Loading...
2020-21 RCTC Measure A Submittal & CertificationCity of La Quinta CITY COUNCIL MEETING: April 21, 2020 STAFF REPORT AGENDA TITLE: APPROVE FISCAL YEAR 2020/21 THROUGH 2024/25 MEASURE A HALF CENT SALES TAX FIVE-YEAR CAPITAL IMPROVEMENT PLAN RECOMMENDATION Approve the fiscal year 2020/21 through 2024/25 Measure A Half Cent Sales Tax 5-year Capital Improvement Plan. EXECUTIVE SUMMARY •On April 7, 2020, Council provided direction on Measure A Half Cent Sales Tax (Measure A) funding through the Capital Improvement Plan study session discussion. •To receive the Measure A funds, the City must comply with the following requirements: o Demonstrate an annual Maintenance of Effort (MOE) expenditure from the City’s General Fund in the amount of $937,007; and o Submit the City’s approved 5-year Measure A Capital Improvement Plan, a Project Status Report, and Maintenance of Effort Certification. FISCAL IMPACT The following table represents the estimated Measure A funding by fiscal year: 2020/21 2021/22 2022/23 2023/24 2024/25 TOTAL $1,299,000 $1,312,000 $1,325,000 $1,338,000 $1,351,000 $6,625,000 BACKGROUND/ANALYSIS Measure A Half Cent Sales Tax funding is to be used for transportation improvements. Each city must demonstrate an annual MOE expenditure from the City’s General Fund in the amount of $937,007 and submit an approved 5-Year Measure A CIP and project status report to the Riverside County Transportation Commission (RCTC) by May 4, 2020 to be eligible for Measure A funding for the following fiscal year. The City is also a full participant in the CONSENT CALENDAR ITEM NO. 6 45 Coachella Valley Multi-Species Habitat Conservation Plan (MSHCP) and the Transportation Uniform Mitigation Fee (TUMF) Programs. The draft Fiscal-Year 2020/21 through 2024/25 Capital Improvement Plan proposes using Measure A funding for the following transportation improvements: Project Description 2020/21 2021/22 2022/23 2023/24 2024/25 Total Monroe Street Pavement Rehabilitation (Avenue 52 to Avenue 53, and near Avenue 61) $257,902 $257,092 Citywide Street and Traffic Signal Maintenance Program Annual Recurring Program $205,000 $500,000 $235,000 $235,000 $235,000 $1,410,000 Fred Waring Drive Pavement Rehabilitation (Washington St to Palm Royale Dr) $813,366 $813,366 Avenue 58 Pavement Rehabilitation (Jefferson St to Madison Str $1,000,000 $1,000,000 Avenue 50 Pavement Rehabilitation (Washington St to Eisenhower Dr) $1,190,000 $1,190,000 Avenue 50 Sidewalk and ADA Improvements (Washington St to Avenida Montero) $400,000 $400,000 Moon River Dr (Avenue 50 to DSUSD ROW) $400,000 $400,000 Seasons Wy (Calle Tampico to Springtime Wy) $276,000 $276,000 TOTAL: $462,902 $1,313,366 $1,235,000 $1,425,000 $1,311,000 $5,746,458 The Monroe Street Pavement Rehabilitation Project is proposed to recei ve Measure A funds in 2020/21. The improvements along Monroe Street include crack fill and slurry seal from Mountain Spur to Avenue 53, and complete pavement reconstruction from Avenue 52 to Mountain Spur and from Avenue 61 to 325 feet north of Avenue 61. The project is partially funded with Measure A Half Cent Sales Tax in the amount of $257 ,902 and SB1 RMRA Funds in the amount of $683,098. The recurring annual Citywide Street and Traffic Signal 46 Maintenance Program is proposed to receive $205,000 in Measure A Funds in 2020/21. Several carryover projects including the Jefferson Street at Avenue 53 Roundabout Project, Washington Street at Fred Waring Triple Left Turn Project and La Quinta Village Complete Streets Project are also using Measure A carryover funds. ALTERNATIVES Council may elect not to approve the Measure A 5-year CIP plan and decline Measure A funds. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, Public Works Director/City Engineer 47 48 MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: LA QUINTA Prepared by: Bryan McKinney, P.E., Public Works Director/City Engineer Phone #: (760) 777-7045 Date: 4/27/2020 Estimated Prior Year Measure A Balance:1,464$ Estimated FY 2021/22 Measure A Allocation:1,312,000 Estimated Measure A Available for FY 2021/22 Projects:1,313,464$ Item No. Project Name / Limits Project Type Total Project Cost Measure A Funds 2021/22 2122TMI Citywide Traffic Signal Maintenance Program Annual Recurring Program 500,000$ 500,000$ 2021-01 Fred Waring Drive Pavement Rehabilitation (Washington St. to Palm Royale Dr.) Pavement Rehabilitation 813,366 813,366 TOTAL 1,313,366$ 1,313,366$ FY 2021/22 FY 2021-22 Page 1 of 1 MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: LA QUINTA Prepared by: Bryan McKinney, P.E., Public Works Director/City Engineer Phone #: (760) 777-7045 Date: 4/27/2020 Estimated Prior Year Measure A Balance:98$ Estimated FY 2022/23 Measure A Allocation:1,325,000 Estimated Measure A Available for FY 2022/23 Projects:1,325,098$ Item No. Project Name / Limits Project Type Total Project Cost Measure A Funds 2022/23 2223TMI Citywide Traffic Signal Maintenance Program Annual Recurring Program 235,000$ 235,000$ 2022-01 Ave 50 Pavement Rehabilitation (Washington St. to Eisenhower Dr. Pavement Rehabilitation 1,000,000 1,000,000 TOTAL 1,235,000$ 1,235,000$ FY 2022/23 FY 2022-23 Page 1 of 1 MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: LA QUINTA Prepared by: Bryan McKinney, P.E., Public Works Director/City Engineer Phone #: (760) 777-7045 Date: 4/27/2020 Estimated Prior Year Measure A Balance:90,098$ Estimated FY 2023/24 Measure A Allocation:1,338,000 Estimated Measure A Available for FY 2023/24 Projects:1,428,098$ Item No. Project Name / Limits Project Type Total Project Cost Measure A Funds 2023/24 2324TMI Citywide Traffic Signal Maintenance Program Annual Recurring Program 235,000$ 235,000$ 2023-01 Ave 58 Pavement Rehabilitation (Jefferson St. to Madison St.) Pavement Rehabilitation 1,400,000 1,190,000 TOTAL 1,635,000$ 1,425,000$ FY 2023/24 FY 2023-24 Page 1 of 1 MEASURE A LOCAL STREETS AND ROADS PROGRAM Agency: LA QUINTA Prepared by: Bryan McKinney, P.E., Public Works Director/City Engineer Phone #: (760) 777-7045 Date: 4/27/2020 Estimated Prior Year Measure A Balance:90,098$ Estimated FY 2023/24 Measure A Allocation:1,338,000 Estimated Measure A Available for FY 2023/24 Projects:1,428,098$ Item No. Project Name / Limits Project Type Total Project Cost Measure A Funds 2023/24 2324TMI Citywide Traffic Signal Maintenance Program Annual Recurring Program 235,000$ 235,000$ 2023-01 Ave 58 Pavement Rehabilitation (Jefferson St. to Madison St.) Pavement Rehabilitation 1,400,000 1,190,000 TOTAL 1,635,000$ 1,425,000$ FY 2023/24 FY 2023-24 Page 1 of 1