Loading...
08-0229 (CSCS) Title 24s� r Z ' TITLE 24 REPORT Title 24 Report for: Souplantation La Quinta State Highway 111 La Quinta, CA Project Designer: TARLOS & ASSOCIATES 17802 MITCHELL I RVI N E , CA 92614 (949) 250-4117 Report Prepared By: Armin Karimi GLP Engineering, Inc. 1751 E. Garry Avenue Santa Ana, CA 92705-5814 (949) 428-8800 Job Number: CITY OF LA QUINTA 150.0012 BUILDING & SAFETY DEPT. JUN � 7 2008 APPROVED FOR CONSTRUCTION By Date: 6/16/2008 DATE % f Of The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.4 by EnergySoft Job Number: 150.0012 User Number: 5481 7`7-709; h�V7 /// I: TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 21 Form OLTG-1-C Certificate of Compliance 22 Form OLTG-2-C Lighting Compliance Summary 24 Form OLTG-3-C Illuminated Area Calculation Worksheet 26 Form LTG -MM Lighting Mandatory Measures 28 Form MECH-MM Mechanical Mandatory Measures 29 EnergyPro 4.4 by Energysoft Job Number: 150.0012 User Number: 5481 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE Souplantation DOCUMENTATION AUTHOR 6/16/2008 PROJECT ADDRESS Armin Karimi BUILDING CONDITIONED FLOOR AREA La Quinta State Highway 111 La Quinta The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is # PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Building Permit TARLOS & ASSOCIATES (949) 250-4117 California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. DOCUMENTATION AUTHOR TELEPHONE Checked by Date GLP Engineering, Inc. (949) 428-8800 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR DATE OF PLANS DATE Armin Karimi BUILDING CONDITIONED FLOOR AREA 6,627 Sq.Ft The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is CLIMATE ZONE 15 BUILDING TYPE through 118, and 140, 142, 143 or 149 of Title 24, Part 6. NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. NEW CONSTRUCTION ADDITION 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNA RE DATE Armin Karimi g The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. ❑ ❑ R 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures NV -1 Required Form PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE TARLOS & ASSOCIATES t Cv 061 o LIGHTING COMPLIANCE Indicate location on plans of Note Block for MandatoryVeasures Required F TG -2, LTG -4, LTG -5 PRINCIPAL LIGHTING DESIGNER - NAME SIGN LIC. NO. DATE Gary Petrak P.E. 19172-51- 4'6 MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required Forms d CH -1 M - ECH-3 MECH-5 PRINCIPAL MECHANICAL DESIGNER -NAME SIGNATU IC. NO. DATE Matthew Pezeshki P.E. Wo IS I EnergyPro 4.4 by EnergySoft User Number: 5481 1 Job Number: 150.0012 Page:3 of 30 1 j PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PERFA PROJECT NAME CATE. Souplantation E/16/2008 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard ENERGY COMPONENT Design Space Heating 0.67 Space Cooling 246.67 Indoor Fans 93.39 Heat Rejection 0.00 Pumps & Misc. 0.00 Domestic Hot Water 39.17 Lighting 84.05 Receptacle 44.08 Process 0.00 TOTALS: 508.03 Percent better than Standard: Proposed Design 0.13 187.85 126.04 0.00 0.00 36.85 101.71 44.08 0.00 496.66 2.2% Compliance Margin j■aeRdsN a_ ___ �'pr,��g___ 0.55 ndo°``"' O1N `*" iRiipadi P- 0 20 40 80 80 10 1 _0 140 130 180 200 220 240 1 kBUKR- r 58.82`°°`° -32.65 0.00 0.00 2.32 -17.66 0.00 1 0.00 11.38 process) ( 2.2% excluding BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones (N) 0 deg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 5,627 sqf. sgft. sqft. 1 120 5 5,627 8 NaturEl Gas Orientation Front Elevation (N) Left Elevation (E) Rear Elevation (S) Right Elevation (W)l Total Roof Gross Area sqft. sqft. sqft. sqft. sqft. sqft. -Glazinq Area Glazing sqft. sqft. sqft, sqft. sqft. sgft. Rato 11.3% 40.3% 14.4% 7.30% 0.0% 1,480 167 432 174 2,110 303 1,238 90 5,2601 734 6,627 E:::::::� Standard Proposed Lighting Power Density 1.267 w/sgft. 1.533 w/sgft. Prescriptive Env. Heat Loss 2,311 Btu/h 1,425 Btu/h Prescriptive Env. Heat Gain 161,499 Btu/h-F 129,869 Btu/h-F Remarks: Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 EnergyPro 4.4 by Energysoft User Number: 5481 Job Number: 150.0012 Page:4 of 33 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Souplantation DATE 6/16/2008 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sgft) Inst LPD (W/sf)1 Ctrl. Credits (Wlsf)2 Allowed LPD Proc. Loads (W/sf) Area /s 3 Tailored /s 4 RTU -1 Zone 1 Entry/Salad Bar Lobby, Main Entry 1,324 4.072 1.018 RTU -2 Zone 2 Dining 700 3.130 0.585 Zone 2 RR Corridor/Restroom/Support 356 0.00 RTU -3 Zone 3 Dining Dining 770 0.777 0.194 RTU4 Zone 4 Dining W Dining 1,897 1.073 0.268 RTU -5 Office Office 88 1.034 Kitchen Kitchen, Food Preparation 1,492 1.723 0.202 Mech Room Electrical, Mechanical Room 120 0.50 Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C (items marked with asterisk, see LTG -2 -C by others) (by others) 4. See LTG -6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST t no iocai enrorcement agency snouia pay special attention to the Items speclttea In this checklist These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System "Carrier 48HJD017 CO2" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 48HJD015" includes Demand Control Ventilation per Standards Section 121. The HVAC System 'RTU -1" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A. The HVAC System "RTU -2" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A. The HVAC System "RTU -3" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A. The HVAC System "RTU -4" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A. The HVAC System "RTU -5" incorporates HERS verified Duct Leakage. Target leakage is calculated and documented on the MECH-5-A. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant kuthorized Signature or Stamp Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:5 of 30 CERTIFICATE OF COMPLIANCE ENV -1-C PROJECT NAME DATE Souplantation 6/16/2008 OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond' Status Joint Appendix IV Reference Location / Comments 1 Wall 2 0.144 None R-7.5 0 90 New 13-F5 Zone 1 Ent /Salad Bar 2 Wall 162 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 1 Ent /Salad Bar 3 Wall 42 0.740 None R-0.0 90 90 New 13-F5 Zone 1 Ent /Salad Bar 4 Wall 216 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 1 Entry/Salad Bar 5 Wall 4 0.144 None R-7.5 180 90 New 13-F5 Zone 1 Ent /Salad Bar 6 Wall 333 0.074 R-19 R-0.0 180 90 New 09-A5 Zone 1 Ent /Salad Bar 7 Wall 648 0.144 None R-7.5 180 90 New 13-F5 Zone 1 Entry/Salad Bar 8 Roof 1,324 0.034 R-30 R-0.0 90 0 New 02-A26 Zone 1 Ent /Salad Bar 9 Roof 70C 0.034 R-30 R-0.0 90 0 New 02-A26 Zone 2 10 Wall 30C 0.740 None R-0.0 0 90 New 13-F5 Zone 2 RR 11 Roof 356 0.034 R-30 R-0.0 90 0 New 02-A26 Zone 2 RR 12 Wall 325,0.144 None R-7.5 180 90 New 13-F5 Zone 3 Dining 13 Wall 239 0.144 None R-7.5 0 90 New 13-F5 Zone 3 Dining 14 Roof 770 0.034 R-30 R-0.0 90 0 New 02-A26 Zone 3 Dining 15 Wall 1,126 0.144 None R-7.5 270 90 New 13-F5 Zone 4 Dining W 16 Door 2 1.4501 None R-0.0 270 90 New 28-A1 Zone 4 Dining, W 17 Wall 460 0.144 None R-7.5 180 90 New 13-F5 Zone 4 Dining W 18 Wall 33 0.144 None R-7.5 0 90 New 13-F5 Zone 4 Dining W 19 Roof 1,89 0.034 R-30 R-0.0 90 0 New 02-A26 Zone 4 Dining W 20 Wall 10q 0.060 None R-19.0 0 90 New 113-F5 Ofiice N. E, A, R (New, Existing, Altered, IMore than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from Standards Table 116-A and B. Certificate shall be filed in the contractors proiect office durino construction and in the buildino manaoefs office after construction # I Type ## Exterior Shade Type Window Overhang Left Fin Right Fin SHGC Hgt. Wd. Len. Hat. LExt.RExt. Dist. Len. Hat. Dist. Len. Hgt. Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazing _Type Location/ Comments 1 Window Front N 87 0.570 NI -1 0.38 COG 0 New PPG solarban Low -e 60 Clear Zone 1 Entry /Salad Bar 2 Window Left (E) 174 0.570 NI -1 0.38 COG 90 New PPG solarban Low -e 60 Clear Zone 1 Entry/Salad Bar 3 Window Rear (S) 174 0.570 NI -1 0.38 COG 180 New PPG solarban Low -e 60 Clear Zone 1 Entry/Salad Bar 4 Window Rear S 9 0.570 NI -1 0.38 COG 180 New PPG solarban Low -e 60 Clear Zone 1 Ent /Salad Bar 5 Window Rear S 80 0.570 NI -1 0.38 COG 180 New PPG solarban Low -e 60 Clear Zone 3 Dining 6 Window Front (N) 40 0.570 NI -1 0.38 COG 0 New PPG solarban Low -e 60 Clear Zone 3 Dining 7 lWindow Right (W) 90 0.570 NI -1 0.38 COG 270 New PPG solarban Low -e 60 Clear Zone 4 Dining W 8 Window Rear S 40 0.570 NI -1 0.38 COG 180 New PPG solarban Low -e 60 Clear Zone 4 Dining W 9 Window Front N 40 0.570 NI -1 0.38 COG 0 New PPG solarban Low -e 60 Clear Zone 4 Dining W 1 Ll -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING ## Exterior Shade Type Window Overhang Left Fin Right Fin SHGC Hgt. Wd. Len. Hat. LExt.RExt. Dist. Len. Hat. Dist. Len. Hgt. 1 None 0.76 2 None 0.76 3 None 0.76 4 None 0.76 3.0 3.0 6.0 0.1 6.0 6.0 5 None 0.76 6 None 0.76 7 None 0.76 8 None 0.76 9 None 0.76 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES The proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general lighting of at least 0.5 W/ft2. See Section 143(c). If this box Is checked, ENV-" must be filled out. when submitting under the Prescriptive Compliance Approach. EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:6 of 30 1 CERTIFICATE OF COMPLIANCE ENVA-C 'ROJECT NAME DATE Souplantation 6/16/2008 OPAQUE SURFACES # Surface T e Area U -Fac. Insulation Cay. Cont. Act. Azm. Tilt Cond: Status Joint Appendix IV Reference Location / Comments 21 Roof 88 0.034 R-30 R-0.0 90 0 New 02-A26 Ofiice 22 Roof 304 0.034 R-30 R-0.0 90 0 New 02-A26 Kitchen 23 Roof 52 0.034 R-30 R-0.0 90 0 New 02-A26 Kitchen 24 Roof 226 0.034 R-30 R-0.0 90 0 New 02-A26 Kitchen 25 Roof 600 0.034 R-30 R-0.0 90 0 New 02-A26 Kitchen 26 Wall 155 0.0601 None R-19.0 0 90 New 13-F5 Kitchen 27 Roof 310 0.034 R-30 R-0.0 90 0 New 02-A26 Kitchen - N, r, m, K thew, exisung, vnerea, Kemoveaf FENESTRATION SURFACES mare manor equal to i u,uuu sq.n. or site -Durr tenestraaon area must include a label certrticate either issued by NFRG or provide a CEG Default Label Certificate using the default 1.1 -factors from Standards Table 116-A and B. Certificate shall be filed in the contractor's project office during construction and in the building managers office after construction Act.Cond. Location/ # Type Area U -Fac' SHGC2 Azm. Stat. Glazina Tvoe Comments 1 U -factor Type: 116-A Default Table from Standards, Table NI.1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value Window I Overhang Left Fin Right Fin # I Exterior Shade Type SHGC Hat. Wd. I pn 14nt I FYt P1=Yt I nict I on Wn* nict 1 on Wnt LJThe proposed building Is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general liahtina of at least 0.5 WHt2. See Section 14316. N this be: Is checked ENV -A -C must hit filled and whan cuhmlNlnn undo, rho A..—h .AO- L EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Paoe:7 of 30 1 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C (PROJECT NAME DATE Souplantation 6/16/2008 INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 61 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 61 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 10 161 ALTERNATE COMPLIANCE ❑X PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 84 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE Time Switch, Dimming, etc.) SPACE CONTROLLED Check if NOTE TO FIELD I EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:8 of 30 1 INSTALLED WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 12,878 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 2,717 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 10,161 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 61 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 61 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 10 161 ALTERNATE COMPLIANCE ❑X PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 84 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE Time Switch, Dimming, etc.) SPACE CONTROLLED Check if NOTE TO FIELD I EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:8 of 30 1 CERTIFICATE OF COMPLIANCE (Part 2 of 3) LTG -1 -C (PROJECT NAME DATE Souplantation 6/16/2008 CONTROLS FOR CREDIT IN CONDITIONED AND UNCONDITIONED SPACES CONTROL LOCATION (Room # or Dwg. #) Zone 1 Zone 1 Zone 1 Zone 1 Zone 2 Zone 2 2 Zone 4 4 CONTROL IDENTIFICATION CONTROLTYPE (Occupant, Daylight, Dimming, etc.) Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control Dimmin w/Load Control Dimming w/Load Control Dimming w/Load Control Dimmin w/Load Control Dimming w/Load Control Dimming w/Load Control Dimming w/Load Control 6 H -T2 3 D 9 IMINAIRES CONTROLLED TYPE # OF LUMINAIRES H -T3 5 H -T2 5 G 8 F 11 E 6 H -T3 2 H -T2 1 G 2 D 2 H -T2 1 F 3 G 2 E 3 H -T2 4 F 16 G 2 E 6 H -T2 3 D 9 NOTE TO FIELD NOTES TO FIELD - For Building Department Use Only Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 EnergyPro 4.4 by Energysoft User Number: 5481 Job Number: 150.0012 Page:9 of 30 CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG -1-C PROJECT NAME Souplantation DATE 6/16/2008 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. Test Description Test Performed B ❑ LTG -2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing ❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing EnergyPro 4.4 by EnergySoft User Number: 5481. Job Number: 150.0012 Page: 10 of 30 1 CERTIFICATE OF COMPLIANCE MECH-1-C PROJECT NAME DATE Souplantation 6/16/2008 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates and operating and maintenance information meet the requirements of Section 10-1 03 b and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that am installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000112 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot watersystems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Bturhr. -Water-loop Heat Pump Controls Applies to all new watertoop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors am greater than 5 hp. Equipment requiring acceptance testing EnergyPro 4.4 by Energysoft User Number: 5481 Job Number: 150.0012 Pagel 1 of 30 INDOOR LIGHTING SCHEDULE (Part 1 of 2) LTG -2-C PROJECT NAME DATE Souplantation 6/16/2008 INSTALLED LIGHTING POWER FOR CONDITIONED SPACES Luminaire Lamps/Ballasts Installed Watts C D E F G H I J Name Type Description r CD � co'c :3 - m fD `� r _ 3m� U) cwc �yQ �r.m m m o c �'mv �� U m 0n dm cn EfD r 3 c 503 L y y X m .... y d A (A) 2'x4' Fluorescent (1) F32T8 3 32 1.0 91.0 X 16 1.456 D (D) 6" Compact Fluorescent F 2W 1 32 1.0 34.0 X 11 374 E (E) 19" Compact Fluorescent FM70W 1 42 1.0 45.0 X 15 675 F (F) Flourescent Vanguard cF 26W 1 28 1.0 31.0 X 30 930 G (H) Low Voltage Studio Track 5MR16 1 35 1.0 35.0 X1 14 490 H -T2 30OW TRANSFORMER 1 300 300.0 X1 1 14 4,200 H -T3 60OW TRANSFORMER 1 600 600.0 X 7 4,200 L (L) 3' Fluorescent Strip 1 24 1.0 24.0 X 8 192 LA (LA) 4' Fluorescent Strip F28T5 1 34 1.0 34.0 X 4 136 N (N) Decorative Gooseneck 1 75 1.01 75.0 X 3 225 PAGE TOTAL 12 878 BUILDING TOTAL (sum of all pages) 12,878 PORTABLE LIGHTING (From LTG -3-C) D CONTROL CREDIT (From LTG -4-C) 2 717 ADJUSTED ACTUAL WATTS 10 161 Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 EnergyPro 4.4 by EnergySoft User Number: 5481 ' Job Number: 150.0012 Page: 12 of 30 INDOOR LIGHTING SCHEDULE - (Part 2 of 2) LTG -2-C PROJECT NAME Souolantation INSTALLED LIGHTING POWER FOR UNCONDITIONED SPACES DATE 6/16/2008 Luminaire Lamps/Ballasts Installed Watts C D E F G H I J Name Type Description �nri v3 M'� c d � 3 3 3 �yv m my 3m� I N c d C 3.� 3 g�Q 2? m `, o c 3� ���_ L N m v m n EP C .-ja Yes T No r C Z 3• c 303 Cr fD R G��$g xvv v N fD n CB (CB) 8' Fluorescent Strip (1) F32T8 2 32 1.0 61.0 X 1 61 PAGE TOTAL 61 BUILDING TOTAL (sum of all pages) 61 CONTROL CREDIT (From LTG -4-C) O ADJUSTED ACTUAL WATTS 61 Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 13 of 30 LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG -4-C CONTROL CREDITS FOR CONDITIONED SPACES PROJECT NAME DATE Souplantation 6/16/2008 A B C D E I F I G H 1 J ROOM # ZONE ID CONDITIONED AREAS LIGHTING CONTROL DESCRIPTION PLAN REF. ROOM AREA (SF) DAYLIGHTING WATTS OF CONTROL LIGHTING LIGHTING ADJUST. FACTOR' CONTROL CREDIT WATTS (H X 1) WINDOW WALL RATIO GLAZING VLT SKYLIGHT EFFECTIVE APERTURE' zone 1 DimmingControl Load H -T3 1,324 3,0001 0.25 750 zone 1 DimmingControl t ol H-T2 1,324 1 500 0.25 375 zone 1 DimmingControl t ol G 1,324 280 0.25 70 zone 1 DimmingControl t ol F 1,324 341 0.25 85 zone 1 DimmingControl t ol E 1,324 270 0.25 68 Zone 2 DimmingControl t ol H-T3 700 1,200 0.25 300 Zone 2 DimmingControl t ol H-T2 700 300 0.25 75 Zone 2 Dimmingoad G 700 70 0.25 18 Zone 2 DimmingControl t ol D 700 68 0.25 17 Zone 3 Dimming w/Load Control H -T2 770 300 0.25 75 Zone 3 Dimming Control t ol F 770 93 0.25 23 Zone 3 Dimming Control t ol G 770 70 0.25 18 Zone 3 DimmingControl t ol E 770 135 0.25 34 Zone 4 Dimming t Control H -T2 1,897 1,200 0.25 300 Zone 4 Dimming w/Load Control F 1,897 496 0.25 124 Zone 4immin Cont of oa G 1,897 70 0.25 18 Zone 4 DimmingControl t ol E 1,89 270 0.25 68 Large Kitchen DimmingControl t ol H-T2 600 900 0.25 225 Large Kitchen Dimming w/Load Control D 600 306 0.25 76 1) From Equation 146-A 2) From Table 146-A PAGE TOTAL 2 717 BUILDING TOTAL 2,717 Enter in LTG -2-C: Lighting Control Credit EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 14 of 30 1 INDOOR LIGHTING POWER ALLOWANCE LTG -5-C PROJECT NAME IDATE Souplantation 6/16/2008 ALLOWED LIGHTING POWER Choose One Method COMPLETE BUILDING METHOD - CONDITIONED SPACES ALLOWED WATTS WATTS PER SF COMPLETE BLDG. AREA ALLOWED WATTS 120 BUILDING CATEGORY (From Section 146 Table 146-B) • AREA CATEGORY METHOD - CONDITIONED SPACES AREA (SF) AREA CATEGORY (From Section 146 Table 146-C) WATTS PER SF ALLOWED WATTS PAGE TOTAL BUILDING TOTAL 120 84 120 AREA 84 WATTS TAILORED METHOD - UNCONDITIONED SPACES TOTAL UNCONDITIONED SPACES ALLOWED WATTS D (From LTG -5-C and LTG -6-C) 0 Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 PAGE TOTAL BUILDING TOTAL D O D D AREA WATTS TAILORED METHOD - CONDITIONED SPACES TOTAL ALLOWED WATTS (From LTG -6-C or from computer run.) D UNCONDITIONED SPACES Complete Building and Area Catagory Methods Category (From Section 146 Table 146 -B&C) WATTS PER SF AREA (SF) ALLOWED WATTS Electrical Mechanical Room 0.70 120 84 PAGE TOTAL BUILDING TOTAL 120 84 120 AREA 84 WATTS TAILORED METHOD - UNCONDITIONED SPACES TOTAL UNCONDITIONED SPACES ALLOWED WATTS D (From LTG -5-C and LTG -6-C) 0 Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 tnergyNro 4.4 by tnergybon User Number: 5481 Job Number: 150.0012 Page: 15 of 30 1 FAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C (PROJECT NAME DATE Souplantation 6/16/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. AIR SYSTEMS, Central or Single Zone RTU -1 RTU -2 RTU -3 1 1 1 Reference on Plans or Specification 1 112(a) 80% AFUE 80% AFUE 83% AFUE 112(a) 11.0 EER 11.0 EER 10.6 EER 112(b) n/a n/a n/a 112(c), 115(a) n/a n/a n/a 121(b) No No No 121(b) 496 cfm 296 cfm 289 cfm 121(2).No No No No 121(c) No No Yes 121(c), 122 a Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122ffl Auto Auto Auto 122(g) n/a n/a n/a 123 124 R-0.0 R-0.0 R-0.0 144 a & b n/a n/a n/a 144 a & b 148 btuh 102 btuh 186 btuh 144 a & b n/a n/a n/a 144 a & b 90,374 btuh 70,860 btuh 89,159 btuh 144 c Constant Volume Constant Volume Constant Volume 144 (c) 144 U No No No 144 d No No No 144 a Diff. Enth (Integrated) Diff. Tem (Integrated) Diff. Tem (Integrated) 144 Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 (k) No No No 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. -AU- EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Paae:16 of 30 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C (PROJECT NAME DATE Souplantation 6/16/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/R' in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. AIR SYSTEMS, Central or Single Zone RTU -4 RTU -5 1 1 Reference on Plans or Specification 1 112(a) 81 % AFUE 82% AFUE 112(a) 10.8 EER 10.8 EER 112(b) n/a n/a 112(c), 115(a) n/a n/a 121(b) No No 121(b) 2474 cfm 161 cfm 121 c No No 121(c) Yes No 121(c), 122(e) Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required 122(D,Auto Constant Temp Auto 122(g) n/a n/a 123 124 R-0.0 R-4.2 144 a & b n/a n/a 144 a & b 223,000 btuh 205,000 btuh 144 a & b n/a n/a 144 a & b 169,897 btuh 156,403 btuh 144 c Constant Volume Constant Volume 144 (c) 144 c No No 144 d No No 144 a Diff. Tem (integrated) Diff. Tem (integrated) 144 Constant Temp Constant Tem 144(f) Constant Temp Constant Temp 144 (k) No No 1 EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Paae:17 of 30 1 IWATER SIDE SYSTEM REQUIREMENTS Part2 of 2 MECH-2-CI PROJECT NAME DATE Souplantation 6/16/2008 SYSTEM FEATURES 2 WATER SIDE SYSTEMS: Chillers, Towers, Boilers, H dronic Loops ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Reference on Plans or Specification Equipment Efficiency 112(a) Pipe Insulation 123 PRESCRIPTIVE MEASURES Calculated Capacity Proposed Capacity Tower Fan Controls Tower Flow Controls Variable Flow System Design Chiller and Boiler Isolation CHW and HHW Reset Controls WLHP Isolation Valves VSD on CHW, CW & WLHP Pumps > 5 HP DP Sensor Location 1: For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Water side systems include wet side system using other liquids such as glycol or brine. Service Hot Water, Pool Heating ITEM OR SYSTEM TAG(S) DHW Heater Number of Systems 2 MANDATORY MEASURES Reference on Plans or Specification' Water Heater Certification Water Heater Efficiency Service Water Heating Installation Pool and Spa Efficiency and Control Pool and Spa Installation Pool Heater - No Pilot Light Spa Heater - No Pilot Light 113 (a) 113 b 113 (c) 114 (a 114 (b 115 (c) 115 d Raypak H4-0402* 85% n/a n/a n/a 1: For each water heater, pool heat and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" ins the column. Run Initiation Time: 06/03/08 08:49:58 Run Code: 1212508198 EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 18 of 30 MECHANICAL VENTILATION MECH-3-C NAME antation DATE 6/16/2008 PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121(b)2) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM n yDa syr.®3 N n �pT �1 °o Q3 vD3 �n ci N �i " 01 3 z .00 C,7 v, 0, m9n o �3 3 a m�3 xc n 'a �1 "? 3 _ vdJ3 ox v o -- D <v n=CD r- T. D 3 - No M o A®o acv -0 (p v y nv F. No a A An os w3 to oyx p T? "" C4 -3 o 3 -'• •' 41 y 0 V D Zone 1 Entry/Salad Bar 1,321 0.15 199 199 496 RTU -1 Total 199 496 Zone 2 70C 0.50 350 350 262 88 Zone 2 RR 356 0.15 53 53 33 20 RTU -2 Total 403 296 Zone 3 Dining 770 0.50 385 385 289 96 RTU -3 Total 385 289 Zone 4 Dining W 1,897 0.50 948 948 2,474 RTU -4 Total 948 2,474 Office 88 0.15 13 13 19 Kitchen 1,492 0.15 224 224 142 82 RTU -5 Total 237 161 C Minimum ventilation rete per Section 121 Table 121-A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating. H Required Ventilation Air (REQ'D V.A.) is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS (column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make up the difference. J Design fan supply cfm (Fan CFM) x 30%; or K Condition area (ft. sq.) x 04 cfm/ft. sq.; or L Maximum of Columns H. J. K, or 300 cfm M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M. EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 19 of 30 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-54 PROJECT NAME Souplantation Control DATE 6/16/2008 CHILLER AND TOWER SUMMARY Type In Plenum Efficiency Tons PUMPS Equipment Name Equipment Type Qty. Tot Qty GPM BHP Motor Eff. Drive Eff. Pump Control CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qtv Out ut Aux. kW Eff. Output Efficiencv Condition Status Economizer Type Carrier 48HJ?012 --- (5/6)7 Packaged DX 1 148 0.0 80%AFUE 120,000 11.0 EER New Diff. Enth (Integrated) 1DHW BOILER SUMMARY Packaged DX Energy Standby TANK INSUL. Rated Vol. Condition Factor Loss or Ext System Name System Type Distribution Type Qty Input I (Gals.) Status or RE Pilot R -Val. Raypak H4-0402' Large Gas No Pipe Insulation 2 399,000 0 New 0.85 0.00% 0.0 Hot Water P mp Hot Water Piping Len th ft Control # HP Type In Plenum Outside Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qtv Out ut Aux. kW Eff. Output Efficiencv Condition Status Economizer Type Carrier 48HJ?012 --- (5/6)7 Packaged DX 1 148 0.0 80%AFUE 120,000 11.0 EER New Diff. Enth (Integrated) Carrier 48HJ?008 --- (5/6)4 Packaged DX 1 102 0.080%AFUE 90,000 11.0 EER New Diff. Temp (Integrated) Carrier 48HJD015 Packaged DX 1 1 186 0.0 83%AFUE 130,000 10.6 EER New Diff. Temp (Integrated) Carrier 48HJD017 CO2 Packa ed DX 1 1 223,000 0.081%AFUE 167,740 10.8 EER New Diff. TempflntegEated Carrier 48HJD020 Packaged DX 1 205,000 0.0 82%AFUE 184,520 10.8 EER New Diff. Temp (Integrated) (ENVELOPE MANDATORY MEASURES ENV -MMI PROJECT NAME Sour lantation DATE 6/16/2008 DESCRIPTION Designer Enforcement 0 §118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. 0 § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). a§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. 0 §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:21 of 30 iCE'R'TIFICATE OF COMPLIANCE (Part 1 of 2) OLTG-1-C PROJECT NAME DATE Souplantation 6/16/2008 PROJECT ADDRESS - - La Quinta State Highway 111 La Quinta PRINCIPAL DESIGNER - LIGHTING TELEPHONE Building Permit # Gary Petrak, P.E. (949)-428-8800 - - DOCUMENTATION AUTHOR TELEPHONE Checked by/Date GLP Engineering, Inc. (949) 428-8800 Enforcement Agency Use GENERAL INFORMATION DATE OF PLANS OUTDOOR LIGHTING ZONE LZ1 LZ2 ❑X LZ3 LZ4 FUNCTION TYPE FXOUTDOOR LIGHTING F—]OUTDOOR SIGNS F—]INDOOR SIGNS PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the outdoor lighting system specifications need to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to building lighting requirements. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE Armin Karimi The Principal Lighting Designer hereby certifies that the proposed outdoor lighting and signs design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the lighting requirements contained in Sections 110, 119, 130 through 132, and 146,and 149 of Title 24, Part 6. Please Check One: (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer or electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. ❑ I affirm that I am eligible under the exemption to Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE DATE LIC. # Gary Petrak P.E. LIGHTING COMPLIANCE FORMS & WORKSHEETS Check box if worksheet is included IROLTG-I -C: Certificate of Compliance. Required on plans for all submittals for outdoor lighting. Part 2 of 2 may be incorporated in schedules on the p Either LTG -1-C or OLTG-1-C may be used for signs as follows: 1. Use LTG -1-C if the project consists solely of indoor signs. 2. Use LTG -1-C if the project consists of indoor lighting, outdoor or indoor signs, but no other outdoor lighting. 3. Use OLTG-1-C if the project consists solely of outdoor signs. 4. Use OLTG-I-C if the project consists of outdoor lighting, outdoor or indoor signs, but no other indoor lighting. Nx OLTG-2-C: LIGHTING COMPLIANCE SUMMARY. Applicable parts required for ALL outdoor lighting allowances (Except Signs). ®OLTG-3-C: AREA CALCULATIONS WORKSHEET. Applicable parts required for all outdoor area calculations. INOLTG-4-C: SIGN LIGHTING COMPLIANCE. Required for all internally and externally illuminated signs, for both indoor and outdoor signs. EnergyPro 4.4 by Energysoft User Number. 5481 Job Number: 150.0012 Page:22 of 30 ans. CERTIFICATE OF COMPLIANCE (Part2 of 2) OLTG-1-Cj (PROJECT NAME I DATE I Sour lantation 6/16/2008 Lighting Schedules on Plans Show that Outdoor Li-ghtinq Meets Allowed Lighting Power X❑ ❑ Lighting power allowance for general site illumination on OLTG-2-C Part 1 of 4 Not Applicable , ❑ ❑X Lighting power allowance for local ordinances or for security multipliers on OLTG-2-C Part 2 of 4 Not Applicable ❑X ❑ Lighting power allowances for specific applications, other than vehicle service stations with canopies on OLTG-2-C Part 3 of 4 Not Applicable ❑ ❑X Lighting power allowances for vehicle service station canopies on OLTG-2-C part 4 of 4 Not Applicable XO ❑ Sign lighting compliance on OLTG-4-C Not Applicable Mandatory Measures on Plans Show that Outdoor Liahtina Mees Outdoor Liahtina Controls And Eauipmen ❑X ❑ Installed lighting power has been determined in accordance with Section 130(c)1 Not Applicable ❑X ❑ All permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumins per Watt or are controlled by a motion sensor per Section 132(a) Not Applicable ❑X ❑ All Luminaires with lamps rated greater than 175 Watts in hardscape area, including parking lots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements of Section 132(b) Not Applicable ❑X ❑ All permanently installed outdoor lighting meets the control requirements of Section 132(c)1 Not Applicable ❑X ❑ Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Multi -Level Lighting Requirements of Section 132(c) Not Applicable MANDATORY AUTOMATIC CONTROLS CONTROL LOCATION (Room #) NOTE TO FIELD CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) AREA CONTROLLED EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 23 of 30 LIGHTING COMPLIANCE SUMMARY (Part 1 of 4) OLTG-2-C Name lantation Date 6/16/2008 LIGHTING POWER ALLOWANCES - GENERAL SITE ILLUMINATION - Table 147-A Allotted Watts Luminaire Lamps/Ballasts Installed Watts A B C D E F G H I J K L M N 1 O Lighting Application Category (Table 147-A) e1DiW0 s°w a x �yWa -a r ° v. D xa n° °' Fin n c Description n �o o; ° �r v3 m° rw °3 3'H d v m rm 3 v v m c°' �y o� o m r, c: u, .° 0 0r m v o M c 3c d� y° 3 y xc. z v d Building Entrance 324 0.70 227 W3 39w Metal Halide MH39 1 391 1.0 45.0 2 90 Total Allotted Watts 227 Total Installed Watts90 EnergyPro 4.4 by EnergySoft . User Number: 5481 Job Number: 150.0012 Page:24 of 30 1 LIGHTING COMPLIANCE SUMMARY (Part 3 of 4) OLTG-2-C Project Name SOUDIantation Date 6/16/2008 LIGHTING POWER ALLOWANCE FOR SPECIFIC APPLICATIONS able 147-13 - Other than Vehicle Station without Canopies Allotted Watts Luminaire Lam s/Ballasts Design Watts A B C D E F G H I J K L M N 1 O P Lighting Application Category (Table 147-B) o chi °m n x x° �`m r=,na m.o r oo D oo m xa n d n CL ® Description 0. n �o ?; o ' r ,,m v3 ,o v r . 01 a 3 �,9n d 9 mM r 0) :E m 3 + 9 m C2 3 y �U) d m'� 3 chi � d.v mC =;;D m l7 v a — 3 . 3 dS — yo r ,'n `� xm�' z ,}�, v a 3 f o oa °m O Building Facade 1,23 0.35 430 W113 9w Metal Halide. MH39 1 391 1.0 45.01 9 405 405 EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:25 of 30 ILLUMINATED AREA CALCULATION WORKSHEET (Part 2 of 5) OLTG-3-C PROJECT NAME DATE Souplantation 6/16/2008 A. Hardsca a Method ii Hardsca a for driveways, site roads, sidewalks, walkways and bikeways A B List Specific Application (Table 147-A) Lengthof 25' wide path incorporating as much of he paved area as possible. Smaller of 18 ft or distance to the edge of the property line Area (sf) (A x B) 18 18 324 Checklist ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ❑ Section 147 (c)1 B Method ii - General illumination areas for site roadway, driveway, sidewalk, walkway, or bikeway includes only those illuminated areas that are in the bounds of the Application and includes a 25 foot wide area runningalongthe axis of the path of travel and much of the paved area as possible. B. Buildingg Entrances without Canopies A B C Width of Door plus 3 feet on each side Smaller of 18 ft or distance to the edge of the property line Area (sf) (A x B) 18 18 324 Checklist ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with the actual use of the areas. Section 147 (c)1 A - General illumination areas includes only those illuminated areas that in the bounds of the Application and are with a square pattern around a ❑ luminaire that is six times the luminaire mounting height, with the luminaire in the middle of the pattern, less any areas that are within buildings, under canopies, beyond property lines, or obstructed by a signs or other structures. I EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:26 of 30 1 ILLUMINATED AREA CALCULATION WORKSHEET (Part 3 of 5) OLTG-3-C PROJECT NAME I DATE Souplantation 6/16/2008 . Outdoor Sales Lot Frontage and Sales Lot Area A B I C I D I E I F G H • Gross Illuminated Area (sq. ft.) If an Outdoor Sales Frontage Allotment was used, subtract that area from the Gross Illuminated Area Overlapping Areas of Another Application Sales Lot Area (A - F - G) Mounting height of Sales Frontage Luminaires (feet) 3 x B Distance (In plan view) from the frontagge luminaire to fron edge of Sales Lot Sales Lot Frontage Length (feet) Sales Frontage Area (C - D) x E (sq. ft.) ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ❑ Section 147 (c)2 B - Measured in plan view, only illuminated sections of outdoor sales frontage areas that are immediately adjacent to the principle viewing location and unobstructed viewing length, and are within 3 mounting heights of the frontage have been used. Luminaires qualifying for this allowance are located in plan view between the principle viewing location and the frontage sales. B. Building Facade Area A B C D E F G H Designated Name and Orientation Length Height Gross Area (B x C) Areas (SF) to Subtract from within the Illuminated Area Net Area Available for Facade (gghting D -G ) Areas covered by signs Area for which Illumination is Obstructed by Other Objects and Area Not Illuminated Sub total (E + F Building Facade 82 15 1,230 0 0 1,230 Checklist ❑ Section 147 (c)1 B - Each portion of all illuminated areas has been assigned only one lighting application, and the applications are consistent with actual use of the areas. ❑ Section 147 (c)2 A - Only facades areas that are illuminated without obstruction or interference, by one or more luminaires, have been used. EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Pane:27 of 30 1 ILIGHTING MANDATORY MEASURES LTG -MMI PROJECT NAME SO DATE 6/16/2008 DESCRIPTION Designer Enforcement X❑ §131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X❑ §131(d)2Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to exceed 5,000 square feet. FX §119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. X] §111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. X] §132 Tandem Wiring for One and Three Lamp Fluorescent Fixtures: All one and three lamp fluorescent fixtures are tandem wired with two lamp ballasts where required by Standards Section 132; or all one and three lamp fluorescent fixtures are specified with electronic high -frequency ballasts and are exempt from tandem wiring requirements. X❑ §131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to - ceiling walls. ' X❑ §131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. X] §131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. ® §131(e) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number. 150.0012 Page:28 of 30 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME Souplantation DATE 6/16/2008 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies X] §11. Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. 0 §115(a) Fan type central furnaces shall not have a pilot light. R§ 23 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls §122(e) Each space conditioning system shall be installed with one of the following: X❑ §122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ §122(e)1 B An occupancy sensor to control the operating period of the system; or §122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. X❑ §122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. §122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® §I22(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. FX §122(c) §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page:29 of 30 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM ECT NAME Souplantation DATE 6/16/2008 Description Designer Enforcement Ventilation ❑X §121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. X] §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. a §122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. 0 §121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or R§121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or R§121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or §121(f)4 Another method approved by the Commission. Service Water Heating Systems X❑ §113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. X❑ §113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro 4.4 by EnergySoft User Number: 5481 Job Number: 150.0012 Page: 30 of 30