Loading...
12810 (SFD) Title 24Carole Christensen, Analyst. Title -24 Energy Calculations ENERGY CALCULATIONS FOR: Sterling Homes P.O. Box 450 La Quinta, CA 92253 PROJECT: PLAN MJG-1 Front Door Facing West ' 1688 sq.ft. Custom Home 52-640 AvenidaJuarez La Quinta, CA Standard - Proposed Compliance 47.09 45.60 + 1.49 Dual Aluminum Glazing, V. Blind; Phillips U -value or better Walls R-11 + 1" Falcon (R4.4); Roof R-38; Duct R-4.2 AFUE 78%; SEER 12.0; One 40 gal gas water heater Table of Contents s CF -IR MF -1R C -2R HVAC Sizing C -3R CF -6R to be posted and completed on site when equipment is installed S 47-596 Lake Canyon Drive, Aguanga, CA 92536 79-733 Country Club Drive, Bermuda Dunes, CA 92201 1-800-735-8152 Member CABEC California Association of Building Energy Consultants TABLE OF CONTENTS TOC Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 Project Address........ 52-640 Avenida Juarez La Quinta . CA Documentation Author... Carole Christensen Building Permi Company ................ Carole Christensen, EA Telephone .............. 1-800-735-8152 Plan Check Da e Compliance Method...... MICROPAS4 by Enercomp, Inc. Field Check/ Date 01 i mm*c 7^"gn 1 ri - MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -TOC User#-MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rllflcn38.4 TABLE OF CONTENTS Report Page FORM CF -1R ................ 1 FORM MF -1R ................ 4 FORM C -2R ................. 6 FORM C -3R................. 10 HVAC SIZING ............... 13 CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 1 CF -1R Project Title......:... Plan MJG-1 1688 Gas Date........ 05/26/94 P t Add 52-64 d J.ess ro�ec ........ 0 Aveni a Juarez La Quinta CA Documentation Author... Carole Christensen Company ................ Carole Christensen, EA Telephone .............. 1-800-735-8152 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 15 Field Check/ Date MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rllflcn38.4 GENERAL INFORMATION Conditioned Floor Area..... Building Type .............. Construction Type ......... Building Front Orientation. Number of Dwelling Units... Number of Stories.......... Floor Construction Type.... 1688 sf Single Family Detached New Front Facing 270 deg (W) 1 1 Slab On Grade (Package D) BUILDING SHELL INSULATION Component Insulation Assembly Type R -value U -Value Location/Comments Wall R-15 0.066 front, left, back, right Wall R-11 0..091 to garage Roof R-38 0.035 attic Door R-0 0.330 solid wood, to garage SlabEdge R-0 0.900 to outside SlabEdge R-0 0.720 to outside SlabEdge R-0 0.550 to garage/mech SlabEdge, R-0 0.500 to garage FENESTRATION # of Interior Over - Area U- Pan- Shading/ Exterior hang/ Framing .Orientation (sf) Value es Description Shading Fins Type Window Front (W) -15.8 1.040 1 Blinds.Lt None Yes None Door Front (W) 40.0 0.770 2 Blinds.Lt None Yes Wood Window Front (W)-- 12.0 0.610 2 Blinds.Lt None Yes Metal Window Front (W) = 6.0 0.610 2 Blinds.Lt None Yes Metal Window Left (N) '4:FT5.0 0.820 2 Blinds.Lt None None Metal Window Left (N) ,16.0 _1x400 2 Drapes.Std None None Metal Window Left (N) &+ 6.0 0.850 2 Blinds.Lt None None Metal Window Left (N) --16_.0 0.620 1 None None None None Door Back (E) 0.780 2 Blinds.Lt None None Metal Window Left (N) 0 0.610 2 Blinds.Lt None None Metal Window Back (E) X20.0 0 0 2 Blinds.Lt None Yes Metal Window Back (E) .a 10.5 0.61 2 Blinds.Lt None None Metal Window Right (S) x-20. 0.820 2 Blinds.Lt None None Metal Window Right (S) -25.0 0.820 2 Blinds.Lt None None Metal Window Right (S) --15.8 1.040 1 Blinds.Lt None None None CERTIFICATE OF COMPLIANCE: RESIDENTIAL Page 2 CF -1R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen, EA Run-PhilVb78.AC12.Rllflcn38.4 -orientation Skylight Horz Type S1abOnGrade SlabOnGrade InteriorHorz InteriorVert Equipment Type Gas ACSplit Minimum Duct Duct Thermostat Efficiency Location R -value Type 0.780 AFUE Attic R-4.2 Setback 12.00 SEER Attic R-4.2 Setback WATER HEATING SYSTEMS Number Tank in Energy Size Tank Type Heater Type Distribution Type System Factor (gal) Storage -Gas Standard 1 0.544 EF 40 SPECIAL FEATURES/REMARKS Phillips External Insulation R -value R-12 FENESTRATION # of Interior Over - Area U- Pan- Shading/ Exterior hang/' Framing (sf), Value es Description Shading Fins Type 3.4 0.800 2 none None None Metal THERMAL MASS Area Thickness Exposed (sf) (in) Location/Comments Yes 785 3.5 No 903 3.5 framing/cabinets Yes 86 1.0 countertops Yes 22 1.0 shwer walls HVAC SYSTEMS Equipment Type Gas ACSplit Minimum Duct Duct Thermostat Efficiency Location R -value Type 0.780 AFUE Attic R-4.2 Setback 12.00 SEER Attic R-4.2 Setback WATER HEATING SYSTEMS Number Tank in Energy Size Tank Type Heater Type Distribution Type System Factor (gal) Storage -Gas Standard 1 0.544 EF 40 SPECIAL FEATURES/REMARKS Phillips External Insulation R -value R-12 CERTIFICATE OF•COMPLIANCE: RESIDENTIAL Page 3 CF -1R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM CF -1R User#-MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rllflcn38.4 COMPLIANCE STATEMENT This certificate of compliance lists the building features and performance specifications needed to comply with Title -24, Parts 1 and 6 of the California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with overall design responsibility. When this certificate of compliance is submitted for a single building plan to be built in multiple orientations, any shading feature that is 'Varied is indicated in the Special Features/ Remarks section. DESIGNER or OWNER Name.... A.P. Lench, II, President Name.... Company. Sterling Homes Company. Address. P.O. Box 450. Address. La Qu' ta, CA 92253 Phone... ( �P1�`{tL Phone... License. #6318 TEN i URES, NC: GEN 'AL PAR7N Signed.. Signed.. EjL.�L RCEMENT AGEN Name.... Title. . Agency:. Phone... Signed.. (date) DOCUMENTATION AUTHOR Carole Christensen Carole Christensen, EA 47-596 Lake Canyon Dr. Aguanga, CA 92536 1-800-735-8152 (date) s,�y MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 4 MF -1R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 Project Address........ 52-640 Avenida Juarez La Quinta CA Documentation Author... Carole Christensen Company ................ Carole Christensen, EA Telephone .............. 1-800-735-8152 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 15 Field Check/ Da e MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM MF -1R User#-MP1017 User -Carole Christensen, EA Run-PhilVb78.AC12.Rllflcn38.4 Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an asterisk (*) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into the permit documents, the features noted shall be considered by all parties as binding minimum component performance specifications for the mandatory measures whether they are shown elsewhere in the documents or on this checklist only. BUILDING ENVELOPE MEASURES Design- Enforce- er ment *150(a): Minimum R-19 ceiling insulation. 150(b): Loose fill insulation manufacturers labeled R -Value. *150(c): Minimum R-13 wall insulation in framed walls (does not apply to exterior mass walls). *150(d): Minimum R-13 raised floor insulation in framed floors; minimum R-8 in concrete raised floors. 150(i): Slab edge insulation - water absorption rate no greater than 0.3%, water vapor transmission rate no greater than 2.0 perm/inch. 118: Insulation specified or installed meets CEC quality standards. Indicate type and form. 116-17: Fenestration Products, Exterior Doors and Infiltration/ exfiltration controls a. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage. b. Manufactured fenestration products have label with certified U -value, and infiltration certification. c. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed. 150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only. 150(f): Special infiltration barrier installed to comply with Sec. 151 meets CEC quality standards. 150(e): Installation of Fireplaces, Decorative Gas Appliances and gas logs 1. Masonry and factory -built fireplaces have: a. Closeable metal or glass door b. Outside air intake with damper and control c. Flue damper and control 2. No continuous burning gas pilots allowed. MANDATORY MEASURES CHECKLIST: RESIDENTIAL Page 5 MF -1R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM MF -1R User#-MP1017 User -Carole Christensen, EA Run-PhilVb78.AC12.Rllflcn38.4 SPACE CONDITIONING, WATER HEATING AND PLUMBING SYSTEM MEASURES Design- Enforce- er ment 110-13: HVAC equipment, water heaters, showerheads and faucets certified by the CEC. 150(i): Setback thermostat on all applicable heating systems. 150(j): Pipe and Tank insulation 1. Indirect hot water tanks (e.g., unfired storage tanks or backup solar hot water tanks) have insulation blanket (R-12 or greater) or combined interior/exterior insulation (R-16 or greater). 2. First 5 feet of pipes closest to water heater tank, non - recirculating systems, insulated (R-4 or greater). 3. All buried or exposed piping insulated in recirculating sections of hot water system. 4. Cooling system piping below 55 degrees insulated. 5. Piping insulated between heating source and indirect hot water tank. *150(m): Ducts and Fans 1. Ducts constructed, installed and sealed to comply with UMC sections 1002 and 1004; ducts insulated to a minimum installed value of R-4.2 or ducts enclosed entirely within conditioned space. 2. Exhaust fan systems have backdraft or automatic dampers. 3. Gravity ventilating systems serving conditioned space have either automatic or readily accessible, manually operated dampers. 114: Pool and Spa Heating Systems and Equipment 1. System is certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance heating and no pilot light. ..2. System installed with: a. At least 36 inches pipe between filter and heater for future solar heating. b. Cover for outdoor pools or outdoor spa. 3.1 Pool system has directional inlets and a circulation pump time switch. 115: Gas-fired central furnace, pool heater, spa heater or household cooking appliance have no continuously burning pilot light (Exception: Non -electrical cooking appliance with pilot < 150 Btu/hr.). LIGHTING MEASURES Design- Enforce- er ment 150(k): 40 lumens/watt or greater for general lighting in kitchens and rooms with water closets; and recessed ceiling fixtures IC (insulation cover) approved. COMPUTER METHOD SUMMARY Page 6 C -2R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 Project Address........ 52-640 Avenida Juarez La Quinta CA Documentation Author... Carole Christensen Company ................ Carole Christensen, EA Telephone........ .... 1-800-735-8152 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 15 Field Check/ Date MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rliflcn38.4 MICROPAS4 ENERGY USE SUMMARY Energy Use Standard Proposed Compliance (kBtu/sf-yr) Design Design Margin Space Heating.'......... 2.50 2.11 0.39 Space Cooling.......... 31.45 30.58 0.87 Water Heating.......... 13.14 12.91 0.23 Total 47.09 45.60 1.49 *** Building complies with Computer Performance *** GENERAL INFORMATION Conditioned Floor Area....'. Building Type .............. Construction Type ..:...... Building Front Orientation. Number of Dwelling Units... Number of Building Stories. Weather Data Type.......... Floor Construction Type.... Number of Building Zones... Conditioned Volume......... Footprint Area ............. Ground Floor Area.......... Slab -On -Grade Area......... Glazing Percentage......... Average Ceiling Height..... i 1688 sf Single Family Detached New Front Facing 270 deg (W) 1 1 ReducedYear Slab On Grade 1 15203 cf 1688 sf 1688 sf 1688 sf 17.8 % of FA 9 ft (Package D) COMPUTER METHOD SUMMARY Page 7 C -2R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM C -2R User#=MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rllflcn38.4 BUILDING ZONE INFORMATION Floor # of Area Volume Dwell Cond- Zone Type (sf) • (cf) Units itioned Vent Special Thermostat Height Vent Area Type (ft) (sf) HOUSE Residence 1688 15203 1.00 Yes Setback 2.0 n/a OPAQUE SURFACES Area U- Insul Act Solar Form 3 Location/ Surface (sf) value R-val Azm Tilt Gains Reference Comments HOUSE 1 Wall 119 0.066 R-15 270 90 Yes W.1IFALCON front 2 Wall 351 0.066 R-15 0 90 Yes W.1IFALCON left 3 Wall 314 0.066 R-15 90 90 Yes W.1IFALCON back 4 Wall 424 0.066 R-15 180 90 Yes W.1IFALCON right 5 Wall 253 0.091 R-11 .270 90 No W.11.GARAGE to garage 6 Roof- 1685 0.035 R-38 0 0 Yes R.38.2X4.24A attic 7 Door 20 0.330 R-0 270 90 Yes None solid wood 8 Door 17 0.330 R-0 270 90 No None to garage PERIMETER LOSSES Length F2 Insul Solar Surface (ft) Factor R-val Gains Location/Comments HOUSE 9 SlabEdge 35 0.900 R-0 No to outside 10 SlabEdge 115 0.720 R-0 No to outside 11 SlabEdge 25 0.550 R-0 No to garage/mech 12 SlabEdge 2 0.500 R-0 No to garage FENESTRATION SURFACES # of Vent SC SC Interior Area Pan- Frame Open U- Act Glass Int Shading/ Surface (sf) es- Type Type value Azm Tlt Only Shade Description HOUSE 1 Window, 15.8 1 None Fixed 1.040 270 90 1.04 0.58 Blinds.Lt 2 Door 40.0 2 Wood Hinged 0.770 270 90 0.88 0.58 Blinds.Lt 3 Window 12.0 2 Metal Fixed 0.610 270 90 0.88 0.58 Blinds.Lt 4 Window 6.0 2 Metal Fixed 0.610 270 90 0.88 0.58 Blinds.Lt 5 Window 25.0 2 Metal Slider 0.820 0 90 0.88 0.58 Blinds.Lt 6 Window 16.0 2 Metal Fixed 1.400 0 90 0.88 0.78 Drapes.Std 7 Window 6.0 2 Metal Slider 0.850 0 90 0.88 0.58 Blinds.Lt 8 Window 16.0 1 None Fixed 0.620 0 90 0.62 0.62 None 9 Door" 53.3 2 Metal Slider 0.780 90 90 0.88 0.58 Blinds.Lt 10 Window 16.0 2 Metal Fixed 0.610 0 90 0.88 0.58 Blinds.Lt 11 Window 20.0 2 Metal Slider 0.820 90 90 0.88 0.58 Blinds.Lt 12 Window 10.5 2 Metal Fixed 0.610 90 90 0.88 0.58 Blinds.Lt COMPUTER METHOD SUMMARY Page 8 C -2R R,44..,.. nim" M.Tr__1 19052 rac bate........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rllflcn38.4 •Surface 13 Window •14 Window 15 Window 16 Skylight Surface # of Area Pan- Frame (sf) es Type 20.0 2 Metal 25.0 2 Metal 15.8 1 None 3.4 2 Metal FENESTRATION SURFACES Vent SC SC Interior Open U- Act Glass Int Shading/ Type value Azm Tlt Only Shade Description Slider 0.820 180 90 0.88 0.58 Blinds.Lt Slider 0.820 180 90 0.88 0.58 Blinds.Lt Fixed 1.040 180 90 1.04 0.58 Blinds.Lt Slider 0.800 270 0 0.88 0.88 none OVERHANGS AND SIDE FINS Window- Overhang Left Fin Area Left Rght (sf) Hght Wdth Dpth Hght Ext Ext Ext Dpth Hght Ext HOUSE 11.5 1.5 1 Window 15.8 4.5 2 Door 40.0 6.8 3 Window 12.0 2.0 4 Window 6.0 2.0 11 Window 20.0 6.8 Area Mass Type (sf) HOUSE 4.0 11.5 1.5 10.0 0 10.0 5.0 3.0 6.0 11.5 3.5 0 6.0 0 5.0 6.0 6.0 11.5 0 0 6.0 0 5.0 6.0 3.0 6.0 0 0 14.0 0 20.0 1.0 6.0 0 0 0 0 0 0 0 THERMAL MASS Right Fin- Dpth Hght 0 0 0 0 0 0 0 0 0 0 0 0 2.0 5.5 4.0 Thick Heat Conduct- Surface (in) Cap ivity P, -value Location/Comments 1 S1abOnGrade 785 3.5 28.0 2 S1abOnGrade 903 3.5 -28.0 3 InteriorHorz 86 1.0 24.0 4 InteriorVert 22 1.0 24.0 System Type 0.98 R-0.0 0.98 R-2.0 0.67 R-0.0 0.67 R-0.0 HVAC SYSTEMS Minimum Efficiency framing/cabinets countertops shwer walls Duct Duct Duct Location R -value Efficiency HOUSE Gas 0.780 AFUE Attic R-4.2 0.830 ACSplit 12.00 SEER Attic R-4.2 0.810 WATER HEATING SYSTEMS Number Tank External in Energy Size Insulation Tank Type Heater Type Distribution Type System Factor (gal) R -value 1 Storage Gas Standard 1 0.544 40 R-12 COMPUTER METHOD SUMMARY Page 9 C -2R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM C -2R User#-MP1017 User -Carole Christensen, EA Run-PhilVb78.AC12.Rllflcn38.4 Phillips SPECIAL FEATURES/REMARKS 0 CONSTRUCTION ASSEMBLY Page 10 3R M44-1 , DIM„ M.Tc_1 1 9PR r_ac nate........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rllflcn38.4 Reference Name . W.1IFALCON Description .... Wall R-11+Falcon 2x4 16oc Type ........... Wall R -Value ........ 15 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing ...... 16 inches on center Fraction ..... 0.15 Sketch of Construction Assembly 'LIST OF CONSTRUCTION COMPONENTS Material Name Description O. FILM. EX 1. STUCCO.0.88 2. FALCONBD 1.0 3. BLDG.PAPER 4c. BATT.R11 4f. FIR.2X4 5. GYP.0.50 I. FILM.IN.WLL Exterior air film: winter value 0.875 in stucco 1.00 Building paper (felt) R-11 batt insul (cavity = 3.5 in) 2x4 in fir framing 0.50 in gypsum or plaster board Inside air film: heat sideways Total Unadjusted R -Values S.FRAMING ADJUSTMENT CALCULATION Cavity Framing Cavity R -Value 0.17 0.17 4.40 0.06 11.00 0.45 0.68 16.94 Total U -Value: (1 / 16.94 x 0.85) + (1 / 9.40 x 0.15) = 0.066 Btuh/sf-F Total R -Value: 1 / 0.066 = 15.12 sf-F/Btuh Frame R -Value 0.17 0.17 4.40 0.06 3.46 0.45 0.68 9.4U CONSTRUCTIOW ASSEMBLY Page 11 3R Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen, EA Run-Phi1Vb78.AC12.Rllflcn38.4 Reference Name . W.11.GARAGE Description .... Wall R-11 2x4 24oc Type ........... Wall R -Value ........ 11 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing ...... 24 inches on center Fraction ..... 0.12 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Name Description 0. FILM.EX Exterior air film: winter value 1. GYP.0.50 0.50 in gypsum or plaster board 2. BLDG.PAPER Building paper (felt) 3c. BATT.R11 R-11 batt insul (cavity = 3.5 in) 3f. FIR.2X4 2x4 in fir framing 4. GYP.0.50 0.50 in gypsum or plaster board I. FILM.IN.WLL Inside air.film: heat sideways Total Unadjusted R -Values FRAMING ADJUSTMENT CALCULATION Cavity U -Value: (1 / 12.81 x 0.88) + (1 / Framing Cavity Frame R -Value R -Value 0.17 0.45 0.06 11.00 0.45 0.68 12.81 Total 5.27 x 0.12) = 0.091 Btuh/sf-F Total R -Value: 1 / 0.091 = 10.94 sf-F/Btuh 0.17 0.45 0.06 3.46 0.45 0.68 5.27 CONSTRUCTION ASSEMBLY Page 12 3R plan MJn-1 1688 Gas Date........ 05/26/94 MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -FORM 3R User#-MP1017 User -Carole Christensen, EA Run-PhilVb78.AC12.Rllflcn38.4 Reference Name . R.38.2X4.24A Description .... Roof R-38 2x4 24oc Type ........... Roof R -Value ........ 38 sf-F/Btuh Framing Material ..... FIR.2X4 Spacing ...... 24 inches on center Fraction ..... 0.07 Sketch of Construction Assembly LIST OF CONSTRUCTION COMPONENTS Material Cavity Frame Name Description R -Value R -Value O. FILM.EX Exterior air film: winter value 0.17 0.17 1. SHNGL.CEMENT Asphault-cement shingles 0.21 0.21 2. BLDG.PAPER Building paper (felt) 0.06 0.06 3. PLY.0.50 0.50 in plywood 0.62 0.62 4c. AIR.RF.3.50 3.5 in & greater air space: heat flow up 0.80 -- 4f. FIR.2X4 2x4 in fir framing -- 3.46 5c. BATT.R38.0 R-38 batt insul (cavity > 11.25 in) 38'.00 -- 6. GYP.0.50 0.50•in gypsum or plaster board 0.45 0.45 I. FILM.IN.RF Inside air film: heat flow straight up 0.61 0.61 Total Unadjusted R -Values 40.92 5.58 FRAMING ADJUSTMENT CALCULATION Cavity Framing Total U -Value: •(1 / 40.92 x0.93) + (1 / 5.58 x 0.07) = 0.035 Btuh/sf-F Total R -Value: 1 / 0.035 = 28.36 sf-F/Btuh HVAC SIZING Page 13 HVAC Project Title.......... Plan MJG-1 1688 Gas Date........ 05/26/94 Project Address........ 52-640 Avenida Juarez La Quinta CA Documentation Author... Carole Christensen Company ................ Carole Christensen, EA Telephone .............. 1-800-735-8152 Compliance Method...... MICROPAS4 by Enercomp, Inc. Climate Zone........... 15 Field Check Date MICROPAS4 v4.02 File-STERMJGI Wth-CTZ15S92 Program -HVAC SIZING User#-MP1017 User -Carole Christensen, EA Run-PhilVb78.AC12.Rllflcn38.4 GENERAL INFORMATION FloorArea ................. Volume.. ........ ... Front Orientation.......... Sizing Location............ Latitude... .. ........ Winter Outside Design...... Winter Inside Design....... Summer Outside Design...... Summer Inside Design....... SummerRange........ ..... Interior Shading Used...... Exterior Shading Used...... Overhang Shading,Used...... Latent Load Fraction....... Description 1688 sf 15203 cf Front Facing INDIO 33.7 degrees 29 F 70 F 112 F 78 F 30 F No No No 0.20 HEATING AND COOLING LOAD SUMMARY 270 deg (W) Heating Cooling (Btuh) (Btuh) Opaque Conduction and Solar...... 12452 6659 Glazing Conduction ............... 10096 8372 Glazing Solar ...................... n/a 11419 Infiltration ..................... 8965 5313 Internal.Gain.................... n/a 2550 Ducts ............................ 3151 3431 Sensible Load..... ............. 34664 37744 Latent Load ...................... n/a 7549 Minimum Total Load 34664 45293 Note: The loads shown are only one of the criteria affecting the selection of HVAC equipment. Other relevant design factors such as air flow requirements, outdoor design temperatures, coil sizing, availability of equipment, oversizing safety margin, etc., must also be considered. It is the HVAC designer's responsibility to consider all factors when selecting the HVAC equipment. INSTALLATION CERTIFICATE CF -6R Use of this form to satisfy the raquirements of the Administrative Code Is optlonal, but the Information must be provided and posted. Site Address J Permit Number An installation certificate is required to be posted at the building site prior to the issuance of the occupancy permit; this form may be used to meet these requirements. All appliance categories listed below are the actual equipment installed. Note that the efficiency and type of the appliance installed must be equivalent or better than the appliance specified on the certificate of compliance (Form CF -1 R). This certificate (or its equivalent) shall be prepared and signed by the person(s) assuming overall responsibility for the. appliance installation. Refer to the reverse side of this certificate for an explanation of information required. • I, the undersigned, verify that the equipment listed in the category above my signature is the actual equipment installed and that the equipment meets or exceeds the requirements of the Appliance Efficiency Standards. In addition; I have verified that the equipment Is equivalent to or more efficient than the equipment specified on the Certificate of Compliance submitted to demonstrate compliance with the Energy Efficiency Standards for residential buildings. HVAC SYSTEMS: Heating Equipment Heating Equip. CEC Certified Actual Distribution Duct or Heating Load Heating Type (Packaged Manuf. Make & Efficiency Type and Piping Before Over- Equipment heat gums etc) Model Number (AFUE. etc.) Location_ azValue Sizing (Btuh) Capacity tuh) Cooling Equipment Cooling Equipment Actual Type (Packaged CEC Certified Compressor Unit Efficiency Duct Duct heaLgumo. etc) Manuf. Make &Model Number (SEER) Location H_Y�LIJs Signature, Date WATER HEATING SYSTEMS Distrib. Water CEC Certified Energy Tank System Heater Manuf. Make & Factor/ Volume Iy&s Sype/# ' F.ffic,_ (gallons) HVAC Subcontractor (Co. Name) OR General Contractor OR Owner Insul Internal Pilot Rated Solar/ Wrap Insul. Standby Light Input • Wood R -value R -value Loss (%) LBtuh) kW/Btu Credits FAUCETS & SHOWER HEADS: All faucets and showerheads installed are listed in the Commissions Directory Of Certified Faucets And Showerheads, pursuant to Ti1le-24, Part 6, Subchapter 2, Section 111. ` Signature, Date Revised December 1992 Plumbing Subcontractor (Co. Name) OR General Contractor OR Owner INSTALLATION CERTIFICATE CF -6R T i �c'O lowing is an explanation of many of the input values required on the opposite ide of this form: HVAC SYSTEMS Heating E ul ment Type; must be one of the followin Furnace• G H f' as or of -fired central furnaces & space heaters. Boiler: Gas or oil -fired boilers. Pck HeatPum : Packaged central heat pumps. S IitHeatPum : Split central heat um s. RoomHeatPump: Room heat puma. roa1ruui �Larlel.lr�3CKaged Heat Pum s ?65,000 Btuh out ut . Electric: nce heatin HSPF-3.413. Radiant electric resist. heatin HSPF=3.55 CombinedH dro: er heater under water heatings stems, below. Refer to CEC publication "Appliance Efficiency Regulations", P400-92-029. CEC Certified Manuf. Make & Model Number; from applicable CEC appliance directory. Actual efficiency; from applicable CEC appliance directory. Dlstrlb type & location; Distrib type is "Ducts", "Piping" or both. Duct location is "Attic", "Crawlspace", "CVCcrawlspace" or "Conditioned space" Piping location is to be listed as "Cond. 'or "Uncond. " Duct or Piping R -Value; from the Directory Of Certified Insulation Materials and/or manuf's data. Heating Load Before Oversiz/ng; refer to CEC -approved heading load calculation procedure. This is the heating load result prior to application of the factor recommended in the load calculation procedure for oversizes the appliance to account for the use of a setback thermostat. Heating Equipment Capaclty; from the applicable CEC appliance directory. Note; location elevations over 2000 it above sea level require a derating of output capacity (refer to manufacturers literature). Cooling Equipment T e• must be one of the following: S litAirCond: Split sstem air conditioner. Pck AirCond: Packaged air conditioner. S /itHeatPum : Split sstem heat pump. Pck HeatPum : Packaged heat pump. RoomHeatPump: Room heat DumD. t_grrcKgHeatPump: Large Packaged Heat Pumps (2_65,000 Btuh output). Substitute EER for SEER is not available. RoomAirCond. Room air conditioner. Min. SEER varies' LrgPckgAirCond: Large Packaged Heat Pumps (2_65,000 Btuh output). Substitute EER for SEER is not available. EvapDirect: Direct Evaporative Cooling System The SEER ' f' d Refer to CEC public—at WATER HEA TING Distrlbutlon system t Standard: Pipe Insulation: is fixe at SEER=11.0. 1 condition is to be fixed at location -attic and duct insulation R-value=4.2. irect: Indirect Evaporative Cooling System. The SEER is fixed at SEER=13.0. condition is to be fixed at location -attic and duct insulation R-value=4.2. m "Appliance Efficiency Regulations", P400-92-029. SYSTEMS e: refer to Residential Manual for more details. Standard SEER when SEER when Te duct The duct POUMWR: Point of use/Hot water recovery Pie Insulation Recirc/No Control: Recirculation loop with no control Recirculation loop with a timer I Racirr✓Domand• Recirculat'o I control The tahla hnlnw ciimm�.heo eh with timer and temp In control 'emp: Recirculation control pop with demand Dop with temperature Input item Energy Factor NAECA Storage Gas or Oil Yes NAECA Storage Electric Yes NAECA Heat Pump Yes 11dlliJ riuduuo Instant. Gas o water Instant. Electric Yes neater Large Storage Gas type. Indirect Gas Boiler Pilot Input, Btu Recov. Eff., fraction Standby Loss, % Tank Volume al. I Tank Insulation, R Ext. Insulation, R Yes Yes ^-- Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes (AFUE) Yes Yes Yes - - - vvniujilou n Urunic J slam: Rated Input, kBtuh Yes Yes Yes Rated Input, kWl YesYes Rec. Eff, fraction Yes I + I I —