Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
12-0809 (AC) Title 24
, BUILDING ENERGY ANALYSIS REPORT PROJECT: Rancho La Quinta Gatehouse 49-003 Jefferson Street Palm Desert, CA Project Designer: Curbs R_ Shupe 72-880 Fred Waring Drive, Suite A-5 Palm Desert, Ca 92260 760,346-7354 Report Prepared by: Joan D. Hacker Insu-form, Inc. 77810 Las Montanas Road, Sufi 201 Palm Desert, Ca 92211 760-345-1352 RF., IVIS NOV 15 2012 0 Cff(C r BYo CITY OF LA QUINTA BUILDING & SAFEZY Dom, Job Number: APPROVED OR CONSTRUCTION DA W-6 I Vie: 1'1/8/2012 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report This program has approval and is authorized by the California Energy Commission for use wish both the Residential and Nonresiden ial 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC—www.energysoftcom. L_ TABLE OF CONTENTS I Cover Page Table of Contents Form ENV 1-C Certificate of Compliance Form ENV -3-C Overall Envelope TDV Approach Form ENV -4-C Minimum Skylight Area Worksheet Foran ENV -MM Envelope Mandatory Measures Form LTG -1-C Certificate of Compliance Form LTG -2-C Lighting, Controls Credit Worksheet Form LTG -3-C Indoor Lighting Power Allowance Form LTG -MM Lighting Mandatory Measures Form OLTG-1-C Certificate of Compliance Foran OLTG-2-C Lighting Compliance Summary Form MECH-1-C Certificate of Compliance Form MECH-2-C Air & Water System Requirements Form MECH-3-C Mechanical Ventilation Form MECH4-C HVAC Misc. Prescriptive Requirements Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary EneroRo 5.1 by EnergySoit Job Number ID: User Number 2555 1 2 3 7 15 17 18 22 23 24 25 29 30 35 37 38 39 40 CERTIFICATE OF COMPLIANCE (Part 1 of 4) ENVA C AND FIELD INSPECTION ENERGIE CHECKLIST Project Name Date Rancho La Quinta Gatehouse 11/8/2012 Project Addresse 48-003 Jefferson Spee# Pairs pert Climate Zon 13 Total Gond Floor Area 4108 Addition Floor Area 408 GENERAL INFORMATION Building T ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room Public School ® Conditioned Spaces ❑ Unconditioned Spaces ❑ Schools (Public School) ❑ Bldg. Spam ❑ . Skylight Area for Large Enclosed Space z 8000 ft2 (it checked include the ENV-4C with submittal) Phase of Construction: ❑ New Construction Q Addition 0 Alteration Approach of Compliance: fl Component ® Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: I 90 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION D Assembly j O i �09 c ac C 3 ppil �2 j =2i C = i CC _$C CLT au rs. V 1 Wall 42 (E) 0.069 R-21 4.3.1A6 New ❑ ❑ 2 Wall 252 (S)i 0.069 R-21 4.3.1 A6 New ❑ ❑ 3 Wall 259 (191 0.069 R-21 4.31 A6 New ❑ ❑ 4 Roe 408 0.025 R-M 421A21 New ❑ ❑ 5 Slab 408 (N) 0.730 None 4.4.7-A1 New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 11- See km*unfiDns in the Nonrrsiderdial Compliance Manual, page 3-Q& 2 If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID FeneatrMlon T c 4w : z O i 14' 2= i O 4 � ro � E— � � fa kA � O C Q m 'I� 80 � Q. Q if 1 Window 59 (E) 0.650 NFRC 05WI 05W NFRC @ New ❑ D 2 Window 53 (S) 0.650 NFRC 0.500 NFRC M New ❑ ❑ 3 Window 45 (N) 0.650 NFRC 0.500 NFRC ' @ New ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O 13 © ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instrkx.tions in the Nonresidential Compliance Manual, page 396. 2 If Fail then describe on Page 2 of the Inspection Checklist Forrn and take appropriate action to correct Verily building plans If necessary. Energy% 51 by En Soft User Number. 2655 RunCode: 2012-11.08Ti6.20.34 ID 3 240 CERTIFICATE OF COMPLIANCE (Part 2 of 4) AND FIELD INSPECTION ENERGIE CHECKLIST ENV-1 C Project Name Rancho is Quinta Gatehouse Date 11/8/2012 ROOFING PRODUCT COOL ROOFS (Note it the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fall' WA ❑ Roofing compliance = required in Climate Zones 1 and16 with a Low-Sloped. 2:12 pitch or less. ❑ D ❑ ❑ Roofing compliance =required In Climate Zone 1 with a Steep-Sloped with less than 51bW- Greater than 2:12 pitch. D Low-stoped Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or SRI that have a U-factor of 0.039 or lower. See Opaque Surface Details roof assembly,Cotumn H of EUV-2C. ❑ D ❑ D ❑ D D Low-stoped Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI that have a U-facer of 0.048 or lower_ See Opaque Surface Details roof assemblybelow, Column H of ENV-2C. El D ❑ ❑ The mot area covered by buifng mtVated phoWwftaic panels and buMing integrated solar thermal panels are13❑ Solar reflectance and thermal emittance or SRI seespreadsheet calculator at www.e a .ca. oy i 124 El Roof constrictions that have thermal mass over the roof membrane with a weight of at least 25 IbV are exempt from the Cool Roof criteria below. D ❑ ❑ High-rise residential buildings and hotels and motels with low-stoped roofs in Climate Zones 1 through 9,12 and 16 are exemptedtrom the bw-s roofing feria D D E3❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct Verify building plans if necessary. CRRC Product ID Number' ; Root Slope s 212 > 2:12 Prodtut Weight Product < SW a 51W TyW2Reflwmuce3 Aged Solar Thermat Emmitance SRIF Pass Fail ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ 13 13 13❑4 ❑ D ❑ ❑ ❑ ❑ i ❑ 4 ❑ ❑ ❑ 13 13 13 134 13 E3 13 a 13 ❑4 13 (313❑ ❑ ❑ ❑4 ❑ ❑ 1. The CRRC Product ID Plumber can be obtained from the Coot Roof Rating Council's Rated Product Directory at www coolroofs oro/products/search oho 2_ Indicate the type of product is being used for the roof top, Le, single-ply roof, asphalt roof, metal root etc. 3. It the Aged Reflectance is not available in the Cool Root Rating Council's Rated Product Direr ry then use the Initial Reflectance value from the same directoryand use the equation (0.2+0.7(x,— 0.2) to obtain a calculated aged value. Where pis the Initial Solar Re lectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at htto Vwww.energy.ca.aov/title24/ 6- lt Fail. #m describe On this page Of this Irtapection Checklist Form and talcs appropriate action fa attract. Valty buldim plans if To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum-Pigmented Asphalt Foot Coating F13 Cement-Sased Roof Coating ❑ Other E=YPro5.1bYEnemYSott User Number. 2655 RunCode: 2012-11-OM6:20:34 /D: Page 4 of 40 CERTIFICATE OF COMPLIANCE (Part 3 of 4) ENV-1C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Rancho La Quinta Gatehouse Date 111/8)2012 Requlnd Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the side-built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Semon in the Appe ck of the Nonresidential Reference Append Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV-2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that cues plants, ins, irn certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV-2A for each different fenestration product line must be provided to the owner of the buildi2g for their records. Test Description ENV-2A Test Performed Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test IWC 6200AWWLvw-E 156 0 ❑ E1 Q E] ❑ 13 E3 ❑ ❑ 13 0 ❑ 0 ❑ ❑ 13 ❑ E3 ❑ Em 5.1 by EnwgySoft User Number. 2655 RU"Code: 2012-11-08T16.-M34 1D:-Page 5 of 40 CERTIFICATE OF COMPLIANCE (Part 4 of 4) ENVA C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Date Rancho La Quinta Gatehouse 111WO12 Project Address Climate zone Total Cond. Floor Area Addition Floor Area 49-M Jefferson Street Palm Desert L CA Clmate Zone 15 408 408 Documentation Author's Declaration Statement I certify that this Certificate of Compliance documentation is accurate and complete. Signature Name Joan D. Hacker Company /nsu4brm, Ina. Date f t/820t2 Address Has alo LMontanan Road, Suite 201 CEA # GE,E � City/State/Zp Palm Desert Ca 92211 Phone 760-345-1352 The Principal Envelope Designer's Declaration Statement 0 1 am ergPble under Division 3 of the California Business and Professions Code to accept responsibciti y far the envelope design. 0 This Certificate of Compliance identifies the envelope features and performance specifications required for compliance with Title -24, Parts 1 and 6 of the Cardomia Code of Regulations. 0 The design features represented on this Certifimft of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this budding permit application. Name Signature Company Curtis R Shupe Date ( l Z Address 72-880 Fred Waling Dnw Suite A-5 License # City/&Mr4P Pabn Desert; Ca 92260 Phone 760.346-7354 Envelope Mandatory Measures Indicate location on building plans of Mandatory Envelope Measures Note Block: INSTRUCTIONS TO APPLICANT ENVELOPE COMPLIANCE & WORKSHEETS check box U worksheet is incl For detailed instructions on the use of this and all Energy Efficiency Standards compliance fomes, please refer to the 2008 Nonresidential Manual published by the Caldomia Energy Commission. ® ENV -1C Certificate of Compliance. Required on plans for all submittals. D ENV -2C Use with the Envelope Component compf'rance approach. Optional on plans. ® ENV -3C Use with the Overall Envelope compliance approach. Optional on plans. 13 ENV -4C Use with Prescriptive compliance for the minimum skylight requirements for large enclosed spaces in climate zones 2 through 15.Optional on plans. En Pro 5.1 by EnergySoff User Number. 2655 RunCode: 2012.11-08716:20:34 Page 6 of 40 OVERALL ENVELOPE TDV ENERGY APPROACH Project Name Rancho La Quinta Gatehouse tPart 1 Of 6 ENV-3C Date 11/8f2012 WINDOW RATIO CALCULATION for ALL WALLS A. Total linear display perimeter O ft X 6 ft Display Area 0 ftp 283 fe B. Total Gross Exterior Walt Area �m fe X OAO ' 40% of Gross Exterior Wall Area 2a3 ff C. Enter Larger of A or B Maximum Standard Area 156 flz D. Enter Proposed Window Area H the proposed Window Area is greater than the Maximum Standard Area, then Proposed Area method may not be used. the envelope component 22-03See A E. Window Wap Ratio - (Row D) Divided by (Row B) RSHG in Table 143-A,143- B, or 143-0 WEST WINDOW RATIO CALCULATION F. West Linear Display 0 ftX 6 ft = West Display Area 0 to 0 if G. West Exterior Wall Area 0 fe X 0.40 401/6 of West Exterior Wall Area 0 ft2 H. Enter Larger of F or G Maximum Standard West Area 0 fe I. Enter Proposed West Window Area H the proposed West Window Area is greater than the Maximum Standard West be used. Proposed West Window Area component method may not Area, then the envelope J. Window Wall Ratio = (Row 9 Divided by (Row G) See West in Table 143-A, or 1443-C3-C E-70 0 % 10:0%].143-B, COMBINED AREA FOR NORTH, EAST AND SOUTH WALLS K. WEIS Display Perimeter (A Minus E) 0ftX 611 = 0 fe N/E/S of West Exterior Wall Area L WE/S Exterior Wall Area (B Minus G) 708ftp X 0.40 = 283 ft 40% NQS Area M. Enter Larger of K or L 283 fe Maximum Standard N/E/S Area N. Proposed N/E/S Window Area (D Minus 1) 156 ft2 Proposed N/E/S Area WINDOW ADJUSTMENT O. If D > C and/or if I > H, proceed to the calculation steps f for all walls or 2 for west wall If not, go to the skylight area test on page 6. 1. If D > C: Use the ca9cubitad Winnow Adjusbment Fbctor (WAF) for all VMft PROPOSED WINDOW MAX. STANDARD AREA. AREA WINDOW from C from D ADJUSTMENT FACTOR � a 2. N I > H. Calculate one Window Adjustment Factor (WAF) for the West wall. Go to Page 6 to calculate Adjusted Area MAX. STANDARD WEST PROPOSED WEST AREA WESTWINDOW AREA from from ADJUSTMENT FACTOR MAX_ STANDARD AREA PROPOSED AREA WESTWINDOW from C from D ADJUSTMENT FACTOR GO to Page 6 to calculate Adjusted Area EhemyPkv 5.1 by EnergySoft User Number. 2655 RunCo&: 2012-11-OT16-20-34 /D: pa e 7 of 40 OVERALL ENVELOPE TDV ENERGY APPROACH Part 2 of 6 ENV-3C Project Name Rancho La Quinta Gatehouse Date 11/8/2012 SKYLIGHT RATIt3 CALGULA—HoN 1 Af bmt Orm Roof Area Mmdfnum Ails Shmdard Skylight Area 20 to A. If Atrium/Skylight Height is:5 55 ft; or 408;,fe X 0.05 _ B. If AbiurnIfSkylight Height is > 55 ft fe X 0.10 ff C. Proposed Skylight Asea0 ftp D. Skylight Ratio = Proposed Skylight Area (Row C) Divided by Actual Gross Roof Area = 0.0 % SRRpmp E Maximum Allowed Skylight Roof Ratio = Maximum Allowed Standard Skylight Area (Row A or B) Divided. by Total Gross Exterior Roof Area = 5 % SRRsm IF THE PROPOSED SKYLIGHT AREA IS GREATER THAN THE STANDARD SKYLIGHT AREA, PROCEED TO THE NEXT CALCULATION FOR THE SKYLIGHT AREA ADJUSTMENT. IF NOT GO TO PAGE 3 OF 6. SKYLIGHT AREA ADJUSTMENT IF F > D, Proceed To Calculation Step 1 Step 1. Calculated the Skylight Adjustment Factor (WAF). STANDARD PROPOSED SKYLIGHT SKYLIGHT ADJUSTMENT SKYLIGHT AREA AREA OF E = 0 ENTER 1 FACTOR(SAn -F _ CARRYTHE WINDOW ADJUSTMENT FACTOR (SAF) TO PAGE 6 OF 6 TO CALCULATE THE ADJUSTED AREA EnemyRo 5.1 by EnewScdt User Number: 2655 RunCW*. 2012.91-08718:20:34 POW 8 of 40 OVERALL ENVELOPE TDV ENERGY APPROACH (Page 3 of 6 ENV -3C Project Name Rancho La Quinta Gatehouse Date 11/8/2012 Climate Zone 15 TDV for the Standard Design BuildIng, See Reference Nonresidential Apendix NAS -2 Occupancy Type and Coefficients Tables 12 Nonresidential See Table NAS -3 113 24 -Hour Use See Table NA5-4 17 Retail See Table NA6-5 A B C D E F G H 1 J K I L M Assembix T e, Orientation Number Of Like Assembly Type4 Roofs or Floor Mass Type' Exterior Surface Area Fenetration Type Criteria Coefflcienta fora Standard TDV Ene le Udractor SHGC VT 1.1 -factor' SHGC' VT' Co., Cso.; Csrt Wall E 1 Light 42 0.042 201.13 351 Window E 1 5 Manufactured 0.470 0.360 0.432 40.08 666.01 -28.86 1,108 Window E 1 5 Manufactured 0.470 0.360 0.432 40.08 666.01 -28,86 1,108 Window E 1 5 Manufactured 0.470 0.360 0.432 40.08 668.01 -28.86 1,108 Window E 1 15 Manufactured 0.470 0.360 0.432 40.08 666.01 -28.86 3,692 Window E 1 15 Manufactured 0.470 0.360 0.432 40.08 666.01 -28.86 3,692 Window E 1 15 Manufactured 0.470 0.360 0.432 40.08 666,01 -28.86 91692 Well S 1 Light 252 0.042 201.13 2,125 Window S 1 15 Manufactured 0.470 0.360 0.432 32.84 586.58 -33.07 3,185 Window S 1 5 Manufactured 0.470 0.360 0.432 32.84 5W. 58 -33.07 955 Window S > 9 Manufactured 0.470 0.360 0.432 32.84 586.58 -33.07 1,911 Window S 1 24 Manufactured 0.470 0.360 0.432 32.84 586.58 -33.07 5,098 Well N 1 Light 259 0.042 201.13 2,188 Window Nt 15 Manufactured 0.470 0.470 0.564 54,49 303.70 -20.19 2,354 Window N 1 151 Manufactured 0.470 0.470 0.564 64.49 303.70 -20.19 2,354 Window N 1 15 Manufactured 0470 0.470 0.564 54.49 303,70 -20.19 2,364 Sum of Total Standard Design 40,319 1. Indicate type of assembly for the Envelope (e.g. Wall, Floor, Roof, Window, Skylight & Door), One assembly type for each row. 2. Enter the ar@a of each different assembly, 3. Enter the type of fenestration; M - Manufactured, 88 = Site -built, SK o $kylighl and F = Fabricated. 4. Grouping of like assemblies in the same orientation Is allowed. Indicate the number In column E. B. Enter Roofs, Floors, Walls and for Mass Walls the catergoies are; light (HC < 7), medium mass (7 5 HC,15), and heavy mass (HC;t. 15). 6. Standard Design 1.1 -factor are from Table 143-A, 8 or C. 7. Standard Design SHGC are from Table 143-A, 8 or C. Enter "0" if not applicable. Note: Not all vertical windows have an overhang then assume SHGC as value entered. 8. To calculate the fenestration standard design VT In Column H. Multiply Column H by 1.2. 9. Coefficients for; U -factor (Caw), SHGC (Cs,.,), and VT(C hA can be found in Table NAS -2, through Table NAS -5 of the Reference Nonresidential Appendlces NAB. The Coefficient for SHGC and VT are only entered for the fenestration products. Enter "0" when not applicable. 10. Calculate the TDV Standard Design for each Envelope Assembly Type: TDVs,a - Column C x (Column E x ((U -factors, x Cew) + (SHGCs, x Csa) + (VTs, x Cs#))) for each Assembly Type. Sea Nonresidential Manual Examples in Section 3.7.1 for details. En Pro 5. 1 by EnergySoft User Number. 2855 RunCode. 2012.11-08716:20:34 l0r Pae 9 of 40 OVERALL ENVELOPE T OV ENERGY APPROACH (Page 3 of 6 ENV -3C Project Name Rancho La Quints Gatehouse Date 11/8!2012 Climate Zone 16 TDV for the Standard Design Building, See Reference Nonresidential AeRendix NAS -2 Occupancy Type and Coefficients Tables m Nonresidential See 'Table NAS -3 113 2"our Use See Table NAS -4 ❑ Retail See Table NA6-5 A B C D E F (1 H 1 J K L tM Assemb Type' Or%ntatlo_n Number Of Like Assembly Type, Roofs or Floor Mass T Exterior Surface Area Fenetratlon Type Criteria Coefficients fa? Standard TDV Eneruylr tJ-tactor SHGC VT U -factor' $NGC' VTe Cs .r Covi Roof 1 Light 408 0.039 191,63 3,048 - Sum of Total Standard amign 40,319 1. Indicate type of assembly for the Envelope (e.g. Wall, Floor, Roof, Window, Skylight & Door). One assembly We for each row. 2. Enter the area of each different assembly. 3. Enter the type of fenestration; M - Manufactun3d, SB - Site-bulft, SK - &kylighl and F . Fabricated. 4. Grouping of like assemblies In the same orientation Is allowed. Indicate the number in column E. 5. Enter Roofs, Floors, Walls and for Mass Walls the catergoles are; light (HC < 7), medium mass (7:9 MC, 15), and heavy mass (HC a 15). 6. Standard Design L14actor are from Table 143-A, B or C. 7. Standard Design SHGC are from Table 143-A, B or C. Enter "0" If not applicable. Note: Not all vertical windows have an overhang then assume SHGC as value entered. 8. To calculate the fenestration standard design VT In Column H. Multiply Column H by 1.2. 9. Coefficients for; LI -factor (Cay,,), SHGC (Cs a), and VT(Csu, can be found in Table NA5-2, through Table NA5-5 of the Reference Nonresidential Appendices NA5. The Coefficient for SHGC and VT are only entered for the fenestretfon products. Enter "0" when not applicable. 10. Calculate the MV Standard Design for each Envelope Assembly Type: TDVsb o Column C x (Column E x ((U4actor& x Cow) + (SHGCa x Cs4 + (VTe x Csn))t for each Assembly Type. See Nonresidential Manual Examples in Section 3.7.1 for details. EnergyPro 5. 1 by EnergySoft User Number: 2055 RunCode. 2012.11.08T16.20.34 10.- Page 10 of 40 OVERALL ENVELOPE TDV ENERGY APPROACH (Page 4 of 6 ENV -3C Project Name Date Rancho La Quinta Gatehouse 11/4/2012 TDV for the Prosed Desl n Bulidina, See Reference Nonresidential rpPendli NA5.3 Occupancy Type and Coefficients ® Nonresidential, See ❑ 24 -Hour Use, See Table 0 Retail, See Table NAS -5 Tables Table NA5-3 NAS -4 Climate Zone: 15 A 8 C D E F G H I J K I L M N Number Total Coefficlentsfor Of Uke Exterior Criteria U -factor° RSHGC° VTs Coot Roof overhand" Assembly Surface Fenestration Proposed MV Assembly Tao' Orientations Type Area' TXp94 U -factors SHGCs VT' COW Cs. Ct l Most L4oH Ens Wall E- 1 42 0.069 201.13 576 Window € 11 5 Manufactured 0.850 0.500 0.504 40.08 666.01 -28.80 0.680 921 Window E 1 5 Manufactured 0.650 0.500 0.500 40.08 666.01 -28.86 0.580 921 Window E 1 5 Manufactured 0.850 0.500 0.500 40.08 666.01 -28.801 0.580 921 Window E 1 15 Manufactured 0.850 0.500 0.5w 40.08 686.01 -28.880.580 4071 Window E 1 15 Manufactured 0.650 0.500 0.500 40,08 666.01 -28.86 0.580 3,071 Window E 1 15 Manufactured 0.850 0.500 0.500 40.08 666.01 -28.86 0.580 4071 Wall S 1 282 0.069 201.13 4490 Window S 1 15 Manufactured 0.650 0.500 0.500 32:84 588.58 -33.07 0.430 11964 Window S ! 5 Manufactured 0.850 0.500 0.500 32-841 586.58 -33.071 0.430 589 Wrndow S 1 9 Manufactured 0.860 0.500 0.600 32.84 586.58 -33.07 0.430 1,178 Window S 1 24 Manufactured 0.650 0.500 0.500 32.84 588.58 -33.07 0.430 4142 Wall N 1 259 0.089 201.13 4594 Window N 1 15 Manufactured 0.850 0.500 0.500 54.49 303.70 -20.19 0.830 2,270 Window N 1 15 Manufactured 0.8601 0.500 0.500 54.49 303.70 -20,19 0.830 2,270 Window N 11 15 Manufactured 0.650 0.500 0.500 54.49 303.70 -20.191 1 0.830 4270 Total Proposed Desl nr° 37,611 ossd S Standard YES _ 1. I ate typo of assembly for the Enve oke e.g. Wall, Floor, Roof, ndow, Skylight & Door . One assem type fpr eachPro row. - 2. Indicate the orientation for walls, doors 8 windows. 2A. Note: Grouping of like assembles In the same orientation Is allowed. Enter the number In column C. 3. Indicate the Exterior Surface Area of the Assembly for that one assembly or if like assemblies then the total surface area of all assemblies In the same rnlentation. 4. Enter the type of fenestration; M - Manufactured, SB = Site -bulk, SK - Skylight and F - Fabricated. 5. Proposed Design U -factor are from Table 143-A, B or C for the appropriate assembly type. 6. Proposed Design SHGC are from Table 143-A, B or C. Enter "0" If not applicable. Note: Not all vertical windows have an overhang then assume SHGC as value entered. 7. To calculate the fenestration proposed design VT In Column H. Multiply Column G by 1.2. S. Coefficients for; U -factor (Cs,,,r}, SHGC (Cv6,,), and VT(Csu, can be found in Table NA5.2, through Table NA5.5 of the Reference Nonresidential Appendices NA6. The Coefficient for SHGC and VT are only entered for the fenestration products. Enter'0" when not applicable. 8. Calculate the Cool Roof, Mcq, first by using the next page (Page 5 of 6). Enter the value in the Proposed Column L. 10. Calculate the Overhang Mo„ on the next page (Page 5 of 6). Enter the value In the Proposed Column M. 11. The Proposed TDV energy use for all assemblies other than roofs must be equal to or less than Standard TDV in Page 3 of 6. Therfore; TDVP = Column D x ((U factor x CSu) + (CRul x URI x MCRI) + (SHGCP x CSsl x MOH ) + (VTP x CSQj Enter the calculated value In Column N. 12. Sum up all the Proposed TDV Energy in Column N and enter value in the cell. Similarly enter the sum of all Standard TDV Energy and compare. Proposed must be s to the Standard. EnergyPro 5.1 by EnergySoft User Number: 2855 RunCode. 201211.08716:20:34 1A; Pa a '11 of 40 OVERALL ENVELOPE TDV ENERGY APPROACH (Page 4 of 6 ENV -3C Project Name Rancho La Quinta Gatehouse Date 111012 TDV for the Proposed Design Building, See Reference Nonresidential 8eeendix NA5.3 Occupancy Type and Coefficients Tables ® Nonresidential, See Table NAS -3 O 24 -Hour Use, See Table NA64 ❑ Retail, See Table NAS -5 I Climate Zone: 15 A B c D E F GH 1 J K f- M N Number Total _ Coefficlentefor Of Like Exterior Criteria t) -factor° RSHGCO VT8 Cool Roof overhang 10 Assembly Surface Fenestration Proposed TDV Assembly T ei Orientation T eP Area' TYPO 4 U -factors SHGCB VT' Cou I Cs, Ct I Moa Mo Ene i Roof 1 408 0.025 191.53 2.143 4,187 Total Proed Desi n" 31,511 Prosed S Standard YES 1. Indicate type of assembly for the nvelopQ e.g. Wall, Mor, Roof, Wlnpow, Skylight Door). One assembly type for'each row. 2. Indicate the orientation for walls, doors & windows. 2A. Note: Grouping of like assemblies In the sameorientation is allowed. Enter the number In Column C. 3. Indicate the Exterior Surface Area of the Assembly for that one assembly or if like assemblies then the total surface area of all assemblies In the same orientation. 4. Enter the type of fenestration; M - Manufactured, SS = Site -built, SK - Skylight and F - Fabricated. 5. Proposed Design U -factor are from Table 143-A, B or C for the appropriate assembly type. 6. Proposed Design SHGC are from Table 143-A, B or C. Enter "0" If not applicable. Note: Not all vertical windows have an overhang then assume SHGC as value entered. 7. To calculate the fenestration proposed design VT In Column H. Multiply Column G by 1.2. 8. Coefficient for; U -factor (Cs„ A), SHGC (Cs,a), and VT(Cs,,r, can be found in Table NA5.2, through Table NA5.5 of the Reference Nonresidential Appendices NA5. The Coefficient for SHGC and VT are only entered for the fenestration products. Enter "0" when not applicable. 9. Calculate the Cool Roof, Mop, first by using the next page (Page 5 of 6). Enter the value in the Proposed Column L. to. Calculate the Overhang Mo„ on the next page (Page 5 of 6). Enter the value In the Proposed Column M. 11. The Proposed TDV energy use for all assemblies other than roofs must be equal to or less than Standard TDV in Page 3 of 6. Therfore; TDVP = Column D x ((U factor x CSu) + (CRul x URI x MCRI) + (SHGCP x CSsi x MOH ) + (VTP x CSt)j Enter the calculated value M Column N. 12. Sum up all the Proposed TDV Energy In Column N and enter value In the cell, Similarly enter the sum of all Standard TDV Energy and compare. Proposed must be s to the Standard. EnergyPro 5.1 by Eno rgySoft User Number., 2855 RunCode: 2012.11.08718:20:34 fD: Pae 12 of 40 OVERALL ENVELOPE TDV ENERGY APPROACH Part 5 of 6 ENV -3C Projekt Name Rancho La Quinta Gatehouse Date 11/8/2012 Cool Roof Mufti Iter McR Occupancy Type and Coefficients Tables ® Nonresidential, See Table NA5-3 T10124 -Hour Use, See am NASA ❑ Retail, See Table NA5-5 Climate ��.15 C"Mcients of Calculatlon A B C D E IF G RelleMme Em ane Proposed Aged Solar Reflectance Standard Aged Solar Reflectance" Proposed Thermal Emfttance Standard Thermal Emittsnc$ Cool Roof -2.540 -0.900 0.10 0.55 0.75 0.75 2.143 Where: Standard design values for Solar Reflectance and Thermal Emittance. Except from Table NA5-2 Standard Aged Solar Reflectance Column D Standard Thermal Emiltance Column Enter multiplier in Pam 4 of 6, Column J_ Low -Rise Low -Sloped, CZ2 thmunh CZ15 0.55 0.75 Low* Rise, Lme•SEo CZt thiough GZ16 0.10 0,75 -High-Rise, Low-Sloped,CZ10through CZ15 0.55 0.75 High -Rise. Low=Sl CZI-9 Mrough CZI6 OLID M75 Steep-Slope0, CZ2 through CZ15 025 0.75 Sbmq),-SIop94 ail other 0.10 0.75 1. Proposed Aged Design Solar Reflectance; pagw pw = 0.7 X (Am pmp + 0.06). Where (pi,e pmp) reflectance value is found in the CRRC Directory. Enter results of the Cool Roof Multiplier equation in footnote 2- 2. 2 Cool Roof Multi tier r=1 + CfWX - + Csa X - Zmor 1+ CoI A X Col C - Col D + Col BX Col E - Col Overhang MuM Iter Occupancy Type and Coefficients Tables I ® Nonresidential, See Table NA5-3 ❑ 24 -Hour Use, See Table NA5-4 ❑ Retail, See Table NA5-5 Climate Zone: 15 Co@fflCf@ntS of F@n@sftitton Overhang Ca cukfftft A B C D E F G Orientation IM Projection Factor' V Projection Factor' rHorizontal Projection vertical Distance Projection Factor2 Overhang Multiplier, E -0.720 0.300 20 1.6 1.000 0.580 E -0.720 0.300 20 1.6 1.000 0.580 E -0.720 0.300 20 1.6 1.000 0.580 E •0.720 0. 20 1.6 1.0001 0.580 E -0.720 0.300 20 1.6 1.000 0.580 1= 4 720 03W 2.0 1-6 1.900 0580 S -1.000 0.430 20 1.6 1.000 0.430 S -1.000 0.430 20 1.6 1.000 0430' S -1.000 0.430 20 1.6 1.00o 0.430 S -1.000 0.430 2.0 1.6 1.0oo 0430 Enter multiplier in P 4 of 6 Column K 1. Where ai and N are he coefficients for the overhang projection factor (see tables) and is climate zone dependent. 2 PF = FUV (Horizontal (H) projection of the overhang from the surface of the window in feet but no greater than V and the Vertical (V) distance from the window sill to the bottom of the overhang, in feet.) Enter results in Column F. 3 =1+ a; X PF, + bi X PF, Enter results in Column G. BmTyPrp 5.1 by En So User Number. 2655 RunCode: 2012.11-OM6:20:34 /D a 13 of 40 OVERALL ENVELOPE TDV ENERGY APPROACH Part 5 of 6 ENV-3C Project Name Rancho La Quints Gatehouse Date 11/8/2012 Coot Roof Muni Iter M Occupancy Type and Coefficients Tables ® Nonresidential, See Table NA" O 24-Four Use, See Tab* NAS-4 0 Retail, See Table NA5-5 Climate Zone: 15 Coefficients of Calculation A B C D E F (, Reflectance EmMance Proposed Aged Solar RetfeMnce Standard Aged Solar Reffectara Proposed Thermal Emlitance Standard Thermal E miltamce Cool Roof tern Where: Standard design values for Solar Reflectance and Thermal Emittance. Excea from Table NA5-2 Standard Aged Solar Reflectance Column D Standard Thermal Emiltance Column Ester multiplier in page 4 of k Column J_ Low-Rise Low-Sloped, CZ2 11hrounh CZ15 0.55 0.75 fore Rise L CZ1 through CZ16 0.10 0.75 H' h-Rise Low-SCZ10 through CZ15 0.55 0.75 High-Rise, LowwSl CZ1-9 through CZ16 OJO 0:75 Ste loped,CZ2 through CZ15 025 0.75 Steep—StSteep-SlopK afl other 0.10 0.75 1. Proposed Aged Design Solar Reflectance; pagw prop = 0.7 X (per pwp + 0.06). Where (pa* pmp) reflectance value is found in the CRRC Directory. Eater results of the Coot Roof Muftiplier equation in footnote Z 2 Cool Roof Multitier M i = I+ Cure X - + C6,d X — or 1+ Col A X Cot C — Col D + Col B X Col E — Col Overhang Mufti icer Occupancy Type and Coefficients Tables ® Nonresidential, See Table NA5-3 ❑ 24-Hour Use, See Table NASS4 ❑ Retail, See Table NA -5 Climate Zone 15 CoeMderrt4 of Fenestration Oveftn Catcefation A B C D E F G Orientation 12nd Projection . Projection Factor' Factor' Horizontal Projection Vertical Distance Projection Factorz Overhang Mufti lieu' N -0310 0.140 2.0' 1.6 1.000 0.830 N 4310 0.140 20 1.6 1.000 0.830 N -0310 0.140 20 1.6 1.000 0.830 Enter multiplier in Page 4 of 6 Column K 1. Where as and b, are he coefficients for the overhang projection factor (see tables) and is climate zone dependent. 2 PF = HN (Horizontal (f) projection of the overhang from the surface of the window in feel: but no greater than V and the Vertical (1n distance from the window sill to the bottom of the overhang, in feet) Enter results in Column F- 3= i+ a; X PF + b; X PF,Z Enter results in Column G. EnergyPro 5.1 by EnergySo User Number 2655 RunCode: 201211-08716:20.34 /D: Page 14 of 40 [MINIMUM SKYLIGHT AREA WORKSHEET _ (Part 1 of 3) ENV -4C Rancho La Quints Gatehouse[ --1-1/8)2012 MiNIMUM SKYLIGHT AREA FOR LARGE ENCLOSED SPACES definition in §131(c), r uiremenIs in 143c 13 This worksheet applies to buildings with three or fewer stories, in climate zones 2 through 15, having an enclosed space > 81000 ff that is directly under a roof, with a ceifing height > 15 ft and the exception below does not apply. Go to Step 1. • Name or reference of Large Enclosed Space on building plans • Proposed daylight area is indicated on page of the building plans. O Skyk is not required as fully dWAWlighting system on page of building plans has general lighting power density of WR, which is less than 0.5 Wtf. . Note: this exemption applies only to buildings with a fully designed fighting system. This exception does not apply to core & shell buildings. STOP HERE IF THIS BOX IS CHECKED. Space is exemptfrom minimum skylight area requiremem. NOTE: The minimum skylight area requirements can be net using skylit daylight areas, primary si debit daylight areas, or a combination of both. Use Step 1 below if using skylft daylight areas for compliance. Use Step 2 below if using sidelit daylight areas for compliance. Use Step 3 below to add together skylit daylight and primary sidefrt daylight areas. Step 1 Calculate ill Proposed Slcylit Daylight Area Is gmater then or equal to Mfnlmum Daylight Aru. M Criterion 1: Check if Total Proposed Skylft Daylight Area is greater than or equal to Minimum Daylit Area. (C a B) H Criterion 1 Is chocked, skip step 2. Go to Step 3. Floor Area of proposed design large enclosed space i A 1 0 If 1 Space floor area Minimum Daylight Area = 0.5 x Floor Area (A) B d ttz Minimum Daylight Area = 0.5 x (A) Proposed design skylit daylight area in accordance with §131(c)1 D and as shown on the plans. C 0 f? Proposed Skylit Daylight Area Step 2 Calculate H Proposed Primary Sidelit Daylight Area is greater than or equal to Minimum Daylight Area 0 Criterion 2: Check If Total Proposed Skyut Daylight Area Is equal to or grimter than Minimum Dayiit Area (D i. Primary sidelit dayift area determined in accordance with D ............. —WY -96 �. QQ §131(c)1B and as shown on the plans E il� -Proposed Primary Sidelft Daylight Area Step 3 Cordkm that PropOed Pdntary Smit + Skyllt Daylight Ame is greater than or equal to Minimum Daylight Area O Criterion 3: Check If Total Pronmed DMMIaht Aran W nrwarar fhan n. e....er •.. ui..o........ rn...au a -- - - - -- - _ _ _ Total Proposed WW Area = Wght Area + Primary — ............. —WY -96 �. QQ Sidelit Area Add C + D and enter into E E ftp Total Proposed Daylight Area t6QM a re a3egaa ws.�wwre 1f &—.4& LM,..�— w 0 .. www.y w...p.cav wu � vl6'�11 �► a .7 W r L O If Criterion 3 is unchecked. Space FAILS,, not enough daylight area, do not continue. MINIMUM SKYLIGHT AREA WORKSHEET Part 2 of 3 ENVAC Project Flame Date Rancho La Quinta Gatehouse 11/8/2012 SKYLIGHT AREA FOR LARGE ENCLOSED SPACES 143c Step 4 – If using SKYUGHT to comply with the minimum skylight area requirements, calculate compliance with minimum skylight area using Step 4a, of compliance with minimum eAlfective aperture using Step 4b. Also verify compliance with skylight haze criteria Is met in Step 4c . Step 4a – If Complying with minimum skylight area: m Criterion 4a: Check H Proposed Skylight Area is equal or greater than Minimum Skylight Area (H 2 G). Proposed Skylight might Area from cell (C), Step 1, on ENV-4C (Page 1 of 3) F 0 ff Proposed Skylight Daylight Area Minimum Skylight /area = Skylight Area (F) X 0.033 G 0 if ` Minimum Skylight Area Total Proposed Skylight Area = Sum of the areas (rough >i opening) of each individual skylight 0 If TOW Proposed Skylight Area Step 4b– H complying with minimum effective aperture: O Criterion 4b: Check H Proposed Skylight Effective Aperture is equal to or greater than Minimum Skylight Effective Aperture (J 21). H this criterion checked, shall also fill out ENV-4-C (Page 3 of 3) Minimum Skylight Effective Aperture 1 0.011 Minimum Skylight Effective Aperture Proposed Skylight Effective Aperture: Shall be taken from ENV-4C (Page 3 of 3) Cell (AB) J Proposed Skylight Effective Aperture Step 4c Required) D Criterion 4c: Check H Proposed Skylight glazing or diffuser haze rating Is equal or greater than 90% (K 2 0.9� Skylight glazing or diffuser haze rating according to ASTM D1003 K Haze rating Haze rating is Indicated on page of plans; D Complies with all of Criterion 4 If either Criterion 4a pr Criterion 4b Is checked, AND Criterion 4c Is checked Step 5 – H using PRIMARY SIDELIGHT to comply with the minimum skylight area requirements: D criterion 5: Check H Proposed Primary Sidelit Effective Aperture Is greater than or equal to Minimum Sideltt Effective Aperture (M 2 L.). Fill out remaining questions on Step 5 below. Minimum. Sidelit Effective Aperture L 0.1. Minimum Sidelit Effective Aperture Enter Proposed Primary Sidelit Effective Aperture from Equa�t 146-A cell (Q) below M Proposed Are Primary Sidelit Effective EQUATION 146-A: Effective Aperture for Primary Sidelit Area I Rough opening of windows adjacent to the sidelit are in - N J— square feet Total window area Visible Fight transmittance of window O Average VLT Primary sidelit daylight area determined according. to §131(c)l from cell (D), step 2 on ENV-4C (Page 1 of 3) P Primary Sidelit Area Primary Sidelit Effective Aperture = (N X O) / (P) Enter results for Primary Sidern Effective Aperture from Q Primary Sideiit EA cell Q into cell in Step 5 Step 6 ® Space PASSES: Check it Criterion 1 and 3 (page 1); and, Criterion 4 (page 2) are checked. D Space PASSES: Check N Criterion 2 and 3 (page 1); and Criterion S (page 2) are c1mcked. D Space PASSES: Check only H Criterion 1 through 5 are all checked gneigyRo 5.1 b Solt User Number. 2655 RunCode: 2012-11-WT16:20:34 /D: Page 18 of 40 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV-MM Project Name Date Rancho La Quinta Gatehouse 11/812012 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R-value of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shaft be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestrabon products and exterior do= shag have air irdittratiora rates not exceeding 0.3 c MIt2 of §116(a)1: window area, 0.3 Cfmfft.2 of door area for residential doors, 0.3 cfm/fL2 of door area for nonresidential single doors (swiNing and sliding),and 1.D Cfm/ft.2 for nonresidential double doors §116(a) 2: Fenestration U-factor shall be rated in accordance with NFRC 100, or the applicable default U-factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site-built fenestration, or the applicable default SHGC. §1 16(b): Site Constructed Doors, Windows and Skylights shaft be caulked between the unit and the building, and shalt be weatherstripped (except for unframed glass doors and fire doors). P EnemyPro 5.1 by EnemySoft User Number. 2655 RunCode. 2012.11-OM6.20.34 Pbae 17 of 40 CERTIFICATE OF COMPLIANCE Pact 1 of 4 LTG-1C Project Flame Date Rancho La Quinta Gatehouse 11/8/2012 Project Address Climate Zone TotalCond> Floor Area unconditioned Floor Area 49-003 Jefferson Street Palm Desert 15 408 0 GENERAL INFORMATION Building T m Nonresidential ❑ High-Rise Residential ❑ HotelfMotel Guest Room ❑ School ❑ Relocatable Public ® Conditioned S School Paces ❑ Unconditioned Spaces Phase of Constiuefion: ❑ New Construction ❑ Addition ® Alteration Method of Compliance: ❑ Complete Building ® Area Category ❑ Tailored Documentation Author=s Declaration Statement I cerfify th;>!t this Certificate of ComMance dow merftwn is ac mwete and cafe 1ptt Name Signature kwu-' Joan D_ Hacker Company Date Insu4hrm, Inc. 11/82012 Address CEA # 77810 Las Montanas Road, Suite 201 CEPE # City/StateOp Phone Palm Desert, Ca 92211 760-345-1352 .The Principal Lighting Designer's Declaration Statement • 1 am eligible under Division 3 of the California Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the lighting features and performance specifications required for compliance with Title 24, Pages 1 and 6 of the Caftmia Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance forms, worksheets, calculatioins, plans and specifications submitted to the enforcement agency for approval with this buildi rmit lication. tVame S Company ` CURTIS R. SHUPE Phone 4(o "73 Address 72880 FRED WARING DR., STE A5 r T license# PALM DESERT, CA 92260 City/State0p _. Date o Llghtlno Mandatory Measures �. Indicate location on building plans of Mandatory Measures We Block LIGHTING COMPLIANCE FORMS & WORKSHEETS check box N worksheets is Inctud For detailed instructions on the use of this and all Energy Efficiency Standards compliance forms; please refer to the Nonresidential Manual published the California Energy Commission. ® LTG-1C Pages 1 through 4 Certificate of Compliance. All Pages required on plans for all submrtls. ❑ LTG-2C Lighting Controls Credit worksheet ® LTG 3C Indoor Lighting Pyr Allowance ® LTG-4C Pages 1 through 4 Tailored Method Worksheet ❑ LTG-5C Pages 1 and 2 Line Voltage Trade Lighting Worksheet 6.9 by EnergySuff Usw ftmber 2856 2012-110M6.M3# Ague 18 ufi40 CERTIFICATE OF COMPLIANCE (Part 2 of 4) LTG-1C Project Name Date Rancho La Quinta Gatehouse 11/812012 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Inreibrtipn (�rdficete LTG-1- INST Retain a Mandventyform is and Field inspector ❑ Certificate of Accwtance, LTCr2A and LTG-3A (Retain a copy and verify form is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Liahtina Schedule is only for: 0 CONDITIONED SPACE ❑ UNCONDITIONED SPACE 0 The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the fust 02 watts per square foot of portable fighting shall not be required to be included in the 0 calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot Is totaled below. Luminaire Lamps,Ballasts Installed Watts A B C D E F G H None or Item Ta Complete Luminaire Description' (i.e.3lampiluorescerntroffer, F32T one dimmable electron ballasts a m-e = 3:3 How wattage VVw determined „� y C 3 I Z -+ � X o m 3 Feld CEC Default From NM m o d �t�, o �' c Q r- 0. LL 800 Lrnrren LCD 48.0 0-1 12 552 ❑ ❑ D ❑1 ❑ ❑ ❑ 1 ❑ ❑, D ® ❑ Cl ❑ ❑ ❑ ❑ D D ❑ ❑ ❑ ❑ ❑ 0 ❑ ❑ ❑ .0 ❑ ❑ ❑ ❑ D ❑ ❑ o ® o D ❑ ❑ ❑ 13.- 13 D ❑ ❑. ❑ E3 ❑ ` ❑ ❑ ❑ ❑ p ❑ ❑ ❑ 13 ❑ ❑ ❑ ❑ D ❑ 0 ❑ ❑ ❑ 13 ❑ D 1 ❑ ❑ ❑, Installed Watts Pacte Total: 552 Building total number of pages: Installed Watts Building Total Sum of all 552 Enter into LTG-1 C Pa e 4 of 4 1. Wattage shalt be determined according to Section 130 (d and e). Wattage shalt be rating. of IiglrE fi lure, not rating of bulb. 2. If Fail then describe on Page 2 of the Inspection Cheddist Form and take appropriate action to correct. Verify building plans if necessary. EnwgvRO 5.1 a 8 U3r fi uir'rfDer.- 28W Ru iCodb: 2012691-63T1S 20--V gt9 Page 19 of 40 CERTIFICATE OF COMPLIANCE Pali 3 of 4 LTG -1C Project Name Rancho La Quinta Gatehouse Date 11/B2012 INDOOR LIGHTING SCHEDULE eid FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 fe, automatic daylighting controls for day'M areas > 2= fe, d) shut -oft' controls, e) display fwjhft controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 fe, in accordance with Section 131. MANDATORY LIGHTING CONTROLS— FIELD INSPECTION ENERGY CHECKLIST Field or Plumber Special Type/ Description of Units Location in Building Features Pass Fair ❑ ❑ ❑ D ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ Q ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ D ❑ O ❑ p ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Q ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ ❑ ❑ ❑ SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1C) The local enforcement agency should pay special attention to the items specified in this checldist These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Field InspeetWe Notes or Discrepancies: EneigyFrp 5.1 by User Number. 2655 RrmCode: 2012-11-08716:20:34 !D: Page 20 &46 CERTIFICATE OF COMPLIANCE Part 4 of 4 LTG-1C Project Name Rancho La Quinta Gatehouse 7—ate 111812012 CONDITIONED AND UNCONDMONED SPACE LtGHTlNG MUST NOT BE COMBINED FOR COMPLIANCE Indoor Ughting Power for Conditioned S ces Indoor Ughting Power for Unconditioned Spaces watts Installed Lighting 552 from Conditioned LTG-1 C e Installed Lighting from Unconditioned LTG-1C Pa watts 0 Lighting Control Credit 138 Conditioned m LTG-2C Lighting Control Credit Unconditioned LTG-2C 0 Adjusted Installed - - U Power — Adjusted Installed Li 'n Panner — 0 Complies if Installed:5 Allowed Complies if Installed:5 Allowed Allam Luing Pyr Conditioned Spaces from LTG-3C or PERF-1 `� Unconditiowed o LightingPomw S aces from LTG-3C)0 Require! Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG 2A and LTG-3A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. It ag the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Syms Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG 2A and LTG-3A forms are not considered complete forms and are not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the property filled out and signed forms before the building can receive final occupancy. A copy of the LTG-2A and LTG-3A for each different lighting luminaire controls) must be provided to the owner of the building for their records. Luminaires Controlled LTG 2A and LTG-3A Equipment Requiring Testin Dimming w/Oec Sensor Description 600 Lumen LCE? Number of Luminalres controlled 12 Location office Controls and Sensors and Automatic Dayligtiting Controls Acceptance � 13 13 13 D 13 13 13 El E35.1 EmmyPro b UwrNy herr: 26 5 RtatCcde: ZOl�fi Df6 :34 OED 21 of 40 LIGHTING CONTROLS CREDIT WORKSHEET Part 1 of 2 LTG-2C Project Name Date Rancho La Quinta Gatehouse 1/8f2012 POWER ADJUSTMENT FACTORS FOR NOWDAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule arse only for: m CONDITIONED SPACES ❑ UNCONDITIONED SPACES A B C D E F d Room # Zone ID Plan -Areas Areas L' hti Control Description'- Reference Room Area Watts of Control Lighting Power /d F`�"? Control Credit Walls Office w/Occ Sensor 408 552 0.25 138 PACE TOTAL 138 Note: Conditioned and Unconditioned Space shall be separe" totaled Buildina total of non ht control credit wafts for all es of LTG-2C Pa 1 of 2 Enter buikft total of all daYfiaht controls credit watts from LTG-2C Pace 2 of 2 0 BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS) Enter in LTG-1 C; Page 4: Lighting Control Credit as appropriate for CONDITIONED or UNCONDITIONED Spaces 13 1. Description shall be consistent with Type of Control defined in Table 146-0 2. Power Adjustment Factor taken from Table 146-C 1EnergyPro5.1byEneqwSoft User Number. 2555 RwWode: 2iif2-11.6`i'6.-20_ { ID'Page 22 of 40 INDOOR LIGHTING POWER ALLOWANCE LTG -3C Project Flame Date Rancho La Quinta Gatehouse 111812012 ALLOWED LFGHTING POWER Chose One Meth A Separate LTG -3C must be filled out for Conditioned and Unconditioned Spaces. Indoor Lighting Power Allowances listed on this page are only for: ® CONDITIONED SPACES O UNCONDITIONED SPACES COMPLETE BUILDING METHOD WATTS BUILDING CATEGORY From §146 Table 146-E PER X COMPLETE BLDG. AREA = ALLOWED WATTS TOTALS AREA CATEGORY METHOD AREA WATTS BUILDING CATEGORY From §146 Table 146 WA PER X Area fig = ALLOWED WATTS Office 250 sgff 1.10 408 449 TOTALS TAILORED METHOD 408 449 AREA WATTS Total Allowed Watts usma the Tailored Method taken from LTG -4C t o4 4 Row 3 0 The indoor lighting power allowance using the Tailored Method of compliance shall be determined using the LTG -4C set of forms. A separate set of LTG - 4C forms shalt be filled out for CONDITIONED and UNCONDITIONED spaces En Pro 5.1 by EnergySoff User Number. 2655 RunCode: 2012.11-08T16:20.34 1D: Page 23 of 40 LIGHTING MANDATORY MEASURES: NONRESIDENTIAL LTG -MM Project Name Rancho La Quinta Gatehouse Date 1118V2012 Indoor Lighting Measures: §131(d):. Shut-off Controls 1. For every floor, all interior fighting systems shall be equipped with a separate automatic control to shut off the lighting. This automatic control shall meet the requirements of Section 119 and may be an occupancy sensor, automatic time switch or other device capable of automatically sh0ing off the II hti 2 Override for Building Lighting Shut-off: The automatic building shut-off system is provided with a manual, accessible override switch in sight of the Ilahts. The area of override is not to exceed 5,000 square feet. §119(h): Automatic Control Devices Certified: All automatic control devices spec ied are certified, all alternate equipment shall be certified and installed as directed by the manufacturer. §111: Fluorescent Ballast and Luminaires Certified: All fluorescent todrues specified for the project are certified and fisted in the Directory. All installed Endures shall be certified. §131(a): Individual Room/Area Controls: Each room and area in this buikfing is equipped with a separate switch or occupancy sensor device for each area with floor-to-ceDing walls. §131(b): Uniform Reduction for Individual Rooms: All rooms and areas greater than 100 square feet and more than 0.8 watts per square foot of lighting load shall be controlled with bl-level switching for uniform reduction of fighting within the room. §131(c): Daylight Area Control: All rooms with windows and skylights that are greater than 250 square feet and that allow for the effective use of daylight in the area shall have 50% of the lamps in each daylil area controlled by a separate switch; or the effective use of daylight cannot be accomplished because the windows are continuously shaded by a building on the adacent lot. Dia ram of shadina durina different times of the year is included on plans. §131(c): Display Lighting. Display fighting shalt be separately switched on circuits that are 20 amps or tess.6. Outdoor Lighting Measures: §130(c)l : Mandatory lighting power determination for medium base sockets without permanently installed ballasts §132(a): AD permanently installed luminaires with lamps rated over 100 Watts either have a lamp efficacy of at least 60 lumens r Watt or are controlled by a motion sensor. §132(b): All Luminaires with lamps rated greater than 175 Watts in hardscape area,, including packing tots, building entrances, canopies, and all outdoor sales areas meet the Cutoff Requirements. §132(c)l : All permanently installed outdoor lighting meets the control requirements listed. c §132 O' Building facades, parking lots, garages, canopies, and outdoor sales areas meet the Mufti -Level Lighting Requirements listed. Ene 5.1 bEnergySoft User Number. 2655 RunCode: 2012.11-08718:20:34 Page 24 of 40 CERTIFICATE OF COMPLIANCE Part 1 of 4 0LTG-1 C "Project Name `Dater Rancho La Quinta Gatehouse 111WO12 Project Addtess 49-003 Jefferson Street Palm Desert, CA Total Illuminated Area 400 GEWRA! INFORMAT101% Phase of Construction: 0 New Construction 0 Addition ® Alteration Documentation Author's Declaration Statement I cer* that this Certificate of Compliance documentation is accurate and complete. . Signature Name Joan D. Has Hacker Company Date Insu-Ibim, Inc. 11/82012 Address 77810 Las it9ontanas Road, Suite 201 CEA # CEPS Cily/State0p, Palm Desert Ca 92211 Phone 760345-1352 Principal Lighting Designer's Declaration Statement • 1 am eligible under Division 3 of the Cafifomia Business and Professional Code to accept responsibility for the lighting design. • This Certificate of Compliance identifies the fighting features and performance specifications required for compliance With Title 24, Pages 1 and 6 of the California Code of Regulations. • The design features represented on this Certificate of Compliance are consistent with the information provided to document this design on the other applicable compliance fomes, worksheets, calculations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Signature Company C U R T I S R. S H U P E PrsDne �P Q f S Address 72880 FRED WARING DR., STE A5 Lacerlse # PALM DESERT, CA 92260 � C4/Stateop - Da,9 y Principal Lighting Designer's Declaration ® 1 certify that this Certificate of Compliance documentation is accurate and complete, and accounts for all outdoor lighting power, including buVi ng mounted, pole mounted, as well as all other lighting designed for the site, and that Additional Lighting Power Allowances for Specific Applications or Additional Lighting Power Allowances for Ordinance Requirements have not been counted more than one time for the same area, in accordance with Section 147 of the Standards. Outdoor Lighting Mandatory Measures Indicate location on building plans of Mandatory Measures NOW Stock: ' S�a LIGHTING COMPLIANCE FORMS & WORKSHEETS (check box if worksheets Is included) For detailed instructions on the use of this and all Energy Efficiency Standards compliance fomes, please refer to the Nonresidential Manual published by the Califomia Energy Commission. Ql OLTG•1 C Certificate of Compliance: All 4 pages required an plans for all submithtis. 13 OLTG-2C (Pages 1 of 3) Lighting Wattage Allowances for General Hardscape, Sales Frontage, or Ornamental Lighting. Optional on ans. 0 OLTG-2C (Pages 2 of 3) Lighting Wattage Allowance for Per Application or Per Area. Optional on plans. ® OLTG-2C (Pages 3 of 3) Additional Lighting Power Allowance for Ordinance R cements. aqui Optional on plans. En Pero 5.1 by En Sof User Number. 2855 MwCode: 2012.11.08716:20:34 ID a 25 of 40 CERTIFICATE OF COMPLIANCEPart 2 of 4 0LTG-1 C lrrojecrlvame bate Rancho La Quinta Gatehouse 111&2012 COMPLIANCE FM(TURE f LIGHTING CONTROL SCHEDULE and FIELD 96PECTION CHECKLIST INSTALLATION CERTIFICATE, OLTG-11NST Retain a copy and verify form is completed and signed.) CERTIFICATE OF ACCEPTANCE OLTG-2A eWin a copy and verify form is completed and signed Field Inspection O Field Inspection ❑ Luminaire Schedule Installed Watts A B C D E I Cs H 1 Name or hemm T Luminaire Qescripti rd' See footnote below i_e 1 !am le to shoe box 400 welt metal halide Q = _® E 3 3 m m ' rn How wattage was determined a m _c E z' 3 `s i°xIWO o Field Inspectae E � o -1 o �� a w, a a (1) 23w Compact Fluorescent 2D 23.0 0 0 [] 4 92 0 0 0 0 0 0 13 D 0 0 13 p 13 13 13 0 0 17 0 13I3 0 0 0 0 0 ❑ 0 0 0 0 0 0 O 0 0 13 0 0 Enter total into OLTG-1C; Page 4 of 4: Row H; Total Installed Watts: 92 1. Type of luminaire (Le.: post top, wall pack, surface, shoe box); for non -incandescent luminaires, indicate nominal lamp wattage and tamp type (i.e.: fluorescent, incandescent, HID); ballast type (i.e.: electronic or magnetic);. number of lamps and number of ballasts per luminaire. For incandescent lurninaires, the tuminaire wattage listed in column D shall be the Maximum relarnping rated wattage on a permanent factory -installed label on the luminaire, NOT the wattage of the Camp (bulb) used; in accordance with Section 130(4 or e). 2. If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans ff necessary. EXEMPT LUMINAIRES Field Ins on 0 Name or Symbol Description of exempt luminaires In accordance with §147 MANDATORY CONTROLS Field Ins on O # Description Location # Desorl tion Location SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of OLTCM.12 The local enforcement agency should pay special' attention to the items specified in this checkfisL These dams require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the_justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. Filed Inspector Notes or Discrepancies: EnemyPro 5.1 by En® Soft User Number. 2855 RunCode: 2012=11-08716:20:34 ID: Pa a 26 of 40 CERTIFICATE OF COMPLIANCE Part 3 of 4 OLTG-1 C Project Name Date Rancho La Quinta Gatehouse 11/8/2012 A. OUTDOOR UGHTiNG ZONE OUTDOOR LIGHTING ZONE: ❑ OLZ 1 El OLZ 2 m OLZ 3 ❑ OLZ 4 Is the Outdoor Ughting Zone: ® Default in accordance with §10-114, or ❑ Amended by JHA Complete the information below if the default Outdoor Lighting Zone has been amended by the local jurisdiction having authority (JHA): ❑ The site is a government designated park, recreational area, wildlife preserve, or portion thereof, and has been designated as LZ2 or LZ3, in accordance with Table 1 D-114-A, because the site is contained within such a zone. ❑ The local jurisdiction having authority has oftiialfy adopteda change to the State Default Lighting Zone and has notified the Energy Commission by providing the materials required in §1 D-114(d) to the Executive Director. ❑ The adopted change is posted on the Energy Commission website. S. ADDITIONAL LIGHTING POWER ALLOWANCE FOR ORDINANCE REQUiREMENTS Are additional I!Shting power allowances for ordinance in Table 147-C used? ❑ Yes ® No Complete the information below 6 additional lighting power allowances for ordinance requirements are used: ❑ The local jurisdiction having authority has officially adopted specific outdoor light levels, which are expressed as average or minimum footcandle levels, by following a public process that allowed for formal public notification, review, and comment about the proposed change. D The local jurisdiction having authority which adopted specific outdoor light levels and has notified the Commission by providing the following materials required §10=-1140 to the Executive Director. C. ACCEPTANCE'FORMSS Required Acceptance Tests Designer:. This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, 0LTG-2A. The designer is required to check the acceptance tests and list all control devices servingthe building or 9 space shall certified as meetingthe Acceptance R uirements for Code Compliance. Wall the'li' fill � p g ng system or control of a certain type requires ui a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminalre controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The 0LTG-2A form is not considered a complete form and is not to be accepted by the entorcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy.. A copy of the OLTG-2A for each different fighting luminaire control(s) must be. provided to the owner of the building for their records. Certificate of Acceptance Luminaires- Controlled OLTG-2A' a:y. of- Equipment ment R iii Testi Description ( Like Controls Location OutdooAcceptance esg 1. Insert: ORAS for Outdoor Motion Sensor; OLSC for Outdoor Lighting Shutoff Controls; OP for Outdoor Photocontrol; ATS for 'AstronomicalTirne S-%-dtch-and;'STS for Standard morn amnomica fine Switch a : Ene Pro5.1 b Ener Soft User Number. 2655 RunCode. 2012-11-08T16.2a.34 ID Ra go 27 of q� CERTIFICATE OF COMPLIANCEPart 4 of 4 OLTG-1 C Project Name Date Rancho La Quinta Gatehouse 11/&f2012 ALLOWED MD M STALLED OUTDOOR LIGHTMG POWER Lighting Wattage Power Allowance A Lighting power allowance for general hardscape (from OLTG-2C Page f of 3) 0 B Specific application lighting wattage allowance per unit length (from 0LTG-2C Page 1 of 3) 0 C Specific application lighting wattage allowance for ornamental lighting .'(from OLTG-2C Page t of 3) 0 D Specific application lighting wattage allowance per application (from OL'TG-2C Page 2 of 3) 0 E Specific application lighting wattage allowance per area (from OLTG-2C Page 2 of 3) 92 F Specific application lighting wattage allowance for ordinance requirements (from OLTG-2C Page 3 of 3) 0 G Total Allowed Wattage = Sum of rows A. through F: 92 H Total installed watts (from Compliance Fixture Schedule, (from OLTG-2C Page 1 of 3) 92 Complies It wattage In row H is less than or equal to the wattages In row G Yes Q No EnemyFro 5.1 by Enem ySoft User Number. 2655 RunCode: 2012-11-08T16:20:34 ID: Pa a 28 of 40 OUTDOOR LIGHTING WORKSHEET Part 2 of 3 OLTG-2C Project Name Rancho La Quinta Gatehouse Date 11/8/2012 D. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER APPLICATION DETERMINE WATTAGE ALLOWANCE DESIGN WATTS ALLOWANCE A a C D E F G H I J Specific lighting Application Number of Applications Specific Application Allowance watts Wattage Allowance S X C Luminaire Symbol Luminaire Type Lumin QTY Watts Per Luminaire Design Wats G X M Allowed Watts Minimum of D or I Enter total into OLTG-1 G; Page 4 of 4t Row D• SRMc Application Woge Allowance Per Application 0 E. SPECIFIC APPLICATION LIGHTING WATTAGE ALLOWANCE PER AREA DETERMINE WATTAGE ALLOWANCE LUMINAIRE TYPE DESIGN WATTS A. 8 C D E F G H. I_ J S ific LWhfing 8pplication Illuminated Area of ADDlication(watts Speditic Application Allowance r -- Wattage Allowance S X C Code for Luminaire Type Luminaire T Lumin QTY Watts Per Luminaire Design Watts G X M Allowed Watts Minimum of D or I Gatehouse Ext Task 400 0.350 940 (9) 23W Compact fluorescent 2D, 4 23.0 92 92 Enter total Into OLTG-1C• P e 4 of 4• Row E• Specific Application Ughting Wattage Allowance Per Area 92 EneigyPro 5.1 by Ener Soft user Number: 2655 RanCode. 2012-11.08716:20:34 Q Pace 29 of 40 CERTIFICATE OF COMPLIANCE and (Part 1 of 5) MECH-1C FIELD INSPECTION ENERGY CHECKLIST Project Name Rancho La Quinta Gatehouse Data 11/8/2012 Project AddressTota! 49-003 Jef erson Street Palm Desert Climate Zone 15 Cond.Floor Area 408 Addition Floor Area 408 GENERAL INFORMATION Buildin T Ei Nonresidential 0 High-Rise Residential 0 Hotel/Motel Guest Room 0 Schools (Public School) 0 Relocatable Public School Bldg. 0 Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: D New Construction 0 Addition 0 Alteration Approach of Compliance: I3 Component 0 Overall Envel°pe, TDV 0 Unconditioned (fife affidavit) Energy Front Orientation: N, E, S, W or In Degrees: 90 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment? inspection Criteria Meets Criteria or Requirements Pass Fall — Describe Reason hem or System Tags i.e. AC-1 RTU-1 HP-1 DHW Heater 13❑ Equipment T 3. Gas Fired DH Boiler 13 ❑ Number of Svstems 1 ❑ ❑ Max Allowed Heating CapacV 40,000 Btu/hr ❑ ❑ Minimum Heating Efficiencyl 0.53 EF ❑ ❑ Max Allowed Cooling Capacity' n/a ❑ Q Coolina Efficiency' n/a ❑ ❑ Duct location/ R-Value n/a ❑ ❑ When duct testing is requiredY submit & MECH-4-HERS n/a 13 13MECH-4A Economizer n/a ❑ ❑ Thermostat n/a ❑ Cl Fan Control n!a ❑ ❑ E ut menu Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason? Item or System tags i.e. AC-1 RTU-1,. HP-1), office ❑ ❑ Equipment T e3: Room PTA 0 0 Number of Systems 1 ❑ p Max Allowed Heallm CqpAW 15,714 Eltu/tir ❑ ❑ Minimum Heatina Efficiency' 3.50 HSPF ❑ ❑ Max Allowed Cooling C@paqIW 27,715 Btu/hr a ❑ Cooling Efficiency' 13.8 EER ❑ ❑ Duce Locationl R-Value n/a E3 ❑ When duct testing is required, submit & MECH-4-HERS NO C3 E3MECW4A Economizer No Economizer 0 ❑ Thermostat No Setback Required ❑ Q Fan Control Constant Volume 0 ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (irom the energy compliance submittal or irom the building tuns) the responsible party shall resubmit energy compliance to include the now changes. 2 For add itionat detailed d>sc n*ancy use Page 2 of the Inspection C eckfist. Form: Compliance Ws, if a Fait, box. is checked! 13. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. EnergyRo5.1_byEnergySoft User Number.- 2655 MwCode: 2012-11.OUT16:20:34 ID: Page 30 of 40 CERTIFICATE OF COMPLIANCE and (Part 2 of 5) MECH.1 C FIELD INSPECTION ENERGY CHECKLIST Rancho La Quinta Gatehouse 11A3,2012 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST Part 3 of 5 MECH-1 C Project Name Date Rancho La Quinta Gatehouse 11/812012 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below are all the acceptance tests for mechanical systems. The designer is required to check the applicable boxes by all acceptance tests that apply and listed all equipment that requires an acceptance test. If all equipment of a certain type requires a test, list the equipment description and the number of systems. The NA number designates the Section in the Appendix of the Nonresidential Reference Appendices Manual that describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Building Departments: - Systems Acceptance: Before occupancy permit is granted for a newly constructed building or space, or a new space -conditioning system serving a building or space Is operated for normal use, all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. Systems Acceptance: Before occupancy permit is granted. All newly installed HVAC equipment must be tested using the Acceptance Requirements. The MECH-1 C form is not considered a completed form and is not to be accepted by the building department unless the correct boxes are checked. The equipment requiring testing, person performing the test (Example: MVAC installer, TAB contractor, controls contractor, PE In charge of project) and what Acceptance test must be conducted. The following checked -off forms are required for ALL newly installed equipment, In addition a Certificate of Acceptance forms shall be submitted to the building department that certifies plans, specifications, Installation, certificates, and operating and maintenance information meet the requirements of §10-103(b) and Title -24 Part 6. The building inspector must receive the property filled out and signed forms before the building can receive final occupancy. TEST DESCRIPTION MECH-2A MECH-3A MEC4-4A MECHvA MECH-6A MECH-7A MECH-8A MECH-9A MECH-10A MECH-11A _ _ -Hydron c - Outdoor Constant Demand Supply system Automatic Ventilation Volume & Air Control supply Valve Water Variable Demand Equipment R ulri Testing or Verification Q . For VAV & CAV Single -Zone Unitary Distribution Ducts Economizer Ventilation Controls DCV Fan VAV leakage Test Temp. Reset Flow Control Shed Control F#ifsu ASU9RFt. 1 ® ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4- 0 C3 0C3 C3CI C3 E3 E3._ C3 C3 ❑ ❑ ❑ o ❑ ❑ ❑❑ ❑ ❑ E3 ❑ ❑ C3[3 E3 C3_ C3 13-a _❑ ❑ 13- 1 ❑ ❑ ❑ o ❑ ❑ ❑ ❑ ❑ ❑ _ ❑ ❑ ❑ ❑ ❑ ❑1:3cl C3 o 13_❑ C3❑ C3 C3- E3 _❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ _❑ _❑ ❑ - p - ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ —o Cl ❑ ❑ o ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ - ❑ -❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ EnemyPro 5.1 bv EnerovSoft User Number: 2655 Run Cade: 2012-11-18716:2034 /D: Pae 32 of 40 CERTIFICATE OF COMPLIANCE and FIELD INSPECTION ENERGY CHECKLIST Part 4 of 5 MECH-1C Project Name Rancho La Quinta Gatehouse Date 11/&2012 TEST DESCRIPTION MECH-12A MECH-13A MECH-14A MECH-15A Equipment R uiri Testing au Detection & Diagnostics for DX Units Automatic Fault Detection & Diagnostics for Air & Zone Distributed Energy Storage DX AC systems Thermal Energy Storage (TES) Systems Test Performed By: _ Fijitsu ASU9RF4 1 ❑ ❑ 13 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ O ❑ p ❑ ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ p ❑ O ❑ ❑ ❑ ❑ ❑ ❑ ❑ E3 o -p ❑ ❑ ❑ ❑ O D_ 13 p 13 13 a o - ❑ ❑ ❑ ❑ ❑ ❑ ❑ p ❑ o ❑ ❑ ❑ 13 ❑. C) ❑ El 13 E3(3_. E3 13 0 ❑ 13 - ❑ ❑ ❑ ❑ ❑ ❑ O — C3 ❑ ❑ 0 Q - ❑ O ❑ Cl ❑ ❑ O ❑ ❑ . O ❑ ❑ _ O ❑ ❑ ❑ Er+e Pro 5.1 by EnergySoft User Number: 2655 RunCode: 2012-11-08T16:20:34 !D: Pae 33 of 40 CERTIFICATE OF COMPLIANCE Part 5 of 5 MECH-1 C Project Name Date Rancho La Quinta Gatehouse 11/a(2012 Documentation Author's Declaration Statement certify that this Certificate of Compliance documentation is accurate and complete. Signature \tWA, Name Joan D Hacker Company Insu-form, Inc. Date 11/82012 Address 77810 Las Montanas Road, Suite 201 CEA # CEPE # CitSl/State/Zip N/m DeCa X11 Phone 7604d&1352 The Principal Mechanical Designer's Declaration Statement • 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the mechanical design. • This Certificate of Compliance identifies the mechanical features and performance specifications required for compliance with Title -24, Parts 1 and 6 at the California Code of Regulations. • The design features represented on ft Certificate of CortnpWace are consisterd with the information provided to document this design on the other applicable compliance forms, worksheets, catcutations, plans and specifications submitted to the enforcement agency for approval with this building permit application. Name Signature Company CURTIS R. SHUPE� Address 72880 FRED WARING DR., STE A5 License# PALM DESERT, CA 92260L --d C4/State2ip / phone Mandatory Measures Indicate location on building plans of Note Block for Mandatory Measures MECHANICAL COMPLIANCE FORMS & WORKSHEETS check box If worksheet Is included For detailed instructions on the use of this and all Energy Efficiency Standards: compliance forms, please refer to the 2008 Nonresidential Manual. Note: The Enforcement Agency may require all. forms to be incorporated onto the buitding plans, 0 MECH-1 C Certificate of Compliance. Required on plans for all submittals. 0 MECH-2C Mechanical Equipment Summary is required for all submittals. 0 MECH-3C Mechanical Verttitation and Reheat is required for all submittals with mechanical ventilation. 0 MECH-4C Fan Power Consumption is required for all prescriptive submittals. EneigyRo 5.1 by DwyySoft User Number. 2655 RunCode: 201211-08718:20:34 ID. Pae 34 of 40 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name We Rancho La Quints Gatehouse 11/8)2012 Item or System Tags Indicate Air Systems Type Central Single Zone Packs VAV or etc... i.e. AC -1 RTU -1 HP -1 office Number of Systems 1 Indicate flal le Re#eremm on Plans or Schedule and Indicate the icable ex s MANDATORY MEASURES T-24 sections Heating Equipment Efficiency 112 a 350HSFF Cooling Equipment Efficiency 112 (6) y3 SEER HVAC Heat Pump Thermostat 112(b), 112(c) n/a Furnace Controls/Thermostat 1112(c), 115(a) n/a Natural Ventilation 121 No Mechanical Ventilation 121 61 cfm VAV Minimum Position Control 121(c) No Demand Control Ventilation 121 c Na Time Control 122(e) Programmable Switch Setback and Setup Control 122(e) No Setback Required Outdoor Damper Control 122(f), Auto Isolation Zones 122 n/a Pipe Insulation 123 Duct Locationt R -value 124 n/a PRESCRIPTIVE MEASURES Calculated Design Heating toad 144(a & b 15.714 Bta/hr Proposed Heating Capacity 144 a & b 25, 000 Stu/hr Calculated Design Cooling toad 144(a & b 19,400 Btu/hr Proposed Cooling Capacity 144(a & b 18 553 ShAr Fan Control 144(c) Constant Volume DP Sensor Location 144(c) Supply Pressure Reset (DDC only) 1 c Yes Simultaneous Heat/Cool 144 No Economizer 144 a No Economizer Heat Air Supply Reset 144 Constant Temp Coot Air Supply Reset 144 Constant Temp Electric Resistance Heating` 144 Air Coop Chiller Limitation 144 i Duct Leakage Sealing. If Yes. a MECH-4-A must be submitted 144(k) 1. Total installed capacity (MBtu/hc) of alt electric heat on this project exclusive of electric atodfiary heat for heat pumps It efeetric heal is used explain which exoeption(s) to §144(8)°- appt r_ En Pro 5.1 by_EnergySoff User Number. 2655 RunCode: 2012-11-OST16:20:34 ID: -page35 of 40 WATER SIDE SYSTEM REQUIREMENTSPart 2 of 2 MECH-2C Project Name r ate Rancho La Quinta Gatehouse 111812012 WATER SIDE SYSTEMS: Chillers Towers Goiters tunic Loops Item or System Tags (i.e. AC -1, RTU -1, HP -1)' Number of Systems Indicate Page Reference on Pians or Specification' ' MANDATORY MEASURES T-24 Sectlons Equipment Efficiency 112(a) Pipe Insulation 123. PRESCRIPTIVE MEASURES Cooling Tower Fan Contrors 1`44(a & b Cooling Tower Flow Control 144(h) Variable Flow System Design 144 h Chilter and Boger, Isolations 144 ; CHW and HHW Reset Controls 144 0) WLHP Isolation Valves 144 VSD on CHIN, CW & WLHP Pumps>5HP 144 0) DP Sensor Location 144 0) 1. The proposed equipment need to match the building plans schedule or specifications. h a requirement is not applicable, put "WA" in the column next to applicable seWom 2. For each chiller, cooling tower, boiler, and hydronic loop (or groups of similar equipment) filt in the reference tor sheet number and/or specification section and paragraph number where the required features are documented. H a requirement is not applicable, put "N/A" in the column next to applicable section. Rem or System Tags Service Hot Water. Pool Heating (i.e. WH -1, WHP, DHW, etc...)' DHWPfeatier Number of Systems 1 Indicate Page Reference on Plans or Schedule? MANDATORY MEASURES T 24 Seettons SERVICE HOT WATER Certified Water Heater 111 113 aStandard Gas 50 gal or Less Water Heater Efficiency 113(b) 0.53 EF Service Water Heating Installation 113(c) Controls Req. Pipe Insulation 1123 Required POOP. AND SPA Pool and Spa Efficiency and Control 114(a) n1a Pool and Spa Installation 114(b) n1a Pool, Heater — No Pilot Light 115 e ; n/a Spa Heater—No Pilot Light 115 n/a -PipeInsulation 123 n1a 1. The Proposed equipment needs to math the building plans schedule or specifications. If a requirement is not applicable, put "WA" in the column next to appGmble section` 2. For each water heater, pool heater and domestic water loop (or groups of similar equipment) fill in the reference to sheet number and/or specification section and paragraph number where the required features are documented. H a requirement is not applicable, put "WA" in the column. EnergyPro 5.1 by EnergySoft User Number. 2655 RunCode; 2012-11-08T16:20:34 ID: Pae 36 of 461 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Rancho La Quinta Gatehouse Date I 11/8/2012 .MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D E F G M I J_ K L M N Zone/System Condition CFM Area per ftz Min CFM Number By Area Of B X C People CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design zone Supply CFM 8 X 0.4 CFM / ftz Max. of Columns H, J, K, 300 CFM Design Minimum Air Se int Transfer Air Office 408 0.15 o1 61 61 Office Total 61 61 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121 Table 121-A. Based on fixed seat or the reater of the expected number umber pf occupants and 50°k of the CBC occupant load for egress purposes tars aces without fixed seating, H Re uired Ventilation Air REQ'D V.A, is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). IMust be greater than or equal to H or use Transfer Air column N to make up the difference. J Design fan supply CFM Fan CFU x 50°6• or the desi n zone outdoor airflow rate p2r 1121. K Condition area tt2 x 0.4 CFM / ftz• or L Maximum of Columns H, J K or 300 CFM M This must be lass than or a ual to Column L and greater than or equal to the sum of Columns H Ous N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air Column M). Where required, transfer air must be greater than or equal to the difference between the RecLuired Ventilation Air Column H and the Desl n Minimum Air Column M Column H minus M. EnergyPro 5.1 by Ener Soft User Number: 2655 RunCode: 201211-MT16:20:34 ID: Page 37 of 40 0610 9E G d :Q/ K-09.9tleft PeLOL -OP03und ggQZ :jGquinN iasfl goS eu3 q 7'4 oJd Gua A1O► IOI 5Z' l ro swepAs awnloA Wetsuo0 rOl W3O/M 9'0 paaoxe lou Mw X30141 X3aNl a3MOd NVA a31Snf'OV J0 X30Nl a3MOd W31SAS NVA 14V101 ' l Wd0/M L0910 ,(9 null x £ Gull) X3aNI a3MOd Nd3 a31snmv (L L Moa uo value pue xepul raMod ue3 pelsnfpy elelnole0 (0 ',dS / 1—!a )-t = jW area '9 agll uo JGlua pim tuGaulsr VV ued erelnple0 fq 'dS 5 5 Gull uo (sds) ue; eqj ssoJoe dap GJnssfud ued le;ol JGju3 V Gull uo BdS JGwG U041 l sRd 5'6Z JO -O 'M tpuI t ueap jelea3B sl (8dg) dojp sinssard ,aAll A (v BdS 6 YUdO/M (Z anoa / 1 M010 X 3 0 N I Id3MOd VS. SAS NW-A £ , oor MIN M01313IV NOISM Alddf3S tz 'SPepuelS ABreu3 eyl;o (0)vvt§ ul y-ftt uoplenb3 iN3W1Snrav 3anSS3ad a31114 Zg;U Wfll00 WnS S1Lt/M) a3MOd W31SAS NVA 11/101 t . siminisnrav cm siviol Z94 OY % 0 001 % 066 oot 0 ue3 AjddnS - saiy0 a X / 96L X 3 X a 611BM �IBad SJBA ►o jaiwnN SAWO Joiow dH evue usisea uo, pwaa ued aual!a� d 3 a a e v a t ue;;o u'oLltdwnsUD3 JGMod OSS'40BOJddVenI josard Gyl buIsn ue4m swa s y ewnloA JIV elgeueA ro swGls S ued (A1/0) ewnlOA ?IV WBAuo,3 Jo} dy SZ uBig i4eat JaModmoy WSr& UP4,iM 8 44VA aamisfs U qOeG J01189 4swm siyl;D Ado* euD Gpv►D td 31©.N Z IOZ/8!t L alb esnotle;ee epnb e7 O(Pueb eweN PGford :Dti-H33W NOIidwnswo H3MOd NVA a . MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name pate Rancho La Quinta Gatehouse 1 i1a42012 Equipment and System Efficiencies §111: Any appliance for which there is a Cafrfomia standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluid's at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The tune switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1B. An occupancy sensor to control the operating period of the system; or 1C. A 4 -hour tinier that can be manually operated to control the operating pe rlod of the systerm 2 Each space conditioning system shall be Installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §tn(g). square feet shag be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with Isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shalt be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat: pumps sfrait be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(0: All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all: ventilation systems serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The c owofs shalt limit the otdW Temperature to 1100 F- 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. Ene Pro 5-1 by EneygySoft User Number: 2855 RunCode. 2012-11-08716:20:34 1D: Pae 39 of 40 f HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Rancho La Quirda Gatehouse Date 11/8/2012 Systemi Name Office Fiber Ana 408 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 1 COIL CFM Total Room Loads 686: Return Vented Lighting Ret m Air Duds Return Fan Ventilation 61 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG, PEAK Heating Svstern Sensible Latent CFM Sensible Output per Systern 25,000 12,441 869 207 7,454 Total Btuh 25,000 o 61.3 622 373 Cooling System o 0 Output r System 25,000 2,348 1,133 61 2,790 Total Output (Etuh 25,000 0 622 1 16,0331 2,002 0 Total ons 2.1 373 Total O tWhf 61.3 Total on 195.8 10,989 Air System CFM per System 300 HVAC EQUIPMENT SELECTION Airflow chn 300 Fljdsu ASU9RFL 18,553 4,022 25,000 Afrftow c*W 0.74 Alrflow chNTon 144.0 Outside Air 20.4 %Total Adjusted System Output (Adjusted for Peak design conditions) TIME OF SYSTEM PEAK 18,553 4,022 25,000 Jfi�13 E�itrt Jan 1 AM Outside Alr ;W 0.15 Note: values above at ARE oondftions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heats Peak 26 OF 60 OF 60 OF 105 OF r Outside Air 61 cfm Supply Fan Heating Col! 300 chn 69 OF 104 OF [ROOM 70 OF E COOLING SYSTEM PSYCHROMETit Airstream Te urea at Time of Cools Peak 112 / 78 OF 83 ! 66 OF 83 / 66 OF 55 / 54 OF Outside Air 61 c1m Supply Fan rd Cog Cad 300 cfin 76 / 62 OF 57 / 54 OF 50.3% I ROOM 74 / 62 OF t EnergyPro 5.1 by Ener ySoft User Number: 2655 RunCode: 2012-11.08718:20:34 1D: Page 40 of 40 CERIMCATE OF ACCEPTANCE OLTG-2A' NA7.7 Outdoor Lkbdm AjyMftnce Tests(Page Project Name/Address: � / q --00 3 Je I*rrm Sf. . 1 of 3 let& (C&d1w. 1-b 6,10.4-Whwe Sy stem Name or.I` mJ1ag: W[</ QXkrfot- Svsiem LocationArea Served: X/ E S Ikkinci°rcos, Enforcement Agency: Permit Number: Noie. Submit one Certificate ofAcceptmice far each system that must demonstrate eomplicmee. Enfo:scuient Agmvy LTse: C heelmd bylDete . FIELD TECHNtCWNS DECLARATION STATEMENT • I certify under penalty of perjury, under the laws of the State of California, the information provided on this form is true and con ect. • I an the personwho perfoaned the acceptance requi cine nts verification reported on this Certificate of Acceptance (Field Technician)- • I certify that the construction/mstallation identified on this form complies with the acceptance regtwernents indicated in the plans and specifications appmvcd by the enforcement agency, and conforms to the applicable =ePta= requirements and procedures specified in Reference Nonresidential Appendix NA7. • I have eomfrmed that the 'Installation Certificate(s) for the conshuctionlinstallstidm identified on this form has been completed and is posted or made available with the buddine oermitfs) issued for the hfitdi- Company Name: Field Techmcmiors Name: FrId Technician's Signature: Phone: - - //f/C •7(o579.7757 Responsible Person's Signora: Date Sighed: Position With Company (Title): RESPONSIBLE PERSON'S DECLARATION STATEMENT • I certify under penalty of perjury, under the laws of the State of California, that I am the Field Technician, or the Field Technician is acting on my beha)f as my employee or my agdmt and I have reviewed the indounation provided on this form • I am a licensed contractor, architect; or engineer, who is eligible under Division 3 of the Business and Professions Code. in the applicable classification, to take responsibility for the scope ofvvork specified on this document and attest to the declarations in this statement (responsible person). - • I ccrb6, that the informationprovidod on this form substantiates that the consbuchOnliMOUatioa identified on this form flies wish the acceptance requirements indicated in the plans and specifications. approved by the enforcement agency, and conforms to the applicable and procedures specified in Rcferrnee NomesidentW .Appendix NA7- • i have cmfirrued but the Installation Cotificate(s) for the . identified on this form has been completed and is posted ormade available with the building permit(s) issued for the building. • I. will ensure that a complemd, signed copy oftim Certificate of Acceptance shall be posted, or made available with the building pen it(s) issued for the building, and made available to the enforcement agency for all applicable inspections. l understand that a signed copy of this Certificate ofAcceptance is.reequimd to be included with the documentation the bmiderwovides to the building owner at no mann Company Name: ;,+niTV Cc l avr�/J� 2.I Responsible Person's Na-me Phone: - - //f/C •7(o579.7757 Responsible Person's Signora: License: Daae Signed: Position With Company (Tit1e): t! �` Q a l BUI�p, ° & � Qv,Nr APP AFE7�, DEP FOR C R VED RUCTION DATt= I7�n ._ — I _ 2008Nonrest*n ial Compliance Forms � co D sEp p b 2012 Lev August 2009 CERTIFICATE OF ACCEPTANCE OLTG2A NA7.7 Outdoor Lighfift Aecepunce Tests UPage 2 of 3 :ProjectNamelAddress: System Name or.l cation fag !?ew � ��o�- f< fig System Location or Area Served_ it/, .!' ��r; Ae a� ada'�t�oh NA7.7.1 Outdoor Motion Sensor Acceptance f1 ol Intent: I Lights are turned offwhen not needed per Section 119(d) & 132. Construction Ins 'on 1. Motion Sensor Construction Inspection 814- Astronomical time switch controls and automatic time switch controls have been certified to the Energy Commission in accordance with the applicable provision in Standards Section 119. Verify that model numbers of all such controls are listed on the EnerjW Commission database as "Certified Appliances & Control Devices." 0 Motion sensor has been located to minimize false.signals ❑ Sensor is not triggered by motion outside of adjacent area ❑ Desired motion sensor coverage is not blocked by obstruction that could adversely affect performance Functional testing 774 1. Simulate motion in area under lights controlled by the motion sensor_ Verify and document the following. Demonstrate and document for the owner time switch programming including weekday, weekend, holiday schedules as well as all set�up and preference program settings ❑ Status indicator operates correctly. D Lights controlled by motion sensors tum on itumedia * upon entry into the am lit by the controlled lights near the motion sensor D Signal sensitivity is adequate to achieve desired control 2. Simulate no motion in area with lighting controlled by the sensor but with motion adjacent to this area. Verify and document the following: 'Verify that the correct time and date is properly set in the standard and astronomical time switch. D Lights controlled by motion sensors tum off within a maximum of 30 minutes from the start of an unoccupied condition per Standard Section 1'1 d . Verify that the correct latitude, longitude and time zoo are setin the astronomical time switch [Verify D The occupant sensor does not trigger a false "on" from movement outside of the controlled area the battery back-up (if applicable) is installed and energized in the standard and astronomical time switch. ❑ Signal sensitivity is adequate to achieve desired control_ NA7.7.2 Outdoor Lkhting Shut-off Controls Construction Inspection 1. Outdoor Lighting Shut-off Controls Construction Inspection ❑ Astronomical time switch controls and automatic time switch controls have been certified to the Energy Commission in accordance with the applicable provision in Standards Section 119. Verify that model numbers of all such controls are listed on the EnerjW Commission database as "Certified Appliances & Control Devices." Controls to tum off lights during daytime hours are installed ❑ Astronomical and standard time switch control is programmed with acceptable weekday, weekend, and holiday ('if applicable) schedules ❑ Demonstrate and document for the owner time switch programming including weekday, weekend, holiday schedules as well as all set�up and preference program settings 2. Lighting systems that meet the criteria of Section 132(c)2 of the Standards shall have a scheduling control (time switch) installed which is able to schedule separately: ❑ A reduction in outdoor fighting power by 50 to SMlo D Turning off all outdoor lighting covered by Section 132(c)2 of the Standards ❑ 'Verify that the correct time and date is properly set in the standard and astronomical time switch. ❑ Verify that the correct latitude, longitude and time zoo are setin the astronomical time switch [Verify ❑ the battery back-up (if applicable) is installed and energized in the standard and astronomical time switch. zuvo n wirt raenruu %_ anywar= j- or= A99ZW 2009 CERTIFICATE OF ACCEPTANCE OLTG-2A 2 NA7.7 Outdoor 14 A Tests 3 Project Name/Address: q A � ®o � 7 t%Q rlo � T"� yI c! �� Sym Nae or zdenidicationaag . ew pro l� h7li�I Systems Location or Area wed: N,.l' «iee� ofio L --A NA7.7.2.2 Outdoor Photocontrol Functional testing Note photocanttrol must be used in conjunction with time switch or motion sensor to meet the requirements of Section 132(c)2 of the Standards. 1. Nighttime test. Simulate or provide conditions without daylight_ Verify and document: D D Comrolled lights -turn on 2. Sunrise test Provide between 10 and 30 horizontal footcandles (fc) to photosensor_ Verify and document the following DComrolled p 1 Controlled lights turn off NA7.7.2.3 Astronomical Time Switch Functional testin 1 Power off test Program control with location information, local date and time, and schedules. Disconnect control from power source for at least l hour. Verif and document D D Control ruins all programmed settings and local date and time On schedule best. Simulate or provide times when fights are scheduled to be ON. Verify and document schedule ON test Simulate or provide times when the sun has set and lights are scheduled to be ON. Verify and � ent DCoatrniled DComrolled lights turn on 3. Night schedule OFF test Simulate or provide times when the sun has set and lights are scheduled to be OFF. Verify and document p D 1 Controlled lights tum off 4. Sunrise test: Simulate or provide the programmed offset time after the time of local sunrise D TCamtrWed lights turn off Standard(ROB-astronomical) Time Switch Functional T INA7.7.2.4 Note: this control must be used in conjunction with a photocontrd to meet requirements of Section 132(c) of the Standards. L Power off test. Program control with local date and fume and schedules. Disconnect control from power source for at least I hour. V and document D Control retains all programmed schedules and local date and time 2. On schedule best. Simulate or provide times when fights are scheduled to be ON. Verify and document DCoatrniled lights turn on 3 _ Schedule test Simulate or provide times when Bre sun has set and lights are scheduled to be OFF. Verify and document: p 1 Controlled lights tum off .. �.......,. _...�...�... • wn��awuxrvrnlJ Augzw2009