Loading...
Citrus - Mandarina TR 24890-1 10-0344 (SFD) (Plans 1 & 2) Title 241 q �rfIce—. CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION DATE 01 D BYIR�= TITLE 24 ENERGY REPORT Eneq yPro5. 0 by EnergySoft Project: Mandarina at The Citrus Location: La Quinta, California Owner: B.L. Farms Inc. 30-875 Date Palm Drive, #C Cathedral City, CA 92234 Phone 760-969-1400 i JUN 4 Zm GALLANT ENERY CONSULTING, Mark Gallant, CEPE 508 W. Mission Ave, Ste 201. Escondido, CA 92025 Phone 760-743-5408 Fax 760-743-5788 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R` Project Name Mandarina Plan 1 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 . Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 3,115 Addition n/a # of Stories 1 FIELD INSPECTION ENERGY CHECKLIST IZI Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION. Construction Type Area Special Cavity (fl Features see Part-2 of 5) Status Wall Wood Framed R-15 1,975 New Roof Wood Framed Attic R-38 3,115 Radiant Barrier Cool Roof New Slab Unheated Slab -on -Grade None 3,115 Perim = 320' New Wall Wood Framed R-15 609 New Door Opaque Door None 21 New FENESTRATION Orientation Area(fe) U- Exterior Factor SHGC Overhang Sidefins Shades Status Right (W) 4.0 0.350 0.32 12.0 none Bug Screen New Right (W) 10.0 0.330 0.34 4.0 none Bug Screen New Right (W) 39.0 0.350 0.32 7.0 none Bug Screen New Right (W) 21.0 0.330 0.34 7.0 none Bug Screen New Right (M 28.0 0.350 0.32 7.0 none Bug Screen New Rear (S) 15.0 0.350 0.32 31.0 none Bug Screen New Left (E) 25.0 0.350 0.32 2.0 none Bug Screen New Left (E) 28.0 0.330 0.34 none none Bug Screen New Left (E) 32.0 0.350 0.32 none none Bug Screen New Right (NW) 17.5 0.330 0.34 6.0 none Bug Screen New Right (NW) 48.0 0.350 0.32 6.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 New WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 1 Large Gas 75 0.80 Recirc/Time+Temp New EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:5 ID: Page 1 of 11 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Mandarina Plan 1 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 3,115 Addition n/a # of Stories 1 FIELD INSPECTION, ENERGY CHECKLIST I I.Yes ❑ No HERS Measures --If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features --If Yes, see Part 2 of 5 of this form for details. INSULATION, Area Special Construction Type, Cavity (ft) Features (see Part-2 ot�5) Status FENESTRATION U- Exterior Orientation Area(ftz) Factor SHGC. Overhang Sidefins Shades Status. Right (NW) 17.5 0.330 0.34 6.0 none Bug Screen New Front (N) 10.5 0.330 0.34 6.0 none Bug Screen New Front (N) 48.0 0.350 0.32 6.0 none Bug Screen New Front (N) 10.5 0.330 0.34 6.0 none Bug Screen New Right (tM 25.0 0.350 0.32 none none Bug Screen New Rear (S) 21.4 0.350 0.32 6.0 none Bug Screen New Rear (S) 25.0 0.330 0.34 6.0 none Bug Screen New Rear (S) 40.0 0.350 0.32 none none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status HVAC DISTRIBUTION Duct -- Location Heating Cooling Duct Location R-Value Status WATER HEATING Qty. Type Gallons Min. Eff Distribution Status EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:5 ID: Page 2 of 13 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Plan 1 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 SPECIAL" FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Compliance for all orientations is specified, see section 151 (c) 2 of the Standards and section RA1-3.3 in Appendix RA-1 of the Residential Compliance Manual. The DHW System Bradford White M-2-XR75S6BN is a non-NAECA large storage gas water heater. Verify DHW details. A hot water recirculation systems has been modeled. Verification of type is required. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in AS TM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5) allowed to avoid backdraft problems. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in AS TM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5) allowed to avoid backdrafr problems. The Roof R-38 Roof Attic Reflectance = 0.42, Emittance = 0.88 shall be rated and labeled by the Cool Roof Rating Council in accordance with Section 10-113 of the standards. The Roof R-38 Roof Attic includes credit for a Radiant Barrier that is Continuous meeting eligibility and installation criteria as specified in Residential Appendix RA4.2.2. The Roof R-38 Roof Attic Concrete Tile (10 #/sf) Roofing requires verification. HERS. REQUIRED VERIFICATION. Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. The Cooling System Trane TUD1B080A9601A14TTR3060A1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. The HVAC System liv includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 713 and 1521 CFM at 50 pascals. The blower door test must be performed using the AS TM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 713 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA =1.5) OR mechanical supply ventilation must be provided. The HVAC System liv incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System liv incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria. The Cooling System Trane TUD 1 B080A9481A/4TTR3042A1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. The HVAC System sleep includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 511 and 1089 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - if this building tests below 511 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. The HVAC System sleep incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. EnerqyPro 5.0 by Ener Soft User Number: 2875 RunCode: 2010-06-08T11:12:5 ID: Pa e 3 of 13 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Plan 1 Building Type m Single Family ❑ Addition Alone Cl Multi Family O Existing+ Addition/Alteration Date 61912010 SPECIAL FEATURES INSPECTION_ CHECKLIST, The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. HERS -,REQUIRED VERIFICATION: Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a , CF-4R form for each of the measures listed below for final to be given. .completed Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System sleep incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria.' EnenqyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010-06-08T11:12:5 ID: Pa a oof l3 PERFORMANCE CERTIFICATE: Residential (Part- 3 of 5) CF-1 R Project Name Building Type m Single Family ❑ Addition Alone Date Mandarina Plan 1 1 ❑ Multi Family ❑ Existing+ Addition/Alteration 61912010 ANNUAL ENERGY USE SUMMARY Standard Facing Margin Facing Margin Facing Margin Facing Margin TDV kBtu/ft2- r North East South West Space Heating 1.92 2.61 -0.70 2.75 -0.84 2.39 -0.47 2.17 -0.26 Space Cooling 58.61 48.72 9.89 47.26 11.35 48.34 10.27 47.22 11.39 Fans 11.66 10.45 1.22 10.17 1.49 10.36 1.30 10.13 1.54- Domestic Hot Water 11.71 16.98 -5.27 16.98 -5.27 16.98 -5.27 16.98 -5.27 Pum s 0.00 0.18 -0.18 0.18 -0.18 0.18 -0.18 0.18 -0.18 Totals 83.90 78.94 4.96 77.35 6.55 78.25 5.65 76.68 7.22 Percent Better Than Standard: 5.9 % 7.8 % 6.7 % 8.6 % BOIL' DING COMPLIES - HERS -VERIFICATION, REQUIRED Fenestration Building Front Orientation: All Four Orientations Ext. Walls/Roof Wall Area Area Number of Dwelling Units: 1.00 (N) 540 69 Fuel Available at Site: Natural Gas (E) 940 85 Raised Floor Area: 0 (S) 570 101 Slab on Grade Area: 3,115 (W) 1,020 210 Average Ceiling Height: 10.0 Roof 3,115 0 Fenestration Average•U-Factor: 0.34 TOTAL: 465 Average SHGC: 0.33 Fenestration/CFA Ratio: 14.9 % REMARKS THE CONTRACTORS ARE RESPONSIBLE FOR THE FINAL SIZING OF HEATING, COOLING AND DHW EQUIPMENT. (CEC Blueprint #60) STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the Efficiency Standards of the California Code of Regulations. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Gallant Energy Consulting Y� Company 61912010 Address 508 W Mission Ave Ste 201 Name Mark Gallant, CEPS City/State/ZipCity/State/Zip Escondido, CA 92025 Phone 760-743-5408 Signed Date The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Company BL Farms Inc Address 30-875 Date Palm Dr #C Name City/State/Zip Cathedral City, CA 92234 Phone 760-250-8611 Signed License # Date EnengyPro 5.0 by EnenqySoft User. Number: 2875 RunCode: 2010-06-08T1 1: 12:5 ID: Page 5 of 13 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R- Project Name Mandarina Plan 1 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area U- Factor Insulation Azm I Tilt Status Joint Appendix 4 Location/Comments Cavity Exterior I Frame Interiorl Frame Wall 378 0.095 R-15 270 90 New 4.3.1-A4 liv Wall 5 0.095 R-15 180 90 New 4.3.1-A4 liv Wail 433 0.095 R-15 90 90 New 4.3.1-A4 liv Roof 1,815 0.025 R-38 0 0 New 4.2.1-A21 liv Slab 1,815 0.730 None 0 180 New 4.4.7-A1 liv Wall 349 0.095 R-15 0 90 New 4.3.1-A4 liv Door 21 0.500 None 01 90 New 4.5. i-A4 liv Wall 260 0.095 R-15 90 90 New 4.3.1-A4 liv Wall 97 0.095 R-15 315 90 New 4.3.1-A4 liv Wall 101 0.095 R-15 0 90 New 4.3.1-A4 sleep Wall 335 0.095 R-15 270 90 New 4.3.1-A4 sleep Wall 464 0.095 R-15 180 90 New 4.3.1-A4 sleep Wall 162 0.095 R-15 90 90 New 4.3.1-A4 sleep Roof 1,300 0.025 R-38 0 0 New 4.2.1-A21 sleep Slab 1,300 0.730 None 0 180 New 4.4.7-A1 Isleep FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC Azm Status Glazing Type Location/Comments 1 Window 4.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 2 Window 10.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 3 Window 24.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 4 Window 15.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 5 Window 10.5 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 6 Window 10.5 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 7 Window 28.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 8 Window 15.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 9 Window 25.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP liv 10 Window 2.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX liv 11 Window 2.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX liv 12 Window 10.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX liv 13 Window 10.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX liv 14 Window 20.0 0.350 NFRC 0.32 NFRC 90 New j NonMetal Lowe2 OP liv 15 Window 8.0 0.350 NFRC 0.32 NFRC 901 New I NonMetal Lowe2 OP liv 16 Window 17.5 0.330 NFRC 0.34 NFRC 3151 New I NonMetal Lowe2 FX liv (1) U-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value (2) SHGC Type: 116-13 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhang Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 1 Bug Screen 0.76 2.0 2.0 12.0 1.0 2.0 2.0 2 Bug Screen 0.76 5.0 2.0 4.0 1.0 2.0 2.0 3 Bug Screen 0.76 8.0 3.0 7.0 1.0 2.0 2.0 4 Bug Screen 0.76 5.0 3.0 7.0 1.0 2.0 2.0 5 Bug Screen 0.76 7.5 1.5 7.0 1.0 2.0 2.0 6 Bug Screen 0.76 7.5 1.5 7.0 1.0 2.0 2.0 7 Bug Screen 0.76 8.0 3.5 7.0 1.0 2.0 2.0 8 Bug Screen 0.76 5.0 3.0 31.0 1.0 2.0 2.0 9 Bug Screen 0.76 5.0 5.0 2.0 0.5 2.0 2.0 10 Bug Screen 0.76 11 Bug Screen 0.76 12 Bug Screen 0.76 13 Bug Screen 0.76 14 Bug Screen 0.76 15 Bug Screen 0.76 16 Bug Screen 1 0.761 7.0 2.5 6.0 1.0 2.0 2.0 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:5 ID: Page 6 of 13 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R. Project Name Mandarina Plan 1 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area Ll- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments Cavity Exterior I Frame Interiorl Frame FENESTRATION SURFACE DETAILS ID Type Area LI-Factor SHGC Azm Status Glazing Type Location/Comments 17 Window 48.0 0.350 NFRC 0.32 NFRC 315 New NonMetal Lowe2 OP liv 18 Window 17.5 0.330 NFRC 0.34 NFRC 315 New NonMetal Lowe2 FX liv 19 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX sleep 20 Window 48.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP sleep 21 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX sleep 22 Window 12.5 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 23 Window 12.5 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 24 Window 21.4 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 25 Window 25.0 0.330 NFRC 0.34 NFRC 180 New NonMetal Lowe2 FX sleep 26 Window 20.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 27 Window 20.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 28 Window 4.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 29 Window 4.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep (1) Ll-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2) SHGC Type: 116-8 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhang Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 17 Bug Screen 0.76 8.0 6.0 6.0 1.0 2.0 2.0 18 Bug Screen 0.76 7.0 2.5 6.0 1.0 2.0 2.0 19 Bug Screen 0.76 7.0 1.5 6.0 1.0 2.0 2.0 20 Bug Screen 0.761 8.0 6.0 6.0 1.0 2.0 2.0 21 Bug Screen 0.76 7.0 1.5 6.0 1.0 2.0 2.0 22 Bug Screen 0.76 23 Bug Screen 0.76 24 Bug Screen 0.76 8.0 2.5 6.0 1.0 2.0 2.0 25 Bug Screen 0.76 5.0 5.0 6.0 1.0 2.0 2.0 26 Bug Screen 0.76 27 Bug Screen 0.76 28 Bug Screen 0.76 29 Bug Screen 0.76 ELI I EnergyPro 5.0 by EnergySoft User Number.- 2875 RunCode: 2010-06-08T11:12:5 ID: Page 7 of 13 CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF-1 R Project Name Mandarina Plan 1 Building Type [Z Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 BUILDING ZONE INFORMATION System Name Zone Name Floor Area ft Volume Year Built New Existing Altered Removed liv liv 1,815 18,150 sleep sleep 1,300 13,000 Totals 3,1151 01 0 0 HVAC SYSTEMS System Name Qty. Heating Type Min. Eff. Cooling Type Min. Eff. Thermostat Type Status liv 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New sleep 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New HVAC DISTRIBUTION System Name Heating Cooling Duct Location Duct R-Value Ducts Tested? Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 0 New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 EI New El WATER HEATING SYSTEMS S stem Name Qty. Type Distribution Rated Input Btuh Tank Cap. al Energy Factor or RE Standby Loss or Pilot Ext. Tank Insul. R- Value Status Bradford White M-2-XR75 1 Large Gas Recirc/Trne+Temp 76,000 75 0.80 2.00 % 12.0 New MULTI -FAMILY WATER HEATING DETAILS HYDRONIC HEATING SYSTEM PIPING Control E _2 E w a Hot Water Piping Length ft o = . 0 U) a — System Name Pipe Length Pipe Diameter Insul. Thick. Qty. HP Plenum Outside Buried ❑ ❑ ❑ ❑ ❑ ❑ EnerpyPro 5.0 by EnenqySoft User Number: 2875 RunCode: 2010-06-08T11:12:5 ID: Page 8 of 13 MANDATORY MEASURES SUMMARY: Residential (Page 1 of 3 MF-1 R Project Name Mandarina Plan 1 Date 61912010 NOTE: Low-rise residential buildings subject to the Standards must comply with all applicable mandatory measures listed, regardless of the compliance approach used. More stringent energy measures listed on the Certificate of Compliance (CF-1 R, CF-1 R-ADD; or CF- 1 R-ALT Form) shall supersede the items marked with an asterisk (*) below. This Mandatory Measures Summary shall be incorporated into the permit documents, and the applicable features shall be considered by all parties as minimum component performance specifications whether they are shown elsewhere in the documents or in this summary. Submit all applicable sections of the MF-1 R Form with plans. Building Envelope Measures: 116 a 1 : Doors and windows between conditioned and unconditioned sp aces are manufactured to limit air leakage. §116(a)4: Fenestration products (except field -fabricated windows) have a label listing the certified U-Factor, certified Solar Heat Gain Coefficient SHGC , and infiltration that meets the requirements of 10-111 (a). 117: Exterior doors and windows are weather-stripped; all joints and penetrations are caulked and sealed. 118 a : Insulationspecified or installed meets Standards for Insulating Material. Indicate type and include on CF-6R Form. §118(i): The thermal emittance and solar reflectance values of the cool roofing material meets the requirements of §118(i) when the installation of a Cool Roof is specified on the CF-1 R Form. * 150 a : Minimum R-19 insulation in wood -frame ceiling orequivalent U-factor. 150 b : Loose fill insulation shall conform with manufacturer's installed design labeled R-Value. * 150 c : Minimum R-13 insulation in wood -frame wall orequivalent U-factor. * 150 d : Minimum R-13 insulation in raised wood -frame floor orequivalent U-factor. 150 f : Air retarding wrap is tested, labeled, and installed according to ASTM E1677-95 2000 when specified on the CF-1 R Form. 150 : Mandatory Vapor barrier installed in Climate Zones 14 or 16. §150(I): Water absorption rate for slab edge insulation material alone without facings is no greater than 0.3%; water vapor permeance rate is no greater than 2.0perm/inch and shall be protected from physical damage and UV light deterioration. Fireplaces, Decorative Gas Appliances and Gas Log Measures: 150 e 1 A: Masonry or factory -built fireplaces have a closable metal or glass door covering the entire opening of the firebox. §150(e)1 B: Masonry or factory -built fireplaces have a combustion outside air intake, which is at least six square inches in area and is equipped with a with a readily accessible, operable, and tight -fitting damper and or a combustion -air control device. §150(e)2: Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of the building, are prohibited. Space Conditioning, Water Heating and Plumbing System Measures: §110-§113: HVAC equipment, water heaters, showerheads, faucets and all other regulated appliances are certified by the Energy Commission. §113(c)5: Water heating recirculation loops serving multiple dwelling units and High -Rise residential occupancies meet the air release valve, backflow prevention, pump isolation valve, and recirculation loop connection requirements of §113(c)5. §115: Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces, household cooking appliances (appliances with an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt), and pool and spa heaters. 150 h : Heating and/or cooling loads are calculated in accordance with ASHRAE, SMACNA or ACCA. 150 i : Heating systems are.a�quippecl with thermostats that meet the setback requirements of Section 112(c). §150(j)1A: Storage gas water heaters rated with an Energy Factor no greater than the federal minimal standard are externally wrapped with insulation having an installed thermal resistance of R-12 or greater. §150(j)1 B: Unfired storage tanks, such as storage tanks or backup tanks for solar water -heating system, or other indirect hot water tanks have R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank. §150(j)2: First 5 feet of hot and cold water pipes closest to water heater tank, non -recirculating systems, and entire length of recirculating sections of hot water pipes are insulated per Standards Table 150-B. §150(j)2: Cooling system piping (suction, chilled water, or brine lines),and piping insulated between heating source and indirect hot water tank shall be insulated to Table 150-B and Equation 150-A. §150(j)2: Pipe insulation for steam hydronic heating systems or hot water systems >15 psi, meets the requirements of Standards Table 123-A. 150 ' 3A: Insulation is protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. §150(j)3A: Insulation for chilled water piping and refrigerant suction lines includes a vapor retardant or is enclosed entirely in conditioned space. 150 ' 4: Solar water -heating systems and/or collectors are certified by the Solar Rating and Certification Corporation. EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:58 ID: Page 9 of 13 MANDATORY MEASURES SUMMARY: Residential (Page 2 of 3 MF-1 R Project Name Date Mandarina Plan 1 61912010 §150(m)1: All air -distribution system ducts and plenums installed, are sealed and insulated to meet the requirements of CIVIC Sections 601, 602, 603, 604, 605 and Standard 6-5; supply -air and return -air ducts and plenums are insulated to a minimum installed level of R- 4.2 or enclosed entirely in conditioned space. Openings shall be sealed with mastic, tape or other duct -closure system that meets the applicable requirements of UL 181, UL 181 A, or UL 181 B or aerosol sealant that meets the requirements of UL 723. If mastic or tape is used to seal openings reater than 1/4 inch, the combination of mastic and either mesh or tape shall be used §150(m)1: Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be compressed to cause reductions in the cross -sectional area of the ducts. §150(m)2D: Joints and seams of duct systems and their components shall not be sealed with cloth back rubber adhesive duct tapes unless such tape is used in combination with mastic and draw bands. 1 50m 7: Exhaust fans stems have back draft or automatic dampers. §150(m)8: Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. §150(m)9: Insulation shall be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind. Cellular foam insulation shall be protected as above or painted with a coating that is water retardant and provides shielding from solar radiation that can cause degradation of the material. 150 m 10: Flexible ducts cannot have porous inner cores. §150(o): All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2-2007 Ventilation and Acceptable Indoor Air Quality in Low -Rise Residential Buildings. Window operation is not a permissible method of providing the Whole Building Ventilation required in Section 4 of that Standard. Pool and Spa Heating Systems and Equipment Measures: §114(a): Any pool or spa heating system shall be certified to have: a thermal efficiency that complies with the Appliance Efficiency Regulations; an on -off switch mounted outside of the heater; a permanent weatherproof plate or card with operating instructions; and shall not use electric resistance heating or a pilot light. §114(b)1: Any pool or spa heating equipment shall be installed with at least 36" of pipe between filter and heater, or dedicated suction and return lines, or built-up connections for future solar heating. 114 b 2: Outdoor pools ors as that have a heat pump or gas heater shall have a cover. §114(b)3: Pools shall have directional inlets that adequately mix the pool water, and a time switch that will allow all pumps to be set or programmed to run only during off-peak electric demand periods. 150 : Residential pool systems orequipment meet the pump sizing, flow rate, piping, filters, and valve requirements of §150 Residential Lighting Measures: §150(k)1: High efficacy luminaires or LED Light Engine with Integral Heat Sink has an efficacy that is no lower than the efficacies contained in Table 150-C and is not a low efficacy Iuminaire asspecified by 150(k)2. 150 k 3: The wattage of permanently installed luminaires shall be determined asspecified by §130(d). §150(k)4: Ballasts for fluorescent lamps rated 13 Watts or greater shall be electronic and shall have an output frequency no less than 20 kHz. §150(k)5: Permanently installed night lights and night lights integral to a permanently installed Iuminaire or exhaust fan shall contain only high efficacy lamps meeting the minimum efficacies contained in Table 150-C and shall not contain a line -voltage socket or line - voltage lamp holder; OR shall be rated to consume no more than five watts of power as determined by §130(d), and shall not contain a medium screw -base socket. 150 k 6: Lighting integral to exhaust fans, in rooms other than kitchens, shall meet the applicable requirements of §150(k). 150 k 7: All switching devices and controls shall meet the requirements of §150(k)7. §150(k)8: A minimum of 50 percent of the total rated wattage of permanently installed lighting in kitchens shall be high efficacy. EXCEPTION: Up to 50 watts for dwelling units less than or equal to 2,500 ft2 or 100 watts for dwelling units larger than 2,500 ft2 may be exempt from the 50% high efficacy requirement when: all low efficacy luminaires in the kitchen are controlled by a manual on occupant sensor, dimmer, energy management system (EMCS), or a multi -scene programmable control system; and all permanently installed luminaries in garages, laundry rooms, closets greater than 70 square feet, and utility rooms are high efficacy and controlled by a manual -on occupant sensor. §150(k)9: Permanently installed lighting that is internal to cabinets shall use no more than 20 watts of power per linear foot of illuminated cabinet. EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:58 ID: Page 10 of 13 MANDATORY MEASURES SUMMARY: Residential (Page 3 of 3 MF-1 R Project Name Date Mandarina Plan 1 61912010 §150(k)10: Permanently installed luminaires in bathrooms, attached and detached garages, laundry rooms, closets and utility rooms shall be high efficacy. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided that they are controlled by a manual -on occupant sensor certified to comply with the applicable requirements of §119. EXCEPTION 2: Permanently installed low efficacy luminaires in closets less than 70 square feet are not required to be controlled by a manual -on occupancy sensor. §150(k)1 1: Permanently installed luminaires located in rooms or areas other than in kitchens, bathrooms, garages, laundry rooms, closets, and utility rooms shall be high efficacy luimnaires. EXCEPTION 1: Permanently installed low efficacy luminaires shall be allowed provided they are controlled by either a dimmer switch that complies with the applicable requirements of §119, or by a manual - on occupant sensor that complies with the applicable requirements of §119. EXCEPTION 2: Lighting in detached storage building less than 1000 square feet located on a residential site is not required to comply with §150 k 11. §150(k)l2: Luminaires recessed into insulated ceilings shall be listed for zero clearance insulation contact (IC) by Underwriters Laboratories or other nationally recognized testing/rating laboratory; and have a label that certifies the lumiunaire is airtight with air leakage less then 2.0 CFM at 75 Pascals when tested in accordance with ASTM E283; and be sealed with a gasket or caulk between the luminaire housing and ceiling. §150(k)l3: Luminaires providing outdoor lighting, including lighting for private patios in low-rise residential buildings with four or more dwelling units, entrances, balconies, and porches, which are permanently mounted to a residential building or to other buildings on the same lot shall be high efficacy. EXCEPTION 1: Permanently installed outdoor low efficacy luminaires shall be allowed provided that they are controlled by a manual on/off switch, a motion sensor not having an override or bypass switch that disables the motion sensor, and one of the following controls: a photocontrol not having an override or bypass switch that disables the photocontrol; OR an astronomical time clock not having an override or bypass switch that disables the astronomical time clock; OR an energy management control system (EMCS) not having an override or bypass switch that allows the luminaire to be always on EXCEPTION 2: Outdoor luminaires used to comply with Exceptionl to §150(k)l3 may be controlled by a temporary override switch which bypasses the motion . sensing function provided that the motion sensor is automatically reactivated.within six hours. EXCEPTION 3: Permanently installed luminaires in or around swimming pool, water features, or other location subject to Article 680 of the California Electric Code need not be high efficacy luminaires. •§150(k)14: Internally illuminated address signs shall comply with Section 148; OR not contain a screw -base socket, and consume no more than five watts of power as determined according to 130 d . §150(k)l 5: Lighting for parking lots and carports with a total of for 8 or more vehicles per site shall comply with the applicable ,requirements in Sections 130, 132, 134, and 147. Lighting for parking garages for 8 or more vehicles shall comply with the applicable requirements of Sections,130, 131, 134, and 146. §150(k)l6: Permanently installed lighting in the enclosed, non -dwelling spaces of low-rise residential buildings with four or more dwelling units shall be high efficacy luminaires. EXCEPTION: Permanently installed low efficacy luminaires shall be allowed provided, that they are controlled by an occupant sensors certified to comply with the applicable requirements of 119. EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:58 ID: Page 11 of 13 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Mandarina Plan 1 6/9/2010 System Name Floor Area liv 1,815 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 851 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 81,000 20,116 1,354 632 22,998 Total Output (Btuh) 81,000 0 Output Btuh/s ft 44.6 1,666 1,706 Cooling System 0 0 Output per System 58,500 0 0 0 0 Total Output (Btuh) 58,500 0 1,354 0 Total Output (Tons) 4.9 1,666 1,706 Total Output (Btuh/sqft) 32.2 Total Output s ft/Ton 372.3 1 23,449 F 26,411 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 2,000 Trane TUD1 B080A9601 A/4TTR3060A1 44,464 5,642 81,000 Airflow cfm/sqft) 1.10 Airflow cfm/Ton). 410.3 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK 44,464 5,642 81,000 Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF 69 OF 69 OF 105 OF Outside Air 0 cfm Supply Fan Heating Coil 104 OF 2,000 cfm !; ROOM 69 OF 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78OF 79/63OF 79/63OF 55/54OF �O• „ ,. Outside Air 0 cfm Supply Fan Cooling Coil 56 / 54 OF 2,000 cfm j 41.8 Rio j ROOM 79 / 63 OF 78 / 62 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:58 ID: Page 12 of 13 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Mandarina Plan 1 Date 6/9/2010 System Name sleep Floor Area 1,300 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 494 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 60,000 11,748 1,484 423 15,409 Total Out ut Btuh 60,000 0 Output Btuh/s ft 46.2 973 1,143 Cooling System 0 0 Output per System 41,500 0 0 0 0 Total Output (Btuh) 41,500 0 1,484 0 Total Output (Tons) 3.5 973 1,143 Total Output (Btuh/sqft) 31.9 Total Output s ft/Ton 375.9 13,695 17,696 Air System CFM per Sys em 1,400 HVAC EQUIPMENT SELECTION Airflow cfm 1,400 Trane TUD1B080A9481A/4TTR3042A1 32,605 2,997 60,000 Airflow (cfm/sgft) 1.08 Airflow (cfm/Ton) 404.8 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME -OF SYSTEM PEAK 32,605 2,997 60,000 Outside Air cfm/s ft 0.00 Jan 1 AM Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF 69 OF a.. Outside Air 0 cfm Supply Fan 1,400 cfm 69 OF 69 OF 105 OF Heating Coil 104 OF f— ROOM 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112 / 78 OF 79 63 OF 79 / 63 OF 55 / 54 °F Outside Air 0 cfm Supply I Fan Cooling Coil 56 / 54 OF 1,400 cfm 42.2 % I ROOM 79 / 63 OF 78 / 63 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:12:58 ID: Page 13 of 13 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Mandarina Plan 1 + Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 3,469 Addition n/a # of Stories 2 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Construction Type Area Special Cavity (fe) Features (see Part 2 of 5) Status Wall Wood Framed R-15 2,650 New Roof Wood Framed Attic R-38 3,115 Radiant Barrier New Slab Unheated Slab -on -Grade None 3,115 Perim = 320' New Wall Wood Framed R-15 609 New Door Opaque Door None 21 New FENESTRATION U- Exterior Orientation Area(fe) Factor SHGC Overhang Sidefins Shades Status Right (tM 4.0 0.350 0.32 12.0 none Bug Screen New Right (M 10.0 0.330 0.34 4.0 none Bug Screen New Right (tM 39.0 0.350 0.32 7.0 none Bug Screen New Right (to 21.0 0.330 0.34 7.0 none Bug Screen New Right (lam 28.0 0.350 0.32 7.0 none Bug Screen New Rear (S) 15.0 0.350 0.32 31.0 none Bug Screen New Left (E) 25.0 0.350 0.32 2.0 none Bug Screen New Left (E) 31.6 0.330 0.34 none none Bug Screen New Left (E) 32.0 0.350 0.32 none none Bug Screen New Right (NW) 17.5 0.330 0.34 6.0 none Bug Screen New Right (NW) 48.0 0.350 0.32 6.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New 1 Split Heat Pump 10.55 HSPF Split Heat Pump 21.0 SEER Setback New HVAC DISTRIBUTION Location Heating Duct Cooling Duct Location R-Value Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 New loft Ductless / with Fan Ductless n/a n/a New WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 1 Large Gas 75 0.80 RecirclTime+Temp New EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Page 1 of 12 PERFORMANCE CERTIFICATE: Residential (Part 1 of 5) CF-1 R Project Name Mandarina Plan 1 + Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 3,469 Addition n/a # of Stories 2 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this fora for details. INSULATION Area Special Construction Type Cavity (ft�) Features (see Part 2 of 5) Status FENESTRATION U- Exterior Orientation Area(fi) Factor SHGC Overhang Sidefins Shades Status Right (NW) 17.5 0.330 0.34 6.0 none Bug Screen New Front (N) 10.5 0.330 0.34 6.0 none Bug Screen New Front (N) 48.0 0.350 0.32 6.0 none Bug Screen New Front (N) 10.5 0.330 0.34 6.0 none Bug Screen New Right (W) 110.0 0.350 0.32 none none Bug Screen New Rear (S) 21.4 0.350 0.32 6.0 none Bug Screen New Rear (S) 25.0 0.330 0.34 6.0 none Bug Screen New Rear (S) 40.0 0.350 0.32 none none Bug Screen New HVAC SYSTEMS Ot . Heating Min. Eff Cooling Min. Eff Thermostat Status HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status WATER HEATING Qty. Type Gallons Min. Eff Distribution Status EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Page 2 of 12 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Plan 1 + Loft Building Type m Single Family ❑ Addition Alone 1 ❑ Multi Family ❑ Existing+ Addition/Alteration Date 6/9/2010 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Compliance for all orientations is specified, see section 151 (c) 2 of the Standards and section RA1-3.3 in Appendix RA-1 of the Residential Compliance Manual. The DHW System Bradford White M-2-XR75S6BN is a non-NAECA large storage gas water heater. Verify DHW details. A hot water recirculation systems has been modeled. Verification of type is required. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5) allowed to avoid backdraft problems. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5 allowed to avoid backdraft problems. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H corresponding to an SLA of 1.5 allowed to avoid backdraftproblems' The Roof R-38 Roof Attic includes credit for a Radiant Barrier that is Continuous meeting eligibility and installation criteria as specified in Residential Appendix RA4.2.2. The Roof R-38 Roof Attic Concrete Tile (10 #/so Roofing requires verification. HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. The Cooling System Trane TUD1B080A9601A14TTR3060A1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. The HVAC System liv includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 713 and 1521 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 713 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. The HVAC System liv incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System liv incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria. The Cooling System Trane TUD 1 B08OA9481 A14TTR3042A 1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation, of the correct Condenser. The HVAC System sleep includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 511 and 1089 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 511 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. The HVAC System sleep incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. EnergyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010.06-09T10:16:0 ID: Page 3 of 12 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Plan 1 + Loft Building Type m Single Family - ❑ Addition Alone 1 ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. HERS REQUIRED VERIFICATION' Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must.receive a .completed CF-4R form for each of the measures listed below for final to be given. Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System sleep incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria. The Cooling System Fujitsu 12RL0 includes credit for a 12.5 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. This building has tight construction with reduced infiltration and a target blower door test range between 139 and 297 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 139 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. Compliance credit for quality installation of insulation has been used. HERS field verification is required. EnerqyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Pa e 4 of 12 PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF-1 R Project Name Building Type m Single Family ❑ Addition Alone Date Mandarina Plan 1 + Loft ❑ Multi Family ❑ Existing+ Addition/Alteration 61912010 ANNUAL ENERGY USE SUMMARY Standard Facing Margin Facing Margin Facing Margin Facing Margin TDV kBtu/Wt r North East South West Space Heating 2.82 3.07 -0.25 3.18 -0.36 2.76 0.06 2.62 0.20 Space Cooling 60.03 53.64 6.39 50.75 9.28 52.62 7.41 51.72 8.31 Fans 12.18 12.43 -0.25 11,72 0.46 12.22 -0.03 12.05 0.14 Domestic Hot Water 9.90 13.67 -3.78 13.67 -3.78 13.67 -3.78 13.67 -3.78 Pumps 0.00 0.16 -0.16 0.16 -0.16 0.16 -0.16 0.16 -0.16 Totals 84.93 82.97 1.96 79.48 5.45 81.43 3.50 80.23 4.70 Percent Better Than Standard: 2.3 % 6.4 % 4.1 % 5.5 % BUILDING COMPLIES- HERS VERIFICATION REQUIRED - Fenestration Building Front Orientation: All Four orientations Ext. Walls/Roof Wall Area Area Number of Dwelling Units: 1.00 (N) 698 69 Fuel Available at Site: Natural Gas (E) 1,164 89 Raised Floor Area: 0 (S) 728 101 Slab on Grade Area: 3,115 (W) 1,244 295 Average Ceiling Height: 9.8 Roof 3,115 0 Fenestration Average U-Factor: 0.34 TOTAL: 554 Average SHGC: 0.33 Fenestration/CFA Ratio: 16.0 % REMARKS THE CONTRACTORS ARE RESPONSIBLE FOR THE FINAL SIZING OF HEATING, COOLING AND DHW EQUIPMENT. (CEC Blueprint #60) STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the Efficiency Standards of the California Code of Regulations. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Gallant Energy Consulting Y) Company 6/9/2010 Address 508 W Mission Ave Ste 201 Name Mark Gallant, CEPE City/State/Zip Escondido, CA 92025 Phone 760-743-5408 Signed Date The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Company BL Farms Inc Address 30-875 Date Palm or #C Name City/State/Zip Cathedral City, CA 92234 Phone 760-250-8611 Signed License # Date EnenqyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Page 5 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Plan 1 + Loft Building Type la Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area U- Factor Insulation Azm Tilt Status Joint Appendix 1 4 Location/Comments Cavity Exterior I Frame Interiorl Frame Wall 378 0.095 R-15 270 90 New 4.3.1-A4 liv Wall 5 0.095 R-15 180 90 New 4.3.1-A4 liv Wall 433 0.095 R-15 901 90 New 4.3.1-A4 liv Roof 1,461 0.025 R-38 0 0 New 4.2.1-A21 liv Slab 1,815 0.730 1 None 0 180 New 4.4.7-A1 liv Wall 349 0.095 R-15 0 90 New 4.3.1-A4 liv Door 21 0.500 None 0 90 New 4.5.1-A4 liv Wall 260 0.095 R-15 90 90 New 4.3.1-A4 liv Wall 97 0.095 R-15 315 90 New 4.3.1-A4 liv Wall 101 0.095 R-15 0 90 New 4.3.1-A4 sleep Wall 335 0.095 R-15 2701 90 New 4.3.1-A4 sleep Wall 464 0.095 R-15 180 90 New 4.3.1-A4 sleep Wall 162 0.095 R-15 90 90 New 4.3.1-A4 sleep Roof 1,300 0.025 R-38 0 0 New 4.2.1-A21 sleep Slab 1,300 0.730 None 0 180 New 4.4.7-A1 slee Wall 158 0.095 R-15 0 90 New 4.3.1-A4 loft FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC2 Azm Status Glazing Type Location/Comments 1 Window 4.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 2 Window 10.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 3 Window 15.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 4 Window 24.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 5 Window 10.5 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 6 Window 10.5 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 7 Window 28.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 8 Window 15.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 9 Window 25.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP liv 10 Window 2.0 0.330 NFRC 6.34 NFRC 90 New NonMetal Lowe2 FX liv 11 Window 2.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX liv 12 Window 10.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX liv 13 Window 10.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX liv 14 Window 20.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP liv 15 Window 8.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP liv 16 Window 17.5 0.330 NFRC 0.34 NFRC 315 New NonMetal Lowe2 FX liv (1) U-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2) SHGC Type: 116-13 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhang Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len Hot 1 Bug Screen 0.76 2.0 2.01 12.0 1.0 2.0 2.0 2 Bug Screen 6.76 5.0 2.0 4.0 1.0 2.0 2.0 3 Bug Screen 0.76 5.0 3.0 7.0 1.0 2.0 2.0 4 Bug Screen 0.761 8.0 3.0 7.0 1.0 2.0 2.0 5 Bug Screen 0.76 7.5 1.5 7.0 1.01 2.0 2.0 6 Bug Screen 0.76 7.5 1.5 7.0 1.0 2.0 2.0 7 Bug Screen 0.76 8.0 3.5 7.0 1.0 2.0 2.0 8 Bug Screen 0.76 5.0 3.0 31.0 1.0 2.0 2.0 9 Bug Screen 0.76 5.0 5.01 2.0 0.5 2.0 2.0 10 Bug Screen 0.76 11 Bug Screen 0.76 12 Bug Screen 0.76 13 Bug Screen 0.76 14 Bug Screen 0.76 15 Bug Screen 0.76 16 JBug Screen 0.761 7.0 2.5 6.0 1.0 2.0 2.0 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Page 6 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Plan 1 + Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area U- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments Cavity Exterior Frame Interior Frame Wall 220 0.095 R-15 90 90 New 4.3.1-A4 loft Wall 158 0.095 R-15 180 90 New 4.3.1-A4 loft Wall 139 0.095 R-15 270 90 New 4.3.1-A4 loft Roof 354 0.025 R-38 0 0 New 4.2.1-A21 loft FENESTRATION SURFACE DETAILS ID Tvpe Area U-Factor SHGC2 Azm Status Glazing Type Location/Comments 17 Window 48.0 0.350 NFRC 0.32 NFRC 315 New NonMetal Lowe2 OP liv 18 Window 17.5 0.330 NFRC 0.34 NFRC 315 New NonMetal Lowe2 FX liv 19 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX sleep 20 Window 48.0 0.350 NFRC a32 NFRC 0 New NonMetal Lowe2 OP sleep 21 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX sleep 22 Window 12.5 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 23 Window 12.5 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 24 Window 21.4 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 25 Window 25.0 0.330 NFRC 0.34 NFRC 180 New NonMetal Lowe2 FX sleep 26 Window 20.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 27 Window 20.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 28 Window 4.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 29 Window 4.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep 30 Window 1.8 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX loft 31 Window 1.8 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX loft 32 Window 16.01 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP loft (1) LI-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2 SHGC Type: 116-13 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhanq Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 17 Bug Screen 0.76 8.0 6.0 6.0 1.0 2.0 2.0 18 Bug Screen 0.76 7.0 2.5 6.0 1.0 2.0 2.0 19 Bug Screen 0.76 7.0 1.5 6.0 1.0 2.0 2.0 20 Bug Screen 0.76 8.0 6.0 6.0 1.0 2.0 2.0 21 Bug Screen 0.76 7.0 1.5 6.0 1.0 2.0 2.0 22 Bug Screen 0.76 23 Bug Screen 0.76 24 Bug Screen 0.76 8.0 2.5 6.0 1.0 2.0 2.0 25 Bug Screen 0.76 5.0 5.0 6.0 1.0 2.0 2.0 26 Bug Screen 0.76 27 Bug Screen 0.76 28 Bug Screen 0.76 29 Bug Screen 0.76 30 Bug Screen 0.76 31 Bug Screen 0.76 32 Bug Screen 0.76 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Pa e 7 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Plan 1 + Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area U- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments Cavity Exterior Frame Interior Frame FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC2 Azm Status Glazing Type Location/Comments 33 Window 16.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP loll 34 Window 20.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP loft 35 Window 33.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP loft (1) Ll-Factor Type: I I6-A = Default Table from Standards, NFRC = Labeled Value 2 SHGC Type: 116-13 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhanq Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 33 Bug Screen 0.76 34 Bug Screen 0.76 35 Bug Screen 0.76 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Page 8 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF-1 R Project Name Mandarina Plan 1 + Loft Building Type 0 Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 BUILDING ZONE INFORMATION System Name Zone Name Floor Area ft Volume Year Built New Existinq Altered Removed liv liv 1,815 18,150 sleep sleep 1,300 13,000 loft loft 354 2,832 Totals 3,469 0 0 0 HVAC SYSTEMS System Name Qty. HeatingT • e Min. Eff. Cooling Type Min. Eff. Thermostat Type Status liv 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New sleep 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New loft 1 Split Heat Pump 10.55 HSPF Split Heat Pump 21.0 SEER Setback New HVAC DISTRIBUTION System Name Heating Cooling Duct Location Duct R-Value Ducts Tested? Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 m New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 Il New loft Ductless / with Fan Ductless n/a n/a ❑ New WATER HEATING SYSTEMS S stem Name Qty. Type Distribution Rated Input Btuh Tank Cap. al Energy Factor or RE Standby Loss or Pilot Ext. Tank Insul. R- Value Status Bradford White M-2-XR75 1 Large Gas Recirc/Time+Temp 76,000 75 0.80 2.00 % 12.0 New L WATER HEATING DETAILS -1MULTI-FAMILY HYDRONIC HEATING SYSTEM PIPING Control E •2 »- °' w o- Hot Water Piping Length ft o m a a c S stem Name Pipe Length Pipe Diameter Insul. Thick. Qty. HP Plenum Outside Buried ❑ ❑ ❑ I❑ EnergyPro 5.0 by Ener Soft User Number: 2875 RunCode: 2010-06-09T10:16:0 ID: Page 9 of 12 HVAC SYSTEM HEATING AND COOLING LOADS -SUMMARY Project Name Mandarina Plan 1 + Loft Date 6/9/2010 System Name liv Floor Area 1,815 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 864 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 81,000 20,518 1,681 655 23,933 Total Output Btuh 81,000 0 Output Btuh/s ft 44.6 1,482 1,469 Cooling System 0 0 Output per System 58,500 0 0 0 0 Total Output (Btuh) 58,500 0 1,681 0 Total Output (Tons) 4.9 1,482 1,469 Total Output (Btuh/sgft) 32.2 Total Output s ft/Ton 372•3 1 23,482 26,870 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 2,000 TraneTUD1B080A9601A/4TTR3060A1 44,235 5,898 81,000 Airflow (cfm/s ft) 1.10 Airflow (cfm/Ton) 410.3 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 44,235 5,898 81,000 Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions Aug 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26 OF 69 OF 69 OF 105 OF Outside Air 0 cfm Supply Fan Heating Coil 2,000 cfm 69 OF 104 OF FROMM 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78OF 79/63OF Outside Air 0 cfm 79 / 63 OF 79/63OF 55/54OF Supply Fan Cooling Coil 56 / 54 OF 2,000 cfm I 42.0 % ROOM 78 / 62 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:04 ID: Page 10 of 12 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Mandarina Plan 1 + Loft Date 6/9/2010 System Name sleep Floor Area 1,300 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 520 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible LEAent CFM Sensible Output per System 60,000 12,391 1,718 448 16,358 Total Output Btuh 60,000 0 Output Btuh/s ft 46.2 895 1,004 Cooling System 0 0 Output per System 41,500 0 0 0 0 Total Output (Btuh) 41,500 0 1,718 0 Total Output (Tons) 3.5 895 1,004 Total Output (Btuh/s ft) 31.9 Total Output s ft/Ton 375.9 14,181 18,366 Air System CFM per System 1.400 HVAC EQUIPMENT SELECTION Airflow cfm 1,400 TraneTUD1B080A9481A/4TTR3042A1 32,473 3,153 60,000 Airflow (cfm/s ft) 1.08 Airflow (cfm/Ton) 404.8 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 32,473 3,153 60,000 Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF 69 OF Outside Air 0 cfm Supply Fan 1,400 cfm 69 of 69 OF 105 OF Heating Coil 104 OF iM R00 �r� 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112 / 78 OF 79 / 63 OF 79 / 63 OF 55 / 54 OF c Outside Air 0 cfm Supply I Fan Cooling Coil 56 / 54 OF 1,400 cfm 42.4 /o ' ROOM 79 / 63 OF 78 / 63 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:04 ID: Page 11 of 12 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Mandarina Plan 1 + Loft 6/9/2010 System Name Floor Area loft 354 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 299 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 16,000 7,325 1,050 149 5,559 Total Output Btuh 16,000 Return Vented Lighting Return Air Ducts 0 Output Btuh/s ft 45.2 0 0 Cooling System Return Fan Ventilation 0 Supply Fan 0 0 Output per System 14,500 0 0 0 0 Total Output (Btuh) 14,500 0 0 Total Output (Tons) 1.2 Supply Air Ducts 01 0 Total Output (Btuh/sqft) 41.0 Total Output s ft/Ton 293.0 TOTAL SYSTEM LOAD 1 7,325 1,050 5,559 Air System CFM per System 374 HVAC EQUIPMENT SELECTION Airflow cfm 374 Fujitsu 12RLQ 12,526 0 . 9,993 Airflow (cfm/sqft) 1.06 Airflow (cfm/Ton) 309.5 Outside Air % 0.0 % Total Adjusted System, Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 12,526 0 9,993 Outside Air cfm/s ft 0.00 Note: values above given at ARl conditions Aug 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 26 OF 70 OF 105 OF 105 OF Outside Air 0 cfm Heating Coil Supply Fan 105 OF 374 cfm " ROOM 70 OF 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78OF 78/63°F 55/54°F 55/54°F C i � Outside Air c. 0 cfm Supply Fan Cooling Coil 55 / 54 OF 374 cfm 44.3 % ROOM 78 / 63 OF 78 / 63 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:16:04 ID: Page 12 of 12 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Mandarina Plan 2 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 2,918 Addition n/a # of Stories 1 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Construction Type Area Special Cavity (fe) Features (see Part 2 of 5) Status Wall Wood Framed R-15 1,687 New Roof Wood Framed Attic R-38 2,918 Radiant Barrier Cool Roof New Slab Unheated Slab -on -Grade None 2,918 Perim = 246' New Wall Wood Framed R-15 489 New Door Opaque Door None 21 New FENESTRATION Orientation Area(ft) U- Exterior Factor SHGC Overhang Sidefins Shades Status Front (N) 10.5 0,330 0.34 7.0 none Bug Screen New Front (N) 24.0 0.350 0.32 7.0 none Bug Screen New Front (N) 10.5 0.330 0.34 7.0 none Bug Screen New Front (N) 80.0 0.350 0.32 none none Bug Screen New Right (W) 28.0 0.330 0.34 none none Bug Screen New Right (W) 12.5 0.350 0.32 16.0 none Bug Screen New Rear (S) 140.0 0.350 0.32 none none Bug Screen New Front (N) 15.0 0.350 0.32 2.0 none Bug Screen New Right (W) 12.5 0.350 0.32 none none Bug Screen New Right (tM 51.4 0.350 0.32 2.0 none Bug Screen New Right (lM 15.0 0.350 0.32 10.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 New WATER HEATING Qty. Type Gallons Min. Eff Distribution Status 1 Large Gas 75 0.80 Recirc/Time+Temp New EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 1 of 10 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Mandarina Plan 2 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 2,918 Addition n/a # of Stories 1 FIELD INSPECTION ENERGY CHECKLIST IZI Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Area Special Construction Type Cavity (ft) Features (see Part 2 of 5) Status FENESTRATION U- Exterior Orientation Area(ft) Factor SHGC Overhang Sidefins Shades Status Left (E) 28.0 0.330 0.34 none none Bug Screen New Lek (E) 36.0 0.350 0.32 none none Bug Screen New HVAC SYSTEMS {fit , Heating Min. Eff Cooling Min. Eff Thermostat Status HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status WATER HEATING Ot . Type Gallons Min. Eff Distribution Status EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 2 of 10 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Plan 2 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special 'ustification and documentation submitted. Compliance for all orientations is specified, see section 151 (c) 2 of the Standards and section RA1-3.3 in Appendix RA-1 of the Residential Compliance Manual. The DHW System Bradford White M-2-XR75S6BN is a non-NAECA large storage gas water heater. Verify DHW details. A hot water recirculation systems has been modeled. Verification of type is required. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5) allowed to avoid backdraft problems. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5 allowed to avoid backdraftproblems' The Roof R-38 Roof Attic Reflectance = 0.42, Emittance = 0.88 shall be rated and labeled by the Cool Roof Rating Council in accordance with Section 10-113 of the standards. The Roof R-38 Roof Attic includes credit for a Radiant Barrier that is Continuous meeting eligibility and installation criteria as specified in Residential Appendix RA4.2.2. The Roof R-38 Roof Attic Concrete Tile (10 #/so Roofing requires verification. HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. The Cooling System Trane TUD1B080A9481A/4TTR3042A1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. The HVAC System liv includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 530 and 1131 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 530 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. The HVAC System liv incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System liv incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria. The Cooling System Trane TUD1B080A9481A/4TTR3042A1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. The HVAC System sleep includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 616 and 1314 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 616 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. The HVAC System sleep incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. EnerqyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 3 of 10 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name• Mandarina Plan 2 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. HERS REQUIRED VERIFICATION. Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System sleep incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria. EnergyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 4 of 10 PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF-1 R Project Name Building Type m Single Family ❑Addition Alone Date Mandarina Plan 2 ❑ Multi Family ❑ Existing+ Addition/Alteration 61912010 ANNUAL ENERGY USE SUMMARY Standard Facing Margin Facing Margin Facing Margin Facing Margin TDV kBtu/ft2 r North East South West Space Heating 1.50 1.68 -0.18 1.93 -0.43 1.89 -0.39 1.69 -0.19 Space Cooling 58.42 49.11 9.30 49.75 8.66 48.27 10.14 49.50 8.91 Fans 11.63 10.49 1.14 10.63 1.00 10.35 1.29 10.58 1.06 Domestic Hot Water 12.50 18.13 -5.63 18.13 -5.63 18.13 -5.63 18.13 -5.63 Pumps 0.00 0.19 -0.19 0.19 -0.19 0.19 -0.19 0.19 -0.19 Totals 84.05 79.61 4.45 80.64 3.41 78.83 5.22 80.09 3.96 Percent Better Than Standard: 5.3 % 4.1 % 6.2 % 4.7 % BUILDING COMPLIES - HERS VERIFICATION REQUIRED Fenestration Building Front Orientation: All Four orientations Ext. Walls/Roof Wall Area Area .Number of Dwelling Units: 1.00 (N) 810 140 Fuel Available at Site: Natural Gas (E) 670 64 Raised Floor Area: 0 (S) 540 140 Slab on Grade Area: 2,918 (W) 640 119 Average Ceiling Height: 10.0 Roof 2,918 0 Fenestration Average U-Factor: 0.35 TOTAL: 463 Average SHGC: 0.32 Fenestration/CFA Ratio: 15.9 % REMARKS THE CONTRACTORS ARE RESPONSIBLE FOR THE FINAL SIZING OF HEATING, COOLING AND DHW EQUIPMENT. (CEC Blueprint #60) STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the Efficiency Standards of the California Code of Regulations. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Gallant Energy Consulting Company 6/9/2010 Address 508 W Mission Ave Ste 201 Name Mark Gallant, CEPE City/State/Zip Escondido, CA 92025 Phone 760-743-5408 Signed Date The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Company BL Farms Inc Address 30-875 Date Palm Dr #C Name City/State/Zip Cathedral City, CA 92234 Phone 760-250-8611 Signed License It Date EnerqyPro 5.0 by EnengySoft User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 5 of 10 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Plan 2 Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area U- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments Cavity Exterior Frame Interior Frame Wall 115 0.095 R-15 0 90 New 4.3.1-A4 liv Wall 360 0.095 R-15 270 90 New 4.3.1-A4 liv Wall 260 0.095 R-15 180 90 New 4.3.1-A4 liv Roof 1,350 0.025 R-38 0 0 New 4.2.1-A21 liv Slab 1,350 0.730 None 0 180 New 4.4.7-A1 liv Wall 260 0.095 R-15 0 90 New 4.3.1-A4 liv Wall 45 0.095 R-15 0 90 New 4.3.1-A4 sleep Wall 161 0.095 R-15 270 90 New 4.3.1-A4 sleep Wall 140 0.095 R-15 180 90 New 4.3.1-A4 sleep Wall 606 0.095 R-15 90 90 New 4.3.1-A4 sleep Roof 1,568 0.025 R-38 0 0 New 4.2.1-A21 sleep Slab 1,568 0.730 None 0 180 New 4.4.7-A1 sleep Wall 229 0.095 R-15 0 90 New 4.3.1-A4 sleep Door 21 0.500 None 0 90 New 4.5.1-A4 sleep FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC Azm Status Glazing Type Location/Comments 1 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX liv 2 Window 24.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP liv 3 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX liv 4 Window 40.0 0.350 NFRC 6.32 NFRC 0 New NonMetal Lowe2 OP liv 5 Window 40.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP liv 6 Window 10.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 7 Window 10.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 8 Window 4.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 9 Window 4.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 10 Window 12.5 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 11 Window 40.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 12 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 13 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 14 Window 25.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 15 Window 15.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP sleep 16 Window 12.5 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep (1) U-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2) SHGC Type: 116-13 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhanq Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 1 Bug Screen 0.76 7.0 1.5 7.0 1.0 2.0 2.0 2 Bug Screen 0.76 8.0 3.0 7.0 1.0 2.0 2.0 3 Bug Screen 0.76 7.0 1.5 7.0 1.0 2.0 2.0 4 Bug Screen 0.76 5 Bug Screen 0.76 6 Bug Screen 0.76 7 Bug Screen 0.76 8 Bug Screen 0.76 9 Bug Screen 0.76 10 Bug Screen 0.76 5.0 2.5 16.0 2.0 2.0 2.0 11 Bug Screen 0.76 12 Bug Screen 0.76 13 Bug Screen 0.76 14 Bug Screen 0.76 15 Bug Screen 0.76 5.0 3.01 2.01 1.0 2.0 2.0 16 Bug Screen 0.76 EnergyPro 5.0 by EnergySoff User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 6 of 10 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Plan 2 Building Type 0 Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area Ll- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments CavitylExterior Frame Interior Frame FENESTRATION SURFACE DETAILS ID Type Area LI-Factor S C2 Azm Status Glazing Type Location/Comments 17 Window 30.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 18 Window 21.4 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 19 Window 15.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 20 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 21 Window 25.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 22 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 23 Window 4.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 24 Window 4.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 25 Window 20.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 26 Window 8.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep 27 Window 20.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep 28 Window 8.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep (1) Ll-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2 SHGC Type: I I6-B = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhang Left Fin Right Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 17 Bug Screen 0.76 5.0 6.0 2.0 1.0 2.0 2.0 18 Bug Screen 0.76 8.0 2.7 2.0 1.0 2.0 2.0 19 Bug Screen 0.76 5.0 3.0 10.0 1.0 2.0 2.0 20 Bug Screen 0.76 21 Bug Screen 0.76 22 Bug Screen 0.76 23 Bug Screen 0.76 24 Bug Screen 0.76 25 Bug Screen 0.76 26 Buq Screen 0.76 27 Bug Screen 0.76 28 Bug Screen 0.76 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 7 of 10 CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF-1 R Project Name Mandarina Plan 2 Building Type © Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 BUILDING ZONE INFORMATION System Name Zone Name Floor Area ft Volume Year Built New Existinq Altered Removed liv liv 1,350 13,500 sleep sleep 1,568 15,680 Totals 1 2,9181 01 0 0 HVAC SYSTEMS System Name Qty. HeatingType Min. Eff. Cooling Type Min. Eff. Thermostat Type Status liv 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New sleep 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New HVAC DISTRIBUTION System Name Heating Cooling Duct Location Duct R-Value Ducts Tested? Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 m New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 0 New WATER HEATING SYSTEMS S stem Name Qty. Type Distribution Rated Input Btuh Tank Cap. al Energy Factor or RE Standby Loss or Pilot Ext. Tank Insul. R- Value Status Bradford White M-2-XR75 1 Large Gas Recirc/Time+Temp 76,000 75 0.80 2.00 % 12.0 New LMULTI-FAMILY WATER HEATING DETAILS -1 HYDRONIC HEATING SYSTEM PIPING Control E E w o_ Hot Water Piping Length ft o Q System Name Pipe Length Pipe Diameter Insul. Thick. Qty. HP Plenum Outside Buried ❑ I❑ ❑ ❑ EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:2 ID: Page 8 of 10 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Mandarina Plan 2 Date 6/9/2010 System Name liv Floor Area 1,350 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 771 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 60,000 18,040 .1,110 422 15,357 Total Output Btuh 60,000 0 Output Btuh/s ft 44.4 1,494 1,140 Cooling System 01 0 Output per System 41,500 0 0 0 0 Total Output (Btuh) 41,500 0 1,110 0 Total Output (Tons) 3.5 1,494 1,140 Total Output (Btuh/sqft) 30.7 Total Output s ft/Ton 390.4 1 21,028 17,636 Air System CFM per System 1,400 HVAC EQUIPMENT SELECTION Airflow cfm 1,400 TraneTUD1B080A9481A/4TTR3042A1 33,072 2,531 60,000 Airflow (cfm/sqft) 1.04 Airflow (cfm/Ton) 404.8 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 33,072 2,531 60,000 Jan 1 AM Outside Air cfm/s ft 0.00 I Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak 26 OF 69 OF Outside Air 0 cfm Supply Fan 1,400 cfm 69 OF 69 OF 105 OF Heating Coil 104 OF .ROOM. IM 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112 / 78 OF 79 / 63 OF 79 / 63 OF 55 / 54 IF Outside Air c 0 cfm Supply Fan Cooling Coil 56 / 54 OF 1,400 cfm 41.9 % i ROOM 79/63OF 78/62OF 4 A 1 1 13 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:29 ID: Page 9 of 10 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Mandarina Plan 2 Date 6/9/2010 System Name sleep Floor Area 1,568 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 648 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 60,000 15,271 1,624 506 18,371 Total Output Btuh 60,000 0 Output Btuh/s ft 38.3 1,265 1,363 Cooling System 0 0 Output perSystem 41,500 0 0 0 0 Total Output Btuh 41,500 0 1,624 0 Total Output (Tons) 3.5 1,265 1,363 Total Output (Btuh/sgft) 26.5 Total Output s ft/Ton 453.4 1 17,802 21,097 Air System CFM perSystem 1,400 HVAC EQUIPMENT SELECTION Airflow (cfm) 1,400 Trane TUD1B080A9481A/4TTR3042A1 32,745 2,907 60,000 Airflow (cfm/s ft) 0.89 Airflow (cfm/Ton) 404.8 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK 32,7451 2,9071 60,000 Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions Aug 3. PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 26 OF 69 OF �Tchi. Outside Air 0 cfm Supply Fan AL 1,400 cfm 69 OF 69 OF 105 OF Heating Coil 104 OF ( ROOM fil 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78OF 79/63OF 79/63OF 55/54OF Outside Air Ar 0 cfm Supply I Fan Cooling Coil !! �I1 56 / 54 F 1,400 cfm 42.3 % i ROOM 79/63OF 78/63OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:29 ID: Page 10 of 10 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Mandarina Plan 2 Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 3,216 Addition n/a # of Stories 2 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes Q No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Construction Type Area Special Cavity (ft) Features see Part-2 of 5) Status Wall Wood Framed R-15 2,200 New Roof Wood Framed Attic R-38 3,216 Radiant Barrier Cool Roof New Slab Unheated Slab -on -Grade None 2,918 Perim = 246' New Wall Wood Framed R-15 489 New Door Opaque Door None 21 New FENESTRATION U- Exterior Orientation Area(ftz) Factor SHGC Overhang Sidefins Shades Status Front (N) 10.5 0.330 0.34 7.0 none Bug Screen New Front (N) 24.0 0.350 0.32 7.0 none Bug Screen New Front (N) 10.5 0,330 0.34 7.0 none Bug Screen New Front (N) 88.0 0.350 0.32 none none Bug Screen New Right (W) 28.0 0.330 0.34 none none Bug Screen New Right (M 12.5 0.350 0.32 16.0 none Bug Screen New Rear (S) 140.0 0.350 0.32 none none Bug Screen New Front (N) 15.0 0.350 0.32 2.0 none Bug Screen New Right (M 32.5 0.350 0.32 none none Bug Screen New Right (W) 51.4 0.350 0.32 2.0 none Bug Screen New Right (W) 15.0 0.350 0.32 10.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New 1 Split Heat Pump 10.55 HSPF Split Heat Pump 2 1. 0 SEER Setback New HVAC DISTRIBUTION Location Heating Duct Cooling Duct Location R-Value Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 New loft Ductless / with Fan Ductless n/a n/a New WATER HEATING Ot . Type Gallons Min. Eff Distribution Status 1 Large Gas 75 0.80 Recirc/Time+Temp New EnergyPro 5.0 by EnergySoft User Number. 2875 RunCode: 2010-06-09T10:25:4 ID: Page 1 of 12 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Mandarina Plan 2 Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 1 Total Cond. Floor Area 3,216 Addition n/a # of Stories 2 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Area Special Construction Type Cavity (fft2) Features see Part 2 of 5) Status FENESTRATION U- Exterior Orientation Area(ft2) Factor- SHGC Overhang Sidefins Shades Status Left (E) 29.3 0.330 0.34 none none Bug Screen New Left (E) 68.0 0.350 0.32 none none Bug Screen New Right (M 33.0 0.340 0.32 8.0 none Bug Screen New HVAC SYSTEMS Ot . Heating Min. Eff Cooling Min. Eff Thermostat Status HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status WATER HEATING Ot . Type Gallons Min. Eff Distribution Status EnergyPro 5.0 by EnergySoft User Number: 2675 RunCode: 2010-06-09T10:25:4 ID: Page 2 of 12 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Plan 2 Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ElExisting+ Addition/Alteration Date 61912010 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Compliance for all orientations is specified, see section 151 (c) 2 of the Standards and section RA 1-3.3 in Appendix RA-1 of the Residential Compliance Manual. The DHW System Bradford White M-2-XR75S6BN is a non-NAECA large storage gas water heater. Verify DHW details. A hot water recirculation systems has been modeled. Verification of type is required. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5) allowed to avoid backdraft problems. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H (corresponding to an SLA of 1.5 allowed to avoid backdraft problems. This building is modeled with reduced infiltration. Consequently the homeowner's manual provided by the builder to the homeowner shall include operating instructions for the homeowner on how to use mechanical ventilation to achieve adequate ventilation. Testing for reduced infiltration shall be performed as specified in ASTM E 779-03. This listing shall also report the target CFM50H required for the blower door test to achieve the modeled SLA and the minimum CFM50H corresponding to an SLA of 1.5) allowed to avoid backdraft problems. The Roof R-38 Roof Attic Reflectance = 0.42, Emittance = 0.88 shall be rated and labeled by the Cool Roof Rating Council in accordance with Section 10-113 of the standards. The Roof R-38 Roof Attic includes credit for a Radiant Barrier that is Continuous meeting eligibility and installation criteria as specified in Residential Appendix RA4.2.2. HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. The Cooling System Trane TUD1B080A9481A14TTR3042A1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. The HVAC System liv includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 530 and 1131 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 530 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. The HVAC System liv incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System liv incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria. The Cooling System Trane TUD1B080A9481A/4TTR3042A1 includes credit for a 12.0 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. The HVAC System sleep includes credit for Verified Fan Energy. Measured Fan Energy may not exceed 0.58 w/cfm. This building has tight construction with reduced infiltration and a target blower door test range between 616 and 1314 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 616 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. The HVAC System sleep incorporates HERS Verified Refrigerant Charge or a Charge Indicator Display. EnergyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010-06-09T10:25:4 ID: Pa e 3 of 12 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Plan 2 Loft Building Type la Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 1 6/9/2010 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special 'ustification and documentation submitted. t HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. Compliance credit for quality installation of insulation has been used. HERS field verification is required. The HVAC System sleep incorporates HERS verified Duct Leakage. HERS field verification and diagnostic testing is required to verify that duct leakage meets the specified criteria. The Cooling System Fujitsu 12RLQ includes credit for a 12.5 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. This building has tight construction with reduced infiltration and a target blower door test range between 117 and 250 CFM at 50 pascals. The blower door test must be performed using the ASTM Standard Test Method for Determining Air Leakage Rate. WARNING - If this building tests below 117 CFM at 50 pascals, the house must either be provided with a ventilation opening that will increase the infiltration to this level (SLA=1.5) OR mechanical supply ventilation must be provided. Compliance credit for quality installation of insulation has been used. HERS field verification is required. EnergyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010-06-09T10:25:4 ID: Pa e 4 of 12 PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF-1 R Project Name Building Type 10 Single Family ❑ Addition Alone Date Mandarina Plan 2 Loft ❑ Multi Family ❑ Existing+ Addition/Alteration 61912010 ANNUAL ENERGY USE SUMMARY Standard Facing Margin Facing Margin Facing Margin Facing Margin TDV kBtU/ft2- r North East South West Space Heating 2.40 2.36 0.03 2.61 -0.21 2.52 -0.12 2.37 0.03 Space Cooling 61.01 51.32 9.69 51.51 9.50 50.80 10.21 51.22 9.79 Fans 12.40 11.89 0.51 11.91 0.49 11.82 0.57 11.83 0.57 Domestic Hot Water 10.68 14.75 -4.07 14.75 -4.07 14.75 -4.07 14.75 -4.07 0.00 0.17 -0.17 0.17 -0.17 0.17 -0.17 0.17 -0.17 -Pumps Totals 86.48 80.50 5.98 80.95 5.53 80.06 6.42. 80.35 6.13 Percent Better Than Standard: 6.9 % 6.4 % 7.4 % 7.1 % BUILDING COMPLIES - HERS VERIFICATION REQUIRED Fenestration Building Front Orientation: All Four Orientations Ext. Walls/Roof Wall Area Area Number of Dwelling Units: 1.00 (N) 962 148 Fuel Available at Site: Natural Gas (E) 822 97 Raised Floor Area: 0 (S) 692 140 Slab on Grade Area: 2,918 (W) 792 172 Average Ceiling Height: 9.8 Roof 3,216 0 Fenestration Average U-Factor: 0.35 TOTAL: 558 Average SHGC: 0.32 Fenestration/CFA Ratio: 17.3 % REMARKS THE CONTRACTORS ARE RESPONSIBLE FOR THE FINAL SIZING OF HEATING, COOLING AND DHW EQUIPMENT. (CEC Blueprint #60) STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the Efficiency Standards of the California Code of Regulations. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Gallant Energy Consulting Company 6/9/2010 Address 508 W Mission Ave Ste 201 Name Mark Gallant, CEPE -City/State/ZipEscondido, CA 92025 Phone 760-743-5408 Signed Date -City/State/Zip The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Company BL Farms Inc Address 30-875 Date Palm Dr #C Name City/State/Zip Cathedral City, CA 92234 Phone 760-250-8611 Signed License It Date EnerqyPro 5.0 by Ener Soft User Number: 2875 RunCode: 2010-06-09T10:25:4 ID: Page 5 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Plan 2 Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area Ll- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments CavitylExterior Frame lInteriorl Frame Wall 115 0.095 R-15 0 90 New 4.3.1-A4 liv Wall 360 0.095 R-15 270 90 New 4.3.1-A4 liv Wall 260 0.095 R-15 1801 90 New 4.3.1-A4 liv Roof 1,350 0.025 R-38 0 0 New 4.2.1-A21 liv Slab 1,350 0.730 None 0 180 New 4.4.7-A1 liv Wall 260 0.095 R-15 0. 90 New 4.3.1-A4 liv Wall 45 0.095 R-15 0 90 New 4.3.1-A4 sleep Wall 161 0.095 R-15 270 90 New 4.3.1-A4 sleep Wall 140 0.095 R-15 180 90 New 4.3.1-A4 sleep Wall 606 0.095 R-15 901 90 New 4.3.1-A4 sleep Roof 1,568 0.025 R-38 01 0 New 4.2.1-A21 sleep Slab 1,568 0.730 None 0 180 New 4.4.7-A1 sleep Wall 229LO.500[None -15 0 90 New 4.3.1-A4 ep Door 21 0 90 New 4.5.1-A4 Ls/eep Wall 144-15 0 90 New 4.3.1-A4 Wall 99-15 270 90 New 4.3.1-A4 FENESTRATION SURFACE DETAILS ID Type Area Ll-Factor SHGC2 Azm Status Glazing Type Location/Comments 1 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX liv 2 Window 24.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP liv 3 Window 10.5 0.330 NFRC 0.34 NFRC 0 New NonMetal Lowe2 FX liv 4 Window 40.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP liv 5 Window 40.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP liv 6 Window 10.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 7 Window 10.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 8 Window 4.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 9 Window 4.0 0.330 NFRC 0.34 NFRC 270 New NonMetal Lowe2 FX liv 10 Window 12.5 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP liv 11 Window 40.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 12 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 13 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 14 Window 25.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP liv 15 Window 15.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP sleep 16 Window 12.5 0.350 NFRC 1 0.32 1 NFRC I lonMetal Lowe2 OP sleep (1) LI-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2) SHGC Type: 116-13 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhanq Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 1 Bug Screen 0.76 7.0 1.5 7.0 1.0 2.0 2.0 2 Bug Screen 0.76 8.0 3.0 7.0 1.0 2.0 2.0 3 Bug Screen 0.76 7.0 1.5 7.0 1.0 2.0 2.0 4 Bug Screen 0.76 5 Bug Screen 0.76 6 Bug Screen 0.76 7 Bug Screen 0.76 8 Bug Screen 0.76 9 Bug Screen 0.76 10 Buq Screen 0.76 5.0 2.5 16.0 2.0 2.0 2.0 11 Bug Screen 0.76 12 Bug Screen 0.76 13 Bug Screen 0.76 14 Bug Screen 0,761 15 JBug Screen 1 0.761 5.0 3.0 2.0 1.0 2.0 2.0 16 JBug Screen 0.76 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:25:4 ID: Pa e 6 of 12 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Plan 2 Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area U- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments Cavity Exterior Frame Interior Frame Wall 152 0.095 R-15 180 90 New 4.3.1-A4 loft Wall 119 0.095 R-15 90 90 New 4.3.1-A4 loft Roof 298 0.025 R-38 0 0 New 4.2.1-A21 loft FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC2 Azm Status Glazing Type Location/Comments 17 Window 30.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 18 Window 21.4 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 19 Window 15.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP sleep 20 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 21 Window 25.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 22 Window 12.5 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP sleep 23 Window 4.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 24 Window 4.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 25 Window 20.0 0.330 NFRC 0.34 NFRC 90 New NonMetal Lowe2 FX sleep 26 Window 8.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep 27 Window 20.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep 28 Window 8.0 0.350 NFRC 0.32 NFRC 90 New NonMetal Lowe2 OP sleep 29 Window 8.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP loft 30 Window 33.01 0.340 NFRC 0.32 NFRC 270 New NonMetal Lowe2 PDR loft 31 Window 20.0 0.350 NFRC 0.32 NFRC 2701 New I NonMetal Lowe2 OP loft 32 Window 16.01 0.350 NFRC 0.32 NFRC 901 New I NonMetal Lowe2 OP loft (1) U-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value 2 SHGC Type: 116-13 = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Overhanq Left Fin Ri ht Fin H t Wd Len H t LExt RExt Dist Len H t Dist Len H t 17 Bug Screen 0.76 5.0 6.0 2.0 1.0 2.0 2.0 18 Bug Screen 0.76 8.0 2.7 2.6 1.0 2.0 2.0 19 Bug Screen 0.76 5.0 3.0 10.0 1.0 2.0 2.0 20 Bug Screen 0.76 21 Bug Screen 0.76 22 Bug Screen 0.76 23 Bug Screen 0.76 24 Bug Screen 0.76 25 Bug Screen 0.76 26 Bug Screen 0.76 27 Bug Screen 0.76 28 Bug Screen 0.76 29 Bug Screen 0.76 30 Bug Screen 0.76 6.7 5.0 8.0 1.0 2.0 2.0 31 Bug Screen 0.76 32 JBug Screen 1 0.76 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:25:4 ID: Pa.0 e 7 of 12 ,-CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Plan 2 Loft l►i Single Family ■ Addition . OPAQUEMandarina Appendix 4 Location/Comments FENESTRATIONJoint Nonmetal Lowe2 ... ow �tM- •- SHADING CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF-1 R Project Name Mandarina Plan 2 Loft Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 BUILDING ZONE INFORMATION System Name Zone Name Floor Area ft Volume Year Built New Existing Altered Removed liv liv 1,350 13,500 sleep sleep 1,568 15,680 loft loft 298 2,384 Totals 3,216 0 0 0 HVAC SYSTEMS System Name Qty. HeatingType Min. Eff. Cooling Type Min. Eff. Thermostat Type Status liv 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New sleep 1 Central Furnace 80% AFUE Split Air Conditioner 14.0 SEER Setback New loft 1 Split Heat Pump 10.55 HSPF Split Heat Pump 21.0 SEER Setback New HVAC DISTRIBUTION System Name Heating Cooling Duct Location Duct R-Value Ducts Tested? Status liv Ducted Ducted Attic, Ceiling Ins, vented 6.0 m New sleep Ducted Ducted Attic, Ceiling Ins, vented 6.0 New loft Ductless / with Fan Ductless n/a n/a ❑ New WATER HEATING SYSTEMS S stem Name Qty. Type Distribution Rated Input Btuh Tank Cap. al Energy Factor or RE Standby Loss or Pilot E xt. Tank Insul. R- Value Status Bradford White M-2-XR75 1 Large Gas Recirc/Time+Temp 76,000 75 0.80 2.00 % 12.0 New MULTI -FAMILY WATER HEATING DETAILS HYDRONIC HEATING SYSTEM PIPING Control E E w a- Hot Water Piping Length ft o Cli 0 c a — System Name Pipe Length Pipe Diameter Insul. Thick. Qty. HP Plenum Outside Buried ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnergyPro 5.0 by Enet�qySoft User Number: 2875 RunCode: 2010-06-09T10:25:4 ID: Page 9 of 12 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Mandarina Plan 2 Loft 6/9/2010 System Name Floor Area liv 1,350 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 796 COOLING PEAK COIL HTG. PEAK Heating System Sensible I Latent CFM Sensible Output per System 60,000 18,707 1,353 447 16,343 Total Output Btuh 60,000 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan 0 Output Btuh/s ft 44.4 1,351 1,003 Cooling System 0 0 Output per System 41,500 0 0 0 0 Total Output (Btuh) 41,500 0 0 Total Output (Tons) 3.5 Supply Air Ducts 1,351 1,003 Total Output (Btuh/s ft) 30.7 TOTAL SYSTEM LOAD 1,353 Total Output s ft/Ton 390.4 21,410 18,348 Air System CFM per System 1,400 HVAC EQUIPMENT SELECTION Airflow cfm 1,400 Trane TUD1B080A9481A/4TTR3042A1 32,895 2,727 60,000 Airflow (cfm/sgft) 1.04 Airflow (cfm/Ton) 404.8 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) 32,895 2,7271 60,000 Outside Air cfm/s ft 0.00 TIME OF SYSTEM PEAK Note: values above given at ARI conditions Aug 3 PM Jan 1 AM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF 69 OF 69 OF 105 OF Outside Air 0 cfm Supply Fan Heating Coil 104 OF 1,400 cfm ROOM 69 OF 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78OF 79/63OF 79/63OF 55/54OF Outside Air Ar 0 cfm Supply Fan Cooling Coil 56 / 54 OF 1,400 cfm 42.1 % ROOM i 79 163 OF 78 / 63 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:25:48 ID: Page 10 of 12 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Mandarina Plan 2 Loft Date 6/9/2010 System Name sleep Floor Area 1,568 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 679 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 60,000 16,047 1,907 536 19,515 Total Output Btuh 60,000 0 Output Btuh/s ft 38.3 1,159 1,198 Cooling System 0 0 Output per System 41,500 0 OF--0 0 Total Output (Btuh) 41,500 0 1,907 0 Total Output (Tons) 3.5 1,159 1,198 Total Output (Btuh/s ft) 26.5 Total Output s ft/Ton 453.4 18,365 21,911 Air System CFM per System 1,400 HVAC EQUIPMENT SELECTION Airflow cfm 1,400 Trane TUD1B080A9481A/4TTR3042A1 32,579 3,103 60,000 Airflow (cfm/sqft) 0.89 Airflow (cfm/Ton) 404.8 Outside Air (%) 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 32,579 3,103 60,000 Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 26 OF 69 OF Outside Air 0 cfm Supply Fan 1,400 cfm 69 OF 69 OF 105 OF Heating Coil 104 OF I — ROOM in i 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112 / 78 OF 79 l 63 OF 79 / 63 OF 55 / 54 OF Outside Air 0 cfm Supply.Fan Cooling Coil 1,400 cfm 42.6 79 / 63 OF 56 / 54 OF % ' Room 78 / 63 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:25:48 ID: Page 11 of 12 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Date Mandarina Plan 2 Loft 6/9/2010 System Name Floor Area loft 298 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 253 COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 16,000 6,197 1,010 127 4,741 Total Output Btuh 16,000 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts 0 Output Btuh/s ft 53.7 0 0 Cooling System 0 0 Output per System 14,500 0 0 0 0 Total Output (Btuh) 14.500 0 0 Total Output (Tons) 1.2 01 0 Total Output (Btuh/sqft) 48.7 TOTAL SYSTEM LOAD 1,010 Total Output s ft/Ton 246.6 6,197 4,741 Air System CFM per System 374 HVAC EQUIPMENT SELECTION Airflow cfm 374 Fujitsu 12RLQ 12,519 0 9,993 Airflow (cfm/s ft) 1.26 Airflow (cfm/Ton) 309.5 Outside Air % 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) TIME OF SYSTEM PEAK 12,519 0 9,993 Jan 1 AM Outside Air cfm/s ft) 0.00 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF 70 OF 105 OF 105 OF Outside Air 0 cfm Heating Coil Supply Fan 105 OF 374 cfm ROOM 70 OF 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78OF 78/63OF 55/54OF 55/54OF pop Outside Air 0 cfm Cooling Coil Supply Fan 55 / 54 OF 374 cfm 44.2 % � ROOM 78 / 63 OF 78 / 63 OF EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-09T10:25:48 /D: Page 12 of 12 PERFORMANCE CERTIFICATE: Residential Part 1 of 5 CF-1 R Project Name Mandarina Casita Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 Project Address La Quinta California Energy Climate Zone CA Climate Zone 15 Total Cond. Floor Area 280 Addition n/a 4 of Stories 1 FIELD INSPECTION ENERGY CHECKLIST ❑ Yes ❑ No HERS Measures -- If Yes, A CF-4R must be provided per Part 2 of 5 of this form. ❑ Yes ❑ No Special Features -- If Yes, see Part 2 of 5 of this form for details. INSULATION Area Special Construction Type Cavity (ft2) Features (see Part 2 of 5) Status well Wood Framed R-15 618 New Roof Wood Framed Attic R-38 280 Radiant Barrier New Slab Unheated Slab -on -Grade None 280 Perim = 68' New FENESTRATION U- Exterior Orientation Area(fl Factor SHGC Overhang Sidefins Shades Status Front (N) 8.0 0.350 0.32 1.0 none Bug Screen New Rear (S) 39.0 0.350 0.32 none none Bug Screen New Right (M 15.0 0.350 0.32 1.0 none Bug Screen New HVAC SYSTEMS Qty. Heating Min. Eff Cooling Min. Eff Thermostat Status 1 Split Heat Pump 10.55 HSPF Split Heat Pump 21.0 SEER Setback New HVAC DISTRIBUTION Duct Location Heating Cooling Duct Location R-Value Status casita Ductless / with Fan Ductless n/a n/a New WATER HEATING Ot . Type Gallons Min. Eff Distribution Status 1 Small Gas 40 0.62 No Pipe Insulation New EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:5 to: Page 1 of 6 PERFORMANCE CERTIFICATE: Residential (Part 2 of 5) CF-1 R Project Name Mandarina Casita Building Type m Single Family ❑ Addition Alone I ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 SPECIAL FEATURES INSPECTION CHECKLIST The enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Compliance for all orientations is specified, see section 151 (c) 2 of the Standards and section RA1-3.3 in Appendix RA-1 of the Residential Compliance Manual. The Roof R-38 Roof Attic includes credit for a Radiant Barrier that is Continuous meeting eligibility and installation criteria as specified in Residential Appendix RA4.2.2. The Roof R-38 Roof Attic Concrete Tile (10 #/so Roofing requires verification. HERS REQUIRED VERIFICATION Items in this section require field testing and/or verification by a certified HERS Rater. The inspector must receive a completed CF-4R form for each of the measures listed below for final to be given. The Cooling System Fujitsu 12RLO includes credit for a 12.5 EER Condenser. A certified HERS rater must field verify the installation of the correct Condenser. EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:5 ID: Pa e 2 of 6 PERFORMANCE CERTIFICATE: Residential (Part 3 of 5) CF-1 R Project Name Building Type m Single Family ❑ Addition Alone Date Mandarina Casita ❑ Multi Family ❑ Existing+ Addition/Alteration 61912010 ANNUAL ENERGY USE SUMMARY Standard Facing Margin Facing Margin Facing Margin Facing Margin TDV kBtu/ft2- r North East South West Space Heating 3.38 2.33 1.04 2.66 0.71 2.54 0.84 2.17 1.21 Space Cooling 100.76 99.53 1.23 99.47 1.29 93.17 7.59 98.19 2.57 Fans 20.69 31.32 -10.63 30.96 -10.26 29.28 -8.58 31.07 -10.38 Domestic Hot Water 75.19 65.77 9.42 65.77 9.42 65.77 9.42 65.77 9.42 Pumps 0.00 0.00 0.00 0. oo 0.00 0.00 0.00 0.00 0.00 Totals 200.02 198.96 1.06 198.86 1.16 190.75 9.27 197.21 2.82 Percent Better Than Standard: 0.5 % 0.6 % 4.6 % 1.4 % BUILDING COMPLIES - HERS VERIFICATION REQUIRED Fenestration Building Front Orientation: All Four Orientations Ext. Walls/Roof Wall Area Area Number of Dwelling Units: 1.00 (N) 140 8 Fuel Available at Site: Natural Gas (E) 200 0 Raised Floor Area: 0 (S) 140 39 Slab on Grade Area: 280 (W) 200 15 Average Ceiling Height: 10.0 Roof 280 0 Fenestration Average U-Factor: 0.35 TOTAL: 62 Average SHGC: 0.32 Fenestration/CFA Ratio: 22.1 % REMARKS THE CONTRACTORS ARE RESPONSIBLE FOR THE FINAL SIZING OF HEATING, COOLING AND DHW EQUIPMENT. (CEC Blueprint #60) STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 the Administrative Regulations and Part 6 the Efficiency Standards of the California Code of Regulations. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Gallant Energy Consulting Company 6/9/2010 Address 508 W Mission Ave Ste 201 Name Mark Gallant, CEPE City/State/Zip Escondido, CA 92025 Phone 760-743-5408 Signed Date The individual with overall design responsibility hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application, and recognizes that compliance using duct design, duct sealing, verification of refrigerant charge, insulation installation quality, and building envelope sealing require installer testing and certification and field verification by an approved HERS rater. Designer or Owner (per Business & Professions Code) Company BL Farms Inc Address 30-875 Date Palm Or #C Name City/State/Zip Cathedral City, CA 92234 Phone 760-250-8611 Signed License # Date EnerpyPro 5.0 by EnerqySoft User Number: 2875 RunCode: 2010-06-08T11:13:5 ID: Page 3 of 6 CERTIFICATE OF COMPLIANCE: Residential (Part 4 of 5) CF-1 R Project Name Mandarina Casita Building Type m Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 OPAQUE SURFACE DETAILS Surface Type Area U- Factor Insulation Azm Tilt Status Joint Appendix 4 Location/Comments Cavity Exterior Frame Interior Frame Wall 132 0.095 R-15 0 90 New 4.3.1-A4 casita Wall 101 0.095 R-15 180 90 New 4.3.1-A4 casita Wall 185 0.095 R-15 270 90 New 4.3.1-A4 casita Wall 200 0.095 R-15 90 90 New 14.3.1-A4 casita Roof 280 0.025 R-38 0 0 New 4.2.1-A21 casita Slab 280 0.730 None 0 180 New 4.4.7-A 1 casita FENESTRATION SURFACE DETAILS ID Type Area U-Factor SHGC;'Azm Status Glazing Type Location/Comments 1 Window 8.0 0.350 NFRC 0.32 NFRC 0 New NonMetal Lowe2 OP casita 2 Window 24.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP casita 3 Window 15.0 0.350 NFRC 0.32 NFRC 180 New NonMetal Lowe2 OP casita 4 Window 15.0 0.350 NFRC 0.32 NFRC 270 New NonMetal Lowe2 OP casita (1) U-Factor Type: 116-A = Default Table from Standards, NFRC = Labeled Value (2) SHGC Type: 116-B = Default Table from Standards, NFRC = Labeled Value EXTERIOR SHADING DETAILS ID Exterior Shade Type SHGC Window Ove hanq Left Fin Ri ht Fin H t Wd Len H t I-Ext RExt Dist Len H t Dist Len H t 1 Bug Screen 0.76 4.0 2.0 1.0 1.5 2.0 2.0 2 Bug Screen 0.76 3 Bug Screen 0.76 4 Bug Screen 0.76 5.0 3.0 1.0 1.5 2.0 2.0 EnergyPro 5.0 by EnergySoft User Number: 2875 RunCode: 2010-06-08T11:13:5 ID: Page 4 of 6 CERTIFICATE OF COMPLIANCE: Residential (Part 5 of 5) CF-1 R Project Name Mandarina Casita Building Type © Single Family ❑ Addition Alone ❑ Multi Family ❑ Existing+ Addition/Alteration Date 61912010 BUILDING ZONE INFORMATION System Name Zone Name Floor Area ft Volume Year Built New Existinq Altered Removed casita casita 280 2,800 Totals 2801 01 01 0 HVAC SYSTEMS System Name Qty. Heating Type Min. Eff. Cooling Type Min. Eff. Thermostat Type Status casita 1 Split Heat Pump 10.55 HSPF Split Heat Pump 21.0 SEER Setback New HVAC DISTRIBUTION System Name Heating Cooling Duct Location Duct R-Value Ducts Tested? Status casita Ductless/with Fan Ductless n/a n/a ❑ New WATER HEATING SYSTEMS S stem Name Qty. Type Distribution Rated Input Btuh Tank Cap.. al Energy Factor or RE Standby Loss or Pilot Ext. Tank Insul. R- Value Status Rheem 42VR40 FHR=68 1 Small Gas No Pipe Insulation 40,000 40 0.62 n/a n/a New MULTI -FAMILY WATER HEATING DETAILS HYDRONIC HEATING SYSTEM PIPING Control E E w w o- Hot Water Piping Length ft o c Q —I System Name Pipe Length Pipe Diameter Insul. Thick. Qt HP Plenum Outside Buried ❑ ❑ ❑ ❑ EnerqyPro 5.0 by EnerpySoft User Number: 2875 RunCode: 2010-06-08T11:13:5 ID: Page 5 of 6 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Mandarina Casita Date 6/9/2010 System Name casita Floor Area 280 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 248 Return Vented Lighting Return Air Ducts Return Fan Ventilation 0 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 16,000 6,059 547 177 6,605 Total Output Btuh 16,000 0 Output Btuh/s ft 57.1 0 0 Cooling System 0 0 Output per System 14,500 0 0 0 0 Total Output (Btuh) 14,500 0 . 547 0 Total Output (Tons) 1.2 0 0 Total Output (Btuh/sqft) 51.8 Total Output s ft/Ton 231.7 1 6,059 6,605 Air System CFM per System 374 HVAC EQUIPMENT SELECTION Airflow (cfm) 374 Fujitsu 12RLQ 12,432 0 9,993 Airflow (cfm/sqft) 1.34 Airflow (cfmfTon) 309.5 Outside Air (%) 0.0 % Total Adjusted System Output (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK 12,432 01 9,993 Jan 1 AM Outside Air cfm/s ft 0.00 Note: values above given at ARI conditions Aug 3 PM HEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heating Peak) 26 OF Outside Air 0 cfm 70 OF 70 OF 105 OF 105 OF 3T• nY.y: Supply Fan Heating Coil 105 OF 374 cfm — ROOM . 70 OF COOLING SYSTEM PSYCHROMETICS (Airstream Temperatures at Time of Cooling Peak) 112/78OF Outside Air Ar 0 cfm 78 / 63 OF 78/63OF 55/54OF 55/54OF Cooling Coil Supply Fan 55 154 OF 374 cfm 42.8 % ROOM 78 / 63 OF EnergyPro 5.0 by EnergySoft User Number. 2875 RunCode: 2010-06-08T11:13:54 ID: Page 6 of 6