Loading...
HomeMy WebLinkAboutBCOM2018-0045 Title 24),q V43s -woo-4osAbj9u9-nmrmm — ajenmi}og }joSffiau3 Aq pedoIanap wei6oid sigl •spiepuelg Aouaio!,43 A6a9u3 6u!pl!n8 9lOZ le!luapisaJuoN pue jei}uep!saa aq; q;oq qj!m asn jol uo!ssiwwoo Abjau3 e!wo;ilex ay; Aq pazuogjne sl pue Ienoidde seq we16oid sigl podaj aouegdwoo s!qj ui pezuewwns suoge!no!eo sq} wjo}aad of pasn uaaq seq wei6oid jaindwoo adA6J8u3 aql 8 � OZ/8/ � � :ale(] WO'O�JlS'8 � :aagwnN qo,r 9006'0V£'09L , - � �ZZ6 VO `}Pasaa wled OZ � epS `aniaa AeMGje J 00£�£ 6uiaa9ui6u3 O�JW eAA,9j :pagli0 :Aq pajedWd podoN INMdOjaea ALiNmium WNtolo rl jo Aug 810?fIAON 0AI3.3H I,-) h00 — g°e 6111 3" 3ONVI IdWOO 3(100 )JO3 ®3M31A38 NOISIAI® ONIGIne :aauBisad }oafoad VINin0 vi -A0 �dio —0-?1.3aq bO `ejuin0 ej 199aIS uolbuiuseM 0£99V jaaegeO oiben s,UAAJeW :103roNd - _ _ — _INOd3N SISAIVNV kON3N3 ONla-lins 9 100 1 :jagwnN jasn l00'0a16-9l :dl :jagwnN qOP uog/6Jau3 Aq Z'L adA6j9u3 z s}ualuoo jo elge.l abed aanoO S1N31NOO :10 3-113VI STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E (Created 9/17) CALIFORNIA ENERGY COMMISSION L J CERTIFICATE OF COMPLIANCE NRCC-LTI-E This document is used to demonstrate compliance with requirements in-,MO-9 33C1.0 '30,2, &Z?rJ,6, and b. 41.2,�v 2 for indoor lighting scopes using the prescriptive path. Project Name: Marvyn's Magic Cabaret IReport Page: Page 1 of 7 Project Address: 46630 Washington Street JDate Prepared: 11/8/2018 A. GENERAL INFORMATION LJi 01 Project Location (city) La Quinta 04 Total Conditioned Floor Area (ft2) 5,815 02 Climate Zone 15 05 Total Unconditioned Floor Area (ft2) 0 03 �✓ ❑ Occupancy Types Within Project (select all that apply): Office ❑ Retail Parking Garage ❑ High -Rise Residential ❑ Warehouse ❑ Relocatable 06 ❑ Z # of Stories (Habitable Above Grade) Hotel/Motel School Other (write in): 1 Support Areas B. PROJECT SCOPE Table Instructions: Include any lighting systems that are within the scope of the permit application and are demonstrating compliance using the prescriptive path outlined in 740.6 or143_i for alterations. WARNING: Changing the Calculation Method in this table will result in the deletion of data previously input. If you need to change the calculation method, please open a new form or use "Save As". Scope of Work Conditioned Spaces Unconditioned Spaces 01 02 03 04 05 My Project Consists of (check all that apply); Calculation Method Area (ft2) Calculation Method Area (ft2) ✓� New Lighting System Area Category 5,815 Area Category 0 Altered Lighting System Total Area of Work (ft2) 5,815 0 C. COMPLIANCE RESULTS Table Instructions: If any cell on this table says "DOES NOT COMPLY" or "COMPLIES with Exceptional Conditions" refer to Table D. for guidance. Lighting in 1 01 conditioned and unconditioned spaces must not Complete be combined for Building compliance per §140.6's'?�1_ /n� J 7 J=140 6fLJ1. (See Table 1) Allowed Lighting Power per 140.E b (Watts) _> Actual Lighting Power per 140.E a (Watts) Compliance Results 02 03 04 = 05 06 07 1 08 = 09 10 Area Category ?140; 51c.)_2 Area Category Footnotes 0_6 c)2G Tailored §.�•6i-L3 N Total Allowed Watts ( ) Total Designed (Watts) Adjustments Total Actual (Watts) *Includes Adjustments 05Mustbe>_09 140.6 Portable Lighting 140.E al. PAF Control Credits L440.6 a'2 N (-) (-) (See Table 1) (See Table K) (See Table L) (See Table F) (See Table J) (See Table R) Conditioned: 5,748.75 = 5,748.75 >_ 3,683.8 3,683.8 COMPLIES Unconditioned: _ >_ = Controls Compliance (See Table H for Details) COMPLIES Rated Power Reduction Compliance (See Table S for Details)i Not Applicable CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance: http://www.energy.ca.gov/title24/2016standards September 2017 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E (Created 9/17) CALIFORNIA ENERGY COMMISSION yJ CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Marvyn's Magic Cabaret IReport Page: Page 2 of 7 Project Address: 46630 Washington Street JDate Prepared: 11/8/2018 EXCEPTIONAL CONDITIONS table is auto filled with uneditable comments because of selections made or data entered in tables throughout the form. No exceptional conditions apply to this project. E. ADDITIONAL REMARKS This table includes remarks made by the permit applicant to the Authority Having Jurisdiction. F. INDOOR LIGHTING FIXTURE SCHEDULE Table Instructions: Include all permanent designed lighting and all portable lighting in offices. 01 02 03 04 05 06 07 08 09 Name or Complete Luminaire Description Design Watts Specialized Luminaire Types Watts per How Wattage is Total number Exempt per Field Inspector Item Tag Track Portable luminaire1 determined luminaires §140.6 aj_3 Pass Fail Type A 25w LED 25 Mfr. Spec' 37 925 Type B 3w LED 3 Mfr. Spec' 20 60 Type C 21w LED 21 Mfr. Spec' 17 357 Type D 60w LED 60 Mfr. Spec' 16 960 Type E 60w LED 60 Mfr. Spec' 7 420 ❑ ❑ Type F-2 4.4w Per SQ. FT. 4.4 Mfr. Spec' 30 132 Type F3 2.2w Per SQ. FT. 2.2 Mfr. Spec' 29 63.8 Type G1 16w LED 16 Mfr. Spec' 13 El 208 Type G2 16w LED 16 Mfr. Spec' 4 ❑ 64 Type H 22w LED 22 Mfr. Spec' 5 D 110 ❑ Type I 24w LED 247�1 Mfr. Spec' 5 ❑ 120 ❑ ❑ Type M 44w LED El ❑ 44 Mfr. Spec' 6 264 ❑ ❑ Total Designed Watts CONDITIONED SPACES: 3,683.8 'NOTES: Authority Having Jurisdiction may ask for Luminaire cut sheets to confirm wattage used for compliance per �130.01cl Wattage used must be the maximum rated for the luminaire, not the lamp. CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance: http://www.energy.ca.gov/title24/2016standards September 2017 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E (Created 9/17) CALIFORNIA ENERGY COMMISSION !.M— CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Marvyn's Magic Cabaret Report Page: Page 3 of 7 Project Address: 46630 Washington Street jDate Prepared: 11/8/2018 G. TRACK LIGHTING This Section Does Not Apply H. INDOOR LIGHTING CONTROLS (Not Including PAFs) Y Table Instructions: Building Level Controls Please include lighting controls for conditioned and unconditioned 01 02 03 _�_ paces in this table. When an option having a * is selected, the notes — Mandatory Demand Response Shut-off Controls Field Inspector section of this table must be completed. The lighting controls section of the Compliance Summary Table on the first page will show "DOES 130.11c) Pass Fail NOT COMPLY" if the notes are left blank. Not Required < 10,000 SF I See Area Level Controls Area Level Controls 04 05 06 07 08 09 10 11 12 Complete Building or Area Category Area Controls Multi -Level Shut -Off Primary/Skylit Secondary Interlocked Field Inspector Area Description Primary Function Area130.1 a Controls Controls Daylighting Daylighting Systems Pass Fail §130 1 b130.1 c 130.1 d 140.6 d 140.6 a 1 Dressing Room 1 Electrical, Mechanical Room Manual ON/OFF Dimmer Occ Sensor N/A N/A Dressing Room 2 Electrical, Mechanical Room Manual ON/OFF Dimmer Occ Sensor N/A N/A Office Office <= 250 sqft Manual ON/OFF Manual ON/OFF Dimmer Bi-level Switch Occ Sensor I Occ Sensor N/A N/A N/A N/A Restroom Bathroom Restroom Bathroom Manual ON/OFF Bi-level Switch Occ Sensor N/A N/A Stage Room Electrical, Mechanical Room Manual ON/OFF Bi-level Switch Occ Sensor N/A N/A Janitor Room Janitors Closet/Utility Manual ON/OFF Bi-level Switch Occ Sensor N/A N/A Corridor Corridor/Restroom/Support Manual ON/OFF Dimmer See Bldg Level N/A N/A Stage Theater, Performance Manual ON/OFF Bi-level Switch Auto Timeswitch N/A N/A Sound Engineer Computer Room Manual ON/OFF Dimmer See Bldg Level N/A N/A El ED] Pre -Show Lounge Lounge, Recreation Manual ON/OFF Bi-level Switch Auto Timeswitch N/A N/A Womens Restroom Bathroom Manual ON/OFF Dimmer Auto Timeswitch N/A N/A El Mens Restroom Bathroom Manual ON/OFF Dimmer Auto Timeswitch N/A N/A Lobby Lobby Manual ON/OFF Dimmer See Bldg Level Included Included 11 + 1:1 E] *NOTES: Controls with a * require a note in the space below explaining how compliance is achieved. 13 IEX. Conference 1: Primary/Skylight Daylighting: Exempt because less than 120 watts of general lighting; Plan Sheet Showing Daylit Zones: EXCEPTION 1 to 1.30.1 d 2 CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance: http://www.energy.ca.gov/title24/2016standards September 2017 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E (Created 9/17) CALIFORNIA ENERGY COMMISSION E CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Marvyn's Magic Cabaret IReport Page: Page 4 of 7 Project Address: 46630 Washington Street JDate Prepared: 11/8/2018 I. LIGHTING POWER ALLOWANCE: COMPLETE BUILDING OR AREA CATEGORY METHODS Table Instructions: Complete the table for each area complying using the Complete Building or Area Category Methods per 140.6(b). allowances per 1140.E c` oradjustments per 140.E o are being used. Indicate if additional lighting power 01 Area Description 02 Complete Building or Area Category Primary Function Area 03 Allowed Density z (W/ft) 04 Area (ftz) 05 Allowed Wattage (Watts) 06 Additional Allowances / Adjustments Footnotes PAF Portable Ltg Magic Lobby Main Entry Lobby 0.95 270 256.5 ❑ Restrooms Corridor, Restrm, Stair, Support 0.6 548 328.8 ❑ Janitor Room Elec, Mech, Telephone 0.55 223 122.65 ❑ ❑ Office Office (<= 250 square feet) 1 39 39 1 ❑ Corridor Corridor, Restrm, Stair, Support 0.6 455 273 ❑ Stage Theater - Performance 1.4 1,808 2,531.2 Bar Lounge 0.9 205 184.5 Pre Show Lounge Lounge 0.9 2,199 1,979.1 Sound Engineer All Other Areas 0.5 68 34 ❑ ❑ ❑ TOTAL: 5,815 5,748.75 See Tables J, K, R for detail J. POWER ADJUSTMENT: PORTABLE LIGHTING IN OFFICES This Section Does Not Apply K. ADDITIONAL LIGHTING ALLOWANCE: AREA CATEGORY METHOD FOOTNOTES This Section Does Not Apply L. TAILORED METHOD GENERAL LIGHTING POWER ALLOWANCE Y This Section Does Not Apply M. ADDITIONAL LIGHTING ALLOWANCE: TAILORED SPECIAL FUNCTION AREAS This Section Does Not Apply N. ADDITIONAL LIGHTING ALLOWANCE: TAILORED WALL DISPLAY This Section Does Not Apply CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance: http://www.energy.ca.gov/title24/2016standards September 2017 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E (Created 9/17) CALIFORNIA ENERGY COMMISSION - CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Marvyn's Magic Cabaret Report Page: Page 5 of 7 Project Address: 46630 Washington Street IDate Prepared: 11/8/2018 O. ADDITIONAL LIGHTING ALLOWANCE: TAILORED FLOOR AND TASK LIGHTING This Section Does Not Apply P. ADDITIONAL LIGHTING ALLOWANCE: TAILORED ORNAMENTAL/SPECIAL EFFECTS ED This Section Does Not Apply Q. ADDITIONAL LIGHTING ALLOWANCE: TAILORED VERY VALUABLE MERCHANDISE This Section Does Not Apply R. POWER ADJUSTMENT: LIGHTING CONTROL CREDIT (PAF) This Section Does Not Apply RATED POWER REDUCTION COMPLIANCE BY SPACE This Section Does Not Apply T. DECLARATION OF REQUIRED CERTIFICATES OF INSTALLATION ED Table Instructions: Selections have been made based on information provided in previous tables of this document. If any selection needs to be changed, please explain why in Table E. Additional Remarks. These documents must be provided to the building inspector during construction and can be found online at htt www.ener ca. av 2D15 ublications CE-400-201,-033 oopendiceslformslNRCI YES NO Form/Title Field Inspector Pass Fail f� C NRCI-LTI-01-E - Must be submitted for all buildings ❑ ❑ NRCI-LTI-02-E - Must be submitted for a lighting control system, or for an Energy Management Control System (FMCS), to be recognized for compliance. ❑ ❑ NRCI-LTI-03-E - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary overcurrent protection panel used to energize only line -voltage track lighting, to be recognized for compliance. ❑ ❑ A NRCI-LTI-04-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a conference ❑ ❑ room, a multipurpose room, or a theater to be recognized for compliance. (0— NRCI-LTI-05-E - Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance. ❑ ❑ NRCI-LTI-06-E - Must be submitted for additional wattage installed in a video conferencing studio to be recognized for icompliance. ❑ ❑ CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance: http://www.energy.ca.gov/title24/2016standards September 2017 STATE OF CALIFORNIA Indoor Lighting Ir' NRCC-LTI-E (Created 9/17) rAi IMPKIIA Fnicary rnnnnnicanni CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Marvyn's Magic Cabaret Report Page: Page 6 of 7 Project Address: 46630 Washington Street JDate Prepared: 11/8/2018 U. DECLARATION OF REQUIRED CERTIFICATES OF ACCEPTANCE Table Instructions: Selections have been made based on information provided in previous tables of this document. If any selection needs to be changed, please explain why in Table E. Additional Remarks. These documents must be provided to the building inspector during construction and must be completed through an Acceptance Test Technician Certification Provider (ATI-CP). For more information visit: ht p 11www. energy.ca, av titie24 attc raviders.html YES NO Form/Title Field Inspector Pass Fail (i C NRCA-LTI-02-A - Must be submitted for occupancy sensors and automatic time switch controls. ❑ ❑ (i NRCA-LTI-03-A - Must be submitted for automatic daylight controls. ❑ (" 4 NRCA-LTI-04-A - Must be submitted for demand responsive lighting controls. 1:1 El i`I (i NRCA-LTI-05-A - Must be submitted for institutional tuning power adjustment factor (PAF). [] CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance: http://www.energy.ca.gov/title24/2016standards September 2017 STATE OF CALIFORNIA Indoor Lighting NRCC-LTI-E (Created 9/17) CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE NRCC-LTI-E Project Name: Marvyn's Magic Cabaret Report Page: Page 7 of 7 Project Address: 46630 Washington Street JDate Prepared: 11/8/2018 DOCUMENTATION AUTHOR'S DECLARATION STATEMENT Documentation Author Name: Gilbert Leyva Company: RTM Engineering Consultants Documentation Author Signature: Signature Date: / - 11/9/2018 Address: 34300 Gateway Drive, Suite 120 CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert, CA 92211 Phone: 760.340.9005 RESPONSIBLE PERSON'S DECLARATION STATEMENT I certify the following under penalty of perjury, under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible designer) 3. The energy features and performance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of Regulations. 4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. 5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available ' to the enforcement agency for all applicable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Designer Name: Company Address: City/State/Zip: Sheetal Roy RTM Engineering Consultants 34300 Gateway Drive Suite 120 Palm Desert, CA 92211 Responsible Designer Signature: Sheetal Roy Date Signed: 11/9/2018 License: Phone: E20931 760.340.9005 CA Building Energy Efficiency Standards - 2016 Nonresidential Compliance: http://www.energy.ca.gov/title24/2016standards September 2017