ENC2019-0013o
See below for Finance Revenue Codes
- GEM of& OESEgI --
JAN 2 t 2019 ENCROACHMENT PERMIT
CITY OF LAQUINTA PUBLIC WORKS CONSTRUCTION
MOAN DEPARTMENT . . . For the construction or puoiic or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works
improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS.
DATE: 1/24/2019
LOCATION OF CONSTRUCTION(Street address or Description): HWY 111 BTW ADAMS ST AND DEPOT DR
PURPOSE OF CONSTRUCTION: TRENCH TO INSTALL CAN CONDUIT AND ROD & ROPE EXISTING CONDUIT
DESCRIPTION OF CONSTRUCTION: COCHRAN COMMUNICATIONS: INSTALL CAN CONDUIT
DIMENSION OF INSTALLATION OR REMOVAL: NEW TRENCH FOR CONDUIT IN R/W 1.170FT / ROD & ROPE TO REPLACE EX 3.160FT
APPROXIMATE TIME WHEN WORK WILL BEGIN: 1/22/2019 TIME OF COMPLETION: 2/5/2019
ESTIMATED CONSTRUCTION COST: (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing
permanent resurfacing and/or replacing improvements)
COMMENTS: THIS PERMIT IS FOR WORK WITHIN THE PUBLIC R/W ONLY. R/W ON HWY 111 BTW DUNE PALMS & DEPOT DR IS 12FT BEHIND CURB
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least t dv hours in the time when work -will bstarted at (760) 777-7097.T&,
'- --
submit an inspecti iieUE'Iéave amessageonthe'Iñspection Request
-
Hotline at (760)777.7097.prior to 1:30 P.M. at least twenty-four (24)
IourspriTo the anticipated inspection., a
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and City of and to
pay for any additional replacement necessary as the result of this work.
or Agent
COCHRAN COMMUNICATION
CONSTRUCTION - PAUL BOZARTH 36630 CATHEDRAL CANYON DRIVE CATHEDRAL CITY, CA 92234 (760)218-8693
Name of Applicant (please print) Business Address Telephone No.
COCHRAN COMMUNICATION
CONSTRUCTION INC 36630 CATHEDRAL CANYON DRIVE CATHEDRAL CITY, CA 92234 (760)328-6778
Name of Contractor and Job Foreman Business Address Telephone No.
478543 LIC-000865
Contractor's License No. City Business License No.
LANDMARK AMERICAN INSURANCE COMPANY LHA140313
Applicant's Insurance Company Policy Number
Finance Revenue Code
PERMIT INSPECTION
EXCAVATION $2,480.00
TECHNOLOGY ENHANCEMENT FEE $5.00
TOTAL: $2,485.00
PERMIT NO: ElC2019-0013
DATE ISSUED: r
ExPIRAION DATE :%
WORK IPII'PECTED BY*:
PERMIT COMPLETION DATE:
If the work is covered by a Subdivision Improvement Agreement,
Subdivider shall request final acceptance of improvements from the
City Council.
u ,oj4ve4LJ
PUBLIC. WORKS DEPARTMENT
APPLICATION FOR PERMIT
Date: f/I
Tract No:
Vicinity:T
. Purpseof
Descriptioi
ips.r4i
_.Project N _._._... aNd1
63 111 jt- a.
ion
,
( Rough Grading, Offsite Street
---------------
ructioA(Bx: ee ln pt 1To O34)
t1 (eAJ('L[f f(O e y Cr
atnorRenioval:$.)
Approximate Construction Start Date: f/22//9
Approximate Construction Completion Date: . Estimated Construction Cost: $ 5 . . .. Estimated Construction Cost shall include the removal of all obstructions, materials, and übns, back-filling, compaction and placing permanent, resurfacing and or replacing 'improvements
. .
Contact Name: PhoneNumbe21. Name of Applicant/Owner: ASS AA (jw Applicant Address: 366 30 4-Ack- 1 Ccduya,1 C4 I. C; y. Applicant Telephone Number: I?O) )<-,0 -
Name of Contractor: (-hri
f4LJI( (Ut;i ('j7 Contractor. Address: 'I46 3i') Contractor Telephone Number: (7(Q 0) 37 Contractor State License Number: 97 Z5'i' . . Corthctor City Business License Number: 41C 0 00 ~.
P- A COPY OF THE CURRENT I1SURANCE CERTIFICAT
E
MUST BE PROVIDEP' Applicant or Contractor General Liability Insurance Company'.
IN Lk ,I i4er, CAj 71 .S (d Applicant or Contractor General Liability Insurance Policy Number& (A '19 o3
Office Use Only:
Inspection Fee:
Permit Fee:
As-Built
Deposit:_____________________
Dust Control
- - - Deposit
- _- - _--- - Credit
TOTAL FEE DUE:
OfficeUseOn1y
Assigned Permit Number
Approval Date:
Expiration
Date:
Issue
Date:
- • -
-4dve*flhofit
Work Area Traffic Control Handbook 31 Work Area Traffic Control Handbook 45
Right Hand Lane Closure on Far Side of Intersection
Mid Block Right Lane Closure
W20-1
(optional)
art
jti000h
4411
(optional)
W20-1 A
—4
A - 7/
W20-1
(120-2
J 16105 OVOBi
063 j
(optional)
Note See TaISCS 6H-2 and
6H-3 for the meaning of
the symbols and or letter
codes used in this figure
o1c.. flTh
EN ROAJ G20-2
'J2Oo
II—
LANE
uR37
TURN
RIGHT
RIGHT (optional)
T
J6 1 W4-2
~'_T <*
- 4W20-5
.4'TL~".
JL6 _IL flues W20-1
0
0
0
0
0 .
CA MUTCD TA-22B (CA)
-
NOT TOSCALE NOT TOSCALE
TEMPORARY TRAFFIC CONTROL PLAN DIMENSION GUIDELINES
------..---..--1---.-.—.--- -.--.---. r--'--• .......
SPEED Dimension Dimension Dimension I Dimension Dimension MAXIMUM MAXIMUM MAXIMUM
MPH WB/C L 1j3 b' CHANNELIZER CHANNELIZER CHANNELIZER
(2) ADVANCE MERGING SHIFTING MINIMUM BUFFER SPACE (4-A) TAPER SPACING tANGENT CONFLICT
WARNING SIGN TAPER I TAPER LENGTH 1 SHOULDER and tPACING SPACING
SPACING (5) LENGTH TAPER FLAGGER STATION (3) (6)
STOPPING SIGHT
DISTANCE (4-8)
(0%) (-3%) (-6%)
MPH Ft ft ft ft ft ft ft ft
25 100 125 65 45 (155) (160) (165) 25
-
50 12
30 250 180 90 60 (200) (205) (215) 30 60 15
35 250 245 125 85 1 (250) (260) (275) 35 70 17
-40 250 320 160 110 (305) (315) (335) 40 80 20
45 350 540 270 180 (360) (380) (400) 45 o 22
50 350 600 - 300 200 (425) (450) (475) 50 100 25
55 1 500 660 330 220
-
(495) (520) (555) 50 100 25
60 500 720 360 240 1 570) (600) (640) 50 100 -
25
65 1 500 780 (645) (685) (730) so 11,00 25 H UNlals on Freeways Bnd Enpresowean APr56 meet the C51trans Standard Plan,
Pooled Speed or observed operating speed (whichever is greater)
and $tanl4u SpecsftcMon regubesnsern1a
- - -
(31 Channelizer spacing otraD be reduced by Palf at areas where work is taking place on curees or arson of head-on conitict
4A)Bitter space may be inserted miOw speed urban areas and, shouldue inserted in high speed urban and rural areas
14-B) The Stopcsrcg Scgrit Orstance elsoldd enable Road Users
Sv spacing in rsrai areas should he 50011
to see the Prrmry Flagger SISIcon and saFely stop -H
(51
Tabler3F-tG1(CA)
SERVICE PATH OVERVIEW
- COAX/FIBER
N N.T.S.
ADER HO-,T i_COATED \, •-.iAJLT
ON N.W CORNER OF ADAMS ST. CON.NHR j ACAIvIS 31. AND HILAHGAY AND HIGHWAY 111. EX. CONDUIT 111, EX. CONDUIT CONTINUES N.E 295 GOES E. 100' TO EX. VAULT TO EX. PEDESTAL LOCATED ON *FINAL DRAWING* ACROSS ADAMS ST. HIGHWAY 111. UPGRADE TO MED
FIBER TIE POINT LOCATED IN VAULT ON N.W PEDESTAL. CORNER OF ADAMS ST. AND HIGHWAY 111. EX.
CONDUIT GOES E. 100' TO EX. VAULT ACROSS
ADAMS ST.PEDESTAL LOCATED ON N.E CORNER
OF ADAMS ST. AND HIGHWAY 111, EX. CONDUIT
CONTINUES S.E 295' TO EX. PEDESTAL
TIE PCBT 2 BERE NCLOSURE LOCATED ON HIGHWAY 111. UPGRADE TO MED IN EX ~DESTA,
VICINITY MAP
-. EX,DuIICJN,LMC.TO HIGHWAY 111 295' TO EX. PEDESTAL, EN. PEDESTAL LOCATED W. OF DUNE
UPGRADE TO MED PEDESTAL. EX. PALMS RD. EX. CONDUIT CONTINUES
CONDUIT CONTINUES E. 1000' TO EX. N.E TO EX. PEDESTAL ON N.W
PEDESTAL, UPGRADE TO MED PED, EX. CORNER OF DUNE PALMS RD AND
CONDUIT CONTINUES 150' TO EX. HIGHWAY 111. EX. CONDUIT CONTINUES
PEDESTAL. E. 100' TO EX. PEDESTAL LOCATED IN
CEMENT ON N.E CORNER OF HIGHWAY
111 AND DUNE PALM RD. BREAK
CONCRETE AND MOVE PEDESTAL 5' N.
UPGRADE TO MED. PEDESTAL.
PEDESTAL. CONDUIT CONTINUES E. ON HIGHWAY
111 295' TO EX. PEDESTAL, UPGRADE TO MED
PEDESTAL. EX. CONDUIT CONTINUES E. 1000'
TO EX. PEDESTAL, UPGRADE TO MED PED, EX.
CONDUIT CONTINUES 150' TO EX.
PEDESTAL. CONDUIT CONTINUES 200' E. TO EX.
PEDESTAL LOCATED W. OF DUNE PALMS RD.
EX. CONDUIT CONTINUES N.E TO EX. PEDESTA_____
ON N.W CORNER OF DUNE PALMS RD AND
HIGHWAY 111. EX. CONDUIT CONTINUES E. 100' 1. TO EX. PEDESTAL LOCATED IN CEMENT ON N.E
CORNER OF HIGHWAY 111 AND DUNE PALM RD.
BREAK CONCRETE AND MOVE PEDESTAL 5' N.
UPGRADE TO MED. PEDESTAL.CONDUIT
CONTINUES S. 225' ACROSS HIGHWAY 111 TO
EX. PEDESTAL LOCATED ON S.E CORNER OF
DUNE PALMS RD AND HIGHWAY 111.
OFFSITE JOB TOTALS:
EX. CONDUIT = 3160'
ED PEDESTA L
UPGRADE TO MED
- EX PEDESTAL
545 EX --ONDUIT
PEDESTAL
-EX
- ED EDNOUIE
- UPGRADE TO MED
25G ED COVJ PEDESTAL
BUP.AK CCMCR000 AAD MOVE
- I PE DESTAL
II k2W ED P NORTH. UPGRADE
TO MED PEDESTAL
c4) DR VA ED4T
EX PEDESTAL
,O MED 226 ED CONDUIT PEDESTAL
F-I
UndegEound Service A'ert
TOLL FREE
81
www.cal IJI.com
TWO WORANG DAYS BEFORE YOU DIG
EX. CCNDJI CC' II.
225' ACROSS HIGHWAY 111 TO
EN. PEDESTAL LOCATED ON S.E
CORNER OF DUNE PALMS RD
AND HIGHWAY 111.
NEW CATV VAULT
EXISTING CATV VAULT
NEW CA PEDESTA
EXISTING CATV PECES.1
EXISTING TELCO VA__
® JOINT POLE
EXISTING CATV RISER
-- NEW CA RISER
DC EXISTING STORAGE LOOP
DC 'TA STORAGE LOOP
4 DYSTING FIBER ENCLOSURE
4 NEW FIBER ENCLOSURE
LEGEND
2 —,NAY SYLIER
3—WAY SPUTTER
DIRE000NAL COUPLER
> LINE EXTENDER
AMPLIFIER
NODE
0 2 POR T TAP
4 PORT TAP
8 PORT TAP
EX EXISTING
EX. LOCKBOX
NEW LOCKBOX
MPOE MAIN POINT CF ENTRY
Y-CAST SEE Y—INTERCEPP DETAIL
NS NEW STRAND
01 OVERLASH
CC CONCRETE CUT
PIL PROPERTY LINE
C
COCHRAN
CO4UN1CATION
CONSTRUCflON.C.
CAT}DEDRALC!TY CA 922U
OFF! C 'TO, 32E-R775
ucaoss
PROJECT LOCATION SERVICE PROVIDER: PRISM 1083572 CONST. SUPERVOOR: TONY L.
DELIVERY RETAIL STORE
79785 HIGHWAY 111
LA QUINTA
922
hrter
473 AVE 48
'DIO CA 9220
LA. SOUTH
PROJECT T Y PE: FIBER/COAX CONST. COORDINATCN: RAMON H.
POPER' NAME DELIVERY RETAIL STORE SURVEY # -
CONTACT NAME: - SYSYEV MAO: -
CONTACT NUMBER: - TCA O UNOS -
ADDRESS 79785 HIGHWAY 111 SVSTEM - NODE L0039
Cfl LA QUINTA ZP. 92253
DATE 11/21/18
--
SERVICE PATH OVERVIEW
- COAX/FIBER
N N.T.S.
'
COAX T E POINT LA. A IN
EX. PEDESTAL, NEW TRENCH
GOES E. 285' ON HIGHWAY
111.
30' NEW ASPHALT CUT
20' NEW BORE
190' NEW TRENCH
TRFACH
30NEWTRENCH 20'NEWBORE
PLACE NEW PEDESTAL
_
ENCH 25' 3NN A-
30' ACROSS DRIVEWAY. NSA
TRENCH CONTINUES 135' S.
- - ,HC0N
E. ON HIGHWAY ill. NEW
BORE 20; UNDER SIDEWALK
TRENCH CONTINUES E. 140'.
PLACE NEW PEDESTAL.
NLA EN 305'
TO S.W CORNER OF HIGHWAY
111 AND DEPOT DR. PLACE NEW
PEDESTAL AND CONTINUE NEW
TRENCH S. 115' ON DEPOT DR.
HIGHWAY 111
505' NEW TRENCH
r PLACE NEW PEDESTAL
115' NEWTRENCH
I T! I ~ I ITIC
75' NEW ASPHALT CU1
EW TRENCH
----- 30' NEW ASPHALT CUT
r)
50' NEW TRENCH
:W BORE
EJ CH
aRE
BE i- PL TP FIBER EQUIPMENT
APS IN MPOE ROOM
30' NEW ASPHALT CUT
- 15'NEWTRENCH
O' S. EN PENC 15'
E. N E W ASPHALT CUT GOES S. SO'.
NEW TRENCH 15' W. THEN BORE 10'
SW, NEW TRENCH CONTINUES 15' S.
THEN BORE UNDER SIDEWALK 10' E.
CORE DRILL INTO MPOE ROOM.
PLACE FIBER EQUIPMENT AND TAPS
IN MPOE ROOM.
OUH1
TIE POINT EX. TAP
IN PEDESTAL
ACROSS DEPOT DR.
CUT SD' E, NEW
TRENCH CONTINUES E. 30',
NEW BORE 20' UNDER
SIDEWALK.
140' NEW TRENCH
VICINITY MAP
*FINAL DRAWING*
COAX TIE POINT EX. TAP IN EX. PEDESTAL,
NEW TRENCH GOES E. 285' ON HIGHWAY
111.NEW ASPHALT CUT 30' E, NEW TRENCH
CONTINUES E. 30', NEW BORE 20' UNDER
SIDEWALK.NEW TRENCH CONTINUES 190' E. ON
HIGHWAY 111. NEW BORE 20; UNDER SIDEWALK
TRENCH CONTINUES E. 140'. PLACE NEW
PEDESTAL.NEW TRENCH CONTINUES E. 505' TO
S.W CORNER OF HIGHWAY 111 AND DEPOT DR.
PLACE NEW PEDESTAL AND CONTINUE NEW
TRENCH S. 115' ON DEPOT DR.NEW ASPHALT
CUT 75' E. ACROSS DEPOT DR.TRENCH 25'
HEN ASPHALT CUT 30' ACROSS DRIVEWAY. NEW
TRENCH CONTINUES 135' S. NEW BORE 10' S.
THEN TRENCH 15' E. NEW ASPHALT CUT GOES
I S. 30'. NEW TRENCH 15' W. THEN BORE 10'
SW, NEW TRENCH CONTINUES 15' S. THEN
BORE UNDER SIDEWALK 10' E. CORE DRILL
I NTO MPOE ROOM. PLACE FIBER EQUIPMENT
AND TAPS IN MPOE ROOM.
JOB TOTALS:
NEW TRENCH = 1495'
NEW ASPHALT CUT = 165'
NEW BORE = 70'
Jr.dcground Servce Alert
TOLL FREE
www.cal 1,511.com
TA3 ACKNG OA"S BEFORE YOU DO
FVJ
I
®
NEW CATV VAULT
EXISTING CATY VAULT
NEW CATY PEDESTAL NEW
EXISTING CATY PEDE
EXISTING TELCO VA
JOINT POLE
-1- EXISTING CATV RISER
NEW CATY RISER
OG EXISTING STORAGE LOOP
O NW STORAGE LOOP
EX STING FIBER ENCLOSURE
"NEW FIRER ENCLOSURE
LEGEND
-12—WA" SPUTTER ® 2 PORT TAP
3—WAY SP U TTE R 4 PORT TAP
DIRECTIONAL COUPLER 8 PORT TAP
- NE ET\LED EX EXISTI NG
AMPLIFIER EX. LOCKBOX
NODE NEW LOCKBOX
MPOE MAIN POINT OF ENTP'
YAST SEE YINTERCEPT OET A L
NS NEW STRAND
OL OVERSH
CC CONCRETE CUT
%630
P/L PROPERTY LINE
CO
COMMUNiCATION
rn coNSU(oN,INC
CATHEDRAL CITY CA 922)4
OmC 760 326776
UC641 1'
PROJECT LOCATCN S:RVCE PPDIIDER: PR SM #1083572 CO'IST SJPER/'SOR.TONY L.
CATWO&AL CANYON DR
RETAIL STORE
79785 HIGHWAY 111
QFTA
92253
830 73 AvE 45
ND 0, CA 92201
SOUTH
DROJECT TYPEi FIBER/COAX cONST COORDINATOR. RAMON H.
NAVE DELIVERY RETAIL STORE SURVEY #- -
PROPERTY NA
CONTACT NAME - SYSTEM MAP: -
CONTACT NUMBER - - TOTAL OF UNITS: -
AOORESS: 79785 HIGHWAY 111 SYSV: - NODE LQ039
OTY QUINTA ZIP 92253
DATE: 11/26/18 PAGE - 2
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number ENC20I9-0013
The following shall atways apply:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way
Whenever construction extends within private property, it Is the responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK-LAYING CONSTRUCTION EQUIPMENT: Cleated track-laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother-faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber-tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spelled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE-WATER OPERTATIONS: If de-watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS
The following shall apply when indicateo
0 RI NOTIFICATION: Permittee shall notify the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
09 R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
0 R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
Q R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( N/A ) inches of A.C. paving placed on ( ** N/A ** ) inches of ( N/A ) aggregate sub-base course having an
"R" value of not less than ( ** N/A ** ) and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch (W) to one foot (1').
R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
Ri CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( 0*N/A 0 ) feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207.
R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 W) of A.C. paving on (0* N/A •• ) of class (*0 N/A *0)
aggregate base.
O R9 SIGHT CLEARANCE: Sight Clearance of six-hundred feet (600') in all directions shall be assured and maintained at all
times.
O RIO SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturers specifications.
City of La Quinta
RII COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
El R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one-thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
19 R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
R16 BACKFILL SAND: Backfill shall be approved transit-mix sand or equivalent and shall be placed on lifts not greater than
Three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
0 R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one-
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State
of California, dated January 1973.
0 R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub-grade. The SC-800 temporary paving shall be placed after
a maximum of three-thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
0 R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
three inches (3") of SC-800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La
Quinta Standard 600 shall be placed no later than ( 5 ) days after completion of temporary road repair.
C] R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfilled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five-hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
PERMIT NO. ENC2019-0013
Cochran Communications/ Trench to Install CATV Conduit and Rod & Rope
Existing Conduit / Hwy 111 Between Adams St and Depot Dr
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications for Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the
actual work performed.
The permittee shall submit inspection requests by calling the City Inspection Hotline at (760.) 777-7097
before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection.
Cochran Communications Construction Inc. (Paul Bozarth), hereinafter referred to as "Permittee",
shall be responsible for providing continuous dust and erosion control.
Streets shall be kept clean. They shall be completely cleaned at-the end of each working day and more
frequently, if required.
This permit is for the proposed CATV conduit to be installed within the RJW only (12' from curb on
Hwy 111 between Dune Palms and Depot Dr. / 23' behind curb on Dune Palms Rd). The permittee
shall obtain written approval from the private land owner for any work or improvements on private
property.
The City of La Quinta reserves the right to require modifications of the work be made at permittee's
sole cost for further. modifications as it relates to any sight distance concerns and/or improvement plan
requirements as required by the City Engineer.
Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1st to April 30: Monday-Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday-Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
Street (i.e. any 4 lane street) before 8:00 a.m.
Special Conditions Page 1 of 5
PERMIT NO. ENC2019-0013
Cochran Communications/ Trench to Install CATV Conduit and Rod & Rope
Existing Conduit / Hwy 111 Between Adams St and Depot Dr
9. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the City Traffic Signal Maintenance Division at (760) 777-7070 if signal operation at the intersection is
to be altered in any way.
10. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), at
residential streets, advance warning signs and traffic control shall be installed and maintained in
accordance with the latest edition of the California Manual of Uniform Traffic Control Devices (CA
MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH).
On Collectors to Arterial Streets, the permittee must submit a traffic control plan which shall be from or
prepared under the guidance of the latest edition of the California Manual of Uniform Traffic Control
Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH).
Traffic Control plans not from the CA MUTCD or the WATCH shall be signed and stamped by a civil
or traffic engineer registered in the State of California. It shall be the Perrnittee's responsibility to
appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street
closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be
maintained at all times.
11. The permittee and/or contractor placing engineered fill must provide adequate time and safety for the
Geotechnical Engineer of Record to perform soils testing during engineered fill placement. The testing
frequency shall be determined by the Geotechnical Engineer of Record such that the fill can be
determined to be placed according to the city approved plans.
12. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private Street
and for any damage to other City streets or facilities as a result of work performed under this permit.
13. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to
start of construction, a letter from any owners of the driveways/access ways that will be closed down
due to the construction. The letter must be approved by the city and at minimum state from the owner
the following:
Approval of the construction
Plan identification
Time Frame of Closure
Alternative Routes
14. Any land on which Williamson Act contracts apply shall remain undisturbed.
15. The permittee shall place temporary no parking signs along the parking area affected by the
construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and
removed immediately after the construction completion date.
Special Conditions Page 2 of 5
PERMIT NO. ENC2019-0013
Cochran Communications/ Trench to Install CATV Conduit and Rod & Rope
Existing Conduit / Hwy 111 Between Adams St and Depot Dr
16. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 811. It shall
be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which
impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines,
electrical conduits, and storm drain facilities.
17. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
18. The City of La Quinta reserves the right to require modifications of the work be made at permittee's sole
cost for proper sight distance requirements per guidelines in the AASHTO "A Policy on Geometric
Design of Highways and Streets, 5t) Edition" or latest, in the installation of all appurtenances abutting
and within the public street right-of-way.
19. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe
random trench compaction testing performed by a city approved material testing firm. If the inspector's
phone number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or
the Associate Engineer at 777-7047 to determine the city inspector's phone number. The inspector shall
determine the number and location of the test location/s. The above testing does not relieve the
permittee's responsibility for future repairs due to settlement at and near the locations of the work area.
Materials testing must be performed under direct supervision of a California Registered Civil Engineer.
20. The issuance of this permit and the City approval of the related construction improvement plans do not
provide a vested entitlement for all design parameters that may have been utilized for the plans. As such,
plans approved for this permit may be "at risk" for further modifications as it relates to any follow up
improvement plan requirements as required by the city or existing errors & omissions by the architect or
engineer of record.
21. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to start
of construction, the name of the City approved contractor, who shall submit to the City the following
items:
General Liability Insurance Company and Policy Number
City Business License
Contractors State License Number
22. The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts
provided in Engineering Bulletin for Indemnification & Insurance Requirements. This insurance shall be
kept in full force and effect at all times by Applicant or Contractor during the prosecution of the permitted
work and updated Certificate of Liability Insurance shall be submitted to the City. Each policy shall name
the City as an additional insured.
23. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris, the permittee shall
inform the City (Inspection staff or 777-7047) of the name and location of the certified dump site.
Special Conditions Page 3 of 5
PERMIT NO. ENC2019-0013
Cochran Communications/ Trench to Install CATV Conduit and Rod & Rope
Existing Conduit / Hwy 111 Between Adams St and Depot Dr
If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to the
Public Works Department, a traffic control plan for review and approval prior to start of construction or
parking on the paved R/W.
If traffic lanes are closed on an any Arterial street (any street with more than 2 lanes) within the City of La
Quinta right of way, The permittee is required to provide an informative message board (approved by the
City Engineer). It shall inform the commuters using the affected roadways of possible traffic delays, time of
construction, and if possible alternate routes. The message board shall be provided for the commuters 48
hours prior to the start of traffic delays. The board does not have to be electrical or solar powered.
Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982), backfill
compaction within Street rights-of-way shall conform to Section 306-1.3 of the latest edition of the
Standard Specifications for Public Works Construction (SSPWC), except as otherwise specified herein.
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the Permittee's
responsibility to provide appropriate geotechnical supervision, testing, and inspection, onsite, at all times
during backfill operations.
Backfill compaction shall be achieved by the following conditions:
When a firm foundation is not encountered due to soft, spongy or other unsuitable material, such
material shall be removed to the limits directed by the Geotechnical Inspector and/or the City
Inspector and the resulting excavation backfilled with pipe bedding material.
Backfill materials shall be brought to or maintained at appropriate moisture content for
compaction. The appropriate moisture content range shall be established at the onset of the
project and ensured prior to use of the materials through progress testing on the stockpiles.
The first length of trench backfilled shall be backfilled in the presence of the City Inspector.
Compaction shall be tested at random depths at approximate three-foot vertical intervals as
backfill is placed to ensure the effectiveness of the compaction methods and to establish the depth
of lift that can be compacted.
If lifts greater than one foot are attempted in this trial length of trench, compaction tests shall be
taken within the lifts to ensure that the full depth of the lift is compacted. Upon satisfactory
completion of this portion of trench, the City Inspector shall establish the maximum lift thickness
to be compacted for the remainder of the project.
In subsequent lengths of trench, the frequency of compaction tests shall equal one per each lift of
backfill, per 300 linear feet of open trench, at randomly selected locations within the open length
of trench.
Special Conditions Page 4 of 5
PERMIT NO. ENC2019-0013
Cochran Communications! Trench to Install CATV Conduit and Rod & Rope
Existing Conduit I Hwy 111 Between Adams St and Depot Dr
The depth of the randomly selected compaction tests shall also be randomly selected except that
where multiple tests are required in a given length of trench, the tests shall be no closer than three
feet (vertically) from each other.
If any compaction test fails, previously placed backfill (in the same length of open trench or
previous lengths of trench) which is represented by the failing test (as determined by the City
Inspector), shall be tested for compliance with compaction requirements.
All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test
results shall be furnished to the City Inspector.
All excavations within City of La Quinta right-of-way shall be backfihled, and temporarily paved if
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can not be backfihled in the same day. Excavated trenches shall not be allowed open overnight;
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
All landscaping, irrigation, decorative rock, decorative concrete, lighting, sidewalk, etc., shall be
replaced to its original condition.
Access and egress to all local properties shall be maintained at all times.
Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed
under this permit with an approved dust control treatment. Soil stabilization shall be done immediately
after completing the operation.
Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § I (part), 1982) the City
has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets
not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a
restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants
permission to use the Street to deliver street construction materials and/or equipment.
The City of La Quinta reserves the right to revoke, suspend or void this permit at any time.
The permittee shall indemnify, hold harmless and assume the defense of the City from all damages,
delay costs, costs or expenses in law or equity that may arise out of work under this permit.
If it is the intent of the permittee to cut the pavement and have it restored by a third party, the
permittee shall postpone cutting the pavement until the intended third party has acquired a permit from
the City to perform the required restoration work.
Special Conditions Page 5 of 5