Loading...
05005 (SFD) Report of in-place testsFitch Engineers Inc. December 18, 1988 Cherokee Homes 79 811 Country Club Dr. Ste. B. Bermuda Dunes, Ca. 92201 SUBJECT: Report of In-Place•Tests-,48 721 Santa Ursula St. La Quinta, Ca. Gentlemen: In accordance with your request, this.report has been.prepared to present the results of the in-place tests performed on the fill material at the subject site by Fitch Engineers, Inc. These tests were performed on 12/17/88. AVAILABLE PLANS To assist in determining the locations and elevations of our field density tests and to define the general extent of the site grading for this -phase of work, we were provided with a grading plan by Fitch Engineers Inc. FIELD TESTING - Field density tests were performed by'a representative of Fitch Engineers, Inc. upon completion of,site grading. The density tests were taken according to A.S..T.M. Test 1556-74 and the location and results of;"those tests are shown on the attached plates. The locations and elevations of the in-situ tests were determined in accordance with -their importance and the accuracy and proximity of the survey control provided by Fitch Engineers Inc. representatives. Unless otherwise noted, their locations and elevations were determined by pacing and hand level methods and should be considered accurate only to the degree implied by the CIVIL ENGINEERING — PLANNING — SURVEYING — DESIGN " P.O. BOX.455 I PALM DESERT, CA 92261 (619) 345-7667 method used. LABORATORY TESTS A maximum dry density determination was performed on a representa- tive sample of the soils used in the compacted.fills, according to A.S.T.M.' Test 1557-7'8, Method A. This method specifies that a four (4) inch diameter cylindrical mold of 1/30 cubic foot volume j, be used and that the soil tested be placed in five (5) equal layers with each layer compacted by twenty-five (25)'blows of a 10 pound ! hammer with a 18 inch drop. 'The results of these tests as pre- sented on Plate No. 1 were used in conjunction with the field density tests to determine the percent of relative compaction of the compacted fill. This report covers only the work performed on 12/17/88. Our opinions presented herein are based on our observations and the relative compaction tests results. Due to possible variations in the uniformity of compacted fills, we only warrant that our work was performed in accordance with the currently accepted standards .of practice and in such a manner as .to have reasonable certainty that the mass grading complies with the job requirements. 'No' other warranty, express or implied,is given or intended., If you should have any questions after reviewing this report, please do not hesitate to contact this office. This opportunity to be of professional service is sincerely ' appreciated. Respectfully.submitted, .FITCH ENGINEERS INC. WM. H. FITCH R.C.E. 12571 L JOB NAME 48 721 Santa Ursula St., La dnta, Ca ELEVATION OR MOISTURE TEST NO. DATE LOCATION DEPTH OF TEST 0/0 JOB NO. DRY DEN. SOIL ' REL. COMI 1b5 /cu Jt. TYPE 0/0 1 12/17/88 See Sketch -0.5' 14.3 115.5 121.2 95.3 2 F.G. 11.1 114.8 121.2 94.7 3 " F.G. 11.1 111.9 121.2 92.3 SOIL TYPE #1= 121.2 lbs. cu./ t. @ 11.7% Moisture Plate No.1 DENSITY TEST 48 721 Santa Ursula St. La Quinta, Ca. BY G. Krause DATE 12/17/88 JOB NO. NTS Plate No.2 1