Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
TC2015-0040
ol' See below for Finance Revenue Codes ENCROACHMENT PERMIT PUBLIC WORKS CONSTRUCTION For the construction of public or private curbs, driveways, pavements, sidewalks, parking lots, sewers, water mains and other like public works improvements in connection with MINOR IMPROVEMENTS and APPROVED SUBDIVISIONS. DATE: 7/6/2015 S LOCATION OF CONSTRUCTION (Street address or Description): JEFFERSON ST AT HWY 111 AND AVE 50 PURPOSE OF CONSTRUCTION: SETUP TRAFFIC CONTROL IN LA QUINTA CITY LIMITS FOR PROPOSED SIDEWALK IMP WITHIN THE CITY OF DESCRIPTION OF CONSTRUCTION: CITY OF INDIO SIDEWALK IMPROVEMENTS DIMENSION OF INSTALLATION OR REMOVAL:N/A ROXIMATE TIME WHEN WORK WILL BEGIN: 7/1/2015 TIME OF COMPLETION: 7/31/2015 ESTIMATED CONSTRUCTION COST:S3.000.00 (Including removal of all obstruction, materials, and debris, backfilling, compaction and placing permanent resurfacing and/or replacing improvements) COMMENTS: THIS PERMIT IS ONLY FOR TRAFFIC CONTROL SETUP WITHIN THE CITY OF LA QUINTA LIMITS. In consideration of the granting of this permit, the applicant hereby agrees to: Indemnify, defend and save the City, its authorized agents, officers, representatives and employees, harmless from and against any and all penalties, liabilities or loss resulting from claims or court action and arising out of any accident, loss or damage to persons or property happening or occurring as a proximate result of any work undertaken under the permit granted pursuant to this application. Notify the Administrative Authority at least twenty-four (24) hours in advance of the time when work will be started at (760) 777-7097. To submit an inspection request, Ieaie a message on the Inspection Request Hotline at (760) 777-7097 prior to 1:30 P.M. at least twenty-four (24) hours prior to the anticipated inspection. Comply with all applicable City Ordinances, the terms and conditions of the permit and all applicable rules and regulations of th',i of and to pay for any additional replacement necessary as the result of this work. of Applicant or Agent CITY OF INDlO - TOM RAFFERTY 100 CIVIC CENTER MALL INDlO, CA 92201 (760)541-4270 Name of Applicant (please print) Business Address Telephone No. TRYCO GENERAL ENGINEERING P 0 BOX 391 RIM FOREST, CA 92378 (909)337-3336 Name of Contractor and Job Foreman Business Address 960285 Contractor's License No. LANDMARK AMERICAN INSURANCE COMPANY Applicant's Insurance Company Finance Revenue Code TOTAL: $0.00 br cloov'1)c 33k;- Telephone No. LIC-762919 City Business License No. LHA138216 Policy N u mber PERMIT NO: TC2015-0040 DATE ISSUED: y, zoic EXP IRATI 4, Z'Of'6 WORK INS CTED BY*: PERMIT COMPLETION DATE*: If the work is covered by a Subdivision Improvement Agreement, Subdivider shall request final acceptance of improvements from the City Council. T,Vf 4 4 a" PUBLIC WORKS DEPARTMENT APPLICATION FOR PERMIT Date: June 23, 2015 Tract No: NIA Project Name: City of Indio Sidewalk Improvements VicinityHWY 111 & Jefferson St. and Jefferson St. & 50th Avenue Purpose of Construction (i.e.: Rough Grading, Offsite Street, etc.) Setup traffic control in La Quinta City Li :La proposed sidewalk imp within the City of Indio Description of Construction (i.e.: See Plan Set No. 01234) Sidewalk Improvements Indio CIP Dimension of Installation or Removal: Nothing in La Quinta Approximate Construction Start Date: July 1, 2015 - Approximate Construction Completion Date: July 31, 2015 Estimated Construction Cost: $ 0.00 for Work in La Qunita (About $3,000 in IC in LQ) Estimated Construction Cost shall include the removal of all obstructions, materials, and debris, back-filling, compaction and placing permanent resurfacing and or replacing improvements Contact Name: Tom Rafferty Phone Number: (7) 541-4270 Name of Applicant/Owner: City of Indio Applicant Address: 100 Civic Center Mall, Indio CA 92201 Applicant Telephone Number: (76d541-4270 Applicant E-mail Address: traffertycindio.org Name of Contractor: Tryco General Engineering - Contractor Address: P0 Box 391 Rimforrest CA 92378 Contractor Telephone Number: !(909)337 3336 - Contractor State License Number: 960285 Contractor City Business License Number: 62.4'I€f - Contractor E-mail Address: trykirtley©yahoo.com 10- A COPY OF THE CURRENT INSURANCE CERTIFICATE MUST BE PROVIDED Applicant or Contractor General Liability Insurance Company: ,Landmark American Insurance Company Applicant or Contractor General Liability Insurance Policy Number: LHA138216 . - Office Use Only: Inspection Fee: Permit Fee: - As-Built Deposit: Dust Control Deposit: Credit Amount: TOTAL FEE DUE: jo Office Use Only: Assigned Permit Number: _p 20 I's-- 4o o Approval Date: Expiration Date: Issue Date: Administrative Authority: City of La Quinta The following General and Special Provisions are attached to and made a part of Permit Number TC2015-0040 The following shall always apply: ENCROACHMENT ON PRIVATE PROPERTY: This permit authorizes-work to be accomplished within the City of La Quinta's right of way ONLY. Whenever construction extends within private property, it is the responsibility of the permittee for his contractors to secure permission from abutting property owners. Such authorization must be secured by the permittee prior to starting work. TRACK-LAYING CONSTRUCTION EQUIPMENT: Cleated track-laying construction equipment shall not be permitted to operate on any paved surface unless fitted with smoother-faced street pads. All mechanical outriggers shall be fitted with rubber street shoes to protect the paving during excavations. Rubber-tired equipment only shall be used in backfill operation in paved areas. If the existing pavement is scarred, spalled, or broken during the term of this contract or if the pavement is marred, City of La Quinta shall request that these portions of road be resurfaced over their entire width. Resurfacing shall consist of one coat of two inches (2) of A.C. surfacing plus appropriate seal coat as specified above. PROTECTION OF TRAFFIC: All excavations and work areas shall be properly lighted and barricaded as deemed necessary by the City Engineer or City of La Quinta Public Works Inspectors. Suitable detours and detour signs shall be placed and maintained for the duration of the project. The City shall be notified twenty-four hours (24) in advance of any traffic detours or delineation. CARE OF DRAINAGE STRUCTURES: Any drainage structure to include corrugated metal pipe, concrete pipe, steel culvert and concrete structures encountered during excavation which necessitate removal shall be replaced in kind. In the event it becomes necessary to remove or cut existing drainage structures, City of La Quinta shall be notified prior to commencement of this work. Drainage structures and open drains shall be kept free of debris at all times for proper drainage. RIGHT-OF-WAY CLEANUP: Any surplus material resulting from excavation and backfill operations shall be removed from the right of way. All paved surfaces shall be broomed clean of earth and other objectionable materials immediately after backfill and compaction. Existing gutter line and drainage ditches shall be replaced to their original standard or better. All excess material shall be removed prior to paving. Water tanker shall be used, as required, to sprinkle the job site to keep down dust conditions and shall be used immediately after backfill. DE-WATER OPERTATIONS: If de-watering operations are required and pumps are forcing water on City of La Quinta roads, it shall be the responsibility of the permittee (contractor) to control this water and to provide off-street barricades when necessary. CLOSING STREETS: No street shall be closed. A minimum of one lane of traffic shall be maintained at all times to provide limited access for the adjoining property owners and emergency vehicles. In the event it is felt by the permittee that he must close a street for any length of time, permittee shall contact this office to obtain the necessary permission. SPECIAL PROVISIONS The following shall apply when indicated: Z RI NOTIFICATION: Permittee shall be notified the City at (760) 777 - 7097 at least forty-eight hours (48) in advance of starting construction. Z R2 UTILITY CLEARANCE: (Substructures) Prior to making any excavations within the City of La Quinta right-of-way authorized by permit, the permittee shall contact all concerned utility companies relative to the location of existing substructures. Damage to existing substructures resulting from operations conducted under this permit shall be the sole responsibility of the permittee. R3 UTILITY CLEARANCE (Surface Structures) No work shall be done under this permit until all utilities are clear of the proposed work site. The permittee shall notify all concerned utility companies of the proposed work. R4 PAVEMENT WIDENING: Area between the proposed concrete gutter line and the existing road pavement shall be surfaced with ( N/A ) inches of A.C. paving placed on ( N/A ) inches of ( N/A ) aggregate sub-base course having an R" value of not less than ( N/A ) and in conformance with the City of La Quinta Road Improvement Standards and Specifications, Ordinance #461. R5 PARKWAY GRADING: Area between the property line and top of the proposed concrete curb shall be graded to a slope of one-fourth inch (W) to one foot (1'). 0 R6 GRADE CHECKING: City of La Quinta shall check grades upon receipt of plan and profile and/or grades as established by a licensed engineer. R7 CURB REMOVAL FOR DRIVEWAYS: A portion of the existing concrete curb and/or curb and gutter ( N/A ) feet shall be removed. Curb and/or curb and gutter shall be saw cut prior to removal. Depressed curb, matching concrete gutter and concrete driveway approach shall be constructed in conformance with City of La Quinta Standard #207. R8 DRIVEWAYS: A.C. driveways shall be constructed as not to alter existing drainage pattern. Surfacing between the property line and the existing road paving shall be two and a half inches (2 W) of A.C. paving on ( N/A ) of class ( N/A ) aggregate base. Z R9 SIGHT CLEARANCE: Sight Clearance of six-hundred feet (600') in all directions shall be assured and maintained at all times. RIO SOIL STERILIZER: The area to be surfaced shall be treated with soil strerilizer. Rate of application shall comply with the manufacturers specifications. City of La Quinta Z RI 1 COORDINATE WORK: The proposed work shall be subordinated to any operation, which the State of California or City of La Quinta may conduct in this area during the period of this permit. Work shall be coordinated with the State or City of La Quinta forces to preclude delay or interference with State or City of La Quinta projects. R12 SURVEY MONUMENTS: Prior to excavation or beginning of construction, all survey monuments which exist on the centerline of all streets or property lines when included shall be completely tied out so they may be readily and correctly, replaced by a licensed civil engineer or surveyor at the expense of the permittee. A complete set of notes showing the ties to these monuments shall be furnished to the City Engineer prior to the removal of any monuments. This office shall be notified upon completion or replacement of all survey monuments for proper clearance. R13 PAVEMENT CUTTING: Pavement will be mechanically saw cut to a straight edge prior to excavation. Method of pavement cutting shall be approved through the office of the City Engineer. (Under no circumstances shall excavating equipment be used to excavate prior to cutting or pavement.) Excavation material shall be placed in such a position as to best facilitate the general flow traffic. Prior to final paving operations, any damage to pavement straight edges shall be corrected. 0 R14 LIMIT OF EXCAVATIONS: Excavations shall be limited to one-thousand feet (1000') of open trench before backfill operations must begin. All excavations shall be properly barricaded with lights overnight, on weekends and holidays for the protection of the traveling public. The Public Works Inspector shall determine the suitability of excavation barricading in each case. No excavation shall remain open for a period exceeding five (5) days. No excavation shall be made unless the construction material is actually on the work site. R15 BACKFILL MATERIAL: Backfill shall be free of brush, roots or other organic substance detrimental to its use for purposes of producing and adequately consolidated backfill. Ant material which the City of La Quinta deems unsuitable (spongy or saturated material) which is encountered during excavation shall not be used for backfill, but shall be supplemented or replaced by an approved sand or gravel. R16 BACKFILL SAND: Backfill shall be approved transit-mix sand or equivalent and shall be placed on lifts not greater than three feet (3') and vibrated using vibrostamper or equivalent equipment. Alternate methods may be substituted, but in any case, a relative compaction of ninety-five percent (95%) shall be maintained with the structural section of the roadway. 0 R17 BACKFILL PLACEMENT: Backfill shall be applied in layers of not more than fifty percent (50%) of the total depth of the trench before flooding or a maximum of five feet (5') lifts where trenches are of excessive depths. Care is to be exercised that the backfill material is not subjected to extreme swell by flooding operations. Backfill material shall be placed so that the resulting compaction shall not be less than ninety percent (90%) or equivalent to the surrounding ground, whichever is the greater compaction. Where ponding or flooding is used for a maximum settlement, adequate dikes will be constructed to retain the water. Where jetting is used, the jets shall be of sufficient length to reach the bottom of each layer and the water supply shall be continuos. R18 COMPACTION TESTS: If so required by the inspector, compaction test shall be made at intervals of not more than one- thousand (1000') feet and a maximum of one (1) test on each road. One (1) copy of each test shall be forwarded tot the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R19 COMPACTION TESTS: If so required by the Inspector, compaction tests shall be made for each crossing or service line. One (1) copy of each test shall be forwarded to the City Engineer for approval and filed prior to making permanent repairs. Compaction tests shall be made as outlined in Sections 6.3.001 of the Standard Specifications, Division of Highways, State of California, dated January 1973. R20 TEMPORARY PAVEMENT REPAIRS: After completion of backfill and compaction operations, a temporary patch consisting of two inches (2") of SC-800 shall be placed on a prepared sub-grade. The SC-800 temporary paving shall be placed after a maximum of three-thousand linear feet (3000') or trench has been excavated and backfill operations completed, but in no case shall the placement of the temporary pavement exceed a five (5) day limit. 0 R21 PERMANENT PAVEMENT REPAIR: After backfill and compaction have been completed, a temporary patch consisting of three inches (3") of SC-800 shall be placed immediately. A permanent patch of Asphalt Concrete surfacing per City of La Quinta Standard 600 shall be placed no later than ( N/A ) days after completion of temporary road repair. R22 FOG SEAL: A fog seal coat consisting of an application of asphaltic emulsion shall be applied over all patch areas as determined by the City Engineer. R23 STREET RESTRIPING: Where street striping is still visible on street to be excavated, such striping shall be replaced upon completion of permanent repairs. R24 TREE RELOCATION OR REMOVAL: Tree relocation within the City of La Quinta road right-of-way shall be accomplished by a licensed, bonded and insured tree service, and handled safely without interference or hazard to the traveling public. It shall be the responsibility of the permitte to maintain the tree in a vigorous growing condition at its new location. Trees to be removed shall be in sections, which can be handled safely without interference or hazard to highway traffic. The entire width of the tree stump, shall be removed and disposed of so that no debris remains in view of the highway. The stump hole shall be backfllled and thoroughly compacted as specified in the following paragraph. Where it becomes necessary to restrict traffic, the work shall be restricted to a maximum of five-hundred feet (500') at any one time. Adequate signs, flagmen and or barricades shall be provided to protect the traveling public at all times. Large holes resulting from tree removal shall be backfilled and compacted to not less than ninety percent (90%) or equivalent tot the surrounding ground, whichever is the greater compaction as determined by the impact or field method. Compaction tests shall comply with Section 6.3.01 of the Standard Specifications, Division of Highways, State of California, dated January 1973. PERMIT NO. TC2015-0040 City of Indio / Traffic Control for City of Indio Sidewalk Improvements I Jefferson Street at Hwy 111 and Ave 50 In addition to the standard permit conditions, the following shall apply: Pursuant to Section 14.16.320 of the-La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), all work shall be performed in accordance with the latest edition of the Standard Specifications For Public Works Construction (SSPWC) and as directed by and to the satisfaction of the City Engineer. City of Indio (Tom Rafferty), hereinafter referred to as "Permittee", shall be responsible for providing continuous dust and erosion control. This permit or copy of it shall be on the work site for inspection during the actual work performed. Streets shall be kept clean. They shall be completely cleaned at the end of each working day and more frequently, if required. Pursuant to Section 6.08.050 of the La Quinta Municipal Code (Ordinance 18 § 1, 1982), throughout the work site, the Permittee shall comply with City regulated work hours. Operation and maintenance of equipment within one-half mile of human occupancy shall be performed only during the following time periods: October 1st to April 30: Monday-Friday 7:00 a.m. to 5:30 p.m. Saturday 8:00 a.m. to 5:00 p.m. May 1st to September 30: Monday-Friday 6:00 a.m. to 7:00 p.m. Saturday 8:00 a.m. to 5:00 p.m. Work shall be prohibited on legal holidays and Sundays. Note: Construction work (including setting up traffic control devices) is not permitted on any Arterial street (ie any 4 lane street) before 8:30 a.m. and after 4:30 p.m. Work within 500 feet of a signalized intersection shall be performed between the hours of 9 a.m. - 3 p.m. Traffic control shall be set up after 9 a.m. and removed before 3 p.m. The Permittee shall contact the City Traffic Signal Maintenance Division at (760) 777-7070 if signal operation at the intersection is to be altered in any way. The permittee shall submit inspection requests by calling the City Inspection Hotline at (760) 777-7097 before 1:30 p.m. and at least twenty-four (24) hours prior to the anticipated inspection. Pursuant to Section 14.16.110 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), Permittee shall assume responsibility for repair of any pavement damage to any public or private street and for any damage to other City streets or facilities as a result of work performed under this permit. Special Conditions Page I of 3 PERMIT NO. TC2015-0040 City of Indio / Traffic Control for City of Indio Sidewalk Improvements I Jefferson Street at Hwy 111 and Ave 50 The Applicant or Contractor shall furnish the City satisfactory evidence of insurance in the amounts provided in Engineering Bulletin for Indemnification & Insurance Requirements. This insurance shall be kept in full force and effect at all times by Applicant or Contractor during the prosecution of the permitted work and updated Certificate of Liability Insurance shall be submitted to the City. Each policy shall name the City as an additional insured. Pursuant to Section 14.16.250 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), advance warning signs and traffic control shall be installed and maintained in accordance with the latest edition of the Work Area Traffic Control Handbook (WATCH Manual) and the latest version of the California Manual of Uniform Traffic Control Devices (MUTCD). A traffic control plan shall be prepared in accordance with the WATCH Manual or under the guidance of the latest version of the MUTCD and submitted to the City for review and approval prior to starting any construction. It shall be the Permittee's responsibility to appropriately detour and barricade all construction sites. Pursuant to Section 14.16.290 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), street closures shall not be permitted. A minimum of two (2) travel lanes of paved surface shall be maintained at all times. Prior to excavating, if required, the Permittee shall contact Underground Service Alert at 1-800-422- 4133. It shall be the Permittee's responsibility to notify the Public Works Department of anticipated excavation which impact City facilities, including but not limited to traffic signal conduits and loops, irrigation lines, electrical conduits, and storm drain facilities Should additional work, materials, or modifications of the work be required in order to meet City standards, safety requirements, signage requirements, or to fit actual field conditions, the work shall be performed by the Permittee as directed by and to the satisfaction of the City Engineer at no cost to the City of La Quinta. Pursuant to Section 14.16.370 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), backfill compaction within street rights-of-way shall conform with Section 306-1.3 of the latest edition of the Standard Specifications For Public Works Construction (SSPWC), except as otherwise specified herein. No excavation is anticipated in the Scope of Work or within this permit. All excavations within City of La Quinta right-of-way shall be backfilled, and temporarily paved if within the existing travel way, at the end of every workday as directed by and to the satisfaction of the City Engineer for the protection of the public. Lengths of open trench shall not greatly exceed that. which can not be backfihled in the same day. Excavated trenches shall not be allowed open overnight, however, Permittee may leave a length of excavated trench, not to exceed twenty (20) feet in length, open overnight at a point where construction will begin the next day, provided that this length of trench is completely covered by steel plating. No excavation is anticipated in the Scope of Work or within this permit. All landscaping, irrigation, decorative rock, decorative concrete, sidewalk, lighting, etc., shall be replaced to its original condition. Special Conditions Page 2 of 3 PERMIT NO. TC2015-0040 City of Indio I Traffic Control for City of Indio Sidewalk Improvements I Jefferson Street at Hwy 111 and Ave 50 16. Access and egress to all local properties shall be maintained at all times. Pursuant to Section 14.16.375 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982), permanent pavement replacement shall be completed no later than seven (7) days after the completion of the work. Permanent pavement replacement shall conform to the following conditions: No asphalt work is anticipated within the scope of work or this permit. Permittee shall permanently stabilize any and all soil that was disturbed as a result of work performed under this permit with an approved dust control treatment. Soil stabilization shall be done immediately after completing the operation. The City of La Quinta reserves the right to require modifications of the work be made at permittee's sole cost for proper sight distance requirements per guidelines in the AASHTO " A Policy on Geometric Design of Highways and Streets, 5th Edition" or latest, in the installation of all appurtenances abutting and within the public Street right-of-way. 20.. Pursuant to Chapter 12.56 of the La Quinta Municipal Code (Ordinance 10 § 1 (part), 1982) the City has designated certain city streets as Truck Routes. The weight limit for restricted streets (i.e., streets not part of the Truck Route network) is three (3) tons; trucks exceeding the weight limit may use a restricted street if making a delivery or pickup on the subject street, or if this permit specifically grants permission to use the street to deliver Street construction materials and/or equipment. The City of La Quinta reserves the right to revoke, suspend or void this permit at anytime. The permittee shall indemnify, hold harmless and assume the defense of the City from all damages, delay costs, costs or expenses in law or equity that may arise out of work under this permit. Special Conditions . . Page 3 of 3 PROPOSED WORK AREA uz* -', PHASE 2 SIDEWALK IMPROVEMENT 600 600' 600' 645 MERGING TAPER SIGN SPACING SIGN SPACING SIGN SPACNG Of Li 51' IT .. OPENING SIGN SPACING LLJ EEE t EEE IIIIIIIIIIIIIIIiiIIIIiiii JEFFERSON sij SPE(O JEFFERSON ST 560' BUFFER SPACE I— L_____ 55' J —11(LT) 9 iSP. J R9-3 C21J(B6E) 03C 12 6N. - Li U z \S L 's NL L6DJ4TA OSYSPPOO LU © SIGN SPACING JEFFERSON 57' DOWNSTREAM TO 13E PLACED AT L'i AVE 48 020-2 39-3 lio -. ,. . ... ... 'Iffid5wovii WWI LU --------------------------------------------------- - - z - I - C_) F— CC 2-517 CITY OF INDlO 5ft,N5 C3O(CA) *20-I 020(00)0 W4-1I 4~ ~ml~lul :~Lsl'TIT c2o(0) *111 03-20(0) 03-7)0) rSHAREJ — -iI(fffl '-Il(1I) Ss EXSTNONNO .. II I lk \FFI( S,( III TIO\S IREVIDA TEl DESCRIPTION IByI TRAFFIC CONTROL PLANS I Us'ILt: I VAN ME JEFFERSON ST. SOUTH HIGHWAY Il/ C/FE OF INDlO/LA QUINTA LAaSTA.cAS2n3 SHEU OF —1 06/15 REVISIONS JE - [ AS1 TRAFFIC CONTROL PLAN GENERAL NOTES All sock and 004renal SEal comply egO, Ore 20140.48200. 00ylial 00 Eflrtonn Tralllc 20011,01 300,060 (CA 607Cc 2 OIl 5100019 ellA 01.20000 sPec 000106,10 the Sale 01 C20ilcerrfl $ 12114.01 6W. cr4501060005 a tIle 20,00060, eyall piO00e 20 Wan `4-"` pospenoaa a thasnlng 051(00 beacons lops-b shall be 415.0001110*20-1 sgns and on all Type-Ill 040604.1510201011920 ears 051614111 5 MI Signs 50.1 be ,efiec100z.d arc 11.144105.0 6 Al blOods 4.501.205 ehal be 36 ora,srrlarr SeCtS Wa .005 atlaS be 28' 06.00.6 Il9tt. refleclslasd and rneerlaated ered 0 the erdloals p05050.- 11 .4 0,0155 * StIll 0. 'seen.2 replaced 0 cleaned neCesaloy 20 paeans. thee appearance and 00050sly and 1110 cr6510. a 12' hQn-lnslady 10.0041154 alIens II lead durelS llghl 7 The 0000.0100 cOal olalrvaln on a 000005008 bass. SI 54905 deleedecls, 112000.3.5 ely Closure eeoctl lee and Safely Of 55010400119 cyna0500an I The 0006.0cr ecall have all 55015,4.40.20010, bemoaafl St plOpenly etlatas pl00000000na0009 .0eo-lnboe 0 T. 001100001 Shall cove, 0101,0020 III 0020.009 SIgnS IC Conello00011 ope,a000s Shed be 000440.0 eieyE a man,., asIc c.,ae cc 11610 ln0000en.nca ad 0005111.00 *10109 property it be000nal 0.010 0000011, cello *30000 bamnadeN may be requeea colts held The opeileo20r SEal be raponilbe for the plaoemant or any addibseal de010es renassalyt asScle eatery the p0200 alaS 1108.001109 caret000leyn 12 Load 00.50, end type 016.1*11*00 SignS 000 be Oracles toe Cay Engalee, 05.14 upOn 000006.1441015 10 NO sOp Closure. sIr 511211.1 Speetso be 0.10.18.0 051.5.0 0,5 1,0,110017 00 an, .00000 anl 01300 PlO and 6'00pm Ia MOO. delnealors aldlpt yonea 100. edge See Spree 00000 ,011-oeoydpu noble Replace bamoades .10 torn tayel 10110 oeeflOtell 16 Re--h.- sOlo 041619 1101-aolberg 100,8 16 Al 00,100519 leeS, cr000119 0110 peel end twos-Cs Shall op leynolbe coos-er eandblaSbng 0006.0 epp105ed 6*6104 p10010 elelaSaloly If I,esttenrgasy elr,pe,g #26.101040920*00 pa- marbeleshel be 1e60054 Pe-oelnenl hat - delnaged t- to f.rnosalotnlaordrge eEaa b.11epaild cOle .0000100.0, or Ire CIII Engpeer The conVect, shad ImplerIlell beer manage.netil pt-Scopes to lre no car 01110 eta eppnr draIn eySlerrr 17 The cons-edo, grad rep-silo and all S100ps19 and peeelnerlt 01a19Ingo thsOrapted or lcrnOoed 550mg 055 0005000000 0 ES eatl.tact,00 OldIe 0rty 61951.51 '0 *61116116 015 feel 05.520Cc 51.5 be ln.allayled belSeen my Opel. eoceoan Spa ad4aoSlt 0a051 121.5 001010 6160c IS The 00*5001 mall 0105105 deggele a deemed naeay by t,a 053 El.g*,eSe Flaggels Sf1111 *60501.111 21604cr SE Iclaggel Cannot 04 plC 2014 CA MUTCO 20 The .06150201 Sped 6.1153 .16160 neqsle.n,anae 01011 done.6.y 0*0*attyno4Db) as reSted 02 pededlflap 5 .4 mar2051 psesolap at 200 Sees w - yellirenwns 50,6*0 00041&detobr etal 000tplo VIOl Ice CalTrara .2014114. 21 PlIed .4000021 LONE CLOSELY 03010A1 alqlos at Type-Il bernpadee as 20150.0 by the CIty Epge,eer 11110*90001 ell*tldbe *6111545.5 I 5001W. Obey 455.0 0,all '06161114 IREISCO' 02710*18005 -al 50 06cr es60es505l eree e001e a51apenit Ole belated 020 22 The 00,005000 50.0 p551180111001'UNEVEN LANES STEEL PLATES MIEAO or 'SOUP' egoS to pesalerl Slatace 050104,0.1. 0 10 504 or elSe, Pavement lesugotone 041 cr1011 20 glaaisl mar cape Of lair (4) 1*016*1116100.1)56.6.1 23 TIle 0000sotol 5169 crESS CAISSON STEEL PLATES 01-lEAD' erdly, 5000601 00*0 5605 11 0110502 00 ESt P1620 bedgeg 24 TM 0000*0 50ae todldy ____________________ at OnES ogler alledsl bereft Sepoloes el Cast Ian 55006119 dayrs P40 Ic 0510500*0*0 09a1300 any atle0aA 54680,5 25 rIse coetbeolon elan nbely SlaSe 00*0*, 112050.5500. hall. eaer05 p04cc .0450. dethflenS 00cr (1) .560 plOt to 54.10150101 26 01006*80 yoerca001-S 24100116.11.0 and lelepbpate lodge. Ipr leepo.-ree 00 0.010 000000 caves 21 Th. 108,6*0 SIsal 000*OI,e Inpimarn bOIse (S) busIness deny,, aduIelEe. the 05315 oalllc W- eeosoeen 00 eaure lmplelsnla20P Of arope, 5605115 01 afleSe taRt sçnSS The proper peSo sgnel 0mpg $61201 bo In 20cc Cl SI linen that tote e.acaeled cello 6.tbO*flmp PROPOSED WORK AREA U ------ - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - ----- ---.-- ------------------- . - 0*-2R • I -- ----------Li (0120-1 (C20(CA)R ( ( wii -i I 020HlIKEW16-1 50' J PHASE 1 SIDEWALK IMPROVEMENT JEFFERSON ST 50 200 600 SHOULDER TAPER MERGING TAPER JEFFERSON ST -- - -- - - - - I CITY 020 CR OLd IOTA TEL IT 9114n-olrl-il S 'I0.I-gh-OC II 1,110, ill e°1i2 0917 OF ItrDO LLJ BUFFER SPACE -___ -3 TYP I SIGNS OONPISTREAM 500' S-4CED AT CLLR BASE / 4Sf 42 IW.o)e.e 004105 41501 LANE L 1t,)A?I.eWC, P5-LiR,oE) 00(500) <2> Fs-HA R El eai !9J1I OYr/EJt/o )NitPlO FI - ' -- 8I1_ -- - cap-v cr0- rppr -.--LQ LLGoND 06 ITYOFLA QUINT A cesA n°s)lmo uclsrelo oct06 \/jâj°\j - us vIOIr9, 02 15050 •-• B s-os 5000 TR \FFI( SOLT 'TIONS H- usd0200 DESCRIPTION BY TRAFFIC CONTROL PLANS TCP 1(1 REe1SESt Ill JETFERSON ST. 1 NORTH OF DUNAOR DR. CITY OF 110010/LA QLIINTA CALF: != 40' SHEUOF JEFFERSON S7 PHASE 3 SIDEWALK IMPROVEMENT - - - - - - - - ----- - - - - - - - - --- - -- - LU - -------- - - - - - - - - - - - - - - - - - - - - - - - AT W4-2R c20(B6SI • - i CH)R - R)_ Ld W1 6l 00' OPENING SIGN SPACING 600 600' 600' ,,,,,, , 200 660' 'SIGN SPAGING SIGN SPACINC SIGN SPACING SHOULDER TAPER MERGING TAPER PROPOSED' WORK AREA 11. I I— I—(2 a- 0 -- I— LU UJ . (1) w z C,) - - -J I— I— SPEED 1 '/?Rcf),1t7 4;,T ; H -------------------------------------------------------------------------- 10 - --------------------------------------------------- -F- LU © 4 rLA , OF -----12'IAN. Ld C) - - p1 C3O(cA) - - LLJ sic R9-3 z 1 I I 1 CA BUFFER SPACE f. SIGNS ..9. O CAO(9KD) NA-O(R) FSHAREJ F& 2-t57'7 CITY OF 16010 IC DC DCSR N1 CA DX1 LEGEND srI TRAFFIC CONTROL PLANS ALE: CITY OF LA QUINTA T.I 5< m, 5415 TO' N 1 JEFFERSON ST. CA DCS, CC 3 EDcR,PT1ON ii \F VA NORTH OF SHEEL OF £ •• © - '° SOLE TIOS I TR.FR N AVENUE 50 IA ACID --: SICNNJZED C OF INDIa/LA 01P#C PHASE 3(CONT. SIDEWALK IMPROVEMENT SPEED JEFFERSON S7' Li In ti I- 0 — -------------------------------------------------------------------------------- LLJ o LLJ --------------------------------------------------------------------------------1/) o 12 MN LLJ TYP z —J C-) JEFFERSON S7 LLJ LLj JR9-3 Ld HAONC CITY OF INDlO SIGNS LEGEND DESCRIPTION BY TRAFFIC CONTROL PLANS pjQ&T Z~ DATE JEFFERSON ST. CITY OF LA QUINTA 1<=1— < G EO N 1 NORTH OF SHEET--4- OF fl-4 CELL I VA AILFNUE 50 TRAFFIC SCILI IIO'S I______ CITY OF 811 - 50)50/LA QLJIWTA