07-3170 (CSCS) Title 24TITLE 24 REPORT
Title 24 Report for:
Jefferson Square Retail shops Building 3
4+e>25, Jefferson Street
La Quinta , CA
Project Designer:
1411 Fifth St., Suite 300
Santa Monica, CA 90401
310-394-2623
Report Prepared By:
Bradley Severson
AMPE, INC
600 W. Broadway #250
Glendale, CA 91204
(818) 265-9720
Job Number:
Date:
8/11/2008
?-'21 - 0
CITY OF LA QUINTA
BUILDING & SAFETY DEPT.
APPROVED
FOR CONSTRUCTION
MA-rr: �' III 103 13YF,"
�#7.-1IE)
AUG 2 5 2008
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.4 by EnergySoft Job Number: User Number: 5424
t F% -F I CF -1
I
f
' TABLE OF CONTENTS
Cover Page
1
Table of Contents
2
Nonresidential Performance Title 24 Forms
3
Form ENV -MM Envelope Mandatory Measures
15
.Form LTG-7-C.�Room Cavity Ratio Worksheet
16
Form LTG -MM Lighting Mandatory Measures
17
Form MECH-MM Mechanical Mandatory Measures
18
HVAC System Heating and Cooling Loads Summary
20
Lighting Inspection Checklist
25
EnergyPro 4.4 by EnergySoft Job Number: User Number: 5424
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 Of 3 PERF -1
PROJECT NAME
Jefferson Square Retail shops Building 3
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
8/11/2008
PROJECT ADDRESS
Jefferson Street La Quinta
DOCUMENTATION AUTHORSIGNATURE
F_
PRINCIPAL DESIGNER -ENVELOPE
TELEPHONE
310-394-2623
Building Permit #
I
DOCUMENTATION AUTHOR
AMPS, INC
TELEPHONE
(818) 265-9720
Checked by/Date
Enforcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHORSIGNATURE
DATE OF PLANS
12/18/07
BUILDING CONDITIONED FLOOR AREATE
6,667 Sq.Ft.
9?/111013
CLIMA ZONE
15
BUILDING TYPE
®
NONRESIDENTIAL HIGH RISE RESIDENTIAL
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
®
NEW CONSTRUCTION 0 ADDITION
F—]
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHORSIGNATURE
DATE
BradleySeverson 7
9?/111013
The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
0 El 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ENV -1
Required Forms
PRINCIPAL ENVELOPE DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
LTG -1, LTG -2
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATOR
LIC. N .
DATE
Sothol Roeun
/�
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
MECH-1 MECH-2 MECH-3 MECH-5
Required Forms
PRINCIPAL MECHANICAL DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
Bradley Severson
EnergyPro 4.4 by EnergySoft - User Number: 5424 Job Number: Pane:3 of 25 1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PER
NAME DATE
Jefferson Square Retail shops Building3 8/11/2008 :1
ANNUAL TDV ENERGY USE SUMMARY
kBtu/s ft- r
Standard
ENERGY COMPONENT Design
Space Heating 0.33
Space Cooling 435.17
Indoor Fans 45.41
Heat Rejection 0.00
Pumps & Misc. 0.00
Domestic Hot Water 16.40
Lighting 187.30
Receptacle 87.43
Process
TOTALS: 772.03
Percent better than Standard:
Proposed
Design
0.03
233.50
46.93
o.00
0.00
16.40
187.30
87.43
571.58
26.0%
Compliance
Margin
i StanOaM .Proposed
0.31
GP-H-I:V S
SP -C - *V'
kd-F-
HWRejaction
'"°0`a"'°°
0 30 60 00 120150 180.210 240 270 300 330 380 300 420
keiWsq>t-yr
201.67
-1.52
0.00
0.00
0.00
0.00`°°`
200.46
( 26.0% excluding
process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation
Number of Stories
Number of Systems
Number of Zones
(N)Odeg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
6,667 sqft.
1
0 sqft.
6
6,667 sqft.
5
Natural Gas
Orientation
Front Elevation N
Left Elevation (E)
Rear Elevation s
Right Elevation (W)l
Total
Roof
Gross Area
sqft.
sqft.
sqft.
sqft.
sqft.
sqft.
Glazing Area
Glazing
sqft.
sqft.
sqft.
sgft.
sqft.
sqft.
Ratio
1,610
80
5.0%
420
192
45.7%
1,120
640
57.1%
840
2001
23.8%
3,990
1,112
6,667
E::::�
0.0%
Standard Proposed
Lighting Power Density 1.700 W/sgft. 1.700 W/sgft.
Prescriptive Env. Heat Loss 1,146 Btu/h 779 Btu/h
Prescriptive Env. Heat Gain 137,575 Btuth-F 101,302 Btu/h-F
Remarks:
Run Initiation Time: 08/11/08 14:03:33 Run Code: 1218492213
EnergyPro 4.4 by Energysoft User Number: 5424 Job Number: Page:4 of 25
t ' �
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
Jefferson Square
Retail shops
Building 3
DATE
8/11/2008
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
(sgft.)
Inst.
LPD
(W/sf)1
Ctrl.
Credits
(W/sf)2
Allowed LPD
Proc.
Loads
I (W/sf)
Area Tailored
(W/S31 (W/S4
SHOP A
SHOP A
Retail Sales, Wholesale
1,214
'1.70
Shop B
SHOP B
Retail Sales, Wholesale
1,199
'1.70
Shop C
SHOP C
Retail Sales, Wholesale
1,210
'1.70
Shop D
SHOP D
Retail Sales, Wholesale
1,691
"1.70
Shop E
SHOP E
Retail Sales, Wholesale
1,353
'1.70
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
;nu tocai emorcement agency snowa pay special attention to the items specified in this checklist. These items require special written justification
nd documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System 'Trane YHC048AY includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC S stem 'Trane YHC048AY is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement.
The HVAC System 'Trane YHC048AY includes Demand Control Ventilation per Standards Section 121.
The HVAC System 'Trane YHC060AY includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC System 'Trane YHC060AY is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement.
The HVAC System 'Trane YHC060A3" includes Demand Control Ventilation Der Standards Section 121.
i no exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized S
UAVC
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:5 of 25 1
CERTIFICATE OF COMPLIANCE ENV -1-C
(PROJECT NAME DATE
L Jefferson Square Retail shops Building 3 8/11/2008
OPAQUE SURFACES
# Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Azm.
Tilt
Cond:
Status
Joint Appendix
IV Reference
Location / Comments
1 Roof
1.21
0.032
R-30
R-0.0
0
0
New
01-A17
SHOP A
2 Wall
256
0.074
R-19
R-0.0
0
90
New
09-A5
SHOP A
3 Door
24
0.700
None
R-0.0
0
90
New
28-A2
SHOP A
4 Wall
12C
0.074
R-19
R-0.0
180
90
New
09-A5
SHOP A
5 Wall
640
0.074
R-19
R-0.0
270 1
90
New
09-A5
SHOP A
6 Roof
1,19
0.032
R-30
R-0.0
0 1
0
New
01-A17
SHOP B
7 Wall
250
0.074
R-19
R-0.0
0
90
New
09-A5
SHOP B
8 Door
24
0.700
None
R-0.0
0
90
New
28-A2
SHOP B
9 Wall
120
0.074
R-19
R40
180
90
New
09-A5
SHOP B
10 IRoof
1,210
0.032
R-30
R-0.0
0
0
New
01-A17
SHOP C
11 Wall
250
0.074
R-19
R-0.0
0
90
New
09-A5
SHOP C
12 Door
24
0.700
None
R-0.0
0 1
90
New
28-A2
SHOP C
13 Wall
120
0.074
R-19
R-0.0
180
90
New
09-A5
SHOP C
14 Roof
1,691
0.048
R-19
R-0.0
0
0
New
01-A14
SHOP D
15 Wall
250
0.074
R-19
R-0.0
0
90
New
09-A5
SHOP D
16 Door
24
0.700
None
R-0.0
0
90
New
28-A2
SHOP D
ll
12
0.074
R-19
R-0.0
180
90
New
09-A5
SHOP D
of
1,35
0.048
R-19
R-0.0
0
0
New
01-A14
SHOP E
ll
f
41
0.074
R-19
R-0.0
0
90SHOP
E
ll
22
0.074
R-19
R-0.0
90
90
New
09-A5
SHOP E
N, E, A, R (New, Existing, Altered, Removed)
FENESTRATION SURFACES
More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractor's protect office during construction and in the building rnaneners ntsr , after r,0nStnfit,,,,
#
lTvpe
Area U -Fac'
SHGC'
Act.
Azm.
Cond.
Stat.
Glazing Type
Location/
Comments
1
lWindow
Rear
S
160 0.280
NI -1
0.38
COG
180
New
PPG SOLARBAN 60 2 CLEAR
SHOP A
2
Window
Right
W)
200 0.280
NI -1
0.38
COG
270
New
PPG SOLARBAN 60 2) CLEAR
SHOP A
3
Window
Rear
S
160 0.280
NI -1
0.38
COG
180
New
PPG SOLARBAN 60 2 CLEAR
SHOP B
4
Window
Rear
S
160 0.280
NI -1
0.38
COG
180
New
PPG SOLARBAN 60 2 CLEAR
SHOP C
5
Window
Rear
S
160 0.280
NI -1
0.38
COG
180
New
PPG SOLARBAN 60 2 CLEAR
SHOP D
6
Window
Front
N
80 0.280
NI -1
0.38
COG
0
New
PPG SOLARBAN 60 2 CLEAR
SHOP E
7
Window
Left
E)
192 0.280
NI -1
0.38
COG
90
New
PPG SOLARBAN 60 2 CLEAR
SHOP E
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
(1) U -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
#
Exterior Shade Type
SHGC
Window
Hgt. Wd.
Overhang Left Fin Riaht Fin
Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
1
None
0.76
8.0 16.5
10.0
0.1
10.0
10.0
2
None
0.76
8.0 16.5
10.0
0.1
10.0
10.0
3
None
0.76
8.0 15.0
10.0
0.1
10.0
10.0
4
None
0.76
8.0 15.0
10.0
0.1
10.0
10.0
5
None
0.76
8.0 15.0
10.0
0.1
10.0
10.0
6
Woven Sunscreen
0.30
8.0 10.0
4.0
0.1
4.0
4.0
7
Woven Sunscreen
0.30
8.0 29.0
2.0
0.1
2.0
2.0
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
The proposed building Is In climate zones 2 through 16 and contains an enclosed space with floor area greater than 25,000 U, a ceiling height greater than 15 feet, and an LPD for general
lighting of at least 0.6 WK. See Section 143(c). If this box Is checked, ENV -4-C must be filled out. when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:6 of 25 1
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1 -C
PROJECT NAME M
Jefferson Square Retail shops Building3 8/11/2008
INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ COMPLETE BUILDING METHOD (From LTG -5-C). ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 11,334
ALTERNATE COMPLIANCE
Q PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
(Room #)
CONTROL
IDENTIFICATION
CONTROLTYPE
(Auto Time Switch, Dimming, etc.)
SPACE CONTROLLED
Check if
NOTE TO
FIELD
NOTES TO FIELD - For Buildinq Department Use Only
Run Initiation Time: 08/11/08 14:03:33 Run Code: 1218492213
EnergyPro 4.4 by EnergySok User Number: 5424 Job Number: Pagel of 25
INSTALLED
WATTS
INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C)
11,334
PORTABLE LIGHTING (From LTG -3-C)
0
LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C)
0
CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER
11.334
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ COMPLETE BUILDING METHOD (From LTG -5-C). ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 11,334
ALTERNATE COMPLIANCE
Q PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
(Room #)
CONTROL
IDENTIFICATION
CONTROLTYPE
(Auto Time Switch, Dimming, etc.)
SPACE CONTROLLED
Check if
NOTE TO
FIELD
NOTES TO FIELD - For Buildinq Department Use Only
Run Initiation Time: 08/11/08 14:03:33 Run Code: 1218492213
EnergyPro 4.4 by EnergySok User Number: 5424 Job Number: Pagel of 25
CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG -1-C
PROJECT NAME
Jefferson Square Retail shops Building 3
DATE
8/11/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance
tests for lighting systems. The designer is required to check the boxes by all acceptance tests that
apply and list all equipment that require an acceptance test. If all equipment of a certain type requires
a test, list the equipment description and the number of systems to be tested in parentheses. The NJ
number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the
test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design
professional or an agent selected by the owner). Since this form will be part of the plans, completion
of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Before an occupancy permit is granted for a newly constructed building or space, or a new lighting .
system system serving a building or space is operated for normal use, all control devices serving the
building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
In addition a Certificate of Acceptance, LTG -1-A, Forms shall be submitted to the building department
that:
A. Certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of§ 10-103(b) and Title 24 Part 6.
Test Descri tion
Test Performed B
❑ LTG -2-A: Lighting Control Acceptance Document
- Occupancy Sensor Acceptance
- Manual Daylight Controls Acceptance
- Automatic Time Switch Control Acceptance
Equipment requiring acceptance testing
❑ LTG -3-A: Automatic Daylighting Controls Acceptance Document
Equipment requiring acceptance testing
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:8 of 25 1
CERTIFICATE OF COMPLIANCE MECH-1-C
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates, and Weratino and maintenance information meet the requirements of Section 10-103th1 and Title 24 Part R
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 R2 of space or less and 25% or more of the ducts are in nonconditioned or semiconditioned space like an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A: -Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant Now chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btu/hr.
-Water-loop Heat Pump Controls
Applies to all new waterloop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable Now chilled, hydronic heat pump
or condenser water systems where the pumps motors are greater than 5 hp.
Equipment requiring acceptance testing
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:9 of 25
N
O
r
tf
co
CL
I
N
oo
W
a
0
W
Q
z
M
m
CI)
Q
O
N
M
N
cu
c
O
CO)
tE
N
It
v
oc1r)
ao
ti
IT
o
L
c1r)
J
co
O
Q'
H
Z
U
CI)
a.
M
M
M
w
M
LO
Cfl
O
rl-
Installed
O
O
O
M
CUO
Watts
N
N
N
N
N
(G x 1)
t�
T
Number
of
M
Luminaires
d
CEC
N
=
Default?
C
Wafts
per
Luminaire
Number of
li
Ballast per
Luminaire
Wafts
W
per
N
Lamp
M
R
m
Number of
0
Lamps per
1
CLE
Luminaire
M
J
U
Lamp
Type
C.
CD
C>
C,
0
ca
to
M
M
M
O
N
N
N
N
N
O
MO
T
M
V
(=j
N
r
.N-
N
r
I
(D
•C
•E
~
O
O
O
O
.O
J
Q
Q
Q
Q
Q
v
v
v
v
v
M
v
m
v
m
v
(`o
v
m
v
.
in3i�;cn3v�3tn3
_
m
E
M
z
'
It
v
oc1r)
o
J
O
Z
_m
JO
O
v
G
W
H
�
c1r)
J
co
O
Q'
H
Z
U
CI)
a.
M
M
M
w
a d
W a
CL E
J
`
u.
C7
v
J
o
H
m
►_-
U
Q
J
O
Z
_m
JO
O
v
G
W
H
�
C7
Z
Dw
m
J
co
O
Q'
H
Z
U
0
Q
a.
L:
a
E
z'
0
;'T
Do N
D A
M
E
E
z'
a
v
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
SYSTEM' FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
AIR SYSTEMS, Central or Single Zone
SHOP A
Shop B
Shop C
1
1
1
T-24
MANDATORY MEASURES Section Reference on Plans or Specification
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
112(a)
82% AFUE
82% AFUE
82% AFUE
112(a)
15.0 SEER / 12.0 EER
15.0 SEER / 12.0 EER
15.0 SEER / 12.0 EER
112(b)
n/a
n/a
n/a
112(c), 115 a
n/a
n/a
n/a
121(b)
No
No
No
121 b
427 cfm
402 cfm
402 cfm
121 c
No
No
No
121 c
Yes
Yes
Yes
121(c), 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122ffi
Auto
Auto
Auto
122(g)
n/a
n/a
n/a
123
124
R-8.0
R-8.0
R-8.0
144 a & b
n/a
n/a
n/a
144 a & b
64,000 btuh
64,000 btuh
64,000 btuh
144 a & b
n/a
n/a
n/a
144 a & b
46,928 btuh
46,695 btuh
46,696 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c)
144 c
No
No
No
144 d
No
No
No.
144 a
Fixed Tem (Integrated)
Fixed Tem (integrated)
Fixed Tem (Integrated)
144
Constant Temp
Constant Temp
Constant Tem
144(f)
Constant Temp
Constant Temp
Constant Temp
144 k
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 11 of 25 1
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
(PROJECT NAME I
DATE
Jefferson Square Retail shops Building 3 8/11/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
Shop D Shop E
2 1
Reference on Plans or Specification 1
112(a)
82% AFUE
82% AFUE
112(a)
15.0 SEER / 11.0 EER
15.0 SEER / 12.0 EER
112(b)
n/a
n/a
112(c), 115(a)
n/a
n/a
121(b)
No
No
121 b
564 cfm
509 cfm
121 c
No
No
121 c
Yes
Yes
121(c), 122(e)
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
122
Auto
Auto
122(
n/a
n/a
123
124
R-8.0
R-8.0
144 a & b
n/a
n/a
144 a & b
128,000 btuh
64,000 btuh
144 a & b
n/a
n/a
144 a & b
113,977 btuh
47,538 btuh
144 c
Constant Volume
Constant Volume
144 c
144 c
No
No
144 d
No
No
144 a
Fixed Tem Non-Inte
Fixed Tem (Integrated)
144
Constant Ternp
Constant Tem
144(l)
Constant Temp
Constant Temp
144 k
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "N/A" in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sqft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
L _ EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paoe:12 of 25 1
MECHANICAL VENTILATION MECH-3-C
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
PRESCRIPTIVE REHEAT
LIMITATION Section 144(d))
MECHANICAL VENTILATION Section
121(b)2)
AREA
BASIS
OCCUPANCY
BASIS
VAV MINIMUM
A
B
C
D
E
F
G
H
I
J
K
L
I M
N
ZONE/SYSTEM
0
o
D�
TAa
v°
NQ
a
c
din
��T
° 3
o
3
W
X Dn
-nOQ
m 3
Z
�c
is
'°eD
0 c
0-'0
Rm-n
' 3
`c
03
m��
Xn3
"' 3
vim
A
0X C
°, <
D
p
n m
T.'.N
3 D 0
NCD
O
o'
n00
TNS'
3
ii
r0o
3
yX
. A
7C0
°°
c
w3o3i
07X
n=°
L
y
N�
�
3
m
'
-yw
D
1
SHOP A
1,214
0.25
304
28.5
15.0
427
427
427
SHOP A
Total
427
427
SHOP B
1,199
0.25
300
26.8
15.0
402
402
402
Shop B
Total
402
402
SHOP C
1,21C
0.25
302
26.8
15.0
402
402
402
Shop C
Total
1 402
402
SHOP D
1,691
0.25
423
37.6
15.0
564
564
564
Shop D
Total
564
564
SHOP E
1,353
0.25
338
33.9
15.0
509
509
509
Shop E
Total
509
509
C Minimum ventilation rate per Section 121 Table 121-A
E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed seating.
H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on and AREA or OCCUPANCY BASIS (column D or G).
I Must be greater than orequal to H or use Transfer Air column N to make up the difference.
J Design fan supply cfm Fan CFM x 30%; or
K Condition area ft. sq.) x 04 cfm/ft. sq.; or
L Maximum of Columns H, J. K, or 300 cm
M This must be less than orequal to Column L and greater that orequal to the sum of Columns H + N.
N Transfer air must be provided where the Required Ventilation Air (column 1) is greater than the Design Minimum Air (column M). Where required, transfer air must be greater than or equal
to the difference between the Required Ventilation Air (column 1) and the Design Minimum Air (column M), column H - M.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 13 of 25
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5-C
PROJECT NAME
Jefferson Square Retail shops Building3
DATE 8/11/2008
CHILLER AND TOWER SUMMARY
Efficiency
Tons
PUMPS
Equipment Name
Equipment Type
Qty.
Tot.
Qty
GPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
1QHW / BOILER SUMMARY
Energy Standby TANK INSUL.I
Rated Vol. Condition Factor Loss or Ext.
System Name System Type Distribution Type Qty Input (Gals.) Status or RE Pilot R -Val.
MULTI -FAMILY CENTRAL WATER HEATING DETAILS
Hot Water P mp Hot Water Piping Len th ft
Add 1/2"
Control # HP . Type In Plenum Outside Buried Insulation
CENTRAL SYSTEM RATINGS
HEATING COOLING
Aux. Condition
System Name S stem T e Qty Output kW Eff. Outout Efficiencv Status Economizer Type
Trane YHC048A3 Packaged DX 4 64,000 0.0 82%AFUE 49,800 15.0 SEER / 12.0 EER New Fixed Temp (Integrate(
)
Trane YHC060A3 Packaged DX 2 64,000 0.0 82% AFUE 62,400 15.0 SEER / 11.0 EER New Fixed Temp (Non-Inte )
ENVELOPE MANDATORY MEASURES ENV -MM
PROJECT NAME DATE
Jefferson Square Retail shops Buildinq 3 8/11%2008
DESCRIPTION
Designer
Enforcement
❑X §118(a) Installed Insulating Material shall have been certified by the manufacturer to
.comply with the California Quality Standards for insulating material, Title 20,
Chapter 4, Article 3.
X] § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
R§ 117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
X] § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors
and fire doors).
X] § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
0 §118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall
have insulation with an installed R -value of no less than R-13 between framing
members.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 15 of 25
A
B
C
D
E
F
Room
Name
Task/Activity
Description
Room
Length (L)
ft)
Room
Width (W)
(ft
Room Cavity
Height (H)
(ft)
Room Cay. Ratio
5xHx(L+W)
/(LxW)
A
B
C
D
E
F
Room
Name
Task/Activity
Description
Room
Area (A)
(so
Room
Perimeter (P)
(ft)
Room Cavity
Height (H)
(ft)
Room Cay. Ratio
2.5 x H x P
/A
LIGHTING MANDATORY MEASURES LTG -
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
DESCRIPTION
Designer
Enforcement
❑X § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic
control to shut off the lighting. This automatic control shall meet the requirements of
Section 119 and may be an occupancy sensor, automatic time switch, or other device
capable of automatically shutting off the lighting.
§ 131(d)2 Override for Building Lighting Shut-off: The automatic building shut-off system is
provided with a manual, accessible override switch in sight of the lights. The area of
override is not to exceed 5,000 square feet.
X § 119(h) Automatic Control Devices Certified: All automatic control devices specified are
certified, all alternate equipment shall be certified and installed as directed by the
manufacturer.
FX]§ 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the
project are certified and listed in the Directory. All installed fixtures shall be certified.
X❑ § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with
a separate switch or occupancy sensor device for each area with floor -to -ceiling
walls.
X] § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100
square feet and more than 0.8 watts per square foot of lighting load shall be
controlled with bi-level switching for uniformreduction of lighting within the room.
R§ 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than
250 square feet and that allow for the effective use of daylight in the area shall have
50% of the lamps in each daylit area controlled by a separate switch; or the effective
use of daylight cannot be accomplished because the windows are continuously
shaded by a building on the adjacent lot. Diagram of shading during different times
of the year is included on plans.
X] § 131(e) Display Lighting. Display lighting shall be separately switched on circuits that are
20 amps or less.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 17 of 25
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
§11 Any appliance for which there is a California standard established in the
Appliance Efficiency Regulations will comply with the applicable standard.
0 §115(a) Fan type central furnaces shall not have a pilot light.
0 §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
§124 Air handling duct systems shall be installed and -insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§122(e) Each space conditioning system shall be installed with one of the following:
a§122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an automatic time switch
with an accessible manual override that allows operation of the system during
off -hours for up to 4 hours. The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power is interrupted; or
a§122(e)1 B An occupancy sensor to control the operating period of the system; or
❑X §l22(e)1C A 4 -hour timer that can be manually operated to control the operating period of
the system.
XJ §122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint.
X❑ §122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
isolation zones. Each zone: shall not exceed 25,000 square feet; shall be
provided with isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas; and shall be controlled by a time control device as described above.
ZNJ §122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both
heating and cooling, the control shall be capable of providing a deadband of at
least 5 degrees.F within which the supply of heating and cooling is shut off or
reduced to a minimum.
X❑ §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and
adjustable setpoint stops accessible only to authorized personnel.
0 §112(b) Heat pumps shall be installed with controls to prevent electric resistance
- supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 18 of 25
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM
(PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
Description
Designer
Enforcement
Ventilation
FX §121(e) Controls shall be provided to allow outside air dampers or devices to be operated
at the ventilation rates as specified on these plans.
§122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems. ,
§122(f) All gravity ventilating systems shall be provided with automatic or readily
accessible manually operated dampers in all openings to the outside, except for
combustion air openings.
§121(f)1 Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
§121(f)2 Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3)
the person with overall responsibility for the design of the ventilation system; or
❑ §I21(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
§121(f)4 Another method approved by the Commission.
Service Water Heating Systems
FX]. §113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
§113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit
the outlet temperature to 110 degrees F.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:19 of 25
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
SYSTEM NAME FLOOR AREA
SHOP A 1,214
ENGINEERING CHECKS 11SYSTEM LOAD
Number of Systems
1
Heating System
Output per System
64,000
Total Output (Btuh)
64,000
Output (Btuh/sgft)
52.7
Cooling System
Output per System
49,800
Total Output (Btuh)
49,800
Total Output (Tons)
4.2
Total Output (Btuh/sqft)
41.0
Total Output (sgft/Ton)
292.5
Air System
CFM per System
1,600
Airflow (cfm)
1,600
Airflow (cfm/sgft)
1.32
Airflow (cfm/Ton)
385.5
Outside Air (%)
26.7
Outside Air (cfm/sgft)
0.35
Note: values above gi
HEATING SYSTEM
26.0 of
Outside Air
427 cfm
69.6 of
at ARI conditions
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel
Latent
CFM
Sensible
2,056
35,009
5,694
360
13,404
0
1,750
670
0
0
427
16,349
4,767
427
19,819
1,353
-1,353
1,7501
670
56,21:2E::;;1
Trane YHC048A3 46,928 0
Total Adjusted System Output 46,928 0
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK I Jul 5 pm
58.0 of i 105.0 of
Heating Coil
Tem
at
Supply Fan
1600 cfm
64,000
64,000
Jan 12 am
105.8 of
-� Supply Air Ducts
105.4 of
ROOMS
70.0 of
�% Return Air Ducts 4
112.0 / 77.9 of 85.6 / 68.6 of . 59.0 / 57.6 of 59.8 / 57.9 of
� J �
Outside Air
427 cfm
76.0/64.7 of
Cooling Coil
O Supply Air Ducts
Supply Fan 60.8 / 58.3 of
1600 cfm 56.7% R.H. ROOMS
75.0 / 64.4 of
Return Air Ducts
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:20 of 25 1
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
SYSTEM NAME FLOOR AREA
Shop B 1,199
Number of Systems
1
Heating System
Output per System
64,000
Total Output (Btuh)
64,000
Output (Btuh/sgft)
53.4
Cooling System
Output per System
49,800
Total Output (Btuh)
49,800
Total Output (Tons)
4.2
Total Output (Btuh/sgft)
41.5
Total Output (sgft/Ton)
288.9
Air System
CFM per System
1,600
Airflow (cfm)
1,600
Airflow (cfm/sqft)
1.33
Airflow (cfm/Ton)
385.5
Outside Air (%)
25.1
Outside Air (cfm/sgft)
0.33
Note: values above given at ARI conditions
26.0 OF
Outside Air
402 cfm
69.8 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible Latent
CFM
I Sensible
45 037 9,8811
Trane YHC048A3 46,695 0
Total Adjusted System Output a6,695 0
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK I Jul 2 pm
PSYCHROMETRICS (Airstream Tel
58.8 OF 105.0 of
Heating Coil
TOOLING SYSTEM PSYCH
12.0 / 77.9 of
Outside Air
402 cfm
75.8/64.6 of
at Time of
64,000
64,000
Jan 12 am
105.8 of
O Supply Air Ducts
Supply Fan 105.6 of
1600 cfm ROOMS
70.0 of
Return Air Ducts I
res at
84.9 / 68.3 of. 59.0 / 57.7 OF
Cooling Coil
Q
Supply Fan
1600 cfm
59.8 / 58.0 of
Supply Air Ducts
60.5 / 58.2 of
56.6% R.H. ROOMS
75.0 / 64.3 of
�..�. ....� A:_ r%.._..
EnergyPro 4.4 by Energysoft User Number: 5424 Job Number:. Page: 21 of 25
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
SYSTEM NAME FLOOR AREA
Shop C 1,210
EATING SYSTEM PSYCHROMETRICS J&ELt
26.0 OF 58.8 OF
Outside Air
402 cfm
69.8 OF
12.0 / 77.9 OF
Outside Air
402 cfm
75.8/64.6 °F
. Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible
Latent
CFM
I Sensible
1,512
25,754
5,355
188
6,987
0
1,288
349
0
0
402
15,492
4,526
402
18,719
1,353
-1,353
1,288
1 349
45 174 9 881 25 052
Trane YHC048A3 46,696 0 64,000
Total Adjusted System Output46,696 0 64,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 2 pm Jan 12 am
105.0 OF
Heating Coil
PSYCHROMETRICS
Supply Fan
1600 cfm
105.8 OF
Supply Air Ducts
105.6 OF
ROOMS
70.0 OF
h Return Air Ducts i
84.9 / 68.3 OF . 59.0 / 57.7 OF,
Cooling Coil
Supply Fa
1600 cfm
59.8 / 58.0 of
Supply Air Ducts
Fan
h Return Air Ducts 11
60.6/58 . 2 of
56.6% R.H. ROOMS
75.0 / 64.3 OF
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:22 of 25 1
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Building 3 8/11/2008
SYSTEM NAME FLOOR AREA
Shop D 1,691
:ATING S
26.0 OF
Outside
��
564 cfm
69.9 OF
112.0 / 77.9 of
>—:11
Outside Air
564 cfm
75.5/64.2 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
Sensible
Latent
CFM
Sensible
2,103
35,803
7,522
224
8,341
0
1,790
417
0
0
564
21,934
6,815
564
26,352
2,707
-2,707
1,790
417
64.0 14 338 32 821
Trane YHC060A3 113,977 0 128,000
Total Adjusted System Output 113,977 0 128,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 2 pm Jan 12 am
RIGS (Airstream Temperatures
63.0 of ® 105.0 of
Heating Coil
Supply Fan
3600 cfm
105.7 of
-� Supply Air Ducts
105.6 of
ROOMS
70.0 of
�% Return Air Ducts 4
ratures
81.2/66.7OF M 59.0/57.8OF
Cooling Coil
Supply Fan
3600 cfm
59.7 / 58.1 of
Supply Air Ducts
60.2 / 58.3 of
55.7% R.H. ROOMS
75.0 / 64.1 of
h Return Air Ducts 'I
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:23 of 25 1
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Buildin 3 8/11/2008
SYSTEM NAME FLOOR AREA
Shop E 1,353
Number of Systems
1
Heating System
Output per System
64,000
Total Output (Btuh)
64,000
Output (Btuh/sqft)
47.3
Cooling System
Output per System
49,800
Total Output (Btuh)
49,800
Total Output (Tons)
4.2
Total Output (Btuh/sqft)
36.8
Total Output (sgft/Ton)
326.0
Air System
CFM per System
1,600
Airflow (cfm)
1,600
Airflow (cfm/sqft)
1.18
Airflow (cfm/Ton)
385.5
Outside Air (%)
31.8
Outside Air (cfm/sgft)
0.38
Note: values above given at ARI conditions
26.0 of
)�
Outside Air
509 cfm
69.6 of
112.0 / 77.9 of
Outside Air
509 cfm
76.0/64.8 of
ETRICS
55.7 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM TSensible
Latent
CFM
I Sensible
58.2 12 233
35 998
Trane YHC048A3 47,538 0 64,000
Total Adjusted System Output 47,538 0 64,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 2 pm Jan 12 am
'earn Temperatures at Time of Heatina Peak)
105.0 of
Heating Coil
Supply Fan
1600 cfm
105.8 of
—� Supply Air Ducts
105.4 of
ROOMS
70.0 of
h Return Air Ducts 4
res at Ti
87.5 / 69.3 of M 59.0/57.60F
Cooling Coil
Supply Fan
1600 cfm
59.8 / 57.9 of
Supply Air Ducts
60.8 / 58.2 of
57.2% R.H. ROOMS
75.0 / 64.5 of
h Return Air Ducts 4
EnergyPro 4.4 by Energysoft User Number: 5424 Job Number: Paoe:24 of 25
ft*,
LIGHTING INSPECTION CHECKLIST LTG -11
(PROJECT NAME INSPECTION DATE
f Jefferson Square Retail shops Building3 8/11/2008
FIXTURE
CODE
TYPE
DESCRIPTION
LAMP
TYPE
LAMP
QUANT.
NUMBER OF
FIXTURES
WATTS PER
FIXTURE
FIELD NOTES
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:25 of 25