Loading...
07-3169 (CSCS) Title 24a] T TITLE 24 REPORT Title 24 Report for: Jefferson Square Retail shops Building 2 Jefferson Street La Quinta , CA Project Designer: 1411 Fifth St., Suite. 300 Santa Monica, CA 90401 310-394-2623 Report Prepared By: Bradley Severson AMPE, INC 600 W. Broadway #250 Glendale, CA 91204 (818) 265-9720 Job Number: Date: 8/11/2008 CITY OF SSAFETYU(INTA BUILDING APPROVED FOR CONSTRUCTION nA tI111t90 gy -0-6914 7-31Co`j 27 AUG 2 5 2008 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2005 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC - www.energysoft.com. EnergyPro 4.4 by EnergySoft Job Number: User Number: 5424 q a -- - 11 TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -MM Envelope Mandatory Measures 14 Form LTG -7-C Room Cavity Ratio Worksheet 15 Form LTG -MM Lighting Mandatory Measures 16 Form MECH-MM Mechanical Mandatory Measures 17 HVAC System Heating and Cooling Loads Summary 19 EnergyPro 4.4 by EnergySoft Job Number: User Number: 5424 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the DATE Jefferson Square Retail shops Building 2 DOCUMENTATION AUTHOR 8/11/2008 PROJECT ADDRESS BUILDING CONDITIONED FLOOR AREA --- - --- --i Jefferson Street La Quinta �CLIMATE ZONE 15 BUILDING TYPE PRINCIPAL DESIGNER -ENVELOPE TELEPHONE Building Permit # HOTEL/MOTEL GUEST ROOM 310-394-2623 .--- —I DOCUMENTATION AUTHOR TELEPHONE Checked by/Date AMPE, INC (818) 265-9720 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR DATE OF PLANS 12/18/07 BUILDING CONDITIONED FLOOR AREA 4, 350 sq.Ft. �CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL ENV. LTG. MECH. HOTEL/MOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION [j ADDITION 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed EXISTING + ADDITION/ALTERATION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation preparer hereby certifies that the documentation is accurate and complete. DOCUMENTATION AUTHOR SIGNATURE DATE Bradley Severson The Principal Designer hereby certifys that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements contained in sections 110, 116, through 118, and 140, 142, 143 or 149 of Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. F] F-1 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code are printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures LTG -1, LTG -2 Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATUREW LIC. NO. DATE Sothol Roeun d P 0�' MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 MECH-5 Required Forms PRINCIPAL MECHANICAL DESIGNER - NAME SIGNATURE LIC. NO. DATE Bradley Severson A1Z79'6,3 08 EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:3 of 21 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part2 of 3 PE PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard ENERGY COMPONENT Design Space Heating 0.33 Space Cooling 386.67 Fans 34.55 Rejection 0.00 & Misc. 0.00 Hot Water 16.51 187.30 87.43 0.00 TOTALS: 712.78 Percent better than Standard: Proposed Design Compliance Margin (( Standard Pmposee 0.01 0.32I 0 30 80 90 120 150 180 210 240 270 300 330 980 keta/sgft-n 245.28 141.39Indoor 39.00 -4.45Heat 0.00 0.00Pumps 0.00 0.00Domestic 16.51 0.00Lighting 187.30 0.00Receptacle 87.43 0.00Process 0.00 0.00 575.52 137.27 19.3% ( 19.3% excluding process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones (N)Odeg Conditioned Floor Area Unconditioned Floor Area Conditioned Footprint Area Fuel Type 4,350 sgft. sgft. 1 0 3 4,350 sgft. 3 Natural Gas Orientation Front Elevation N Left Elevation (E) Rear Elevation s Right Elevation (W)l Total Roof Gross Area sgft. sgft. sgft. sgft. sqn. sqn. Glazing Area Glazing sqft. sgft. sgft. sgft. sgft. sgft. Ratio 0 0 0.0% 786 536 68.2% o 0 0.0% 7861 0 0.00% 1,572 536 4,350 ==� Standard Proposed Lighting Power Density 1.700 W/sgft. 1.700 W/sgft. Prescriptive Env. Heat Loss 572 Btu/h 361 Btu/h Prescriptive Env. Heat Gain 64,631 Btu/h-F 45,878 Btu/h-F Remarks: Run Initiation Time: 08/11/08 14:08:37 Run Code: 1218492517 EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:4 of 21 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME Jefferson Square Retail shops Building2 DATE 8/11/2008 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sgft.) Inst. LPD (W/sf)1 Ctrl. Credits (W/sf)2 Allowed LPD Pr c. Loads (Wlsf) Area Tailored Is 3 /s 4 Shop A SHOP A Retail Sales, Wholesale 1,405 -1.700 1 Shop B SHOP B Retail Sales, Wholesale 1,470 "1.70 Shop C SHOP C Retail Sales, Wholesale 1,475 '1.70 Notes: 1. See LTG -2-C 2. See LTG -4-C 3. See LTG -5-C (items marked with asterisk, see LTG -2 -C by others) (by others) 4. See LTG -6-C Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST ��m ���a� n�����..m....... ayvncy bnutnu pay bpeciae daemon to the items specmea in tms cnOCKust. i nese items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. The HVAC System 'Trane YHC060A3" includes an Economizer. This system has a cooling output < 75,000 Btuh or a supply cfm < 2500. The HVAC S stem 'Trane YHC060AY is designated as 3 Phase, or is Exempted from the NAECA 13 SEER requirement. The HVAC System 'Trane YHC060A3" includes Demand Control Ventilation oer Standards Section 121. no exceptionai matures ustea in tnis perrormance approacn application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Sionatu EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:5 of 21 1 CERTIFICATE OF COMPLIANCE ENV -1-C PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 OPAQUE SURFACES # Surface Type Area U -Fac. Insulation Cay. Cont. Act. Am. Tilt Cond. Status Joint Appendix IV Reference Location / Comments 1 Roof 1,405 0.032 R-30 R-0.0 0 0 New01-A17 Window Left E SHOP A 2 Wall 242 0.074 R-19 R-0.0 270 90 New 09-A5 SHOP A 3 Door 24 0.700 None R-0.0 270 90 New 28-A2 SHOP A 4 Wall 90 0.074 R-19 R-0.0 90 90 New 09-A5 SHOP A 5 Roof 1,470 0.032 R-30 R-0.0 0 0 New 01-A17 SHOP B 6 Wall 70 0.074 R-19 R-0.0 90 90 New 09-A5 SHOP B 7 Wall 230 0.074 R-19 R-0.0 270 90 New 09-A5 SHOP B 8 Door 24 0.700 None R-0.0 270 90 New 28-A2 SHOP B 9 Roof 1,475 0.032 R-30 R-0.0 0 0 New 01-A17 SHOP C 10 Wall 84 0.074 R-19 R-0.0 90 90 1 New 09-A5 SHOP C 11 lWall 236 0.074 R-19 R-0.01 270 90 New 09-A5 SHOP C 12 Door 24 0.700 None R-0.0 270 90 New 28-A2 SHOP C Existing, Altered, Removed) FENESTRATION SURFACES More than or equal to 10,000 sq.ft. of site -built fenestration area must include a label certificate either issued by NFRC or provide a CEC Default Label Certificate using the default U -factors from Standards Table 116-A and B. Certificate shall be filed in the contractor's project office during construction and in the building managers office after construction # 1Tvpe Area U -Fac' SHGC2 Act. Am. Cond. Stat. Glazin T e Location/ Comments 1 Window Left E 176 0.280 NI -1 0.38 COG 90 New PPG SOLARBAN 60 2 CLEAR SHOP A 2 Window Left E 184 0.280 NI -1 0.38 COG 90 New PPG SOLARBAN 60 2 CLEAR SHOP B 3 Window Left E 176 0.280 NI -1 0.38 COG 90 New PPG SOLARBAN 60 2 CLEAR SHOP C MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES (1) U -factor Type: 116-A Default Table from Standards, Table NI -1 Default Table from the ACM Manual Appendix, NFRC Labeled value. 2 SHGC Type: 116-8 Default Table from Standards, COG Center of Glass, NFRC Labeled Value EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 8.0 16.5 10.0 0.1 10.0 10.0 2 None 0.76 8.0 15.0 10.0 0.1 10.0 10.0 3 None 0.76 8.0 15.0 10.0 0.1 10.0 10.0 MINIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES LiThe proposed building Is In climate zones 2 through 15 and contains an enclosed space with Floor area greater than 25,000 ft2, a ceiling height greater than 16 feet, and an LPD for general lighting of at least 0.5 W/ft2. See Section 143(c). If this box Is checked, ENV4-C must be filled out. when submitting under the Prescriptive Compliance Approach. EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:6 of 21 1 CERTIFICATE OF COMPLIANCE (Part 1 of 3) LTG -1-C NAME DATE Jefferson Square Retail shops Building 2 1 8/11/2008 1 INSTALLED INDOOR LIGHTING POWER FOR CONDITIONED AND UNCONDITIONED SPACES INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ • COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 7,395 ALTERNATE COMPLIANCE ❑X PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) Check if SPACE CONTROLLED Daylighting NOTE TO FIELD NOTES TO FIELD - For Building Department Use Only Run Initiation Time: 08/11/08 14:08:37 Run Code: 1218492517 EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Pagel of 21 INSTALLED WATTS INSTALLED LIGHTING, CONDITIONED SPACES (From LTG -2-C) 7,395 PORTABLE LIGHTING (From LTG -3-C) 0 LIGHTING CONTROL CREDIT, CONDITIONED SPACES (From LTG -4-C) 0 CONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 7,395 INSTALLED LIGHTING, UNCONDITIONED SPACES (From LTG -2-C) 0 LIGHTING CONTROL CREDIT, UNCONDITIONED SPACES (From LTG -4-C) 0 UNCONDITIONED SPACE ADJUSTED INSTALLED LIGHTING POWER 0 ALLOWED INDOOR LIGHTING POWER FOR CONDITIONED SPACES ❑ • COMPLETE BUILDING METHOD (From LTG -5-C) ALLOWED ❑ AREA CATEGORY METHOD (From LTG -5-C) WATTS ❑ TAILORED METHOD (From LTG -5-C) ALLOWED LIGHTING POWER 7,395 ALTERNATE COMPLIANCE ❑X PERFORMANCE METHOD ❑ COMMMON LIGHTING SYSTEM (From LTG -8-C) ALLOWED INDOOR LIGHTING POWER FOR UNCONDITIONED SPACES From LTG -5-C) 0 MANDATORY INDOOR AND DAYLIGHTING AUTOMATIC CONTROLS CONTROL LOCATION (Room #) CONTROL IDENTIFICATION CONTROL TYPE (Auto Time Switch, Dimming, etc.) Check if SPACE CONTROLLED Daylighting NOTE TO FIELD NOTES TO FIELD - For Building Department Use Only Run Initiation Time: 08/11/08 14:08:37 Run Code: 1218492517 EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Pagel of 21 CERTIFICATE OF COMPLIANCE (Part 3 of 3) LTG-1-C PROJECT NAME Jefferson Square Retail shops Building 2 DATE 8/11/2008 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for lighting systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that require an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: Before an occupancy permit is granted for a newly constructed building or space, or a new lighting system system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, LTG-1-A, Forms shall be submitted to the building department that: A. Certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of§ 10-103(b) and Title 24 Part 6. Test Description Test Performed BY: ❑ LTG-2-A: Lighting Control Acceptance Document - Occupancy Sensor Acceptance - Manual Daylight Controls Acceptance - Automatic Time Switch Control Acceptance Equipment requiring acceptance testing ❑ LTG-3-A: Automatic Daylighting Controls Acceptance Document Equipment requiring acceptance testing EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:8 of 21 1 CERTIFICATE OF COMPLIANCE MECH-1-C (PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the boxes by all acceptance tests that apply and list all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems to be tested in parentheses. The NJ number designates the Section in the Appendix of the Nonresidential ACM Manual that describes the test. Also indicate the person responsible for performing the tests (i.e. the installing contractor, design professional or an agent selected by the owner). Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: SYSTEM ACCEPTANCE. Before an occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. In addition a Certificate of Acceptance, MECH-I-A Form shall be submitted to the building department that certifies plans, specifications, installation certificates. and ooeratina and maintenance information meet the requirements of Sertinn 1n-10,Athi and Title 24 Part a STATEMENT OF COMPLIANCE ❑ MECH-2-A: Ventilation System Acceptance Document -Variable Air Volume Systems Outdoor Air Acceptance -Constant Air Volume Systems Outdoor Air Acceptance Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-3-A: Packaged HVAC Systems Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. ❑ MECH-4-A: Air -Side Economizer Acceptance Document Equipment requiring acceptance testing Test required on all New systems both New Construction and Retrofit. Units with economizers that are installed at the factory and certified with the commission do not require equipment testing but do require construction inspection. ❑ MECH-5-A: Air Distribution Acceptance Document Equipment requiring acceptance testing This test required If the unit serves 5,000 R2 of space or less and 25% or more of the ducts are in nonoonditioned or semiconditioned space like an attic. New systems that meet the above requirements. Retrofit systems that meet the above requirements and either extend ducts, replace ducts or replace the packaged unit. ❑ MECH-6-A: Demand Control Ventilation Acceptance Document Equipment requiring acceptance testing All new DCV controls installed on new or existing packaged systems must be tested. ❑ MECH-7-A: Supply Fan Variable Flow Control Acceptance Document Equipment requiring acceptance testing All new VA fan volume controls installed on new or existing systems must be tested ❑ MECH-8-A:-Hydronic System Control Acceptance Document -Variable Flow Controls Applies to chilled and hot water systems. -Automatic Isolation Controls Applies to new boilers and chillers and the primary pumps are connected to a common header. -Supply Water Temperature Reset Controls Applies to new constant flow chilled and hot water systems that have a design capacity greater than or equal to 500,000 Btu/hr. -Water-loop Heat Pump Controls Applies to all new wale loop heat pump systems where the combined loop pumps are greater than 5 hp. -Variable Frequency Controls Applies to all new distribution pumps on new variable flow chilled, hydronic heat pump or condenser water systems where the pumps motors are greater than 5 hp. Equipment requiring acceptance testing EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page:9 of 21 U 1 N 00 ,^ O V O N J fb W � I-- 04 04 O ca EL LO LO O O LO M M M ^' � r-: o d Q ® w ° Q o aE 3y. O U E LL C9 Z JO N 00 rn 00 ~ o v N CL O W a Q — a :3 N LU m o J Cl) Z O O LU N ~ Z v! N O Z H = :3 � Cr (/) c N LL W a C7 Z_ J a� 2 Installed M W J O O z W J Z IL K rn LO LO O O LO M M M ^' � r-: o d Q ® w ° Q o aE 3y. O U E LL C9 Z JO C1 E °r 1-- o 00 rn 00 ~ o v f] e Q a Z C CL , Installed M IT M Wafts N N N (G x 1) Number of Luminaires d CEC fAA = Default? C Watts O per Luminaire Number of W Ballast per Luminaire Wafts W per U) Lamp m Number of 0 Lamps per N CLE Luminaire fa J U Lamp Type 00 CD0 N f0 M C Q Q Q O N N fA a LO O LO U r r r L fn �C C �E d lC f0 f0 ~ O O O J Q Q Q v v v m v m v m v �N �N fCN tn3v)3i AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2-C PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 SYSTEM FEATURES ITEM OR SYSTEM TAG(S) Number of Systems T-24 MANDATORY MEASURES Section Heating Equipment Efficiency Cooling Equipment Efficiency Heat Pump Thermostat Furnace Controls Natural Ventilation Minimum Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation PRESCRIPTIVE MEASURES Calculated Heating Capacity x 1.43 2 Proposed Heating Capacity 2 Calculated Sensible Cooling Capacity x 1.212 Proposed Sensible Cooling Capacity 2 Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heating Air Supply Reset Cooling Air Supply Reset Duct Sealing for Prescriptive Compliance AIR SYSTEMS, Central or Single Zone Shop A 4 Shop B Shop C 1 1 1 Reference on Plans or Specification 1 112(a) 82% AFUE 82% AFUE 82% AFUE 112(a) 15.0 SEER / 11.0 EER 15.0 SEER / 11.0 EER 15.0 SEER / 11.0 EER 112(b) n/a n/a n/a 112(c), 115(a) n/a n/a n/a 121(b) No No No 121(b) 494 cfm 534 cfm 535 cfm 121 c No No No 121 c Yes Yes Yes 121(c), 122(e) Programmable Switch Programmable Switch Programmable Switch 122(e) Heating & Cooling Required Heating & Cooling Required Heating & Cooling Required 122 Auto Auto Auto 122(g) n/a n/a n/a 123 124 R-8.0 R-8.0 R-8.0 144 a & b n/a n/a n/a 144 a & b 64,000 btuh 64,000 btuh 64,000 btuh 144 a & b n/a n/a n/a 144 a & b 58,880 btuh 59,216 btuh 59,231 btuh 144 c Constant Volume Constant Volume Constant Volume 144 c) 144 c No No No 144 d No No No 144 a Fixed Tem Non-Inte Fixed Tem Non-Inte Fixed Tem Non-Inte 144 Constant Temp Constant Ternp Constant Tem 144 (f) Constant Temp Constant Temp Constant Temp 144 k) No No No 1: For each central and single zone air systems (or group of similar units) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. If a requirement is not applicable, put "NIX in the column. 2: Not required for hydronic heating and cooling. Either enter a value here or put in reference of plans and specificatons per footnote 1. 3: Enter Yes if System is: Constant Volume, Single Zone; Serves < 5,000 sgft; Has > 25% duct in unconditioned space. Duct sealing is required for Prescriptive Compliance, see PERF -1 for performance method duct sealing requirements. EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:11 of 21 U M U W O r Z Oct U Z 2 W 00 O 0 N r 00 04 Z Transfer Air N 0 Design Min. Ai g 04 U, Setpoint o 0 v E a L o Max of m Y •U m -j Columns H, J, LD z K or 300 CFM a _ 1 z O _ 2Bx 0.4 Y E j a Y CFM/sq. ft. y LH > m i 30% of Design x o e J Zone Supply $ o CFM d Design A Of f A M LO " `o Q 2— Vent. Air It "•' 'n "' m h o m CFM „ ; 9 REQ'D V.A� b 8 X Max of v 'n to LO LO ' v E (D or G) H m g Min CFM 'Olt)m m M m m z a= E N by Occupant � m 'O F 9 > > ' z' m (E x F) 0U E 3 a O U CFM ° o m E Z i` per Z Qa Person 0 a 08 m O co r� c00i E c E W Number of Cli M ui M L0 c+� m E E m 0 People o v v U Min CFM,n $ y 'y 0 by Area C'' r'Oi Cl) (BxC) y m E o d E N N E L° m —'9 N N CFM LO N N N c Z c ^ m U per o 0 0 o `—° = o < E w Square Foot n m -88' - 8 C a Condition d C m Area m; w a= (SF) a m m m E ~ O~ 0 m d h ' C C E E m V Z E `o ¢ X w o U m O d d ry f > = O $ LL c: o `O d c N a O m LU�= U y a m O J m O' I� C W O E LL%= t' D E Z H E m E G" E ` < } O J i x> c w o nm E Q Z c E � m c E •- `° b a V N m c> E> m 5 o a. a�mK m a�'i E 0UM L = Q Q m m U U c w V W n L Q a L 0 OL U w= — Y Z 2 g = U)U) r- N MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5-C PROJECT NAME Jefferson Square Retail shops Building 2 DATE 8/11/2008 CHILLER AND TOWER SUMMARY Efficiency Tons PUMPS Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control Energy Standby TANK INSUL. Rated Vol. Condition Factor Loss or Ext. System Name System Type Distribution Type Qty Input (Gals.) Status or RE Pilot I R -Val. Hot Water P mp Hot Water Piping Length ft Add 1/2" Control # HP Type In Plenum Outside Buried Insulation CENTRAL SYSTEM RATINGS HEATING COOLING Aux. Condition System Name System Type Qtv Output kW Eff. Out ut Efficiency Status Economizer Type Trane YHC060A3 Packaged DX 3 64,000 0.0 82% AFUE 62,400 15.0 SEER / 11.0 EER New Fixed Temp (Non-Inte ) ENVELOPE MANDATORY MEASURES ENV -MM ECT NAME Jefferson Square Retail shops Buildi DATE 8/11/2008 DESCRIPTION Designer Enforcement §118(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20,. Chapter 4, Article 3. X] § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. FXJ §117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. ❑ § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). X] § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. ' EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 14 of 21 A B C D E F Room Name Task/Activity Description Room Length (L) (ft) Room Width (W) (ft) Room Cavity Height (H) (ft) Room Cay. Ratio 5xHx(L+W) /(LxW) A B C D E F Room Name Task/Activity Description Room Area (A) (st) Room Perimeter (P) (ft) Room Cavity Height (H) (ft) Room Cay. Ratio 2.5 x H x P /A LIGHTING MANDATORY MEASURES LTG -MM PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 DESCRIPTION Designer Enforcement § 131(d)1 For every floor, all interior lighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch, or other device capable of automatically shutting off the lighting. X] § 131(d)2 override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the lights. The area of override is not to -exceed 5,000 square feet. ,FX] § 119(h) Automatic Control Devices Certified: All automatic control devices specified are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. RI § 111 Fluorescent Ballast and Luminaires Certified: All fluorescent fixtures specified for the project are certified and listed in the Directory. All installed fixtures shall be certified. § 131(a) Individual Room/Area Controls: Each room and area in this building is equipped with a separate switch or occupancy sensor device for each area with floor -to -ceiling walls. X❑ § 131(b) Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bi-level switching for uniform reduction of lighting within the room. § 131(c) Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylit area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adjacent lot. Diagram of shading during different times of the year is included on plans. X❑ § 131(a) Display Lighting. Display lighting shall be separately switched on circuits that are 20 amps or less. EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 16 of 21 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies a§11 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. 0 §115(a) Fan type central furnaces shall not have a pilot light. RX §123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the 2001 CMC Standards. Controls §122(e) Each space conditioning system shall be installed with one of the following: RI §122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or §122(e)1 B An occupancy sensor to control the operating period of the system; or FIX 1 §122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. XJ §122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. X] §122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® §122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. FX §122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 17 of 21 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE Jefferson Square Retail shops Building 2 1 8/11/2008 Description Designer Enforcement Ventilation ❑X §121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. ❑ §122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. , §1 24(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. F�. §I21(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or §121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or §121 (f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or §141(f)4 Another method approved by the Commission. Service Water Heating Systems §113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. §113(c) Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. EnergyPro 4.4 by Energysoft User Number: 5424 Job Number: Page:18 of 21 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 SYSTEM NAME FLOOR AREA Shop A 1,405 Number of Systems 1 Heating System Output per System 64,000 Total Output (Btuh) 64,000 Output (Btuh/sgft) 45.6 Cooling System Output per System 62,400 Total Output (Btuh) 62,400 Total Output (Tons) 5.2 Total Output (Btuh/sqft) 44.4 Total Output (sgft/Ton) 270.2 Air System CFM per System 1,800 Airflow (cfm) 1,800 Airflow (cfm/sgft) 1.28 Airflow (cfm/Ton) 346.2 Outside Air (%) 27.5 Outside Air (cfmisgft) 0.35 Note: values above given at ARI conditions 26.0 of —) 1 Outside Air 494 cfm 69.8 of M PSYCHROMETRICS 57.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 1,841 31,352 6,590 F 193 7,187 .0 1,568 359 0 0 494 19,031 5,468 494 23,045 1,353 -1,353 1,5681 359 54,8 12 058 29 598 Trane YHC060A3 58,880 0 64,000 Total Adjusted System Output 58,880 0 64,000 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am Cream Temperatures at Time of Heating Peak) 105.0 of 105.7 of O Supply Air Ducts Heating Coil Supply Fan 105.5 of 1800 cfm ROOMS 70.0 of h Return Air Ducts `i COOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0 / 77.9 of 85.8168.7 of 59.0 / 57.6 of 59.7 / 57.9 of O Supply Air Ducts Outside Air 494 cfmF Cooling Coil Supply Fan 60.5 / 58.2 0 1800 cfm 56.8% R.H. ROOMS 75.8/64.70F 75.0/64.4OF h Return Air Ducts 11 EnergyPro 4.4 by Energysoft User Number: 5424 Job Number: Page: 19 of 21 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 SYSTEM NAME FLOOR AREA Shop B 1,470 Number of Systems 1 Heating System Output per System 64,000 Total Output (Btuh) 64,000 Output (Btuh/sgft) 43.5 Cooling System Output per System 62,400 Total Output (Btuh) 62,400 Total Output (Tons) 5.2 Total Output (Btuh/sqft) 42.4 Total Output (sgft/Ton) 282.7 Air System CFM per System 1,800 Airflow (cfm) 1,800 Airflow (cfm/sgft) 1.22 Airflow (cfm/Ton) 346.2 Outside Air (%) 29.6 Outside Air (cfm/sgft) 0.36 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM Sensible 1,932 32,897 7,113 198 7,377 0 1,645 369 0 0 534 20,520 5,800 534 24,873 1,353 -1,353 1,645 369 58,0601 12,9141 31 633 Trane YHC060A3 59,216 0 64,000 Total Adjusted System Output 59,216 0 64,000 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0 OF 56.8 OF 105.0 OF 105.7 OF O Supply Air Ducts Outside Air 534 cfm Heating Coil Supply Fan 105.5 OF 1800 cfm ROOMS 69.8 OF 70.0 °F . h Return Air Ducts 4 DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0/77.9°F 86.6/69.0°F 59.0/57.6°F 59.7/57.9 OF O Supply Air Ducts Outside Air 534 cfm Cooling Coil Supply Fan 60.6 / 58.2 OF 1800 cfm 57.0% R.H. ROOMS 75.9/64.7 °F 75.0 / 64.5 OF I Return Air Ducts It EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Page: 20 of 21 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE Jefferson Square Retail shops Building 2 8/11/2008 SYSTEM NAME FLOOR AREA Shop C 1,475 26.0 OF Outside 0 535 cfm 69.8 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent I CFM I Sensible 1,925 32,785 7,138 198 7,375 0 1,639 369 0 0 535 20,592 5,815 535 24,957 1,353 -1,353 1,639 369 58,0081 12 953 1 3:1717 Trane YHC060A3 59,231 0 64,000 Total Adjusted System Output59,231 0 64,000 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am RICS (Airstream Tei 56.8 OF . 105.0 OF Heating Coil Supply Fan 1800 cfm 105.7 OF —� Supply Air Ducts 105.5 OF ROOMS 70.0 OF h Return Air Ducts `S (COOLING SYSTEM PSYCHROMETRICS (Airstream Temperatures at Time of Coolina Peak) 12.0 / 77.9 OF )� Outside Air 535 cfm 75.9/64.7 °F 86.6 / 69.0 OF . 59.0 / 57.6 OF, Cooling Coil 0 Supply Fa 1800 cfm 59.7 157.9 of Supply Air Ducts Fan 60.6 / 58.2 of 57.1% R.H. ROOMS 75.0 / 64.5 OF h Return Air Ducts `S I EnergyPro 4.4 by EnergySoft User Number: 5424 Job Number: Paae:21 of 21 1