Loading...
13523 (SFD) Revision 1 Title 24TITLE 24 REPORT FOR: Plan 1 Stephen Jones Project La Quinta, Ca. PROJECT DESIGNER: } Stephen Jones, Design & Construction Post Office Drawer 4656 Palm Desert, Ca. 92261 346-3366 REPORT PREPARED BY: Tim Scott BREEZE AIR CONDITIONING 75-145 ST CHARLES PLACE PALM DESERT, CA, 92260 ( 619) 346-0855 Job Number: Date: 6/2/1994 The COMPLY 24 computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential. Building Energy Efficiency Standards. This program developed by Gabel Dodd Associates (510) 428-0803. Table Of Contents for Title 24 Report ------------------------------------ r CoverPage........................................................... 1 `fable of Contents ................................................... 2 Form CF -1R Certificate of Compliance: Residential 3 Form MF -1R Mandatory Measures Checklist: Residential ................ b Form C -2R Computer Method Summary ........... 7 HVAC Zone & Space Loads Summary ..................................... 10 --------------------------------------------------------------------------- Project Name: Plan 1 ;Date: 6/2/1994 Address: Stephen Jones Project La Quinta, Ca. ;Building Permit No Designer: Stephen Jones, Design & Construction ;Checked by / Date Documentation: BREEZE AIR CONDITIONING ;COMPLY 24 User 3665 --------------------------------------------------------------------------- GENERAL INFORMATION Compliance Method: Climate Zone: Conditioned Floor Area.- Building rea:Building Type: Building Front Orientation: Number of Dwelling Units: Floor Construction Type: BUILDING SHELL INSULATION Component ----------------------- R-21 Wall (W.21.2x6.16) R-38 Roof( R .38 .2x 14 .16 ) Slab Perimeter w/R-O.O Slab Perimeter w/R-0.0" FENESTRATION Orient. Area Lel" t ( N ) 33.0 Bac k ( E ) 108.0 Bac k ( E ) 53.0 Right ( S ) 4.5 Front ( W ) 72.0 Skylight 15.8 U -Val Type 0.87 Double 0.87 Double 0.87 Double 0.72 Double 0.87 Double 0.52 Double COMPLY 24 version 4.11 15 1631 sqf t Single Fam Det 270 deg ( W ) 1 Slab on Grade U -Value Location/Comments ------- ------------------------------------ 0.059 Plan 1 0.028 Plan 1 0.900 Plan 1 0.720 Plan 1 Shading Devices Frame Interior Exterior OH SF Type --------------- --------------- -- -- ----- Light Blind Standard Bug Scr N N Metal Light Blind Standard Bug Scr N N Metal Light Blind Standard Bug Scr Y 'N Metai Light Blind none N- N Metal Light Blind Standard Bug Scr Y N Metal none none N N Metal THERMAL MASS Area Thick Type Covering (sf) (in) Location/Description ----------------------------- ----- ----- ------------------------------ Concrete, Heavyweight Exposed 655 3.50 Slab on Grade Concrete, Heavyweight Covered 958 3.50 Slab on Grade --------_ ---_ -_ -_ --------------------------------7------------------- PToject Name: Plan 1 ;Date 6/2/1994 Documentation: BREEZE ATR CONDITIONING ;COMPLY 24 User 3665 --------------------------------------------------------------------------- HVAC SYSTEMS Minimum Distrib,Type Duct TStat System Type Efficiency and Location RVal Type Location/Comments ------------------------------------- ---- ------ ------------ ----------- PackHtPump 6.850 HSPF Ducts in Attic 8.0 SetBck Plan 1 PackHtPump 11.050 SEER Ducts in Attic 8.0 SetBck Water No. Tank Ext. WATER HEATING SYSTEMS Heater in Energy Size Insui System Name Distribution Type Type Sys Factor (gal) R -Val ----------------------- ------------------ ------- --- ------ ----- ----- AO SMITH FSG -50 Standard StorGas 1 0.53 50.0 21.0 AFUE WATER HEATER EQUIPMENT DETAIL /Rec Rated Stdby Tank Pilot System Name System Type Eff Input Loss R -Val Light ----------------------- ----------- ---- ----- ----- ----- ----- AO SMITH FSG -50 DomesticHW 0.780 37000 0.035 0.0 0 SPECIAL FEATURES/REMARKS N COMPLIANCE STATEMENT This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 & 6 of the Califor- nia Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is varied is indicated in the Special Features/Remarks section DESIGNER or OWNER (Per Business & Professions Code) Stephen Jones, Design & Construction Post Office Drawer 4656 Palm Desert, Ca. 92261 346-3366 Lic #:- (signature) : (signature) ENFORCEMENT AGENCY Name: Title: Agency: Telephone: ( date ) DOCUMENTATION AUTHOR Tim Scott BREEZE AIR CONDITIONING 75-145 ST CHARLES PLACE PALM DESERT, CA 92260 ( 619 1 346-0855 (signature) (date) (signature/stamp) (date) --------------------------------------------------------------------------- Nroject Name: Plan 1 ;Date: 6/2/1994 Documentation: BREEZE ATR CONDITIONING � ;COMPLY 24 User 3665 ------------------------------------------ -------------------------------- NOTE: Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as binding minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES o Sec. 150(a): Minimum R-19 ceiling insulation. o Sec. 150(b): Loose fill insulation manufacturers labeled R -Value. o Sec. 150(c): Minimum R-13 wall insulation in framed walls (does not apply to exterior mass walls). * o Sec. 150(d): Minimum R-13 raised floor insulation in tramed floors; Minimum R-8 in concrete raised floors. * o Sec. 150(1): Slab edge insulation - water absorption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0 perm/inch. Enforcement o Sec. 118: Insulation specified or installed meets California Energy Commission quality standards. Indicate Type & form. o Sec. 116-117: Fenestration Products, Ext Doors & Infil/Exfil Controls a. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. b. Manufactured fenestration products have label w/certitied U -Value c. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. o Sec. 150(8): Vapor barriers mandatory in Climate Zones 14 and 16 only. o Sec. 150(t): Special infiltration barrier installed to comply with Sec. 151 meets Commission quality standards. o Sec. 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. -------_ -_ --------------------------------------------------------------- Project'Name: Plan 1 ;Date: 6/2/1994 Documentation: BREEZE AIR CONDITIONING ;COMPLY 24 User 3665 --------------------------------------------------------------------------- SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES Enforcement o Sec. 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission. o Sec. 150(i'): Setback thermostat on all applicable heating systems. o Sec. 150(j): Pipe and Tank Insulation 1. Indirect hot water tanks (eg unfired storage tanks or backup solar hot water tanks) have insulation blanket (R-12 or greater) or combined interior/exterior insulation (R-16 or greater). 2. First 5 feet of pipes closest to water heater tank, non -recirculation systems, insulated (R-4 or greater. 3. All buried or exposed piping insulated in recirculation sections of hot water system. 4. Cooling system piping below 55 F insulated. 5. Piping insulated between heating source and indirect hot water tank. o Sec. 150 m) Ducts and Fans * 1. Ducts constructed, installed and sealed to comply with UMC Sections 1002 and 1004; ducts insulated to a minimum R-4.2 or ducts enclosed entirely within conditioned space. 2. Exhaust systems have backdraft or automatic dampers. 3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible manually operated dampers. o Sec. 114:Pool and Spa Heating,Systems and Equipment 1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating and no pilot light. 2. System is instai'led with: a. At least 36" pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spas. 3. Pool system has directional inlets and a circulation pump time switch. o Sec. 115: Gas-fired central furnace, pool heater, spa heater or household cooking appliance have no continuously burning pilot light. (Exception: Non -electrical cooking appliance with pilot < 150 Btuh) LIGHTING MEASURES o Sec. 150�k): Lighting - 40 lumens/watt or greater for general lighting in kitchens and rooms with water closets; and recessed ceiling fixtures IC (insulation cover) approved. ---_ -- --- - - - -------------------------------------------------------- PT oject Name: Plan 1 ;Date: 6/2/1994 Documentation: BREEZE AIR CONDITIONING --------------------------------------------------------------------------- ;COMPLY 24 User 3665 Standard Proposed Compliance Source Energy Use (KBtu/sf-yr) ------------------------------ Design -------- Design -------- Margin Space Heating 4.59 3.99 ---------- 0.61 Space Cooling 31.51 31.95 -0.44 Domestic Hot Water 13.43 13.18 0.25 TOTALS 49.53 49.11 0.42 *** BUILDING COMPLIES *** GENERAL INFORMATION Compliance Method: Climate Zone: Conditioned Floor Area: Building Type: Building Front Orientation: Number of Dwelling Units: Number of Stories: Floor Construction Type: Total Conditioned Volume: Conditioned Footprint Area: Ground Floor Area: COMPLY 24 version 4.11 15 1631 sgft Single Fam Det 270 deg ( W ) 1 1 Slab on Grade 14679 cuf t 1613 sqf t 1613 sqf t BUILDING ZONE INFORMAT'I'ON Floor # of Vent Zone Name Area Volume Units Zone Type TStat Type Hgt Area ----------------------- ----- ------ -------------------------- --- ---- Plan 1 1631 14679 1.00 Conditioned Setback 2 n/a OPAQUE SURFACES Act Type Area U -Val Azm. ---- ---- ----- --- ZONE:NAME = Plan 1 Wall 355 0.059 180 Wail 368 0.059 270 Wall 279 0.059 90 Wall 349 0.059 0 Root 1597 0.028 0, Solar Tilt Gains Form 3 Reference Location/Comments ---- ----- ----------------------- -------------------- 90 Yes R-21 Wall ( W .21 .2x6.16) Plan 1 90 Yes R-21 Wall ( W .21 .2x6 .16) Plan 1 90 Yes R-21 Wall ( W .21 .2x6 .16) Plan 1 90 Yes R-21 Wall ( W .21 .2x6 .16) Plan 1 22 Yes R-38 Roof(R.38.2xl4.16) Plan 1 --------------------------------------------------------------------------- K oject Mame: Plan 1 ;Date: 6/2/1994 Documentation: --------------------------------------------------------------------------- BREEZE AIR CONDITIONING ;COMPLY 24 User 3665 PERIMETER LOSSES Type Length --------- ------ ZONE NAME = Plan 1 Exposed 99.0 Covered 105.0 FENESTRATION SURFACES # Type `LONE NAME = Plan I Wow Right ( S ) 2 Wow Right ( S ) 3 Wow Front ( W ) 4 Wow Back ( E ) 5 Wow back ( E ) 6 Wow Back ( E ) 7 Wow Back ( E ) 8 Wow Left ( N ) 9 Wow Left ( N ) 10 Wow Lent ( N ) 11 Sky Lett ( N ) F2 Insulation Factor R -Val Depth Location/Comments ------ ----- ----- --------- -------------- 0.90 0.0 0 in Plan 1 '0.72 0.0 0 in Plan 1 Area Frame Div U -Val ----- ----- --- ----- 1 SC Act Glass Azm Tilt Only Location/Comments --- ---- ----- --------------------- 2.3 Metal No 0.72 180 90 0.88 Plan 1 2.3 Metal. No 0.72 180 90 0.88 Plan 1 72.0 Metal No 0.87 270 90 0.88 Plan 1 72.0 Metal No 0.87 90 90 0.88 Plan 1 18.0 Metal No 0.87 90 90 0.88 Plan 1 18.0 Metal No 0.87 90 90 0.88 Plan 1 53.0 Metal No 0.87 90 90 0.88 Plan 1 18.0 Metal No 0.87 0 90 0.88 Plan 1 3.0 Metal No 0.87 0 90 0.88 Plan 1 12.0 Metal No 0.87 0 90 0.88 Plan 1 15.8 Metal No 0.52 0 0 0.55 Plan 1 INTERIOR & EXTERIOR SHADING # Type Interior Shade Type -- ---- ----------------------- 1 Wow, Light Blind 2 Wow Light Blind 3 Wow Light Blind 4 Wow Light Blind 5 Wow Light Blind 6 Wow Light Blind 7 Wow Light Blind 8 Wow Light Blind 9 Wow Light Blind 10 Wow Light Blind 11 Sky None SC Exterior Shade Type SC 0.58 None 1.00 0.58 None 1.00 0.58 Standard Bug Screen 0.87 0.58 Standard Bug Screen 0.87 0.58 Standard Bug Screen 0.87 0.58 Standard Bug Screen 0.87' 0.58 Standard Bug Screen 0.87 0.58 Standard Bug Screen 0.87 0.58 Standard Bug Screen 0.87 0.58 Standard Bug Screen 0.87 1.00 None 1.00 ---------- --------------------------------------------------------------- Project Name= Plan 1 ;Date: 6/2/1994 Documentation: ---------------------------------------------------------------------------- BREEZE AIR CONDITIONING ;COMPLY 24 User 3665 OVERHANGS/SIDE FINS --Window-- # Type Ht Wd _- ---_ _--- ___- 3 Wdw 8.0 9.0 7 Wdw 6.7 8.0 ----- overhang -----_ Len Ht LExt RExt ---- ---- ---- ---- 6.0 0.1 6.0 6.0 4.0 0.1 4.0 4.0 ---Left Fin--- ---Right Fin -- Dist Len Ht Dist -Len Ht --------- ---- ---_ __-- __-- THERMAL MASS Area Thick Heat Inside Location Type ( sf) (in) Cap Cond Form 3 Reference R -Val . Comments ------------- ---- ----- ----- --------------------------- ------ -------- ZONE NAME = Plan 1 Exposed Slab 655 3.50 28 0.98 n/a 0 Covered Slab 958 3.50 28 0.98 n/a 2 HVAC SYSTEMS Minimum Distrib Type Duct TStat System type Efficiency and Location RVal Type Location/Comments ------------------------------------- ---- ------ ----------------------- PackHtPump 6.850 HSPF Ducts in Attic 8.0 SetBcK Plan 1 PacKHtWump 11.050 SEER Ducts in Attic 8.0 SetBck Water No. Tank Ext. WATER HEATING SYSTEMS Heater in- Energy Size insui System Name Distribution Type Type Sys Factor (gal) R -Val ----------------------- ------------------ ------- --- ------ ----- --_-- AO SMITH FSG -50 Standard StorGas 1 0.53 50.0 21.0 AFUE WATER HEATER EQUIPMENT DETAIL /Rec Rated Stdby Tank Pilot System Name System Type Eff Input Loss R -Val Light ----------------------- ----------- _--- ----- ----- ----- ----- AO SMITH FSG -50 DomesticHW 0.780 37000 0.035 0.0 0 SPECIAL FEATURES/REMARKS -- ------------------------- -------------------------------------------------------------- Aojec wroject Name: Plan - ---------------------------------------- 1 ;Date: ------------ 6/2/1994 . Documentatio n -------------------------------------------------------------------------- .BREEZE AIR CONDITIONING i ;COMPLY 24 User 3665 HVAC ZONE DESCRIPTION HVAC Gone Name: Heating System Name: Cooling System Name: System Multiplier: Fan Schedule: Peak Load Method: Relative Humidity: SPACES 1N THIS ZONE PEAK ----------------------- ---- Plan 1 ( Jan 12am ) TOTAL SPACE LOAD Duct Gains & Losses: Ventilation ( 0 CFM) Return Air Lighting Gain TOTAL SYSTEM LOAD SYSTEM OUTPUT AT DESIGN CONDITIONS Plan 1 Lennox CHP20-b5i 1 Ali On Load Calcs COINCIDENT 50 COOLING HEATING PEAK SENSIBLE LATENT ------- ------------- ------ 34394 (Aug 2pm) 34758 -3163 34394 34758 -3163 3439 3476 0 0 U 0 37833 38234 -3163 45351 45506 5558 NO0 The TOTAL SYSTEM LOAD shown represents the minimum size equipment which will heat or cool this zone during the design conditions indicated. These numbers include no'safety factor, and the HVAC contractor should oversize by a reasonable margin to account for variations in weather conditions and the pick-up capacity required to bring the zone to temper- ature as a result of a setback thermostat. Those responsible for final equipment selection should note that Sensible and Latent Cooling Loads are indicated to allow for accurate comparison with manufacturer's output data. J --------------------------------------------------------------------------- Nroject Name: Plan.1 ;Date: 6/2/1994 Documentation: BREEZE ATR CONDITIONING ;COMPLY 24 User 3665 7 -------------------------------------------------------------------- Space Name : Plan 1 Design indoor Dry Bulb Temperature: Design Outdoor Winter Dry Bulb Temperature: Design l emperature Difference: Conduction R-21 Wail ( W .21 .2x6 .16 ) Double Clear Default(R ) Double Clear Default(R ) Double Clear Default(R ) Double Clear Default(R ) Double Clear Default(R ) Double White Trans R-38 Root(R .38 :2x14 .16 ) Slab on Grade Slab on Grade Infiltration: 1.00 x 0.018 x Heating AirFlow u 72 F 31 F 41 F 34394 Btu/hr / L1.07 x 33 F DeltaT)j = 974 cfm Area ------ U -Value ------- TD Btu/hr 1350.5 x 0.0592 x ---- 41.0 ------ - 3278 33.0 x 0.8700 x 41.0 = 1177 108.0 x 0.8700 x 41.0 - 3852 53.0 x 0.8700 x 41.0 = 1891 4.5 x 0.7200 x 41.0 - 133 72.0 x 0.8700 x 41.0 - 2568 15.8 x 0.5200 x 41.0 - 336 1597.2 x 0.0283 x 41.0 = 1856 Perim = 99.0 x 42 = 4158 Perim = 105.0 x 42 = 4410 1631 sf x 9.0 ft x 1.00 AC x 41.0 = 10734 TOTAL HOURLY HEAT LOSS FOR SPACE 34394 34394 Btu/hr / L1.07 x 33 F DeltaT)j = 974 cfm --------------------------------------------------------------------------- .Project Name: Plan 1 Area Heat Gain ;Date: 6/2/1994 Btu/hr Documentation: ------------------------ BREEZE AIR CONDITIONING -------------------------------------------------- ;COMPLY 24 User 3665 Space Name: Occupants 1.00 x 1631.0 x 225 / Plan 1 - 1102 Design Indoor Dry Bulb Temperature: x 1.00 AC x-14.9 76 F Design Outdoor Summer Dry Bulb Temperature: 113 F Design Temperature Difference: 37 F Conduction ----------------------- Area ------ U -Value DETD Btu/hr R-21 Wall ( W .21 .2x6 .16 ) 1350.5 ------- x 0.0592 x ---- ------ 32.6 - 2607 Double Clean Default(R) 33.0 x 0.8700 x 37.0 = 1062 Double Clear Default(R) 108.0 x 0.8700 x 37.0 = 3477 trouble Clear Default(R) 53.0 x 0.8700 x 37.0 = 1706 Double Clear Default(R) 4.5 x 0.7200 x 37.0 = 120 Double Clear Default(R) 72.0 x 0.8700 x 37.0 - 2318 Double White Trans 15:8 x 0.5200 x 37.0 = 303 R-38 Roof(R.38.2x14.16) 1597.2 x 0.0283 x 53.0 = 2400 Intiltration: 1.00 x 0.018 x 1631 sf x 9.0 ft x 1.00 AC x 37.0 = 9687 Shaded Unshaded Solar Gain ----------------------- Orient. --------- Area SGF Area SGF Sc Double Clear Default(R) South ---- --- L 0.0 x 15 ---- --- + 2.3 x 32J ---- x 0.51 = 36 Double Clear Default(R) South L 0.0 x 15 + 2.3 x 32j x 0.51 = 36 Double Clear Default(R) West L 42.3 x 15 + 29.7 x 73J x 0.49 = 1373 Double Clear Default(R) East 0.0 x 15 + .72 .0 x 73i x 0.49 = 2575 Double Clear Default(R) East L 0.0 x 15 + 18.0 x 73,J x 0.49 = 644 Double Clear Default(R) East L 0.0 x 15 + 18.0 x 73J x 0.49 = 644 Double Clear Default(R) East 24.6 x'15 + 28.4 x 731 x 0.49 = 1195 Double Clear Default(R) North [ 0.0 x 15 + 18.0 x 15.J x 0.49 = 132 Double Clear Default(R) North 0.0 x 15 + 3.0 x 15J x 0.49.= 22 Double Clear Default(R) North 0.0 x 15.+ 12.0 x 15J x 0.49 = 88 Double White Trans Skylight 0.0 x 15 + 15.8 x152) x 0.50 = 1186 Internal Gain -------------------- Op Frac. -------- -------- Area Heat Gain Conv. Lighting 1.00 ------ x 1631.0 --------- x 0.200 x ----- 3.413 - 1113 Equipment 1.00 x 1631.0 x 0.100 x 3.413 = 557 Occupants 1.00 x 1631.0 x 225 / 333 - 1102 TOTAL HOURLY SENSIBLE HEAT GAIN FOR SPACE 34758 Latent Gain --------------------=-- Op Frac. -------- Area Heat Gain Conv. Btu/hr Equipment- 1.00 x ------ 1631.0 x --------- 0.000 x ----- 3.413 ------ = 0 Occupants 1.00 x 1631.0 x 225 / 333 - 1102 Infiltration: 1.00 x 0.018 x 1631 sf x 9.0 ft x 1.00 AC x-14.9 - -3912 TOTAL HOURLY LATENT HEAT GAIN FOR SPACE -3163 Cooling AirFlow: 34758 Btu/hr / [1.07 x 21 F DeltaT)J = 1547 cfm