PM102020-0004PLEASE READ AND FILL OUT THIS DOCUMENT APPROPRIATELY. EVEN SMALL PROJECTS MUST
ROUGH GRADING
SITE PREPARATION MOBILIZATION)
DO THEIR PART. PMIp DUST (POWDERY DUST OF 10 MICRONS OR SMALLER DIAMETER) HAS
PHASE 'A'.' ROUGH GRADING (SITE PREP. & MOBILIZATION) CONTINUED
BEEN IDENTIFIED AS A POTENTIALLY SERIOUS HEALTH THREAT. THIS FINE DUST CAN LODGE
SUB -PHASE
DEEP IN THE LUNGS AND HAS BEEN ASSOCIATED WITH BRONCHITIS AND OTHER RESPIRATORY
5.
THE TIRES OF VEHICLES BEING USED ON-SITE SHOULD BE INSPECTED AND WASHED IF
ILLNESSES. DESERT DUST CAN BE PARTICULARLY UNHEALTHFUL, BEING ASSOCIATED WITH
TRUCK AC.
NECESSARY TO STOP TRACKING OF DIRT ONTO PUBLIC STREETS. IF EXTENSIVE EXPORT OR
"DESERT LUNG SYNDROME" AND LUNG INFECTIONS CAUSED BY FUNGAL SPORES CARRIED IN
TRUCKS
IMPORT OF DIRT IS TO BE DONE, A PAVED OR GRAVELED WHEEL WASHING AREA AT LEAST 30'
DESERT DUST. CHILDREN, THE ELDERLY, AND PERSONS WITH RESPIRATORY CONDITIONS, ARE
20.04
WIDE BY 100' LONG SHOULD BE PROVIDED AT THE EXIT, TO FACILITATE THE INSPECTION AND
PARTICULARLY SENSITIVE TO FINE DUST BUT EVERYONE IS ADVERSELY AFFECTED BY THE
-
CLEANING OF TIRES. RUMBLE STRIPS" MADE FROM LUMBER, RAILROAD TRACK,OR SIMILAR
RELATIVELY HIGH LEVELS OF PMI0 THAT OCCUR IN THE COACHELLA VALLEY. LARGER SAND
MATERIALS CAN HELP REDUCE THE MUD GETTING ONTO THE CLEANING AREA. STREET SWEEPING
PARTICLES CAN BE TURNED INTO THIS DUST THROUGH THE GRINDING ACTION OF TIRES ON
AND WASHING IS STILL TYPICALLY REQUIRED, BUT MAY BE REDUCED BY PROPER USE OF A
ROADWAYS AND THROUGH REPETITIVE PLOWING AND DISKING OPERATIONS.
"WHEEL WASHING AREA" LIKE THIS. THEY ARE REQUIRED ON PROJECTS OVER 5 ACRES OR WITH
OVER 5,000 CUBIC YARDS OF IMPORT OR EXPORT.
PROJECT DATA (SEE ATTACHED PLAN ALSO)
DATE: 3/912020 PROJECT NAME: CLUB VILLA
5.
A STANDARD SIGN WITH THE FOLLOWING INFORMATION MUST BE POSTED ON THE SITE, AT LEAST
STREET ADDRESS / SITE LOCATION: 58-830 MARBELLA. LA QUINTA. CA 92253
ONE SIGN PER FRONTING STREET. THE SIGN MUST INCLUDE: THE GRADING PERMIT NUMBER,
ROUGH GRADING
ASS GRADING
THE PROJECT NAME, MAP NUMBER IF APPROPRIATE, THE AUTHORIZED DUST CONTROLLER PHONE
ADJOINING PROPERTY INFO. (FOR SENSITIVITY, TYP. WINDS BLOW N.W. TO S.E.)
RET. BASINS,
NUMBERS , THE CITY PHONE NUMBER, AND THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT
EASTERLY RESIDENTIAL & GOLF COURSE
SUB -PHASE
(S. C.A.Q.M)D.) PHONE NUMBER. THE CITY WILL ISSUE THE SIGAl WITH THE VARIABLES PUT ON
SOUTHEASTERLY RESIDENT/AL & GOLF COURSE
SPRINKLER AC.
WITH STICK -ON LETTERS AND NUMBERS, AT THE PRE-CONSTRUCT/ON MEETING WHEN THE GRADING
SOUTHERLY FUTURE RESIDENTIAL & GOLF COURSE
#
PERMIT /S ISSUED. NO GRADING CAN TAKE PLACE UNLESS EACH SIGN IS PROPERLY POSTED.
SOUTHWESTERLY GOLF COURSE & TENNIS CLUB
B1
DAMAGED OR LOST SIGNS MUST BE REPLACED AT $2Q0 PER SIGN BEFORE GRAD/NG CAN CONTINUE.
WESTERLY TENNIS CLUB
-
NORTHWESTERLY GOLF COURSE & RESIDENTIAL
7.
VEHICLES TRAVELING ON DIRT AND/OR ON UNPAVED ROADS SHOULD RESTRICT THEIR SPEED TO
NORTHERLY GOLF COURSE
B2
15 M.P.H. MAXIMUMM, SIGNS TO THAT EFFECT SHOULD BE PLACED AT THE PROJECT ENTRANCE
NORTHEASTERLY RESIDENTIAL & GOLF COURSE
ON PROJECTS OVER 5 ACRES TO IMPROVE COMPLIANCE.
CURRENT LAND USAGE. VACANT
8.
WHEN WIND SPEEDS EXCEED 25 MPH, BY CONTINUOUS ANEMOMETER READING, OR IN GUSTS AT
PROPOSED LAND USAGE. RESIDENT/AL
B3
LEAST TWICE WITHIN A THIRTY MINUTE PERIOD, MEASURED ON THE SITE, VEHICULAR ACTIVITY ON
LOT. • 1-63 TR: 37790 LAND USE PERMIT NO.:
THE SITE SHALL CEASE, EITHER VOLUNTARILY, OR BY CITY OR A.Q.M.D. INSPECTOR NOTIFICATION,
A.P.N. 764-200-071, 072, 073, 075 PARCEL SIZE 20.04 ACRES 872.942 SQ. FT.
EXCEPT FOR WATER TRUCKS AND SPRINKLER -TENDING VEHICLES, IF ANY
EARTHWORK QUANTITIES ESTIMATE(BALANCED SITE PREFERRED)
PHASE 'C"
Fl ISH GRAD I G
TOTAL AREA TO BE DISTURBED 20.04 ACRES 872.942 SQ. FT.
SITE SPECIFIC DETAILS.
STRIPPING & SUBSIDENCE LOSSES (TYP. 0.3' X AREA/27CF/CY.) 6.904 C, y.
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
RAW CUT VOLUME.- 18.948 C. Y. CUT AFTER SHRINKAGE. 17.366 C. Yl
RAW IMPORT VOLUME. 0 C. Y. IMPORT AFTER SHRINKAGE. 0 C. Y.
1.
PRE -WATERING METHOD (AS SHOWN IN 1. OR AS DETAILED HERE): WATER TRUCKS
COMPACTED FILL VOLUME. 10.541 C. Y.
WATER
TUCK AC.
RAW EXPORT VOLUME. 0 C. Y. COMPACTED EXPORT VOL.: 0 C. Y.
OF
WATER AVAILABILITY, INITIAL STAGE: EXISTING HYDRANT-CVWD 000 GPM)
(SEE HAUL ROUTE DETAIL ON ATTACHED PLAN IF ANY IMPORT OR EXPORT, EXCEPT TRASH.)
911312020
20.04
SOIL TYPE. 'A"
20.04
PHASING OF GRADING ACTIVITIES
2.
OFF-SITE WORK PERMISSION NEEDED: N/A
THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE EFFECTIVELY WATERED
4 TIMES PER DAY BY EITHER SPRINKLERS OR WATER TRUCKS, TYPICAL 2000 GALLON WATER TRUCKS
J.
ACCESS WILL BE CONTROLLED BY. DEVELOPER / CONSTRUCTION GATE
CAN EFFECTIVELY WATER ABOUT 4 ACRES PER HOUR. THEREFORE AN 8 HR. WORKDAY DIVIDED BY
4 WATERINGS PER DAY TIMES 4 AC./HR. = 8 ACRES PER TRUCK. SINCE WATER TRUCKS ARE
4.
INITIAL STAGING AREA: SEE MAP AT RIGHT
ALLOWED TO WORK 7 DAYS A WEEK, 24 HOURS A DAY, IN SOME LOCATIONS, UP TO 24 AC. PER
TRUCK MAY BE ACHIEVED THAT WAY, WITH SPECIAL PERMISSION. LARGER PROJECTS MUST HAVE
EQUIPMENT STORAGE SEE MAP AT RIGHT
MORE TRUCKS, MORE HOURS, MORE SPRINKLERS, OR LESS DISTURBED AREA AT ANY ONE TIME.
Fl ISH GRADING
(BUILDING UTILITIES BUILDING
AREAS ALREADY GRADED OR STOCKPILED MUST BE STABILIZED WITH CHEMICALS, HYDROMULCH, OR
TEMPORARY OFFICE SEE UAP AT RIGHT
VEGETATION, BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING. THE PHASING PATTERN
SUB -PHASE
APPROX. DTE
BELOW SHALL BE SHOWN IN THE REFERENCE MAP ON THIS SHEET AT UPPER RIGHT. DRIVING ROUTES
SPRINKLER AC.
EMPLOYEE PARKING SEE MAP AT RIGHT
THROUGH A PROJECT MUST BE COUNTED IN ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER.
IT IS BETTER TO TREAT THEM WITH AN APPROVED "OIL" (LIKE ENVIROKLEEN) OR SIMILAR NON -CRUSTING 5. WHEEL WASHING PROVISIONS: AT CONSTRUCTION ENTRANCE
DUST PALLIATIVE, TO SAVE WATER.
PHASE A"
ROUGH GRADING
SITE PREPARATION MOBILIZATION)
SUB -PHASE
APPROX. DTE
DISTURBED AC.
SPRINKLER AC.
WATER
TRUCK AC.
OF
TRUCKS
A 1
711812020
20.04
20.04
-
1
A2
A3
PHASE B"
ROUGH GRADING
ASS GRADING
OF STREETS
PADS
RET. BASINS,
PER!
ETER ALL
SUB -PHASE
APPROX. DTE
DISTURBED AC.
SPRINKLER AC.
WATER
TRUCK AC.
#
OF
TRUCKS
B1
8/1/2020
20.04
-
20.04
3
B2
B3
PHASE 'C"
Fl ISH GRAD I G
MAJOR UTILITY AND
STREET CONSTRUCTION)
SUB -PHASE
APPROX. DTE
DISTURBED AC.
SPRINKLER AC.
WATER
TUCK AC.
OF
TRUCKS
Cl
911312020
20.04
-
20.04
3
C2
C3
PHASE 'D"
Fl ISH GRADING
(BUILDING UTILITIES BUILDING
CONSTRUCTION, LANDSCAPING)
SUB -PHASE
APPROX. DTE
DISTURBED AC.
SPRINKLER AC.
WATER
TRUCK AC.
#
OF
TRUCKS
DI
11/14/2020
20.04
-
20.04
3
D2
D3
FUGITIVE PM 10 DUST CONTROL MEASURES
HERE IS THE SUMMARIZED MATRIX OF REQUIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE:
A B C D
X PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS. )
SIGNS POSTED ON SITE WITH 24 HR. PHONE NUMBER(S) FOR DUST CONTROLLER
SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING MASONRY WALLS)
X X X X SITE WATERING 7 DAYS A WEEK (IRRIGATION SYSTEM, M/N. 4 TIMES PER 24 HRS.,
OR BY WATER TRUCKS, YIN. 4 TIMES PER 24 HRS., 1 TRUCK / 8 ACRES)
PERIMETER SPRINKLER SYSTEM (ALL SIDES, CONTINUOUS NIGHT WATERING WHEN WINDY)
GRAVEL (M/N. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS)
X X X X WHEEL CLEANING AT TRUCK EXITS, ('RUMBLE STRIPS", DRIVE-THROUGH PONDS,
GRAVEL AREAS, ETC. DETAIL METHOD ON REFERENCE MAP AT AT RIGHT)
INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, APPROVED OIL, OR PLANTS)
ACTIVE AREA SOIL STAB1L1ZERS (ENVIR KLEEN "OIL", OR SIMILAR WETTING AGENTS)
X X X X STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH
• STREET SWEEPING WHENEVER NEEDED
• PERMANENT VEGETATION / LANDSCAPING
BLOCK WALLS
ROAD PAVING
NOTE: THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE DUST CONTROL PLAN REVIEW
GUIDANCE FOR LOCAL GOVERNMENT" FROM THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT,
AVAILABLE FROM THE CITY OF LA QUINTA OR THE S.C.A.Q.M.D.
PROJECT RECORDKEEPING/REPORT.• RECORD ALL ACTIVITIES, CONTRACTS AND MATERIALS PURCHASES
ASSOCIATED WITH BLOWSAND/FUGITIVE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO
THE PUBLIC WORKS DEPARTMENT FOR REVIEW THIS 'FEEDBACK" WILL EVENTUALLY HELP THE CITY
TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN BOTH SHORT TERM
AND LONG TERM SITUATIONS. SEE THE REPORT FORM THAT'S AVAILABLE FROM THE CITY OR IN THE
AFORESAID DOCUMENT.
FUGITIVE PMt, DUST CONTROL PROGRAM DETAILS
EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON
ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REQUIRED DUST CONTROL PLAN EXHIBIT (AT
RIGHT OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS
TEMPORARY IRRIGATION LINES, TRUCK/WHEEL WASHERS, TEMPORARY SAND FENCING, CONSTRUCTION
PHASING, WORKER'S PARKING AREAS, GRAVELED ENTRANCE/EXIT, AND OTHER THINGS AS NEEDED.
PHASE 'A" ROUGH GRADING (SITE PREP, & MOBIL IZA TION)
GENERAL REQUIREMENTS
1. WRITTEN AND NOTARIZED PERMISSION LETTERS SHALL BE SUBMITTED TO THE PUBLIC WORKS
DEPARTMENT FROM ANY ADJACENT LAND OWNERS WHOSE PROPERTY WILL BE USED IN ANY
, RIR TO ANY SUCH USAGE.
HE OWNER ANDNSTRUCTIONAUTHORIZED DUST CONTROLLERNNER FOR CO, STAGG, ACCESS,EFOR THIS PROJECT WILL BE RESPONSIBLE
FOR THE DUST CD TROL O ANY OFF-SITE DIS
TURBED AREAS ASLL ASO THIS PROJECT
A DUST CONTROL SECURITY OF $2,000 PER ACRE, OR AS OTHERWISE APPROVED BY THE CITY
ENGINEER, SHALL BE POSTED FOR ALL AREAS TO BE DISTURBED BY THE PROJECT, BOTH
ON-SITE AND OFF-SITE, DISTURBANCE OF SITE AREAS NOT INCLUDED IN THIS AGREEMENT
SHALL BE REASON FOR THE CITY TO ASSESS ADDITIONAL CHARGES, AND POSSIBLY STOP ALL
IF IT
ISRK AT THE SITE SUSPECTED THAT OFF-SITE AREATIL THE S MAY BE DISTURBEOF THE D DURINCE IS G THE WORK, SHOW THEM ON
THIS PLAN AND MAKE THE APPROPRIATE ARRANGEMENTS IN ADVANCE.
2. SAND FENCING IS NOT PROPOSED TO BE USED FOR THIS PROJECT. ANDALUSIA HAS AN EXISTING
6 FOOT WALL AROUND THE ENTIRE PERIMETER OF THE PROJECT. THE CONSTRUCTION SITE IS
LOCATED IN THE CENTRAL AREA OF THE PROJECT AND IS SURROUNDED BY THE EXISTING GOLF
COURSE AND EXISTING RECREATIONAL FACILITIES THAT ARE OWNED AND MAINTAINED BY THE
DEVELOPER. THE NEAREST RESIDENTIAL UNIT IS LOCATED APPROXIMATELY 175 FEET FROM THE
EASTERLY BOUNDARY OF THE PROJECT WITH THE MAJORITY OF EXISTING RESIDENCES LOCATED IN
EXCESS OF 300 FEET FROM THE CONSTRUCTION SITE. THE DEVELOPER PROPOSES TO USE
ENHANCED SITE WATERING TO MITIGATE WIND BLOWN DUST ISSUES.
J. PRE -WATERING SHALL COMMENCE AT LEAST THREE (3) DAYS PRIOR TO ACTUAL GRADING
USING A TEMPORARY ON-SITE IRRIGATION SYSTEM CONNECTION TO ANY EXISTING WATER
SYSTEM SHALL BE DONE IN COMPLIANCE WITH C.V.W.D. TEMPORARY WATER LINES SHALL
BE INSTALLED WITH A MINIMAL DISTURBANCE OF ANY OFF-SITE AREAS THEY PASS THROUGH.
WHEN THE GRADING BEGINS, A SPRINKLER SYSTEM SHALL BE PLACED AROUND THE PERIMETER
OF THE PROJECT, WITH FREQUENT WATERING, ESPECIALLY IN THE TYPICALLY WINDY EVENINGS.
PLACING THE PERIMETER SPRINKLERS ON THE SAND FENCE KEEPS THEM SAFE AND EFFECTIVE.
WATERING FOR AREAS NOT COVERED BY THE SPRINKLERS SHALL BE PROVIDED BY WATER
TRUCKS. (ONE TRUCK PER 8 ACRES FOR 8 HR. WORKDAYS. SEE ABOVE.)
4. ACTIVITY AREAS SUCH AS: EQUIPMENT STORAGE AREA, MATERIALS STORAGE AREA, TEMPORARY
OFFICE TRAILERS, AND EMPLOYEE PARKING, SHOULD BE LOCATED IF POSSIBLE ON EXISTING
PAVED SURFACES, IF TRAFFIC WOULD NOT BE AFFECTED. IN LIEU OF EXISTING PAVING, A SOIL
STABILIZER THAT DOES NOT REQUIRE CONSTANT WATERING, SUCH AS A WASHED GRAVEL, OR
"BIODEGRADABLE OIL" COULD BE USED FOR THE INITIAL STAGING AREA. ANY CHEMICALS USED
MUST BE CLEARED WITH THE CITY AND REGIONAL WATER QUALITY CONTROL BOARD.
6. SPEED RESTRICTION SIGN LOCATION: 1 SPEED LIMIT SIGN AT CONSTRUCTION ACCESS
7. NUMBER OF POSTED 'DUST CONTROL SIGNS" I (ONE) SEE MAP AT RIGHT
(TYP. 1 PER FRONTING ROAD OR 1 PER 660 FEET OF FRONTAGE)
8. OTHER PRELIMINARY WORK:
PHASE "B':• ROUGH GRADING (MASS GRADING, PERIMETER WALLS)
GENERAL REQUIREMENTS
1. HAULING PROCEDURES.
ALL VEHICLES GOING FROM DIRT AREAS ONTO PAVED STREETS SHALL HAVE TIRES AND
WHEELS INSPECTED AND WASHED IF NECESSARY TO AVOID "TRACKING -OUT" DIRT.
TRUCKS HAULING DIRT ON PAVED STREETS SHALL MAINTAIN AT LEAST A HALF FOOT
FREEBOARD" FROM RIM TO DIRT, AND COVER ALL DIRT OR DUSTY DEBRIS LOADS
WITH AN APPROPRIATE TARP.
THE HAUL ROUTE SHOULD BE SHOWN HEREON OR ON AN ATTACHED SHEET, AND
SHALL BE CLEARED WITH THE CITY ENGINEER FOR ANY APPLICABLE TRANSPORT
PERMITS PRIOR TO ITS USE. ALL HAULING TRUCKS SHALL HAVE A COPY OF THESE
PROVISIONS WITH THEM AT ALL TIMES.
THE IMPORT OR EXPORT SITE MUST HAVE A VALID GRADING PERMIT ALSO, AND SHOULD
BE COMPLYING WITH ALL APPROPRIATE DUST MITIGATION MEASURES ALSO.
WHEN PRACTICAL, TRUCKS AND EQUIPMENT SHOULD SHUT OFF ENGINES RATHER THAN
IDLING FOR EXTENDED PERIODS, TO MINIMIZE EXHAUST EMISSIONS AND NOISE. THIS
BECOMES MORE CRITICAL AS THE SIZE AND NUMBERS OF VEHICLES INCREASES.
2. ALL STRIPPED, GRADED OR OTHERWISE DISTURBED AREAS SHALL BE STABILIZED
BY SOME APPROPRIATE MEANS. AREAS ACTIVELY BEING GRADED CAN USUALLY BE
STABILIZED BY APPLYING LOTS OF WATER. DISTURBED AREAS NOT ACTIVELY BEING
WORKED MAY BE EFFECTIVELY TREATED WITH SOME MORE DURABLE SOIL STABILIZER,
SUCH AS HYDROMULCH, TO AVOID CONSTANT WATERING. THE PREFERRED METHOD OF
SITE WATERING IS BY SPRINKLER, ESPECIALLY AROUND THE PERIMETER. SPRINKLERS MUST
BE SET TO RUN ON WEEKENDS AND EVENINGS WHEN WATER TRUCK DRIVERS ARE NOT
AVAILABLE, A TYPICAL WATER TRUCK CAN ONLY HANDLE WELL ABOUT 4 ACRES PER HOUR.
J. IF PERIMETER BLOCK WALLS ARE TO BE BUILT THEY SHOULD BE GIVEN A HIGH
PRIORITY SINCE THEY WILL HELP TO CATCH BLOWSAND AND COULD THEREBY
REDUCE THE AMOUNT OF STREET SWEEPING REQUIRED.
SITE SPECIFIC DETAILS:
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. HAULING PROCEDURES. (AS SHOWN ABOVE UNLESS OTHERWISE DETAILED)
PER GENERAL REQUIREMENTS. NO EXPORT FROM CONSTRUCTION SITE
2. SOIL STABILIZATION METHODS.
ACTIVE AREA WATER SCHEDULE: (MIN. 4 TIMES PER 24 HRS.)
CONTINUED WATERING DURING CONSTRUCTION
WEEKEND WATERING SCHEDULE: (M/N. 4 TIMES PER 24 HRS. )
4 TIMES PER 24 HRS.
INACTIVE AREA STABILIZATION METHOD(S): (ACRYLIC POLYMER, HYDROMULCH, PLANTINGS,
BIODEGRADABLE 'OIL'; OR AS SHOWN HERE) CHEMICAL STABILIZER SHALL
INCLUDE GREEN COLORANT OR EQUAL AND USED ON INACTIVE AREAS.
J. PERIMETER BLOCK WALL SCHEDULE: N/A
4. OTHER. AFTER 10 DAYS OF COMPLETING GRADING, AREAS THAT WILL NOT BE
STABILIZED BY CONTINUED WATERING SHALL BE STABILIZED BY ACRYLIC
POLYMER OR PLANTING
PHASE "C" FINISH GRADING (UTILITY & STREET CONST.)
GENERAL REQUIREMENTS.
1. DIRT STOCKPILED NEXT TO UTILITY TRENCHES SHALL BE KEPT WATERED OR
OTHERWISE STABILIZED OR COVERED TO HELP COUNTERACT THEIR HIGH PROFILE
EXPOSURE TO THE WIND.
2. ALL PREVIOUSLY ROUGH GRADED AREAS THAT WILL BE INACTIVE IN THIS PHASE
SHOULD BE TREATED WITH A DURABLE SOIL STABILIZER OR GROUND COVER SYSTEM.
IF A VEGETATED GROUND COVER IS UTILIZED IT IS ONLY NECESSARY TO GET IT
INITIALLY ESTABLISHED, THE ROOT SYSTEM AND TOP STUBBLE MAY BE SUFFICIENT
TO HOLD THE DUST EVEN IF WATERING IS DISCONTINUED.
J. FOR TRACTS, MULTIPLE PARCELS, AND EXTENSIVE COMMERCIAL SITES, PAVED
ACCESS TO THE BUILDING SITES SHALL BE COMPLETED AS SOON AS POSSIBLE.
BUILDINGS. THIS CONSTRUCTION STAGE USUALLY INDICATES AN INCREASE IN THE
NUMBERS OF WORKERS AND THEIR VEHICLES. ALSO, THE PAVED ACCESS IS
RECOMMENDED FOR FIRE FIGHTING PURPOSES. IF PAVING IS DESIRED BEFORE
ALL UTILITIES AND/OR LATERALS ARE INSTALLED, THE BASE LIFT OF ASPHALT
IS SUFFICIENT FOR ACCESS. THE A.C. CAN BE 'CAPPED" LATER, LEAVING A FINAL
SURFACE THAT IS FREE OF UTILITY CUTS AND PATCHES.
4. AS PAVED ACCESS IS EXTENDED, THE STAGING AREA CAN BE MOVED CLOSER
TO THE BUILDING SITES. THE STORAGE AND OFFICE TRAILERS, EQUIPMENT,
AND EMPLOYEE PARKING CAN BE MOVED ONTO PAVED PORTIONS OF THE SITE,
SITE SPECIFIC DETAILS:
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. TRENCH STOCKPILE TREATMENT• (WATER AS NECESSARY) BY WATER TRUCK
2. INACTIVE AREA TREATMENT: (SEAL WITH HYDROMULCH, ACRYLIC POLYMER, PLANTINGS, ETC.)
ACRYLIC POLYMER OR PLANTING
J. STREET PAVING SCHEDULE: PER GENERAL REQUIREMENTS
4. STAGING AREA MOVEMENT SCHEDULE: STAGING AREA TO REMAIN AT LOCATION
SHOWN UNTIL PROJECT COMPLETION
5. OTHER:
PHASE "D"- FINISH GRADING (BLDG. UTIL., BLDG. CONST., LANDSCAPING)
GENERAL REQUIREMENTS.
1. ALL INACTIVE AREAS SHOULD HAVE BEEN STABILIZED BY THIS STAGE, IF PREVIOUSLY
COVERED, THE ACTUAL BUILDING PADS MAY NOW NEED TO BE STRIPPED, SCARIFIED,
AND RECOMPACTED FOR BUILDING PAD COMPACTION AND ELEVATION CERTIFICATIONS.
DUST WOULD BE KEPT DOWN BY WATERING, USUALLY BY TEMPORARY SPRINKLERS.
2. TRENCHING FOR BUILDING UTILITIES, DRYWELL CONSTRUCTION, POOLS, AND TENNIS
COURT CONSTRUCTION FORM THE BULK OF EARTHWORK AFTER THE PADS HAVE BEEN
CERTIFIED. TEMPORARY SPRINKLERS MAY STILL BE USED ON THE BUILDING SITE FOR
DUST CONTROL PRIOR TO THE BEGINNING OF FRAMING. TREATMENT WITH A BIODEGRADABLE
"OIL" APPROVED FOR DUST CONTROL IS RECOMMENDED WHERE IT IS DIFFICULT TO WATER,
J. ESTABLISHING THE LANDSCAPE AND SPRINKLER SYSTEM AROUND THE PERIMETER OF
LARGE PROJECTS SHOULD BE DONE AT THIS STAGE. PLANTINGS AROUND THE
PERIMETER SERVE AS A WIND BUFFER AND COLLECTION SYSTEM FOR DUST AND SAND.
IT IS GOOD TO HAVE DUST AND SAND WELL UNDER CONTROL PRIOR TO THE BUILDING
PHASE FOR THE SAKE OF CERTAIN GLUING AND PAINTING PROCESSES THAT CAN BE
RUINED BY BLOWSAND OR DUST.
4. DISTURBED AREAS AROUND BUILDINGS SHOULD BE WATERED BY HAND FOR DUST
CONTROL UNTIL SUCH TIME THAT THE SPRINKLER SYSTEM IS FULLY FUNCTIONAL
AND GROUND COVER AND OR LANDSCAPING IS ESTABLISHED. IF WATERING IS DIFFICULT
DUE TO BUILDING INTERFERENCE, CHEMICAL OR MULCH TREATMENTS ARE AVAILABLE
THAT CAN STABILIZE THE SOIL WITHOUT FREQUENT WATERING.
5. CONSTRUCTION DUST SUCH AS FROM CEMENT, PLASTER, PAINT OVERSPRAY, WOOD
CUTTING, GRINDING OPERATIONS, ETC., SHOULD BE MINIMIZED ALSO. A PERIMETER
BARRIER OF SPRINKLERS AND PLANTINGS CAN SERVE TO CATCH SOME OF THIS
POTENTIALLY HAZARDOUS MATERIAL AS WELL AS NATURAL DUST AND BLOWSAND.
CONCENTRATIONS OF CONSTRUCTION DUSTS CAN RESULT FROM WASHING OF
EQUIPMENT AND SHOULD BE PROPERLY DISPOSED OF BEFORE THEY CAN DRY OUT
AND BLOW OR BE WASHED ACROSS PROJECT BOUNDARIES.
6. NOTE THAT SWALES SHOULD BE INSPECTED BY CITY PRIOR TO SETTING OF PERMANENT
GROUND COVER OR OTHER PLANTS,
SITE SPECIFIC DETAILS.
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. BUILDING PAD WATERING. (BY HAND WATERING AS NECESSARY AROUND BUILDING SITE)
PAD AREA TEMPORARY PARKING STABILIZED WITH 4" AGGREGATE.
2. FORMWORK AND TRENCH WATERING. (BY HAND WATERING AS NECESSARY)
N/A
J. PERIMETER LANDSCAPE SCHEDULE. (AS SOON AS POSSIBLE)
PER GENERAL REQUIREMENTS
4. OTHER,
ABATEMENT OF DUST MITIGATION FAILURE
AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO PERMIT THE CITY OR
THEIR DESIGNEE TO ENTER UPON THE SITE UNDER THE FOLLOWING CIRCUMSTANCES:
A. IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY
THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (S.C.A.Q.M.D.) FOR A PARTICULAR DAY;
B. IN THE EVENT OF AN ON-SITE ANEMOMETER THAT CONFORMS TO ALL S.C.A.Q.M.D. STANDARDS
REGISTERING 2 WIND GUSTS IN EXCESS OF 25 M.P.H. WITHIN A CONSECUTIVE 30 MINUTE
PERIOD; OR
C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FOR A DISTANCE OF 50 FEET FROM
ANY BOUNDARY LINE, • OR
D. THE CITY IS UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE
'AUTHORIZED DUST CONTROLLER" AFTER A 60 MINUTE CONSECUTIVE PERIOD WHICH SHALL
START WITH THE FIRST TELEPHONE CALL, WHETHER ANSWERED OR NOT; THEN THE CITY WILL
UNDERTAKE TO INITIATE ONE OR ALL OF THE BELOW LISTED ACTIONS.
1. THE CITY WILL CAUSE THE CESSATION OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT
LIMITED TO EARTH MOVING, CONSTRUCTION, DEMOLITION OR VEHICULAR MOVEMENT AND
MANEUVERING. ANY WATER TRUCKS OR VEHICLES SERVICING SPRINKLERS WOULD CONTINUE.
2. IN THE EVENT THAT AN ON-SITE IRRIGATION SYSTEM IS NOT INSTALLED AND/OR OPERATIONAL,
THE CITY WILL CAUSE THE SITE TO BE WATERED OR TREATED WITH DUST CONTROL CHEMICALS.
THE DUST CONTROL SECURITY WILL BE UTILIZED FIRST TO COVER ANY COSTS INCURRED.
IF COSTS EXCEED ANY DUST CONTROL SECURITY REMAINING, ADDITIONAL COSTS MAY BE ASSESSED
AGAINST THE OWNER OF THE PROJECT.
J. IN THE EVENT AN ON-SITE IRRIGATION SYSTEM IS INSTALLED, BUT ITS CONTROL CLOCK HAS NOT
TURNED THE SYSTEM ON WHEN NEEDED, THE CITY MAY TAKE ALL NECESSARY STEPS TO TURN ON
THE SYSTEM. IF IT IS INACCESSIBLE BEHIND LOCKED GATES OR LOCKED CONTROL BOXES, AND THE
CITY CAN NOT FIND THE APPROPRIATE KEYS, THE CITY MAY CUT OR BREAK LOCKS AS NECESSARY.
E. IF, IN THE OPINION OF THE CITY ENGINEER OR HIS DESIGNEE, THE INTENSITY, FREQUENCY OR
DURATION OF FUGITIVE DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OF
THE PUBLIC, BY INTRUSION BEYOND THE PROJECT BOUNDARY, THE CITY ENGINEER OR HIS DESIGNEE OR
AGENT MAY IMMEDIATELY ENTER UPON THE SITE OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE
NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT LIMITED TO COMMENCING WATERING ON THE SITE
OR ORDERING THE CESSATION OF ANY EMISSION -GENERATING ACTIVITY OCCURRING ON-SITE.
F. ANY OF THE ABOVE ACTIONS MAY BE CONSTRUED AS AN ABATEMENT FOR WHICH THE CITY
WILL 'BACK CHARGE" THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER
AS THE CITY SHALL DEEM APPROPRIATE.
APPLICATION CONSENT
APPLICATION FOR APPROVAL OF A LOCAL AIR QUALITY MANAGEMENT (L.A.Q.M.P.) PLAN IS HEREBY MADE
TO THE CITY ENGINEER OR HIS DESIGNEE, AS PART OF A GRADING PERMIT APPLICATION, SUBJECT TO
THE CONDITIONS AND RESTRICTIONS SET FORTH HEREIN:
1. EACH PERSON UPON WHOSE BEHALF THIS APPLICATION IS MADE AND EACH PERSON AT WHOSE
REQUEST AND FOR WHOSE BENEFIT WORK IS PERFORMED UNDER AND PURSUANT TO ANY PERMIT
ISSUED AS A RESULT OF THIS APPLICATION AGREES TO, AND SHALL INDEMNIFY AND HOLD HARMLESS
THE CITY OF INDIO, ITS OFFICERS, AGENTS AND EMPLOYEES.
2. ANY PERMIT ISSUED AS A RESULT OF THIS APPLICATION BECOMES NULL AND VOID IF WORK IS
NOT COMMENCED WITHIN 90 DAYS FROM THE DATE OF ISSUANCE OF SUCH PERMIT.
3. THE APPLICANT OWNER, CONTRACTOR(S), SUBCONTRACTOR(S) OR OTHER AGENTS, HEIRS OR
ASSIGNEES SHALL CONFORM TO THE ATTACHED DUST CONTROL PLAN AS APPROVED BY THE CITY.
SAID PLAN INCLUDES NOTES AND/OR DRAWINGS OF TEMPORARY OR PERMANENT CONTROL METHODS
OR DEVICES PROPOSED TO BE USED. THIS L.A.Q.M.P. SHALL BE CONSIDERED AN ADDENDUM TO,
AND A NECESSARY PART OF, ANY GRADING, STOCKPILE, IMPROVEMENT, OR DEMOLITION PLAN
OTHERWISE REQUIRED FOR CITY PERMITS.
4. BY AGREEING TO CONFORM TO THIS PLAN AS APPROVED BY THE CITY, THE OWNER AND DESIGNATED
'AUTHORIZED DUST CONTROLLER" DO ALSO AGREE TO ABIDE BY THE PROVISIONS OF THE ABATEMENT
PROCEDURES AS SHOWN ABOVE.
OWNER'S CERTIFICATION:
I CERTIFY THAT I HAVE READ THIS APPLICATION AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE.
I UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY MAY BE USED
BY THE CITY, PLUS ADDITIONAL CHARGES IF NEEDED, IF I FAIL TO KEEP THE DUST UNDER CONTROL.
I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS A DAY, 7 DAYS A WEEK, FROM THE
TIME THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND
MUST CONTINUE UNTIL THE TIME THAT THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED OR PAVED.
RESPONSIBILITY FOR THE DUST CONTROL ON THIS SITE CAN NOT BE TRANSFERRED SOLELY BY
TRANSFERRING ALL OR A PORTION OF THIS PROPERTY TO OTHER PEOPLE. A REPLACEMENT
L.A.Q.MP. AND DUST CONTROL SECURITY MUST BE SUBMITTED FOR ANY TRANSFERRED PORTION.
I HEREBY AUTHORIZE THE PERSON LISTED BELOW AS 'AUTHORIZED DUST CONTROLLER" TO BE
MY REPRESENTATIVE AND CONTACT PERSON FOR ALL DUST COMPLAINTS INVOLVING THIS PROJECT.
I CERTIFY THAT I HAVE READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN
IS TRUE AND CORRECT. I AGREE TO COMPLY WITH CITY ORDINANCES, AND ALL LAWS
RELATING TO GRADING OPERATIONS. 1 AUTHORIZE REPRESENTATIVES OF THE CITY
OF LA QUINTA TO ENTER UPON THE ABOVE-MENTIONED PROPERTY FOR INSPECTION AND/OR
ABATEMENT PURPOSES, AND 1 AGREE TO HOLD HARMLESS THE CITY AND ITS REPRESENTATIVES
FROM LIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT.
OWNERS NAMES) SUNRISE L.Q. LLC
OWNER'S ADDRESS 8 70 CARBONERAS LA QUINTA CA 92253
OWNER'S SIG ATURE(S) 4.
DATE 2 9 Z Z
AUTHORIZED DUST CONTROLLER CERTIFICATION:
I CERTIFY THAT I HAVE READ THIS APPLICATION AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE.
AS THE AUTHORIZED DUST CONTROLLER" FOR THIS PROJECT I WILL HAVE MY PHONE NUMBER ON
THE REQUIRED SITE SIGNS, AND WILL RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT.
I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS A DAY, 7 DAYS A WEEK, FROM THE
TIME THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND
MUST CONTINUE UNTIL THE TIME THAT THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED OR PAVED.
DUST CONTROLLER NAME (PRINT) CHRIS KING
DUST CONTROLLER ADDRESS 81-570 CARBO RAS LA QUINTA CA 92253
DUST CONTROLLER SIGNATURE DATE6' 30
CONTACT PHONE NUMBERS (24HR) 760-77 -1707
CERTIFICATE NO. CV 18 1 1-00 7 128-7183
8'
CITY OF LA QUINTA PERMIT NO. HWY111
TM 37790
IF YOU SEE DUST COVING FROM 50TH AVE
THIS PROJECT PLEASE CALL:
uii
ui
4' 777=1
54TH AVE.
IF YOU DO NOT GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL ° (MH La
THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT PROJECT AIRPOR BLVD-
(760)
LVD.(760) 416- 5 315 SITE 58TH AVE. III
REPORT THE PERMIT OR PROJECT NO. AT THE PHONE NUMBER ABOVE o % o
OR CALL AIR QUALITY MANAGEMENT DISTRICT AT , 1-800-288-7664co
Z 60TH AVE.
6' I POST '
-POST � 6 0
PM- 10 PROJECT SIGNING
E lI'STING GOLF
I RON
EXISTING WATER
SOURCE CVWD_
HYDRANT
(500 GPM)
XISIIN GOLF
COu -SE
SPA
PRO SHOP
PROPOSED
GATE ACCESS
W/ GRAVELED
CONSTRUCTION ENTRANCE
AND TRACK OUT
R
5 N
6
7
�j 162ND AVE.
VICINITY MAP
NTS
- TEMPORARY
CONSTRUCTION
EQUIPMENT YARD
& STAGING AREA �o
8
63 62 9
61 10
66
60 11
59 12
58 �� 13
67
64
EX SWIM & TENNIS FACILITY
57
56 15
55 16
43
68 F 42
39
40
r
41 ����P 24 23 22
MPS 25
' 38
37
36
35 34
26
27
28
29 1 ,
30 '
31
32
S3
21
EXISTING GOLF COURSE
PROP STORM DRAIN
ADD A DRAWING HERE FOR SPECIAL DUST CONTROL ITEMS NOT TYPICALLY SHOWN ON GRADING PLANS, SUCH AS:
TRUCK WHEEL WASH AREAS, EMPLOYEE PARKING AREAS, WATER TOWER LOCATIONS, HAUL ROAD DETAILS, SPEED
SIGN LOCATION, SAND FENCE LOCATIONS, PERIMETER SPRINKLER LOCATIONS, STAGING AREAS, BORROW PITS, ETC.
IF ALL REQUIRED FEATURES ARE ALREADY SHOWN ON THE GRADING PLAN WHICH IS ATTACHED, OWNER INITIAL HERE _
REFERENCE MAP GRADING PLAN FEATURES
MONITORING TO BE PROVIDED PER COACHELLA VALLEY FUGITIVE SCALE. 1 "= 150'
DUST CONTROL HANDBOOK SECTION 6.2.
DUST CONTROL SECURITY REQUIREMENTS:
SECURITY AMOUNT.' $40,080.00 1" TO 3" COARSE
(25% CASH: $10,020.00) AGGREGATE6" THICKBASE
(75% BOND: $30, 060.00)
o
"TRACK CLEAN" RUMBLE STRIP 10 X 48'
MANUFACTURER TRENCH SHORING
z
Lu
2
w
Q
a
U-
0 O
w
0
Lu
Cr
z
m
X
Lu.
w
TYPICAL CONSTRUCTION ENTRANCE
N.T.S
WDID NO.7 33C387384
PREPARED BY. lS KIN NO. CY1811-007128-7183 CITY OF LA QUINTA
SIGNATURECHR/S KING LOCAL AIRQUALITY MANAGEMENTPLANSHEET �
PRINT NAME
ADDRESS, PH. 81-570 CARBONERAS, LA QUINTA, CA DATE
760-408-1164 PM10 DUST Ml TIGA TION
APPROVED BY. CITY OF LA QUINTA FOR: TRACT 37790
PROJECT NAME, CLUB VILLA
7-1-2020 SITE ADDRESS. 58-830 MARBELLA, LA QUINTA, CA 92253 A.P.N.: 764-200-071,072,073,075
DATE
IN THE NW, NE & SE 1/4 OF SECTION 27, T.6.S., R.7.E., S.B.M.
CITY ENGINEER RCE NO. 49418 EXP. DATE 9/30/20
Pm1nan
OF I
GRADING PERMIT #
E