Loading...
06-3805 (CSCS) Revision 1 Title 24� AUG 3 1 2007 TITLE 24 REPORT Title 24 Report for: The Dunes Retail Center - Retail 3 79-710 Highway 111 La Quinta, CA 92253 Project Designer: KKE Architects 525 East Colorado Boulevard Pasadena, CA 91101 (626) 796-8230 Report Prepared By: C+J Technical Solutions C+J Technical Solutions and Services, Inc. 1320 Valley Vista Dr. Suite 206 Diamond Bar, CA 91765 (909) 896-3631 Job Number: C07079 Date: 8/14/2007 CITY OF LA QU NTA BUILDING & SAFETY DEPT. APPROVED OR CONSTRUCTION DA D Y The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.2 by EnergySoft Job Number: C07079 User Number: 5950 I k► � AUG 3 1 2007 TITLE 24 REPORT Title 24 Report for: The Dunes Retail Center - Retail 3 79-710 Highway 111 La Quinta, CA 92253 Project Designer: KKE Architects 525 East Colorado Boulevard Pasadena, CA 91101 (626) 796-8230 Report Prepared By: C+J Technical Solutions C+J Technical Solutions and Services, Inc. 1320 Valley Vista Dr. Suite 206 Diamond Bar, CA 91765 (909) 896-3631 Job Number: C07079 Date: 8/14/2007 CITY OF LA QU NTA BUILDING & SAFETY DEPT. APPROVED OR CONSTRUCTION DA D Y The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.2 by EnergySoft Job Number: C07079 User Number: 5950 I PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE The Dunes Retail Center - Retail 3 DOCUMENTATION AUTHOR 8/14/2007 PROJECT ADDRESSux,. C+J Technical Solutions BUILDING CONDITIONED FLOOR AREA 79-710 Highway 111 La QuintaBu,ld,n The Principal Designer hereby certifys that the proposed building desi repr sen in t ' set of construction docu s CLIMATE ZONE 1 15 'Permit#` �• g` t=+ 1'Yw'rtyieliBL {`YY PRINCIPAL DESIGNER - ENVELOPE TELEPHONE KKE Architects (626) 796-8230 3f DOCUMENTATION AUTHOR TELEPHONE Chck d by/Dated C+J Technical Solutions and Services, Inc. 909 896-3631,,Enfgrcenienfa ens GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR DATE OF PLANS C+J Technical Solutions BUILDING CONDITIONED FLOOR AREA 10,008 Sq.Ft. The Principal Designer hereby certifys that the proposed building desi repr sen in t ' set of construction docu s CLIMATE ZONE 1 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ❑ ADDITION ❑ EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE L"44 C+J Technical Solutions - The Principal Designer hereby certifys that the proposed building desi repr sen in t ' set of construction docu s consistent with the other compliance forms and worksheets, with th s ecificatio n w' any other calculations sub itted ith this permit application. The proposed building as designed meets the rgy efficiency requirements contained in sections 110 16, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that 1 am licensed in the State of California as a civil engineer, mechanical engineer, or I am a licensed architect. 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. 0 ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE KKE Architects LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 MECH-5 Requir orms PRINCIPAL' MECHANICAL DESIGNER - NAME NAT ILIC. NO. DAT Polar Barr Air Conditioning,Inc. , Q �6 i 1w - I EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paae:3 of 24 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 PROJECT NAMEDATE The Dunes Retail Center - Retail 3 8/14/2007 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft - ENERGY COMPONENT Standard Design 10,008 Proposed Design 0.48 274.68 61.41 0.00 0.00 0.00 18730 s743 o.00 .' 611.29 Compliance Margintill - ss Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process . TOTALS: 0.58 0.10 ` .: - i' _ '� a ,0., 3 80 �4 2lt 0 .180 '1• = 4 0�. 330 '' ' a 357.01 82.33 56.36 -5.05 0.00 0.00 0.00 0.00 0.00 0.00 18730 0.00 87a3 0.00 o.00 o.00 688.67 77.38 Percent better than Standard: 11.21/6 ( 11.2% excluding process) Building Orientation Number of Stories Number of Systems Number of Zones N 0 deg Conditioned Floor Area 'Unconditioned Floor Area Conditioned Footprint Area Fuel Type 10,008 sqft. sqft. sqft. 1 0 10 10,008 81 I Natural Gas Left Elevation Orientation Gross Area Glazing Area Glazing Ratio Front Elevation N 950 sqft. 427 sqft. 44.9% Left Elevation (E) 1,700 sqft. 107 sqft. 6.3% Rear Elevation S 600 sqft. 250 sqft. 41.6% Right Elevation Total Roof (W)i 2,235sgft. 5,485 10,008 sgft. sqft. 1,316 2,100 [::� sgft. sgft. sqft. 58.9% 0.0% Standard Proposed Lighting Power Density 1.700 wisgft. 1.700 Will Prescriptive Env. Heat Loss 1,687 Btu/h 1,787 scum Prescriptive Env. Heat Gain 183,842 Btu/i 220,179 Btum-F Remarks: m Time: 08/14/0710:16:51 Run Code: 1187111811 User Number: 5950 Job Number: C07079 Page:4 of 24 [PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME The Dunes Retail Center - Retail 3 DATE 8/14/2007 ZONE INFORMATION FloorFln.Cr Allowed LPDA t PArea stem Name Zone Name Occu anc T e (s tt.) ICoaiJS t �(W/s>)? 3 4 Xs � ""''- SMI/�� Tenant Zone 1 Retail Sales, Wholesale 1,308 '1.70 , �' j 4018 a Tenant B17 1 Retail Sales, Wholesale 1,200 '1.70 Via° T 0 � �..., a . Tenant C . Zone 1 Retail Sales, Wholesale 1,200 -1.70 Tenant D Zone 1 Retail Sales, Wholesale 1,200 `1.70�s .r Tenant E. Zone 1 Retail Sales, Wholesale 1',200 '1.70` Tenant F Zone 1 Retail Sales Wholesale 1,200 '1.70 t1w�=1 Tenant G.. Zone 1 Retail Sales, Wholesale 1,200 '1.70 N `" OWN I 1" Tenant H Zone 1 Retail Sales Wholesale 1,50 '1.70�� aS 1WI � f 4 _ - . - iiriFYY-Yquat3'a... '�" Z�} h'y2+"` �' ����i;� ���*uvi� Y>3"if'Ci A. 1110,. ��E.Yi .?�y'^'a,{��•aw• d '•.moi 59:.`ym+' R. a�$.�.v�+,} Y$�._v�.� - I Wil"M ?s��-�" No 101"i +..i IRK NOW • it F -4`x,.7, 4'a7y'd 1141 51 1 Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C 4. See LT (items marked with asterisk, see LTG -2 -C by others) (by others) 3-6-C Items above r'elu �e sem" ' q peas) documentationx�' on The local enforcement agency should pay special an to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. -------- t rea p--•• ��••�^ ^w -c arca.nq.any ucen reviewea. Aaequate tifti documentation for their use have been' provided by the applicant.ant. ; wntten jusicaon and Authorized Signature or Stam Run Initiatian Ti 10:16:51 Run • 1187111811 EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:S of 24 CERTIFICATE OF COMPLIANCE ENV -1 - PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Azm. Tilt Cond: Status Joint Appendix IV Reference Location / Comments 1 Wall 461 0.074 R-19 R-0.0 0 90 New 09-A5 Zone 1 2 Wall 250 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 1 3 Wall 347 0.074 R-19 R-0.0 270 90 New 09-A5 Zone 1 4 Roof 1,308 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 5 Wall 200 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 1 6 Wall 12 0.074 R-19 R-0.0 270 90 New 09-A5 Zone 1 7 Roof 1,200 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 8 Wall 200 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 1 9 Wall 12 0.074 R-19 R-0.0 270 90 New 09-A5 Zone 1 10 Roof 1,200 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 11 Wall 200 0.074 R-19 R-0.01 90 90 New 09-A5 Zone 1 12 Wall 512 0.074 R-19 R-0.0 270 90 New 09-A5 Zone 1 13 Roof 1,200 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 14 Wall 200 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 1 15 Wall 12 0.074 R-19 R-0.0 270 90 New 09-A5 Zone 1 16 Roof 1,200 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 17 Wall 200 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 1 18 Wall 12 0.074 R-19 R-0.0 270 90 New 09-A5 Zone 1 19 Roof 1 200 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 20 Wall 200 0.074 R-19 R 0.0 90 90 New 09 A5 Zone 1 - N, t, A. H (New, txist ng, Altered, Hemoved) FENESTRATION SURFACES More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -tactors from Standards Table 116-A and B. CenifiratA shall hA BIAd in the mntractnec n ion nfe rn .,;nn r,.netn,ninn end in tho Nahlinn m -e ..fr„e Baer.,.nct-;n,. # T e Area U -Fac' SHGC2 Act. Azm. Cond. Stat. Glazing Type Location/ Comments 1 Window Front N 75 0.560 NFRC 0.41 NFRC 0 New SOLARBAN 60 LOW -E Zone 1 2 Window Front N 140 0.560 NFRC 0.41 NFRC 0 New SOLARBAN 60 LOW -E Zone 1 3 Window Front N 24 0.560 NFRC 0.41 NFRC 0 New SOLARBAN 60 LOW -E Zone 1 4 Window Right W 48 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 5 Window Right W 140 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 6 Window Right W 140 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 7 lWindow Right W 48 0.560 NFRC 0.41 JNFRC 270 New SOLARBAN 60 LOW -E Zone 1 8 Window Right W 140 0.560 NFRC 0.41 jNFRC 270 New SOLARBAN 60 LOW -E Zone 1 9 Window Right W 48 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 10 Window Right W 140 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 11 Window Right W 48 0.560 NFRC 0.41 NFRCj 270 New SOLARBAN 60 LOW -E IZone 1 12 Window Right W 140 0.560 NFRC 0.41 NFRCJ 2701 New ISOLARBAN 60 LOW -E lZone 1 13 Window Right W 48 0.560 NFRC 0.41 NFRCI 2701 New ISOLARBAN 60 LOW -E Zone 1 1 U -tactor Type: 11 F -A Default Table from Standards, Table NF1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 1168 Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 10.0 7.0 4.0 0.1 4.0 4.0 2 None 0.76 3 None 0.76 7.0 3.0 4.0 0.1 4.0 4.0 4 None 0.76 7.0 3.0 4.0 0.1 4.0 4.0 5 1 None 0.76 6 1 None 0.76 8.0 13.3 4.0 0.1 4.0 4.0 7 None 0.76 7.0 3.0 4.0 0.1 4.0 4.0 8 None 0.76 9 None 0.76 8.0 3.0 4.0 0.1 4.0 4.0 10 None 0.76 10.5 7.0 3.0 0.1 3.0 3.0 11 None 0.76 8.0 3.0 3.0 0.1 3.0 3.0 12 None 0.76 13 1 None 0.76 8.0 3.0 4.0 0.1 4.0 d n MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 1:1The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 15 feet and a LPD for general lighting of at least OS W/sq.tL If this box is checked. ENV -4C must hA filled nut wham euhmmtnn undn. the orecnd..u,.e r-11- A...,. -h EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paoe:6 of 24 1 CERTIFICATE OF COMPLIANCE ENV -1-C PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond. Status Joint Appendix IV Reference Location / Comments 21 Wall 12 0.074 . R-19 R-0.0 270 90 New 09-A5 Zone 1 22 Roof 1,200 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 23 Wall 62 0.074 'R-19 R-0.0 0 90 New 09-A5 Zone 1 24 Wall 350 0.074 R-19 R-0.0 180 90 New 09-A5 Zone 1 25 lWall 1 143 0.074 R-19 R-0.0 90 90 New 09-A5 Zone 1 26 Roof 1,500 0.036 R-30 R-0.0 0 0 New 02-A9 Zone 1 New SOLARBAN 60 LOW -E Zone 1 21 Window Rear S 94 0.560 NFRC 0.41 NFRC 180 New SOLARBAN 60 LOW -E Zone 1 22 Window Rear S 107 0.560 NFRC 0.41 NFRC 180 New SOLARBAN 60 LOW -E Zone 1 23 Window Left E 107 0.560 NFRC 0.41 JNFRC 90 New SOLARBAN 60 LOW -E Zone 1 More than or equal to 10,000 sq.fL of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U-factorsfrom Standards Table 116-A and B. Certificate shall be filed in the rmntrartnr's nrniart nffim di vinn-tmrtinn anrf in tha N dtdlnn .nom -e, nfr- nftcr rnn- Min. # 1TvDe Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazin T e Location/ Comments 14 Window Right W 48 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 15 Window Right W 140 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 16 Window Right W 140 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 17 Window Right W 48 0.560 NFRC 0.41 NFRC 270 New SOLARBAN 60 LOW -E Zone 1 18 Window Front N 140 0.560 NFRC 0.41 NFRC 0 New SOLARBAN 60 LOW -E Zone 1 19 lWindow Front N 48 0.560 NFRC 0.41 NFRC 0 New SOLARBAN 60 LOW -E Zone 1 20 Window Rear S 48 0.560 NFRC 0.41 NFRC 180 New SOLARBAN 60 LOW -E Zone 1 21 Window Rear S 94 0.560 NFRC 0.41 NFRC 180 New SOLARBAN 60 LOW -E Zone 1 22 Window Rear S 107 0.560 NFRC 0.41 NFRC 180 New SOLARBAN 60 LOW -E Zone 1 23 Window Left E 107 0.560 NFRC 0.41 JNFRC 90 New SOLARBAN 60 LOW -E Zone 1 W1 U -tactor type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhanci Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. HE. Dist. Len. H t. 14 None 0.76 8.0 3.0 4.0 0.1 4.0 4.0 15 None 0.76 16 None 0.76 17 None 0.76 7.0 3.0 4.0 0.1 4.0 4.0 18 None 0.76 1 8.0 13.3 4.0 0.1 4.0 4.0 19 None 0.76 8.0 3.0 4.0 0.1 4.0 4.0 20 None 0.76 8.0 3.0 4.0 0.1 4.0 4.0 21 None 0.76 10.0 9.0 2.0 0.1 2.0 2.0 22 None 0.76 8.0 10.0 4.0 0.1 4.0 4.0 23 None 0.76 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 1:1The proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 15 feet and a LPD for general lighting of at least 0.5 W/sq.fL II this box Is checked. ENV -4C must he filled out when sun n hmtntnnd>. tho Oroerdntinn t'. -.H.- A .... -h L EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:7 of 24 1 CERTIFICATE OF COMPLIANCE MECH-I-C PROJECT NAME DATE The Dunes Retail Center - Retail 3 1 8/14/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require conshuction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 112 of space or less and 25% or more of the ducts are in noncondifioned or sem conditioned space like an attic New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A: -Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 BhAr. -Water-loop Heat Pump Controls Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable Bow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment re uirin acceptance testing EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:8 of 24 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems AIR SYSTEMS Central or Single Zone Tenant A Tenant B Tenant C 2 1 1 T-24 ' MANDATORY MEASURES Section Reference on Plans or Specification Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity z Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF 112(a) 13.0 SEER / 11.3 EER 13.0 SEER / 11.2 EER 13.0 SEER / 11.2 EER 112(b) Yes Yes Yes 112(c), 115(a) n/a n/a n/a 121(b) No No No 121 b 327 cfm 300 cfm 300 cfm 121 c No No No 121 c No No No 121 c 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 Gravity Gravity Gravity 122 n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 144 a & b n/a n/a n/a 144 a & b 52,464 btuh 34,976 btuh 34,976 btuh 144 a & b n/a n/a n/a 144 a & b 61,854 btuh 44,043 btuh 46,431 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c No No No 144 d No No No 144 a No Economizer No Economizer No Economizer 144 Constant Temp Constant Temp Constant Tem 144(f) Constant Temp Constant Temp Constant Temp 144 k No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. NOTES TO FIFL n - Fnr Rnilriinn Ilnnartmant lion rinlxr I EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paae:9.of 24 1 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C IPROJECTNAMF DATE The Dunes Retail Center - Retail 3 8/14/2007 -] SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put °N/A" in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. AIR SYSTEMS Central or Single Zone Tenant D Tenant E Tenant F 1 1 1 Reference on Plans or Specification 1 112(a) 7.70 HSPF 7.70 HSPF 7.70 HSPF 112(a) 13.0 SEER / 11.2 EER 13.0 SEER / 11.2 EER 13.0 SEER / 11.2 EER 112(b) Yes Yes Yes 112(c), 115 a n/a n/a n/a 121(b) No No No 121 b 300 cfm 300 cfm 300 cfm 121 c No No No 121 c No No No 121 c 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122(f) Gravity Gravity Gravity 122 n/a n/a n/a 123 124 R-4.2 R-4.2 R-4.2 144 a & b n/a n/a n/a 144 a & b 34,976 btuh 34,976 btuh 34,976 btuh 144 a & b n/a n/a n/a 144 a & b 46,458 btuh 46,431 btuh 46,431 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c 144 c No No No 144 d No No No 144 a No Economizer No Economizer No Economizer 144 f Constant Temp Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k No No No 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 251/6 duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Pane: 10 of 24 1 O AIR SYSTEM, REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT�NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control' Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance T-24 Section AIR SYSTEMS Central or Single Zone Tenant G Tenant H 1 2 Reference on Plans or Specification 1 112(a) 7.70 HSPF 7.70 HSPF 112(a) 13.0 SEER / 11.2 EER 13.0 SEER / 11.3 EER 112 b Yes Yes 112(c), 115(a) n/a n/a 121(b) No No 121 b 300 cfm 375 cfm 121 c No No 121 c No No 121 c 122(e) Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Require 122(f) Gravity GravitV 122 n/a n/a 123 124 R-4.2 R-4.2 144 a & b n/a n/a 144 a & b 34,976 btuh 52,464 btuh 144 a & b n/a n/a 144 a & b 46,429 btuh 64,374 btuh 144 c Constant Volume Constant Volume 144 C 144 c No No 144 d No No 144 a No Economizer No Economizer 144 f Constant Temp Constant Tem 144 (f) Constant Temp Constant Temp 144 k No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A' in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. K In InITIMTI^n 11 4 1 li 1 11 EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:11 of 24 MECHANICAL VENTILATION MECH-3-C PROJECT NAME The Dunes Retail Center - Retail 3 DATE PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121 (b)2I AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G H I J K L M N ZONE/SYSTEM o NDS .T.. f1DG Cl)CA c don NMM 0 1 W ,�� XD n d 2 M CD3 0Q `D o' o ��A NCDT 1 �' tr O� m�3 Xn „ 7 E Cif^ 0 0X� _-A 00 D C A� 0 n.�N �' n' 0 o 3\ A�0 -n �a M �fO n Too 9X N a 0 ,aC tag o7X 0_ C- a (A mt � 'C >> D d rn r. D one 1 1,308 0.25 327 327 327 Tenant A Total 327 327 Zone 1 1,200 0.25 300 300 300 Tenant B Total 300 300 Zone 1 1,200 0.25 300 300 300 Tenant C Total 300 300 Zone 1 1,200 0.25 300 300 300 Tenant D Total 300 300 Zone 1,200 0.25 300 300 300 Tenant E Total 300 300 Zone 1 1,200 0.25 300 300 300 Tenant F Total 300 300 one 1 1,200 0.25 300 300 300 Tenant G Total 300 300 one 1 1,50 0.25 375 375 375 Tenant H Total 375 375 mi-- vantilati n rate per SActenn 1;)1 Table 121-A E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress pureoses fors aces without fixed seating. H Required Ventilation Air RE 'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). I Must be greater than or equal to H or use Transfer Air column N to make up the difference. J Design fan supply cfm Fan CFM x 30%; or K Condition area ft. Sq.) x 04 cfm/ft. s .• or L Maximum of Columns H J K or 300 cfm M This must be less than or equal to Column L and greater that or equal to the sum of Columns H + N. N Transfer air must be provided where the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Atr (column M), column H - M. EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page: 12 of 24 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME The Dunes Retail Center - Retail 3 DATE 8/14/2 CHILLER AND TOWER SUMMARY Distribution Type Rated Input Vol. (Gals.) Tons PUMPS Equipment Name Equipment T e oty.Efficient Tot. OW GPM BHP Motor Eff. Drive Eff. Pump Control MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water P mp Hot Water Piping Len th ff Control # HP Type In Plenum Outside Buried Insulation DHW / BOILER SUMMARY Energy Factor or RE Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Rated Input Vol. (Gals.) Condition Status Ext R -Val. MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water P mp Hot Water Piping Len th ff Control # HP Type In Plenum Outside Buried Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type ft Output Aux. kW Eff. Out ut Eff iciency Condition Status Economizer Type York BHP042 Packaged DX 4 42,000 0.0 7.70 HSPF 42,000 13.0 SEER / 11.3 EER New No Economizer York BHP060 Packaged DX 6 56,000 0.0 7.70 HSPF 55,000 13.0 SEER / 11.2 EER New No Economizer CENTRAL S TEM FAN SUMMARY System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. York BHP042 Constant Volume Draw -Through 1,400 0.40 66.0% 97.0% none York BHP060 Constant Volume Draw -Through 2,000 0.60 76.0% 100.0% none Run Initiation 11187111811 EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page: 13 of 24 ENVELOPE MANDATORY MEASURES ENV -MM (PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 DESCRIPTION Desi mer Enforcement FX_T 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. FXJ. § 118(c) All Insulating Materials shall be Installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. X] § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and 'fire doors). § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. FRI §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. EnergyPro By EnergySoft User Number: User Job Number: C07079 Page: 14 of 24 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM ,mul u The Dunes Retail Center - Retail 3 DATE 8/14/2007 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. X] § 115(a) Fan type central furnaces shall not have a pilot light. § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. X] § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls § 122(e) Each space conditioning system shall be installed with one of the following: XJ § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or ❑ § 122(e)1 B An occupancy sensor to control the operating period of the system; or E§ 122(e)1 C A 4 -hour timer that can be manually operated to control the operating period of the system. X❑ § 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and%or a setup cooling thermostat setpoint. ❑ § 122(8) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. ❑ § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro By EnergySoft User Number: User Job Number: C07079 Page: 15 of 24 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME The Dunes Retail Center - Retail 3 DATE 8/14/2007 Description Designer Enforcement Ventilation 0 § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 1��0 All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. 0 § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the Installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or 0 § 121(03 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or § 121(04 Another method approved by the Commission. Service Water Heating Systems ❑ §113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. ❑ §113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro By EnergySoft User Number: User Job Number: C07079 Page: 16 of 24 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME FLOOR AREA Tenant A 1,308 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 2 Heating System Output per System 42,000 Total Output (Btuh) 84,000 Output (Btuh/sqft) 64.2 Cooling System Output per System 42,000 Total Output (Btuh) 84,000 Total Output (Tons) 7.0 Total Output (Btuh/sqft) 64.2 Total Output (sgft/Ton) 186.9 Air System CFM per System 1,400 Airflow (cfm) 2,800 Airflow (cfm/sqft) 2.14 Airflow (cfm/Ton) 400.0 Outside Air (%) 11.7 Outside Air (cfm/sqft) 0.25 Note: values above given at ARI conditions 26.0 of Outside 327 cfm 69.7 of 11.0 / 77.6 of Outside 1 — 327 cfm 74.7/61.8 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent I CFM I Sensible 2,140 43,268 5,450 431 16,038 0 2,163 802 0 0 327 12,615 6,231 327 15,218 0 0 2,1631 802 60 232 11 681 32 860 York BHP042 61,854 11,967 52,464 Total Adjusted System Output61,854 11,967 52,464 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m Jan 12 am RICS (Airstream Temperatures at 64.6oF ® 105.OoF Heating Coil Airstream 1 79.0 / 64.0 of Supply Fan 2800 cfm 105.0 of -� Supply Air Ducts 104.7 of ROOMS 70.0 OF �% Return Air Ducts `i 55.0/53.8OF Cooling Coil Supply Fan 2800 cfm 55.0 153.8 OF -� Supply Air Ducts 55.7/54.1OF 49.7% R.H. ROOMS 74.0 / 61.6 of I h Return Air Ducts 11 EnergvPro 4.2 by EnergvSoft User Number: 5950 Job Number: C07079 Page:17 of 24 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME FLOOR AREA Tenant B 1,200 26.0 of 0 Outside 300 cfm 69.8 of R 11.0 / 77.6 of Outside �� 300 cfm 72.7/61.4 of 63.3 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAKCOIL HTG. PEAK CFM Sensible Latent CFM I Sensible 1,620 29,314 5,000 194 7,223 0 1,466 361 0 0 300 12,222 5,474 300 13,994 0 0 1,466 361 44,5141 10,474 21 939 York BHP060 44,043 4,474 34,976 Total Adjusted System Outputoa3 a,a74 34,s7s (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK F Jul 4 m Jan 12 am 105.0 of Heating Coil Supply Fan 2000 cfm 105.0 of Supply Air Ducts 104.8 of ROOMS 70.0 of h Return Air Ducts `i 78.4 / 64.2 of . 55.0 / 53.9 of Cooling Coil Supply Fan 2000 cfm 55.0 / 53.9 of -� Supply Air Ducts 55.7/54.2OF 54.2% R.H. ROOMS 72.0 / 61.1 of h Return Air Ducts '� I EneravPro 4.2 by EnemvSoft User Number: 5950 Job Number: C07079 Paae:18 of 24 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME FLOOR AREA Tenant C 1,200 Number of Systems 1 Heating System Output per System 56,000 Total Output (Btuh) 56,000 Output (Btuh/sqft) 46.7 Cooling System Output per System 55,000 Total Output (Btuh) 55,000 Total Output (Tons) 4.6 Total Output (Btuh/sqft) 45.8 Total Output (sgft/Ton) 261.8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.67 Airflow (cfm/Ton) 436.4 Outside Air (%) 15.0 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensible Latent CFM Sensible 1,552 31,382 5,000 194 7,223 0 1,569 361 0 0 300 11,569 5,573 300 13,994 0 0 1,569 361 46,1171 10 573 York BHP060 46,431 2,460 Total Adjusted System Output as,a31 2,460 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 4 pm 34,976 34,976 Jan 12am IFIEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heatina Peak) 1 26.0 of Outside Air 300 cfm 69.8 of 111.0 / 77.6 of Outside Air 300 cfm 74.7/62.0 of 63.3 OF M 105.OoF Heating Coil Supply Fan 2000 cfm 105.0 of Supply Air Ducts 104.8 of ROOMS 70.0 of h Return Air Ducts `S 80.2 / 64.7 of. 55.0 / 53.8 of Cooling Coil Supply Fa 2000 cfm 55.0 / 53.8 of -� Supply Air Ducts Fan 55.7/54.1OF 50.3% R.H. ROOMS 74.0 / 61.7 of h Return Air Ducts `i EnergyPro 4.2 by EnergySoft User Number. 5950 Job Number: C07079 Pg; 179 of 24 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME FLOOR AREA Tenant D 1,200 Number of Systems 1 Heating System Output per System 56,000 Total Output (Btuh) 56,000 Output (Btuh/sgft) 46.7 Cooling System Output per System 55,000 Total Output (Btuh) 55,000 Total Output (Tons) 4.6 Total Output (Btuh/sgft) 45.8 Total Output (sgftrron) 261.8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.67 Airflow (cfm/Ton) 436.4 Outside Air (%) 15.0 Outside Air (cfm/sgft) 0.25 Note: values above given at ARI conditions 26.0 OF 310 Outside Air 300 cfm 69.8 OF c,300C Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent I CFM I Sensible 1,602 32,399 5,000 238 8,851 0 1,620 443 0 0 300 11,562 5,574 300 13,981 0 0 1,620 443 47,2251 10 574 23 718 'ork BHP060 46,458 2,437 34,976 Total Adjusted System Outputas,a58 2,x37 34,s7s (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m Jan 12 am yam Temperatures at Time of Heating Peak) 105.0 °F 105.0 of Heating Coil x � Supply Air Ducts Supply Fan 104.8 OF 2000 cfm ROOMS 70.0 OF I Return Air Ducts `S TOOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak) 11.0/77.6°F 80.2/64.7°F 55.0/53.8°F 55.0/53.8OF 310 Supply Air Ducts ,Outside Air` 300 cfm Cooling Coil Supply Fan 55.8/54.1 °F 2000 cfm 50.3% R.H. ROOMS 74.8/62.0 °F 74.0/61.7°F Return Air Ducts EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paae:20 of 24 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME FLOOR AREA Tenant E 1,200 Number of Systems 1 Heating System Output per System 56,000 Total Output (Btuh) 56,000 Output (Btuh/sgft) 46.7 Cooling System Output per System 55,000 Total Output (Btuh) 55,000 Total Output (Tons) 4.6 Total Output (Btuh/sqft) 45.8 Total Output (sgft/Ton) 261.8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.67 Airflow (cfmfron) 436.4 Outside Air (%) 15.0 Outside Air (cfm/sqft) 0.25 Note: values above given at ARI conditions 26.0 OF Outside Air 300 cfm 69.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK ICOILHTG.PEAK CFM I Sensiblel Latent I I CFM I Sensible 1,55 31,382 5,000 194 7,223 0 1,569 361 0 0 300 11,569 5,573 300 13,994 0 0 1,569 361 46,1171 1 0 573 21 939 York BHP060 46,431 2,460 34,976 Total Adjusted System Outputx6,431 2,aso 3x,976 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m Jan 12 am 63.3 OF ® 105.OoF Heating Coil at Time of Supply Fan 2000 cfm 105.0 of -) Supply Air Ducts 104.8 of ROOMS 70.0 of K Return Air Ducts 'I 11.0/77.6OF 80.2/64.7OF 55.0/53.8OF 55.0/53.8OF Outside Air 300 cfm 74.7/62.0 OF Cooling Coil upp y Ir uc s Supply Fan 55.7/54 . 1 OF 2000 cfm 50.3% R.H. ROOMS 74.0 / 61.7 of Return Air Ducts I EnerovPro 4.2 by EnerovSoft User Number: 5950 Job Number: C07079 Paoe:21 of 24 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME FLOOR AREA Tenant F 1,200 Number of Systems 1 Heating System Output per System 56,000 Total Output (Btuh) 56,000 Output (Btuh/sqft) 46.7 Cooling System Output per System 55,000 Total Output (Btuh) 55,000 Total Output (Tons) 4.6 Total Output (Btuh/sgft) 45.8 Total Output (sgft/Ton) 261.8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.67 Airflow (cfm/Ton) 436.4 Outside Air (%) 15.0 Outside Air (cfm/sqft) 0.25 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD VAC EQUIPMENT SELE 'ork BHPO60 COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent I CFM I Sensible 1,552 31,382 5,000 194 7,223 105.OoF 0 Supply Air Ducts 1,569 361 0 0 300 11,569 5,573 300 13,994 0 Heating Coil 0 1,569 361 46,1171 10,5731 Total Adjusted System Output 46,431 2,460 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m 34,976 34,976 Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 OF 63.3 OF 105.OoF 105.0 OF Supply Air Ducts 0 Outside Air 300 cfm 104.8 of Heating Coil Supply Fan 2000 cfm ROOMS 70.0 of 69.8 of ' lie Return Air Ducts COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 111.0 / 77.6 OF 80.2 / 64.7 OF 55.0 / 53.8 OF 55.0153.8 OF Supply Air Ducts Q : . Outside Air : 300 cfm Cooling Coil Supply Fan 55.7 / 54.1 of 2000 cfm 50.3% R.H. ROOMS 74.0/61.7OF 74.7/62.00F Return Air Ducts i EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:22of 24 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME FLOOR AREA Tenant G 1,200 Number of Systems 1 Heating System Output per System 56,000 Total Output (Btuh) 56,000 Output (Btuh/sqft) 46.7 Cooling System Output per System 55,000 Total Output (Btuh) 55,000 Total Output (Tons) 4.6 Total Output (Btuh/sgft) 45.8 Total Output (sgft/Ton) 261.8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sqft) 1.67 Airflow (cfmlron) 436.4 Outside Air (%) 15.0 Outside Air (cfm/sqft) 0.25 Note: values above given at ARI conditions 26.0 OF Outside �..� 300 cfm 69.8 of ETRI 11.0 / 77.6 of Outside 0 300 cfm 74.7/62.0 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent I CFM I Sensible 1,547 31,283 5,000 194 7,223 0 1,564 361 0 0 300 11,570 5,573 L 300 13,994 0 0 1,564 1 361 46,0101 10,5731 F 21 939 York BHP060 46,429 2,463 34,976 Total Adjusted System Output46,429 2,463 34,976 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 4 m Jan 12 am -earn Temperatures at Time of Heating Peak) 105.0 of 105.0 of Supply Air Ducts 1048OF Heating Coil Supply Fan 2000 cfm ROOMS 70.0 of K Return Air Ducts `i 80.2 / 64.7 of M 55.0 / 53.8 of Cooling Coil Supply Fan 2000 cfm 55.0 / 53.8 of Supply Air Ducts 55.7/54.1OF 50.3% R.H. ROOMS 74.0 / 61.7 of — %. I h Return Air Ducts 11 EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:23 of 24 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE The Dunes Retail Center - Retail 3 8/14/2007 SYSTEM NAME - FLOOR AREA Tenant H 1,500 Number of S stems . 2 Heating System Output per System 42,000 Total Output (Btuh) 84,000 Output (Btuh/sqft) 56.0 Cooling System Output per System 42,000 Total Output (Btuh) 84,000 Total Output (Tons) 7.0 Total Output (Btuh/sqft) 56.0 Total Output (sgft/Ton) 214.3 Air System CFM per System 1,400 Airflow (cfm) 2,800 Airflow (cfm/sqft) 1.87 Airflow (cfm/Ton) 400.0 Outside Air (%) . 13.4 Outside Air (cfm/sqft) 0.25 Note: values above given at ARI conditions :ATING S 26.0 OF —)0 Outside Air 375 cfm 74.7 OF 68.2 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensiblel Latent I I CFM I Sensible 2,078 44,232 6,250 614 19,601 0 2,212 980 0 0 375 14,469 7,112 375 19,424 0 0 2,212 980 63,1331 13 362 40 985 'ork BHP042 64,374 9,830 52,464 Total Adjusted System Output 64,374 9,830 52,464 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 m Jan 12 am !am Temperatures at Time of Heating Peak) 105.0 of 105.0 OF -� 4 S I A' D t Heating Coil Supply Fan 2800 cfm upp y Ir uc s 104.7 OF ROOMS 75.0 OF k Return Air Ducts I DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of CoolingPeak 112.0/77.9°F 80.6/64.6OF 55.0/53.7OF 55.0/53.7OF Supply Air Ducts Outside Air 375 cfm Cooling Coil Supply Fan 55.7 / 54.0 OF 2800 cfm 48.1% R.H. ROOMS 75.7/62.2 °F 75.0 / 62.0 of i Return Air Ducts EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:24 of 24