BCOM2014-1041 Title 24COPY.
- BUILDING ENERGY ANALYSIS REPORT
PROJECT:
State Farm Insurance
79-440 Corporate Center Drive.
La Quinta, CA 92253
Project Designer:
Robert Ricciardi Architects
75-400 Gerald -Ford STE 115
Palm Desert, CA 92211
(760) 408-1208
Report Prepared by:
Jon Scott
Scott Design and Title 24, Inc,
77-085 Michigan Drive
Palm Desert, CA 92211
(760) 200-4780
cf
Job Number:
Date:
12/23/2014
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2013 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC — www.energysoft.com.
f EnergyPro 6.3 by EnergySoft User Number.' 6712 ID: 1
I TABLE OF CONTENTS
Cover Page .
Table of Contents
Form ENV -MM Envelope Mandatory Measures
Form LTI-01-E Indoor Lighting
Form LTI-02-E Lighting Controls
Form LTI-03-E Indoor Lighting Power Allowance
Form MCH -01-E Mechanical Systems
Form MCH -02-E HVAC System Requirements
Form MCH -03-E Mechanical Ventilation and Reheat
EnergyPro 6.3 by EnergySoft Job Number: ID: User Number: 6712
1
2
3
4
10
14
17
20
22
ENVELOPE MANDATORY MEASURES: NONRESIDENTIAL ENV -MM
Project Name
Date
State Farm Insurance
12/23/2014
DESCRIPTION
Building Envelope Measures:
§110.8(a): Installed insulating material shall have been certified by the manufacturer to comply with the California Quality
Standards for insulating material, Title 20 Chapter 4, Article 3.
§110.8(c): All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of
Sections 2602 and 707 of Title 24, Part 2.
§110.8(f): The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value
of no less than R-13 between framing members.
§110.7(a): All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed,
weatherstripped or otherwise sealed.
Manufactured fenestration products and exterior doors shall have air infiltration rates not exceeding 0.3 cfm/ft.z of
§110.6(a): window area, 0.3 cfm/ft.Z of door area for residential doors, 0.3 cfm/ft.Z of door area for nonresidential single doors
(swinging and sliding), and 1.0 cfm/ft.2 for nonresidential double doors (swinging).
§110.6(a): Fenestration U -factor shall be rated in accordance with NFRC 100, or the applicable default LI -factor.
§110.6(a) Fenestratiori SHGC shall be rated in accordance with NFRC 200, or NFRC 100 for site -built fenestration, or the
applicable default SHGC.
§110.6(b): Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be
weatherstripped (except for unframed glass doors and fire doors).
Ener Pro 6.3 by Energ Soft User Number: 6712 RunCode: 2014-12-23712:37:44 ID: Page 3 of 23
CALIFORNIA ENERGY COMMISSION
SER INSTRUCTIONS NRCC-LTI-01-E
(Page 1 of 5)'
;gDate Prepared: 12/23/2014
)ned Floor Area: 1,980
this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.
)RM
TITLE
t& -LIT -01-E
itioned Floor Area : 0
tCC-LIT-02-E
Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals.
tCC-LIT-03-E
Indoor Lighting Power Allowance
tCC-LIT-04-E
Tailored Method Worksheets
tCC-LIT-05-E
Line Voltage Track Lighting Worksheets
NRCC-LTI-01-E, page 4
® Nonresidential
❑ Relocatable Public Schools
❑
❑
High -Rise Residential
Conditioned Spaces
❑
❑
Hotel/Motel
Unconditioned Spaces
❑ New Construction
❑
Addition
❑
Alteration
❑ Complete Building
❑
Area Category
❑
Tailored
(select yes for each document included)
this and all Energy Efficiency Standards compliance documents, refer to the Nonresidential Manual published by the California Energy Commission.
)RM
TITLE
t& -LIT -01-E
Certificate of Compliance. All Pages required on plans for all submittals.
tCC-LIT-02-E
Lighting Controls, Certificate of Compliance, and PAF Calculation. All Pages required on plans for all submittals.
tCC-LIT-03-E
Indoor Lighting Power Allowance
tCC-LIT-04-E
Tailored Method Worksheets
tCC-LIT-05-E
Line Voltage Track Lighting Worksheets
ig Power
;pace Lighting must not be combined for compliance
sting Power for Conditioned Spaces
Indoor Lighting Power for Unconditioned Spaces
Watts
Watts
Installed Lighting
Installed Lighting
1
0
1
NRCC-LTI-01-E, page 4
+
,446
NRCC-LTI-01-E, page 4
+
PORTABLE ONLY FOR OFFICES
NRCC-LTI-01-E, page 3
Minus Lighting Control Credits
0
Minus Lighting Control Credits
0
NRCC-LTI-02-E, page 2
NRCC-LTI-02-E, page 2
Adjusted Installed Lighting Power
_
1,446
Adjusted Installed Lighting Power
�
_
0
(row 1 plus row 2 minus row 3 )
(row 1 minus row 3)
.
Is - 2013 Nonresidential Compliance June 2014
CALI
SER INSTRUCTIONS NRCC-LTI-01-E
(Page 2 of 5)
ice I Date Prepared: 12/23/201.4 I
Complies ONLY if Installed <_ Allowed
Complies ONLY if Installed <_ Allowed
ed Lighting Power
1 NRCC-LTI-03-E, page 1
1.980
Allowed Lighting Power
Unconditioned.NRCC-LTI-03-E, page 1
0
on Certificates — Declare by selecting yes for all Installation Certificates that will be submitted. (Retain copies and verify forms are
-E - Must be submitted for all buildings
❑ Field Inspector
-E - Must be submitted for a lighting control system, or for an Energy Management Control System (EMCS),
sized for compliance.
❑ Field Inspector
-E - Must be submitted for a line -voltage track lighting integral current limiter, or for a supplementary
protection panel used to energize only line -voltage track lighting, to be recognized for compliance.
❑ Field Inspector
-E - Must be submitted for two interlocked systems serving an auditorium, a convention center, a
room, a multipurpose room, or a theater to be recognized for compliance.
❑ Field Inspector
-E -'Must be submitted for a Power Adjustment Factor (PAF) to be recognized for compliance.
❑ Field Inspector
-E - Must be submitted for additional wattage installed 'in a video conferencing studio to be recognized for
❑ Field Inspector
ies of Acceptance — Declare by checking all of the Certificates of Acceptance that will be submitted. (Retain copies and verify forms are
2-A - Must be submitted for occupancy sensors and automatic time switch controls.
❑ Field Inspector
3-A - Must be submitted for automatic daylight controls.
❑ Field Inspector
4-A - Must be submitted for demand responsive lighting controls.
❑ Field Inspector
Js - 2013 Nonresidential Compliance June 2014
CALIFORNIA ENERGY COMMISSION "
SER INSTRUCTIONS NRCC-LTI-01-E
(Page 3 of 5)
ce Date Prepared: 12/23/2014
;t Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule. is only for:
❑ UNCONDITIONED SPACE
:DULE and FIELD INSPECTION ENERGY CHECKLIST
ever listed on this page and on the next page includes all installed permanent and planned portable lighting systems.
:hod is used for compliance, list each different type of luminaire on separate lines.
or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines
;chedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed.
aires in Offices — Exception to Section 140.6(a)
ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of
ine if greater than 0.3 watts of portable lighting is planned for any office
h different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance
offices having different lighting systems.
re
Office Installed Portable luminaire Watts Per Square
Office Location
Field
Foot
Inspector
B
C
D
E
F
G
H
I
J
Installed
Z
portable
L+
Watts
If F 5 0.3,
Identify Office area in which
3 3
luminaire
a iv
per
enter zero;
-n
3 a -(D
"
watts in this
° —
square
E x G
these portable luminaires are
�+
_
ounied
.Watts per
°
office
o
foot
if F > 0.3,
installed
Luminaire
(B x C)
(D / E)
(F-0.3)
❑
❑
❑
❑
❑
❑
Enter sum total of all pages into NRCC-
-table luminaire watts that are greater than 0.3 watts per square foot per office:
LTI-01-E; Page 1
Is - 2013 Nonresidential Compliance June 2014
CALIFORNIA ENERGY COMMISSIONj#�
SER INSTRUCTIONS NRCC-LTI-01-E
(Page 3 of 5)
Ce Date Prepared: 1.2/23/2014
;t Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for:
m UNCONDITIONED SPACE
:DULE and FIELD INSPECTION ENERGY CHECKLIST
rarer listed on this page and on the next page includes all installed permanent and planned portable lighting systems.
:hod is used for compliance, list each different type of luminaire on separate lines.
or Tailored Method is used for compliance, list each different type of luminaire by each different function area on separate lines
schedule, and submit the track lighting compliance form (NRCC-LTI-05-E) when line -voltage track lighting is installed.
aires in Offices — Exception to Section 140.6(a)
ONLY for portable luminaires in offices (As defined in §100.1). All other planned portable luminaires shall be documented on next page of
ine if greater than 0.3 watts of portable lighting is planned for any office
h different office. Small offices that are typical (having the same general and portable lighting) may be grouped together. This allowance
offices having different lighting systems.
re
Office Installed Portable Luminaire Watts Per Square
Office Location
Field
Foot
Inspector
B
C
D
E
F
G
H
I
J
Installed
z
portable
Watts
If 1`5 0.3,,
Identify Office area in which
3 3
luminaire
N a
�;
per
enter zero;
E x G
these portable luminaires arecu
-
,n
watts in this
° —
squarerD
installed
_
ounted
Watts per
°
office
:;
foot
if F > 0.3,
Luminaire
(B x C)
(D / E)
(F-0.3)
❑
❑
❑
❑
❑
❑
Enter sum total of all pages into NRCC-
-table luminaire watts that are greater than 0.3 watts per square foot per office:
LTI-01-E; Page 1
Is - 2013 Nonresidential Compliance June 2014
CALIFORNIA ENERGY COMMISSION `4rz'
SER INSTRUCTIONS NRCC-LTI-01-E
(Page 4 of 5)
Ice I Date Prepared: 12/23/2014 I
'Be Filled Out for Conditioned and Unconditioned Spaces. Installed Lighting Power listed on this Lighting Schedule is only for: I
] UNCONDITIONED SPACE
DULE and FIELD INSPECTION ENERGY CHECKLIST
hedule
Installed Watts
Location
Field Inspector 1
B
C
D
E
F
G
H
How wattage was
determined
:
o
iinaire Description
r
n �D'+
o ^ °
c
35. z
3 d
s
uorescent troffer,
3 10Da LU CL
Z �; o •w
x °'
Primary Function area in which
ble electronic ballast)
m `�00=
`�
a a
these luminaires are installed
Pass
Fail
8 ElecRO .
27:0
® ❑
2
54
Office <= 250 sqft
❑
❑
'8 ElecRO
48.0
® ❑
13
624
Office <= 250 sqft
❑
❑
'8 ElecRO
48.0
® ❑
16
768
Office <= 250 sqft
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
❑ ❑
❑
❑
INSTALLED WATTS PAGE TOTAL:
1,446
Enter sum total of all pages into
NRCC-LTI-01-E; Page 2
Is - 2013 Nonresidential Compliance June 2014
SER INSTRUCTIONS NRCC-LTI-01-E
(Page 5 of 5)
,e I Date Prepared: 12/23/2014
RATION STATEMENT
)mpliance documentation is accurate and complete.
Documentation Author Signature:
gn and Title 24, Inc,
signature Date: 12/23/2014 '
Jon d. Scott
;hlgan Drive
CEA/ HERS Certification Identification (if applicable):
!rt, CA 92211
Phone: (760) 200-4780
)N STATEMENT
alty of perjury, under the laws of the State of California:
s Certificate of Compliance is true and correct.
the Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
nance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
drements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
.ystem design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
tions, plans and specifications submitted to the enforcement agency for approval with this building permit application.
;ned copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
cable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the
Dwner at occupancy.
:iardi
Responsible Designer Signature:
:iardi Architects
Date Signed:
ald Ford STE 115
License:
1, CA 92211
Phone: (760) 408-1208
is - 2013 Nonresidential Compliance June 2014
HTING CONTROLS
CALIFORNIA ENERGY COMMISSION
N RCC-LTI-02-E
(Page 1 of 3
Date Prepared: 12/23/2014
Ised to document all mandatory and prescriptive lighting controls that are applicable to the project.
Declaration Statements (Indicate if the measure applies by checking yes or no below:)
ments
controlled by self-contained lighting control devices which are certified to the Energy Commission according to the Title 20 Appliance
itions in accordance with Section 110.9.
controlled by a lighting control a system or energy management control system in accordance with §110.9. An Installation Certificate
�d in accordance with Section 130.4(b).
ick Lighting Integral Current Limiters shall be installed which have been certified to the Energy Commission in accordance with §110.9 and
pally, an Installation Certificate shall be submitted in accordance with Section 130.4(b).
Supplementary Overcurrent Protection Panel shall be installed in accordance with Section 110.9 and Section 130.0. Additionally, an
fic•ate shall be installed in accordance with Section 130.4(b).
ols and equipment shall comply with the applicable requirements in §110.9 and shall be installed in accordance with the manufacturer's
:cordance with Section 130.1.
all be functionally controlled with manually switched ON and OFF lighting controls in accordance with Section 130.1(a).
shall be separately controlled from all other lighting systems in an area. Floor and wall display, window display, case display, ornamental,
As lighting shall each be separately controlled on circuits that are 20 amps or less. When track lighting is used, general, display,
I special effects lighting shall each be separately controlled; in accordance with Section 130.1(a)4.
Jng of any enclosed area 100 square feet or larger, with a connected lighting load that exceeds 0.5 watts per square foot shall meet the
ng control requirements in accordance with Section 130.1(b).
for lighting shall be equipped with controls that meet the applicable Shut -OFF control requirements in Section 130.1(c).
ylit Zones shall be controlled in accordance with the requirements in Section 130.1(d) and daylit zones are shown on the plans.
n buildings larger than 10,000 square feet shall be capable of being automatically reduced in response to a Demand Responsive Signal in
Section 130.1(e).
ancy permit is granted for a newly constructed building or area, or a new lighting system serving a building, area, or site is operated for
)or lighting controls serving the building, area, or site shall be certified as meeting the Acceptance Requirements for Code Compliance in
Section 130.4.(a). The controls required to meet the Acceptance Requirements include automatic daylight controls, automatic shut -OFF
mand responsive controls.
- 2013 Nonresidential Compliance June 2014
HTING CONTROLS.�
CALIFORNIA ENERGY COMMISSION �"'X
NRCC-LTI-02-E
2of3)
Date Prepared: 12/23/2014
)e filled out for Conditioned and Unconditioned Spaces. This page is used only for the following:
❑ UNCONDITIONED SPACES
PTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST
PAF Credit Calculation 2
`
T
rl
f
m
�+ D
C.
Standards Complying With 1
O
04 Or
s o
(l
'�
n
rD
CU
N
a
`°
:ontrol Schedule
(✓ all that apply, or enter if Exempted)
opo a
-n
= °
a
°
6
C
D
E
F
G
H
I I
J
K
L
M
N
O
ype/ Description of Lighting
mtrol (i.e.: occupancy sensor,
#
01
`40M
to,
a;
L40M
Q'
'4'
automatic time switch,
of
o 0
0
0
0
o
a
Jimmer, automatic daylight,
Units
c+
0-
F
2L
v
°'
n
N
etc... )
❑
❑
❑
❑
❑
❑
❑
❑
Control Credit PAGE TOTAL (Sum of Column M):
p
MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):
0
Enter Control Credit total
into NRCC-LTI-01-E; Page
1.
-Is; §130.0(b) = Multi Level, • §130.1(c) = Auto Shut -Off; §130.1(d) = Mandatory Daylight, §130.1(e) = Demand Responsive; §140.6(d) _
?d to earn a PAF, • §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls.
Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF, an Installation Certificate is
?d, and submitted.
; - 2013 Nonresidential Compliance June 2014
HTING'CONTROLS
CALIFORNIA ENERGY COMMISSION
rlk-
NRCC-LTI-02-E
2 of
12/23/2014
)e filled out for Conditioned and Unconditioned Spaces. This page is used only for the following:
Z UNCONDITIONED SPACES
PTIVE INDOOR LIGHTING CONTROL SCHEDULE, PAF CALCULATION, and FIELD INSPECTION CHECKLIST
PAF Credit Calculation Z
t
_T
n
r n *
rl
.,
^ n
a
Standards Complying With 1
? o
?
�.
:ontrol Schedule
(✓ all that apply, or enter 'E' if Exempted)
w a
T
=
o
B
C
D
E
F
G
H
I
J
K
L
M
N
O
ype/ Description of Lighting
mtrol (i.e.: occupancy sensor,
#
Q71
a;
'4'
°'
;°;
p
automatic time switch,
of
o
0
0
0
0
o
W
v
Dimmer, automatic daylight,
Units
N
o,
-o
a
v
a
a
o,
a
etc...)
❑
❑
❑
❑
❑
❑
1:1 .
❑
Control Credit PAGE TOTAL (Sum of Column M):
0
MULTIPLE PAGES ARE USED, ENTER SUM TOTAL OF Control Credit for all pages HERE (Sum of all Column M):
0
Enter Control Credit total
into NRCC-LTI-01-E; Page
1.
,Is §130.0(b) = Multi Level; §130.1(c) = Auto Shut -Off; §130.1(d) = Mandatory Daylight; §130.1(e) = Demand Responsive, §140.6(d) _
?d to earn a PAF; §140.6(d) = Prescriptive Secondary Sidelit Daylight Controls.
Factor. PAFs shall not be traded between conditioned and unconditioned spaces. As a condition to earn a PAF an Installation Certificate is
!d, and submitted.
c 2013 Nonresidential Compliance June 2014
HTING'CONTROLS
Date Prepared: 12/23/2014
N RCC-LTI-02-E
(Page 3 of 3)
2ATION STATEMENT
,mpliance documentation is accurate and complete.
Documentation Author Signature:
]n -and Title 24, Inc,-
signature Date: 12/23/2014
Jon d. Scott
CEA/ HERS Certification Identification (if applicable): •
.higan Drive
!rt, CA 92211
Phone' (760)200-4780
)N STATEMENT
alty of perjury, under the laws of the State of California:
Certificate of Compliance is true and correct.
:he Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
lance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
irements of Title 24, Part 1 and Part 6 of the California Code of Regulations.
ystem design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
:ions, plans and specifications submitted to the enforcement agency for approval with this building permit application.
;ned copy of this Certificate of Compliance shall be made available with the building per (s ssued for the building, and made available to the
cable inspections. I understand that a completed signed copy of this Certificate of Com ii n is required to be included with the documentation the
)wner at occupancy.
:iardi
Responsible Designer gn re:
.iardi Architects
Date Signed: O n
�c
ald Ford STE 115
License:
t, CA 92211
Phone: (760) 408- 208
; - 2013 Nonresidential Compliance June 2014
ER ALLOWANCE
CALIFORNIA ENERGY COMMISSION
N RCC-LTI-03-E
Lighting Power Allowance (Page 1 of 4),
Date Prepared: 12/23/2014
for Conditioned and Unconditioned Spaces. This page is only for:
❑ UNCONDITIONED spaces
.IGHTING POWER ALLOWANCES
thod for compliance, use only the total in column (a) as total allowed building watts.
I, Tailored Method, or a combination of Area Category and Tailored Method for compliance, use only the total in column (b) as the total
(a) (b)
ved Watts. Documented in section B of NRCC-LTI-03-E (below on this page)
Watts. Documented in section C-1 of NRCC-LTI-03-E (below on this page) 1,980
Documented in section A of NRCC-LTI-04-E 0
NG WATTS. Enter,number into correct cell on NRCC-LTI-01, Page 2, Row 1 1,980
both conditioned and unconditioned areas.
:THOD LIGHTING POWER ALLOWANCE
A
B
1,980
C
0
D
,F BUILDING (From §140.6 Table 140.6-B)
WATTS
PER (ft)
X
COMPLETE
BLDG. AREA
=
ALLOWED
WATTS
Total Area:
Total Watts. Enter Total Watts into section A, row 1 (Above on this page)
HOD TOTAL LIGHTING POWER ALLOWANCES (C-2 plus C-3)
Watts
Total from section C-2
1,980
Total from section C-3
0
Total Watts. Enter Total Watts into section A, row 2 (Above on this page)
1,980
I ; -2013 Nonresidential Compliance June 2014
ER ALLOWANCE
CALIFORNIA ENERGY COMMISSION
NRCC-LTI-03-E
Lighting Power Allowance (Page 2 of 4)
Date Prepared: 12/23/2014
It for Conditioned and Unconditioned Spaces. This page is only for:
❑ UNCONDITIONED spaces
M GENERAL LIGHTING POWER ALLOWANCE
ig for offices. Portable lighting for offices shall be documented only in section B of NRCC-LTI-01-E.
n primary function area as defined in §100.1 of the Standards.
A. B C D
,TEGORY (From §140.6 Table 140.6-C) WATTS ALLOWED
g Primary Function Area per Table 140.6-C PER (ft) X AREA (ft) = WATTS
Office <= 250 sqft 1.00 1,980 1,980
TOTALS 1,980
Enter sum total Area Category allowed watts into section C-1 of NRCC-LTI-03-E (this compliance form) 1,980
WATTS
2013 Nonresidential Compliance June 2014
ER ALLOWANCE
CALI
0�
COMMISSION
N RCC-LTI-03-E
Lighting Power Allowance (Page 4 of 4)
Date Prepared:
1-2/23/2014
2ATION STATEMENT
impliance documentation is accurate and complete.
Documentation Author Signature:
;ign and Title 24, Inc,
Signature Date: 1'2/23/2014
ichigan Drive
CEA/ HERS Certification Identification (if applicable):
ion a. Scott
;ert, CA 92211
Phone: (760) 200-4780
)N STATEMENT
alty of perjury, under the laws of the State of California:
; Certificate of Compliance is true and correct.
:he Business and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance
lance specifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of
irements of Title 24, Part 1 and Part 6 of the California Code of Regulations. .
ystem design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance
:ions, plans and specifications submitted to the enforcement agency for approval with this building permit application.
;ned copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the
cable inspections. I understand that a completed signed copy of this Certificate of Compliance is required to be included with the documentation the
)wner at occupancy.
:iardi
Responsible Designer Signature:
:iardi Architects
Date Signed:
ald Ford STE 115
License:
1, CA 92211
Phone: (760) 408-1208
; - 2013 Nonresidential Compliance June 2014
Em
NRCC-MCH-01-E
(Page 1 of 3)
Date Prepared: 12/23/2014
IORKSHEETS (check box if worksheet is included)
s and all Energy Efficiency Standards compliance forms, refer to the 2013 Nonresidential Manual
fire all forms to be incorporated onto the building plans.
t
Title
'art 1 of 3)
Certificate of Compliance, Declaration. Required on plans for all submittals.
'art 2 of 3)
Certificate of Compliance, Required Acceptance Tests (MCH -02A to 11A). Required on plans for all submittals.
'art 3 of 3)
Certificate of Compliance, Required Acceptance Tests (MCH -12A to 18A). Required on plans where applicable.
'art 1 of 2)
Mechanical Dry Equipment Summary is required for all submittals with Central Air Systems. It is optional on plans.
'art 2 of 2)
Mechanical Wet Equipment Summary is required for all submittals with chilled water, hot water or condenser water
systems. It is optional on plans.
MCH -10A
Mechanical Ventilation and Reheat is required for all submittals with multiple zone heating and cooling systems. It is
optional on plans.
MS (check box for required forms)
,ttached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all
,ment that requires an acceptance test. All equipment of the same type that requires a test list the equipment description and the number of systems.
is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has
-h person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
considered a completed form and is not to be accepted by the building department unless the correct boxes are checked.
ed all newly installed process systems must be tested to ensure proper operations.
MCH -03A
MCH -04A
MCH -05A
MCH -06A
MCH -07A
MCH -08A
MCH -09A
MCH -10A
MCH -11A
Single Zone
Air
Economizer
Demand
Supply Fan
Valve Leakage
Supply Water
Hydronic
Automatic
Unitary
Distribution
Controls
Control
VAV
Test
Temp. Reset
System
Demand Shed
Ducts
Ventilation
Variable Flow
Control
(DCV)
Control
❑
.❑
❑
❑.
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
.❑
❑
❑
❑
❑
B Nonresidential Compliance June 2014
NRCC-MCH-01-E
(Page 2 of 3)
Date Prepared: 12/23/2014
VIS (check box for required forms)
,ttached to the plans. Listed below are all the acceptance tests for HVAC systems. The designer is required to check the applicable boxes for all
-"Ment that requires an acceptance test. All equipment of the same type that requires a test, list the equipment description and the number of systems.
is responsible to either conduct the acceptance test them self or have a qualified entity run the test for them. If more than one person has
:h person shall sign and submit the Certificate of Acceptance applicable to the portion of the construction or installation for which they are responsible.
considered a completed form and is not to be accepted by the building department unless the correct boxes are checked,
ed all newly installed process systems must be tested to ensure proper operations.
?A
MCH -13A
MCH -14A
MCH -15A
MCH -16A
MCH -17A
MCH -18A
tion &
for.DX
Automatic Fault
Detection &
Diagnostics for Air &
Zone
Distributed Energy
Storage DX AC .
Systems
Thermal Energy
Storage (TES)
Systems
Supply Air
Temperature Reset
Controls
Condenser Water
Reset Controls
ECMS
❑
❑
❑
❑
❑
❑
❑.
❑
❑
❑
❑
❑
❑'
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
.❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
❑
13 Nonresidential Compliance June 2014
CALIFORNIA ENERGY COMMISSION
NRCC-MCH-01-E
(Page 3 of 3)
Date Prepared: 12/23/2014
V STATEMENT
ice documentation is accurate and complete. tl
13 Nonresidential Compliance June 2014
Documentation Author Signature:
id Title 24, Inc,
Signature Date: 12/23/2014
Jon d. Scott
In Drive
CEA/ HERS Certification Identification (if applicable):
A 92211
Phone: (760) 200-4780
.TEMENT
perjury, under the laws of the State of California:
icate of Compliance is true and correct.
;iness and Professions Code to accept responsibility for the building design or system design identified on Lhis Certificate of Compliance (responsible
;pecifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
1, Part,1 and Part 6 of the California Code of Regulations.
design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
!cifications submitted to the enforcement agency for approval with this building permit application.
)py of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and made available to the enforcement
understand that a completed signed copy of this Certificate of Compliance is required to be included with the do mentation the builder provides to the
Responsible Designer Signature:
Id Title 24, Inc.
Date Signed:
Jon d. Scott
n Drive
License: 12-23-14
Phone: (760) 200-4780
a 92211
13 Nonresidential Compliance June 2014
J I H I t UI' UHLWUKIMIH
HVAC SYSTEM REQUIREMENTS,
GEC-NRCC-MCH-02-E (Revised 06/14) CALIFORNIA ENERGY COMMISSION
- CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
HVAC Dry System Requirements (Page 1 of 3)
Project Name: State Farm Insurance Date Prepared: 12/23/2014 .,
Equipment Tags and System Description'
HVAC 1
MANDATORY MEASURES
Heating Equipment Efficiency3
Cooling Equipment Efficiency3
HVAC or Heat Pump Thermostats
Furnace Standby Loss Control
Low leakage AHLls
Ventilation
Demand Control Ventilations
Occupant Sensor Ventilation Control6
Shutoff and Reset Controls'
Outdoor Air and Exhaust Damper Control
Isolation Zones
Automatic Demand Shed Controls
Economizer FDD
Duct Insulation
PRESCRIPTIVE'MEASURES
T-24 Sections Reference to the Requirements in the Contract Documenm2
110.1 or 110.2(a)
110.1 or 110.2(a)
110.2(b), 110.2(c)
110.2(d)
110.2(f)
120.1(b)
120.1(c)4
120.1(c)5, 120.2(e)3
120.2(e)
120.2(f)
120.2(g)
120.2(h)
120.2(i)
120.4
Equipment is sized in conformance with 140.4(a & b) Y
140.4(a&b)
Supply Fan Pressure Control 140.4(c)
Simultaneous Heat/Coo18 140.4(d)
Economizer 140.4(e)
Heat and Cool Air Supply Reset 140.4(f)
Electric Resistance Heating9 140.4(g)
Duct Leakage Sealing and Testing.10 140.4(1)
Notes:
1. Provide equipment tags (e.g. AHU 1 to 10) and system description (e.g. Single Duct VAV reheat) as appropriate. Multiple units
with common requirements can be grouped together.
2. Provide references to plans (i.e. Drawing Sheet Numbers) and/or specifications (including Section name/number and relevant
paragraphs) where each requirement is specified. Enter "N/A" if the requirement is not applicable to this system.
3. The referenced plans and specifications must include all of the following information: equipment tag, equipment nominal
capacity, Title 24 minimum efficiency requirements, and actual rated equipment efficiencies. Where multiple efficiency
requirements are applicable (e.g. full- and part -load) include all. Where appliance standards apply (110.1), identify where
equipment is required to be listed per Title 201601 et seq.
4. Identify where the ventilation requirements are documented for each central HVAC system. Include references to both central
unit schedules and sequences of operation. If one or more space is naturally ventilated identify where this is documented in the
plans and specifications. Multiple zone central air systems must also provide a MCH -03-E form.
5. If one or more space has demand controlled ventilation identify where it is specified including the sensor specifications and the
sequence of operation.
6. - If. one or more space has occupant sensor ventilation control identify where it is specified including the sensor specifications and
the sequence of operation
7. If the system is DDC identify the sequences for the system start/stop, optimal start, setback (if required) and setup (if required).
For all systems identify the specification for the thermostats and time clocks (if applicable).
8. Identify where the heating, cooling and deadband airflows are scheduled for this system. Include a reference to the
specification of the zone controls. Provide a MCH -03-E form.
9. Enter N/A if there is no electric heating. If the system has electric heating indicate which exception to 140.4(g) applies.
10. If duct leakage sealing and testing is required, a MCH -04-A form must be submitted.
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
STATE OF CALIFORNIA
HVAC SYSTEM REQUIREMENTS
Ra,
,EC-NRCC-MCH-02•E (Revised 06/13) CALIFORNIA ENERGY COMMISSION
CERTIFICATE OF COMPLIANCE NRCC-MCH-02-E
HVAC Wet System Requirements (Page 3 of 3)
Project Name: State Farm Insurance Date Prepared: 12/23/2014
DOCUMENTATION AUTHOR'S DECLARATION STATEMENT
1. 1 certify that this Certificate of Compliance documentation is accurate and complete.
Documentation Author Name: Jon Scott
Documentation Author Signature:
Company: Scott Design and Title 24, Inc,
signature Date: 12/23/2014
Address: 77-085 Michigan Drive
CEA/HERS Certification Identification(ifapplicable):
Pon d. Scott
City/State/zip: Palm Desert, CA 92211
Phone' (760) 200-4780
RESPONSIBLE PERSON'S DECLARATION STATEMENT
I certify the following under penalty of perjury, under the laws of the State of California:
1. The information provided on this Certificate of Compliance is true and correct.
2. I am eligible under Division 3 of the Business and Professions Code to accept responsibility for the building design or system design
identified on this Certificate of Compliance (responsible designer).
3. The energy features and performance specifications, materials', components, and manufactured devices for the building design or system
design identified on this Certificate of Compliance conform to the requirements of Title 24, Part 1 and Part 6 of the California Code of
Regulations.
4. The building design features or system design features identified on this Certificate of Compliance are consistent with the information
provided on other applicable compliance documents, worksheets, calculations, plans and specifications submitted to the enforcement
agency for approval with this building permit application.
5. 1 will ensure that a completed signed copy of this Certificate of Compliance shall be made available with the building permit(s) issued for the
building, and made available to the enforcement agency for all applicable inspections. I understand that a mpI ted sig copy of this
Certificate of Compliance is required to be* included with the documentation the builder provides to t!]P bui •ng own at o upa
Responsible Designer Name: Jon Scott
Responsible Designer Signature:
Company: Scott Design and Title 24, Inc.
Date Signed:
Jon d. Scott.
Address: 77-085 Michigan Drive
.
License:
12-23-14
Phone: (760) 200-4780
City/State/Zip: Palm Desert, Ca 92211
CA Building Energy Efficiency Standards - 2013 Nonresidential Compliance June 2014
AND REHEAT,
CALIFORNIA ENERGY COMMISSION
N RCC -MCH -03-E
(Page 1 of 2)
Date Prepared: 12/23/2014
raining cells are protected and automatic
died by the terminal unit when it's operating in the cooling mode.
pplied by the terminal unit in the deadband mode.
died by the terminal unit when it's operating in the heating mode.
DDC controls, or non -DDC controls. Each control category ha•s different reheat limitations in code.
tequired Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C).
§120.1. Table 120.1-A.
applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating.
!ntilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L)
the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. -
for DDC, Design Primary Cooling Airflow * 0.30 for Non -DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. .
I. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable.
the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D.
for DDC. Not applicable for Non -DDC zones or zones where Design Primary Cooling Airflow is is 300 cfm or less.
. Not applicable if the Design Primary Cooling Airflow is 300 cfm or less.
the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C.
3 Nonresidential Compliance June 2014
VAV Reheated Primary Air
VAV Deadband
AREA BASIS
OCCUPANCY BASIS
MINIMUM
CFM
Primary Air CFM
E
F
G
H
I
1
K
L
M
N
O
P
Q
R
%S
T
0
Z
Z
C
3
3
Z
33
m
r�
0 3
x
n
Z o
? pc
n
<
D z
n T 0
Z
D
T
O
v
'^
T
k D
n z p
O
3
p o D
r3 Z z
3
O^ C
O
p oe
('1 Z p
D ru
3 C,
O
��
�rOr
.._.
xD�
m
-<
�<
�OO<
—
30051
O O
0X3
p o
n
"r)
3 .... Z
r
M
00
m
A
Z
A
m
M
M
O
O Z
m
,^
w
O m
m
O
n
Z
N
n
m
O
A
mD
y
m
0
Z
n
r0
m
D
Z
D
O
.
A
1,980 jO.15
j297
j19.8 j
15.0
j 297
j 594 jY
Total
1594
raining cells are protected and automatic
died by the terminal unit when it's operating in the cooling mode.
pplied by the terminal unit in the deadband mode.
died by the terminal unit when it's operating in the heating mode.
DDC controls, or non -DDC controls. Each control category ha•s different reheat limitations in code.
tequired Ventilation Airflow (Column M) is greater than the Design Primary Deadband Airflow (Column C).
§120.1. Table 120.1-A.
applicable or the greater of the expected number of occupants and 50% of the CBC occupant load for egress purposes for spaces without fixed seating.
!ntilation Airflow) is the larger of the ventilation rates calculated on an AREA BASIS or OCCUPANCY BASIS (Column I or L)
the Design Primary Deadband Airflow complies or not. It compares the value in column M to the value in column C and column F. -
for DDC, Design Primary Cooling Airflow * 0.30 for Non -DDC. If the Design Primary Cooling Airflow is less than 300 cfm, then this is not applicable. .
I. If the Design Primary Cooling Airflow is 300 cfm or less, then this is not applicable.
the Design Primary Reheat Airflow at the zone level, complies or not. It compares the value in column P to the value in column D.
for DDC. Not applicable for Non -DDC zones or zones where Design Primary Cooling Airflow is is 300 cfm or less.
. Not applicable if the Design Primary Cooling Airflow is 300 cfm or less.
the Design Primary Deadband Airflow at the zone level, complies or not. It compares the value in column S to the value in column C.
3 Nonresidential Compliance June 2014
AND REHEAT
Prepared: 12/23/2014
NRCC-MCH-03-E
(Page 2 of 2)
V STATEMENT
ice documentation is accurate and complete.
Documentation Author Signature:
Signature Date: 12/23/2014 ]J�d.Scott
and Title 24, Inc,
Ian Drive
CEA/ HERS Certification Identification (if applicable):
CA 92211
Phone: (760) 200-4780
.TEMENT
perjury, under the laws of the State of California:
icate of Compliance is true and correct.
>iness and Professions Code to accept responsibility for the building design or system design identified on this Certificate of Compliance (responsible
>pecifications, materials, components, and manufactured devices for the building design or system design identified on this Certificate of Compliance
t, Part 1 and Part 6 of the California Code of Regulations. .
design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,
!cifications submitted to the enforcement agency for approval with this building permit application.
)py of this Certificate of Compliance shall be made available with the building permit(s) issued for the building, and m e available he enforcement
ter
inderstand that a completed signed copy of this Certificate of Compliance is required to be included with the d cumen tion the ui provides to the
Responsible Designer Signature:.
nd Title 24, Inc.
Date Signed:
license: Jon U. Scott
in Drive
12-23-14
?none: (760) 200-4780 L I,
:a 92211
3 Nonresidential Compliance June 2014