TC2014-10034
See below for Finance Revenue Codes
Tay 4
OP
ENCROACHMENT PERMIT FILES CPV
PUBLIC WORKS CONSTRUCTION
or the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public
works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS.
DATE: 7/17/2014
..00ATION OF CONSTRUCTION(Street address or Description): ADAMS ST NORTH OF MILES
URPOSE OF CONSTRUCTION: REPAIR BURIED VERIZON CABLE.
DESCRIPTION OF CONSTRUCTION: VERIZON: ADAMS ST NORTH OF MILES
DIMENSION OF INSTALLATION OR REMOVAL:4X6 SQ FT OF ASPHALT
kPPROXIMATE TIME WHEN WORK WILL BEGIN: 7/21/2014 TIME OF COMPLETION: 7/21/2014
ESTIMATED CONSTRUCTION COST:_ (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing
permanent resurfacing and/or replacing improvements)
COMMENTS: SAW CUT 4 X 6 SQ FT TO DIG PIT TO REPAIR CABLE.
In consideration of the granting of this permit, the applicant hereby agrees to:
Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all
penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property
happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application.
Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-7097. To
submit an inspection request, leave a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at least twenty-four
(24) hours prior to the anticipated inspection.
Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of the City of and
to pay for any additional replacement necessary as the result of this work.
Sijquie of Applicant or Agent
AGUSTIN SOLORZANO 81529 INDUSTRIAL PLACE #B INDIO, CA 92201
Name of Applicant (please print) Business Address
PAULEY CONSTRUCTION INC 2021 W MEUNDA LN PHOENIX, AZ 85027
Name of Contractor and Job Foreman Business Address
689723 10025
Contractor's License No. city Business License No.
(760)625-5161
Telephone No.
(623)581-1200
Telephone No.
LIBERTY MUTUAL FIRE INSURANCE COMPANY TB2631004260013
Applicant's Insurance Company Policy Number
Finance Revenue Code PERMIT NO: TC2014-1003
PERMIT INSPECTION DATE ISSUED: 7/1712014
TRAFFIC CONTROL ONLY - ONE DAY $286.001 EXPIRATION DATE:7/17/2015
FIL RE copy
BY: AMY VU
WORK INSPECTED BY':
PERMIT COMPLETION DATE':
'If the work is covered by a. Subdivision Improvement Agreement,
Subdivider shall request final acceptance of improvements from the
City Council.
ILA
PUBLIC WORKS DEPARTMENT
APPLICATION FOR PERMIT
Date: l_____________________________
Tract No: Project Name: IV ' ortWiTt
Vicinity: U ]
Purpose of Construction (i.e.: Rough Grading, Mite Street, etc.)Re.f24iQ.JdEC
.L t.2C4i(
Description of Construction (i.e.: See Plan Set No. ce
nots r' f" C.49 zr
Approximate Construction Start Date: F,-3O-/Y _-
Approximate Construction Completion Date: 17J7Y
Estimated Construction Cost:
Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back-filling, compaction and
placing permanent resurfacing and or replacing improvements -
Contact Name: - - IPhone Number J(ozSI"/ _I1
Name of Applicant/Owner c,.jvO - -
Applicant Address: F
Applicant Telephone Number. t'Olin 2S—o k 1
Applicant I
Name of Contractor:
Contractor Address: I i5l'f 'Adcc-1-ri.( p&c ô .znu C4
Contractor Telephone Number'. t - --
Contractor State License Number: I ...o I
Contractor City Business License Number:
Contractor E-mail Address:L 1
10- A COPY OF THE CURRENT INSURANCE CERTII
Applicant or Contractor General Liability Insurance l Y14
0
Applicant or Contractor General Liability. insurancçj
Office Use Only:
I H
ci t
Inspection Fee:
Permit Fee:
As-Built
Deposit:
Dust Control
Deposit:
Credit
Amount:
'rorAL FEE DUE: 2_tj
Urr,II1 :ho,yII? - I-rsrm II. nrIIu-?lAI
V i
t4
I - L"4*iOw
;
fr\74 : '
Al
41
Go.)Slc earth feet 100
meters 40
C \\
City of La Quinta
The following General and Special Provisions are attached to and made a part of
Permit Number TC2014-1 003
The following shall always aDDly:
ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes work to be accomplished within the City of La Quinta's right of way
ONLY. Whenever construction extends within private property, it Is the, responsibility of the permittee for his contractors to secure permission
from abutting property owners. Such authorization must be secured by the permittee prior to starting work.
TRACK4AYING CONSTRUCTION EQUIPMENT: Cleated track-laying construction equipment shall not be permitted to operate on any paved
surface unless fitted with smoother-faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving
during excavations. Rubber-tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spelled,
or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced
over their entire width. Resurfacing shall consist of one coat of two inches (2") of A.C. surfacing plus appropriate seal coat as specified above.
PROTECTION OF TRAFFIC: All excavations and work areas shall be property lighted and barricaded as deemed necessary by the City
Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the
project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation.
CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete
structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or
cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains
shall be.kept free of debris at all times for proper drainage.
RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All
paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line
and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker
shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill.
DE-WATER OPERTATIONS: If de-watering operations are required and pumps are forcing water on City of La Quinta roads, It shall be the
responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary.
CLOSING STREETS: No street shall be closed. A minimum of one line of traffic shall be maintained at all times to provide limited access for
the adjoining property owners and emergency vehicles. In the event It is felt by the permittee that he must close a street for any length of time,
permittee shall contact this office to obtain the necessary permission.
SPECIAL PROVISIONS.
The following shall anply when Indicated:
RI NOTIFICATION: Permittee shall notify the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting
construction.
Z R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized
by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures.
Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the
permittee.
0 R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the
proposed work site. The permittee shall notify all concerned utility companies of the proposed work.
R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced
with ( N/A ) inches of A.C. paving placed on ( N/A ) inches of ( N/A ) aggregate sub-base course having an
R° value of not less than ( N/A ) and in conformance with the City of La Quinta Road Improvement Standards and
Specifications, Ordinance #461.
R5 . PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of
one-fourth inch (h/4) to one foot (1)
R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by
a licensed engineer.
RI CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( N/A ) feet shall
be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and
concrete driveway approach shall be constructed In conformance with City of La Quinta Standard #207.
R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property
line and the existing road paving shall be two and a half inches (2 W) of A.C. paving on ( ) of class ( N/A"')
aggregate base.
0 R9 SIGHT CLEARANCE: Sight Clearance of six-hundred feet (600') in all directions shall be assured and maintained at all
times.
RIO SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the
manufacturers specifications.
City of La Quinta
R11 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of
La Quinta may conduct In this area during the period of this permit. Work shall be coordinated with the State or City of La
Quinta forces to preclude delay or interference with State or City of La Quinta projects.
R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the
centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly,
replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties
to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be
notified upon completion or replacement of all survey monuments for proper clearance.
0 R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement
cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be
used to excavate prior to cutting Or pavement.) Excavation material shall be placed in such a position as to best facilitate the
general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected.
R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one-thousand feet (1000') of open trench before backfill
operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the •
protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in
each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the
construction material is actually on the work site.
RIS BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes
of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or
saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or
replaced by an approved sand or gravel.
R16 BACKFILL SAND: Backfill shall be approved transit-mix sand or equivalent and shall be placed on lifts not greater than
three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any
case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway.
R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the
trench before flooding or a maximum of five feet,(5') lifts where trenches are of excessive depths. Care is to be exercised
that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the
resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the
greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to
retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water
supply shall be continuos.
R18 COMPACTION TESTS: If so required by the inspector, compactiontest shall be made at intervals of not more than one-
thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City
Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section
6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973.
R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line.
One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs.
Compaction tests shall be made as outlined In Sections 6.3.001 of the Standard Specifications, Division of Highways, State'
of California, dated January 1973.
P20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting
of two inches (2") of SC-800 shall be placed on a prepared sub-grade. The SC-800 temporary paving shall be placed after
a maximum of three-thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no
case shall the placement of the temporary pavement exceed a five (5) day limit.
R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of
three inches (3") of SC-800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La
Quinta Standard 600 shall be placed no later than (5 ) days after completion of temporary road repair.
D R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as
determined by the City Engineer.
P.23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon
completion of permanent repairs.
R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished
by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It
shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location.
Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The
entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The
stump hole shall be backfllled and thoroughly compacted as specified in the following paragraph. Where it becomes
necessary to restrict traffic, the work shall be restricted to a maximum of five-hundred feet (500') at any one time. Adequate
signs, flagmen and or barricades shall be provided to protect the traveling public at all times.
Large holes resulting from tree removal shall be backfllled and compacted to not less than ninety percent (90%) or
equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method.
Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California,
dated January 1973.
S
PERMIT NO. TC2014-1003
Verizon / Traffic Control to Repair Buried Verizon Cable I Adams St North of
Miles Ave
In addition to the standard permit conditions, the following shall apply:
Pursuant to Section 14.16.320 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all
work shall be performed in accordance with the latest edition of the Standard Specifications For Public
Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer.
The permittee may only work at night if approved by the City Manager. If approved by the city manager,
night work may be halted if the city receives complaints about the night work.
Prior to commencing the excavation of a trench 5 feet in depth or greater and into which a person will
be required to descend, the Contractor shall first obtain a permit to do so from the Division of Industrial
Safety pursuant to 7-10.4.1.
This permit is for work within the R/W. The permittee shall not encroach upon private property without
prior written approval (submit to the Public Works Department, attention to the Assistant Civil
Engineer) of the private land owner whom is being encroached upon.
The City of La Quinta reserves the right to require modifications of the work be made at permittee's
sole cost for further modifications as it relates to any sight distance concerns and/or improvement plan
requirements as required by the City Engineer.
"The permittee shall not construct an improvement that reduces vehicular sight distances. If such
improvement is found to reduce the vehicular sight distance, then the permittee shall relocate the
improvement prior to sign off of their encroachment permit."
The permittee shall not install improvements with the intention of providing video transmission services
unless the permittee obtains a valid Franchise Agreement.
The permittee shall remove any underground utility markings that are no longer being used for this
project. The permittee shall remove markings on paved areas using high pressure wash or a method
equivalent and at the discretion of the City Engineer.
Any asphaltic or concrete repairs shall closely match the existing paved areas in color at the discretion
of the City Engineer. A finish product with a checkerboard appearance will not be accepted.
The permittee shall maintain the existing pedestrian path of travel and must maintain ADA compliant
pathways leading to areas for use of public transportation systems.
No stockpiling of any materials will be allowed within the City R/W without an approved permit
explicitly stating the use for stockpiling and/or storage.
This permit or copy of it shall be on the work site (usually the job trailer) for inspection during the
actual work performed.
Special Conditions Page 1 of 6
PERMIT NO. TC2014-1003
Verizon / Traffic Control to Repair Buried Verizon Cable I Adams St North of
Miles Ave
Verizon and Pauley Construction (Agustin Solorzano), hereinafter referred to as "Permittëe", shall
be responsible for providing continuous dust and erosion control.
Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more
frequently, if required.
The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097
before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection.
The permittee is required to provide a changeable message board informing the commuters using the
affected Major and Primary Arterial roads of major construction and possible traffic delays, time of
construction, and if possible alternate routes. The message board shall be provided for the commuters
48 hours prior to the start of traffic delays.
Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the
work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of
equipment within one-half mile of human occupancy shall be performed only during the following time
periods:
October 1st to April 30: Monday-Friday 7:00 a.m. to 5:30 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
May 1st to September 30: Monday-Friday 6:00 a.m. to 7:00 p.m.
Saturday 8:00 a.m. to 5:00 p.m.
Work shall be prohibited on legal holidays and Sundays.
Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial
street (ie any 4 lane street) before 8:00 a.m.
Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. -3
p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact
the City Traffic Signal Maintenance Technician at (760) 250-0571 if signal operation at the intersection
is to be altered in any way.
Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
Permittee shall assume responsibility for repair of any pavement damage to any public or private Street
and for any damage to other City streets or facilities as a result of work performed under this permit.
The permittee shall place temporary no parking signs along the parking area affected by the
construction. The signs shall be placed along the area 48hrs prior to the start of closing the area, and
removed immediately after the construction completion date.
Special Conditions Page 2 of 6
PERMIT NO. 1C20144003
Verizon / Traffic Control to Repair Buried Verizon Cable I Adams St North of
Miles Ave
21. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 811. It shall
be the Permittee's responsibility to notify the Public Works Department of anticipated excavation
which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation
lines, electrical conduits, and storm drain facilities.
22. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to
start of construction, a letter from any owners of the driveways/access ways that will be closed down
due to the construction. The letter must be approved by the city and at minimum state from the owner
the following:
Approval of the construction
Plan identification
Time Frame of Closure
Alternative Routes
23. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), at
residential streets, advance warning signs and traffic control shall be installed and maintained in
accordance the latest edition of the California Manual of Uniform Traffic Control Devices (CA
MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH).
24.
On Collectors to Arterial Streets, the permittee must submit a traffic control plan which shall be from or
prepared under the guidance'of the latest edition of the California Manual of Uniform Traffic Control
Devices (CA MUTCD) or the latest edition of the Work Area Traffic Control Handbook (WATCH).
Traffic Control plans not from the CA MUTCD or the WATCH shall be signed and stamped by a civil
or traffic engineer registered in the State of California. It shall be the Permittee's responsibility to
appropriately detour and barricade all construction sites.
Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall
be maintained at all times.
25. Should additional work, materials, or modifications of the work be required in order to meet City
standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be
performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the
City of La Quinta.
26. The City of La Quinta reserves the right to require modifications of the work be made at permittee's
sole cost for proper sight distance requirements per guidelines in the AASHTO " A Policy on
Geometric Design of Highways and Streets, 5m Edition" or latest, in the installation of all
appurtenances abutting and within the public street right-of-way.
27. The permittee shall be responsible for calling the city inspector to arrange the city inspector to observe
random trench compaction testing performed by a city approved material testing firm. If the inspector's
phone number is unknown, the permittee shall call the Public Works front counter phone at 777-7075 or
the Assistant Civil Engineer at 777-7047 to determine the city inspector's phone number. The inspector
Special Conditions Page 3 of 6
b
PERMIT NO. TC2014-1003
Verizon I Traffic Control to Repair Buried Verizon Cable / Adams St North of
Miles Ave
shall determine the number and location of the test location/s. The above testing does not relieve the
permittee' s responsibility for future repairs due to settlement at and near the locations of the work area.
Materials testing must be performed under direct supervision of a California Registered Civil Engineer.
28. The issuance of this permit and the City approval of the related construction improvement plans do not
provide a vested entitlement for all design parameters that may have been utilized for the plans. As
such, plans approved for this permit may be "at risk" for further modifications as it relates to any
follow up improvement plan requirements as required by the city or existing errors & omissions by the
architect or engineer of record.
29. This permit is not valid until the permittee submits, to the Public Works Department 2 weeks prior to
start of construction, the name of the City approved contractor, who shall submit to the City the
following items:
General Liability Insurance Company and Policy Number
City Business License
Contractors State License Number
30. The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts
provided in the Engineering Bulletin for Indemnification & Insurance Requirements. This insurance
shall be kept in full force and effect at all times by Applicant or Contractor during the prosecution of
the permitted work and updated Certificate of Liability Insurance shall be submitted to the City. Each
policy shall name the City as an additional insured.
31. The permittee shall not encroach upon private property without prior written approval (submit to the
Public Works Department, attention to the Assistant Civil Engineer) of the private land owner whom is
being encroached upon.
32. The permittee shall haul all offsite debris to a certified landfill. Prior to hauling debris, the permittee
shall inform the City (Inspection staff or 777-7047) of the name and location of the certified dump site.
33. If public traffic lanes are required to be closed, this permit is not valid until the permittee submits, to
the Public Works Department, a traffic control plan for review and approval prior to start of
construction or parking on the paved R/W.
34. The permittee is required to provide an informative message board (approved by the City Engineer)
informing the commuters using the affected Primary Arterial roads or heavier traffic of possible traffic
delays, time of construction, and if possible alternate routes. The message board shall be provided for
the commuters 48 hours prior to the start of traffic delays.
35. Backfill compaction within street rights-of-way shall conform to Section 306-1.3 of the latest edition
of the Standard Specifications for Public Works Construction (SSPWC), except as otherwise
specified herein.
Special Conditions Page 4 of 6
PERMIT NO. TC2014-1003
Verizon / Traffic Control to Repair Buried Verizon Cable / Adams St North of
Miles Ave
Native material may be used as backfill material provided that minimum compaction, achieved in the
manner prescribed herein, is achieved. Backfill shall be performed by mechanical means; no water
densified compaction via jetting or flooding or other means shall be allowed. It shall be the
Permittee's responsibility to provide appropriate geotechnical supervision, testing, and inspection,
onsite, at all times during backfill operations.
All costs incurred due to the conditions above shall be borne by the Permittee. Copies of all test results
shall be furnished to the City Inspector.
All excavations within City of La Quinta right-of-way shall be backfllled, and temporarily paved if
-
within the existing travel way, at the end of every workday as directed by and to the satisfaction of the
City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that
which can not be backfilled in the same day. .Excavated trenches shall not be allowed open overnight,
however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length,
open overnight at a point where construction will begin the next day, provided that this length of trench
is completely covered by steel plating.
Access and egress to all local properties shall be maintained at all times.
Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982),
permanent pavement replacement shall be completed no later than seven (7) days after the completion
of the work. Permanent pavement replacement shall conform to the following conditions:
Existing asphalt concrete pavement shall be sawcut one (1) foot beyond trench edges. Edges shall
be straight and clean.
Permanent pavement replacement structural section, within all trenches, shall be 1" thicker than
existing of asphalt concrete over the same existing thickness of crushed aggregate base or crushed
miscellaneous base, meeting the requirements of Sections 200-2.2 and 200-2.4 of the Standard
Specifications for Public .Works Construction. The replaced pavement and base material shall be
compacted to 95% relative compaction and respectively tested, for each 300 linear feet of trench.
Verify exact structural replacement section thicknesses with the City prior to installation.
Permanent pavement replacement shall be installed using a City approved 3h" max medium
asphalt concrete as the base course lift and a City approved V2" max medium finish course lift for
capping. Asphalt concrete mix design shall be approved by the City prior to its placement.
Cold-Mill and Overlay - The existing pavement which was properly protected in place during the
trenching operation located adjacent to the trench saw cut shall be cold-milled to a depth of 0.10
feet with butt joint created next to the existing unmilled pavement surface. The cold-milled area
and base asphalt concrete in the trench area shall be overlaid with a City approved C2-AR-4000
asphalt concrete mix. The width of the cold milling area shall be as follows:
Special Conditions Page 5 of 6
)rk Area Traffic Control Handbook 31
Mid Block Right Lane Closure
Work Area Traffic Control Handbook 41
Right Hand Lane Closure on Far Side of Intersection
RIGHT LAW]
-• MUST
/ TURN RIGHT
A Optional
right turn area
4.4t:;'tL
CAMUTCYA-22B CA lcdified)
NOT TO SCALE
MWM($, RECOMMENDED
DIMENSION DIME -I DOWN ON A '5" B c D
DIMENSION MAXIMUM MAXIMUM
SPMPH 9)
EED SIGN SPACING '5 MINIM1 MINIIMUM MINIMUM E
BUFFER
CHANNEUR CHANNEUR
MERGING
TAPER L
SHIFTING
TAPER 1/2 L
SHOULDER SPACE (4)
SPACING
TAPER 1 1
SPACING
TANGENT (3) ft TAPER 1/3 L
25 125
ft
63
ft ft ft ft
- 30 250 180 90
42 158 25
250 245 123
60
82
205 30 6
50
0 40 250
45
320 160 107
257
315
35 70
350
50 350
540 270 180 378
40
45
80
500
600
660
300
330
200 446 50
90
100 60 500 720 360
220
240
520 50 100
500
W ofl on Freeways and Expressways
780 390 260 -
598
682
50
50
100
100 ,21 w,th speeds of 65 mph Posted Speed or observed operating speespeed
Chann (whichever
or greater shall J meet the Standard Plans and Standard Specifications of Caftrans
spacing shall be reduced in half at areas where 4i
is greater)
rk is taking place, on curves, Buffer space may be riseiled or areas low of head-on in speed urban areas and
Sign spacing in rural areas Should be 500 ft should be inserted in high speed urban
conflict
and rural areas