Loading...
Alta Verde - Pasa Tiempo TR 34243 (Plans 1-3) Revision 1 - Title 24LA QUINTA, CA CLIMATE ZONE,15 i . D & R Calcs . CITY OF LA QUINTA BUILDING & SAFETY DEPT.. APPROVED FOR CONSTRUCTION DATE,'zi — + BY . Title 24 Energy Calculations D & R Calcs Micropas v7.10 Performance Method (858) 486-9506®0� August 16, 2006 TITLE 24 COMPLIANCE REQUIREMENTS SUMMARY PASA Tiempo Plan 1 'Ceiling Insulation = R-30 min. PROVIDE RADIANT BARRIER ROOF SHEATHING (NOTE ON PLANS) Wall Insulation. = R-19 min. Floor Insulation = N/A Thermal Mass Areas = See floor plan Glazing All windows & doors to be dual glazed. Allglass is Low E. Glazing shall be installed with a NFRC certifying label attached showing Uvalue. Solar Heat Gain Co -efficient = 0. 35. windows & doors Uvalue = 0 40 vinyl/wd windows Owner to purchase windows &doors w/ specified Uvalues'& SHGC's or better. Hot Water Heater = (1) 75 GAL a. o. Smith #BTC-251-*** or eq. Standby loss 2.0 min. Provide demand recirc pump.. Infiltration— Standard AFUE - 0 .,78 min. SEER - 13. 0 min WITH TXV Duct Insulation = R-4:2 min. PROVIDE DUCT TESTING BY HERS RATER Heater sizing Zone 1 "LIVING". Zone 2 "SLEEPING/' - Air Conditioning - Zoned "LIVING" Zone 2 "SLEEPING" Sensible heat load.- 25,063.Btu (Verify HVAC equip. w/ Mechanical) Sensible heat load - 24,035 Btu (Verify HVAC equip. w/ Mechanical) Sensible cool'g load = 19,602 Btu Latent cool'g load- = 4,724 Btu*, Sensible cool'g load ='18,467.Btu Latent cool'g load = 4,450 Btu Verify HVAC sizing & equipment with a Mechanical Engineer/Contractor. Owner may install any Make & Model HVAC equipment that is equal or greater than the minimum efficiencies.listed above. All equipment is listed "or eq" ~ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD, CF-1R Page 1 Project Title.......... Pasa Tiempo Plan,.l ---------------- Date..08/16/06 10:09:35 ?roject.Address.,....... 5th & Madison ******* --------------------- La Quinta *v7.10* )ocumentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107.Ipava Drive Plan Check / Date Poway,' CA 92064 858-486-9506 Field Check/Date _'limate Zone........... 15 --------------------- "bmpliance Method...:.. MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15SO5 Program -FORM CF-1R 1 User#-MP0864 --------------------------------------=--------------------------------------- User-D & R Calcs Run-Pasa Tiempo Plan 1 = MICROPAS7 ENERGY USE SUMMARY = = Energy Use, Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = - Space Heating.......... 2.04 1.97 0.07 = Space Cooling.......... 70.74 67.87 2.87 = = Water Heating.......... . 9.66 9.97 -0.31. _ = North Total 82.44. 79.81 2.63 = = Space Heating.......... 2.04 2.10 -0.06 = = Space Cooling:......... 70.74 68.09 2.65 _ Water Heating.......... 9.66 9.97 -0.31 = = East Total 82.44 80.16 2.28 - Space Heating.......... 2."04 2.13 -0.09 = - Space Cooling.......... 70.74 67.24 3.50 = = Water Heating.......... 9.66 .9.97 -0.31 = = South Total. 82.44 79.34 3.10 = = Space Heating.......... 2.04 2.04 0.00 _ = Space Cooling.......... 70.74 67.98 2.76 = = Water Heating.. ...... 9.66 9.91 -0.31 = _ West Total- 82.44 79.99 2.45 = _ *** Building complies with Computer Performance _ *** HERS.Verification Required -for Compliance :ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 2 ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1 ---------'---------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 2659 sf Building Type.............. Single Family Detached Construction Type ......... New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of -Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage.......... Average Glazing U-factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 28198 cf 265.9 sf 18 % of floor area 0.4 Btu/hr-sf-F 0.35 10.6 ft BUILDING ZONE INFORMATION Floor # of # of Cond- Thermo- Vent Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or. - ;one Type -------------- (sf) ----- (cf) ------ Units ----- le ----- ioned ----- Type -------- (ft) ----- (sf) ------- Housewrap -- ------- .,IVING Residence 1304 14648 0.49 1.5 Yes Setback 2.0 Standard No )LEEPING Residence 1355 1.3550 0.51 1.5 Yes Setback 2.0 Standard No OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments. `.,IVING 1 Door Wood 28 0.500 0 0 315 90 Yes IV.5 A4 2 Wall Wood 109 0.074 19 0 0 90 Yes IV.9 A5 3 Wall Wood 135 0.074 19 0 0 90 No IV.9 A5 5 Wall Wood 440 0.074 19 0 90 90 Yes IV.9 A5 7 Wall Wood 213 0.074 19 0 180 90 Yes IV.9 A5 9 Wall Wood 125 0.074 19 0 270 90 Yes IV.9 A5 ,.1 RoofRad Wood 1304 0.032 30 0 n/a 0 Yes IV.1 A7 )LEEPING 4 Wall Wood 190 0.074 19 0 0 90 Yes IV.9 A5 6 Wall Wood 295 0.07.4 19 0 90 90 Yes'IV.9 A5 t 'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 3 ------------------------------------------ >roject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 ---------------------------------------- - MICROPAS7 v7 10 File-PSTMPOI Wth-CTZ15S05 Program-FORM.CF-1R User#-MP0864. User-D & R Calcs Run-Pasa Tiempo Plan 1 ------------------------------------------------------------------------=-- --- OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ 8 Wall ----- Wood ---- 191 ----- 0.074 ----- 19 ----- 0 --- 180 ---- 90-Yes --- ----------------------- IV.9 A5 _0 Wall Wood 542 0.074 19 0 270 •.90 Yes IV.9 A5 '.2 RoofRad Wood 1355 0.032 30. 0 n/a 0 Yes IV..1 A7 PERIMETER LOSSES Appendix Length F2 Insul Solar IV Location/ Surface (ft) Factor R-val Gains Reference Comments ------------ LIVING ------ -------- ------- ----- --------- ---------------------- 13 SlabEdge 127 0.730 R-0 No IV.26 Al SLEEPING 14 SlabEdge 120 0.730 R-0 No IV.26 Al FENESTRATION SURFACES --------------------- Exterior Area U- Act Shade )rientation (sf) factor SHGC Azm Tilt Type Location/Comments JIVING 1 Door Front (N) 40.0 0.400 0.350 0 90 Standard FRONT/Vinyl/Wd Dr LoE 2 Wind Front (N) 18.0 0.400 0.350 0 90 Standard FRONTI/Vinyl/Wd Op LoE 4 Wind Left (E) 20.0.0.4.00 0.350 90 90 Standard LEFT/Vinyl/Wd Op LoE 5 Wind Left (E) 8.0 0.400 0.350 90 90 Standard LEFTI/Vinyl/Wd Op LoE 6 Wind Left (E) 14.0 0.400 0.350 90 90 Standard LEFT11/Vinyl/Wd Op LoE 8 Door Back (S) 80.0 0.400 0.350 180 90 Standard BACK/Vinyl/Wd Dr LoE 9 Wind Back (S) 40.0 0.400 0.350.180 90 Standard BACK1/Vinyl/Wd Op LoE -.1 Wind Right (W) 50.0 0.400 0.350 270 90 Standard RIGHT/Vinyl/Wd Op LoE ,3LEEPING !. 3 Wind Front (N) 40.0 0.400 0.350 0 90 Standard FRONT2/Vinyl/Wd Op LoE 7 Door Left (E) 40.0 0.400 0.350 90 90 Standard LEFT2/Vinyl/Wd Dr LoE -0 Door Back (S) 64.0 0.400 0.350 180 90 Standard BACK2/Vinyl/Wd Dr LoE .2 Wind Right (W) 15.0 0.400 0.350 270 90 Standard RIGHT2/Vinyl/Wd Op LoE -_3 Wind Right (W) 50.0 0.400 0.350 270 90 Standard RIGHT21/Vinyl/Wd Op Lo.E 'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 4 )roject Title.,......... Pasa Tiempo Pl.an..l. Date..08/16/06 ---------------- 10:09:35 MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 7 Program -FORM ------------ CF-1R --------------------------------------------------------------------------- User#-MP0864 User-D &'R Calcs Run-Pasa Tiempo Plan 1 OVERHANGS ---Window--- ------------ Overhang ------------ Area Left Right Surface (sf) Width Height ------ Depth ----- Height Extension ------ --------- Extension. --------- ----------- LIVING ----- ----- 1 Door 40.0 n/a 8.0. 2.0 1.5 n/a n/a 2 Window 18.0 n/a 6.0' 8..0 1.5 n/a n/a 4 Window 20.0 n/a 5.0 7.0 2.0 n/a n/a 5 Window 8.0 n/a 2-0. 1.5 2.0 n/a n/a 6 Window 14.0 n/a 4.0 1.5 2.0 n/a n/a 8 Door 80.0 n/a 8.0 11..5 1.0 n/a n/a 9 Window 40.0 n/a 5.0 1.5 2.0 n/a n/a 11 Window 50.0 n/a' 5.0 .8.0 1.0 n/a n/a SLEEPING 7 Door 40.0 n/a 8.0 2.5 2.0 n/a n/a 10 Door 64.0- n/a 8.0 1.5 2.0 n/a n/a 12 Window 15.0, n/a 3.0 1.5 2..0 n/a n/a 13 Window 50.0 n/a 8.0 1.5 2.0 n/a n/a' SLAB SURFACES ------------- Area Slab Type (sf) LIVING Standard Slab 1304 SLEEPING Standard Slab. 1355 HVAC SYSTEMS Verified Number. Verified Verified Verified.Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER. or TXV Airflow Draw Capacity JIVING Furnace 1 0.780 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER No Yes No No No ;LEEPING Furnace 1 0.780 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER No Yes No No No ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD .CF-1R Page 5 --------------- ------------------------------- - -Iroject Title...,....... Pasa Tiempo Plan 1 Date..'08/16/06 10:09:35 ----------------------------------------------------- MICROPAS7 v7 10 File-PSTMPOI Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-P.asa Tiempo Plan 1 ------------------------------------------------------------------------------ HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr). LIVING Furnace 25063 n/a n/a n/a ACSplit n%a 19536 24244 n/a SLEEPING Furnace .24035 n/a n/a n/a ACSplit n/a 18467 22917 n/a ----------------------------------------------------- Total .49098 38002 47161 n/a Orientation of -Maximum..... Front Facing 270 deg (W) Sizing Location............. PALM DESERT Winter Outside Design ...... .26 F Winter Inside Design....... 7.0 F Summer Outside Design...... 111*F Summer Inside -Design ....... 75 F Summer Range .............. .,34 F DUCT SYSTEMS ------------- Verified.Verified Verified System Duct Duct Duct Surface Buried Type Location R-value Leakage Area Ducts LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2, Yes No No SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes .No No WATER HEATING SYSTEMS --------------------- Number Tank External Heater in Energy Size Insulation .'ank.Type Type Distribution Type System Factor (gal) -R-value. 1 Large Gas Recirc/Demand 1 n/a '75 R-n/a- 'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 6 ------------------------------------------------------------------------------- _)roject Title .......... Pasa Tiempo Plan 1 Date...08/16/06 10:09:35. ----------------------------------------------- MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1 ------------------------------------------------------------------------------- WATER HEATING SYSTEMS DETAIL Standby Internal Tank Recovery Rated Loss Insulation Pilot System. Efficiency Input Fraction R-value Light -------------------------------------------------------------------- 1 Large 0.79 n/a 0.02 R-n/a n/a SPECIAL FEATURES AND MODELING'ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans,"*** *** installed to manufacturer and CEC specifications, and ***. *** verified during plan -check -and field inspection. *** -his building incorporates a HERS verified.Refrigerant Charge test it a HERS verified Thermostatic Expansion Valve (TXV). If a !ooling system is not installed, then HERS verification is not necessary. ,'his building incorporates HERS verified Duct Leakage. ,his is a multiple orientation building. This printout is for the front -'acing North. -his building incorporates a Radiant. Barrier. 'his building incorporates a non-standard Water Heating System. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and, *** *** must be reported on the CF-4R installation certificate. *** 'his building incorporates a HERS verified Refrigerant Charge test ,r a HERS verified Thermostatic Expansion Valve (TXV). If a !ooling system is not installed, then HERS verification is not necessary. 'his building incorporates HERS verified Duct Leakage. Target leakage is -alculated and documented on the CF-4R. If the measured CFM is above the -arget, then corrective action must be taken to reduce the duct leakage and hen must be retested. Alternatively, the compliance calculations could be edone without duct testing. If ducts are not installed, then HERS ..erification is not necessary. l ;ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 7 ---------------- ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09;35 MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1 ------------------------------------------------=------------------------------ REMARKS 'Terify HVAC sizing & equipment w/Mechanical engineer/contractor. COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building.features and performance specifications needed to comply with Title-24,,Parts 1 and 6 of the. California Code of Regulations, and the administrative regulations to implement them.' This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER Name.... Bill Currier Company. Colbourn Currier Noll Address. 10675 Treena Street #101 San Diego, CA 92031 Phone... (858) 695-1914 License. DOCUMENTATION AUTHOR Name.... Diane P. Mendoza Company. D & R Calcs Address. '14107 Ipava Drive Poway, CA 92064 Phone... 858-486-9506 Signed.. Signed.. -Q lb�L (date) te) ENFORCEMENT AGENCY Name.... Title'... Agency.. Phone. Signed. (date) ^IANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- lroject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 'project Address........ 5th & Madison ******* --------------------- La Quinta *v7.10* )ocumentation Author... Diane P. Mendoza ******* Building Permit #' D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92064 858-486-9506 Field Check/ Date "limate Zone............ 15 --------------------- :ompliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ---------------=--------------=----=------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan l ------------------------------------------------------------------------------- dote: Lowrise residential buildings subject to the Standards. must contain these neasures regardless of the compliance approach used. More, stringent compliance zequirements from the Certificate of Compliance supersede the items marked with in asterisk (*). When this checklist is incorporated into the permit documents, ':he features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. 3UILDING ENVELOPE MEASURES De- En- sign- force- n/a er ment �150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U-factor in metal frame ceiling l 150(b): Loose fill insulation manufacturer's labeled R-Value ,150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U-factor in metal frame walls (does not apply to exterior mass walls) 150(d) Minimum R-13 raised floor insulation in framed floors or equivalent U-factor 150(e): Installation of Fireplaces, Decorative.Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable.metal or glass door covering the entire opening of the firebox b. Outside air intake with damper -and control, flue damper and control 2. No continuous burning gas pilot lights allowed i 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(g): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF-6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have ZANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 2 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- _'roject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1 label with certified U-factor,- certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints. and penetrations caulked and sealed ;PACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- .sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with'ASHRAE, SMACNA or ACCA 150(i): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation .1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance -of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other -indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R-value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness.: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture; equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction Piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation / 150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5;.supply-air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, RANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 3 ------------------------------------------------------------------------------- ?rojec.t Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 -------=----------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOI Wth-.CTZ15S05 .Program -FORM MF-1R User#-MP0864 User-D & R-Calcs Run-Pasa Tiempo Plan 1 ------------------------------------------------------------------------------- UL 181A, or UL 181B, or aerosol sealant that meets the requirements of.UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic / and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers; and plenums defined or constructed with -materials other than sealed sheet metal, duct board or flexible duct shall not be used for.conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platformsshall not be compressed to cause reductions in the cross -sectional area of the duct s 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes.unless such tape is used in combination with _mastic and draw bands. Exhaust fan systems have back draft or automatic dampers .4. 5. Gravity ventilating systems serving conditioned space have �G either automatic or readily accessible, manually operated dampers / 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7.-Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A .thermal efficiency that complies with the Appliance Efficiency Regulations, on -off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas -fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(i): Cool Roof material meets specified criteria .tESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are .electronic and have an output frequency no less than 20 kHz 1ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 4 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- >roject Title........ . Pasa Tiempo Plan 1 Date..08/16/06 1.0:09:35 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864. User-D & R Calcs Run-Pasa Tiempo Plan 1 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires -50(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be' high. efficacy luminaires OR are controlled by an occupant -sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option ".50(k)4: Permanently installed luminaires located other than. in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR -are controlled by a dimmer switch OR are controlled'by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option -5.0(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation.cover (IC) and are certified air tight to ASTM E283 and labeled as air tight.(AT) to less than 2.0 CFM at 75 Pascals .50(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with. Section 119(d) -.50(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 -50(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be. high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) 0 gVAC SIZING ---------------- HVAC Page 1 Project Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 Project Address........ 5th & Madison ******* -=------------------- La Quinta *v7.10* )ocumentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs. 14107 Ipava Drive Plan Check / Date Poway,.CA 92064 858-486-9506 Field Check/ Date :limate Zone........... 15 ------------- ------ :ompliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7.10 File=PSTMPOI. Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs -------------------------------------------------------------------------------- Run-Pasa Tiempo Plan 1 GENERAL INFORMATION ------------------- Floor Area ................. 2659 sf Volume ..................... 28198 cf Front Orientation.......... Front Facing 0 deg (N) .Sizing Location............ PALM DESERT Latitude .............. ... 33.7 degrees Winter Outside. Design,..... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F .Summer Inside Design....... 75 F Summer Range............... 34 F Interior Shading Used....... Yes Exterior Shading Used...... Yes Overhang Shading Used...... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 23004 10507 Glazing Conduction and Solar...:. 8430 .12342 Infiltration ..................... 10012 5789 Internal Gain .................... n/a 2290 Ducts .............................. 7652 6414 Sensible Load ...................... 49098 37342 Latent Load ...................... n/a 8999 Minimum Total Load 49098 46341 Note: The loads shown are only one of the criteria affecting the.selection of HVAC equipment'. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. IVAC SIZING HVAC Page 2 _?roject.Title..*......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:.35 MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program-HVAC SIZING L User#-MP0864 User-D & R Calcs Run-Pasa Tiem o Plan 1 HEATING AND COOLING LOAD SUMMARY BY -ZONE ----------------------------------------- ZONE 'LINING' Floor Area.............. ......... 1304 sf Volume ........................... 14648 cf Heating Cooling Description .(Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 11495 5313 Glazing Conduction and Solar..... 4752 6031 Infiltration ..................... 4910 2839 Internal Gain. ..... ............ n/a 1122 Ducts ............................ 3906 3174 Sensible Load .............. ..... 25063 18479 Latent Load...., ................. n/a 4453 Minimum Zone Load 25063 22932. ZONE 'SLEEPING' Floor Area....... ........... 1355 sf Volume...... .... .............. 13550 cf Heating Cooling. Description (Btu/hr) (Btu/hr). Opaque Conduction and Solar...... 11509 5194 Glazing Conduction and Solar..... 3678 6311 Infiltration.......... .. ...... ._ 5102 2950 Internal Gain... .................. n/a 1168 Ducts .......................... 3746 3240 Sensible Load ................ .... 24035' 18863 Latent Load....... ............... n/a 4546 Minimum Zone Load 24035 23409 3VAC SIZING HVAC Page 3 --------------- ------------------------------- ?roject Title.......... Pasa Tiempo Plan 1 Date..08/16/.06 10:09:35 -----------------=----------------------------=-------------------------------- MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo,Plan l ------------------------------------------------------------------------------- GENERAL INFORMATION ------------------- Floor Area ................. 2659 sf' Volume ....................... 28198 cf Front..Orientation.......... Front Facing 90 deg (E) Sizing Location ............. PALM DESERT Latitude ................... 33.7 degrees Winter Outside Design ....... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range............... 34 F Interior Shading Used ....... Yes Exterior Shading Used...... Yes Overhang Shading Used....... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description --------------------------------- (Btu/hr) ----------- (Btu/hr.) ----------- Op aque Conduction and Solar...... 23004 9979 Glazing Conduction and Solar...... 8430 13408 Infiltration.... ............... 10012 5789 Internal Gain .................... n/a 2290 Ducts....... .......... ........ 7652 6526 Sensible Load .................... 49098 37991 Latent Load ...................... n/a 9156 ----------- Minimum Total Load 49098 ----------- 47147 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must.also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. [VAC SIZING HVAC Page 4 Iroject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program-HVAC-SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1 --------------------------------------------------------------------------------- HEATING'AND COOLING LOAD SUMMARY'BY ZONE ---------------------------------------- ZONE 'LIVING' Floor.Area.......... .............. 1304 sf Volume.......... ............. 14648 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque.Conduction and Solar...... 11495 5159 Glazing Conduction and Solar..... 4752 7116 Infiltration..................... 4910 2839. Internal Gain .................... n/a 1122 Ducts ... ........................ 3906 3367 ----------- Sensible Load ................. 25063 ----------- 19602 Latent Load ....................... n/a 4724 Minimum Zone Load 25063 24327 ZONE 'SLEEPING' Floor Area ....................... 1355 sf Volume 13550 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 11509 .4820 Glazing Conduction and Solar..:.. 3678 6292 •Infiltration.. ................... 5102 2950 Internal Gain. ...............:... n/a 1168 Ducts..... ..... ........... 3746 3159 Sensible Load .................... 24035 18389 Latent Load., .................... n/a 4432 Minimum Zone. Load 24035 22820 r [VAC SIZING HVAC Page 5 ------------------ -'roject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 1.0:09:35 MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program-HVAC.SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1 ------------------------------------------------------------------------------ GENERAL INFORMATION ------------------- Floor Area... ........ 2659 sf Volume.................... 28198 cf Front Orientation.......... Front Facing 180 deg (S). Sizing Location............ PALM DESERT Latitude ................... 33.7 degrees Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F .Summer Inside Design....... 75 F Summer Range.......... ... 34 F Interior Shading Used...... Yes Exterior Shading Used...... Yes Overhang Shading Used...... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 23004 10507 Glazing Conduction and Solar..... 8430 12342 Infiltration........ ........... 10012 5789 Internal Gain .................... n/a 2290 Ducts............. .............. 76.52 6414 Sensible Load .................... 49.098 37342 Latent Load ...................... n/a 8999 Minimum'Total Load ----------- 49098 ----------- 46341 Note: The loads shown are only one of the criteria affecting the'selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment•,.oversizing safety.margin, etc., must also be consideredit is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. r iVAC SIZING HVAC Page 6 ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan l Date..08/16/06 10:09:35 -------------------=------------------------------------------------------=---- ------------------------------------------------------------------------------- MICROPAS7'v7.10 File-PSTMPOI Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan ,1 ------------------------------------------------------------------------------- HEATING AND COOLING LOAD SUMMARY BY ZONE ---------------------------------------- ZONE 'LIVING' Floor Area................ ..... 1304 sf Volume ........................... 14648 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 11495 5313 Glazing Conduction and Solar..... 4752 6031 Infiltration ..................... 4910 2839 Internal Gain ................. n/a 1122 Ducts .................... ...... 3906 3174 Sensible Load............. ..... . ----------- 25063 ----------- 18479 Latent Load .:..................: n/a 4454 Minimum Zone Load 25063 22933, ZONE'SLEEPING' Floor Area...... 1355 sf Volume ........................... 13550 cf Heating Cooling Description- --------------------------------- (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... ----------- 11509 ----------- 5194 Glazing Conduction and Solar..... 3678 6311 Infiltration ..................... 5102 2950 Internal Gain................. n/a 1168. Ducts ....... .................... 3746 3240 Sensible Load .................... . 24035 18862 Latent Load ...................... n/a 4546 Minimum Zone Load 24035 23408 iVAC'SIZING HVAC Page 7 --------------- _'roject Title........., Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 ---------------- 7 MICROPAS7 v7.10 File-PSTMPOI Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864. User-D & R Calcs Run-Pasa Tiempo Plan 1 -------------------------------------------------------------------------------- GENERAL'INFORMATION Floor Area.. 2659 sf Volume ..................... 28198 cf Front Orientation.......... Front Facing 270 deg (W) Sizing Location............ PALM DESERT Latitude.. 33.7 degrees Winter Outside Design...... 26 F. Winter Inside Design....... 70 F Summer Outside, Design...... 111 F Summer Inside Design....... 75 F Summer Range............. 34 F Interior Shading Used...... Yes Exterior Shading Used...... Yes Overhang Shading Used...... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description --------------------------------- .(Btu/hr) ----------- (Btu/hr) ----------- Opaque Conduction and Solar...... 23004 9989 Glazing Conduction and Solar..... . 8430 13408 Infiltration .. .. ............... .10012 5789 Internal Gain ...................... n/a .229.0 Ducts......... :................ 7652 6527 Sensible Load.......... ........ 49098 38002 Latent Load ...................... n/a 9159 Minimum Total Load 49098 47161 Note: The loads shown are only one of the criteria affecting the selection. of HVAC equipment. Other relevant design factors such ,as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. . It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. rN iVAC SIZING HVAC Page 8 ?roject Title.......... Pasa Tiempo Plan 1 Date..08/16/06 10:09:35 ------------------------------- ---------- MICROPAS7 v7.10 File-.PSTMPOl Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1 HEATING AND COOLING.LOAD SUMMARY BY ZONE ---------------------------------------- ZONE 'LIVING' Floor Area....... 1304 sf Volume ............................ 14648 cf Heating Cooling Description --------------------------------- (Btu/hr) ----------= (Btu/hr) ----------- Opaque Conduction and Sblar...... 11495 5103 Glazing Conduction and Solar....., 4752 7116 Infiltration ...................... 4910 2839 Internal Gain .................... n/a 1122 Ducts ............................ 3906 3356 Sensible Load .................... ---------=- 25063 -----------� 19536 Latent Load............... ..... n/a 4708. Minimum.Zorie Load 25063 24244 ZONE 'SLEEPING' Floor Area ....................... 1355 sf. Volume ........................... 13550 cf Heating, Cooling Description (Btu/hr). (Btu/hr) Opaque Conduction and Solar...... 11509 4885 Glazing Conduction and Solar..... 3678 6292 Infiltration ...................... 5102 2950 Internal Gain.. ............... n/a 1168 Ducts............ .............. 3746 3172 Sensible Load .................... 24035 18467 Latent Load....... .............. n/a 4450 Minimum Zone Load 24035 229.17 PASA TIEMPO PLAN 1 w/ CASITA LA QUINTA, ' . CA CLIMATE ZONE 15 D & R Calcs Title 24 Energy Calculations Micropas v7.10 Performance Method August 1.6, 2006 TITLE.24 COMPLIANCE REQUIREMENTS SUMMARY PASA Tiempo Plan 1 w/ Casita Ceiling Insulation = R-30 min. PROVIDE RADIANT BARRIER ROOF SREATHING (NOTE ON PLANS) Wall Insulation = R-19 min. Floor Insulation = N/A Thermal Mass Areas = See floor plan i Glazing = All windows & doors to be dual glazed. All glass is Low E. Glazing shall be installed with a,NFRC certifying label attached showing Uvalue. Solar Heat Gain Co -efficient = 0.35 windows & doors Uval.ue 0.40 vinyl/wd windows Owner to purchase windows & doors w/ specified Uvalues & SHGC's-or better. Hot Water Heater = (1) 75 GAL a. o. Smith #BTC-251-*** or eq. Standby loss 2.0 min. Provide demand recirc pump. Infiltration = Standard AFUE - 0.78 min. SEER - 13. 0 min WITH TXV Duct' Insulation = R-4.2 min. PROVIDE DUCT TESTING BY HERS RATER Heater sizing Zone 1 "LIVING" Sensible heat load - 25,063 Btu (Verify HVAC equip. w/ Mechanical) Zone 2 "SLEEPING" Sensible heat load,- 30,050 Btu (Verify HVAC.equip. w/ Mechanical). Air Conditioning - Zone 1 "LIVING" Sensible cool'g load = 19,436 Btu Latent cool'g load = 4,684 Btu Zone 2 "SLEEPING" Sensible'cool'g load = 22,015 Btu Latent cool'g load, 5,306 Btu Verify HVAC.sizing &.equipment with a Mechanical Engineer/Contractor. Owner may install any Make & Model HVAC equipment that is equal or greater than the minimum efficiencies listed above. All equipment'is.listed "or eq" :ERTIFICATE.OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 1 --------------------------------------=---------------------------------------- >roje.ct Title.......... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 droject Address........ 5th & Madison ******* --------------------- La Quinta *v7.10* )ocument.ation Author... Diane-P'. Mendoza *******. Building Permit # D & R Calcs 14107 Ipava Drive Plan Check /Date Poway., CA. 92064 858-486-9506 Field Check/ Date "limate Zone ........... 15 --------------------- .ompliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 ------------------------------------------------------------------------------- User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita = MICROPAS7 ENERGY USE SUMMARY = = Energy ---------------------------- Use Standard Proposed Compliance _ (kTDV/sf-yr) _----------------------- ---------- Design ---------- Design Margin = _ Space Heating.......... 1.94 1.93 ---------- _ 0.01 = - Space Cooling .. 67.56 65.26 2.30. _ = Water Heating.......... 8.57 8.85 -0.28 = = North Total 78.07 76.04 2.0.3 - Space Heating1.94 2.04 -0.10 = = Space Cooling........... 67.56 64.93 2.63 = _ -Water Heating.......... 8.57 8.85 -0.28 = = East Total 78.07 75.82 2.25 = = Space Heating........... 1.94 2.07 -0.13 = - Space Cooling67.56 64.78 2'.78 _ = Water'Heating.......... 8.57 8.85. -0.28 = = South Total 78.07 75.70 2.37 = = Space Heating.......... 1.94 1.97 -0.03 = Space Cooling.......... 67.56 65.24 2.32 = = Water Heating.......... 8.57 8.85 -0.28 = = West Total .78.07 76.06 2.01 = _ *** Building complies with Computer Performance _ *** HERS Verification Required for Compliance-*** _ :ERTIFICATE OF COMPLLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 2 ?roject Title.......... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10':02 ----------------------- ------------------------------------------------------------------------------ MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program -FORM CF-1R L. User#-MP.0864 User-D & R Cal.cs Run-Pasa Tiempo Plan 1/Casita GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 2998 sf Building Type.............. Single Family Detached Construction Type New Fuel Type NaturalGas Building Front Orientation. Cardinal - N.,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume.......... Slab -On -Grade Area......... Glazing Percentage..:....... Average Glazing U-factor... Average Glazing SHGC....... Average.Ceiling Height..... Slab On Grade 2 . 31588 cf 2998 sf 16.8 % of floor area 0.4 Btu/hr-sf-F 0.35 10.5 ft BUILDING ZONE INFORMATION Floor # of # of Cond- Thermo- Vent Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or ;one Type ------------- (sf) ----- (cf) Units ------ ----- le ----- ioned ----- Type., -------- (ft) (sf) Housewrap ----- ------- ---------- .JIVING Residence 1304 14648 0.43 1.3 Yes Setback 2.0 Standard No 'SLEEPING Residence 1694 16940 0.57 1..7 Yes Setback 2.0 Standard No OPAQUE SURFACES i7= --------------- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments 'JIVING 1 Door Wood 28 0.500 0 0 315 90 Yes IV.5 A4 2 Wall Wood 109 0..074 19 0 0 90 Yes IV.9 A5 3 Wall Wood 135 0.074 19 0 0 90 No IV.9 A5 5 Wall Wood 440 0.074 19 0 90 90 Yes IV.9 A5 7 Wall Wood 213 0.074 1.9 0 180 90 Yes IV.9 A5 9 Wall Wood 125 0.074 19 0 270 90 Yes IV.9 A5 _1 RoofRad Wood 1304 0.032 30 0 n/a 0 Yes IV.1 A7 ;LEEPING 4 Wall Wood 194 0.074 19 0 0 90 Yes IV.9 A5 6 Wall Wood 278 0.074 19 0 90 90 Yes 'IV.9 A5 'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 3 >roject Title Pasa Tiempo.Plan 1/Casita Date..08/16/06 10:10:02 -------=---------------------------------------------------------------------=- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program -FORM CF-iR User#-MP0864 User-D & R-Calcs Run-Pasa Tiempo Plan 1/Casita Surface 8 Wall _0 Wall ,_2 RoofRad Surface. ------------ ,LIVING. 13 S1abEdge SLEEPING 14 S1abEdge )rientation OPAQUE SURFACES --------------- U- Sheath Solar Appendix Frame Area fact- Cavity ing. Act Gains IV .Location/ Type (sf) or R-val R-val Azm Tilt Reference Comments Wood 191 0.074 19 0 180 90 Yes IV.9 A5 Wood 730 0.074 19 0 270 90.Yes IV.9 A5 Wood 1694 0.032 30 0 n/a. 0 Yes IV.1 A7 PERIMETER LOSSES ---------------- Appendix Length F2. Insul Solar IV Location/ (ft) Factor R-val Gains Reference.Comments --------.------------- ------------------------------------ 127 , 0.730 R-'0 180 0.730 R-0 .jIVING 1 Door. Front (N) 2 Wind Front (N) 4 Wind Left (E) 5 Wind Left (E) 6 Wind Left (E) 9 Door Back ( S ) .0 Wind Back (S) -'-2 Wind Right . (W) _SLEEPING 3 Wind Front (N) 7 Door Left (E) 8 Door Left (E) _ 1 Door Back ( S ) ,3 Wind Right (W) _4 Wind Right (W) No IV.26 Al No IV.26 Al FENESTRATION SURFACES --------------------- Exterior Area U- Act Shade (s"f) factor SHGC Azm Tilt Type Location/Comments ----- ----- ----- --- ------------------------------------ '40.0 �18.0 0.400 0.350 0 90 -Standard FRONT/Vinyl/Wd Dr LoE 0.400 0.350 0 90 Standard FRONTI/Vinyl/Wd Op LoE )20.0 0.400 0.350 90 90 Standard LEFT/Vinyl/Wd Op LoE 8.0 0.400 0.350 90 90 Standard LEFT1/Vinyl/Wd Op LoE ✓14.0 0.400 0.350 90 90 Standard LEFT11/Vinyl/Wd Op LoE A80.0 0.400 0.350 180 90 Standard BACK/Vinyl/Wd Dr LoE �40.0 0*.400 0.350.180 90 Standard BACK1/Vinyl/Wd Op LoE 50.0 0.400 0.350 270 90 Standard, RIGHT/Vinyl/Wd Op LoE 46.0 0.400 0.350 0 90 Standard FRONT2/Vinyl/Wd Op LoE V40.0 0.400 0.350 90 90 Standard LEFT2/Vinyl/Wd Dr LoE 120.0 0.400 0.350 90 90 Standard LEFT21/Vinyl/Wd Dr.LoE ✓64.0 0.400,0.350 180 90 Standard BACK2/Vinyl/Wd Dr LoE 15.0 0.400 0.350 270 90 Standard RIGHT2/Vinyl/Wd Op LoE 50.0 0.400 0.350 270 90 Standard RIGHT21/Vinyl/Wd Op LoE, ,ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 4 ?roject Title...:...... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 ' MICROPAS7 v7.10 -File-PSTMPOIC' Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita -----=------------------------------------------------------------------------ OVERHANGS ---Window--- ----------- -Overhang ------- ----- Area Left Right Surface (sf) Width Height Depth Height Extension Extension LIVING. 1 Door 40.0 n/a 8.0 2.0 1.5 n/a n/a 2 Window 18.0 n/a 6.0 8.0 1.5 n/a n/a 4 Window 20.0 n/a 5.0 7.0. .2.0 n/a n/a 5 Window 8.0 n/a 2.0 1.5 2.0 n/a n/a 6 Window 14.0 n/a 4.0 1.5 2.0 n/a n/a 9 Door 80.0, n/a 8.0 11.5 1.0 n/a n/a 10 Window .40.0 n/a 5.0 1.5 2.0 n/a n/a 12 Window 50.0 n/a 5.0 8.*0 1.0 n/a n/a SLEEPING 7 Door 40.0 n/a 8.0 2.5 2.0 n/a n/a 8 Door 20.0 n/a 8.0 7.0 2:0. n/a n/a 11 Door 64.0 n/a. 8.0 1.5 2.0 n/a n/a. 13 Window 15.0 n/a' 3.0 1.5 2.0 n/a. n/a 14 Window 50.0 n/a 8.0 1._5 2.0 n/a n/a SLAB SURFACES ------------ Area Slab Type (sf) LIVING Standard Slab 1304 SLEEPING Standard Slab 1694 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified Maximum System -of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency EER or TXV Airflow Draw Capacity ------------ ------- ----------- JIVING Furnace 1 0.780 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER No Yes No No No SLEEPING Furnace 1 0.780 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER No Yes No No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 5 ------------------ ?roject.Title.......... Pasa Tiempo Plan l/Casita Date..08/16/06 10:'10:02 ------ --------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calc.s Run-Pasa Tiempo Plan 1/Casita HVAC SIZING Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type ------------- (Btu/hr) ---------- (Btu/hr) ---------- (.Btu/hr) --------- ---------- (Btu/hr) LIVING - Furnace 25063 n/a n/a n/a ACSplit h/a 19370 .24038 n/a SLEEPING Furnace 30050 n/a n/a n/a ACSplit n/a 21382 26535 n/a ------------- Total ---------- 55113 ---------- 40752 -------------------- 50573 n/a Orientation of Maximum..... Front Facing 270 deg (W) Sizing Location............ PALM DESERT Winter Outside Design...... 26 F Winter Inside'Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range............... 34 F System Type LIVING Furnace ACSplit SLEEPING Furnace ACSplit DUCTSYSTEMS - Verified Verified Verified Duct Duct Duct Surface Buried Location R-value Leakage Area Ducts Attic R-.4.2 Yes No Attic R-4.2 Yes No Attic R-4.2, Yes No Attic R-4.2 Yes No Heater -'ank Type Type ---------------------=- 1 Large Gas WATER HEATING SYSTEMS --------------------- Number in Energy Distribution Type System Factor ------------------- -------------- Recirc/Demand 1 n/a No No No No Tank External Size Insulation (gal) R-value ------ 75 ---------- R-n/a _'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 6 7-7 3roject Title........... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 ----------------------------------------------------=-------------------------- ---------------------7-7------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05. Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita -------------- ---------------------------------------------------------------- WATER HEATING SYSTEMS DETAIL Standby Internal Tank Recovery Rated Loss Insulation Pilot System Efficiency Input Fraction R-value Light -------------------------------------------------------------------- 1 Large 0.79 n/a 0.02 R-n/a n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** ***,installed to manufacturer and CEC specifications, and **.* *** verified during plan check and field inspection. *** -his.building incorporates a HERS verified Refrigerant Charge test jr a HERS verified Thermostatic Expansion Valve (TXV). If a :ooling system is not installed, then HERS verification is not necessary. 'his building incorporates HERS verified Duct Leakage. This is a multiple orientation building. This printout is for the front :acing North. -his building incorporates a Radiant Barrier. 'his building incorporates a non-standard Water Heating System. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** ***.verification by a certified home energy rater under_ *** ***.the supervision of a CEC-approved HERS provider using *** *** CEC. approved testing and/or verification methods and *** *** must be reported on the CF-4R installation certificate. *** this building incorporates a HERS verified Refrigerant Charge test )r a HERS verified Thermostatic Expansion Valve (TXV). If a :ooling system is not installed, then HERS verification is not necessary. 'his building incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the CF-4R. If the measured CFM is above the `arget, then corrective action must be taken to reduce the duct leakage and :hen must be retested. Alternatively, the compliance calculations could be -edone without duct testing. If ducts are not installed, then HERS verification is not necessary. 'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 7 ---------- 'roject.Title.......... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 MICROPAS7 v7.10 File-PSTMPOIC 'Wth-CTZ15805 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita REMARKS "erify.HVAC sizing & equipment w/ Mechanical engineer/contractor. COMPLIANCE STATEMENT This certificate of compliance lists the buil'ding•features and performance. specifications needed to comply with Title-24, Parts 1 and 6 of the California Code of Regulations, and.the administrative regulations to implement them. This certificate has.been signed by the individual with overall design responsibility. DESIGNER -or OWNER DOCUMENTATION AUTHOR Name..'.:, Bill Currier Name.... Diane P. Mendoza Company. Colbourn Currier Noll Company. D & R Calcs Address. 10675 Treena Street #101 Address. 14107 Ipava Drive San Diego, CA 92031 Poway, CA 92064 Phone.'.. (858) 695-1914' Phone... 858-486-9506' License. Signed.. Signed.,. :"0(" (date) date) ENFORCEMENT AGENCY Name.... Title... Agency.. Phone... Signed.. (date) -V.ANDATORY MEASURES CHECKLIST: RESTDENTIAL MF-1R Page 1 ---------------- ---- project Title........... Pasa Tiempb Plan 1/Casita Date...08/16/06 10:10:02 9roject Address........ 5th & Madison ******* --------------------- La Quinta *v7.10* Documentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway., CA 92064 858-486-9506 Field Check/ Date _"limate Zone........... 15 --------------------- -ompliance Method...... MICROPAS7 v7.10 for 2005 Standards by Enercomp, Inc. -------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User=D & R Calcs Run-Pasa Tiempo Plan 1/Casita -------:------------------------------------------------------------------------ Jote: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance -equirements from the Certificate of Compliance supersede the items marked with in asterisk (*). When this.checklist is incorporated into the permit documents,. :he features noted shall be considered by all parties as minimum component ?erformance. specifications for the mandatory.measures whether they are shown elsewhere in the documents or on this checklist only. .3UILDING ENVELOPE MEASURES n/a ,150(a) Minimum R-19 insulation in wood framed ceiling or equivalent U-factor in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R-Value �150(c):. Minimum R-13 wall insulation in wood framed walls or equivalent U-factor in metal frame walls (does not apply to exterior mass walls) ,150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U-factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs l..Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire . opening of the firebox b. Outside air intake with damper.and control, flue damper and.control 2. No continuous burning gas' pilot lights allowed 150(f): Air retarding wrap .installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual 150(g) Vapor barriers mandatory in Climate Zones 14,16,only �G 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF-6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field -fabricated) have De- En- sign- force- er ment i l Z 4ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page .2 ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 1/Casita. Date..08/16/06 10:10:02 ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Cal'cs Run-Pasa Tiempo Plan 1/Casita ----------------------------------------------------------------------------- label with certified U-factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed . SPACE CONDITIONING, WATER,HEATING AND PLUMBING SYSTEM MEASURES De En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA _ 150(i): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater_ 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R-value 3. The following piping is insulated according to Table or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest 150-A/B to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be.insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot-water systems >15 psi Meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation 7150 (m) Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL.181, 4ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page,3 ?roject Title.......... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15505 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita ----------------------------------------------------------------7-------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater,than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions=in the cross -sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct.tapes unless such tape is used in combination with / mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause j degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment ' 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, on -off switch mounted outside of heater, weatherproof operating instructions, no .the electric resistance heating and no pilot light � 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas -fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception:'Non-electrical cooking appliances / with pilot < 150 Btu/hr) 118(i): Cool Roof material meets specified criteria -ZESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base.socket / (E24/E26). Ballast for lamps 13 watts or greater are electronic and have.an output frequency no less than 20 kHz MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 4 -----------------------=------------------------------------------------------- ------------------------------------------------------------------------------- Project Title.......... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 --------------------------------------------------------------=---------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan l/Casita 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined.in.Table 150-C, luminaire has factory installed HID. ballast• 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may.be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires L50(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option 150(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option 150(k)5: Luminaires that are recessed into insulated.ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less.than 2.0 CFM at 75 Pascals L50(k)6: Luminaires providing outdoor lighting and permanently .mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires.(not in- cluding lighting around swimming pools/water features or .other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) 150(k)7: Lighting for parking lots for 8 or -more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall. have lighting that complies with Sec. 130, 131, and 146 150(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR / are controlled .by an occupant sensor(s) certified to comply with Section 119(d) gVAC SIZING HVAC Page 1 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 1/Casita Date..08/16/06.10:10-:02 "roject Address........ 5th & Madison ******* --------------------- La Quinta *v7.10* )ocumentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92.064 858-486-9506 Field Check/ Date 21imate Zone......... 15 --------------------- Method ....... MICROPAS.7 v7.10 for 2005 Standards.by Enercomp, Inc. ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita ------------------------------------------------------------- GENERAL INFORMATION ------------------- Floor Area ...........:..... Volume....... Front Orientation.......... Sizing Location............ Latitude ................... Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range.. ........... Interior Shading Used...... Exterior Shading Used...... Overhang Shading Used...... Latent Load Fraction....... 2998 sf 31588 cf Front Facing 0 deg (N) PALM DESERT 33.7 degrees 26 F 70 F 111 F 75 F 34 F Yes Yes Yes 0.24 HEATING AND COOLING LOAD SUMMARY r Description ----- 7----- 7--------------------- Opaque Conduction and Solar...... Glazing Conduction and Solar..... Infiltration ...................... Internal Gain .................... Ducts............................. Sensible Load .................... Latent Load. ..................... Heating Cooling (Btu/hr) (Btu/hr) ---------------------- 26348 11497 8888 13087 11288 6527 n/a 2290 8589 6927 55113 40328 n/a 9719 ----------- -------- Minimum Total Load 55113 50047 Note: The loads shown are only one of the criteria affecting the selection of. HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil. sizing, availability of equipment, oversizing safety margin, etc., must also be considered. - It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. IVAC SIZING HVAC Page 2 ?roject Title .......... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 __ __--------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 -User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita HEATING AND COOLING LOAD SUMMARY BY ZONE . ------------------------------- - -------- ZONE 'LIVING' Floor Area .................... 1304 sf- Volume......................... 14648 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and.Solar...... 11495 5313 Glazing Conduction and Solar..... 4752 6031 Infiltration...... ..... ....... 4910 2839 Internal Gain .................... n/a 985 Ducts..... ................... 3906 3146 Sensible Load............. ...... 25063 18313 Latent Load ........ I............... n/a .4413 Minimum Zone Load 25063 22726 ZONE 'SLEEPING' Floor Area ............:.......... 1694 sf Volume ........................... 16940 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 14852 6184_ Glazing Conduction 'and Solar...... 4136 7056 Infiltration.,..... .......... 6378 3688 Internal Gain:..... .............. n/a 1305 Ducts ........:....... 4683 3781 Sensible Load ..................... 30050 22015 Latent.Load...................... n/a 5306 Minimum Zone Load 30050 27321 [VAC SIZING HVAC Page 3 ---------------------------------------------------------------------------=--- ------------------------------------------------------------------------------- ?roject Title........... Pasa Tiempo Plan !/Casita Date..08/1'6/06 10:10:02 ----------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita ------------------------------•------------------------------------------------ GENERAL INFORMATION -------------------- Floor Area.............:... 2998 sf Volume ..................... 31588 cf Front Orientation.......... Front Facing 90 deg (E) Sizing Location............ PALM DESERT - Latitude ................... 33.7 degrees Winter Outside Design:..... 26 F Winter Inside*Design..:.... 70 F Summer Outside Design...... 111.F Summer Inside Design....... 75 F Summer Range......... .... 34 F Interior Shading Used...... Yes. Exterior Shading Used...... Yes Overhang Shading Used...... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description --------------------------------- (Btu/hr) ----------- (Btu/hr) Opaque Conduction and Solar.....:. 26348 ----------- 10817 Glazing Conduction and Solar..... 8888 14055 Infiltration .. .................. 11288 6527 Internal Gain. .................... n/a 2290 . Ducts....... *..................... 8589 6987 Sensible Load .................... 55113 40675 Latent Load ...................... n/a 9803 Minimum Total Load 55113 50478 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant. design factors such as air flow requirements, outside "air, outdoor design temperatures, coil sizing, availability of equipment,..oversizing safety margin, etc., must also be considered. It is -the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. iVAC SIZING HVAC Page.4 ------------- ?roject Title.......... Pasa Tiempo Plan l/Casita Date..08/16/06,10:10:0.2 MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R-Calcs Run-Pasa Tiempo Plan 1/Casita 'HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE 'LIVING' Floor Area... ...... ........ 1304 sf Volume ........................... 14648 cf Heating Cooling Description (.Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 11495 5159 Glazing Conduction and Solar..... 4752 7116. Infiltration.... 4910 2839 Internal Gain :.................... n/a 985 Ducts...... ......... 3906 3339 Sensible Load.......:. ......... 25063 19436 Latent Load..... ...... n/a 4684, Minimum Zone Load 25063 2412.1 ZONE 'SLEEPING' Floor Area ....................... 1694 sf Volume. ............................ 16940 cf Heating Cooling Description (Btu/hr) .(Btu/hr) Opaque Conduction and Solar...... 14852 5659 Glazing Conduction and Solar....,. 4136 6939 Infiltration.. .... ......... 6378 3688 Internal Gain... .... ......... n/a 1305 Ducts ............................ .4683' 3648 Sensible Load.......... ........ 30050 21239 Latent Load ........................ n/a 5119 Minimum Zone Load 30050 26357 -IVAC SIZING HVAC Page 5 ------------------------ ?roject.Title......I.... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita GENERAL INFORMATION Floor Area ................. 2998 sf Volume ...................... 31588 cf Front Orientation.......... Front Facing 180 deg (S) Sizing Location............ PALM DESERT Latitude ................... 33.7 degrees Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design....... -111 F Summer Inside Design ........ 75 F Summer Range................ 34 F. Interior Shading Used ....... Yes Exterior Shading Used...... Yes Overhang Shading Used...... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING.LOAD SUMMARY --------------------------------- Heating Cooling Description --------------------------------- (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... ---------------------- 26348 11498 Glazing Conduction and Solar...... 8888 13087 Infiltration ..................... 11288 .6527 Internal Gain ....:..............: n/a 2290 Ducts ............................... 8589 69:27 Sensible Load......... .. .... 55113 40329 Latent Load ...................... n/a 9719 Minimum Total Load 55113' 50048 Note:'The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as .air flow requirements, outside air,.outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. iVAC SIZING HVAC Page 6 ?roject .Title:...:..:... Pasa Tiempo Plan 1/Casita Date..08/16/06 10':10:02 MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-H-VAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 1/Casita HEATING AND COOLING LOAD SUMMARY BY ZONE -------------------------------------- ZONE 'LIVING' Floor Area.. ....................... 1304 sf Volume .................... ..... 14648 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 11495 5313 Glazing Conduction and Solar..... 4752 6031 Infiltration........ ......... 4914 2839 Internal Gain.........,. .... n/a 985 Ducts . ............. ............ 3906' 3146 Sensible Load .................... . 25063 18313 Latent Load ...................... n/a 4414, Minimum Zone Load 25063 22727 ZONE 'SLEEPING' Floor Area ........................ 1694 sf. Volume ........................... 16940 cf Heating Cooling `Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 14852 6185 Glazing Conduction and Solar..... 4136 7055 Infiltration.. ............... . 6378 3688 Internal Gain ...................... n/a 1305 Ducts ............................ 4683 3781 Sensible Load .................... 30050 22015 Latent Load ....:................. n/a 5306 Minimum Zone Load 30050 27321 iVAC SIZING HVAC Page 7 ------------------------------------------------------------------------------- ?roject Title........... Pasa,Tiempo Plan 1/Casita Date..08/16/06 10:10:02 MICROPA S7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan l/Casita GENERAL INFORMATION Floor Area ................. 2998 sf Volume... ........... 31588 cf Front Orientation........... Front.Facing 270 deg (W) Sizing Location............ PALM DESERT Latitude. 33.7 degrees Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 1.11 F . Summer Inside Design....... 75 F Summer Range...... 34 F Interior Shading Used......, Yes Exterior Shading Used...... Yes Overhang Shading Used...... Yes. 'Latent Load Fraction........ 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description --------------------------------- (Btu/hr) ----------- (Btu/hr) Opaque Conduction and Solar::.... 26348 ----------- 10882 Glazing Conduction and Solar..... 8888* 14054 Infiltration........... ........ 11288 - 6527 Internal Gain .................... . .n/a 2290 Ducts.....'............ 8589 7.000 Sensible Load... ............... 55113 40752 Latent Load..... ................. n/a 9821 Minimum Total Load ----------- 55113 ----------- 50573 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors.such as air -flow-- requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin., etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. 1 IVAC SIZING HVAC Page 8 ?roject Title.......... Pasa Tiempo Plan 1/Casita Date..08/16/06 10:10:02 -------------------------------=---------------------=------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.10 File-PSTMPOIC Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864, User-D &'R Calcs Run-Pasa Tiempo Plan 1/Casita, HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE 'LIVING' Floor Area ....................... 1304 sf Volume ........................... 14648 cf Heating Cooling Description (Btu/hr). (Btu/hr) Opaque Conduction and Solar...... .11495 5103 Glazing Conduction and S.olar..... . 4752 7116 Infiltration ...................... 4910 2839 Internal Gain .................... n/a 985 Ducts.......... ................ 3906 3327. Sensible Load— ............. 25063 19370 Latent Load. ................... n/a 4668. Minimum Zone Load 25063 24038 ZONE 'SLEEPING' Floor Area........... 1694 sf Volume ........................... 16940 cf Heating Cooling Description --------------------------------- (Btu/hr) (Btu/hr)' Opaque Conduction and Solar...... ----------- 14852 - --------- 5778 Glazing Conduction and Solar..... 4106 6938 Infiltration .................... 6378 3688 Internal Gain.................... n/a 1305 Ducts .... :....................... .. 4683 3673 Sensible Load ..................... 30050 21382 Latent Load ...................... n/a 5153 Minimum Zone Load 30050 26535 D & R Calcs 4 Title.24 Energy Calculations D & R Calcs Micropas v7'.20..Performance' Method (858) 4186-'9506 April.4, 200.7 TITLE.24 COMPLIANCE REQUIREMENTS SUMMARY Pasa Tiempo Plan'2 Ceiling Insulation = •R-30 min. PROVIDE RADIANT BARRIER ROOF. SHT'G (NOTE ON PLANS)' Wall' Insulation R-19 min. Floor Insulation _ N/A Thermal Mass Areas = See Floor plan. Glazing All windows & doors to be dual ,glazed. All glass is Low E. Glazing.shall be installed with a NFRC certifying label attached showing Uvalue•: Solar Heat Gain Co efficient = 0.35 dual windows, doors Uvalue = 0.40 vinyl/wd windows & doors Owner to purchase windows & doors wl specified Uvalues'& SHGC's or better. Hot Water Heater _ (1) 75 gal A.O.Smith #BTC-2517.*** or eq. Standby loss is 2.0 min. Provide a recirc pump. Infiltration = Standard AFUE - 0 .• 78 min. SEER - 13. 0 min.. WITH TXV Duct Insulation . = R-4.2 min. PROVIDE DUCT TESTING BY HERS RATER Heater sizing Zone 1 "LIVING" Sensible heat load - 28;370 Btu (verify HVAC equip. w/ Mechanical) Zone 2 "SLEEPING" Sensible heat load-,25,077 Btu (verify HVAC equip. w/ Mechanical) A/C Sizing Zone 1 "LIVING" Sensible _cool'g load 20,225 Btu Latent cool'g load = 4,874 Btu Zone-2 "SLEEPING Sensible cool'g load = 19,42.9•Btu Latent.cool'g load = 4,682 Btu Verify HVAC sizing & equipment with a Mechanical Engineer/Contractor.. Owner may install any Make & Model HVAC equipment.that is equal or'greater than the minimum efficiencies listed above. All equipment is listed"or eq" -'ERTIFICATE OF COMPLIANCE: RESIDENTIAL.COMPUTER METHOD CF-lR Page 1 ?roject Title.......... Pasa Tiempo Plan 2' Date..04/04/07 10:02:56 project Address......... 5th & Madison ******* --------------------- La Quinta *v7.20* )ocumentation Author... Diane P..Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92064 858-486-5506 Field Check/ Date 'limate Zone........... 15 -------.-------------- .ompliance Method....... MICROPAS7 v7.20 for 2005 Standards by Enercomp, Inc. ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP02R Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 ------------------------------------------------------------------------------- User-D & R Calcs Run-Pasa Tiempo Plan.2 ---------------------------- ---------------------------- MICROPAS7 ENERGY USE SUMMARY = Energy Use Standard Proposed . Compliance = = .(kTDV/sf-yr) Design Design Margin. _ = Space Heating........... 2.05 2.09 =0..04 = = Space Cooling........... 68.30 67.68 0.62 _ Water Heating.......... 9.01 9.30 -0.29 _ = North Total 79.36 79.07 0.29 = = Space Heating.. ....... 2.05 2.26' -0.21 _ = Space -Cooling ........ 68.30, 65.77 2.53 = = Water Heating.......... 9.01 9.30 -0.29 _ = East Total 79.36 77.33 . 2.03 = = Space Heating.......... 2.05 2.24 -0.19 = = Space Cooling........... .68.30 66.45 1.85. _ = Water Heating.....!.... 9.01 9.30 -0.29 _ South Total 79.36 77.99 1.37 = _ Space Heating.......... 2.05 1.93 0.12 = - Space Cooling.......... 68.30 66.42 1.88 = = Water Heating.......... 9.01 9.30 -0.29 = = West Total 79.36 77.65 1.71 = _ *** Building complies with Computer Performance _ ***.HERS Verification Required for Compliance *** _ I 'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF--1R Page 2 ?roject Title.......... Pasa Tiempo Plan 2.'. Date..04/04/07 10:02:56 MICROPAS7 v7 20 File-PSTMPO2R Wth-CTZ15S'05. Program -FORM CF-1R User#-MP08'64 User-D & R Calcs Run-Pasa Tiempo Plan 2 ------------------------------------------------------------------------------- GENERAL INFORMATION ------------------- HERS Verification.......... Required Conditioned Floor Area..... 2851 sf Building Type........... Single Family Detached Construction Type ......... New Fuel Type ................. NaturalGas Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units:... 1 Number'of Building Stories. 1 Weather Data Type.......... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U-factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 29839 cf 2851 .s.f 16.2 % of floor area 0 .'4 Btu/hr-sf -F 0.35 10.5 ft BUILDING ZONE INFORMATION Floor # of # of Cond- Thermo- Vent . Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or 7one.Type (sf) (cf) Units le ioned Type -------- (ft) ----- (sf)' ------- Housewrap ---------- -------------- IjIVING ----- ------ ----- ----- ----- Residence 1541 16739 0.54 1.6 Yes Setback 2.0 Standard No SLEEPING Residence 1310 13100 0.46 1.4 Yes Setback 2:0 Standard No OPAQUE SURFACES U- Sheath- Solar. Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ �IVING ----- ---- ----- ----- ----- --- ---- --- ----------------------- 1 Door Wood 28 0.500 0 0 315 -.90 Yes IV.5 A4 2 Wall Wood 117 0.074 19 0 0 90 Yes IV.9 A5 3 Wall Wood 230 0.074 19 0 0 90 No IV.9 A5 5 Wall Wood 392 0.074 19 0 .90 90 Yes IV.9 A5 6 Wall Wood 150 0.074 19 0 90, 90 No IV:9 A5 8 Wall Wood 275 0.074 19 0 180 90 Yes IV.9 A5 LO Wall Wood 165 0.074 19 0 270 90 Yes IV.9 A5 L2 RoofRad Wood 1541 0.032 30 0 n/a 0 Yes IV.1 A7 SLEEPING 4 Wall Wood 139 0.074 19 0 0 90 Yes IV.9 A5 CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-lR Page 3 ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 ------------------------------------------ ------ - ------------ MICROPAS7 v7.20 File-PSTMP02R Wth-CTZ15SO5 Program -FORM CF-lR User#-MP0864 User-D & R Cal.cs Run-Pasa Tiempo Plan 2 OPAQUE SURFACES --------------- U Sheath- Solar -Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Surface Type (sf) or R-val R-val Azm Tilt Reference Comments ------------ ----- ---- ----- ----- ----- --- ---- -------------------------- 7 Wall Wood 310 0..074 19 0 90 90 Yes IV.9 A5 9 Wall Wood 131 0.074 19 0 180 90 Yes IV.9 A5 Ll Wall Wood 653 0.074 19 0 270 90 Yes IV.9 A5 L3 RoofRad Wood 1310 0.032 30 0 n/a 0 Yes IV.1 A7 Surface LIVING 14 SlabEdge SLEEPING 15 S1abEdge PERIMETER LOSSES Appendix Length F2 Insul. Solar IV Location/ (ft) Factor R-val Gains Reference Comments 150 0.730 R-0 No IV.26 Al . 146 0.730 R-0 No IV.26 Al. )rientation .jIVING 1 Door Front (N) 3 Wind Left (E) 4 Wind Left (E) 6 Door Back- (S) 7 Wind Back (S) 9 Wind Right (W) -'_0 Wind Right (W) _3LEEPING 2 Wind Front (N) 5 Door Left ('E) 8 Door Back (S) .1 Wind Right (W) Wind Right- (W) FENESTRATION SURFACES ------------------- Exterior Area U- Act Shade (sf) factor SHGC Azm Tilt Type Location/Comments 40.0 0.400 0.350 0 90 8.0 0.400 0.350 90 90 30.0 0.400 0.350 90 90 96.0.0.400 0.350 180 90 30.0 0.400. 0.350 180 90 25.0 0.400 0.350 270 90 10.0 0.400 0.350 270 90 36.0 0.400 0.350 0 90 .40.0 0.400 0.350 90 90 64.0 0.400 0.350 180 >90 75.0 0.400 0.350 270 90 7.5 0.400 0.350 270 90 Standard FRONT/Vinyl/Wd Dr LoE Standard LEFT/V.inyl/Wd Op LoE Standard LEFT1/Vinyl/Wd Op LoE Standard BACK/Vinyl/Wd Dr LoE Standard BACK1/Viny.1/Wd Op LoE Standard RIGHT/Vinyl/Wd'Op LoE Standard RIGHTI/Vinyl/Wd Op LoE Standard FRONT2/Vinyl/Wd Op LoE Standard LEFT2/Vinyl/Wd Dr LoE Standard BACK2/Vinyl/'Wd Dr LoE Standard RIGHT2/Vinyl/Wd Op LoE Standard RIGHT21/Vinyl/Wd Op LoE CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 4 Project Title.......... Pasa Tiempo Plan 2. Date..04/04/07 10:02:56 MICROPAS7 v7.20 File-PSTMPO2R. Wth-CTZ15S05 Program -FORM CF-lR User#-MP0864 User-D & R Calcs .Run-Pasa Tiempo Plan 2 ------------------------------------------------------------------------- - - - - - - Surface LIVING .1 Door 3 Window 4 Window 6 Door 7 Window 9 Window. 10 Window SLEEPING 5 Door 8 Door 11 Window 12 Window OVERHANGS ---Window--- =-------- --Overhang------=----- Area Left Right (sf) Width Height Depth Height Extension Extension ----- ----- -- --- ----- - ---------------------- 40.0 n/a 8.0 1.5 2.0 n/a n/a 8.0 n/a 2.0 1.5 2.0 n/a n/a 30.0 n/a 5.0 1.5 2.0 n/a n/a 96.0 n/a 8.0 12.0 1.0 n/a_ n/a 30.0 n/a 5.0 1.5 2.0 n/a n/a 25.0 n/a 5.0 1.5 2.0 n/a n/a 10.0 n./a 4.0 1.5 2'.0 n/a n/a 40.0 n/a 8.0 1.5 2:0 n/a n/a 64.0 n/a 8.0 1.5 2.0 n/a n/a 75-0 n/a 5.0 1.5 2.0 n/a n/a 7.5 n/a .3.0 1.5 2.0 n/a n/a SLAB SURFACES Area Slab Type (.sf ) LIVING Standard Slab. 1541 SLEEPING Standard Slab 11310 HVAC SYSTEMS ------------ Verified Number Verified Verified Verified Verified.Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency , EER or TXV Airflow Draw Capacity ,IVING Furnace. 1 0..780 AFUE n/a n/a n/a n/a n/a . ACSplit 1 13.00 SEER No Yes No No No _:LEEPING Furnace 1 0.780 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER No Yes No No No :'ERTIFICATE OF COMPLIANCE: RESIDENTIAL.COMPUTER METHOD CF-1R Page 5 )roject Title.......... Pasa Tiempo Plan-2 Date.:04/04/07 10:02:56 ------------------------------------------------------------------------------- MICROPAS7-v7.20 File-PSTMP02_R Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run'-Pasa*Tiempo Plan 2 ------------------------------------------------------------------------------- HVAC SIZING ---- - - - - - - Verified Total Sensible Design Maximum Heating Cooling, Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu'/hr) (Btu/hr) (Btu/hr) LIVING Furnace 28370 n/a n/a n/a ACSplit n/a 20225 25100. n/a SLEEPING' Furnace 25077 n/a n/a n/a ACSplit n/a 19427 24109 n/a Total 53446 39652 49208. n/a Orientation of Maximum..... Front Facing 0 deg (N) Sizing Location ............. PALM DESERT Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range.......... ..... 34 F DUCT SYSTEMS ------------ Verified Verified Verified System Duct. Duct' Duct •� Surface Buried Type Location. ,R-value Leakage Area Ducts LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No. SLEEPING Furnace Attic R-4.2 Yes No No ACSplit: Attic R-4.2 Yes No No' WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation. -'ank Type Type Distribution Type. System Factor (gal). R-value 1 Large Gas Recirc/Demand 1 n/a 75 R-n/a v CERTIFICATE OF COMPLIANCE.: RESIDENTIAL COMPUTER METHOD CF-1R Page 6 ?roject'Title.......... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 ------------------------------------------- MICROPAS7 v7 20 File-PSTMPO2R Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2. -------------------------------------------------------------------------------- WATER HEATING SYSTEMS DETAIL Standby. Internal Tank Recovery Rated Loss .Insulation Pilot System.. Efficiency Input Fraction R=value Light 1 Large 0.79 n/a. 0.02 R- n/a n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS ----------------------------------------- *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during.plan'check and field inspection. *** This building incorporates a HERS verified Refrigerant Charge test Dr a HERS verified. Thermostatic Expansion Valve (TXV). If a tooling system is not installed, then HERS verification is not necessary. Chis building incorporates HERS verified Duct Leakage. -his is a.multiple orientation building. This printout is for the front -acing North.. .his building incorporates a Radiant Barrier... 'his building incorporates a non-standard Water Heating System. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC'approved ' testing 'and/or verification methods and *** *** must be reported on the CF-4R installation certificate. *** this building incorporates a HERS verified Refrigerant Charge test )r a HERS verified Thermostatic Expansion Valve (TXV)..-If a -=ling'system is not installed, then HERS verification is not necessary. 'his building incorporates HERS verified Duct Leakage. Target leakage is ,alculated and documented on the CF-4R. If the measured CFM is above the ,target, then corrective.,action must be taken to reduce the duct leakage and. .hen must be retested. Alternatively, the compliance calculations could be -edone without duct testing. If ducts are.not installed, then HERS .,erification is not necessary. 1 'ERTIFICATE OF COMPLIANCE:.RESIDENTIAL COMPUTER METHOD. CF-1R Page 7 -------------- ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 2. Date..04/04/07 10:02:56 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP02R Wth-CTZ15S05 Program -FORM CF-1R User#7MP0864 User-D & R Calcs Run-Pasa Tiempo.Plan.2 ------------------------------------------------------------------------------- REMARKS ,Ierify HVAC sizing & equipment w/ Mechanical engineer/contractor. COMPLIANCE STATEMENT -------------------- This certificate of compliance lists the building features and performance specifications needed to comply with`Title-24, Parts 1 and 6 of the California Code. of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design. responsibility. , DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Bill Currier Company. Colbourn Currier Noll Address.. i0675 Treena Street #101 San Diego, CA.92031 Phone... (858) 695-1914 License. Signed... (date) ENFORCEMENT AGENCY Name.... Title. Agency.. Phone.. Signed:. (date) Name.... Diane P. Mendoza Company. D & R Calcs. Address. 14107 Ipava Drive Poway, CA 92064. Phone.... 858-486-9506 Signed.. - /)!�(da AANDATORY MEASURES CHECKLIST: RESIDENTIAL' MF-1R Page 1 ?roject Title.......... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 Project Address........ 5th & Madison ******* --------------------- La Quinta *v7.20* Documentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92064 858-486-9506 Field Check/ Date _'limate Zone........... 15 --------------------- -ompliance Method...... MICROPAS7 v7.20 for 2,005 Standards by Enercomp, Inc.- ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.20. File-PSTMPO2R Wth-CTZ15S05 Program -FORM MF-1R { User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2 ------------------------------------------------------------------------------- Jote: Lowrise residential buildings subject to the Standards must contain.these measures regardless of the compliance approach used. More stringent compliance :equirements from.the Certificate of Compliance supersede the items marked with in asterisk (*). When this checklist is incorporated into the permit documents, -he features noted shall be.considered by all parties as minimum component performance specifications for the mandatory measures whether they are shown L�lsewhere in the documents or on this checklist only. _3UILDING ENVELOPE MEASURES n/a ,150(a): Minimum R-19 insulation in wood framed ceiling or equivalent U-factor in metal frame ceiling. 150(b): Loose fill insulation manufacturer's labeled R-Value ,150(c): Minimum R713 wall insulation in wood framed walls or equivalent U-factor in metal frame walls (does not apply to exterior mass walls) '150(d): Minimum R-13 raised floor insulation in framed floors or.equivalent U-factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual '150(g): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF-6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and.windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration -products -(except field -fabricated) have De-. En- sign- force- 'er ment 4ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 2 ?roject Title.......... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 MICROPAS7 v7.20 File-PSTMPO2R Wth-CT215S05 Program -FORM MF-1R User#-MP0864' User-D & R Calcs Run-Pasa Tiempo Plan 2 label with certified U-factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certif.ication 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES 110-113: HVAC.equipment, water heaters, showerheads and faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA De- En- sign- force n/a er ment 150(i) Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an Energy Factor less than 0..58 must be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the.R-value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water.pipes closest to water heater tank, no systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B 2. Cooling system piping (suction., chilled water, or brine lines), piping insulated between heating source. and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi,* meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the.. Solar Rating and Certification Corporation —�- 150(m): Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned.space. Openings shall be sealed with mastic, tape; or other duct -closure system that meets the applicable requirements of UL 181, 4ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 3 ----------------------------------------=---------------=---------------------- ------------------------------------------------------------------------------- ?roject Title............ Pasts Tiempo Plan 2 Date..04/04/07 10:02:56 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP02R Wth-CTZ15S05 .Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2 UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch,. the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to reductions in the cross -sectional area of the ducts _ 3. Joints and seams -of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands _ 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected ,from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1..A thermal efficiency that complies with the'Appliance Efficiency Regulations, on -off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: cause a. At least 36 inches of pipe between filter and heater for future solar.heating b. Cover for outdoor pools or outdoor spas. 3..Pool system has directional inlets and a circulation pump time switch 115: Gas -fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot.light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(i): Cool Roof material meets specified criteria . ..ESIDENTIAL LIGHTING MEASURES De.- En- sign- force n/a er ment 150(k)1: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 15.0-C,, and do not contain a medium screw -base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic and have an output frequency no less than 20 kHz RANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 4 ?roject Title.......... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 MICROPAS7 v7'.20 File-PSTMPO2R Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D &.R Calcs Run-Pasa Tiempo Plan 2 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high .efficacy luminaires .50(k)3: Permanently installed luminaires in bathrooms, garages,.laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have an always on option .50(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms'shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on -option _50(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air. tight (AT).to less than 2.0 CFM at 75 Pascals .50(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) '.50(k)7: Lighting for parking.lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages.for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and. 146 —� _50(k)8: Permanently installed lighting in the enclosed, non-. dwelling spaces of low-rise residential buildings with four or more dwelling units -shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) AVAC SIZING' HVAC Page 1 ?roject Title.......... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 Project Address........ 5th & Madison ******* --------------------- La Quinta *v7.20* 7ocumentation Author...- Diane P. Mendoza ******* Building Permit # D & R Calcs 14107. Ipava Drive Plan Check / Date Poway, 'CA 92064 858-486-9506 Field Check/ Date _'limate Zone........... 15 --------------------- ompliance Method...... MICROPAS7 v7.20 for 2005 Standards by Enercomp, Inc. ------------=-------------------------------=-------------=-------------------- MICROPAS7 v7.20 File-PSTMPO2R Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2 c --------------------------------------------------------------------=---------- GENERAL INFORMATION Floor Area ......... :....... Volume .................... Front Orientation.......... Sizing Location............ Latitude .................:. Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range., ............. Interior Shading Used...... Exterior Shading Used...... Overhang Shading Used...... Latent Load Fraction....... Description 2851 sf 29839 cf Front Facing 0 deg -(N) PALM DESERT 33.7 degrees 26 F 70 F 111 F 75 F 34 F Yes Yes Yes 0.24 HEATING AND COOLING LOAD SUMMARY -------------------------------- Opaque Conduction and Solar...... Glazing Conduction and Solar..... Infiltration ................ .... Internal Gain............ ...... Ducts. ........................... Sensible Load:..... ........... Latent Load.* .................... Heating Cooling (Btu/hr) (Btu/hr) 26260 11122 8122 13223 10735 6207 n/-a 2290 8329 6811. 53446 39652 n/a 9556 Minimum Total Load 53446 49208 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, .coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility 'to consider all factors when selecting the HVAC equipment. -TVAC SIZING HVAC Page 2 -------------------------------- Iroject Title........... Pasa Tiempo Plan 2. Date..04/04/07 10:02;56 ------------------------------------------------------- MICROPAS7 v7.20 File-PSTMPO2R Wth-CTZ15S05 'Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2 -------------------- ------------------------------------------------------------ HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE 'LIVING ' Floor Area... ............... 1541 sf Volume ........................... 16739 cf Heating Cooling Description (Btu/hr) ----------- (Btu/hr) ----------,- --------------------------------- Opaque Conduction and Solar....... 13940 5867 Glazing Conduction and•Solar...... 4206 6293 Infiltration . ............ ..... 5802 3355 Internal Gain........ .......... n/a 1237 Ducts ............................ 4421 3474 Sensible Load ..................... 28370 20225 Latent Load........ ........ .. n/a 4874 Minimum Zone Load 28370 25100 ZONE 'SLEEPING' Floor Area. ... ................ 1310 sf Volume ........................... 13100 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 12320 5255 Glazing Conduction and Solar...... 3916 6929 Infiltration ..................... 4933 2852 Internal Gain .................... n/a .1053 Ducts ............................ 3908 3337 Sensible.Load..................... 25077 19427 Latent Load ....................... n/a 4682 Minimum Zone Load ----- - - - - -- .- 25077 ---- - - - - - - .24109 -iVAC SIZING { HVAC Page 3 ------------------------------------------------------------------------------- ?roject Title..........., Pasa.Tiempo Plan 2 Date..04/04/07 10:02:56 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP02R Wth-CTZ15S05 Program-HVAC SIZING ' User#-MP0864 User-D & R Calcs, Run-Pasa Tiempo Plan 2 GENERAL INFORMATION ------------------- Floor Area ................. 2851 sf Volume.. ................. 29839 cf Front Orientation.......... Front Facing 90.deg (E) Sizing Location......... PALM DESERT Latitude ................... 33.7 degrees Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range ............... 34 F Interior Shading Used:..... Yes Exterior Shading Used...... Yes Overhang Shading'Used...... Yes Latent Load Fraction ........ 0.24. HEATING AND COOLING -LOAD SUMMARY Heating Cooling Description (Btu/.hr). (Btu/hr) Opaque Conduction and Solar...... 26.260 10445 Glazing Conduction and Solar....: 8122 12722 Infiltration........... ......... 10735 6207 Internal Gain..... ............. n/a 2290 Ducts.... ......... .......... 8329 6567 Sensible Load......... ......... ----------- 53446 ----------- 38230 Latent Load......... ........... n/a 9213 Minimum Total Load 53446 47443 Note: The loads shown are. only one of the criteria affecting the selection of HVAC equipment.. Other relevant design.factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. _1VAC SIZING HVAC Page 4. ?roject Title............ Pasa Tiempo Plan 2 Date..04/04./07 10:02:56 MICROPAS7 v7.20 File-PSTMP02R Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2 HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE 'LIVING' Floor Area......... 1541 sf Volume ............................ 16739 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 13940 5752 Glazing Conduction and Solar..... 4206 6234 Infiltration.. ....... 58.02 3355 Internal Gain .................... n/a 1237 Ducts ............................ 4421 3438. Sensible Load... ............. 28370 2.0016 Latent Load. ............... .. n/a 4824 Minimum Zone Load 28370 24840 ZONE 'SLEEPING' Floor Area...... .. ........ 1310 sf Volume ............................ 13100 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction.and Solar.:.... 12320 4692 Glazing Conduction -and Solar..... 3916 6488 Infiltration....... ............ 4933 2852 Internal Gain .................... n/a 1053 Ducts.. ........................... 3908 3128 Sensible Load............." ... ----------------------- .25077 18214 Latent Load... ......... .... n/a 43.90 Minimum,Zorie Load 25077 22603 _1VAC SIZING HVAC Page 5 ---------------------- Project Title...:...... Pasa Tiempo Plan 2 Date..0.4/04/07 10:02:56 MICROPAS7 v7 20 File-PSTMP02R Wth-CTZ15SO5 Program-HVAC SIZING ' User#-MP0864 User-D.& R Calcs Run-Pasa Tiempo Plan 2 -------------------------------------------------------------------------------- GENERAL INFORMATION Floor Area ................. 2851 sf Volume ......... .............:29839 cf Front Orientation.......... Front Facing Sizing Location............ PALM DESERT Latitude. .... 33.7 degrees Winter Outside Design...... 26 F Winter Inside Design........ 70 F Summer Outside Design...... 111 F Summer Inside Design........ 75 F' Summer Range ............... 34 F Interior Shading Used ....... Yes Exterior Shading -Used ....... Yes Overhang.Shading Used....... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY -------------------------------- Heating Description (Btu/hr) Opaque Conduction and Solar...... .26260 Glazing Conduction and Solar..... 8122 Infiltration ..................... 10735 Internal Gain... ...... n/a Ducts.. 8329 Sensible Load............ ...... 53446 Latent Load ...................... n/a Minimum -Total Load 53446 180 deg (S) Cooling (Btu/hr) 11110 13222 6207 2290 6808 39637 9553 49.190 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment.' Other relevant design factors such. as air flow requirements, outside air, outdoor design temperature.s, coil sizing, availability of equipment, oversizing safety margin, etc., must also 'be considered. It is the HVAC designer's responsibility to consider- all factors when selecting the HVAC equipment. [VAC SIZING HVAC Page 6 'roject Title.......... Pasa Tiempo Plan 2 Date...04/04/07,10:02:56 --------------------------------------------------------- MICROPAS7 v7 20 File-PSTMPO2R Wth,CTZ15S05 Program-HVAC SIZING. User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan72 ------------------------------------------------------------------------------- HEATING AND COOLING LOAD SUMMARY BY ZONE ---------------------------------------- ZONE 'LIVING' Floor Area ........................ 1541 sf Volume ........................... 16739 cf 'Heating: Cooling Description (Btu/hr). (Btu/hr) Opaque Conduction and Solar...... 13.940 5853 Glazing Conduction and Solar..... 4206 6293 Infiltration ........................ 5802 3355 Internal Gain... ............... n/a 1237 Ducts....... .........:......... 4421 3471 Sensible Load.. .... ............. 28370 20208 Latent Load ....................... n/a 4870 Minimum Zone Load 28370 25078 ZONE 'SLEEPING' Floor Area... .................... 1310 sf Volume.. 13100 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 12320 5257 Glazing,Conduction and Solar..... 3916 6929 Infiltration.......... ............. 49.33 2852 Internal Gain................. n/a 1053 Ducts .............................. 3908 3337 Sensible Load .................... ----------- 25077 ----------- 19429 Latent Load ......................... n/a 4682 Minimum Zone Load ---------------------- 25077 24112 _1VAC SIZING HVAC Page 7 ------------------------------------- 'roject Title.......... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 MICROPAS7 v7 20 File-PSTMP02R Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2 -------------------------------------------------------------------------------- GENERAL INFORMATION Floor Area ................. 2851 sf Volume ......... ........... 29839 cf Front Orientation.......... Front Facing 270 deg (W) Sizing Location. .......... PALM DESERT p Latitude ... ............... 33.7 degrees Winter Outside Des .ign...... 26 F Winter Inside Design...:... 70 F Summer Outside Design...... 111-F Summer Inside Design....... 75 F Summer Range ............... 34 F Interior Shading Used...... Yes. Exterior Shading Used...... Yes Overhang Shading Used...... Yes. Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description --------------------------------- (Btu/hr) ---------------------- (Btu/hr) Opaque Conduction and Solar....... 26260 10503 Glazing Conduction and Solar..... 8122 12.722 Infiltration ..................... 10735 6207 Internal Gain......... n/a 2290 Ducts ............................ 8329 65.79 Sensible Load........ 53446 38301 Latent -Load ............. n/a 9230 Minimum Total Load 53446 47531 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin,.etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. 3VAC SIZING HVAC Page 8 ---------------------------------------------------==-------------------------- Project Title ........... Pasa Tiempo Plan 2 Date..04/04/07 10:02:56 MICROPAS7 V7.20 File-PSTMPO2R Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864. User-D & R Calcs Run-Pasa Tiempo Plan 2 HEATING AND COOLING LOAD SUMMARY BY ZONE ---------------------------------------- ZONE 'LIVING' .Floor Area .............. .... 1541 sf Volume..... .................... 16739 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque.Conduction and Solar...... 13940 5720 Glazing Conduction and Solar...... 4206 6234 Infiltration.. ............ .... 5802 3355 Internal Gain........ ........ n/a 1237 Ducts............ .... .. ..... 4421 3431 Sensible Load....... ........... 28.370 19977 Latent Load ...................... n/a 4815 Minimum Zone Load 28370 24792 ZONE 'SLEEPING' Floor Area........ ................ 1310 sf Volume... ......... ........... 13100 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 12320 4783 Glazing Conduction and Solar..'.... 3916 .6488 Infiltration...... ..... ....... 4933 2852 Internal -Gain.......'.:...... n/a 1053 Ducts ............................. 3908 3147 Sensible Load.................. 25077 18323 Latent Load ...................... n/a 4416 Minimum Zone Load 25077 22739 12 PASA-TIEMPO PLAN 2'w/ CASITA LA QUINTA, CA CLIMATE ZONE 15 Title 24 Energy Calculations D & R Calcs Micropas v7.20 Performance Method (858) 486-9506 April 4:, 2007 " TITLE,24 COMPLIANCE REQUIREMENTS SUMMARY Pasa Tiempo Plan 2 w/ Casita Ceiling Insulation = R-30 min. PROVIDE RADIANT BARRIER ROOF SHT'G (NOTE ON PLANS) Wall Insulation = R-19 min. Floor Insulation = N/A Thermal Mass Areas = See Floor plan Glazing All .windows & doors to be dual glazed. Ali glass is.Low E. Glazing shall be installed with -a NFRC certifying label. attached.showing Uvalue. Solar Heat Gain Co -efficient = 0.35 dual windows, , doors Uvalue = 0.40 vinyl/wd windows & doors Owner to purchase windows & doors w/ specified Uvalues & SHGC's or better. Hot Water Heater = (1) 75 gal A.O.Smith #BTC-251 *** or eq. Standby loss is 2.0 min. Provide a recirc pump.. Infiltration Standard AFUE - 0. 78 min. SEER - 13. 0 min. WITH TXV Duct Insulation = R-4.2. min. ' PROVIDE DUCT TESTING BY HERS RATER Heater sizing Zone 1 "LIVING" Sensible heat load*- 28,292 Btu (verify HVAC equip. wl Mechanical) Zone 2 "SLEEPING" 'Sensible heat load 31,.001 Btu '(verify HVAC equip.. w/ Mechanical) A/C Sizing Zone 1 "LIVING" Sensible cool'g load = 2.0,045 Btu Latent.cool'g load = 4;831 Btu Zone 2 "SLEEPING" Sensible cool'g load = 23,212 Btu i, Latent.cool'g load = 5,594 Btu Verify HVAC sizing & equipment with a Mechanical Engineer/Contractor.. Owner may install any Make &.Model HVAC equipment that is equal or greater. than the minimum efficiencies listed above. All equipment is listed "or.eq ,CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 1 -------------------------=-------------------------=--------------------------- ?ro.ject Title.......... Pasa.Tiempo Plan (2/Casita Date..04/04/07 10:09:43 -3roject Address........ 5th & Madison *******--------------------- La Quinta *v7.20* Documentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92064 858-486-9506 Field Check/ Date :limate Zone........... 15 --------------------- _ompliance Method...... MICROPAS7 v7.20 for 2005 Standards -by Enercomp, Inc. ------------------------------- -- - ---- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita ----------------------------------------------------------=-- = MICROPAS7 ENERGY USE SUMMARY = _ 'Energy ---------------------------- Use Standard Proposed Compliance = _ (kTDV/sf-yr) Design Design Margin = = Space Heating.......... 2.15 2.13 0.02 _ = Space Cooling...:.... 69.04 68.33 0.71 = = Water Heating.......... 8.25 8.51 -0.26 = = North Total 79.44 78.97 0.47 =. = Space Heating.......... 2.15 2.34 -0.19 = = Space Cooling.. ...... 69.04 67.39 _ 1.65 = = Water Heating.......... 8.25 .8.51 -6.26 = = East Total 79.44 78.24 1.20 = J = Space Heating...... .. 2.15 2.34 -0.19 = Space Cooling.......... 69.04 66.86 2.18 = = Water Heating..... ... 8.25 8.51 -0..26 = = South Total 79.44 77.71 1.73 = = Space Heating.......... 2.15 2.01 0.14 = - Space Cooling.......... 69.04 67.66 1.38 = = Water Heating.......... 8.25 .8.51 70.26 = = West Total 79.44 78.18 1.26 = _ ***Building complies with Computer Performance _ ------=---------------------------------------------------------- *** HERS Verification Required for Compliance"**,* _ s "ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 2 ?roject Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 -------------------------------------------------------------=----------------- ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan-2/Casita ------------------------------------------------------------------------------- GENERAL INFORMATION HERS Verification.......... Required Conditioned Floor Area..... 3115 sf. Building Type .............. Single Family Detached Construction Type New Fuel Type ................. NaturalGas. Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units... 1 Number of Building Stories. 1 Weather Data Type..:....... FullYear Floor Construction Type.... Number of Building Zones... Conditioned Volume;....r... Slab -On -Grade Area......... Glazing Percentage......... Average Glazing U-factor... Average Glazing SHGC....... Average Ceiling Height..... Slab On Grade 2 32479 cf 3115 sf 16.6 % of floor area 0..4 Btu/hr-sf-F 0.35 10.4 ft BUILDING ZONE INFORMATION Floor # of # of Cond- Thermo- Vent Vent Verified Area Volume Dwell Peop- it- stat Height Area Leakage or ;one Type (sf) (cf) Units le ioned Type (ft) (sf) Housewrap ------------- __jIVING ----- ------ ----- ----- ----- -------- ----- ----------------- Residence 1541 16739 0.49 1.5 Yes Setback 2.0 Standard No `;LEEPING Residence 1574 15740 0.51 1.5 Yes Setback 2.0 Standard No _�urface T,IVING 1 Door 2 Wall 3 Wall 5 ,Wall 6 Wall 8 Wall -0 Wall. 2 RoofRad -LEEPING 4 Wall OPAQUE SURFACES U- --------------- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Type (sf) or R-val R-val Azm Tilt Reference Comments Wood 28 0.500 0 .0 315 90 Yes IV.5 A4 Wood 120 0.074 19 0 0 90 Yes IV.9 A5 Wood 210 0.074 19 0 0 '90 No IV.9 A5 Wood 392 0.074 19 0 90 90 Yes IV.9 A5 Wood 150 0.074 19 0 90, 90 No IV.9 A5 Wood 275 0.074 19 0 180 90 Yes IV.9 A5 Wood 165 0.074 19 0 270 90 Yes IV.9 A5 Wood 1541 0.032 30. 0 n/a 0 Yes IV.1 A7 Wood 209 0.074 19 0 0 90 Yes IV.9 A5 'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 3 ------------------------------------------------------------------------------= ?roject Title........... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 -----------------------------------------=------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita ------------------------------------------------------------------------------- Surface ------------ 7 Wall 9 Wall '.1 Wall __3 RoofRad Surface LIVING 14.S1abEdge SLEEPING 15 SlabEdge ')rientation OPAQUE SURFACES U- --------------- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Type (sf) or R-val R-val Azm Tilt Reference Comments Wood '420 0.074 19 0 90 90 Yes IV.9 A5 Wood 171 0.074 19 0 180 90 Yes IV.9-A5 Wood .758 0.074 19 0 270 90 Yes IV.9 A5 Wood 1574 0.032 30 0 n/a 0 Yes IV.1 A7 PERIMETER LOSSES ---------------- Appendix Length F2 Insul Solar IV Location/ (ft)' Factor R-val Gains Reference Comments 150 184 JIVING 1 Door Front (N) 3 Wind Left (E) 4 Wind Left (E) 6 Door Back (S) 7 Wind Back (S) 9 Wind Right (W) .0 Wind Right (W) jLEEPING 2 Wind Front (N) 5 Door Left (E) 8 Door Back (S) .1 Wind Right. (W) -.2 Wind Right (W) 0.730 R-0 No IV.26 Al 0.730 R-0 No IV.26 Al FENESTRATION SURFACES --------------------- Exterior Area U- Act Shade (sf).factor SHGC Azm Tilt Type ----- ----- ----- --- ------------ Location/Comments ------------------------ 40'.0 0.400 0.350 0 90 Standard FRONT/Vinyl/Wd Dr LoE 8.0 0.400 0.350 90 90 Standard LEFT/Vinyl/Wd Op LoE 30.0 0.400 0.350 90 90 Standard LEFT1/Vinyl/Wd Op LoE 96.0 '0.400 0.350.180 90 Standard BACK/Vinyl/Wd Dr Lo'E 30.0 0.400 0'.350 180 90 Standard BACK11/Vinyl/Wd Op LoE 25.0 0.400 0.350 27,0 90 Standard RIGHT/Vinyl/Wd Op LoE 10.0 0.400 0.350 270 90 Standard RIGHTI/Vinyl/Wd Op LoE 51.0 0.400 0.350 0 90 Standard FRONT2/Vinyl/Wd Op'LoE .40.0 0.400-0.350 90 90 Standard LEFT2/Vinyl/Wd Dr LoE 104.0 0.400 0.350 180 90 Standard'BACK2/Vinyl/Wd Dr LoE 75.0 0.400 0.350 270 90 Standard RIGHT2/Vinyl/Wd Op LoE 7.5 0.400 0.350 270 90 Standard RIGHT21/Vinyl/Wd Op LoE 1 :ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER.METHOD CF-1R Page 4 ?roject Title Pasa Tiempo Plan 2/Casita Date..04/04/07 10:.09.:43 ---------------------------------------------------------------------- MICROPAS7 v7.20 ..File-PSTMP2CR Wth-CTZ15S05 Program -FORM CF-1R. t User#-MP0864" User-D & R Calcs. Run-Pasa Tiempo Plan 2/Casita OVERHANGS ---Window--- ------------- Overhang ------------ Area. Left ' Right Surface (sf).Width Height Depth -Height Extension Extension LIVING 1 Door 40.0 n/a 8.0 1.5 2.0. n/a n/a 3 Window 8.0 n/a 2.0 1.5 2.0 n'/a n/a 4 Window" 30.0 n/a 5.0 1.5 2.0 n/a n/a 6 Door 9.6.0 n/a 8.0 .12..5 1.0 n/a n/a 7 Window 30.0 n/a 5.0 1.5 2.0 n/a n/a 9 Window 25.0 n/a 5.0. 1.5 2.0 n/a n/a. 10 Window 10.0 n/a 4.0 -1.5 2.0 n/a n/a SLEEPING 5 D"oor 40.0 n/a 8.0 1.5 "2.0 n/a n/a 8 Door. 104.0 n/a 8.0 1.5 2.0 n/a n/a 11 Window 75.0 n/a 5.0 1.5 2.0 n/a n/a 12 Window 7.5 n/a 3.0 1.5 2.0 n/a n/a SLAB SURFACES Area Slab Type (sf) LIVING Standard Slab 1541 SLEEPING Standard Slab 1574 HVAC SYSTEMS ------------ Verified Number. Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt Cooling Type Systems Efficiency. EER or TXV Airflow Draw Capacity _jIVING Furnace 1 0.780 AFUE n/a n/a. n/a n/a n/a ACSplit 1 13.00 SEER No Yes No No No .>LEEPING Furnace 1 0.780 AFUE n/a n/a n/a n/a' n/a ACSplit 1 13.00 SEER No Yes No No No' :ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 5 ?roject.Title.......... Pasa Tiempo Plan.2/Casita Date..04/04/07 10:09:43 1 MICROPAS7 v7 20 ------------------------------------------------- File-PSTMP2CR Wth-CTZ15S05 Program -FORM CF-1R. User#-MP0864 ----------------------------------- User-D & R Calcs Run-Pasa Tiempo 7-------------------------------------------- Plan 2/Casita, HVAC SIZING, Verified Total Sensible Design. Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type (Btu/hr) (Btu/hr) (Btu/hr) (Btu/hr)' LIVING Furnace 28292 n/a n/a n/a ACSplit n/a 20045 24876 n/a SLEEPING Furnace. 31001 n/a n/a n/a ACSplit n/a 23101 28668 n/a Total 59292 43146 53545. n/a Orientation of Maximum.... Sizing Location... ........ Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range ............... Front Facing O,deg (N) PALM . DESERT 26 F , 70 F 111 F 75 F 34 F DUCT SYSTEMS Verified Verified Verified - System Duct Duct Duct Surface Buried Type Location R-value Leakage Area Ducts LIVING Furnace. Attic R-4.2 Yes- No No. ACSplit Attic R-4.2 Yes No No SLEEPING Furnace Attic R-4.2 Yes No No ACSplit Attic, R-4.2 Yes No No Heater 'ank Type Type 1 Large Gas WATER HEATING SYSTEMS Number in Energy Distribution Type System: Factor. Recirc/Demand 1 n/a Tank ' External Size. Insulation (gal) R-value 75 R-n/a 'ERTIFICATE.OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 6 -------------=----------------------------------------------------------------- ------------------------------------------------------------------------------- 'roject Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 ---------=----------=-------------------------------------------------=-------- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita ------------------------------------------------------------------------------- WATER.HEATING SYSTEMS DETAIL Standby Internal Tank . Recovery Rated Loss Insulation Pilot System Efficiency Input Fraction R-value Light -------------------------------------------------------------------- 1 Large 0.79 n/a 0.02 R- n/a. n/a SPECIAL FEATURES AND%MODELING ASSUMPTIONS ----------------------------------------- *** Items in thissection should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection. *** —his building incorporates a HERS verified Refrigerant Charge test jr a HERS verified Thermostatic Expansion Valve (TXV). If a :ooling.system is not installed, then HERS verification is not necessary. :his building incorporates HERS verified Duct Leakage. —his is a multiple orientation building. This printout is for the front pacing North. —his-building incorporates a Radiant Barrier. 'his building incorporates a non-standard Water Heating System. HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods and *** *** must be reported on the CF-4R installation certificate. *** .'his building incorporates a HERS verified Refrigerant Charge test ,r a HERS verified Thermostatic Expansion Valve (TXV). If a .00ling system is not installed, then HERS verification is not necessary. 'his building incorporates HERS verified Duct Leakage. Target leakage is !alculated and documented on the CF-4R. If the measured CFM is above the Larget, then corrective.action must be taken to reduce the duct leakage and hen must be retested. Alternatively, the compliance calculations could be -edone without duct testing. If ducts are not installed, then HERS verification is no_t.necessary. '_ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 7 ?roject Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 -------------- . .MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita I. ------------------------------------------------------------------------------- REMARKS �Terify HVAC sizing & equipment W/ Mechanical engineer/contractor. COMPLIANCE STATEMENT This certificate of compliance lists the, building,features and performance specifications needed to comply with Title-24,'Parts 1 and 6 of the California Code of Regulations, and the administrative' regulations to implement them. This certificate has been signed by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name..... Bill Currier Company..Colbourn Currier Noll Address. 10675 Treena Street#101 San Diego, CA 92031 Phone:.. (858) 695-1914 License. Signed.. (date) Name.... Title... Agency.. Phone... Signed. Name.... Diane P. Mendoza Company. D & R Calcs Address. 14107 Ipava Drive Poway, CA 92064 Phone... 858-486-9506 Signed.. ENFORCEMENT AGENCY (date) t --IANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 1 'roject Title.......... Pasa Tiempo Plan 2/Casita ---------------- Date..04/04/07 10:09:43 -'roject Address........ 5th & Madison ******* --------------------- I La Quinta *v7:20* )ocumentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92064 858-486-9506 Field Check/ Date 'limate Zone..... ...... 15 --------------------- .ompliance Method...... MICROPAS7 v7.20 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 -----------------------------------------------------------------------------= User-D & R Calcs Run-Pasa Tiempo Plan 2/Casit-a Tote: Lowrise residential buildings subject to the.Standards must contain these -ieasures regardless of the compliance approach used. More stringent compliance --equirements from the Certificate of Compliance supersede the items marked with in asterisk (*). When this checklist is incorporated into the permit documents, `.he' features noted shall be considered by all parties as minimum component ,erformance specifications for .the mandatory measures whether they are shown !lsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES n/a 150(a).: Minimum R-19 insulation in wood framed ceiling or equivalent U-factor .in metal frame ceiling 150(b): Loose fill insulation manufacturer's labeled R-Value �C 150(c): Minimum-R-13 wall insulation in wood framed walls or equivalent U-factor in metal frame walls (does not apply to exterior mass walls) 150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U-factor 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door covering the entire opening of the firebox b. Outside air intake with damper and control, flue damper and control 2. No continuous burning gas pilot lights allowed 150(f): Air retarding wrap installed to comply with Sec. 151 meets requirements specified in ACM Residential Manual / 150(g): Vapor barriers mandatory in Climate Zones 14,16 only 150.(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.30, water vapor permeance rate.no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF-6R-form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2..Fenestration products (except field -fabricated) have De- .En- sign- force- er ment [ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 2 _'roject Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 ------------- - ----- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program-FORM.MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita -------------------------------------------------------------------------------- label with certified U-factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed PACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES De- En- sign- force n/a er ment 110-113: HVAC equipment, water heaters, showerheads and. faucets certified by the Energy Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(i): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation 1. Storage gas water heaters rated with an -Energy Factor less than 0.58 must be externally wrapped with insulation having an installed thermal resistance of.R12 or greater 2. Back-up tanks for solar system, unfired.storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R=value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First'5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes shall be insulated to Table 150B �. 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to / Table 150-B and Equation 150-A 4. Steam hydronic heating systems or hot water systems >15 psi, meet requirements.of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance and wind 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by the Solar Rating and Certification Corporation 150 (m) : Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of .the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, QANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 3 -------=---------------------------------------------=------------------------- ?roject Title........... Pasa Tiempo Plan,2/Casita Date..04/04/07 10:09:43 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita ------------ ------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2: Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not .be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross -sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually. operated dampers / 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation.shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause / degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with the Appliance Efficiency Regulations, -on -off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas -fired central furnaces, pool heaters, spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr) 118(i): Cool Roof material meets specified criteria .ESIDENTIAL LIGHTING MEASURES De- En- sign -.force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only.high efficacy lamps as -outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic and have an output frequency no less than 20 kHz IANDATORY MEASURES CHECKLIST:RESIDENTIAL MF-1R Page 4 ------------------------------ )roject Title........:. Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- .MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as -outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy.luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy luminaires, provided that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires. .50(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an'occupant sensor(s) certified to comply with Section 119(d) that does not turn on automatically or have aft always on option -1.50(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 70 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that.complies with. -Section 119(d) that does not turn on.automatically or have an always on option _50(k)5: Luminaires that are recessed into insulated ceilings are -approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals .50(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or other Article 680 locations.) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) ,.50(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 -50(k)8: Permanently.installed lighting in the enclosed, non - dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) gVAC SIZING HVAC Page 1 ?roject Title.......... Pasa Tiem o Plan 2/Casita Date..04/04/07 10:09:43 ?roject Address........ 5th & Madison ******* ----------=----------- La Quinta *v7.20* )ocumentat.ion Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92064. 858-486-9506 Field -Check/ Date 21imate Zone.... 15 --------------------- :ompliance Method...... MICROPAS7 v7.20 for 2005 Standards by Enercomp, Inc. ----------------------------------------------- - -- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita ----------------------------------=-------------------------------------------- GENERAL INFORMATION ------------------- Floor Area ................. Volume. ................. Front Orientation.......... Sizing Location........ ... Latitude .................... Winter Outside Design...:.. Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... Summer Range.. .. ..... Interior Shading Used...... Exterior Shading.Used....... Overhang.'Shading Used...... Latent Load Fraction....... Description 3115 sf 32479 cf Front Facing 0 deg (N). PALM DESERT 33.7 degrees 26 F 70 F 111 F 75 F 34 F Yes Yes Yes 0.24 HEATING AND COOLING LOAD SUMMARY -------------------------------- Opaque Conduction and Solar...... Glazing Conduction and Solar..... Infiltration:..... .... ....... Internal Gain .................... Ducts........:..........I........ Sensible Load .................... Latent Load ....................... Minimum Total Load Heating Cooling (Btu/hr) (Btu/hr) ----------- 29233 ----------- 12324 9090 14340 11729 6781 n/a 2290 9240 7411 59292 43146 n/a 10398 59292 53545 Note: The loads shown are only one of. the criteria.affecting of HVAC equipment. Other relevant de°sign factors such requirements, outside air, outdoor design temperatures, availability of equipment, oversizing safety margin, etc., considered.- It is the HVAC designer's responsibility to factors when selecting the HVAC equipment. the selection as air flow coil sizing, Must also be consider all' [VAC SIZING HVAC Page 2 'rojec.t Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 ------------------------ MICROPAS7 v7.20; File-PSTMP2CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita HEATING AND COOLING LOAD SUMMARY BY ZONE ------------- - -------------------------- ZONE 'LIVING' Floor Area ....................... 1541 sf Volume ............................ 16739 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 138.74 5832 Glazing Conduction and Solar...:. 4206 6293 Infiltration.:..... .... 5802 3355 Internal Gain.................. n/a 1122 Ducts....... ............ ...... 4409' 3443 Sensible Load........... ....... 28292 20045 Latent Load ..:................... n/a 4831 Minimum Zone Load 28292 24876 ZONE 'SLEEPING' Floor Area... ..................... 1574 sf Volume ........................... 15740 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar ...... 15359 '6491 Glazing Conduction and Solar,_... 4884 8047 Infiltration ..................... 5927 3427 Internal Gain... ...... n/a 1168 Ducts.. ........................... 4831 3968 Sensible:Load..................... 31001 23101 ,Latent Load ....................... n/a. 5567 Minimum Zone Load 31001 28668 [VAC SIZING HVAC Page 3 'roject Title.......... Pasa Tiempo Plan 2/Casita . Date..04/04/07 10:09:43 ---------------------------------------------------=--------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita ------------------------------------------------------------------------------ GENERAL INFORMATION Floor Area................. 3115 sf Volume.............. 32479 cf Front Orientation.......... Front Facing 90 deg (E) Sizing Location............ PALM DESERT Latitude ................... 33.7 degrees Winter Outside Design...... 26 F Winter Inside, Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range.... ......... 34 F . Interior Shading Used...... Yes .Exterior Shading Used...... Yes Overhang Shading,Used.....'. Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...:.. 29233 11575 Glazing Conduction and Solar...... 9090 14921 Infiltration ..................... 11729 6781 Internal Gain .................... n/a 2290 Ducts ................... ... ... 92.40 7376 Sensible Load ..:................. 59292 42943 Latent Load... ... ....... n/a 10349 Minimum Total Load 59292 53292 Note: The loads shown are only one of the criteria affecting the.selection of HVAC equipment. Other relevant design factors such `as air flow requirements, outside air, outdoor design temperatures,coil sizing, availability of equipment, oversizing safety margin,.etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting,the HVAC equipment. [VAC SIZING HVAC Page 4 'roject.Title........... Pasa Tiempo Plan 2%Casita. Date..04/04/07 10:09:43 'MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05' Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE 'LIVING' Floor Area .................... 1541 sf Volume... ....................... . 16739 cf Heating. Cooling. Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar....... 13874 5721 Glazing Conduction and Solar..... 4206 6234 Infiltration ..................... 5802 3355 Internal Gain .................... n/a 1122 - Ducts. .......... .. ... ......... 4409 3408 Sensible Load ..................... 28292 19839 Latent Load ........................ n/a 4781 Minimum Zone Load 28292 24621 ZONE 'SLEEPING' Floor Area ....................... 1574 sf. Volume ........................... 15740 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 15359 5854 Glazing Conduction and Solar..... 4884 8686 Infiltration. ........ .....:.. 5927 3427 Internal Gain ...................... n/a 1168 Ducts ............................. 4831 3968 Sensible Load .............. .... 31001. .23104 Latent Load ....................... n/a. 5568 Minimum Zone Load 31001 28672 IVAC SIZING HVAC Page.5 >roject Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 ----------------- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program-HVAC SIZING User#.-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita ------------=------------------------------------------------------------------ GENERAL INFORMATION Floor Area .................. 3115 sf Volume. .................. 32479 cf Front Orientation.......... Front Facing 180 deg (S) Sizing Location............ PALM DESERT Latitude .......:........... 33.7 degrees Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design......' 111 F Summer Inside Design....... 75 F. Summer Range ............... 34 F Interior Shading Used...... Yes Exterior Shading.Used....... Yes Overhang Shading Used....... Yes Latent Load .Fraction ....... 0.24 ` HEATING AND COOLING LOAD -SUMMARY -------------------------------- Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 29233 12321 Glazing Conduction and Solar..... 9090 14340 Infiltration ...................... 11729 6781 Internal Gain. ...................... n/a 2290 Ducts......* ................... 9240 7410 Sensible Load ...................... 59292 43142 Latent Load ...................... n/a 10397 Minimum Total.Load 59292 53539 Note,: The loads shown are only one of -'the criteria affecting the selection. of HVAC equipment. Other relevant design factors such as air flow requirements,, outside air, outdoor, design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It, is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. iVAC SIZING �HVAC Page 6 ------------------ ?roj-,ect Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/07 10:09:43 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita' ------------------------------------------------------------------------------- HEATING AND COOLING LOAD SUMMARY BY ZONE ----------------------------------------- ZONE 'LIVING' Floor Area........................ 1541 sf Volume................ 16739 cf Heating- Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 13874 5819 Glazing Conduction and Solar...... 4206 6293 Infiltration ..................... 5802 3355 Internal Gain ........................ n/a 1122 Ducts. ............... ..... .4409 3440 Sensible Load....... ........... 28292 20029 Latent Load ...................... n/a 4827 Minimum Zone Load- 28292 24856 ZONE 'SLEEPING' Floor Area....................... 1574 sf Volume ........................... 15740 cf Heating Cooling Description .(Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 15359 6501 Glazing Conduction and Solar..... 4884 8047 Infiltration.... ............... 5927 3427 Internal Gain. .. .. ......... n/a 1168 Ducts. ............... ........ 4831 3970 Sensible Load. .................. 31001 23113 Latent Load...........11 ........... n/a 5570 Minimum Zone Load 31001 28683 [VAC SIZING HVAC Page 7 _'roject Title ........ .:..Pasa Tiempo Plan 2/Casita Date..04/04/07.10:09:43 --------------------------------------------------------- MICROPAS7 v7 20 File-PSTMP2CR. Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 2/Casita GENERAL INFORMATION ------------------- Floor Area ................. 3115 sf Volume ..................... 32479 cf Front Orientation.......... Front Facing.270 Sizing Location............ PALM DESERT Latitude... .............. 33.7 degrees Winter Outside'Design...... 26 F Winter Inside Design....... 70 F - Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range ............... 34 F Interior Shading Used...... Yes Exterior Shading Used...... Yes Overhang Shading Used...... Yes Latent Load Fraction....... 0.24 - HEATING AND COOLING LOAD SUMMARY Heating Description. (Btu/hr). Opaque Conduction and Solar...... 29233 Glazing Conduction and Solar..... 9090 Infiltration ...................... 11729 Internal Gain .................... n/a Ducts ............................ 9240 Sensible Load ................ .. 59292 Latent Load ...................... n/a Minimum Total Load 59292 deg (W) Cooling (Btu/hr) 11632 14921 6781 2290 7388 43013 10366 53379 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors .such as air flow requirements, outside air, outdoor design temperatures, coil -sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to. consider all factors when selecting the HVAC equipment. [VAC SIZING HVAC Page 8 Iroject Title.......... Pasa Tiempo Plan 2/Casita Date..04/04/,07 10:09:43 MICROPAS7 v7.20 File-PSTMP2CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-'D & R Calcs Run-'Pasa Tiempo Plan 2/Casita HEATING.AND.COOLING LOAD ---------------------------------------- SUMMARY BY ZONE ZONE 'LIVING' Floor Area ................... 1541 sf Volume............ ..........:..... 16739 cf Heating.' Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 13874 5689 Glazing Conduction and Solar..... .4206 6234 Infiltration......... ......... 5802 3355 -Internal Gain ............. n/a. 1122 Ducts ............................ 4409 3401 Sensible Load.. ................... ..28292 i9801 Latent Load... .......... ....... n/a 4772. Minimum Zone Load 28292 24573 ZONE 'SLEEPING' Floor Area.... ................. 1574 sf Volume....... .................. 15740 cf Heating Cooling . Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 15359 5944 Glazing Conduction and Solar..... 4884' 8687 Infiltration.... .................. 5927 3427 Internal Gain... ............. n/a 1168 Ducts .............................. 4831 3987 Sensible Load .................... 31001 23212 Latent Load......... .......... n/a 5594 Minimum Zone Load 31001 28806 i PASA .. TIEMPO PLAN 3 w/ CASITA LA QUINTA, CA CLIMATE ZONE 15 D & R Calcs', Title 24 Energy.Calculations Micropas v7.20 Performance Method July 16., 2007 ThTLE 24 COMPLIANCE REQUIREMENTS SUMMARY- PASA Tiempo Plan 3 w/ Casita r Ceiling Insulation = R-30 min. PROVIDE RADIANT BARRIER ROOF SHEATHING (NOTE ON PLANS) Wall Insulation = R-19 min. Floor. Insulation = n/a Thermal Mass Areas See floor plan. Glazing = All windows & doors to be dual glass. All glass is Low E.- Glazing shall be installed with a NFRC certifying label attached showing Uvalue. Solar Heat Gain Co -efficient = 0-.35 dual windows & doors UValue = 0.40 vinyl/wd windows & doors Owner to purchase windows & doors w/ specified Uvalues & SHGC's or better. Hot Water Heater = (1) 75 gal A. O. Smi th #BTC-251- * * * or eq. : Standby Loss is 2.0 min. Provide a recirc pump. Infiltration = Standard AFUE - 0. 78 (e) SEER - 13. 0 min WITH TXV - HERS- VERIFIED Duct Insulation = R-4.2 min. PROVIDE DUCT TESTING BY A HERS RATER Heater sizing Zone 1."LIVING" Sensible heat load - 28,311 Btu (Verify HVAC-equip. w/ Mechanical) Zone.2 "SLEEPING" Sensible heat load - 26,641 Btu (Verify HVAC equip. w/ Mechanical) A/C Sizing Zone 1 "LIVING" Sensible cool'g load =:20,053 Btu. ' Latent cool'g load ='.4,833 Btu Zone 2."SLEEPING" Sensible cool'g load = 17,939 Btu Latent cool'g load = 4,323 Btu Verify HVAC sizing & equipment with a Mechanical.Engineer/Contractor. Owner may install any Make & Model HVAC equipment that is equal or greater than the minimum efficiencies.listed above. All equipment is listed "or eq" CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 1 ---------------------------------------------=--------------------------------- ------------------------------------------------------------------------------- Project Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07.14:25:17 Project Address........ 5th & Madison ******* ---------------=------ La Quinta *v7.20* Documentation Author... Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check %.Date Poway; CA 920.64 858-486-9506 Field Check/ Date Climate Zone........... 15 --------------------- Compliance Method....... MICROPAS7 v7.20 for 2005 Standards by Enercomp, Inc. MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program-FORM.CF-1R User#-MP0864 User-D & R,Calcs Run-Pasa Tiempo Plan 3/Casita _. MICROPAS7 ENERGY USE SUMMARY = = Energy Use ---------------------------- Standard Proposed Compliance = _ (kTDV/sf-yr) ------------------------ Design. ------------------- Design Margin. _ - = Space Heating.......... 1.83 1.84 ---------- -0.01 = - Space Cooling.......... 64.69 62.37 2.32 = = Water Heating.......... 8..25 8.51 -0.26 = _ North Total 74.77 72.72 2.05 = - Space Heating.......... . 1.83 2.19 -0.36 = - Space Cooling ............ 64.69 61.32 3.37 = = Water Heating.......... .. 8.25 8.51 -0.26 = = East Total' 74.77 72.02 2.75 = = Space .Heating .......... 1.83 2.34 -0.51 = _ Space Cooling.......... 64.69 61,33 3.36 = = Water Heating. ....... 8.25 8.51 -0.26 = = South Total 74.77 72.18 2.59 _ = Space Heating... .... 1.83 1.95 -0.12 = = Space Cooling........ 64.69 60.10 4.59 = _ Water Heating....... .. 8.25 8.51 -0.26 = _ West Total 74.77 70.56 4.21 = Building complies with Computer Performance _ *** HERS Verification Required for Compliance****._ CERTIFICATE OF COMPLIANCE: RESIDENTIAL_COMPUTER METHOD CF-1R Page 2 Project Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 ,14:25:17 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa.Tiempo Plan 3/Casita I' ---------------------------------------=--------------------------------------- GENERAL INFORMATION HERS Verification........... Required Conditioned Floor Area...... 3113 sf Building Type., ............ Single Family Detached Construction Type .......... New Fuel.Type ................ NaturalGas" Building Front Orientation. Cardinal - N,E,S,W Number of Dwelling Units.... 1 Number of Building Stories. 1 Weather Data Type..;....... FullYear Floor -Construction Type.... Number of Building Zones... Conditioned Volume......... Slab -On -Grade Area......... Glazing Percentage......... .Average Glazing U-factor... Average.Glazing SHGC....... Average Ceiling Height..... lone Type --------------- JIVING Residence -)LEEPING Residence jurf ace ------------ 'JIVING 1 Door 2 Wall 4 Wall 5 Wall 8 Wall -.0 Wall _..2 RoofRad . LEEPING 3 Wall 6 Wall Slab On Grade 2 32534 cf 31'13 sf 15.5 % of floor area 0.4 Btu/hr-sf-F 0.35 10.5 ft BUILDING ZONE INFORMATION Floor # of # of Cond- Thermo- 'Vent Vent Verified Area Volume Dwell Peop- it: stat Height Area Leakage or (sf) (cf) Units le ioned Type (ft). (sf). Housewrap ---- ------ ---=- ----- ------------- ---------------------- 1658 17984 1455 14550 Frame Area Type (sf) U- fact- or 0.53 1.6 Yes Setback 2.0 Standard No 0.47 1.4 Yes Setback 2.0 Standard No OPAQUE SURFACES --------------- Sheath Solar Appendix Cavity ing Act Gains IV Location/ R-val R-val Azm Tilt Reference Comments Wood 24 0.500 0 0 315 90 Yes IV.5 A4 Wood 126 0.074 19 0 0 90,Yes IV.9 A5 Wood 75 0.074 19 0 90 90 Yes IV.9 A5 Wood 90 0.074 19 0 90 90 No IV.9 A5 Wood 244 0.074 .19 .0 180 90.Yes IV.9 A5 Wood 518 0'.074 19 0 270 90 Yes IV.9 A5 Wood 1658 0.032 30 0 n/a 0 Yes IV.1 A7 Wood 390 0.074 19 0 0 90 Yes IV.9 A5 Wood 495 0.074 19 0 90 90 Yes IV..9 A5 -'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 3 ---------------------------------------------------=--------------------------- ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 ----------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita ------------------------------------------------------------------------------- Surface ------------ 7 Wall 9 Wall '-1 Wall -3 RoofRad Surface LIVING 14 SlabEdge SLEEPING 15 SlabEdge 'lrientation OPAQUE SURFACES U- Sheath- Solar Appendix Frame Area fact- Cavity ing Act Gains IV Location/ Type (sf) or. R-val R-val Azm Tilt Reference Comments - --- ---- -- -- ----- ----- --- ---- --- --------- -------------- Wood 148 0.'074 19 0 90 90 No IV.9 A5 Wood 157 0.074 19 0 180 90 Yes IV.9 A5 Wood .200 0.0.74 19 0 270 90 Yes IV.9 A5 Wood 1455 0.032 30 0 n/a. 0 Yes IV.1•A7 PERIMETER LOSSES ---------------- Appendix Length F2 Insul Solar IV. Location/ (ft) Fact.or R-val Gains Reference Comments 136 0.730 R-0 No IV.26 Al 158 0.730 R-0 No IV.26 Al ,IVING L Door Front (N) , 2 Wind Left (E) 6 Door Back (S) 7-Wind Back (S) y0 Door Right (W) 1 Wind Right (W) .2 Wind Right (W) -'LEEPING 3 Wind Left (E) 4 Wind Left (E) 5 Wind Left (E) 8 Door Back ( S ) 9 Wind Back. (S) ,3 Door Right (W) FENESTRATION SURFACES --------------------- Exterior Area U- Act Shade (sf) factor SHGC,Azm Tilt Type Location/Comments 40.0 0.400 0.350 0 90 Standard FRONT/Vinyl/Wd Dr LoE 25.0 0.400 0.350 90 90 Standard LEFT/Vinyl/Wd Op LoE 96.0 0.400 0.350 180 90 Standard BACK /Vinyl/Wd Dr LoE 30.0 0.400 0'.350 180 90 Standard BACK1/Vinyl/Wd Op LoE 40.0 0.400 0.350 270 90 Standard RIGHT/Vinyl/Wd Dr LoE 45.0 0.400 0.350 270 90' Standard RIGHT1/Vinyl/Wd Op LoE. 12.0 0.400 0.350 270 90 Standard RIGHTII/Vinyl/Wd Op.,-LoE 6.0 0:4,00 0.350 90 90 Standard LEFTIR/Vinyl/Wd Op LoE .4.0 0.400 0.350 90 90 Standard LEFT2/Vinyl/Wd Op LoE 75.0 0.400 0.350 90. 90 Standard LEFT21/Vinyl/Wd Op LoE 64.0 0.400 0.350 180. 90 Standard BACK2/Vinyl/Wd.Dr LoE 4.0 0.400 0.350 180 90 Standard BACK21/Vinyl/Wd Op LoE 40.0 0.400.0.350 270 90 Standard RIGHT2/Vinyl/Wd Dr LoE CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 4 ----------------- -----------------.------------------------------------------------------------_ Project Title........... Pasa Tiempo.Plan 3/Casita. Date..07/16/07 14:25:17 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita ------------------------------------------------------------------------------- OVERHANGS ---Window--- -------------- Overhang ------------ Area Left Right Surface (sf).Width ----- Height Depth Height Extension Extension ----------- LIVING ------ ------ ----- ------ --------- --------- 1 Door 40.0 n/a 8.0 10.0 0.0 n/a n/a . .2 Window 25.0 n/a 5_0 8.0 1.0 n/a n/a 6 Door 96.0 n/a 8.0 11.5 1.0 n/a n/a 7 Window 30.0 n/a 5.0 1.5 2.0 n/a n/a 10 Door 40.0 n/a 8.0 8.5 0.0 n/a n/a _ 11 Window 45.0 n/a 5..0, 1.5 2.0 n/a n/a' 12 Window 12.0 n/a 2.0 1.5 2.0 n/a n/a SLEEPING 3 Window 6.0 n/a 3.0. 1.5 2.0 n/a n/a 4 Window 4.0 n/a 2.0 1_5 2.0 n/a n/a 5 Window 75.0 n/a 5.0 1.5 2.0 n/a' n/a 8 Door 64.0 n/a 8.0 1.5 2'.0 n/a n/a 9 Window 4.0 n/a .2.0 5.0 1.0 n/a n/a .13 Door 40.0 n/a 8.0 8.5 0.0 n/a n/a SLAB SURFACES ------------- Area Slab Type (sf) LIVING Standard Slab 1658 SLEEPING Standard Slab 1455 HVAC SYSTEMS Verified Number Verified Verified Verified Verified Maximum System of Minimum Refrig Charge Adequate Fan Watt -Cooling Type Systems Efficiency EER or TXV- Airflow Draw Capacity ' ,IVING Furnace 1 0.780 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.00 SEER- No Yes No No No "LEEPING Furnace 1 0.780 AFUE n/a n/a n/a n/a n/a ACSplit 1 13.0.0 SEER No Yes No No No CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 5 ---------------------------------- Project Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17, --------------------------------------------------------=====------------------ MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita --------------------------------------=---------------------------------------- HVAC SIZING r Verified Total Sensible Design Maximum Heating Cooling Cooling Cooling System Load Load Capacity Capacity Type ------------- (Btu/hr) -------- (Btu/hr) (Btu/hr) (Btu/hr) LIVING - ----------- -------------------- p Furnace 28311 n/a n/a n/a ACSplit n/a 20948 25996 n/a, SLEEPING Furnace 26641 n/a n/a n/a, ACSplit n/a 18797.. 23328 n/a Total 549,52 39745 49324 n/a Orientation of Maximum..... Front Facing 180 deg (S) Sizing Location............ PALM DESERT - Winter Outside Design....... 26 F Winter Inside Design::..... 70 F Summer Outside Design...... 111 F Summer Inside Design.:..... 75 F Summer Range ....:.......... 34 F' DUCT SYSTEMS Verified Verified Verified System Duct Duct Duct Surface Buried Type Location R-value Leakage Area Ducts LIVING Furnace Attic R-4.2 Yes No No ACSplit Attic R-4.2 Yes No No SLEEPING Furnace Attic R-4.2 .Yes No No ACSplit Attic R-4.2 Yes No No WATER HEATING SYSTEMS Number Tank External Heater in Energy Size Insulation -'ank'Type Type Distribution Type System Factor (gal) R-value ------------------------------------------ -------------- ---------------- 1 Large Gas Recirc/Demand 1 n/a 75 R-n/a i _'ERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD CF-1R Page 6 -----------------=-----------------------------------------------------=-------- ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 ----------------------------------=-------------------------------------------- ------------------------------------------------------------------------------- ' MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM CF-1R` User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita ------------------------------------------------------------------------------- WATER HEATING SYSTEMS DETAIL' ---------------------------- Standby Internal Tank Recovery .Rated Loss. Insulation Pilot System Efficiency Input. Fraction R-value 'Light 1 Large 0.19 n/a 0.02 R- n/a n/a SPECIAL FEATURES AND MODELING ASSUMPTIONS *** Items in this section should be documented on the plans, *** *** installed to manufacturer and CEC specifications, and *** *** verified during plan check and field inspection'. *** ,his building incorporates a HERS verified Refrigerant Charge test jr a HERS verified Thermostatic Expansion Valve (TXV). If a :ooling system is not installed, then HERS verification is not necessary. this building incorporates HERS verified Duct Leakage. ,his is a multiple orientation building. This printout is for the front 'acing North. -'his building incorporates'a Radiant Barrier. 'his building incorporates a non-standard Water Heating System. ' HERS REQUIRED VERIFICATION *** Items in this section require field testing and/or *** *** verification by a certified home energy rater under *** *** the supervision'of a CEC-approved HERS provider using *** *** CEC approved testing and/or verification methods.and *** *** must .be.reported on the CF-4R installation certificate. *** .'his building incorporates a HERS verified Refrigerant Charge test )r a HERS veri.fied Thermostatic Expansion Valve (TXV). If a pooling system is not installed, then HERS verification is not necessary. 'his building incorporates HERS verified Duct Leakage. Target leakage.is :alculated and documented on the CF-4R. If the measured CFM -is above the ..arget, then corrective action must be taken to reduce the duct leakage and hen must be retested. Alternatively, the compliance calculations could be -edone without duct testing. If ducts are not installed, then HERS %erification.is not necessary. CERTIFICATE OF COMPLIANCE: RESIDENTIAL COMPUTER METHOD- CF-1R- Page 7 ------------------------ Project Title........... Pasa Tiempo Plan 3/Casita Date..07/16/07.14:25 17. ---------------------------------------------------------- MICROPAS7 v7. 20 File=PSTMP3CR Wth-CTZ15S05 Program -FORM CF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita REMARKS Verify HVAC sizing & equipment-w/ Mechanical engineer/,contractor.. COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications 'needed to comply with Title-24, Parts 1 and 6'of the California Code of Regulations, and 'the administrative regulations to implement them. This certificate has been signed.by the individual with overall design responsibility. DESIGNER or OWNER DOCUMENTATION AUTHOR Name.... Bill Currier Name_.. Diane P. Mendoza Company..Colbourn Currier Noll Company. D & R Calcs Address. 10675 Treena Street 410.1 Address. 14107 Ipava Drive San Diego, CA 92031 Poway, CA 92064 Phone... (858) 695=1914 Phone... 858-.48:6-9506 " License. Signed.. Signed.. �� �' �� Z1% (date) (date) ENFORCEMENT.AGENCY Name.... Title... Agency.. Phone... Signed.: (date) ,MANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page,1 ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17. ?roject Address........ 5th & Madison ******* --------------------- La Quinta *v7.20* )ocumentation Author... -Diane P. Mendoza ******* Building Permit # D & R Calcs 14107 Ipava Drive Plan Check / Date Poway, CA 92064 858-486-9506 Field Check/.Date '-limate Zone........... 15 ---------=----------- -ompliance Met.hod...... MICROPAS7 v7.20 for 2005 Standards by Enercomp, Inc. ------------=------------------------------=----------------------------------- -------------------------------------------------------------------------------- MICROPAS7 v7.'20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita ------------------ ----------------------------------------------------=-------- Tote: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. More stringent compliance -equirements from the Certificate of Compliance supersede the items marked with in asterisk (*). When this checklist is incorporated into the permit documents,. -:he features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures whether.they are shown !lsewhere in the documents or on this checklist only. 3UILDING ENVELOPE MEASURES 150(a): Minimum R-19 insulation in wood framed ceiling or De- En- sign force- n/a er ment equivalent U-factor in metal frame ceiling / 150(b): Loose fill insulation manufacturer's labeled R-Value 150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U-factor in metal frame walls (does not apply to exterior mass walls) ✓- 150(d): Minimum R-13 raised floor insulation in framed floors or equivalent U-factor ✓ 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and.factory-built fireplaces have: a: Closeable metal or glass door covering the entire opening of the firebox / b. Outside air intake with damper and control, flue damper and control / 2. No'continuous burning gas pilot lights allowed / 150(f): Air retarding wrap installed to comply with Sec..151 meets requirements specified in ACM Residential,Manual / 150(g): Vapor barriers mandatory in Climate Zones 14,16 only 150(1): Slab edge insulation - water absorption rate for the insulation material without facings no greater than 0.3%, water vapor permeance rate no greater than 2.0 perm/inch 118: Insulation specified or installed meets insulation quality standards. Indicate type and include CF-6R form 116-17: Fenestration Products, Exterior Doors and Infiltration/ Exfiltration Controls 1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage 2. Fenestration products (except field. -fabricated) have RANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 2 -------------------------------------------------------------------------------- ------------------------------------------------------------------------------- ?roject Title...:...... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User=D & R Calcs Run-Pasa Tiempo Plan 3/Casita ------------------------------------------------------------------------------- label with certified U-factor, certified Solar Heat Gain Coefficient (SHGC), and infiltration certification 3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed 'PACE' CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES n/a 110-113: HVAC.equipment, water heaters, showerheads and faucets certified by the Energy"Commission 150(h): Heating and/or cooling loads calculated in accordance with ASHRAE, SMACNA or ACCA 150(i): Setback thermostat on all applicable heating and/or cooling systems 150(j): Water system pipe and tank insulation and cooling systems line insulation J . Storage gas water heaters -rated with an Energy Factor less than 0.58 must,be externally wrapped with insulation having an installed thermal resistance of R12 or greater 2. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external insulation or R-16 internal and indicated on the exterior of the tank showing the R-value 3. The following piping is insulated according to Table 150-A/B or Equation 150-A Insulation Thickness: 1. First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of, hot water pipes shall. be insulated to Table 150B 2. Cooling system piping (suction, chilled water, or brine lines), piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A De- En- sign- force er ment M l 4. Steam hydronic heating systems or not water systems >15 psi, meet requirements of Table 123-A 5. Insulation must be protected from damage, including that due to sunlight, moisture; equipment maintenance and wind z� 6. Insulation for chilled water piping and refrigerant suction piping includes a vapor retardant or is enclosed entirely in conditioned space 7. Solar water -heating systems/collectors are certified by thy/ Solar Rating and Certification Corporation '150 (m) : Ducts and Fans 1. All ducts and plenums installed, sealed and insulated to meet the requirements of the CMC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R-4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, 4ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 3 ------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 3/Casita. Date..07/16/07 14:25:17 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita ------------------------------------------------------------------------------- UL 181A, or UL 181B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used 2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross -sectional area of the ducts 3. Joints and seams of duct systems and their components shall not be sealed with cloth backed rubber adhesive duct tapes unless such tape is used in combination with f mastic and draw bands 4. Exhaust fan systems have back draft or automatic dampers 5. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers 6. Protection of Insulation. Insulation shall be protected from damage due to sunlight, moisture, equipment mainten- ance and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material 7. Flexible ducts cannot have porous inner cores 114: Pool and Spa Heating Systems and Equipment 1. A thermal efficiency that complies with.the Appliance Efficiency Regulations, on -off switch mounted outside of the heater, weatherproof operating instructions, no electric resistance heating and no pilot light 2. System is installed with: a. At least 36 inches of pipe between filter and heater for future solar heating b. Cover for outdoor pools or out spas. 3. Pool system has directional inlets and a circulation pump time switch 115: Gas -fired central furnaces, pool heaters,.spa heaters or household cooking appliances have no continuously burning pilot light (Exception: Non -electrical -cooking appliances with pilot < 150 Btu/hr) 118(i): Cool Roof material meets, specified criteria RESIDENTIAL LIGHTING MEASURES De- En- sign- force n/a er ment 150(k)l: HIGH EFFICACY LUMINAIRES OTHER THAN OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, and do not contain a medium screw base socket (E24/E26). Ballast for lamps 13 watts or greater are electronic / and have an output frequency no less than 20 kH-z _4ANDATORY MEASURES CHECKLIST: RESIDENTIAL MF-1R Page 4 ------------- Project Title........... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 MICROPAS7 v7.20 File=PSTMP3CR Wth-CTZ15S05 Program -FORM MF-1R User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita 150(k)l: HIGH EFFICACY LUMINAIRES - OUTDOOR HID: contain only high efficacy lamps as outlined in Table 150-C, luminaire has factory installed HID ballast 150(k)2: Permanently installed luminaires in kitchens shall be high efficacy luminaires. Up to 50 percent of the wattage, as determined in Sec. 130(c), of permanently installed luminaires in kitchens may be in luminaires that are not high efficacy .luminaires, provided.that these luminaires are controlled by switches separate from those controlling the high efficacy luminaires L50(k)3: Permanently installed luminaires in bathrooms, garages, laundry rooms, utility rooms shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply.with Section 119(d) that does not turn on automatically or have an always on option -,_50(k)4: Permanently installed luminaires located other than in kitchens, bathrooms, garages, laundry rooms, and utility rooms shall be high efficacy luminaires (except closets less than 10 ft2), OR are controlled by a dimmer switch OR are controlled by an occupant sensor(s) that complies with Section 119(d) that does not turn on automatically or have an always on option .50(k)5: Luminaires that are recessed into insulated ceilings are approved for zero clearance insulation cover (IC) and are certified air tight to ASTM E283 and labeled as air tight (AT) to less than 2.0 CFM at 75 Pascals .50(k)6: Luminaires providing outdoor lighting and permanently mounted to a residential building or.to other buildings on the same lot shall be high efficacy luminaires (not in- cluding lighting around swimming pools/water features or .other Article 680 locations) OR are controlled by occupant sensors with integral photo control certified to comply with Section 119(d) ,50(k)7: Lighting for parking lots for 8 or more vehicles shall have lighting that complies with Sec. 130, 132, and 147. Lighting for parking garages for 8 or more vehicles shall have lighting that complies with Sec. 130, 131, and 146 _50(k)8: Permanently installed lighting in the enclosed, non - dwelling spaces.of low-rise residential buildings with four / or more dwelling units shall be high efficacy luminaires OR are controlled by an occupant sensor(s) certified to comply with Section 119(d) i, HVAC SIZING HVAC Page 1 -------------------- Project Title.......... Pasa Tiempo.'Plan 3/Casita Date..07/16/07 14:25:17: Project Address........ 5th & Madison ******* ------------------- 7- La Quinta *v7.20* Documentation Author.:. Diane P. Mendoza ******* Building Permit.# D & R Calcs 14107 Ipava Drive Plan Check /- Date Poway, CA 92064 8587486-9506 Field Check/ Date _"limate Zone:..:....... 15 --------------------- -ompliance Method...... MICROPAS7 v7.20 for 2005 Standards by Enercomp, Inc: ----------------------------------------------------------------- MICROPAS7.v7.20 File-PSTMP3CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 -User-D & R Calcs Run-Pasa-Tiempo Plan 3/Casita GENERAL INFORMATION ------------------- Floor Area... 3113 sf Volume ..................... 32534 cf Front Orientation.......... Front Facing O'deg (N): Sizing Location............ PALM DESERT Latitude................... 33.7 degrees Winter Outside Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer In Design........ 75 F Summer Range. ...... ..... 34 F Interior Shading Used ...... 'Yes Exterior Shading Used....:. Yes.. Overhang Shading Used.::... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY Heating Description (Btu/hr) Opaque Conduction and Solar...... 26201 Glazing Conduction and Solar..... 8466 Infiltration........ ........... .11721 Internal Gain .... ...... ........ n/a Ducts.. ... ......... ... ..... 8564 Sensible Load... ........:...... 54952' Latent Load........ ............... n/a Minimum Total Load 54952 Cooling (Btu/hr) 10992 12804 6777 2290 6815 .39678 9563 49241 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design .temperatures coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It 'is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. -1VAC SIZING HVAC 'Page 2 ----------------------- Project Title.:........ Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 ----------------------------------------------------------------- MICROPAS7 v7..20 File-PSTMP3CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita HEATING AND COOLING LOAD SUMMARY BY ZONE ---------------------------------------- ZONE 'LIVING' Floor Area ............... ...... 1658 sf Volume ........................... 17984 cf, Heating Cooling Description (Btu/hr) .(Btu/hr) Opaque Conduction and Solar....... 12587 5441 Glazing Conduction and Solar..... 5069 7093 .Infiltration... .....:............. .6243 3609 Internal Gain............. ..... n/a 1214 Ducts .. ......................... 4412 3600 Sensible Load:, .... .. ......... 28311 .20956 Latent Load........ ..... n/a 5050 Minimum Zone Load 28311 26007 ZONE 'SLEEPING' Floor Area............ ......... 1455 sf Volume ..:........................ 14550 cf Heating. Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 13614 5552 Glazing.Conduction-and Solar..... 3397 5711 Infiltration ...................... 5478 3168 Internal Gain ................ .. n/a 1076 Ducts............ ......... ....... 4152 3216 Sensible Load ..................... 26641 18722 Latent Load ...................... n/a 4512 Minimum Zone Load 26641 23234 iVAC SIZING HVAC Page 3 ---------------------------- 7 3roject Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 14.:25:17. ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program-HVAC SIZING J User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita ------------------'------------------------------------------------------------ GENERAL INFORMATION ------------------- Floor Area .................. 3113 sf Volume..... 32534 cf Front Orientation.......... Front Facing 90 deg (E)' .Sizing'Location............ PALM DESERT Latitude........... 33.7 degrees Winter Outside.Design...... 26 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range .............. .. 34 F Interior Shading.Used..... Yes Exterior Shading Used....... Yes Overhang Shading Used.... Yes. Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD.SUMMARY --------------------------------- Heating Cooling Description (Btu/.hr) (Btu/hr)' --------------------------------------------------- --- Opaque Conduction and Solar...... 26201 10710 Glazing Conduction -and Solar..... 8466 11625 Infiltration..................... 11721 6777 Internal."Gain........... _ ........... n/a 2290 Ducts .................. 8564 6513 Sensible Load............ ...... 54952 37915 Latent Load ....................... n/a 9138 Minimum Total Load 54952 47053 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also_ be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. r iVAC SIZING HVAC Page 4 ---------------- Project Title ............ Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 MICROPAS7 v7:20 File-PSTMP3CR Wth-CTZ15S0.5 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita -------------------'-------------------------------------.----------------------- HEATING AND COOLING LOAD SUMMARY BY ZONE ZONE 'LIVING' Floor Area ..................... 1658 sf Volume ........................... 17984 cf Heating Cooling Description --------------------------------- (Btu/hr) ----------- (Btu/hr) ----------- Opaque Conduction and Solar...... 12587 5200 Glazing Conduction and Solar..... 5069 6444 Infiltration ..................... 6243 3609 Internal Gain....... ............ n/a 1214 Ducts ..... .................... 4412 3415 Sensible Load..... ............. 28311 19883 Latent Load...... ........... n/a 4792 Minimum Zone Load, ----------- 28311 ----------- 24674 ZONE 'SLEEPING' Floor Area ....................... 1455 sf Volume. ............._...... .. . 14550 cf Heating Cooling Description (Btu/hr) (Btu/hr) ,.Opaque Conduction and Solar...... 13614 5511 Glazing Conduction and Solar..... 3.397 5181 Infiltration ..................... 5478 3168 Internal Gain ..................... n/a 1076 Ducts ............................... 4152 3097 Sensible Load .................... 26641 18033 Latent Load ........................ n/a 4346 Minimum Zone Load 26641 22379 iVAC SIZING HVAC Page 5 -------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/.07 14:2.5:17 ---=--------------------------------------------------------------------------- ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo.Plan 3/Casita ------------------------------------------------------------------------------- GENERAL INFORMATION ------------------- Floor Area. .............. 3113 sf Volume ..................... 32534 cf. t Front Orientation.......... Front Facing 180 deg (S) Sizing Location .............. PALM DESERT Latitude ................... 33.7 degrees Winter Outside Design:..... 26 F Winter Inside Design....... 70 F Summer Outside Design....... 111 F Summer Inside Design........ 75 F Summer Range....... ...... 34• F Interior Shading Used....... Yes' Exterior Shading Used...... Yes. Overhang Shading -Used...... Yes Latent Load Fraction....... 0.24 HEATING AND COOLING LOAD SUMMARY ----------=--------------------- Heating Cooling Description (Btu/hr) (Btu/hr) ------------------------------------------------------- Opaque Conduction and Solar...... 26201 11047 Glazing Conduction and Solar..... 8466 12804 s Infiltration............ ........ 11721 6777 Internal Gain ..................... n/a 2290 Ducts............ .............. 8564 6827 Sensible Load .................... 54952 39745 Latent Load....... ................ n/a 9579 ---------------------- Minimum Total Load 54952 49324 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements; outside air, outdoor 'design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc.,, must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. iVAC SIZING HVAC Page. 6 -------------------- Project Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 ------- - - - ---- ---------------- ---- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan 3/Casita HEATING AND COOLING LOAD SUMMARY BY ZONE -------------------------------------- ZONE 'LIVING' Floor Area ..................:.... 1658.sf Volume .............. ............ 17984 cf Heating Cooling Description --------------------------------- (Btu/hr) ----------- (Btu/hr) ----------- Opaque Conduction and Solar...... 12587 5434 Glazing Conduction and Solar..... 5069 7093 Infiltration ..................... 6243 3609 Internal Gain ............... ... n/a 1214. Ducts ............................ 4412 3598 Sensible Load ..................... 28311 20948 Latent Load.......... .......... n/a 5048 Minimum Zone Load ----------- 28311 ----------- 25996 ZONE 'SLEEPING' Floor Area..... 1455 sf Volume .........I .................. 14550 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and.Solar...... 13614 5613 Glazing Conduction and Solar...... 3397 5712 Infiltration ..................... 5478 3168 Internal Gain .................... n/a 1076 Ducts ............................ 4152 3229 Sensible Load.................... 26641 18797 Latent Load ...................... n/a 4530 - Minimum Zone Load 26641 23328 iVAC SIZING HVAC Page 7 --------------------------------------------------------------------------------- ?roject Title.......... Pasa Tiempo Plan:3/Casita. Date...07/16/07 14:25:17 -----------------==-------------------------=---------------------------------- MICROPAS7 v7.2.0 File-PSTMP3CR Wth=CTZ15S05 Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo Plan.3/Casita ------------------------------------------------------------------------------- GENERAL INFORMATION Floor Area ................. 3113 sf Volume ... ................. 32534 cf Front Orientation.......... Front Facing 270 deg (W) Sizing Location........*.... PALM DESERT Latitude ................. 33.7 degrees Winter Outside Design...... 2.6 F Winter Inside Design....... 70 F Summer Outside Design...... 111 F Summer Inside Design....... 75 F Summer Range .............. 34 F Interior Shading Used...... Yes Exterior Shading.Used...... Yes. Overhang Shading Used...... Yes Latent Load Fraction....... 0.24 . HEATING AND COOLING LOAD SUMMARY Heating. Cooling Description r(Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 26201 10773 Glazing Conduction and Solar..... 8466 11625 . Infiltration........... 11721 6777 Internal Gain........ n/a 2290 Ducts.... 8564 6526 Sensible Load .................... 54952 37992 Latent Load.... n/a .9156 Minimum Total Load 54952 47148 Note: The loads shown are only one of the criteria affecting.the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outside air,.outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin,.etc.,- must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. HVAC SIZING HVAC .—Page 8 Project Title.......... Pasa Tiempo Plan 3/Casita Date..07/16/07 14:25:17 ------------------------------------------------------------------------------- MICROPAS7 v7.20 File-PSTMP3CR Wth-CTZ15S05. .Program-HVAC SIZING User#-MP0864 User-D & R Calcs Run-Pasa Tiempo. Plan 3/Casita HEATING AND COOLING LOAD.SUMMARY -------------------------------------- BY ZONE ZONE 'LIVING' Floor Area. 1658 sf Volume....... .................. 17984 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 12587 5341 Glazing Conduction and Solar..... 5069 6444 Infiltration ................. 6243 3609 Internal Gain..... ...._...... .. n/a 1214 Ducts .............. .*........... 4412 3444 Sensible Load... ... ........... 28311 20053 Latent Load.. ................... . n/a 4833 Minimum Zone Load 28311 24885' ZONE 'SLEEPING' Floor Area....... .............. 1455 sf Volume.. ............... ...... 14550 cf Heating Cooling Description (Btu/hr) (Btu/hr) Opaque Conduction and Solar...... 13614 5433 Glazing Conduction and Solar..:.. 3397 5181 - Infiltration ............... 5478 3168 Internal Gain .................... n/a 107.6 Ducts ............................. 4152 3081 Sensible Load........ .......... 26641 17939 Latent Load ................... n/a 4323 Minimum Zone Load 26641 22262 19 r