Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
13-0381 (SFD) Report of Observations and Testing During Rough Grading
REPORT OF OBSERVATIONS AND TESTING DURING ROUGH GRADING TRADITION - TRACT 28470 LA QUINTA, CALIFORNIA — Prepared By — Sladden Engineering 6782 STANTON AVE., SUITE E BUENA PARK, CA 90621 (213) 864-4121 (714) 523-0952 Slodden Engineering Sladden Engineering 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (310) 864-4121 (714) 523-0952 Fax (714) 523-1369 39-725 Garand Ln., Suite G, Palm Desert, CA 92211 (619) 772-3893 Fax (619) 772-3895 July 30, 1997 Tradition Club Associates, LLC c/o Winchester Development Company 41-865 Boardwalk, Suite 101 Palm Desert, California 92211 Attention: Mr. Mike Rowe Project: Tradition - Tract 28470 La Quinta, California Project No. 522-6138-G1 Subject: Report of Observations and Testing During Rough Grading Ref Geotechnical Update prepared by Sladden Engineering dated December 12, 1996; Project No. 444-6130 Summarized in this report are our observations and the results of in-place density tests performed at the project site during rough grading. The rough grading consisted of the grading of an eighteen hole golf course surrounded by residential building pads. As indicated in the previous geotechnical reports and summarized in the referenced Geotechnical Update, portions of the project site including some of the building pads were previously graded in 1988 as part of the East La Quinta Flood Control project. Due to the varying soils conditions on the site (including previously graded building pads), the extent of the remedial grading -work performed during rough grading varied across the site. Observations and field testing was performed during the rough grading operations from January 2, 1997 to April 4, 1997. Grading operations were performed by Nuevo Engineering using conventional heavy equipment. A representative of Sladden Engineering was present on the site continuously during the grading of building pads and intermittantly during the grading of golf course areas. July 30, 1997 (2) Project No. 522 -6138 -GI Field 'Pests: In-place moisture/density tests were performed using a nuclear density gauge in accordance with test methods ASTM D 2922 and ASTM D 30I7. A total of 1417 tests were performed during the initial rough grading. The approximate test locations are indicated on the grading plans included with this report and test results are summarized on the attached data sheets. Testing indicates that a minimum of 90 percent relative compaction was attained in the areas tested. The passing test results indicate compliance with the project specifications at the tested locations and depths but are no guarantee or warranty of the contractor's work. Laboratory 'Pests: The moisture -density relationships for the tested materials were determined in the laboratory in accordance with test method ASTM D 1557-91. Laboratory test results are summarized on the attached data sheet. Discussion: As previously discussed, the remedial grading performed at the site varied with location and soils conditions. Prior to grading, the building areas were stripped of weeds, brush and other surface vegetation. Clearing operations also included the removal of citrus trees and other trees from the lower (northern) portion of the site_ In general, remedial grading throughout the southern portion of the site consisted of watering and compaction of the native soils in-place along with the placement of engineered fill material to construct the building pads. Native soils were watered so that near optimum moisture content was attained to a minimum depth of three feet below original grade or four feet below pad grade, whichever was deeper. The exposed surface was compacted so that at least 90 percent relative compaction was attained to a depth of two feet below original grade or three feet below pad grade, whichever was deeper. In most areas, fill material obtained from the adjacent golf course areas was placed to construct the building pads. The lots graded as described above included lots 150 through 229 and 238 to 241. The majority of the lots located within the middle portion of the site were previously rough graded. These lots were cleared of weeds and brush and watered prior to grading. In general, grading consisted.primarily of some minor cuts and fills (some in excess of 10 feet) to achieve the plan elevations. In most cases, the building pads did not extend laterally beyond the previously graded building pads. In areas where the pads were extended substantially (such as along the rear property lines of lots 81 through 84), the fills were initiated within firm native soils near the toe of the slopes. A keyway was established near the toe of the slope and fill soils were benched into the existing slope during placement. The previously graded lots that were regraded as described above include lots 27 through 36 and lots 76 through 150. Slodden Engineering July 30, 1997 (3) Project No. 522-6138-G1 The remedial grading performed throughout the northern portion of the site included overexcavation and recompaction within the building areas. In general, lots were. overexcavated to a depth of at least three feet below original grade. The previously removed soils were replaced in thin lifts and compacted along with fill soils obtained from the nearby golf course areas to construct the building pads. The lots that were overexcavated include lots 1 through 26 and 37 through 75, and the maintenance building area Some of the residential lots have been used for the storage of rock, trees, other construction materials and excess fill soils subsequent to grading. Although some of these lots may require additional clearing or fine grading„ no degradation of the compacted fill material is expected. Fill material was stockpiled on lots 193 through 207 for use during the future grading of lots 230 through 236. The stockpiled material was not tested because it will be removed at a later date. Irrigation lines were encountered in the area of the existing pond and accessing the pond. The pond was removed during grading but some of the irrigation lines were left in place for future abandonment. These irrigation lines should be removed from building pads and roadway areas when abandonment is allowed. The resulting excavations should be properly backfilled and backfill material should be properly compacted. Recommendations: The allowable bearing pressures recommended in the original Geotechnical Engineering Report prepared by Buena Engineers, Inc. dated November 27, 1984 (B-14796-P1, 84-11-216) remain applicable. Conventional shallow spread footings should be bottomed in properly compacted fill material at least 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least two feet wide. Continuous footings and isolated pad footings may be designed utilizing an allowable bearing pressures of 1500 psf. An allowable increase of 200 psf for each additional six inches of depth may be utilized if desired. The maximum allowable bearing pressure should be 3000 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. Lateral forces may be resisted by friction acting along the base of the foundations and passive resistance along the sides of the footings. A friction coefficient of 0.45 times the normal dead load forces is suggested for use in design. Passive resistance may be estimated using an equivalent fluid weight of 300 pcf. If used in combination, we suggest that either the frcitional resistance or the passive resistance be reduced by one-third Siodden Engineering July 30, 1997 (4) Project No. 522 -6138 -GI Cantilever retaining walls should be designed using "active" pressures. Active pressures may be estimated using an equivalent fluid weight of 35 pcf. Walls that are restrained should be designed using "at rest" pressures. At rest pressures may be estimated using an equivalent fluid weight of 55 pcf. The given design pressures are applicable for free - drained level bacl fill conditions. The project site is located in a seismically active area and the potential for seismic activity should be considered in building design. In general, the Uniform Building Code requirements for Seismic Zone 4 should be adequate for the design of the planned residential structures. Because some of the site soils (primarily the silty sands and sandy silts encountered throughout the northern portion of the site) may be susceptible to settlements due to the introduction of excess moisture, care should be taken to minimize infiltration adjacent to building foundations. Positive drainage should be provided to direct water away from the structures. The ponding of water adjacent to buildings or paved areas should not be allowed. Proper grading should be performed to direct stormwater runoff away from structures and landscape irrigation should be minimized. Limitations: Sladden Engineering has prepared this report for the exclusive use of the client and it's authorized representatives. This report has been prepared in accordance with generally accepted geotechnical engineering practices as of this date. No other warranties, either expressed or implied are made. If there are any questions regarding this report or the testing summarized herein, please contact the undersigned. Respectfully submitted, SLADDEN ENGMERING %C' l✓ �Z s,4� Hogan R. Wright Brett L. An erson ProjectEngineer Principal Engineer Copies: 2- Tradition Club Associates, LLC 2- Winchester Development Company Sladden Engineering July 30, 1997 (5) Project No. 522-6138-G1 Laboratory Test Results: Gray brown fine to coarse grained sand with gravel (SP) Maximum Dry Density - 127.8 pcf / Optimum Moisture Content - 8.7% Brown silty fine to coarse grained sand with gravel (SM) Maximum Dry Density - 123.5 pcf / Optimum Moisture Content - 7.9% Brown slightly silty fine to coarse grained sand with gravel (SP) Maximum Dry Density - 130.7 pcf / Optimum Moisture Content - 8.7% Brown silty fine grained sand (SM) Maximum Dry Density - 116.2 pcf / Optimum Moisture Content - 13.4% Brown very silty fine grained sand (SM) Maximum Dry Density - 110.0 pcf / Optimum Moisture Content - 11.7% Brown silty fine to medium grained sand (SM) Maximum Dry Density - 120.0 pcf / Optimum Moisture Content - 8.9% Sladden Engineering File: 422-6138 January 31, 1997 Page I Test No. Date Loc. Elpv. Moist Cont Fid Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Percent Maximum 1 1-02-97 K Street 134.0 8.50 119.8 127.8 93.7 2 1-02-97 of 135.0 8.25 120.0 127.8 93.8 3 1-02-97 136.0 8.75 119.5 127.8 93.5 4 1-02-97 135.0 8.50 119.8 127.8 93.7 5 1-02-97 It 136.0 8.75 118.1 127.8 92.4 6 1-02-97 137.0 8.50 119.3 127.8 93.3 7 1-02-97 it137.0 8.75 119.0 127.8 93.1 8 1-02-97 It 138.0 8.75 117.2 127.8 91.7 9 1-03-97 139.0 8.75 119.1. I27.8 93.1 10 1-03-97 140.0 8.75 119.3 127.8 93.3 11 1-03-97 Pad 220 153.0 7.50 121.8 127.8 95.3 12 1-03-97 " 154.0 9.00 117.8 127.8 92.2 13 1-03-97 Pad 219 153.0 8.50 117.5 127.8 91.9 14 1-03-97 Pad 218 151.0 8.50 119.3 127.8 93.3 15 1-03-97 Pad 221 151.0 8.25 119.1 127.8 93.1 16 1-03-97 " 152.0 8.00 120.3 127.8 94.1 17 1-03-97 It 151.0 8.25 119.6 127.8 93.8 18 1-03-97 If 152.0 8.25 119.1 127.8 93.1 Slodden Engineering File: 422-6138 January 31, 1997 Page 2 Test Moist Cont Fld Dry Den Max Dry Den Percent No Date Loc Elev PercentLbs/Cu FtLbs/Cu Ft Maximum 19 1-03-97 Pad 220 154.0 8.25 120.0 127.8 93.8 20 1-03-97 " . 154.0 8:50 120.7 127.8 93.8 21 1-03-97 154.0 8.50 119.3 127.8 93.3 22 1-03-97 it150.0 8.50 118.8 127.8 92.9 23 1-03-97 151.0 8.50 118.8 127.8 92.9 24 1-03-97 151.0 8.25 119.6 1.27.8 93.5 25 1-06-97 Pad 239 142.0 7.75 120.4 127.8 94.2 26 1-06-97 143.0 8.50 119.3 127.8 93.3 27 1-06-97 144.0 9.00 118.8 127.8 92.9 28 1-06-97 Pad 239/240 140.0 8:25 118.7 127.8 92.8 29 1-06-97 141.0. 8.00 119.9 127.8 93.8 30 1-06-97 142.0 8.25 119.6 127.8 93.5 31 1-06-97 Pad 238/239 145.0 8.75 120.4 127.8 94.2 32 1-06-97 Pad 219 146.0 8.75 119.6 127.8 94.2 33 1-06-97 It 154.0 9.00 118.8 127.8 92.9 34 1-06-97 it154.0 9.00 117.8 127.8 92.1 35 1-06-97 154.0 8.75 119.5 127.8 93.5 36 A -06-97 Pad 218 154.0 9.00 119.2 127.8 93.3 Slodden Engineering File: 422-6138. January 31, 1997 Page 3 Test Moist Cont Fld Dry Den Max Dry Den Percent No. Dates Loc Eley, PQrunt Lbs/Cu Ft Lbs/Cu Ft Maximum 37 1-06-97 Pad 218 152.0 9.00 118.8 127.8 92.9 38. 1-06-97 152.0 8.75 119.0 127.8 93.1 39 1-06-97 Pad 241 150.0 9.00 117.8 127.8 92.1 40 1-06-97 Pad 241 150.0 9.00 118.8 127.8 92.9 41 1-07-97 if152.0 9.00 118.8 127.8 92.9 42 1-07-97 Pad 239 152.0 8.75 121.8 127.8 95.3 43 1-07-97 153.0 9.00 120.6 127.8 94.3 44 1-07-97 154.0 9.25 119.9 127.8 93.8 45 1-07-97 Pad 238 152.0 9.00 120.6 127.8 94.3 46 1-07-97 153.0 9.25 119.9 127.8 93.8 47 1-07-97 154.0 9.00 120.6 127.8 94.2 48 1-07-97 Pad 217 145.0 8.75 120.4 127.8 94.2 49 1-07-97 147.0 8.75 119.5 127.8 93.5 50 1-07-97 148.0 8.75 119.5 127.8 93.5 51 1-07-97 149.0 8.75 120.9 127.8 94.6 52 1-07-97 Pad 216 145.0 9.00 119.2 127.8 93.3 53 1-07-96 if146.0 8.75 118.6 127.8 92.8 54 1-07-97 it 147.0 9.00 120.1 127.8 94.0 55. 1-07-97 Pad 215 144.0 9.00 119.7 127.8 93.6 Slodden Engineering File: 422-6138 January 31, 1997 Page 4 Test Moist Cont Fid Dry Den Max Dry Den Percent No. Date Loc. Eley, Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 56 1-07-97 Pad 215 145.0 8.75 119.5 127.8 93.5 57 1-07-97 146.0 9.00 118.8 127.8 92.9 58 1-07-97 Pad 214 143.0 9.00 120.6 127.8 94.3 59 1-07-97 144.0 8.75 120.4 127.8 94.2 60 1-07-97 145.0 9.00 119.7 127.8 93.6 61 1-07-97 Pad 213 141.0 8.75 120.4 127.8 94.2 62 1-07-97 It 142.0 9.00 119.7 127.8 93.6 63 1-07-97 143.0 9.00 120.6 12.7.8 94.3 . 64 1-07-97 Pad 212 139.0 8.75 119.5 127.8 93.5 65 1-07-97 140.0 9.00 120.6 127.8 94.3 66 1-07-97 141.0 8.75 120.0 127.8 93.8 67 1-07-97 Pad 211 135.0 9.00 120.6 127.8 94.3 68 1-07-97 It 136.0 8.75 117.2 127.8 91.7 69 1-07-97 of 137.0 8.75 119.0 127.8 93.1 70 1-07-97 Pad 210 130.0 8.75 120.4 127.8 94.2 71 1-07-97 131.0 9.00 119.2 127.8 93.3 72 1-07-97 132.0 8.75 118.6 127.8 92.8 73 1-08-97 Pad 217 150.0 9.00 119.2 127.8 93.2 Sladden Engineering File: 422-6138 January 31, 1997 Page 5 Test Moist Cont Fld Dry Den Max Dry Den Percent No. Date Loc. Eley. _ Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 74 1-08-97 Pad 217 150.0 8.75 119.5 127.8 93.5 75 1-08-97 150.0 9.00 118.8 127.8 92.9 76 1-08-97 Pad 216 148.0 8.75 119.0 127.8 93.1 77 1-08-97 148.0 8:75 119.5 127.8 93.5 78 1-08-97 148.0 9.00 119.2 127.8 93.2 79 1-08-97 Pad 215 147.0 9.00 119.2 127.8 93.2 80 1-08-97 147.0 9.00 119.2 127.8 93.2 81 1-08-97 147.0 9.00 119.2 127.8 - 93.2 82 1-08-97 Pad 214 146.0 9.00 118.8 127.8 92.9 83 1-08-97 146.0 8.75 119.5 127.8 93.5 84 1-08-97 146.0 8.75 119.0 127.8 93.1 85 1-08-97 Pad 229 142.0 9.00 119.7 127.8 93.6 86 1-08-97 143.0 9.00 119.2 127.8 93.2 87 1-08-97 144.0 8.75 119.5 127.8 93.5 88 1-08-97 Pad 228 138.0 8.75 119.5 127.8 93.5 89 1-09-97 it139.0 9.00 119.7 127.8 93.1 90 1-09-97 It 140.0 8.75 119.0 127.8 93.1 91 1-09-97 Pad 227 135.0 9.00 119.7 127.8 93.6 92 1-09-97 It 136.0 9.00 118.8 127.8 92.9 Slodden Engineering File: 422-6138 January 31, 1997 Page 6 Test Moist Cont Fld Dry Den Max Dry Den Percent 93 1-09-97 Pad 227 137.0 8.75 120.0 127.8 93.8 94 1-09-97 Pad 226 135.0 9.00 119.2 127.8 93.2 95 1-09-97 136.0 8.75 119.0 127.8 93.1 96 1-09-97 137.0 9.00 118.8 127.8 92.9 97 1-09-97 Pad 225 140.0 9.00 119.2 127.8 93.2 98 1-09-97 141.0 9.00 119.2 127.8 93.2 99 1-09-97 142.0 8.75 118.6 127.8 92.8 100 1-10-97 Pad 210 133.0 6.90 126.0 127.8 99.0 101 1-10-97 133.0 7.20 123.4 127.8 97.0 102 1-10-97 133.0 7.30 120.9 127.8 95.0 103 1-10-97 Pad 211 138.0 6.80 127.2 127.8 99.0 104 1-10-97 138.0 7.50 126.4 127.8 99.0 105 1-10-97 138.0 7.30 131.0 127.8 97.0 106 1-10-97 Pad 212 142.0 I0.2 142.0 127.8 98.0 107 1-10-97 142.0 7.00 125.1 127.8 98.0 108 1-10-97 142.0 7.50 124.0 127.8 97.0 109 1-10-97 Pad 213 144.0- 7.90 123.2 127.8 96.0 110 1-10-97 144.0 6.70 122.9 127.8 96.0 111 1-10-97 144.0 8.60 124.7 127.8 98.0 Slodden Engineering File: 422=6138 . January 31, 1997 Page 7 Test No. Date Loc. Eley. Moist Cont Percent' Fid Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 112 1-10-97 Pad 208 114.0 9.40 122.7 127:8 96.0 1I3 1-10-97 .115.0 8.10 124.5 127.8 97.0 114 1-10-97 it 116.0 7.20 122.1 127:8 96.0 115 1-10-97 Pad 205 115.0 7.70 122.7 127.8 96.0 116 1-10-97 116.0 8.60 121.3 127.8 95.0 117 1-10-97 117.0 8.40 123.1 127.8 96.0 118 1-10-97 Pad 201 109.0 8.10 121.1 127.8 95.0 119 1-10-97 110.0 7.70 124.9 127.8 98.0 120 1-10-97 111.0 7.10 120.9 127.8 95.0 121 1-10-97 Pad 199 105.0 8.60 121.3 127.8 95.0 122 1-10-97 106.0 8.40 121.4 127.8 95.0 123 .1-10-97 107.0 8.60 123.3 127.8 96.0 124 1-10-97 Pad 197 105.0 10.3 121.6 127.8 95.0 125 1-10-97 106.0 8.70 120.9 127.8 95:0 126 1-10-97 107.0 6.90 121.4 127.8 95.0 127 1-14-97 Pad 199 108.0 8.25 122.4 127.8 95.7 128 1-14-97 109.0 7.75 122.9 127.8 96.1 129 1-14-97 110.0 9.25 121.2 127.8 94.8 130 1-14-97 Pad 198 108.0 9.00 120.1 127.8 93.9 Sladden Engineering File: 422-6138 January 31, 1997 Page 8 Test NQ. Date Loc. Eley, Moist Cont Percent Fld Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 131 1-14-97 Pad 198. 109.0 .8.75 120.9 127.8 94.6 132 1-14-97 110.0 8.50 119.3 127.8 93.3 133 1-14-97 Pad 197 109.0 8.50 121.6 127.8 95.1 134 1-14-97 11.0 8.75 120.9 127.8 94.6 135 1-14-97 " 111.0 9.00 120.6 127.8 94.3 136 1-14-97 Pad 196 11.0 8.25 121.9 127.8 953 137 1-14-97 to 111.0 8.50 121.I 127.8 94.7 138 1-14-97 of 112.0 8.75 119.0 127.8 93.1 139 1-14-97 Pad 203 112.0 8.25 119.1 127.8 93.1 140 1-14-97 113.0 8.75 120.4 127.8 94.2 141 1-14-97 114.0 8.00 '122.2 127.8 95.6 142. 1-14-97 Pad 204 112.0 9.25 120.3 127.8 94.1 143 1-14-97 ". 113.0 7.75 119.7 127.8 93.6 144 1-14-97 114.0 8.25 120.5 127.8 94.2 145 1-14-97 Pad 202 112.0 8.50 121.1 127.8 94.7 146 1-14-97 113.0 8.25 121.0 127.8 94.6 147 1-14-97 114.0 8.00 119.9 127.8 93.8 148 1-15-97 Pad 200 110.0 8.75 119.0 127.8 93.1 149 1-15-97 111.0 8.75 119.0 127.8 93.1 Slndden Engineering He: "422-6138 January 31, 1997 Page 9 Test. No Date Loc Eley Moist Cont Percent Fld Dry Den Max Dry lien Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 150 1-15-97 Pad 200 112.0 9.00 119.8 127.8 93.6 151 1-15-97 Pad 207 116.0 9.25 120.8 127.8 94.5 152 1-15-97 117.0 9.50 121.4 127.8 94.9 153 1-15-97 118.0 9.00 120.6 127.8 94.3 154 1-15-97 Pad 206 116.0 9.25 118.5 127.8 92.7 155 1-15-97 117.0 8.75 119.0 127.8 93.1 156 1-15-97 118.0 8.50 119.8 127.8 93.7. 157 1-15-97 Pad 204/205 113.0 8.75 120.0 127.8 93.8 158 1-15-97 114.0 9.00 122.0 127.8 95.4 159 115-97 119.0 8.75 119.0 127.8 93.1 160 1-15-97 Pad 203 114.0 9.00 121.5 127.8 95.0 161 1-15-97 115.0 8.50 120.7 127.8 94.4 162 1-15-97 115.0 8.50 120.7 127.8 93.1 163 1-15-97 Pad 201 112.0 9.25 120.8 127.8 94.5 164 1-15-97 113.0 8.75 119.5 127.8 93.5 165 1-15-97 114.0 9.25 120.3 127.8 94.1 166 1-16-97 Pad 221 154.0 9.25 117.6 127.8 92.0 167 1-16-97 154.0 9.25 116.7 127.8 91.3 168 1-16-97 154.0 9.00 118.3 127.8 92.5 Slodden Engineering File: 422-613 8 _ January 31, 1997 Page 10 Test No. Date Loc. Elev.. Moist Cont Pem; nt Fld Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/ .0 Ft Maximum 169 1-16-97 Pad 222 150.0 9.00 117.4 127.8 91.8 170 1-16-97 150.0 9.25 117.1 127.8 91.6 171 1-16-97 150.0 8.75 117:2 127.8 91.7 172 1-16-97 Pad 241 154.0 8.75 118.1 127.8 92.4 173 1-16-97 154.0 8.75 119.7 127.8 93.6 174 1-16-97 154.0 9.00 119.7 127.8 93.6 175 1-16-97 Pad 240 155.0 9.25 118.5 127.8 92.7 176 1-16-97 155.0 8.75 116.7 127.8 91.3 177 1-16-97 155.0 8.75 1.20.9 127.8 94.6 178 1-16-97 Pad 239 157.0 8.75 118.1 127.8 92.4 179 1-16-97 157.0 9.00 118.3 127.8 92.6 180 .1-16-97 157.0 9.00 119.2 127.8 93.3 181 1-16-97 Pad 238 157.0 9.25 1.20.8 127.8 94.5 182 1-16-97 157.0 9.00 120.6 .127.8 94.3 183 1-16-97 157.0 9.00 118.3 127.8 92.6 184 1-16-97 Temp Prkg 157.0 12.00 105.8 127.8 91.0 185 1-16-97 157.0 11.75 106.4 127.8 91.5 186 1-16-97 157.0 12.00 105.3 127.8 90.6 187 1-16-97 157.0 12.25 105.5 127.8 90.7 Slodden Engineering Fite: 422-6138 January 31, 1997 Page 11 Test No Date Loc Flev Moist Cont Percent Fld Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft •Maximum 188 1-17-97 Lot 189 117.0 9.5 121.9 127.8 95.0 189 1-17-97 118.0 8.8 121.2 127.8 95.0 190 1-17-97 119.0 10.0 119.5 127.8 94:0 191 1-17-97 Lot 190 116.0 9.2 122.8 127.8 96.0 192 1-17-97 117.0 9.0 120.8 127.8 95.0 193 1-17-97 118.0 7.9 130.4 127.8 95.0 194 1-17-97 Lot 191 112.0 11.7 123.4 127.8 97.0 195 1-17-97 113.0 10.8 121.5 127.8 95.0 196 1-17-97 114.0 10.2 118.6 127.8 93.0 197 1-17-97 Lot 192 108.0 9.0 118.8 127.8 92.9 198 1-17-97 61109.0 8.7 116.7 127.8 91.3 199 1-17-97 108.00 9.0 117.4 127.8 91.8 200 1-17-97 109.0 9.0 120.6 127.8 94.3 201 1-17-97 Lot 191 114.0 9.2 120.8 127.8 94.5 202 1-17-97 If115.0 9.5 120.0 127.8 93.9 203 1-17-97 116.0 9.5 120.0 127.8 93.9 204 1-17-97 Lot 190 119.0 8.7 119.0 127.8 93.1 205 1-17-97 120.0 9.0 120.1 127.8 94.0 206 1-17-97 121.0 9.2 121.2 127.8 .94.8 Slodden Engineering File: 422-6138. January 31, 1997 Page 12 Test No Date Loc Eley, Moist Cont Percent Fld Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 207 1-17-97 Lot 189 121.0 9.0 119.7 127.8 93.6 208 1-17-97 122.0 .9.0 119.2 127.8 93.3 209 1-17-97 123.0 9.2 118.9 127.8 93.1 210 1-21-97 Lot 188 116.0 10.3 113.0 127.8 88.0 211 1-21-97 117.0 9.6 120.2 127.8 94.0 212 1-21-97 118.0 10.3 116.0 127.8 91.0 213 1-21-97 Lot 187 112.0 8.7 118.7 127.8 93.0 214 1-21-97 113.0 11.0 113.7 127.8 89.0 215 1-21-97 114.0 8.1 115.5 127.8 90.0 216 1-21-97 Lot 223 143.0 10.5 114.7 127.8 90.0 217 1-21-97 to 144.0 10.9 120.7 127.8 94.0 218 1-21-97 It145.0 9.6 118.7 127.8 93.0 219 1-21-97 146.0 10.3. 120.0 127.8 94.0 220 1-21-97 Lot 224 141.0 10.3 118.5 127.8 93.0 221 1-21-97 142.0 9.6 121.2 127.8 95.0 222 1-21-97 143.0 9.8 118.0 127.8 92.0 223 1-21-97 144.0 11.0 118.2 127.8 93.0 224 1-21-97 Lot 225 140.0 10.3 120.0 127.8 94.0 Sladden Engineering File:' 422-6138 January 31, 1997 Page 13 Test Moist Cont Fld Dry Den Max Dry Den Percent 225 1-21-97 Lot 225 141.0 10.0 120.7 127.8 94.0 226 1-21-97 142.0 10.7 119.5 127.8 94.0 227 1-21-97 Lot 186 109.0 9.9 116.5 127.8 91.0 228 1-21-97 110.0 9.4 114.0 127.8 89.0 229 1-21-97 110.0 8.5 116.5 127.8 91.0 230 1-21-97 Lot 185 106.0 10.8 115.5 127.8 9Q0 231 1-21-97 01 107.0 8.7 118.2 127.8 93.0 232 1-21-97 108.0 8.9 119.0 127.8 93.0 233 1-21-97 Lot 184 103.0 10.1 117.2 127.8 92.0 234 1-21-97 104.0 10.7 117.5 127.8 92.0 235 1-21-97 105.0 10.0 120.7 127.8 94.0 236 1-21-97 Lot 183 100.0 9.6 117.7 127.8 92.0 237 1-21-97 101.0- 10.3 116.0 127.8 91.0 238 1-21-97 102.0 10.3 120.0 127.8 94.0 239 1-21-97 Lot 182 97.0 9.4 120.5 127.8 94.0 240 1-21-97 98.0 9.8 118.5 127.8 93.0 241 1-21-97 99.0 9.6 119.7 127.8 94.0 242 1-21-97 Lot 181 93;0 9.6 117.7 127.8 93.0 Sladden Engineering File: 422-6138 January 3.1, 1997 Page 14 Test No. Date Loc. Eley, Moist Cont Percent Fld Dry Den Max DryDen Percent Lbs/CuFt Lbs/Cu Ft Maximum 243 1-21-97 Lot 181 94.0 9.8 117.0 127.8 94.0 244 1-21-97 95.0 9.6 118.7 127.8 95.0 245 1-21-97 Lot 180 90.0 10.0 .119.7 127.8 90.0 246 1-21-97 91.0 9.4 120.0 127.8 91.0 247 1-21-97 92.0 10.3 119.5 127.8 94.0 248 1-21-97 Lot 179 90.0 9.6 119.2 127.8 90.0 249 1-21-97 It91.0 9.4 119.0 127.8 91.0 250 1-21-97 92.0 9.4 120.0 127.8 94.0 251 1-21-97 Lot 178 86.0 9.6 118.2 127.8 93.0 252 1-21-97 87.0 10.3 120.0 127.8 94.0 253 1-21-97 88.0 10.7 119.5 127.8 94..0 254 1-21-97 Lot 177 82.0 10.1 118.2 127.8 93.0 255 1-21-97 of 83.0 10.7 119.0 127.8 94.0 256 1-21-97 It84.0 9.6 120:2 127.8 940 257 1-27-97 Lot 191 116.0 9.4 119.5 127.8 94.0 258 1-27-97 116.0 9.8 118.0 127.8 92.0 259 1-27-97 116.0 9.4 119.5 127.8 94.0 260 1-27-97 Lot 190 117.0 9.6 119.2 127.8 93.0 Slodden Engineering File: 422-6138 January 31, 1.997 .Page 15 Test Moist Cont Fld Dry Den Max Dry Den Percent No Date Loc Eley. Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 261 1-27-97 Lot 190 117.0 10.1 119.2 127.8 93.0 262 1-27-97 If 117.0 10.3 119..5 127.8 94.0 263 1-27-97 Lot 189 122.0 9.6 119.7 127.8 94.0 264 1-27-97 of122.0 9.8 119.0 127.8 93.0 265 1-27-97 If122.0 8.9 120.0 127.8 94.0 266 1-27-97 Lot 188 1180 9.2 119.2 127.8 93.0 267.1-27-97 At118.0 9.8 117.5 127.8 92.0 268 1-27-97 of118.0 9.6 118.2 127.8 93.0 269 1-27-97 Lot 187 114.0 9.8 119.5 127.8 94.0 270 1-27-97 114.0 10.0 119.7 127.8 94.0 271 1-27-97 114.0 9.4 119.5 127.8 94.0 272--l-27-97 Lot 186 111.0 9.8 119.5 127.8 94.0 273 1-27-97 to 111.0. 8.9 120.2 127.8 94.0- 274 1-27-97 it111.0 8.9 120.5 127.8 94.0 275 1-27-97 Lot 185 108.0 8.7 121.2 127.8 94.0 ti 276 1-27-97 108.0 9.2 117.7 127.8 92.0 277 1-27-97 118.5 8.9 118.5 127.8 93.0 278 1-27-97 Lot 184 105.0 10.0 117.7 127.8 92.0 279 1-27-97 If 105.0 9.6 120.2 127.8 94.0 Slndden Engineering File: 422-6138 January 31, 1997 Page 16 Test Moist Cont Fid Dry Den Max Dry Den Percent No Date Loc Bev Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 280 1-27-97 Lot 184 105.0 9.8 121.0 127.8 95.0 281 1-27-97 Lot 183- ,102.0 9.2 118.7 127.8 93.0 282 1-27-97 102.0 9.4 120.0 127.8 94.0 283 1-27-97 102.0 9.6 118.7 127.8 93.0 284 1-27-97 Lot 182 99.0 9.8 119.0 127.8 93.0 285 1-27-97 of99.0 9.8 119.0 127.8 93.0 286 1-27-97 " 99.0 9.6 118.7 127.8 93.0 287 1-27-97 Lot 181 95.0 10;1 118.7 127.8 93.0 288 1-27-97 95.0 9.8 120.5 127.8 94.0 289 1-27-97 95.0 9.3 119.2 127.8 93.0 Maximum Dry Density - 127.8 Lbs/Cu Ft; Optimum Moisture - 8.7% Sfadden Engineering File: 422-6138 (Add) April, 1997 Page 1 Test Moist Cont Fld Dry Den Max Dry Den Percent 290 1-28-97 Lot 94 74.0 9.1 118.7 127.8 91.0 291 1-28-97 75.0 8.2 118.7 127.8 93.0 292 1-28-97 76.0 8.3 126.4 127.8 99.0 . 293 1-28-97 Lot 93 71.0 9.1 121.4 127.8 95.0 294 1-28-97 It72.0 9.4 118.7 127.8 93.0 295 1-28-97 of73.0 8.3 122.5 127.8 96.0. 296 1-28-97 Lot 92 68.0 10.4 120.0 127.8 92.0 297 1-28-97 69.0 10.9 120.5 127.8 92.0 298 1-28-97 69.0 9.5 118.7 127.8 93.0 299 1-28-97 Lot 91 68.5 10.6 117.4 127.8 92.0 300 1-28-97- 69.0 10.1 119.9 127.8 94.0 301 1-28-97 69.0 9.5 117.6 127.8 92.0 302 1-28-97 Lot 157 87.0 10.0 117.8 127.8 92.0 303 1-28=97 of88.0 7.3 121.2 127.8 95.0 304 1-28-97 Lot 158 86.0 10.7 120.3 127.8 94.0 305 1-28-97 87.0 8.8 123.9 127.8 97.0 306 1-29-97 Lot 150 85.0 9.4 126.2 127.8 99.0 307 1-29-97 86.0 8.3 125.3 127.8 98.0 308 1-29-97 Lot 151 85.0 6.7 121.9 127.8 95.0 Sladden Engineering File: 422-6138 (Add) February 28; 1997 Page 2 Test Moist Cont Fld Dry Den Max Dry Den Percent No. Date Loc. Eley, Percent Lbs/Cu Ft Lbs/Cu Ft Maximum '309 1-29-97 Lot 151 86.0 6.6 122.1 127.8 96.0 310 1-29-97 Lot 165 81.0 6.2 122.3 127.8 96.0 311 1-29-97 82.0 6.2 122.6 127.8 96.0 312 1-29-97 83.0 6.8 118.2 127.8 93.0 313 1-29-97 Lot 166 81.0 8.4 120.4 127.8 94.0 314 1-29-9 82.0 6.4 118.0 127.8 92.0 315 1-29-97 83.0 6.6 121.8 127.8 95.0 316 1-29-97 Lot 167 82.0 6.2 125.1 127.8 98.0 317 1-29-97 " . 83.0 7.1 122.0 127.8 95.0 318 1-29-97 84.0 7.2 123.5 127.8 97.0 319 1-29-97 Lot 168 82.0 8.2 120.2 127.8 94.0 320 1-29-97 83.0 8.0 119.3 127.8 93.0 321 1-29-97 84.0 9.0 121.5 127.8 95.0 322 1-29-97 Lot 173 83.0 8.6 121.4 127.8 95.0 323 1-29-97 83.0 8.7 120.4 127.8 94.0 324 1-29-97 83.0 6.9 117.1 127.8 92.0 325 1-29-97 Lot 172 85.0 10.1 119.4 127.8 93.0 326 1-29-97 85.5 8.6 120.6 127.8 94.0 327 1-29-97 86.0 8.9 120.7 127.8 94.0 Sladden Engineering _ File: 422-6138 (Add) . April. 10, 1997 Page 3 Test Na Date Loc Eley. Moist Cont Fid Dry Den Max Dry Den Percent Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 328 1-29-97 Lot 171 88.0 8.1 120.5 127.8 94.0 329 1-29-97 88.5 8.5 118.8 127.8 93.0 33.0 1-29-97 89.0 8.2 120.4 127:8 94.0 331 1-29-97 Lot 170 90.0 9.2 120.9 127.8 95.0 332 1-29-97 '.' 90.0 7.7 123.3 127.8 96.0 333 1-29-97 90.0 7.6 121.2 127.8 95.0 334 1-29-97 Lot 169 92.0 9.5 119.6 127.8 94.0 335 1-29-97 92.0 9.9 120.5 127.8 94.0 336 1-29-97 92.0 9.0 121.0 127.8 92.0 337 1-29-97 Lot 153 86.0 9.2 118.2 127.8 92.0 338 1-29-97 87.0 8.2 122.1 127.8 96.0 339 1-29-97 88.0 9.6 116.8 127.8 91.0 340 1-29-97 Lot 152 85.0 8.3 117.4 127.8 92.0 341 1-29-98 86.0 7.9 119.9 127.8 94.0 342 1-29-97 87.0 8.0 118.6 127.8 93.0 343 1-29-97 Lot 154 87.0 8.5 118.4 127.8 93.0 344. 1-29-97 88.0 8.1 118.9 127.8 93.0 345 1-29-97 89.0 9.9 118.1 127.8 92.0 346 1-29-97 Lot 160 80.0 9.5 120.7 127.8 94.0 Slcdden Engin®ening File:. 422-6138 (Add) April 10, 1997 Page 4 Test Moist Cont Fid Dry Den Max Dry Den Percent No. Date Loc. Elev, Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 347 1-29-97 Lot 160 82.0 8.6 121.6 127.8 95.0 348 1-29-97 It83.0 9.5 121.4 127.8 95.0 349 1-29-97 Lot 161 77.0 10.0 118.9 127.8 93.0 350 1-29-97 78.0 8.8 119.1 127.8 93.0 351 1-29-97 79.0 8.8 119.7 127.8 94.0 352 1-29-97 Lot 162 75.0 8.3 121.9 127.8 95.0 353 1-29-97 76.0 10.1 124.3 127.8 97.0 354 1-29-97 77.0 10.1 126.7 127.8 96.0 355 1-29-97 Lot 163 74.0 10.7 123.2 127.8 96.0 356 1-29-97 75.0 10.0 121.7 127.8 95.0 357 1-29-97 76.0 9.0 123.0 127.8 .96.0 358 1-29-97 Lot 155 90.0 9.2 117.7 127.8 92.0 359 1-30-97 91.0 7.2 115.5 127.8 90.0 360 1-30-97 Lot 156 90.0 7.0 115.1 127.8 90.0 361 1-30-97 91.0 7.8 119.1 127.8 93.0 362 1-30-97 92.0 9.4 121.7 127.8 95.0 363 1-30-97 Lot 157 89.0 6.9 122.7 127.8 96.0 364 1-30-97 90.0 7.6 121.4 127.8 95.0 365 1-30-97 90.0 7.0 116.6 127.8 91.0 Sladden Englneering File: 422-6138 (Add). April 10, 1997 Page -5 Test No. Date Loc_ Eley, Moist Cont Fld Dry Den Max Dry Den Percent P�rcent Lbs/Cu Ft Lbs/Cu Ft Maximum 366 1-30-97 Lot 158 88.0 8.4 121.0 127.8. 95.0 367 1-30-97 89.0 7.0 122.0 127.8 96.0 368 1-30-97 Lot 159 85.0 6.8 122.8 127.8 96.0 369 1-30-97 87.0 7.9 121.0 127.8 95.0 370 1-30-97 Lot 160 85.0 9.6 120.2 127.8 94.0 371 1-30-97 87.0 7.9 121.7 127.8 95.0 372 1-30-97 88.0 9.7 120.7 127.8 94.0 373 1-30-97 Lot 161 82.0 8.6 120.0 127.8 94.0 374 1-30-97 83.0 7.9 121.2 127.8 95.0 375 1-30-97 84.0 8.3 118.3 127.8 93.0 376 1-30-97 Lot 162 79.0 10.1 119.3 127.8 93.0 377 1-30-97 81.0 9.2 119.8 127.8 94.0 378 1-30-97 82.0 8.9 118.3 127.8 93.0 379 1-30-97 Lot 163 78.0 9.8 119.7 127.8 94.0 380 1-30-97 it79.0 11.5 122.2 127.8 96.0 381 1-30-97 it80.0 10.7 120.4 127.8 94.0 382 2-03-97 Lot 160 88.0 8.3 126.7 127.8 99.0 383 2-03-97 Lot 159 87.0 8.3 125.7 127.8 98.0 384 2-03-97 88.0 7.5 127.1 127.8 99.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 6 Test Moist Cont Fid Dry Den Max Dry Den Percent 385 2-03-97 Lot 15.8 89.0 6.4 123.1 127.8 96.0 386 2-03-97 90.0 6.7 115.1 127.8 90.0 387 .2-03-97 90.0 6.5 124.4 127.8 90.0 388 2-03-97 Lot 154 89.0 6.5 119.1 127.8 90.0 389 2-03-97 Lot 153 88.0 7.2 118.4 127.8 93.0 390 2-03-97 Lot 152' 88.0 8.9 118.1 127.8 92.0 391 2-03-97 Lot 151 88.0 7.9 120.4 127.8 94.0 392 2-03-97 Lot 165 83.0 13.1 116.8 123.5 95.0 393 2-03-97 it 84.0 10.6 118.8 123.5 96.0 394 2-03-97 Lot 166 84.0 10.3 118.1 123.5 96.0 395 2-03-97. 85.0 8.4 117.4 123.5 95.0 396 2-03-97 Lot 167 87.0 8.9 111.5 123.5 90.0 397 2-03-97 Lot 168 89.0 7.9 112.2 123.5 91.0 398 2-03-97 Lot 159 89.0 7.8 111.4 123.5 90.0 399 2-03-97 89.0 7.8 112.6 123.5 91.0 400 2-03-97 Lot 161 85.0 9.0 115.4 123.5 93.0 401 2-03-97 " 85.0 9.1 116.7 123.5 94.0 402 2-03-97 Lot 162 83.0 8.4 114.8 123.5 93.0 403 2-03-97 it83.0 11.8 114.0 123.5 92.0 Slodden Engineering File: 422-6138_ (Add). April 10, 1997 Page 7 Test No. ate Loc: Eley. Moist Cont Fid Dry Den Max Dry Den Percent PercQnt Lbs/Cu Ft Lbs/Cu Ft Maximum 404 2-03-97 Lot 163 81.0 10.3 114.8 123.5 93.0 405 2-03-97 .81.0 9.1 117:1 123.5 95.0 406 2-03-97 Lot 164 75.0 10.5 118.5 127.8 93.0 407 2-03-97 1176.0 9.3 122.1 127.8 96.0 408 2-03-97 " 77.0 9.5 120.7 127.8 94.0 409 2-03-97 Lot 144 75.0 8.8 119.7 127.8 94.0 410 2-03-97 to 76.0 10.3 120.5 127.8 94.0 411 2-03-97 1177.0 9.5 118.6 127.8 93.0 412 2-03-97 Lot 145 79.0 8.6 119.3 127.8 93.0 413 2-03-97 1180.0 9.1 120.1 127.8 94.0 414 2-03-97 Lot 140. 64.0 9.7 118.2 127.8 92.0 415 2-04-97 1164.5 9.7 120.6 127.8 94.0 416 2-04-97 It65.0 9.6 120.5 127.8 94.0 417 2-04-97 Lot 135 52.0 11.2 117.8 127.8 92.0 418 2-04-97 54.0 9.4 122.9 127.8 96.0 419 2-04-97 .55.0 9.8 122.1 127.8 96.0 420 2-04-97 Lot 136 55.0 9.6 119.9 127.8 94.0 421 2-04-97 56.0 8.7 119.5 127.8 94.0 422 2-04-97 57.0 7.8 121.9 127.8 95.0 516dden. Engineering File:. 422-6138 (Add) April 10, 1997 Page 8 Test No. Date Loc. Eley. Moist Cont Fid Dry Den Max Dry Den Percent Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 423 2-04-97 Lot 137 56.0 11.6 123.2 127.8 96.0 424 2-04-97 57.0 11.7 120.9 127.8 95.0 425 2-04-97 58.0 7.8 124.2 127.8 97.0 426 2-04-97 Lot 138 58.0 8.9 120.0 127.8 94.0 427 2-04-97 If 59.0 10.9 123.0 127.8 96.0 428 2-04-97 60.0 10.3 122.3 127.8 96.0 429 2-04-97 Lot 139 60.0 9.0 121.5 127.8 95.0 430 2-04-97 61.0 8.4 120.8 127.8 95.0 431 2-04-97 62.0 10.8 121.5 127.8 95.0 432 2-04-97 Lot 111 60.0 8.8 113.8 123.5 92.0 433 2-04-97 61.0 10.2 112.3 123.5 91.0 434 2-04-97 If 62.0 9.0 113.6 123.5 98.0 435 2-04-97 Lot 112 59.0 9.2 120.6 123.5 98.0 436 2-04-97 60.0 10.0 115.5 123.5 94.0 437 2-04-97 61.0 8.8 114.6 123.5 94.0 438 2-04-97 Lot 113 60.0 9.5 114.1 123.5 92.0 439 2-04-97 61.0 10.1 114.2 123.5 92.0 440 2-04-97 62.0 8.5 116.9 123.5 95.0 441 2-04-97 Lot 114 59.0 8.2 114.9 123.5 93.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 9 Test Moist Cont Fld Dry Den Max Dry Den Percent 442 2-04-97 Lot 114 60.0 8.7 115.7 123.5 94.0 443 2-04-97 61.0 9.1 113.3 123.5 92.0 444 2-04-97 Lot 115 57.0 10.9 113.1 123.5 92.0 445 2-04-97 58.0 10.4 113.1 123.5 92.0 4462-04-97 56.0 10.9 114.0 123.5 92.0 447 2-04-97 Lot 116 55.0 10.7 112.3 123.5 91.0 4482-04-97 56.0 9.1 114.5 123.5 93.0 4492-04-97 57.0 10.9 113.9 123.5 92.0 4502-04-97 Lot 51 43.0 8.1 107.8 110.0 98.0 4512-04-97 44.0 8.8 .106.9 110.0 97.0 452 2-04-97 Lot 50 43.0 9.2 105.2 110.0 96.0 453 2-04-97 44.0 10.9 105.7 110.0 96.0 454 2-04-97 Lot 49 43.0 11.3 106.2 110.0 96.0 455 2-04-97 42.0 9.8 104.9 110.0 95.0 4562-04-97 Lot 53 41.0 8.7 108.0 110.0 98.0 4572-04-97 Is 42.0 8.5 107.9 110.0 98.0 458 2-04-97 Lot 52 43.0 10.6 106.2 110.0 98.0 4592-04-97 Is44.0 8.7 107.6 110.0 98.0 4602-05-97 Lot 116 58.0 7.6 115.2 123.5 93.0 Slcdden Engineering . \ . File: 422-6138 (Add) . April -10, 1997 Page 10 Test No Date Loc Eley Moist Cont Percent Fid Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 461 2-05-97 Lot 116 59.0 7.9 120.1 123.5 97.0 462 2-05-97 60.0 7.6 118.6 123.5 96.0 463 2-05-97 Lot 115 59.0 8.2 119.8 123.5 97.0 464 2-05-97 60.0 7.8 121.8 123.5 99.0 465 2-05-97 61.0 10.3 120.9 123.5 98.0 466 2-05-97 Lot 135 55.0 10.3 112.5 123.5 91.0 467 2-05-97 56.0 9.7 118.9 123.5 96.0 468 2-05-97 51.0 8.6. '115.2 123.5 93.0 469 2-05-97 Lot 109 63.0 12.0 120.9 127.8 95.0 4702-05-97 64.0 9.7 125.7 127.8 98.0 4712-05-97 it65.0 12.3 125.0 127.8 98.0 472 2-05-97 Lot 110 61.0 16.8 116.1 127.8 91.0 473 2-05-97 62.0 15.9 115.5 127.8 90.0 474 2-05-97 63.0 14.3 117.8 127.8 92.0 475 2-05-97 Lot 136 58.0 9.7 117.5 127.8 93.0 476 2-05-97 59.0 9.3 116.6 123.5 94.0 477 2-05-97 60.0 9.3 117.0 123.5 95.0 478 2-05-97 Lot 105 64.0 7.2 117.7 127.8 92.0 479 2-05-97 65.0 9.9 122.4 127.8 96.0 Sladden Engineering File: .422-6138 (Add) April 10, 1997 _ Page 11 ---• IIo__ Date Loc. Eley. --- --.&& Percent l su Lly be/CII Lull 1Yian illy L/Gll.r VI GOIIL 1t Lbs/Cu Ft Maximum 480 2-05.97 Lot 105 66.0 6.3 121.4 .127.8 95.0 481 2-05-97 Lot 106 66.0 7.6 124.1 127.8 97.0 482.2-05-97 67.0 7.2 118.7 127.8 93.0 483 2-05-97 68.0. 7.4 122.3 127.8 96.0 484 2-05-97 Lot 111 63.0 7.8 123.1 127.8 96.0 485 2-05-97 64.0 7.3 120.1 127.8 94.0 486 2-05-97 65.0 7.1 119.9 127.8 94.0 487 2-05-97 Lot 110 64.0 9,1 119.8 127.8 94.0 488 2-05-97 65.0 8.6 118.7 127.8 93.0 489 2-05.97 66.0 7.6 118.9 127.8 93.0 490 2-05-97 Lot 109. 66.0 7.9 120.7 127.8 94.0 491 2-05-97 1167.0 8.7 120.6 127.8 94.0 4922-05-97 '1 68.0 8.0 119.9 127.8 94.0 493 2-05-97 Lot 112 63.0 7.6 119.3 127.8 63.0 494 2-05-97 64.0 8.1 118.7 127.8 93.0 495 2-05-97 65,0 9.1 119.2 127.8 93.0 496 2-05-97 Lot 107 65.0 8.2 119.8 127.8 94.0 497 2-05-97 66.0 10.4 124.3 127.8 97.0 498 2-05-97 67.0 9.8 123.9 127.8 97.0 gladden Engineering File: 422-6138 (Add) April 10, 1997 Page 12 Test Moist Cont Fld Dry Den Max Dry Den Percent 499 2-05-97 Lot 108 65.0 8.5 126.0 127.8 99.0 500 2-05-97 It66.0 9.1 120.4 127.8 94.0 501 2-05-97 67.0 10.6 122.2 127.8 96.0 502 2-05-97 Lot 103 70.0 8.8 118.9 127.8 93.0 503 2-05-97 of. 71.0 9.6 120.2 127.8 94.0 504 2-05-97 72.0 11.2 123.5 127.8 97.0 505 2-05-97 Lot 104 64.0 10.7 123.1 127.8 96.0 506 2-05-97 65.0 8.0 125.2 127.8 98.0 507 2-05-97 66.0 9.1 120.9 127.8 95.0 508 2-06-97 Lot 117 51.0 6.7 122.0 127.0 96.0 509 2-06-97 52.0 6.9 124.5 127.0 98.0 510 2-06-97 5-3.0 8.2 120.8 127.0 95.0 511 2-06-97 Lot 118 51.0 8.0 115.4 127.0 91.0 512 2-06-97 52.0 8.8 115.8 127.0 91.0 513 2-06-97 53.0 9.2 116.7 127.0 92.0 514 2-06-97 Lot 119 53.0 8.4 115.3 127.0 91.0 515 2-06-97 54.0 10.2 118.0 127.0 93.0 516 2-06-97 55.0 9.8 117.7 127.0 93.0 517 2-06-97 Lot 137 59.0 12.4 17.7 127.0 93.0 Siadden Engineering File: 422-6138 (Add) April 10, 1997 Page 13 Test Moist Cont Fld Dry Den Max Dry Den Percent No Date Loc Eley, Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 518 2-06-97 Lot 137 60.0 8.8 118.6 127.0 93.0 519 2-06-97 if.61.0 10.6 116.6 127.0 92.0 520 2-06-97 Lot 134 53.0 8.7 123.5 127.0 97.0 521 2-06-97 54.0 12.7 115.4 127.0 91.0 522 2-06-97 55.0 10.1 117.1 127.0 92.0 523 2-06-97 Lot 117 54.0 12.9 119.4 127.0 94.0 524 2-06-97 55.0 14.5 117.6 127.0 93.0 525 2-06-97 56.0 13.9 114.3 127.0 90.0 526 2-06-97 Lot 118 54.0 14.1 115.4 127.0 91.0 527 2706-97 55.0 12.9 117.4 127.0 92.0 528 2-06-97 56.0 14.4 119.0 127.0 94.0 529 2-06-97 Lot 113 61.0 12.6 119.0 127:0 94.0 530 2-06-97 62.0 12.1 117.2 127.0 92.0 531 2-06-97 63.0 12.0 123.1 127.0 97.0 532 2-06-97 Lot 152 88.0 7.0 121.2 127.8 95.0 533 2-06-97 88.0 7.6 119.3 127.8 93.0 534 2-06-97 Lot 165 85.0 8.4 116.5 127.8 91.0 Slodden .Engineering File; 422-6138 (Add) April 10, .1997 Page 14 Test Moist Cont Fid Dry Den Max Dry lien Percent No Date Low Eley, Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 535 2-06-97 Lot 165 85.0 7.2 121.5 127.8 95.0 536 2-06-97 Lot 166 87.0 8.4 121.4 127.8 95.0 537 2-06-97 " 87.0 12.0 121.3 127.8 95.0 538 2-06-97 If87.0 9.6 123.8 127.8 97.0 539 2-06-97 Lot 167 90.0 7.4 116.6 127.8 91.0 540 2-06-97 to90.0 7.7 117.3 127.8 92.0 541 2-06-97 90.0 7.8 121.2 127.8 90.0 542 2-06-97 Lot 168 92.0 10.7 124.5 127.8 92.0 543 2-06-97 92.0 8.6 118.4 127.8 93.0 544 2-06-97 Lot 99 81.0 8.3 122.2 127.8 96.0 545 2-06-97 It81.0 7.5 120.0 127.8 94.0 546 2-06-97 Lot 98 78.0 8.6 114.7 127.8 98.0 547 2-06-97 if78.0 7.7 124.8 127.8 98.0 548 2-06-97 Lot 139 63.0 8.7 119.7 127.8 94.0 549 2-06-97 64.0 8.3 119.3 127.8 93.0 550 2-06-97 Lot 138 61.0 8.8 118.6 127.8 93.0 551 2-06-97 62.0 7.9 126.4 127.8 99.0 552 2-06-97 Lot 108 68.0 8.4 121.6 127.8 95.0 553 2-06-97 69.0 8.7 127.2 127.8 96.0 Slcdden Engineering File: 422-6138 (Add) April 10, 1997 Page 15 Test Moist Cont Ed Dry Den Max Dry Den Percent 554 2-06-97 Lot 71 48.0 10.1 105.1 110.0 96.0 555 2-06-97 49.0 9.4 107.5 110.0 98.0 556 2-06-97 50.0 9.7 108.6 120.0 91.0 557 2-06-97 Lot 70 48.0 8.8 110.3 120.0 92.0 558 2-06-97 It49.0 7.6 108.9 120.0 91.0 559 2-06-97 50.0 8.8 110.0 120.0 92.0 560 2-06-97 Lot 69 48.0 7.6 113.5 120.0 95.0 561 2-06-97 of49.0 9.2 113.4 120.0 95.0 562 2-06-97 of50.0 8.9 112.1 120.0 93.0 563 2-06-97 Lot 69 47.0 9.8 112.5 120.0 94.0 564 2-06-97 of48.0 8.8 111.1 120.0 93.0 565 2-06-97 49.0 9.6 110.9 120.0 92.0 566 2-06-97 Lot 67 47.0 9.2 111.2 120.0 93.0 567 2-06-97 48.0 8.6 110.4 120.0 92.0 568 2-06-97 49.0 9.0 109.7 120.0 91.0 569 2-06-97 Lot 66 46.0 7.2 114.4 120.0 95.0 570 2-06-97 It47.0 8.4 110.4 120.0 92.0 571 2-06-97 It 48.0 10.7 109.3 120.0 91.0 572 2-06-97 Lot 65 45.0 8.8 113.7 120.0 95.0 Slodden Engineering File: 422-6138 (Add)] April 10, 1997 Page 16 Test Moist Cont Fld Dry Den Max Dry Den Percent 573 2-06-97 Lot 65 46.0 8.9 111.3 120.0 93.0 574 2-06-97 Lot 74 51.0 6.6 112.6 120.0 94.0 575 2-06-97 " 52.0 11.1 112.5 120.0 94.0 576 2-06-97 53.0 9.3 113.9 120.0 95.0 577 2-06-97 Lot 73 49.0 7.8 113.2 120.0 94.0 578 2-06-97 1150.0 9.7 111.8 120.0 93.0 579 2-06-97 to51.0 8.6 111.3 120.0 93.0 580 2-06-97 Lot 72 48.0 7.9 111.6 120.0 93.0 581 2-06-97 49.0 10.7 108.0 120.0 90.0 582 2-06-97 50.0 10.5 111.5 120.0 93.0 583 2-06-97 Lot 138 63.0 8.7 118.7 127.8 93.0 584 2-06-97 63.0 7.2 117.9 127.8 92.0 585 2-06-97 63.0 9.1 119.9 127.8 94.0 586 2-06-97 Lot 134 65.0 8.7 119.5 127.8 94.0 587 2-06-97 65.0 8.5 118.4 127.8 93.0 588 2-06-97 Lot 141 72.0 9.1 119.3 127.8 93.0 589 2-06-97 it72.0 9.9 120.4 127.8 94.0 590 2-06-97 It72.0 9.5 118.0 127.8 92.0 591 2-06-97 Lot 142 76.0 10.0 116.7 127.8 93.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 17 Test No Date Loc Eley. Moist Cont Fld Dry Den Max Dry Den Percent Percent Lbs/C-u Ft Lbs/Cu Ft Maxim rq 592 2-06-97 Lot 142 76.0 11.5 119.1 127.8 93.0 593 2-06-97 76.0 10.7 121.0 127.8 .95.0 594 2-06-97 Lot 143 79.0 10.3 119.0 127.8 93.0 595 2-06-97 of79.0 9.7 118.3 127.8 93.0 596 2-06-97 79.0 8.2 121.4 127.8 95.0 597 2-10-97 Lot 105 67.0 6.5 114.3 120.0 95.0 598 2-10-97 It67.0 6.7 110.4 120.0 92.0 599 2-10-97 if67.0 6.5 114.4 120.0 95.0 600 2-10-97 Lot 104 67.0 6.9 108.7 120.0 91.0 601 2-10-97 it67.0 7.5 109.5 120.0 91.0 602 2-10-97 It67.0 7.4 111.4 120.0 93.0 603 2-10-97 Lot 106 69.0 6.4 108.3 120.0 93.0 604 2-10-97 69.0 8.0 111.8 120.0 93.0 605 2-10-97 69.0 6.5 112.5 120.0 97.0 606 2-10-97 Lot 56 38.0 12.6 104.7 116.2 90.0 607 2-10-97 39.0 9.8 109.8 116.2 94.0 608 2-10-97 .40.0 10.1 108.6 116.2 93.0 609 2-10-97 Lot 57 39.0 15.6 105.5 116.2 91.0 610 2-10-97 It40.0 9.7 108.6 116.2 93.0 Sladden Engineering File: 422-6138 (Add). April 10, 1997 Page 18 Test Nn Date Loc Elev Moist Cont Percent Fid Dry Den Max Dry lien Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 611 2-10-97 Lot 57 41.0 10.6 109.9 116.2 95.0 612 2-10-97 Lot 58 39.0 11.4 110.9 116.2 95.0 613 2-10-97 40.0 10.7 110.5 116.2 95.0 614 2-10-97 41.0 9.5 112.8 116.2 97.0 615 2-10-97 Lot 164 79.0 9.8 116.1 127.8 91.0 616 2-10-97 79.0 7.3 126.4 127.8 99.0 617 2-10-97 Lot 163 81.0 7.9 121.9 127.8 95.0 618 2-10-97 81.0 8.6 119.1 127.8 93.0 619 2-10-97 Lot 162 83.0 7.8 119.0 127.8 93.0 620 2-10-97 it83.0 6.5 114.8 127.8. 90.0 621 2-10-97 Lot 161 85.0 6.1 122.6 127.8 96.0 622 2-10-97 of85.0 6.2 119.6 127.8 94.0 623 2-10-97 Lot 160 88.0 9.5 115.7 127.8 91.0 624 2-10-97 88.0 6.6 119.6 127.8 94.0 625 2-10-97 Lot 101 77.0 6.7 119.4 127.8 93.0 626 2-10-97 1178.0 6.8 116.3 127.8 91.0 627 2-10-97 Lot 100 75.0 6.6 120.6 127.8 94.0 628 2-10-97 76.0 7.3 124.3 127.8 97.0 629 2-10-97 77.0 12.9 122.0 127.8 95.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 19 Test Moist Cont Fld Dry lien Max Dry lien Percent No Date Loc. Eley. Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 630 2-10-97 Lot 63 44.0 11.7 102.6 110.0 93.0 631 2-10-97 45.0 10.3 107.1 110.0 97.0 632 2-10-97 46.0 10.4 107.4 110.0 98.0 633 2-10-97 Lot 64 45.0 10.0 106.8 110.0 97.0 634 2-10-97 46.0 11.8 103.9 110.0 94.0 635 2-10-97 47.0 8.5 109.0 110.0 99.0 636 2-10-97 Lot 65 46.0 10.0 107.7 110.0 98.0 637 2-10-97 47.0 10.8 106.6 110.0 97.0 638 2-10-97 48.0 9.8 107.7 110.0 98.0 639 2-10-97 Lot 145 81.0 7.8 121.2 127.8 95.0 640 2-10-97 81.0 7.3 119.8 119.8 94.0 641 2-10-97 Lot 144 79.0 7.8 117.8 127.8 92.0 642 2-10-97 It79.0 8.8 122.0 127.8 95.0 643 2-10-97 :Lot 55 39.0 8.4 108.5 116.2 93.0 644 2-10-97 40.0 8.7 107.0 116.2 92.0 645 2-10-97 41.0 8.2 110.5 116.2 95.0 646 2-10-97 Lot 57 41.0 7.8 109.2 116.2 94.0 647 2-10-97 42.0 7.6 109.6 116.2 94.0 648 2-10-97 It 43.0 7.7 109.4 116.2 94.0 Slodden Engineering File: 422-613 8 (Add) April 10, 1997 Page 20 Test Moist Cont Fld Dry Den Max Dry Den Percent 649 2-10-97 Lot 59 41.0 7.2 109.2 116.2 94.0 650 2-10-97 it42.0 7.8 110.7 116.2 95.0 651 2-10-97 it 43.0 9.1 107.3 116.2 92.0 652 2-10-97 Lot 60 41.0 8.7 107.3 116.2 92.0 653 2-10-97 It 42.0 10.5 104.0 116.2 90.0 654 2-10-97 It 43.0 11.0 104.8 116.2 90.0 655 2-10-97 Lot 61 42.0 12.7 105.9 116.2 91.0 656 2-10-97 It43.0 9.8 110.7 116.2 95.0 657 2-10-97 of44.0 8.3 110.4 116.2 95.0 658 2-10-97 Lot 62 42.0 9.3 108.1 116.2 93.0 659 2-10-97 " 43.0 11.3 107.5 116.2 93.0 660 2-10-97 it44.0 12.6 105.8 116.2 91.0 661 2-11-97 Lot 102 77.0 6.2 121.4 127.8 95.0 662 2-11-97 If78.0 6.9 122.4 127.8 96.0 663 2-11-97 Lot 101 73.0 7.4 119.8 127.8 94.0 664 2-11-97 it15.0 6.7 120.8 127.8 95.0 665 2-11-97 77.0 7.3 121.8 127.8 95.0 666 2-11-97 Lot 61 41.0 7.6 113.8 116.2 98.0 667 2-11-97 42.0 9.3 108.1 116.2 93.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 21 Test Moist Cont Fid Dry Den Max Dry Den Percent No. Date Loc Elev PcrSent Lbs/Cm Ft Lbs/Su Ft Maximum. 668 2-11-97 Lot 61 43.0 7.8 109.2 116.2 93.0 669 2-11-97 Lot 63 46.0 7.6 107.7 116.2 93.0 670 2-11-97 It 47.0 7.0 112.1 116.2 96.0 671 2-11-97 to48.0 6.6 111.5 I16.2 96.0 672 2-11-97 Lot 65 47.0 10.5 109.1 116.2 94.0 673 2-11-97 48.0 9.8 108.9 116.2 94.0 674 2-11-97 49.0 9.8 107.2 116.2 92.0 675 2-11-97 Lot 67 49.0 11.4 110.0 116.2 95.0 676 2-11-97 50.0 9.7 108.6 116.2 93.0 677 2-11-97 51.0 10.5 108.2 116.2 93.0 678 2-11-97 Lot 68 50.0 11.7 105.8 116.2 91.0 679 2-11-97 If 51.0 10.6 109.8 116.2 94.0 680 2-11-97 " 52.0 11.3 105.8 116.2 91.0 681 2-11-97 K -Street 58.0 8.4 108.5 116.2 93.0 682 2-11-97 60.0 8.8 108.8 116.2 94.0 683 2-11-97 Lot 62 44.0 7.0 108.1 116.2 92.0 684 2-11-97 If45.0 7.6 107.61 116.2 93.0 685 2-11-97 46.0 8.1 106.5 116.2 92.0 686 2-11-97 Lot 64 47.0 11.2 109.8 116.2 94.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 22 Test No Date Loc Elev Moist Cont Fid Dry Den Max Dry Den Percent Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 687 2-11-97 Lot 64 48.0 14.3 109.5 116.2 94.0 688 2-11-97 it49.0 11.3 109.8. 116.2 94.0 689 2-11-97 Lot 66 48.0 8.7 108.2 116.2 93.0 690 2-11-97 49.0 9.4 106.9 116.2 92.0 691 2-11-97 50.0 8.2 107.7 116.2 93.0 692 2-11-97 Lot 69 50.0 8.4 113.4 116.2 93.0 693 2-11-97 Lot 102 79.0 8.7 115.7 127.8 91.0 694 2-11-97 it79.0 8.4 118.5. 127.8 93.0 695 2-11-97 Lot 101 78.0 7.5 10.6 127.8 92.0 696 2-11-97 78.0 8.4 118.5 127.8 93.0 697 2-11-97 Lot 103 74.0 6.9 123.0 127.8 96.0 698 2-11-97 It74.0 7.1 117.0 127.8 92.0 699 2-11-97 Lot 100 77.0 6.7 119.0 127.8 93.0 700 2-11-97 to 77.0 7.1 119.9 127.8 94.0 701 2-11-97 Lot 69 50.0 11.3 102.3 110.0 93.0 702 2-11-97 " 51.0 11.4 102.4 110.0 93.0 703 2-11-97 to 52.0 11.7 102.4. 110.0 93.0 704 2-11-97 Lot 70 50.0 11.2 108.9 110.0 99.0 705 2-11-97 51.0 12.7 103.0 110.0 94.0 Siodden Engineering File: 422-6138 (Add) April 10, 1997 Page 23 Test Moist Cont Fld Dry Den Max Dry Den Percent No. Date Loc. Eley Percent Lbs/Cu Ft Lbs/Cu Et Maximum 706 2-11-97 Lot 70 52.0 11.8 101.3 110.0 92.0 707 2-11-97 Lot 84 59.0 11.3 110.7 116.2 95.0 708 2-11-97 60.0 8.8 110.9 116.2 95.0 709 2-11-97 to 61.0 10.1 111.6 116.2 96.0 710 2-11-97 Lot 83 58.0 7.9 109.1 116.2 94.0 . 711 2-11-97 If59.0 9.4 109.0 116.2 94.0 712 2-11-97 It60.0 9.3 108.1 116.2 93.0 713 2-11-97 Lot 82 58.0 9.3 106.7 116.2 92.0 714 2-11-97 59.0 7.4 108.7 116.2 94.0 715 2-11-97 60.0 8.4 110.4 116.2 95.0 716 2-11-97 Lot 81 57.0 8.1 110.4 116.2 95.0 717 2-11-97 58.0 11.0 109.5 116.2 94.0 718 2-11-97 59.0 9.6 109.9 116.2 95.0 719 2-11-97 Lot 85 63.0 9.7 107.3 116.2 92.0 720 2-11-97 63.0 11.9 109.4 116.2 94.0 721 2-11-97 63.0 10.1 106.6 116.2 92.0 722 2-11-97 Lot 86 64.0 12.2 109.0 116.2 94.0 723 2-11-97 64.0 11.4 106.1 116.2 91.0 724 2-11-97 64.0 11.9 106.7 116.2 92.0 Slodden Engineering Tile: 422-6138 (Add) April 10, 1997 Page 24 1 CSL No Date Loc Eley. 1-1- Percent .. -. J __....-.... Lbs/Cu Ft Y.) --.. - -. --." Lbs/C.0 Ft Maximum 725 2-11-97 Lot 80 59.0 9.6 111.6 116.2 96.0 726 2-11-97 1160.0 8.7 109.1 116.2 94.0 727 2-11-97 " 61.0 12.3 110.5 116.2 95.0 728 2-11-97 It 61.0 11.0 108.7 116.2 94.0 729 2-11-97 Lot 81 12.3 106.6 106.6 116.2 92.0 730 2-11-97 61.0 12.2 105.5 116.2 91.0 731 2-11-97 Lot 82 61.0 11.0 106.5 116.2 92.0 732 2-11-97 it 61.0 9.6 107.3 116.2 92.0 733 2-11-97 Lot 83 61.0 12.8 110.9 116.2 95.0 734 2-11-97 It 61.0 10.8 109.2 116.2 94.0 735 2-11-97 Lot 84 62.0 10.5 107.6 116.2 93.0 736 2-11-97 62.0 9.6 108.3 116.2 93.0 737 2-12-97 Lot 71 52.0 .9.8 107.9 110.0 98.0 738 2-12-97 of 53.0 11.7 106.4 110.0 97.0 739 2-12-97 It 54.0 14.2 102.2 110.0 93.0 740 2-12-97 Lot 69 51.0 9.8 108.4 110.0 99.0 741 2-12-97 52.0 15.1 105.6 110.0 96.0 742 2-12-97 53.0 10.5 107.8 110.0 98.0 743 2-12-97 Lot 70 10.3 10.3 108.5 110.0 99.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 25 Test Moist Cont Fld Dry Den .Max Dry Den Percent 744 2-12-97 Lot 70 53.0 9.4 107.4 110.0 98.0 745 2-12-97 to54.0 8.7 108.4 110.0 99.0 746 2-12-97 Lot 73 52.0 7.6 105.4 110.0 96.0 747 2-12-97 53.0 7.5 106.5 110.0 97.0 748 2-12-97 54.0 7.1 105.5 110.0 96.0 749 2-12-97 Lot 72 51.0 6.7 106.0 110.0 96.0 750 2-12-97 52.0 7.6 105.5 110.0 96.0 751 2-12-97 53.0 7.3 107.1 110.0 97.0 752 2-12-97 Lot 71 54.0 7.2 107.4 110.0 98.0 753 2-12-97 55.0 7.0 107.1 110.0 97.0 754 2-12-97 56.0 7.8 108.1 110.0 98.0 755 2-12-97 Lot 50 44.0 9.3 102.1 110.0 93.0 756 2-12-97 045.0 12.7 100.4 110.0 91.0 757 2-12-97 It 46.0 10.1 99.7 110.0 91.0 758 2-12-97 Lot 51 44.0 8.7 99.8 1.10.0 91.0 759 2-12-97 45.0 10.5 99.9 110.0 91.0 760 2-12-97 46.0 12.9 99.9 110.0 91.0 761 2-12-97 Lot 108 69.0 8.8 119.2 127.8 93.0 762 2-12-97 1169.0 90 118.5 127.8 93.0 Sadden Engln®ering File: 422-6138 (Acid) April 10, 1997 Page 26 Test Moist Cont Fid Dry lien Max Dry lien .Percent No. Date Loc- Eley. Percent LbsMu Ft Lbs/Cu Ft Maximum 763 2-12-97 Lot 107 69.0 11.2 121.0 127.8 95.0 764 2-12-97 69.0 10.7 118.6 127.8 93.0 765 2-12-97 69.0 9.1 122.8 I27.8 96.0 766 2-12-97 Lot 109 69.0 8.2 119.7 127.8 94.0 767 2-12-97 69.0 10.3 122.6 127.8 96.0 768 2-12-97 69.0 9.6 119.6 127.8 94.0 769 2-12-97 Lot 110 67.0 12.1 120.5 127.8 94.0 770 2-12-97 67.0 11.7 123.1 127.8 96.0 771 2-12-97 67.0 8.8 119.8 127.8 94.0 772 2-12-97 Lot 111 66.0 9.4 121.1 127.8 95.0 773 2-12-97 66.0 9.6 120.3 127.8 94.0 774 2-12-97 66.0 8.3 119.9 127.8 94.0 775 2-12-97 Lot 112 66.0 10.9 120.5 127.8 94.0 776 2-12-97 of66.0 9.5 121.8 127.8 95.0 777 2-12-97 it 66.0 9.2 116.9 127.8 91.0 778 2-12-97 Lot 113 64.0 9.6 119.6 127.8 94.0 779 2-12-97 64.0 8.6 120.6 127.8 94.0 780 2-12-97 64.0 10.4 120.0 127.8 94.0 781 2-12-97 Lot 114 63.0 10.0 125.0 127.8 98.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 27 Test Moist Cont Fld Dry Den Max Dry Den Percent No Date Loc Eley. Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 782 2-12-97 Lot 114 63.0 10.6 123.6 127.8 97.0 783 2-12-97 It63.0 8.3 121.2 127.8 95.0 784 2-12-97 Lot 115 62.0 9.5 123.0 127.8 96.0 785 2-12-97 It62.0 9.6 122.2 127.8 96.0 786 2-12-97 62.0 8.6 120.3 127.8 94.0 787 2-12-97 Lot 116 61.0 8.5 120.7 127.8 94.0 788 2-12-97 61.0 10.0 118.5 127.8 93.0 789 2-12-97 61.0 12.2 118.9 127.8 93.0 790 2-13-97 Lot 46 42.0 7.9 109.0 120.0 91.0 791 2-13-97 43.0 9.5 111.8 120.0 93.0 792 2-13-97 Lot 47 44.0 12.0 112.1 120.0 93.0 793 2-13-97 45.0 9.2 113.9 120.0 95.0 794 2-13-97 Lot 48 44.0 8.3 113.4 120.0 95.0 795 2-13-97 It45.0 7.8 112.2 120.0 94.0 796 2-13-97 Lot 52 45.0 9.3 112.8 120.0 94.0 797 2-I3-97 46.0 7.9 112.6 120.0 94.0 798 2-13-97 47.0 11.5 111.0 120.0 93.0 799 2-13-97 Lot 50 47.0 9.2 111.5 I20.0 93.0 800 2-13-97 48.0 78 112.0 120.0 93.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 28 Test No Date Loc Elev. Moist Cont Rd Dry Den Max Dry Den Percent Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 801 2-13-97 Lot 50 49.0 8.3 112.4 120..0 94.0 802 2-13-97 Lot 51 46.0. 7.2 111.2 120.0 93.0 803 2-13-97 47.0 8.9 112.7 120.0 94.0 804 2-13-97 48.0 9.8 113.7 120.0 95.0 805 2-13-97 Lot 46 45.0 8.0 118.1 120.0 98.0 806 2-13-97 Lot 47 46.0 8.8 118.1 120.0 98.0 807 2-13-97 47.0 9.3 119.2 120.0 99.0 808 2-13-97 Lot 45 42.0 6.9 114.6 120.0 96.0 809 2-13-97 It43.0 7.9 110.6 120.0 92.0 . 810 2-13-97 it 44.0 7.2 115.8 120.0 97.0 811 2-13-97 Lot 72 55.0 8.3 108.3 120.0 90.0 812 2-13-97 It 56.0 12.5 109.7 120.0 91.0 813 2-13-97 It 57.0 12.3 110.6 120.0 92.0 814 2-13-97 Lot 73 55.0 13.3 110.6 116.2 95.0 815 2-13-97 56.0 10.2 113.5 116.2 98.0 816 2-13-97 57.0 15.3 108.2 116.2 93.0 817 2-13-97 Lot 74 56.0 10.9 110.9 116.2 95.0 818 2-13-97 57.0 8.6 111.3 116.2 96.0 819 2-13-97 58.0 9.4 112.7 116..2 97.0 Slodden. Engineering File: 422-6138 (Add) April 10, 1997 Page 29 Test No Date Loc Eley. Moist Cont Fld Dry Den Max Dry Den Percent Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 820 2-13-97 Lot 75 60.0 10.7 110.8 116.2 95.0 821 2-13-97 " 61.0 11.7 111.2 116.2 96.0 822 2-13-97 Lot 93 74.0 6.9 121.7 127.8 95.0 823 2-13-97 74.0 7.0 121.8 127.8 95.0 824 2-13-97 74.0 12.0 121.5 127.8 95.0 825 2-13-97 Lot 92 70.0 7.2 121.3 127.8 95.0 826 2-13-97 70.0 7.0 120.6 127.8 94.0 827 2-13-97 70.0 3.8 118.1 127.8 92.0 828 2-13-97 Lot 91 69.0 7.4 121.5 127.8 95.0 829 2-13-97 It 69.0 5.4 120.6 127.8 94.0 830 2-13-97 69.0 7.8 120.2 127.8 94.0 831 2-13-97 Lot 90 67.0 7.4 121.7 127.8 95.0 832 2-13-97 67.0 5.6 118.7 127.8 93.0 833 2-13-97 67.0 6.2 120.5 127.8 94.0 834 2-13-97 67.0 5.9 122.7 127.8 96.0 835 2-13-97 Lot 89 65.0 7.8 120.7 127.8 94.0 836 2-13-97 it65.0 8.0 118.1 127.8 92.0 837 2-13-97 65.0' 7.0 119.7 127.8 94.0 838 2-13-97 65.0 7.6 118.5 127.8 93.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 30 Test Moist Cont Fld Dry Den Max Dry Den Percent No Date Loi Eley. Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 839 2-13-97 Lot 88 63.0 6.4 121.0 127.8 95.0 840 2-13-97 1163.0 .6.1 119.7 127.8 94.0 841 2-13-97 of 63.0 5.2 118.7 127.8 93.0 842 2-13-97 Lot 87 63.0 6.8 118:0 127.8 96.0 843 2-13-97 63.0 5.2 119.0 127.8 96.0 844 2-13-97 63.0 6.6 113.9 127.8 92.0 . 845 2-13-97 63.0 6.3 116.0 127.8 94.0 846 2-18-97 Lot 103 74.0 5.5 123.3 127.8 96.0 847 2-18-97 of74.0 7.0 121.7 127.8 95.0 848 2-18-97 Lot 104 67.0 7.0 123.5 127.8 97,0 849 2-18-97 Lot 101 78.0 6.7 123.1 127.8 96.0 850 2-18-97 Lot 44 41.0 13.7 110.6 120.0 92.0 851 2-18-97 42.0 10.1 117.0 120.0 98.0 852 2-18-97 43.0 12.3 117.2 120.0 98.0 853 2-18-97 Lot 48 46.0 10.3 112.3 120.0 94.0 854 2-18-97 it47.0 10.2 110.1 120.0 92.0 855 2-18-97 Lot 47 47.0 13.2 118.5 120.0 99.0 856 2-18-97 ti48.0 14.9 115.5 120.0 96.0 857 2-18-97 Lot 49 47.0 12.5 119.3 120.0 99.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 31 Test Moist Cont Fld Dry Den Max Dry Den Percent No Date Loc lev. ercQnt Lbs/Cu Ft Lbs/Cu Ft Maximum 858 2-18-97 Lot 49 48.0 13.2 118.0 120.0 98.0 859 2-18-97 Lot 53 44.0 10.7 114.1 120.0 95.0 860 2-18-97 45.0 12.2 118.2 120.0 99.0 861 2-18-97 46.0 8.3 116.0 120.0 97.0 862 2-18-97 48.0 8.8 115.3 120.0 96.0 863 2-18-97 49.0 10.6 117.8 120.0 98.0 864 2-18-97 Lot 51 50.0 11.1 116.1 120.0 97.0 865 2-18-97 Lot 50 49.0 8.8 116.8 120.0 97.0 866 2-18-97 50.0 9.6 118.6 120.0 99.0 867 2-18-97 51.0 9.7 118.9 120.0 99.0 868 2-18-97 Lot 44 44.0 8.2 112.3 120.0 94.0 869 2-18-97 " 45.0 10.7 114.7 120.0 96.0 870 2-19-97 it46.0 7.1 118.6 123.5 96.0 871 2-19-97 47.0 9.6 121.7 123.5 99.0 872 2-19-97 48.0 8.7 121.8 123.5 99.0 873 2-19-97 Lot 46 48.0 6.5 118.0 123.5 96.0 874 2-19-97 It 49.0 10.5 117.7 123.5 95.0 875 2-19-97 to50.0 6.0 116.7 123.5 9.4.0 876 2-19-97 Lot 48 49.0 9.7 112.3 123.5 91.0 Slodden Engineering File: -422-6138 (Add) April 10, 1997 Page 32 Test No Date Loc Eley. Moist Cont Fid Dry Den Max Dry Den Percent Percent Lbs/Cult LbsCu Ft Maximum 877 2-19-97 Lot 48 50.0 8.8 112.3 123.5 91.0 878 2-19-97 51.0 9.7 111.5 123.5 90.0 879 2-19-97 Lot 53 46.0 7.6 113.8 123.5 92.0 880 2-19-97 47.0 7.4 114.1 123.5 92.0 881 2-19-97 48.0 7.9 114.0 123.5 92.0 882 2-19-97 Lot 75 62.0 8.4 112.0 123.5 92.0 883 2-19-97 63.0 11.2 119.7 123.5 97.0 884 2-19-97 Lot 74 62.0 10.7 110.6 123.5 90.0 885 2-19-97 If63.0 9.4 111.4 123.5 90.0 886 2-19-97 Lot 73 59.0 11.4 111.2 123.5 90.0 887 2-19-97 it 60.0 8.6 112.7 123.5 91.0 888 2-19-97 .Lot 72 58.0 12.5 119.1 123.5 96.0 .889 2-19-97 59.0 11.9 115.6 123.5 94.0 890 2-19-97 Lot 76 62.0 11.9 118.6 123.5 96.0 891 2-19-97 63.0 11.7 117.0 123.5 95.0 892 2-19-97 If 64.0 10.6 114.0 123.5 92.0 893 2-19-97 Lot 77 62.0_ 11.2 113.8 123.5 92.0 894 2-19-97 63.0 9.5 113.7 123.5 92.0 895 2-19-97 Lot 78 61.0 9.3 117.4 123.5 94.0 Sladden Englne®ring File: 422-6138 (Add) April 10, 1997 Page 33 Test Moist Cont Fld Dry Den Max, Dry Den Percent 896 2-19-97 Lot 78 62.0 8.8 116.4 123.5 94.0 897 2-19-97 0163.0 8.6 118.4 123.5 96.0 898 2-19-97 Lot 73 60.0 9.4 115.3 123.5 93.0 899 2-19-97 It61.0 8.5 114.1 123.5 92.0 900 2-19-97 Lot 74 62.0 9.3 113.9 123.5 92.0 901 2-19-97 63.0 10.7 114.4 123.5 93.0 902 2-19-97 64.0 10.3 114.7 123.5 93.0 903 2-19-97 64.0 10.1 113.6 123.5 92.0 904 2-20-97 Lot 75 63.0 14.1 113.7 123.5 92.0 905 2-20-97 64.0 11.7 115.2 123.5 93.0 906 2-20-97 65.0 12.8 112.2 123.5 91.0 907 2-20-97 Lot 76 63.0 8.5 118.0 123.5 96.0 908 2-20-97 It64.0 8.7 117.2 123.5 95.0 909 2-20-97 of65.0 8.4 117.8 123.5 95.0 910 2-20-97 Lot 78 63.0 9.6 115.7 123.5 94.0 911 2-20-97 63.0 8.3 1.16.2 123.5 94.0 912 2-20-97 63.0 10.0 115.7 123.5 94.0 913 2-20-97 Lot 79 62.0 8.9 119.2 123.5 97.0 914 2-20-97 62.0 10.5 118.7 123.5 96.0 Siadden Engineering File: 422-6138 (Add) April 10, 1997 Page 34 1 est No Date Loc Eley, Moist Lont rid Dry lien Max Dry lien Percent Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 915 2-20-97 Lot 79 62.0 10.4 120.0 123.5 97.0 916 2-20-97 Lot 55 41.0 12.3 113.7 123.5 92.0 917 2-20-97 IT 42.0 10.1 115.6 123.5 94.0 918 2-20-97 if43.0 11.1 112.9 123.5 91.0 919 2-20-97 Lot 56 41.0 10.7 114.2 123.5 92.0 920 2-20-97 " . 42.0 9.8 112.9 123.5 91.0 921 2-20-97 43.0 8.3 112.9 123.5 91.0 922 2-20-97 Lot 58 42.0 11.6 113.6 123.5 92.0 923 2-20-97 1143.0 9.4 117.6 123.5 95.0 924 2-20-97 IT44.0 8.9 117.1 123.5 95.0 925 2-20-97 Lot 59 43.0 9.6 115.0 123.5 93.0 926 2-20-97 It44.0 8.0 118.2 123.5 96.0 927 2-20-97 It45.0 9.5 116.7 123.5 94.0 928 2-20-97 Lot 60 44.0 10.0 117.2 123.5 95.0 929 2-20-97 45.0 12.2 115.1 123.5 93.0 930 2-20-97 46'.0 8.7 112.9 123.5 91.0 931 2-20-97 Lot 61 45.0 9.1 117.6 123.5 95.0 932 2-20-97 46.0 9.5 115.2 123.5 93.0 933 2-20-97 47.0 10.5 114.5 123.5 93.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 35 Test No Date Loc Flee Moist Cont Percent Fid Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 934 2-20-97 Lot 62 46.0 8.1 119.0 123.5 96.0 935 2-20-97 It47.0 8.7 118.3 123.5 96.0 936 2-20-97 It48.0 9.6 115.4 123.5 93.0 937 2-20-97 Lot 209 129.0 6.5 120.2 127.8 94.0 938 2-20-97 129.0 6.7 123.7 127.8 97.0 939 2-20-97 129.0 6.4 121.4 127.8 95.0 940 2-25-97 Lot 94 77.0 8.2 120.7 127.8 94.0 941 2-25-97 77.0 6.8 119.0 127.8 93.0 942 2-25-97 77.0 7.2 122.7 127.8 96.0 943 2-25-97 Lot 177 81.0 7.6 124.5 127.8 97.0 944 2-25-97 It 81.0 7.1 123.9 .127.8 97.0 945 2-25-97 81.0 8.6 124.9 127.8 98.0 946 2-25-97 Lot 178 85.0 9.5 125.0 127.8 98.0 947 2-25-97 85.0 7.2 122.6 127.8 96.0 948 2-25-97 85.0 8.0 121.6 127.8 95.0 949 2-25-97 Lot 179 88.0 7.8 119.2 127.8 93.0 950 2-25-97 It88.0 8.6 122.6 127.8 96.0 951 2-25-97 It88.0 8.5 117.8 127.8 92.0 952 2-25-97 Lot 180 91.0 7.2 123.6 127.8 91.0 Sicdden Engineering File: 422-6138 (Add) April 10, 1997 Page 36 Test No Date Loc Fjev Moist Cont PQrrentt_ Fld Dry Den Max Dry Den Lbs/Cu Ft Lbs/Cu Ft Percent Maximum 953 2-25-97 Lot 180 91.0 7.7 123.1 .127.8 96.0 954 2-25-97 It91.0 8.2 125.2 127.8 91.0 955 2-25-97 Lot 7 34.0 15.6 103.6 110.0 94.0 956 2-25-97 If 35.0 13.8 101.0 110.0 92.0 957 2-25-97 .Lot 9 33.0 15.1 103.5 110.0 94.0 958 2-25-97 34.0 16.9 105.9 110.0 96.0 959 2-25-97 Lot 11 33.0 16.3 102.5 110.0 93.0 960 2-25-97 If 34.0 17.4 100.4 110.0 91.0 961 2-25-97 Lot 18 31.0 17.9 99.4 110.0 90.0 962 2-25-97 32.0 14.7 100.7 110.0 92.0 963 2-26-97 Lot 17 31.0 14.2 103.0 110.0 94.0 964 2-26-97 32.0 14.8 103.6 110.0 94.0 965 2-26-97 Lot 16 31.0 14.3 101.5 110.0 92.0 966 2-26-97 It 32.0 15.9 103.3 110.0 94.0 967 2-26-97 Lot 14 32.0 17.3 99.3 110.0 90.0 968 2-26-97 33.0 15.2 100.2 110.0 91.0 969 2-26-97 34.0 13.8 102.8 110.0 93.0 970 2-26-97 Lot 8 34.0 17.5 100.7 110.0 92.0 971 2-26-97 " 35.0 12.4 100.6 110.0 91.0 Slodden Engineering File: 422-613 8 (Add) April 10, 1997 Page 37 Test Moist Cont Fld Dry Den Max Dry Den Percent No. Date Loc Eley. Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 972 2-26-97 Lot 8 36.0 13.8 100.5 110.0 91.0 973 2-26-97 Lot -10 34.0 13.6 102.6 110.0 93.0 974 2-26-97 35.0 11.7 103.8 110.0 94.0 975 2-26-97 36.0 14.8 101.7 110.0 92.0 976 2-27-97 Lot 137 62.0 8.6 116.5 127.8 91.0 977 2-27-97 62.0 9.1 119.2 127.8 93.0 978 2-27-97 62.0 9.6 118.6 127.8 93.0 979 2-27-97 Lot 117 59.0 8.3 120.2 127.8 94.0 980 2-27-97 59.0 11.3 119.5 127.8 94.0 981 2-27-97 59.0 8.9 117.6 127.8 92.0 982 2-27-97 Lot 118 58.0 9.0 117.9 127.8 92.0 983 2-27-97 it58.0 9.7 121.2 127.8 95.0 984 2-27-97 It 58.0 8.5 118.2 127.8 92.0 985 3-03-97 Lot 2 36.0 14.2 101.6 110.0 92.0 986 3-03-97 it37.0 14.6 106.7 110.0 97.0 987 3-03-97 It 38.0 10.8 106.0 110.0 96.0 988 3-03-97 Lot 4 35.0 11.0 103.9 110.0 94.0 989 3-03-97 36.0 12.4 104.2 110.0 95.0 990 3-03-97 37.0 13.4 102.6 110.0 93.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 3 8 JL QbL No. Date Loc.. Eley, moisT Lom Pement ria 1jry lien Max Dry lien Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 991 3-03-97 Lot 6 36.0 12.7 105.1 110.0 96.0 992 3-03-97 37.0 13.3 105.9 110.0 96.0 993 3-03-97 3 8.0 10.5 104.2 110.0 95.0 994 3-04-97 Lot 1 36.0 6.4 107.7 110.0 98.0 995 3-04-97 37.0 8.9 105.4 110.0 96.0 996 3-04-97 38.0 10.8 .103.4 110.0 94.0 997 3-04-97 Lot 13 35.0 14.6 106.5 110.0 97.0 998 3-04-97. 36.0 14.3 101.6 110.0 92.0 999 3-04-97 37.0 11.8 108.3 110.0 98.0 1000 3-04-97 Lot 15 34.0 16.3 104.8 110.0 95.0 1001 3-04-97 35.0 17.6 107:8 110.0 98.0 1002 3-04-97 36.0 15.6 108.5 110.0 99.0 1003 3-04-97 Lot 49 53.0 8.4 122.6 127.8 96.0 .1004 3-04-97 It53.0 7.7 124.3 127.8 97.0 1005 3-04-97 Lot 48 53.0 8.1 121.7 127.8 95.0 1006 3-04-97 It53.0 7.7 121.4 127.8 95.0 1007 3-05-97 Lot 1 . 39.0 12.4 104.7 110.0 95.0 1008 3-05-97 it40.0 13.2 108.2 110.0 98.0 1009 3-05-97 Lot 2 41.0 10.0 107.7 110.0 98.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 39 Test No. Date Loc. Elev. Moist Cont Pere nt Fld Dry Den Max Dry Den Percent LbsICuLFt Lbs/Cu F1 Maximum 1010 3-OS-97 Lot 3 39.0 11.5 107.0 110.0 97.0 1011 3-05-97 of 40.0 11.3 105.2 110.0 96.0 1012 3-05-97 It 41.0 12.8 106.7 110.0 97.0 1013 3-05-97 Lot 5 40.0 13.5 103.9 110.0 94.0 1014 3-05-97 41.0 12.5 103.5 110.0 94.0 1015 3-05-97 42.0 11.4 105.6 110.0 96.0 1016 3-05-97 Lot 12 36.0 14.1 102.9 110.0 94.0 1017 3-05-97 37.0 13.3 103.8 110.0 94.0 1018 3-05-97 it 38.0 13.1 103.5 110.0 94.0 1019 3-05-97 Lot 11 37.0 10.9 105.1 110.0 96.0 1020 3-05-97 " 38.0 12.3 104.5 110.0 95.0 1021 3-05=97 39.0 11.2 104.9 110.0 95.0 1022 3-05-97 Lot 9 38.0 11.5 105.6 110.0 96.0 1023 3-05-97 39.0 12.5 108.5 110.0 99.0 1024 3-05-97 40.0 11.5 107.2 110.0 97.0 1025 3-05-97 Lot 7 39.0 10.6 107.1 110.0 97.0 1026 3-05-97 If 40.0 11.9 106.5 110.0 97.0 1027 3-05-97 of 41.0 11.5 103.1 110.0 94.0 1028 3-05-97 Lot 22 30.0 14.7 101.9 110.0 93.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 40 Test Moist Cont Fid Dry Den Max Dry Den Percent 1029 3-05-97 Lot 22 31.0 1.4.3 105.1 110.0 96.0 1030 3-05-97 to 32.0 13.2 107.0 110.0 97.0 1031 3-05-97 Lot 24 29.0 12.7 105.9 110.0 96.0 1032 3-05-97 30.0 13.6 105.8 110.0 96.0 1033 3-05-97 31.0 10.9 107.6 110.0 98.0 1034 3-06-97 Lot 8 39.0 11.4 109.1 110.0 99.0 1035 3-06-97 if 40.0 10.7 107.6 110.0 98.0 1036 3-06-97 41.0 10.7 106.9 110.0 97.0 1037 3-06-97 Lot 9 38.0 11.9 107.1 110.0 97.0 1038 3-06-97 if 39.0 11.1 108.7 110.0 99.0 1039 3-06-97 it40.0 14.1 103.2 110.0 94.0 1040 3-06-97 Lot 10 38.0 14.4 105.6 110.0 96.0 1041 3-06-97 39.0 12.8 106.2 110.0 97.0 1042 3-06-97 " 40.0 .10.5 105.1 110.0 96.0 1043 3-06-97 Lot 23 31.0 11.4 108.5 110.0 99.0 1044 3-06-97 of 32:0 10.5 105.4 110.0 96.0 1045 3-06-97 It 33.0 12.6 107.2 110.0 97.0 1046 3-06-97 Lot 21 31.0 11.6 107.5 110.0 98.0 1047 3-06-97 of. 32.0 11.7 106.1 110.0 96.0 Sudden Engineering File: 422-6138 (Add) April 10, 1997 Page 41 Test Moist Cont Fld Dry Den Max Dry Den Percent 1048 3-06-97 Lot 21 33.0 10.5 104.9 110.0 95.0 1049 3-06-97 Lot 19 31.0 11.8 105.4 110.0 96.0 1050 3-06-97 it32.0 10.5 104.2 110.0 95.0 1051 3-06-97 Lot 19 32.0 10.5 104.2 110.0 95.0 1052 3-06-97 Lot 14 36.0 11.6 108.9 110:0 99.0 1053 *3-06-97 37.0 11.3 108.0 110.0 98.0 1054 3-06-97 38.0 10.9 107.6 110.0 98.0 1055 3-06-97 Lot 16 35.0 9.6 106.9 110.0 97.0 1056 3-06-97 If 36.0 11.4 107.5 110.0 98.0 1057 3-06-97 if37.0 12.3 105.1 110.0 96.0 1058 3-06-97 Lot 18 35.0 12.8 107.1 110.0 97.0 1059 3-06-97 36.0 14.5 103.9 110.0 94.0 1060 3-06-97 If 37.0 10.0 105.4 110.0 96.0 1061 3-06-97 Lot 26 30.0 13.3 101.9 110.0 93.0 1062 3-06-97 to 31.0 15.1 103.3. 110.0 94.0 1063 3-06-97 " 32.0 11.5 106.5 110.0 97.0 1064 3-06-97 Lot 22 33.0 12.3 107.9 110.0 98.0 1065 3-06-97 It34.0 9.9 104.2 110.0 95.0 1066 3-06-97 it 35.0 10.6 107.7 110.0 98.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 42 Test No, Date Loc Eley, Moist Cont Fid Dry Den Max Dry Den Percent Percent T s/ u Ft I s/Cu Ft Maximum 1067 3-06-97 Lot 20 32.0 11.7 107.1 110.0 97.0 1068 3-06-97 33.0 12.3 105.6 110.0 96.0 1069 3-06-97 34.0 12.2 105.6 110.0 96.0 1070 3-10-97 Lot 19 34.0 11.4 109.1 110.0 99.0 1071 3-10-97 35.0 11.9 107.6 110.0 98.0 1072 3-10-97 36.0 11.7 107.1 110.0 97.0 1073 3-10-97 Lot 21 34.0 14.3 101.2 110.0 92.0 1074 3-10-97 35.0 12.8 105.7 110.0 96.0 1075 3-10-97 36.0 12.4 105.1 110.0 96.0 1076 3-10-97 Lot 23 34.0 10.6 102.0 110.0 93.0 1077 3-10-97 It 35.0 11.3 104.9 110.0 95.0 1078 3-10-97 It 36.0 10.9 106.7 110.0 97.0 1079 3-10-97 Lot 24 34.0 14.3 101.1 110.0 92.0 1080 3-10-97 It 35.0 10.6 107.6 110.0 98.0 1081 3-10-97 If 36.0 10.0 104.5 110.0 95.0 1082 3-10-97 Lot 21 35.0 .10.8 104.3 110.0 95.0 1083 3-10-97 it36.0 12.0 102.9 110.0 94.0 1084 3-10-97 37.0 10.8 102.7 110.0 93.0 1085 3-10-97 Lot 25 33.0 12.3 105.6 110.0 96.0 Sladden Engineering C - File: 422-6138 (Add) April 10, 1997 Page 43 Test Moist Cont Fid Dry Den Max Dry Den Percent No Date Loc Eley- Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1086 3-10-97 Lot 25 34.0 12.9 104.3 110.0 95.0 1087 3-10-97 it 35.0 13.6 107.6 110.0 98.0 1088 3-11-97 Lot 42 36.0 10.4 109.3 110.0 94.0 1089 3-11-97 37.0 12.3 113.2 116.2 94.0 1090 3-11-97 38.0 11.5 107.2 116.2 92.0 1091 3-11-97 Lot 41 37.0 13.2 109.6 116.2 94.0 1092 3-11-97 38.0 13.5 109.0 116.2 94.0 1093 3-11-97 39.0 15.0 111.3 116.2 96.0 1094 3-11-97 Lot 40 38.0 13.5 112.1 116.2 96.0 1095 3-11-97 39.0 12.5 .110.3 116.2 95.0 1096 3-11-97 40.0 12.1 109.8 116.2 94.0 1097 3-11-97 Lot 37 39.0 14.2 107.9 116.2 93.0 1098 3-11-97 40.0 13.4 110.2 116.2 92.0 1099 3-11-97 41.0 14.3 106.9 116.2 92.0 1100 3-11-97 Lot 38 39.0 12.2 109.2 116.2 94.0 1101 3-11-97 40.0 13.1 110.0 116.2 95.0 1102 3-11-97 41.0 12.6 107.1 116.2 92.0 1103 3-11-97 Lot 39 38.0 9.6 107.5 116.2 93.0 1104 3-11-97 to 39.0 11.1 107.5 116.2 94.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 44 Test Moist Cont Ed Dry Den Max Dry Den Percent No. Date Loc. Eley. Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1105 3-11-97 Lot 39 40.0 13.3 106.9 116.2 92.0 1106 3-11-97 Lot 27 57.0 14.4 105.1 110.0 96.0 1107 3-11-97 58.0 15.3 103.6 110.0 94.0 1108 3-11-97 59.0 15.5 106.7 110.0 97.0 1109 3-11-97 Lot 28 59.0 16.3 108.5 110.0 99.0 1110 3-11-97 60.0 16.2 103.2 110.0 94.0 1111 3-11-97 61.0 13.7 104.9 110.0 94.0 1112 3-11-97 Lot 30 57.0 13.4 101.9 110.0 93.0 1113 3-11-97 58.0 16.9 103.3 110.0 94.0 1114 3-11-97 59.0 15.6 102.9 110.0 94.0 1115 3-11-97 Lot 29 54.0 15.3 105.6 110.0 96.0 1116 3-11-97 55.0 16.5 101.6 110.0 92.0 1117 3-11-97 56.0 16.3 105.0 110.0 95.0 1118 3-11-97 Lot 31 53.0 13.7 106.9 110.0 97.0 1119 3-11-97 54.0 15.7 103.1 110.0 94.0 1120 3-11-97 it55.0 14.7 105.1 110.0 96.0 1121 3-11-97 . Lot 36 47.0 14.9 107.1 110.0 97.0 1122 3-11-97 48.0 11.8 106.3 110.0 97.0 1123 3-11-97 49.0 11.5 108.5 110.0 99.0 Slodden Englne®ring File: 422-61.38 (Add) April 10, 1997 Page 45 Test Moist Cont Fld Dry Den Max Dry Den Percent No. Date Loc. Eley, Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1124 3-11-97 Lot 28 61.0 13.8 105.2 110.0 96.0 1125 3-11-97 It 62.0 13.5 105.5 110.0 96.0 1126 3-11-97 Lot 1 42.0 10.6 105.2 110.0 96.0 1127 3-11-97 It 42.0 9.6 105.9 110.0 96.0 1128 3-11-97 Lot 2 42.0 12.0 102.9 110.0 94.0 1129 3-11-97 " 42.0 12.2 107.1 110.0 97.0 1130 3-11-97 Lot 3 42.0 11.5 104.2 110.0 95.0 1131 3-11-97 " 42.0 12.9 1.04.5 110.0 95.0 1132 3-11-97 Lot 4 43.0 14.6 104.9 110.0 95.0 1133 3-11-97 " 43.0 11.0 103.7 110.0 94.0 1134 3-11-97 Lot 5 43.0 12.3 105.7 110.0 96.0 1135 3-11-97 " 43.0 12.2 104.2 110.0 95.0 1136 3-12-97 Lot 31 51.0 8.4 109.0 116.2 94.0 1137 3-12-97 52.0 9.7 106.3 116.2 91.0 1138 3-12-97 53.0 8.0 106.8 116.2 92.0 1139 3-12-97' Lot 28 62.0 7.9 111.7 116.2 96.0 1140 3-12-97 63.0 9.9 107.2 116.2 92.0 1141 3-12-97 64.0 8.7 105.9 116.2 91.0 1142 3-12-97 Lot 29 58.0 8.2 105.0 116.2 90.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 46 Test No. Date Loc. Elev. Moist Cont Fld Dry Den Max Dry Den Percent PetGgnt Lbs/Cu Ft Lbs/Cu Ft Maximum 1143 3-12-97 Lot 29 59.0 9.1 108.5 116.2 93.0 1144 3-12-97 1160.0 8.8 107.9 116.2 93.0 1145 3-12-97 Lot 28 63.0 10.1 108.7 116.2 94.0 1146 3-12-97 " 64.0 9.0 112.6 116.2 97.0 1147 3-12-97 it65.0 11.4 112.0 116.2 96.0 1148 3-12-97 Lot 30 59.0 11.2 111.2 116.2 96.0 1149 3-12-97 60.0 8.9 107.9 116.2 93.0 1150 3-12-97 61.0 8.5 112.7 116.2 97.0 1151 3-12-97 Lot 29 61.0 10.8 110.6 116.2 95.0 1152 3-12-97 if 62.0 7.1 110.0 116.2 95.0 1153 3-12-97 0163.0 8.8 108.7 116.2 94.0 1154 3-12-97 Lot 40 41.0 9.6 112.7 116.2 97.0 1155 3-12-97 42.0 10.7 109.2 116.2 94.0 1156 3-12-97 43.0 10.4 109.7 116.2 94.0 1157 3-12-97 Lot 41 39.0 10.3 111.7 116.2 96.0 1158 3-12-97 40.0 9.8 109.0 116.2 94.0 1159 3-12-97 41.0 8.6 112.0 116.2 96.0 1160 3-12-97 Lot 42 39.0 10.6 108.9 116.2 94.0 1161 3-12-97 40.0 10.4 109.2 116.2 94.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 47 Test Moist Cont Fld Dry Den Max Dry Den Percent 1162 3-12-97 Lot 42 41.0 10.9 109.9 116.2 94.0 1163.3-12-97 Lot 38 38.0 8.9 107.9 116.2 93.0 1164 3-12-97 44.0 9.7 106.9 116.2 92.0 1165 3-12-97 45.0 11.4 110.7 116.2 95.0 1166 3-12-97 Lot 39 41.0 11.2 111.7 116.2 96.0 1167 3-12-97 42.0 11.6 108.2 116.2 93.0 1168 3-12-97 430 8.4 106.5 116.2 92.0 1169 3-12-97 Lot 37 42.0 8.6 109.9 116.2 95.0 1170 3-12-97 43.0 10.5 109.2 116.2 94.0 1171 3-12-97 44.0 10.3 111.8 116.2 96:0 1172 3-12-97 Lot 6 43.0 14.2 105.7 116.2 91.0 1173 3-12-97 Lot 7 42.0 14.7 107.9 116.2 93.0 1174 3-12-97 42.0 13.8 104.8 116.2 90.0 1175 3-12-97 Lot 8 42.0 14.9 106.7 116.2 92.0 1176 3-12-97 Lot 9 41.0 12.9 104.2 116.2 90.0 1177 3-12-97 Lot 10 41.0 11.7 104.6 116.2 90.0 1178 3-12-97 to 41.0 12.7 108.9 116.2 94.0 1179 3-12-97 Lot 11 41.0 14.2 107.6 116.2 93.0 1180 3-12-97 Lot 12 40.0 14.0 107.5 116.2 93.0 Slodden Engineering File: 422-6138 (Add) Apruil 10, 1997 Page 48 Test Moist Cont Fld Dry Den Max Dry Den Percent No. Date Loc. Eley, Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1181 3-13-97 Lot 12 40.0 15.6 108.8 116.2 94.0 1182 3-13-97 Lot 13 40.0 12.8 107.6 116.2 93.0 1183 3-13-97 40.0 13.7 105.9 116.2 91.0 1184 3-13-97 Lot 14 39.0 14.0 105.9 116.2 91.0 1185 3-13-97 Lot 15 39.0 11.5 107.2 116.2 92.0 1186 3-13-97 " 39.0 15.3 109.9 116.2 95.0 1187 3-13-97 Lot 16 38.0 14.6 106.4 116.2 92.0 1188 3-13-97 Lot 17 38.0 14.2 107.0 116.2 92.0 1189 3-13-97 of 38.0 13.5 106.3 116.2 91.0 1190 3-13-97 Lot 77 65.0 8.3 115.7 123.5 94.0 1191 3-13-97 it65.0 9.6 113.9 123.5 92.0 1192 3-13-97 Lot 76 66.0 10.9 116.6 123.5 94.0 1193 3-13-97 Lot 75 66.0 10.5 116.9 123.5 95.0 1194 3-13-97 " 66.0 10.8 112.9 123.5 91.0 1195 3-13-97 Lot 74 65.0 7.5 114.0 123.5 92.0 1196 3-13-97 Lot 73 63.0 8.2 116.7 123.5 94.0 1197 3-13-97 Lot 72 62.0 8.5 116.0 123.5 94.0 1198 3-13-97 62.0 9.0 115.2 123.5 93.0 1199 3-13-97 . Lot 71 58.0 8.2 117.3 123.5 95.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 49 Test Moist Cont Fid Dry Den Max Dry Den Percent No. Date Loc. Eley_ Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1200 3-13-97 Lot 70 55.0 8.7 116.9 123.5 95.0 1201 3-13-97 Lot 69 54.0 10.1 116.0 123.5 94.0 1202 3-13-97 Lot 68 53.0 9.5 118.5 123.5 96.0 1203 3-13-97 Lot 67 52.0 10.1 114.3 123.5 93.0 1204 3-13-97 Lot 66 51.0 7.4 114.9 123.5 93.0 1205 3-13-97 Lot 65 50.0 10.5 113.6 123.5 92.0 1206 3-13-97 Lot 64 50.0 8.6 116.2 123.5 94.0 1207 3-13-97 Lot 63 49.0 8.8 116.3 123.5 94.0 1208 3-13-97 Lot 62 49.0 8.6 114.6 123.5 93.0 1209 3-13-97 Lot 61 48.0 7.4 112.2 123.5 91.0 1210 3-13-97 Lot 60 47.0 7.1 113.0 123.5 91.0 1211 3-13-97 Lot 59 46.0 7.6 112.9 123.5 91.0 1212 3-13-97 Lot 58 45.0 8.6 115.9 123.5 94.0 1213 3-13-97 Lot 57 45.0 8.1 114.2 123.5 92.0 1214 3-13-97 Lot 56 44.0 8.8 118.2 123.5 96.0 1215 3-13-97 Lot 55 44.0 8.2 115.9 123.5 94.0 1216 3-17-97 Lot 95 71.0 7.0 121.3 127.8 95.0 1217 3-17-97 71.0 7.6 118.7 127.8 93.0 1218 3-17-97 71.0 7.6 118.5 127.8 93.0 Sladden rEnglneering File: 422-6138 (Add) April 10, 1997 Page 50 Test No bate Loc Eley. Moist Cont Percent Fld Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1219 3-17-97 Lot 96 74.0 8.2 123.9 127.8 96.0 1220 3-17-97 it74.0 8.0 119.2 127.8 93.0 1221 3-17-97 It74.0 8.5 120.2 127.8 94.0 1222 3-17-97 Lot 97 76.0 7.0 120.7 127.8 94.0 1223 3-17-97 it76.0 7.3 124.0 127.8 97.0 1224 3-17-97 It76.0 7.1 120.9 127.8 97.0 1225 3-17-97 Lot 98 78.0 7.6 119.7 127.8 94.0 1226 3-17-97 78.0 7.1 119.5 127.8 94.0 1227 3-17-97 Lot 174 80.0 7.0 120.9 127.8 95.0 1228 3-17-97 if80.0 7.7 124.7 127.8 98.0 1229 3-17-97 80.0 6.1 122.6 127.8 96.0 1230 3-17-97 Lot 175 77.0 7.0 120.0 127.8 94.0 1231 3-17-97 77.0 7.1 123.1 127.8 96.0 1232 3-17-97 77.0 7.2 123.9 127.8 97.0 1233 3-17-97 Lot 176 74.0 7.9 121.9 127.8 95.0 1234 3-17-97 to74.0 7.3 122.6 127.8 96.0 1235 3-17-97 It74.0 7.1 120.3 127.8 94.0 1236 3-17-97 Lot 136 61.0 8.5 124.2 127.8 97.0 1237 3-17-97 It 61.0 9.1 123.9 127.8 97.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 51 Test No. Date Loc Eley. Moist Cont Fid Dry Den Max Dry Den Percent Percent Lbs/CuFt Lbs/Cu Ft Maximum 1238 3-17-97 Lot 140 68.0 7.9 120.6 127.8 94.0 1239 3-17-97 68.0 8.5 122.7 127.8 96.0 1240 3-18-97 Lot 244 31.1 16.6 101.2 110.0 92.0 1241 3-18-97 32.1 17.0 105.9 110.0 96.0 1242 3-18-97 33.1- 16.8 105.9 110.0 96.0 1243 3-18-97 33.1 16.4 104.3 110.0 95.0 1244 3-18-97 If 32.1 14.3 104.9 110.0 95.0 1245 3-18-97 33.1 15.0 104.8 110.0 95.0 1246 3-18-97 31.1 14.2 105.7 110.0 96.0 1247 3-18-97 If 32.1 15.1 103.2 110.0 94.0 1248 3-18-97 to 33.1 13.8 103.5 110.0 94.0 1249 3-26-97 Lot 120 53.0 8.2 119.6 127.8 94.0 1250 3-26-7 54.0 7.8 121.3 127.8 95.0 1251 3-26-97 55.0 7.8 117.9 127.8 92.0 1252 3-26-97 Lot 133 57.0 9.1 119.2 127.8 93.0 1253 3-26-97 1157.0 8.3 119.0 127.8 93.0 1254 3-26-97 Lot 132 56.0 7.7 123.6 127.8 97.0 1255 3-26-97 56.0 7.6 123.5 127.8 97.0 1256 3-26-97 to56.0 7.7 125.2 127.8 98.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 52 Test Moist Cont Fid Dry Den Max Dry Den Percent 1257 3-26-97 Lot 131 55.0 7.7 125.0 127.8 98.0 1258 3-26-97 55.0 7.1 123.6 127.8 97.0 1259 3-26-97 55.0 6.7 123.1 127.8 96.0 1260 3-26-97 Lot 130 54.0 7.0 124.7 127.8 98.0 1261 3-26-97 54.0 7.3 120.6 127.8 94.0 1262 3-26-97 54.0 6.4 120.7 127.8 94.0 1263 3-26-97 Lot 129 53.0 7.0 121.9 127.8 95.0 1264 3-26-97 of53.0 6.9 123.6 127.8 97.0 1265 3-26-97 It53.0 7.4 123.0 127.8 96.0 1266 3-26-97 Lot 128 52.0 6.7 123.9 127.8 97.0 1267 3-26-97 1152.0 7.0 120.7 127.8 94.0 1268 3-26-97 to52.0 6.6 123.7 127.8 97.0 1269 3-26-97 Lot 127 52.0 7.5 120.0 127.8 94.0 1270 3-26-97 " . 52.0 7.9 119.5 127.8 94.0 1271 3-26-97 It 52.0 6.3 119.1 127.8 93.0 1272 3-26-97 Lot 126 52.0 6.4 123.2 127.8 96.0 1273 3-26-97 52.0 7.3 125.0 127.8 98.0 1274 3-26-97 52.0 7.6 125.1 127.8 98.0 1275 3-26-97 Lot 125 52.0 7.3 124.6 127.8 97.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 53 Test Moist Cont Fld Dry Den Max Dry Den Percent 1276 3-26-97 Lot 125 52.0 6.7 124.0 127.8 97.0 1277 3-26-97 " 52.0 7.0 125.5 127.8 98.0 1278 3-26-97 Lot 124 52.0 7.0 123.6 127.8 97.0 1279 3-26-97 It52.0 6.7 122.9 127.8 96.0 1280 3-26-97 to52.0 7.4 119.9 127.8 94.0 1281 3-26-97 Lot 123 54.0 7.3 119.5 127.8 93.0 1282 3-26-97 " 54.0 7.9 121.6 127.8 95.0 1283 3-26-97 '; 54.0 7.0 121.9 127.8 95.0 1284 3-26-97 Lot 122 55.0 7.1 125.4 127.8 98.0 1285 3-26-97 55.0 6.2 125.0 I27.8 98.0 1286 3-26-97 55.0 6.2 121.6 127.8 95.0 1287 3-26-97 Lot 121 56.0 6.7 121.0 127.8 95.0 1288 3-26-97 56.0 7.0 124.6 127.8 97.0 1289 3-26-97 56.0 6.8 124.2 127.8 97.0 1290 3-26-97 Lot 120 56.0 7.6 123.2 127.8 96.0 1291 3-26-97 56.0 7.1 123.1 127.8 96.0 1292 3-26-97 56.0 7.9 124.7 127.8 98.0 1293 3-27-97 Lot 18 38.0 13.8 104.7 110.0 95.0 1294 3-27-97 Lot 19 37.0 13.2 108.5 I10.0 99.0 5lodden Engineering File: 422-6138 (Add) April 10, 1997 Page 54 I cbL No. Date Loc. Eley moist t-ont P r nt ria ury lien Max Dry lien Percent Lbs/Cu Et Lbs/Cu Ft Maximum 1295 3-27-97 Lot 20 37.0 12.3 109.0 110.0 99.0 1296 3-27-97 Lot 21 38.0 12.6 106.3 110.0 97.0 1297 3-27-97 Lot 22 38.0 12.8 106.0 110.0 96.0 1298 3-27-97 Lot 23 38.0 9.7 107.2 110.0 97.0 1299 3-27-97 Lot 24 37.0 9.9 103.0 110.0 94.0 1300 3-27-97 Lot 25 36.0 11.1 103.9 110.0 94.0 1301 3-27-97 Lot 26 36.0 12.6 105.6 110.0 94.0 1302 3-27-97 Lot 244 35.1 11.7 107.1 110.0 97.0 1303 3-27-97 35.1 11.4 1059 110.0 96.0 1304 3-27-97 35.1 9.9 105.5 110.0 96.0 1305 3-27-97 Lot 53 49.0 9.1 120.0 123.5 97.0 1306 3-27-97 49.0 10.4 119.5 123.5 97.0 1307 3-27-97 Lot 52 50.0 8.7 115.6 123.5 94.0 1308 3-27-97 1150.0 7.8 116.6 123.5 94.0 1309 3-27-97 Lot 51 51.0 8.2 117.9 123.5 95.0 1310 3-27-97 11 51.0 8.0 120.1 123.5 97.0 1311 3-27-97 Lot 50 52.0 , 9.6 119.0 123.5 96.0 1312 3-27-97 It 52.0 9.3 114.9 123.5 93.0 1313 3-27-97 Lot 47 53.0 9.6 116.5 123.5 94.0 Sladden Emineerina File: 422-6138 (Add) April 10, 1997 Page 55 Test Moist Cont Fld Dry Den Max Dry Den Percent 1314 3-27-97 Lot 47 53.0 9.1 118.9 123.5 96.0 1315 3-27-97 Lot 46 51.0 8.6 121.6 123.5 98.0 1316 3=27-97 51.0 10.4 119.2 123.5 97.0 1317 3-27-97 Lot 45 50.0 10.3 118.9 123.5 96.0 1318 3-27-97 50.0 8.5 120.2 123,5 97.0 1319 3-27-97 Lot 44 49.0 8.9 114.9 123.5 93.0 1320 3-27-97 49.0 9.1 116.7 123.5 94.0 1321 3-31-97 Lot 37 46.0 13.2 108.7 116.2 94.0 1322 3-31-97 " 46.0 12.6 110.2 116.2 95.0 1323 3-31-97 Lot 38 46.0 11.7 108.0 116.2 93.0 1324 3-31-97 It 46.0 11.5 108.2 116.2 93.0 1325 3-31-97 Lot 39 44.0 11.6 111.6 116.2 96.0 1326 3-31-97 " 44.0 10.4 111.0 116.2 96.0 1327 3-3-97 Lot 40 44.0 9.8 112.9 116.2 96.0 1328 3-31-97 It44.0 10.5 I11.6 116.2 96.0 1329 3-31-97 Lot 41 42.0 9.6 110.9 116.2 95.0 1330 3-31-97 42.0 10.5 108.5 116.2 93.0. 1331 3-31-97 42.0 11.3 107.6 116.2 93.0 1332 3-31-97 Lot 42 42.0 11.1 109.7 116.2 94.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 56 1 est No. Date Loc. Elev. Moist cont Percent rid Dry lien Max Dry lien Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1333 3-31-97 Lot 42 42.0 9.8 109.2 116.2 94.0 1334 3-31-97 " 42.0 11.4 110.6 116.2 95.0 1335 3-31-97 Lot 27 57.0 10.5 110.0 116.2 95.0 1336 3-31-97 to57.0 9.2 109.2 116.2 94.0 1337 3-31-97 " 57.0 8.9 111.2 116,2 96.0 1338 4-01-97 Lot 28 66.0 10.5 110.3 116.2 95.0 1339 4-01-97 to 67.0 11.0 108.6 116.2 93.0 1340 4-01-97 Lot 29 64.0 9.7 107.1 116.2 92.0 1341 4-01-97 " 65.0 11.5 111.1 116.2 96.0 1342 4-01-97 66.0 9.8 109.7 116.2 94.0 1343 4-01-97 Lot 30 63.0 10.5 111.7 116.2 96.0 1344 4-01-97 It 64.0 11.0 110.5 116.2 95.0 1345 4-01-97 to 64.0 11.3 109.9 116.2 95.0 1346 4-01-97 Lot 31 55.0 10.6 108.7 116.2 94.0 1347 4-01-97 " 56.0 10.7 108.5 116.2 93.0 1348 4-01-.97 It57.0 9.2 110.0 116.2 96.0 1349 4-01-97 Lot 28 66.0 9.7 107.9 116.2 93.0 1350 4-01-97 " 67.0 11.0 110.0 116.2 95.0 1351 4-01-97 Lot 36 57.0 9.2 114.7 123.5 93.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 57 Test No. Date Loc. Eley. Moist Cont Fld Dry Den Max Dry Den Percent Percent Lbs/Cu Ft Lbs/Cu Ft Maximum 1352 4-01-97 Lot 36 57.0 9.8 113.5 123.5 92.0 1353 4-01-97 Lot 35 56.0 7.4 115.7 123.5 94.0 1354 4-01-97 it56.0 8.6 115.3 123.5 93.0 1355 4-01-97 It56.0 8.2 116.2 123.5 94.0 1356 4-01-97 Lot 34 55.0 9.6 115.0 123.5 94.0 1357 4-01-97 It55.0 9.4 116.1 123.5 94.0 1358 4-01-97 If55.0 8.1 116.3 123.5 92.0 1359 4-01-97 Lot 33 54.0 8.0 113.9 123.5 92.0 1360 4-01-97 " 54.0 10.0 118.4 123.5 96.0 1361 4-01-97 It 54.0 13.6 116.9 123.5 95.0 1362 4-01-97 Lot 32 52.0 11.2 117.0 123.5 95.0 1363 4-01-97 " 52.0 11.8 117.0 123.5 95.0 1364 4-01-97 it52.0 10.0 114.5 123.5 93.0 1365 4-01-97 Lot 43 41.0 11.3 112.0 120.0 93.0 1366 4-01-97 It42.0 8.2 115.2 120.0 96.0 1367 4-01-97 It 43.0 8.2 1I5.0 120.0 96.0 1368 4-01-97 Lot 54 41.0 8.5 113.6 120.0 95.0 1369 4-01-97 42.0 10.7 112.1 120.0 93.0 1370 4-01-97 43.0 7.5 112.9 120.0 94.0 Sladden Engineering File: 422-6138 (Add) April 10, 1997 Page 58 Test No. Date Loc. Eley. Moist Cont Percent Fid Dry Den Max Dry Den Percent Lbs/Cu Ft Lbs/Cu Ft Maxie 1371 4-01-97 Lot 242 N 38.0 9.5 114.5 120.0 95.0 1372 4-01-97 " 39.0 10.1 113.6 120.0 95.0 1373 4-02-97 Lot 43 43.0 8.6 110.9 120.0 92.0 1374 4-02-97 44.0 13.3 115.5 120.0 96.0 1375 4-02-97 45.0 12.4 118.0 120.0 98.0 1376 4-02-97 Lot 242 S 38.0 12.6 112.9 120.0 94.0 1377 4-02-97 It 39.0 13.3 115.3 120.0 96.0 1378 4-02-97 It 40.0 12.5 118.4 120.0 99.0 1379 4-02-97 39.0 12.5 118.0 120.0 98.0 1380 4-02-97 40.0 11.3 118.9 120.0 99.0 1381 4-02-97 Lot 54 44.0 13.0 113.9 120.0 95.0 13 82 4-02-97 45.0 12.3 108.6 120.0 91.0 1383 4-02-97 46.0 8.8 108.0 120.0 90.0 1384 4-02-97 Lot 243 N 41.0 9.9 108.4 120.0 90.0 1385 4-02-97 " 42.0 11.3 108.2 120.0 90.0 1386 4-02-97 43.0 12.1 109.0 120.0 91.0 1387 4-02-97 41.0 9.0 110.6 120.0 92.0 1388 4-02-97 42.0 6.7 113.2. 120.0 94.0 1389 4-02-97 Lot 54 44.0 13.9 118.7 120.0 99.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 59 Test No. Date Loc._.ley. Moist Cont Percent Fld Dry Den Max Dry Den Lbs/Cu FtLbs/Cu Ft Percent Maximum 1390 4-02-97 Lot 54 45.0 13.8 109.7 120.0 91.0 1391 4-02-97 46.0 12.6 109.0 120.0 91.0 1392 4-02-97 Lot 43 44.0 7.9 110.0 120.0 93.0 1393 4-02-97 45.0 9.8 112.7 120.0 94.0 1394 4-02-97 46.0 11.6 109.5 120.0 91.0 1395 4-02-97 Lot 242 S 41.0 7.7 110.8 120.0 92.0 1396 4-02-97 of42.0 7.2 110.9 120.0 92.0 1397 4-02-97 It41.0 7.9 109.8 120.0 92.0 1398 4-02-97 to42.0 7.7 114.2 120.0 95.0 1399 4-02-97 Lot 242 N 43.0 8.7 116.9 120.0 97.0 1400 4-02-97 43.0 7.4 115.2 120.0 96.0 1401 4-02-97 44.0 11.2 114.1 120.0 95.0 1402 4-02-97 Lot 242 S 41.0 12.2 111.3 120.0 93.0 1403 4-02-97 It42.0 9.7 113.0 120.0 94.0 1404 4-02-97 it43.0 8.5 112.1 120.0 93.0 1405 4-02-97 It 41.0 6.6 109.1 120.0 91.0 1406 4-02-97 42.0 7.0 108.0 120.0 90.0 1407 4-02-97 43.0 11.2 112.3 120.0 94.0 1408 4-02-97 41.0 11.5 115.3 120.0 96.0 Slodden Engineering File: 422-6138 (Add) April 10, 1997 Page 60 Test Moist Cont Fld Dry Den Max Dry Den Percent 1409 4-02-97 2425 42.0 10.8 115.1 120.0 96.0 1410 4-03-97 Lot 28 68.0 8.4 109.2 116.2 94.0 1411 4-03-97 It68.0 8.5 111.6 116.2 96.0 1412 4-03-97 Lot 29 67.0 9.6 110.0 116.2 95.0 1413 4-03-97 66.0 9.1 113.0 116.2 97.0 1414 4-03-97 Lot 30 66.0 8.3 111.7 116.2 96.0 1415 4-03-97 it66.0 10.5 109.2 116.2 94.0 1416 4-03-97 Lot 31 58.0 10.4 107.9 116.2 93.0 1417 4-03-97 58.0 9.2 109.5 116.2 94.0 Slodden Engineering Sladden Engineering 45090 Golf Center Parkway, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 6782 Stanton Avenue, Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 800 E. Florida Avenue, Hemet, CA. 92543 (951) 766-8777 Fax (951) 766-8778 March 7, 2013 Fedderly & Associates 38747 Nopales Road Palm Desert, California 92211 Subject: Geotechnical Update Project: Custom Residence 53540 Del Gato Drive Tradition Golf Club — Lot 101 La Quinta, California Project No. 544-13047 13-03-082 Ref: Report of Testing and Observation During Rough Grading prepared by Sladden Engineering dated July 30, 1997; Project No. 522-6138G1 Geotechnical Update report prepared by Sladden Engineering dated December 12, 1996; Project No. 444-6130 As requested, we have reviewed the referenced geotechnical reports as they relate to the design and construction of the proposed custom residence. The project site is located at 78-271 Deacon Drive West within The Tradition Golf Club development in the City of La Quinta, California. It is our understanding that the proposed residential structure will be of relatively lightweight wood - frame construction and will be supported by conventional shallow spread footings and concrete slabs on grade. The lot was previously graded during the initial rough grading of the Tradition Golf Club project site. The rough grading included over excavation and/or recompaction of the native surface soil along with the placement of engineered fill material to construct the building pads. The site grading is summarized in the referenced grading report along with the compaction test results. The referenced reports include recommendations pertaining to the design and construction of residential structure foundations. Based upon our review of the referenced reports, it is our opinion that the structural values included in these reports remain applicable for the design and construction of the proposed residential structure foundations. February 20, 2013 -2- Project No. 544-13032 13-02-065 Conventional shallow spread footings should be bottomed into properly compacted fill material a minimum of 12 inches below lowest adjacent grade. Continuous footings should be at least 12 inches wide and isolated pad footings should be at least 2 feet wide. Continuous footings and isolated pad footings should be designed utilizing allowable bearing pressures of 1800 psf and 2000 psf, respectively. Allowable increase of 200 psf for each additional 1 foot of width and 250 psf for each additional 6 inches of depth may be utilized, if desired. The maximum allowable bearing pressure should be 3000 psf. The recommended allowable bearing pressures may be increased by one-third for wind and seismic loading. -Increases in allowable bearing pressures may be realized with increased footing size. Resistance to lateral loads can be provided by a combination of friction acting at the base of the slabs or foundations and passive earth pressure along the sides of the foundations. A coefficient of friction of 0.48 between soil and concrete may be used with dead load forces only. A passive earth pressure of 300 pounds per square foot, per foot of depth, may be used for the sides of footings, which are placed against properly compacted native soils. The bearing soil is non -expansive and falls within the "very low" expansion category in accordance with 2010 California Building Code (CBC) classification criteria. Slab thickness and reinforcement should be determined by the structural engineer, we recommend a minimum floor slab thickness of 4.0 inches. All slab reinforcement should be supported on concrete chairs to ensure that reinforcement is placed at slab mid -height. Because the lot has been previously graded, the remedial grading required at this time for the proposed residence should be minimal. The building areas should be cleared of surface vegetation, scarified and moisture conditioned prior to precise grading. The exposed surface should be compacted so that a minimum of 90 percent relative compaction is attained prior to fill placement. Any fill material should be placed in thin lifts at near optimum moisture content and compacted to at least 90 percent relative compaction. Based on our field observations and understanding of local geologic conditions, the soil profile type judged applicable to this site is SD, generally described as stiff soil. The following presents additional coefficients and factors relevant to seismic mitigation for new construction based upon the 2010 California Building Code (CBC). The seismic design category for a structure may be determined in accordance with Section 1613 of the 2010 CBC or ASCE7. According to the 2010 CBC, Site Class D may be used to estimate design seismic loading for the proposed structures. The period of the structures should be less than 1h second. This assumption should be verified by the project structural engineer. The 2010 CBC Seismic Design Parameters are summarized below. Sladden Eneineerine February 20, 2013 -3- Project No. 544-13032 13-02-065 Occupancy Category (Table 1604.5): I1 Site Class (Table 1613.5.5): D Ss (Figure 1613.5.1):1.50g SI (Figure 1613.5.1): 0.608 Fa (Table 1613.5.3(1)):1.0 Fv (Table 1613.5.3(2)):1.5 Sms (Equation 16-36 (Fa X Ss}): 1.50g Smi (Equation 16-37 (Fv X S1)): 0.90g SDS (Equation 16-38 (2/3 X Sms)): 1.00g SM (Equation 16-39 (2/3 X Smi)): 0.60g Seismic Design Category D In addition, we have sampled the surface soil on the subject lot to determine the soluble sulfate content as it relates to selecting appropriate concrete mix designs. Testing indicates that the site soil is generally considered non- corrosive with respect to concrete. The testing indicated soluble sulfate content of 350 ppm (0.035 percent) that corresponds with the "negligible" exposure category in accordance with ACI 318-08, Table 3. Based upon this, the use of sulfate resistance concrete mixes is not required. We appreciate the opportunity to provide service to you on this project, if you have any questions regarding this letter or the referenced reports please contact the undersigned. Respectfully submitted, SLADDEN ENGINEERING BRETT L. ANDERSON No. 045389 Brett L. Anderson xp. 9/30114 Principal Engineer * ENGINEE SER/gvm l FC Copies: 4/ Fedderly & Associates Vaddon F.nvinoorino Sladden Engineering 6782 Stanton Ave., Suite A, Buena Park, CA 90621 (714) 523-0952 Fax (714) 523-1369 45090 Golf Center Pkwy, Suite F, Indio, CA 92201 (760) 863-0713 Fax (760) 863-0847 450 Egan Avenue, Beaumont, CA 92223 (951) 845-7743 Fax (951) 845-8863 Date: March 11, 2013 Account No.: 544-13047 Customer: Fedderly & Associates Location: Traditions, 53540 Del Gato Drive, Lot 101, La Quinta Sulfate Series Analytical Report Soluble Sulfates per CA 417 ppm 350 Soluble Chloride per CA 422 ppm 170 Sulfate 544-13n47 m111'1 , V. TABLE 19-A-2—REQUIREMENTS FOR SPECIAL EXPOSURE COMMONS TABLE 19-A7-3—REQUIREMENTS.FOR CONCRETE EXPOSED TO SULFATE-CONTAINfNG-SOLUTIONS MINIMUM f", MAXIMUM NORfAAL.WEIGHT AND . WATER:CEMENTTIIOUS ; UGFrTWFJGHT. AGGREGATE•CONCRETE, MATERIAL'S` RAT16;.BY. : AGGREGATE WEIGHTNORMAL=WEIGHT x 0.00689 for MPa EXPOSURE CONDITION AGG*AEGATE CONCRETE Concrete intended to have low permeability when 11 Normal- '.Yfelght exposed to water 0.50 4,000 Concrete exposed to'freezing and thawing in a moist WATER-SOLUBLE condition or to deicing chemicals 0.45 4,500 For corrosion protection for reinforced concrete SULFATE SOIL, exposed to chlorides from deicing chemicals, salts or WO' h?, :, Nd,rm g: Ago*ale. Ccrete,ps(SO)IN is ' brackish'Nvatcr, or -Spray -from these sources 0.40 5,000 TABLE 19-A7-3—REQUIREMENTS.FOR CONCRETE EXPOSED TO SULFATE-CONTAINfNG-SOLUTIONS IA lower water-ccmcntitious materials ratio or higher strength may be.required for low permeability -or for protection against corrosion *of embedded items or freezing and thawing (Table 19-A-2)- 2 cawater. 3Pozzolan that has been determined by test or service record to improve sulfate resistance when used in concrete con- taining Type V cement, 2-264 UGMT.WEIGHT NORMAL -WEIGHT AGGREGATE AGGREGATE CONCRETE Maxlmum'Water- 11 Normal- '.Yfelght WATER-SOLUBLE Camentltlous Materials Ratio; bq.. and .' .Llghtwelghl . SULFATE SOIL, WO' h?, :, Nd,rm g: Ago*ale. Ccrete,ps(SO)IN is ' SULFATE PERCENTAGE BY SULFATE (SO4)IN Aggregate x 0.00689'tor MPa. EXPOSURE WEIGHT WATER, ppm. CEMENT TYPE Concretar Negligible 0.00-0,10 0-150 — —. — Modcratc2. 0.10-0.20 150-1,500 II, IP(MS), IS 0.50 4,000 (MS) Scvcrc 0.20-2.00 1,50040,000 V 0.45 4,500 Very severe Ovcr 2.00 Over 10,000 V plus 0.45 4,500 pozzolan3 IA lower water-ccmcntitious materials ratio or higher strength may be.required for low permeability -or for protection against corrosion *of embedded items or freezing and thawing (Table 19-A-2)- 2 cawater. 3Pozzolan that has been determined by test or service record to improve sulfate resistance when used in concrete con- taining Type V cement, 2-264