Loading...
07-3066 (RC) Revision 2 Certificate of Compliance.. i PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME ------------ — �- -----i-- — DATE -- — Komar _Desert _C_ enter - Bld_g H_— _ —__ Sq.Ft. 12/4/2007 PROJECT ADDRESS NONRESIDENTIAL HIGH RISE RESIDENTIAL NEW CONSTRUCTION L7 ADDITION lJ HOTEUMOTEL GUEST ROOM EXISTING + ADDITION/ALTERATION consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this Hway 111 and Jefferson CA 1. 1 hereby affirm that I am eligible under the provisions of Division I ahMl INIG "A sE)ERTq sign this document as the person responsible for its preparation; ar d that I a li _L_a_Q_u_inta, !PRINCIPAL DESIGNER - ENVELOPE _ !TELEPHONE i, J u 2. I affirm that I am eligible under the provisions of Division 3 of the Business and rofessions ode ec ion Building Permit # SGPA Architecture Planning i 619.297.0131 Code Sections 5537, 5538, and 6737.1. (These sections of the Business an Profs Cod are printed in full in the Nonresidential Manual.) --- 00CUMENTATION AUTHOR ITELEPHONE Required F Checked by/Date LSW Engineers California, Inc. _ (858) 268_3224 Indicate location on plans of Note Block for Manda ory Measures 'Lig- ing Compliance Not In The Scope Of 1 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DATE OF PLANS —--------- IBUILDING CONDITIONED FLOOR AREA — i — — -----10,194 Sq.Ft. (CLIMATE ZONE 15 BUILDING TYPE �iC� PHASE OF CONSTRUCTION NONRESIDENTIAL HIGH RISE RESIDENTIAL NEW CONSTRUCTION L7 ADDITION lJ HOTEUMOTEL GUEST ROOM EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SI J— DATE Chris French /-2 vy oy _ — _ — — The Principal Designer hereby certifys that the proposedi ding design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency re(0 116 through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. CITY i OF LA QUINTA 1. 1 hereby affirm that I am eligible under the provisions of Division I ahMl INIG "A sE)ERTq sign this document as the person responsible for its preparation; ar d that I a li California as a civil engineer, mechanical engineer, electrical engin w, or I is n 7� J FOR 9ONSTRYCTI�f�. i, J u 2. I affirm that I am eligible under the provisions of Division 3 of the Business and rofessions ode ec ion 5537.2 or 6737.3 to sign this document as the person responsible f r its pre ra ion; and that I am a lic ns d contractor performing this work. DATE! By m — 1[-J ❑ 01 3. 1 affirm that I am eligible under Division 3 of the Business and Pro a io because it pertains to a structure or type of work described as exec ain= nc. Code Sections 5537, 5538, and 6737.1. (These sections of the Business an Profs Cod are printed in full in the Nonresidential Manual.) --- ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Required F PRINCIPAL ENVELOPE DESIGNER - NAME I SIGNATU I -LI NO. TDAT �/l 1 SGPA Architecture Plannin LIGHTING COMPLIANCE Indicate location on plans of Note Block for Manda ory Measures 'Lig- ing Compliance Not In The Scope Of -- Required Forms 1Sub-mittat----- — PRINCIPAL LIGHTING DESIGNER - NAME 'SIGNATURE RE :LIC. NO. DATE ------I I I ! MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures rms ; CH -1 MECH-2 MECH-3 MECH-5 Bquired iPRINCIPAL MECHANICAL DESIGNER - NAME I U LIC. NO. I DATE L Devin A. Abellon,_ P.E.- LSW Engineers, _ _�_Z_ 131 /YR ;12. y� •J7 4.4 User Number: 3137 ?,7 - 715- /// - P='I'4 ;7�1 - Job Number: F`"ryZi AND JOB CARD ARE NOT ON THE SITE FOR A SCHEDULED INSPECTION. NO EXCEPTIONS! PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF-' PROJECT NAME r Desert Center - Blida H Standard Proposed Compliance ENERGY COMPONENT_ _Design Design Margin _ Space Heating 1.59 _ 0.83 Space Cooling 323.69 _ _ 255.40 68.28 Indoor Fans 105.56 151.13 -45.561 Heat Rejection F 0.00 0.00 -2-04 Pumps & Misc. I 0.00 0.00 0.00 Domestic Hot Water 13.79 13.79 0.00 Lighting I 164.07 164.07 0.001 Receptacle 81.51 ; - 81.51 0.00 Process L- 0.00 0.00 I 0.00 TOTALS: 690.21 666.72 23.49 Percent better than Standard: 3.4% ( 3.4% excl (DATE 12/4/2007 £ r r:vq g1�y X74 ixkn fxa' :�ic� •:,zy: ,� iMM lkJo-"kn � 4 ,� R�•� � P: NW 6zi •... _ F •ON r�i yK` .� W1.1.. AC f z n.--firIN v zn aC;so eo+t+p+zoiaoieo+abxoozeq<go�eaensboazo F Building Orientation I E 90 de Conditioned Floor Area 10,194 sqn. Number of Stories 1 Unconditioned Floor Area - o sqn. Number of Systems �_ 7 Conditioned Footprint Area 10,194 soft. jI Number of Zones_ - -- aI M Fuel Type --- L Natural Gas Orientation Gross Area Glazing Area Glazing Ratio Front Elevation (E) 1,065 sqn. 4351 sqn. 40.8i° Left Elevation _(S)I _ 2,33a sqn. o sgrt. 0.0% I Rear Elevation (wHjj 1,624 sgn. ojsgn, o.0°i° -1 i Right Elevation (N)� 1,973 sqn. 1 1.2231sgn. _62.0%! 1 Total -_ 6,996 sgft. I 1,6581sgrt. 23.7%J Roof 10,194 g .C -o qrt. l o o.o% i Standard_ Proposed Lighting Power Density t.asi wrsgn.i.a911 W/sqn. Prescriptive Env. Heat Loss 1, 5'Btuih I 2,7291Btuwh Prescriptive Env. Heat Gain r Btu/h-F 191,145I8tu/h-F 283,1121 i - Remarks: i EnergyPro 4.4 by EnergySoft _ _ User Number: 3137 Job Number: 2006796.000 Page:2 of 9 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -11 PROJECT NAME Komar Desert Center - Bldg H _ _ _ 12/_4/2007 ZONE INFORMATION --- System Name _�- Zone Name i Occupancy Type Floor Area 1 (sgft.) Inst. LPD ( (W/sf)1 Ctrl. Credits (W/sf)2 Allowed LPD Area I Tailored M-1-02 w1s�4 Proc. Loads (W/sf) RTU H-6 &RTU H-7 Lease Space I Comp Bldg Retail and Wholesale � _2,524 '1.50 - -- —_ ;The Zone 'Lease Space' has a North/East/South Displa rL erimeter Credit of 87 ft. - --RTU H-1 - RTU H.5 r —� Lease Space - Comp Bldg Retail and Wholesale __ I 7,5731 –�---- '1.50 ---- ----I ---- I Restrm_--__ Corridor/Restroom/Support 491 '0.60 --_--_ --- Restrm -_ Corridor/Restroom/Suppon 49 -0.60 __-- — - - I Notes: 1. See LT -2-C 2. See LTG -4-C 3. See LTG -5-C 4. See LTG -6-C (items marked with asterisk, see LTG -2 -C by others) (by others) Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency snoulo pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation s;uhmittpd- IrThe Roof Roof R-30 is a CRRC Certified Roof with Reflectance = 0.30, Emittance = 0.75. _ The HVAC System 'Carrier 50HJQ006-5 w/ DCV" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. iThe HVAC Siem "Carrier 50HJQ006-5 w/ DCV" is designated as 3 Phase, or is Exempted from the NAEC_A 13 SEER reguireme_nt. _ The HVAC System "Carrier 50HJQ006-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121. The HVAC System "Carrier 50HJ0007-5 w/ DCV" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2_500. The HVAC System "Carrier 50HJ0007-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121_ — -- - -- — �The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft. — _ — --- The Zone 'Lease Space' has a West Display Perimeter Credit of 14 ft. —_ ;The Zone 'Lease Space' has a North/East/South Displa rL erimeter Credit of 87 ft. - - -_ - -- - --- The Zone "lease Space" has a West Dispj�yferimeter Credit of 14 ft. ----- The exceptional features Iisteo in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Sianature or EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Paoe:3 of 9 1 CERTIFICATE OF COMPLIANCE ENV -1 -Cl 7PROJECT NAME--_-_-----.-�---------- - ----- DATE -_ Komar Desert Center - Bldg _ _ _ 12/4/2007 OPAQUE SURFACES # Surface I Insulation Act. I Cond: TY_ee-I Area ' U -Fac. 1 Cay. Cont. �mmmmmmmmmmm. Tilt Status Joint Appendix - -j ( IV Reference Location / Comments 1_ 2 Wall _ �- 81 _0.074 _ R -19R-0.0 270 90 New _1!-09--A5 Roof 2,5_ _ 2 0.036 R-30 R-0_0 0 0 New 0� 2-A9 Space _ Lease Space 3 ]Wall I_ 81 0.0741 R-19 R-0.0 2790 New 09 -AS Lease Space 4 S 'Roof_ rt 7,573. 0.036 R-30 R-0.0 0 0 New 102 A9 Wall 75 0.074_! __ R-191 R-0.0`_0 90 New 709 -A5 - Lease Space__ Space 6 Wall 63d 0.074_ R -19-T _R-0.0 9-00 990 _ � New 109-A5 --Lease ILease Space 7 8 9 10 �. Wall _ _2_1_3 0074_)--R-19 R-0.0 180 90 New --, Door_ 2 0.700 None R-0.01 180 90 New Door 0.700 None _ R 0.01 180 90 ; New Door 2 0.7001 None i R-0.01 180 90 ; New �09_A5 '28-A2 128-A2 Lease Space _ Lease Space _ - Lease Space--- - Lease Space 111 12 13 _ _28-A2 Door 2 , 0.700 Noner R-0.01 180 90 ! New 28-A2 Wall _ 110-0.074 R_19 R-0.0 180 90 i New 09 A5rRestrm Roof 4 0.036 R-30 R-0.01 0 0i I New 02-A9 _ -ILease Space _ -_ !Restrm 14 Roof 4 0.036 R-30 R-0.0 0 New 02-A9 - Restrm None None _ _0 , ----� --- - _--�---- -- - 1.2 3.8 0 1.2-5.0 0 ---i -- ---- -- - -1 - Window Rih9 t (N) ;- 177 1.190 116-A 0.83116_BB�- 01 NewlStorefront -----!Lease Space -_--j 8 Window Front E 47 1. 1901, 116-A 0.83 116-B I 90101 New I Storefront I Lease Space 9 �10 Window Front E) 135 1.190116-A0.83 116 -BBQ 90 N. E. A, R (New, Existing, Altered. IF More than or equal to 10,000 sq.lt. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from I Standards Table 116-A and B. Certificate shall be filed in the contractor's rimlect office dudnn constmctinn and in thn mdidinn ma oe, nefco arra, nnn�t�,nrnn # ITyj�e Act. I Cond Location/ Area U -Fac' SHGC2 Azm.[Stat, Glazing Type 'Comments r1 IWindow_ Right 177 1.190 116-A Overhang - I I Left Fin.- I _Right Fin 1 2 Window (N) --1 R�ht N)_ 127 1.190 116-A 0.83 116-B 01 New I Storefront - --- 0.83 116 -BI 0 New Storefront _.ILease Space - ILease space _4 3 _ -_-- _ indow Right (N) 223 1.190 116 -Al 0.83 116-B _0 New Storefront__ W (indow R!ght(N) 177 1.190 116-A 0.83 116-B 0 New Storefront Lease Space _ Lease Space L5 6 rWindow lWindow Right (N)_ 89 1.190 116-A Ri hg N) 253 1.1901 116-A 0.83 116-B 0 116-6 01 New Storefront _ New Storefront _ Lease Space _ lease Space 5 6 None None 1 0.76_ 1 10.0 6.3 0.76 1 10.0 25.3 _0.83 -_ _--�---- -- - 1.2 3.8 0 1.2-5.0 0 7 Window Rih9 t (N) ;- 177 1.190 116-A 0.83116_BB�- 01 NewlStorefront -----!Lease Space -_--j 8 Window Front E 47 1. 1901, 116-A 0.83 116-B I 90101 New I Storefront I Lease Space 9 �10 Window Front E) 135 1.190116-A0.83 116 -BBQ 90 New _ tor Sefront ,Storefront LeaseSpaace 6.8 Window Front (E) _- _25311.190116 -A116 -B1 90 New ILease Space ------iii -� MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 1 u -tactor type: n b -A uetaun table from standards, ]able NI -1 uelault Table from the AGM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-B Default Table from Standards. COG Center of Glass. NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Window Type 1SHGC1 Hgt. Wd. Overhang - I I Left Fin.- I _Right Fin Len. Hgt. LExt.RExt. Dist. Len. Hgt.- Dist. Len. Hgt._ U 3 None None None 0.776�-_ 10.0 1_2.7 ; _ 6.0 10.76 10.0 12.7 7.0 1 0.76 I 10.0 22.3 1 7.0 0.1 20.0 20.0 0.1 10.8 15.0 0.1 10.0- I 4 None 10.76 10.0 12.7 1 6.0 0.1 11.0 7.0 5 6 None None 1 0.76_ 1 10.0 6.3 0.76 1 10.0 25.3 8.0 11.0 0.1 3.3 21.0 0.1 32.0 32.0 _--�---- -- - 1.2 3.8 0 1.2-5.0 0 7 None ---- -T ---'---F- ( 0.76 10.0 12.7 -- - - -- --- - 9.4 _ 0.1 _7.3 _ 3_0.0 -- -- - ------ - -- ;-- - - --- 8 9 None 'None 10.76 10.0 3.3 ; -! 0.76_ 10.0 28.0 0.1 0.0 6.7 �- _ 9.7 _ 6.8 0.1 20.0 10_0 110 ___ None -_-_- - 10.76 11 10.0 25.3 6.8 0.1 0.1 20.0 -- - MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES II The proposed building is In climate zones 2 through 15 and contains an enclosed space with floor area greater than 25,000 tt2, a telling height greater than 15 feet, and an LPD for general - lighting of at least 0.5 W/tt2. See Section 143(c). If this box is checked, ENV -4-C must be filled out. when submitting under the Prescriptive Compliance Approach. 1-_-_EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page:4 of 9 1 CERTIFICATE OF COMPLIANCE MECH-I-C PROJECT NAME i DATE Komar Desert Center - Bldg H _— i 12/4/2007 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Forth shall be submitted to the building department that certifies plans, specifications, installation certificates, and operating and maintenance information meet the reauirements of Section 10-103(b) and Title 24 Part 6. STATEMENT OF COMPLIANCE MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing _— i Test required on all New systems both New Construction and Retrofit. [� MECH-3-A: Packaged HVAC Systems Acceptance Document ---� Equipment requiring acceptance testing -- Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing-_— — Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. MECH-5-A: Air Distribution Acceptance Document ! Equipment requiring acceptance testing — This test required If the unit serves 5, 000 h2 of space or loss and 25% or more of the ducts are in nonconditioned or semiconditioned space like an attic. New systems that moot the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. 1 11 MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. Ll MECH-7-A: Supply Fan Variable Flow Control Acceptance Document i Equipment requiring acceptance testing All new VAV fan volume controls installed on newer existing systems must be tested--- ❑ MECH-8-A:-Hydronic System Control Acceptance Document —I -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to now boilers and chillers and the primary pumps are connected to a common header. I -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500.000 Btu/hr. -Water-loop Heat Pump Controls I Applies to all new watedoop host pump systems where the combined loop pumps ate greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chillotl, hydropic neat purnp i orcondensor water systems where the pumps motors are greater than 5 hp. Equipment requiring acceptance testing__ _ j EnergyPro 4.4 by EnergySoft _—_ User Number: 3137 Job Number 2006796.000 __ Page:5 of 9 IAIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-CI ('PROJECT NAME rDATE �— _ -Komar Desert Center =Bldg H_— __— I 12/4/2.007 _ SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous HeattCool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance I AIR SYSTEMS, Central or Single Zone — RTU H-6 & RTU H-7 _ RTU H-1 - RTU H-5 --- — 2 -- — --- -- 5 T-24 Section Reference on Plans or Specification t F- 144 144 a & b I n/a —_-� 1112(l) 7.70 HSPF_—_ 2.20 COP -� -------- _-I _ 11 12(a)13.0 SEER / 11.0 EER _ j 11.0 EER- ---- � 112(b) j Yes Yes � 112(c), 115 a i n/a---I__ n/a I _ 121(b) _ Yes Yes _ _ --- 121 b) 555 cfm —_ 1866 cfm__- 121 c No I No —1 -- I I 121(c) Yes Yes --J{ 121 c 122(e) Programmable Switch Proarammable Switch 122(e) Heating & Coolin _Required Heating &Cooling Re uired 122(f) Auto —� Auto I-- t 122_— n/a ---- n/a - ---- 123 {- - 124-- R-8.0 ; R-0.0 F- 144 144 a & b I n/a 144 (a & b) 144 ja ice-__ _— 70,202 btuh ( 215,478 btuh —T -- n/a — - - n/a -- -� -------- 144 a &b) 87,417 btuh—� - 277,969 btuh _ 144 c X144 (c) Constant Volume I Constant Volume � I I 144 (c) ( Yes { Yes -----I I _ 144jdj— No I No _ --- 124 a Diff. Enth Integrated I Diff. Temp�ntegrated� 144 (1)� Constant Temp Constant Temp —1 144(o —i---- Constant Temp j Constant Temp --; ----No I 144 (k) No --J{ 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "N/A' in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes it System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has -- 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.4 by EnergySoft User Number: 3137 Job Number: 2006796.000 Paae:6 of 9 1 IMECHANICAL VENTILATION MECH-3-CI PROJECT NAME DATE Komar Desert Center - Bldg H 12/4/2007 _.] PRESCRIPTIVE REHEAT LIMITATION Section 144(d)) MECHANICAL VENTILATION Section 121(b)2) AREA BASIS 1 BASIS VAV MINIMUM - A B o a� �M CIL i C I cn Ic mvn IABD 71 D Cr3 31 SI xDn _OCCUPANCY I E �c m3 I F m n yf�p-n G I Cr � mO� xFf H 'a m o'K I ! � nfD�(c>�o -A J w N O 3e T(n -" K -� m x L_ � °c �, 07M I_ My � �y fD`O 'fl0 N m o y ZONE/SYSTEM O 0 (�A TI — 3 V� A M0 0 O-+� 7 n C T �� 3 f7 O �a5 •- D �• 1D D - 3 �CQ V p_ m I O I x A IOy0 T=• O 5 e; D — Lease Space I 2,5242 i 0.22 555 73.2 — —7.6 555 555 555 — I �^ RTU H-6 & RTU H-7 —_ .4 I I _ �_ Total 555 555 -� I Lease Space _ Restrm_ Restrm 7,57 _ 4 49j 0.22j 0.151 0.15(17� 1,666 7 219_6 - 7.6 1,666 1,6_66 j 7 1,666 100 -- - - RTU H-1 RTU -I-7 I �- 100 - H-5 ----- I--- I---i----'—�—_ I Total —'— 1,681 1,8661 —7-'— -- I i I I � ! I I 1 L... C ;Minimum ventllaton rate Per Section 121, j—_ E— �Basod on flzed stator the Table t21 -A ccupant load tore r0gLe4Toses fobs aces without lixod seating. -- H I Required Ventilation Air.( is the Larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G). —_-- — 1 I ._'Must be greater than or equal to H, or use Transler Air column H to make uD the dilference. _ ---- -- — _ -- — --__— J _ De> n tan sup ty cfm (Fan CFM x 30%: or I K I Condition area it. sq.) x 04 cfm/ft. sq.: j--'-t — -- -- L Maximum of Columns H. J. K. or 300 cfm I M (This must be less than or gual to Column L and greater that or equal to the sum of Columns H + N_ _ ---- —__ —_ ------ — — FN Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal 1 to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M. I EnergyPro 4A by EnergySoft User Number: 3137 Job Number: 2006796.000 Page:7 of 9 I MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-S-C PROJECT NAME— Komar_Desert Center -_Bid E g _ I DATE �___ 12/4/2007 J H LLER AND TOWER SUMMARY I_—_.—.-------_ Equipment Name ------ Equipment Type city. — --�-- --- —.-�-- 1 I Tot. i ; Eff Iclency Tons Oty GPM BHP I I i PUMPS Motor _Dr Eff. ve Eff. r.—-- L--Pumpi Control ,DHW / BOILER SUMMARY _. Energy Standby TANK INSUL. Rated Vol. — Condition I Factor Loss or Ext. System Name I System Type Distribution Type IOty Input (Gals.) ( Status { or RE Pilot 1 R -Val. CENTRAL SYSTEM RATINGS HEATING I COOLING ITAux. I Condition System Name System Type — Qty OutDut kW I Eff.i� Output Efficiency --_ Status Economizer T e Carrier 50HJ0006-5 w/ — i T-- DCV Packaged DX 2 56,200 0.a 7.70 HSPF 61,000113.0 SEER / 11_0 EER -- New Diff_Enth (integrated) Carrier 50HJ0007-5 w/ I` DCV !Packaged DX 1 5 69,000 0.0 2.20 COP 76,000!11.0 EER New (Diff. Temp (Integrated) i MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5-C