07-3066 (RC) Revision 1 Certificate of Compliancei
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1
PROJECT NAME �, V / '
Komar Desert Center `'BId-`H'j � li
This Certificate of.Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE1 017/2007
PROJECT ADDRESS.:_.;c
DOCUMENTATION AUTHOR
DATE OF PLANS
Hway 111 and Jefferson La Quinta, CA,
BUILDING CONDITIONED FLOOR AREA
Building Permit #
PRINCIPAL DESIGNER - ENVELOPE
TELEPHONE
SGPA Architecture Planning
619.297.0131
NONRESIDENTIAL HIGH RISE RESIDENTIAL E]
DOCUMENTATION AUTHOR
TELEPHONE
Checked by/Date
LSW Engineers California, Inc.
858 268-3224
Enforcement Agency Use
GENERAL INFORMATION
This Certificate of.Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
DATE OF PLANS
DATE
BUILDING CONDITIONED FLOOR AREA
10,194 Sq.Ft.
/ev -� �- ��
CLIMATE ZONE
1 15
BUILDING TYPE
®
NONRESIDENTIAL HIGH RISE RESIDENTIAL E]
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
®
NEW CONSTRUCTION ADDITION
2. 1 affirm that.l am igible under the pr visions of Divisio 3 o the Business and Profess' ns Code Section
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of.Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIG _�1 E
DATE
Chris French
--
/ev -� �- ��
The Principal Designer hereby certifys that the proposed bul ding design represented in this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as des'cned mee �thP anarnv pff�� . y requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 �. �� LA QUINTA
ENV. LTG. MECH. -�
1. 1 hereby affirm th t lBfjj Ii�WG&rSAF oQWD'vi ion 3 of the Business and Professions Code to
sign this document sgthe pe I j('�r paratio that I am licensed in the State of
gf
;and
California as a civil n ineer h ni I I c ncal a ineer, or I am a licensed architect.
FOR CONST UCtIOf
2. 1 affirm that.l am igible under the pr visions of Divisio 3 o the Business and Profess' ns Code Section
5537.2 or 6737.3 to ign this docum t e sone le for its preparation; and am a licensed
contractor performin t[PATABrk.
F] ❑ ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code t this cMcie
because it pertains to a structure or type of work described as exempt pursuant to es Prof si
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Prof ssions Co Ire print
full in the Nonresidential Manual.) y $ ?o
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
t Required Forms
ENV -1
PRINCIPAL ENVELOPE DESIGNER -NAME
SIGN
LIC. NO.
��2D58
DATE
SGPA Architecture Plannin
ID-I�I-b'j
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
Lighting Compliance Not In The Scope Of
I his Submitted
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
MECH-1 MECH-2 MECH-3 MECH-5
Required rms
PRINCIPAL MECHANICAL DESIGNER - NAME SIG
LIC. NO.
',D TE
'®'•�
Devin A. Abellon P.E.- LSW Engineers,I
y
FL�I
EnergyPro 4.3 by EnergySo
User Number. 3137
Job Number: 2006796.000 Page:1 of 9
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1
PROJECT NAME DATE
Komar Desert Center - BldgH 10/17/2007
ANNUAL TDV ENERGY USE SUMMARY
kBtu/s ft- r
Standard
ENERGY COMPONENT Design
Space Heating 1.53
Space Cooling 284.45
Indoor Fans 104.31
Heat Rejection 0.00
Pumps & Misc. 0.00
Domestic Hot Water 13.79
Lighting 164.07
Receptacle 81.51
Process o.00
TOTALS: 649.65
Percent better than Standard:
Proposed
Design
0.67
229.50
149.90
0.00
0.00
13.79
164.07
81.51
o.o0
639.44
1.6%
Compliance
Margin]
0.86
.,
"a° F`" : •" ' ' '" 'V j(
0 120 , 401 60 , 80~100 120 140 160 180 200 "0 260 280 ;
---__ - �_ __, �_Tu✓Sa+t v __. _ _ a.___ _ - �.:
process)
54.95
-45.60
0.00
0.00°""°
0.00DhW-
0.00
0.00
0.00
10.21
( 1.6% excluding
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation
Number of Stories
Number of Systems
Number of Zones
E 90 deg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
10,194
sqft.
sqft.
sqft.
1
0
5
10,194
3
Natural Gas
Orientation
Front Elevation E
Left Elevation (s)
Rear Elevation w
Right Elevation (N)
Total
Roof
Gross Area
Glazing
sqft.
sqft.
sqft.
sqft.
sqft.
sgft.sgft.
Area
435
Glazing
sqft.
sqft.
sqft.
sgft.
sgft.
Ratio
40.8%
0.0%
0.0%
62.0%
1,065
2,3341
0
812
0
1,973
11223
6,184
1,658
26.80/(
10,194
E0.0%
Standard Proposed
Lighting Power Density 1.491 W/sgft. 1.491 W/sgft.
Prescriptive Env. Heat Loss 1,752 Btu/ 2,669 Btu/h
Prescriptive Env. Heat Gain 186,590 Btu/h-F 276,807 Btu/h-F
Remarks:
Run Initiation Time: 10/16/0708:41:17 Run Code: 1192549277
EnergyPro 4.3 by Energysoft User Number. 3137 Job Number: 2006796.000 Page•2 of 9
a
I
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
Komar Desert Center - Bldg
H `'
DATE
10/17/2007
ZONE INFORMATION
System Name Zone Name
Occupancy Type
Floor
Area
(sgft.)
Inst.
LPD
(W/sf)1
Ctrl.
Credits
(W/s02
Allowed LPD
Proc.
Loads
Area. Tailored
(W/s3
RTU 1-11-1 - RTU 1-11-5 Lease Space
Comp Bldg Retail and Wholesale
10,097
'1.50
Restrm
Corridor/Restroom/Support
49
`0.60
Restrm
Corridor/Restroom/Support
49
'0.60
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C
Items above require special documentation
]
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
'"e111'1;61
emorcement agency snoura pay specrar attention fo ine nems specmeo in this checklist. These items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The Roof Roof R-30 is a CRRC Certified Roof with Reflectance = 0.30, Emittance = 0.75.
The HVAC System "Carrier 50HJQ007-5 w/ DCV" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System "Carrier 50HJ0007-5 w/ DCV" includes Demand Control Ventilation per Standards Section 121.
The Zone "Lease Space" has a North/East/South Display Perimeter Credit of 87 ft.
The Zone "Lease Space" has a West Display Perimeter Credit of 14 ft.
r ne exceptionar reaiures usiea in mrs performance approacn application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
CERTIFICATE OF COMPLIANCE ENV -1-C
PROJECT NAME DATE
Komar Desert Center - Bldg H 10/17/2007
OPAQUE SURFACES 771
#
Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Azm.
Tilt
Cond:
Status
Joint Appendix
I IV Reference
Location / Comments
1
Wall 1
81
0.074
R-19
R-0.01
270
90
New
09-A5
Lease Space
2
JRoof 1
10,00 I
0.036
R-30
R-0.0
0
0
New
02-A9
Lease Space
3
Wall 1
751
0.074
R-19
R-0.0
0
90
New
09-A5
Lease Space
4
lWall I
63Q
0.074
R-19
R-0.0
90
90
New
09-A5
Lease Space
5
lWall 1
2,130
0.074
R-19
R-0.0
180 1
90
1 New
09-A5
Lease Space
6
IDoor I
2A
0.700
_-0-.7001
None I
R-0.0
180 1
90
1 New
28-A2
Lease Space
7
jDoor 1
2
N
None I
R-0.01
180 1
90
1 New
28-A2
Lease Space
8
jDoor 1
21
0.7001
None
R-0.01
180 1
90
New
28-A2
Lease Space
9
IDoor 1
2
0.700
None
R-0.01
180
90
New
28-A2
Lease Space
10 lWall I
11C
0.074
R-19
R-0.0
180
90
New
09-A5
Restrm
11
lRoof 1
4
0.036
R-30
R-0.0
0
0
New
02-A9
Restrm
12
lRoof I
4e
0.036
R-30
R-0.0
0
0
New
02-A9
Restrm
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
- N, ❑, A, n (New, exisung, Aaerea, riemovea)
FENESTRATION SURFACES
More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default LI -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractor's nmiect nffica dudnn cnnsfn,oenn and in the h„adinmann ara office after ..ons!ructicn
#
JType
Area I U -Fac?
SHGC2
Act.
Am.
Cond.
Stat.
Glazing Type
Location/
Comments
1
Window
Ri ht
N
177 1.190 116-A
0.83
116-B
0
New
Storefront
Lease Space
2
Window
Right
N
127 1.190 116-A
0.83
116-6
0
New
Storefront
Lease Space
3
Window
Right
N
223 1.190 116-A
0.83
116-B
0
New
Storefront
Lease Space
4
Window
Right
N
177 1.190 116-A
0.83
116-B
0
New
Storefront
Lease Space
5
Window
Right
N
89 1.190 116-A
0.83
116-B
0
New
Storefront
Lease Space
6
lWindow
Right
N
253 1.190 116-A
0.83
116-B
0
New
Storefront
Lease Space
7
lWindow
Right
N
177 1.190 116-A
0.83
116-B
0
New
Storefront
Lease Space
8
lWindow
Front
E
471 1.1901116 -Al
0.83
116-890
New
Storefront
Lease Space
9
lWindow
Front
E
1351 1.1901116 -Al
0.83
116-B
90
New
Storefront
Lease Space
10 Window
Front
E
2531 1.1901116 -Al
0.83
116-B
90
New
Storefront
Lease Space
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
11 fu-racior i ype: 11 b -A uetaun fable from Standards, table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2) SHGC Type: 116-B Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
#
Exterior Shade Type
SHGC
Window
Hgt. Wd.
Overhang
Len. H t. LExt.RExt.
Left Fin
Dist. Len. H t.
Right Fin
Dist. Len. H t.
1
None
0.76
10.0 12.7
6.0
0.1
20.0
20.0
2
None
0.76
10.0 12.7
7.0
0.1
10.8
15.0
3
None
0.76
10.0 22.3
7.0
0.1
10.0
10.0
4
None
0.76
10.0 12.7
6.0
0.1
11.0
7.0
5
None
0.76
10.0 6.3
8.0
0.1
3.3
21.0
6
None
1 0.76
10.0 25.3
11.0
0.1
32.0
32.0
1.2 3.8 0
1.2 5.0 0
7
None
1 0.76
10.0 12.7
9.4
0.1
7.3
30.0
8
None
0.76
10.0 3.3
28.0
0.1
0.0
6.7
9
None
0.76
10.0 9.7
6.8
0.1
20.0
10.0
10
None
0.76
10.0 25.3
6.8
0.1
0.1
20.0
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
Ui fie proposea ounafng is to comate zones z through 15 and contains an enclosed space with floor area greater than 25,000 ft2, a ceiling height greater than 15 feet, and an LPD for general
lighting of at least 0.5 W/ft2. See Section 143(c). If this box is checked, ENV -4-C must be filled out. when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Paae:4 of 9
CERTIFICATE OF COMPLIANCE MECH-I-C
PROJECT NAME DATE
Komar Desert Center - Bldq H 1 10/17/2007
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses, The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates. and ooeratino and maintenance information meet the requirements of Section 10-103(h) and Title 24 Part R_
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require construction Inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 tt2 of space or less and 25% or more of the ducts are in noncondifioned or semiconditioned space like an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls Installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls Installed on new or existing systems must be tested
❑ MECH-8-A:-Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot watersystems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 etulhr.
-Water-loop Heat Pump Controls
Applies to all new watertoop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump
or condenser water systems where the pumps motors are greater than 5 hp.
Equipment requiring acceptance testing
EnergyPro 4.3 by EnergySoft User Number. 3137 Job Number: 2006796.000 Page:5 of 9
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
(PROJECT NAME DATE
Komar Desert Center - Bldg H 10/17/2007
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
AIR SYSTEMS, Central or Single Zone
RTU H1-1 - RTU H1-5
5
Reference on Plans or Specification t
112(a)
2.20 COP
112(a)
11.0 EER
112(b)
Yes
112(c), 115(a)
n/a
121(b)
Yes
121 b
2421 cfm
121 c
No
121 c
Yes
121 c 122(e)
Pro rammable Switch
122(e)
Heatinq & Cooling Required
122(f)
Auto
122
n/a
123
124
R-0.0
144 a & b
n/a
144 a & b
215,478 btuh
144 a & b
n/a
144 a & b
275,807 btuh
144 c
Constant Volume
144 c
144 c
Yes
144 d
No
144 a
Diff. Tem Inte rated
144 f
Constant Tem
144 (f)
Constant Temp
144 k
No
M&M
EnergyPro 4.3 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page:6 of 9 1
MECHANICAL VENTILATION MECH-3-C
PROJECT NAME tDATE1Komar Desert Center - Bldg H 0/17/2007
' '`
PRESCRIPTIVE REHEAT
LIMITATION (Section 144(d))
MECHANICAL VENTILATION Section
121(b)2)
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
I G
H
I
J
K
L
M
N
ZONE/SYSTEM
n.0
o
ND3
... y
3
c
don
�1 1
°o
oo'�n
t;7 W 11
m
Z
�c
m3
"o
�to "n
O
tr
Xvn mCO)o
C T
"3
..
33
ohm
y0
O 0 p
D
<
� p
f)�co
.r tC
D
Ca
o
7 0
n10 -n 0
C p
v T
`r. o
n
-n
O
a
o o
c
wad
O y K
T=
L
0
N.
:>
O
?
D
-
tv
> .
D
Lease Space
10,097
0.22
2,221
292.8
7.6
2,2211
2,221
2,221
Restrm
49
0.15
7
7
100
Restrm
49
0.151
7
7
100
RTU H1-1 - RTU 1-11-5
Total
2,236
2,421
C Minimum ventilation rate per Section 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 60% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air (REO'D V.A.) is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS column D or G).
I Must be greater than orequal to H, -or use Transfer Air column N to make up the difference.
J Design tan supply cfm Fan CFM x 30%; or
K ContlI,i n area ft. sq.) x 04 cfm/It. sq.; or
L Maximum of Columns H, J. K, or 300 cfm
M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) Is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.3 by EnergySoft User Number: 3137 Job Number: 2006796.000 Page:7 of 9
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-S-C
PROJECT NAME
Komar Desert Center - Bldg H
CFM
DATE, 0/17/2007
CHILLER AND TOWER SUMMARY
Drive
Eff.
Energy
Factor
or RE
Standby
Loss or
Pilot
ANK INSUL.
System Name
System Type
Distribution Type
•
Efficiency
Tons
PUMPS
Condition
Status
Equipment Name
Equipment Type
Qty.
Tot.
Oty
GPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
DHW BOILER SUMMARY
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P Mp Hot Water Piping Len th ft
Add 1/2"
Control # HP Type In Plenum Outside Buried Insulation
a
CENTRAL SYSTEM RATINGS
HEATING COOLING
Aux. Condition
System Name System Type Qty Outout kW I Eff. Output Efficiency Status Economizer Type
Carrier 50HJ0007-5 w/
DCV Packaged DX 5 69,000 0.0 2.20 COP 76,000 11.0 EER New Diff. Temp (Integrated)
System Name
Fan Type
Motor Location
CFM
BHP
Motor
Eff.
Drive
Eff.
Energy
Factor
or RE
Standby
Loss or
Pilot
ANK INSUL.
System Name
System Type
Distribution Type
Oty
Rated
Input
Vol.
(Gals.)
Condition
Status
Ext.
R -Val.
none
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P Mp Hot Water Piping Len th ft
Add 1/2"
Control # HP Type In Plenum Outside Buried Insulation
a
CENTRAL SYSTEM RATINGS
HEATING COOLING
Aux. Condition
System Name System Type Qty Outout kW I Eff. Output Efficiency Status Economizer Type
Carrier 50HJ0007-5 w/
DCV Packaged DX 5 69,000 0.0 2.20 COP 76,000 11.0 EER New Diff. Temp (Integrated)
System Name
Fan Type
Motor Location
CFM
BHP
Motor
Eff.
Drive
Eff.
CFM
BHP
Motor
Eff.
Drive
Eff.
Carrier 50HJ0007-5 w/
DCV
Constant Volume
Draw -Through
2,400
1.65
84.0%
97.0%
none
EnergyPro 4.3 by EnergySoft User Number: 3137 Job Number: 2006796.000 Pag:Bo
z
MECHANICAL EQUIPMENT DETAILS Part 2 of 2 MECH-5-Cl