06-3805 (CSCS) Revision 1 Title 24� AUG 3 1 2007
TITLE 24 REPORT
Title 24 Report for:
The Dunes Retail Center - Retail 3
79-710 Highway 111
La Quinta, CA 92253
Project Designer:
KKE Architects
525 East Colorado Boulevard
Pasadena, CA 91101
(626) 796-8230
Report Prepared By:
C+J Technical Solutions
C+J Technical Solutions and Services, Inc.
1320 Valley Vista Dr. Suite 206
Diamond Bar, CA 91765
(909) 896-3631
Job Number:
C07079
Date:
8/14/2007
CITY OF LA QU NTA
BUILDING & SAFETY DEPT.
APPROVED
OR CONSTRUCTION
DA D Y
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.2 by EnergySoft Job Number: C07079 User Number: 5950
I
k►
� AUG 3 1 2007
TITLE 24 REPORT
Title 24 Report for:
The Dunes Retail Center - Retail 3
79-710 Highway 111
La Quinta, CA 92253
Project Designer:
KKE Architects
525 East Colorado Boulevard
Pasadena, CA 91101
(626) 796-8230
Report Prepared By:
C+J Technical Solutions
C+J Technical Solutions and Services, Inc.
1320 Valley Vista Dr. Suite 206
Diamond Bar, CA 91765
(909) 896-3631
Job Number:
C07079
Date:
8/14/2007
CITY OF LA QU NTA
BUILDING & SAFETY DEPT.
APPROVED
OR CONSTRUCTION
DA D Y
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.2 by EnergySoft Job Number: C07079 User Number: 5950
I
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
The Dunes Retail Center - Retail 3
DOCUMENTATION AUTHOR
8/14/2007
PROJECT ADDRESSux,.
C+J Technical Solutions
BUILDING CONDITIONED FLOOR AREA
79-710 Highway 111 La QuintaBu,ld,n
The Principal Designer hereby certifys that the proposed building desi repr sen in t ' set of construction docu s
CLIMATE ZONE
1 15
'Permit#`
�• g` t=+
1'Yw'rtyieliBL {`YY
PRINCIPAL DESIGNER - ENVELOPE TELEPHONE
KKE Architects
(626) 796-8230
3f
DOCUMENTATION AUTHOR
TELEPHONE
Chck d by/Dated
C+J Technical Solutions and Services, Inc.
909 896-3631,,Enfgrcenienfa
ens
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
DATE OF PLANS
C+J Technical Solutions
BUILDING CONDITIONED FLOOR AREA
10,008 Sq.Ft.
The Principal Designer hereby certifys that the proposed building desi repr sen in t ' set of construction docu s
CLIMATE ZONE
1 15
BUILDING TYPE
®
NONRESIDENTIAL HIGH RISE RESIDENTIAL
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
®
NEW CONSTRUCTION ❑ ADDITION
❑
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGNATURE
L"44
C+J Technical Solutions
-
The Principal Designer hereby certifys that the proposed building desi repr sen in t ' set of construction docu s
consistent with the other compliance forms and worksheets, with th s ecificatio n w' any other calculations sub itted ith this
permit application. The proposed building as designed meets the rgy efficiency requirements contained in sections 110 16,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that 1 am licensed in the State of
California as a civil engineer, mechanical engineer, or I am a licensed architect.
2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
0 ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ENV -1
Required Forms
PRINCIPAL ENVELOPE DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
KKE Architects
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Lighting Compliance Not In The Scope Of
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
MECH-1 MECH-2 MECH-3 MECH-5
Requir orms
PRINCIPAL' MECHANICAL DESIGNER - NAME NAT
ILIC. NO.
DAT
Polar Barr Air Conditioning,Inc. , Q
�6 i
1w -
I
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paae:3 of 24
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1
PROJECT NAMEDATE
The Dunes Retail Center - Retail 3 8/14/2007
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft -
ENERGY COMPONENT
Standard
Design
10,008
Proposed
Design
0.48
274.68
61.41
0.00
0.00
0.00
18730
s743
o.00
.'
611.29
Compliance
Margintill
-
ss
Space Heating
Space Cooling
Indoor Fans
Heat Rejection
Pumps & Misc.
Domestic Hot Water
Lighting
Receptacle
Process
.
TOTALS:
0.58
0.10
`
.:
- i'
_
'� a ,0., 3 80 �4 2lt 0 .180 '1• = 4 0�. 330 ''
' a
357.01
82.33
56.36
-5.05
0.00
0.00
0.00
0.00
0.00
0.00
18730
0.00
87a3
0.00
o.00
o.00
688.67
77.38
Percent better than Standard: 11.21/6 ( 11.2% excluding process)
Building Orientation
Number of Stories
Number of Systems
Number of Zones
N 0 deg
Conditioned Floor Area
'Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
10,008
sqft.
sqft.
sqft.
1
0
10
10,008
81
I Natural Gas
Left Elevation
Orientation Gross Area Glazing Area Glazing Ratio
Front Elevation
N
950
sqft.
427
sqft.
44.9%
Left Elevation
(E)
1,700
sqft.
107
sqft.
6.3%
Rear Elevation
S
600
sqft.
250
sqft.
41.6%
Right Elevation
Total
Roof
(W)i
2,235sgft.
5,485
10,008
sgft.
sqft.
1,316
2,100
[::�
sgft.
sgft.
sqft.
58.9%
0.0%
Standard Proposed
Lighting Power Density 1.700 wisgft. 1.700 Will
Prescriptive Env. Heat Loss 1,687 Btu/h 1,787 scum
Prescriptive Env. Heat Gain 183,842 Btu/i 220,179 Btum-F
Remarks:
m Time: 08/14/0710:16:51 Run Code: 1187111811
User Number: 5950 Job Number: C07079 Page:4 of 24
[PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
The Dunes Retail Center - Retail 3
DATE
8/14/2007
ZONE INFORMATION
FloorFln.Cr
Allowed LPDA t
PArea
stem Name Zone Name Occu anc T e (s tt.)
ICoaiJS
t
�(W/s>)?
3 4
Xs �
""''-
SMI/��
Tenant Zone 1 Retail Sales, Wholesale 1,308
'1.70 , �'
j 4018
a
Tenant B17
1 Retail Sales, Wholesale 1,200
'1.70
Via° T 0 � �...,
a
.
Tenant C . Zone 1 Retail Sales, Wholesale 1,200
-1.70
Tenant D Zone 1 Retail Sales, Wholesale 1,200
`1.70�s
.r
Tenant E. Zone 1 Retail Sales, Wholesale 1',200
'1.70`
Tenant F Zone 1 Retail Sales Wholesale 1,200
'1.70 t1w�=1
Tenant G..
Zone 1 Retail Sales, Wholesale 1,200
'1.70
N
`"
OWN
I 1"
Tenant H Zone 1 Retail Sales Wholesale 1,50
'1.70�� aS 1WI
�
f
4
_ -
. -
iiriFYY-Yquat3'a...
'�" Z�} h'y2+"` �'
����i;� ���*uvi�
Y>3"if'Ci A. 1110,.
��E.Yi .?�y'^'a,{��•aw• d
'•.moi
59:.`ym+' R. a�$.�.v�+,}
Y$�._v�.�
-
I Wil"M
?s��-�"
No 101"i
+..i
IRK
NOW
•
it F
-4`x,.7, 4'a7y'd
1141 51 1
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C 4. See LT
(items marked with asterisk, see LTG -2 -C by others) (by others)
3-6-C Items above r'elu
�e sem" '
q peas) documentationx�'
on
The local enforcement agency should pay special an to the items specified in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
-------- t rea p--•• ��••�^ ^w -c arca.nq.any ucen reviewea. Aaequate tifti
documentation for their use have been'
provided by the applicant.ant. ; wntten jusicaon and
Authorized Signature or Stam
Run Initiatian Ti 10:16:51 Run • 1187111811
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:S of 24
CERTIFICATE OF COMPLIANCE ENV -1 -
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
OPAQUE SURFACES
# Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Azm.
Tilt
Cond:
Status
Joint Appendix
IV Reference
Location / Comments
1 Wall
461
0.074
R-19
R-0.0
0
90
New
09-A5
Zone 1
2 Wall
250
0.074
R-19
R-0.0
90
90
New
09-A5
Zone 1
3 Wall
347
0.074
R-19
R-0.0
270
90
New
09-A5
Zone 1
4 Roof
1,308
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
5 Wall
200
0.074
R-19
R-0.0
90
90
New
09-A5
Zone 1
6 Wall
12
0.074
R-19
R-0.0
270
90
New
09-A5
Zone 1
7 Roof
1,200
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
8 Wall
200
0.074
R-19
R-0.0
90
90
New
09-A5
Zone 1
9 Wall
12
0.074
R-19
R-0.0
270
90
New
09-A5
Zone 1
10 Roof
1,200
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
11 Wall
200
0.074
R-19
R-0.01
90
90
New
09-A5
Zone 1
12 Wall
512
0.074
R-19
R-0.0
270
90
New
09-A5
Zone 1
13 Roof
1,200
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
14 Wall
200
0.074
R-19
R-0.0
90
90
New
09-A5
Zone 1
15 Wall
12
0.074
R-19
R-0.0
270
90
New
09-A5
Zone 1
16 Roof
1,200
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
17 Wall
200
0.074
R-19
R-0.0
90
90
New
09-A5
Zone 1
18 Wall
12
0.074
R-19
R-0.0
270
90
New
09-A5
Zone 1
19 Roof
1 200
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
20 Wall
200
0.074
R-19
R 0.0
90
90
New
09 A5
Zone 1
- N, t, A. H (New, txist ng, Altered, Hemoved)
FENESTRATION SURFACES
More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -tactors from
Standards Table 116-A and B. CenifiratA shall hA BIAd in the mntractnec n ion nfe rn .,;nn r,.netn,ninn end in tho Nahlinn m -e ..fr„e Baer.,.nct-;n,.
#
T e
Area U -Fac'
SHGC2
Act.
Azm.
Cond.
Stat.
Glazing Type
Location/
Comments
1
Window
Front
N
75 0.560 NFRC
0.41 NFRC
0
New
SOLARBAN 60 LOW -E
Zone 1
2
Window
Front
N
140 0.560 NFRC
0.41 NFRC
0
New
SOLARBAN 60 LOW -E
Zone 1
3
Window
Front
N
24 0.560 NFRC
0.41 NFRC
0
New
SOLARBAN 60 LOW -E
Zone 1
4
Window
Right
W
48 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
5
Window
Right
W
140 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
6
Window
Right
W
140 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
7
lWindow
Right
W
48 0.560 NFRC
0.41 JNFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
8
Window
Right
W
140 0.560 NFRC
0.41 jNFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
9
Window
Right
W
48 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
10 Window
Right
W
140 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
11 Window
Right
W
48 0.560 NFRC
0.41 NFRCj
270
New
SOLARBAN 60 LOW -E
IZone 1
12 Window
Right
W
140 0.560 NFRC
0.41 NFRCJ
2701
New
ISOLARBAN 60 LOW -E
lZone 1
13 Window
Right
W
48 0.560 NFRC
0.41 NFRCI
2701
New
ISOLARBAN 60 LOW -E
Zone 1
1 U -tactor Type: 11 F -A Default Table from Standards, Table NF1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 1168 Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
#
Exterior Shade Type
SHGC
Window
Hgt. Wd.
Overhang Left Fin Right Fin
Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
1
None
0.76
10.0 7.0
4.0 0.1
4.0
4.0
2
None
0.76
3
None
0.76
7.0 3.0
4.0 0.1
4.0
4.0
4
None
0.76
7.0 3.0
4.0 0.1
4.0
4.0
5
1 None
0.76
6
1 None
0.76
8.0 13.3
4.0 0.1
4.0
4.0
7
None
0.76
7.0 3.0
4.0 0.1
4.0
4.0
8
None
0.76
9
None
0.76
8.0 3.0
4.0 0.1
4.0
4.0
10
None
0.76
10.5 7.0
3.0 0.1
3.0
3.0
11
None
0.76
8.0 3.0
3.0 0.1
3.0
3.0
12
None
0.76
13
1 None
0.76
8.0 3.0
4.0 0.1
4.0
d n
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
1:1The
proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 15 feet and a LPD for general lighting of at least OS W/sq.tL If this
box is checked. ENV -4C must hA filled nut wham euhmmtnn undn. the orecnd..u,.e r-11- A...,. -h
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paoe:6 of 24 1
CERTIFICATE OF COMPLIANCE ENV -1-C
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
OPAQUE SURFACES
# Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Am.
Tilt
Cond.
Status
Joint Appendix
IV Reference
Location / Comments
21 Wall
12
0.074
. R-19
R-0.0
270
90
New
09-A5
Zone 1
22 Roof
1,200
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
23 Wall
62
0.074
'R-19
R-0.0
0
90
New
09-A5
Zone 1
24 Wall
350
0.074
R-19
R-0.0
180
90
New
09-A5
Zone 1
25 lWall
1 143
0.074
R-19
R-0.0
90
90
New
09-A5
Zone 1
26 Roof
1,500
0.036
R-30
R-0.0
0
0
New
02-A9
Zone 1
New
SOLARBAN 60 LOW -E
Zone 1
21 Window
Rear
S
94 0.560 NFRC
0.41 NFRC
180
New
SOLARBAN 60 LOW -E
Zone 1
22 Window
Rear
S
107 0.560 NFRC
0.41 NFRC
180
New
SOLARBAN 60 LOW -E
Zone 1
23 Window
Left
E
107 0.560 NFRC
0.41 JNFRC
90
New
SOLARBAN 60 LOW -E
Zone 1
More than or equal to 10,000 sq.fL of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U-factorsfrom
Standards Table 116-A and B. Certificate shall be filed in the rmntrartnr's nrniart nffim di vinn-tmrtinn anrf in tha N dtdlnn .nom -e, nfr- nftcr rnn- Min.
# 1TvDe
Area U -Fac'
SHGC2
Act.
Am.
Cond.
Stat.
Glazin T e
Location/
Comments
14 Window
Right
W
48 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
15 Window
Right
W
140 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
16 Window
Right
W
140 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
17 Window
Right
W
48 0.560 NFRC
0.41 NFRC
270
New
SOLARBAN 60 LOW -E
Zone 1
18 Window
Front
N
140 0.560 NFRC
0.41 NFRC
0
New
SOLARBAN 60 LOW -E
Zone 1
19 lWindow
Front
N
48 0.560 NFRC
0.41 NFRC
0
New
SOLARBAN 60 LOW -E
Zone 1
20 Window
Rear
S
48 0.560 NFRC
0.41 NFRC
180
New
SOLARBAN 60 LOW -E
Zone 1
21 Window
Rear
S
94 0.560 NFRC
0.41 NFRC
180
New
SOLARBAN 60 LOW -E
Zone 1
22 Window
Rear
S
107 0.560 NFRC
0.41 NFRC
180
New
SOLARBAN 60 LOW -E
Zone 1
23 Window
Left
E
107 0.560 NFRC
0.41 JNFRC
90
New
SOLARBAN 60 LOW -E
Zone 1
W1 U -tactor type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
#
Exterior Shade Type
SHGC
Window
Hgt. Wd.
Overhanci Left Fin Right Fin
Len. H t. LExt.RExt. Dist. Len. HE. Dist. Len. H t.
14
None
0.76
8.0 3.0
4.0 0.1 4.0
4.0
15
None
0.76
16
None
0.76
17
None
0.76
7.0 3.0
4.0 0.1 4.0
4.0
18
None
0.76 1
8.0 13.3
4.0 0.1 4.0
4.0
19
None
0.76
8.0 3.0
4.0 0.1 4.0
4.0
20
None
0.76
8.0 3.0
4.0 0.1 4.0
4.0
21
None
0.76
10.0 9.0
2.0 0.1 2.0
2.0
22
None
0.76
8.0 10.0
4.0 0.1 4.0
4.0
23
None
0.76
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
1:1The
proposed building contains an enclosed space with floor area greater than 25,000 sq.ft, a ceiling height greater than 15 feet and a LPD for general lighting of at least 0.5 W/sq.fL II this
box Is checked. ENV -4C must he filled out when sun n
hmtntnnd>. tho Oroerdntinn t'. -.H.- A .... -h
L EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:7 of 24 1
CERTIFICATE OF COMPLIANCE MECH-I-C
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 1
8/14/2007
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates and operating and maintenance information meet the requirements of Section 10-103(b) and Title 24 Part 6.
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require conshuction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 112 of space or less and 25% or more of the ducts are in noncondifioned or sem conditioned space like an
attic New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A: -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 BhAr.
-Water-loop Heat Pump Controls
Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable Bow chilled, hydronic heat pump
or condenser water systems where the pumps motors are greater than 5 hp.
Equipment re uirin acceptance testing
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:8 of 24
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
AIR SYSTEMS Central or Single Zone
Tenant A
Tenant B
Tenant C
2
1
1
T-24 '
MANDATORY MEASURES Section Reference on Plans or Specification
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity z
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
112(a)
7.70 HSPF
7.70 HSPF
7.70 HSPF
112(a)
13.0 SEER / 11.3 EER
13.0 SEER / 11.2 EER
13.0 SEER / 11.2 EER
112(b)
Yes
Yes
Yes
112(c), 115(a)
n/a
n/a
n/a
121(b)
No
No
No
121 b
327 cfm
300 cfm
300 cfm
121 c
No
No
No
121 c
No
No
No
121 c 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122
Gravity
Gravity
Gravity
122
n/a
n/a
n/a
123
124
R-4.2
R-4.2
R-4.2
144 a & b
n/a
n/a
n/a
144 a & b
52,464 btuh
34,976 btuh
34,976 btuh
144 a & b
n/a
n/a
n/a
144 a & b
61,854 btuh
44,043 btuh
46,431 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
No
No
No
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144
Constant Temp
Constant Temp
Constant Tem
144(f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
NOTES TO FIFL n - Fnr Rnilriinn Ilnnartmant lion rinlxr
I EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paae:9.of 24 1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
IPROJECTNAMF DATE
The Dunes Retail Center - Retail 3 8/14/2007
-]
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put °N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
AIR SYSTEMS Central or Single Zone
Tenant D
Tenant E
Tenant F
1
1
1
Reference on Plans or Specification 1
112(a)
7.70 HSPF
7.70 HSPF
7.70 HSPF
112(a)
13.0 SEER / 11.2 EER
13.0 SEER / 11.2 EER
13.0 SEER / 11.2 EER
112(b)
Yes
Yes
Yes
112(c), 115 a
n/a
n/a
n/a
121(b)
No
No
No
121 b
300 cfm
300 cfm
300 cfm
121 c
No
No
No
121 c
No
No
No
121 c 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122(f)
Gravity
Gravity
Gravity
122
n/a
n/a
n/a
123
124
R-4.2
R-4.2
R-4.2
144 a & b
n/a
n/a
n/a
144 a & b
34,976 btuh
34,976 btuh
34,976 btuh
144 a & b
n/a
n/a
n/a
144 a & b
46,458 btuh
46,431 btuh
46,431 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c
144 c
No
No
No
144 d
No
No
No
144 a
No Economizer
No Economizer
No Economizer
144 f
Constant Temp
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 251/6 duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Pane: 10 of 24 1
O
AIR SYSTEM, REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT�NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
MANDATORY MEASURES
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control'
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
T-24
Section
AIR SYSTEMS Central or Single Zone
Tenant G Tenant H
1 2
Reference on Plans or Specification 1
112(a)
7.70 HSPF
7.70 HSPF
112(a)
13.0 SEER / 11.2 EER
13.0 SEER / 11.3 EER
112 b
Yes
Yes
112(c), 115(a)
n/a
n/a
121(b)
No
No
121 b
300 cfm
375 cfm
121 c
No
No
121 c
No
No
121 c 122(e)
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Require
122(f)
Gravity
GravitV
122
n/a
n/a
123
124
R-4.2
R-4.2
144 a & b
n/a
n/a
144 a & b
34,976 btuh
52,464 btuh
144 a & b
n/a
n/a
144 a & b
46,429 btuh
64,374 btuh
144 c
Constant Volume
Constant Volume
144 C
144 c
No
No
144 d
No
No
144 a
No Economizer
No Economizer
144 f
Constant Temp
Constant Tem
144 (f)
Constant Temp
Constant Temp
144 k
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A' in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
K In InITIMTI^n 11 4 1 li 1 11
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:11 of 24
MECHANICAL VENTILATION MECH-3-C
PROJECT NAME
The Dunes Retail Center - Retail 3
DATE
PRESCRIPTIVE REHEAT
LIMITATION Section 144(d))
MECHANICAL VENTILATION Section 121 (b)2I
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
ZONE/SYSTEM
o
NDS
.T.. f1DG
Cl)CA
c
don
NMM
0 1
W ,��
XD
n d
2
M
CD3
0Q
`D o'
o
��A
NCDT
1 �'
tr
O�
m�3
Xn
„ 7 E
Cif^
0
0X�
_-A 00 D
C
A�
0
n.�N
�' n'
0 o
3\
A�0
-n
�a M
�fO
n
Too
9X
N
a
0
,aC
tag
o7X
0_
C-
a
(A
mt
�
'C
>>
D
d
rn
r.
D
one 1
1,308
0.25
327
327
327
Tenant A
Total
327
327
Zone 1
1,200
0.25
300
300
300
Tenant B
Total
300
300
Zone 1
1,200
0.25
300
300
300
Tenant C
Total
300
300
Zone 1
1,200
0.25
300
300
300
Tenant D
Total
300
300
Zone
1,200
0.25
300
300
300
Tenant E
Total
300
300
Zone 1
1,200
0.25
300
300
300
Tenant F
Total
300
300
one 1
1,200
0.25
300
300
300
Tenant G
Total
300
300
one 1
1,50
0.25
375
375
375
Tenant H
Total
375
375
mi-- vantilati n rate per SActenn 1;)1 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load for egress pureoses fors aces without fixed seating.
H Required Ventilation Air RE 'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G).
I Must be greater than or equal to H or use Transfer Air column N to make up the difference.
J Design fan supply cfm Fan CFM x 30%; or
K Condition area ft. Sq.) x 04 cfm/ft. s .• or
L Maximum of Columns H J K or 300 cfm
M This must be less than or equal to Column L and greater that or equal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column H) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or
equal to the difference between the Required Ventilation Air (column H) and the Design Minimum Atr (column M), column H - M.
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page: 12 of 24
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2
MECH-5-C
PROJECT NAME
The Dunes Retail Center - Retail 3
DATE 8/14/2
CHILLER AND TOWER SUMMARY
Distribution Type
Rated
Input
Vol.
(Gals.)
Tons
PUMPS
Equipment Name
Equipment T e
oty.Efficient
Tot.
OW
GPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp
Hot Water Piping Len th ff
Control
#
HP
Type
In Plenum
Outside
Buried
Insulation
DHW / BOILER SUMMARY
Energy
Factor
or RE
Standby
Loss or
Pilot
TANK INSUL.
System Name
System Type
Distribution Type
Rated
Input
Vol.
(Gals.)
Condition
Status
Ext
R -Val.
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp
Hot Water Piping Len th ff
Control
#
HP
Type
In Plenum
Outside
Buried
Insulation
CENTRAL SYSTEM RATINGS
HEATING
COOLING
System Name
System Type
ft
Output
Aux.
kW
Eff.
Out ut
Eff iciency
Condition
Status
Economizer Type
York BHP042
Packaged DX
4
42,000
0.0
7.70 HSPF
42,000
13.0 SEER / 11.3 EER
New
No Economizer
York BHP060
Packaged DX
6
56,000
0.0
7.70 HSPF
55,000
13.0 SEER / 11.2 EER
New
No Economizer
CENTRAL S TEM FAN SUMMARY
System Name
Fan Type
Motor Location
CFM
BHP
Motor
Eff.
Drive
Eff.
CFM
BHP
Motor
Eff.
Drive
Eff.
York BHP042
Constant Volume
Draw -Through
1,400
0.40
66.0%
97.0%
none
York BHP060
Constant Volume
Draw -Through
2,000
0.60
76.0%
100.0%
none
Run Initiation 11187111811
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page: 13 of 24
ENVELOPE MANDATORY MEASURES ENV -MM
(PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
DESCRIPTION
Desi mer
Enforcement
FX_T 118(a) Installed Insulating Material shall have been certified by the manufacturer to comply
with the California Quality Standards for insulating material, Title 20, Chapter 4, Article
3.
FXJ. § 118(c) All Insulating Materials shall be Installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
X] § 117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
§ 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors and
'fire doors).
§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
FRI §118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall have
insulation with an installed R -value of no less than R-13 between framing members.
EnergyPro By EnergySoft User Number: User Job Number: C07079 Page: 14 of 24
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
,mul u
The Dunes Retail Center - Retail 3
DATE
8/14/2007
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
§111 Any appliance for which there is a California standard established in the Appliance
Efficiency Regulations will comply with the applicable standard.
X] § 115(a) Fan type central furnaces shall not have a pilot light.
§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
X] § 124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§ 122(e) Each space conditioning system shall be installed with one of the following:
XJ § 122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the requirements
of Section 112 (d)) shall be installed with an automatic time switch with an
accessible manual override that allows operation of the system during off -hours for
up to 4 hours. The time switch shall be capable of programming different
schedules for weekdays and weekends and have program backup capabilities that
prevent the loss of the device's program and time setting for at least 10 hours if
power is interrupted; or
❑ § 122(e)1 B An occupancy sensor to control the operating period of the system; or
E§ 122(e)1 C A 4 -hour timer that can be manually operated to control the operating period of the
system.
X❑ § 122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and%or a setup cooling thermostat setpoint.
❑ § 122(8) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with isolation
zones. Each zone: shall not exceed 25,000 square feet; shall be provided with
isolation devices, such as valves or dampers, that allow the supply of heating or
cooling to be setback or shut off independently of other isolation areas; and shall
be controlled by a time control device as described above.
§ 122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the control
shall be adjustable up to 85 degrees F or higher. Where used for both heating and
cooling, the control shall be capable of providing a deadband of at least 5 degrees
F within which the supply of heating and cooling is shut off or reduced to a
minimum.
§ 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable
setpoint stops accessible only to authorized personnel.
❑ § 112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro By EnergySoft User Number: User Job Number: C07079 Page: 15 of 24
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM
PROJECT NAME
The Dunes Retail Center - Retail 3
DATE
8/14/2007
Description
Designer
Enforcement
Ventilation
0
§ 121(e)
Controls shall be provided to allow outside air dampers or devices to be operated at
the ventilation rates as specified on these plans.
§ 122(f)
Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems.
§ 1��0
All gravity ventilating systems shall be provided with automatic or readily accessible
manually operated dampers in all openings to the outside, except for combustion air
openings.
0
§ 121(f)1
Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
§ 121(f)2
Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
Installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the
person with overall responsibility for the design of the ventilation system; or
0
§ 121(03
Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
§ 121(04
Another method approved by the Commission.
Service
Water Heating Systems
❑
§113(b)2
If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
❑
§113(c)
Lavatories in restrooms of public facilities shall be equipped with controls to limit the
outlet temperature to 110 degrees F.
EnergyPro
By EnergySoft User Number: User Job Number: C07079 Page: 16 of 24
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM NAME FLOOR AREA
Tenant A 1,308
ENGINEERING CHECKS SYSTEM LOAD
Number of Systems
2
Heating System
Output per System
42,000
Total Output (Btuh)
84,000
Output (Btuh/sqft)
64.2
Cooling System
Output per System
42,000
Total Output (Btuh)
84,000
Total Output (Tons)
7.0
Total Output (Btuh/sqft)
64.2
Total Output (sgft/Ton)
186.9
Air System
CFM per System
1,400
Airflow (cfm)
2,800
Airflow (cfm/sqft)
2.14
Airflow (cfm/Ton)
400.0
Outside Air (%)
11.7
Outside Air (cfm/sqft)
0.25
Note: values above given at ARI conditions
26.0 of
Outside
327 cfm
69.7 of
11.0 / 77.6 of
Outside
1
—
327 cfm
74.7/61.8 OF
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible Latent
I CFM
I Sensible
2,140
43,268
5,450
431
16,038
0
2,163
802
0
0
327
12,615
6,231
327
15,218
0
0
2,1631
802
60 232 11 681 32 860
York BHP042 61,854 11,967 52,464
Total Adjusted System Output61,854 11,967 52,464
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 4 m Jan 12 am
RICS (Airstream Temperatures at
64.6oF ® 105.OoF
Heating Coil
Airstream 1
79.0 / 64.0 of
Supply Fan
2800 cfm
105.0 of
-� Supply Air Ducts
104.7 of
ROOMS
70.0 OF
�% Return Air Ducts `i
55.0/53.8OF
Cooling Coil Supply Fan
2800 cfm
55.0 153.8 OF
-� Supply Air Ducts
55.7/54.1OF
49.7% R.H. ROOMS
74.0 / 61.6 of
I
h Return Air Ducts 11
EnergvPro 4.2 by EnergvSoft User Number: 5950 Job Number: C07079 Page:17 of 24
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM NAME FLOOR AREA
Tenant B 1,200
26.0 of
0
Outside
300 cfm
69.8 of
R
11.0 / 77.6 of
Outside
��
300 cfm
72.7/61.4 of
63.3 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAKCOIL
HTG. PEAK
CFM
Sensible Latent
CFM
I Sensible
1,620
29,314
5,000
194
7,223
0
1,466
361
0
0
300
12,222
5,474
300
13,994
0
0
1,466
361
44,5141 10,474 21 939
York BHP060 44,043 4,474 34,976
Total Adjusted System Outputoa3 a,a74 34,s7s
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK F Jul 4 m Jan 12 am
105.0 of
Heating Coil
Supply Fan
2000 cfm
105.0 of
Supply Air Ducts
104.8 of
ROOMS
70.0 of
h Return Air Ducts `i
78.4 / 64.2 of . 55.0 / 53.9 of
Cooling Coil
Supply Fan
2000 cfm
55.0 / 53.9 of
-� Supply Air Ducts
55.7/54.2OF
54.2% R.H. ROOMS
72.0 / 61.1 of
h Return Air Ducts '�
I EneravPro 4.2 by EnemvSoft User Number: 5950 Job Number: C07079 Paae:18 of 24 1
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM NAME FLOOR AREA
Tenant C 1,200
Number of Systems
1
Heating System
Output per System
56,000
Total Output (Btuh)
56,000
Output (Btuh/sqft)
46.7
Cooling System
Output per System
55,000
Total Output (Btuh)
55,000
Total Output (Tons)
4.6
Total Output (Btuh/sqft)
45.8
Total Output (sgft/Ton)
261.8
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sgft)
1.67
Airflow (cfm/Ton)
436.4
Outside Air (%)
15.0
Outside Air (cfm/sgft)
0.25
Note: values above given at ARI conditions
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible Latent
CFM
Sensible
1,552
31,382
5,000
194
7,223
0
1,569
361
0
0
300
11,569
5,573
300
13,994
0
0
1,569
361
46,1171 10 573
York BHP060 46,431 2,460
Total Adjusted System Output as,a31 2,460
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK I Jul 4 pm
34,976
34,976
Jan 12am
IFIEATING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Heatina Peak) 1
26.0 of
Outside Air
300 cfm
69.8 of
111.0 / 77.6 of
Outside Air
300 cfm
74.7/62.0 of
63.3 OF M 105.OoF
Heating Coil
Supply Fan
2000 cfm
105.0 of
Supply Air Ducts
104.8 of
ROOMS
70.0 of
h Return Air Ducts `S
80.2 / 64.7 of. 55.0 / 53.8 of
Cooling Coil Supply Fa
2000 cfm
55.0 / 53.8 of
-� Supply Air Ducts
Fan 55.7/54.1OF
50.3% R.H. ROOMS
74.0 / 61.7 of
h Return Air Ducts `i
EnergyPro 4.2 by EnergySoft User Number. 5950 Job Number: C07079 Pg; 179 of 24
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM NAME FLOOR AREA
Tenant D 1,200
Number of Systems
1
Heating System
Output per System
56,000
Total Output (Btuh)
56,000
Output (Btuh/sgft)
46.7
Cooling System
Output per System
55,000
Total Output (Btuh)
55,000
Total Output (Tons)
4.6
Total Output (Btuh/sgft)
45.8
Total Output (sgftrron)
261.8
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sgft)
1.67
Airflow (cfm/Ton)
436.4
Outside Air (%)
15.0
Outside Air (cfm/sgft)
0.25
Note: values above given at ARI conditions
26.0 OF
310
Outside Air
300 cfm
69.8 OF
c,300C
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel Latent
I CFM
I Sensible
1,602
32,399
5,000
238
8,851
0
1,620
443
0
0
300
11,562
5,574
300
13,981
0
0
1,620
443
47,2251 10 574 23 718
'ork BHP060 46,458 2,437 34,976
Total Adjusted System Outputas,a58 2,x37 34,s7s
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 4 m Jan 12 am
yam Temperatures at Time of Heating Peak)
105.0 °F 105.0 of
Heating Coil
x �
Supply Air Ducts
Supply Fan 104.8 OF
2000 cfm ROOMS
70.0 OF
I
Return Air Ducts `S
TOOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Cooling Peak)
11.0/77.6°F 80.2/64.7°F 55.0/53.8°F 55.0/53.8OF
310 Supply Air Ducts
,Outside Air`
300 cfm Cooling Coil Supply Fan 55.8/54.1 °F
2000 cfm 50.3% R.H. ROOMS
74.8/62.0 °F 74.0/61.7°F
Return Air Ducts
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Paae:20 of 24
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM NAME FLOOR AREA
Tenant E 1,200
Number of Systems
1
Heating System
Output per System
56,000
Total Output (Btuh)
56,000
Output (Btuh/sgft)
46.7
Cooling System
Output per System
55,000
Total Output (Btuh)
55,000
Total Output (Tons)
4.6
Total Output (Btuh/sqft)
45.8
Total Output (sgft/Ton)
261.8
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sqft)
1.67
Airflow (cfmfron)
436.4
Outside Air (%)
15.0
Outside Air (cfm/sqft)
0.25
Note: values above given at ARI conditions
26.0 OF
Outside Air
300 cfm
69.8 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
ICOILHTG.PEAK
CFM
I Sensiblel Latent I
I CFM
I Sensible
1,55
31,382
5,000
194
7,223
0
1,569
361
0
0
300
11,569
5,573
300
13,994
0
0
1,569
361
46,1171 1 0 573 21 939
York BHP060 46,431 2,460 34,976
Total Adjusted System Outputx6,431 2,aso 3x,976
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 4 m Jan 12 am
63.3 OF ® 105.OoF
Heating Coil
at Time of
Supply Fan
2000 cfm
105.0 of
-) Supply Air Ducts
104.8 of
ROOMS
70.0 of
K Return Air Ducts 'I
11.0/77.6OF 80.2/64.7OF 55.0/53.8OF 55.0/53.8OF
Outside Air
300 cfm
74.7/62.0 OF
Cooling Coil
upp y Ir uc s
Supply Fan 55.7/54 . 1 OF
2000 cfm 50.3% R.H. ROOMS
74.0 / 61.7 of
Return Air Ducts
I EnerovPro 4.2 by EnerovSoft User Number: 5950 Job Number: C07079 Paoe:21 of 24 1
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM NAME FLOOR AREA
Tenant F 1,200
Number of Systems
1
Heating System
Output per System
56,000
Total Output (Btuh)
56,000
Output (Btuh/sqft)
46.7
Cooling System
Output per System
55,000
Total Output (Btuh)
55,000
Total Output (Tons)
4.6
Total Output (Btuh/sgft)
45.8
Total Output (sgft/Ton)
261.8
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sqft)
1.67
Airflow (cfm/Ton)
436.4
Outside Air (%)
15.0
Outside Air (cfm/sqft)
0.25
Note: values above given at ARI conditions
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
VAC EQUIPMENT SELE
'ork BHPO60
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel Latent I
CFM
I Sensible
1,552
31,382
5,000
194
7,223
105.OoF
0
Supply Air Ducts
1,569
361
0
0
300
11,569
5,573
300
13,994
0
Heating Coil
0
1,569
361
46,1171 10,5731
Total Adjusted System Output 46,431 2,460
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 4 m
34,976
34,976
Jan 12 am
EATING SYSTEM PSYCHROMETRICS
Airstream Temperatures
at Time of Heating
Peak
26.0 OF 63.3 OF
105.OoF
105.0 OF
Supply Air Ducts
0
Outside Air
300 cfm
104.8 of
Heating Coil
Supply Fan
2000 cfm
ROOMS
70.0 of
69.8 of
'
lie
Return Air Ducts
COOLING SYSTEM PSYCHROMETRICS
Airstream Temperatures
at Time of Cooling
Peak
111.0 / 77.6 OF
80.2 / 64.7 OF
55.0 / 53.8 OF 55.0153.8 OF
Supply Air Ducts
Q :
.
Outside Air
:
300 cfm
Cooling
Coil Supply Fan
55.7 / 54.1 of
2000 cfm
50.3% R.H. ROOMS
74.0/61.7OF
74.7/62.00F
Return Air Ducts i
EnergyPro 4.2 by EnergySoft User Number: 5950
Job Number: C07079
Page:22of 24
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
The Dunes Retail Center - Retail 3 8/14/2007
SYSTEM NAME FLOOR AREA
Tenant G 1,200
Number of Systems
1
Heating System
Output per System
56,000
Total Output (Btuh)
56,000
Output (Btuh/sqft)
46.7
Cooling System
Output per System
55,000
Total Output (Btuh)
55,000
Total Output (Tons)
4.6
Total Output (Btuh/sgft)
45.8
Total Output (sgft/Ton)
261.8
Air System
CFM per System
2,000
Airflow (cfm)
2,000
Airflow (cfm/sqft)
1.67
Airflow (cfmlron)
436.4
Outside Air (%)
15.0
Outside Air (cfm/sqft)
0.25
Note: values above given at ARI conditions
26.0 OF
Outside
�..�
300 cfm
69.8 of
ETRI
11.0 / 77.6 of
Outside
0
300 cfm
74.7/62.0 OF
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
ISensiblel Latent
I CFM
I Sensible
1,547
31,283
5,000
194
7,223
0
1,564
361
0
0
300
11,570
5,573
L 300
13,994
0
0
1,564
1 361
46,0101 10,5731 F 21 939
York BHP060 46,429 2,463 34,976
Total Adjusted System Output46,429 2,463 34,976
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 4 m Jan 12 am
-earn Temperatures at Time of Heating Peak)
105.0 of 105.0 of
Supply Air Ducts
1048OF
Heating Coil Supply Fan
2000 cfm ROOMS
70.0 of
K Return Air Ducts `i
80.2 / 64.7 of M 55.0 / 53.8 of
Cooling Coil
Supply Fan
2000 cfm
55.0 / 53.8 of
Supply Air Ducts
55.7/54.1OF
50.3% R.H. ROOMS
74.0 / 61.7 of
— %. I
h Return Air Ducts 11
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:23 of 24 1
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME
DATE
The Dunes Retail Center - Retail 3
8/14/2007
SYSTEM NAME -
FLOOR AREA
Tenant H
1,500
Number of S stems .
2
Heating System
Output per System
42,000
Total Output (Btuh)
84,000
Output (Btuh/sqft)
56.0
Cooling System
Output per System
42,000
Total Output (Btuh)
84,000
Total Output (Tons)
7.0
Total Output (Btuh/sqft)
56.0
Total Output (sgft/Ton)
214.3
Air System
CFM per System
1,400
Airflow (cfm)
2,800
Airflow (cfm/sqft)
1.87
Airflow (cfm/Ton)
400.0
Outside Air (%)
. 13.4
Outside Air (cfm/sqft)
0.25
Note: values above given at ARI conditions
:ATING S
26.0 OF
—)0
Outside Air
375 cfm
74.7 OF
68.2 OF
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensiblel Latent
I I CFM
I Sensible
2,078
44,232
6,250
614
19,601
0
2,212
980
0
0
375
14,469
7,112
375
19,424
0
0
2,212
980
63,1331 13 362 40 985
'ork BHP042 64,374 9,830 52,464
Total Adjusted System Output 64,374 9,830 52,464
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 m Jan 12 am
!am Temperatures at Time of Heating Peak)
105.0 of 105.0 OF -� 4 S I A' D t
Heating Coil
Supply Fan
2800 cfm
upp y Ir uc s
104.7 OF
ROOMS
75.0 OF
k Return Air Ducts I
DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of CoolingPeak
112.0/77.9°F 80.6/64.6OF 55.0/53.7OF 55.0/53.7OF
Supply Air Ducts
Outside Air
375 cfm
Cooling Coil Supply Fan 55.7 / 54.0 OF
2800 cfm 48.1% R.H. ROOMS
75.7/62.2 °F 75.0 / 62.0 of
i
Return Air Ducts
EnergyPro 4.2 by EnergySoft User Number: 5950 Job Number: C07079 Page:24 of 24