Loading...
SBA 1993-19278-495 CALLE TAMPICO — LA GUINTA, CALIFORNIA 92253 - (619) 777-7000 FAX (619) 777-7101 July 16, 1993 Coronel Construction P.O. Box 1238 La Quinta, CA 92253 Dear Coronel Construction: SETBACK ADJUSTMENT: 93-192 LOCATION: 53-845 Avenida Cortez APN: 773-141-017 This letter is to report approval of your recent -application for a,setback adjustment, pursuant to Chapter 9.188 of the City of La Quinta Planning & Zoning Regulations. The following setback adjustment has been approved subject to conditions and in accordance with attached Exhibit A. SETBACK ADJUSTMENT: Reduction of rear yard setback from five feet to three feet and a reduction of the pool. distance to the existing house from 5 feet. to 3 feet. FOR: Swimming Pool CONDITIONS: 1. Obtain a building permit; provide additional reinforcing as required by code. 2. The S -R fencing requirements shall be met. 3.. Pool equipment shall comply with required setbacks and maintain.a minimum of five feet from property .line. 4. That a three inch (3") PVC conduit, schedule 40 or better., be placed within the easement area. This would facilitate our accessing the area in the future, should the need to replace our facilities arise. This conduit is to be capped off within five (5) feet of side property lines, and should be placed at a minimum depth of thirty (30) inches. After review it was determined that: 1. This adjustment is consistent with the intent and purpose of -the Zoning Ordinance. 2. There are special circumstances applicable to the property, including such factors as size, shape, topography, location or surroundings that justify approval of the adjustment.. These special circumstances are: small size of lot. MAILING ADDRESS - P.O. BOX 1504 - LA QUINT -A. CALIFORNIA 92253 1 I 3. This adjustment will not be detrimental to -the health, safety, and general welfare of the community or be detrimental to property in the vicinity of the parcel for which the adjustment is requested. If you have any questions, please contact the undersigned. Very truly yours, G 8 DEVELOPMENT DIRECTOR Planner GT: ccs Attachment: Exhibit A cc: Building & Safety Department 0 -'.) :,01, L DOW CASE NLI. • mi