Loading...
13-0331 (RC) Ste. 100 Title 24BUILDING ENERGY ANALYSIS REPORT PROJECT: Dr. Karimyan Dental 78-138 Calli Tampico La Quinta, CA 92253 off- i c� CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED Y _.' r — 1 0 Project Designer: AA Design 81-692 Rancho Santana Dr. La Quinta, CA 92253 760-272-4285 Report Prepared by: Gina Rose -Starkey EQS, Inc. 42335 Washington St. #F-330 Palm Desert, CA 92211 760-218-3350 INC.. QED RECEI Job Number: MAR 2 0 2013 UINTA Date: � CIV OF LA Q COMMUNITY DEVELOPMENT 3/2/2013 The EnergyPro computer program has been used to perform the calcula=ions summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2008 Building Energy Efficiency Standards. This program developed by EnergySoft, LLC — www.energysoft.com. EnergyPro 5.1 by EnergySoft User Number: 5862 RunCode: 2013-03-02710:19:58 /D: { TABLE OF CONTENTS Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3'. Form ENV -MM Envelope Mandatory Measures 1.8 Form MECH-MM Mechanical Mandatory Measures 19 HVAC System Heating and Cooling Loads Summary 20 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C Project Name Date Dr. Karimyan Dental 3/2/2013 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 78-138 Calli Tampico La Quinta CA Climate Zone 15 3,135 n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Relocatable - indicate ❑ specific climate zone ❑ all climates Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration STATEMENT OF COMPLIANCE This certificate of compliance lists the building features and specifications needed to comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This certificate applies only to a Building using the performance compliance approach. The documentation author hereby certifies that the documentation is accurate and complete. Documentation Author Name Signature Gina Rose-Starkey Company EQS, Inc. Date 3/212013 Address 42335 Washington St. #F-330 Phone 760-218-3350 City/State/Zip Palm Desert, CA 92211 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. e 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that 1 am licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name [Signature Company AA Design Date 3 —S- 13 Address 81-692 Rancho Santana Dr. License # City/State/Zip La Quinta, CA 92253 Phone 760-272-4285 Principal Mechanical Designer Name Signature Company Date Address License # City/State/Zip Phone Principal Lighting Designer Name Signature Company Date Address License # City/State/Zip Phone INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if worksheets are included) m ENV-1C Certificate of Compliance. Required on plans. m MECH-1C Certificate of Compliance. Required on plans. G3 LTG-1C Certificate of Compliance. Required on plans. m MECH-2C Air/Water Side/Service Hot Water & Pool Requirements. m LTG-2C Lighting Controls Credit Worksheet. m MECH-3C Mechanical Ventilation and Reheat. ❑ LTG-3C Indoor Lighting Power Allowance. m MECH-5C Mechanical Equipment Details. EnergyPro 5.1 by EnergySoft User Number: 5862 RunCode: 2013-03-02710:19:58 /D: Page 3 of 20 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF -1C Project Name Date - Dr. Karim an Dental r 3/2/2013 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard Proposed Compliance Energy Component Design Design Margin -.-- - Space Heating Heating' Space Cooling Cooling "Indoor Fans - Fans t. Heat Rejection Heat Rej •b -• _ �. Pumps & Misc. Pumps Domestic Hot Water DHW i rt Lighting Lighting } Receptacle Receptacle Process Process_ •`_ " ,. " i Process Lighting Process Ltg TOTALS Percent better than Standard 3.6% 3.6 % excludingprocess) BUILDING COMPLIES , GENERAL INFORMATION Building Orientation' (N) 0deg Conditioned Floor Area 3,135 sqft. Number of Stories 1 Unconditioned Floor Area 0 sqft. Number of Systems 4 Conditioned Footprint Area 3,135 sqft. Number of Zones 1 Natural Gas Available On Site Yes Orientation Gross Area GlazingArea GlazingRatio Front Elevation sqft. 285 sqft. 57.1 % Left Elevation sqft. o sqft. ` 0.0 Rear Elevation sgft. - 284 sqft. 56.7 Right Elevation sqft. 269 sqft. 41.4 Total *sqft. 838 sqft. 36.4 Roof sqft. o sqft. 0.0 Standard Proposed Prescriptive Values for Prescriptive Lighting Power Density 1.100 W/sgft. 0.963 W/sgft. Comparison only. See Prescriptive Envelope TDV Energy 188,329 392,081 LTG -1C for allowed LPD. 'Remarks: Ener Pro 5.1 b Ener Soft User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Page 4 of 20 o.ss � o.s2 o.os 176.02 173.77 2.25 o.00 o.00 � •o.00 o.00 • o.00 o.00 ' o.00 o.00 o.00 ' o.00 o.00 o.00 76.96 ' 67.37 9.58 75.64 75.64 0.00 o.00 o.00 o.00 o.00 o.00 o.00 329.31 317.41 11.90 (N) 500 (E) 650 (S) 500 (vt7 sso 2, 300 3,135 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C Project Name Dr. Karimyan Dental Date 3/2/2013 ZONE INFORMATION System Name Zone Name Occu anc T e Floor Area s ft. Inst. LPD W/sf' Ctrl. Credits W/Sf 2 Allowed LPD Proc. Loads W/sf Area Tailored W/Sf s W/Sf a Dental Dental Comp Bldg Medical and Clin 3,135 1.203 0.241 Notes: 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk, see LTG -1-C by others) (by others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the s ecial iustification and documentation submitted. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 5.1 by EnergySoft User Number: 5862 Run Code: 2013-03-02710:19:58 ID: Page 5 of 20 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dr. Karimyan Dental Date 3/2/2013 Project Address 78-138 Calli Tampico La Quinta Climate Zone 15 Total Cond. Floor Area 3,135 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School m Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space >_ 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyT ez d a C Cn N W4 O z (; r '> i m v M y « x m w> C C_ «` x� w LL O GI m > O C d o c LL e x C N C a 'o a � Q c O N 7 c U y y a w 1 Wall 215 (N) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 2 Wall 650 (E) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 3 Wall 217 (S) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 4 Wall 381 (W) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 5 Slab 672 (N) 0.730 None 4.4.7-A1 Existing ❑ ❑ 6 Slab 2,463 (N) 0.730 None 4.4.7-A1 Existing ❑ ❑ 7 Roof 3,135 (N) 0.031 R-30 4.2.1-A20 Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Tag/ID' Fenestration Tez 2! a c c3: ;a uS cW O ° 2> ; `' i > to U = mN 2¢ U 't i rn N mc m a O o o U to mzmLLi a R 1L 1 Window 285 (N) 0.790 NFRC 0.700 NFRCJ ❑ Existing ❑ ❑ 2 Window 284 (S) 0.790 NFRC 0.700 NFRC ❑ Existing ❑ ❑ 3 Window 269 (W) 0.790 NFRC 0.700 NFRC ❑ Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page.2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. EnergyPro 5.1 by Ener Soft User Number: 5862 RunCode: 2013-03-02T10:19:58 ID: Page 6 of 20 CERTIFICATE OF COMPLIANCE (Part 2 of 3) AND FIELD INSPECTION ENERGY CHECKLIST ENV -1 C Project Name Dr. Karimyan Dental Date 3/2/2013 ROOFING PRODUCT COOL ROOFS (Note if the roofing product is not CRRC certified, this compliance approach cannot be used). Go to Overall Envelope Approach or Performance Approach. CHECK APPLICABLE BOX BELOW IF EXEMPT FROM THE ROOFING PRODUCT "COOL ROOF" REQUIREMENTS: Pass Fail' N/A ❑ Roofing compliance not required in Climate Zones 1 and16 with a Low -Sloped. 2:12 pitch or less. ❑ ❑ ❑ ❑ Roofing compliance not required in Climate Zone 1 with a Steep -Sloped with less than 5 Ib/ftz. Greater than 2:12 pitch. ❑ ❑ ❑ Wood framed roofs in Climate Zones 3 and 5 are exempted, solar reflectance and thermal emittance or 13SRIthat have a U -factor of 0.039 or lower. See Opaque Surface Details roof assembly, Column H of ENV -2C. 13 13 13SRI Metal building roofs in Climate Zone 3 and 5 are exempted, solar relectance and thermal emittance or SRI 13thathave a U -factor of 0.048 or lower. See Opaque Surface Details roof assemblybelow, Column H of ENV -2C. ❑ 11 11that ❑ The roof area covered by building integrated photovoltaic panels and building integrated solar thermal panels are exempted. Solar reflectance and thermal emittance or SRI, seespreadsheet calculator at www.ener .ca. ov/title24/ ❑ ❑ ❑ constructions that have thermal mass over the roof membrane with a weight of at least 25 Ib/ft are exempt from 13 the Cool Roof criteria below. 13 11 13the ❑ High-rise residential buildings and hotels and motels with low -sloped roofs in Climate Zones 1 through 9, 12 and 16 are exempted from the low -sloped roofing criteria. ❑ ❑ ❑ 1. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. CRRC Product ID Number' Roof Slope s 2:12 > 2:12 Product Weight < 5lb/ft2 z 5lb/ft2 Product T peZ Aged Solar Reflectance} Thermal Emmitance SR 15 Pass Fail6 ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ 4 ❑ 1 ❑ ❑ ❑ ❑ ❑ ❑4 1 1❑ ❑ ❑1 ❑ ❑ ❑ ❑ 4 ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ 4 ❑ ❑ 1. The CRRC Product ID Number can be obtained from the Cool Roof Rating Council's Rated Product Directory at www.coolroofs.org/r)roducts/search.php 2. Indicate the type of product is being used for the roof top, i.e. single -ply roof, asphalt roof, metal roof, etc. 3. If the Aged Reflectance is not available in the Cool Roof Rating Council's Rated Product Directory then use the Initial Reflectance value from the same directory and use the equation (0.2+0.7(p;,,;tial — 0.2) to obtain a calculated aged value. Where p is the Initial Solar Reflectance from the Cool Roof Rating Council's Rated Product Directory. 4. Check box if the Aged Reflectance is a calculated value using the equation above. 5. The SRI value needs to be calculated from a spreadsheet calculator at httr)://www.eneray.ca.clov/title24/ 6. If Fail then describe on this page of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. To apply Liquid Field Applied Coatings, the coating must be applied across the entire roof surface and meet the dry mil thickness or coverage recommended by the coatings manufacturer and meet minimum performance requirements listed in §118(i)4. Select the applicable coating: ❑ Aluminum -Pigmented Asphalt Roof Coating ❑ Cement -Based Roof Coating ❑ Other Discrepancies: EnergyPro 5.1 by Energ ySoft User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Page 7 of 20 CERTIFICATE OF COMPLIANCE (Part 3 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dr. Karimyan Dental Date 3/2/2013 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for Envelope Fenestrations system. The designer is required to check the acceptance tests and list all the fenestration products that require an acceptance test. If all the site -built fenestration of a certain type requires a test, list the different fenestration products and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or whenever new fenestration is installed in the building or space shall be certified as meeting the Acceptance Requirements. The ENV -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the ENV -2A for each different fenestration product line must be provided to the owner of the building for their records. 'Test Description ENV -2A Test Performed By: Fenestration Products Name or ID Area of like Building Envelope Requiring Testing or Verification Products Acceptance Test 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 13 El 13 ❑ 13 EnergyPro 5.1 by Ener Soft User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Page 8 of 20 CERTIFICATE OF COMPLIANCE (Part 1 oP3) LTG -1 C Project Name Dr. Karimyan Dental Date 3/2/2013 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST Retain a copy and verify form is completed and signed. Field Inspector ❑ Certificate of Acceptance, LTG -2A (Retain a copy and verify form is completed and signed.) d Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is only for: m CONDITIONED SPACE ❑ UNCONDITIONED SPACE m The actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §146(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the .0 calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D E F G_ H None or Item Ta Complete Luminaire Description' (i.e, 3 lamp fluorescent troffer, F32T8, one dimmable electronic ballasts LL aa.a .5 a U)�' N .0.5 f: � J How wattage Was determined. N O N E ;E > > Z J X (nm Field Ins ector2 a OI CEC .m Default o � From L) o NA8 Q ~ N m m a LL (1) 20W Fluorescent ❑ 20.0 ® ❑ 3 60 ❑ ❑ (2) 2 ft Fluorescent T8 Elec ❑ 64.0 ® ❑ 58 3,712 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ ❑. ❑ ❑ ❑ ❑ El: ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ;❑. ❑ ❑ ❑ ❑, ❑ . ❑ ❑ ❑ 01 ❑' ❑ ❑ ❑ ❑' ❑: ❑ ❑ 10 ❑ ❑ ❑ ❑ 0- El Installed Watts Page Total: 3,772 Building total number`of pages: - Installed Watts Building Total Sum of all pages) 3,772 Enter into LTG -1 C Pa e 4 of 4 1. Wattage shall be determined according to Section 130 (d and e). Wattage shall be rating of light fixture, not rating of bulb. 2 . If Fail then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. Verify building plans if necessary. Ener Pro 5.1 by Ener Soft User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Pace 9 of 20 CERTIFICATE OF COMPLIANCE (Part 2 of 3) LTG -1 C Project Name Dr. Karimyan Dental Date 1 3/2/2013 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Fill in controls for all spaces: a) area controls, b) multi-level controls, c) manual daylighting controls for daylit areas > 250 ft2, automatic daylighting controls for daylit areas > 2,500 ft2, d) shut-off controls, e) display lighting controls, f) tailored lighting controls — general lighting controlled separately from display, ornamental and display case lighting and g) demand responsive automatic controls for retail stores > 50,000 ft2, in accordance with Section 131. MANDATORY LIGHTING CONTROLS - FIELD INSPECTION ENERGY CHECKLIST Field Inspector Number Special Type/ Description of Units Location in Building Features f Pass Fail ❑ ❑ 1 ❑ ❑. ❑. ❑ I ❑ ❑ ❑ ❑ ❑' ❑ ❑ ❑1 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑'. ❑ ❑ ❑ ❑ ❑; 11 ❑ ❑ ❑ ❑ ❑ ❑ ❑. ❑ F❑ ❑ ❑r ❑ ❑ ❑ o ❑ ❑ El ❑ o. ❑ ❑ ❑. ❑ ❑ ❑ ❑ I ❑ ❑. ❑ ! ❑t 1 '❑ SPECIAL FEATURES INSPECTION CHECKLIST See Page 2 of 4 of LTG -1 C The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. _ r Field Inspector's Notes or Discrepancies: Ener Pro 5.1 by Energ Soft User Number: 5862 RunCode: 2013-03-02T10:19:58 ID: Pae 10 of 20 CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1 C Project Name Date Dr. Karimyan Dental 3/2/2013 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts Watts Installed Lighting 3,772 Installed Lighting 0 from Conditioned LTG -1 C, Page 2 from Unconditioned LTG -1 C, Page 2 Lighting Control Credit 754 Lighting Control Credit 0 Conditioned Spaces from LTG -2C Unconditioned Spaces from LTG -2C Adjusted Installed — 3,018 Adjusted Installed = 0 Li htin Power Lighting Power Complies if Installed:5 Allowed Complies if Installed:5 Allowed Allowed Lighting PowerAllowed Lighting Power Conditioned Spaces from LTG -3C or PERF -1 3,018 Unconditioned Spaces from LTG -3C 0 Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG -2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG -2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Controls for Credits LTG -2A Controls and Sensors and Automatic Number of Daylighting Luminaire Controls Equipment Re uirin Testing Descri tion controls Location Acceptance Occ Sensor - Multi -Level (2) 2 ft Fluorescent T8 Elec 58 dental m Occ Sensor - Multi -Level (1) 20W Fluorescent 3 dental m Ener Pro 5.1 by Ener Soli User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Pae 11 of 20 CERTIFICATE OF COMPLIANCE and (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Dr. Karimyan Dental Date 3/2/2013 Project Address 78-138 Calli Tampico La Quinta Climate Zone 15 Total Cond. Floor Area 3,135 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 0 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST Equipment? Ins ection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags AC -1, RTU -1, HP -1 Dental ❑ [3i.e. Equipment T e3: Packaged DX ❑ ❑ Number of Systems 4 ❑ ❑ Max Allowed Heating Capacity' 55,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 7.70 HSPF ❑ ❑ Max Allowed Cooling Capacity' 5 7, 000 Btu/hr ❑ ❑ Coolinq Efficiency' 13.0 SEER / 10.0 EER ❑ ❑ Duct Location/ R -Value R-4.2 ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS No ❑ ❑ Economizer Fixed Temp (Non-Integ) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC -1, RTU -1, HP -1 ❑ ❑ Equipment T e3: ❑ ❑ Number of Systems ❑ ❑ Max Allowed Heating Capacity' ❑ ❑ Minimum Heating Efficiency' ❑ ❑ Max Allowed Cooling Capacity' ❑ ❑ Cooling Efficiency' ❑ ❑ Duct Location/ R -Value ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS ❑ ❑ Economizer ❑ ❑ Thermostat ❑ ❑ Fan Control ❑ ❑ 1. If the Actual installed equipment performance efficiency and capacity is less than the Proposed (from the energy compliance submittal or from the building plans) the responsible party shall resubmit energy compliance to include the new changes. 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form. Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC, or other. Ener Pro 5.1 by Ener Soft User Number: 5862 RunCode: 2013-03-02T10:19:58 /D: Pae 12 of 20 CERTIFICATE OF COMPLIANCE and (Part 2 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name E ate Dr. Karimyan Dental 3/2/2013 Discrepancies: EnergyPro 5.1 by EnergySoft User Number 5862 RunCode: 2013-03-02710:19:58 /D: Page 13 of 20 LIGHTING CONTROLS CREDIT WORKSHEET (Part 1 of 2) LTG-2C Project Name Dr. Karimyan Dental Date 3/2/2013 POWER ADJUSTMENT FACTORS PAF FOR NON-DAYLIGHT CONTROLS A Separate PAF Worksheet Must Be Filled Out for Conditioned and Unconditioned Spaces. Control Credits listed on this schedule are only for: m CONDITIONED SPACES ❑ UNCONDITIONED SPACES A B C D E F G Watts of Power Room # Zone ID Plan Room Area Control Adjustments Areas Lighting Control Description' Reference(ft) Lighting Factorz Control Credit Watts E x F dental Occ Sensor - Multi-Level 3,135 3,712 0.20 742 dental Occ Sensor - Multi-Level 3,135 60 0.20 12 PAGE TOTAL 754 Note: Conditioned and Unconditioned Building total of non-daylight control credit watts for all pages of LTG-2C Pae 1 of 2 Enter building total of all daylight controls credit watts from LTG-2C Page 2 of 2 0 Space shall be separately totaled BUILDING TOTAL OF ALL CONTROL CREDIT WATTS (FOR BOTH NON-DAYLIGHT AND DAYLIGHT CONTROL CREDITS) Enter in LTG-1C; Page 4: Lighting Control Credit as appropriate for CONDITIONED or UNCONDITIONED Spaces 754 1. Description shall be consistent with Type of Control defined in Table 146-C 2. Power Adjustment Factor taken from Table 146-C .EnergyPro5.1byEnergySoft User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Pae 14 of 20 AIR SYSTEM REQUIREMENTS Part 1 of2 MECH-2C Project Name Date . Dr. Karimyan Dental 3/2/2013 Indicate Air Systems Type Central, Single Zone, Package, VAV, or etc... Item or System Tags i.e. AC -1, RTU -1, HP -1 Dental Number of Systems 4 Indicate Page Reference on Plans or Schedule and indicate the applicable exception(s) MANDATORY MEASURES T-24 Sections Heating Equipment Efficiency 112(a) 7.70 HSPF Cooling Equipment Efficiency 112(a) 13.0 SEER / 10.0 EER HVAC Heat Pump Thermostat 112(b), 112(c) Yes Furnace Controls/Thermostat 112(c), 115(a) n/a Natural Ventilation 121 b No Mechanical Ventilation 121 b 470 cfm VAV Minimum Position Control 121 c No Demand Control Ventilation 121 c No Time Control 122(e) Programmable Switch Setback and Setup Control 122(e) Setback Required Outdoor Damper Control 122(f) Auto Isolation Zones 122 n/a Pipe Insulation 123 Duct Insulation 124 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load 144(a & b n/a Proposed Heating Capacity 144(a & b 137,406 Btu/hr Calculated Design Cooling Load 144(a & b n/a Proposed Cooling Capacity 144(a & b 145,130 Btu/hr Fan Control 144(c) Constant Volume DP Sensor Location 1 44 c Supply Pressure Reset (DDC only) 144(c) Yes Simultaneous Heat/Cool 144(d) No Economizer 144(e) Fixed Temp (Non-Integ) Heat Air Supply Reset 144(f) Constant Temp Cool Air Supply Reset 144(f) Constant Temp Electric Resistance Heating' 144 Air Cooled Chiller Limitation 144(i) Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(k) No 1. Total installed capacity (MBtu/hr) of all electric heat on this project exclusive of electric auxiliary heat for heat pumps. If electric heat is used explain which exception(s) to §144(g) apply. EnergyPro 5.1 by EnergySoft User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Page 15 of 20 MECHANICAL VENTILATION AND REHEAT MECH-3C Project Name Dr. Karimyan Dental Date 3/2/2013 MECHANICAL VENTILATION 121 b 2 REHEAT LIMITATION (§144(d)) AREA BASIS OCCUPANCY BASIS VAV MINIMUM A B C D F G H I J K L M N Zone/S stem Condition Area ft2 CFM per ft2 Min CFM By Area BXC fNumber CFM per Person Min CFM by Occupant E X F REQ'D V.A. Max of D or G Design Ventilation Air CFM 50% of Design Zone Supply CFM B X 0.4 CFM /ft2 Max. of Columns H, J, K, 300 CFM Design Minimum Air Setpoint Transfer Air Dental 3,135 0.15 470 470 470 Dental Total 470 470 Totals Column I Total Design Ventilation Air C Minimum ventilation rate per Section 121, Table 121-A. E Based on fixed seat or the greater of the expected number of occupants and 50% of the CBC occupant load foregress purposes fors aces without fixed setting. H Required Ventilation Air REQ'D V.A. is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS Column D or G). I Must be greater than orequal to H, or use Transfer Air column N to make u the difference. J Design fan supply CFM Fan CFM x 50%; or the design zone outdoor airflow rate per 121. K Condition area(ft) x 0.4 CFM / ft2; or L Maximum of Columns H, J, K, or 300 CFM M This must be less than orequal to Column L and greater than orequal to the sum of Columns H plus N. N Transfer Air must be provided where the Required Ventilation Air (Column H) is greater than the Design Minimum Air (Column M). Where required, transfer air must be greater than or equal to the difference between the Required Ventilation Air Column H and the Design Minimum Air Column M), Column H minus M. Energ Pro 5.1 by Energ Soft User Number. 5862 RunCode: 2013-03-02T10:19:58 ID: Page 16 of 20 MECHANICAL EQUIPMENT DETAILS Part 1 of 2 MECH-5C Project Name Dr. Karimyan Dental Date 3/2/2013 CHILLER AND TOWER SUMMARY PUMPS Equipment Name Type Ot . Eff iciency Tons Ot . GPM Premium BHP Eff. Motor Pump Control DHW / BOILER SUMMARY System Name Type Distribution of . Vol. Energy Factor Rated Input (Gals). or RE Standby Loss Tank Ext. or Pilot R -Value Status MULTI -FAMILY CENTRAL WATER HEATING DETAILS Hot Water Pump Hot Water iping Length ft Control aty. HP Type In Plenum Outside I Buried Add 1/2" Insulation CENTRAL SYSTEM RATINGS HEATING COOLING System Name Type Ot . Out ut Aux. kW Eff iciency Output Eff iciency Status Existing Day and Night Packaged DX 4 55,000 0.0 7.70 HSPF 57,000 13.0 SEER/ 10.0 EER Existing CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type Economizer Type Premium CFM BHP Eff. Motor CFM BHP Premium Eff. Motor Existing Day and Night Constant Volume Fixed Temp (Non-Integ) 2,000 0.00 m none ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ Ener Pro 5.1 by Ener Soft User Number: 5862 RunCode: 2013-03-02T10:19:58 ID: Pae 17 of 20 ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM Project Name Dr. Karimyan Dental Date 3/2/2013 DESCRIPTION Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter 4, Article 3. §118(c): All Insulating Materials shall be installed incompliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. 18 f The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value §1 ()' of no less than R-13 between framing members. §117(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.2 of §116(a) 1: , window area, 0.3 cfm/ft.2 of door area for residential doors, 0.3 cfm/ft.2 of door area for nonresidential single doors (swinging and sliding), and 1.0 cfm/ft.z for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or--NFRC 100 for site -built fenestration, or the applicable default SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). Ener Pro 5.1 by Ene Soft User Number: 5862 RunCode: 2013-03-02T10:19:58 /D: Pae 18 of 20 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Dr. Karimyan Dental 3/2/2013 Equipment and System Efficiencies §111: Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(8)' square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. §122(b): Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. 22 f §1 ()' All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2 Circulating service water -heating systems shall have a control capable of automatically turning off the circulating pump when hot water is not required. Ener Pro 5.1 by Energ Soft User Number: 5862 RunCode: 2013-03-02710:19:58 ID: Pae 19 of 20 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY Project Name Dr. Karimyan Dental Date 3/2/2013 System Name Dental Floor Area 3,135 ENGINEERING CHECKS SYSTEM LOAD Number of Systems 4 COIL CFM Total Room Loads 7,004 Return Vented Lighting Return Air Ducts Return Fan Ventilation 470 Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COOLING PEAK COIL HTG. PEAK Heating System Sensible Latent CFM Sensible Output per System 55,000 107,119 6,458 614 45,556 Total Output Btuh 220,000 0 Output Btuh/s ft 70.2 5,356 2,278 Cooling System 0 0 Output per System 57,0001 18,192 6,016 470 21,886 Total Output Btuh 228,000 0 12,474 0 Total Output Tons 19.0 5,356 2,278 Total Output Btuh/s ft 72.7 Total Output s ft/Ton 165.01 136,023 F 71,998 Air System CFM per System 2,000 HVAC EQUIPMENT SELECTION Airflow cfm 8,000 Existing Day and Night 145,130 57,709 137,406 Airflow cfm/s ft 2.55 Airflow cfm/Ton 421.1 Outside Air % 5.9% Total Adjusted System Output (Adjusted for Peak Design conditions) I TIME OF SYSTEM PEAK 145,130 57,709 Sep 3 PM 137,406 Jan 1 AM Outside Air cfm/s ft 0,15 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak) 26 OF Outside Air 470 cfm 70 OF 67 OF 140 OF 140 OF Heating Coil Supply Fan 8,000 cfm o 140 F ROOM 70 OF COOLING SYSTEM PSYCHROMETICS Airstream Temperatures at Time of Cooling Peak 111/78°F Outside Air 470 cfm 75/64°F 77/65°F 59/58°F 59/58°F c �O� A c Cooling Coil Supply Fan 8,000 cfm 60 / 58 OF -- 56.8% � ROOM 74/64°F EnergyPro 5.1 by EnergySoft User Number: 5862 RunCode: 2013-03-02710:19:58 /D: Page 20 of 20 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 1 of 3) PERF-1 C Project Name Date Dr. Karimyan Dental 9/3/2013 Project Address Climate Zone Total Cond. Floor Area Addition Floor Area 78-138 Calli Tampico La Quinta CA Climate Zone 15 3,135 n/a GENERAL INFORMATION Building-Type: m Nonresidential ❑ High-Rise Residential ❑est Room ❑ Relocatable - indicate [3specific climate zone ❑ a tes Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteratio VJ- STATEMENT OF COMPLIANCE .This certificate of compliance lists the building features and specifications needed to SEP comply with Title 24, Parts 1 and 6 of the California Code of Regulations. This 15.2013 certificate applies only to a Building using the performance compliance approach. CIT-' O The documentation author hereby certifies that the documentation is accurate and com et . Np Iry461V41 EVE, Documentation Author Name Gina Rose-Starkey Signature �� % . Company EQS, Inc. Date 9/3/2013 Address P.O. Box 170 Phone 760-218-3350 City/State/Zip Gold Hill, OR 97525 The Principal Designer hereby certifies that the proposed building design represented in this set of construction documents is consistent with the other compliance forms and worksheets, with the specifications, and with any other calculations submitted with this permit application. The proposed building has been designed to meet the energy efficiency requirements contained in sections 110, 116 through 118, and 140 through 149 of Title 24, Part 6. Please check one: ENV. LTG. MECH. I hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to ❑ ❑ ❑ sign this document as the person responsible for its preparation; and that I am -licensed in the State of California as a civil engineer, mechanical engineer, electrical engineer, or I am a licensed architect. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code by section ❑ ❑ ❑ 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document ❑ ❑ ❑ . because it pertains to a structure or type of work described as exempt pursuant to Business and Professions Code Sections 5537, 5538 and 6737.1. Principal Envelope Designer Name Signature Company AA Design Date Address 81-692 Rancho Santana Dr. License # City/State/Zip La Quinta, CA 92253 Phone 760-272-4285 'Principal Mechanical Designer Name Signature Company Date Address License # City/State/Zip Phone Principal Lighting Designer Name C ------_ fSig �atu�f F LA Of I D Company aif_ilvr;& .e g Address t. , LJ cense �"-, Yr { `� ; ry Enh �PtaTe City/State/Zip j FOR C RIFT INSTRUCTIONS TO APPLICANT COMPLIANCE & WORKSHEETS (check box if workshe are in I ded) m ENV-1C Certificate of Compliance. Required on plans. m MECH-I-C rti to of mpliance. Required on plans. m LTG-1C Certificate of Compliance. Required on plans. m MECH-2C--- i tl / erv' of Water Pool Requirements. m LTG-2C Lighting Controls Credit Worksheet. m M'ECH3C""'Mechani a tion and Re eat ❑ LTG-3C Indoor Lighting Power Allowance. m MECH-5C Mechan Equipment Details. EnergyPro 5.1 by EnergySoft User Number: 5862 RunCode: 2013-09-03710:43:20 ID: Page 3 of 20 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 2 of 3) PERF-1,C Project Name Date Dr. Karim an Dental 9/3/2013 ANNUAL TDV ENERGY USE SUMMARY kBtu/s ft- r Standard, Proposed Compliance .Energy Component Design Design Margin -- - - -_- - - ---- Space Heating Heating Space Cooling Cooling Indoor Fans Fans Heat Rejection Heat Rej t Pumps & Misc. , Pumps -j k Domestic Hot Water DHW : Lighting . Lighting Receptacle Receptacle t . t Process Process .a Process Lighting Process Ltg TOTALS Percent better than Standard 5.0% 5.0 % excludingprocess) BUILDING COMPLIES GENERAL INFORMATION Building Orientation (N) 0 deg Conditioned Floor Area 3,135 sqft. Number of Stories f Unconditioned Floor Area, ,0 sqft. Number of Systems 4 Conditioned Footprint Area 3,135 sqft. Number of Zones 1 Natural Gas Available On Site yes Orientation Gross Area GlazingArea GlazingRatio Front Elevation sqft. 285 sqft. 57.1% . Left Elevation sqft. ; o sqft.' 0.0% ' Rear Elevation sqft. _ 284 sqft. 56.7% Right'Elevation sqft. 288 •sqft. 44.4 % Total sqft. 857 ,Sgft. 37.3 % •, Roof sqft. o sqft- an Standard Proposed Prescriptive Values for Prescriptive Lighting Power Density 1.100 W/sqft. 0.879 W/sqft. Comparison only. See Prescriptive Envelope TDV Energy 188,329 402,606 y LTG-1C for allowed LPD. Remarks: E"�''� 4..A C�UIN7' . 3UILD-NSG SAFETY DEP/Tq, AP . � �-o�' coNs���i� .. - r C� • N DATE By F, _ Ener Pro 5.1 b� Ener Soft User Number: 5862 RunCode: 2013-09-03710:43:20 ID: Page 4 of 20 0.62 � 0.68 -0.07 175.50 174.55 0.95 • o.00 . • o.00 o.00 • -o.00 o.00 o.00 o.00 _ o.00 o.00 � o.00 ' o.00 - . o.00 76.96 61.50 15.46 75.64 75.64 0.00 o.00 � o.00 � o.00 o.00 o.00 o.00 ' 328.71 312.37 16.34 (N) 500 ' (E) • •650 - •' (S) 500 (lM 650 ' w 2, 300 3,135 PERFORMANCE CERTIFICATE OF COMPLIANCE (Part 3 of 3) PERF -1 C Project Name Dr. Karimyan Dental Date 9/3/2013 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area s ft. Inst. LPD W/sf t Ctrl. Credits W/sf 2 Allowed LPD Proc. Loads W/sf Area Tailored W/sf s W/sf a Dental Dental Comp Bldg Medical and Clin 3,135 1.018 0.139 Notes:. 1. See LTG -1C 2. See LTG -2C 3. See LTG -3C 4. See LTG -4C items marked with asterisk, see LTG -1-C by others) (by others Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency . determines the adequacy of the justifications, and may reject a building or design that otherwise complies based on the adequacy of the special justification and documentation submitted. .-- v�.it t�llh� SAF FTV SPR �- The exceptional features listed in this performance approach application have spe"citlj�hlly'be�e��r v�ewgii.rAdeq ate writt justification and documentation for their use have been provided by the applicant. !! �U( TION Authorized Signature or Stamp 9 06TE , Energ Pro 5.1 by EnergySoft User Number: 5862 RunCode: 2013-09-03Tf0.43:20_l Page 5 of 20 CERTIFICATE OF COMPLIANCE (Part 1 of 3) ENV -1 C AND FIELD INSPECTION ENERGY CHECKLIST Project Name Dr. Karimyan Dental Date 9/3/2013 Project AddressClimate 78-138 Calli Tampico La Quinta Zone 15 Total Cond. Floor Area 3,135 Addition Floor Area n/a• GENERAL INFORMATION Building Type: ® Nonresidential ❑ High -Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Bledlocatable g. Public School m .Conditioned Spaces ❑ Unconditioned Spaces ❑ Skylight Area for Large Enclosed Space a 8000 ft2 (If checked include the ENV -4C with submittal) Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component m Overall Envelope ❑ Unconditioned (file affidavit) Front Orientation: N, E, S, W or in Degrees: 0 deg FIELD INSPECTION ENERGY CHECKLIST OPAQUE SURFACE DETAILS INSULATION Ta /ID' AssemblyType 2 d a c C U1 d w O z V LL �. 3 >> M Vac G .�-. x m w> C .�-. x w LL o y d m > O C LL v C C a o a Q O y C �' 0:9 v cn N a LL 1 Wall 215 (N) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 2 Wall 650 (E) 0.074 R-19 4.3.1-A5 Existing 1 ❑ ❑ 3 Wall 217 (S) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 4 Wall 362 (W) 0.074 R-19 4.3.1-A5 Existing ❑ ❑ 5 Slab 672 (N) 0.730. None 4.4.7-A 1 Existing ❑ ❑ 6 Slab 2,463 (N) 0.730 None 4.4.7-A1 Existing ❑ ❑ 7 Roof 3,135 (N) 0.031 R-30 4.2.1-A20 Existing ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail, then describe on Page 2 of the Inspection Checklist Form and take appropriate action to correct. A fail does not meet compliance. FENESTRATION SURFACE DETAILS Fenestration Te2 NL a C r U c w O 2 > d LL >o V{ V S N Oi m A L) r Z 'o > C co o a LLTag/ID' 1 Window 285 (N) 0.790 NFRC 0.700 NFRC ❑ Existing ❑ ❑ 2 Window 284 (S) 0.790 NFRC 0.700 NFRC ❑ Existing ❑ ❑ 3 Window 248 (W) 0.790 NFRC 0.700 NFRC ❑ Existing ❑ ❑ 4 Window 40 (W) 0.710 Default 0.730 Default ❑ New ❑ ❑ ❑ ❑ ❑ ❑ ❑ jr, 1!! DING' ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ 1. See Instructions in the Nonresidential Compliance Manual, page 3-96. 2. If Fail then describe on Page 2 of the Inspection Checklist Form and tak if necessary. Ener Pro 5.1 6 Ene Soft User Number: 5862 RunCode: 20-3-09-03y 1�d3:2�� Page 6 of 20 e a�n�rr.. ropriate-action.to-corre`��%a/�rify_buildiag-plan • t` LTG -1 C ' Date • - • .CERTIFICATE OF COMPLIANCE (Part 1 of 3) Project Name Dr. Karimyan Dental 9/3/2013 INDOOR LIGHTING SCHEDULE and FIELD INSPECTION ENERGY CHECKLIST Installation Certificate, LTG -1- INST Retain a co and verify form is completed and signed. Field Inspector ❑ Certificate of Acceptance, LTG -2A (Retain a copy and verify form.is completed and signed.) Field Inspector ❑ A separate Lighting Schedule Must Be Filled Out for Conditioned and Unconditioned Spaces Installed Lighting Power listed on this Lighting Schedule is onlyfor: m CONDITIONED SPACE ❑ UNCONDITIONED SPACE 0, The. actual indoor lighting power listed below includes all installed permanent and portable lighting systems in accordance with §1.46(a). Only for offices: Up to the first 0.2 watts per square foot of portable lighting shall not be required to be included in the m calculation of actual indoor lighting power density in accordance with the Exception to §146(a). All portable lighting in excess of 0.2 watts per square foot is totaled below. ,. Luminaire (Type, Lamps, Ballasts Installed Watts A B C D I E F G H How wattage Field I Was determined Ins ector2 ``r � •w • .None - a CEC �, �? j t or Complete Luminaire Description ' c� m ._ � Default o �, � Item Ta (Le, 3 lamp fluorescent troffer,, F32T8, one dimmable electronic ballasts n � ' m = ` 3 J From L o 3 NA8 Q ~ Z J `� m a m t1 24" Undercounter Fluorescent ❑'• 16.0 ® ❑ 7 112 ❑ `r •. ❑ a 48" Undercounter Fluorescent ❑ 32.0 ® ❑ 12 384 i Ell Ely (2) 2 It Fluorescent T8 Elec ❑ 64.0 ® ❑ 34 2,176 ` ❑t D j (1) 20W Fluorescent /` ❑ 20.0 0 ❑ 26 520 E- ❑s El ❑ ❑ ❑ f ❑. Or ❑ ❑ ❑ ❑ ❑: ❑ .❑ ❑ ❑� ❑' ❑ ❑ ❑ ❑t ❑; ❑ ❑ ❑' I ❑� t ❑E- r ; ❑ ❑ ❑ �'❑I `'❑ • ❑ ❑ ❑ �'❑� ' ❑I ❑ ❑ ❑ ❑i , ❑€ ❑ ❑ ❑ t Wil' .Or il led Of a Antal 3,192 , . • f Inst a „V. tlil� tJll�dC1'n ale ca s I+r�jfgt Building total number of pages:) rn �t all pages e4of 31192 v i n 1 1. Wattage shall be determined according to Section 130 (d and e). Wattage Sall be rating of light fixture, not 'rating of bulb. 2 . If Fail then describe on Page 2 of the Inspection Checklist Form and take 4pprrop is a action to correct. Verify building plans if ecessary. BY Ene Pro 5.1 6 Ene Soft . " User Number: 5862 Run Code: 2d13 -099-03X%0. d3r20 Jo" Pae 9 of 20 �� r CERTIFICATE OF COMPLIANCE Part 3 of 3 LTG -1 C Project Name Date Dr. Karimyan Dental 9/3/2013 CONDITIONED AND UNCONDITIONED SPACE LIGHTING MUST NOT BE COMBINED FOR COMPLIANCE Indoor Lighting Power for Conditioned S aces Indoor Lighting Power for Unconditioned Spaces Watts . Watts Installed Lighting 3192 Installed Lighting 0 from Conditioned LTG -1 C, Page 2 from Unconditioned LTG -1 C, Page 2 Lighting Control Credit 435 Lighting Control Credit 0 Conditioned Spaces from LTG -2C Unconditioned Spaces from LTG -2C Adjusted Installed 2,757 Adjusted Installed = 0 Lighting Power Lighting Power Complies if Installed:5 Allowed Complies if Installed <_ Allowed Allowed Lighting PowerAllowed Lighting Power Conditioned Spaces from LTG -3C or PERF -1 2'757 Unconditioned Spaces from LTG -3C Required Acceptance Tests Designer: This form is to be used by the designer and attached to the plans. Listed below is the acceptance test for the Lighting system, LTG -2A. The designer is required to check the acceptance tests and list all control devices serving the building or space shall be certified as meeting the Acceptance Requirements for Code Compliance. If all the lighting system or control of a certain type requires a test, list the different lighting and the number of systems. The NA7 Section in the Appendix of the Nonresidential Reference Appendices Manual describes the test. Since this form will be part of the plans, completion of this section will allow the responsible party to budget for the scope of work appropriately. Forms can be grouped by type of Luminaire controlled. Enforcement Agency: Systems Acceptance. Before Occupancy Permit is granted for a newly constructed building or space or when ever new lighting system with controls is installed in the building or space shall be certified as meeting the Acceptance Requirements. The LTG -2A form is not considered a complete form and is not to be accepted by the enforcement agency unless the boxes are checked and/or filled and signed. In addition, a Certificate of Acceptance forms shall be submitted to the enforcement agency that certifies plans, specifications, installation certificates, and operating and maintenance information meet the requirements of §10-103(b) of Title 24 Part 6. The field inspector must receive the properly filled out and signed forms before the building can receive final occupancy. A copy of the LTG -2A for each different lighting luminaire control(s) must be provided to the owner of the building for their records. Controls for Credits LTG -2A Controls and Sensors and Automatic Number of Daylighting Luminaire Controls Equipment Re uirin Testing Descri tion controls Location Acceptance Occ Sensor - Multi -Level (2) 2 It Fluorescent T8 Elec 341 dental m 1 CITY OF LA U ❑ BUILDING & SAFETY DEP ❑ A .310 n ❑ r .. ❑. ❑ TF V IL ❑ EnergyPro 5.1 by EnerqySoA User Number: 5862 RunCode: 2013-09-03T10:43:20 ID: Pae 11 of 20 CERTIFICATE OF COMPLIANCE and ' (Part 1 of 4) MECH-1 C FIELD INSPECTION ENERGY CHECKLIST Project Name Dr. Karimyan Dental Date 9/3/2013 Project Address 78-138 Calli Tampico La Quinta Climate Zone 15 Total Cond. Floor Area 3,135 Addition Floor Area n/a GENERAL INFORMATION Building Type: ® Nonresidential ❑ High-Rise Residential ❑ Hotel/Motel Guest Room ❑ Schools (Public School) ❑ Relocatable Public School Bldg. m Conditioned Spaces . ❑ Unconditioned Spaces affidavit Phase of Construction: ❑ New Construction ❑ Addition ❑ Alteration Approach of Compliance: ❑ Component ❑ Overall Envelope TDV ❑ Unconditioned (file affidavit) Energy Front Orientation: N, E, S, W or in Degrees: 10 deg HVAC SYSTEM DETAILS FIELD INSPECTION ENERGY CHECKLIST E ui ment2 Inspection Criteria Meets Criteria or Requirements Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 Dental ❑ ❑ Equipment T e3: Packaged DX ❑ ❑ Number of Systems 4 ❑ ❑ Max Allowed Heating Capacity' 55,000 Btu/hr ❑ ❑ Minimum Heating Efficiency' 7.70 HSPF ❑ ❑ Max Allowed Cooling Ca acit ' 57,000 Btu/hr ❑ ❑ Cooling Efficiency' 13.0 SEER/ 10.0 EER ❑ ❑ Duct Location/ R-Value R-4.2 ❑ ❑ When duct testing is required, submit & MECH-4-HERS NO ❑ 13MECH-4A Economizer Fixed Temp (Non-Integ) ❑ ❑ Thermostat Setback Required ❑ ❑ Fan Control Constant Volume ❑ ❑ E ui ment2 Inspection Criteria FIELD INSPECTION ENERGY CHECKLIST Pass Fail — Describe Reason Item or System Tags i.e. AC-1, RTU-1, HP-1 ❑ ❑ Equipment T e3 ❑ ❑ Number of Systems ❑ ❑ Max Allowed Heating Capacity' ❑ ❑ Minimum Heating Efficiency' ❑ ❑ Max Allowed Cooling Capacity, 1 ❑ ❑ Cooling Efficiency' ❑ ❑ Duct Location/ R-Value ❑ ❑ When duct testing is required, submit MECH-4A & MECH-4-HERS ❑ ❑ Economizer ❑ Thermostat �,: 1 t a 6❑y ❑ Fan Control j ��� ❑ LJ 1. If the Actual installed equipment performance efficient and capacity is less than the Proposed fro yt�e-eke o� ff subm the building plans),the responsible party shall resubmienergy compliance to include the' ne�iV dhaf b& 0 I ���� 2. For additional detailed discrepancy use Page 2 of the Inspection Checklist Form! Compliance fails if a Fail box is checked. 3. Indicate Equipment Type: Gas (Pkg or, Split), VAV, HP (Pkg or split), Hydronic, PTAC�rOr other. BY e u tt al or from Ener Pro 5.1 by Ener Soft User Number- 5862 RunCode: 2013-09zWT10:43:20----119. Pae 12 of 20 AIR SYSTEM REQUIREMENTS Part 1 of 2 MECH-2C Project Name Date Dr. Karimyan Dental 9/3/2013 Item or System Tags Indicate Air Systems Type Central, Single Zone, Packa e, VAV, or etc... i.e. AC -1, RTU -1, HP -1 144(a & Dental 144(a & 144(a & Number of Systems 144(c) 4 144(d) 144(e) MANDATORY MEASURES Heating Equipment Efficiency Cooling Equipment Efficiency HVAC Heat Pump Thermostat Furnace Controls/Thermostat Natural Ventilation Mechanical Ventilation VAV Minimum Position Control Demand Control Ventilation Time Control Setback and Setup Control Outdoor Damper Control Isolation Zones Pipe Insulation Duct Insulation Indicate Pa a Reference on Plans or Schedule and indicate the applicable exception(s) T-24 Sections 112(a) 7.70 HSPF 112(a) 13.0 SEER 110.0 EER 112(b), 112(c) Yes 112(c), 115(a) n/a 121 b No 121 b 470 cfm 121 c No 121 c No 122(e Programmable Switch 122(e) Setback Required 122(f) Auto 122 n/a 123 124 R-4.2 PRESCRIPTIVE MEASURES Calculated Design Heating Load Proposed Heating Capacity Calculated Design Cooling Load Proposed Cooling Capacity Fan Control DP Sensor Location Supply Pressure Reset (DDC only) Simultaneous Heat/Cool Economizer Heat Air Supply Reset Cool Air Supply Reset Electric Resistance Heating' Air Cooled Chiller Limitation Duct Leakage Sealing. If Yes, a MECH-4-A must be submitted 144(a & 144(a & 144(a & 144(a & 144(c) 144(c) 144(c) 144(d) 144(e) 144(f) 144(f) 144 144(i) 144(k) n/a 137,406 Btu/hr n/a 145,122 Btu/hr Constant Volume Yes No Fixed Temp (Non-Integ) Constant Temp Constant Temp 1. Total installed capacity (MBtu/hr) of all electric heat on this project er explain which exceptions) to §144(g) apply. (311712Y 9-4'x, r. UrL•r n n o�- it 6� A r l.-. FOR CONSTRUCTION ^lusive of electric auxiliary heat for heat pumps. If e DATE BY I ctric heat is used Page 15 of 20 1 -ENVELOPE -MANDATORY MEASURES: NONRESIDENTIAL. .; ENV -MM Project Name Date Dr. Karimyan Dental. 9/3/2013 DESCRIPTION " Building Envelope Measures: §118(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20 Chapter.4, Article 3. §118(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. §118(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-13 between framing members. All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked' gasketed, §117(a): weatherstrippedbr{otherwise sealed. Manufactured fenestration products and'exterior'doors shall have air infiltration rates not exceeding,0.3 cfm/ft.2 of §116(a) 1: window area, 0.3 cfm/ft.z of door area for residential doors, 0:3 cfm/ft.2 of door area for nonresidential single doors (swingingand sliding), and, 1.0 cfm/ft.2 for nonresidential double doors (swinging). §116(a) 2: Fenestration U -factor shall be in accordance with NFRC 100, or the applicable default U -factor. §116(a) 3: Fenestration SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the applicable default,SHGC. §116(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building', and shall be weatherstripped (except for unframed glass doors and.fire doors). 1 , r \ CIT' OF � QUINTA . ' BUILDING ','G & SAFETY DEPT. Pe'VED . FOR CONSTRUCTION 'DATE BY Ene Pro5.1 6 Ener Soft , User Number: 5862 RunCode: 2013-09-03T10:43:20 ID: Pae 18 of 20 MECHANICAL MANDATORY MEASURES: NONRESIDENTIAL MECH-MM Project Name Date Dr. Karimyan Dental 9/3/2013 Equipment and System Efficiencies §111: Any appliance for which there is a California standard -established in the Appliance Efficiency Regulations will comply with the applicable standard. §115(a): Fan type central furnaces shall not have a pilot light. §123: Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. §124: Air handling duct systems shall be installed and insulated in compliance with Sections 601, 602, 603, 604, and 605 of the CMC Standards. Controls §122(e): Each space conditioning system shall be installed with one of the following: 1A. Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends and have program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or 1 B. An occupancy sensor to control the operating period of the system; or 1 C. A 4 -hour timer that can be manually operated to control the operating period of the system. 2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 §122(g). square feet shall be provided with isolation zones: Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. §122(c): Thermostats shall have numeric -setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. 22 b §1 ()' Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be. adjustable down to 55 degrees F or lower. For cooling, the §122(a&b): control shall be adjustable up to 85 degrees F or higher. here used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. Ventilation §121(e): Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. §122(f): All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. Ventilation System Acceptance. Before an occupancy permit is granted for a newly constructed building or space, or a §121(f): new ventilating system serving a building or space is operated for normal use, all ventilation systems serving the building ors ace shall be certified as meeting the Acceptance Requirements for Code Compliance Service Water Heating Systems §113(c) Installation 3. Temperature controls for public lavatories. The controls shall limit the outlet Temperature to 110° F. 2' service systems shall have a c n r�� ab.(e a ofnatcayd+xtu��itl T t e irculating pump �v UY when hot waer not requeedng BUILDING & t DEPT. APPROVED FOR CONSTRUCTION DATE BY EnergyPro 5.1 by EnergySoft User Number: 5862 RunCode: 2013-09-03710:43:20 ID: Pae 19 of 20