07-3169 (CSCS) Title 24a]
T
TITLE 24 REPORT
Title 24 Report for:
Jefferson Square Retail shops Building 2
Jefferson Street
La Quinta , CA
Project Designer:
1411 Fifth St., Suite. 300
Santa Monica, CA 90401
310-394-2623
Report Prepared By:
Bradley Severson
AMPE, INC
600 W. Broadway #250
Glendale, CA 91204
(818) 265-9720
Job Number:
Date:
8/11/2008
CITY OF
SSAFETYU(INTA
BUILDING
APPROVED
FOR CONSTRUCTION
nA tI111t90 gy
-0-6914
7-31Co`j
27
AUG 2 5 2008
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC - www.energysoft.com.
EnergyPro 4.4 by EnergySoft Job Number: User Number: 5424
q a -- - 11
TABLE OF CONTENTS
Cover Page
1
Table of Contents
2
Nonresidential Performance Title 24 Forms
3
Form ENV -MM Envelope Mandatory Measures
14
Form LTG -7-C Room Cavity Ratio Worksheet
15
Form LTG -MM Lighting Mandatory Measures
16
Form MECH-MM Mechanical Mandatory Measures
17
HVAC System Heating and Cooling Loads Summary
19
EnergyPro 4.4 by EnergySoft Job Number: User Number: 5424
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1
PROJECT NAME
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
DATE
Jefferson Square Retail shops Building 2
DOCUMENTATION AUTHOR
8/11/2008
PROJECT ADDRESS
BUILDING CONDITIONED FLOOR AREA
--- - --- --i
Jefferson Street La Quinta
�CLIMATE ZONE
15
BUILDING TYPE
PRINCIPAL DESIGNER -ENVELOPE
TELEPHONE
Building Permit #
HOTEL/MOTEL GUEST ROOM
310-394-2623
.--- —I
DOCUMENTATION AUTHOR
TELEPHONE
Checked by/Date
AMPE, INC
(818) 265-9720
Enforcement Agency Use
GENERAL INFORMATION
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
DATE OF PLANS
12/18/07
BUILDING CONDITIONED FLOOR AREA
4, 350 sq.Ft.
�CLIMATE ZONE
15
BUILDING TYPE
® NONRESIDENTIAL
HIGH RISE RESIDENTIAL
ENV. LTG. MECH.
HOTEL/MOTEL GUEST ROOM
PHASE OF CONSTRUCTION
® NEW CONSTRUCTION
[j ADDITION
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
EXISTING + ADDITION/ALTERATION
STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations. This certificate applies only to a Building using the performance compliance approach.
The documentation preparer hereby certifies that the documentation is accurate and complete.
DOCUMENTATION AUTHOR
SIGNATURE
DATE
Bradley Severson
The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is
consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this
permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116,
through 118, and 140, 142, 143 or 149 of Title 24, Part 6.
ENV. LTG. MECH.
1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to
sign this document as the person responsible for its preparation; and that I am licensed in the State of
California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect.
2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section
5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed
contractor performing this work.
F] F-1 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document
because it pertains to a structure or type of work described as exempt pursuant to Business and Professions
Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in
full in the Nonresidential Manual.)
ENVELOPE COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
ENV -1
Required Forms
PRINCIPAL ENVELOPE DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
LIGHTING COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
LTG -1, LTG -2
Required Forms
PRINCIPAL LIGHTING DESIGNER - NAME
SIGNATUREW
LIC. NO.
DATE
Sothol Roeun
d
P 0�'
MECHANICAL COMPLIANCE
Indicate location on plans of Note Block for Mandatory Measures
MECH-1 MECH-2 MECH-3 MECH-5
Required Forms
PRINCIPAL MECHANICAL DESIGNER - NAME
SIGNATURE
LIC. NO.
DATE
Bradley Severson
A1Z79'6,3
08
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:3 of 21 1
PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PE
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r
Standard
ENERGY COMPONENT Design
Space Heating 0.33
Space Cooling 386.67
Fans 34.55
Rejection 0.00
& Misc. 0.00
Hot Water 16.51
187.30
87.43
0.00
TOTALS: 712.78
Percent better than Standard:
Proposed
Design
Compliance
Margin
((
Standard Pmposee
0.01
0.32I
0 30 80 90 120 150 180 210 240 270 300 330 980
keta/sgft-n
245.28
141.39Indoor
39.00
-4.45Heat
0.00
0.00Pumps
0.00
0.00Domestic
16.51
0.00Lighting
187.30
0.00Receptacle
87.43
0.00Process
0.00
0.00
575.52
137.27
19.3%
( 19.3% excluding
process)
BUILDING COMPLIES
GENERAL INFORMATION
Building Orientation
Number of Stories
Number of Systems
Number of Zones
(N)Odeg
Conditioned Floor Area
Unconditioned Floor Area
Conditioned Footprint Area
Fuel Type
4,350 sgft.
sgft.
1
0
3
4,350 sgft.
3
Natural Gas
Orientation
Front Elevation N
Left Elevation (E)
Rear Elevation s
Right Elevation (W)l
Total
Roof
Gross Area
sgft.
sgft.
sgft.
sgft.
sqn.
sqn.
Glazing Area
Glazing
sqft.
sgft.
sgft.
sgft.
sgft.
sgft.
Ratio
0
0
0.0%
786
536
68.2%
o
0
0.0%
7861
0
0.00%
1,572
536
4,350
==�
Standard Proposed
Lighting Power Density 1.700 W/sgft. 1.700 W/sgft.
Prescriptive Env. Heat Loss 572 Btu/h 361 Btu/h
Prescriptive Env. Heat Gain 64,631 Btu/h-F 45,878 Btu/h-F
Remarks:
Run Initiation Time: 08/11/08 14:08:37 Run Code: 1218492517
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:4 of 21
PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1
PROJECT NAME
Jefferson Square
Retail shops
Building2
DATE
8/11/2008
ZONE INFORMATION
System Name
Zone Name
Occupancy Type
Floor
Area
(sgft.)
Inst.
LPD
(W/sf)1
Ctrl.
Credits
(W/sf)2
Allowed LPD
Pr c.
Loads
(Wlsf)
Area Tailored
Is 3 /s 4
Shop A
SHOP A
Retail Sales, Wholesale
1,405
-1.700
1
Shop B
SHOP B
Retail Sales, Wholesale
1,470
"1.70
Shop C
SHOP C
Retail Sales, Wholesale
1,475
'1.70
Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C
(items marked with asterisk, see LTG -2 -C by others) (by others)
4. See LTG -6-C
Items above require special documentation
EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST
��m ���a� n�����..m....... ayvncy bnutnu pay bpeciae daemon to the items specmea in tms cnOCKust. i nese items require special written justification
and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of
the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation
submitted.
The HVAC System 'Trane YHC060A3" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500.
The HVAC S stem 'Trane YHC060AY is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement.
The HVAC System 'Trane YHC060A3" includes Demand Control Ventilation oer Standards Section 121.
no exceptionai matures ustea in tnis perrormance approacn application have specifically been reviewed. Adequate written justification and
documentation for their use have been provided by the applicant.
Authorized Sionatu
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:5 of 21 1
CERTIFICATE OF COMPLIANCE ENV -1-C
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
OPAQUE SURFACES
# Surface
Type
Area
U -Fac.
Insulation
Cay. Cont.
Act.
Am.
Tilt
Cond.
Status
Joint Appendix
IV Reference
Location / Comments
1 Roof
1,405
0.032
R-30
R-0.0
0
0
New01-A17
Window Left E
SHOP A
2 Wall
242
0.074
R-19
R-0.0
270
90
New
09-A5
SHOP A
3 Door
24
0.700
None
R-0.0
270
90
New
28-A2
SHOP A
4 Wall
90
0.074
R-19
R-0.0
90
90
New
09-A5
SHOP A
5 Roof
1,470
0.032
R-30
R-0.0
0
0
New
01-A17
SHOP B
6 Wall
70
0.074
R-19
R-0.0
90
90
New
09-A5
SHOP B
7 Wall
230
0.074
R-19
R-0.0
270
90
New
09-A5
SHOP B
8 Door
24
0.700
None
R-0.0
270
90
New
28-A2
SHOP B
9 Roof
1,475
0.032
R-30
R-0.0
0
0
New
01-A17
SHOP C
10 Wall
84
0.074
R-19
R-0.0
90
90
1 New
09-A5
SHOP C
11 lWall
236
0.074
R-19
R-0.01
270
90
New
09-A5
SHOP C
12 Door
24
0.700
None
R-0.0
270
90
New
28-A2
SHOP C
Existing, Altered, Removed)
FENESTRATION SURFACES
More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from
Standards Table 116-A and B. Certificate shall be filed in the contractor's project office during construction and in the building managers office after construction
#
1Tvpe
Area U -Fac'
SHGC2
Act.
Am.
Cond.
Stat.
Glazin T e
Location/
Comments
1
Window Left E
176 0.280 NI -1
0.38 COG
90
New
PPG SOLARBAN 60 2 CLEAR
SHOP A
2
Window Left E
184 0.280 NI -1
0.38 COG
90
New
PPG SOLARBAN 60 2 CLEAR
SHOP B
3
Window Left E
176 0.280 NI -1
0.38 COG
90
New
PPG SOLARBAN 60 2 CLEAR
SHOP C
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
(1) U -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value.
2 SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value
EXTERIOR SHADING
# Exterior Shade Type
SHGC
Window
Hgt. Wd.
Overhang Left Fin Right Fin
Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t.
1 None
0.76
8.0 16.5
10.0 0.1 10.0 10.0
2 None
0.76
8.0 15.0
10.0 0.1 10.0 10.0
3 None
0.76
8.0 15.0
10.0 0.1 10.0 10.0
MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES
LiThe proposed building Is In climate zones 2 through 15 and contains an enclosed space with Floor area greater than 25,000 ft2, a ceiling height greater than 16 feet, and an LPD for general
lighting of at least 0.5 W/ft2. See Section 143(c). If this box Is checked, ENV4-C must be filled out. when submitting under the Prescriptive Compliance Approach.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:6 of 21 1
CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1-C
NAME
DATE
Jefferson Square Retail shops Building 2 1 8/11/2008 1
INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ • COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 7,395
ALTERNATE COMPLIANCE
❑X PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
(Room #)
CONTROL
IDENTIFICATION
CONTROL TYPE
(Auto Time Switch, Dimming, etc.)
Check if
SPACE CONTROLLED Daylighting
NOTE TO
FIELD
NOTES TO FIELD - For Building Department Use Only
Run Initiation Time: 08/11/08 14:08:37 Run Code: 1218492517
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Pagel of 21
INSTALLED
WATTS
INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C)
7,395
PORTABLE LIGHTING (From LTG -3-C)
0
LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C)
0
CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER
7,395
INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0
LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0
UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0
ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES
❑ • COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED
❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS
❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 7,395
ALTERNATE COMPLIANCE
❑X PERFORMANCE METHOD
❑ COMMMON LIGHTING SYSTEM (From LTG -8-C)
ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0
MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS
CONTROL LOCATION
(Room #)
CONTROL
IDENTIFICATION
CONTROL TYPE
(Auto Time Switch, Dimming, etc.)
Check if
SPACE CONTROLLED Daylighting
NOTE TO
FIELD
NOTES TO FIELD - For Building Department Use Only
Run Initiation Time: 08/11/08 14:08:37 Run Code: 1218492517
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Pagel of 21
CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1-C
PROJECT NAME
Jefferson Square Retail shops Building 2
DATE
8/11/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance
tests for lighting systems. The designer is required to check the boxes by all acceptance tests that
apply and list all equipment that require an acceptance test. If all equipment of a certain type requires
a test, list the equipment description and the number of systems to be tested in parentheses. The NJ
number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the
test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design
professional or an agent selected by the owner). Since this form will be part of the plans, completion
of this section will allow the responsible party to budget for the scope of work appropriately.
Building Departments:
Before an occupancy permit is granted for a newly constructed building or space, or a new lighting
system system serving a building or space is operated for normal use, all control devices serving the
building or space shall be certified as meeting the Acceptance Requirements for Code Compliance.
In addition a Certificate of Acceptance, LTG-1-A, Forms shall be submitted to the building department
that:
A. Certifies plans, specifications, installation certificates, and operating and maintenance
information meet the requirements of§ 10-103(b) and Title 24 Part 6.
Test Description
Test Performed BY:
❑ LTG-2-A: Lighting Control Acceptance Document
- Occupancy Sensor Acceptance
- Manual Daylight Controls Acceptance
- Automatic Time Switch Control Acceptance
Equipment requiring acceptance testing
❑ LTG-3-A: Automatic Daylighting Controls Acceptance Document
Equipment requiring acceptance testing
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:8 of 21 1
CERTIFICATE OF COMPLIANCE MECH-1-C
(PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
Designer:
This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to
check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the
equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential
ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent
selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work
appropriately.
Building Departments:
SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a
building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for
Code Compliance.
In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation
certificates. and ooeratina and maintenance information meet the requirements of Sertinn 1n-10,Athi and Title 24 Part a
STATEMENT OF COMPLIANCE
❑ MECH-2-A: Ventilation System Acceptance Document
-Variable Air Volume Systems Outdoor Air Acceptance
-Constant Air Volume Systems Outdoor Air Acceptance
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-3-A: Packaged HVAC Systems Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit.
❑ MECH-4-A: Air -Side Economizer Acceptance Document
Equipment requiring acceptance testing
Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the
commission do not require equipment testing but do require construction inspection.
❑ MECH-5-A: Air Distribution Acceptance Document
Equipment requiring acceptance testing
This test required If the unit serves 5,000 R2 of space or less and 25% or more of the ducts are in nonoonditioned or semiconditioned space like an
attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or
replace the packaged unit.
❑ MECH-6-A: Demand Control Ventilation Acceptance Document
Equipment requiring acceptance testing
All new DCV controls installed on new or existing packaged systems must be tested.
❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document
Equipment requiring acceptance testing
All new VA fan volume controls installed on new or existing systems must be tested
❑ MECH-8-A:-Hydronic System Control Acceptance Document
-Variable Flow Controls Applies to chilled and hot water systems.
-Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header.
-Supply Water Temperature Reset Controls
Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btu/hr.
-Water-loop Heat Pump Controls
Applies to all new wale loop heat pump systems where the combined loop pumps are greater than 5 hp.
-Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump
or condenser water systems where the pumps motors are greater than 5 hp.
Equipment requiring acceptance testing
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:9 of 21
U
1
N 00
,^ O
V O
N
J
fb
W
�
I--
04 04
O
ca
EL
LO LO O O LO
M M M ^'
� r-:
o
d
Q ®
w °
Q o
aE
3y.
O
U
E
LL
C9
Z
JO
N
00
rn
00
~
o
v
N
CL
O
W
a
Q
—
a
:3
N
LU
m
o
J
Cl)
Z
O
O
LU
N
~
Z
v!
N
O
Z
H
=
:3
�
Cr
(/)
c
N
LL
W
a
C7
Z_
J
a�
2
Installed
M
W
J
O
O
z
W
J
Z
IL K
rn
LO LO O O LO
M M M ^'
� r-:
o
d
Q ®
w °
Q o
aE
3y.
O
U
E
LL
C9
Z
JO
C1
E
°r
1--
o
00
rn
00
~
o
v
f] e
Q
a
Z
C
CL
,
Installed
M
IT
M
Wafts
N
N
N
(G x 1)
Number
of
Luminaires
d
CEC
fAA
=
Default?
C
Watts
O
per
Luminaire
Number of
W
Ballast per
Luminaire
Wafts
W
per
U)
Lamp
m
Number of
0
Lamps per
N
CLE
Luminaire
fa
J
U
Lamp
Type
00
CD0
N
f0
M
C
Q
Q
Q
O
N
N
fA
a
LO
O
LO
U
r
r
r
L
fn
�C
C
�E
d
lC
f0
f0
~
O
O
O
J
Q
Q
Q
v
v
v
m
v
m
v
m
v
�N
�N
fCN
tn3v)3i
AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
SYSTEM FEATURES
ITEM OR SYSTEM TAG(S)
Number of Systems
T-24
MANDATORY MEASURES Section
Heating Equipment Efficiency
Cooling Equipment Efficiency
Heat Pump Thermostat
Furnace Controls
Natural Ventilation
Minimum Ventilation
VAV Minimum Position Control
Demand Control Ventilation
Time Control
Setback and Setup Control
Outdoor Damper Control
Isolation Zones
Pipe Insulation
Duct Insulation
PRESCRIPTIVE MEASURES
Calculated Heating Capacity x 1.43 2
Proposed Heating Capacity 2
Calculated Sensible Cooling Capacity x 1.212
Proposed Sensible Cooling Capacity 2
Fan Control
DP Sensor Location
Supply Pressure Reset (DDC only)
Simultaneous Heat/Cool
Economizer
Heating Air Supply Reset
Cooling Air Supply Reset
Duct Sealing for Prescriptive Compliance
AIR SYSTEMS, Central or Single Zone
Shop A
4
Shop B
Shop C
1
1
1
Reference on Plans or Specification 1
112(a)
82% AFUE
82% AFUE
82% AFUE
112(a)
15.0 SEER / 11.0 EER
15.0 SEER / 11.0 EER
15.0 SEER / 11.0 EER
112(b)
n/a
n/a
n/a
112(c), 115(a)
n/a
n/a
n/a
121(b)
No
No
No
121(b)
494 cfm
534 cfm
535 cfm
121 c
No
No
No
121 c
Yes
Yes
Yes
121(c), 122(e)
Programmable Switch
Programmable Switch
Programmable Switch
122(e)
Heating & Cooling Required
Heating & Cooling Required
Heating & Cooling Required
122
Auto
Auto
Auto
122(g)
n/a
n/a
n/a
123
124
R-8.0
R-8.0
R-8.0
144 a & b
n/a
n/a
n/a
144 a & b
64,000 btuh
64,000 btuh
64,000 btuh
144 a & b
n/a
n/a
n/a
144 a & b
58,880 btuh
59,216 btuh
59,231 btuh
144 c
Constant Volume
Constant Volume
Constant Volume
144 c)
144 c
No
No
No
144 d
No
No
No
144 a
Fixed Tem Non-Inte
Fixed Tem Non-Inte
Fixed Tem Non-Inte
144
Constant Temp
Constant Ternp
Constant Tem
144 (f)
Constant Temp
Constant Temp
Constant Temp
144 k)
No
No
No
1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the
required features are documented. If a requirement is not applicable, put "NIX in the column.
2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1.
3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance,
see PERF -1 for performance method duct sealing requirements.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:11 of 21
U
M
U
W
O
r
Z
Oct
U
Z
2
W
00
O
0
N
r
00
04
Z
Transfer Air
N
0
Design Min. Ai
g
04
U,
Setpoint
o
0
v
E
a
L o
Max of
m
Y •U
m
-j
Columns H, J,
LD
z
K or 300 CFM
a
_
1 z
O
_
2Bx
0.4
Y
E
j
a
Y
CFM/sq. ft.
y
LH
>
m
i
30% of Design
x
o
e
J
Zone Supply
$
o
CFM
d
Design
A
Of
f
A
M
LO
"
`o
Q
2—
Vent. Air
It
"•'
'n
"'
m
h
o
m
CFM
„
;
9
REQ'D V.A�
b
8
X
Max of
v
'n
to
LO
LO
'
v
E
(D or G)
H
m
g
Min CFM
'Olt)m
m
M
m
m
z
a=
E
N
by Occupant
�
m
'O
F
9
>
> '
z'
m
(E x F)
0U
E 3
a
O
U
CFM
°
o
m E
Z
i`
per
Z
Qa
Person
0
a
08
m
O
co
r�
c00i
E
c E
W
Number of
Cli
M
ui
M
L0
c+�
m
E E
m
0
People
o
v v
U
Min CFM,n
$
y 'y
0
by Area
C''
r'Oi
Cl)
(BxC)
y
m
E
o
d
E
N
N
E
L°
m
—'9
N
N
CFM
LO N
N
N
c
Z
c
^
m
U
per
o
0
0
o
`—° =
o
<
E
w
Square Foot
n
m -88'
-
8
C
a
Condition
d
C
m
Area
m;
w
a=
(SF)
a m
m m
E
~
O~
0
m
d
h
' C
C
E
E
m V
Z
E `o
¢
X w
o U
m
O
d
d ry
f
> =
O $
LL
c: o
`O
d c
N a
O m
LU�=
U
y
a m
O
J
m
O'
I�
C
W
O
E
LL%=
t'
D E
Z
H
E m
E
G"
E
`
<
}
O
J
i x>
c w
o nm
E
Q
Z
c
E
�
m c
E •-
`°
b
a
V
N
m
c>
E>
m
5
o
a.
a�mK
m
a�'i E
0UM
L
=
Q
Q
m
m
U
U
c
w
V
W
n
L
Q
a
L
0
OL
U w=
—
Y
Z
2
g
=
U)U)
r-
N
MECHANICAL EQUIPMENT DETAILS
Part 1 of 2 MECH-5-C
PROJECT NAME
Jefferson Square Retail shops Building 2
DATE
8/11/2008
CHILLER AND TOWER SUMMARY
Efficiency
Tons
PUMPS
Equipment Name
Equipment Type
Qty.
Tot.
Qty
GPM
BHP
Motor
Eff.
Drive
Eff.
Pump
Control
Energy Standby TANK INSUL.
Rated Vol. Condition Factor Loss or Ext.
System Name System Type Distribution Type Qty Input (Gals.) Status or RE Pilot I R -Val.
Hot Water P mp Hot Water Piping Length ft
Add 1/2"
Control # HP Type In Plenum Outside Buried Insulation
CENTRAL SYSTEM RATINGS
HEATING COOLING
Aux. Condition
System Name System Type Qtv Output kW Eff. Out ut Efficiency Status Economizer Type
Trane YHC060A3 Packaged DX 3 64,000 0.0 82% AFUE 62,400 15.0 SEER / 11.0 EER New Fixed Temp (Non-Inte )
ENVELOPE MANDATORY MEASURES ENV -MM
ECT NAME
Jefferson Square Retail shops Buildi
DATE
8/11/2008
DESCRIPTION
Designer
Enforcement
§118(a) Installed Insulating Material shall have been certified by the manufacturer to
comply with the California Quality Standards for insulating material, Title 20,.
Chapter 4, Article 3.
X] § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating
and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2.
FXJ §117(a) All Exterior Joints and openings in the building that are observable sources of air
leakage shall be caulked, gasketed, weatherstripped or otherwise sealed.
❑ § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit
and the building, and shall be weatherstripped (except for unframed glass doors
and fire doors).
X] § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not
exceeding those shown in Table Number 1-E. of the Standards. Manufactured
fenestration products must be labeled for U -value according to NFRC procedures.
§118(e) Demising Walls in Nonresidential Buildings:
The opaque portions of framed demising walls in nonresidential buildings shall
have insulation with an installed R -value of no less than R-13 between framing
members. '
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 14 of 21
A
B
C
D
E
F
Room
Name
Task/Activity
Description
Room
Length (L)
(ft)
Room
Width (W)
(ft)
Room Cavity
Height (H)
(ft)
Room Cay. Ratio
5xHx(L+W)
/(LxW)
A
B
C
D
E
F
Room
Name
Task/Activity
Description
Room
Area (A)
(st)
Room
Perimeter (P)
(ft)
Room Cavity
Height (H)
(ft)
Room Cay. Ratio
2.5 x H x P
/A
LIGHTING MANDATORY MEASURES LTG -MM
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
DESCRIPTION
Designer
Enforcement
§ 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic
control to shut off the lighting. This automatic control shall meet the requirements of
Section 119 and may be an occupancy sensor, automatic time switch, or other device
capable of automatically shutting off the lighting.
X] § 131(d)2 override for Building Lighting Shut-off: The automatic building shut-off system is
provided with a manual, accessible override switch in sight of the lights. The area of
override is not to -exceed 5,000 square feet.
,FX] § 119(h) Automatic Control Devices Certified: All automatic control devices specified are
certified, all alternate equipment shall be certified and installed as directed by the
manufacturer.
RI § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the
project are certified and listed in the Directory. All installed fixtures shall be certified.
§ 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with
a separate switch or occupancy sensor device for each area with floor -to -ceiling
walls.
X❑ § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100
square feet and more than 0.8 watts per square foot of lighting load shall be
controlled with bi-level switching for uniform reduction of lighting within the room.
§ 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than
250 square feet and that allow for the effective use of daylight in the area shall have
50% of the lamps in each daylit area controlled by a separate switch; or the effective
use of daylight cannot be accomplished because the windows are continuously
shaded by a building on the adjacent lot. Diagram of shading during different times
of the year is included on plans.
X❑ § 131(a) Display Lighting. Display lighting shall be separately switched on circuits that are
20 amps or less.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 16 of 21
MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
DESCRIPTION
Designer
Enforcement
Equipment and Systems Efficiencies
a§11 Any appliance for which there is a California standard established in the
Appliance Efficiency Regulations will comply with the applicable standard.
0 §115(a) Fan type central furnaces shall not have a pilot light.
RX §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees
Fahrenheit, or within HVAC equipment, shall be insulated in accordance with
Standards Section 123.
§124 Air handling duct systems shall be installed and insulated in compliance with
Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards.
Controls
§122(e) Each space conditioning system shall be installed with one of the following:
RI §122(e)1A Each space conditioning system serving building types such as offices and
manufacturing facilities (and all others not explicitly exempt from the
requirements of Section 112 (d)) shall be installed with an automatic time switch
with an accessible manual override that allows operation of the system during
off -hours for up to 4 hours. The time switch shall be capable of programming
different schedules for weekdays and weekends and have program backup
capabilities that prevent the loss of the device's program and time setting for at
least 10 hours if power is interrupted; or
§122(e)1 B An occupancy sensor to control the operating period of the system; or
FIX 1 §122(e)1C A 4 -hour timer that can be manually operated to control the operating period of
the system.
XJ §122(e)2 Each space conditioning system shall be installed with controls that temporarily
restart and temporarily operate the system as required to maintain a setback
heating and/or a setup cooling thermostat setpoint.
X] §122(g) Each space conditioning system serving multiple zones with a combined
conditioned floor area more than 25,000 square feet shall be provided with
isolation zones. Each zone: shall not exceed 25,000 square feet; shall be
provided with isolation devices, such as valves or dampers, that allow the supply
of heating or cooling to be setback or shut off independently of other isolation
areas; and shall be controlled by a time control device as described above.
® §122(a&b) Each space conditioning system shall be controlled by an individual thermostat
that responds to temperature within the zone. Where used to control heating, the
control shall be adjustable down to 55 degrees F or lower. For cooling, the
control shall be adjustable up to 85 degrees F or higher. Where used for both
heating and cooling, the control shall be capable of providing a deadband of at
least 5 degrees F within which the supply of heating and cooling is shut off or
reduced to a minimum.
FX §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and
adjustable setpoint stops accessible only to authorized personnel.
§112(b) Heat pumps shall be installed with controls to prevent electric resistance
supplementary heater operation when the heating load can be met by the heat
pump alone.
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 17 of 21
MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 1 8/11/2008
Description
Designer
Enforcement
Ventilation
❑X §121(e) Controls shall be provided to allow outside air dampers or devices to be operated
at the ventilation rates as specified on these plans.
❑ §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be
provided on the outside air intakes and discharges of all space conditioning and
exhaust systems. ,
§1 24(f) All gravity ventilating systems shall be provided with automatic or readily
accessible manually operated dampers in all openings to the outside, except for
combustion air openings.
F�. §I21(f)1 Air Balancing: The system shall be balanced in accordance with the National
Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or
Associated Air Balance Council (AABC) National Standards (1989); or
§121(f)2 Outside Air Certification: The system shall provide the minimum outside air as
shown on the mechanical drawings, and shall be measured and certified by the
installing licensed C-20 mechanical contractor and certified by (1) the design
mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3)
the person with overall responsibility for the design of the ventilation system; or
§121 (f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or
remote device capable of measuring the quantity of outside air on a continuous
basis and displaying that quantity on a readily accessible display divice; or
§141(f)4 Another method approved by the Commission.
Service Water Heating Systems
§113(b)2 If a circulating hot water system is installed, it shall have a control capable of
automatically turning off the circulating pump(s) when hot water is not required.
§113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit
the outlet temperature to 110 degrees F.
EnergyPro 4.4 by Energysoft User Number: 5424 Job Number: Page:18 of 21
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
SYSTEM NAME FLOOR AREA
Shop A 1,405
Number of Systems
1
Heating System
Output per System
64,000
Total Output (Btuh)
64,000
Output (Btuh/sgft)
45.6
Cooling System
Output per System
62,400
Total Output (Btuh)
62,400
Total Output (Tons)
5.2
Total Output (Btuh/sqft)
44.4
Total Output (sgft/Ton)
270.2
Air System
CFM per System
1,800
Airflow (cfm)
1,800
Airflow (cfm/sgft)
1.28
Airflow (cfm/Ton)
346.2
Outside Air (%)
27.5
Outside Air (cfmisgft)
0.35
Note: values above given at ARI conditions
26.0 of
—) 1
Outside Air
494 cfm
69.8 of
M PSYCHROMETRICS
57.8 of
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensible
Latent
CFM
I Sensible
1,841
31,352
6,590
F 193
7,187
.0
1,568
359
0
0
494
19,031
5,468
494
23,045
1,353
-1,353
1,5681
359
54,8 12 058 29 598
Trane YHC060A3 58,880 0 64,000
Total Adjusted System Output 58,880 0 64,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
Cream Temperatures at Time of Heating Peak)
105.0 of 105.7 of
O Supply Air Ducts
Heating Coil Supply Fan 105.5 of
1800 cfm ROOMS
70.0 of
h Return Air Ducts `i
COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak
112.0 / 77.9 of 85.8168.7 of 59.0 / 57.6 of 59.7 / 57.9 of
O Supply Air Ducts
Outside Air
494 cfmF
Cooling Coil Supply Fan 60.5 / 58.2 0
1800 cfm 56.8% R.H. ROOMS
75.8/64.70F 75.0/64.4OF
h Return Air Ducts 11
EnergyPro 4.4 by Energysoft User Number: 5424 Job Number: Page: 19 of 21
HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
SYSTEM NAME FLOOR AREA
Shop B 1,470
Number of Systems
1
Heating System
Output per System
64,000
Total Output (Btuh)
64,000
Output (Btuh/sgft)
43.5
Cooling System
Output per System
62,400
Total Output (Btuh)
62,400
Total Output (Tons)
5.2
Total Output (Btuh/sqft)
42.4
Total Output (sgft/Ton)
282.7
Air System
CFM per System
1,800
Airflow (cfm)
1,800
Airflow (cfm/sgft)
1.22
Airflow (cfm/Ton)
346.2
Outside Air (%)
29.6
Outside Air (cfm/sgft)
0.36
Note: values above given at ARI conditions
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensible
Latent
CFM
Sensible
1,932
32,897
7,113
198
7,377
0
1,645
369
0
0
534
20,520
5,800
534
24,873
1,353
-1,353
1,645
369
58,0601 12,9141 31 633
Trane YHC060A3 59,216 0 64,000
Total Adjusted System Output 59,216 0 64,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak
26.0 OF 56.8 OF 105.0 OF 105.7 OF
O Supply Air Ducts
Outside Air
534 cfm
Heating Coil Supply Fan 105.5 OF
1800 cfm ROOMS
69.8 OF 70.0 °F .
h Return Air Ducts 4
DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak
112.0/77.9°F 86.6/69.0°F 59.0/57.6°F 59.7/57.9 OF
O Supply Air Ducts
Outside Air
534 cfm
Cooling Coil Supply Fan 60.6 / 58.2 OF
1800 cfm 57.0% R.H. ROOMS
75.9/64.7 °F 75.0 / 64.5 OF
I
Return Air Ducts It
EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 20 of 21
1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY
PROJECT NAME DATE
Jefferson Square Retail shops Building 2 8/11/2008
SYSTEM NAME FLOOR AREA
Shop C 1,475
26.0 OF
Outside
0
535 cfm
69.8 OF
Total Room Loads
Return Vented Lighting
Return Air Ducts
Return Fan
Ventilation
Supply Fan
Supply Air Ducts
TOTAL SYSTEM LOAD
COIL COOLING PEAK
COIL HTG. PEAK
CFM
I Sensiblel
Latent
I CFM
I Sensible
1,925
32,785
7,138
198
7,375
0
1,639
369
0
0
535
20,592
5,815
535
24,957
1,353
-1,353
1,639
369
58,0081 12 953 1 3:1717
Trane YHC060A3 59,231 0 64,000
Total Adjusted System Output59,231 0 64,000
(Adjusted for Peak Design Conditions)
TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am
RICS (Airstream Tei
56.8 OF . 105.0 OF
Heating Coil
Supply Fan
1800 cfm
105.7 OF
—� Supply Air Ducts
105.5 OF
ROOMS
70.0 OF
h Return Air Ducts `S
(COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak)
12.0 / 77.9 OF
)�
Outside Air
535 cfm
75.9/64.7 °F
86.6 / 69.0 OF . 59.0 / 57.6 OF,
Cooling Coil
0
Supply Fa
1800 cfm
59.7 157.9 of
Supply Air Ducts
Fan
60.6 / 58.2 of
57.1% R.H. ROOMS
75.0 / 64.5 OF
h Return Air Ducts `S
I EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:21 of 21 1