Loading...
No Permit No (SPIN)1 xavier urbina 11 93,marbella ct.. November 16, 2005 Lench Design Group P.O. Box 450 La Quinta, CA .92247 Re: Tucson II architect grover g�D ARCy Na C-13353 N9�9FN,` oy �Q. Dear Skip, The following discrepancies were observed during the field visit on Sunday past. Please see that they are corrected for the final inspection by the city inspector. The city inspector may perform the follow-up inspection and approve the installation. Please send photographs of the completed work. 1. Provide 6 x 6 posts at Great Room patio cover. 2. Top bolt for tube section to top plate was installed at excessive angle. Reposition and provide a positive connection. 3. Install anchor bolts instead of shot -pins at numerous locations throughout project for all bearing walls where anchor bolts are missing. Install epoxy anchors of same diameter and 7-1/2" long. Epoxy anchor bored holes must be blown free of all dust and debris and wiped with damp cloth for the full depth in concrete. Locations: A. Bedroom #3/Garage wall B. Garage rear wall C. Bedroom #2 rear wall D. Great Room/Master Bedroom shear wall E. Great Room outside angled wall F. At all mudsill joints within 9" of break 4. Provide corner posts at Bedroom #3 patio columns. 5. Provide nuts at holddowns in Bedroom #2. 6. Reposition anchor bolts at Garaage/Kitchen common wall. Bolts too close to the edge of the mudsill. 7. "LST20" straps missing at rear wall of garage. Install per enclosed detail. 8. Provide steel protective plates at all pipe penetrations through studs or plates. 9. Provide "A35" anchors a truss to shear wall in Kitchen. 10. Provide `X' bracing at Great Room/ Master Bedroom shear wall. 11. Verify that all "A35" anchors are installed at all locations for truss to top plate connections at bearing walls. 12. Bolt spacing for detail 6/- on sheet 7 should be 24" o.c. 13. Cover all patio columns with 3/8" plywood all four sides. 14. "SW" strong wall anchor bolts too short in Master Bedroom/Great Room shear wall. Please extend anchor bolts as required by manufacturer. 15. Tighten holddown nuts in Master Bedroom/Master Bath shear wall. 16. Provide "A35" anchors truss to strong wall in Den (outside wall). 17. Provide longer bolts at tube section top plate tabs in Master Bedroom. Please see that the discrepancies are corrected. Please feel free to call if you have any questions. , 4pectfully Z,' 1 �avier urbina xavier urbina architect 1193 marbella ct.. grover beach, calif. 93433 (805) 704-0768 11/23/2005 10:34 7148796419 SIMPSON STRONG—TIE PAGE 01/03 260 N. Palm St., Brea, CA 92921 800 999-5099 www.strangde.com 1 bhcycr@strongde.com _ 714 738-2023 telephone 714 879-6419 fax To: Ish @ Coronel Construction From: Bill Heyer Fax: (760)564-4202 Date: November 23, 2005 Phone: (760)564-4604 Pages: 3 total Re: Simpson Strong -wall Anchorage with SET Epoxy CC: Calle Ensenada Project — La Quinta. CA Notes: 11/23/2005 10:34 7148796419 SIMPSON STRONG -TIE PAGE 02/03 SIMPSON STRONG -TIED COMPANY, INC. 77te World's "No Equal " Structural Connector Company 4120 Dublin Blvd. #400 . Dublin, California 94568 Phone; 800-999-8099 November 23, 2005 Coronel Construction Phone: (760)564-4604 Fax: (760)564-4202 Attn: Ish Re: 77-415 Calle Ensenada La Quinta, CA Dear Ish, Simpson Strong -Tic SET high strength epoxy may be used with the appropriate threaded rods as an alternative to cast -in-place anchors or., as required, for field repairs due to misplaced or, omitted anchor bolts. Anchors shall be installed in accordance with the following requirements: • Existing concrete strength shall be 2000 psi or greater. The concrete capacity of the existing concrete foundation/stemwall/eurbs shall be as analyzed and approved by the Engineer of Record. Where applies, guidelines shall be established, by the Engineer of Record, to avoid drilling near post -tensioned cables. • If the Strong -Wall is in place to remain, then slight overdrilling of the 5/8" anchor bolt holes will be required .for installation of the shear anchors. This oversized mudsill hole shall be filled with epoxy after the final position of the wall is set. Epoxy f 11 of the mudsill shall not apply around the 7/8" diameter holdown epoxy anchors. • For the mudsill bolts. drill a 3/4" diameter hole(oversizing existing hole to 13/16' maximum is acceptable). Cut the existing 5/8" anchor bolt flush to the top of the Strong -Wall sill plate and install a 5/8" diameter A36 threaded rod with 8" minimum concrete embedment, 13/4" minimum edge distance, 7 1/2" minimum end distance, and a minimum projection of 4" above the concrete. Re -install the Strong -Wall bearing plate with SDS screws after epoxy has cured. Epoxy capacities are as shown in ICBO ER -5279. Special Inspection may be required in accordance with the local building code. Sincerely, SIMPSON STRONG -TIE CO., INC. W-6 -a /A�;Ok Hill Heyer Strong -Wall Support 11/23/2005 10:34 7148796419 SIMPSON STRONG -TIE PAGE 03/03 • SIMPSON STRONG -TIE® COMPANY, INC. 776, Warld's "Nn Equal" Srruruval Conneclor Company 4120 Dublin Blvd. #400 . Dublin, Califomia 94566 Phone: 800-999-5099 • November 23, 2005 Coronel Construction Phone: (760)5644604 Fax: (760)564-4202 Attn: Ish Re: 52-690 Calle Ensenada La Quinta, CA Dear Ish, Simpson Strong -Tie SET high strength epoxy may be used with the appropriate threaded rods as an alternative to cast -in-place anchors or, as required, for field repairs due to misplaced or omitted anchor bolts. Anchors shall be installed in accordance with the following requirements: • Existing concrete strength shall be 2000 psi or greater. The concrete capacity of the existing concrete foundation/stemwall/curbs shall be as analyzed and approved by the Engineer of Record. Where applies, guidelines shall be established, by the Engineer of Record, to avoid drilling near post -tensioned cables. If the Strong -Wall is not in place, then the corresponding Simpson Strong -Tie template should be used to ensure the anchors are installed vertically plumb and at the correct locations. If the Strong -Wall is in place to remain, then slight overdrilling of the 5/8" anchor bolt holes will be required for installation of the shear anchors. This oversized mudsill hole shall be gilled with epoxy after the final position of the wall is set. if the holdown anchors need to be installed then one-time removal & reattachment of the pre -attached holdowns is permitted for installation accessibility. Epoxy fill of the mudsill shall not apply around the 7/8" diameter holdown epoxy anchors. Angled installation of the epoxy anchors with the use of a bent bolt is also not permitted. • For the holdown bolts, drill a 1" diameter hole and install a 7/8" diameter A36 threaded rod with 15" minimum concrete embedment into the footing. The 15" minimum embedment shall be into. a minimum 8" thick stem wall except for the SWI 6 & SW22 portal walls may be epoxied into a 6 -inch thick stem. The 7/8" diameter epoxy bolts shall have 13/4" minimum concrete edge distance, 5" minimum concrete end distance, and a minimum projection of 5 inches above the concrete. • For the mudsill bolts, drill a 3/4" diameter hole and install a 5/8" diameter A36 threaded ,rod with 5" minimum concrete embedment, 1 3/4" minimum edge distance, 7 1/2" minimum end distance, and a minimum projection of 4" above the concrete. Epoxy capacities are as shown in ICBG ER -5279. Special Inspection may be required in accordance with the local building code. Sincerely, SIMPSON STRONG -TIE CO., INC. TANDY'S INSPECTION SERVICES, INC. PO BOX 13766 - PALM DESERT, CA 92255-3766 OFFICE / FAX- 951 .769.9717 PAGER 760.776.3339 SPECIAL INSPECTION DAILY / WEEKLY REPORT TYPE OF INSPECTION PERFORMED ,E"xv Amokays PERMIT NUMBER TYPE OF STRUCTURE lsf-. Res. DATE PROJECT ADDRESS (INCLUDE STREET ADDRESS AND CITY OR COUNTY) 77-14S Co./le EK$emdJ L a Ou i t�Cto, , Co - PROJECT NAME (INCLUDE COUNTRY CLUSIBUSINESS PARIUCORPORATE CENTER. ECT. NAME) ReSi rcemCe ARCHITECT ` Xav;t--v a b4i-a ENGINEER GENERAL CONTRACTOR SUB CONTRACTOR DESCRIPTION OF WORK INSPECTED &onxv aH&I.."✓ iA"ta//an-on ��v a- siw)pSCIX StVOM4 W,5-Y.v4 Mo.ste e br-jy om 4-tiol .ICA sii ll bA1ts a --f lb a 5 o.eld vPsse � by 1� QY d«�d 11/16,40 9, A 1 i * x gk pr s ;>t t* r1 2- Lw d -a 11 D eY o-rdl i tco-,l s Je-ol A— � O ebA S o -ESA u .Si jo p-:54 k �E7Z -7 l-0AQ-F-RaP s- Z 79 ExP,JaA5� ev/ 7 WELDING INFORMATION WELDERS NAME" CERTIFYING AGENCY NAME AND NUMBER PROCESS AND ELECTRODE SAMPLE INFORMATION TIME SUPPLIER TICKET NUMBER MIX NUMBER AIR TEMP SAMPLE SLUMP WATER TIME IN TEMP ADDED MIXER d ' LOCATION TAKEN: LOCATION TAKEN: I HEREBY CERTIFY THAT I HAVE INSPECTED ALL OF THE'ABOVE REPORTED WORK, UNLESS OTHERWISE NOTED. AND TO THE BEST OF MY ABILITY I HAVE FOUND THIS WORK TO COMPLY WITH THE APPROVED PLANS. SPECIFICATIONS & pAPPLICABLE BUILDING LAWS. 6zINSPECTORS5SIGNATURE INSPECTORS CERTIFICATION AGENCY AND NUMBER