Loading...
07-2250 (CSCS) Report of Observation and Testing During Rough GradingA y R Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-M2 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 November 1, 2006 Equity Directions, Inc. 77-564 Country Club Drive, Suite 100 Palm Desert, California, 92211 Project: Center Pointe Development SEC Washington Street &c Miles Avenue La Quinta, California Subject: Report of Observations and Testing During Rough Grading Project No. 522-3598 06-07-755 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED BY. Ref: Geotechnical Investigation report prepared by Sladden Engineering dated January 16, 2004, Project No. 544-3598, Report No. 04-01-056 Summarized in this report are the results of in-place density tests performed at the subject site during rough grading along with pertinent observations. The project- site is located on the southeast comer of Washington Street and Miles Avenue in the City of La Quinta, California_. The project includes a hotel complex. -" The building pad areas were overexcavated to a depth of approximately 3 feet below existing grade or 4 feet below pad grade, whichever was deeper. The previously removed soils, native soils obtained from the cut areas of the=project site and import soils were placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. The rough grading was performed as recommended in the above referenced Geotechnical Investigation report. Observations and field testing was performed from January 20, 2005 through August 12, 2005. Testing indicates that a minimum of 90 percent relative compaction was attained in the areas tested. The passing test results indicate compliance with the project specifications at the tested .locations and depths but are no guarantee or warranty of the contractors work. Field Tests: In-place moisture/density tests were performed using a nuclear density gauge in accordance with test methods ASTM D 2922 and ASTM D 3017. A total of 143 density tests were performed. The test results are summarised on the attached data sheets. Laboratory Tests: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with test method ASTM D 1557-91, 1 M C M � T �[ AUG 0 7 2007 November 1, 2006 -2- Project No. 522.3598 06-07-7,55 Allowable Bearing Pressures: Footings should extend at least 12 inches beneath lowest adjacent grade. Isolated square or rectangular footings, at, least 2 feet square and continuous footings should be at least 12 inches wide. Continuous footings may bee designed using an allowable bearing value of 1500 pounds per square foot and isolated pad footings may be designed using an allowable bearing pressure of 1.800 psf, The allowable bearing pressures are for dead and frequently applied live loads and may be increased by 1/3 to resist wind, seismic or other transient loading. The bearing soils are non -expansive and fall within the "very low" expansion category_ in accordance with Uniform Building Code (UBC) classification criteria. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. Respectfully submitted SLADDEN ENGINEERING IJ Brett L. Anderso-r^-' v v * Exp, 0.30.2008 Principal Engineer � CM>r Grading/lh of pWlr•� Copies 4/Equity Directions, Inc. Sladden Engineering TEST RESULTS PROJECT NAME: Center Pointe PROJECT NO: 522-3598 LOCATION- La Quinta, California REPORT NO: 06-07-755 Test No. Date Tested Location Elevation Dry Density % Moisture I Relative Maximum In Place In Place Compa4p- on Density 1 2 3 4 5 6 7 8 9 10 11 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 01-20-05 01-20-05 01-20-05 01-20-05 01-24-05 01-24-05 01-24-05 01-24-05 01-24-05 01-25-05 01-25-05 01-25-05 01-25-05 01-25-05 01-26-05 01-26-05 01-26-06 01-28-05 01-28-05 01-28-05 01-28-05 01-28-05 01-28-05 02-01.-05 02-01-05 02-01-05 02-01-05 02-01-05 02-02-05 02-02-05 02-02-05 02-02-05 Building .Pads Casita # 1 E. to W. along Miles 5.0 BPC Casita # 2 E. to W. along Miles 5.0 BPG Casita # 3 E. to W. along Miles 5.0 BPG Casita # 4 E. to W. along Miles 5.0 BPG Lot H 3.0 BPC Lot H 3.0 BPG Lot H 3.0 BPG Lot H 3.0 BPG Lot H 3.0 BPG Hotel Pad NW Section Moisture Check Hotel Pad NW Section Moisture Check Hotel Pad NW Section Moisture Check Hotel Pad NW Section Moisture Check Hotel Pad NW Section Moisture Check Hotel Pad North West 5.0 BPG Hotel Pad North West 7.0 BPG Hotel Pad North West 5.0 BPG S. end along Storm Channcl N. 20,0 BPG S. end along Storm Channel S. 20.0 BPG S. end along Storm Channel N. 20.0 BPG S. end along Storm Channel S. 20.0 BPC S. end along Storm Channel N. 20.0 BPG S. end along Storm Channel S. 20.0 BPG- PCArea AreaNorth of Wash 18.0 BPG Area North of Wash 18.0 BPG Area North of Wash 16.0 SPG Area North of Wash 16.0 BPC Area North of Wash 16.0 BPG Casita # 5 Bottom 2.0 BPG Casita # 7 2.0 BPG Lot H South West Section 3.0 BPG Lot H South West Section 1.0 BPG 110.0 105.7 107.9 104.9 106.0 109.3 99.9 108.7 100.6 105.9 110.0 1.00.0 99.5 99,6 100.0 100.3 99.9 100.6 108.5 106.2 99.8 99.4 110.1 104A 110.0 104.3 110.2 7,8 5.4 8.7 5.0 12.1 8.2 4..8 10.1 7.1 1.6 9.8 5:3 4.1 3.3 8.2 11.7 6.3 18.7 10.6 17.6 9.8 18.2 10.2 11.7 13.8 23.8 18S 13.0 10.8 9.3 9.6 1.0.3 99 95 97 95 95 98 90 98 91. 95 99 90 90 90 90 90 90 91 98 96 90 90 99 94 99 94 99 DATE: November 1, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Center Pointe PROJECT NO: 522-3598 LOCATION: La Quinta; California REPORT NO: 06-07-755 Test No. Date Tested Location Elevation Dry Density % Moisture Relative Maximdm In Place In Place omvaetion Density 1.0 BPG Casita # 11 Building Pads Casita # 11 1.0 BPG Hotel Pad North East Section 4.0 BPC 33 02-03-05 North West Corner of Parcel # 5 3.0 BPG 107.2 5.9 97 111.0 34 02-03-05 North West Corner of. Parcel # 5 1.0 BPG 110.2 6.5 99 1.19..0 35 02-03-05 West Parking 3.0 BPG 102.3 4.2 92 111.0 36 02-03-05 West Parking 1.0 BPC 1.10.1 5.0 99 111.0 37 02-04-06 N. of Storm Channel 14.0 BPG 100.6 13.0 91 ;111.0 38 0249-05 N. of Storm Channel 14.0 BPG 104.9 9.6 95 111.0 39 02-04-05 N. of Storm Channel 14.0 BPG 105.3 15.7 95 111.0 40 02-04-05 N. of Storm Channel 14.0 BPG 99.9 14.5 90 111.0 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 'DATE: I 02-07-05 02-07-05 02-07-05 02-07-05 02-09-05 02-09-05 02-09-05 02-09-05 02-09-05 02-09-05 02-09-05 02-09-05 02-14-05 02-14-05 02-14-05 02-14-05 02-14-05 02-14-05 02-14-05 02-14-05 02-15-05 02-15-05 02-15-05 02-16-05 02-16-05 02-16-05 02-16-05 02-16-05 4ovember 1, 2 Casita # 9 3.0 BPG Casita # 9 1.0 BPG Casita # 11 3.0 BPG Casita # 11 1.0 BPG Hotel Pad North East Section 4.0 BPG Hotel Pad North East Section 2.0 BPG Hotel Pad South Section 3.0 BPC Hotel Pad South Section 1.0 BPG Casita Area South of Hotel 3.0 BPC Casita Area South of Hotel 1.0 BPG Hotel Pad North East Section 4.0 BPC Hotel Pad North East Section 2.0 BPG Casitas West to East N. of Hotel 3.0 BPG Casitas West to East N. of Hotel 1.0 BPG Casitas West to East N. of Hotel 3.0 BPG Casitas West to East N. of Hotel 1.0 BPG Casitas West to East N, of"Hotel 3.0 BPG Casitas West to East N. of Hotel 1.0 BPG Casitas West to East N. of Hotel 3.0 BPC Casitas West to East N. of Hotel 1.0 BPG Parcel # 5 Parcel # 5 Parcel 9 5 Hotel Pad Hotel Pad Hotel Pad Hotel Pad Hotel Pad 706 107.7 106.4 109.6 106.2 110.0 108.6 108.5 110.1 109.9 110.2 109.7 110.0 109.5 109.8 109.6 110.2 109.1 108.9 1.00.0 106.6 2.0 BPG 112.4 1.0 BPG 110.5 2.5 BPG 113.6 PG 104.3 PC 108.4 PG 109.6 PC 110.0 PG 108.8 9.2 7.1 10.7 9.4 7.5 7.9 9.5 7.6 8.4 9.8 7:2 6.1 9.7 9.4 8.9 8.9 7.7 6.5 7.2 7.2 97 96 99 96 99 98 98 99 99 99 99 99 99 99 99 99 98 98 90 96 7.1 . 95 118.0 8.3 94 118.0 7.5 96 118.0 10.7 94 111.0 11.7 98 111.0 9.7 99 111.0 9.3 99 111.0 10.6 98 111.0 Sladden Engineering PROJECT NAME: Center Pointe TEST RESULTS PROJECT NO: 522-3598 LOCATION: La Quinta, California REPORT NO: 06-07-755 Tcst No. I Date Tested Location Elevation I Dry Density % Moisture I Relative I Maximum In Place in Place Compaction Density Sladden Engineering Building Pads 69 02-16-05 Hotel Pad PG 108.9 11.2 98 111.0 70 02-16-05 Hotel Pad PG 103.8 8.3 94 111.0 71 02-16-05 Hotel Pad PG 105.1 1.0.1 95 111.0 72 02-16-05 -Hotel Pad PG 106.8 11.4 96 111.0 73 02-16-05 Hotel Pad PC 104.9 12.2 95 111.0 74 02-17-05 Parking .Area NW Storm Channel 14.0 BPG 110.0 10.7 99 111.0 75 02-17-05 Parking Area NW Storm Channel 14.0 BPG 101.9 5.4 92 111.0 76 02-17-05 Parking Area NW Storm Channel 1.4..0 BPG 100.7 6.0 91 111.0 77 02-17-05 Parking Area NW Storm Channel 14.0 BPG 103.0 8.2 93 111.0 78 02-17-05 Parking Area NW Storm Channel 10.0 BPG 1.05.0 8.1 95 111.0 79 02-17-05 Parking Area NW Storm Channel 8.0 BPG 1.01.1 8.8 91 111.0 80 02-17-05 Parking Area NW Storm Channel 6.0 BPG 1.01.4 9.1 91 111.0 81 02-24-05 N. of Wash S. end of Project E to W 10.0 B 106.6 7.5 96 111.0 82 02-24-05 N. of Wash S. end of Project E to W10.0 BPC 105.6 8.0 95 111.0 83 02-24-05 N. of Wash S. end of Project E to W10.0 B 103.5 8.0 93 111.0 84 02-24-05 N. of Wash S. end of Project E to W10.0 BFC 103.7 10.2 93 111.0 85 02-25-05 Casita # 1 PG 104.9 9.3 95 111.0 86 02-25-05 Casita # 1 PG 110.2 9.4 99 111.0 87 02-25-05 Casita # 2 PG 110.1 6.5 99 111.0 88 02-25-05 Casita # 2 PG 109.8 6.4 99 111.0 89 02-25-05 Casita # 3 PC 109.9 7.9 99 111.0 90 02-25-05 Casita # 3 PG 109.8 6.5 99 111.0 91 02-25-05 Casita Parking Area PG . 105.8 10.8 95 111.0 92 02-25-05 Casita Parking Area PC 109.6 7.8 99 111.0 93 02-25-05 Casita Parking Area PG 109.3 9.2 98 111.0 94 02-25-05 Casita Parking Area PG 109.9 8.4 99 111.0 95 02-25-05 South end North of Wash W to E 5.0 BPG 109.7 11.0 99 111.0 96 02-25-05 South end North of Wash W to E 5.0 BPG 107.1 10.7 97 111.0 97 02-25-05 South end North of Wash W to E 3.0 BPG 105.1 9.5 95 111.0 98 02-25-05 South end North of Wash W to E 2.0 BPG 105.0 9.8 95 111.0 99 02-25-05 South end North of Wash W to E 5.0 BPG 104.1 13.9 94 111.0 100 02-25-05 South end Next to Place W to E 3.0 BPG 100.2 10.3 90 111..0 101 03-01-05 Lot 9 Casita PC 107.1 9.7 97 111.0 102 03-01.-05 Lot 9 Casita PG 107.3 8.8 97 111.0 103 03-01-05 Lot 10 Casita PC= 109.6 9.0 99 111.0 104 03-01-05 Lot 10 Casita PC 109.8 9.5 99 111.0 105 03-01.-05 Lot 4 Casita PG 107.2 5.7 97, 111.0 106 03-01-05 Lot 4 Casita PG 110.1 5.3 99 111.0 DATE: November 1, 2006 Sladden Engineering TEST RESULTS PROJECT NAME: Center Pointe PROJECT NO: 522-3598 LOCATION: La Quinta, Califomia REPORT NO: 06-07-755 Test No. I Date Tested Location Elevation Dry Density % Moisture I Relative I Maximum In Place In Place Compaction - Density DATE: November 1, 2006 Sludden Engineering Building Pads 107 03-01-05 Lot 5 Casita PC 110.0 8,4 99 108 03-01-05 Lot 5 Casita PG 109.9 7.0 99 109 03-01-05 Lot 6 Casita PG 109,4 5.0 99 110 03-01-05 Lot 6 Casita PG 108.4 11.1 98 111 03-01-05 ' Lot 7 Cas! to PG 108.3 7.8 98 112 03-01-05 Lot 7 Casita PG 107.7 11.8 .98 113 03-01-05 Lot 8 Casita PG 105-5 13.5 95 114 03-01-05 Lot 8 Casita PG 106.1 81 96 115 03-02-05 Casita 11 FC 110.2 9.0 99 116 03-02-05 Casita 11 FG 108.9 12.2 98 117 03-02-05 Casita 14 FG 109.4 6.0 98 118 03-02-05 Casita 14 FG 108.6 5.5 98 119 03-02-05 Casita 16 FG 1.09.7 10.5 99 120 03-02-05 Casita 16 FG 109.4 8.9 99 121 03-02-05 Restaurant Pad 2.0 BPG 105.9 12.9 96 1.22 03-02-05 Restaurant Pad 4:0 BPG 106.2 9.1 96 123 03-02-05 Restaurant Pad 4.0 BPG 106.4 1.1..2 97 124 03-03-05 Casiia 1.8 PG 109.9 8.9 99 125 03-03-05 Casita 18 PG 109.4 7.3 99 126 03-03-05 Casita 19 PG 110.1 7.7 99 127 03-03-05 Casita 19 PG 109.5 7.7 99 128 03-03-05 Future Medical Area Surface 99.6 9.6 90 129 03-03-05 Future Medical Area Surface 104.2 6.6 94 130 03-03-05 Future Medical Area 2.0 BPG 105.4 12.2 95 131 03-03-05 Future Medical Area 2.0 BPG 104.0 9.7 94 132 03-03-05 Future Medical Area' 1.0 BPG 102.5 9.6 93 133 03-03-05 Future Medical Area 1.0 BPC 104.6 9.8 95 134 03-03-05 Future Medical Area 4,0 BPG 105.6 10.2 96 135 03-03-05 Future Medical Area 4.0 BPG 104.1. 8.4 94 136 03-07-05 Lot 12 Casita PG 109.2 6.5 98 137 03-07-05 Lot 12 Casita PG 106.6 7.4. 96 138 03-07-05 Lot 13 Casita PG 107.7 6.4 97 139 03-07-05 Lot 13 Casita PG 108.6 6.2 98 140 03-08-05 Restaurant Pad PG 109.6 6.2 99 1.41 03-08-05 Restaurant Pad PG 109.8 7.6 99 142 03-08-05 Parcel # 5 PG 107.8 11.1 96 143 03-08-05 Parcel # 5 PG 109.6 8.6 99 DATE: November 1, 2006 Sludden Engineering