SP 2015-0001 Villas at Indian Springs1
The Villas at Indian Springs Specific Plan
Prepared for the City of La Quinta, California
April 2015 – REVISED AUGUST/DECEMBER 2015
ATTACHMENT 4
2
LIST OF CONSULTANTS
Planner Global Development, Inc.
75161 Sago Ln
Palm Desert, CA 92210
760-834-8278
Architect GLS Architecture Group, Inc.
74991 Joni Dr. #9
Palm Desert, CA 92260
760-340-3528
Landscape Architect Lush & Efficient Landscape Design
52293 Avendia Madero
La Quinta, CA 92253
760-835-6358
Civil Engineer Watson Engineering
50200 Monroe St.
Indio, CA 92201
760-275-1553
Soil Engineer Sladden Engineering
45090 Golf Center Parkway, Suite F
Indio, CA 92201
760-863-0713
3
City Officials Acknowledgement
Community Development
Director: Les Johnson
Public Works Director: Tim Jonasson
Principal Planner: Wally Nesbit
Principal Engineers: Bryan McKinney
Ed Wimmer
4
Table of Contents
1. Introduction & Background Page 5
2. Specific Plan Land Use Page 5
3. Siting Standards Page 6
4. Architectural Design Guidelines Page 6
5. Engineering & Improvements Page 7
6. Landscape Architectural Guidelines Page 8
7. Standards for the Conservation, Development,
and Utilization of Natural Resources Page 8
8. Implementation Programs & Measures Page 9
9. Relationship to the General Plan Page 9
10. Specific Plan Consistency With General Plan Page 10
List of Illustrations
Global Development Specific Plan Delineation (Page 19)
Ownership Map (Page 20 & 21)
Conceptual Land Plan (Page 22)
Tentative Tract Map Exhibit (Page 23)
Architectural Plans (Pages 24-26)
Entry Landscape (Page 27)
Retention Landscape (Page 28)
Front Yard Landscape (Page 29)
5
1. Introduction & Background:
The Specific Plan covers 3.22 net acres of land on the eastern edge of The City of La
Quinta. The current General Plan for the area is: Medium/High Density Residential.
The Specific Plan guidelines are intended for Medium Density Residential.
Global Development, LLC. owns 2.34 acres and the City of La Quinta owns 0.88
acres, Global Development is in contract with the City of La Quinta to buy their land.
The land the City of La Quinta owns included nine developed lots purchased using
redevelopment funds in order to widen Jefferson Street; the homes on those lots
were subsequently demolished and new right-of-way was established, with the
remainder of the lots being retained by the City.
The 2.34 acres Global Development owns was an old golf course fairway that was
redesigned and left out of its original plan.
2. Specific Plan Land Use:
Introduction. The 2035 La Quinta General Plan designates the site land use as
Medium/High Density Residential. The site is currently zoned for Golf Course and
Low Density Residential, and requires a zone change to be consistent with the City
General Plan Land Use. As such, a zoning designation of Medium Density Residential
has been proposed.
The majority of the land in the Specific Plan is undeveloped requiring new
infrastructure including street, drainage, utility systems, grading of the topography
and other infrastructure. The land in the Specific Plan is located on the eastern edge
of the City of La Quinta, with several utility districts governing various aspects of
public utility infrastructure.
a. Residential Density. The Specific Plan and associated tract map propose a 16-
lot development on 3.22 acres, establishing a residentyial density of 4.97
units/acre. The project was revised from 15 lots in December 2015 based on an
allowance from CVWD to discharge project drainage into the Whitewater
Channel, which allowed adding 1 lot to replace the original retention basin.
b. Conceptual Development Illustrations. The residential project area site,
landscaping and unit plans are provided for reference in this document, as noted
in the List of Illustrations on Page 4. These plans are generally intended to be
representative of the project layout, density and design concept, but are not
intended to establish specific detailed plans for construction. Detailed design
components of the project will vary as the development process continues.
6
3. Siting Standards:
a. Single Family Lot Standards. Each lot size varies due to irregularly shaped
lots. The ninimum lot size shall be 6000 sq. ft.
b. Single Family Siting Standards. The Standards listed below are minimum,
except when they refer to a maximum allowed item. The architectural theme
should be compatible and related to the Single Family Themes.
Maximum Height: 17 feet/One story
Front yard setback: 15 feet
Side yard setback: 5 feet
Rear yard setback: 10 feet
Architectural projection: 2 feet into front or rear setback
A/C setbacks: 3.5 feet from any property line
4. Architectural Design Guidelines:
a. Roofing. All plans will have two elevations, an A elevation and a B elevation.
All A elevations will have S concrete tile roofs; All B elevations will have flat
concrete tile roofs. All roofing colors will be show on the color chart.
b. Window Trim. All elevations will have window trim around the windows on
front elevations.
c. Rock Veneer. All A elevations will have rock veneer on front elevation.
d. Painted Pop Outs. All B elevations will have paint areas on the front elevation.
e. Wood Grain Metal Garage Doors. All plans will have wood grain metal doors.
f. Courtyard. All plan 3’s will have courtyards.
g. Drive Ways & Walkways. All driveway & walkways are to be gray concrete.
h. Block Walls. All courtyard walls are to be plastered to match home, all other
walls to be tan precision block.
i. Wrought Iron Fencing. Wrought iron fencing to be used around retention area
will be relocated from Jefferson side of project after removal for the new block
wall.
7
5. Engineering & Improvements:
Introduction. The majority of the area within the Specific Plan is undeveloped
requiring new infrastructure including a private street, underground utility systems,
grading of the topography and other infrastructure. The Specific Plan is located on
the easterly edge of the City of La Quinta, with several utility districts governing
various aspects of public utility infrastructure. The planned area is bounded by
Jefferson St., Palm Circle Dr., Westward Isle Homes and the wash. The overall
capacity and existing condition of this public infrastructure is adequate to serve the
planned uses, however, some improvements and upgrading of existing utilities are
necessary. This section establishes standards and policies for the design and
installation of the new-engineered infrastructure for the complete build-out of the
plan and establishes the proper framework necessary for future development.
a. Street Design Standards. The residential street within the Specific Plan is
designed to be private and maintained by its own Home Owners Association. This
street will be designed in accordance with the street sections provided in the
plan. Any deviations from these standards will require review and approval by
the city of La Quinta.
b. Topography & Grading. The area covered by the Specific Plan contains various
topographic and drainage features that require specific guidelines in order to
ensure conformance with local agency requirements as minimal impact to natural
topography. The finished elevations within the plan range from approximately
60-64 feet above mean sea level.
Flood Elevation Requirements. Development within the Specific Plan is
required to comply with the City of La Quinta flood elevation standards. The
building pads of all occupied structures will be elevated to a minimum of 60
feet above mean sea level with the finished floor being a minimum of 6 inches
above the building pad.
Grading & Drainage. The drainage systems within the plan area are similar
to most new developments. Lots, streets, and landscaped areas will be graded
to convey runoff to new inlets within the development, which will then
transport the storm water through underground piping to the retention
basin.
Storm Water Treatment. The development within the Specific Plan is
required to prepare and summit project-specific Storm water Management
Plans (SWMP) to determine and implement storm water runoff treatment
measures to reduce potential impacts from sediment-laden runoff and other
pollutants.
8
c. Infrastructure & Utilities. The Specific Plan requires new public and
privately maintained utility infrastructure to serve the uses. The existing site is
primarily undeveloped land; therefore, almost no existing infrastructure
resides with in the development envelope.
Sanitary Sewer. Sanitary sewerage in the area is operated by CVWD.
Conventional underground sewer system within the public street that will
connect to the existing system within Jefferson St. The developer will leave
a sewer stub out for future use of Westward Isle H.O.A.
Water Supply & Service. Water service for the new development is
serviced by CVWD. The development has gone through a CVWD review and
CVWD has concluded that there is adequate water supply.
Energy. So. Cal Gas & IID provides energy and natural gas service to the
Specific Plan area. Existing natural gas and electric infrastructure exist
within the surrounding public streets.
6. Landscape Architectural Guidelines:
a. Introduction and Landscape Concept. The Landscape must respond to the
significant site climate issues including extreme drought, high winds and hot
desert climates. The majority of the plant material must be low water use,
drought tolerant or native to the desert. We will not be installing any grass due
to the issues the state of California is currently experiencing. Every home and
the surrounding areas will consist of desert landscape. The irrigation system
on site will be automatic, underground, and state of the art systems using the
latest water conservation available. Drip irrigation will be used to minimize
any drought concerning issues.
7. Standards for the Conservation, Development, and Utilization of Natural
Resources:
a. Existing Natural Resources. There are no Natural Resources on this land,
originally there were homes on 1/3 of the land and then golf course on 2/3’s of
the remaining land. All the land has been disturbed from its original state.
b. Development. The development of this Specific Plan will be built by private
funds and will not require any city financing.
c. Conservation. Due to the issues the state of California is currently
experiencing the irrigation system on site will be automatic, underground, and
state of the art systems using the latest water conservation technologies
available, The majority of the plant material must be low water use, drought
9
tolerant or native to the desert. Drip irrigation will be used to minimize any
drought concerning issues.
8. Implementation Programs & Measures:
a. Development Phasing. The development will have three phases, Phase 1 (all
off sites & lots 12-15), Phase 2 (lots1-4) & Phase 3 (lots 5-11).
b. Review and Approval Process. The Specific Plan, Zone Change, Tentative Map and
Site Development Permit applications will be reviewed conjunctively, with
Planning Commission review and a recommendation to the City Council for
their decision. After approval, the Community Development Director will have the authority
to approve any minor changes to the Specific Plan within the context and
guidelines contained within this document and the City’s guiding General Plan
policies.
9. Relationship to the General Plan:
a. Land Use and Zoning Consistency. The General Plan land use designation of
the property is Medium/High Density Residential, which allows single and
multi-family residential up to a maximum density of 16 dwelling units per acre.
The zoning designation of the property is Low Density Residential (RL) and Golf
Course (GC). The proposed project is inconsistent with the current zoning for
golf course use, as well as the proposed lot size and density. Based on initial
review, it would appear the project is consistent with the medium Density (RM)
zoning district, which allows a density range between 4 and 8 dwelling units
per acre. This district would accommodate the proposed minimum lot size
6,000 square feet, at the proposed density of 4.97 units/acre.
b. Development:
House Plans: Plan 1- 1,815 sq.
Plan 2- 1,930 sq.
Plan 3-2,305 sq.
2 different Elevations each plan
10
Specific Plan Consistency With La Quinta General Plan
Global Development would like to develop a well-planned and desirable neighborhood that
meets the communities’ vision in the highest quality for which they are known. The following
shows the relationship between our Specific Plan and project to the City of La Quinta’s
General Plan.
Goals, Policies, and Programs:
Community Development
Land Use
Goal LU-1
Policy LU-1.1a
We are consistent with all Land Maps and Zoning Maps, consistent with the
Zoning Designation Consistency Matrix.
Policy LU-1.2
All land use decisions are consistent with the applicable General Plan policies.
We have hosted three meetings with the homeowners in the surrounding areas
and the majority of them support and approve the project.
Livable Communities
Goal SC-1
Policy SC-1.2a
Conservation of Natural Resources
This project has implemented the conservation programs including CVWD
Urban Management Plan, City of La Quinta’s Landscape Ordinance, Cal Green
codes, and Federal Water Saving programs.
Policy SC-1.3
Storm Water Runoff and Water Quality Protection
We have submitted a storm water run off and water quality protection plan
that covers all necessary requirements.
Policy SC-1.4
Air Quality
We have two certified officers within the company that have received
Certificates of Completion for the Coachella Valley Fugitive Dust Control class
supplied by the South Coast Air Quality Management District. They will be
11
monitoring the site at all times to make sure we are in complete compliance to
their requirements.
Lic. # CV1406-000763-836
Lic. # CV1406-000788-861
Policy SC-1.5a
Energy Resource
This project is in compliance with the California Efficiency Standards. (Title 24
in Building Codes)
Policy SC-1.5c
Pedestrian Connections
We are going to be providing a gate connecting the community to the new CV
Link that will be developed in the near future so that our homeowners can
access the trail.
Policy SC-1.6b
We are going to be providing a gate connecting the community to the new CV
Link that will be developed in the near future so that our homeowners can
access the trail.
Policy SC-1.6c
We are going to be providing a gate connecting the community to the new CV
Link that will be developed in the near future so that our homeowners can
access the trail.
Policy SC-1.7a
This land is part of a Redevelopment Project that the City did to widen
Jefferson St. We believe and have been told that the residential development
fits the zoning ordinance.
Policy SC-1.8b
We are going to be providing a gate that will connect the community to the
new CV Link being developed in the near future so that our homeowners can
access the trail.
Economic Development
Goal ED-1
Policy ED-1.1a
This project maintains a balance of land use designations to address economic
needs. It utilizes a vacant and underutilized area of land to increase the new
home inventory that will address market needs.
12
Policy ED-1.3a
This project is pedestrian-friendly. It will interconnect with the CV Link and is
within walking distance of golf, restaurants, Home Depot, Costco, and many
other retail stores.
Policy ED-1.6
This project will bring revenue to the City of La Quinta by the purchasing of
said land from the city. We have established a comprehensive program to
enforce all payments of taxes and dues.
Parks, Recreation and Trails
Goal PR-1
Policy PR-1.3
This project will bring revenue to the City of La Quinta by the purchasing of
said land from the city. We have established a comprehensive program to
enforce all payments of taxes and dues.
Policy PR-1.5a
We are going to be providing a gate that will connect the community to the
new CV Link being developed in the near future so that our homeowners can
access the trail.
Policy PR-1.5c
We are going to be providing a gate connecting the community to the new CV
Link that will be developed in the near future so that our homeowners can
access the trail.
Policy PR-1.8
We are going to be providing a gate that will connect the community to the
new CV Link being developed in the near future so that our homeowners can
access the trail.
Policy PR-1.8a
This project is within walking distance from Indian Springs Golf Course and
many other fitness facilities such as gyms and wellness centers.
Housing
Goal H-1
Policy H-1.2a
13
This project will take underutilized, vacant land and increase the capacity for
housing.
Policy H-1.2b
This project consists of smaller lots that create potential for first-time
homeowners, small families and seniors to purchase a home. The project is a
small infill site that we are asking for flexible development standard
allowances specific to small lots that are usually reserved for affordable
projects. It will have smaller lots but still be considered single-family detached
homes.
Policy H-1.4
This project will create new affordable homes in the city of La Quinta.
Goal H-2
Policy H-2.1
This Project will increase the moderate housing choices in the city of La Quinta.
Policy H-2.3
Program H-2.3j
Our company would like to look at this program with the city and see if it can
help with the moderate-income households.
Program H-6.5d
To help with the Landscape Water Management Plan our company plans to use
landscape that must respond to the significant site climate issues including
extreme drought, high winds and hot desert climates. The majority of the plant
material must be low water use, drought tolerant or native to the desert. We
will not be installing any grass due to the issues the state of California is
currently experiencing. Every home and the surrounding areas will consist of
desert landscape. The irrigation system on site will be automatic,
underground, and state of the art systems using the latest water conservation
available. Drip irrigation will be used to minimize any drought concerning
issues.
Natural Resources
Air Quality
Policy AQ-1.1
We have two certified officers here in the company that have received
Certificates of Completion for the Coachella Valley Fugitive Dust Control class
supplied by the South Coast Air Quality Management District. They will be
14
monitoring at all times to make sure we are in complete compliance to their
requirements.
Lic. # CV1406-000763-836 and Lic. # CV1406-000788-861
Policy AQ-1.1a
Our project will be monitored, managed and all SCAQMD rules will be
enforced.
Policy AQ-1.3
This project is pedestrian-friendly. It will interconnect with the CV Link and is
within walking distance of golf, restaurants, Home Depot, Costco, and many
other retail stores.
Policy AQ-1.3e
We are going to be providing a gate connecting the community to the new CV
Link that will be developed in the near future so that our homeowners can
access the trail.
Policy AQ-1.3g
This development is within walking distance from public parks, schools, golf
courses, and commercial businesses.
Policy AQ-1.5a
Our project will be monitored, managed and all SCAQMD rules will be
enforced.
Policy AQ-1.5b
PM10 Plan was submitted to the city of La Quinta.
Policy AQ-1.6
PM10 Plan was submitted to the city of La Quinta.
Energy and Mineral Resources
Goal EM-1
Policy EM-1.1
This project consists of homes that have a Title 24 Report that mandates
conservations of energy resources.
Biological Resources
Goal BIO-1
Policy BIO-1.1
15
This project will pay the MSHCP Local Development Mitigation fee when
appropriate before building permits are paid.
Policy BIO-1.2a
Program BIO-1.2a
This program has had a qualified biologist on the property to do a biological
resource survey.
Cultural Resources
Goal CUL-1
Policy CUL-1.1
This project has had a qualified archeologist on site to study and report any
archaeological, historic, and paleontological resources found.
Policy CUL-1.4b
A geotechnical analysis has been completed including soil borings.
Water Resources
Goal WR-1
Policy WR-1.1
Our projects landscape will respond to the significant site climate issues
including extreme drought, high winds and hot desert climates. The majority of
the plant material must be low water use, drought tolerant or native to the
desert. We will not be installing any grass due to the issues the state of
California is currently experiencing. Every home and the surrounding areas
will consist of desert landscape. The irrigation system on site will be
automatic, underground, and state of the art systems using the latest water
conservation available. Drip irrigation will be used to minimize any drought
concerning issues.
Policy WR-1.2
Our company will pay, when necessary, the appropriate recharge aquifer fee to
CVWD.
Policy WR-1.4
Our project has a set Water Quality Management Plan (WQMP) for storm water
pollution.
Policy WR-1.4c
This project has an onsite retention basin to provide added recharge to the
aquifer.
16
Open Space and Conservation
Goals OS-1
Policy OS-1.2c
We are going to be providing a gate that will connect the community to the
new CV Link being developed in the near future so that our homeowners can
access the trail.
Environmental Hazards:
Noise
Goals N-1
Policy N-1.2
This project has submitted a noise study in conjunction with the first Planning
Department Application.
Policy N-1.5
This project has submitted a noise study in conjunction with the first Planning
Department Application.
Soils and Geology
Goals GEO-1
Policy GEO-1.2
This project has submitted a Geotechnical Report.
Flooding and Hydrology
Goals FH-1
Policy FH-1.3a
This project has an onsite Retention/Detention Basin that is capable of
managing 100-year storm water flows.
Hazardous Materials
Goals HAZ-1
Policy HAZ-1.1
17
This project will have no hazardous materials onsite.
Public Infrastructures and Services:
Emergency Services
Goals ES-1
Policy ES-1.1a
This project will pay Development Impact Fees that will help develop future
Fire Stations and facilities.
Policy ES-1.2
We will be submitting a Fire Sprinkler Plan to the Fire Department for this
project. We will be submitting street plans to the Fire Department to assure
that the projects access and design provides maximum fire and life safety.
Policy ES-1.6
This project will be routed to the Police Department to assure that the project
access and design provide for defensible space and maximum crime
prevention while maintaining City design standards and codes.
Water, Sewer and other Utilities
Goals UTL 1.1
Policy UTL 1.1
This project has submitted plans to CVWD for available water. The water is
available in the street next to the project.
Policy UTL 1.1b
The Landscape must respond to the significant site climate issues including
extreme drought, high winds and hot desert climates. The majority of the plant
material must be low water use, drought tolerant or native to the desert. We
will not be installing any grass due to the issues the state of California is
currently experiencing. Every home and the surrounding areas will consist of
desert landscape. The irrigation system on site will be automatic,
underground, and state of the art systems using the latest water conservation
available. Drip irrigation will be used to minimize any drought concerning
issues.
Policy UTL 1.1b 2
This project has coordinated a plan between the Fire Department and CVWD to
ensure adequate water supplies for fire suppression.
18
Policy UTL 1.2b
The Landscape must respond to the significant site climate issues including
extreme drought, high winds and hot desert climates. The majority of the plant
material must be low water use, drought tolerant or native to the desert. We
will not be installing any grass due to the issues the state of California is
currently experiencing. Every home and the surrounding areas will consist of
desert landscape. The irrigation system on site will be automatic,
underground, and state of the art systems using the latest water conservation
available. Drip irrigation will be used to minimize any drought concerning
issues.
Policy UTL 2.1
This project is going to bring sewer to the site and connect to the sanitary
sewer service. The sewer is across Jefferson St. and will be a great expense to
get it to the project. Our project will allow the existing project without sewer to
hook in at no cost to them. This should encourage the elimination of the pre
existing projects septic system.
Public Facilities
Goals PF-1
Policy PF 1.3a
This project will be paying all required Development Impact Fees.
Policy PF 1.6b
This project will be paying all required School Impact Fees.
19
20
21
22
23
24
25
26
27
28
29