811 1 548 23 882 6,076 CARRIER 50JX0605 37,339 16,650 Total Adjusted System Output37,339 16,650 (Adjusted for Peak Design Conditions) Heating Coil TIME OF SYSTEM PEAK I Jul 3 pm 83.2 of rstream T Time of H 19 089 83.2 OF ---& Supply Air Ducts Supply Fan 82.9 of 2000 cfm ROOMS 70.0 of Return Air Ducts I 77.2 / 65.8 of ■ 59.7 / 58.8 of Cooling Coil Supply Fan 2000 cfm 59.7 / 58.8 of -> � Supply Air Ducts h Return Air Ducts `i 60.1 / 58.9 of 60.2% R.H. ROOMS 74.0 / 64.4 of EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page 32 of 57 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Corporate Centre Professional Plaza -Bldg 2 5/15/2006 SYSTEM NAME FLOOR AREA HVAC -6 935 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 61.0 Cooling System Output per System 60,000 Total Output (Btuh) 60,000 Total Output (Tons) 5.0 Total Output (Btuh/sgft) 64.2 Total Output (sgfUTon) 187.0 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 2.14 Airflow (cfm/Ton) 400.0 Outside Air (%) 7.0 Outside Air (cfm/sgft) 0.15 Note: values above (EATING SYSTE 26.0 of Outside Air 140 cfm 69.5 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,569 23,256 4,268 1,472 19,953 0 1,163 998 0 0 140 5,590 1,446 140 6,497 0 0 1,163 998 3111772T--5.7141 CARRIER 50JX0605 37,560 16,286 Total Adjusted System Output 37,560 16,286 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 3 pm at ARI conditions I L- YCHROMETRICS (Airstream Tem 66.5 of 83.2 of Heating Coil 28,445 35,601 35,601 Jan 12 am 83.2 OF ® = Supply Air Ducts Supply Fan 82.7 of 2000 cfm ROOMS 70.0 OF Return Air Ducts I 1000LING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) 112.0 / 77.9 of Outside Air 140 cfm 74.5/64.5 of 77.2 / 65.6 of. 59.5 / 58.6 of Cooling Coil Supply Fan 2000 cfm 59.5 / 58.6 of --j Supply Air Ducts 60.1/58 . 8 of 59.6% R.H. ROOMS 74.0164.3 OF Return Air Ducts `i EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:33 of 57 ROOM LOAD SUMMARY PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 SYSTEM NAME HVAC -1 FLOOR AREA 655 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 1 Zone 1 1 1,104 16,335 2,996 1,104 16,335 2,996 893 12,623 PAGE TOTAL 1 1,104 16,335 2,996 893 TOTAL 1 1,104 16,335 2,996 893 12,623 12,623 EnergyPro By EnergySoft User Number: User Job Number: Page:34 of 57 ROOM LOAD SUMMARY PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 SYSTEM NAME HVAC -2 FLOOR AREA 1,006 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 2 Zone 2 1 1,281 18,870 4,592 1,281 18,870 4,592 958 13,069 PAGE TOTAL 1 1,281 18,870 4,592 958 13,069 TOTAL 1 1,281 18,870 4,592 958 13,069 EnergyPro By EnergySoft User Number: User Job Number: Page: 35 of 57 ROOM LOAD SUMMARY PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 SYSTEM NAME HVAC -3 FLOOR AREA 1,006 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 3 Zone 3 1 1,009 15,020 4,595 1,004 14,944 4,592 798 10,967 PAGE TOTAL 1 1,004 14,944 4,592 798 10,967 TOTAL 1 1,004 14,944 4,592 798 10,967 EnergyPro By EnergySoft User Number: User Job Number: Page:36 of 57 ROOM LOAD SUMMARY PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 SYSTEM NAME HVAC -4 FLOOR AREA 1,006 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 4 Zone 4 1 1,098 16,289 4,595 1,093 16,212 4,592 798 10,967 PAGE TOTAL 1 1,093 16,212 4,592 798 TOTAL 1,093 16,212 4,592 798 10,967 10,967 EnergyPro By EnergySoft User Number: User Job Number: Page:37 of 57 ROOM LOAD SUMMARY PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 SYSTEM NAME HVAC -5 FLOOR AREA 1,006 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 5 Zone 5 1 1,098 16,289 4,595 1,093 16,212 4,592 798 10,967 PAGE TOTAL 1 1,093 16,212 4,592 798 10,967 TOTAL 1 1,093 16,212 4,592 798 10,967 EnergyPro By EnergySoft User Number: User Job Number: Page: 38 of 57 [ROOM LOAD SUMMARY PROJECT NAME Corporate Centre Professional Plaza -Bldg 2 DATE 5/15/2006 SYSTEM NAME HVAC -6 FLOOR AREA 935 ROOM LOAD SUMMARY ROOM COOLING PEAK COIL COOLING PEAK COIL HTG. PEAK ZONE NAME ROOM NAME Mult. CFM SENSIBLE LATENT CFM SENSIBLE LATENT CFM SENSIBLE Zone 6 Zone 6 1 1,569 23,256 4,268 1,569 23,256 4,268 1,472 19,953 PAGE TOTAL 1,569 _23,256 4,268 1,472 TOTAL 1 1,569 23,256 4,268 1,472 19,953 19,953 EnergyPro By EnergySoft User Number: User Job Number: Page:39 of 57 ROOM HEATING PEAK LOADS "roject Title Date 7nrnnratP C:PntrP Prnfaccinnal Playa-Rlrin * ti/1 ti/gnnA Room Information Desi n Conditions Room Name zone 1 Time of Peak Jan 12 am Floor Area 655 Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 7001= Btu/hr Conduction Area X X X X X X X x X x x x x x x x X X x x X X X x x X x X X x x X X x X x X x X U -Value X X X X X X X X X x x X X X x X X X X X X X X x x X x X X x x X. X x X x X x X AT of = = = = = = = = = = = = = = = = = = = = Btu/hr 655.0 0.0360 44 1,038 96.0 0.0740 44 313 39.0 0.8700 44 1,493 135.0 0.0740 44 440 407.0 0.0740 44 1,325 39.0 0.8700 44 1,493 39.0 0.8700 44 1,493 perimeter = 77.0 0.7300 44 2,473 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 10 067 Infiltration: 1.00 X 1.064 X 655 X 10.00 X 0.500 / 60] X 44 = 2 556 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 12,623 EnergyPro 4.1 by EnergySoft User Number- 6712 Job Number: Page: 40 of 57 ROOM HEATING PEAK LOADS ^roject Title Date :ornnrate Centre Professional Playa-Rldn 2 xvi siongr-, Room Information Desi n Conditions Room Name zone 2 Time of Peak Jan 12 am Floor Area 1,006 Outdoor Dry Bulb Temperature 26 OF Indoor Dry Bulb Temperature 70 OF Btu/hr Conduction Area X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LI -Value X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X nT of = = = = = = = = = = = = = Btu/hr 1006.0 0.0360 44 1,594 72.0 0.0740 44 234 39.0 0.8700 44 1,493 42.0 0.8700 44 1,608 18.0 0.8700 44 689 39.0 0.8700 44 1,493 210.0 0.0740 44 684 perimeter = 42.0 0.7300 44 1,349 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 9 143 Infiltration: 1 1.00 x 1.064 X 1 006 X 10.00 X 0.500 / 6] X 44 = 3 926 chedule Air Sensible Area Ceiling Height ACH QT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 13,069 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 41 of 57 ROOM HEATING PEAK LOADS Title ..-4 Date Room Information Desicin Conditions Room Name zone 3 Time of Peak Jan 12 am Floor Area 1,006 Outdoor Dry Bulb Temperature 26OF Indoor Dry Bulb Temperature 70 OF Conduction Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 7 042 Infiltration: 1.00 1 X 1.064 X 1 006 X 10.00 X 0.500 / 60] X 44 = 3 926 chedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 10,967 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:42 of 57 1006.0 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 0.0360 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 44 = = = = = = = = = = = = 1,594 132.0 0.0740 44 430 39.0 0.8700 44 1,493 39.0 0.8700 44 1,493 210.0 0.0740 44 684 perimeter 42.0 0.7300 44 1,349 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 7 042 Infiltration: 1.00 1 X 1.064 X 1 006 X 10.00 X 0.500 / 60] X 44 = 3 926 chedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 10,967 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:42 of 57 ROOM HEATING PEAK LOADS Project Title Date Corporate Centre Professional Plaza -Bldg 2 5/15/2006 Room Information Desicin Conditions Room Name zone 4 Time of Peak Jan 12 am Floor Area 1,006 Outdoor Dry Bulb Temperature 26°F Indoor Dry Bulb Temperature 70 OF Conduction Area Ll -Value Z�T of Btu/hr Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 7 042 Infiltration: 1.00 X 1.064 X 1 006 X 10.00 X 0.500 / 6] X 44 = 3 926 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 10,967 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 43 of 57 1006.0 X x x X X x x x x x x x x X x X x x x X x x X x X X x x X X x X x x X x X x x 0.0360 X x X X X X x x x x x x x X X X X X X x x X X x x x x X x X x X X X X x x x x 44 = = = = = = = = = = = = = = 1,594 132.0 0.0740 44 430 39.0 0.8700 44 1,493 39.0 0.8700 44 1,493 210.0 0.0740 44 684 perimeter = 42.0 0.7300 44 1,349 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 7 042 Infiltration: 1.00 X 1.064 X 1 006 X 10.00 X 0.500 / 6] X 44 = 3 926 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 10,967 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 43 of 57 FROOM HEATING PEAK LOADS 'Iroject Title Date Corporate Centre Professional Plaza -Bldg 2 5/15/2006 Room Information Desi - n Conditions Room Name zone 5 Time of Peak Jan 12 am Floor Area 1,006 Outdoor Dry Bulb Temperature 26OF Indoor Dry Bulb Temperature 70 OF Conduction Items shown with an asterisk (*r) denote conduction through an interior surface to another room. Page Total: 7 042 Infiltration: 1.001X 1.064 x 1 006 x 10.00 x 0.500 / 6] x 0 = 3 926 chedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 10,967 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:44 of 57 1,006.0 X X x X X x x x x X x x X X X X x x X X X X X x X x x x x X X X X X x x X X X 0.0360 X X X X X x x x x X X x x X x x X x X X x x x x X X X X X X x X x x x X x X X 44 = = = = = = = = = = = = = = 1,594 132.0 0.0740 44 430 39.0 0.8700 44 1,493 39.0 0.8700 44 1,493 210.0 0.0740 44 684 perimeter = 42.0 0.7300 44 1,349 Items shown with an asterisk (*r) denote conduction through an interior surface to another room. Page Total: 7 042 Infiltration: 1.001X 1.064 x 1 006 x 10.00 x 0.500 / 6] x 0 = 3 926 chedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 10,967 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page:44 of 57 [ROOM HEATING PEAK LOADS Title n - Room Information Desi n Conditions Room Name Zone Time of Peak Jan 12 am Floor Area 935 Outdoor Dry Bulb Temperature 26°F Indoor Dry Bulb Temperature 70°F Conduction Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 16 304 Infiltration: 1.00 1 X 1.064 X 935 X 10.00 X 0.500 / 6] X 44 = 3 648 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 19,953 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 45 of 57 935.0 X x X x X X X X X x X X X X X X X X X X X X X x x X X X X x X X X x X x x x X 0.0360 X X X x x X X X X x x x X X X X X X X X X X X X X X x x x X x X X x x x x x x 44 = = = = = = = = = = = = = = = 1,481 152.0 0.0740 44 495 39.0 0.8700 44 1,493 42.0 0.8700 44 1,608 18.0 0.8700 44 689 39.0 0.8700 44 1,493 407.0 0.0740 44 1,325 39.0 0.8700 44 1,493 39.0 0,8700. 44 1.493 290.0 0.0740 944 perimeter = 118.0 0.7300 44=3,790 Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total: 16 304 Infiltration: 1.00 1 X 1.064 X 935 X 10.00 X 0.500 / 6] X 44 = 3 648 chedule Air Sensible Area Ceiling Height ACH pT Fraction TOTAL HOURLY HEAT LOSS FOR ROOM 19,953 EnergyPro 4.1 by EnergySoft User Number: 6712 Job Number: Page: 45 of 57 ROOM COOLING PEAK LOADS roject Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 Room Name Zone 1 Floor Area 655 Indoor Dry Bulb Temperature 740F Time of Peak Jul 5 pm Outdoor Dry Bulb Temperature 109 OF Outdoor Wet Bulb Temperature 77 OF Conduction Area X X X X X X X X X U -Value X X X X X X X X X DETD t = = = = = = = = = Btu/hr -30 Roof 655.0 0.0360 52.7 1,243 -19 Metal Stud Wall 96.0 0.0740 53.9 383 Double Metal Tinted Default 117.0 0.8700 25.1 2,553 -19 Metal Stud Wall 135.0 0.0740 35.8 358 -19 Metal Stud Wall 407.0 0.0740 67.8 2,043 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Page Total 6 578 Solar Gain Orientation Area X X X X X X X X X X SGF X X X X X X X X X X Sc Weighting X X X X X X X X X X Factor = = = = = = = = (N) 39.0 43 0.657 0.795 (W) 39.0 134 0.657 0.438 (W) 39.0 134 0.657 0.438 Page Total Btu/hr 875 1,509 1,509 3 893 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor fights 1.0 x 655 x 0.757 Watts/sgft x 3.41 Btuh[Watt x 0.999 = 1,692 ccu ants 1.0c X 655 X 300 Btuh/OCC. / 10C sgft/occ. X 1.00 = 1,965 Receptacle 1.0c x 655 X 0.000 Watts/sgft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0c X 655 X 0.000 Watts/sqft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration: X 1.064 X 655 X 10.00 X 0.50 /601 X 38 = 2 207 chedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 16,335 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccu ants 1.00 X 655 X 300 Btuh/OCC. / 100 sgft/occ. = 1 965 Receptacle 1.00 x x o.00rl Watts/sgft x a41al Btuh/Watt = Process 1.00 X 655 X 0.000 Watts/sgft x 1 3.413 Btuh/Watt = o Infiltration: x Latent x � x x � / 6] x _ chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2 ggg EnergyPro By EnergySoft User Number: User Page:46 of 57 ROOM COOLING PEAK LOADS roject Title Date Corporate Centre Professional Plaza -Bldg 2 2 1 5/15/2006 Room Name zone 2 Time of Peak Jul 3 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 112 9F Indoor Dry Bulb Temperature 740F Outdoor Wet Bulb Temperature 78 `k Conduction Roof Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03601 DETD 1 X X X X X X X X X 71.8 = = = = = = = = = 110.4 26.2 40.3 Weighting X X X X X X X X X X Factor = = = = = = (N) 39.0 Page Total Orientation Area X X X X X X X X X X SGF X x X X X X X X X X Sc Weighting X X X X X X X X X X Factor = = = = = = (N) 39.0 41 0.657 0.797 (N) 42.0 41 0.657 0.798 (N) 18.0 41 0.657 0.797 (N) 39.0 41 0.657 0.797 Page Total Btu/hr 2,600 588 3,149 626 6 963 Btu/hr 837 903 386 837 2 962 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights 1.0c X 1,006 x 0.740 Watts/sgft X 3.41 Btuh/Watt x 0.999 = 2,537 ccu ants 1.0c X 1,006 X 300 Btuh/OCC. / 10 sgft/occ. x 1.00 = 3,018 eceptacle 1.0c X 1,006 X 0.000 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 0 rocess j1.0 X 1,006 X 0.000 Watts/sgft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration: I 1.00 x 1.064 x 1 006 x 10.00 x 0.50 /601 x 38 = 3 390 chedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 18,870 Sched. Btu/hr Latent Gain Frac. Area Heat Gain ccu ants 1.00 x 1,0061 X 3001 Btuh/OCC. / 100 sgft/OCc. = 3 018 Receptacle 1.00 x x0-00 Wafts/sqft x 11 Btuh[Watt = Process 1.00 X 1,006 X 0.000 Watts/sgft X 1 3.4131 Btuh/Watt = 0 Infiltration: x 4,771 x 1 nos x x/ 60] x= 1,574 chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4:5 :9:2 EnergyPro By EnergySoft User Number: User Page:47 of 57 ROOM COOLING PEAK LOADS r3roject Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 1 Room Name Zone 3 Time of Peak Jul 2 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 111 9F Indoor Dry Bulb Temperature 740F Outdoor Wet Bulb Temperature 78 `F Conduction 2-30 Roof -19 Metal Stud Wall Area 1,006.0 X 132.0 X 78.0 X 210.0 X X X X X X 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03601 DETD X X X X X X X X X 76.6 = = = = = = = = = 58.0 25.0 42.2 Weighting X X x X X X X X= X X Factor = = = = = (N) 39.0 Page Total Orientation Area X X x X X X X X X X SGF X x x X x X x x X X SC Weighting X X x X X X X X= X X Factor = = = = = (N) 39.0 46 0.657 0.700 (N) 39.0 46 0.657 0.700 Page Total Btu/hr 2,773 567 1,699 656 5 694 Btu/hr 825 825 1 649 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr i hts 1.0c x 1,006 X 0.370 Watts/sqft x 3.41 Btuh/Watt x 0.999 = 1,268 ccu ants 1.0c X 1,006 x 300 Btuh/OCC. / 10C sgft/occ. X 1.00 = 3,018 Receptacle 1.0c X 1,006 X 0.000 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0c x 1,006 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 Infiltration: I 1.00 x 1.064 x 1 006 x 10.00 x 0.50 /601 x 38 = 3 390 chedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 15,020 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 1,0061 X 300 Btuh/OCC. / 100 sgft/occ. = 3 018 Receptacle 1.00 x x 0000 Watts/sgft x Btuh/Watt = Process 1.00 X 1,006 X 0.000 Watts/sqft x 3.413 Btuh/Watt = o Infiltration: x 4 771 x 1,OD6 x x � / 6] x � chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4 595 EnergyPro By EnergySoft User Number: User Page:48 of 57 ROOM COOLING PEAK LOADS 'Project Title Date Corporate Centre Professional Plaza -Bldg 2 5/15/2006 ROOM INFORMATION DESIGN CONDITIONS Room Name zone 4 Time of Peak Jul 2 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 111 `k Indoor Dry Bulb Temperature 74`k Outdoor Wet Bulb Temperature 78 `k Conduction 00 Roof -19 Metal Stud Wall Area 1,006.0 132.0 1 210.01 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.0360 X 0.0740 X 0.8700 X 0.0740 X 39.0 X 0.657 X (N) X 46 X 0.700 DETD 1 X X X X X X X X X 76.6 = = = = = = = = = 58.0 25.0 42.2 Weighting x X x x X x X X X X Factor = = = = (N) 39.0 Page Total Orientation Area x x X x x X X X X X SGF X x X X x X X X X X SC Weighting x X x x X x X X X X Factor = = = = (N) 39.0 46 0.657 0.700 (N) 39.0 46 0.657 0.700 Page Total Btu/hr 2,773 567 1,699 656 5 694 Btu/hr 825 825 1 649 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr i hts 1.0c X 1,006 X 0.740 Watts/sqft x 3.41 BtuhlWatt x 0.999 = 2,537 ccu ants 1.0c X 1,006 X 300 Btuh/OCC. / 10 sgft/occ. X 1.00 = 3,018 Receptacle 1.0c X 1,006 x 0.000 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0c X 1,006 X 0.000 Watts/sqft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration: 1.00 x 1.064 X 1 006 X 10.00 x 0.50 /601 X 38 = 3 390 chedule Air Sensible Area Ceiling Height ACH LT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 16,289 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1.0061 X 3001 Btuh/OCC. / 100 sgft/occ. = 3 018 Receptacle 1.00 x x Watts/sgft x 3 4111 Btuh/Watt = Process 1.00 x 1,006 x 0.000 Watts/sqft X 3.413 Btuh[Watt = o Infiltration: x 4,771 x � x x / 60] x chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4 595 EnergyPro By EnergySoft User Number: User Page: 49 of 57 ROOM COOLING PEAK LOADS Title I Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 ROOM INFORMATION DESIGN CONDITIONS Room Name zone 5 Time of Peak Jul 2 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 111 9F Indoor Dry Bulb Temperature 74`F Outdoor Wet Bulb Temperature 78 c� Conduction -30 Roof -19 Metal Stud Wall Double Metal Tinted Default -19 Metal Stud Wall Area 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (*) denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03601 DETD 1 X X X X X X X X X 76.6 = = = = = = = = = 58.0 25.0 42.2 Weighting X X X X X X X X X X Factor = = (N) 39.0 Page Total Orientation Area X X X X X X X X X X SGF X X X X X X X X X X SC Weighting X X X X X X X X X X Factor = = (N) 39.0 46 0.657 0.700 (N) 39.0 46 0.657 0.700 Page Total Btu/hr 2,773 567 1,699 656 5 694 Btu/hr 825 825 1 649 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor fights 1.0 x 1,006 x 0.740 Watts/sqft x 3.41 Btuh[Watt x 0.999 = 2,537 ccu ants 1.0c x 1,006 X 300 Btuh/OCC. / 10C sgft/occ. X 1.00 = 3,018 Receptacle 1.0c X 1,006 X 0.000 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0c X 1,006 x 0.000 Watts/sgft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration: 1.00 X 1.064 X 1 006 X 10.00 X 0.50 /601 X 38 = 3 390 —Schedule Air Sensible Area Ceiling Height ACH LT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 16,289 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X1 006 X 300 Btuh/OCC. / 100 sgft/occ. = 3 018 Receptacle 1.00 x x Watts/sgft x Btuh/Watt = Process 1.00 X 1,006 X 0.000 Watts/sqft x 3.413 Btuh/Watt = o Infiltration: x 4,771 x 1,QOs x x � / 6] x � = chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4 595 EnergyPro By EnergySoft User Number: User Page:50 of 57 ROOM COOLING PEAK LOADS Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 J Room Name zone 6 Time of Peak Jul 3 pm Floor Area 935 Outdoor Dry Bulb Temperature 112 c� Indoor Dry Bulb Temperature 740F Outdoor Wet Bulb Temperature 78 OF Conduction -30 Roof -19 Metal Stud Wall Double Metal Tinted Default Area 935.0 X 152.0 X 216.0 X 407.0 X 290.0 X X X X X 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 0.0360 DETD 1 X X X X X X X X X 71.8 = = = = = = = = = 72.2 26.2 47.9 40.3 Factor = = = = = = = (N) 39.0 Page Total Orientation Area X X X x X X X X X X SGF X X X X X X X X X X SC Weighting X X X X X X X X X X Factor = = = = = = = (N) 39.0 41 0.657 0.797 (N) 42.0 41 0.657 0.798 (N) 18.0 41 0.657 0.797 (N) 39.0 41 0.657 0.797 (E) 39.0 41 0.657 1.040 (E) 39.0 41 0.657 1.040 Page Total Btu/hr 2,417 812 4,928 1,442 865 10 464 Btu/hr 837 903 386 837 1.092 1,092 5 146 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor i hts 1.0 x 935 x 0.530 Watts/sgft x 3.41 Btuh/Watt x 0.999 = 1,691 ccu ants 1.0c X 935 X 300 Btuh/OCC. / 10 sgft/occ. X 1.00 = 2,805 Receptacle 1.0c x 935 X 0.000 Watts/sgft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0c x 935 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 Infiltration: 1.0o X 1.064 X 935 X 10.00 X 0.50 /601 X 38 = 3 151 chedule Air Sensible Area Ceiling Height ACH DT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 23,256 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X 935 X 3001 Btuh/OCC. / 100 sgft/OCc. = 2 805 Receptacle 1.00 x x 000 Watts/sgft x 34113 Btuh/Watt = Process 1.00 X 935 x 0.000 Watts/sgft x 1 3.413 Btuh/Watt = o Infiltration: x x x x�/ 6] x_ chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4726781 EnergyPro By EnergySoft User Number: User Page: 51 of 57 V ROOM COOLING COIL LOADS Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 Room Name Zone 1 Time of Peak Jul 5 pm Floor Area 655 Outdoor Dry Bulb Temperature 109 OF Indoor Dry Bulb Temperature 740F Outdoor Wet Bulb Temperature 77 OF Conduction -30 Roof 19 Metal Stud Wall Double Metal Tinted Default Area 117 135 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03601 DETD X X X X X X X X X 52.7 = = = = = = = = = 53.9 25.1 35.8 67.8 Factor = = = = = = (N) 39.0 Page Total Orientation Area X X x X X x x X X X SGF X x x x x X X X x X SC Weighting X X X X X X X X X X Factor = = = = = = (N) 39.0 43 0.657 0.795 (W) 39.0 134 0.657 0.438 (W) 39.0 134 0.657 0.438 Page Total Btu/hr 1,243 383 2,553 358 2,043 6 578 Btu/hr 875 1,509 1,509 3 893 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights 1.0 X 655 X 0.757 Watts/sqft X 3.41 Btuh/Watt X 0.999 = 1,692 ccu ants 1.0 X 655 X 300 Btuh/OCC. / 10C sgft/occ. x 1.00 = 1,965 Receptacle 1.0 x 655 X 0.000 Watts/sqft x 3.41 BtuhfWatt x 1.00 = 0 rocess 1.0 X 655 x 0.000 Watts/sgft X 3.41 BtuhlWaft X 1.00 = 0 Infiltration:1.00 X 1.064 X 655 X 10.00 X 0.50 /601 X 38 = 2 207 Ledule Air Sensible Area Ceiling Height ACH LT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 16,335 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 655 x 300 Btuh/OCC. / F 100 sgft/occ. = 1 965 Receptacle 1.00 x x o.000 Watts/sgft x Btuh/Watt = Process 1.00 X 655 X 0.000 Watts/sqft x I Btuh/Watt = o Infiltration: x a 71 x x x � / 6] x � _ chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 2 996 EnergyPro By EnergySoft User Number: User Page:52 of 57 ROOM COOLING COIL LOADS Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 Room Name zone 2 Time of Peak Jul 3 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 112 97 Indoor Dry Bulb Temperature 74`F Outdoor Wet Bulb Temperature 78 97 Conduction 00 Roof -19 Metal Stud Wall Area 1,006.0 72.0 138.0 210.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.0360 X X 0.0740 X X 0.8700 X X 0.0740 X X 0.797 X X 41 X X (N) X X 0.657 X X 39.0 X DETD ' 71.8 = 110.4 = 26.2 = 40.3 = Page Total Orientation Area x X X X X X x X x x SGF X x X x X x x X x x SC Weighting X X X X x x x X x x Factor = = = = = = = = (N) 39.0 41 0.657 0.797 (N) 42.0 41 0.657 0.798 (N) 18.0 41 0.657 0.797 (N) 39.0 41 0.657 0.797 Page Total Btu/hr 2,600 588 3,149 626 6 963 Btu/hr 837 903 386 837 2 962 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights 1.0c X 1,006 X 0.740 Watts/sgft X 3.41 Btuh[Watt x 0.999 = 2,537 ccu ants 1.0c x 1,006 X 300 Btuh/occ. / -10C sgft/occ. X 1.00 = 3,018 Receptacle 1.0c X 1,006 X 0.000 WattS/Sgft X 3.41 Btuh[Watt X 1.00 = 0 rocess r11.0c X 1,006 X 0.000 Watts/sgft X 3.41 BtuhfWatt x 1.00 = 0 Infiltration: I 1.00 x 1.064 x 1 006 x 10.00 x 0.50 /601 x 38 = 3 390 chedule Air Sensible Area Ceiling Height ACH n,T Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 18,870 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 X1 006 x 300 Btuh/OCC. / 100 Sgft/occ. = 3 018 Receptacle 1.00 x x Watts/sgft x Btuh[Watt = Process 1.00 X 1,006 x 0.000 Watts/sqft X 3.413 Btuh[Watt = o Infiltration: x Latent x 1,006 x x � / 6] x � chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4,5921 EnergyPro By EnergySoft User Number: User Page: 53 of 57 r ROOM COOLING COIL LOADS Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 Room Name zone 3 Time of Peak Jul 3 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 112 OF Indoor Dry Bulb Temperature 740F Outdoor Wet Bulb Temperature 78 97 Conduction h-30 Roof 19 Metal Stud Wall Area X X X X X X X X X 1,006.0 132.0 78.0 210.0 Weighting X X x X X X X X X X Factor = = = = = (N) 39.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03601 DETD 1 X X X X X X X X X 71.8 = = = = = = = = = 60.2 26.2 40.3 Weighting X X x X X X X X X X Factor = = = = = (N) 39.0 Page Total Orientation Area X X x X X X X X X X SGF X X x x X X X X X X Sc Weighting X X x X X X X X X X Factor = = = = = (N) 39.0 41 0.657 0.797 (N) 39.0 41 0.657 0.797 Page Total Btu/hr 2,600 588 1,780 626 5 594 Btu/hr 837 837 1 673 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr Lights 1.0c x 1,006 x 0.370 Watts/sgft x 3.41 Btuh/Watt x 0.999 = 1,268 ccu ants 1.0c X 1,006 X 300 Btuh/OCC. / 10 sgftlocc. X 1.00 = 3,018 Receptacle 1.0c x 1,006 x 0.000 Watts/sqft x 3.41 Btuh/Watt x 1.00 = 0 rocess (1.0c X 1,006 x 0.000 Watts/sgft X 3.41 Btuh/Watt X 1.00 = 0 Infiltration: I 1.00 x 1.064 x 1 006 x 10.00 x 0.50 /601 x 38 = 3 390 chedule Air Sensible Area Ceiling Height ACH QT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 14,944 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 XA1,006 X 300 Btuh/OCC. / 100 sgft/OCc. = 3 018 Receptacle 1.00 xx Watts/sgft x Btuh/Watt = Process 1.00 X X 0.000 Watts/sgft X 1 3.413 Btuh/Watt = 0 Infiltration: x 4 771 x x x � / 6] x � _ chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4592 EnergyPro By EnergySoft User Number: User Page: 54 of 57 ROOM COOLING COIL LOADS Qroject Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 Room Name Zone 4 Time of Peak Jul 3 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 112 `k Indoor Dry Bulb Temperature 740F Outdoor Wet Bulb Temperature 78 OF Conduction -30 Roof -19 Metal Stud Wall Double Metal Tinted Default Area 78.0 210.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (•) denote conduction through an interior surface to another room. Solar Gain U -Value 1 0.03601 DETD t 71.81 = 60.2 = 26.2 = 40.3 = Page Total Orientation Area X X X X X X X X X X SGF X X X X X X X X X X SC Weighting X X X X X X X X X X Factor = = = = = = (N) 39.0 41 0.657 0.797 (N) 39.0 41 0.657 0.797 Page Total Btu/hr 2,600 588 1,780 626 5 594 Btu/hr 837 837 1 673 Sched. Weighting Btu/hr Internal Gain Frac. Area Heat Gain Factor fights 1.0 x 1,006 x 0.740 Watts/sqft x 3.41 Btuh/Watt x 0.999 = 2,537 ccu ants 1.0c x 1,006 X 300 Btuh/occ. / 10sqftlocc. x 1.00 = 3,018 Receptacle 1.0c x 1,006 x 0.000 Watts/sqft x 3.41 Btuh[Watt x 1.00 = 0 rocess 1.0c x 1,006 x 0.000 Watts/sqft x 3.41 Btu hfWatt x 1.00 = 0 Infiltration: 1.00 x 1.064 x 1 006 x 10.00 x 0.50 / 6] x 38 = 3,3901 chedule Air Sensible Area Ceiling Height ACH OT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 16,212 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x1.0061 X 300 Btuh/OCC. / 100 sgft/OCc. = 3 018 Receptacle 1.00 x X 0 Ono Watts/sgft X 1 3.4131 Btuh/Watt Process 1.00 X 1,006 x 0.000 Watts/sqft x 3.413 Btuh/Watt = o Infiltration: x x x x � / 6] x � _ chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4.5921 EnergyPro By EnergySoft User Number: User Page: 55 of 57 TO ROOM COOLING COIL LOADS roject Title Date Corporate Centre Professional Plaza -Bldg 2 1 5/15/2006 Room Name zone 5 Time of Peak Jul 3 pm Floor Area 1,006 Outdoor Dry Bulb Temperature 112 c� Indoor Dry Bulb Temperature 749k Outdoor Wet Bulb Temperature 78 `k Conduction -30 Roof -19 Metal Stud Wall Double Metal Tinted Default Area 1,006.0 132.0 78.0 210.0 1. Design Equivalent Temperature Difference (DETD) Items shown with an asterisk (') denote conduction through an interior surface to another room. Solar Gain U -Value X 0.0360 X X 0.0740 X X 0.8700 X X 0.0740 X X 0.797 X X 41 X X X X X X X DETD ' 71.8 = 60.2 = 26.2 = 40.3 = Page Total Orientation Area X X X X X X X X X X SGF X X X X X X X X X X SC Weighting X X X X X X X X X X Factor = = = = (N) 39.0 41 0.657 0.797 (N) 39.0 41 0.657 0.797 Page Total Btu/hr 2,600 588 1,780 626 5 594 Btu/hr 837 837 1 673 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr fights 1.0c X 1,006 X 0.740 Watts/sqft X 3.41 Btuh/Watt X 0.999 = 2,537 Occupants 1.0c x 1,006 X 300 Btuh/OCC. / 10c sgft/occ. x 1.00 = 3,018 Receptacle 1.0c X 1,006 X 0.000 Watts/sgft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0c X 1,006 X 0.000 Watts/sqft X 3.41 Btuh[Watt X 1.00 = 0 Infiltration: 1.00 X 1.064 X 1 006 X 10.00 X 0.50 /601 X 38 = 3 390 chedule Air Sensible Area Ceiling Height ACH LST Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 16,212 Sched. Btu/hr Latent Gain Frac. Area Heat Gain Occupants 1.00 X 1,006 x 300 Btuh/OCC. / 100 sgft/occ. = 3 018 Receptacle 1.00 x 1,006 x Watts/sgft x Btuh/Watt = Process 1.00 X 1,006 X 0.000 Watts/sgft x 1 3.413 Btuh/Watt = o Infiltration: x 4771 x 1,QOs x x � /6] x � _ chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4 592 EnergyPro By EnergySoft User Number: User Page:56 of 57 t--r ROOM COOLING COIL LOADS 'project Title Area X X X X X x X X x x SGF Date SC Corporate Centre Professional Plaza -Bldg 2 Factor = = = = = = 5/15/2006 ROOM INFORMATION DESIGN CONDITIONS 0.657 0.797 (N) Room Name Zone Time of Peak 0.798 (N) Jul 3 pm Floor Area 935 Outdoor Dry Bulb Temperature (N) 112 97 Indoor Dry Bulb Temperature 74OFOutdoor Wet Bulb Temperature (E) 78 97 Conduction Area U -Value 1.040 DETD 1 Btu/hr -30 Roof 935.0 X 0.0360 X 71.8 = 2,417 -19 Metal Stud Wall 152.0 X 0.0740 X 72.2 = 812 Double Metal Tinted Default 216.0 X 0.8700 X 26.2 = 4,928 -19 Metal Stud Wall 407.0 X 0.0740 X 47.9 = 1,442 -19 Metal Stud Wall 290.0 X 0.0740 X 40.3 = 865 X X = X X = X X = X X = 1. Design Equivalent Temperature Difference (DETD) Page Total 10 464 Items shown with an asterisk (') denote conduction through an interior surface to another room Solar Gain Orientation Area X X X X X x X X x x SGF X X X X x X X X X X SC Weighting X X X X X X X X X X Factor = = = = = = (N) 39.0 41 0.657 0.797 (N) 42.0 41 0.657 0.798 (N) 18.0 41 0.657 0.797 (N) 39.0 41 0.657 0.797 (E) 39.0 41 0.657 1.040 (E) 39.0 41 0.657 1.040 Page Total Btu/hr 837 903 386 837 1,092 1,092 5 146 Sched. Weighting Internal Gain Frac. Area Heat Gain Factor Btu/hr i hts 1.0 X 935 X 0.530 Watts/sgft x 3.41 Btuh/Watt X 0.999 = 1,691 ccu ants 1.0 X 935 x 300 Btuh/OCC. / 10 sgft/occ. X 1.00 = 2,805 Receptacle 1.0 X 935 x 0.000 Watts/sqft x 3.41 Btuh/Watt X 1.00 = 0 rocess 1.0 X 935 x 0.000 Watts/sgft x 3.41 BtuhfWatt x 1.00 = 0 Infiltration: 1.00 x 1.064 x 935 x 10.00 x 0.50 /601 x 38 = 3 151 -Schedule Air Sensible Area Ceiling Height ACH LT Fraction TOTAL HOURLY SENSIBLE HEAT GAIN FOR ROOM 23,256 Sched. Latent Gain Frac. Area Heat Gain Btu/hr Occupants 1.00 x 935 X 300 Btuh/OCC. / 100 sgft/occ. = 2 805 Receptacle 1.00 x x Watts/sgft x 3 4131 Btuh/Watt = Process 1.00 X 935 X 0.000 Watts/sgft x 3.413 Btuh/Watt = o Infiltration: x x x x � / 6] x � _ chedule Air Latent Area Ceiling Height ACH pyy TOTAL HOURLY LATENT HEAT GAIN FOR ROOM 4268 EnergyPro By EnergySoft User Number: User Page: 57 of 57