14-0370 (SFD) Geotechnical Investigation ReportSladden Engineering 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemet, CA. 92543 (951) 766-8777 Fax (951) 766-8778 January 30, 2014 Mr. Mark McClure c/o Hayer Architecture 445 Marine View Avenue, Suite 280 Del Mar, California 92014 Subject: Geotechnical Update Project: Custom Residence Lot 67B - The Madison Club La Quinta, California Project No. 544-14020 14-01-039 Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated January 28, 2005; Project No. 544-4810, Report No. 05-01-101 Report of Testing and Observation During Rough Grading prepared by Sladden Engineering dated March 2, 2006; Project No. 522-4810; Report No. 06-02-120 As requested, we have reviewed the above referenced geotechnical reports as they relate to the design and construction of the proposed custom residence to be to be constructed on Lot 67B within the Madison Club development in the City of La Quinta, California. It is our understanding that the proposed residential structure will be of relatively lightweight wood - frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. s The subject lot was previously graded during the rough grading of the Madison Club project site. The rough grading included recompaction of the native surface soil along with the placement of engineered fill material to construct the building pad. The site grading is summarized in the referenced report of Testing and Observation During Rough Grading along with the compaction test results. Because the lot has been previously should be minimal provided that tl building envelope. The building az moisture conditioned prior to precis minimum of 90 percent relative coml and any fill material should be pl; compacted to at least 90 percent relq' rough graded, the remedial grading required at this time ,e building area that falls within the previously assumed s should be cleared of sur€ace vegetation, scarified and ��.fil LA 0; �igradAkD'Tliea exposed surfaceyX ould be compacted to a ,action prz�dtt�o�# l' lac&nent. jTher,•previously removed soil .ced inLhn lifts at�near[optzmum �oisture content and �ujv� ve compa//ccppti�on..�� (JC7 i�tv January 30, 2014 -2- Project No. 544-14020 14-01-039 The referenced reports include. recommendations pertaining to the construction of residential structure foundations. The previous reports ' also address the potential for liquefaction, subsidence and differential settlement. Based upon our review of the referenced reports, it is our opinion that the structural values included in these reports remain applicable for the design and construction of the proposed residential structure 'foundations. The allowable bearing pressures recommended in the referenced Geotechnical Investigation report remain applicable.. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing. pressures of 1500 psf and 2000 psf, respectively. Allowable increases of 300 psf for each additional 1 foot of width and 300 psf for each additional 6 inches of depth maybe utilized, if desired. The maximum allowable: bearing pressure should be 3000 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. Lateral forces may be resisted by friction along the base of the foundations and passive resistance along the sides of the footings. A friction coefficient of 0.48 times the normal dead load forces is recommended for use in design. Passive resistance may be estimated using an equivalent fluid weight of 300 pcf. If used in combination with the passive resistance, the frictional resistance should be reduced by one third to 0.33 times the normal dead load forces. The bearing soil is generally non -expansive and falls within the "very low" expansion category in accordance with the 2013 (CBC) classification criteria. Pertinent 2013 CBC Seismic Design parameters are summarized on the following page. Sladden has reviewed the 2013 California Building Code (CBC) and summarized the current seismic design parameters for the proposed structure. The seismic design category for a structure may be determined in accordance.with Section 1613 of the 2013 CBC or ASCE7. According to the 2013 CBC, Site Class D may be used to estimate design seismic loading for the proposed structures. The 2013 CBC Seismic Design Parameters are summarized below. Risk Category (Table 1.5-1): I/II/III Site Class (Table 1613.3.2): D Ss (Figure 1613.3.1): 1.6338 S1 (Figure 1613.3.1): 0.7748 Fa (Table 1613.3.3(1)):1.0 Fv (Table 1613.5.3(2)):1.5 Sms (Equation 16-37 (Fa X Ss)): 1.633g Sm1 (Equation 16-38 {Fv X S1)): 1.160g SDs (Equation 16-39 (2/3 X Sms)): 1.088g SM (Equation 16-40 (2/3 X Sm1)): 0.774g Seismic Design Category: E Sladden Engineering January 30, 2014 -3- Project No. 544-14020 14-01-039 We appreciate the opportunity to provide service to you on this project, if you have any questions regarding this letter or the referenced reports please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING _ 1 l c Copies: 4/ Mr. Mark McClure c/o Hayer Architecture Sladden Engineering - LA QUINTA Please verify that soils reports contain all of the above information. In addition, to assure continuity between'the investigation/reporting stage and the execution stage, please use the following checklist to verify that the conclusions and recommendations in the report coverall the required elements. Only then. can we be assured that the construction documents address all of the site soil conditions. U Quinta Geotechnical Report Checklist Does the "Conclusions and Recommendations" section of the report address each of the following criteria? "Address" means: (a) the criterion is considered significant.and mitigation measure(s) noted, Or; (b) the criterion is considered insignificant and explicitly.so stated. Yes'No Criterion ❑ Foundation criteria based upon bearing capacity of natural or compacted soil. ❑ Foundation criteria to mitigate the effects of expansive soils. ® Foundation criteria based upon bearing capacity. -of natural or --compacted soil. ❑ Foundation criteria to mitigate the effects of liquefaction. Lv ❑ Foundation criteria. to mitigate the effects of seismically induced differential �v settlement. ❑ Foundation criteria to mitigate the effects of long-term differential settlement. ❑ Foundation criteria to mitigate the effects of varying soil strength. . ❑ Foundation criteria to mitigate expected total and differential settlement. Any "No" answers to the -above checklist should be noted as specific required coh'ections. `d^ *,Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 80621 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 March 2, 2006 Project No. 522-4810 06-02-120 East of Madison, LLC 80-349 Via Mirasol La Quinta, California 92253 Project: Madison Club - Tract 33076 NWC Avenue 54 and Monroe Street La Quinta, California Subject: Report of Observations and Testing During Rough Grading Ref: Geotechnical Investigation Report prepared by Sladden Engineering dated January 28, 2005, Project No. 544-4810; Report No. 05-01-101 Summarized in this report are the results of in-place density tests performed at the subject site during the rough grading of the building pads along with pertinent observations. The subject site is located on the northwest corner of Avenue 54 and Monroe Street in the City of La Quinta, California. Rough grading was' performed by Nuevo Engineering using conventional heavy equipment. The building pad areas were overexcavated to a depth of at least 3 feet below existing grade or 4 feet below pad grade, whichever was deeper. ;Deep removals up to 10 feet in depth were performed in areas where substantial roots were encountered. The previously removed native soils and native soils obtained from cut areas of the site were placed in thin 'lifts.st near optimum moisture content and compacted to at least 90 percent relative compaction. The overexcavation generally extended laterally at least 5 feet beyond the previously approved building setbacks as indicated on the rough grading plans prepared by RCE. The remedial grading including overexcavation of the surface soil was performed as recommended within the above referenced Geotechnical Investigation report. Observations and field testing was performed from April 22, 2005 through January 4, 2006. Testing indicates that after reworking areas of low density, a minimum of 90 percent relative compaction was attained in the areas tested. The passing test results indicate compliance with the project specifications at the-testednlocatioM and depths but are no guarantee or warranty of the contractors work. LDATE TY OF UN TY 0 IN rp SAFETY'BUILDING & SETA PT.RECEIVED FOR CO'NGI'J�; RUCTd0PV ����� APR 0.4 2014 :U B CITY OF LA QUINTA COMMUNITY bEVELOPMENT 1 � March 2, 2006 2- Project No. 522-4810 06-02-120 Field Tests: In-place moisture/density tests. were performed using a nuclear density gauge in accordance with test methods ASTM D 2922 and ASTM D 3017. A total of 2355 density tests were performed by Sladden Engineering personnel during rough grading. the approximate test locations are indicated by lot number and on the attached plans and test results are summarized on the attached data sheets. Laboratory Tests: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with test method ASTM D 1557-91. Allowable Bearing Pressures: The structural values recommended in the referenced Geotechnical investigation report prepared by Sladden Engineering remain applicable for use in foundation design. Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressures of 1.500 psf and 1800 psf, respectively. The allowable bearing pressures are for dead and frequently applied live loads and may be increased by 1/3 to resist wind, seismic or other transient loading. The recommended allowable bearing pressures may be increased. by one- third for wind and seismic loading. The bearing soils are non -expansive and fall within the "very low' expansion category in accordance with Uniform Building Code (UBC) classification criteria. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. , Respectfully submitted SLADDEN ENGIKI EKING . AN4F����� Brett L. Mn y m No C 45399 Z m Principal Engineer a Exp. 9130106 M Grading/lh ST ClV\\- Q��P �TFOF CAG�FO Copies 4/East of Madison, LLC { TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tart No, I Date Testcd l Location Elcvation Dry Density In Place % Moisture In Place Relative Compaction Maximum I)enqity Building Pads 1 0422-05 Lot 8A back half 992 109.2 10.2 99 110.0 2 04-22=05 Lot 8A back half 99.4. 104.4 8.0 95 110.0 3 0422-05 Lot 8A front half -992 106.6 9.7 97 1.1.0.0 4 04-22-05 Lot 8A front half 994 105.6 12.4 96 110.0 5 04-22-05 Lot 9A back half 992 109.2 11.0 I 99 110.0 6 04-22-05 Lot 9A back half 994 101.7 8.5 92 110.0 7 04-22-05 Lot 9A front half 992 109.0 10.3 99 110.0 8 04-22-05 Lot 9A front half 994 104.1 10.6 95 110.0 9 04-22-05 Lot 10A back half 991 100.11 19.3 91. 110.0 10 04-22-05 Lot 10A back half . 992 106.6 13.2 97 11.0.0 11 04-22-05 Lot 10A front half 993 1.06.3 15.0 97 110.0 12 04-22-05 Lot 10A front half 1995 98.7 12.0 90 110.0 13 04-25-05 Lot 14A front half 988 105.4 10.4 96 110.0 14 04-25-05 Lot 14A front half ' 990 106.1 8.6 96 110.0 15 04-25-05 Lot 14A back half 995 106.3 9.4 92 110.0 16 04-25-05 Lot 14A back half 993 103.4 12.0 94 120.0 17 04-25-05 Lot 1.2A back half 996 98.9 10.3 90 110.0 18 04-25-05 Lot 12A back half 998 107.9 13.0 98 110.0 19 04-25-05 Lot 12A front half 1000.5 101.6 12.0 92 1.10.0 20 04-25-05 I i..ot 12A front half 98.5 108.9 11.3 j 99 110.0 21 04-25-05 Lot 11A back half '991 98.6 8.0 I 90 110.0 22 04-25-05 I Lot 11A back half 993 100.0 12.3 I ; 91 i 110.0 23 04-25-05 Lot 11A front half 991 103.6 10.1 i 94 110.0 24 04-25-05 Lot 11A front half 993 98.4 8.2 90 I 110.0 25 04-25-05 i Lot 15A back half 991 105.3 9.6 96 110.0 26 04-25-05 i Lot 15A back half 993 1.09.1 8.9 j 99 i 110.0 27 04-25-05 ' Lot 15A front half 992 104.2 9.7 I 95 110.0 28 04-25-05 Tot 15A front half 994 104.0 7.6 ( 95 110.0 29 04-25-05 Lot 13A back half 996 109.6 7.3 99 i 110.0 30 04-25-05 Lot 13A back half 998 103.9 7.6 94 i 110.0 31 0425-05 Lot 13A front half 992 109.9 12.2 99 110.0 32 04-25-05 Lot 13A front half 994 107.2 13.7 98 11.0.0 33 0425-05 Lot 12A front ha If 1002.5 109.7 12.5 99 110.0 34 04-25-05 Lot 12A front half 1004.5 98.9 8.9 90 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME,; Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date TestedLocation Elevation Dry Density % Moisture I Relative Maximum I _ I in Place I in Place Comnaction r)enairy DATE: Murch 2, 2006 995 109.7 Over -excavation 35 04-26-05 Lot 15A back half 36 04-26-05 Lot 15A back half 37 04-26-05 Lot 14A back half 38 04-26-05 Lot 14A back half 39 04-26-05 Lot 13A back half 40 04-26-05 Lot 13A back half 41. 04-26-05 Lot 12A back half 42 04-26-05 Lot 12A back half 43 04-26-05 Lot 11A back half 44 04-26-05 Lot 11A back half 45 04-26-05 Lot 10A back half 46 f 04-26-05 Lot 10A back half 47 04-26-05 Lot 9A back half 48 04-26-05 Lot 9A back half 49 04-26-05 Lot 8A back half 50 04-26-05 Lot 8A back half 51 04-26-05 Lot 8 B 52 04-26-05 Lot 8 8 53 04-26-05 Lot 6 B 54 04-26-05 Lot 6 B 55 I 04-26-05 Lot 6 B 56 04-26-05 Lot 6 B 57 04-26-05 I Lot 4 B 58 04-26-05 Lot 4. B 59 04-26-05 ! Lot 5 B 60 04-26-05 i Lot 513 61 04-26-05 Lot 8 A front half 62 04-26-05 Lot 8 A front half 63 04-26-05 Lot 9 A front half 64 I 04-26-05 Lot 9 A front half 6504-27-05 110.0 Lot 13 A front half 66 i 04-27-05 Lot 13 A front half 67. I 04-27-05 Lot 13 A front half 68 04-27-05 Lot 13 A front half 69 04-27-05 Lot 13 A front half 70 04-27-05 Lot 13 A front half 71 04-27-05 Lot 13 A front half 72 04-27-05 Lot 13 A front half 73 04-27-05 Lot 13 A front half 74 0427-05 Lot 13 A front half DATE: Murch 2, 2006 995 109.7 11.1 99 110.0 997 109.4 4.8 99 110.0 .999 109.4 11.9 99 110.0 1001 105.8 12.0 96 '110.0 1000 107.3 13.5 97 110.0 1002 103.3 7.6 94 I 110.0 1000 109.5 7.3 99 110.0 1000 109.6 6.1 99 110.0 995 104.7 9.6 95 1100 997 108.9 9.3 99 110.0 995 109.6 13.0 99 110.0 997 107.5 14.4 98 110.0 996 109.1 9.4 99 110.0 .998 108.9 7.8 _ 99 110.0 996 109.9 13.8 I 99 11.0.0 998 106.9 11.7 97 110.0 993.3 99.0 21.2 90 1.10.0 994.3 103.6 10.9 94 110.0 994.6 99.9 14.3 91 110.0 996.6 108.0 9.5 98 ; 110.0 994.0 99.2 12.9 90 110.0 996.0 103.9 13.7 94 110.0 995.3 90.3 9.3 82* 110.0 995.3 103.4 11.3 94 110.0 996.3 99.2 I 15.8 90 110.0 994.0 105.3 12.0 96 110.0 996 109.6 8.2 99 110.0 998 109.3 8.6 99 110.0 996 107.7 I 9.7 97 110.0 998 102.1 8.4 93 1.10.0 994 103.9 8.8 94 i 110.0 996 105.4 10.1 96 I 1.1.0.0 990 101.8 9.3 93 j 110.0 992 106.9 11.4 97 110.0 994 104.5 8.3 95 110.0 996 105.8 13.1 96 110.0 997 108.1 11.4 98 110.0 998 106.8 10.9 97 110.0 99.4. 1.06.1. 9.8 96 120.0 995 103.8 8.6 94 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date TestedI Location Elevation Dry Dcrwity I In Place % Moisture In Place Relative m a Coction Maximum Density 75 04-27-05 Lot 17 A front half 993.5 106.1 9.8 96 110.0 76 04-27-05 Lot 26 A front half 988 103.0 6.9 94 110.0 77 04-27-05 Lot 26 A front half 990 1.05.6 7.2 96 110.0 78 04-27-05 Lot 25 A front half 988 1015 8.1 92 110.0 79 04-27-05 Lot 25 A front half 990 102.8 7.9 93 110.0 80 04-27-05 Lot 24 A front half 988 100.3 9.1 91 110.0 81 04-27-05 Lot 24 A front half 990 102.5 8.0 93 110.0 82 04-27-05 Lot 8 A Back half 2 994.5 106.9 10.5 97 110.0 83 04-27-05 Lot 8 A Back half 996.5 104.7 12.5 95 I 110.0 84. 04.27-05 Lot 9 A Back half 994 107.0 11.6 97 110.0 85 04-27-05 Lot 9 A Back half 996 105.3 13.4 96 110.0 86 04-28-05 Lot 24 A back half 989 103.0 ( 9.6 94 110.0 87 04-28-05 Lot 24 A back half 991 i 104.4 12,9 95 7 :1.0.0 88 04-28-05 Lot 25 A back half 993 99.6 10.3 91 110.0 89 04-28-05 Lot 25 A back half 995 105.3 7.4 96 110.0 90 04-28-05 Lot 26 A back half I 993 98.7 6.7 i 90 110.0 91 04-28-05 Lot 26 A back half 995 106.6 11.6 I 97 110.0 92 04-28-05 Lot 24 A front half 992 102.5 13.3 93 110.0 93 04.-28-05 Lot 24 A front half 994 I 110.3 10.8 91 110.0 94 j 04-28-05 Lot 25 A front half 992 103.6 11.5 94 110.0 95 04-28-05 Lot 25 A front half 994 1 100.5 10.3 92 '110.0 96 04-28-05 Lot 20 A front half 992 108.6 9.1 99 110.0 97 04-28-05 Lot 20 A front half 994 i 109.6 6.4 99 110.0 98 ! 04-28-05 Lot 21 A front half 992 108.7 7.1 99 110.0 99 04-28-05 Lot 21 A front half 994 102.8 5.5 I 93 110.0 100 04-28-05 Lot 22 A front half 992 I 107.2 " 5.1 I 97 110.0 101 04-28-05 Lot 22 A front half 994 I 100.6 I 11.5 I 91 110.0 102 04-28-05 Lot 26 A front half 992 109.1 9.5 j 99 110.0 103 04.-28-05 ! Lot 26 A front half 994 107.7 ! 7.8 ! 98 I 110.0 104 , 04-28-05 Lot 24 A Back half 993 101.7 9.8 I 97 110.0 '105 04-28-05 Lot 24 A Back half 995 105.4 9.8 j 96 I 110.0 106 04-28-05 Lot 25 A Back half 996 106.8 11.3 97 110.0 107 04-28-05Lot 25 A Back half 998 101.3 6.7 92 110.0 108 04-28-05 Lot 26 A Back half 996 105.5 6.3 96 110.0 109 04-28-05 Lot 26 A Back half 998 100.9 7.3 92 110.0 110 04-29-05 Lot 16 A back half 994.5 102.4 8.3 93 110.0 11.1 04-29-05 Lot 16 A Back half 996 100.1 7.6 91 110.0 112 04-29-05 Lot 15 A Back half 996 97.0 10.8 88w 110.0 113 04-29-05 Lot 14 A Back half 999 104.5 12.9 95 110.0 114 04-29-05 Lot 13 A Back half 999 101.8 9.0 I 93 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No, Date Tested Location Elevation Dry Density I % Moisture RelativeMaximum In Place I fn Place Compaction I Densitv 115 04-29-05 Lot 21 A Back half 116 04-29-05 Lot 21 A Back half 117 04-29-05 Lot 20 A Back half 118 04-29-05 Lot 20 A Back half 119 04-29-05 i Lot 1.8 A Back half. 120 04-29-05 I Retest # 57 121 04-29-05 Lot 4 B Back half 122 05-02-05 Lot 21 A Back Half 123 05-02-05 Lot 21 A Back Half 124 05-02-05 Lot 23 A Back Half 125 i 05-02-05 Lot 23 A Back Half 126 05-02-05 Lot 21 A Front Half 127 05-02-05 Lot 21 A Front Half 128 05-02-05 Lot 24 A Back Half 1.29 05-02-05 Lot 24 A Back Half 130 05-02-05 Lot 24 A Back Half 131 05-02-05 Lot 24 A Back Half 132 05-02-05. Lot 24 A Center 1.33 05-02-05 Lot 25 A Center. 134 05-02-05 i Lot 26 A Center 135 05-02-05 Lot 24 A Front Half 136 05-02-05 I Lot 25 A Front Half 137 05-02-05 i Lot 26 A 'Front Half 138 05-02-05 1 Lot 23 A Front Half 1.39 05-02-05 i Lot 23 A front Half 140 05-02-05 Lot 22 A Front Half 141 05-02-05 Lot 22 A Front Half i 142 05-03-05 Lot 20 A Front Half 143 05-03-05 I Lot 20 A tack Half 144. ! 05-03-05 Lot 20 A Back Half 145 05-03-05 Lot 25 A Back Half 146 05-03-05 Lot 25 A Back Half 147 05-03-05 Lot 25 A Front Half .148 05-03-05 Lot 25 A Front Half 149 05-03-05 Lot 24 A Front Half 1.50 I 05-03-05 Lot 24 A Front Half 151 I 05-03-05 Lot 23 A Front Half 1.52 05-03-05 Lot 23 A Front Half 153 I 05-03-05 Lot 22 A Back Half 154 I 05-03-05 Lot 22-A Back Half DATE: March 2, 2006 992.2 99.6 10.8 91 110.0 994 99.1 111 90 110.0 993.2 103.2 8.8 94 110.0 994.5 102.4 10.1 93 110.0 995.6 94.1 12.8 86* 110.0 106.0 9.1 96** 110.0 997 107.5 12.2 1 98 110.0 995 102.9 17.4 93 110,0 996.5 101.5 9,8 92 110.0 993 108.1 7.4 98 110.0 995 I 103.2 13.1 96 110.0 996 107.6 9.5 98 11.0.0 .997.5 103.7 1 6.9 94 110.0 996 106.3 1 14.0 97 11.0.0 997.5 100.9 i 12.8 92 110.0 998.5 104.6 ! 15.1 95 110.0 999.5 101.9 13.2 I 93 1 J 11010 .994 106.3 14.1 I 97 110.0 993 105.1 12.2 I 96 110.0 994 105.8 13.5 96 110.0 995.5 101.8 10.4 93 I 110.0 995.5 106.6 13.0 97 110.0 996 105.0 11.9 95 110.0 994 106.3 1 14.0 97 1 110.0 996 100.9 12.8 92 i 1.10.0 995.5 104.6 1.5.1. 95 110.0 996.5 101.9 13.2 93 110.0 996 95.4 I 25.1 I 81* 1 110.0 996 107.1 i 8.8 97 i 110.0 997.5 104.7 1 11.4 95 I 110.0 999 103.5 16.9 94 110.0 1000 101..3 17.4 92 110.0 997 99.9 17.1 90 110,0 999 108.2 7,7 98 110.0 997 99.5 16.0 90 110.0 999 99.2 20.1 90 I 1.10.0 998 106.4 14.6 97 i 110.0 1000 101.0 15.2 92 110.0 997 10.4.9 14.9 95 110.0 999 109.4 11.7 99 110.0 Sladden Engineering . TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Datc Tt:stcd I Location Elevation Dry Density I % Moisture I Relative I Maximum I in Place In Place I Compaction Densi 755 05-03-05 Lot 23 A Back Half 996 102.9 16.8 93 110.0 156 05-03-05 Lot 23 A Back Half 998 100.6 12.9 91 110.0 157 05-03-05 Retest # 142 101.4 9,5 92** 11.0.0 158 05-03-05 Lot 20 A Center 998 103.9 12.2 94 110.0 1.59 05-03-05 Lot 21 A Center 996 99.9 13.6 91 110.0 160 05-03-05 Lot 21 A Center 997.5 109.7 .11.3 99 110.0 161 05-03-05 Lot 22 A Center' 995 106.3 74.1 96 � 110.0 162 05-03-05 Lot 22 A Center 997 i 107.1 15.0 97 110.0 163 05-03-05 Lot 23 A Center 996 I 108.7 11.3 99 110.0 164 05-03-05 Lot 24 A Center 998 109.1 14.2 99 110.0 165 05-04-05 Lot 54 A Center 988.7 I 107.7 i 6.9 98 110.0 166 05-04-05 Lot 54 A Center 990 I 99.1 14.8 90 11.0.0 167 05-04-05 Lot 53 A Center 988.3 105.8 I 6.7 96 110.0 168 ! 05-04.-05 Lot 53 A Center 990.5 I 102.5 I 7.8 93 110.0 169. I 05-04-05 Lot 54 A Front Half 990 1 105.4 I 6.8 96 1.10.0 170 05-04-05 Lot 54 A Fiont Half 992 I 101.7 10.0 1 92 110.0 171 05-04-05 Lot 53 A Front Half 7987.5 105.4 8.7 96 110.0 172 05-04-05 Lot 2 A Back Half 993 106.0 8.2 96 110.0 173 I 05-04.-0S Lot 1 A Back Half ,993.5 108.1 7.8 98 110.0 174 i 05-04-05 I Lot 1 A Back Half 995 101.3 6.6 92 110.0 175 05-04-05 Lot 1 A Center 993.5 108.4 7.6 98 110.0 176 05-04-05 Lot 1 A Center 995 99.8 11.5 90 1 110.0 177 i 05-04-05 Lot 2 A Center 991 106.4 5.8 97 170.0 178 05-04-05 Lot 2 A Center 992.5 98.9. 9.4 90 I 110.0 1.79 1 05-04-05 ! Lot 2 A Front Half 992.5 109.6 8.3 99 I 11.0.0 180 05-04-05 Lot 2 A Front Half 994 104.0 6.1 94 110.0 181 05-04-05 Lot 1. A Front Half 992 108.9 7.7 99 j 1.10.0 1.82 1 05-04-05 Lot 1 A Front Half 993.5 105.9 1 5.9 96 i 110.0 183 05-05-05- Lot 2 A Front Half '992.5 109.6 8.3 94 I 110.0 184 ; 05-05-05- Lot 2 A Front Half 994.5 104,0 4.3 94 110.0 185 05-05-05- Lot 1 A Front Half 992 108.0 7.7 99 110.0 1.86 05-05-05- Lot 1 A Front Half I 994 105.9 4.4 96 1 110.0 187 I 05-05-05- Lot 15 Back Half 999 10.4.6 1.3.6 I 95 110.0 1.88 ? •05-05-05- I Lot 1 B Back Half 1001 99.3 14.5 90 110.0 189 j 05-05-05 Lot 113 Center 1000 101.9 11.1 93 110.0 3.90 j 05-05-05 Lot 1 B Center 1002 102.2 12.9 1 93 110.0 191 ' 05-05-05 I Lot 2 8 Center 997 105.9 I 13.8 96 110.0 192 05-05-05 Lot 2 B Center 999 100.5 11.4 91 110.0 193 05-05-05 3 8 Front Half 998 109.6 11.5 99 110.0 194 05-05-05 3 B Front Half 1000 107.2 5.9 97 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.j Date Tested Location Elevation Dry Density % Moisture I Relative Maximum In Place In Place Comvaction I Density 195 05-05-05 Lot 2 B Front Half 196 05-05-05 Lot 2 B Back Half 197 05-05-05 Lot 2 B Back Half 198 05-05-05 l.ot 3 B Back Half 199 05-05-05 Lot 2 A Back Half 200 05-05-05 loot 1. A Back Half 201 05-05-05 Lot 1 A Back Half 202 05-05-05 Lot 1 A Center 203 05-05-05 Lot A Center 204 05-05-05 Lot 2 A Center 205 05-05-05 Lot 2 A Center 206 05-06-05 Lot 54 A Front Half 207 05-06-05 Lot 53 A Front Half 208 05-06-05 Lot 52 A Front Half 209 05-06-05 Lot 51 A Front Half 210 05-06-05 Lot 54 A Front Half 211 05-06-05 Lot 54 A Back Half 212 05-06-05 Lot 53 A Back Half 213 05-06-05 Lot 53 A Back Half 214 j 05-06-05 Lot 52 A Back Half 215 05-06-05 Lot 52 A Back Half 216 05-06-05 Lot 51 A Back Half 217 i 05-06-05 Lot 51 A Back Half 218 05-09-05 Lot 18 A Front 219 i 05-09-05 Lot 18 A Front . 220 1 05-09-05 Retest a 119 221 05-09-05 Lot 18 A Back 222 05-09-05 Lot 1.9 A Front 223 05-09-05 Lot 19 A Front 224 i 05-09-05 Lot 19 A Back 225 05-09-05 Lot 19 A Back 226 05-09-05 Lot 21 Front 227 05-09-05 Lot 21. Front 228 05-09-05 Lot 21 Back 229 05-09-05 Lot 21 Back 230 05-09-05 Lot 4 B Back 231 05-09-05 Lot 4 B Back 232 05-09-05 Lot 4 B Front 233 05-09-05 Lot 4 B Front 234 05-09-05 j Lot 7 B Hack DATE: March 2, 2006 997 100.1 8.8 91. i 110.01 1000 103.1 11.4 99 110.0 1002 102.8 12.1 93 110.0 999 104.5 10.2 95 11.0.0 993 106.0 8.2 96 110.0 993.5 109.1 7.8 99 11.0.0 995 101.3 5.4 92 110.0 993 108.4 7.6 98 110.0 995.2 99.8 11.52 90 110.0 991 106.4 4.5 97 110.0 993 98.9 9.4 90 110.0 993 .109.1 9.1 99 I 110.0 991.5 1 107.9 12.6 98 110.0 992 100.9 17.4 92 I 110.0 991 i 103.5 8.8 94 110.0 991 104.9 13.6 I 95 110.0 992.5 98.6 12.0 90 1 110.0. 988.5 104.3 1.3.6 95 110.0 990 1.01.0 15.8 92 110.0 988.5 105.3 16.1 96 110.0 990 107.5 1.0:0 98 110.0 990.5 105.9 I 171 96 11.0.0 992 107.6 16.9 98 110.0 994 108.9 16.1 99 110.0 996 106.1 12.5 96 110.0 109.7. 11.5 99- 110.0 999 107.9 13.8 i 98 110.0 996.5 106.1 8.5 96 110.0 997.5 102.8 8.6 93 110.0 991 104.9 14.1 95 i 110.0 997 106.4 14.8 97 11.0.0 998.5 106.1 13.3 96 ! 110.0 999.5 105.7 12.9 96 110.0 998 99.1 6.1 90 ' 110.0 1000 98.8 5.2 90 110.0 997 99.0 9.7 90 110.0 999 104.5 5.6 95 110.0 997 105.6 7.7 96 110.0 999 1.05.1 7.8 95 110.0 996 104.1 i 9.0 95 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 t Test No. Date Tested Location Elevation Dry Density % Moisture RelativeMaximum In Place In Place Comoaction I • Density 235 I 05-09-05 236 05-09-05 237 05-09-05 238 I 05-09-05 239 05-09-05 Lot 7 B Back Lot 7 B Front Lot 7 B Front Lot 8 B Front Lot 8 B Front 240 1 05-10-05 Lot 44 A Front 241 05-10-05 Lot -45 A Front 242 05-10-05 Lot 46 A Front 243 05-10-05 Lot 51 A Front 244 05-10-05 Lot 51 A Front 245 05-10-05 Lot 52 A Front 246 05-10-05 Lot 52 A Front 247 05-10-05 Lot 53 A Front 248 05-10-05 1 Lot 53 A Front 249 i 05-10-05 ; Lot 54 A Front 250 05-70-05 [_,ot 54 A Front 251 05-10-05 Lot 54 A Back 252 05-1.0-05 Lot 54 A Back 253 05-10.05 Lot53 A Back 254 05-10-05 Lot 53 A Back 255 05-10-05 Lot 52 A Back 256 i 05-10-05 Lot 52 A Back 257 05-1.0-05 . Lot 89 B Back 258 I 05-10.05 Lot 8913 Back 259 05-10-05 Lot 90 B Back 260 05-10-05 ],ot 9013 Back 261 05-10-05 Lot 91 B Back 262 05-10-05 Lot 91 B Back 263 05-10-05 Lot 4 B Back 264 05-10-05 Lot 3 B Front I 265 05-11-05 Lot 4 B Front 266 I 05-11-05 Lot 4 B Front 267.105-11-05 1.08.1 i Lot 4 B Front 268 I 05-11-05 Lot 3 B Front 269. 05-11-05 Lot 3 B Front 270 i 05-11-05 Lot 3 B Front 271 05-11-05 Lot 4 B Back 272 05-11-05 Lot 4 B Back 273 05-11-05 Lot 4 B Back 274 I 05-11-05 Lot 3 B Back DATE: March 2, 2006 ,994 103.9 8.6 t 996 107.7 13.7 '994 103.2 5.3 994 98.9. 7.6 996 1.03.6 8.3 991 '1 046 11.9 991.5 100.5 I 13.8 991.5 1 94.1 1.3.5 993 i 101.1 16.9 995 99.6 1112 994 104.5 16.5 996 103.5 1.0.6 993.5 108.8 14.8 995 10810 13.3 993.5 109.2 I 1.7.0 995 108.9 13.0 993.5 108.7 17.2 1995 108.4 16.0 993 102.7 11.9 995 i 991 8.5 994 108.0 13.2 995.5 1.08.1 11.3 984.5 100.5 14.3 986 104.4 13.1 ,985 1.0.4.5 14.8 987 i 109.7 6.3 4 982 1.04.6 12.8 984 1.08.1 i 11.3 1003 98.9 12.7 1001 107.3 i 6.8 4003 104.3 j 9.9 :1004 109.5 ; 4.0 -1.005 103.2 13.9 1003.5 1 106.5 16.1 1004.2 I 109.5 11.6 1005.5 108.0 7.0 11004 107.7 7.3 1005.5 109.8 5.4 1007 104.4 5.8 ` 1003 106.6 1.1.4 94 110.0 98 110.0 99 ' 110.0 91 110.0 94 110.0 95 110.0 91 110.0 86"' 110.0 92 110.0 90 110.0 95 110.0 94 110.0 99 '11.0.0 98 110.0 99 110.0 99 1.10.0 99 110.0 99 i 110.0 93 110:0 90 110.0 98 110.0 98 110.0 91. 110.0 95 110.0 95 110.0 99 110.0 95 110.0 98 110.0 90 1.1.0.0 97 110.0 95 110.0 99 110.0 96 110.0 97 11.0.0 98 1 110.0 96 110.0 98 110.0 99 110.0 95 110.0 97 110.0 Sladden Engineering 'rEST RESULTS PROJECT NAME; Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date TestedI Location Elevation I Dry Density % Moisture I Relative Maximum In Place In Place Comuaction I Density 275 276 277. 278 279 280 281 282 283 284 285 286 287 288 289 290 291 05-11-05 05-11-05 05-11-05 05.11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 05-11-05 Lot 3 B Back 1004 108.3 Lot 3 B Back - 1005.5 107.9 Lot 46 A Front.' 993 100.9 Lot 49 A Back 898 107.1 Lot 49 A Back 991 108.1 Lot 50 A. Back 989.5 1.01..5 Lot 50 A Back 991 107.4 Lot 51 A Back 991 1.09.6 Lot 51 A Back 993 101.6 Lot 44 A Back 991 103.9 Lot 48 A Front 1991 105.1 Lot 48 A Front 992 100.9 Lot 49 A Front 991 102.8 Lot 49 A Front ; 992 101.0 Lot 50 A Front 992 I 101.8 Lot 50 A Front 993 i 100.5 Retest # 242 991.5 101.4 292 05-12-05 1 of 50 A Back 993 107.6 293 05-12-05 Lot 50 A Back 994.5 109.2 294 05-12-05 Lot 49 A Back 991 105.1 295 I 05-12-05 1 Lot 49 A tack 993 104.4 296 05-12-05 Lot 51 A Front 997 108.9 297 05-12-05 Lot 51 A Front 999 105.9 298 05-12-05 Lot 54 A Front 997.5 104.0 299 05-12-05 1 Lot 54 A Front 999.5 100.5 300 05-12-05 Lot 53 A Front 997 106.4 301 05-12-05 Lot 53 A Front 999 98.9 302 05-12-05 ' Lot 53 A Back 994.5 107.6 303 '; 05-12-05 Lot 53 A Back 996.5 106.5 304 ! 05-1.2-05 1..ot 54 A Back 997 108.3 305 05-12-05 Lot 54 A Back '998.5 99.3 306 i 05-12-05 Lot 1 A Back 996 100.8 307 05-12-05 Lott A Back 995 101.3 308 05-12-05 Lot 2 A Front 996 99.5 309 i 05-12-05 Lot 52 A Front 996. 106.1 310 05-12-05 Lot 49 A Front 9925 I 105.3 311 05-12-05 Lot 50 A Front 994 103.8 312 05-12-05 Lot 31 A Front 9915 I 1.00.3 313 05-12-05 Lot 31 A Front 9925 103.5 314 05-12-05 Lot 30 A Front 99.1 1.02.1. DATE: March 2, 2006 9.1 7.0 6.3 10.2 8.5 16.3 7.4 9.8 9.3 13.0 11.4 10.2 9.9 10.4 11.0 8.7 9.0 12.5 9.1 13.1 13.9 10.5 1.0.6 14.1 5.1 14.8 11.2 12.7 13.4 8.7 12.5 10.4 11.2 9.0 1.4.3 12.5 10.9 1.0.6 10.4 8.7 98 110:0 98 110.0 92 110.0 97 110.0 98 j 110.0 92 110.0 98 110.0 99 110.0 92 110.0 94 110.0 96 110.0 92 110.0 93 110.0 92 110.0 93 110.0 91 110.0 92"" 110.0 98 1 110.0 99 110.0 95 110.0 95 I 110.0 99 1.1.0.0 96 i 110.0 95 110.0 92 110.0 97 110.0 90 '110.0 98 110.0 97 110.0 98 110.0 90 110.0 92 110.0 92 110.0 99 110.0 96 110.0 96 110.0 94 110.0 91. 110.0 94 110.0 93 110.0 Sladden Engineering I TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested ( Location Elevation Dry Density % Moisture I Relative I Maximum In Place In Place Conmaetion Dcnsitv 315 05-13-05 Lot 2 B Front 316 05-13-05 Lot 2 B Center 317 05-1.3-05 Lot 2 B Front 318 05-13-05 Lot 1 B Front 319 05-13-05 Lot 1 13 Front 320 05-13-05 Lot 1 B Center 321 I 05-1.3-05 :Lot 1 B Back 322 1 05-13-05 Lot 1 B Back 323 05-13-05 Lot 1 8 Center 324 05-13-05 Lot 2 B Back 325 05-13-05 Lot 2 8 Back 326 05-13-05 Lot 2 B Center 327 05-13-05 I Lot 17 A Back 328 05-13-05 Lot 17 A Back 329 I 05-13-05 Lot 17 A Center 330 I 05-13-05 Lot 33 A Front 331 I 05-13-05 Lot 32 A Center 332 I 05-13-05 Lot 32 A Center 333 05-13-05 Lot 14 A Back 334 I 05-13-05 Lot 13 A Back i 335: 05-16-05 Retest # 112 336 05-16-05 Lot 15 A Back 99.2 17.4 337 05-16-05 Retest # 333 338 05-16-05 Lot 14 A Back 339 05-1.6-05 1.ot .) 4 A Center 340 05-16-05 Lot 13 A Back 341 ;' 05-16-05 Lot 13 A Back 342 05-16-05 I,ot '13 A Center 343 05-16-05 ; Lot 15 A Front 344 05-16-05 Lot 15 A 'Front 345 05-16-05 Lot 15 A Center. 346E 05-16-05 Lot 14 A Front 347 i 05-16-05 Lot14 A Front 348 05-16-05 Lot 15 A Center 349 I 05-16-05 Lot 13 A Front 350 05-16-05 Lot 13 A Front 351 05-16-05 'Lot 13 A Front 352 05-17-05 Lot 17 A Center 353 05-17-05 Lot 16 A Back 354 05-17-05 i.ot 15 A Back DATE: March 2, 2006 1001 ! 100.4 14.6 1001 104.5 12.1 1003 100.0 13.2 1001.5 105.9 16.4 1003 i 101.5 11.2 1001 103.2 13.0 1003.5 101.5 14.3 1005 99.2 12.9 1003 104.5 11.3 1002 102.0 11.6 1003.5. 104.6 8.1 1003 104.1 9.5 996 103.7 7.7 1000 1 98.7 9.4 998 106.5 10.1. 999' i 101.8 14.3 990 ! 108.6 8.9 990 I 100.8 10.5 998 95.1 18.1 998 i I 104.4 11.0 109.5 10.9 998.5 106.8 10.3 99.2 17.4 1002.5 102.3 1 11.9 1001 104.6 10.2 1001 104.1 17.9 1003 100.4 8.5 1001.5 i 103.1 10.5 998 108.7 13.2 1000 99.3 9.4 998.5 I 106.0 10.1 1001.5 103.8 18.0 1003.5 101.9 15.4 1001 104.4 11.3 1000 101.0 16.7 .1002 104.9 '12.1 1000 106.8 10.9 999 109.:1. 10.9 1002 107.5 12.0 1000 103.0 10.6 91 110.0 95 110.0 91 110.0 96 110.0 92 110.0 94 110.0 92 1.1.0.0 90 110.0 95 1.1.0.0 93 110.0 95 1.1.0.0 95 110.0 94 110.0 90 110.0 97 110.0 93 110.0 99 110.0 92 110.0 86"' 110.0 95 110.0 99** 110.0 97 110.0 90" 1.10.0 93 110.0 95 110.0 95 110.0 91 110.0 94 110.0 99 110.0 90 110.0 96 110.0 94 110.0 93 110.0 95 110.0 92 110.0 95 '110.0 97 110.0 99 110.0 98 110.0 94 110.0 Sladden .Engineering I TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location: Elevation Dry Density % Moisture Relative f Maximum In Place I In Place I COmDaction I Densitv 355 05-17-05 Lot 15 A Front 1000 106.4 9.5 97 110.0 356 05-17-05 Lot 1.6 A Front 999 105.3 1.1..7 96 110.0 357 05-17-05 Lot 10 A Back ' 999 108.1 12.4 98 110,0 358 05-17-05 Lot 10 A Back 1001 ' 106.7 13.0 97 i 110.0 359 05-17-05 Lot 11 A Back 999 105.9 7.1 96 110.0 360 05-1.7-05 Lot 11 A Back 1001 107.8 11.4 98 110.0 361 05-17-05 Lot 9 A Front 999 107.7 8,1 98 110.0 362 05-17-05 Lot 10 A Front 998.5 105.7 13.4 96 190.0 363 05-17-05 j Lot 37 A Back 990 102.3 1.4.3 93 110.0 364 05-17-05 I Lot 37 A Front 990 103.3 11.6 94 110.0 365 05-17-05 + Lot 37 A 'Front 992 104.1. 1.0.9 95 1 110.0 366 j 05-17-05 Lot 8 A Back 998.5 104.7 15.8 95 110.0 367 j 05-17-05 j Lot 8 A Back 1000.5 106,5 11,3 97 110.0 368 i 05-17-05 Lot 9 A Back 998 104.1 13.8 I 95 110.0 369 1 05-17-05 ( Lot 9 A Back 1000 102.0 12,0 ' 93 110.0 370 05-17-05 Lot 36 A Front 990.5 900.6 12,1 91 1.10.0 371 05-17-05 Lot 36 A Front 991.5 1 101.4 11.3 92 110.0 372 05-17-05 Lot 35 A Front 990 102.5 10.6 93 110.0 373 05-17-05 Lot 35 A Front 991 103.8 10.4 94 I 110,0 374 05-17-05 Lot 16 A Center 1000 105.0 12.5 95 110.0 375. 05-17-05 Lot 15 A Center 999.5 104.4 13.2 95 i 110.0 376 05-17-05 Lot 17 A Center 1000 106.3 13.8 97 110.0 I 377 05-18-05 Lot 18 A Center 99.5 1.07.9 8.0 98 110.0 378 '; 05-18-05 Lot 18 A Center 1000 98.5 12.7 ! 90 � 110.0 379 05-18-05 Lot 19 A Front 998.5 108.7 9.7 1 90 110.0 380 05-18-05 Lot 19 A Front 1000 105.3 13.1 I 96 110.0 381 05-18-05 Lot 20 A Front 998 1 103.6 9.3 j 96 1.10.0 382 1 05-1.8-05 1 of 20 A Front 1000 106.6 10.8 96 110.0 383 05-18-05 Lot 14 A Front 999 i 107.2 14.6 97 110.0 384 05-18-05 1 Lot 14 A Front 1001 109.0 10.6 99 1'10.0 385 05-1.8-05 Lot 1.1 A Front 997.5 105.6 11.3 96 .110.0 386 05-18-05 I Lot 11 A Front 999 107.0 10.6 97 110,0 387 05-18-05 1 Lot 17 A luck 9985 104.06 � 9.9 95 110,0 388 05-18-05 j Lot 17 A Back 1000.5 104.4 16.3 95 110.0 389 05-18-05 ; Lot 18 A Back 999.0 106.6 8.0 97 110.0 390 05-18-05 ! Lot 18 A Back 999.5 '100,6 16,4 94 110.0 391 05-18-05 Lot 19 A Back 997.5 103.6 15.3 94 110.0 392 05-1&05 I l,ot 1.9 A Back 999.5 101.1 15.0 92 110.0 393 05-18-05 Lot 20 A Back 998.0 107.2 1.1.9 97 110.0 394 05-18-05 Lot 20 A Back 1000 107.5 9.7 98 110.0 395 05-18-05 Lot 17 A Front 997.5 1.06.4 14.4 97 I 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I Relative Maximum In Place In Place I Comvaction I Density 396 05-18-05 Lot 17 A Front 397 05-18-05 Lot 8 A Front 398 05-18-05 Lot 8 A Front 399 ; 05-19-05 Lott A Front 400 05-19-05 Lot 1 A Front 401 05-19-05 Lot 105 Back 402 05-19-05 Lot 104 Back 403 05-19-05 Lot 103 Back 404 ' : 05-19-05 Lot 105 Center 405 ; 05-19-05 ; Lot 104 Center 406 I 05-19-05 Lot 103 Center 407 05-19-05 Lott A Front 408 I 05-19-05 Lott A Front 409 05-20-05 Lot 22 A Back 410 i 05-20-05 Lot 23 A Back . 411 05-20-05 Lot 18 A Front 412 05-20-05 Lot 22 A Front 413 05-20-05 1 Lot 22 A Front 414 05-20-05 Lot 23 A Front 415 I 05-20-05 Lot 25 A Back 416 05-20-05 Lot 26 A.Back 417 I 05-20-05 Lot 22 Center 418 05-20-05 Lot 23 Center 419 05-23-05 Lot 102 B Back 420 05-23-05 Lot 103 B Back 421 05-23-05 Lot 104 B Back 422 05-23-05 Lot 105 B.Back 423 I 05-23-05 Lot 54 A Front 424 I 05-23-05 Lot 54 A Front 425 I 05-23-05 Lot 54 A Back 426 05-23-05 Lot 54 A Back 427 05-23-05 Lot 53 A Back 428 05-23-05 Lot 53 A Back 429 05-23-05 Lot 54 A Front 430 05-23-05 Lot 54 A Front 431 05-23-05 Lot 53 A Front 432 05-23=05 Lot 53 A Front 433 05-23-05 Lot 52 A Front 434 05-23-05 Lot 52 A Front DATE: March 2, 2006 999.5 102.4 11.8 997 105.4 14.0 998.5 103.9 13.3 i 996 104.7 15.9 998 1.04.8 1.1..6 983 104.1 16.9 982 105.0 1 8.9 982 105.7 13.0 983 103.2 11.8 982 102.9 10.1 982 104.1 10.8 997 105.4 16.9 9985 104.0 14.2 1.001 106.8 15.2 1001 105.1 13.7 998 107.7 9.6 998.5 j 104.5 14.5 1001 94.1 I 20.1 1001 95.3 I 19.4 1001 97.2 j 21.4 1001.5 96.5 I 18.4 995.5 102.4 '106.2 1000 103.6 I 15.6 983 101.5 14.8 984 105.6 I 13.4 984 106.1 j 12.3 984 102.7 I 20.4 1001 108.1 I 13.9 1002 104.0 12.8 1000.5 103.3 14.1 1001.5 104.5 I 13.2 998.5 104.1 11.6 1000.5 102.9 12.0 1000 109.7 7.5 •1001.5 101.9 11.0 .1000 102.5 16.6 1001.5 101.0 12.9 998 108.1 I 13.2 1000 100.3 11.6 93 110.0 96' 110.0 94 110.0 95 110.0 95 110.0 95 110.0 95 110.0 95 110.0 95 110.0 94 i 110.0 95 ! 110.0 96 110.0 95 11.0.0 97 110.0 95 110.0 98 110.0 95 110.0 86* 110.0 87* 110.0 88* I 110.0 80* i 110.0 93 I 110.0 94 i 110.0 92 '110.0 96 110.0 96 110.0 93 110.0 98 110.0 94 110.0 94 1.1.0.0 95 1.10.0 95 110.0 93 110.0 93 112.0 91 112.0 91 110.0 90 112.0 96 112.0 90 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Tcst No. Date Tested Location Elevation I Dry Density I % Moisture` Relative I Maximum in Place In Place I Compaction Density 435 436 437 438 439 440 441 442 443 444 445 4.46 447 448 449' 450 451 452 453 454 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-23-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 05-24-05 Retest # 413 Lot 22 A Front Retest 11414 Lot 23 A Front Retest # 415 Lot 25 A back Lot 52 A Back Lot 51 A Back Lot 52 A Center Lot 51 A Center Lot 104 B Front Lot 103 B Front Lot 103 B Front Lot 102 B Front Lot 102 B Front Lot 101 B Front Lot 101 B Front Lot 103 B Ccntcr Lot 102 R Center Lot 101 B Center 455 05-25-05 Tot 50 A Front 456 05-25-05 i Lot 50 A Front 457 05-25.05 Lot 51 A Front 458 i 05-25-05 j Lot 51 A Front 459 05-25-05 Retest # 416 .460 05-25-05 I.,ot 26 A Front 461. 05-25-05 Lot 27 A Front 462 05-25-05 1 Lot 27 A Front 463 05-25-05 Lot 1 B Back .464 ! 05-25-05 1 Lot '1 8 Back 465 j 05-25-05 I Lot 1 B Front 466 i 05-25-05 i Lot 2 B Front 467 I 05-25-05 I Lot 2 B Back 468 I 05-25-05 Lot 51 A Front 469 05-25-05 Lot 51 A Center 470 05-25-05 Lot 50 A Front 471 05.25-05 Lot 50 A Front 472 05-25-05 Lot 49 A Front 473 05-25-05 Lot 49 A Front 474 05-25-05 Lot 51 A Back DATE: March 2, 2006 Sladden .Engineering j 104.7 14.2 93** I 112.0 1003 106.3 14.0 95 1'12.0 101.9 17.2 91** 112.0 1003 ' 103.9 18.0 93 1.12.0 108.5 7.8 ! 97"* 112.0 100]. 1.00.9 22.1. I 90 112.0 997.5 109.3 9.5 98 112.0 995 108.7 8.8 97 112.0 997 105.1 1 9.9 94 112.0 995 103.8 10.6 93 112.0 983 1.03.9 :1.:1..4 93 112.0 983 106.2 1 .8.1 96 i 110.0 984.5 108.3 7.7 97 112.0 982 100.8 11.9 92 I 11.0.0 983.5 ! 101.9 13.1 93 110.0 981.5 99.9 16.5 91 110.0 983 106.1 8.1 95 112,0 984 103.3 9.4 92 I 112.0 984 I 105.8 10.1 94 I 112.0 982.5 102.4 8.8 93 110.0 996 i 100.4 16.8 i 91 110.0 997 102.5 13.3 1 93 110.0 1000 1.04.4 1.4.8 95 110.0 1000.5 106.1 12.9 96 I 110.0 94.3 22.1" ' 86** 110.0 999.5 95.6 18.4* 82* 110.0 996 101.3 16.6 I 92 110.0 998 103.1 14.0 94 110.0 1005 106.2 1.0.9 95 I 112.0 1007 107.6 7.0 I 96 112.0 1.005 i 105.1 13.4 94 I 112.0 1005.5 105.9 16.9 I 95 i 112.0 .1005 102.0 17.1 93 110.0 1001 100.2 1.6.3 91 ! 110.0 1001.5 108.7 6.4 97 I 112.0 996 107.8 9.7 98 110.0 998 103.2 13.0 94 110.0 994.5 105.1 13.2 95 110.0 996.5 104.5 12.1 95 110.0 997 101.0 15.1 92 110.0 DATE: March 2, 2006 Sladden .Engineering j TEST_RESU:LTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation I Dry Density % Moisture Relative Maximum In Place I in Place I Comoaction I Density 475 05-25-05 Lot 51 A Back 999 102.6 12.1 93 I 110.0 476 05-25-05 Lot 27 A Back 998.5 107,1 6.8 96 112,0 477 05-25-05 Lot 27 A Back 990 102.1 11.9 93 ' 110.0 478 05-25-05 Lot 28 A Back '988 106,9 7.1 95 112.0 479 05-25-05 Lot 28 A Front 992 100.1 7.4 91 110.0 480 05-26-05 Lot 2 A Back 997 106.5 1 16.4 95 112.0 481 05-26-05 Lot -2 A Back 999 101.3 i 12.4 90 112.0 482 05-26-05 Lot -1 A Back 998 109.1 9.8 97 1012.0 483 05-26-05 I,ot '1 A Back 1000 1.0.4..2 12.1 93 112.0 484 05-26-05 I Lot 47 A Back 991.5 104.0 10.6 93 112,0 485 05-26-05 i Lot 48 A Back 995 106.2 6.3- 95 112.0 486 05-26-05 ' Lot 49 A Back 995 108.9 13.0 97 1.12.0 487 05-26-05 Lot 50 A Back .996.5 109.4 12.3 98 112.0 488 05-26-05 Lot 47 Center 992 1 103.7 11,2 93 112.0 489 05-26-05 Lot 48 Center 994.5 1 102.9 8.9 92 112.0 490 05-26-05 Lot 49 Center 994 1.06.1 10.1 95 112.0 491 05-26-05 j Lot 50 Center 995.5 104.0 9.3 93 112.0 492 05-27-05 i Lot 31 A Back 994 100.7 10,0 j 90 j 1.12.0 493 05-27-05 Lot 34 A Front 993 109.4 6.2 98 i 112.0 494 05-27-05 Lot 33 A Front 993 107.6 11.8 ; 96 4f 112.0 495 05-27-05 Lot 32 A Front 992.5 103.9 8.3 93 I 112,0 496 05-27-05 Lot 31 A Front 994.5 101.3 9.1 90 I 112.0 497 05-27-05 Lot 31 A Center 992.5 102A 7.9 ' 91 1.12.0 498 05-27-05 Lot 32 A Center 992 105.5 10.3 r 94 I 112,0 499 05-27-05 Lot 33 A Center 993 107.2 I 9.0 1 96 112.0 500 I 05=27-05 Lot 34 A Center 993 104A '11.4 ` 93 112.0 I i I 501 i 05-31-05 Lot 34 A Back 995 108.3 8.9 97 112.0 502 1 05-31-05 Lot 34 A Back 997 104.1 9.3 i 93 I 112.0 503 05-31-05 Lot 32 A Back 994.5 103.6 8.4 1 93 1 112.0 504 I 05-31-05 Lot 32 A Back 996.5 101.9 10.1 91 112.0 505 05-31-05 Lot 31 A Back 996 104.1 9.0 93 112.0 506 05-31-05 lot 31 A Back 997 105.3 '11.1 94 112.0 507 05-31-05 Lot 29 A Back 996 104.9 10.5 94 112.0 508 05-31-05 Lot 29 A Back 997 103.0 8.7 92 i 112.0 509 05-31-05 Lot 1 B Front 1007 105.4 13.3 94 11.2.0 510 05-31-05 Lot 1 B Back '1007 102.1 16.5 91 112.0 511 05-31-05 Lot 5 B Back 997,5 104.8 14.1 94 ( 112,0 512 05-31-05 Lot 5 B Back 999 101.6 10.9 93 I 112.0 513 05-31-05 Lot 33 A Center 994.5 108.4 8.6 97 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California. PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative I Maximum In Place I 1n Place I Compaction I Dcnsity 514 05-31-05 515 05-31-05 516 05-31-05 517 05-31-05 518 05-31-05 519 05-31-05 520 05-31-05 521 05-31-05 522 05-31-05 523 1 05-31-05 524 05-31-05 I 525 1 06-01-05 526 i 06-01-05 527 06-01-05 528 06-01-05 529 i 06-01.-05 530 06-01-05 531. 06-01-05 532 ' 06-01-05 533 i 06-01-05 534 06-01-05 535 06-01-05 536 06-01-05 537 06-01-05 538 06-01-05 539 06-01-05 540 06-01-05 Lot 33 A Center Lot 32 A Center Lot 32 A Center Lot 33 A Back Lot 30 A Back Lot 30 A Back Lot 31 Center Lot 2 B Back Lot 2 B Front Lot 6 B Back Lot 6 B Back Lot 34 A Back Lot 33 A Back , Lot 32 A Back Lot 34 A Back Lot 34 A Back Lot 33 A Back Lot 33 A Back Lot 32 A Back Lot 32 A Back Lot 48 A Back Lot 48 A Back Lot 48 A Front Lot 50 A Front Lot 33 A Center I..ot 31 A Center Lot 34 A Center 996 '994 996 '992 994 996 994.5 ;1007 1007 .998 1000 991 991 990.5 993 994 993.5 99.4.5 993 994.5 997 999 992 994 993.5 994 994 541 06-02-05 Lot 34. A Front 995 542 1 06-02-05 I Lot 34 A Front 996.5 543 06-02-05 I Lot 31 A Front 996.5 544 06-02-05 i Lot 31 A Front 998 545 06-02-05 Lot 33 A Back 996.5 546 06-02-05 Lot 33 A Back 998 547 06-02-05 i Lot 31 A Back 998 548 06-02-05 Lot 31 A Back +999.5 549 06-02-05 I Lot 33 A Front 993 550 06-02-05 j Lot 33 A Front 995 551 06-02-05 Lot 32 A Front 994 552 06-02-05 Lot 32 A Front 996 553 06-02-05 Lot 32 A Back 997.5 105.5 7.1 94 106.2 8,5 95 106.6 9.0 95 107.2 6.7 96 107.5 1 11.2 96 107.0 14,4 96 103.8 10.5 93 100.1. 1.6.8 91 105.7 13.7 94 107.6 5.3 96 105.9 8.7. 95 103.3 8.5 92 102.4 8.1 ! 91 104.1 9.0 93 100.6 9.1 90 1.02.1. 8.3 91 103.7 10.6 93 10110 8.8 90 101.9 ! 10.1 91 106.8 I 9.0 90 106.5 I 7.4 95 105.6 5.9 94 108.5 8.1 97 102,5 8.7 92 102.9 9.9 i 92 104.6 11,4 1 93 103.3 10.0 92 108.1 14.8 I 97 108.4 12.7 97 105.1 I 12.0 I 94 101.1 :13.2 j 90 106.3 1 11.5 95 102.8 13.1 92 107.6 j 12.8 96 108.2 j 13.0 97 109.9 ! 10.7 98 103.3 1 11.4 92 101.4 j 15.7 91 106.5 6.8 95 106.0 j 12.2 95 1'12.0 112.0 112.0 112.0 112.0 112.0 112,0 110.0 11.2.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 DATE: March 2, 2006 SIadden Engineering i TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I Date Tested Location Elevation I Dry Density I % Moisture I Relative I Maximum In Place In Place Comnaction Densitv 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 06-02-05 06-02-05 06-02-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 06-03-05 577 06-06-05 578 06-06-05 579 06-06-05 580 i 06-06-05, 581 06-06-05 582 i 06-06-05 583 06-06-05 584 06-06-05 585 06-06-05 586: 06-06-05 587 i 06-06-05 588 i 06-06-05 589, 06-06-05 590 i 06-06-05 591 06-06-05 592 I 06-06-05 593 06-06-05 DATE: March 2, 20C Lot 32 A Back Lot 34 A Back Lot 34 A Back Lot 47 A Back Lot 47 A Front Lot 46 A Front Lot 46 A Hock Lot 45 A Back Lot 45 A Front Lot 42 A Front Lot 42 A Front Lot 41 A Front Lot 42 A Back Lot 43 Back Lot 44 A Back Lot 44 A Front Lot 41 A Front Lot 42 A Front Lot 41. A Flack Lot 42 A Back Lot 43 A Back Lot 44 A Hack Lot 44 A Front Lot 41 Front Lot 41 Front Lot 41 Center i,ot 43 Front Lot 43 Front Lot 43 Center Lot 44 Front Lot 44 Front Lot 44 Center Lot 43 Back Lot 43 Center Wt 41 Back Lot 41 Back Lot 41 Center Lot 42 A Front Lot 42 A Front Lot 42 A Center 999 997 998 107.3 1.06.5 104.0 991 106.6 991 104.5 991.5 103.8 992 101.6 991.5 105.1 ' 991.5 102.6 992 106.6 993 103.0 989 102.2 991 108.4 992 101,6 993 106.3 992 108.0 991 101.3 994 102.1 992 105.1 993 100,5 993.5 104.5 994 103.8 993.5 106.0 993 105.1 995 , 107.1 992.5 103.5 991 103.6 993 101.0 991.5 i 106.3 995 101.3 996 j 105.9 994 ' 104.0 995 1.05.2 994.5 107.2 994 109.0 996 101.5 994 103.3 993.5 108..4 994.5 I 103.0 994 101.4 10.6 13.6 10.5 9.9 11.3 10.1 13.9 8.3 12.2 10.5 9.1 6.3 9.7 16.5 6.7 6.0 17.0 14.8 14.5 1.6.0 17.1 15.9 15.3 14.9 12.6 11.8 1.7.6 17.2 12.7 18.3 14.2 13.1 1.5.5 12.6 13.9 14.2 10.9 15.8 14.4 16.6 96 95 93 95 93 93 91 94 92 95 92 91 97 91 95 96 90 91 94 90 93 93 95 94 96 92 93 90 95 90 95 93 94 96 97 91 92 97 92 91 112.0 112.0 112.0 112.0 112.0 112,0 112.0 112.0 112.0 i 112.0 112.0 112.0 -112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 112,0 112.0 112.0 1.12.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club -The Hideaway LOCATTON: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density a o Moisture Relative Maximum In Place In Place I Compaction I Densitv 594. 06-06-05 Lot 44 A Back 595 06-06-05 Lot 44 A Back 596 06-06-05 Lot 44 A Center. 597 06-06-05q Lot 42 A Back 598 06-06-05 Lot 42 A Back 599 I 06-06-05 Lot 42 A Center 600 I 06-07-05 Lot 38 A Front 601 06-07-05 Lot 39 A Back 602 06-07-05 Lot 39 A Front 603 06-07-05 Lot 39 A Back 604 06-07-05 Lot 40 A Front' 605 06-07-05 Lot 40 A Back 606 06-07-05 Lot 40 A Front 607 06-07-05 Lot 40 A Back 608 06-07-05 i No Test 609 j 06-07-05 No Test 610 06-07-05 I Lot 40 A Back 611 06-07-05 Lot 40 A Back 612 06-07-05 Lot 39 A Back 613 i 06-07-05 i Lot 39 A Back 614 I 06-07-05 i Lot 38 A Back 615 06-07-05 Lot 38 A Back 616 I 06-07-05 Lot 37 A Back 617 06-07-05 Lot 37 A Back 618 06-07-05 j Lot 36 A Back 619 06-07-05 Lot 36 A Back 620 I 06-07-05 i Lot 36 A Front 621 06-07-05 Lot 36 A Front 622 ' 06-07-05 Lot 36 A Center 623 j 06-07-05 Lot 37 A Front 624 06-07-05 I Lot 37 A Center 625 06-07-05 Lot 38 A Front 626 06-07-05 I Lot 38 A Front 627 06-07-05 i Lot 38 A Center 628 06-07-05 I Lot 39 A Front 629 06-07-05 Lot 39 A Front 630 06-07-05 Lot 39 A Center 631 06-07-05 Lot 40 Front 632 I 06-08-05 Retest a611 633 1 06-08-05 Retest k 631 DATE: March 2, 2006 994.5 995.5 995 993.5 994.5 994 101.8 103.7 106.6 106.3 102.7 104.6 991 103.4 991 I 105.3 990.5 101.4 991. I 1.04.0 '991 j 106.7 990.5 ; 102.2 992.5 105.4- 992 105.1 994 995 993.5 994.5 993. 994 993 994 993.5 994.5 993.5 995 993.5 994 993' 992.5 994 994 993 994.5 994 994 109.4 94.8 106.9 98.0 97.6 96.2 98.4 95.0 93.2 f 96.7 96.5 96.1 102.4 90.8 I 94.0 104.8 106.1 102.9 95.1 9.4..3 83.7 97.8 103.1 105.3 15.3 10.9 11.7 14.5 10.9 11.3 11.1 10.6 12.9 1.1..8 13.1 10.2 9.3 10.0 11.4 15.2 13.8 1.6.0 20.1 18.9 21.9 22.6 21.5 20.3 23.2 2'1.3 16.6 24.7 21.8 15.5 14.0 16.2 19.9 22.0 21.2 20.5 17.5 14.0 91 93 95 95 92 93 92 94 91 93 95 91 94 94 98 85* 90 88W 80* 86" 88" 85* 83" 86* 86" 86* 91 .81 " 84* 94 95 92 85* 84* 84* 87* 92** 94" 11.2.0 112.0 112.0 112.0 112.0 11.2.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, Califomia PROJECT NO: 522-4810 REPORT N006-02-120 'fest No. I Date Tested Location Elevation I Dry Density I % MoistureI Relative I Maximum In Place In Place Comnaction Density 634 06-08-05 Retest # 613 101.2 16.9 635 06-08-05 Retest # 628 104.1 15.3 636 06-08-05 Retest # 629 103.3 12.9 637 06-08-05 Retest # 630 106.0 14.8 638 06-08-05 Retest # 614 107.1 14.2 639 06-08-05 Retest # 615 i 103.6 13.9 640 06-08-05 Retest # 616 ! 105.2 16.2 641 06-08-05 Retest # 617 97.6 18.6 642 06-08-05 Retest # 618 101.4 17.2 643 06-08-05 Rctcst # 61.9 97.0 24.2 644 06-08-05 Retest # 623 103.4 16.8 645 I 06-08-05 I Retest # 624 102.2 18.0 646 06-08-05 Retest # 620 100.9 17.0 647 I 06-08-05 Retest # 621 101.6 16.5 6.4.8 06-08-05 Lot 7 B A Front 998 1.09.1. 1.3.5 649 ! 06-08-05 I Lot 7 B A Front 1000 1()2,0 18.1 650 06-08-05 ! Lot 6 B Back 998 103.2 14.4 651 I 06-08-05 E Lot 6 B Back 1000 100.8 12.1 652 ! 06-08-05 Lot 5 8 Front 1001 99.6 12.7 653 I 06-08-05 ! Lot 5 8 Front 1003 99.8 17.6 654 06-08-05 Lot 6 B Front 1002 1.01.3 11..0 655 I 06-08-05 Lot 6 B Front 1003 104.9 13.1 656 ! 06-08-05 Lot 7 B Back 998 I 102.2 16.0 657 06-08-05 Lot 7 B Back 999 i 102.8 14.7 658 06-08-05 Lot 5 B Back 999.5 101.4 12.9 659 06-08-05 Lot 5 B Back 1000,5 ; 1.00.1. 14.4 660 06-09-05 Lot 35 A Front 993 j 99.0 10.9 661 i 06-09-05 Lot 35 A Front 995 1.02.9 15.1 662 06-09-05 Lot 33 A Front 997 108.7 13.2 663 ! 06-09-05 Lot 32 A Front 998 107.3 10.3 664: 06-09-05 Lot 30 A Front 993 i 1.01.2 15.2 665. 06-09-05 Lot 30 A Front 995 j 102.7 16.6 666 i 06-09-05 Lot 30 A Front 997 102.8 18.2 667 06-09-05 Lot 35 A Back 990 103.4 9.6 668 ! 06-09-05 Lot 35 A Back 992 108.9 11.7 669 j 06-09-05 Lot 35 A Back 994 106.3 114.4 670 06-09-05 Lot 45 A Back 993.5 109.6 16.3 671 I 06-09-05 Lot 45 A Back 995.5 102.8 13.8 672 06-09-05 Lot 46 A Back 995 I 105.4 6.9 673 06-09-05 ` Lot 46 A Back 997 I 101.6 14.1 674 06-09-05 I Lot 47 A Back 993 1 103.5 9.1 DATE: March 2, 2006 90** 112.0 93** 112.0 92** 112.0 95** 112.0 96** 11.2.0 93** 112.0 94*" 112.0 87* 112.0 91 ** 1.1.2.0 87* 112.0 92*" 112.0 91*'" 112.0 90** 112.0 91** 112.0 97 112.0 91 112.0 92 112.0 90 I 1.12.0 91 110.0 91 110.0 90 112.0 94 112.0 91 112.0 92 I 112.0 91 112.0 91. 110.0 90 110.0 92 112.0 97 112.0 96 112.0 92 110.0 92 j 112.0 92 11.2.0 92 112.0 97 112.0 95 112.0 98 112.0 92 112.0 94 112.0 91 112.0 92 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation I Dry Density % Moisture I Relative I Maximum In Place In Place Comnacdon Density 675 06-09-05 Lot 47 A Back 995 101.8 11.6 91 112.0 676 06-09-05 Lot 47 A Back 997 99.0 13.6 90 .110.0 677 06-09-05 Lot 31 A Front 999 104.5 13.8 93 112.0 678 06-09-05 Lot 30 A Back 998 108.0 12.9 96 112.0 679 06-09-05 Lot 30 A Back 7000 105.5 13.1 94 '112.0 680 06-09-05 Lot 50 A Back PC 106.1 13.4 95 112.0 681 06-09-05 Lot 50'A Back PG 102.9 11.3 94 110.0 682 I 06-10-05 Lot 44 A Back 996.5 ! 102.3 9,9 93 110.0 683 06-10-05 Lot 45 A Back ;993.5 101.6 I 12.6 I 92 110.0 68.4. i 06-10-05 Lot 45 A Back 995.5 109.3 1 17.9 94 110.0 685 06-10-05 Lot 46 A Back 1.995 107.4 14.6. I 97 110.0 686 I 06-10-05 Lot 46 A Back 997 104.2 15.3 94 110.0 687 06-10-05 Lot 47 A Back 993 105.1 13.7 95 110.0 688 06-10-05 Lot 47 A flack 995 .103.6 1.5.6 94 110.0 689 06-10-05 Lot 47 A Back 997 1()2.4 16.2 93 110.0 690 I 06-10-05 Lot 49 A Back 997 103.9 8.6 94 110.0 691 i 06-10-05 Lot 49 A Back 999 107.7 13.7 98 1.1.0.0 692 ; 06-10-05 Lot 51 A Back 1001 109.2 9.2 99 110.0 693 ! 06-10-05 I Lot 52 A Back 999 105.6 11.9 96 110.0 694 06-10-05 I Lot 52 A Back 1001 104.7 13.3 95 110.0 695 ; 06-10-05 Lot 53 A Back 1002 5 109.3 12.9 I 99 110.0 696 06-10-05 j Lot 54 A Back 1003.5 103.6 I 14.8 94 110.0 697 06-10-05( Lot 3 A Back 998 I 707.9 I 13.1 I 98 110.0 698 06-10-05 Lot 36 A Back 996 103.2 8.9 93 710.0 699 06-1.0-05 Lot 45 A Front 993.5 99.5 i 14,9 i 90 110.0 700 i 06-10-05 I Lot 45 A Front 995.5 105.7 i 20.0 96 110.0 701 1 06-10-05 I Lot 46 A Front 993.5 j 1.02.3 I 11..4 93 110.0 702 ; .06-10-05 Lot 46 A Front 996.5 i 99.5 i 1.9.3 90 110.0 703 06-10-05 ': Lot 47 A Front 993 j 105.4 12.9 95 110.0 704: 06-10-05 Lot 47 A Front 995 i 107.1 i 14.6 i 97 110.0 705 06-10-05 Lot 47 A Front 997 1.01.6 1.3.9 i 92 110.0 706 06-10-05 Lot 48 A Front 994 109.3 15.0 99 110.0 707 ! 06-10-05 I Lot 48 A Front 996 I 1 MA 11.4 96 11.0.0 708 06-10-05 Lot 48 A Front 998 101.6 I 10.2 92 110.0 709 06-10-05 ! Lot 49 A Front 998.5 .103.0 16.1 j 93 110.0 710 i 06-10-05 ; Lot 50 A Front 996 106.9 1.4.0 97 110.0 711 06-10-05 I Lot 50 A Front 998 106.1 13.5 96 110.0 712 06-10=05 1 Lot 50 A Front 1000 103.7 15.1 1 94 110.0 713 06-10-05 Lot 52 A Front 1002 106.3 15.3 96 110.0 714) 06-10-05 I Lot 53 A Front 1003.5 109.4 16.3 99 110.0 715 I 06-10-05 Lot 4.1 Front PG ! 103.3 9.9 92 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 T.cst No. 1 Date'rested I Location Elevation Dry Density In Place % Moisture I In Place Relative Compaction I Maximum Density 716 I 06-10-05 Lot 41 Center PC 102.7 9.1 93 110.0 717 06-10-05 Lot 41 Back PG 104.5 16.5 95 110.0 718 06-10-05 Lot 42 Front PG 105.3 16.1 95 110.0 719 I 06-10-05 Lot 42 Center PG 104.3 16.6 94 110.0 720 06-10-05 Lot 42 Back PC 103.4 11.1 94 110.0 721 06-10-05 Lot 43 Front PG 106.6 14,1 97 110.0 722 I 06-10-05 Lot 43 Center PG 103.0 12.5 93 110.0 723 I 06-10-05 Lot 43 Back PC 107.9 10.9 98 1.10.0 724 06-10-05 Lot 4.4 Front PG 103.1 13.3 93 110.0 725 06-10-05 Lot 44 Center PC 104.7 16.1 95 110.0 726 06-10-05 Lot 44 sack PG 101.3 10.7 92 110.0 727 06-13-05 Lot 21 A Front 1001.5 107.9 13.2 98 110.0 728 06-13-05 Lot 24 A Front 1001 104.0 17.0 94 110.0 729 06.13-05 Lot 24. A Front 1003 104.8 14.1 95 110.0 730 06-13-05 Lot 25 A Front '1001 106.9 11.3 97 110,0 731 06-13-05 Lot 25 A Front 1003 105.3 16.1 95 110.0 732 06-13-05 Lot 26 A Front 1001 108.0 15.5 98 110.0 733 06-13-05 Lot 26 A Front 1003 109.7 16.0 99 110.0 734 06-13-05 Lot 27 A Front 1000 109.0 13.8 99 110.0 735 06-13-05 Lot 27 A front 1002 108.6 15.1 99 110.0 736: 06-13-05 Lot 28 A Front 994 102.0 12.0 93 110.0 737 1 06-13-05 Lot 28 A Front 996 I 106.8 18.3 97 110.0 738 06-13-05 Lot 29 A Front 998 1 103.0 16.0 94 110.0 739 06-13-05 ' . Lot 38 A Front 993 107.1 9.6 97 110.0 740 06-13-05 I Lot 38 A Front 995 106.3 15.7 96 110.0 741 I 06-13-05 I Lot 40 A Front 996 108.6 17.1 99 110.0 742 06-13-05 Lot 43 A Front 995 103.0 I 9.5. 94 110.0 743 ': 06-13-05 1 Lot 54 A Front 1003.5 100.6 18,8 91 110.0 744. 06-13-05 I Lot 49 A Center 998.5 101.0 1 14.7 92 1.10.0 745 i 06-13-05 I Lot 23 A Back 1003 104.6 14.6 I 95 ; 110.0 746 i 06-13-05 Lot 24 A Back 999.3 109.3 15.4 99 110.0 747 06-13-05 Lot 24 A Back 1001.5 108.1 9.3 i 98 i 1.10.0 748 I 06-13-05 Lot 24 A Back 1003.5 101.4 9.9 i 92 110.0 749 06-13-05 Lot 25 A Back. 1003 109.7 14.1 99 110.0 750 06-13-05 Lot 26 A Back 1003 107.8 17.7 I 98 110.0 751 06-13-05 Lot 27 A Back 992 102.7 11.8 ( 93 110.0 752 06-13-05 Lot 27 A Back 994 107.0 11.3. 97 110.0 753 06-13-05 Lot 27 A Back 996 106.1 13.6 96 110.0 754 06-13-05 Lot 28 A Back 990 102.5 13.3 93 110.0 755 I 06-13-05 Lot 28 A Back 992, 106.6 11.2 97 1.10.0 756 j 06-13-05 Lot 28 A Rack 994 , 103.6 12.8 94 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date TestedI Location Elevation DryDensiry j % Moisture I Relative I Maximum In Place I In Place Compaction Densitv 757 06-13-05 Lot 29 A Back 758 06-13-05 Lot 29 A Back 759 I 06-14-05- Lot 50 A Back 760 06-14-05 Lot 50 A Back 761 I 06-14-05 Lot 27 A Back 762 06-1.4-05 Lot 27 A Back 763 06-14-05 Lot 28 A Back 76.4 06-14-05 Lot 28 A Back 765 06-14-05 I Lot 28 A Back. 766 06-14.-05 j Lot 28 A Front 767 06-14-05 Lot 30 A. Front 768 06-14-05 Lot 54 A Front 769 06-14-05 Lot 54 A Center 770 j 06-14-05 Lot 54 A Back 771 06-14-05 Lot 53 A Front 772 i 06-14-05 Lot 53 A Center 773 I 06-14-05 Lot 53 A Back 774 06-14-05 Lot 52 A Front 775 06-14-05 Lot 52 A Center 776 06-14-05 Lot 52 A Back _ 777- ' 06-14-05 Lot 51 A Front 778: 06-14-05 Lot 51 A Center 779 06-14-05 Lot 51 A Back 780 06-14-05 Lot 50 A Front 781 06-14-05 j Lot 50 A Center 782 06-14-05 i Lot 50 A Back 783 06-14-05 Lot 99 A Front 784 06-14-05 Lot 99 A Back 785 06-14-05 I Lot 99 A Center 786 06-14-05 I Lot 98 A Front 787 06-14-05 Lot 98 A Back 788 06-14-05 'Lot 98 A Center I 789 ! 06-15-05 Retest # 780 790 ! 06-15-05 I Retest # 782 791 i 06-15-05 Retest # 781 ' 792 ' 06-15-05 Lot 47 A Front 793 ! 06-15-05 Lot 47 A Back 794 i 06-15-05 i Lot 47 A Center 795 ! 06-15-05 f Lot 46 A Front 796 i 06-15-05 I Lot 46 A Back DATE: March 2, 2006 999 1001 998.5 100.0 998 100.0 996 998 1000 998 999 PG . PC PG PG PG PG PC PC PG PC .PG PG PC PG PG PG PG PC PG PG FG' PG PG PC PG PC 102.5 9.7 108.3 14.8 104.4 13.3 102.8 12.6 105.0 20.0 104.2 16.7 101.5 11.2 108.7 15.0 105.4 14.2 105.3 17.1 102.1 13.3 99.2. 11.5 100.5 8.3 105.9 9.4 105.5 10.3 106.1 7.7 99.1 9.3 103.0 13.7 1.09.3 12.8 104.4 I 11.1 101.4 12.3 100.2 9.5 101.6 10.3 91.4 10.2 92.8 9.5 94.4 8.8 101.2 9.3 103.3 12,2 102.6 11.6 99.6 8.6• 103.1 I 11.2 107.0 I 10.5 98.9 I 12.9 100.2 12.5 101.9 10.4 102.1 9.1 99.7 8.8 103.6 9.2 100.0 9.1 102.8 10.7 93 110.0 98 110.0 94 110.0 97 110.0 95 110.0 95 110.0 92 110.0 99 110.0 96 110.0 95 110.0 93 1.1.0.0 90 110.0 91 1.10.0 96 110.0 96 110.0 96 110.0 90 110.0 94 110.0 99 110,0 95 110.0 92 110.0 91 110,0 92 110.0 83* i 110.0 84.* I 110.0 86* 110,0 92 110.0 94. 110.0 93 110.0 90 110.0 93 110.0 97 110.0 90'x* 110.0 91** 1.1.0.0 92" 110.0 93 110.0 91 110.0 94 110.0 91 110.0 93 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.i Date Tested Location Elevation I Dry Density % Moisture Relative I Maximum i In Place In Place Comr)action Density 797 06-15-05 Lot 46 A Center PG 105.4 8.9 96 110.0 798 06-15-05 Lot 45 A Front PG 1.09.2 12.2 99 110.0 799 06-15-05 Lot 45 A Back PG 104.1 11.1 95 11.0.0 800 06-15-05 Lot 45 A Center PC 106.8 11.3 97 110.0 801. 06-15-05 Lot 41 A Front PG 101.3 12.1 92 110.0 802 06-15-05 Lot 41 A Back PG 106.2 13.3 96 110.0 803 06-15-05 Lot 41 A Center PG 102.9 17.1 93 110.0 804 06-16-05 Lot 25 A Front PG 107.9 13.4 98 110.0 805 06-16-05 Lot 25 A Center PC 102.8 11.5 93 110.0 806 06-16-05 Lot 25 A Back PG 1.07.1 13.2 97 110.0 807 06-16-05 Lot 26 A Front PG 100.3 18.1 91 110.0 808 06-1.6-05 Lot 26 A Center PG 100.4 12.4 91 110.0 809 06-16-05 Lot 26 A Back PG 108.3 12,5 I 98 110.0 810 06-1.6-05 i Lot 27 A Front PG 106.4 16.9 i 97 110.0 811 06-16-05 Lot 27 A Center PG 1.01.2 13.9 92 110.0 812 I 06-16-05 Lot 27 A Back PG 99.4 1 11.2 90 110.0 813 06-17-05 Lot 28 A Front PG 103.3 I 13,7 94 1.10.0 814 06-17-05 Lot 28 A Center PC 1 103.7 18.1 94 j 110.0 815 06-17-05 Lot 28 A Back PG i 102.5 12.9 93 110.0 816 1 06-17-05 I Lot 29 A Front PC 103.7 10.4 94 110.0 817 06-1.7-05 Lot 29'A Center PG 104.2 15.1 95 � 110.0 818 I 06-17-05 1 Lot 29 A Back PG 100.0 10.9 91 ! 110.0 819 06-17-05 ! Lot 30 A Front PC 107.2 13.9 97 j 110.0 .820 06-1.7-05 Lot 30 A Center PG 109.9 10.7 99 ( 110.0 821 06-17-05. Lot 30 A Back PC 108.5 12.1 98 ( 110.0 822 06-17-05 i Lot 31 A Front PC 106.4 11.1 96 I 110.0 823 , 06-17-05 Lot 31 A Center PC 109.31 15.0 99 110.0 824 ! 06-17-05 Lot 31 A Back PC 106.9 9.1 97 i 110.0 825 06-17-05 Lot 55 A Back 989 100.1 8.8 91 i 110,0 826 i 06-17-05 Lot 56 A Back 988 99.5 9.0 90 110.0 827 06-17-05 Lot 57 A Back 989 99.0 11.2 90 110.0 828 06-17-05 Lot 58 A Rack 989.5 102.8 7.9 93 ' 110.0 829 i 06-17-05 Lot 55 A Front 989 103.0 17.1 94 110.0 830'1 06-17-05 Lot 56 A Front 988 104.1 9.4 95 110.0 821 1 06-17-05 Lot 57 A Front 989 94.1 12.9 85" 110.0 832 !� 06-17-05 Lot 58 A Front 989.5 105.6 7.8 96 110.0 833 06-17-05 Lot 59 A Front 990 93.1 11.5 85"' 110.0 834 06-20-05 Lot 55 A Front 991 102.8 ' 13.1 92 112.0 835 06-20-05 Lot 55 A Front 993 103.9 8.6 93 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I bate Tested I Location Elevation I Dry Dcnsity I % Moisture I Relative Maximum In Place f In Place Compaction Densitv 836 06-20-05 837 06-20-05 838 06-20-05 839 06-20-05 840 06-20-05 841 06-20-05 842 06-20-05 843 06-20-05 844 06-20-05 845 06-20-05 846 06-20-05 847 06-20-05 848 06-20-05 849 06-20-05 850 i 06-20-05 851 i 06-20-05 852 06-20-05 853 i 06-20-05 854 06-20-05 855 06-21.-05 856 06-21-05 857 06-21-05 858. 06-21-05 859 i 06-21-05 860 06-21-05 861 06-21-05 862 i 06-21-05 863 06.21-05 864 06-21-05 865 06-21-05 866 i 06-21-05 867 ' 06-21-05 868 ; 06-21-05 869 I 06-21-05 870 06-21-05 871 06-21-05 872 I 06-21-05 873 06-21-05 874 j 06-21-05 875 06-21-05 876 06-21-05 DATE. March 2, 2006 Lot 56 A Front Lot 56 A Front Retest # 821 & 833 Lot 57 A Front Lot 55 A Back Lot 55 A Back Lot 56 A Back Lot 56 A Back Lot 57 A Back Lot 57 A Back Lot 32 A Front Lot 32 A Center Lot 32 A Back Lot 33 A Front Lot 33 A Center Lot 33 A Back Lot 55 A Center Lot 56 A Center Lot 57 A Center Lot 13 A Front Lot 13 A Front Lot 13 A Back Lot 13 A Back Lot 13 A Center Lot 1.3 A Center. Lot 12 A Front 1,ot 12 A Front Lot 12 A Back Lot 12 A Back Lot 56 A Back Lot 58 A flack Lot 34 A Front Lot 34 A Center Lot 34 A Back Lot 35 A Front Lot 35 A Back Lot 35 A Center Lot 36 A Front Lot 36 A Back Lot 36 A Center i,ot 55 A Back 990 991.5 992.5 991 992 990 991.5 991 992.5 PG PG PC PG PC PC 991 990 991 1004.5 1006 1004.5 1006 '1004.5 1006 1006.5 1.008 1006.5 1008 993.5 991.5 PG PC PG PG PC PG PG PG PG 994 101.4 9.3 100.8 10.3 104.3 14.1 101.5 11.0 104.3 10.9 105.1 8.8 103.0 15.0 102.4 9.8 105.3 11.4 102.2 9.2 103.8 8.8 109.3 10.0 106.3 11.2 107.8 11.5 108.6 12.0 107.1 9.8 104.4 10.9 102.0 11.5 105.1 9.4 91 90 93** 91 93 94 92 91 94 91 93 98 95 96 97 96 93 91 94' 100.9 I 12.1 I 92 104.3 1 10.9 JI 95 102.8 11.0 j 93 103.4 ` 9.1 1 94 105.9 f 9.3 f 96 101.4 12.5 92 101.1 7.6 I 92 94.4 9.9 I 86* 100.1 10.2 i 91 103.3 8.7 94 104.7 15.2 I 93 106.4 14.4 i 95. 107.0 8.5 I 96 105.3 9.6 94 108.4 8.9 97 99.8 10.7 91 106.7 9.0 95 104.5 9.9 93 100.6 9.1 91 105.3 10.7 94 102.4 8.0 91 103.5 13.3 92 112.0 112.0 112.0 112.0- 112.0 112.0 112.0 112,0 112:0 112.0 112.0 112.0 112.0 . 112.0 112.0 112.0 112.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 1.12.0 112.0 1.12.0 112.0 112.0 110.0 112.0 112.0 110.0 112.0 112.0 117.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California - REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation Dry Density I % Moisture Relative I Maximum J In Placc In Place Compaction Densitv 877 06-21-05 Lot 57 A Back 994.5 101.4 10.9 92 110.0 878 06-21-05 Lot 55 A Center 993.5 105.0 8.7 94 112.0 879 06-21-05 Lot 57 A Center 994 103.1 7.9 92 112.0 880 06-22-05 Lot 60 A Front 990.5 93.7 8.4 85* 110.0 881 06-22-05 Lot 60 A Front 992 103.1. 10.6 94 110.0 $82 06-22-05 Lot 59 A Front 990.5 102.1 11.3 93 110.0 883 06-22-05 Lot 58 A Front 991.5 1 100.6 7.1 91 110.0 884. 06-22-05 Lot 57 A Front 994 104.5 8.8 95 110.0 885 , 06-22-05 Lot 57 A Front 995 1.04.1 8.2 , 95 110.0 886 06-22-05 Lot 56 A Front 990 106.2 10.1 97 110.0 887 06-22-05 1 Lot 56 A Front 991.5 102.7 7.9 93 110.0 888 06-22-05 Lot 55 A Front 991 103.8 9.0 94 110.0 889 06-22-05 I Lot 55 A Front 992.5 103.1. 7.8 94 110.0 890 06-23-05 Lot 60 A Center 993 104.1 13.4 93 112.0 891 06-23-05 Lot 59 A Center 991.5 106.9 11.8 95 112.0 892 1 06-23-05 Lot 57 A Center 994 103.0 14.0 92 112.0 893 06-23-05 Lot 56 A Front 993 101.8 10.5 91 112.0 894 1 06-23-05 Lot 56 A Front .994.5 101.4 10.1 91 ! 110.0 $95 06-23-05 Lot 55 A Front 994 104.8 14.0 94 j 112.0 896 06-23-05 Lot 55 A Front 995 102.0 11.9I 91 112.0 897 06-23-05 Lot 55 A Back 995 107.1 10.4 96 112.0 898 1 06-23-05 Lot 55 A Back 996 104.4 8.7 1 93 112.0 899 06-23-05 Lot 56 A Back 994.5 i 106.0 1.1..5 95 112.0 900 06-23-05 ! Lot 56 A Back 996 I 103.2 I 11.1 92 112.0 901 06-23-05 I Lot 56 A Center 994 I 107.3 I 8.8 96 112.0 902 i 06-23-05 Lot 55 A Center 995 ( 104.5 i 9.0 93 1.12.0 903.: 06-23-05 Lot 37 A Front PC 105.1 ' 8.3 94 • 112.0 904 06-23-05 Lot 37 A Back PC 102.2 9.4 91 112.0 905 06-23-05 Lot 37 A Center PC 103.6 9.1 93 112.0 906 06-23-05 Lot 38 A Front PC 103.9 8.5 93 112.0 907 06-23-05 Lot 38 A Hack PC '106.5 10.4 95 112.0 908 06-23-05 Lot 38 A Center PC 104.7 9.9 93 112.0 909 06-23-05 Lot 39 A Front PC 101..9 10.6 91 112.0 916 06-23-05 Lot 39 A Back PC 105.3 10.2 94 112.0 911 I 06-23-05 I Lot 39 A Center PC I 104.0 7.9 93 112.0 912 06-24-05 Lot 30 B Center 989.5 102.6 8.3 93 110.0 913 06-24-05 Lot 30 B Center 991 I 101.41 9.9 92 11.0.0 914 06-24-05 Lot 31 B Front 989.5 I 94.9 10.1 93 102.0 915 06-24-05 Lot 31 B Front 991 103.5 113 i 94 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.( Date Tested Location Elevation Dry Density In Place % Moisture I In Place Relative Compaction ! Maximum Densi 916 06-24-05 Lot 32 8 Front 990 96.2 8.3 94 102.0 917 06-24-05 Lot 32 B Front 991.5 104.1 10.6 95 110.0 918 I 06-24-05 Lot 33 B Front 989 101.8 12.1 93 110.0 919 06-24-05 Lot 33 B Front 991 104,7 9.0 95 110.0 920 i 06-24-05 Lot 34 B Front .988 100.8 10.3. 92 110,0 921 ` 06-24-05 Lot 34 B Front : 989 10511 8.1 96 110.0 922 06-24-05 Lot 30 B Back ' 990 100.5 9.5 91 110.0 923 06-24-05 Lot 30 B Back 991 101.6 8.3 92 110.0 924 06-24-05 Lot 31 B Back 990 97.3 10.1 95 1.02.0 925 06-24-05 Lot 32 8 Back 990 1.01.'..4.. 1.1.5 92 110.0 926 06-24-05 I Lot 33 B Back 990 96.2 8.9 94 102.0 927 06-24-05 j Lot 3013 Center 1991.5 103.6 10.4 94 110.0 928 06-24-05 Lot 31 B Center ; 990.5 106.7 I 12.9 i 97 .11010 929 06-24-05 ( Lot 32 B Center 1991.5 1.04.4 I 1.1..3 � 95 110.0 930 06-24-05 Lot 33 B Center 992 107.1 9.9 97 1.1.0.0 931 06-24-05 I Lot 34 B Center 991 103.3 10.4 i 97 110.0 932 06-27-05 Lot 33 B Back 991.5 100.2 11.2 91 11.0.0 933 06-27-05 Lot 33 8 Back 993 93.1 12.8 91 102.0 934. 06-27-05 Lot 55 A Front 997 106.2 16.7 95 112.0 935 06-27-05 Lot 55 A Front 999 99.2 13.9 90 1.1.0,0 936 06-27-05 Lot 56 A Front 997 1.02.4 1.0.5 93 110.0 937 06-27-05 Lot 56 A Front 999 102.0 13.7 93 110.0 938 06-27-05 I Lot 57 A Front 995 100.9 15.3 92 110.0 939 06-27-05 Lot 57 A Front 996 99.2 9.6 90 1.10.0 940 06-27-05 Lot 58 A Front 991 i 105.5 I 10.1 94 i 112.0 941 06-27-05 Lot 59 A Front ' 991.5 106.1 11.3 95 I 112.0 942 06-27-05 Lot 55 A Back 997 I 99.6 16.8 91 110.0 9.43 06-27-05 Lot 55 A Back 999 99.2 9.3 90 1.1.0.0 944 06-27-05 I Lot 56 A Back 997 1.06.4 11.7 95 112.0 945 I 06-27-05 Lot 57 A Back 992 109.5 15.8 98 .112.0 946 06-27-05 Lot 57 A Back 994 104.8 16.0 94 11.2.0 947 06-27-05 j Lot 59 A Back 991.5 103.0 9.7 94 110.0 948 06-27-05 Lot 59 A Back ; 993.5 102.4 15.9 93 110.0 949 06-27-05 Lot 31 B Back 991,5 106.3 11.4 97 110.0 950 06-27-05 Lot 31 B Back 993 102.9 9.9 92 112.0 951 06-27-05 Lot 32 8 Back -991.5 96.8 12.8 95 102.0 952 06-27-05 Lot 32 B Back - 993 99.2 8,7 90 110.0 953 06-27-05 Retest # 880 101.5 7.6 92" 110.0 954 06-27-05 Lot 60 A Front '990.5 101.0 8.3 92 110.0 955 06-27-05 Lot 58 A Back 992.5 104.8 13.1 94 112.0 956 06-27-05 Lot 58 A Back 994 106.1 11.6 95 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 'fest No. I Date Tested I Location Elevation I Dry Dewity In Place ! % Moisture I In Place I Relative l Compaction I Maximum Density 957 06-27-05 Lot 60 A Back 990 103.4 9.9 92 112.0 958 j 06-27-05 Lot 60 A Back 992 102.2 10.4 91 112.0 959 06-28-05 Lot 58 A Front 993 103.7 15.1 94 11.0.0 960 I 06-28-05 Lot 58 A Front 994.5 102.6 12.3 93 110.0 961 ; 06-28-05 Lot 55 A Back 1001 100.9 9.3 I 92 110.0 962 I 06-28-05 Lot 55 A Back 1002 I 101.5 10.6 93 110.0 963 ' 06-28-05 Lot 55 A Front ' 1000 i 104.7 13.8 95 110.0 964 06-28-05 Lot 55 A Front 1001 104.1 12.7 95 110.0 965 06-28-05 Lot 56 A Front 1000 106.8 14..5 97 110.0 966 I 06-28-05 Lot 56 A Front 1001 103.4 11.9 94 110.0 967 06-28-05 Lot 56 A Back 999 105.5 15.3 96 110.0 968 I 06-28-05 Lot 56 A Back 1000.5 102.9 13.1 94 I 110.0 969 I 06-28-05 Retest a 862 103.4 i 9.8 94"" 110.0 970 ' 06-28-05 Lot 15 A Front 1002 1.06.1. 1.0.5 96 i 110.0 971 06-28-05 Lot 15 A Back 1002 104.3 11.6 95 j 110.0 972 j 06-28-05 Lot 16 A Front 1001. 1.05.5 8.3 96 i 110.0 973 06-28-05 Lot 57 A Front 998 101.9 13.1 95 11.0.0 974 I 06-28-05 Lot 57 A Front 999.5 103.0 10.2 94 I 110.0 975 06-28-05 Lot 57 A Back 996 103.9 1.1.4 94 1 110.0 976 06-28-05 Lot 57 A Back 997.5 105.4 I 9.9 96 I 110.0 977 06-28-05 Lot 58 A Front 993 106.6 10.7 97 I 110.0 978 ! 06-28-05 Lot 58 A Front 995 104.0 8.4 95 1.1.0.0 979 06-28-05 Lot 58 A Back 996 101.3 9.9 92 110.0 980 I 06-28-05 Lot 58 A Back - 997.5 100.9 '10.3 92 1.10.0 981 06-28-05 Lot 59 A Front 993.5 107.1 10.5 96 112.0 982 . I 06-28-05 I Lot 59 A Front 995 105.6 8.8 94 112.0 983 06-28-05 Lot 59 A Back 995 102.2 I 13.1 93 ' 110.0 984 06-28-05 Lot 59 A Back 996.5 103.4 11.4 94 I 110.0 985 06-29-05 Lot 55 A Front 1002 102.0 16.3 I 93 I 110.0 986 ', 06-29-05 1'ot 55 A Front 1003.5 101.2 16.5 92 110.0 987 06-29-05 Lot 56 A Front 3001.5 103.1 11.9 I 94 110.0 988 i 06-29-05 Lot 56 A Front ' 1002.5 164.4 11.4 I 95 I 110.0 989 06-29-05 Lot 55 A. Back 1002.5 106.1 10.2 95 112.0 990 06-29-05 Lot 55 A Back .1.003.5 103.4 1.3.4 I 94 110.0 991 06-29-05 Lot 56 A Back 1001.5 103.6 � 9.1 94 110.0 992 06-29-05 Lot 56 A Back 1.002.5 1.05.5 I 8.4 96 110.0 993 06-29-05 Lot 57 A Front 1000.5 107.4 13.4 96 112.0 994 06-29-05 Lot 57 A Front 1001.5 106.2 14.5 95 112.0 995 06-29-05 Lot 57 A Back 999 99.1 I 17.1 I 90 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation Dry Density % MoistureI Relative Maximum In Place In Place Compaction Density 996 06-29-05 Lot 57 A Back 1.000.5 1.01.3 11..8 997 06-29-05 Lot 58 A Front 996.5 105.2 13.4 998 06-29-05 Lot 58 A Front 998 106.6 10.8 999 06-29-05 Lot 58 A Back 998.5 107.3 12.5 1000 06-29-05 Lot 58 A Back 999.5 104.2 14.0 1001 06-29-05 Lot 59 A Front , 996 104.1 11.6 1002. 06-29,-05 Lot 60 A Front 992.5 105.5 8.0 1003 06-29-05 Lot 60 A Font 1994.5 99.8 12.1 1004 06-29-05 Lot 61 Front 992.5 108.4 10.9 1005 06-29-05 Lot 61 Front 994.5 103.1 10.3 1006 06-29-05 Lot 12 A Front PC 99.2 10.6 1007 06-29-15 Lot 1.2 A Center PG 99.8 8.3 1008 06-29-05 Lot 12 A Back PC 102.4 9.6 1009 06-29-05 Lot 1.3 A Front PC 101.1 1.5.4 1010 06-29-05 Lot 13 A Center PC 103.5 9.9 1011 06-29-05 Lot 13 A Back PG 100.4 12.1 1012 06-29-05 Lot 14 A Front PG 99.0 9.2 1013 06-29-05 Lot 14 A Back 4 PC 101.4 8.3 1014 06-29-05 Lot 14 A Center . PG 102.4 10.4 1015 06-29-05 Lot 15 A Front PG 102.0 16.1 1016 06-29-05 Lot 15 A Center PC 100.6 i 15.8 1.017 06-29-05 Lot 15 A tack PG ! 106.3 16.4 1018 06-30-05 Lot 68 Front ; 989 I 100.6 15.5 1.019. 06-30-05 Lot 68 Front 991 ! 102.2 10.2 1020! 06-30-05 Lot 67 Front 989 101.0 13.4 1021: 06-30-05 Lot 67 Front 991 1.03.1 11.1 1022; 06-30-05 Lot 66 Front ! 989 104.5 ! 14.2 1023 06-30-05 1 Lot 66 Front `.991 j 102.5 1 12.3 1024 06-30-05 I Lot 65 Front } 990 ( 102.3 1 10.8 1025 06-30-05 Lot 64 Front ? 990 I 104.1. I 11.4 10261- 06-30-05.1 Lot 69 Front ; 993106.3 I 9.0 1027 06-30-05 Lot 69 Front 99.4.5 l 1.03.9 10.1 1028 06-30-05 Lot 62 Front 1990.5 105.4 8.8 1029 06-30-05 Lot 62 Front ;992.5 102.9 11.4 1030 06-30-05 Lot 63 Back '990.5 1.04.4 11.8 1031 06-30-05 Lot 63 Back ;992.3 104.1 10.2 1032 06-30-05 Lot 62 Back 1 990 101.8 13.1 1033 06-30-05 Lot 62 Back ! 992 I 106.3 9.9 1034 06-30-05 Lot 63 Front 990 103.4 12.7 1035 l 06-30-05 Lot 63 Front 992 100.8 11.0 1036 06-30-05 Lot 69 Front R 989 103.3 11.8 DATE: March 2, 2006 92 96 97 98 95 95 96 91 99 94 90 91. 93 92 94 94 90 92 93 93 91 97 91 93 92 94 95 93 93 95 97 94 96 94 95 95 - 93 97 94 92 94 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0. 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club' PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.f Date Tested Location Elevation j Dry Density % Moisture I Relative I Maximum In Place In Place Compaction Densitv 1037 06-30-05 Lot 69 Front 991 105.0 10.1 1038 06-30-052 Lot 68 Front 993 101.6 9.9 1039 06-30-05 Lot 68'Front 994.5 104.5 11.3 1.040 06-30-05 Lot 67 Front 993 I 103.3 i 14A 1041 06-30-052 Lot 67 Front . 995 105.0 10.6 1042 06-30-05 Lot 66 Front 993 100.8 13.5 1043 06-30-05 Lot 66 Front 994.5 101.5 1.1..7 1044 06-30-05 Lot 65 Front 992 104.7 8.3 1.045 06-30-05 i Lot 65 Front 994' 107.1. 8.9 1046 06-30-05. Lot 64 Front 992 102.2 12.4 1047 07-01-05 I Lot 69 A Front 996 101.4 11.3 1048 07-01-05 Lot 69 A Front 997.5 1.01..6 10.7 1049 07-01-05 Lot 68 A Front 996 104.3 9.8 1050 07-01-05 Lot 68 A .Front 997.5 1.02.6 12.5 1051 07-01-05 I Lot 67 A Front 996 103.4 10.0 10,521 07-01-05 Lot 67 A Front 997.5 100.8 I 11.3 1053 i' 07-01.-05 Lot 62 A Front 993 105.1 14,1 1054 07-01-05 Lot 62 A Front 994.5 104.6 1 I 13.2 1055 07-01-05 i Lot 63 A Front 993 102.5 12.9 1056 07-01-05 Lot 63 A Front -994.5 101.4 14.6 10571 07-01.-05 i ' Lot 66 A Front 996 103.4 12.6 1058 i 07-01-05 Lot 66 A Front 997 103.0 11.8 10591 07-01.-05 Lot 65 A Front 995 101,4 13.5 10601 07-01-05 Lot 65 A- Front 996.5 100.8 12.0 1.061 i 07-01-05 I )mot 64 A Front 994 106.0 10.7 10621 07-01-05 I Lot 64 A Front 995.5 104.2 11.9 10631 07-01-05 Lot 24 A Front PG 10.4.6 11.1 1064; 07-01-05 I Lot 24 A Center IAC 104.2 15.6 1065,! 07-01-05 Lot 24 A Back PC 107.8 8.4 1066; 07-01-05 Lot 23 A Front PG 99.1 10.0 10671' 07-01-05 Lot 23 A Center PC 106.9 9.3 1068 , 07-01-05 Lot 23 A Back PG 107.4 8.4 10691 07-01-05 Lot 22 A Front PC 106.5 11.1 10701 07-01-05 Lot 22 A Center PG 104.6 7.7 1071 I 07-01-05 Lot 22 A Back PG 107.1 8.6 1072 07-01-05 Lot 21 A Front 11G 105.9 6.8 1073 I 07-01-05 Lot 21 A Center PG 100.5 7.7 1074 i 07-01-05 Lot 21 A Back PG 103.7 6.5 1 10751 07-05-05 Lot 69, A Front 998.5 102.4 9.9 1076 j 07-05-05 Lot 69 A Front 1000 104.0 1.1..1 DATE: Mauch 2, 2006 95 110.0 920 110.0 95 110.0 94 110.0 95 1.1.0.0 92 110.0 92 110.0 95 110.0 97 110.0 93 110.0 92 11.0.0 92 110.0 95 1.1.0.0 93 110.0 94 110.0 92 110.0 96 110.0 95 110.0 93 110.0 92 110.0 94 110.0 94 110.0 92 110.0 92 110.0 96 110.0 95 I 110.0 95 110.0 95 110.0 98 110.0 90 110.0 95 112.0 96 112.0 95 112.0 93 112.0 96 112.0 96 1.12.0 91 110.0 94 110.0 91 112.0 93 112.0 Sladden Engineering r TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I Relative I Maximum In Place I In Place I Comvaction Densiry 1077 07-05-05 Lot 68 A Front 998.5 104.5 1078 07-05-05 Lot 68 A Front 1000.5 101.3 1.079 07-05-05 Lot 67 A Front 948.5 106.1 1080 07-05-05 Lot 67 A Front 1000 102.7 1081 07-05-05 Lot 62 A Front 995.5 100.8 10821 07-05-05 Lot 62 A Front 997 103.4 1083 07-05-05 Lot 63 A Front 995,5 1.05.7 1084 07-05-05 Lot 63 A Front 997 102.0 1085 07-05-05 Lot 60 A Front 996 i 107.1 1086 07-05-05 Lot 60 A Front 997 104.4 1087 07-05-05 Lot 61 A Front 995.5 1.03.8 1088 07-05-05 Lot 61 A Front 997 105.1 1089 07-05-05 Lot 60 A Back 994 101..8 1090 07-05-05 Lot 60 A Back 995.5 100.6 1091 07-05-05 Lot 61 A Back 994 104,8 1092 07-05-05 Lot 61 A Back 996 1.02.6 1093 07-05-05 i Lot 63 A Back 994 1 101.1 1094 07-05-05 Lot 63 A Back 996 101.5 1095 07-05-05 Lot 62 A Back 994 103.0 10961 07-05-05 lot 62 A Back 996 102.4 i 1097' 07-06-05 Lot 44 B Front 984 102.2 10981 07-06-05 Lot 45 B Front 984 100.4 1.0991 07-06-05 I Lot 45 B Front 986 102,5 1100 07-06-05 Lot 45 8 Back 985 104.6 1101' 07-06-05 ! Lot 45 B Back 987 105.9 11021 07-06-05 Lot 1.06 B Back 980.5 100.7 11031 07-06-05 I Lot 107 B Back 979.5 I 101.4 1104' 07-06-05 i Lot 106 B Back 982 96.4 1105, 07-06-05 Lot 107 B Back 981.5 94.2 1106 07-06-05 I Lot 108 B Front 978 99.8 1107 07-06-05- I Lot 108 B Back 978 101A 1.1.08 07-06-05 Lot 44 B Back 985 105.1 1109 07-06-05 'Lot 44 B Back 987 102A 1110 07-06-05 Lot 46 B Back 985 101.3 1111 07-06-05 Lot 46 B Back 987 103.0 1112 07-06-)5 Lot 106 8 Front 981 i 106.3 1113 07-06-05 Lot 106 B Front 982.5 1 102.5 1114 07-06-05 Lot 107 B Front 979.5 104,4 1115 07-06-05 Lot 107 B Front 981.5 96.0 1116 07-07-05 1 Lot 45 B Back DATE: March 2, 2006 989 1 107.1 10.7 8.6 12.4 90 12.8 10.2 11.4 9.1 9.3 13.5 13.1 14.3 11.4 14.1 10.3 8.9 10.5 8.4 12.9 10.8 9.5 15.6 '15.3 9.0 13.3 17.2 16.9 5.1* 3.8* 8.7 9.2 9.8 10.3 11.4 8.6 10.4 8.1 11.6 5.3* 93 90 95 92 90 94 94 91 96 93 93 94 91 91. 94 93 92 92 94 93 93 91 93 95 96 90 92 86* 84* 91 92 94 91 90 92 95 92 93 86* 112.0 112.0 112.0 112.0 112.0 11.0.0 112.0 112.0 112,0 112.0 112,0 112.0 112.0 110.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 110.0 1:10.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 12.8 I 96 1 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No,I Date Tested Location Elevation .I Dry Density % Moisture I Relative I Maximum In Place In Place Comoaction Dcnsity 1117 07-07-05 Lot 45 B Back 991 1083 1.4.1. 97 1118 07-07-05 Lot 44 B Back .989 101.9 10.4 91 1119 07-07-05 Lot 44 B Back -991 101.1 14.5 90 1120 07-07-05 Lot 43 B Back 984 100.8 -8.2 90 1121 07-07-05 Lot 4313 back 986 101.8 11.0 91 1122 07-07-05 Lot 45 B Front 988 109.5 14.8 98 1123 07-07-05 Lot 4513 Front 990 104.6 9.1 93 1124 07-07-05 Lot 44 B Front -986 103.4 10.7 92 1125' 07-07-05 'Lot 44 B Front 988 102.3 11.5 91 1126 � 07-07-05 Lot 43 B Front 984 10.3 16.6 92 1127 07-07-05 Lot 43 8 Front 986 104.0 12.7 93 1128 07-07-05 Lot 42 B Front 984.5 108.7 10.5 97 1129i 07-07-05 Lot 42 8 Front .986.5 100.6 15.2 90 1130 07-07-05 . Lot 41 B Front 984.5 101.4 , '11.5 91 11.31. 07-07-05 Lot 4113 Front 986.5 105.5 9.0 94 11.32 ! 07-07-05 � Lot 43 B Ccnter 986 1 106.8 11.3 90 11331 07-07-05 Lot 42 B Center 985.5 i 103.6 9.4 93 1134 I 07-07-05 I Lot 41 8 Center 986 102.0 13.2 91 1135; 07-08-05 Lot 46 B Front 985 103.6 8.8 93 1136, 07-08-05 I Lot 46 8 Front 987 101.9 8.2 91 11371 07-08-05 Lot 45 B Front 992 105.5 1.0.7 94 1138, 07-08-05 Lot 45 B Front 993.5 104.0 11.5 93 1139 07-08-05 Lot 44 B Front 990 1.01..4 9.9 92 1140 07-08-05 Lot 44 B Front 991.5 105.7 I 13.4 94 1141 07-08-05 Lot 43 8 Front 988 106.2 12.6 95 1142 07-08-05 Lot 43 B Front 989.5 I 102.8 11.3 93 1.1.43 07-08-05 Lot 42 B Front 988.5 i 104.1 8.7 93 1144 07-08-05 Lot 42 B Front 990 101.3 10.5 92 1145 07-08-05 Lot 41 B Front 988.5 101.4 11.5 91 1146 07-08-05 I Lot 41 B Front 990 1.05.0 9.0 94 11.47 07-08-05 Lot 46 B Back 989 102.8 10.6 92 11481 07-08-05 I Lot 46 B Back 991 106.3 8.8 95 1149 i 07-08-05 Lot 45 B Back 992 104.0 12.4 I 93 11501 07-08-05 1 Lot 45 B Back 993.5 103.3 17.1 I 92 1151.1 07-08-05 Lot 44 B Back 992 101.4 9.3 91 10521 07-08-05 Lot 44 B Back '993 101.8 10.2 91 11,53! 07-08-05 Lot 43 8 Back 988 107.3 ' 8.6 96 11541 07-08-05 Lot 43 B Sack 989.5 103.1 9.9 92 11551 07-08-05 Lot 42 B Back 985 102.4 10.5 I 91 1.1561 07-08-05 Lot .4213 Back '986.5 100.6 13.4 f 90 11571 07-08-05 Lot 41 B Back 984.5 104.4 9.2 i 93 DATE: March 2, 2006 112.0 1.1.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 1.12.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 110.0 112.0 112.0 110.0 112.0 11.0.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 Sladden Engineering TEST RESULTS PROJECT NAME, Madison Club PROJECT NO: 52211810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation I DryDensity% Moisture j Relative Maximum In Place In Place Compaction I Densitv 11581 07-08-05 1 Lot 41 B Back '986.5 1 104.1 11591 07-11-05 Lot 109 B Back 977 99.3 11601 07-11-05 Lot 109 B back 978.5 1.06.2 11611 07-11-05 Lot 110 B Back 997 102.2 11621 07-11-05 Lot 110 8 Back 979 101.4 11631 07-11-05 Lot 110 B Front 977 99.8 1164 07-11-05 Lot 110 B Front 978.5 99.3 11651 07-11-05 Lot 109 B Front 977 1 106.7 1166 07-11-05 Lot 109 B Front 978.5 102.8 1167 07-11-05 Lot 70 A Back 990.5 103.5 11681 -07-11-05 Lot 70 A Back 992.5 100.8 1169 07-11-05 Lot 69 A Back 990 102.0 1.1.701 07-11.-05 Lot 69 A Back 992 108.5 11711 07-11-05 1 Lot 68 A Back 990 100.0 1172 07-11-05 Lot 68 A Back 992 105.9 '1173 07-11-05 Lot 67 A Sock 989 108.5 1174 07-11-05 Lot 67 A Back 991 107.0 1175 I 07-11-05 Lot 66 A Back 990. 102.2 1176. 07-11-05 Lot 66 A Back 992 107.3 1177 07-11-05 Lot 65 A Back 990.5 104.4 1178 07-11-05 Lot 65 A Back 992.5 105.3 1179 07-11-05 Lot 70 A Back 994.5 101.1. 1180 07-11-05 i Lot 69 A Back 994 103.6 1181 07-1.1-05 • Lot 68 A Back 994 1 1.07.2 1182 07-11-05 Lot 67 A Back 993- I 105.5 11.831 07-11.-05 Lot 66 A Back 994. ; 103.2 1184 I 07-12-05 Lot 7 B Back 1001 101.5 1185 07-12-05 Lot 7 B Back 1003 108.4 1186 07-12-05 Lot 8 B Back 1002.5 99.2 1187 07-12-05 1 Lot 8 B Back 1004.5 102.1 1188 07-12-052 Lot 8 B Front 1000.5 101.6 1189 07-12-05 i Lot 8 B Front 1002.5 104.1 1190 07-12-05 Lot 7 B Front 1.002 103.6 1191 07-12-05 Lot 7 B Front I 1004 108.9 1192 07-12-05 Lot 9 A Front 1001 10810 1193 07-12-05 Lot 10 A Front 1000.5 107.8 1194 07-1.2-05 Lot 10 A Front 1002.5 102.0 1195 07-12-05 Lot 11 A Front 10011 101.4 1196 07-12-05 Lot 11 A Front 1003 1.02.6 1197 07-12-05 Lot 11 A Back 1003 99.7 DATE: March 2, 2006 11.3 I 93 I 112.0 9.2 I 90 110.0 1.0.0 96 110.0 9.1 93 110.0 10.8 92 110.0 f 13.0 91 110.0 16.7 90 110.0 10.0 97 110.0 9.2 93 110.0 16.8 94 ! 110.0 14.2 92 I 110.0 17.1 91 1.1.2.0. 13.3 97 I 112.0 16.6 91 11.0.0 9.0 95 1.12.0 16.5 97 112.0 16.8 96 112.0 15.9 93 110.0 13.6 ! 96 112.0 10.8 1 95 110.0 12.7 96 110.0 11.0 92 110.0 9.9 94 j 1.10.0 12.4 96 1 112.0 10.6 94 112.0 1.3.3 94. 110.0 17.3 I 92 110.0 13.5 97 I 112.0 14.8 90 110.0 9.6 93 i 110.0 1.0.7 92 110.0 13.6 95 ' I 110.0 16.9 94 110.0 12.1 99 110.0 16.6 96 11.0.0 16.2 96 112.0 7.4 93 110.0 9.2 92 110.0 14.1 93 1 1.10.0 8.5. 91 I 110.0 •Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO; 5224810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Iteladvel Maximum In Place In Place I Compaction I Densitv 1198 07-12-05 Lot 11 A Back 1005 104.5 7.0 1199 07-12-05 Lot 10 A Back 1003 1.03.0 14.5 1200 07-12-05 Lot 10 A Back 1005 109.1 9.4 1201 07-12-05 Lot 9 A Back 1002 106.3 10.7 1202! 07-13-05 Lot 111 B Front 987 i 1.02.4 8.6 1.203 07-1.3-05 Lot 1110 Front 980 104.5 12.1 1204 07-13-05 Lot 112 B Front 977.5 99.5 16.6 1205 07-1.3-05 Lot 112 B Front 979 102.2 17.4 1206 07-13-05 Lot 113 B Front 975 98.8 16.3 1207 07-13-05 Lot 113 B Front 977 98.9 15.4 1208 07-13-05 Lot 112 5 Back 977.5 99.7 12.5 1209 07-13-05 Lot 112 B Back 979 103.1 i 14.6 7.21.0 07-13-05 I Lot 111 13 Back 978 104.7 14.3 1211 07-13-05 ' Lot 111 B Back 979.5 99.1 13.3 12121 07-13-05 I Lot 70 B Back 996.5 99.0 17.0 1213: 07-13-05 Lot 70 B Back 998.5 98.7 14.1 1214 07-13-05 Lot 69 B Back 996 104.0 17.3 1215! 07-13-05 Lot 69 B Back 998 105.0 14.2 1216 07-13-05 Lot 68 B back 996 1.02.5 11.5 1217 , i 07-13-05 Lot 68 B Back 998 102.9 12.9 I 1218'; 07-14-05 Lot 57 A Front PG 108.3 I 10.5 1219!: 07-14-05 Lot 57 A Center PG 1 108.6 i 9.3 1220' 07-14-05 Lot 57 A Back PC 106.7 12.6 1221; 07-14-05 Lot 98 B Back 975 103.2 17.2 1222- 07-14-05 Lot 97 B Back 976.5 104.8 11.2 1223 07-14-05 Lot 98 B Front 975 105.2 14.0 12241 07-14-05 Lot 98 B Front 977 99.7 1 19.9 1225 1 07-14-05 Lot 97 B Front 976.5 91.0 20.5 12261 07-14-05 Lot 97 B Front 978.5 94.3 18.8 12271 07-14-05 `. Lot 98 B Center 975 I 104.1 16.5 12281 07-14-05 i Lot 98 B Center 976 102.2 15.8 12291 07-14-05 Lot 97 B Center 976 101.3 16.7 1230. i 07-14-05 i Lot 97 8 Center 977 102.9 14.8 1231 07-18-05 Lot 90 B Back 978.5 108.1 I 13.9 1232 07-18-05 Lot 90 B Back '980 102.4 1 8.9 1233 07-18-05 Lot 89 B Back .978 90.1 ilii 71 1234 07-18-05 Lot 90 6 Front 978 103.5 j 1.0.6 1235 07-18-05 Lot 90 B Front 980 105.2 1 13.8 1236 07-18-05 Lot 918 Front 977 96.3 6.2 95 94 97 95 93 95 90 93 90 90 91 94 95 90 90 91 95 95 93 94 97 97 95 94 95 96 89* 83* 86* 95 93 92 94 97 91 80* 92 94 86* 110.0 110.0 112.0 112.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 ' 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 110.0 i 110.0 110.0 112.0 110.0 f 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 112.0 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I Date Tested I Location Elevation I Dry Density I % Moisture Relative Maximum In Place In Place Compaction Density 123 123 123 124 124 124 124 124 124 124 124 1.2.4 124 125 125 07-18=05 Lot 92 B Front 07-18-05 Rete,St # 1.236 07-18-05 Lot 91 B Front 07-18-05 ; Retest #12,33 07-18-05 Lot 89 B Back 07-18-05 Lot 89 B Center 07-18-05 Lot 89 B Center 07-18-05 Lot 90 B Center 07-18-05 Lot 90 B Center 07-18-05 Lot 91 B Center 07-18-05 Lot 90 B Center 07-18-05 Lot 90 B Front 07-18-05 Lot 89'B Front 07-18-05 Lot 90 B Back 07-18-05 ( Lot 90 6 Back 1252 07-19-05 Lot 84 B Front 1253 07-19-05 Lot 89 B Front 1254 07-19-05 Lot 89 B Back 12551 07-19-05 Lot 89 B Back 1256: 07-19-05 Lot 90 8 Front 1257 07-19-05 Lot 90 B Front 1258! 07-19-05 Lot 91 8 Back 1259 07-19-05 Lot 91 B Back 1260; 07-19-05 Lot 92 B Back 1261' 07-19-05 Lot 92 B Back 12621 I 07-19-05 1 Lot 91 B Front 12631 07-19-05 Lot 91. 8 Front 1264, 07-19-05 Lot 92 B Front 1265:i 07-19-05 Lot 92 B Front 1266; 07-20-05 1 Lot 58 A Front 12671 07-20-05 I Lot 58 A Center 1268 07-20-05 Lot 58 A [lack 1269 07-20-05 I Lot 59 A Front 1270 07-20-05 I Lot 59 A Center 1271 07-20-05 Lot 59 A Back 1272 07-20-05 Lot 60 A Front 1273 07-20-05 Lot 60 A Center 1274 07-20-05 Lot 60 A Back '1275 07-20-05 Lot 64. A Back 1276 07-20-05 Lot 64. A Back DATE: March 2, 2006 977 101.4 8.3 91 112.0 977 103.0 9.9 92'" 112.0 979 104.5 11.4 93 112.0 102.2 10.3 91"" 112.0 '1980 106.1 12.1 95 11.2.0 978 103.4 11.0 92 112.0 980 103.7 11.5 93 112.0 978.5 101.9 10.1 91 112.0 980.5 104.5 12.4 93 112:0 977.5 100.9 9.3 90 112.0 979.5 105.0 13.6 94 112.0 978.2 102.3 8.8 91 112.0 980.5 102.9 10.7 92 112.0 979 106.6 9.2 95 112.0 981 103.0 10.5 92 112.0 981.5 1.03.3 8.8. 92 112.0 982.5 104.6 9.3 93 112.0 981.5 1 99.8 16.8 91 110.01 982.5 1.01.3 11.6 92 110.0 981 105.4 7.1 94 112.0 982 101.4 9.7 i 92 1'10,0 977 99.3 ! 11.2 90 110.0 979 107.2 ! 12.7 96 112.0 979.5 105.9 13.6 95 112.0 981.5 108.0- I 15.3 96 1.12.0 980 104.4 9.9 93 112.0 981.5 102.9 I 8.7 92 112.0 979 106.1 11.5 95 1 112.0 981 101.1 10.8 90 i 112.0 PG 104.3 10.1 93 112.0 PG 109.8 7.7 98 112.0 PG 106.3 8.5 95 112.0 PG 103.9 9.2 93 112.0 PG 106.5 i 8.6 95 112.0 PC 105.1 9.1 94 112.0 PG 109.1 10.1 97 112.0 PC ! 108.7 11.3 97 112.0 PG 105.2 8.8 94 112.0 994 101.9 10.5 91 112.0 996 103.3 12.4 92 12.0 ,Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. rate TestedI Location Elevation D Density% Moisture Relative Maximum n PlaceI In Placc I Comnaction I Densitv 1277 07-20-05 Lot 65 A Back 994.5 107.2 9.1 96 11.2.0 1278 07-20-05 Lot 65 A Back 996 104.3 13.4 93 112.0 1279 07-20-025 Lot 66 A Back -995.5 101.8 11,3 91 112.0 1280 07-20-05 Lot 66 A Back 996.5 105.0 12.0 94 112.0 1281 07-20-05 Lot 67 A Back 995 106.9 i 8.5 95 112.0 1282 07-20-05 Lot 67 A Back 996.5 103.3 10.2 92 112.0 1283 07-20-05 Lot 64 A Back 997.5 100.9 14.0 90 112.0 1284 07-20-05 lot 65 A Back 998 1 103.8 11.2 93 1.12.0 1285 07-20-05 i Lot 65 A Back 1000 100.4 14,3 90 112.0 1286 07-20-05 Lot64 a back 999 I 101.6 15.1 91 112.0 12871 07-20-05 Lot 64 A Back 1001 104.7 13.6 93 112.0 12881 07-20-05 1 Lot 66 A Rack 998 108.1 12.9 97 11.2.0 12891 07-20-05 ; Lot 66 A Back 1000 109.01 1 14.5 1 97 112.0 12901 07-20-05 i Lot 67 A Back 998 105.8 13.2 ! 94 112.0 1291 i 07-20-05 Lot 67 A Back 1000 101..5 9.8 91 112.0 1292 07-21.-05 Lot 89 B Front 984.5 1 103.1 9.8 92 112.0 1293 07-21-05 Lot 89 B Front 986.5 ! 99.2 1.4.8 90 110.0 1294 07-21-05 Lot 89 8 Back 984 ! 105.3 11,9 94 i 112.0 12951 07-21-05 Lot 89 B Back 986 102.8 13.0 1 92 112.0 12961 07-21-05 Lot 90 B Front 984 106.6 9.8 I 95 112.0 1297 07-21-05 Lot 90 B Front 985.5 100.3 15.7 91 110.0 1298 07-21=05 Lot 90 B Back 983 104.7 1 12.5 i 93 112.0 1299 107-21.-05 I Lot 90 B Back 985 101.8 12.7 1 91 112.0 1300; 07-21-05 Lot 91 B Front 984 , 105.1 13.5 1 94 112.0 13011 07-21-05. Lot 91 B Front 986 ! 105.3 11.6 94 112.0 13021 07-21-05 Lot 91 B Back 981 I I 103.1 9.9 92 112.0 1303 07-21-05 Lot 91 B Back 983 i 107.2 14.0 96 112.0 1304; 07-21-05 ! Lot 92 8'Front 983 I 104.6 13.4 93 112.0' 1305; 07-21.-05 ' Lot 92 B Front 984.5 101.0 12.1 90 1.12.0 1306; 07-21-05 Lot 92 B Back 983 107.8 17.5 96 112.0 1307' 07-21-05 Lot 92 B Back 984.5 104.4 12,8 93 112.0 .1308; 07-21-05 Lot 93 8 Front 980 105.1 I 9.4 94 112.0 13091 07-21-05 Lot 93 B Front 981.5 108.3 8.5 97 112.0 1310 07-21-05 Lot 93 B Back 980 103.3 1 10.1 92 112,0 1311 07-21-05 Lot 93 B Back 981.5 104.0 1 11.3 93 I 112.0 1312 07-21-05 Lot 93 6 Front 982.5 104.3 9.'1 93 112.0 1313 07-21-05 Lot 93 B Front 984 103.4 13.0 92 112.0 1314 07-21-05 Lot 93 B Back 983 100.8 15.5 90 I 112.0 1315 07-21-05 Lot 93 B Back. 984 102.4 10.8 91 i 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No, bate Tested Location Elevation Dry Density I % Moisture Relative1 Maximum• In Place In Place Compaction Denpity 13161 07-22-05 Lot 71 A Front PG 102.9 11.8 93 110.0 1317•07-22-05 Lot 71 A Center PC 1045 11.9 95 110.0 13181 07-22-05 Lot 71 A Back PC 102.2 8.7 93 110.0 1319 07-22-.05 Lot 70 A Front PC 101.4 9,1 91 112.0 1320 07-22-05 Lot 70 A Center PC 104.4 9.6 93 112.0 1321 07-22-05 Lot 70 A Back PC 106.9 10.1 95 112.0 1322 07-22-05 Lot 69 A Front PC 105.5 14.1 94 112.0 1323 07-22-05 Lot 69 A Center PC 99.7 15.2 91 110.0 1324. 07-22-05 Lot 69 A Back PC, 102.7 13.5 93. 1.10.0 1325; 07-22-05 Lot 68 A Front PC 104.6 8,2 93 112.0 '1326 07-22-05 Lot 68 A Center 1'C 108.9 10.1 97 1 112.0 1327 07-22-05 Lot 68 A Back PC 107,6 9.5 96 112,0 1328 07-22-05 Lot 67 A Front PC 101.6 12.5 J 91 112.0 1329 07-22-05 Lot 67 A Center PC 102.1 8.4 I 91 112.0 '1330 07-22-05 Lot 67 A Back PG 106.6 7.5 95 112.0 1331, 07-22-05 Lot 66 A Front PC 105.4 10.3 94 112.0 13321 07-22-05 Lot 66 A Center PC 106.6 1.1.8 95 112.0 1333' 07-22-05 Lot 66 A BackPC 107.2 8.3 96 112.0 1334 07-22-05 Lot 65 A Front PG 1.08.5 10.6 1 97 11.2.0 1335 i 07-22-05 Lot 65 A Center PC 104,1 1 9.5 93 11-2.0 13361 07-22-05' Lot 65 A Back PC 101.8 I 7.7 1 91 112.0 13371 07-22-05 Lot 64 A Front PG 105.0 13.5 94 112.0 13381 07-22-05 Lot 64 A Center PC 107.5 11.0 96 112.0 13391 07-22-05 I Lot 64 A Back PC ' 106.4 9.6 95 1.12.0 1340' 07-22-05 I Lot 63 A Front PC 107.6 9.2 96 1 112.0 13411. 07-22-05 LOT 63 A Center 11C 106.3 9.4 95 I 112.0 1342' 07-22-05 j Lot 63 A Back PC 1.03.2 j 10.1 92 112.0 13431 07-22-05 i Lot 62 A Front PC '109.1 ' 7.8 i 97 112.0 1344 07-22-05 Lot 62 A Center PC 107.3 8.8 96 1.12.0 1345 07-22=05 Lot 62 A Back PC 108.6 9.2 93 112.0 1346 07-22-052 Lot 61 A Front PC 1.04.5 11.5 93 112.0 1347! 07-22-05 Lot 61 A Center PG 109.3 10.4 98 12.0 134$1 07-22-05 Lot 61. A Back PC 109.2 11,6 98 112.0 1349 07-25-05 Retest 91224 103.3 16,7 92** 112.0 1350 07-25-05 Lot 98 B Front 979 105,1 14.5 94 112.0 1351 07-25-05 Lot 98 B Back 977 101.6 17.0 91 112,0 1352 07-25-05 1 Lot 98 B Back 979 104.4 15.1 93 112.0 1353 07-25-05 Retest # 1225 102.2 16.0 91** 112.0 1354 07-25-05 Retest # 1226 101.8 13.6 91** 112.0 1355 07-25-05 Lot 97 B Back 978.5 .105.3 13.9 , 94 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation Dry Density In Place % Moisture In Place Relative Compaction Maximum Densis 1356 07-25-05 Lot 97 B Back 980.5 103.4 14.7 92 112.0 1357 07-25-05 Lot 9813 Front 981 106.6 12.9 95 1.12.0 1358 07-25-05 Lot 98 B Front 983 1035 12.4 1 92 112.0 1359 07-25-05 Lot 9813 Back 981 102.1 1.3.6 91 112.0 1360 07-25-05 Lot 98 B Back 983 102.9 17.0 92 712.0 1361 07-25-05 Lot 97 B Front 980.5 100.9 15.5 90 112.0 1.362 07-25-05 Lot 97 B Front 987.5 105.0 11.6 94 112.0 1363 07-25-05. Lot 97 B Back 981.5 106.6 13.3 95 112.0 1.364. 07-25-05 Lot 97 B Back 983 104.8 11,2 94 1.12.0 1365 07-26-05 Lot 114 B. Front 977.5 105.1 8.3 94 112.0 1366 07-26-05 Lot 114 B. Front 979.5 103.7 17.5 93 112,0 1367 07-26-05 Lot 114 B Back 977.5 102.5 8.9 92 112.0 1368 07-26-05 Lot 114 B Back 979.5 101.1 14.5 90 112.0 1369 07-26-05 Lot 115 B Front 977 106.0 '9.6 95 112.0 1370 07-26-05 Lot 115 8 Front 978.5 105.1 12.4 i 94 112.0 1371 07-26-05 Lot 115B Back 977 100.8 10.0 90 112.0 1372 07-26-05 Lot 115 B Back 978.5 107.1 17.2. 96 112.0 1373 07-26-05 Lot 11.6 8 Front 975.5 103.8 10.3 93 112.0 1374 07-26-05 Lot 116 B Front 977 i 103.6 I 11.2 93 112.0 1375 07-26-05 Lot 11.6 8 Back 975.5 , 105.3 15.7 94 1.12.0 13761 07-26-05 Lot 116 B Back 977 104.0 16.9' 93 I 112.0 13,771 07-26-05 Lot 114 B Front 981. 1.03.1 10.0 92 112.0 1378 07-26-05 Lot 11413 Back 981 106.3 11.4 95 � 112.0 1379 07-26-05 Lot 115 B Front 980.5 107.0 16.8 96 ; 112.0 13801 07-26-05 Lot 115 B Back 980 106.7 17.1 95 I 11.2.0 t 13811 07-27-05 Lot 39 B Front 984.5 101.4 9.3 91 112.0 1382 07-27-05 I Lot 39 B Front 986.5 105.0 10.8 94 112.0 1383 07-27-05 Lot 38 BFront 984 1.06.8 12.5 95 112.0 13841 07-27-05 Lot 38 B Front 986 104.3 11.1 93 ; 112.0 1385 07-27-05 Lot 37 B Front 984.5 103.1 8.8 92 i 112.0 1386 07-27-05 Lot 37 B Front 986.5 103.9 10.4 93 j 112.0 1387 07-27-05 Lot 39 B Front 988.5 107.5 11.3 96 i 112.0 1388 07-27-05 Lot 39 B Front 990.5 105.6 13.3 94 f 172,0 1389 07-27-05 Lot 38 B Front 788 101.8 14.8 91. ` 112.0 1390 07-27-05 Lot 38 B Front 989.5 100.9 12.2 90 112.0 1391 07-27-05 Lot 37 B Front 988.5 108.1 13.5 97 112.0 1392 07-27-05 Lot 37 B Front 990 106.3 12.6 95 112.0 1393 07-27-05 Lot 39 B Back 984.5 103.9 '14.4 93 112.0 13941 07-27-05 Lot 39 B tack 986 103.2 12.0 92 112.0 DATE: March 2, 2006 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested I Location 1395 07-27-05 Lot 38 B Back 1396 07-27-05 Lot 38 B Back 1397 07-27-05 Lot 37 B Back 1398 07-27-05 Lot 37 B Back 1399 07-27-05 Lot 39 B Back 14001 07-27-05 Lot 39 B Back 14011 07-27-05 Lot 38 B Back 14021 07-27-05 Lot 38 B Back 11.3 91 112.0 1403 07-27-05 Lot 37 B Back 1404 i 07-27-05 Lot 37 B Back 1405 07-28-05 Lot 39 B Back 1406: 07-28-05 i Lot 39 B Back 1407; 07-28-05 j Lot 38 B Back 1408. 07-28-05 Lot 38 B Back 1409 • 07-28-05 Lot 37 8 Back 141.0 07-28-05 Lot 37 B Back 1411 07-28-05 Lot 39 B Front 14121 07-28-05 Lot 39 B Front 1413 i 07-28-05 Lot 38 B Front 14141 07-28-05 Lot 38 B Front 1415; 07-28-05 Lot 37 B Front 1416 07-28-05 Lot 37 B3 Front 1417 ! 07-29-05 I Lot 37 B Front 14181 07-29-05 I Lot 37 B Back 14191 07-29-05 I Lot 38 B Front 1420;j 07-29-05 f Lot 38 B Back 1421; 07-29-05 Lot 39 B Front 14221 07-29-05 1 Lot 39 B Back 14231 07-29-05 i Lot 98 B Front 1424 07-29-05 I Lot 98 B Front 1425 07-29-05 Lot 98 B Back 1426 07-29-05 Tot 98 B Back 1.4.27 07-29-05 Lot 97 B Front 1428 07-29-05 Lot 97 B Front 1429 07-29-05 Lot 97 B Back 1430 07-29-05 Lot 97 B Back 1431 07-29-05 Lot 88 B Front 1432 07-29-05 Lot 88 B Back DATE: March 2, 2006 TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 Elevation Dry DensityI % Moisture Relative I Maximum In Place In Place [ Comnaction Density 984 986 984.5 986.5 988 989.5 988 989.5 988.5 990 991.5 ' 992.5 991 992.5 991 992.5 991.5 992.5 991 992.5 991 i 992.5 i 993.5 993:5 993.5 993.5 994 994 985 986 985 986 984 '985.5 984.5 985.5 976 '975.5 107.0 104.5 102.9 101.0 108.0 105.1 102.0 105.7 101.5 106.0 1.08.4 103.7 109.6 '103.7 104.2 108.6 102.5 1.01.0 102.9 105.8 107.3 108.5 99.9 105.2 99.7 1.01.5 1.03.3 100.1 93.1 92.4 102.8 104.4 106.3 105.8 104.0 101.6 107.6 104.9 9.9 96 112.0 10.7 I 93 112.0 15.1 92 112.0 11.0 90 ! 112.0 12.2 96 ; 112.0 15.1 94 I 11.2.0 9.6 91 112.0 13.2 94 1.12.0 11.3 91 112.0 8.7 95 112.0 14.1 97 112.0 10.7 92. 1.12.0 12.4 98 112.0 12.6 93 j 112.0 16.7 93 I 112.0 12.9 97 112.0 12.4 92 112.0 17.6 90 112.0 12.1 92 112.0 10.7 I 94 112.0 16.6 96 112.0 15.1 97 112.0 i 15.6 j 91 110.0 1 10.8 94 I 112.0 , 10.8 91 110.0 ' 11.2 91 112.0 16.3 i 92 112.0 , 11.2 ` 91 110.0 7.1' 1 85r j 110.0 6.6~ 84~ 1 110.0 10.9 I 93 110.0 13.6 95 110.0 14.1 95 112.0 12.9 94 112.0 11.8 93 112.0 10.7 91 112.0 14.5 96 112.0 12.3 94 112.0 f Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-0810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Tcst No. Datc Tcstcd Location Elevation I Dry Density In Place I % Moisture In Place Relative Compaction I Maximum Dcnsi 1433 08-01-05 Lot 52 B Front 979 104.1 11.9 93 112.0 1434 08-01-05 I Lot 52 B Back 978.5 102.4 9.7 91 112.0 1435 08-01-05 Lot 53 B Front 978 101.8 12.5 91 1 112.0 1436 08-01-05 loot 53 8 Back 978.5 105.9 10.6 95 112.0 1437 08-01-05 Lot 54 B Front 977.5 106.6 12.3 95 112.0 1438 08-01-05 Lot 5413 Back '977 101.0 1.4.9 90 112.0 1439 08-01-05 Lot 55 B Front 977.5 103.4 i 9.8 92 112.0 '1440 08-01-05 Lot 55 B Hack 977.5 103.8 13.2 93 112.0 1441 08-01-05 Lot 56 B Front 977 107.3 13.9 96 112.0 1.4.4.2 08-01.-05 Lot 56 B Back .976.5 104.4 11.0 96 112.0 1443 08-01-05 Lot 57 B Front 976.5 101.3 I 8.9 90 112.0 1444! 08-01-05 Lot 57 B Back ; 977 102.7 12.1 92 112.0 1A ; 08-01-05 Club House 966.0 99.3 17.2 90 ( 110.0 2A i 08-01-05 Club House X968.0 102.0 18.7 94 I '1'10.0 3A ! 08-01-05 Club House 966.0 99.7 19.2 91 110.0 4A 08-01-05 I Club House 9b1..0 100.9 i 19.9 92 110.0 5A 08-01-05 I Club House 963.0 1.03.5 20.9 95 110.0 6A 08-01-05 i . Club House 967.0 100.1 19.2 I 91 110.0 7A ! 08-01-05 I Club House :969.0 102.9 14.9 94 1:10.0 8A i 08-01-05 i Club House 965.0 102.3 17.5 93 110.0 9A I 08-01-05 ! Club House 967.0 98.6 12.7 90 110.0 10A 08-02-05 Club House 969.0 104.0 17.0 95 110.0 11A 08-02-05 Club House 971.0 100.1 16.4 91 110.0 12A 08-02-05 Club House ,970.0 101.2 18.7 92 I 110.0 13A 08-02-05 Club House .971.0 102.7 19.4 94 110.0 14A 08-02-05 1 Club House 973.0 102.4 20.5 ! 93 110.0 14451 08-02-05 Per Plan 979.5 100.8 16.6 i i 92 110.0 1446! 08-02-05 Per Plan ;980.5 101.9 10.8 93 110.0 1447 i 08-02-05 Per Plan 979.5 104.3 11.9 i 95 1'10.0 1448 08-02-05 Per Plan 981. 1.01..5 9.4 i 92 110.0 14491 08-02-05 I Per Plan ?978.5 102.7 12.5 92 ! 112.0 14501 08-02-05 Per Plan 979.5 '100.9 1 8:8 92 110.0 14511 08-02-05 Per Plan ;979.5 104.8 10.2 94 112.0 1452, 08-02-05 Per Plan ;981.5 104.6 10.9 93 112.0 14531 08-02-05 Per Plan 980 108.1 13.3 97 112.0 1454 08-02-05 Per Plan 1981.5 105.4 11.6 94 ! 112.0 1455 08-02-05 Per Plan 980 106.3 11.0 95 jf 112.0 1456 08-02-05 I Per Plan i981.5 103.9 12.5 93 I 112.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 'fest No. Date Tested Location Elevation Dry Density % Moisture Relative ' ' Maximum In Place In Place Comoaction 1 Density 1457 08-03-05 Lot 89 B Front 988.5 105.1 13.3 1458 I 08-03-05 Lot 89 B Front 990.5 104.2 11.6 1459- 08-03-05 Lot 89 B Back 988, j 107.9 9.9 14601 08-03-05 Lot 89 B Back 99U 103.8 12.0 1.4611. 08-03-05 i Lot 90 B Front 978.5 106.6 10.5 14621 08-03-05 Lot 90 B Front 989.5 106.1 11.3 14631 08-03-05 I Lot 90 B Back 987 102.5 14.5 1464 08-03-05 Lot 90 B Back 989 102.8 13.4 1465 08-03-05 Lot 91 B Front 988 108.1 10.7 1466 08-03-05 Lot 91 B Back 985 105.3 13.8 1467 08-03-05 Lot 91 B Back 987 101.6 1.0.0 1468 08-03-05 Lot 92 B Front 986.5 103.7 9.2 1469 08-03-05 Lot 92 B Back 986.5 103.5 1.2.4 1470 08-03-05 Lot 93 B Front 985.5 107.8 11.0 1471 08-03-05 Lot 93 B Sack 985 1 104.4 14.1 A 08-03-05 I Lot 60 Front 975 102.4 1.6.0 B 08-03-05 j Lot 60 Back 975 101.1 10.1 C 08-03-05 I Lot 59 Back- 975 103.7 19.3 D 08-03-05 Lot 59 Front 975 100.2 10.2 E 08-03-05 Lot 58 Front 976 103.1 I 15.9 F I 08-03-05 ; Lot 58 Back 976 101.8 17.5 1472; � I 08-04-0.5 Lot 94 B Front 980 1.01.8 10.9 1473. 08-04-05 Lot 94 B Back 979.5 103.3 13.5 1474 08-04-05 I Lot 95 A Front 979 107.5 11.0 147.51 08-04-05 I Lot 95 B Back 797 104.4 8.8 14761 08-04-05' ` Lot 46 B Front 978 102.9 12.6 1477 08-04-05 Lot 46 B Back 978.5 105.1 11.7 1478 08-04-05 Lot 94 B Front 982 1 1.08.2 14.1 1479 08-04-05 Lot 94 8 Front 983.5 1 106.1 12.5 1480 08-04-05 Lot 95 13Froni 981 ! 104.5 10.8 1481 08-04-05 Lot 95 B Front 983 102.4 13.0 1482 08-04-()5 Lot 96 8 Front 980 103.9 11.4 1483 08-04-05 Lot 96 B Front 982 105.5 14.5 1484 08-04-05 Lot 94 B Back 981.5 101.2 9.6 1.485 08-04-05 j Lot 94 B Back 983.5 103.1 10.3 1486 08-04-05. Lot 95 B Back 981 107.4 13.2 1487 08-04-05 I Lot 95 8 flack 983 104.6 11.4 1488 08-04-05 Lot 96 B Back 980.5 104.8 10.2 1489 08-14-05 Lot 96 B Back 982 101.6 127 1490 08-04-05 Retest li 1423 101.3 8.6 DATE: March 2, 2006 94 11.2.0 93 112.0 96 112.0 93 112.0 95 112.0 95 112.0 92 112.0' 92 112,0 97 112.0 94 112.0 91 112.0 93 112.0 92 112.0 96 112.0 93 112.0 93 110.0 92 110,0 95 110.0 91 110.0 94 110.0 93 110.0. 91 112.0 92. I 112.0 96 112.0 93 1.12.0 92 112.0 94 112.0 97 112.0 95 112.0 93 112.0 91 1.1.2.0 93 112.0 94 112.0 90 1.1.2.0 92 112.0 96 112.0 93 112.0 94 112.0 91 112.0 90" 112.0 Sladden Engineering W TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation Dry Density 1n Place % Moisture in Placc I Relative Corni3actiewn I Maximum Densi 1491 08-04-05 Retest 4 1424 103.5 9.0 92** 112,0 1.492 08-04-05 Lot 98 B Back 986 104.4 8.5 93 112.0 1493 08-04-05 Lot 97 B Front 987.5 102.0 11.3 94 112.0 . 1494 08-04-05 Lot 97 B Back 987.5 105.1 10.5 94 112,0 1495 08-04-05 Lot 96 B Front 984 103.3 13.9 93 112.0 1496 08-04-05 Lot 96 B flack '984 107.6 12.7 96 112.0 1497 08-05-05 loot 89 B Front PG 108.3 10.4 97 112,0 1498 08-05-05 Lot 89 B Center PC 1.05.5 1.1.6 94 , 112.0 14.99 08-05-05 Lot 89 B Back . PG 108.4 .10.9 97 112.0 1500 08-05-05 Lot 90 B Front PC 103.8 1 1.3.8 I 93 ! 112.0 1501 08-05-05 Lot 90 B Back PG 105.9 12.1 95 112,0 1502 08-05-05 Lot 90 B Center PC 102.6 12.9 92 i 112.0 1503 08-05-05 Contour Between 981104.7 I 14.8 i 93 I 112.0 1504 08-05-05 Meriwether & 981.5 102,0 13.2 I 91 112.0 7505 08-05-05 Humboldt 1981 108.9 15.3 97 112.0 1506 08-05-05 Per Plan 982 106.1 12.8 95 1.1.2.0 1.507 08-05-05 Per Plan 980.5 103.6 10.7 93 112.0 1508 08-05-05 Per Plan 980.5 105.5 15.5 94 112.0 1509 08-05-05 'Per Plan 981 109.1 13.3 97 112.0 1510 08-05-05 Per Plan 982 1.06.4 11.8 95 112.0 1511 08-05-05 Per Plan :981,5 104.5 12.5 93 112.0 1B ! 08-05-05 , Club House 1975.0 1.01.8 17.8 93 110.0 2B ( 08-05-05 Club House : 975.0 100.1 8.9 91 110.0 3B 08-05-05 Club House 975.0 104.0 15.8 96 110.0. 4B 08-05-05 Club House 975.0 108.8 9.4 99 110.0 5B I 08-05-05 Club House '975.0 99.2 10.1 90 110.0 6B 08-05-05 Club House 972.0 107,6 9.5' 98 110.0 7B I 08-05-05 Club House 974.0 100.4 9.7 91 110.0 8B 08-05-05 Club House 975,0 102.5 12.4 94 110.0 9B OM5-05 Club House 977.0 101.3 10.9 92 1.1.0.0 10B 08-05-05 Club House 977.0 105.2 8.9 95 110.0 IIB -08-05-05 Club House 479.0 1.00,3 13.1 91 1.10.0. 120 08-05-05 Club House 975.0 103.2 10.8 94 110.0 13B 08-05-05 Club House '977.0 101.4 10.1 92 110.0 14B 08-05-05 Club House 975.0 108.2 1.5.9 98 110.0- 10.015B 15B08-05-05 Club House -977.0 106.8 18.1 97 110.0 1613 08-05-05 Club House '977.0 105.6 16.2 96 110.0 .17B I 08-05-05 Club House 977.0 101.0 13.9 92 110.0 18B 08-05-05 Club House 977.0 104.4 19.2 95 I 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 5224810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Tcst No.I Datc Tcstad 1 Location Elevation Dry Density % Moisturc I Relative Maximum in P1aoc In Place Compaction Densitv 19B 08-05-05 Club House . X977.0 105.6 10.2 20B 1 1 08-05-15 Club House 977.0 106.3 12.8 1512' 08-08-05 Lot 91 B Front PC 108.3 9.0 15131 08-08-05 Lot 91 13 Center PC 105.1 11.4 1514 08-08-05 Lot 91 B Back PC '106.5 10.7 1515 08-08-05 Lot 92 B Front PC 103.8 12.6 1516 08-08-05 Lot 92 B Center PC 102.9 1.1..1 1517 08-08-05 Lot 92 B Back PC, 104.7 13.3 1518 08-08-05 1 Lot 93 B Front PC 101.3 9.9 1519 08-08-05 Lot 93 B Center PC 107.2 11.7 1520 08-08-05 Lot 93 B Back PC 104,4 13.8 1521 08-08-05 Lot 9413.Front PC i 108.5 10.7 1522 08-08-05 Lot 94 B Center PC :1.05.6 8.8 1523; 08-08-05 Lot 94 B Back PC 103.0 12.4 15241 OM"5 Lot 9513 Front PC 103.9 10.0 1525 08-08-05 Lot 95 B Center PC 107.2 {{ i 8.3 1526 08-08-05 Lot 95 B Back PC 104.6 11..5 1527 08-08-05 Lot 88 8 Front 997.5 102.2 9.6 1528 08-08-5 Lot 88 B Back 977.5 1 104.0 8.1 15291 08-08-05 Lot 88 B Front 979.5 I 101.6 12,7 1530 08-08-05 i Lot 88 B Back 979:5 105.0 9.0 1531 08-08-05 Lot 88 B Front 981 103.6 1.3.2 15321 08-08-05 1 Lot 88 B Back 981 103.8 i 12.1 1C 1 I 08-08-05 I Club House 979.0 106.4 I 15.7 2C 1 08-08-05 I Club House 981.0 106.2 10.2 3C 08-08-05 Club House 979.0 1 104,5 I 12.4 4C i 08-08-05 Club House 981.0 1 105.3 11.2 5C 1 08-08-05 Club House 979.0 i 103.8 12.3 6C I 08-08-05 1 Club House 1981.0 ! 1.02.1 9.8 7C 08-08-05 1 Club House 979.0 104.9 12.2 8C 08-08-05 i Club House 1981.0 '107.3 13.4. 9C 08-08-05 Club House 979.0 104.1 13.9 10C 08-08-05 I Club House 981.0 105.9 12.6 11C' 08-08-05 Club House 979.0 108.0 15.8 12C 08-08-05 ' Club House 981.0 101.2 16.2 1,533 08-09-05 II Lot 12 B Back 975.5 100.8 22.4* 1534 08-09-05 Lot 12 B Back .976.5 101.3 18.5* 1535 08-09-05 Lot 63 B Back 975 1.01.2 12.7 DATE: March 2, 2006 95 110.0 96 110.0 97 112.0 94 112.0 95 112.0 93 112.0 92 112.0 93 112.0 90 112.0 96 112.0 93 112.0 97 ! 112.0 94 112.0 92 172,0 93 112.0 96 112.0 93 112.0 91 1.12.0 93 112.0 91 I 112.0 94 j 11.2.0 93 I 112.0 93 112.0 96 110.0 96 110.0 95 110.0 95 71.0.0 95 110.0 93 110.0 95 I 110.0 97 I . 110.0 95 110.0 96 I 110.0 98 I 110.0 92 110.0 85* 119.0 85* 119.0 90 1.1.2.0 Sla#en ,Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION- La Quinta, California REPORT NO: 06-02-120 Test No. I Date TestedI Location Elevation I DryDensity I % Moisture RelAtivC Maximum i In Place In Place I Comnaction I Density 1536 08-09-05 Lot 63 B Back 976 1.03.6 17.8* 93 1537 08-09-05 , Lot 64 B Back 9745 106.4 19.4* 90 1538 08-09-05 Lot 64 B Back 9755 102.3 • 20.2* 86* 1539 08-09-05 Lot 65 B Back 1975 97.1 14,3 87* 1540 08-09-05 Lot 65 B Back 976 95.6 13.1 85* 1541 08-09-05 Lot 66 B Back 976 9915 20.1* 89* 1542 r 08-09-05 Lot 66 8 Back 977 103.4 18.2* 92 1D 08-09-05 Club House 983.0 103.6 13.8 95 2D 08-09-05 CIub.House 985.0 100,1 10.3 91 3D 08-09-05 Club House 983.0 105.4 14.7 95 4D 08-09-05 Club House 985.0 1.01..5 15.3 •93 5D 08-09-05 Club House 983.0 102.5 14.5 94 6D 08-09-05 Club House 985.0 100.7 12.4 92 7D 08-09-05 Club House '983.0 108.1. 13.6 98 8D 08-09-05 Club House 1985.0 103.4 10.5 94 9D 08-09-05 Club House 983.0 103.8 1.7.9 95 10D 08-09-05 Club House 985.0 101.7 18.6 93 11D 08-09-05 Club House 983.6 107.2 16.8 97 12D ; 08-09-05 Club House 985.0 105.1 I 15.2 95 15431 0&-10-05 Lot 62 B Front .975.5 109.4 16.5 92 15441 08-10-05 Lot 62 B Front 9763.5 108.3 13.7 91 1545! 08-10-05 Lot 63 8 .Front '976.5 104.5 11.0 93 1546 08-10-05 Lot 64 B Front 978 1.06.6 14.8 95 1547 08-10-05 Lot 65 B•Front 975 103.9 16.2 93 1548 08-10-05 Lot 66 B.Front 977 1.05.5 15.3 94 1549; 08-10-05 1 Lot 67 B Front 973 104.1 1 13.0 93 1550 i 08-10-05 I Retest # 1.533 & 1.534. 104.5 14.8 93** 1551 08-10-05 Lot 63 B Back 976 I 1 101.3 i 77,1 90 1552 08-10-05 Lot 64 B Back 974.5 103.4 1.6.0 I 92 1553 08-10-05 Retest a 1538 105.3 15.6 94 1554 08-10-05 ( Retest # 1539 & 1.540 975 103.1 14.0 92** 1555 08-10-05 Retest # 1541 976 104.7 16.3 93** 1556 08-10-05 Lot 67 B Back 972 100.8 11.4 90 A 08-10-05 Lot 47 983 104.1 13.9 95 B 08-10-05 Lot 47 985 102,9 12.7 C 08-10-05 Lot 48 983 105.2 14.6 D 08-10-05 Lot 48 985 101.4 113.4 DATE: March 2, 2006 112,0 112.0 1.1.9.0 112.0 112.0 112.0 112.0 110.0 110,0 110.0 11.0.0 110.0 1.10.0 11.0.0 110.0 110,0 110.0 110.0 110.0 119.0 119.0 112.0 112.0 112.0 112.0 112.0 112 112.0 112,0 112.0 112.0 112.0 112.0 Sladden Engineering 110.0 94 110.0 . 94 110.0 92 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. Date Tested Location. Elevation ' Dry Density In Place I % Moisture In Place Relative Com action Maximum Deni lE 08-10-05 Club House 987.0 1.01.9 14.8 93 110.0 2E 08-10-05 Club House 989.0 104.8 13.9 95 110.0 3E 08-10-05 1. Club House 987.0 1.00.2 i 18.1 91 110.0 4E ; 08-10-05 '. Club House 989.0 100.3 14.4 91 11.0.0 5E 08-10-05 Club House 987.0 104.0 16.1 95 110.0 6E 08-10-05 Club House 989.0 101.4 13.2. 94 110.0 7E 08-10-05 Club House -987.0 102.9 17.8 94 110.0 8E 08-10-05 Club House 989.0 100.2 1.6.5 91 110.0 9E 08-10-05 Club House 987.0 101.8 18.2 93 ' 110,0 10E 08-10-05 Club House 989.0 104.2 11.7 95 110.0 11E 08-10-05 Club House '987.0 103.1 15.1 94 110.0 12E 08-10-05 Club House 989.0 102.4 15.7 93 110.0 1557 08-11-05 Lot 88 B Front 982.5 103.9 i 10.6 93 112.0 15581 08-11-05 I Lot 88 B Back 983 101.6 11.5 91. 112.0 1559 08-11-05 Lot 8813 Front , 984 105.8 9.6 94 112.0 15601 08-11705 Lot 88 B Back 984.5 107.7 9.2 96 112.0 15611 08-11-05 1 Lot 96 B Front PG 106.0 8.8 95 1.12.0 15621 08-11-05 1 Lot 96 B Center PC 104.4 12.4 93 1 112.0. 1563! 08-11-05 Lot 96 B Back PG 108.1 9.2 97 112.0 1564: 08-1.1-05 1 Lot 97 B Front PG 102.3 10.6 91 ! 112.0 1565. 08-11-05 Lot 97 B Back PC 105.1 13.0 94 I 112.0 15661 08-11-05 Lot 97 B Center PG 107.4 11.8 96 1.12.0 15671 08-11-05 Lot 98 B Front PG 108.8 9.0 i 97 112.0 1568 08-11-05 Lot 98 B Center PG 105.3 I 13.1 94 112.0 1569 08-11-05 Lot 98 8 Back PC 1 104.7 10.4 93 112.0 15701 08-11-05 Lot 68 B Front 971 93.5 I 17.1 83" 112.0 1571 08-11-05 Lot 68 B Back 970,5 94.3 I 1.8.9 84* 112.0 15721 08-11-05 I Lot 69 B Front 972 96.5 ! 19.4 86* 112.0 1573 08-11-05 i Lot 69 B Back 971.5 I 95.1 ! 18.5 I 85* 112.0 A 1 08-11-05 Lot 47 B Back 987.0 99.6 10.9 I 91 110.0 B 08-11-05 I Lot 47 B Back 989.0 100.7 13.1 ': 92 110.0 C 08-11-05 Lot 48 B Back 989.0 1023 14.7 93 110.0 D 08-11-05 Lot 48 B Back 989.0 105.1 12.8 95 110.0 1 F 08-11-05 I Club House 991.0 105.3 13.7 95 110.0 2F 08-11-05 Club House 991.0 1.05.9 18.5 96 110.0 3F 08-11-05 Club House 992.0 104.5 13.5 95 110.0 4F 08-11-05 Club House 99:1.0 1.02.1 1.0.9 93 110.0 5F 08-11-05 Club House 991.0 103.4 11.7 94 110.0 6F 08-11-05 Club Flouse .991.0 100.7 1.3.4 92 11.0.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: 'La Quinta, California REPORT NO: 06-02-120 Test No.E Date Tested Location Elevation Dry Dermity % Moist= Relative Maximum 1 I In Place I In Place ImCoaction I Densitv 1C i 08-12-05 Club House 993.0 105.3 2G 08-12-05 I Club T -louse 995.0 1031 3C 08-12-05 Club House 993.0 103.9 4G 08-12-05 Club House 995.0 101,7 5G 08-12-05 Club House 993.0 107.9 1H 08-13-05 Club House 993.0 103.1 2H 08-13-05 Club House 995.0 105.2 3T -I 08-13-05 Club ITouse 993.0 105.4 4H 08-13-05 Club House 995.0 103.6 5H I 08-13-05 Club House 993.0 103.1 6H I 08-1.3-05 Club House 995.0 101..9 7H 08-13-05 Club House 995.0 104.4 A 08-15-05 Lot 48 B Back 991.0 102.5 B 08-15-15 Lot 48 B Back 993.0 104.6 C 08-15-05 . Lot 47 B Back 991.0 106.2 D 08-15-05 Lot 47 B Back ' 993.0 105.9 E 08-15-05 Lot 72 990.0 108.1 F ( 0845-05 Lot 72 972.0 105.2 G 08-15-05 Lot 71 970.0 104.5 H I 08-15-05 i Lot 71 972.0 105.1 1 I 08-1.5-05 ; Lot 70 970.0 100.4 I I 08-15-05 Lot 70 972.0 105.7 K 1 08-1.5-05 Lot 69 971.0 100.9 L ( 08-15-05 Lot 69 973.0 102.3 M I 08-15-05 Lot 68 971.0 108.2 N 1 08-15-05 i Lot 68 973.0 106.4 AAI 08-16-05 Lot 60 Front , 977 99.6 813 08-16-05 Lot 59 Front 977 1.05.6 CC 08-16-05 Lot 58 Front 977 104.3 DD 08-16-05 Lot 57 Front 979 101.8 EE 08-16-05 Lot 56 Front , 974 108.8 FF 08-16-05 Lot 55 Front 979 152.4 GG 08-16-05 Lot 54 Front 979 102.9 HH 08-16-05 Lot 54' Back 979 103.6 IT 08-16-05 Lot 54 Back 979 105.2 J} 08-1.6-05 Lot 56 Back 979 102.1 KK 08-16-05 j1 Lot 57 Back' 979 101.2 LL I 08-16-05 ; Lot 58 Back - 977 99.3 DATE: March 2, 2006 14.0 95 110.0 13.2 94 110.0 13.8 95 110.0 12.7 93 , 110.0 11.3 98 110.0 10.2 94 110.0 12.1 95 110.0 13.8 95 110.0 12.1 95 110.0 15.2 94 1.1.0.0 13.7 93 110.0 17.1 95 11.0.0 12.1 93 110,0 11.9 95 110.0 15.2 96 • 110.0 14.6 95 I 1.10.0 17.8 98 11.0.0 15.1 95 1 110.0 20.5 95 110.0 18.2 94 110.0 22.1 91 110.0 19.8 I 95 1.1.0.0 16.9 I 92 1 110.0 17.2 I 93 11.0.0 20.1 98 110.0 15.9 i 96 i 110.0 I 15,7 91 110.0 15.8 96 110.0 11.9 95 110.0 16.3 93 110.0 14.7 99 110.0 20.1 93 1.10.0 17.2 94 110.0 16.1 95 110.0 15.5 95 110.0 17.3 93 . 110.0 92 110.0 13.4 90 110.0 Sladden Engineering PROJECT NAME: Madison Club LOCATION: La Quinta, California Test No. I Date Tested I Location TEST RESULTS PROJECT NO: 522-4810 REPORT NO: 06-02-120 P:levation I Dry Density I % Moisture I Relative I Maximum MM 08-16-15 Lot 59 Back 977 NN 08-16-05 Lot 60 Back 977 00 08-1.6-05 Lot 47 Back 995 PP 08-16-05 Lot 48 Back 995 QQ 08-17-05 Lot 68 Back 974 RR 08-17-25 Lot 68 Back 976 SS 08-17-05 Lot 70 Back 975 TT 08-17-05 Lot 70 Back 977 UU 08-17-05 Lot 72 Back 975 vv 08-17-05 Lot 72 Back 933 WW 08-17-05 Lot 74 Back 975 XX 08-17-05 Lot 74 Back 977 YY I 08-17-05 I Lot 75 Back 97.4. %'/_ I 08-17-05 Lot 75 back 976.0 AAAI 08-17-05 I Lot 76 Back 973.0 BBB I 08-17-05 i Lot 76 Back 975.0 CCCI 08-19-05 I Lot 83 Back 971.0 DDD 08-19-05 Lot 84 Back 972.0 EEE 08-19-05 Lot 85 Back 972.0 FFF 08-1.9-05 Lot 86 Back 972.0 GGG 08-19-05 Lot 87 Back 973.0 HHFV 08-19-05 i Lot 75 A 965.0 1:11 08-19-05 ; Lot 75 A 967.0 jjj 08-19-05 Lot 75 A 965.0 KKK; •08-19-05 Lot 75 A 967.0 LLL I 08-19-05 Lot 80 B 971.5 mmm 08-19-05 Lot 88 B 973.5 NNN 08-19-05 Lot 81 B 971.5 000 I 08-19-05 Lot 816 ` 973.5 PPP I 08-19-05 Lot 82 B 971.0 QQQ . 08-19-05 Lot 82 B 973.0 RRR 08-20-05 Lot 75 A 969 SSS 08-20-05 Lot 75 A 969 '1'1'C 08-20-05 Lot 75 A PG UUU 08-20-05 Lot 75 A PG A 08-22-05 Lot 83 B Back ' 973.0 B 08-22-05 Lot 84 B Back 1 974.0 DATE: March 2, 2006 105.1 103.2 102.1 104.3 108.3 103.2 100.8 101.7 102.1 105.9 104.2 102.0 103.5 100.4 105.2 1.02.1 100.5 101.6 i 103.2 104.0 102.4 94.4 1.01.7 106.3 100.8 '100.7 102.3 101.3 104.6 102.9 100.1 102.6 104.0 105.1 102.8 108.2 1.04.3 11.9 15.2 13.6 12.9 11.2 14.4 13.2 15.7 16.3 15.2 18.1 17.4 15.7 13.2 16.7 14.8 17.5 1.8.5 19.2 20.4 16.9 18.7 17.2 18.4 22.1. 1.9.5 19.2 20.1 17.8 19.2 20.4 7.4 7.7 6.9 7.3 13.2 19.3 95 94 93 95 98 94 92 93 93 96 95 93 95 91 95 93 92 93 94 95 93 90 93 96 92 92 93 92 95 94 91 93 95 96 93 98 95 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 '11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 I 110.0 110.0 110.0 110.0 1 110.0 110.0 j 110.0 SJadden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested 1 Location Elevation 1 Dry Density In Place % Moisture I In Place Relative Co action Maximum Den4it C 08-22-052 Lot 85 B Back 974.0 102.9 17.7 94 110.0 D 08-22-05 Lot 86 B Back 974.0 105.2 16.9 95 110.0 E 08-22-05 ; 1 Lot 87 B Back 975.0 100.9 18.2 92 110.0 1574 08-23-05 Lot 35 B3 Front ' 989 103.4 8.8 94 110.0 1575 08-23-05 Lot 35 B Front 991 101.5 9.9 92 {{` 110.0 1576 08-23-05 i Lot 36 B Front 990 101..4 12,5 92 I 110.0 1577 08-23-05 Lot 36 B Front 992 i 105.0 10.7 95 110.0 1578 08-23-05 t Lot 35 B Back 984 ' 104.3 1.0.2 95 110.0 1579 08-23-05 Lot 35 B Back 986 102.2 11.7 93 110.0 1580 08-23-05 Lot 36 B Back 984 100.8 9.1 92 110.0 1581 08-23-05 Lot 36 83 Back 986 i 104,5 8.4 95 110.0 1582 08-23-05 Lot 35 B Front 993 106.7 8.9 97 110.0 1583 08-23-05 Lot 35 B3 Front 995 103.3 10.4 94 110.0 1584 08-23-05 Lot 36 B Front 994 101.0 7.9 92 110.0 1585 08-23-05 Lot 36 B Front 996 105.4 9,2 96 110.0 1586 08-23-05 Lot 35 B Back. 988 104.6 .11.8 95 110.0 1587 08-23-05 Lot 35 B Back 990 100.9 10.6 93 110.0 1588 08-23-05 Lot 36 B Back 988 102.3 10.4 93 1.1.0.0 1589 08-23-05 Lot 36 B Back 990 101.7 9.0 I 92 110.0 A 08-23-05 Lot 77 B Back 966.0 107.1 ' 12.6 J 97 110.0 B 08-23-05 Lot 77 B Back 968.0 105.4 16.2 I 95 7.10.0 C 08-23-05 Lot 75 B Back 967.5 98.1 22.9 89* 110.0 D 08-23-05 Lot 75 B Back 967.5 98.1 ; 22.9 I 89" 110.0 E ! 08-23-05 Lot 76 B Back 967.0 107.8 i 18.2 97 110.0 F 08-23-05 Lot 76 B Back 969.0 101.2 j 16.7 92 110.0 C 08-23-05 Lot 77 B Back 966.0 .105.9 17.2 I 95 110.0 H i 019-23-05 Lot 77 B Back 968.0 103.1 15.1 94 110.0 I 15901 08-24-05 I Lot 34 B Front 992 103.3 8.6 94 110.0 1591; 08-24-05 i Lot 34 B Front 993.5 102.1 10.5 93 1 110.0 1592; 08-24-05 Lot 34 B Back 985 1.06.0 9.4 96 17.0.0 15931 08-24-05 Lot 34 B Back 987 103.9 8.8 94 I 110.0 1594 08-24-05 Lot 35 B Front 996 105.5 12.1 96 110.0 1595 I 08-24-05 'Lot 35 B Front 997 104.4 11.3 95 I 110.0 1596 j 08-24-05 Lot 36 B Back 992 106.9 10.0 97 170.0 1.597 08-24-05 Lot 36 B Back 994 102.8 13.5 93 110.0 1598 08-24-05 I� Lot 34 B Hack 988.5 100.7 11.0 92 110.0 1599 08-24-05 f Lot 34 B Back 990.5 102.5 9.5 93 110.0 1600 08-24-05 I Lot 34 8 hack 992 105.8 8.7 96 110.0 1601 08-24-05 Lot 34 B Back • 993 104.0 10.4 95 110.0 DATE: March 2, 2006 Slardden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested I Location )elevation I Dry DensityI % Moisture I Relative Maximum In Place In Place Compaction Densitv 1602 08-25-05 Lot 3413 Front 1603 08-25-05 Lot 34 B Back 1604 08-25-052 Lot 35 B front 1605 08-25-05 Lot 35 B Back 1606 08-25-05 Lot 36 B Front 1607 08-25-05 Lot 36 b Back 1608 08-25-05 Lot 35 B Back A 08-25-05 Lot 66 B Back B 08-25-05 Lot 66 B Back C 08-25-05 Lot 64-B Back D 08-25-05 Lot 64 B Back E 08-25-05 Lot 65 B Back F 08-25-05 Lot 65 13 Back G 08-25-05 Lot 64 B Back H 08-25-05 Lot 64 B Back 1 08-25-05 Lot 66 B Back , 1 08-25-05 Lot 66 B Back K 08-25-05 ! Lot 65 B Back L 08-25-05 Lot 65 B Back M. 08-25-05 I Lot 67 B Back N 08-25-05 Lot 67 8 Back O 08-25-05 1 Lot 67 B Back P i 08-25-05 i Lot 67 B Back 1609! 08-26-05 Lot 33 B Center 16101 08-26-05 Lot 34 B Center 16111 08-26-05 Lot 35 B Center 1612 08-26-05 Lot 36 B Center 1613 i 08-26-05 Lot 34 B Back 16141 08-26-05 Lot 35 B Back 1615; 08-26-05 Lot 35 B Back 1616 .08-26-05 Lot 36 B Front 16171 08-26-05 Lot 36 B Back 1618i 08-26-05 Lot 75B Front 16191 08-26-05 Lot 75 B Front 1620 08-26-05 Lot 76 B Front 16211 08-26-05' Lot 76 B Front 1622 1623 1624 08-29-05 08-29-05 08-29-05 DATE: March 2, 2006 Lot 55 B Back Lot 55 B Back Lot 58 B Back 995 994.5 998 992 997.5 996 99.4 997.0 999.0 978.0 980.0 977.0 .979.0 978.0 980.0 977.0 979.0 979.0 979.0 976.0 978.0 976.0 978.0 992 99.4. 994 995 995.5 995.5 997 998.5 997.5 966 968 966 968 1.00.4 102.3 105.1 103.6 107.1 104.0 105.5 104.1 1.01..2 106.3 102.9 103.7 104.2 109.0 101.4 103.9 106.2 101.3 105.3 105.1 102.4 104.7 101.8 101.1 102.5 105.3 101.7 '103.6 100.1 101.8 106.1 104.0 '101.3 94.5 103.3 102.0 9.1 13.7 11..0 9.0 8.6 10.4 12.6 13.2 14.9 15.6 12.9 13.9 15.2 13.9 17.2 19.5 14.7 17.0 1.3.4 13.9 13.0 13.6 11.9 11.3 14.1 12.4 11.3 10.0 8.3 13.4 13.2 12.5 '16.9 20.4 15.5 14.3 `981.0 108.2 15.5 983 102.5 14.9 979.5 105.4 19.2 91 110.0 93 110.0 96 110.0 94 110.0 97 110.0 95 110.0 96 110.0 95 11.0.0 92 110.0 96 110.0 94 110.0 93 110.0 95 I 110.0 99 11.0.0 92 11 U.0 95 110.0 96 110.0 92 110.0 95 110.0 95 1.10.0 93 110.0 95 110.0 93. I 110.0 92 110.0 93 110.0 96 11.0.0 92 110.0 94 110.0 91 110.0 93 I 1.10.0 96 110.0 95 I 110.0 90 112.0 84* 112.0 92 112.0 91 112.0 91 119.0 92 112.0 94 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison -Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. Date Tested Location Elcvation Dry Density In Place I % Moisture I 1n Placc Relative Compaction Maximum Densi 1625 08-29-05 Lot 58 B Back 981.5 105.6 16.7 94 112.0 1626 08-29-05 Lot 54 B Back '981 103.8 16.0 93 112.0 1627i 08-29-05 Lot 54 B Back 983 103.4 15.3 92 112.0 16281 08-29-05 Lot 5313 Front :980 106.5 14.7 95. 112.0 16291 08-29-05 Lot 53 Front 982.0 102.3 17.3 91 112.0 1630 08-29-05 Lot 56 B Front 981 108.9 .16Z 92 1.1.9.0 1631; 08-29-05 Lot 56 B Front 983 107.6 13.2 I 96 112.0 16321 08-29-05 Lot 57 B Front '981 1.04.8 15.1 1 94 112.0 16331 08-29-05 Lot 57 B Front 983 103.4 12.0 1 92 112.0 1634; 08-29-05 Lot 54 B Front '781 107.2 11.6 96 1.12.0 16351 08-297-05 Lot 54 B Front 983 105.6 13.1 1 94 112.0 1636 i 08-29-05 Lot 55 B Front 981. 104.0 13.8 93 1.12.0 1637' 08-29-05 Lot 55 B Front 983 105.3 12.6 94 112.0 16381 08-29-05 I Lot 58 B Front 980 103.3 10.9 92 112.0 16391 08-29-05 ' Lot 58 B Front 1982 101.5 1.2.4 91 112.0 1.640; 08-29-05 � Lot 56 B Back 981 r 108.0 11.3 93 112.0 1641 08-29-05, Lot 56 B Back 983 106.1 1.5.0 95 112.0 16421 08-29-05 Lot 57 B Back 980 105.5 14.4 94 112.0 16431 08-29-05 Lot 57 B Back 982 104.7 11.9 93 i 112.0 1644 08-30-05 Lot 53 B Back P984 105.9 16.6 96 110.0 1645 08-30-05 Lot 54 B Back ' 985 106.5 12.5 96 110.0 1646 08-30-05 Lot 55 B Back 985 108.9 9.8 99 i 110.0 1647: 08-30-05 Lot 56 B Back 984.5 102.3 15.2 93 110.0 1648' 08-30-05. loot 57 8 Back 984.0 104.2 13.9 95 j 110.0 1649 08-30-05 Lot 58 B Back 983.0 107.3 17.1 97 ; 110.0 1650 08-30-05 Lot 59 B Back 979.0 1.03.1 16.4 94 110.0 1651 08-30-05 Lot 59 B Back 981.0 100.8 11.9 92 110.0 • 1.652 I 08-30-05 Lot 60 B Back 979.0 105.2 13.7 95 110.0 16531 08-30-05 Lot 60 B Back 981.0 103.4 15.5 94 110.0 1654 08-30-05 Lot 35 B Front : 999 104.1 14.3 93 112.0 1655 08-30-05 Lot 36 B Front 999.5 106.8 15.2 95 112.0 16561 08-30-05 Lot 35 B Back 998 I 102.2 13.1 I 91 112.0 1657 08-30-05 Lot 35 B Back 999 i 101.3 11.8 90 1.12.0 1658 08-30-05 Lot 36 B Back 998.5 105.1 13.3 I 91 112.0 1659 08-30-05 Lot 36 B Back 1000 ( 103.0 14.7 92 112.0 1660 08-31-05 Lot 59 B Front 982.0 103.2 12.8 94 110.0 1661 08-31-05 Lot 59 B Front 984.0 102.3 15.5 93 110.0 1662 08-31-05 Lot 60-B Front 982.0 106.8 10.9 95 110.0 1663 08-31-05 Lot 60 B Front 984.0 102.4 11.2 93 1 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density I % Moisture Relative I Maximum I In Place I In Place I COMDaction I Densitv 1664 1665 1666 1667 1668 1669 1670 1671 1672 1673 1674 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 08-31-05 1675 09-01-05 1676 09-01-05 1677 09-01-05 1678 09-01-05 1679 09-01-05 1680 09-01-05 1681 09-01-05 1682 09-01-05 16831 09-01-05 16841 09-01-05 1685, -09-01-05 16861 09-01-05 1687: . 09-01-05 1688 09-01-05 1689 09-01-05 1690 09-01-05 16911 09-01-05 1692 1.693 1694 1695 1696 1697 1698 1699 1700 1701 1.702 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 09-07-05 DATE: March 2, 2006 Lot 64 B Center 975.0 104.9 13.8 95 110.0 Lot 61. 8 Center 977.0 103.2 15,12 94 110.0 Lot 61 B Center 979.0 106.4 14.7 96 110.0 Lot 59 B Back 982.0 102.2 15.8 93 1.1.0.0 Lot 59 B Back 984.0 105.6 11.9 96 110.0 Lot 60 8 Back 982.0 104.3 14.3 95 10.0 Lot 60 B Back 984.0 106.8 113.6 97 110.0 Lot 31 8 Front 993 101.3 8.1 92 110.0 Lot 31 B Back 995 100.4 7.6 91 110.0 Lot 32 13 Front 993.5 102.5 9.3 93 110.0 Lot 32 B Back 995 101.8 8.4 93 I 110.0 I Lot 60 B Front 985.0 102.7 15.4 94 110.0 Lot 61 B Front 981.0 99.1 17.7 90 i 110.0 Lot 61 B Front 983.0 107.6 14.6 98 j 110.0 Lot 62 B Front 978.0 100.4 12.8 91 110.0 Lot 62 B Front 980.0 103.3 17.4 94 j 110.0 Lot 63 B Front 979.0 1.00.2 1.3.7 91 110.0 Lot 63 B Front 981.0 104.2 13.3 95 I 110.0 Lot 64 B Front 981..0 165.4 15.2 95 110.0 Lot 64 B Front 983.0 106.9 16.3 97 110.0 Lot 64 B Back 980.0 103.7 I 14.4 95 110.0 Lot 64 B Back 982 I 103.2 15.2 94 110.0 Lot 63 B Back 979 I 101.4 13.9 92 110.0 Lot 63 B Back 981.0 1.07.2 1.6.3 I 97 110.0 Lot 62 B Back 979.0 100.2 15.4 91 110.0 Lot 62 B Back 981.0 I 105.8 14.6 96 110.0 Lot 61 B Back 981.0 ; 103.6 15.9 95 110.0 Lot 61 B Back 985.0 i 102.9 15.3 94 110.0 Lot 103 B Front PC I 107.1 8.8 96 i 112.0 Lot 103 B Center PC ' 105.4 10.2 94 112.0 Lot 10313 Back PG 104.3 9.7 93 112.0 Lot 104 B Front PC 106.0 10.5 95 112.0 Lot 104 B Center PG 103.3 8.7 92 112.0 Lot 104 B Back PC 104.5 8.1 93 112.0 Lot 60 B Front 986 107.3 9.9 96 112.0 Lot 60 B Back 985.5 1.03.5 12.5 I 92 112.0 Lot 60 B Center 936 103.7 13.4 1 93 112.0 Lot 61 B Front 986 104.5 11.2 93 112.0 Lot 61 B Back 985.5 101.3 1.4.1. 90 , 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No.I Date Tested Location Elevation" I Dry Density I % Moisture I Relative i Maximum In Place In Place Compaction Densitv 1703 09-07-05 Lot 61 B Center 1704 09-07-05 Lot 62 B Front 1705 09-07-05 Lot 62 B Back 1706 09-08-05 Retest # 1104 1707 09-08-05 Retest # 1.1.15 1708 09-08-05 Retest # 1105 1709 09-08-05 Lot 108 B Front 1710 09-08-05 Lot 108 B Back 1711! 09-08-05 I Lot 112 B Front 1712! 09-08-05 Lot 112 B Back 1713E 09-08-05 Lot 113 B Front 17141 09-08-05 I Lot 113 8 Front 1715 09-08-05 Lot 113 B Back 1716 09-08-05 Lot 113 B Back 1717 09-08-05 Lot 114 B Front 1718 09-08-05 Lot 114 B Back 1719 09-08-05 Lot 116 B Front 1720 09-08-05 Lot 116 B Back 1721 09-08-05 Lot 106 B Front 1722 09-08-05 Lot 10611 Center 1723- 09-08-05 Lot 106 B Back '17241 09-08-05 Lot 107 B Front 1725! 09-08-05 Lot 107 B Hack 1726; 09-08-05 Lot 108 B Front 1727! 09-08-05 Lot 106 B Hack 1728 09-08-05 1 Lot 108 B Center 1729 09-08-05 I Lot 109 B Front 1730 09-08-05 ! Lot 109 B Back 1731 09-08-05 Lot 110 B Front 1732 09-08-05 Lot 110 8 Back 1733 09-08-05 ! Lot 113 B Front 1734 09-08-05 Lot 113 B Back 1735 I 09-08-05 Lot 11313 Center 1 Contour Grading 17361 09-12-05 Per Plan 1737 09-12-05 Per Plan 17381 09-12-05 Per Plan 1739 09-12-05 Per Plan 1740 09-12-05 Per Plan DATE: March 2, 2006 985.5 983 983.5 1.03.5 105.5 101.0 103.4 104.6 101..9 ! 980 I 100.8 980 102.6 '981 105.5 981 105.2 979 104.3 981 103.1 979.5 100.6 9811.5 :106.1 983 104.3 983 104.1 979 96.3 `979 95.1 PC I 107,2 PC i 105.3 PC 106.5 PC 104.1 PC 102.6 PC I 101.4 PC 105.5 PC 103.7 PC 103.4 PC 106.6 PC 107.7 PG 106.3 PC 108.5 PC 105.3 PC 106.9 12.6 11.2 10.7 9.0 10.3 8.7 8.5 10.6 1.1..3 9.4 12.2 11.0 13.3 8.3 12.7 1.0.9 5.4* 4.63* 8.1 11.4 9.9 8.8 7.9 10.7 13.0 1.:1..8 10.9 9.4 7.8 8.4 8.9 10.5 9.8 92 94 90 92 93 91 90 92 94 94 93 92 90 95 93 93 86* 85* 96 94 95 93 92 91 94 93 92 95 96 95 97 94 95 112,0 112.0 1.12.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 11.2.0 112.0 112.0 112.0 112.0- 112.0 1'12.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 112.0 980 100.4 12.3 90 112.0 980 108.1 9.6 97 112.0 979.5 95.7 10.3 85* 112.0 4980 96.3 12.8 86* 112.0 979.5 103.5 11.1 93 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation Dry Deniity I % Moisture I Rclativc I Maximum In Place In Place Comvaction Density 1741 09-12-05 Per Plan 1.742 09-12-05 Retest # 1719 1743 09-12-05 ! Retest 9 '1720 17441 09-12-05 Lot 116 B Front 17451 09-12-05 Lot 116 B Back 1746 09-12-05 Lot 116 B Center 1747 09-12-05 Lot 50 B Front 1748 09-13-05 Lot 50 B Front 1749 09-13-05 Lot 49 B Back 1750 09-13-05 Lot 4913 Back 1751 09-13-05 Lot 50 B Back 1752 09-13-05 Lot 50 B Back 1753 09-13-05 Lot 49 B Front 1754 09-1.3-05 Lot 46 8 Front 9.3 92 112.0 17551 09-13-05 Lot 87 B, Front 1756 09-13-05 Lot 87 B Back 1757. 09-13-05 Lot 86 8 Front 1758 09-13-05 Lot 86 B Back 1759! 09-13-05 1 Lot 85 B Front 17601 09-13-05 i Lot 85 8 Back 17611 09-13-05. Lot 84 B Fron 1762 09-13-05 i Lot 84 B Back 17631 09-13-05 L.ot 83 B Fron 1.764 09-13-05 i Lot 83 B Back 1765 09-13-05 Lot 82 B Fron 1766 09-13-05 Lot 81 B Fron 1767 09-13-05 Lot 80 8 Fron 1768 09-14-05 Retest A 1738 17691 09-14-05 � Retest # 1739 17701 09-14-05 I Per Plan 17711 09-14-05 Per Plan 17721 09-14-05 Per flan 1.773 09-14-05 Per Plan 1774 09-14-05 1 Per Plan 1775 09-14-05 Per Plan 1776 09-14-05 i Per Plan 1777 09-14-05 Per Plan 1778 09-14-05 Per Plan 1779 09-14-05 Per Plan DATE: March 2, 2006 980.5 104.0 1.03.2 101.5 PC 106.3 PC 104.7 PC 104.1 985 104.6 987 104.8 986 1.06.3 988 103.5 985 107.1 987 102.9 982.5 105.7 987.5 103.5 PC 102.8 PC 104.0 PG 106.4 PC 105.5 ' PG 103.3 PC 107.1 PC 101.8 PC 104.6 PC 100.8 PC 101..4 PC 96.5 PC 97.1 PC 95.4 I 104.1 I 101.5 981.5 101.6 982 105.5 982 103.7 983 100.9 983.5 105..4. 983.5 102.7 984 107.1 983.5 105.3 984 104.0 9835 102.3 10.2 93 t 8.4 92" 112.0 8.9 i 91 112.0 11.4 95 t 13.5 93 112.0 12.6 93 t 9.8 93 t 12.3 94 t 10.5 95 112.0 13.2 92 112.0 11..3 96 112.0 14.0 92 112.0 13.4 94 112.0 11.1 92 112.0 9.3 92 112.0 8.8 93 112.0 10.5 95 112.0 9.1 94 112.0 12.1 92 112.0 8.7 i 96 112.0 8.5 1 91 112.30 980.5 104.0 1.03.2 101.5 PC 106.3 PC 104.7 PC 104.1 985 104.6 987 104.8 986 1.06.3 988 103.5 985 107.1 987 102.9 982.5 105.7 987.5 103.5 PC 102.8 PC 104.0 PG 106.4 PC 105.5 ' PG 103.3 PC 107.1 PC 101.8 PC 104.6 PC 100.8 PC 101..4 PC 96.5 PC 97.1 PC 95.4 I 104.1 I 101.5 981.5 101.6 982 105.5 982 103.7 983 100.9 983.5 105..4. 983.5 102.7 984 107.1 983.5 105.3 984 104.0 9835 102.3 10.2 93 1.12.0 8.4 92" 112.0 8.9 i 91 112.0 11.4 95 112.0 13.5 93 112.0 12.6 93 112.0 9.8 93 112.0 12.3 94 112.0 10.5 95 112.0 13.2 92 112.0 11..3 96 112.0 14.0 92 112.0 13.4 94 112.0 11.1 92 112.0 9.3 92 112.0 8.8 93 112.0 10.5 95 112.0 9.1 94 112.0 12.1 92 112.0 8.7 i 96 112.0 8.5 1 91 112.30 10.4 I 93 112.0 9.3 90 112.0 9.9 91 i 112.0 12.2 i 83* ! 112.0 11,4 I 89* I 112.0 1.0.2 85* 112.0 14.4 93 112.0 11.5 91 112.0 12.4 91 i 1.12.0 12.9 94 ' 112.0 10.7 93 i 112.0 15.1 I 90 112.0 14.2 94 112.0 10.7 92 112.0 12.0 96 112.0 14.1 94 112.0 16.7 93 1.1.2.0 12.5 91 I 112.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested I Location Elevation Dry Densiry In Place % Moisture In Place Relative Compaction Maxir tum Density 1780 09-15-05 Lot 77 B Front 1969 103.4 11..5 92 112.0 1781 09-15-05 Lot 77 8 Back 969 105.1 9.6 94 112.0 1782 09-15-05 Lot 76 B Front 970 101.8 I 13.5 91 112.0 1783 09-15-05 Lot 76 B Back 969.5 102.1 i 10.7 91 1.1.2.0 1784 09-15-05 Retest # 104.3 15.1 93 112.0 17851 09-15-05 Lot 75 B Front '970 100.9 j 14.0 90 11.2.0 1786 09-15-05 Retest # D 8/23/05 103.3 i 12.8 92 112.0 17871 09-15-05 Retest.# D 8/23/05 1.05.5 I 16.5 94 112.0 17881 09-15-05 Lot 75 B Back 969.5 107.2 11.8 96 112.0 17891 09-15-05 Lot 74 B Front 970.5 1.03.4 14.9 92 112.0 1.7901 09-15-05 Lot 74 B Back 970.5 101.1 12.8 90 112.0 i 17911 09-15-05 Lot 73 B Front 971.5 106.6 1.3.3 95 112.0 1792 09-15-05 Lot 73 8 13ack 971.5 104.0 10.6 93 112.0 17931 09-15-05 Lot 72 B Front 973.5 108.1 11.3 97 112.0 1794 I 09-15-05 Lot 72 B Back 973.5 106.2 9.7 95 112.0 1795 09-15-05 Lot 7713 Front PG 10.8 125.0 93 112.0 17961 09-15-05 Lot 77 B Back PC 1.06.9 10.7 95 1.12.0 1797; 09-15-05 Lot 77 B Center PG 102.6 11.1 92 I12,0 '17981 09-16-05 Lot 70 B Back ; PG 11.3.0 11.5 95 119.0 1799i 09-16-05 Lot 70 B Center . PG 113.4 9.9 95 119.0 18001, 0946-05 Lot 71 B Back PG 116.3 9.4 98 119.0 1801 09-16-05 Lot 71 Center 1'G 1.12.8 12.3 95 119.0 I 18021 09-16-05 Lot 71 B Front PG 116.1. 10.2 98 119.0 18031, 09-16-05 Lot 72 B Front PC 111.8 8.7 94 119.0 1804! 09-1.6-05 Lot 72 B Center PG 107.1 10.6 90 112.0 18051 09-16-05 Lot 72 B Back PC 114.0 8.8 ; 96 I 119.0 1906! 09-16-05 Lot 73 B Back PC 106.3 1.3..4 95 112.0 .1.807' 09-16-05 Lot 73 8 Center PG 115.9 11.0 97 19.0 18081 09-16-05 Lot 73 B Front PC 11.7.3 12.7 99 11.9.0 1809 09-16-05 Lot 74 B PC, '112.6 9.8 95 119,0 1810 09-16-05 Lot 74 B PC 11.2.2 14.0 94 � 119.0 1811 I 09-16-05 Lot 74 B PC 1083 11.1 97 i 112.0 1812 09-16-05 Lot 75 B PG 107.2 8.4 96 112.0 1813 09-16-05 Lot 75 B ' PG 116.6 10.7 98 119.0 1.814 09-16-05 Lot 75 B PC 116.1 12.4 98 119,0 1815 09-16-05 Lot 76 B PG 108.3 9.6 97 112.0 1816 09-16-05 Lot 76 B PG 117.7 8.3 99 1.19.0 1817 09-16-05 Lot 76 B PC 114.4 10.5 96 119.0 1818 09-16-05 l Lot 21 B Front 990 100.8 11.0 90 112.0 1819 09-16-05 f Lot 67 B Front PG 109.1. 9.4 92 119.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation I Dry Density In Place % Moisture In Place Relative (Compaction Maximum Density 1820 09-16-05 Lot 67 B Back PG 108.4 10.1 97 112.0 1.821. 09-16-05 Lot 67 B Center. PG 107.0 9.2 96 112.0 1822 09-16-05 Lot 68 B Front PG 111.5 1019' 94 1.19.0 1823 09-16-05 Lot 68 S Center PC 113.4 8.8 95 119.0 1824 09-16-05 Lot 68 B Back PG 110.9 8.5 93 119.0 1825 09-16-05 Lot 6913 Back PG 115.1 13.1 97 119.0 1826 09-16-05 Lot 69 B Center PG 116,3 11.5 98 119.0 1827 09-16-05 Lot 69 B Front PG 113.8 12.6 96 119.0 1828 09-16-05 Lot 70 B Front PG 114.3 10.0 96 119.0 1829 09-16-05 Lot 2113 Back 898.5 102.1 13.4 91 I 112.0 18301 09-1.6-05 Lot 20 B Front 989 1.05.3 10.6 94 112.0 1831 09-16-05 Lot 20 B Back 989 101.5 11.3 91 I 11.2.0 1.832 09-16-05 Lot 19 3N Front 988.5 i 1.00.9 9.3 90 112.0 1833 09-16-05 Lot 19 B Back 988.5 101.4 10.7 91 1.12.0 1834 09-16-05 Lot 18 B Front 989 103.3 11.8 I�I I 92 112.0 1835 09-16-05 Lot 18 B Back .988.5 102.2 14.1 I 91 112.0 1836 09-19-05 Lot 21 B Front 991 103.1 10.0 92 112:0 1837 09-19-05 Lot 21 B Back 991 101.6 9.6 91 i 112.0 1838 09-19-05 Lot 20 B Front 990.5 105.3 11.4 94 1.12.0 1839 09-19-05 Lot 20 B Back 991 104.4 9.3 93 112.0 1840 09-19-05 Lot 19 B Front 990.5 101.3 12.4 90 ; 112.0 1.8.41 09-1.9-05 Lot 19 B Back 990 102.7 11.8 92 j 112.0 1842 09-19-05 Lot 21 B Front 992.5 106.1 1.3.1. 95 I 112.0 1843 09-19-05 Lot 21 B Back 992 j 103.3 10.9 92 112.0 .1844 09-19-05 Lot 20 B Front 992 104.4 8.8. .93 112.0 1845 09-19-05 I Lot 20 B Back 992.5 I 100.8 11.3 90 112.0 1846 09-19-05 i Lot 19 B Front '992.5 102.0 12.9 91 ( 112.0 1847, 09-1905 I Lot 19 B Hack 992 I ; 104.1 12.5 93 I 112.0 1848 09-20-05 i Lot 21 B Front 993.5 100.5 8.1 90 112,0 1849 09-20-05 . Lot 21 B Back 993 94.3 4.2" 84" 112,0 1850 09-20-05 Lot 20 B Front 993 I 93.6 3.3* 84* 112.0 1851 09-20-05 Lot 20 B Back 993.5 99.1 2.9* 88* 112.0 1852 09-20-05 Lot 19 B Front 99.4. 95.3 4.0" 85"' 112.0 1853 09-20-05 Lot 19 B Back 993.5 97.1 3.6*. 87* 112.0 1854 09-20-05 Lot 22 B Front 990 101.4 9.1 92 1.1.0.0 1855 09-20-05 Lot 22 B Back 990 101.1 8.3 92 110.0 1856 09-20-05 Lot 23 B Front 986 103.3 10.0 94 I 110,0 1857 09-20-05 Lot 23 B Back 988 102.7 9.6 93 110.0 1.858 09-20-05 Lot 22 8 Front ..991.5 104.1 8.0 95 � 110.0 DATE: March 2, 2006 • .Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No.Date Tested Location F,levation I Dry Density I % Moisture I Relative I Maximum I I In Place In Place Comoaction Density 1859 09-20-05 Lot 22 B Back. 991 101,6 11.3 1860 I 09-20-05 Lot 23 B Front 987.5 94.0 4.5* 1861 09-20-05 Lot 23 B Back 989 94.1 3.3 1862 09-21-05 Retest 1i 102.6 12.5 1863 09-21-05 Retest # 105.3 14.8 1864 09-21-05 Retest b 104.7 15.7 1865 09-21-05 Retest # 100.8 11.3 1866 09-21-05 Retest k 103.0 9.9 1867 09-21-05 Lot 21 B Front 994.5 95.1 13.3 1868 09-21-05 I Lot 21 13 Back 995 96.5 15.1 1869 09-21-05 Lot 20 B Front 995 94.1 12.4 1.870 09-21-05 Lot 20 B Back 994.5 97.2 11.8 18711 09-21-05 Lot 19 B Front 995 93.1 1.4..7 1872 09-21-05 Lot 19 B Back 995 97.3 10.9 1873 09-21-05 Lot 1.7 B Front 989 103.1 8.7 1874 09-21-05 Lot 17 B Back 989.5 100.6 12.1 1875, 09-21-05 Lot 16 B Front 989.5 101.5 9.6 1876: 09-21-05 Lot 16 B Back 990 102.0 13.4 18771 09-22-05 Lot 30 B Front 993 101.4 10.3 1878 09-22-05 Lot 30 B Front 995 103.0 1.4.1. 1879. 09-22-05 Lot 30 B Back 990 104.5 13.6 1880 09-22-05 1 o 30 B Back 992 104.1 j 12.2 18811 09-22-05 Lot 31 B Front 995 100.4 8.8 18821 09-22-05 Lot 31 B Front 996.5 106.3 11.4 1883 , 09-22-05 Lot 31 B Back 997. 102.7 15.6 1884 I 09-22-05 Lot 31 B Back '998 102.5 14.3 1885! 09-22-05 1 l..ot 30 8 Back 994 105.25 1.2.1. 1.886 ; 09-22-05 Lot 30 B Back 996 106.8 16.3 1887 i 09-22-05 Lot 18 B Front 990.5 I 100.3 9.2 18881 09-22-05 Lot 18 B Back 990 101.3 10.4 1889 09-22-05 Lot 17 B Front 990 i 102.5 8.7 1890 09-22-05 Lot 17 B tack '990.5 99.1 9.5 1891 09-22-05 Lot 16 B Front 990.5 99.4 8.1 1892 09-22-05 Lot 16 B Back 991 101.0 10.7 1893 09-23-05 Lot 17 Front 989.6 99.9 13.6 1894 09-23-05 Lot 17 Front 990.0 99.2 14.74 1895 09-23-05 Lot 18 Front 991.5 101.2 12.9 1896 09-23-05 Lot 18 Back 995.4 99.5 13.1 92 110.0 85* 110.0 86* 110.0 92 112.0 94 112.0 93 112.0 90 112.0 92 112.0 93 102.0 95 102.0 92 102.0 95 102.0 91 102.0 95 102.0 94 110.0 91 110.0 92 110.0 93 110.0 91 112.0 92 112.0 93 112.0 93 112.0 90 112.0 95 112.0 92 112.0 92 112.0 94 112.0 95 112.0 91 110.0 92 110.0 93 110.0 90 110.0 90 110.0 92 11.0.0 91 110.0 90 110.0 92 110.0 90 I 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Tcst No.I Date Tested j Location - Elevation f Dry Density% Moisture I Relative I Maximum In Place In Place Comnaction Densitv 1897 09-23-05 Lot 23 Front 996.5 99 18.1 90 110.0 1898 09-23-05 Lot 23 Back 989.5 101.7 13.2 I 92 110.0 1899 09-23-05 Lot 24 Front 989.5 99.6 12.1 91 11.0.0 1900 09-23-05 Lot 24 Back 986.5 49.9 15.6 I 91 110.0 1901 09-23-05 Lot 23 Front 989.5 100.4 15.9 91 ' 110.0 1902 09-26-05 Lot 29 B Front 990.5 101.6 9.9 I 92 � 110.0 1903 09-26-05 Lot 29 B Front 992 103.8 11.1 94 110.0 1904 09-26-05 Lot 28 B Front 991 104.0 8.6 95 110.0 1905 09-26-05 Lot 28 B Front 992.5 100.8 10.7 92 110.0 1906 09-26-05' Lot 29 B Back 990.5 1.00.4 j 12.5 91 110.0 1907 09-26-05 Lot 29 B Back 992.5 1 102.0 10.3 93 110.0 1908 _ 09-26-05 Lot 28 6 Back 990 704.3 9.5 95 110.0 1909 09-26-05 Lot 28 B Back . 992 101.2 13.41 .92 110.() 1910 09-26-05 Lot 25 B Front - 989 101.8 j 16.6 93 110.0 1911 09-26-05 Lot 25 8 Front 991 103.4. 17.1 92 .112.0 1912 09-26-05 Lot 25 B Back • 990 105.5 13.6 96 110.0 1913 09-26-05 Lot 25 0 Back 992 102.7 14.8 93 110.0 1914 09-26-05 Lot 26 B Front 989.5 101.0 12.6 92 .110.0 1915 09-26-05 Lot 26 B Front 991.5 106.3 10.8 97 110.0 1916 09-26.05 Lot 26 B Back 1991 100.4 16.0 91 110.0 1917 09-26-05 Lot 27 B Front 991.5 103.3 12.9 94 110.0 1918 09-26-05 Lot 27 B Back 991 102.5 11.1 93 110.0 1919 09-27-05 Lot 9 B Front 995 101.3 8.4 92 110.0 1920 09-27-05 Lot 9 B Front 9.97 100.9 9.1 92 110.0 1927 09-27-U5 Lot 9 B Back 995 102.04 11.8 93 110.0 19221 09-27-05 ' Lot 9 B Back 997 102.6 10.7 93 110.0 1923 09-27-05 Lot 1.0 8 front 994.5 103.5 8.1 94 110.0 1924 09-27-05 Lot 10 B Front 996.5 100.3 12.6 91 110.0 1925 09-27-05 Lot 10 B Back 994.5 99.4 11.0 90 110.0 1926 09-27-05 Lot 10 8 Back 996 104.1 8.9 95 110.0 1927 09-27-05 Lot 11 B Front 994.5 101.8 10.5 93 110.0 1928 09-27-05 Lot 11 B Front 996 100.6 13.1 91 110.0 1929 09-27-05 Lot 11 B Back 994 103.9 11.4 94 110.0 1930 09-27-05 Lot '11 0 Back 996 103.5 14.3 94 110.0 1931 09-27-05 Lot 12 B Front 994.5 1.00..4 10.7 91 110.0 1932 09-27-05 Lot 12 B Front 996.5 99.3 101.1 90 110.0 1933 09-27-05 Lot 12 B Back 994.5 104.4 9.2 95 110.0 1934 09-27-05 Lot 12 B Back 996 102.7 12.1 93 110.0 DATE; March 2, 2006 Sladden Engineering I TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Teat No. I . Date Tested I Location Elevation I Dry Density I % Moisture I Relative I Maximum 1935 09-28-05 Lot 9 8 Front 999 100.2 8.1 91 1936 09-28-05 Lot 9 B Back 999 100.6 11.6 + 91 1937 09-285 i Lot 10 B Front .998 104.1 10.5 95 1938 09-28-05 Lot 10 B Back .998.5 102.0 14.1. 93 1939 09-28-05 Lot 11 B Front 998 102.8 12.7 93 1940 09-28-05 Lot 11 B Back 997.5 105.1 1.1.0 96 1.9,4.'1. 09-28-05 Lot 12 B Front 998 103.3 9.7 94 1942 + 09-28-05 Lot 12 B Back 998.5 101.4 1.2.5 92 1.943: 09-28-05 Lot 25 B Front 993 104.3 10.6 95 1944:09-28-05 Lot 25 B Back 994 103.0 14.4 94 1945' 09-28-05 Lot 26 B Front 993.5 ! 100.6 12.7 91 1946' 09-28-05 Lot 26 B Back 993 1.01..1. 11.1 92 19471 09-28-05 Lot 27 B Front 993.5 105.6 13.6 96 1948 09-28-05 Lot 27 B Back 993 102.5 15.1 93 19491 09-28-05 Lot 23 B Front 990.5 1.02.8 13.8 93 1950 09-28-05 Lot 23 B Back 991.5 100.5 10.9 91 1951 09-28-05 Lot 24 B'Front 989.5 1.0.4..4. 13.6 95 1952 09-28-05 Lot 24 B Back 988.5 101.5 11.3 92 1953 09-28-05 Lot 23 B Front 992.5 106.1 14.5 96 1954. 09-28-05 Lot 23 B Back 993.5 105.6 12.7 96 1955 09-28-05 Lot 2.413 Front 991.5 j 102.9 11.8 94 1956, 09-28-05 I Lot 24 B Back 990.5 i 104.1 12.8 95 1957 09-28-05 I Lot 24 B Front 993.5 I 100.5 I 10.0 91 1958; 09-28-05 i Lot 24 B Back ' 992.5 102.6 11.9 93 1959 09-29-05 Lot 9 B Front 1000.5 105.3 13.1 96 19601 09-29-05 Lot 9 B Back 1000.5 1.02.6 15.7 93 1961 09-29-05 Lot 10 B Front. 1.000 1.00.3 I 15.4 91 1962 I 09-29-05 Lot 10 B Back 1000 1.03.1 I 12.8 94 1963 i 09-29-05 ILot 11 B Front 999.5 101.5 i 16.3 92 1964; 09-29-05 I Lot 118 Back 999 101.8 14.0 93 1965: 09-29-05 Lot 12 0 Front 1000 100.5 I 16.8 91 1966 09-29-05 Lot 12 B Back 999.5 106.6 I 13.0 I 97 1967 09-29-05 Lot '13 B Front ; 995 103.9 1.1.7 94 1968 09-29-05 Lot 13 B Back 994.5 i 99.4 15.9 j 90 1969 10-03-05 Lot 9 B Front 1002.5 ! 106.1 11.0 ! 95 1970 10-13-05 i Lot 9 B Back 1002.5 108.2 9.8 97 1971 10-03-05 Lot 10 B Front 1002 I104.7 10.6 93 1972 10-03-05 ; Lot 10 B Back 11001.5 104.3 10.4 93 1973 10-03-05 ; Lot 116 Front 1001 107.5 9.5 96 DATE: March 2, 2006 110.0 110.0. 11.0.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110; 0 110.0 110.0 110.0 110.0 110.0 110.0 112.0 112.0 112.0 112.0 '112.0 Stadden Engineering TEST RESULTS PROJECT NAME: Madison Club .LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density In Place % Moisture I In Place I Relative Compaction I Maximum ' Density 1974 10-03-05 Lot 11 B Back 1001.5. 103.4 13.1 92 1.10.0 1975 10-03-05 Lot 13 8 Front 996 1 101.8 12.3 91 112.0 1976 10-03-05 Lot 13 B Back 996 I 103.9 11.2 93 112.0 1977 10-03-05 Lot 23 B Front 994.5 ! 100.3 8.8 91 110.0 1978 10-03-05 Lot 23 B Back 995.5 j 102.7 11.5 93 110.0 1979 10-03-05 Lot 24 B Front 995.5 103.8 13.7 94 110.0 1980 10-03-05 Lot 24 B Back 994.5 j 100.4 12.6 91 110.0 1981 10-03-05 Lot 25 B Front 995 j 99.5 14.1 90 110.0 1982 10-03-05 Lot 25 B Back 996 104.4 10.2 95 110.0 1983 10-04-05 Lot 3 A Back 993 104.3 17.1 95 110.0 1984. 10-04-05 Lot 3 A Back 994.5 100.4 12.6 91 1 110.0 19851 10-04-05 Lot 4 A Back 993 96.1 21.3* 87* 1 110.0 1986 10-04-05 Lot 4 A Back 995 98.4 15.1 89* 110.0 1987+ 10-04-05 Lot 5 A Back 995 98.1 20.6* tib" , 110.0 1988 ! 10-04-05 Lot 5 A Back 996 101.3 14A 92 1 110.0 1989 10-0.4-05 Lot 6 A Back 993.5 101.6 9.1 92 i 110.0 1990 10-04-05 Lot 6 A Back 995.5 102.9 13.4 94 i 110.0 1991I 10-04-05 Lot 17 B Front 991.5 103.6 1.0.5 94 ! 1.1.0.0 1992 10-04-05 Lot 17 B Back '"2 103.8 12.7 94 110,0 1993 10-04-05 Lot 16 B Front 992.5 19.5* 87* 110.0 1 19941 10-04-05 Lot 16 B Back I ;993 101.3 13.3 92 i 110.0 1995 10-04-05 Lot 1511 Front .990 100.4 11.2 91 j 110.0 1996 10-04-05 Lot 15 B Back 990 104.1 I 12.3 I 95 ! 110.0 1997 10-05-05 Lot 3 A Back 996 96.1 23.4 87* 110.0 1998 10-05-05 Lot 3 A Back 997 97.4 I 11.8 84* 110.0 1999 10-05-05 Retest 4 1985 100.2 I 20.1 91 110.0 2000 10-05-05 Retest k 1986 102.3 i 12.9 93 110.0 20011 10-05-05Retest >< 1987 95.2 ! 20.7" I 87" 110.0 2002i 10-05-05 Lot 5 A Back 996 i 96.9 I 13.5 1 88* 110.0 2003 10-05-05 I Lot 6 A Back 996.5 102.4 15.2 ; 93 110.0 2004 10-05-05 i Lot 6 A Back 997.5 103.5 14.3 94 110.0 2005 10-05-05 Lot 6 A Front 994 101.1 10.6 92 110.0 2006 10-05-05 I Lot 6 A Front 996 104.5 9.3 95 110.0 2007 10-05-05 Lot 7 A Front 994 100.8 11.4. 92 110.0 2008 10-05-05 Lot 7 A Front 996 96.2 9.3 87* 310.0 20091 10-05-05 Lot 3 A Front 994 104.4 14.4 95 110.0 20101 10-05-05 Lot 3 A Front 996 103.8 13.0 94 i 110.0 2011 10-05-05 Lot 4 A Front 993.5 102.7 15.3 93 i 110.0 2012 10-05-05 Lot 4 A Front 995.5 98.1 11.6 89* 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-.120 Test No. I Date Tested ( Location Elevation I Dry Density % Moisture I Relative I Maximum In Place In Place Comoaction I Density 2013 10-05-05 Lot 5 A Front 2014 10-05-05 Lot A Front 2015 10-06-05 Rctcst # 1997 20161 10-06-05 Retest # 1998 2017 10-06-05 Lot 4 A Back 201.8 10-06-05 Lot 4 A Back 2019 10-06-05 Retest # 2001 2020 10-06-05. Retest # 2002 2021 10.06-05 Lot 6 A Back 2022 10-06-05 Lot6 A Back 2023 10-06-05 Lot 7 A Back 2024 10-06-05 Lot 7 A Back 2025 10-06-05 Retest # 2012 2026 10-06-05 Lot 4 A Front 2027 10-06-05 Lot 5 A Front 2028 10-06-05 1 Lot 5 A Front. 2029 ' 10-06-05 ! Lot'6 A Front 2030 10-06-05 Loth A Front 2031 10-06-05 i Retest # 2008 2032 1.0-06-05 i Lot 7 A 'Front 2033 10-07-05 tot 3 A Back 2034 10-07-05 I Lot 3 A Back, 10.0 90 110.0 2035 10-07-05 ' Lot 4 A Back 2036 10-07-05 Lot 4 A Back 2037 10-07-05 1 Lot 5 A Back 2038, 10-07-05 Lot 5 A Back' 20391 10-07-05 i Lot 6 A Back 2040 10-07-05 I,ot 6 A 13ack 2041 10-07-05 Lot 7 A Back 2042 10-07-05 Lot 7 A Back 2043 10-07-05 Lot 4 A Front 2044 10-07-05 Lot 4 A Front 2045 10-07-05 Lot A Front 2046 10-07-05 Lot 5 A Front 20471.0-07-05 91 Lot 6 A Front 2048 10-07-05 Lot A Front 2049 10-07-05 Lot? A Front 2050 10-07-05 Lot 7 A Front DATE: March 2, 2006 ;994.5 104.4 996.5 101.0 ` 101.8 108.3 996.5 101.4 998.5 102.8 ' 99.5 100.3 998.5 103.1 1000 102.0 996 104.4 998 101.7 106.9 997.5 103.7 997.5 103.5 998 100.1 997.5 105.2 999 101.6 99.6 ' 998 100.8 999 101.3 1001 102.4 '1000 99.3 1001.5 99.2 998 103.6 11000 102.8 1001.5 102.5 ,1003 104.1 01000 100.6 1002 103.4 ' 999.5 106.5 1001 104.0 1000 I 104.8 1001.5 101.5 11000.5 102.6 1002 100.2 11000 I 102.4 -1001.5 I 99.6 � I I 14.8 95 110.0 12.3 92 110.0 10.3 93** 110.0 14.6 98** 110.0 15.1 92 110.0 14.0 ' 93 110.0 16.1 I 90** I 110.0 14.3 91 ** i 110.0 10.4 94 110.0 11.6 93 110.0 13.1 95 110.0 9.6 92 110.0 8.8 97** 110.0 12.6 94 110.0 11.3 94 11.0.0 15.4 91 110.0 10.7 96 10.0 14.4 1 92 110.0 13.3 91** 110.0 16.0 I 92 110.0 i 8.6 ! 92 110.0 11.5 93 110.0 10.0 90 110.0 9.1 90 1.1.0.0 8.9 I 94 110.0 10.7- 1 93 110.0 12.8 l 93 110.0 11.0 95 1.10.0 9.9 91 110.0 13.0 94 110.0 8.4 ( 97 110.0 12.5 ' 95 110.0 11.3 95 110.0 13.4 92 110.0 9.7 93 110.0 9.5 91 1.10.0 11.1 93 110,0 10.3 91 11.0.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, Califomia. PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture Relative + Maximum In Place I In Place I Comvaction I Density 2051 2052 2053 2054 2055 2056 2057 10-10-05 10-10-05 10-10-05 10-10-05 10-10-05 10-10-05 10-10-05 2058 10-11-05 2059. 10-11-05 2060 I 10-11-05 20611 10-11-05 20621. 10-11-05 2063 10-11-05 2064! 10-11-05 2065 : 10-11-05 2066! 10-11-05 2067 10-11-05 2068' 10-11-05 i 2069' 10-11-05 2070' 10-11-05 20711 10-11-05 20721 10-11-05 ! 2073, 10-11-05 2074 10-11-05 2075 10-11-05 8.8 92 1 2076 10-11-05 2077! 10-11-05 2078' 2079. 2080; 2081 2082' 2083' 2084 2085; 2086 2087 2088 1.0-12-05 1.0-12-05 10-12-05 10-12-05 10-12-05 10-12-05 10-12-05 10-12-05 10-13-052 10-13-05 10-13-05 Lot3 A Back Lot A Back Lot 5 A Back Lot 117 B Front Lot 117 B Back Lot 11.8 8 Front Lot 118 B Back Lot 3 A Back Lot 4 A Back. Lot 5 A Back Lot A Front Lot 3 A Front Lot A Back Lot 7 A Back Lot A Front Lot 6 A Front Lot 7 A Front Lot 3 A Front Lot 4 A Front Lot 5 A Front Lot 6 A Front Lot 7 A Front Lot A Back Lot A Back Lot 5 A.Back Lot A Back Lot? A Back Parking Lot Parking Lot Parking Lot Parking Lot Parking Lot Parking Lot Parking Lot Parking Lot Lot A Lot B Lot C 1002 1002.5 1001.5 974 974 973.5 973 1004 1004.5 1005 1004.5 1004 1005.2 1004.5 1005 1005.5 1004.5 1002.5 1003 1003 1004 1003 1002.5 1003.5 +1002 1004 1003 988 988 989 • 988.5 990 990 991 1990.5 982.5 983 985 104.5 1.01..6 101.8 92.3 93.4 91.8 95.0 115.9 103.8 101.4 100.1 106.0 109.7 104.1 105.3 103.4 103.8 105.4 102.6 106.3 100.2 99.4 103.5 101.4 104.0 101.8 102.5 '101..3 10.'3.6 99.3 105.4 102.0 101.3 104.1 102.8 102.1 105.4 100.3 11.9 95 110.0 14.8 92 110.0 15.3 93 110.0 17.1* 84* 110.0 18.9* 85* 110.0 20.4* 83* 110.0 21.3* 86" 110.0 12.0 97 119.0 13.1 94 110.0 14.6 92 110.0 11.8 91 110.0 11.4 96 I 110.0 8.8 92 1 119.0 12.9 95 1.10.0 10.6 96 110.0 14.1 94 110.0 13.5 94 .110.0 13.5. I 96 110.0 11.8 93 110.0 14.1 97 110.0 12.0 91 I 110.0 10.7 90 110.0 12.8 94 ! 110.0 15.6 92 110.0 11.1 95 110.0 9.9 93' i 110.0 13.3 93 I 110.(1 9.1 92 110.0 8.2 94 I 100.0 10.3 90 110.0 13.1 96 110.0 11.8 93 110.0 12.9 92 110.0 10.7 95 110.0 13.5 93 110.0 11.4 93 1.10.0 10.0 96 110.0 13.5 91 110.0 DATE: March 2, 2006 Sladden Engineering I TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 5224810 REPORT NO: 06-02-120 Test No, Date Toted Location Elevation Dry Density % Moisture Relative I Maximum In Place I in Place I Compaction I Dcnsity 2089 2090 2091 2092 2093 2094 2095 209 209 209 209 210 210 21.0 210 210 210 2106 2107 2108 2109 2110 2111 2112 2113 2114 2115 2116 2117 2118 2119 2120 2121 2122 2123 2124 2125 2126 1.0-13-05 10-13-05 1.0-13-05 10-13-05 1.0-13-05 10-13-05 10-13-05 Lot D Lot E Lot F Lot C Lot H Lot Lot ) 10-14-05 Lot A 10-14-05 Lot B 10-14-05 Lot C 10-14-05 Lot D 10-14-05 Lot E 10-14-05 Lot F 10-14-05 Lot G 10-14-05 Lot H 10-14-05 Lot I 10-14-05 Lot) 1.0-24-05 Lot 8 A Front 10-24-05 Lot A Front 10-24-05 Lot A Front 10-24-05 Lot 9 A Front 10-24-05 Lot 10 A Front 10-24-05 Lot 10 A Front 10-24-05 Lot 1.1. A Front 10-24-05 Lot 11 A Front 10-24-05 Lot 8 A Back. 10-24-05 Lot8 A Back 10-24-05 Lot 9 A Back 10-24-05 Lot A Back 10-24-05 Lot 10 A Back 10-24-05 Lot 11 A Back 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 10-26-05 Lot 17 B Front Lot 17 B Front Lot 18 B Front Lot 18 8 Front Lot 19 B Front Lot 20 B Front Lot 20 8 Front 985.5 985 987 9.87.5 987 988 988.5 '987 987.5 989.5 990 989.5 991.5 '991 989.5 X991 .992 1000.5 1002.5 1003 1005 1002.5 1004.5 1005 1006 1002.5 1004.5 1004 1005.5 1006 1006.5 993.5 995.5 993.5 995.5 997 997 999 106.1 103.5 101.6 101,2 104.3 107.1 103.1 101.1 101.6 103.9 102.8 99.3 104..5 100.8 104.1 103.9 102.5 102.9 105.8 103.5 1.01..4 100.8 104.7 99.5 103.0 106.1 105.3 101.9 103.4 103.9 101.3 104.5 102.6 100.3 101.6 105.4 101.8 101.3 9.6 8.9 12.4 12.9 14.1 8.9 10.2 9.3 11..8 12.4 1.0.2 9.6 11.2 '13.8 11.0 10.7 12.4 13.2 11.0 14.5 12.6 10.7 10.4 14.1 12.7 11.0 15.1 13.4 10.5 10.7 1.2.1. 9.9 11.4 8.6 10.0 102.8 11.1 8.7 96 94 92 92 95 97 94 92 92 94 93 90 95 92 95 94 93 94 96 94 92 92 95 90 94 96 96 93 94 94 92 95 93 91 92 96 93 92 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 '11.0.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 DATE: March 2, 2006 , Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Testcd I Location Elevation DryDensity% Moisture Relative I Maximum In Place In Place Compaction Density 2127. 10-26-05 Lot 21 B Front 2128 10-26-05 Lot 21 B Front 2129 10-26-05 Lot 22 B Front 2130 10-26-05 Lot 22 B Front 2131 10-26-05 Lot 23 B Front 2132 10-26-05 Lot 23 B Front 2133 10-26-05 Lot 22 B Front 2134 10-26-05 Lot 22 B Front 2135 10-26-205 Sales Center 2136 10-26-05 Sales Center 2137 10-27-05 Lot 17 B Back 2138 10-27-05 Lot 17 B Back 21391 10-27-05 Lot 18 B Back 2140 10-27-05 Lot 19 B Back 2141 10-27-05 Lot 20 B Back 2142 10-27-05 Lot 20 B Back 2143 10-27-05 Lot 21 B Back 21.44 10-27-05 Lot 21 B Back 2145 10-27-05 Lot 22 B Back 2146' 10-27-05 Lot 22 B Back 2147 i 10-27-05 Lot 22'8 Back 2148 10-27-05 Lot 22 B Back 21491 10-27-05 Catc House 2150: 10-27-05 Gate House 2151 10-28-05 Lott A Front 2152' 10-28-05 ; Lot A Front 2153 i 10-28-05 Lot 2 A Front 21541 10-28-05 Lot 2 A Front 2155; 10-28-05 Lott A Front 2156; 10-28-05 I Lott A Front 21,571 10-2845 I Lot A Front 2158, 1.0-28-05 Lot 2 A Front 2159 10-28-05 Lott A Back 21601 10-28-05 Lot 11 A Front 2161 10-28-05 Lot 11 A Back 2162 10-28-05 Lot 11 A Center 2163 10-28-05 Lot 10 A Front 2164 10-28-05 Lot -10 A Back 2165 10-28-05 Lot 10•A Center 2166, 10-28-05 Lot 9 A Front 998.5 106.6 1000 103.9 993.5 100.6 995.5 102.2 996.5 102.9 998.5 I 105.3 997.5 i 103.0 999 ' 106.1 989.5 103.9 989.5 101.1 994 102.2 996 1.00.4 997.5 `` 104.1 997 f 103.0 '996.5 106.1 998 104.5 997 101.1 999 100.3 993 105.1 995 102.8 997 101.5 999 101.9 992 99.1 994 100.6 996 101.6 998 101.9 998 1.04.7 1000 102.8 1000. 103.4 1002 100.2 1002 105.3 1003.5 101.2 1003.5 103.1 PG 107.2- PG 07.2PG 103.8 PG j 104.3 PG 101.5 PG 100.1 PG I 102.6 PG 105.4 13.4 97 110.0 13.0 94 110.0 10.1 91. 110.0 14.3 93 110.0 12.6 96 110.0 11.8 96 110.0 13.2 94 110.0 1.0.7 96 110.0 12.5 94 110.0 10,6 92 11.0.0 8.8 . 93 110.0 10.9 91. 110.0 11.6 95 110.0 9.3 94 110.0 13.2 96 110.0 12.1 95 110.0 14.0 92 110.0 11.4 91 110.0 13.2 96 110.0 13.2 93 110.0 10.3 92 110.0 14.1 93 110.0 7.1 90 110.0 8.3 91 110.0 13.1 92 110.0 11.5 93 110.0 14.3 95 1.1.0.0 12.6 93 110.0 12.1 94 110.0 15.1 91 110.0 13.6 96 110.0 11.6 92 110.0 10.7 94 110.0 9.6 97 ( 110.0 11.1 94 110.0 10.8 95 i 110.0 12.6 1 92 110.0 8.7 I 91 11.0.0 11.0 93 110.0 9.3 j 96 110.0 DATE: March 2, 2006 Sladden Engineering TEST RESULTS PROJECT NAME; Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Test No, Datc Tcstcd I Location Elevation DryDensity % Moisture Relative Maximum In Place I In Place I Compaction I Densitv 2167 21.68 21691 2170 21711 21721 2173' 2174, 2175 2176 2177 2178 2179 2180 2181 2182 2183 2184 2185 2186 2187 2188 2189 2190 2191 21921 2193 2194 2195 21961 2197 21981 2199i 22001 2201 2202 2203 2204 2205 10-28-05 1.0-28-05 j 10-28-05 I 10-28-05 I 10-28-05 I 10-28-05 10-28-05 10-28-05. 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 10-28-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 I1-01-05 11-01-05 11-01-05 'I1-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-01-05 11-02-05 11-02-05 11-02-05 11-02-05 DATE: March 2, 2006 Lot 9 A Back Lot 9 A Center Lot 8 A Front Lot 8 A Back Lot? A Front Lot.7 A Back Lot A Front Lot 6 A Back Lot 6 A Center Lot 5 A Front Lot 5 A Back t,ot 4 A 'Front Lot 4 A Back Lot 4 A Center Lot 3 A Front Lot A Back Lot 2 A Front Lott A Back Lott A Front Lott A Back Lot 10 B Back Lot 10 B Front Lot 13 B Front Lot 13 B Back Lot 14 B Front Loot 14 13 Back Lot 1.5 B Front Lot 15 B Front Lot 15 B Back Lot 15 B Rack Retest # Lot 16 B Front Lot 16 B Back Lot 15 B Front Lot 15 B Back Lot 23 B Back Lot 23 B Back Lot 24 B Front Lot 24 B Front PG 103,7 11.0 94 PG 106.6 9.2 97 PC 102,4 12.5 93 PG 102.7 13.0 93 PG 704,7 73.7 95 PG 108.1 11.0 98 PC 106.3 11.4 97 PG 103.4 14.1 94 PC i 105.3 10.9 96 PG 100.9 14.5 92 PG 1 102.6 12.0 93 PG 1 104.4 9.8 95 PG I 107.1 11..0 97 'PG 105.4 12.6 96 PG i 103.2 8.8 94 PC I 1.03.5 10,4 94 'PG ! 106.6 11.8 97 PC' 1.02,4 12.4 93 PC I 99.3 9.1 90 PG + 100.7 i 1 9.6 1 92 1003 1.04.0 I 9.3 95 1002 i 102.0 10.7 I 93 998 100.4 11.6 91 998 103.3 13.1 94. 997 105.1 9.8 96 997 101.4 11.0 92 992 100.1 10.7 91 994 100.6 10.2 91 992 103.7 12.6 94 994 104.8 10.1 95 ' 99.3 8.7 90 ti994..5 102.5 12.3 95 995 105.6 13.4 96 996 103.4 10.8 94 996 106.8 9.5 97 997.5 104.9 1.1..8 95 .999.5 102.6 10.1 93 997.5 106.7 13.4 97 999.5 103.5 9.6 94 110.0 110.0 110,0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 1.10.0 110.0 110.0 11.0.0 110.0 1.10.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 110.0 11.0.0 110.0 Sladden Engineering. TEST RESULTS PROJECT NAME- Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No.I bate Tested I Location Elevation Dry Density % Moisture I Relative I Maximum In Place In Place Comnaction Dcnsity 2206 11-02-05 Lot 24 B Back 996.5 100.3 2207 11-02-05 Lot 24 B Back 998.5 104.1 2208 11-02-05 Lot 25 B Front 997 101,1 2209 11-02-05 Lot 25 B Front .999 101.4 2210 11-02-05 Lot 25 B Back 998 10.4,4 2211 11-02-05 Lot 25 B Back 1000 103.6 2212 11-02-05 I Lot 26 B Front 995.5 I 106.0 221.3 11-02-05 Lot 26 B Front 997.5 ' 102.5 2214 11-02-05 Lot 26 B Back 995 101.8 2215, 11-02-05 Lot 2613 Back 997 103.7 2216 11-03-05 i Lot 9 B Front PG 105.1 2217 11-03-05 Lot 9 B Back PG 102.8 2218 11-03-05 Lot 10 B Front PG 102.5 2219.1 11-03-05 ; Lot 10 B Back PG 104.0 2220 11-03-05 Lot 11 B Front PG 100.5 2221 11-03-05 Lot 11 B Back PG 100.8 2222 11-03-05 Lot 12 B Front PG 103.1 2223 11-03-05 Lot 12 B Back PG 105.7 2224 11-03-05 Lot 13 B Front ' PG 106.9 2225 i 11-03-05 Lot 13 B Back , PG 104.4 20261 11-03-05 I Lot 1413 Front PG 101,7 22271 11-03-05 I Lot 14 B Back PC j 1.02.1 2228; 11-03-05 Lot 15 B Front PG 105.5 2229 11-03-05 I Lot 15 B Back PG 103.3 2230; 11-03-05 Lot 16 B Front PC 107.1 2231 11-03-05 I Lot 16 B Back PG 104.2 22321 11-04-05 Lot 17 B Front 997.5 103,6 22331 11-04-05 Lot 17 B Back 998 105.4 2234 i 11-04-05 Lot 18 B Front 997.5 101.0 2235 11-04-05 Lot 18 B Back 998 100.6 2236 I 11-04-05 Lot 19 B Front 999 104.3 22371 11.-04-05 ' Lot 19 B Back 999 104.1 2238 11-04-05 Lot 20 B Back 1.000 1.02.8 2239 11-04-05 Lot 21 B Front 1001.5 167.3 2240 11-04-05 Lot 21 B Back 1001 1.05.0 2241 11-04-05 Lot 22 B Front 1001 103.3 2242 11-04-05 Lot 22 B Back 1001 104.6 2243 11-07-05 1 Lot 17 B Front . PC 1 103.3 DATE: March 2, 2006 11.1 91 110.0 10.0 95 110.0 12.4 92 110.0 14.1 _. 92 110.0 9.7 95 110.0 8.8 94 110,0 11.4 96 110.0 9.9 93 110.0 12.9 93 110.0 13.4 94 110.0 9.5 96 110.0 11..0 93 110.0 10.4 93 110.0 12.3 95 110.0 11.1 91 110.0 9.3 92 110.0 12.8 94 110.0 12.1 96 11.0.0 9.7 97 110.0 9.2 95 110.0 1.0.0 93 110.0 10.5 93 110.0 '12.6 96 1.1.0.0 13.1 94,3 I 110.0 8.8 97 110.0 10.7 95 ( 110.0 10.1 94 11.0.0 i 11.5 96 j 110.0 12.5 92 110.0 9,8 91 110.0 14.6 95 I 110.0 12.9 95 I 110.0 13.6 93 110.0 11.4 98 110.0 11.9 95 1.1.0.0 15.1 94 110.0 13.0 95 110.0 9.0 1 94 1 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. I Date Tested Location Elevation Dry Density I % Moisture I Relative Maximum In Place I In Place Compaction Density 2244 11-07-05 Lot 1.7 B Back 22.45 11-07-05 Lot 17 B Center 2246 11-07-05 Lot 18 B Front 2247 11-07-05 Lot 18 B Back 2248 11-07-05 Lot 18 B Center 2249 11-07-05 Lot 19 8 Front 2250 11-07-05 Lot 19 B Back 2251 11-07-05 Lot 1.9 B Center 2252 11-07-05 Lot 20 B Front 2253 11-07-05 Lot 20 B Back 2254 11-07-05 Lot 20 B Center 2255 11-08-05 Lot 118 B 2256 11-08-05 Lot 119 B 2257 11-08-05 Lot 120 B 2258 11-08-05 Lot 121 B 2259 11-08-05 Lot 122 B 2260 11-09-05 Lot 25 B 2261 11-09-05 Lot 25 B 2262 11-09-05 Lot 25 B 2263 11-09-05 Lot 26 B 2264 1.1-09-05 Lot 26 B 2265 11-09-05 Lot 26 B 2266 11-09-05 Lot 27 B 2267 11-09-05 Lot 27 B 2268 11-09-05 Lot 27 B 2269 11-09-05 Lot 2113 2270 11-09-05 Lot 21 B 2271 1.1-09-05 Lot 21 B 2272 11-09-05 T,ot 22 B 2273 11-09-05 Lot 22 B 2274 11-09-05 Lot 22 B 2275 11-09-05 Lot 23 B 2276 11-09-05 Lot 23 B 2277 1.1-09-05 Lot 23 B 2278 11-09-05 Lot 24 B 2279 11-09-05 Lot 24 B 2280! 11-09-05 1 Lot 24 B 22811 11-10-05 1 Lot 117 B DATE: March 2, 2006 PG 101.4 8.1 PG 104.6 11.5 PC 100.5 7.9 PG 102.8 10.7 PG 104.9 9.3 PG 106.1 11.4 PC 103.5 8.8 PG 105.3 I 12.4 PG 101.8 11.0 PC 101.4 I 9.9 PG 104.0 j 10.7 3.0 BPG 110.2 8.4 3.6 B PG .110.2 12.5 3.0 PC 104.3 14,7 3.0 BPG 104.9 14.7 3.0 BPC 101..8 11.8 PG 106.5 13.2 PG 1 99.9 7.1 PG 104.4 6.8 PG i 106.8 12.2 PG 101.2 5.0 PG 102.7 7.0 PG 101.8 7.9 PG 103.2 9.2 PG 104.1 11.6 PC 99.6 11.1 PC 99.9 I 1.1.6 PG 108.5 9.5 PG 99.0 5.9 PG 107.5 8.4 PG 103.8 15.1 PC 101.0 9.6 PG 104.6 5.7 PG 104.6 10.4 PG 101.0 9.9 PC 103.7 12.8 PG 100.5 10.4 1IG 1 103.4 1 9.2 92' 110.0 95 110.0 91 110.0 93 110.0 95 110.0 96 1.1.0.0 94 ( 110.0 96 110.0 93 1 110.0 92 110.0 95 110.0 i 98 112.0 98 112.0 93 ! 112.0 94 1 112.0 91 1 112.0 97 I 110.0 91 110.0- 95 ; 110.0 97 110.0 92 110.0 93 110.0 92 1 '11,0.0 94 I 110.0 95 11.0.0 91 1.10.0 91 110.0 99 i 110.0 90 110.0 98 110.0 94 110.0 92 1.1.0.0 95 710.0 95 110.0 92 110.0 94 110.0 91 110.0 94 1 110.0 Sladden Engineering TEST RESULTS PROJECT NAME: Madison Club LOCATION: La Quinta, California PROJECT NO: 522-4810 REPORT NO: 06-02-120 Test No. Date Tested Location Elevation Dry Density % Moisture I Relative I Maximum In Place In Place I Compaction I Density 2282 11-10-05 2283 11-10-05 2284 11.-1.0-05 i 22851 11-10-05 2286 11-10-05 2287 11-10-05 2288 11-10-05 2289 11-10-05 2290 11-10-05 2291 11-10-05 2292 11-10-05' 2293 11-10-05 2294 1! 11-10-05 2295 11-10-05 2296 11-10-05 2297 11-10-05 2298 11-10-05 2299 11-10-05 2300 11-10-05 2301 11-10-05 2302 i 11-10-05 23031 11-14-05 2304: 11-14-05 23051 11-14-05 23061 1.1-14-05 2307; 11-14-05 23081 11-14-05 23091 11-14-05 23101 11.-1.4-05 2311 2312 2313 2314, 2315' 2316 2317 2318 2319 2320 11-15-05 11-15-05 11-15-05 11-15-05 11-15-05 11-15-05 11=15-05 11-15-05 11-15-05 11-15-05 DATE: March 2, 2006 Lot 117 B Lot 118 B Lot 118 B Lot 1.1.9 B Lot 119 B - Lot 4013 Lot 40 B Lot 11813 Lot 119 B Lot 120 8 Lot 121 B Lot 1.22 8 Lot 29 B Lot 29 B Lot 29 B Lot 28 B Lot 28 B Lot 28 B Lot 30 B Lot 30 B Lot 30 B 1,ot 31 B Lot 31 B Lot 32 B Lot 32 B Lot 36 B Lot 36 B Lot 35 B Lot 35 B Lot 39 B Lot 39 8 Lot 38 B Lot 38 B Lot 37 B Lot 37 B Lot 33 B Lot 33 B Lot 34 B Lot 34 B i PG PG .ISG 'PC PG iPC PG 1.0 BPC 1,0 BPG 1.0 BPC 1,0 BPG 1.0 BPC 'PG, PC PG PG PG PG PG PC PG 1 PC PG PG PG PG PC PG PG PG PC PG PC PG PG PC PG PG PC 105.3 108.8 103.4 105.3 109.1 108.3 109.1 99.9 100.6 1.00.0 99.8 102.0 109.2 107.9 108.2 108.9 108.9 109.1 105.0 1.04.0 105.9 108.5 108.0 108.8 104.5 107.5 100.4 102.5 103.3 109.0 108.7 103.1 108.6 108.4 104.7 108.2 101.7 103.1 100.1 11.8 9.8 9.6 10.2 11.7 9.8 11.5 12.2 11.9 12,6 14.4 1.1..4 9.5 7.7 13.1 14.6 8.3 11.4 15.1 15.2 14.2 7.5 6.2 7.1 7.4 11..7 6.4 11.2 15.1 8.1 6.0 15.1. 9.5 11.9 7.3 7.5 10.8 8.3 6.1 96 110.0 99 110.0 93 11.0.0 96 110.0 99 110.0 98 110.0 99 110.0 91 110.0 92 110.0 91 110.0 91 110.0 93 110.0 99 110.0 98 110.0 99 110,0 99 110.0 99 110.0 99 110.0 95 110.0 95 110.0 96 i 110.0 99 110.0 98 110.0 99 110.0 95 110.0 98 110.0 91 110.0 93 110.0 94 i 1.10.0 1 99 1.1.0.0 99 110.0 94 110.0 99 110.0 98 110.0 95 110.0 98 110.0 93 1.1.0.0 94 110.0 92 110.0 Sladden Engineering V �J TEST RESULTS PROJECT NAME: Madison Club PROJECT NO: 522-4810 LOCATION: La Quinta, California REPORT NO: 06-02-120 Tcst No. Date Tested Location Elevation Dry Density I % Moisture Relative I Maximum In Place in Place I Compaction I Densitv 2321 11-17-05 Lot 120 B PC 109.1 9.9 99 110.0 2322 11-17-05 Lot 120 B PG 103.5 16.5 94 110.0 2323 11-17-05 Lot 121 B PC 105.2 11.1 96 110.0 2324 1.1-17-05 Lot 121 B PG 109.0 13.7 99 110.0 23251 11-17-05 Lot 122 B PC 105.1 11.4 96 110.0 2326 11-17-05 Lot 122 B PG 106.7 13.3 97 110.0 2327: 11-17-05 lot 82 8PG 103.1 8.9 94 110.0 2328 11-17-05 Lot 82 B' PG 108.1 8.9 94 110.0 2329 11-17-05 Lot 81 5 PG 104.4 13.6 95 110.0 2330 11-17-05 Lot 81 B PG 105.9 12.8 '96 110.0 2331 11-17-05 'Lot 8013 PG 103.1 11.9 94 110.0 2332 11-17-05 Lot 80 B PG 99.9 10.6 91 110.0 2333 11-21-05 Lot 43 B PG 109.1 11.4 99 710.0 2334 11-21-05 Lot 43 B PG 108.1 13.1 98 110.0 2335 11-21.-05 Lot 42 B PG 109.1 12.4 99 110.0 2336 11-21-05 Lot 42 B PG 1 1.08.9 11.9. 99 110.0 2337 11-21.-05 Lot 41 B PC 106.8 13.1 97 110.0 2338 11-21-05 Lot 41 B PC 109.1 11.6 99 110.0 2339 11-21-05 Lot 48 B PG 1.07.3 1 7.4 97 110.0 2340 11.-21-05 Lot 48B , PG 108.7 7.0' 99 110.0 23414 11-21-05 Lot 47 B. PC 106.7 6.1 97 i 110.0 2342: 11-21-05 Lot 47 B PG 105.9 7.1 96 ' .110.0 23431 11-21-05 I Lot 46 B PG 108.8 6.5 99 110.0 23441 11-21-05 j Lot 46 B PG j 109.1. 6.1 99 i 110.0 2345 11-21.-05 Lot 45 B PC 108.7 7.1 99 110.0 2346 11-21-05 Lot 45 B PC 107.7 6.5 98 110.0 2347 11-21-05 Lot 44 B PC 107.8 10.2 98 110.0 2348 11-21-05 Lot 44. B PG 106.7 9.4 97 110.0. 23491 11-28-05 Lot 6313 PC 1.07.9 10.2 98 110.0 23501 11-28-05 I Lot 63 B PC 106.2 j 10.4 ' 97. 110.0 2351 i 01.-04-06 Sales Office 5.0 BSC 101.9 9.7 93 109.0 2352 01-04-06 Sales Office 4.0 BSG 99.9 8.3 92 109.0 2353 01-04-06 Sales Office 2.0 BSIG 99.8 9.6 92 109.0 235.4 01-04-06 Sales Office 5.0 BSG 98.1 10.6 90 109.0 2355 01-04-06 Sales Office 3.0 BSG E 99.9 15.4 92 109.0 DATE: March 2, 2006 Sladden Engineering