BRES2017-0192 Title 24er
I BUILDING ENERGY ANALYSIS REPORT I
r
PROJECT:
Hicks.Residence
80957 Via Pessaro - The Hideaway
La Quinta, CA 92253
Project Designer:
Broc,k)...'Pay.tort,. Inc.
8391 Beverly Blvd., Suite 482
Los Angeles, CA 90048
>. ((310) 720-6589-
Report Prepared by:
Tim Scott
Scott Design and Title 24, Inc,
74-818 Velie Way, Suite #8
Palm Desert, CA 92260
(760) 200-4780
Job Number:
Date:
11/14/2017
QWU0`
CITY OF LA QUINTA
BUILDING & SAFETY DEPT
w APPROVED
FOR CONSTRUCTION
DATE`< 1: .ram Y-4---
S50W 7 •eig 2.
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2016 Building Energy Efficiency Standards:
This program developed by.;EnergySoft;Software=www.energysoft.com.
CERTI*E OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE OD
Project ame: Hicks Residence C culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.dbdl6x
CRF-01
Papel of 13
GENERAL INFORMATION
01
Project Name
Hicks Residence
02
Calculation Description
Title 24 Analysis
03
Project Location
80957 Via Pessaro - The Hideaway
04
City
La Quinta
05
Standards Version
Compliance 2017
06
Zip Code
92253
07
Compliance Manager Version
BEMCmpMgr 2016.3.0 (934 SP1)
08
Climate Zone
CZ15
09
Software Version
EnergyPro 7.2
10
Building Type
Single Family
11
Front Orientation (deg/Cardinal)
0
12
Project Scope
Newly Constructed
13
Number of Dwelling Units
1
14
Total Cond. Floor Area (ft2)
7262
15
Number of Zones
4
16
Slab Area (ft2)
7262
17
Number of Stories
1
18
Addition Cond. Floor Area(ft2)
n/a
19
Natural Gas Available
Yes
20
Addition Slab Area,(ft2)
n/a
21
Glazing" Percentage (%)
40.7%
COMPLIANCE RESULTS`.
01
Building Complies with,Compyte
,r,Performance..°r..
02
This building incorporates feafureskthat.require fieldiesting�,and/ortverificat o by a41cerefie&HERS 'Fater underftt'he supervision of a CEC-approved HERS provider.
03
This building incorporates one ?rmore Specla Fea ureAhow below. M- M W U W V
ENERGY USE SUMMARY
04
05
06
07
08
Energy Use (kTDV/ft2-yr)
Standard Design
Proposed Design
Compliance Margin
Percent Improvement
Space Heating
2.20
7.19
-4.99
-226.8%
Space Cooling
78.43
78.48
-0.05.
-0.1 %
IAQ Ventilation
0.70
0.70
0.00
0.0%
Water Heating
1.96
8.79
-6.83
-348.5%
Photovoltaic Offset
—
-13.58
13.58
—
Compliance Energy Total .
83.29
81.68
1.71
2.1%
Registration Number: 217-Po10256607C-000-000-0000000-0000 Registration Dateffime: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTI f E OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE OD
Project ame: Hicks Residence Ca culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.ribdl6x
CRF-01
Pa e2of13
ENERGY DESIGN RATING
Energy Design Rating (EDR) is an alternate way to express the energy performance of a building using a scoring system where 100 represents the energy performance of the Residential
Energy Services (RESNET) reference home characterization of the 2006 International Energy Conservation Code (IECC) with California modeling assumptions. A score of zero represents
the energy performance of a building that combines high levels of energy efficiency with renewable generation to"zero out" its TDV energy. Because EDR includes consideration of
components not regulated by Title 24, Part 6 (such as domestic appliances and consumer electronics), it is not used to show compliance with Part 6 but may instead be used by local
jurisdictions pursuing local ordinances under Title 24, Part 11 (CALGreen).
As a Standard Design building under the 2016 Building Energy Efficiency Standards is significantly more efficient than the baseline EDR building, the EDR of the Standard Design building
is provided for Information. Similarly, the EDR score of the Proposed Design is provided separately from the EDR value of installed PV so that the effects of efficiency and renewable
energy can both be seen
EDR of Standard Efficiency
EDR of Proposed Efficiency
EDR Value of Proposed PV + Battery
Final Proposed EDR
47.2
52.9
11.3
41.6
❑
Design meets Tier 1 requirement of 15% or greater code compliance margin (CALGreen A4.203.1.2.1) and QII verification prerequisite.
❑
Design meets Tier 2 requirement of 30% or greater code compliance margin (CALGreen A4.203.1.2.2) and QII verification prerequisite.
❑
Design meets Zero Net Energy (ZNE) Design Designation requirement for Single Family in climate zone CZ15 (Palm Springs) (CALGreen A4.203.1.2.3) including on -site
photovoltaic (PV) renewable energy'generation sufficient to achieve a Final Energy Design Rating (EDR) of zero or less. The PV System must be verified.
Notes:;` `V_
• Excess PV Generation EDR Credit: Bypass !riPV size limit may violate Net Energy Metering NEM rules.:
ENERGY DESIGN RATING PV SYSTEM INPUTS- DETAILED,,,..
DC System Size (kWdc)
Mod e y e
CFI
Xd (d
Tfiittlnput
Array. Angle (deg)
Ttt'
in 12)e.
Inverter Eff. (%)
.
@
- ` 3s
I K ?a
(x .
4.5 :.
; . r' S' Standard
EIX
0 11a
1. L180
U deg V "k10
22.0
4.8
96
REQUIRED SPECIAL FEATURES 'Fi t-1 K 'LJ.. �V I L.Y t: K
The following are features that must be installed as condition for meeting the modeled energy performance for this computer analysis.
• PV System: 4.5 kWdc
• Cool roof
• Window overhangs and/or fins
Registration Number: P17-Po10256607C-000-000-0000000-0000 Registration Date/Time: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55 .
CERTI'VE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE COD
Project ame: Hicks Residence Ca culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.ribdl6x
HERS FEATURE SUMMARY
CF&RF-01
Page 3 of 13
The following is a summary of the features that must be field -verified by a certified HERS Rater as a condition for meeting the modeled energy performance for this computer analysis. Additional detail is
provided in the building components tables below.
Building -level Verifications:
High quality insulation installation (QII)
• IAQ mechanical ventilation
Cooling System Verifications: .
• Minimum Airflow
• Verified EER
• Verified SEER
• Verified Refrigerant Charge
• Fan Efficacy Watts/CFM
HVAC Distribution System Verifications:
Duct Sealing
Low -leakage Air Handling. Unit
Domestic Hot Water System Verifications:
. _ None -
BUILDING - FEATURES INFORMATION
01�
.""' 02�.'+�04""`03
04
OS
06 '
07
Project Name
-"'-'
Conditioned Floor Area (ft2)
aRt
Number of Dwellii7
b g
Units
es-o. wt
"Number of Bedrooms.
%ra..._i b �f •f-,a. lad
'_
Numberof2ones
\ i'.-I. f; ui «
Number of Ventilation
Cooling Systems
Number of Water
Heating Systems
Hicks Residence
}i7262 ?1
_Jt
4
0
1
ZONE INFORMATION` .— H E R. S PROVIDER
01
02
03
04
05
06 • .
07
Zone Name
Zone Type
HVAC System Name
Zone Floor Area
(ft2)
Avg. Ceiling
Height
Water Heating System 1
Water Heating System 2
Master Bdrm Zone
Conditioned
HVAC-Masterl
1467
11.8
DHW Sys.1
n/a
Great/Kit/Lou./Off Zone
Conditioned
HVAC-Living2
4443
11.8
DHW Sys 1
n/a
Casita Zone
Conditioned
HVAC-Casita3
967
11.8
DHW Sys 1
n/a
Bdrn 1 Zone
Conditioned
HVAC-Casita3
385
11.8
DHW Sys 1
n/a
Registration Number: 217-PO10256607C-000-000-0000000-0000 Registration DateMme: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTIf�E OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE OD
Project ame: Hicks Residence Ca culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis
Input File Name: Hicks Res-Payton-17.ribdl6x
CF�RF-01 -
Pa e4of13
OPAQUE SURFACES
01
02
03
04
05
06
07
08
Name
Zone
Construction
Azimuth
Orientation
Gross Area (ftZ)
Wndow & Door Area (ftZ)
Tilt (deg)
N Wall
Master Bdrm Zone
R-21 Wall
0
Front
30
0
90
S Wall
Master Bdrm Zone
R-21 Wall
180
Back
368
186.399
90
W Wall
Master Bdrm Zone
R-21 Wall
270
Right
616
71.5781
90
Interior Surface
Master Bdrm
Zone»GreaUKiULou./Off Zone
R-0 Interior Surface
n/a
n/a
272
0
n/a
Interior Surface 2
Master Bdrm Zone
R-0 Interior Surface
n/a
n/a
286
0
n/a
Interior Surface 3
Master Bdrm Zone»Casita Zone
R-0 Interior Surface
n/a
n/a
190
0
n/a
Roof
Master Bdrm Zone
R-38 Roof W/R-13 :
n/a
n/a.
1207
n/a
n/a
N Wall 2
Great/Kit/Lou./Off Zone
R-21 Wall
0
Front
1408
465.7
90
E Wall
GreaUKiULou./Off Zone
R-21 Wall
90
Left :
1415
339.13
90
S Wall 2
GreaUKiULou./Off Zone
R-21 Wall
180
Back,
1554
846.3
90
W Wall 2
GreatKit/ ou./Off Zone
"'"-- R-21 Wall
270
Right:
943
510.2
90
interior Surface 4
GreaUKiULou./Off Zone Masts
�' BdmrZone`
--
R-0 Intenor Surface
n/a
n/a '
272
0
n/a
Interior Surface 5
' / GreaUKifLou:%Off Zone t
R-0 Inteerrior�Surfa�c�.e
n%a� tr
a n/al `%
,a a 286
0
n/a
Roof 2
: GreaUKiULou:/�O`ff Zone 1U� j
I: CR-3%Roof W/R ;13 0€
+Na,"i
n/a, : A
3320
n/a
n/a
N Wall 3
Casita Zone
W R-21 Wall
0 -
y.� Front :�
550
41
90
E Wall 2
Casita Zone
R-21 Wall
90
Left _
320
205.2
90
S Wall 3
Casita Zone
R-21 Wall
235
- specify -
170
33.3
90
W Wall 3
Casita Zone
R-21 Wall
270
Right
.350
92.6
90
Interior Surface 6
Casita Zone»Master Bdrm Zone
R-0 Interior Surface
n/a
n/a
190
0
n/a
Interior Surface 7
Casita Zone>>Bdrm 1 Zone
R-0 Interior Surface
n/a
n/a
90
0
n/a
Roof 3
Casita Zone
R-38 Roof W/R-13
n/a
n/a
862
n/a
n/a
E Wall 3
Bdrm 1 Zone
R-21 Wall
90
Left
253
174.2
90
Interior Surface 8
Bdrm 1 Zone»Great/Kit/Lou./Off
Zone
R-0 Interior Surface
n/a
n/a
286
0
n/a
Interior Surface 9
Bdrm 1 Zone»Master Bdrm Zone
R-0 Interior Surface
n/a
n/a
286
0
n/a
Interior Surface 10
Bdrm 1 Zone»Casita Zone
R-0 Interior Surface
n/a
n/a
90
0
n/a
Roof 4
Bdr n 1 Zone
R-38 Roof W/R-13
n/a
n/a
385
n/a
n/a
Registration Number: 217-P010256607C-000-000-0000000-0000 Registration Dateffime: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTIqkE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE OD
Project ame: Hicks Residence Ca culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.dbdl6x
CF RF-01
Page 5 of 13
OPAQUE SURFACES — Cathedral Ceilings
01
02
03
04
05
06
07
08
09
10
11
Name
Zone
Type
Orientatio
n
Area (ft)
Skylight Area
(ft2)
Roof Rise
(x in 12)
Roof
Pitch
Roof Tiik
(deg)
Roof
Reflectance
Roof
Emittance
Framing
Factor
Flat Roof
Master Bdrm Zone
R-38 Flat Roof W/ R-10
Right
260
0
1
0.08
4.76
0.61
0.92
0.1
Flat Roof 2
Great/Kit/Lou./Off
Zone
R-38 Flat Roof W/ R-10
Front
360
16
1
0.08
4.76
0.61
0.92
0.1
Flat Roof 3
Casita Zone
R-38 Flat Roof W/ R-10
Front
105
0
1
0.08
4.76
0.61
0.92
0.1
ATTIC
01
02
03
04
05
06
07
08
Name
Construction
Type
Roof Rise
Roof Reflectance
Roof Emittance
Radiant Barrier
Cool Roof
Attic Master Bdrrn Zone
Attic RoofMaster Bdrm Zone
Ventilated
3
0.22
0.92'
Yes
Yes
UKiULou./Off Zone
Attic GreaVentilated
Attic RoofGreaUl(it/Lou.%Off
Zone",( j :°
1
0.22
0.92
Yes
Yes
one .
Attic Casita Zone"..
Attic RoofCasita Zone..
Ventilated_
3
0.22
0.92-.,
Yes
Yes
Attic Bdnn 1 Zone',
Attic RoofBdml 1 Zone ''
/��-V.ventilated}+E Syr:@fir
R� ntila s kR R! :
1
9.E..
[y+y, 0.22
i r..s
0.92 .:
Yes
Yes
1
Registration Number: 217-PO10256607C-000-000-0000000-0000 Registration DateRme: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTIgE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE OD
Project ame: Hicks Residence C culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis
Input File Name: Hicks Res-Payton-17.ribd16x
C_*RF-01
Page 6 of 13
FENESTRATION / GLAZING
01
02
03
04
05
06
07
08
09
10
Name
Type
Surface (Orientation -Azimuth)
Width (ft)
Height
(ft)
Multiplier
Area
(ft)
U-factor
SHGC
Exterior Shading
D11
Window
S Wall (Back-180)
14.0
10.0
1
140.0
0.44
0.22
Insect Screen (default)
W15
Window
S Wall (Back-180)
-
-
1
35.6
0.33
0.24
1 Insect Screen (default)
W14
Window
S Wall (Back-180)
4.7
2.3
0.999
10.8
0.33
0.24
Insect Screen (default)
W16
Window
W Wall (Right-270)
3.4
10.0
1.029
35.0
0.35
0.26
Insect Screen (default)
W13
Window
W Wall (Right-270)
5.5
2.3
1.004
12.7
0.33
0.24
Insect Screen (default) .
W12
Window
W Wall (Right-270)
3.3
2.3
1.001
7.6
0.33
0.24
Insect Screen (default)
W11
Window
W Wall (Right-270)
3.3
2.3
11.001
7.6
0.33
0.24
Insect Screen (default)
W10
Window '�
W Wall (Right-270)
3.8
2.3
0.995
8.7
0.33
0.24
Insect Screen (default)
D09
Window', i
N Wall 2 (Front-0)
5.5
10.0
1
55.0
0.44
0.22
Insect Screen (default)
W27
Window,
N Wall 2 (Front-0)
9.0
11.0
1 =
99.0
0.35
0.26
Insect Screen (default) .:
D02
--W ndow
N Wall 2 (Font-0)
8.0
11.0
1 :..
88.0
0.44
0.22'
Insect Screen (default) ..
W25
Window
- ' N 1Nall 2 (Front-0) :" : (
6 8 �
11.0
-1, .
74.8
0.35
0.26'
Insect Screen (default) .
W24
Wndow/.-
A N Wall2?(Front}0)
-ty
`��
19.0
0.35
0.26
Insect Screen (default)
W23
Wiridow `
tJ`-Wall 2 Front-0) 101�= f
U #
::0:!>1
U U1 A; '
-1-1'9 0
0.35
0.26
Insect Screen (default) ,
W19
Wndow
"�A N=1Nall E-(Fronti0) _S
-C)
-
1 :
J 9.5
0.44
0.20
Insect Screen (default)
W26
"Window
N Wall 2 (Front-0)
-
-
1
20.4
0.35
0.26
Insect Screen (default)
W28
Window
N Wall 2 (Front-0)
-
-
1
27.0
0.35
0.26
Insect Screen (default)
D05
Window
N Wall 2 (Front-0)
-
-
1
45.0
0.44
0.22
Insect Screen (default)
W33
Window
N Wall 2 (Front-0)
-
-
1
9.0
0.35
0.26
Insect Screen (default)
W29
Window
E.Wall (Left-90)
-
-
1
19.8
0.24
0.23
Insect Screen (default)
W29 2
Window
E Wall (Left-90)
-
-
1
19.8
0.24
0.23
Insect Screen (default)
W29 3
Window
E Wall (Left-90)
-
-
1
19.8
0.24
0.23
Insect Screen (default)
D18
Window
E Wall (Left-90)
-
-
1
27.0
0.35
0.18
Insect Screen (default)
W18
Window
E Wall (Left-90)
6.1
9.5
0.497
28.8
0.44
0.20
Insect Screen (default)
D17
Window
E Wall (Left-90)
-
-
1
24.0
0.35
0.18
Insect Screen (default)
W17
Window
E Wall (Left-90)
-
-
1
20.3
0.44
0.20
Insect Screen (default)
D13
Window
E Wall (Left-90)
6.3
12.0
1
75.6
0.44
0.22
Insect Screen (default)
W20
Window
E Wall (Left-90)
6.1
9.5
1.381
80.0
0.35
0.26
Insect Screen (default)
D16
Window
S Wall 2 (Back-180)
15.8
12.0
1
189.6
0.44
0.22
Insect Screen (default)
Registration Number: 217-Po10256607C-000-000-0000000-0000 Registration Date/Time: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTIE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE OD
Project ame: Hicks Residence C culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis
Input File Name: Hicks Res-Payton-17.ribdl6x
C*RF-01
Page 7of13
D14
Window
S Wall 2 (Back-180)
33.5
12.0
1
402.0
0.44
0.22
Insect Screen (default)
D12
Window
S Wall 2 (Back-180)
15.3
12.0
1
183.6
0.44
0.22
Insect Screen (default)
W21
Window
S Wall 2 (Back-180)
-
-
1
26.1
0.44
0.20
Insect Screen (default)
D04
Window
S Wall 2 (Back-180)
-
-
1
45.0
0.44
0.22
Insect Screen (default)
W22
Window
W Wall 2 (Right-270)
-
-
1
19.0
0.35
0.26
Insect Screen (default)
D03
Window
W Wall 2 (Right-270)
15.0
10.0
1
150.0
0.44
0.22
Insect Screen (default)
D15,
Window
W Wall 2 (Right-270)
13.3
12.0
1
159.6
0.44
0.22
Insect Screen (default)
W31
Window
W Wall 2 (Right-270)
-
--
1
11.0
0.35
0.26
Insect Screen (default)
W32
Window
W Wall 2 (Right-270)
-
-
1
11.0
0.35
0.26
Insect Screen (default)
D16 2
Window
W Wall 2 (Right-270)
13.3
12.0
1
159.6
0.44
0.22
Insect Screen (default)
Skylight
Skylight
Flat Roof 2 (Front-0)
1
16.0
0.39
0.29
W07
Window
N Wall 3 (Front-0)
-
-
1
6.0
0.44
0.20
Insect Screen (default)
W06
Window
a N Wall 3 (Front-0)
-
-
1
1 17.5
0.33
0.24
Insect Screen (default)
W05
Window
N Wall 3 (Front-0)
-
-
1
17.5
0.33--.
0.24
Insect Screen (default)
D06
;,, Window
E Wall 2 (Left-90)
-
-
1
90.0
0.44
0.22
Insect Screen (default)
D07
Window
, - 4E Wall 2 (Left 90)Pw j
e t
=
it 1
115.2
0." ,
0.22
Insect Screen (default)
W30 -
Wiridow.
-1I1k S�Wall 3 (( p c fy Z235)
'
-
1
r 33.3
0.33
0.24
Insect Screen (default)
D10
Window At
�1N,Wall 3:(Riglit-270)l1Mh Uis Itfc-
t
01 V
11iW7+7,:6
0.44 ..
0.22
Insect Screen (default)
W08
Wndow
W.Wall 31(Righ 270)�; P
R-,n
V-A
'[7) 1F
:� 7.5
0.40
0.18
Insect Screen (default)
W09
Window
W Wall 3 (Right-270)
-
-
1
7.5
0.44
0.20
Insect Screen (default)
W29 4
Window
E Wall 3 (Left-90)
-
-
1
19.8
0.24
0.23
Insect Screen (default)
W29 5
Window
E Wall 3 (Left-90)
-
-
1
19.8
0.24
0.23
Insect Screen (default)
W29 6
Window
E Wall 3 (Left-90)
-
-
1
19.8
0.24
0.23
Insect Screen (default)
W29 7
Window
E Wall 3 (Left-90)
-
-
1
19.8
0.24
0.23
Insect Screen (default)
D08
Window
E Wall 3 (Left-90)
-
-
1
95.0
0.44
0.22
Insect Screen (default)
OPAQUE DOORS
01
02
03
04
Name
. Side of Building
Area (ft2)
U-factor
D31
E Wall
24.6
0.50
Registration Number: 217-Po10256607C-000-000-0000000-0000 Registration Date/Time: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTI�TE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE
Project ame: Hicks Residence culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.ribdl6x
C RF-01
Pa 8 of 13
OVERHANGS AND FINS
01
02
03
04
05
06
07
08
09
10
11
12
13
14
Overhang
Left Fin
Right Fin
Window
Depth
Dist Up
Left
Extent
Right
Extent
Flap HL
Depth
Top Up
Dist L
Bot Up
Depth
Top Up
Dist R
Bot Up
D11
12
0.1
12
12
0
0
0
0
0
0
0
0
0
W14
4
0.1
4
4
0
0
0
0
0
0
0
0
0
W16
4
0.1
4
4
0
0
0
0
0
0
0
0
0
W13
4.
0.1
4
4
0
0
0
0
0
0
0
0
0
W12
4
0.1
4
4
0
0
0
0
0
0
0.
0
0
W11
4
0.1
4
4
0
0
0
0
0
0
0
0
0
W10
4-.,A
0.1
4
4
0
0
0
0
0
0
0.
0
0
D09
12,j<r%,
0.1
12
12,
0
0:
0
0
0
0
0_
0
0
W27
4"",�
0.1
4
4
0
0., .
0
0
0
0
0
0
0
=1)02
-- 4`.
"`�0:1 w
A �►-'
.`.. • 4
0
0,
0
0
0
0
0 ..'
0
0
W25
>r4
,,f0 --
oWi4
4 0
W=0�
00
0
". 0
0
0
0
0
W18
3 8.r'/
0.1 f
8=
+
. 8
I. 0 4
:�.
0�p ff
U�`
0
0
0
0
0
D13
f23 . 1a
NA'*0.1 �
�_ ty2%4
'
bm�-d U
V b
0U
U i
0
0
0
0
0
W20'
8; :Ot�1
3 "18
^y
� 8
i[F0
i...�
on
0
. 0
0
0 ; >
0
0
D16
12.
0.1
12
12
0
0`
0
0
0
0
0:..-,*..
0
0
D1.4
23.
0.1
23
23
0
0
0
0
0
0
0
0
0
D12
8.1
0.1
8
8
0
0
0
0
0
0
0
0
0
D03
12-'0.1
12
12
0
0
0
0
0
0
0
0
0
D15
8"
0.1
8
8
0
0
0
0
0
0
0:
0
0
D162
12
0.1
12
12
0
0
0
0
1 0
0
10
0
0
Registration Number: 217-Po10256607C-000-00o-0000000-0000 Registration DateRme: 2017-11-14 11:29:16
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1
HERS Provider: CaICERTS inc.
Report Generated at: 2017-11-14 11:18:55
CERTIqrE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE �OD
Project ame: Hicks Residence Ca culation Date/Time: 11:17, Tue, Nov 14; 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.ribdl6x
CRF-01
Pa e9of13
OPAQUE SURFACE CONSTRUCTIONS
01
02
03
04
05
06
07
Total Cavity
Winter Design
Construction Name
Surface Type
Construction Type
Framing
R-value
U-factor
Assembly Layers
• Around Roof Joists: R-0.0 insul.
• Cavity/Frame: R-13.0/2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck: Wood Siding/sheathing/decking
Attic RoofMaster Bdnn Zone
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 13
0.078
Roofing. Light Roof (Asphalt Shingle)
• Inside Finish: Gypsum Board
Ceilings (below
Cavity/Frame: R-9.1 /2x4
R-38 Roof W/R-13
attic)
Wood Framed Ceiling
2x4 @ 16 in. O.C.
R 38
0.025
Over Ceiling Joists: R-28.9 insul.
• Inside Finish: Gypsum Board
• Cavity / Frame: R-38 / 2x 12
• Roof Deck: Wood Siding/sheathing/decking
R-38 Flat Roof W/ R-10
Cathedral Ceilings,
Wood Framed Ceiling
2x12 @ 16 in. O.C.
R 38
0.030 .. -
Roofing. Light Roof (Asphalt Shingle)
Inside Finish: Gypsum Board
Cavity/Frame: R-21 /2x6
R-21 Wall.
•Exterior Walls `..
Wood Framed Wall_ _
2x6 @ 16 in. O.C.
R 21
0.069..
Exterior Finish: 3 Coat Stucco
ra
mom
Inside Finish: Gypsum Board
t
Cavity/Frame: no insul. /2x4
R-0 Interior Surface
Interior Walls
tWood Framed Wall .
2x4 @1.6 iTO
novel
A0 277 . .
Other Side Finish: Gypsum Board
I I I
*#I
I
•Around RoA Joists: R-0.0 insul.
Attic RoofGreat/Kit/Lou./Off
H E
R'of
_„ R"Y
4,4Jbp Chord of,}RoofjTrussq@ 24
W
Cavity/Frame: R-13.0/2x4 Top Chrd
Roof Deck: Wood Siding/sheathing/decking
Zone
Attic Roofs
Wood Framed Ceiling.
wm in. O.C.
R 13
0.078
Roofing: Light Roof (Asphalt Shingle)
• Around Roof Joists: R-0.0 insul.
• Cavity/Frame: R-13.0/2x4 Top Chrd
2x4Top Chord of Roof Truss @ 24
Roof Deck. Wood Siding/sheathing/decking
Attic RoofCasita Zone
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 13
0.078
Roofing: tight Roof (Asphalt Shingle)
• Around Roof Joists: R-0.0 insul.
• Cavity/Frame: R-13.0/2x4 Top Chrd
2x4 Top Chord of Roof Truss @ 24
Roof Deck., Wood Siding/sheathing/decking
Attic RoofBdrm 1 Zone
Attic Roofs
Wood Framed Ceiling
in. O.C.
R 13
0.078
Roofing: Light Roof (Asphalt Shingle)
SLAB FLOORS
01
02
03
04
05
06
07
Name
Zone
Area (ft)
Perimeter (ft)
Edge Insul. R-value & Depth
Carpeted Fraction
Heated
Slab -on -Grade
Master Bdnn Zone
1467
93
None
0.8
No
Slab -on -Grade 2
Great/Kit/Lou./Off Zone
4443
74
None
0.8
No
Slab -on -Grade 3
Casita Zone
967
136
None
0.8
No
Slab -on -Grade 4
Bdrm 1 Zone
385
24
None
0.8
No
Registration Number: 217-Po10256607C-ooa000-0000000-0000 Registration Dateffime: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTI&E OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCE OHOD
Project Name: Hicks Residence Calculation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis
Input File Name: Hicks Res-Payton-17.ribdl6x
CF*RF-01
Page 10 of 13
BUILDING ENVELOPE - HERS VERIFICATION
01
02
03
04
Quality Insulation Installation (QII)
Quality Installation of Spray Foam Insulation
Building Envelope Air Leakage
CFM50
Required
Not Required
Not Required
n/a
WATER HEATING SYSTEMS
01
02
03
04
05
06
Name
System Type
Distribution Type
Water Heater
Number of Heaters
Solar Fraction (%)
DHW Sys 1
DHW
Standard
DHW Heater 1 (2)
2
.0%
WATER HEATERS
01
02
03
04
05
06
07
08
09
10
11
12
Input Rating /
Tank
Standby
Heater
A
Tank
Uniform Energy
Pilot /
Insulation
Loss /
First Hour
Tank Location
Element
Number
Volume
Factor / Energy
Thermal
R-value
Recovery
Rating /
NEEA Heat Pump
orAmbient
Name
Type
:Tank Type
of Units
(gal)
Factor / Efficiency
Efficiency
(IntlExt)
Eff
Flow Rate
Brand / Model
Condition.'.,
DHWHeater 1
Gas
Large Storage
_ 2 _I
100-7
— 0.8 frac
85,000 Btu/hr
0
1 0.03
n/a
n/a
n/a
SPACE.CONDITIONING SYSTEMS
01 f ! .'
d/►. 023..__:a 10. _.4 03
« .y _
.� 05
06
SC Sys Name
"System Type M,,
Heating Urnit Name
C oling#Unit Name
Fan Name
Distribution Name
Other Heating andtooiing
' 14"
i tv 4" rr%
HVAC-Masterl .
System
Heating Component 1
Cooling Component 1
HVAC Fan 1
Air Distribution System 1.
HVAC-Living2
Other Heating and Cooling
System
Heating Component 2
Cooling Component 2
HVAC Fan 2
Air Distribution System 2
HVAC-Casita3
Other Heating and Cooling
System
Heating Component 3
Cooling Component 3
HVAC Fan 3
Air Distribution System 3
HVAC -HEATING UNIT TYPES
01
02
03
04
Name
System Type
Number of Units
Efficiency
Heating Component 1
CntrlFumace
1
80 AFUE
Heating Component 2
CnMFumace
3
80 AFUE
Heating Component 3
CntrlFumace
1
80 AFUE
Registration Number: 217-Po10256607C-ooaooa0000000-0000 Registration Date/Time: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTISTE OF COMPLIANCE - RESIDENTIAL PERFORMANCE COMPLIANCEWOD
Project ame: Hicks Residence ation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.ribd16x
C�RF-01
Page-'11 of 13
HVAC - COOLING UNIT TYPES
01
02
03
04
05
06
07
08
Efficiency
Name
System Type
Number of Units
EER SEER
Zonally Controlled
Compressor Type
HERS Verification
Cooling Component 1
SplitAirCond
1
13.2
16.5
Not Zonal
Single Speed
Cooling Component
1-hers-cool
Cooling Component 2
SplitAirCond
3
13.2
16.5
Not Zonal
Single Speed
Cooling Component
2-hers-cool
Cooling Component 3
SplitAirCond
1
13.2
16.5
Not Zonal
Single Speed
Cooling Component
3-hers-cool
HVAC COOLING - HERS VERIFICATION
01
02
03
04
05
06
Name ...
' Verified Airflow
Airflow Target
Verified EER
Verified SEER
Verified Refrigerant
Charge
Cooling Component 1=hers-cool
r r Required—
350
Required
;Required
Required
Cooling Component'2-hers-cool
ti Required---, -
350
Required
Required
Required
Cooling Component 3-hers-cool
3 ;Required
j35d
Requ �eq:;, . ,
a� Required
Required
HVAC - DISTRIBUTION SYSTEMS . f°j" ;' % U. - It 1 11 lk II ?All' tD H s
01
02 &
a1 L. 1
#04% '� '*I
r05 r
06
07
Name
Type ,i
Duct Leak g t
Insulati n R-value.
'' - Duct Location
Bypass Duct
HERS Verification
Air Distribution System 1
DuctsAttic
Specified Lower Leakage
Target
8
Attic
None
Air Distribution System
1-hers-dist
Air Distribution System 2
DuctsAttic
Specified Lower. Leakage
Target .
8
Attic
None
Air Distribution System
2=hers list
Air Distribution System 3
DuctsAttic
Specified Lower. Leakage
8
Attic
None
Air Distribution System
Target
3 hers-dist
HVAC DISTRIBUTION-' HERS VERIFICATION
01
02
03
04
.05
06
07
08
Name
Duct Leakage
Verification
Duct Leakage
Target (%)
Verified Duct
Location
Verified Duct
Design
Buried
Ducts
Deeply Buried
Ducts
Low -leakage
Air Handler
Air Distribution System 1-hers-list
Required
5.0
Not Required
Not.Required
Not Required
Not Required
Required
Air Distribution System 2-hers-dist
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Air Distribution System 3-hers-list
Required
5.0
Not Required
Not Required
Not Required
Not Required
Required
Registration Number: 217-Po10256607C-000-000-0000000-0000 Registration DateMme: 2017-11-14 11:29:16 HERS Provider: CaICERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERT19FE OF COMPLIANCE -RESIDENTIAL PERFORMANCE COMPLIANCE OD
Project ame: Hicks Residence Ca culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.ribdl6x
C*RF-01
Page 12 of 13
HVAC-FAN SYSTEMS
01
02
03
04
Name
Type
Fan Power (Watts/CFM)
HERS Verification
HVAC Fan 1
Single Speed PSC Furnace Fan
0.55
HVAC Fan 1-hers-fan
HVAC Fan 2
Single Speed PSC Furnace Fan
0.55
HVAC Fan 2-hers-fan
HVAC Fan 3
Single Speed PSC Furnace Fan
0.55
HVAC Fan 3-hers-fan
HVAC FAN SYSTEMS - HERS VERIFICATION
01
02
03
Name
Verified Fan Watt Draw
Required Fan Efficiency (Watts/CFM)
HVAC Fan 1-hers-fan
Required
0.55
HVAC Fan 2-hers-fan
Required
0.55
HVAC Fan 3-hers-fan
Required
0.55
IAQ (Indoor Air Quality) FANS
01
4ma 02 ?
� 03
04
05
06
Dwelling Unit
,IAQ CFM
IAQ /CFM :
IAQ Fan Type
IAQ Recovery .
Effectiveness(%)
HERS Verification
SFam IAQVentRpt
+�1110
+0:25 V ta
4 Def ult .. s
0
Required
Registration Number: 217-Po10256607C-000-000-0000000-0000 Registration Date[Time: 2017-11-14 11:29:16 HERS Provider: CaiCERTS inc.
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1 Report Generated at: 2017-11-14 11:18:55
CERTIlfE OF COMPLIANCE -RESIDENTIAL PERFORMANCE COMPLIANCE a OD
Project ame: Hicks Residence Ca culation Date/Time: 11:17, Tue, Nov 14, 2017
Calculation Description: Title 24 Analysis Input File Name: Hicks Res-Payton-17.ribdl6x
C*RF-01
Page 13 of 13
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name:
Documentation Author Signature:
Tim Scott
Company:
Signature Date:
Scott Design and.Title 24, Inc.
2017-11-14 11:29:16
Address:
CEA/HERS Certification Identification (If applicable):
77085 Michigan Drive
City/State/Zip:
Phone:
Palm Desert, CA 92211
760-200-4780
RESPONSIBLE PERSON'S DECLARATION STATEMENT
certify the following under penalty of pedury, under the laws of the State of California:
1. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design. identified on this Certificate of Compliance.
2. 1 certify that the energy features and performance: specifications identified on this Certificate of Compliance conform to the requirements of Title. 24 Part 1 and Part 6 of the Califomia Code of
Regulations.
3. The building design feature or system design features identified.on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
worksheets, calculations, plans and specifications' submi ed"to.the enforcementt agencyjfor ap_prgvalgwitb th�sbuilding peinnit application.
Responsible Designer Name:. , IL" I
iResponsible Designer Signatcit
Tim Scott
Company:
Date Signed:
Scott Design and Title 24, Inc.
2017--11-14 111;2�9:16�
Address:
License:
77085 Michigan Drive
NA
City/State/Zip:
Phone:
Palm Desert, CA 92211
760-200-4780
Digitally signed by CaICERTS. This digital signature is provided in order to secure the content of this registered document, and in noway implies Registration
Provider responsibility for the accuracy of the information.
Registration Number: 217-Po10256607c-000-000-0000000-0000 Registration Date/Time: 1 2017-11-1411:29:16
CA Building Energy Efficiency Standards - 2016 Residential Compliance Report Version - CF1 R-09012017-934 SP1
❑ ❑
HERS Provider: CaICERTS inc.
Report Generated at: 2017-11-14 11:18:55
RESIDENTIAL MEASURES SUMMARY
RMS-1
Project Name
Hicks Residence
Building Type
m Single Family ❑ Addition Alone
❑'Multi Family ❑ Existing+Addition/Alteration 11111412017
Date
Project Address
80957 Via Pessaro - The Hideaway La Q
California Energy Climate Zone
CA Climate Zone 15
Total Cond. Floor Area
7,262
Addition
n/a
# of Units
1
INSULATION
Construction Type
Cavity
Area
ft Special Features Status
FENESTRATION
Orientation Area ft2
Total Area: 2,958 Gla Jn Percentage: 40.7 %
U-Fac SHGC Overhang . Sidefins
New/Altered Average U-Factor: 0.41
Exterior Shades Status
Left (E) 28.8
. 0.440
0.20.. .8.0.
none.
Bug Screen New
Left (E) 20.3
0.440
0.20 none
none
Bug Screen New
Left (E) 75.6
0.440
0.22 23.0
none
Bug Screen New
Left (E) 80.0
0.350
0.26 8.0
none
Bug Screen New
Rear (S) 402.0
0.440
0.22 23.0
none
Bug Screen New
Rear (S) 183.6
0.440
0.22 8.0
none
Bug Screen New
Rear (S) 26.1
0.440
0.20 none
none
Bug Screen New
Rear (S) 45.0
0.440
0.22 none
none
Bug Screen New
Right (lM 41.0
0.350
0:26 none
none
Bug Screen New
Right (M 309.6
0.440
0.22 12.0
none
Bug Screen New
Right (Vt) 159.6
0.440
0.22 8.0
none
Bug Screen New
Front(N) 35.0
0.330
0.24 none
none
Bug Screen New
Left (E) 300.2
0.440
0.22 none
none
Bug Screen New
Right (SM 33.3
0.330
0.24 none
none
Bug Screen New
HVAC SYSTEMS
Qty. Heating
Min. Eff
Cooling.Min.
Eff..
Thermostat Status
HVAC DISTRIBUTION
Location Heating
Cooling
Duct Location
Duct
R-Value Status
WATER HEATING
Qty. Type
Gallons Min. Eff Distribution Status
EnerqvPro 7.2 by EnerqvSoft User Number: 6712
ID:
Page 17 of 42
•
r�
•
RESIDENTIAL MEASURES SUMMARY
RMS-1
Project Name
Hicks Residence
Building Type m Single Family ❑ Addition Alone
❑ Multi Family ❑ Existing+ Addition/Alteration 11111412017
Date
Project Address
80957 Via Pessaro - The Hideaway La Q
California Energy Climate Zone
CA Climate Zone 15
Total Cond. Floor Area
7,262
Addition
n/a
# of Units
1
INSULATION
Construction Type
Area
Cavity ft S ecial Features Status
FENESTRATION I Total Area: 2.958 Glazing Percents e: 40.7 New/Altered Average U-Factor. 0.41
Orientation Area ft2 U-Fac SHGC Overhang Sidefins Exterior Shades Status
Right (Vl) 77.6 0.440
0.22 none none Bug Screen New
Right (M 7.5 0.400
0.18 none none Bug Screen New
Right (169 7.5 0.440
0.20 none none Bug Screen New
HVAC SYSTEMS
Qty. Heating Min. Eff
Cooling Min. Eff Thermostat Status
HVAC DISTRIBUTION
Location Heating
Duct
Coolin -Duct'Location R-Value Status
WATER HEATING
Qty. Type Gallons Min. Eff Distribution Status
EneMyPro 7.2 by Enerp ySoft User Number: 6712
ID:
Page 18 of 42
4
2016 Low -Rise Residential Mandatory Measures Summary
NOTE: Low-rise residential buildings subject to the Energy Standards must comply with all applicable mandatory measures, regardless of the compliance approach
used. Review the respective section for more, information. 'Exceptions may apply.
fOriainal 08/2016)
Building Envelope Measures:
§ 110.6(a)l:
Air Leakage. Manufactured fenestration, exterior doors, and exterior pet doors must limit air leakage to 0.3 cfm/ft2 or less when tested per
NFRC-400 or ASTM E283 or AAMAIWDMA/CSA 101/l.S.2/A440-2011 '
§ 110.6(a)5:
Labeling. Fenestration products must have a label meeting the requirements of § 10-111(a).
§ 110.6(b):
Field fabricated exterior doors and fenestration products must use U-factors and solar heat gain coefficient (SHGC) values from TABLES
110.6-A and 110.E-B for com liance and must be caulked and/or weatherstried.'
§ 110.7:
Air Leakage. All joints, penetrations, and other openings in the building envelope that are potential sources of air leakage must be caulked,
asketed or weather stripped.
§ 110.8(a):
Insulation Certification by Manufacturers. Insulation specified or installed must meet Standards for Insulating Material.
§ 110.8(g):
Insulation Requirements for Heated Slab Floors. Heated slab floors must be insulated per the requirements of § 110.8(g).
§ 110.8(i):
Roofing Products Solar Reflectance and Thermal Emittance. The thermal emittance and aged solar reflectance values of the roofing
material must meet the requirements of § 110.8 i when the installation of a cool roof is specified on the CF1 R.
§ 110.80):
Radiant Barrier. A radiant barrier must have an emittance of 0.05 or less and be certified to the Department of Consumer Affairs.
Ceiling and Rafter Roof Insulation. Minimum R-22 insulation in wood -frame ceiling; or the weighted average U-factor must not exceed 0.043.
Minimum R-19 or weighted average U-factor of 0.054 or less in a rafter roof alteration. Attic access doors must have permanently attached
§ 150.0(a):
insulation using adhesive or mechanical fasteners. The attic access must be gasketed to prevent air leakage. Insulation must be installed in
direct contact with a continuous roof or ceiling which is sealed to limit infiltration and exfiltration as specified in § 110..7, including but not limited
to placing insulation either above or below the roof deck or on to .of a -drywall ceiling.'
§ 150.0(b):
Loose -fill Insulation. Loose fill insulation must meet the manufacturer's required density for the labeled R-value.
Wall Insulation. Minimum R-13 insulation in 2x4 inch wood framing wall or have a U-factor of 0.102 or less (R-19 in 2x6 or U-factor of 0.074 or
§ 150.0(c):
less). Opaque non -framed assemblies must have an overall assembly U-factor not exceeding 0.102, equivalent to an installed value of R-13 in a
wood framed assembly.'
§ 150.0(d):
Raised -floor Insulation. Minimum R-19 insulation in raised wood framed floor or 0.037 maximum U-factor.'
§ 150.0(f):
Slab Edge Insulation. Slab edge insulation must meet all of the following: have a water absorption rate, for the insulation material alone without
facings, no greater than 0.3%; have a water vapor permeance no greater than 2.0 permfinch; be protected from physical damage and UV light
deterioration; and, when installed as part of a heated slab floor, meet the requirements of § 1 10.8.
Vapor Retarder. In Climate Zones 1-16, the earth floor of unvented crawl space must be covered with a Class I or Class II vapor retarder. This
§ 150.0(g)l:
requirement also applies to controlled ventilation crawls ace for building§complying with the exception to § 150.0(d).
§ 150.0(g)2:
Vapor Retarder. In Climate Zones 14 and 16, a Class I or Class II vapor retarder must be installed on the conditioned space side of all
insulation in all exterior walls, vented attics, and unvented attics with air -permeable insulation.
150.0
§ (q)'
Fenestration Products. Fenestration, including skylights, separating conditioned space from unconditioned space or outdoors must have a
maximum U-factor of 0.58; or the weighted average U-factor of all fenestration must not exceed 0.58.'
Fireplaces, Decorative Gas Appliances, and Gas Log Measures:
§ 150.0(e)1A:
Closable Doors. Masonry or factory -built fireplaces must have a closable metal or glass door covering the entire opening of the firebox.
§ 150.0(e)l B:
Combustion Intake. Masonry or factory -built fireplaces must have a combustion outside air intake, which is at least six square inches in area
and is equipped with a readily accessible, operable, and tight -fitting damper or combustion -air control device'
§ 150.0(e)l C:
Flue Damper. Masonry or factory -built fireplaces must have a flue damper with a readily accessible control.'
§ 150.0(e)2:
Pilot Light. Continuous burning pilot lights and the use of indoor air for cooling a firebox jacket, when that indoor air is vented to the outside of
the building, are prohibited.
Space Conditioning, Water Heating, and Plumbing System Measures:
§ 110.0-§ 110.3:
Certification. Heating, ventilation and air conditioning (HVAC) equipment, water heaters, showerheads, faucets, and all other regulated
appliances must be certified by the manufacturer to the Energy Commission.'
§ 110.2(a):
HVAC Efficiency. Equipment must meet the applicable efficiency requirements in TABLE 110.2-A through TABLE 110.2-K.'
Controls for Heat Pumps with Supplementary Electric Resistance Heaters. Heat pumps with supplementary electric resistance heaters
§ 110.2(b):
must have controls that prevent supplementary heater operation when the heating load can be met by the heat pump alone; and in which the
cut -on temperature for compression heating is higher than the cut -on temperature for supplementary heating, and the cut-off temperature for
compression heating is hi her.than the cut-off temperature for supplementary heating.'
§ 110.2(c):
Thermostats. All unitary heating or cooling systems not controlled by a central energy management control system (EMCS) must have a
setback thermostat.'
Water Heating Recirculation Loops Serving Multiple Dwelling Units. Water heating recirculation loops serving multiple dwelling units must
§ 110.3(c)5:
meet the air release valve, backflow prevention, pump priming, pump isolation valve, and recirculation loop connection requirements of §
110.3(c)5.
§ 110.3(c)7:
Isolation Valves. Instantaneous water heaters with an input rating greater than 6.8 kBTU/hr (2 kW) must have isolation valves with hose bibbs
or other fittings on both cold water and hot water lines of water heating systems to allow for water tank flushing when the valves are closed.
§ 110.5:
Pilot Lights. Continuously burning pilot lights are prohibited for natural gas: fan -type central furnaces; household cooking appliances (appli-
ances without an electrical supply voltage connection with pilot lights that consume less than 150 Btu/hr are exempt); and pool and spa heaters.'
Building Cooling and Heating Loads. Heating and/or cooling loads are calculated in accordance with ASHRAE Handbook, Equipment
§ 150.0(h)l:
Volume, Applications Volume, and Fundamentals Volume; SMACNA Residential Comfort System Installation Standards Manual; or ACCA
Manual J using design conditions specified in § 150.0(h)2.
4
4
2016 Low -Rise Residential Mandatory Measures Summary
§ 150.0(h)3A:
Clearances. Installed air conditioner and heat pump outdoor condensing units must have a clearance of at least 5 feet from the outlet of any
dryer vent.
§ 150.0(h)3B:
Liquid Line Drier. Installed air conditioner and heat pump systems must be equipped with liquid line filter driers if required, as specified by
manufacturer's instructions.
§ 150.00)1:
Storage Tank Insulation. Unfired hot water tanks, such as storage tanks and backup storage tanks for solar water -heating systems, must have
R-12 external insulation or R-16 internal insulation where the internal insulation R-value is indicated on the exterior of the tank.
Water piping and cooling system line insulation. For domestic hot water system piping, whether buried or unburied, all of the following must
be insulated according to the requirements of TABLE 120.3-A: the first 5 feet of hot and cold water pipes from the storage tank; all piping with a
§ 150.00)2A:
nominal diameter of 3/4 inch or larger; all piping associated with a domestic hot water recirculation system regardless of the pipe diameter;
piping from the heating source to storage tank or between tanks; piping buried below grade; and all hot water pipes from the heating source to
kitchen fixtures.'
§ 150.00)2B:
Water piping and cooling system line insulation. All domestic hot water pipes that are buried below grade must be installed in a water proof
and non -crushable casing or sleeve.'
§ 150.00)2C:
Water piping and cooling system line insulation. Pipe for cooling system lines must be insulated as specified in § 150.00)2A. Distribution
piping for steam and h dronic heating systems or hot waters stems must meet the requirements in TABLE 120.3-A.'
§ 150.00)3:
Insulation Protection. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and wind.
Insulation Protection. Insulation exposed to weather must be installed with a cover suitable for outdoor service. For example, protected by
§ 150.00)3A:
aluminum, sheet metal, painted canvas, or plastic cover. The cover must be water retardant and provide shielding from solar radiation that can
cause degradation of the material.
§ 150.00)3B:
Insulation Protection. Insulation covering chilled water piping and refrigerant suction piping located outside the conditioned space must have a
Class I or Class II vapor retarder.
Gas or Propane Systems. Systems using gas or propane water heaters to serve individual dwelling units must include all of the following: a
§ 150.0(n)1:
120V electrical receptacle within 3 feet of the water heater, a Category III or IV vent, or a Type B vent with straight pipe between the outside
termination and the space where the water heater is installed; a condensate drain that is no more than 2 inches higher than the base of the
water heater, and allows natural draining without pump assistance; and a gas supply line with a capacity of at least 200,000 Btu/hr.
§ 150.0(n)2:
Recirculating Loops. Recirculating loops serving multiple dwelling units must meet the requirements of § 110.3(c)5.
§ 150.0(n)3:
Solar Water -heating Systems. Solar water -heating systems and collectors must be certified and rated by the Solar Rating and Certification
Corporation SRCC or by a listing agency that is approved by the Executive Director.
Ducts and Fans Measures:
§ 110.8(d)3:
Ducts. Insulation installed on an existing space -conditioning duct must comply with § 604.0 of the California Mechanical Code (CMC). If a
contractor installs the insulation, the contractor must certify to the customer, in writing, that the insulation meets this requirement.
CMC Compliance. All air -distribution system ducts and plenums must be installed, sealed, and insulated to meet the requirements of CMC
§§ 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006 HVAC Duct Construction Standards Metal and Flexible 3rd Edition. Portions
of supply -air and return -air ducts and plenums must be insulated to a minimum installed level of R-6.0 (or higher if required by CMC § 605.0) or
a minimum installed level of R4.2 when entirely in conditioned space as confirmed through field verification and diagnostic testing
§ 150.0(m)1:
(RA3.1.4.3.8). Connections of metal ducts and inner core of flexible ducts must be mechanically fastened. Openings must be sealed with .
mastic, tape, or other duct -closure system that meets the applicable requirements of UL 181, UL 181A, or UL 181B or aerosol sealant that
meets the requirements of UL 723. If mastic or tape is used to seal openings greater than'% inch, the combination of mastic and either mesh or
tape must be used. Building cavities, support platforms for air handlers, and plenums designed or constructed with materials other than sealed
sheet metal, duct board or flexible duct must not be used for conveying conditioned air. Building cavities and support platforms may contain
ducts. Ducts installed in cavities and support platforms must not be compressed to cause reductions in the cross -sectional area of the ducts.'
Factory -Fabricated Duct Systems. Factory -fabricated duct systems must comply with applicable requirements for duct construction,
§ 150.0(m)2:
connections, and closures; joints and seams of duct systems and their components must not be sealed with cloth back rubber adhesive duct
tapes unless such tape is used in combination with mastic and draw bands.
§ 150.0(m)3:
Field -Fabricated Duct Systems. Field -fabricated duct systems must comply with applicable requirements for. pressure -sensitive tapes,
mastics, sealants and other requirements specified for duct construction.
§ 150.0(m)7:
Backdraft Dampers. All fan systems that exchange air between the conditioned space and the outside of the building must have backdraft or
automatic dampers.
§ 150.0(m)8:
Gravity Ventilation Dampers. Gravity ventilating systems serving conditioned space must have either automatic or readily accessible,
manually operated dampers in all openings to the outside except combustion inlet and outlet air openings and elevator shaft vents.
Protection of Insulation. Insulation must be protected from damage, including that due to sunlight, moisture, equipment maintenance, and
§ 150.0(m)9:
wind. Insulation exposed to weather must be suitable for outdoor service. For example, protected by aluminum, sheet metal, painted canvas, or
plastic cover. Cellular foam insulation must be protected as above or painted with a coating that is water retardant and provides shielding from
solar radiation.
§ 150.0(m)10:
Porous Inner Core Flex Duct. Porous inner core flex duct must have a non -porous layer between the inner core and outer vapor barrier.
Duct System Sealing and Leakage Test. When space conditioning systems use forced air duct systems to supply conditioned air to an
§ 150.0(m)11:
occupiable space, the ducts must be sealed and duct leakage tested, as confirmed through field verification and diagnostic testing, in
accordance with § 150.0 m 11 and Reference Residential Appendix RA3.
Air Filtration. Mechanical systems that supply air to an occupiable space through ductwork exceeding 10 feet in length and through a thermal
§ 150.0(m)12:
conditioning component, except evaporative coolers, must be provided with air filter devices that meet the design, installation, efficiency,
pressure drop,and labeling requirements of § 150.0(m)12.
4
4
4
2016 Low -Rise Residential Mandatory Measures Summary
Duct System Sizing and Air Filter Grille Sizing. Space conditioning systems that use forced air ducts to supply cooling to an occupiable
space must have a hole for the placement of a static pressure probe (HSPP), or a permanently installed static pressure probe (PSPP) in the
§ 150.0(m)13:
supply plenum. The space conditioning system must also demonstrate airflow z 350 CFM per ton of nominal cooling capacity through the return
grilles, and an air -handling unit fan efficacy:5. 0.58 WICFM as confirmed by field verification and diagnostic testing, in accordance with
Reference Residential Appendix RA3.3. This applies to both single zone central forced air systems and every zone for zonally controlled central
forced airs stems.'
Ventilation for Indoor Air Quality. All dwelling units must meet the requirements of ASHRAE Standard 62.2. Neither window operation nor
§150.0(o):
continuous operation of central forced air system air handlers used in central fan integrated ventilation systems are permissible methods of
providing whole -building ventilation.
§ 150.0(o)1A:
Field Verification and Diagnostic Testing. Whole -building ventilation airflow must be confirmed through field verification and diagnostic
testing, in accordance with Reference Residential Appendix RA3.7.
Pool and Spa Systems and Equipment Measures:
Certification by Manufacturers. Any pool or spa heating system or equipment must be certified to have all of the following: a thermal efficiency
§ 110.4(a):
that complies with the Appliance Efficiency Regulations; an on -off switch mounted outside of the heater that allows shutting off the heater
without adjusting the thermostat setting; a permanent weatherproof plate or card with operating instructions; and must not use electric
resistance heating.'
§ 110.4(b)1:
Piping. Any pool or spa heating equipment must be installed with at least 36 inches of pipe between the filter and the heater, or dedicated
suction and return lines, or built-in or built-up connections to allow for future solar heating.
§ 110.4(b)2:
Covers. Outdoor pools or spas that have a heat pump or gas heater must have a cover.
§ 110.4(b)3:
Directional inlets and time switches for pools. Pools must have directional inlets that adequately mix the pool water, and a time switch that
will allow all pumps to be set or programmed to run only during off-peak electric demand periods.
§ 110.5:
Pilot Light. Natural gas pool and spa heaters must not have a continuously burning pilot light.
§ 150.0 (p):
Pool Systems and Equipment Installation. Residential pool systems or equipment must meet the specified requirements for pump sizing, flow
rate, piping, filters, and valves.'
Lighting Measures:
§ 110.9:
Lighting Controls and Components. All lighting control devices and systems, ballasts, and luminaires must meet the applicable requirements
of § 110.9.'
§ 110.9(e):
JA8 High Efficacy Light Sources. To qualify as a JA8 high efficacy light source for compliance with § 150.0(k), a residential light source must
be certified to the Energy Commission according to Reference Joint Appendix JA8.
§ 150.0(k)1A:
Luminaire Efficacy. All installed luminaires must be high efficacy in accordance with TABLE 150.0-A.
Blank Electrical Boxes. The number of electrical boxes that are more than 5 feet above the finished floor and do not contain a luminaire or
§ 150.0(k)1 B:
other device must be no greater than the number of bedrooms. These electrical boxes must be served by a dimmer, vacancy sensor control, or
fan speed control.
Recessed Downlight Luminaires in Ceilings. Luminaires recessed into ceilings must meet all of the requirements for. insulation contact (IC)
§ 150.0(k)1 C:
labeling; air leakage; sealing; maintenance; and socket and light source as described in § 150.0(k)1 C. A JA8-2016-E light source rated for
elevated temperature must be installed by final inspection in all recessed downli ht luminaires in ceilings.
§ 150.0(k)1 D:
Electronic Ballasts. Ballasts for fluorescent lamps rated 13 watts or greater must be electronic and must have an output frequency no less than
20 kHz.
Night Lights. Permanently installed night lights and night lights integral to installed luminaires or exhaust fans must be rated to consume no
§ 150.0(k)1 E:
more than 5 watts of power per luminaire or exhaust fan as determined in accordance with § 130.0(c). Night lights do not need to be controlled
by vacancy sensors.
§ 150.0(k)1F:
Lighting Integral to Exhaust Fans. Lighting integral to exhaust fans (except when installed by the manufacturer in kitchen exhaust hoods)
must meet the applicable requirements of § 150.0(k).*
Screw based luminaires. Screw based luminaires must not be recessed downlight luminaires in ceilings and must contain lamps that comply
§ 150.0(k)1 G:
with Reference Joint Appendix JA8. Installed lamps must be marked with "JA8-2016" or "JA8-2016-E" as specified in Reference Joint Appendix
JA8.'
§ 150.0(k)1 H:
Enclosed Luminaires. Light sources installed in enclosed luminaires must be JA8 compliant and must be marked with "JA8-2016-E."
§ 150.0(k)2A:
Interior Switches and Controls. All forward phase cut dimmers used with LED light sources must comply with NEMA SSL 7A.
§ 150.0(k)2B:
Interior Switches and Controls. Exhaust fans must be switched separately from lighting systems.'
§ 150.0(k)2C:
Interior Switches and Controls. Luminaires must be switched with readily accessible controls that permit the luminaires to be manually
switched ON and OFF.
§ 150.0(k)2D:
Interior Switches and Controls. Controls and equipment must be installed in accordance with manufacturer's instructions.
§ 150.0(k)2E:
Interior Switches and Controls. No control must bypass a dimmer or vacancy sensor function if the control is installed to comply with
150.0(k).
§ 150.0(k)2F:
Interior Switches and Controls. Lighting controls must comply with the applicable requirements of § 110.9.
Interior Switches and Controls. An energy management control system (EMCS) may be used to comply with dimmer requirements if it:
§ 150.0(k)2G:
functions as a dimmer according to § 110.9; meets the Installation Certificate requirements of § 130.4; meets the EMCS requirements of §
130.5 ; and meets all other requirements in § 150.0(k)2.
Interior Switches and Controls. An EMCS may be used to comply with vacancy sensor requirements in § 150.0(k) if it meets all of the
§ 150.0(k)2H:
following: it functions as a vacancy sensor according to § 110.9; the Installation Certificate requirements of § 130.4; the EMCS requirements of §
130.5 ; and all other requirements in § 150.0(k)2.
§ 150.0(k)21:
Interior Switches and Controls. A multiscene programmable controller may be used to comply with dimmer requirements in § 150.0(k) if it
provides the functionality of a dimmer according to § 110.9, and complies with all other applicable requirements in § 150.0(k)2.
4
x 2016 Low -Rise Residential Mandatory Measures Summary
§ 150.0(k)2J:
Interior Switches and Controls. In bathrooms, garages, laundry rooms, and utility rooms, at least one luminaire in each of these spaces must
be controlled by a vacancy sensor.
§ 150.0(k)2K:
Interior Switches and Controls. Dimmers or vacancy sensors must control all luminaires required to have light sources compliant with
Reference Joint Appendix JAB, except luminaires in closets less than 70 square feet and luminaires in hallways.'
§ 150.0(k)2L:
Interior Switches and Controls. Undercabinet lighting must be switched separately from other lighting systems.
Residential Outdoor Lighting. For single-family residential buildings, outdoor lighting permanently mounted to a residential building, or to other
§ 150.0(k)3A:
buildings on the same lot, must meet the requirement in item § 150.0(k)3Ai (ON and OFF switch) and the requirements in either item
§ ,150.0(k)3Aii (photocell and motion sensor) or item § 150.0(k)3Aiii (photo' -control and automatic time switch control, astronomical time clock, or
S.
EMCS.
Residential Outdoor Lighting. For low-rise multifamily residential buildings, outdoor lighting for private, patios, entrances, balconies,
§ 150.0(k)3B:
and porches; and outdoor lighting for residential parking lots and residential carports with less than eight vehicles per site must comply with
either § 150.0 k 3A or with the applicable requirements in §§ 110.9 130.0 130.2,130.4 140.7 and 141.0.
§ 150.0(k)3C:
Residential Outdoor Lighting. For low-rise residential buildings with four or more dwelling units, outdoor lighting not regulated by
150.0 k 3B or § 150.0 k 3D must comply with the applicable requirements in §§ 110.9 130.0 130.2 130.4 140.7 and 141.0.
§ 150.0(k)3D:
Residential Outdoor Lighting. Outdoor lighting for residential parking lots and residential carports with a total of eight or more
vehicles per site must comply with the applicable requirements in §§ 110.9 130.0, 130.2, 130.4,140.7 and 141.0.
§ 150.0(k)4:
Internally illuminated address signs. Internally illuminated address signs must comply with § 140.8; or must consume no more than 5 watts of
power as determined according to § 130.0(c).
§ 150.0(k)5:
Residential Garages for Eight or More Vehicles. Lighting for residential. parking.garages for eight or more vehicles must comply with the
applicable requirements for nonresidential garages in 110.9,130.0,130.1.130.4 140.6 and 141.0.
Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior
§ 150.0(k)6A:
common area in a single building equals 20 percent or less of the floor area, permanently installed lighting for the interior common areas in that
building must be high efficacy luminaires and controlled by an occupant sensor.
Interior Common Areas of Low-rise Multi -Family Residential Buildings. In a low-rise multifamily residential building where the total interior
common area in a single building equals more than 20 percent of the floor area, permanently installed lighting in that building must:
§ 150.0(k)6B:
I. Comply with the applicable requirements in §§ 110.9,130.0,130.1, 140.6 and 141.0; and
ii. Lighting installed in corridors and stairwells must be controlled by occupant sensors that reduce the lighting power in each space by at least
50 percent, The occupant sensors must be capable of turning the light fully on and off from all designed paths of ingress and egress.
Solar Ready Buildings:
Single Family Residences. Single family residences located in subdivisions with ten or more single family residences and where the
§ 110.10(a)1:
application for a tentative subdivision map for the residences has been deemed complete by the enforcement agency must comply with the
requirements of § 110.1 0b through § 110.10 e .
§ 110.10(a)2:
Low-rise Multi -family Buildings. Low-rise multi -family buildings must comply with the requirements of § 110.10(b) through § 110.10(d).
Minimum Area. The solar zone must have a minimum total area as described below. The solar zone must comply with access, pathway, smoke
ventilation, and spacing requirements as specified in Title 24, Part 9 or other Parts of Title 24 or in any requirements adopted by a local
jurisdiction. The solar zone total area must be comprised of areas that have no dimension less than 5 feet and are no less than 80 square feet
each for buildings with roof areas less than or equal to 10,000 square feet or no less than 160 square feet each for buildings with roof areas
§ 110.10(b)1:
greaterthan 10,000 squarefeet.
For single family residences the solar zone must be located on the roof or overhang of the building and have a total area no less than 250
square feet. For low-rise multi -family buildings the solar ione must be located on the roof or overhang of the building, or on the roof or overhang
of another structure located within 250 feet of the building, or on covered parking installed with the building project, and have a total area no less
than 15 percent of the total roof area of the building excluding any skylight area.'
§ 110.10(b)2:
Orientation. All sections of the solar zone located on steep -sloped roofs must be oriented between 110 degrees and 270 degrees of true north.
§ 110.10(b)3A:
Shading. The solar zone must not contain any obstructions, including but not limited to: vents, chimneys, architectural features, and roof
mounted equipment.*
Shading. Any obstruction located on the roof or any other part of the building that projects above a solar zone must be located at least twice the
§ 110.10(b)3B:
distance, measured in the horizontal plane, of the height difference between the highest point of the obstruction and the horizontal projection of
the nearest point of the solar zone, measured in the vertical lane.'
§ 110.10(b)4:
Structural Design Loads on Construction Documents. For areas of the roof.designated as solar zone, the structural design loads for roof
dead load and roof live load must be clearly indicated .on the construction. documents.
Interconnection Pathways. The construction documents must indicate: a location for inverters and metering equipment and a pathway for
§ 110.10(c):
routing of conduit from the solar zone to the point of interconnection with the electrical service (for single family residences the point of
interconnection will be the main service anel)• and a pathway for routing of plumbing from the solar zone to the water -heating system.
§ 110.10(d):
Documentation. A copy of the construction documents or a comparable document indicating the information from § 110.10(b) through
110.10 c must be provided to the occupant.
§ 110.10(e)1:
Main Electrical Service Panel. The main electrical service panel must have a minimum busbar rating of 200 amps.
Main Electrical Service Panel. The main electrical service panel must have a reserved space to allow for the installation of a double pole circuit
§ 110.10(e)2:
breaker for a future solar electric installation. The reserved space must be: positioned at the opposite (load) end from the input feeder location or
main circuit location; and permanently marked as "For Future Solar Electric".
•