08-0229 (CSCS) Title 24s�
r Z ' TITLE 24 REPORT
Title 24 Report for:
Souplantation
La Quinta State Highway 111
La Quinta, CA
Project Designer:
TARLOS & ASSOCIATES
17802 MITCHELL
I RVI N E , CA 92614
(949) 250-4117
Report Prepared By:
Armin Karimi
GLP Engineering, Inc.
1751 E. Garry Avenue
Santa Ana, CA 92705-5814
(949) 428-8800
Job Number: CITY OF LA QUINTA
150.0012 BUILDING & SAFETY DEPT.
JUN � 7 2008 APPROVED
FOR CONSTRUCTION
By Date:
6/16/2008 DATE % f Of
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.4 by EnergySoft Job Number: 150.0012 User Number: 5481
7`7-709; h�V7 ///
I: TABLE OF CONTENTS
Cover Page
1
Table of Contents
2
Nonresidential Performance Title 24 Forms
3
Form ENV -MM Envelope Mandatory Measures
21
Form OLTG-1-C Certificate of Compliance
22
Form OLTG-2-C Lighting Compliance Summary
24
Form OLTG-3-C Illuminated Area Calculation Worksheet
26
Form LTG -MM Lighting Mandatory Measures
28
Form MECH-MM Mechanical Mandatory Measures
29
EnergyPro 4.4 by Energysoft Job Number: 150.0012 User Number: 5481
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
Souplantation
DOCUMENTATION AUTHOR
6/16/2008
PROJECT ADDRESS
Armin Karimi
BUILDING CONDITIONED FLOOR AREA
La Quinta State Highway 111 La Quinta
The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is
#
PRINCIPAL DESIGNER - ENVELOPE
TELEPHONE
Building Permit
TARLOS & ASSOCIATES
(949) 250-4117
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
DOCUMENTATION AUTHOR
TELEPHONE
Checked by Date
GLP Engineering, Inc.
(949) 428-8800
Enforcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
DATE OF PLANS
DATE
Armin Karimi
BUILDING CONDITIONED FLOOR AREA
6,627 Sq.Ft
The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is
CLIMATE ZONE
15
BUILDING TYPE
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
NONRESIDENTIAL HIGH RISE RESIDENTIAL
HOTELIMOTEL GUEST ROOM
PHASE OF CONSTRUCTION
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
NEW CONSTRUCTION ADDITION
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGNA RE
DATE
Armin Karimi
g
The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
❑ ❑ R 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
❑ ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
NV -1
Required Form
PRINCIPAL ENVELOPE DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
TARLOS & ASSOCIATES
t
Cv 061 o
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for MandatoryVeasures
Required F
TG -2, LTG -4, LTG -5
PRINCIPAL LIGHTING DESIGNER - NAME
SIGN
LIC. NO.
DATE
Gary Petrak P.E.
19172-51-
4'6
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Required Forms
d CH -1 M - ECH-3 MECH-5
PRINCIPAL MECHANICAL DESIGNER -NAME
SIGNATU
IC. NO.
DATE
Matthew Pezeshki P.E.
Wo IS
I EnergyPro 4.4 by EnergySoft User Number: 5481 1 Job Number: 150.0012 Page:3 of 30 1
j PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PERFA
PROJECT NAME CATE.
Souplantation E/16/2008
ANNUAL TDV ENERGY USE SUMMARY
kBtu/s ft- r
Standard
ENERGY COMPONENT Design
Space Heating 0.67
Space Cooling 246.67
Indoor Fans 93.39
Heat Rejection 0.00
Pumps & Misc. 0.00
Domestic Hot Water 39.17
Lighting 84.05
Receptacle 44.08
Process 0.00
TOTALS: 508.03
Percent better than Standard:
Proposed
Design
0.13
187.85
126.04
0.00
0.00
36.85
101.71
44.08
0.00
496.66
2.2%
Compliance
Margin
j■aeRdsN a_ ___ �'pr,��g___
0.55
ndo°``"'
O1N
`*"
iRiipadi
P-
0 20 40 80 80 10 1 _0 140 130 180 200 220 240
1 kBUKR- r
58.82`°°`°
-32.65
0.00
0.00
2.32
-17.66
0.00
1 0.00
11.38
process)
( 2.2% excluding
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation
Number of Stories
Number of Systems
Number of Zones
(N) 0 deg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
5,627
sqf.
sgft.
sqft.
1
120
5
5,627
8
NaturEl Gas
Orientation
Front Elevation (N)
Left Elevation (E)
Rear Elevation (S)
Right Elevation (W)l
Total
Roof
Gross Area
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
-Glazinq Area
Glazing
sqft.
sqft.
sqft,
sqft.
sqft.
sgft.
Rato
11.3%
40.3%
14.4%
7.30%
0.0%
1,480
167
432
174
2,110
303
1,238
90
5,2601
734
6,627
E:::::::�
Standard Proposed
Lighting Power Density 1.267 w/sgft. 1.533 w/sgft.
Prescriptive Env. Heat Loss 2,311 Btu/h 1,425 Btu/h
Prescriptive Env. Heat Gain 161,499 Btu/h-F 129,869 Btu/h-F
Remarks:
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
EnergyPro 4.4 by Energysoft User Number: 5481 Job Number: 150.0012 Page:4 of 33
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
Souplantation
DATE
6/16/2008
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
(sgft)
Inst
LPD
(W/sf)1
Ctrl.
Credits
(Wlsf)2
Allowed LPD
Proc.
Loads
(W/sf)
Area
/s 3
Tailored
/s 4
RTU -1
Zone 1 Entry/Salad Bar
Lobby, Main Entry
1,324
4.072
1.018
RTU -2
Zone 2
Dining
700
3.130
0.585
Zone 2 RR
Corridor/Restroom/Support
356
0.00
RTU -3
Zone 3 Dining
Dining
770
0.777
0.194
RTU4
Zone 4 Dining W
Dining
1,897
1.073
0.268
RTU -5
Office
Office
88
1.034
Kitchen
Kitchen, Food Preparation
1,492
1.723
0.202
Mech Room
Electrical, Mechanical Room
120
0.50
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
t no iocai enrorcement agency snouia pay special attention to the Items speclttea In this checklist These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System "Carrier 48HJD017 CO2" includes Demand Control Ventilation per Standards Section 121.
The HVAC System "Carrier 48HJD015" includes Demand Control Ventilation per Standards Section 121.
The HVAC System 'RTU -1" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "RTU -2" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "RTU -3" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "RTU -4" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The HVAC System "RTU -5" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A.
The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant
kuthorized Signature or Stamp
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:5 of 30
CERTIFICATE OF COMPLIANCE ENV -1-C
PROJECT NAME DATE
Souplantation 6/16/2008
OPAQUE SURFACES
# Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Am.
Tilt
Cond'
Status
Joint Appendix
IV Reference
Location / Comments
1 Wall
2
0.144
None
R-7.5
0
90
New
13-F5
Zone 1 Ent /Salad Bar
2 Wall
162
0.074
R-19
R-0.0
0
90
New
09-A5
Zone 1 Ent /Salad Bar
3 Wall
42
0.740
None
R-0.0
90
90
New
13-F5
Zone 1 Ent /Salad Bar
4 Wall
216
0.074
R-19
R-0.0
90
90
New
09-A5
Zone 1 Entry/Salad Bar
5 Wall
4
0.144
None
R-7.5
180
90
New
13-F5
Zone 1 Ent /Salad Bar
6 Wall
333
0.074
R-19
R-0.0
180
90
New
09-A5
Zone 1 Ent /Salad Bar
7 Wall
648
0.144
None
R-7.5
180
90
New
13-F5
Zone 1 Entry/Salad Bar
8 Roof
1,324
0.034
R-30
R-0.0
90
0
New
02-A26
Zone 1 Ent /Salad Bar
9 Roof
70C
0.034
R-30
R-0.0
90
0
New
02-A26
Zone 2
10 Wall
30C
0.740
None
R-0.0
0
90
New
13-F5
Zone 2 RR
11 Roof
356
0.034
R-30
R-0.0
90
0
New
02-A26
Zone 2 RR
12 Wall
325,0.144
None
R-7.5
180
90
New
13-F5
Zone 3 Dining
13 Wall
239
0.144
None
R-7.5
0
90
New
13-F5
Zone 3 Dining
14 Roof
770
0.034
R-30
R-0.0
90
0
New
02-A26
Zone 3 Dining
15 Wall
1,126
0.144
None
R-7.5
270
90
New
13-F5
Zone 4 Dining W
16 Door
2
1.4501
None
R-0.0
270
90
New
28-A1
Zone 4 Dining, W
17 Wall
460
0.144
None
R-7.5
180
90
New
13-F5
Zone 4 Dining W
18 Wall
33
0.144
None
R-7.5
0
90
New
13-F5
Zone 4 Dining W
19 Roof
1,89
0.034
R-30
R-0.0
90
0
New
02-A26
Zone 4 Dining W
20 Wall
10q
0.060
None
R-19.0
0
90
New
113-F5
Ofiice
N. E, A, R (New, Existing, Altered,
IMore than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractors proiect office durino construction and in the buildino manaoefs office after construction
#
I Type
## Exterior Shade Type
Window Overhang Left Fin Right Fin
SHGC Hgt. Wd. Len. Hat. LExt.RExt. Dist. Len. Hat. Dist. Len. Hgt.
Area U -Fac'
SHGC2
Act.
Am.
Cond.
Stat.
Glazing _Type
Location/
Comments
1
Window
Front
N
87 0.570
NI -1
0.38
COG
0
New
PPG solarban Low -e 60 Clear
Zone 1 Entry /Salad Bar
2
Window
Left
(E)
174 0.570
NI -1
0.38
COG
90
New
PPG solarban Low -e 60 Clear
Zone 1 Entry/Salad Bar
3
Window
Rear
(S)
174 0.570
NI -1
0.38
COG
180
New
PPG solarban Low -e 60 Clear
Zone 1 Entry/Salad Bar
4
Window
Rear
S
9 0.570
NI -1
0.38
COG
180
New
PPG solarban Low -e 60 Clear
Zone 1 Ent /Salad Bar
5
Window
Rear
S
80 0.570
NI -1
0.38
COG
180
New
PPG solarban Low -e 60 Clear
Zone 3 Dining
6
Window
Front
(N)
40 0.570
NI -1
0.38
COG
0
New
PPG solarban Low -e 60 Clear
Zone 3 Dining
7
lWindow
Right
(W)
90 0.570
NI -1
0.38
COG
270
New
PPG solarban Low -e 60 Clear
Zone 4 Dining W
8
Window
Rear
S
40 0.570
NI -1
0.38
COG
180
New
PPG solarban Low -e 60 Clear
Zone 4 Dining W
9
Window
Front
N
40 0.570
NI -1
0.38
COG
0
New
PPG solarban Low -e 60 Clear
Zone 4 Dining W
1 Ll -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
## Exterior Shade Type
Window Overhang Left Fin Right Fin
SHGC Hgt. Wd. Len. Hat. LExt.RExt. Dist. Len. Hat. Dist. Len. Hgt.
1 None
0.76
2 None
0.76
3 None
0.76
4 None
0.76 3.0 3.0 6.0 0.1 6.0 6.0
5 None
0.76
6 None
0.76
7 None
0.76
8 None
0.76
9 None
0.76
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
The proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general
lighting of at least 0.5 W/ft2. See Section 143(c). If this box Is checked, ENV-" must be filled out. when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:6 of 30 1
CERTIFICATE OF COMPLIANCE ENVA-C
'ROJECT NAME DATE
Souplantation 6/16/2008
OPAQUE SURFACES
# Surface
T e
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Azm.
Tilt
Cond:
Status
Joint Appendix
IV Reference
Location / Comments
21 Roof
88
0.034
R-30
R-0.0
90
0
New
02-A26
Ofiice
22 Roof
304
0.034
R-30
R-0.0
90
0
New
02-A26
Kitchen
23 Roof
52
0.034
R-30
R-0.0
90
0
New
02-A26
Kitchen
24 Roof
226
0.034
R-30
R-0.0
90
0
New
02-A26
Kitchen
25 Roof
600
0.034
R-30
R-0.0
90
0
New
02-A26
Kitchen
26 Wall
155
0.0601
None
R-19.0
0
90
New
13-F5
Kitchen
27 Roof
310
0.034
R-30
R-0.0
90
0
New
02-A26
Kitchen
- N, r, m, K thew, exisung, vnerea, Kemoveaf
FENESTRATION SURFACES
mare manor equal to i u,uuu sq.n. or site -Durr tenestraaon area must include a label certrticate either issued by NFRG or provide a CEG Default Label Certificate using the default 1.1 -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractor's project office during construction and in the building managers office after construction
Act.Cond. Location/
# Type Area U -Fac' SHGC2 Azm. Stat. Glazina Tvoe Comments
1 U -factor Type: 116-A Default Table from Standards, Table NI.1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
Window I Overhang Left Fin Right Fin
# I Exterior Shade Type SHGC Hat. Wd. I pn 14nt I FYt P1=Yt I nict I on Wn* nict 1 on Wnt
LJThe proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general
liahtina of at least 0.5 WHt2. See Section 14316. N this be: Is checked ENV -A -C must hit filled and whan cuhmlNlnn undo, rho A..—h
.AO-
L EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Paoe:7 of 30 1
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C
(PROJECT NAME DATE
Souplantation 6/16/2008
INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 61
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 61
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 10 161
ALTERNATE COMPLIANCE
❑X PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 84
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
(Room #)
CONTROL
IDENTIFICATION
CONTROL TYPE
Time Switch, Dimming, etc.)
SPACE CONTROLLED
Check if
NOTE TO
FIELD
I EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:8 of 30 1
INSTALLED
WATTS
INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C)
12,878
PORTABLE LIGHTING (From LTG -3-C)
0
LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C)
2,717
CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER
10,161
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 61
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 61
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 10 161
ALTERNATE COMPLIANCE
❑X PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 84
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
(Room #)
CONTROL
IDENTIFICATION
CONTROL TYPE
Time Switch, Dimming, etc.)
SPACE CONTROLLED
Check if
NOTE TO
FIELD
I EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:8 of 30 1
CERTIFICATE OF COMPLIANCE (Part 2 of 3) LTG -1 -C
(PROJECT NAME DATE
Souplantation 6/16/2008
CONTROLS FOR CREDIT IN CONDITIONED AND UNCONDITIONED SPACES
CONTROL LOCATION
(Room # or Dwg. #)
Zone 1
Zone 1
Zone 1
Zone 1
Zone 2
Zone 2
2
Zone 4
4
CONTROL
IDENTIFICATION
CONTROLTYPE
(Occupant, Daylight, Dimming, etc.)
Dimming w/Load Control
Dimming w/Load Control
Dimming w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimmin
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimmin
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
Dimming
w/Load Control
6
H -T2
3
D
9
IMINAIRES CONTROLLED
TYPE
# OF LUMINAIRES
H -T3
5
H -T2
5
G
8
F
11
E
6
H -T3
2
H -T2
1
G
2
D
2
H -T2
1
F
3
G
2
E
3
H -T2
4
F
16
G
2
E
6
H -T2
3
D
9
NOTE TO
FIELD
NOTES TO FIELD - For Building Department Use Only
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
EnergyPro 4.4 by Energysoft User Number: 5481 Job Number: 150.0012 Page:9 of 30
CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG -1-C
PROJECT NAME
Souplantation
DATE
6/16/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance
tests for lighting systems. The designer is required to check the boxes by all acceptance tests that
apply and list all equipment that require an acceptance test. If all equipment of a certain type requires
a test, list the equipment description and the number of systems to be tested in parentheses. The NJ
number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the
test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design
professional or an agent selected by the owner). Since this form will be part of the plans, completion
of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Before an occupancy permit is granted for a newly constructed building or space, or a new lighting
system system serving a building or space is operated for normal use, all control devices serving the
building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department
that:
A. Certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of§ 10-103(b) and Title 24 Part 6.
Test Description
Test Performed B
❑ LTG -2-A: Lighting Control Acceptance Document
- Occupancy Sensor Acceptance
- Manual Daylight Controls Acceptance
- Automatic Time Switch Control Acceptance
Equipment requiring acceptance testing
❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document
Equipment requiring acceptance testing
EnergyPro 4.4 by EnergySoft User Number: 5481. Job Number: 150.0012 Page: 10 of 30 1
CERTIFICATE OF COMPLIANCE MECH-1-C
PROJECT NAME DATE
Souplantation 6/16/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates and operating and maintenance information meet the requirements of Section 10-1 03 b and Title 24 Part 6.
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that am installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000112 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A: -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot watersystems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Bturhr.
-Water-loop Heat Pump Controls
Applies to all new watertoop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump
or condenser water systems where the pumps motors am greater than 5 hp.
Equipment requiring acceptance testing
EnergyPro 4.4 by Energysoft User Number: 5481 Job Number: 150.0012 Pagel 1 of 30
INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C
PROJECT NAME DATE
Souplantation 6/16/2008
INSTALLED LIGHTING POWER FOR CONDITIONED SPACES
Luminaire
Lamps/Ballasts
Installed Watts
C
D
E
F
G
H
I
J
Name
Type Description
r
CD �
co'c
:3 -
m
fD `�
r
_
3m�
U)
cwc
�yQ
�r.m
m m o
c
�'mv
�� U
m
0n
dm
cn
EfD
r
3 c
503
L
y
y
X m
.... y d
A
(A) 2'x4' Fluorescent (1)
F32T8
3
32
1.0
91.0
X
16
1.456
D
(D) 6" Compact Fluorescent
F 2W
1
32
1.0
34.0
X
11
374
E
(E) 19" Compact Fluorescent
FM70W
1
42
1.0
45.0
X
15
675
F
(F) Flourescent Vanguard
cF 26W
1
28
1.0
31.0
X
30
930
G
(H) Low Voltage Studio Track
5MR16
1
35
1.0
35.0
X1
14
490
H -T2
30OW TRANSFORMER
1
300
300.0
X1
1
14
4,200
H -T3
60OW TRANSFORMER
1
600
600.0
X
7
4,200
L
(L) 3' Fluorescent Strip
1
24
1.0
24.0
X
8
192
LA
(LA) 4' Fluorescent Strip
F28T5
1
34
1.0
34.0
X
4
136
N
(N) Decorative Gooseneck
1
75
1.01
75.0
X
3
225
PAGE TOTAL 12 878
BUILDING TOTAL (sum of all pages) 12,878
PORTABLE LIGHTING (From LTG -3-C) D
CONTROL CREDIT (From LTG -4-C) 2 717
ADJUSTED ACTUAL WATTS 10 161
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
EnergyPro 4.4 by EnergySoft User Number: 5481 ' Job Number: 150.0012 Page: 12 of 30
INDOOR LIGHTING SCHEDULE - (Part 2 of 2) LTG -2-C
PROJECT NAME
Souolantation
INSTALLED LIGHTING POWER FOR UNCONDITIONED SPACES
DATE
6/16/2008
Luminaire
Lamps/Ballasts
Installed Watts
C
D
E
F
G
H
I
J
Name
Type Description
�nri
v3
M'�
c d �
3 3 3
�yv
m
my
3m�
I N
c d C
3.� 3
g�Q
2?
m `, o
c
3�
���_
L N
m
v
m n
EP
C
.-ja
Yes T No
r
C Z
3• c
303
Cr
fD
R
G��$g
xvv
v N fD
n
CB
(CB) 8' Fluorescent Strip (1)
F32T8
2
32
1.0
61.0
X
1
61
PAGE TOTAL 61
BUILDING TOTAL (sum of all pages) 61
CONTROL CREDIT (From LTG -4-C) O
ADJUSTED ACTUAL WATTS 61
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 13 of 30
LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG -4-C
CONTROL CREDITS FOR CONDITIONED SPACES
PROJECT NAME DATE
Souplantation 6/16/2008
A
B
C
D
E I F I G
H
1
J
ROOM #
ZONE ID
CONDITIONED
AREAS
LIGHTING
CONTROL
DESCRIPTION
PLAN
REF.
ROOM
AREA
(SF)
DAYLIGHTING
WATTS OF
CONTROL
LIGHTING
LIGHTING
ADJUST.
FACTOR'
CONTROL
CREDIT
WATTS
(H X 1)
WINDOW
WALL
RATIO
GLAZING
VLT
SKYLIGHT
EFFECTIVE
APERTURE'
zone 1
DimmingControl Load
H -T3
1,324
3,0001
0.25
750
zone 1
DimmingControl
t ol
H-T2
1,324
1 500
0.25
375
zone 1
DimmingControl
t ol
G
1,324
280
0.25
70
zone 1
DimmingControl
t ol
F
1,324
341
0.25
85
zone 1
DimmingControl
t ol
E
1,324
270
0.25
68
Zone 2
DimmingControl
t ol
H-T3
700
1,200
0.25
300
Zone 2
DimmingControl
t ol
H-T2
700
300
0.25
75
Zone 2
Dimmingoad
G
700
70
0.25
18
Zone 2
DimmingControl
t ol
D
700
68
0.25
17
Zone 3
Dimming w/Load
Control
H -T2
770
300
0.25
75
Zone 3
Dimming
Control
t ol
F
770
93
0.25
23
Zone 3
Dimming
Control
t ol
G
770
70
0.25
18
Zone 3
DimmingControl
t ol
E
770
135
0.25
34
Zone 4
Dimming
t
Control
H -T2
1,897
1,200
0.25
300
Zone 4
Dimming w/Load
Control
F
1,897
496
0.25
124
Zone 4immin
Cont of oa
G
1,897
70
0.25
18
Zone 4
DimmingControl
t ol
E
1,89
270
0.25
68
Large Kitchen
DimmingControl
t ol
H-T2
600
900
0.25
225
Large Kitchen
Dimming w/Load
Control
D
600
306
0.25
76
1) From Equation 146-A
2) From Table 146-A
PAGE TOTAL 2 717
BUILDING TOTAL 2,717
Enter in LTG -2-C: Lighting Control Credit
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 14 of 30 1
INDOOR LIGHTING POWER ALLOWANCE LTG -5-C
PROJECT NAME IDATE
Souplantation
6/16/2008
ALLOWED LIGHTING POWER Choose One Method
COMPLETE BUILDING METHOD - CONDITIONED SPACES
ALLOWED
WATTS
WATTS
PER SF
COMPLETE
BLDG. AREA
ALLOWED
WATTS
120
BUILDING CATEGORY (From Section 146 Table 146-B) •
AREA CATEGORY METHOD - CONDITIONED SPACES
AREA
(SF)
AREA CATEGORY (From Section 146 Table 146-C)
WATTS
PER SF
ALLOWED
WATTS
PAGE TOTAL
BUILDING TOTAL
120
84
120
AREA
84
WATTS
TAILORED METHOD - UNCONDITIONED SPACES
TOTAL UNCONDITIONED SPACES ALLOWED WATTS D
(From LTG -5-C and LTG -6-C) 0
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
PAGE TOTAL
BUILDING TOTAL
D
O
D
D
AREA
WATTS
TAILORED METHOD - CONDITIONED SPACES
TOTAL ALLOWED WATTS
(From LTG -6-C or from computer run.)
D
UNCONDITIONED SPACES
Complete Building and Area Catagory Methods
Category (From Section 146 Table 146 -B&C)
WATTS
PER SF
AREA
(SF)
ALLOWED
WATTS
Electrical Mechanical Room
0.70
120
84
PAGE TOTAL
BUILDING TOTAL
120
84
120
AREA
84
WATTS
TAILORED METHOD - UNCONDITIONED SPACES
TOTAL UNCONDITIONED SPACES ALLOWED WATTS D
(From LTG -5-C and LTG -6-C) 0
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
tnergyNro 4.4 by tnergybon User Number: 5481 Job Number: 150.0012 Page: 15 of 30 1
FAIR SYSTEM REQUIREMENTS
Part 1 of 2 MECH-2-C
(PROJECT NAME DATE
Souplantation 6/16/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
AIR SYSTEMS, Central or Single Zone
RTU -1
RTU -2
RTU -3
1
1
1
Reference on Plans or Specification 1
112(a)
80% AFUE
80% AFUE
83% AFUE
112(a)
11.0 EER
11.0 EER
10.6 EER
112(b)
n/a
n/a
n/a
112(c), 115(a)
n/a
n/a
n/a
121(b)
No
No
No
121(b)
496 cfm
296 cfm
289 cfm
121(2).No
No
No
No
121(c)
No
No
Yes
121(c), 122 a
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122ffl
Auto
Auto
Auto
122(g)
n/a
n/a
n/a
123
124
R-0.0
R-0.0
R-0.0
144 a & b
n/a
n/a
n/a
144 a & b
148 btuh
102 btuh
186 btuh
144 a & b
n/a
n/a
n/a
144 a & b
90,374 btuh
70,860 btuh
89,159 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 (c)
144 U
No
No
No
144 d
No
No
No
144 a
Diff. Enth (Integrated)
Diff. Tem (Integrated)
Diff. Tem (Integrated)
144
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 (k)
No
No
No
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
-AU-
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Paae:16 of 30 1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
(PROJECT NAME DATE
Souplantation 6/16/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/R' in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
AIR SYSTEMS, Central or Single Zone
RTU -4 RTU -5
1 1
Reference on Plans or Specification 1
112(a)
81 % AFUE
82% AFUE
112(a)
10.8 EER
10.8 EER
112(b)
n/a
n/a
112(c), 115(a)
n/a
n/a
121(b)
No
No
121(b)
2474 cfm
161 cfm
121 c
No
No
121(c)
Yes
No
121(c), 122(e)
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
122(D,Auto
Constant Temp
Auto
122(g)
n/a
n/a
123
124
R-0.0
R-4.2
144 a & b
n/a
n/a
144 a & b
223,000 btuh
205,000 btuh
144 a & b
n/a
n/a
144 a & b
169,897 btuh
156,403 btuh
144 c
Constant Volume
Constant Volume
144 (c)
144 c
No
No
144 d
No
No
144 a
Diff. Tem (integrated)
Diff. Tem (integrated)
144
Constant Temp
Constant Tem
144(f)
Constant Temp
Constant Temp
144 (k)
No
No
1 EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Paae:17 of 30 1
IWATER SIDE SYSTEM REQUIREMENTS Part2 of 2 MECH-2-CI
PROJECT NAME DATE
Souplantation 6/16/2008
SYSTEM FEATURES
2 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section Reference on Plans or Specification
Equipment Efficiency 112(a)
Pipe Insulation 123
PRESCRIPTIVE MEASURES
Calculated Capacity
Proposed Capacity
Tower Fan Controls
Tower Flow Controls
Variable Flow System Design
Chiller and Boiler Isolation
CHW and HHW Reset Controls
WLHP Isolation Valves
VSD on CHW, CW & WLHP Pumps > 5
HP
DP Sensor Location
1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph
number where the required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Water side systems include wet side system using other liquids such as glycol or brine.
Service Hot Water, Pool Heating
ITEM OR SYSTEM TAG(S) DHW Heater
Number of Systems 2
MANDATORY MEASURES Reference on Plans or Specification'
Water Heater Certification
Water Heater Efficiency
Service Water Heating Installation
Pool and Spa Efficiency and Control
Pool and Spa Installation
Pool Heater - No Pilot Light
Spa Heater - No Pilot Light
113 (a)
113 b
113 (c)
114 (a
114 (b
115 (c)
115 d
Raypak H4-0402*
85%
n/a
n/a
n/a
1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and
paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column.
Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 18 of 30
MECHANICAL VENTILATION MECH-3-C
NAME
antation
DATE
6/16/2008
PRESCRIPTIVE REHEAT
LIMITATION Section 144(d))
MECHANICAL VENTILATION Section
121(b)2)
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
ZONE/SYSTEM
n
yDa
syr.®3
N
n
�pT
�1
°o
Q3
vD3
�n
ci N �i
" 01 3
z
.00 C,7
v,
0,
m9n
o �3
3
a
m�3
xc n
'a �1
"? 3
_
vdJ3
ox v
o
-- D
<v
n=CD
r- T.
D 3
-
No
M o
A®o
acv
-0 (p
v y
nv
F.
No
a
A
An
os
w3 to
oyx
p
T? ""
C4
-3
o 3
-'• •'
41
y
0
V
D
Zone 1 Entry/Salad Bar
1,321
0.15
199
199
496
RTU -1
Total
199
496
Zone 2
70C
0.50
350
350
262
88
Zone 2 RR
356
0.15
53
53
33
20
RTU -2
Total
403
296
Zone 3 Dining
770
0.50
385
385
289
96
RTU -3
Total
385
289
Zone 4 Dining W
1,897
0.50
948
948
2,474
RTU -4
Total
948
2,474
Office
88
0.15
13
13
19
Kitchen
1,492
0.15
224
224
142
82
RTU -5
Total
237
161
C Minimum ventilation rete per Section 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS (column D or G).
I Must be greater than orequal to H, or use Transfer Air column N to make up the difference.
J Design fan supply cfm (Fan CFM) x 30%; or
K Condition area (ft. sq.) x 04 cfm/ft. sq.; or
L Maximum of Columns H. J. K, or 300 cfm
M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 19 of 30
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-54
PROJECT NAME
Souplantation
Control
DATE 6/16/2008
CHILLER AND TOWER SUMMARY
Type
In Plenum
Efficiency
Tons
PUMPS
Equipment Name
Equipment Type
Qty.
Tot
Qty
GPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Type
Qtv
Out ut
Aux.
kW
Eff.
Output
Efficiencv
Condition
Status
Economizer Type
Carrier 48HJ?012 --- (5/6)7
Packaged DX
1
148
0.0
80%AFUE
120,000
11.0 EER
New
Diff. Enth (Integrated)
1DHW BOILER SUMMARY
Packaged DX
Energy Standby TANK INSUL.
Rated Vol. Condition Factor Loss or Ext
System Name System Type Distribution Type Qty Input I (Gals.) Status or RE Pilot R -Val.
Raypak H4-0402' Large Gas No Pipe Insulation 2 399,000 0 New 0.85 0.00% 0.0
Hot Water P mp
Hot Water Piping Len th ft
Control
#
HP
Type
In Plenum
Outside
Buried
Add 1/2"
Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Type
Qtv
Out ut
Aux.
kW
Eff.
Output
Efficiencv
Condition
Status
Economizer Type
Carrier 48HJ?012 --- (5/6)7
Packaged DX
1
148
0.0
80%AFUE
120,000
11.0 EER
New
Diff. Enth (Integrated)
Carrier 48HJ?008 --- (5/6)4
Packaged DX
1
102
0.080%AFUE
90,000
11.0 EER
New
Diff. Temp (Integrated)
Carrier 48HJD015
Packaged DX
1
1 186
0.0
83%AFUE
130,000
10.6 EER
New
Diff. Temp (Integrated)
Carrier 48HJD017 CO2
Packa ed DX
1
1 223,000
0.081%AFUE
167,740
10.8 EER
New
Diff. TempflntegEated
Carrier 48HJD020
Packaged DX
1
205,000
0.0
82%AFUE
184,520
10.8 EER
New
Diff. Temp (Integrated)
(ENVELOPE MANDATORY MEASURES ENV -MMI
PROJECT NAME
Sour lantation
DATE
6/16/2008
DESCRIPTION
Designer
Enforcement
0 §118(a) Installed Insulating Material shall have been certified by the manufacturer to
comply with the California Quality Standards for insulating material, Title 20,
Chapter 4, Article 3.
§ 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
§117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
0 § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors
and fire doors).
a§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
0 §118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall
have insulation with an installed R -value of no less than R-13 between framing
members.
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:21 of 30
iCE'R'TIFICATE OF COMPLIANCE (Part 1 of 2) OLTG-1-C
PROJECT NAME
DATE
Souplantation
6/16/2008
PROJECT ADDRESS
- -
La Quinta State Highway 111 La Quinta
PRINCIPAL DESIGNER - LIGHTING
TELEPHONE
Building Permit #
Gary Petrak, P.E.
(949)-428-8800
- -
DOCUMENTATION AUTHOR
TELEPHONE
Checked by/Date
GLP Engineering, Inc.
(949) 428-8800
Enforcement Agency Use
GENERAL INFORMATION
DATE OF PLANS
OUTDOOR LIGHTING ZONE
LZ1 LZ2 ❑X LZ3 LZ4
FUNCTION TYPE FXOUTDOOR LIGHTING F—]OUTDOOR SIGNS F—]INDOOR SIGNS
PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the outdoor lighting system specifications need to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations.
This certificate applies only to building lighting requirements.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGNATURE
DATE
Armin Karimi
The Principal Lighting Designer hereby certifies that the proposed outdoor lighting and signs design represented in this set of
construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other
calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements
contained in Sections 110, 119, 130 through 132, and 146,and 149 of Title 24, Part 6.
Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.)
I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this
document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer
or electrical engineer, or I am a licensed architect.
I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or
6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing
this work.
❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code
Sections 5537, 5538 and 6737.1.
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE
DATE
LIC. #
Gary Petrak P.E.
LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included
IROLTG-I -C: Certificate of Compliance. Required on plans for all submittals for outdoor lighting. Part 2 of 2 may be incorporated in schedules on the p
Either LTG -1-C or OLTG-1-C may be used for signs as follows:
1. Use LTG -1-C if the project consists solely of indoor signs.
2. Use LTG -1-C if the project consists of indoor lighting, outdoor or indoor signs, but no other outdoor lighting.
3. Use OLTG-1-C if the project consists solely of outdoor signs.
4. Use OLTG-I-C if the project consists of outdoor lighting, outdoor or indoor signs, but no other indoor lighting.
Nx OLTG-2-C: LIGHTING COMPLIANCE SUMMARY. Applicable parts required for ALL outdoor lighting allowances (Except Signs).
®OLTG-3-C: AREA CALCULATIONS WORKSHEET. Applicable parts required for all outdoor area calculations.
INOLTG-4-C: SIGN LIGHTING COMPLIANCE. Required for all internally and externally illuminated signs, for both indoor and outdoor
signs.
EnergyPro 4.4 by Energysoft User Number. 5481 Job Number: 150.0012 Page:22 of 30
ans.
CERTIFICATE OF COMPLIANCE (Part2 of 2) OLTG-1-Cj
(PROJECT NAME I DATE I
Sour lantation
6/16/2008
Lighting Schedules on Plans Show that Outdoor Li-ghtinq Meets Allowed Lighting Power
X❑
❑
Lighting power allowance for general site illumination on OLTG-2-C Part 1 of 4
Not Applicable ,
❑
❑X
Lighting power allowance for local ordinances or for security multipliers on OLTG-2-C Part 2 of 4
Not Applicable
❑X
❑
Lighting power allowances for specific applications, other than vehicle service stations with canopies on OLTG-2-C Part 3 of 4
Not Applicable
❑
❑X
Lighting power allowances for vehicle service station canopies on OLTG-2-C part 4 of 4
Not Applicable
XO
❑
Sign lighting compliance on OLTG-4-C
Not Applicable
Mandatory
Measures on Plans Show that Outdoor Liahtina Mees Outdoor Liahtina Controls And Eauipmen
❑X
❑
Installed lighting power has been determined in accordance with Section 130(c)1
Not Applicable
❑X
❑
All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumins per Watt or are
controlled by a motion sensor per Section 132(a)
Not Applicable
❑X
❑
All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all
outdoor sales areas meet the Cutoff Requirements of Section 132(b)
Not Applicable
❑X
❑
All permanently installed outdoor lighting meets the control requirements of Section 132(c)1
Not Applicable
❑X
❑
Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements of Section 132(c)
Not Applicable
MANDATORY AUTOMATIC
CONTROLS
CONTROL LOCATION
(Room #)
NOTE TO
FIELD
CONTROL
IDENTIFICATION
CONTROL TYPE
(Auto Time Switch, Dimming, etc.)
AREA CONTROLLED
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 23 of 30
LIGHTING COMPLIANCE SUMMARY (Part 1 of 4) OLTG-2-C
Name
lantation
Date
6/16/2008
LIGHTING POWER ALLOWANCES
- GENERAL
SITE ILLUMINATION - Table 147-A
Allotted Watts
Luminaire
Lamps/Ballasts
Installed Watts
A
B
C
D
E
F
G
H
I
J
K
L
M
N 1
O
Lighting Application
Category
(Table 147-A)
e1DiW0
s°w
a
x
�yWa
-a r
° v.
D
xa
n°
°'
Fin
n
c
Description
n
�o
o;
°
�r
v3
m°
rw
°3
3'H
d v
m
rm
3
v v
m
c°'
�y
o� o
m
r,
c:
u, .°
0
0r
m
v o
M
c
3c
d�
y°
3
y
xc.
z
v d
Building Entrance
324
0.70
227
W3
39w Metal Halide
MH39
1
391
1.0
45.0
2
90
Total Allotted Watts 227
Total Installed Watts90
EnergyPro 4.4 by EnergySoft . User Number: 5481 Job Number: 150.0012 Page:24 of 30 1
LIGHTING COMPLIANCE SUMMARY (Part 3 of 4) OLTG-2-C
Project Name
SOUDIantation
Date
6/16/2008
LIGHTING POWER ALLOWANCE FOR SPECIFIC APPLICATIONS able 147-13 - Other than Vehicle Station without Canopies
Allotted Watts
Luminaire
Lam s/Ballasts
Design Watts
A
B
C
D
E
F
G
H
I
J
K
L
M
N 1
O
P
Lighting Application
Category
(Table 147-B)
o chi
°m
n x
x°
�`m
r=,na
m.o r
oo
D
oo m
xa
n
d
n
CL
®
Description
0. n
�o
?;
o
'
r
,,m
v3
,o v
r
. 01
a 3
�,9n
d 9
mM
r 0) :E
m
3 +
9
m
C2
3 y
�U)
d
m'�
3 chi
�
d.v
mC
=;;D
m
l7
v
a
—
3 . 3
dS
—
yo
r ,'n
`�
xm�'
z ,}�,
v a
3 f
o
oa
°m
O
Building Facade
1,23
0.35
430
W113
9w Metal Halide.
MH39
1
391
1.0
45.01
9
405
405
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:25 of 30
ILLUMINATED AREA CALCULATION WORKSHEET (Part 2 of 5) OLTG-3-C
PROJECT NAME DATE
Souplantation 6/16/2008
A. Hardsca a Method ii
Hardsca a for driveways, site roads, sidewalks, walkways and bikeways
A
B
List Specific Application (Table 147-A)
Lengthof 25' wide path incorporating as
much of he paved area as possible.
Smaller of 18 ft or distance to the edge of the
property line
Area (sf)
(A x B)
18
18
324
Checklist
❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas.
❑ Section 147 (c)1 B Method ii - General illumination areas for site roadway, driveway, sidewalk, walkway, or bikeway includes only those illuminated areas that are in the
bounds of the Application and includes a 25 foot wide area runningalongthe axis of the path of travel and much of the paved area as possible.
B. Buildingg Entrances without Canopies
A
B
C
Width of Door plus 3 feet on each side
Smaller of 18 ft or distance to the edge of the
property line
Area (sf)
(A x B)
18
18
324
Checklist
❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with the actual use of the
areas.
Section 147 (c)1 A - General illumination areas includes only those illuminated areas that in the bounds of the Application and are with a square pattern around a
❑ luminaire that is six times the luminaire mounting height, with the luminaire in the middle of the pattern, less any areas that are within buildings, under canopies, beyond
property lines, or obstructed by a signs or other structures.
I EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:26 of 30 1
ILLUMINATED AREA CALCULATION WORKSHEET (Part 3 of 5) OLTG-3-C
PROJECT NAME I DATE
Souplantation 6/16/2008
. Outdoor Sales Lot Frontage and Sales Lot Area
A
B
I C
I D
I E I
F
G
H
•
Gross Illuminated Area
(sq. ft.)
If an Outdoor Sales
Frontage Allotment was
used, subtract that area
from the Gross Illuminated
Area
Overlapping
Areas of
Another
Application
Sales Lot Area
(A - F - G)
Mounting height of
Sales Frontage
Luminaires (feet)
3 x B
Distance (In plan
view) from the
frontagge
luminaire to fron
edge of Sales
Lot
Sales Lot
Frontage
Length (feet)
Sales Frontage
Area
(C - D) x E
(sq. ft.)
❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas.
❑ Section 147 (c)2 B - Measured in plan view, only illuminated sections of outdoor sales frontage areas that are immediately adjacent to the principle viewing location and
unobstructed viewing length, and are within 3 mounting heights of the frontage have been used. Luminaires qualifying for this allowance are located in plan view between the
principle viewing location and the frontage sales.
B. Building Facade Area
A
B
C
D
E F G
H
Designated Name
and Orientation
Length
Height
Gross Area
(B x C)
Areas (SF) to Subtract
from within the Illuminated
Area
Net Area
Available for
Facade
(gghting
D -G )
Areas covered
by signs
Area for which
Illumination is
Obstructed by
Other Objects
and Area Not
Illuminated
Sub total
(E + F
Building Facade
82
15
1,230
0
0
1,230
Checklist
❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas.
❑ Section 147 (c)2 A - Only facades areas that are illuminated without obstruction or interference, by one or more luminaires, have been used.
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Pane:27 of 30 1
ILIGHTING MANDATORY MEASURES LTG -MMI
PROJECT NAME
SO
DATE
6/16/2008
DESCRIPTION
Designer
Enforcement
X❑ §131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic
control to shut off the lighting. This automatic control shall meet the requirements of
Section 119 and may be an occupancy sensor, automatic time switch, or other device
capable of automatically shutting off the lighting.
X❑ §131(d)2Override for Building Lighting Shut-off: The automatic building shut-off system is
provided with a manual, accessible override switch in sight of the lights. The area
of override is not to exceed 5,000 square feet.
FX §119(h) Automatic Control Devices Certified: All automatic control devices specified are
certified, all alternate equipment shall be certified and installed as directed by the
manufacturer.
X] §111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for
the project are certified and listed in the Directory. All installed fixtures shall be
certified.
X] §132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three
lamp fluorescent fixtures are tandem wired with two lamp ballasts where required
by Standards Section 132; or all one and three lamp fluorescent fixtures are
specified with electronic high -frequency ballasts and are exempt from tandem
wiring requirements.
X❑ §131(a) Individual Room/Area Controls: Each room and area in this building is equipped
with a separate switch or occupancy sensor device for each area with floor -to -
ceiling walls. '
X❑ §131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100
square feet and more than 0.8 watts per square foot of lighting load shall be
controlled with bi-level switching for uniform reduction of lighting within the room.
X] §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than
250 square feet and that allow for the effective use of daylight in the area shall
have 50% of the lamps in each daylit area controlled by a separate switch; or the
effective use of daylight cannot be accomplished because the windows are
continuously shaded by a building on the adjacent lot. Diagram of shading during
different times of the year is included on plans.
® §131(e) Display Lighting. Display lighting shall be separately switched on circuits that
are 20 amps or less.
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number. 150.0012 Page:28 of 30
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
PROJECT NAME
Souplantation
DATE
6/16/2008
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
X] §11. Any appliance for which there is a California standard established in the
Appliance Efficiency Regulations will comply with the applicable standard.
0 §115(a) Fan type central furnaces shall not have a pilot light.
R§ 23 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
§124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§122(e) Each space conditioning system shall be installed with one of the following:
X❑ §122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an automatic time switch
with an accessible manual override that allows operation of the system during
off -hours for up to 4 hours. The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power is interrupted; or
❑ §122(e)1 B An occupancy sensor to control the operating period of the system; or
§122(e)1C A 4 -hour timer that can be manually operated to control the operating period of
the system.
X❑ §122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint.
§122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
isolation zones. Each zone: shall not exceed 25,000 square feet; shall be
provided with isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas; and shall be controlled by a time control device as described above.
® §I22(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both
heating and cooling, the control shall be capable of providing a deadband of at
least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
FX §122(c) §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and
adjustable setpoint stops accessible only to authorized personnel.
§112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:29 of 30
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM
ECT NAME
Souplantation
DATE
6/16/2008
Description
Designer
Enforcement
Ventilation
❑X §121(e) Controls shall be provided to allow outside air dampers or devices to be operated
at the ventilation rates as specified on these plans.
X] §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems.
a §122(f) All gravity ventilating systems shall be provided with automatic or readily
accessible manually operated dampers in all openings to the outside, except for
combustion air openings.
0 §121(f)1 Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
R§121(f)2 Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3)
the person with overall responsibility for the design of the ventilation system; or
R§121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
§121(f)4 Another method approved by the Commission.
Service Water Heating Systems
X❑ §113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
X❑ §113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit
the outlet temperature to 110 degrees F.
EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 30 of 30