SDP 2020-0002 Dutch Bros Coffee (08.07.2020)
August 7, 2020
Ryan Ramey
Cole Valley Partners
3519 NE 15th Avenue Suite 251
Portland, OR 97212
SUBJECT: SITE DEVELOPMENT PERMIT 2020-0002 DUTCH BROS COFFEE
Dear Mr. Ramey:
The Design and Development Department has reviewed and approved your request
for Site Development Permit 2020-0002 for an 862 square foot drive through coffee
shop located at 44-175 Jefferson Street. The approval is subject to Conditions of
Approval attached to the staff report. The appeal period for this decision is 15 days
and will end on Monday, August 24th, 2020.
Should you have any questions, please feel free to contact me directly at (760) 777-
7086 and/or at sfernandez@laquintaca.gov .
Sincerely,
Sijifredo Fernandez
Associate Planner
Enclosures:
• Staff Report with Conditions of Approval
City of La Quinta
DIRECTOR’S DECISION: August 7, 2020
STAFF REPORT
AGENDA TITLE: SITE DEVELOPMENT PERMIT 2020-0002 AND
ENVIRONMENTAL ASSESSMENT 2020-0002 PROPOSING AN 862 SQUARE-FOOT
DOUBLE DRIVE-THROUGH DUTCH BROS COFFEE SHOP LOCATION: SOUTHWEST
CORNER OF FRED WARING DRIVE AND WASHINGTON STREET.
PROJECT INFORMATION
PROJECT: DUTCH BROS COFFEE SHOP
APPLICANT: COLE VALLEY PARTNERS
OWNER: CV THE FIFTH DB, LLC
CEQA: THE DESIGN AND DEVELOPMENT DEPARTMENT HAS
DETERMINED THAT THE PROPOSED PROJECT IS CONSISTENT
WITH THE MITIGATED NEGATIVE DECLARATION APPROVED FOR
ENVIRONMENTAL ASSESSMENT 2002-462 APPROVED ON
JANUARY 20, 2004.
LOCATION: 300 FEET SOUTH OF THE SOUTHWEST CORNER OF FRED
WARING DRIVE AND WASHINGTON STREET
LEGAL: APN 604-521-011
EXECUTIVE SUMMARY
• The Jefferson Square Shopping Center (Center) was approved in
January 20, 2004 via Jefferson Square Specific Plan (SP 2002-062) and
Environmental Assessment 2002-462 (EA 2002-462) for a 113,173
square-foot (sf) shopping center on 10.7 acres, consisting of a
supermarket, drugstore with drive-through and various other smaller
shops.
• Two specific plan amendments have been approved for the site, in
November 2005 and in May 2008.
• The applicant proposes to construct an 862 square foot drive-through
Dutch Bros Coffee Shop building with an outdoor patio within the
existing center on one of the remaining vacant pads (Attachment 1).
BACKGROUND/ANALYSIS
The SP 2002-062 was approved in January 2004 for a 113,173 sf commercial
shopping center on 10.7 acres at the southwest corner of Jefferson Street and
Fred Waring Drive, consisting of a supermarket, drugstore with drive-through,
gasoline service station, three freestanding buildings, ancillary facilities and
parking. The project proposes to develop one of the remaining vacant pads
with an 862 square-foot coffee shop with a double drive-through, for a
branded Dutch Bros Coffee Shop. The vacant project site was previously
approved for a 4,500 sf drive-through bank through the Specific Plan.
Site Development Permit
The applicant requests Site Development Permit (SDP) approval for the new
862 sf double drive-through Dutch Bros Coffee Shop. SDP approval is
requested for landscaping and architectural design (Attachment 2).
Site Design
The building will consist of a Dutch Bros Coffee Shop with an outdoor patio
and double drive-through facility. The building reflects a design similar to and
compatible with the surrounding buildings within the Center: flat roofs with
tower elements, exterior plaster, and metal awnings and will also incorporate
stone veneer and a light tan and brown color palette (Attachment 3). The
design of the architecture is modeled after the branded logo design and
incorporates similar colors of the existing Specific Plan color palette. The
proposed coffee shop will not provide indoor dining but will provide for walk
up services. The double drive-through for vehicles will provide an escape lane
for patrons who receive their order prior to the person ahead of them, in order
to reduce drive through congestion. The building meets all development
standards of the Neighborhood Commercial (CN) zone, including setbacks,
floor area ratio, and heights for structures within 150 feet of Jefferson Street.
The maximum structure height is 22 feet, with an allowance of 10% of the
building mass to extend up to 36 feet. The height of the proposed building
reaches a maximum of 20 feet, with a tower parapet reaching 24 feet. The
building requires nine (9) parking stalls and the proposal includes twelve (12)
parking spaces on site. Nine of the twelve parking stalls are existing, with
three new stalls proposed with this project. Along with this, the rest of
Jefferson Square has parking stalls within close vicinity.
The applicant prepared a traffic memo to analyze impacts the new building
and drive-through facility could have on surrounding streets, to the
satisfaction of the City Engineer and City Traffic Engineer (Attachment 4). The
daily trips generated from the bank was estimated at 292, while the coffee
shop is projected to produce 190 daily trips. The drive-through configuration
meets the drive-through standards of the City’s Municipal Code.
Landscaping and Lighting
New landscaping is proposed within the project site (Attachment 2, Page
L1.0). The landscaping along the Jefferson Street perimeter will remain as is.
The assorted species of plants and trees, including palo verde, Mediterranean
fan palm, and red yucca, add character to the proposed development, are
consistent with desert landscaping palettes, and provide sufficient screening
and accents around the vehicular circulation areas. The proposed shrubs and
existing screen wall along the drive-through stacking area provide sufficient
screening and complements the existing center.
A single light post will be added to match the existing light posts throughout
Jefferson Square, which will remain in place. Modern outdoor sconces will be
used as building mounted lights, located well below the roof line (Attachment
2, Page A6.0). The photometric plan provided meets the City’s parking lot
lighting standards.
AGENCY AND PUBLIC REVIEW
Public Agency Review
This request was sent to all applicable City departments and affected public
agencies on April 29, 2020. All written comments received are on file and
available for review with the Design and Development Department. All
applicable comments have been adequately addressed and/or incorporated in
the recommended Conditions of Approval.
ENVIRONMENTAL REVIEW
The Design and Development Department has determined that the proposed
project is consistent with the Mitigated Negative Declaration approved under
Environmental Assessment 2002-462 for Specific Plan 2002-062, on January
20, 2004. The original approval included a shopping center with a build out
of 113,173 sf of commercial space. Subsequent amendments reduced this to
90,441 square feet, the current configuration. The approvals also included
approval of a 4,500 square foot drive-through bank on the currently proposed
project site. This proposal decreases the square footage of this pad to 826
square feet, well under the original 4,500 square feet analyzed by the
currently approved Specific Plan. The applicant prepared a traffic memo, on
file with the Design and Development Department, that demonstrates no
significant impacts from the drive-through facility.
Prepared by: Sijifredo Fernandez, Associate Planner
Reviewed by: Cheri Flores, Planning Manager
Approved by: Danny Castro, Design and Development Director
Attachments: 1. Project Information
2. Site Development Permit Plan Set
3. Color and Material Board
4. Traffic Memo
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 1 of 15
FINDINGS
1. Consistency with General Plan
The proposed development is consistent with the General Plan land use
designation of General Commercial. The City’s General Plan policies
relating to General Commercial encourage a full range of commercial
uses within the City, and the proposed use maintains those policies.
• Goal LU-6 and ED-1 as it will contribute to a balanced and
varied economic base which provides fiscal stability to the City
and provide a broad range of goods and services to its residents
and region.
• Goal LU-2 as the project consists of high-quality design that
complements and enhances the City. The design of the project
incorporates the existing architectural elements within the
commercial center and enhances it with modern architectural
style.
• Program CIR-1.12.a: Locate land uses that provide jobs and
housing near each other to allow the use of alternative modes of
travel and produce shorter work commutes. The project will be
developed with existing adjacent residential development,
immediately to the north, south, and west, providing an
opportunity for jobs and housing near each other.
• Program SC-1.5c: New development projects shall include
vehicular, pedestrian and bicycle connections to the greatest
extent possible, both through the project and connecting to
adjacent projects. The project is designed to reduce internal
congestion by providing an abundance of stacking spaces and
the project will meet ADA compliance to provide safe pedestrian
access. A minimum of five (5) bicycle parking spaces will be
provided on site.
• Policy ED-1.2 as it will support and assist in the retention of
existing businesses and the recruitment of new businesses. This
proposal is for Dutch Bros to construct a new building in an
existing center. Drive-throughs are an attractive use in
facilitating the recruitment of new businesses.
2. Consistency with Zoning Code
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 2 of 15
The proposed development, as conditioned, is consistent with the
development standards of the City’s Zoning Code, the purpose and intent
of the Neighborhood Commercial District, and the Jefferson Square
Specific Plan. The Neighborhood Commercial district is intended to meet
the daily needs of a neighborhood area. The project site is in an area that
serves multiple neighborhoods as it abuts existing residential
developments, is in close proximity to Interstate 10 and residential
homes west of Washington Street. Director’s Decision Site Development
Permits are authorized by the Zoning Code and the proposed Site
Development Permit is consistent with the purpose and intent of Chapter
9.210.010. The Jefferson Square Specific Plan allows for a drive-through
establishment within the project site, and the proposed development is
consistent with the Zoning Code.
3. Compliance with CEQA
The Design and Development Department has determined that the
proposed project is consistent with the Mitigated Negative Declaration
approved under Environmental Assessment 2002-462 for Specific Plan
2002-062, on January 20, 2004. The original approval included a
shopping center with a build out of 113,173 sf of commercial space.
Subsequent amendments reduced this to 90,441 square feet, the current
configuration. The approvals also included approval of a 4,500 square
foot drive-through bank on the currently proposed project site. This
proposal decreases the square footage of this pad to 826 square feet,
well under the original 4,500 square feet analyzed by the currently
approved Specific Plan. The applicant prepared a traffic memo, on file
with the Design and Development Department, that shows that the
proposed project would generate 102 less daily trips than the drive-
through bank that is currently approved on this pad; demonstrating no
significant impacts from the drive-through facility. The project shall
comply with all applicable mitigation measures.
4. Architectural Design
The architecture and layout of the project is compatible with, and not
detrimental to, the existing surrounding commercial land uses, the
existing commercial buildings within the shopping center, and is
consistent with the development standards in the Municipal Code. The
design is modeled after the branded logo design and incorporates similar
colors to the existing Specific Plan. The proposed building contains flat
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 3 of 15
roofs with tower elements, exterior plaster, and metal awnings and will
also incorporate stone veneer which is consistent with the existing center.
5. Site Design
The site design of the project is compatible with surrounding
development and with the quality of design prevalent in the City. The
double drive-through design provides seventeen (17) stacking spaces
which exceeds the municipal code requirement of seven (7) spaces. The
additional stacking will reduce any potential impacts to the circulation of
the shopping center. The double drive-through will provide an escape
lane, for patrons who receive their order prior to the person ahead of
them, in order to reduce drive-through congestion. The drive-through
lane is oriented in a way so that even in the unlikely scenario that queues
extend beyond the available stacking space, traffic will not overflow onto
public streets. The building requires nine (9) parking stalls and the
proposal includes twelve (12) parking spaces on site. Nine of the twelve
parking stalls are existing, with three new stalls proposed with this
project. Along with these stalls, the rest of Jefferson Square has parking
stalls within close vicinity. The screening of equipment and trash
enclosures, exterior lighting, and other site design elements are
compatible with the existing development.
6. Landscape Design
The proposed project is consistent with the landscaping standards and
plant palette and implements the standards for landscaping and
aesthetics established in the General Plan and Zoning Code. Landscape
improvements are designed and sized to provide visual appeal. The
permanent overall site landscaping utilizes various tree and shrub species
to enhance the building architecture, be compatible with existing
landscaping surrounding the building, and helps provide adequate
screening for the double drive-through.
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 4 of 15
CONDITIONS OF APPROVAL GENERAL
1. The applicant agrees to defend, indemnify and hold harmless the City of
La Quinta (“City”), its agents, officers and employees from any claim,
action or proceeding to attack, set aside, void, or annul the approval of
this Site Development Permit. The City shall have sole discretion in
selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or
proceeding and shall cooperate fully in the defense.
2. Site Development Permit 2020-0002 shall comply with all applicable
conditions and/or mitigation measures for the following related approval:
Specific Plan 2002-062
Environmental Assessment 2002-462
Tentative Parcel Map 36241
Site Development Permit 2007-898
In the event of any conflict(s) between approval conditions and/or
provisions of these approvals, the Design and Development Director shall
adjudicate the conflict by determining the precedence.
3. For the purposes of this Site Development Permit, the City waives
condition of approval #110 from SP2002-0062 Amendment #2 to the
extent said condition may be applicable. The City’s waiver applies only as
long as the development to be established is a drive-through coffee shop
as approved under this permit. Any subsequent change in use from a
drive-through coffee shop (or similar, limited coffee/non-alcoholic
beverage quick-serve facility with a drive-through) shall require either
compliance with said condition or a specific plan amendment for SP2002-
0062.
4. Prior to the issuance of any grading, construction, or building permit by
the City, the applicant shall obtain any necessary clearances and/or
permits from the following agencies, if required:
• Riverside County Fire Marshal
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 5 of 15
• La Quinta Public Works Department (Grading Permit, Green Sheet
(Public Works Clearance) for Building Permits, Water Quality
Management Plan (WQMP) Exemption Form – Whitewater River
Region, Improvement Permit)
• La Quinta Planning Division
• Riverside Co. Environmental Health Department
• Desert Sands Unified School District (DSUSD)
• Coachella Valley Water District (CVWD)
• Imperial Irrigation District (IID)
• California Regional Water Quality Control Board (CRWQCB)
• State Water Resources Control Board
• SunLine Transit Agency
• South Coast Air Quality Management District Coachella Valley
(SCAQMD)
The applicant is responsible for all requirements of the permits and/or
clearances from the above listed agencies. When these requirements
include approval of improvement plans, the applicant shall furnish proof
of such approvals when submitting those improvements plans for City
approval.
5. The applicant shall comply with applicable provisions of the City’s NPDES
stormwater discharge permit, LQMC Sections 8.70.010 et seq.
(Stormwater Management and Discharge Controls), and 13.24.170
(Clean Air/Clean Water); Riverside County Ordinance No. 457; the
California Regional Water Quality Control Board – Colorado River Basin
Region Board Order No. R7-2013-0011 and the State Water Resources
Control Board’s Order No. 2012-0006-DWQ.
A. The applicant shall include provisions for all of the following Best
Management Practices (“BMPs”) (LQMC Section 8.70.020
(Definitions)):
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non-Storm Water Management.
6) Waste Management and Materials Pollution Control.
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 6 of 15
B. The BMPs shall remain in effect for the entire duration of project
construction until all improvements are completed.
6. Developer shall reimburse the City, within thirty (30) days of
presentment of the invoice, all costs and actual attorney’s fees incurred
by the City Attorney to review, negotiate and/or modify any documents
or instruments required by these conditions, if Developer requests that
the City modify or revise any documents or instruments prepared initially
by the City to effect these conditions. This obligation shall be paid in the
time noted above without deduction or offset and Developer’s failure to
make such payment shall be a material breach of the Conditions of
Approval.
7. Developer shall reimburse the City, within thirty (30) days of
presentment of the invoice, all costs and actual consultant’s fees incurred
by the City for engineering and/or surveying consultants to review and/or
modify any documents or instruments required by this project. T his
obligation shall be paid in the time noted above without deduction or
offset and Developer’s failure to make such payment shall be a material
breach of the Conditions of Approval.
PROPERTY RIGHTS
8. Prior to issuance of any permit(s), the applicant shall acquire or confer
easements and other property rights necessary for the construction or
proper functioning of the proposed development.
9. Pursuant to the aforementioned condition, conferred rights shall include
approvals from the master developer over easements and other property
rights necessary for construction and proper functioning of the proposed
development not limited to access rights over proposed and/or existing
parking lot that access public streets and open space/drainage facilities of
the master development.
10. The applicant shall furnish proof of easements, or written permission, as
appropriate, from those owners of all abutting properties on which
grading, retaining wall construction, or other encroachments will occur.
PARKING LOTS and ACCESS POINTS
11. The design of parking facilities shall conform to LQMC Chapter 9.150 and
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 7 of 15
in particular the following:
A. The parking spaces and aisle widths and the double hairpin stripe
parking space design shall conform to LQMC Chapter 9.150.
B. Cross slopes should be a maximum of 2% where accessibility is
required including accessibility routes between buildings.
C. Building access points shall be shown on the Precise Grading Plans
so that accessibility issues can be evaluated.
D. Accessibility routes to public streets and adjacent development
shall be shown on the Precise Grading Plan.
E. Parking space lengths shall be according to LQMC Chapter 9.150
and be a minimum of 18 feet in length with a 2-foot overhang for
all parking spaces or as approved by the City Engineer. One van
accessible parking space is required per 6 accessible parking
spaces.
F. Drive aisles between parking spaces shall be a minimum of 26 feet
with access drive aisles to Public Streets a minimum of 30 feet or
as approved by the City Engineer.
12. The applicant shall design street pavement sections using CalTrans'
design procedure for 20-year life pavement, and the site-specific data for
soil strength and anticipated traffic loading (including construction
traffic). Minimum structural sections shall be as follows:
Parking Lot & Aisles (Low Traffic) 3.0" a.c./4.5" c.a.b.
Parking Lot & Aisles (High Traffic) 4.5” a.c./5.5” c.a.b.
or the approved equivalents of alternate materials.
13. The applicant shall submit current mix designs (less than two years old at
the time of construction) for base, asphalt concrete and Portland cement
concrete. The submittal shall include test results for all specimens used
in the mix design procedure. For mix d esigns over six months old, the
submittal shall include recent (less than six months old at the time of
construction) aggregate gradation test results confirming that design
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 8 of 15
gradations can be achieved in current production. The applicant shall not
schedule construction operations until mix designs are approved.
14. Improvements shall include appurtenances such as traffic control signs,
markings and other devices, raised medians if required, street name
signs and sidewalks.
15. Improvements shall be designed and constructed in accordance with City
adopted standards, supplemental drawings and specifications, or as
approved by the City Engineer. Improvement plans for streets, access
gates and parking areas shall be stamped and signed by qualified
engineers.
IMPROVEMENT PLANS
16. As used throughout these Conditions of Approval, professional titles such
as “engineer,” “surveyor,” and “architect,” refers to persons currently
certified or licensed to practice their respective professions in the State of
California.
17. Improvement plans shall be prepared by or under the direct supervision
of qualified engineers and/or architects, as appropriate, and shall comply
with the provisions of LQMC Section 13.24.040 (Improvement Plans).
18. The following improvement plans shall be prepared and submitted for
review and approval by the Public Works Department. A separate set of
plans for each line item specified below shall be prepared. The plans
shall utilize the minimum scale specified, unless otherwise authorized by
the City Engineer in writing. Plans may be prepared at a larger scale if
additional detail or plan clarity is desired. Note, the applicant may be
required to prepare other improvement plans not listed here pursuant to
improvements required by other agencies and utility purveyors.
A. Final WQMP (Plan submitted in Report Form)
B. On-Site Commercial Precise Grading 1" = 20' Horizontal
NOTE: A through B to be submitted concurrently.
(Separate Storm Drain Plans if applicable)
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 9 of 15
Other engineered improvement plans prepared for City approval that are
not listed above shall be prepared in formats approved by the City
Engineer prior to commencing plan preparation.
“On-Site Commercial Precise Grading” plan is required to be submitted
for approval by the Building Official, Planning Manager and the City
Engineer.
“On-Site Commercial Precise Grading” plans shall normally include all on-
site surface improvements including but not necessarily limited to finish
grades for curbs & gutters, building floor elevations, parking lot
improvements and accessibility requirements.
19. The City maintains standard plans, detail sheets and/or construction
notes for elements of construction which can be accessed via the Public
Works Development “Plans, Notes and Design Guidance” section of the
City website (www.laquintaca.gov). Please navigate to the Design and
Development Department home page and look for the Standard Drawings
hyperlink.
20. The applicant shall furnish a complete set of the mylars of all approved
improvement plans on a storage media acceptable to the City Engineer.
21. Upon completion of construction, and prior to final acceptance of the
improvements by the City, the applicant shall furnish the City with
reproducible record drawings of all improvement plans which were
approved by the City. Each sheet shall be clearly marked "Record
Drawing" and shall be stamped and signed by the engineer or surveyor
certifying to the accuracy and completeness of the drawings. The
applicant shall have all approved mylars previously submitted to the City,
revised to reflect the as-built conditions. The applicant shall employ or
retain the Engineer of Record during the construction phase of the project
so that the EOR can make site visits in support of preparing "Record
Drawing". However, if subsequent approved revisions have been
approved by the City Engineer and reflect said "Record Drawing"
conditions, the Engineer of Record may submit a letter attesting to said
fact to the City Engineer in lieu of mylar submittal.
GRADING
22. The applicant shall comply with the provisions of LQMC Section 13.24.050
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 10 of 15
(Grading Improvements).
23. Prior to occupancy of the project site for any construction, or other
purposes, the applicant shall obtain a grading permit approved by the
City Engineer.
A. To obtain an approved grading permit, the applicant shall submit
and obtain approval of all of the following:
B. A grading plan prepared by a civil engineer registered in the State
of California,
C. A preliminary geotechnical (“soils”) report prepared by a
professional registered in the State of California,
D. A Fugitive Dust Control Plan prepared in accordance with LQMC
Chapter 6.16, (Fugitive Dust Control), and
E. A WQMP prepared by an authorized professional registered in the
State of California, and
All grading shall conform with the recommendations contained in the
Soils Report, and shall be certified as being adequate by soils engineer,
or engineering geologist registered in the State of California.
The applicant shall furnish security, in a form acceptable to the City, and
in an amount sufficient to guarantee compliance with the approved
Fugitive Dust Control Plan provisions. Additionally, the applicant shall
replenish said security if expended by the City of La Quinta to comply
with the Plan as required by the City Engineer.
24. The applicant shall maintain all open graded, undeveloped land in order
to prevent wind and/or water erosion of such land. All open g raded,
undeveloped land shall either be planted with interim landscaping, or
stabilized with such other erosion control measures, as were approved in
the Fugitive Dust Control Plan.
25. Building pad elevations on the precise grading plan submitted for City
Engineer’s approval shall conform with the pad elevation shown on the
Site Development Permit Preliminary Grading Plans, unless the pad
elevations have other requirements imposed elsewhere in these
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 11 of 15
Conditions of Approval.
26. Prior to any site grading or regrading that will raise or lower any portion
of the site by more than plus or minus five tenths of a foot (0.5’) from
the elevations shown on the Site Development Permit Preliminary
Grading Plans, the applicant shall submit the proposed grading changes
to the City Staff for a substantial conformance finding review.
27. Prior to the issuance of a building permit for any building lot, the
applicant shall provide a lot pad certification stamped and signed by a
qualified engineer or surveyor with applicable compaction tests and over
excavation documentation.
Each pad certification shall list the pad elevation as shown on the
approved grading plan, the actual pad elevation and the difference
between the two, if any. Such pad certification shall also list the relative
compaction of the pad soil.
DRAINAGE
28. Stormwater handling shall conform with the approved hydrology and
drainage report for Jefferson Square, SDP 2020-0002, or as approved by
the City Engineer.
29. Stormwater may not be retained in landscaped parkways or landscaped
setback lots. Only incidental storm water (precipitation which directly falls
onto the setback) will be permitted to be retained in the landscape
setback areas. The perimeter setback and parkway areas in the street
right-of-way shall be shaped with berms and mounds, pursuant to LQMC
Section 9.100.040(B)(7).
30. The applicant shall comply with applicable provisions for post construction
runoff per the City’s NPDES stormwater discharge permit, LQMC Sections
8.70.010 et seq. (Stormwater Management and Discharge Controls), and
13.24.170 (Clean Air/Clean Water); Riverside County Ordinance No. 457;
and the California Regional Water Quality Control Board – Colorado River
Basin (CRWQCB-CRB) Region Board Order No. R7-2013-0011.
A. For post-construction urban runoff from New Development and
Redevelopments Projects, the applicant shall implement
requirements of the NPDES permit for the design, construction and
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 12 of 15
perpetual operation and maintenance of BMPs per the approved
Water Quality Management Plan (WQMP) for the project as
required by the California Regional Water Quality Control Board –
Colorado River Basin (CRWQCB-CRB) Region Board Order No. R7-
2013-0011.
B. The applicant shall implement the WQMP Design Standards per
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing
BMPs approved by the City Engineer. A project specific WQMP shall
be provided which incorporates Site Design and Treatment BMPs
utilizing first flush infiltration as a preferred method of NPDES
Permit Compliance for Whitewater River receiving water, as
applicable.
C. The developer shall execute and record a Stormwater
Management/BMP Facilities Agreement that provides for the
perpetual maintenance and operation of all post-construction
stormwater BMPs.
UTILITIES
31. The applicant shall comply with the provisions of LQMC Section 13.24.110
(Utilities).
32. The applicant shall obtain the approval of the City Engineer for the
location of all utility lines within any right-of-way, and all above-ground
utility structures including, but not limited to, traffic signal cabi nets,
electric vaults, water valves, and telephone stands, to ensure optimum
placement for practical and aesthetic purposes.
33. Underground utilities shall be installed prior to overlying hardscape. For
installation of utilities in existing improved streets, the applicant shall
comply with trench restoration requirements maintained, or required by
the City Engineer. The applicant shall provide certified reports of all utility
trench compaction for approval by the City Engineer. Additionally, grease
traps and the maintenance thereof shall be located as to not conflict with
access aisles/entrances.
RIVERSIDE COUNTY FIRE MARSHAL
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 13 of 15
32. At time of Building Department Permit submittal, include a Fire Flow
Report from CVWD confirming that a minimum fire flow of 1,500 gpm @
20 psi residual is provided from the nearest/existing fire hydrant.
33. Requests for installation of traffic calming designs/devices on fire
apparatus access roads shall be submitted and approved by the Office of
the Fire Marshal. Ref. CFC 503.4.1
34. Submittal of construction plans to the Office of the Fire Marshal for
development, construction, installation and operational use permitting
will be required. Final fire and life safety conditions will be addressed
when the Office of the Fire Marshal reviews these plans. These conditions
will be based on occupancy, use, California Building Code (CBC),
California Fire Code, and related codes, which are in effect at the time of
building plan submittal.
35. All commercial buildings shall display street numbers in a prominent
location on the address side and additional locations as required. Ref.
CFC 505.1 and County of Riverside Office of the Fire Marshal Standard
#07-01
CONSTRUCTION
34. Plans shall be prepared to the applicable code at the time of submittal for
building permit. As of January 1, 2020, these are the 2019 California
Building Codes.
35. Any building, structure, facility, complex or improved area, or portions
thereof, which are used by the general public shall be provided barrier
free design to ensure that these improvements are accessible to and
usable by persons with disabilities. Plans shall fully detail how the
proposed facility complies with the California Accessibility Standards
defined in Title 24 Chapter 11B and Federal ADA Regulations.
a. The parallel curb ramp design as currently shown from building
to accessible parking space will require a warning curb per CBC
11B-303.5 for abrupt changes in level exceeding 4 inches in a
vertical dimension.
b. Walk Up Sale and Service Counter required to comply with CBC
11B-227 / 904.4.
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 14 of 15
c. Protruding objects, including a projecting sale or service counter,
shall comply with CBC 11B-307.
36. The provisions of California Green Building Standards Code outline
planning, design and development methods that include environmentally
responsible site selection, building design, building siting and
development to protect, restore and enhance the environmental quality
of the site and respect the integrity of adjacent properties, please provide
compliance information on plans as applicable. Include planning and
design requirements of division 5.1, and the applicable water efficiency
and conservations and the material conservation and resource efficiency
for exterior items of division 5.3, and 5.4 respectfully.
37. The City will conduct final inspections of habitable building only when the
buildings have parking lot improvements and (if required) sidewalk
access to publicly-maintained streets. The improvements shall include
required traffic control devices, pavement markings and street name
signs.
LANDSCAPE AND IRRIGATION
38. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping
Setbacks) & 13.24.140 (Landscaping Plans).
39. The applicant shall provide landscaping in the required setbacks,
retention basins, and common lots. Said landscaping shall be constantly
maintained by the center owner with damaged, dead or dying plant
material immediately replaced with healthy plant material of equivalent
size.
40. Landscape and irrigation plans for landscaped lots and setbacks,
medians, retention basins, and parks shall be signed and stamped by a
licensed landscape architect.
41. All new and modified landscape areas shall have landscaping and
permanent irrigation improvements in compliance with the City’s Water
Efficient Landscape regulations contained in LQMC Section 8.13 (Water
Efficient Landscape).
42. Lighting plans shall be submitted with the final landscaping plans for a
recommendation to the Planning Manager for his approval. Exterior
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 15 of 15
lighting shall be consistent with LQMC Section 9.100.150 (Outdoor
Lighting). All freestanding lighting shall not exceed 18 feet in height, and
shall be fitted with a visor if deemed necessary by staff to minimize
trespass of light off the property. The illuminated carports shall be
included in the photometric study as part of the final lighting plan
submittal.
43. All water features shall be designed to minimize “splash”, and use high
efficiency pumps and lighting to the satisfaction of the Planning Manager.
They shall be included in the landscape plan water efficiency calculations
per Municipal Code Chapter 8.13.
44. All rooftop mechanical equipment shall be completely screened from
view. Utility transformers or other ground mounted mechanical
equipment shall be fully screened with a screening wall or landscaping
and painted to match the adjacent buildings.
45. The applicant shall submit the final landscape plans for review,
processing and approval to the Design and Development Department, in
accordance with the Final Landscape Plan application process. Planning
Manager approval of the final landscape plans is required prior to
issuance of the first building permit unless the Planning Manager
determines extenuating circumstances exist which justifies an alternative
processing schedule.
NOTE: Plans are not approved for construction until signed by the
appropriate City official, including the Planning Manager and/or City
Engineer.
46. The applicant or his agent has the responsibility for proper sight distance
requirements per guidelines in the AASHTO “A Policy on Geometric
Design of Highways and Streets, 5th Edition” or latest, in the design
and/or installation of all landscaping and appurtenances abutting and
within the private and public street right-of-way.
MAINTENANCE
47. The applicant shall comply with the provisions of LQMC Section 13.24.160
(Maintenance).
FINDINGS AND CONDITIONS OF APPROVAL
SITE DEVELOPMENT PERMIT 2020-0002
DUTCH BROS COFFEE
APPROVED: AUGUST 7, 2020
Page 16 of 15
48. The applicant shall make provisions for the continuous and perpetual
maintenance of all private on-site improvements, perimeter landscaping,
access drives, sidewalks, and stormwater BMPs.
FEES AND DEPOSITS
49. The applicant shall comply with the provisions of LQMC Section 13.24.180
(Fees and Deposits). These fees include all deposits and fees required by
the City for plan checking and construction inspection. Deposits and fee
amounts shall be those in effect when the applicant makes application for
plan check and permits.
50. Permits issued under this approval shall be subject to the provisions of
the Development Impact Fee and Transportation Uniform Mitigation Fee
programs in effect at the time of issuance of building permit(s).
PROJECT INFORMATION
CASE NUMBER: SITE DEVELOPMENT PERMIT 2020-0002
ENVIRONMENTAL ASSESSMENT 2020-0002
APPLICANT: COLE VALLEY PARTNERS
PROPERTY OWNER: CV THE FIFTH DB, LLC
REQUEST: APPROVE SITE DEVELOPMENT PERMIT 2020-0002
FOR AN 862 SQUARE FOOT DRIVE-THROUGH COFFEE
SHOP AND FIND THE PROJECT CONSITENT WITH THE
PREVIOUSLY ADOPTED MITIGATED NEGATIVE
DECLARATION PREPARED UNDER THE CALIFORNIA
ENVIRONMENTAL QUALITY ACT.
LOCATION: 300 FEET SOUTH OF THE SOUTHWEST CORNER OF
FRED WARING STREET AND WASHINGTON STREET
APN: 604-521-011
GENERAL PLAN
DESIGNATION: GENERAL COMMERCIAL
ZONING
DESIGNATION: NEIGHBORHOOD COMMERCIAL
SURROUNDING
ZONING/LAND USES: NORTH: LOW DENSITY RESIDENTIAL
ESPLANADE COMMUNITY
SOUTH: LOW DENSITY RESIDENTIAL
MONTICELLO COMMUNITY
WEST: LOW DENSITY RESIDENTIAL
MONTICELLO PARK AND
COMMUNITY
EAST: CITY OF INDIO/EXISITING
COMMERCIAL
ATTACHMENT 1
INDEX SHEETG0.0““”“””SHEET NAME:SHEET NUMBER:DESCRIPTION:DATE:REV:Project No: CA3703
Dutch Bros Coffee - New Freestanding Store
DB2040-A2
SOUTH OF SWC OF JEFFERSON ST & FRED WARING DR.
LA QUINTA, CA 92253
APN: 604-521-011c ARMET DAVIS NEWLOVE &ASSOCIATES, AIA ARCHITECTS1330 OLYMPIC BLVD.SANTA MONICA, CALIFORNIA 90404PH 310 452-5533 FAX 310 450-4742DATE: 4/10/20DUTCH BROS COFFEENEW FREESTANDING BUILDINGCA 3703SWC JEFFERSON ST. &FRED WARING DR.LA QUINTA, CA. 92253DRAWING INDEX:G0.0COVER SHEET/ GENERAL INDEX1 OF 1ALTA SURVEYSP1.0ARCHITECTURAL SITE PLAN1 OF 3PRELIMINARY GRADING PLANL-1CONCEPTUAL LANDSCAPE PLANA1.0EQUIPMENT PLANA4.0ROOF PLANA6.0EXTERIOR ELEVATIONS VICINITY MAPSITEPROJECT DATA:
01/12/2020
JEFFERSON STREETGMPROPOSEDDUTCH BROS862 SF123458777910101112131415161719202122232525252626262626276181924““”“””SHEET NAME:SHEET NUMBER:DESCRIPTION:DATE:REV:Project No: CA3703
Dutch Bros Coffee - New Freestanding Store
DB2040-A2
SOUTH OF SWC OF JEFFERSON ST & FRED WARING DR.
LA QUINTA, CA 92253
APN: 604-521-011c ARMET DAVIS NEWLOVE &ASSOCIATES, AIA ARCHITECTS1330 OLYMPIC BLVD.SANTA MONICA, CALIFORNIA 90404PH 310 452-5533 FAX 310 450-4742DATE: 4/10/20SITE PLANSITE PLANSP1.01.WALK-UP SERVICE WINDOW2.ADA VAN PARKING STALL - SEE DETAIL 2/SP2.0 SIM.3.PARKING STALL, TYPICAL (18' X 9')4.TRASH ENCLOSURE, WITH LOCKING GATES AND SITE LIGHTREFER TO SHEET A9.0 FOR DETAILSCOORDINATE W/ LOCAL TRASH COMPANY FOR MIN.REQUIREMENTS AND CLEARANCES.5.PEDESTRIAN ACCESS FROM SIDEWALK - MAX. 5% SLOPE IN DIRECTION OF TRAVEL,MAX 2% CROSS SLOPE6.MONUMENT / POLE SIGN FACING MAIN STREET. REFER TO SP-1.1 FOR REFERENCE7.STATIC BACKLIT LED MENU BOARD, POLE MOUNTED FURNISH POWER AND DATAAND WATER PROOF J BOX FOR POWER. PROVIDE 2" CONDUIT WITH PULL STRINGFROM ELECTRICAL ROOM TO MENU BOARD LOCATION FOR FUTURE UPGRADE.8.DIRECTIONAL PAINT - TYP. - SEE DETAIL 15/SP2.09.SIDEWALK FOR RUNNERSDRIVER'S SIDE OF AISLE, 5' WIDE MIN.10.PAINT STRIPING, BEFORE AND AFTERCONCRETE DIVIDER. PAINT STRIPS 4" WIDE,12" O.C. SAFETY YELLOW11.MIN. 5' WIDE DIVIDING MEDIAN12.TRASH LOADING ZONE, COORDINATE APPROACH AND ORIENTATION OFENCLOSURE WITH SERVICE PROVIDER.13.SAFETY PULL OUT - PAINTED STRIPES 4" WIDE, 12" O.C. SAFETY WHITE14.CONCRETE AT DRIVE THRU WINDOW - SEE CIVIL PLANS.15.6" BOLLARD W/ DB BOLLARD COVERS. BOLLARD LOCATIONS VARY FOR INDIVIDUALSTORE DESIGNS. SEE FLOOR PLANS. - SEE DETAIL 16/SP2.016.CONCRETE FLATWORK. SEE CIVIL PLANS17.ADA PARKING ONLY SIGN - SEE DETAIL 6/SP2.018.SHORT TERM & LONG TERM BIKE PARKING. LONG TERM TO BE DURABIKE DL2LOCKER OR APPROVED EQUAL. IF REQUIRED BY CITY - SEE DETAIL 17/SP2.019.TOPICAL BLACK CONCRETE STAIN AT DRIVE-THRU AND TRASH ENCLOSURE20.NEW SITE LIGHTS. SEE CIVIL & ELECTRICAL PLANS.DETAIL 10/SP2.021.PROPOSED GAS METER LOCATION. SEE PLUMBING PLANS.22.CLEARANCE BAR, BY SIGNAGE VENDOR. N.I.C.23."CHOOSE SHORTEST LANE" SIGN, BY SIGNAGE VENDOR. N.I.C.24.UNAUTHORIZED PARKING SIGNAGE. SEE DETAIL 12/SP 2.025.MAX 5% SLOPE IN DIRECTION OF TRAVEL AND MAX 2% CROSS SLOPE.26.EXISTING LIGHT STANDARD27.RELOCATED LIGHT STANDARDSITE PLAN PARAMETERS KEYNOTESVICINITY MAPSITE
HARIYA LLC
CITY OF LA QUINTA
O
Exp. 6-30-2021
TTA
ES NROFACLIF AINo. 46771
R
EETGN
GSILORPDE
REFO
M
NGY
U
NEIENLAOINSSE
NG
ER.
VIC I L
APPROVED BY: CITY OF LA QUINTA
BENCHMARK:
PRELIMINARY GRADING AND
BASIS OF BEARING
VICINITY MAP
SITE
JEFFERSON STREETDUTCH BROS. COFFEE
GM
PROPOSED
DUTCH BROS
862 SF
6" THICK CONC. SLAB POURED
1.5' MIN.
STANDARD GRATE INLET ( by NYLOPLAST
24" WIDE CURB INLET WITH 24" SQUARE
24" DRAIN BASIN WITH CURB & GRATE INLET
6" THICK ¾ - 2 INCH WASHED
CRUSHED ANGULAR STONE
IN WOVEN (POROUS) FILTERFABRIC.
12" HDPE PIPE
(866) 888-8479 OR EQUIVALENT WITH TRASH
MONOLITHICALLY WITH CURB24" DRAIN BASIN
EXIST. 30" RCP PIPE
GRADE
BASKET INSERT
ON-SITE SEWER/WATER PLAN
ADA TILE INSET
RAISED TRUNCATED DOME
SCALE: 1/2" = 1'-0"ENLARGED COOLER PLAN2SCALE: 3/8" = 1'-0"EQUIPMENT PLAN10'4'2'GENERAL NOTES1.THIS DRAWING IS FOR EQUIPMENT LAYOUT PURPOSES ONLY.PLEASE SEE FLOOR PLAN FOR FULLY DIMENSIONED PARTITIONLOCATIONS AND ASSEMBLIES.2.NOTE: PLEASE SEE SHEET G1.0, COVER SHEET, FOR CODESUMMARY, BUILDING DATA AND EXIT ACCESS REQUIREMENTS.3.G.C. TO VERIFY ALL DIMENSIONS IN THE FIELD BEFORECOMMENCING CONSTRUCTION.4.ALL FIRE EXTINGUISHERS SHALL BE STATE CERTIFIED. ALL FIREEXTINGUISHERS SHALL BE BE PROPERLY MOUNTED AT THEHEIGHT REQUIREMENTS OF NO HIGHER THAN 4'-6" A.F.F. TO THETOP OF THE EXTINGUISHER AND AT LEAST 6" FROM FLOOR TOTHE BOTTOM OF EXTINGUISHER. (NFPA 10: 6.1.3.8)5.ALL PROPERLY MOUNTED FIRE EXTINGUISHERS SHALL NOTEXCEED 75' OF TRAVEL DISTANCE APART. (NFPA 1: 6.1)6.FIRE EXTINGUISHERS SHALL BE CONSPICUOUSLY LOCATEDWHERE THEY ARE READILY ACCESSIBLE AND IMMEDIATELYAVAILABLE IN THE EVENT OF FIRE. (NFPA 10: 6.1.3)7.FIRE EXTINGUISHERS SHALL BE LOCATED ALONG NORMALPATHS OF TRAVEL, INCLUDING EXITS FROM AREAS. (NFPA 10:6.1.3)8.FIRE EXTINGUISHERS SHALL NOT BE OBSTRUCTED OROBSCURED FROM VIEW. (NFPA 10: 6.1.3.3)7.TACTILE SIGNAGE SHALL BE PROVIDED AT ALL EXIT DOORS TOMEET THE FOLLOWING CRITERIA:A. TACTILE SIGNAGE SHALL BE LOCATED AT EACH EXIT DOORREQUIRING AN EXIT SIGN;B. TACTILE SIGNAGE SHALL READ AS FOLLOWS: “EXIT”;C. TACTILE SIGNAGE SHALL COMPLY WITH ICC/ANSI A117.1COOLER GENERAL NOTES1.COOLER INSULATION VALUES FOR WALLS, CEILING, AND DOORSSHALL BE MIN. R-252.AUTOMATIC DOOR CLOSERS SHALL BE PROVIDED THAT FULLYCLOSE WALK-IN DOORS THAT HAVE BEEN CLOSED TO WITHIN 1INCH OF FULL CLOSURE3.DOORWAYS SHALL HAVE STRIP DOORS, CURTAINS,SPRING-HINGED DOORS OR OTHER METHOD OF MINIMIZINGINFILTRATION WHEN DOORS ARE OPEN4'-0"2" AIR GAP MIN.8'-7"1'-0"1'-0"2'-0"7"8'-0"3'-0"12'-0"MILK CRATES BY OWNER(3) 2'-0" x 6'-0" GLASS DOORSBY COOLER BOX MANUFACTURERPRE-FAB INSULATEDCOOLER BOX PANELS,BY MANUFACTURER.3'-0" x 6''-8" DOORBY COOLER BOXMANUFACTURER.1'-0"VERIFY WALL DIMENSIONSAT COOLER DOOR;ADJUST FOR COOLER DOORHINGE LOCATION AND CLEARANCES.EVAPORATOR COIL, ABV.A1.0EQUIPMENT PLAN/ENLARGED PLANS““”“””SHEET NAME:SHEET NUMBER:DESCRIPTION:DATE:REV:Project No: CA4101
Dutch Bros Coffee - New Freestanding Store
DB2040-A2
SOUTH OF SWC OF JEFFERSON ST & FRED WARING DR.
LA QUINTA, CA 92253
PARCEL 4 PM 36241, P.M.B. 235/1-7c ARMET DAVIS NEWLOVE &ASSOCIATES, AIA ARCHITECTS1330 OLYMPIC BLVD.SANTA MONICA, CALIFORNIA 90404PH 310 452-5533 FAX 310 450-4742DATE: 3/20/20
SCALE: 1/4" = 1'-0"ROOF PLAN1GENERAL NOTES:1.COORDINATE WITH PLUMBING, MECHANICAL, AND ELECTRICALDRAWINGS FOR LOCATION AND NUMBER OF OTHER ROOFPENETRATIONS (IE: VENT STACKS VENT PIPES, CONDUITPENETRATIONS, ETC.). FLASH ALL PENETRATIONS WEATHER TIGHT.2.SLOPE ALL CRICKETS AS SHOWN AT A MINIMUM SLOPE OF 1/4" PERFOOT FROM HORIZ. PLANE, UNLESS NOTED OTHERWISE.3.PROVIDE BUILT-UP TAPERED INSULATION ROOF CRICKETS AT ALL CURBLOCATIONS TO ALLOW POSITIVE DRAINAGE AND PREVENT PONDING.4.ALL METAL ROOF FLASHING DETAILS SHALL BE PER SMACNA ANDMANUFACTURERS RECOMMENDATIONS AND REVIEWED BY THEARCHITECT FOR DESIGN INTENT.5.PROVIDE ROOF INSULATION SYSTEM BELOW ROOFING MEMBRANE, PERTHE ROOFING ASSEMBLIES SPECIFIED IN DIVISION 07 SECTIONS"THERMOPLASTIC POLYOLEFIN ROOFING" AND "APPLIEDFIREPROOFING".6.PROVIDE SUPPLEMENTAL INSULATION OVERBUILDS WHERE INDICATEDFOR ROOF SLOPE CONTINUATION.SCALE: 3" = 1'-0"TYPICAL 4" ROOF DRAIN & OVERFLOW -DURO-LAST3SUSPENDED ALUMINUM AWNING DETAILSCALE: 1" = 1'-0"2SCALE: 3" = 1'-0"SINGLE PLY SYSTEM ASSEMBLY11SCALE: 3" = 1'-0"TYPICAL ROOF TO PARAPET12SCALE: 3" = 1'-0"SELF-FLASHING CURB13SCALE: 3" = 1'-0"CURB DETAIL - DURO-LAST4SCALE: 3" = 1'-0"MECHANICAL LINES PENETRATION -DURO-LAST5SCALE: 3" = 1'-0"ROOF ACCESS HATCH - DURO-LAST6SCALE: 3" = 1'-0"MECHANICAL UNIT SLEEPER - DURO-LAST7SCALE: 3" = 1'-0"PARAPET CAP W/ CONT. CLEAT -DURO-LAST8SCALE: 3" = 1'-0"TWO-WAY AIR VENT - DURO-LAST9ROOF OVERFLOW - DURO-LASTSCALE: 1 1/2" = 1'-0"10SCALE: 1 1/2" = 1'-0"METAL SIDING BLOCKING DETAIL14+10'-6"B.O. CANOPYPRE-FINISHED METAL FLASHING6"X6"X3/8" ALUMINUM PLATEWITH (4) 5/8" Ø THRU BOLTS5/8" ZINC PLATED STEEL RODAT 48" O.C. MAX4"X4"X3/8" AL. CLEVIS PLATE,W/ 5/8" Ø BOLT.PRE-FINISHEDMETAL FLASHINGLAG BOLT PERSTRUCTURAL6" ALUMINUM CHANNEL, TYP.,PRIME & PAINT FINISH,PER MANUFACTURER..090 ALUMINUM SHEET DECK,ATTACH TO EA. ANGLE W/ 1/4" TEKSCREWS AT 9" O.C. MAX. SLOPE TOBUILDING.RAIN GUTTER, WHERE OCCURSOVER ENTRY WALKS. SLOPE TO DOWNSPOUT& STORM SEWER S YSTEMPER RCP - A3.0PRE-FINISHED METAL FLASHINGBLOCKING PER STRUCTURALBLOCKING PER STRUCTURALDURO-LAST MEMBRANE,MUST EXTEND BEYOND THEINSIDE OF THE CLAMPING RING.THE HOLE IN THE MEMBRANEMUST BE LARGER THANTHE DRAIN PIPE DIAMETER.CLAMPING RINGDURO-LAST APPROVEDSEALANT (1/2 TUBE MIN.)FERNCO FITTINGDRAIN BODYCLAMPING BOLTFILLER(MINIMAL EXPANDINGSPRAY FOAM OR SIMILAR)ROOF SHEATHING,PER STRUCTURAL1/4" DENSDECKPRIME ROOF BOARD2" HIGH WATER DAM COLLAR ATOVERFLOW DRAIN, AS OCCURS8" MIN.DURO-LAST CUSTOM-FABRICATEDCURB FLASHINGDURO-LAST APPROVEDPLATES/ FASTENERS1 1/4" ROOFING NAILS,SPACED 6" O.C.RECTANGULARPENETRATIONFIELD WELD,MIN. 1 1/2" WIDE.ROOF SHEATHING,PER STRUCTURAL1/4" DENSDECKPRIME ROOF BOARDDURO-LAST MEMBRANESDURO-LAST APPROVEDSEALANT (1/2 TUBE MIN.)DURO-LASTCUSTOM-FABRICATEDSTACK FLASHINGFIELD WELD,MIN. 1 1/2" WIDE.2" MIN.ONE PAIR OF COMPOSITEDRAIN RINGS (CDR) PLACEDAT THE BOTTOM OF THESTACK FLASHINGAPPROVED DURO-LASTFASTENERS,MIN. ONE PER DRAINROOF SHEATHING,PER STRUCTURAL1/4" DENSDECKPRIME ROOF BOARDFIELD WELD,MIN. 1 1/2" WIDE.DURO-LASTTWO-WAYAIR VENTROOF SHEATHING,PER STRUCTURALDURO-LAST MEMBRANE1/4" DENSDECKPRIME ROOF BOARDCOPING CAP,WITH HEXHEAD SCREWSAND NEOPRENE WASHERAT 24" O.C., MAX.DBL. TOP PLATE,PER PLAN1 1/4" ROOFING NAILS,SPACED 12" O.C., MAX.METAL CLEATSHEATHING,PER PLANDURO-LAST ROOFINGMEMBRANE, PER PLANDURO-LAST MEMBRANECURB FLASHINGDURO-LAST APPROVEDPLATES/ FASTENERSROOF HATCH,PER PLANFIELD WELD,MIN. 1 1/2" WIDE.ROOF SHEATHING,PER STRUCTURAL1/4" DENSDECKPRIME ROOF BOARDFIELD WELD,MIN. 1 1/2" WIDE.DURO-LAST CUSTOM-FABRICATEDCURB FLASHINGDURO-LAST ROOF TRAK IIIWALKWAY PADAPPROVED DURO-LAST CAULKMECHANICAL UNIT, PER PLAN;ATTACH MECH. UNIT TO SLEEPERPER MANUFACTURER'S INSTRUCTIONS.DURO-LAST APPROVED SEALANTROOF SHEATHING,PER STRUCTURAL1/4" DENSDECKPRIME ROOF BOARD4" MIN.MECHANICAL LINESAPPROVED DURO-LAST CAULK,WATER MUST NOT BE ALLOWEDTO POND W/IN PITCH PAN.1/2" MIN.FIELD WELD,MIN. 1 1/2" WIDE.FILLER(MINIMAL EXPANDINGSPRAY FOAM OR SIMILAR)VINYL-COATED METAL PITCH PANW/ DURO-LAST MEMBRANE SKIRTENSURE APPROVED DURO-LAST SEALANTIS LEVEL W/ TOP OF CURB AND COVER W/APPROVED DURO-LAST CAULK, SLOPE TOOUTSIDE OF PITCH PAN.ROOF SHEATHING,PER STRUCTURAL1/4" DENSDECKPRIME ROOF BOARDMETAL PANEL SYSTEM- SEE WALL TYPE Z1METAL CLOSURE STRIP- TYP. (4) SIDESCONT. SEALANT - TYP.BLOCKING PERSTRUCTURALROD & CLEVIS BY CANOPYMANUFACTURERMETAL PANEL SYSTEM- SEE WALL TYPE Z1METAL CLOSURE STRIP- (4) SIDESPREFAB AWNINGMOUNTING PER AWNINGBLOCKING PER STRUCT.CONT. BACKER ROD &SEALANT - TYP.CONTINUOUS APPROVEDTERMINATION BARSINGLE-PLY MEMBRANE FLASHING4" MIN. LAP OVER SEAMPLATE. FASTENER @ 12" O.C.GASKETED FASTENER @ 12" O.C. MAX4"CONTINUOUS BEAD OF SEALANTRTUINSULATED METAL CURBSINGLE-PLY ROOFING,MECHANICALLY ATTACHED,OVER 1/2" DENSDECK OVERROOF SHEATHING PERSTRUCTURALWELDED SPLICESINGLE-PLY ROOFING,MECHANICALLY ATTACHED,OVER 1/2" DENSDECK OVERROOF SHEATHING PERSTRUCTURALEXTERIOR SHEATHING PERSTRUCTURALFULLY ADHERE SINGLE-PLYMEMBRANE TO SHEATHING4" MIN. LAP OVER SEAMPLATE. FASTENER @ 12" O.C.2X WOOD FRAMING4"LAP & SEAL SINGLE-PLY ROOFINGMEMBRANE OVER SEAM PLATEWELDED SPLICE8" MAX
4" CANT STRIP4" MIN. LAP OVER SEAM PLATESINGLE-PLY ROOFINGOVER 1/2" DENSDECKFASTENERS @ 12" O.C.PRE-ENGINEEREDTAPERED TRUSSROOF SHEATHING PERSTRUCTURAL4" 14"
PER 1'-0"BUILDINGPARAPET 2ROOF MOUNTEDHVAC EQUPMENT;COORD. W/MECHANICAL 14"PER 1'-0" 14"
PER 1'-0" 14"PER 1'-0"CRICKET 12"PER 1'-0" 14"
PER 1'-0"ROOF MOUNTEDICE MACHINECONDENSING UNIT,COORD. WITHMECHANICAL;INSTALLED ONSLEEPERS.ROOF MOUNTEDWALK-IN COOLERCONDENSING UNIT,COORD. WITH MECHANICAL;INSTALLED ON SLEEPERS.METALAWNINGBELOWMETALAWNINGBELOWMETALAWNINGBELOWMETALAWNINGBELOW 14"
PER 1'-0"ROOFACCESSHATCHSLOPED RIGIDINSULATION CRICKETBUILDINGPARAPET 1BUILDINGPARAPET 2PARAPET 3 ROOF DRAIN, WITH OVERFLOW.DRAIN & DAYLIGHT ONTO PARAPET 2 ROOF.DAYLIGHT OVERFLOW ABOVE GRADE.PARAPET 2 ROOF DRAIN WITH OVERFLOW.DRAIN PARAPET 2 ROOF TO DAYLIGHTTO NEAREST LANDSCAPE OR STORM SEWER.DAYLIGHT OVERFLOW ABOVE GRADE. 14"
PER 1'-0" 14"PER 1'-0"5A8.05A8.014A8.014A8.014A8.014A4.02A4.02A4.02A4.02A4.02A4.013A4.013A4.036"x36"KEYED ACCESS,BY G.C.AWNING DRAIN TO DOWNSPOUTS,DAYLIGHT THOUGH CURB-O-LET TONEAREST ASPHALT.AWNING DRAIN TO DOWNSPOUTS,DAYLIGHT TO DRIVE-THRU AISLE.AWNING DRAIN TO DOWNSPOUTS,DAYLIGHT THOUGH CURB-O-LET TONEAREST ASPHALT.AWNING DRAIN TO DOWNSPOUTS,DAYLIGHT THOUGH CURB-O-LET TONEAREST ASPHALT.AWNING DRAINTO DOWNSPOUTS,DAYLIGHT THOUGHCURB-O-LET TONEAREST ASPHALT.PARAPET 1 ROOF DRAINWITH OVERFLOW. CONNECT TOPARAPET 2 DRAIN AND DAYLIGHTTO NEAREST LANDSCAPEOR STORM SEWER.DAYLIGHT OVERFLOWABOVE GRADE.DURO-LAST - ROOF TRAK III PADS-(GC TO VERIFY IN THE FIELD)-60"x60" PADS-60"x30" PADS3'-4"9 1/2"CRICKETCRICKET7A4.010A8.0BUILDINGPARAPET 38A4.0SIM.8A4.0P-8P-8P-86A4.06A4.06A4.06A4.0A4.0ROOF PLAN/ ROOFDETAILS““”“””SHEET NAME:SHEET NUMBER:DESCRIPTION:DATE:REV:Project No: CA4101
Dutch Bros Coffee - New Freestanding Store
DB2040-A2
SOUTH OF SWC OF JEFFERSON ST & FRED WARING DR.
LA QUINTA, CA 92253
PARCEL 4 PM 36241, P.M.B. 235/1-7c ARMET DAVIS NEWLOVE &ASSOCIATES, AIA ARCHITECTS1330 OLYMPIC BLVD.SANTA MONICA, CALIFORNIA 90404PH 310 452-5533 FAX 310 450-4742DATE: 3/20/20
ELEVATION - DRIVE-THRU WINDOWSCALE: 1/4" = 1'-0"REAR ELEVATIONSCALE: 1/4" = 1'-0"ELEVATION - WALK-UP WINDOWSCALE: 1/4" = 1'-0"FRONT ELEVATIONSCALE: 1/4" = 1'-0"1243EXTERIOR FINISH SCHEDULEID TAGMATERIALMANUFACTURERMODELREMARKSZONE 1 (BODY) COLOR: DB BLUE OR LIGHT BROWN1AEXTERIOR CEMENTPLASTERSHERWIN WILLIAMSGP-0624DB BLUE; MEDIUM SAND/CEMENTPLASTER1BEXTERIOR CEMENTPLASTERPPG INDUSTRIESPPG1020-4 EL CAPITANLIGHT BROWN; MEDIUM SAND/CEMENTPLASTERZONE 2 (TOWER) (Z2) COLOR: REDWOOD2COMPOSITE SIDINGNICHIHAVINTAGE WOOD: REDWOODORIENTATION: HORIZONTALZONE 3 (3' BASE) (Z3) COLOR: SIOUX FALLS3WAINSCOTCORONADO STONEHONEY LEDGE: SIOUX FALLSORIENTATION: HORIZONTAL1A7.0STAINLESS STEEL SERVICE TRAY,DUTCH BROS FURNISHED,CONTRACTOR INSTALLED.PRE-FINISHED PARAPETCAP FLASHING,COLOR: LIGHT BROWN6" STEEL PIPE BOLLARD WITHPLASTIC SLEEVE,COLOR: DUTCH BROS BLUELED MENU BOARDEQ14METAL AWNING,SEE DETAIL 2/A4.03A7.02A7.0PRE-FINISHED PARAPET CAP FLASHING,COLOR: LIGHT BROWN4A7.06" STEEL PIPE BOLLARDWITH PLASTIC SLEEVE,COLOR: DUTCH BROS. BLUEPRE-FINISHED PARAPETCAP FLASHING,COLOR: LIGHT BROWNNICHIHA HORIZONTAL COMPOSITESIDING VINTAGE WOODCOLOR: REDWOOD 2METAL AWNING,SEE DETAIL 2/A4.02.5"x7.5"x.5" THIN BRICK TILE 3PRE-FINISHED PARAPETCAP FLASHING,COLOR: DUTCH BROS BLUEMETAL CANOPY,SEE DETAIL 2/A4.05A7.0NICHIHA HORIZONTAL COMPOSITESIDING VINTAGE WOODCOLOR: REDWOOD 2PRE-FINISHED PARAPETCAP FLASHING,COLOR: LIGHT BROWNPRE-FINISHED PARAPETCAP FLASHING,COLOR: LIGHT BROWNT.O. PARAPET 3+24'-0"T.O. PARAPET 2T.O. CAP+3'-0"T.O. SLAB+0'-0"METAL AWNING,SEE DETAIL 2/A4.0METAL AWNING,SEE DETAIL 2/A4.0WALL MOUNTEDLIGHT FIXTURE1A7.0LIGHTED SIGN,INSTALLED BY SIGN CONTRACTOR,COORDINATE WITH ELECTRICALJ-BOX AND BLOCKING REQUIREMENTSPRE-FINISHED PARAPETCAP FLASHING,COLOR: LIGHT BROWNPRE-FINISHED PARAPETCAP FLASHING,COLOR: LIGHT BROWNMETALAWNING2A7.0STUCCOCOLOR: DB BLUE1A+24'-0"T.O. PARAPET 3T.O. PARAPET 2B.O AWNING+10'-6"T.O. PARAPET 1+11'-0"T.O. CAP+3'-0"T.O. SLAB+0'-0"T.O. PARAPET 3T.O. PARAPET 2T.O. CAP+3'-0"T.O. SLAB+0'-0"T.O. PARAPET 3T.O. PARAPET 2T.O. CAP+3'-0"T.O. SLAB+0'-0"METAL AWNING,SEE DETAIL 2/A4.078" EXTERIOR CEMENT PLASTERW/ MEDIUM SAND FINISH, TYP.COLOR: DB BLUE1AB.O AWNING+10'-6"T.O. PARAPET 1+11'-0"B.O AWNING+10'-6"B.O AWNING+10'-6"T.O. PARAPET 1+11'-0"1B4A7.05A7.01AOVERFLOW DOWNSPOUT,COORD. W/ PLUMBING.OVERFLOW DOWNSPOUT,COORD. W/ PLUMBING.WEATHERPROOFUSB OUTLET+20'-10 1/2"+20'-10 1/2"+24'-0"+20'-10 1/2"+20'-10 1/2"+24'-0"PRE-FINISHED PARAPETCAP FLASHING,COLOR: DB BLUE2.5"x7.5"x.5" THIN BRICK TILE 32.5"x7.5"x.5" THIN BRICK TILE 3SCONCE LIGHTS,8'-0" B.O. FIXTURESSCONCE LIGHTS,8'-0" B.O. OF FIXTURES21680ADDRESS NUMBERS:-12" ARIAL FONT-2" STROKE-SATIN ALUM. FINISH-VERIFY FINAL LOCATIONPRE-FINISHED PARAPETCAP FLASHING,COLOR: DUTCH BROS. BLUELED MENU BOARDEQ14SCONCE LIGHTS,8'-0" B.O. FIXTURES19'-8"78" EXTERIOR CEMENT PLASTERW/ MEDIUM SAND FINISH, TYP.COLOR: LIGHT BROWN1BFREEZE PROOFHOSE BIB, COORD.W/ PLUMINGEXTERIOR DOOR, PAINTED,LIGHT BROWN2.5"x7.5"x.5" THIN BRICK TILE 378" EXTERIOR CEMENT PLASTERW/ MEDIUM SAND FINISH, TYP.COLOR: LIGHT BROWN1BLIGHTED SIGN,INSTALLED BY SIGN CONTRACTOR,COORDINATE WITH ELECTRICALJ-BOX AND BLOCKINGREQUIREMENTSLIGHTED SIGN, INSTALLED BY SIGNCONTRACTOR, COORDINATE WITHELECTRICAL J-BOX AND BLOCKINGREQUIREMENTSLIGHTED SIGN, INSTALLED BYSIGN CONTRACTOR,COORDINATE WITH ELECTRICALJ-BOX AND BLOCKING REQUIREMENTS78" EXTERIOR CEMENT PLASTERW/ MEDIUM SAND FINISH, TYP.COLOR: DB BLUE1A78" EXTERIOR CEMENT PLASTERW/ MEDIUM SAND FINISH, TYP.COLOR: DB BLUE1A78" EXTERIOR CEMENT PLASTERW/ MEDIUM SAND FINISH, TYP.COLOR: DB BLUE1A78" EXTERIOR CEMENT PLASTERW/ MEDIUM SAND FINISH, TYP.COLOR: LIGHT BROWN1BNICHIHA HORIZONTAL COMPOSITESIDING VINTAGE WOODCOLOR: REDWOOD 2A6.0BUILDING ELEVATIONS““”“””SHEET NAME:SHEET NUMBER:DESCRIPTION:DATE:REV:Project No: CA3703
Dutch Bros Coffee - New Freestanding Store
DB2040-A2
SOUTH OF SWC OF JEFFERSON ST & FRED WARING DR.
LA QUINTA, CA 92253
APN: 604-521-011c ARMET DAVIS NEWLOVE &ASSOCIATES, AIA ARCHITECTS1330 OLYMPIC BLVD.SANTA MONICA, CALIFORNIA 90404PH 310 452-5533 FAX 310 450-4742DATE: 4/10/20
JEFFERSON STREETGM
PROPOSED
DUTCH BROS
862 SF
Existing light standard
Relocated light standard New light standard to match
existing
ARMET DAVIS NEWLOVE ARCHITECTS
PHONE: 310-773-7772
Paint Color (Main Building):
"Dutch Bros Blue" (Custom)
Awning Paint Color:
"Dutch Bros Gray" (Custom)
Tower Finish Material:
Nichiha Vintage Wood Fiber
Cement Panels
Color: "Redwood"
Stone Veneer Wainscot:
Coronado Honey Ledge
Color: Sioux Falls
Dutch Bros Coffee
SWC Fred Waring Dr.&
Jefferson St.
La Quinta, CA.
Paint Color (Main Building) :
"El Capitan" PPG1020-4
translutions, inc.
17632 Irvine Boulevard, Suite 200,
Tustin, California 92780
Phone (949)656-3131 Fax (949)445-3131
solutions@ translutions.com
the transportation solutions com pany...
March 19, 2020
Mr. Ryan Ramey, Project Manager
Cole Valley Partners
3519 NE 15th Ave, Suite 251
Portland, Oregon 97212
(via email)
Subject: Jefferson Square Coffee Shop – Trip Generation Analysis
Dear Ryan:
Translutions, Inc. (Translutions) is pleased to provide this letter report evaluating the trip generation for Pad A of the Jefferson Square
project in the City of La Quinta, The purpose of this letter report is to identify if the proposed project is likely to result in more impacts
than the approved project.
APPROVED PROJECT
The approved Jefferson Square planned for approximately 90,000 square feet of retail use, of which Pad A was considered as a drive
through bank of approximately 4,500 square feet. Translutions prepared a trip generation analysis for Pad A using rates for Land Use:
912 - "Drive-in Bank" from the Institute of Transportation Engineers’ (ITE), Trip Generation, 10th Edition. Table A (all tables attached)
shows the trip generation for Pad A if it were developed as a bank. As shown in Table A, the bank use is forecast to generate 43 trips
in the a.m. peak hour, 93 trips in the p.m. peak hour, and 450 daily trips.
Banks, shopping centers and fast food uses will typically draw some of its trips from the adjacent street traffic, so that some of the
project trips are not actually “new” trips to the adjacent circulation system. These trips are referred to as “pass-by” trips. Pass-by trips
are trips that are on the roadway immediately adjacent to the retail center which make intermediate stops on the way from an origin
to a primary trip destination without route diversion. Therefore, pass-by trips only occur at the driveways of all shopping centers.
Based on the ITE Trip Generation, pass-by trips account for 29% of the a.m. peak hour trips and 35% of the p.m. peak hour trips for
drive through banks. ITE Trip Generation does not provide daily pass-by rates, but to present a conservative analysis, we have applied
the higher pass by rates to minimize trips for the baseline scenario. For the proposed project, pass-by trips are forecast to be 12 trips
during the a.m. peak hour, 33 trips during the p.m. peak hour, and 158 daily trips. After taking credit for pass-by trips, the net new trip
generation for the proposed project is forecast to be 31 trips during the a.m. peak hour, 60 trips during the p.m. peak hour, and 292
daily trips.
PROPOSED PROJECT
The proposed project proposes a drive through coffee shop with no indoor seating. The coffee shop will be 862 square feet in size
and provides two drive-through lanes. Figure 1 shows a schematic site plan for the proposed project.
The trip generation analysis for Pad A were developed using rates for Land Use: 938 - "Coffee/Donut Shop with Drive-Through
Window and No Indoor Seating” from the ITE Trip Generation, 10th Edition. Table B shows the trip generation for Pad A for the
proposed project. As shown in Table B, the bank use is forecast to generate 291 trips in the a.m. peak hour, 72 trips in the p.m. peak
hour, and 1,754 daily trips.
Pass-by trips also occur for coffee shops. Based on the ITE Trip Generation, pass-by trips account for approximately 89% of trips for
all analysis hours. For the proposed project, pass-by trips are forecast to be 291 trips during the a.m. peak hour, 64 trips during the
p.m. peak hour, and 1,534 daily trips. After taking credit for pass-by trips, the net new trip generation for the proposed project is
forecast to be 32 trips during the a.m. peak hour, 8 trips during the p.m. peak hour, and 190 daily trips.
The project proposes two drive-through lanes with stacking for 19 vehicles, which is a very conservative for coffee shops. The drive-
through lane is oriented in a way so that even in the unlikely scenario that queues extend beyond the available stacking space, traffic
will not overflow onto public streets.
3/19/2020 (\\TRANSLUTIONS\Projects\CVP - La Quinta\Trip Gen Memo.docx) 2
the transportation solutions company...
DISCUSSION & CONCLUSION
Based on discussion with City staff, if the project trip generation for a modification to an existing use results in similar trip generation,
impacts to adjacent roadways are unlikely to be worse. Table C shows the comparison of net trips generated by the planned and
proposed project. As seen on Table C, the proposed project is anticipated to generate 1 more trip during the a.m. peak hour, 52 fewer
trips during the p.m. peak hour, and 102 fewer daily trips. Based on the above discussion, it is our professional opinion that the
proposed project will not result in additional impacts than those disclosed in the environmental documents for the approved project.
We hope you will find this information helpful. Should you have any questions, please don’t hesitate to call or email us.
Sincerely,
translutions, Inc.
Sandipan Bhattacharjee, P.E., T.E., AICP, ENV SP
Principal
Attachments:
1. Table A - Approved Project (Bank) Trip Generation
2. Table B - Project Trip Generation
3. Table C - Change in Trip Generation
4. Figure 1 – Site Plan
the transportation solutions com pany...
Land Use In Out Total In Out Total Daily
Bank with Drive Through
Trip Generation Rates 1 4.75 4.75 9.50 10.23 10.23 20.45 100.03
Trip Generation 4.500 TSF 21 22 43 46 47 93 450
Pass By Trips 2 29% AM & Daily/35% PM (6) (6) (12) (16) (17) (33) (158)
Total Net Trips 15 16 31 30 30 60 292
Total Net Trip Generation 15 16 31 30 30 60 292
1
2 Pass-By rates based on rates for Land Use: 912 - "Drive-in Bank" from ITE Trip Generation Handbook (3rd Edition).
Table A - Approved Project (Bank) Trip Generation
A.M. Peak Hour P.M. Peak Hour
Units
Notes: TSF = Thousand Square Feet
Trip generation based on rates for Land Use: 912 - "Drive-in Bank" from Institute of Transportation Engineers' (ITE) Trip Generation (10th Edition).
Project Trips.xlsx\Trip Gen Bank
the transportation solutions com pany...
Land Use In Out Total In Out Total Daily
Coffee Shop with No Indoor Seating
Trip Generation Rates 1 168.52 168.52 337.04 41.67 41.67 83.33 2000
Trip Generation 0.862 TSF 145 146 291 36 36 72 1,724
Pass By Trips 2 89%(AM, PM, Daily) (129) (130) (259) (32) (32) (64) (1,534)
Total Net Trips 16 16 32 4 4 8 190
Total Net Trip Generation 16 16 32 4 4 8 190
1
2 Pass-By rates based on rates for Land Use: 938 - "Coffee/Donut Shop with Drive-Through Window and No Indoor Seating" from ITE Trip Generation Handbook (3rd
Edition).
Trip generation based on rates for Land Use: 938 - "Coffee/Donut Shop with Drive-Through Window and No Indoor Seating" from Institute of Transportation Engineers'
(ITE) Trip Generation (10th Edition).
Table B - Project Trip Generation
A.M. Peak Hour P.M. Peak Hour
Units
Notes: TSF = Thousand Square Feet
Project Trips.xlsx\Trip Gen Coffee
the transportation solutions com pany...
Land Use In Out Total In Out Total Daily
Coffee Shop with No Indoor Seating 0.862 TSF 16 16 32 4 4 8 190
Bank with Drive Through 4.50 0 15 16 31 30 30 60 292
Change in Trip Generation 1 0 1 -26 -26 -52 -102
Table C - Change in Trip Generation
A.M. Peak Hour P.M. Peak Hour
Units
Notes: TSF = Thousand Square Feet
Project Trips.xlsx\Change
FIGURE 1Jefferson Plaza Coffee Site Planthe transportation solutions company...\\TRANSLUTIONS\Projects\CVP - La Quinta\Z30 Site Plan.xlsx (3/19/2020)