Loading...
9907-596 (OFC) InspectionsJCM INSPECTIONS Complete General and Special Inspection Services • 39725 Garand Lane, Suite F, Palm Desert, California 92211 Ph. (760) 345-5554 Fax (760) 772-3895 May 17, 2000 Client:KSL Desert Resorts, Inc. La Quinta Resort & Club 49-499 Eisenhower Dr. P.O. Box 69 La Quinta, Ca. 92253 Phone: 760 - 777- 4855 Fax: 760 - 771 — 4132 Attention: Andrea Merrill -Mock i , Ikon( "(ik4//VQ RECD • Project: Greg Norman Golf Clubhouse & Maintenance Building Project: 99-830 PGA West La Quinta, Ca. Subject: Final Report - Reinforced Concrete, Structural Masonry, and Field Welding. From November 8, 1999 to April 12, 2000 Specification Compliance: Complies JCM Inspections performed special inspection on the following portions of work at the above address which required special inspection and which JCM Inspections was employed to inspect for the Cart Storage, Pro Shop, Kitchen/Dining Room/Bar. Reinforced Concrete Conducted structural concrete inspection for the column piers, footing, grade beams, and slabs on grade. • Received millcertifications for steel reinforcement placed for this job. Checked the rebar for grade, size, placement, coverage and splices. Rebar was securely tied. Also, inspected the placement of welded wire mesh and/or rebar for the slabs. ,:;:� JCM INSPECTIONS 2 Complete General and Special Inspection Services • 39725 Garand Lane, Suite F, Palm Desert, California 92211 Ph. (760) 345-5554 Fax (760) 772-3895 Observed the placement of hardrock and 3/8" aggregate concrete. A mechanical vibrator was used to consolidate the concrete. Concrete cylinders were molded for 28 -day compression tests. Inspected the epoxy of rebar for doweling purposes and the epoxy of anchor bolts Structural Masonry Observed the placement of CMU's, steel reinforcement, structural embeds and the grouting procedures (low and high lift grouting). Checked rebar for grade, size, placement, coverage and splices and grout spaces for cleanliness. During the placement of grout, a mechanical vibrator was used to consolidate the grout. • Performed the sampling of grout prisms 3x3x6, mortar shots 2x4, and masonry prisms for 28 day compression tests. Field Welding Visually inspected the structural welding (fillets and flare bevel groove welds including A706 steel rebar). Checked fitup (edge and surface preparation, root openings, root face dimensions, flare bevel angles) and completed welds for type, size, length, and appearance. Welder's certifications received. Throughout my inspections, I checked the materials, equipment, details of construction, procedures. Based upon my personal observation and written reports of this work, it is my judgment that the inspected work was performed, to the best of my knowledge, in accordance with the approved plans, specifications, applicable workmanship provisions of the 1997 Uniform Building Code, AWS D1.1/1.4, and approved written change orders from the Architect and/or Structural • Engineer. JCM INSPECTIONS 3 Complete General and Special Inspection Services • 39725 Garand Lane, Suite F, Palm Desert, California 92211 Ph. (760) 345-5554 Fax (760) 772-3895 • • If there are any questions regarding this letter, please contact this office. Sincerely, JCM Inspections Jack C. Millin ICBO #0842216-80 -82 -85 -86 AWS #95030691 Copies: Owner Structural Engineer Architect General Contractor Governing Agency JCM Files KSL Desert Resorts, Inc. TRANSMITTAL Attn: Construction Dept., NO. 00266 49-499 Eisenhower Drive Phone: 760-777-4857 La Quinta, CA 92253 Fax: 760-771-4132 &OJECT: The Greg Norman Course DATE: 5/31/00 TO:. City of La Quinta REF: Inspections package 78-495 Calle Tampico Final report PO Box 1504 La Quinta, CA 92253 ATTN: Danny Crawford Jr. WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted Letter 9 Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications ❑ Attached ❑ Returned for Corrections ❑ Other: 0 Separate Cover Via: US Mail ID Due Date: ITEM NO. COPIES DATE ITEM NUMBER REV. NO. DESCRIPTION STATUS' 1 1 5/17/00 LAB Copy of Final report from JCM Inspections FYI emarks: This is a copy of the Final report from JCM Inspections with regards to the Greg Norman Clubhouse. Any questions please call me at 760-777-4857 CC: Expedition . .. '•�'. { 7', 7.. 'i �..JL3-. t. 1. �' '� �� ... ..i.:f .. Signed: Nickie Gormley KSL Desert Resorts, Inc. TRANSMITTAL No. 00252 49-499 Eisenhower Drive La Quinta, CA 92253 OROJECT: The Greg Norman Course TO: City of La Quinta 78-495 Calle Tampico PO Box 1504 La Quinta, CA 92253 ATTN: Danny Crawford Jr. Phone: 760-777-4857 Fax: 760-771-4132 DATE: 4/12/00 REF: Inspection reports Structural Masonry Welding WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Letter Rf Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications ❑ Attached ❑ Returned for Corrections Other: Inspection reports Separate Cover Via: US Mail I ❑ Due Date: JITEMNO. _COPIES ,DATE ITEMNUMBER_ _Y REV. NO. DESCRIPTION___STATUS! 1 12 4/12/00 JCM Inspections dated 4/4/00 - 4/12/00 larks: JCM Inspection reports for the Greg Norman Clubhouse. Dated 4/4/-4/12/00. • Signed: Nickie Gormley Expedition • JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 • Fax: 760-772-3895 oject Name: w r L r,.� �n n Project No: fy� Q (_ O Date: Proje, Address: �• c►; c. UBCi` Title 24 Other: Client: Sub -Contractor: �.otoe Weather: General Contractor: r Architect:Structural rr ^ Engineer: Location of Samples: JZc,t_ r. Col q'n q C t//c1x ��' W,�ar r� II li24 s fl -� t0 c 1 t r r el tzt tj ����a� Welding Process/ Electrod : _ Slump (inches): 9.00 Supplier: Ej A M:;�,Z Time Sampled: I At. IK Q r-, Mix Design: Q*_ r� �- i'��� Time in Mixer: (min.) i o Specified Strength: (PSI)r,2_25>0 Water Added @ Jobsite: (galss , .-1 tir ' .MAdmixture: In Concrete Temperature: (T) `t� o Truck #: ' Ticket#: Ambient Air Temperature: °F 1I13 Field I.D. Marking:i' n. Welders: Unresolved Items: None IR See below Description of Work Inspected: P i/ ,►GA r I .- : r ✓l r rr I p r7 fl er ��� U ,r n. htln 7� a y 1 1 '�n '-Phi C: Fn �^ir i1k4.O v /`,.• \ 5 C, .. S Cn c l+r.,•F'�+ , J � o e i ., Cn r r i nT<Sr ',fl C 1 — ereby certify that I have inspected all of the above reported work, unless otherwise note ald -1 best o m abtt'lit ave found is work to comply with the approved plans, specifications & applicable building laws. Final re 6 at roject o letidn., ( Page of In ector ^� A e,,glo y Contra to ` ere ent v Copy 1 JCM Inspections Copy 2 Proj ct Superintendent f �/ Copy 3 Governing Agency 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: LI_ Lf_-,-� oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: 1 City: La Quinta, CA Title 24 AWS F✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other - Client: Sub -Contractor: KSL Desert Resorts, Inc `Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD`Architects Paul Koehler Engineering Slump (inches): Supplier: r . ,_ (� h1: i `) Time Sampled: i ; r� Mix Design: - 11\,C Time in Mixer (min.): f r Specified Strength (PSI): Water Added @ Jobsite (gals.): 1),, t 1 Addmixture: Concrete Temperature (F): -'1 Truck #: -- Ticket #: Ambient Air Temperature (F): , Field ID Marking: 4) l Weather: Unresolved Items: © None � tSee Below Location of Sample: -, 4:_. •,. ,X r r r. - i t ,$ , r ! , ; , ., > ;~ ``�. ,�, c _ �''1- fI� ,.r i•�I `. t No Samples Taken r Description of Work Inspected: i' • ! c �,.,1 (�� 1 ` ti,`' 1✓ "' ` (,� ! 1 1 1 • 7' r'1 r r ^e� \ na e,� ^C.� T•'• �i�._;\ ' ' '1 �.1, . ,� !,^� � � c 7` i. � r+ r ^� •, r . � , r .1 1,+ ; +� \. •\�.,, C I \i •\� .. �;T r.. a � ..J.�,�. `)",:i) - 1...�'./ ,+nr,,� �n, , / .� �� � i •\.. � � , � � ! .--} �! t._,+n� I ' � it r... ��f � r, ��... tY� , 1n��A.`r•h !^ �t '+�� �r.,.,\' �}<� �r-, ,-�1•, ` �r..\,1�"�,n..--, �% /:Tt�� - r� f,.• -t \ \ ,. \. it .•i "1. r , !J t .��, L. / •. (i r , t r .n.. .� t r 1 -" _1.-- P��-.. lf�! �..�1' I ! J/ hereby certify that I have inspected all of the above work, unless. otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin10560 Certification No: 0842216-82 Contractors Re�pmsi a taAttiivee:o \ 1 \ - - /- , v { i Copy 1 JCM Inspections Copy 2 Project Superintendent i /� Copy 3 'Governing Agency Page of i I SS` Desert Resorts, Inc. C17y O;r LA r ,RANSMITTAL 4No. 00249 49-499 Eisenhower Drive La Quinta, CA 92253 OROJECT: The Greg Norman Course TO: City of La Quinta 78-495 Calle Tampico PO Box 1504 La Quinta, CA 92253 ATTN: Danny Crawford Jr. Phone: 760-777-4857 Fax: 760-771-4132 APR a 3 RECD DATE: 3/31/00 REF: Beam Notch Valley Beam Connection Stampted approval WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Letter Your Use Rf Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned W Specifications ❑ Attached ❑ Returned for Corrections ❑ Other: 2 Separate Cover Via: USMail ❑ Due Date: ITEM NO. COPIES DATE ITEM NUMBER -REV. NO. DESCRIPTION 1 1 3/31/00 Structural acceptance of Beam Notch & Valley Beam connection �emarks: Enclosed stampted copies of approved Beam connection from Paul Koehler Engineer. CC: Signed: Nickie/ o -ley Expedition 0 STATUS Mar-jI -UU iU:44am r1um-UFU ARIHIit(.IURL t 14u0ui4uuJ 1 uu� 1 u1 ipi I J1 L Greg Norman Golf Coune at La Quints RQUnNG SLIP • DFD Contact Tom Zandier, Hdan 514vnter DFU P901 ~Is JRFAX pages tinCL cover Aft -0 0 DE VEA ElMA1L or ❑ FED EX I:4%"4% Rowe & Club A Ndc / Greg ®ae3thart ❑ lJe>�gu 9,�tMweencafies - Hnaa►Rren, t� C1am& UdkW 76.135 Bl Paeeo, Ste 11. Palm Demt CA 9ZM CAM 396 -LVO / (760) 346-7981 FAX ❑ SWden Ingmsering 301.725 rand Lc:., Ste. G, rata. VeGOM CA gnu (760) 772- / 1760) 772,3896 FAX ❑ MD6 Cbds tier 79-799 Old A caw S4 The Bull mm Lt OAC44 Cal 923 (7601771-4013 / c/60) 771-4W3 FAX ❑ MuMUL Paid Kuchkx alsku M6 lack Koebw • 7170 8. WEW%ald Dr., Suite 6 Scottsdale, 85253 480 / 450422`.3M FAX Porn* K H"S, ASI A, Irm Fina Stevens 251! Newport Cater Dr Suft 104 Newport Bach, CA 926W (90) 719-M54 / (910) 719-056! FAX ❑ 1-ll3Y�t��fi1 Rarer 0760) X72.31x3 / C160) 772-0293 Scott Carlson 727! N.16th St., Ste U5, rhoenic, AZ &5M (002) 943.6609 / 963-6161 FAX 5w kwyAwu Dave W atatm 42.6 8. Saudwn Ave-, Stye. A, Tempe. AZ 85282 ( 1-5 M / (480)731.5.353 FAX EM ltF.Rysctas Frank Redmond A.xmxUus Kdlb Mc. ha 16415 F- buUm Sdwot Rd-, Phoenix, AZ 85016 (6U) 266-7393 / 266-1937 FAX CSA. ❑ Joey GaVOO,, Club Director 55.945 PGA West, La Qumra, CA 92253 (7601564-7105 / (760) 771-2823 Steve Auckland, SQPO TPC StadlusA Course • 7.&-811 Ave. 54,1A Quima, CA 9zM 760%V)% -8<t.41 /c e11760 -39'9 -1066/76Q -771-054e Fax Ma Bout l.'SM Ut Q %dntk CA 92253-25% ❑CwmwAty DM*MWA* DVrL chdsdine Di fade, Maul* Macaw . (76A1 777-7125 / t76M 777-= Fax ❑awwas & Swew DePk Mak Huo1a, Blas 4c safety me., (' w) 777-7019 / dived ('760)79R7M5 l (76t1) 777-7qf I Fax MU) OB88RVATION RVORTS N SHOP DRAWINGS ARCUTrBCTURAL DRAWINGS S ICIFICAVOMS APPUCATIONFDR FAYMEwr SC19OXMRS sus -01 r �r /• �L!/ may/ FOR YOUR UBS AS REQURSrED FOR YOUR .APMVA1. M FOR REVIOW 4c C'OMMhNT DAM Mar -31-00 10:34am From -DFD ARCHITECTURE 9 - TTA L 16029519603 T-669 P -02/U4 F-512 P A U L 9 K O E'H L F consulting structural engineers, Enc. .7170 E. McDonald Dxiv=,.S�4u:.5 - 922-"5-4 434�`9'?Z='373 DATE: - _ fl �t� - ,.,� TIME: TO; ATTN:�. FAX NO.: _ FROM. COMMENTS, l aclu da�g this ccver page, you Should have receWed a Mill of pages with this fiY. • x cu �r ci3i�m zP ;arding this fax, plva=s caH Tammy at 430022-3354. U - Mar -31-00 10:35am From -DFD ARCHITECTURE PAUL '# KOEMLER CONSUi.TiNG 31RUCTURAL ENGINEER'S. INC. f n n 16029579603 T-669 P.04/04 F-572 Job Name Job No. f o Sheefi Na. SiK3`'1 By � y A rreja. t�r+�xs�L 3 x 3 x 3j►c, x�%�,,,,�� �C1� �►the. �->�-fA� rICRam.'i y No _<q4L-Z Mar -31-00 10:35am From -DFD ARCHITECTURE 16020579603 f-668 P.U3/U4 F -5N lir-90-AO 10:18-im from -DFD ARCHITECTURE 1&x26579603 T-643 P 02l02 F -S1 Sim From. Ancrea Macs► (AMaCKUK51meli.comj Sent: vy. nesttay. Maven 29. =0 S_ 4 PM To: I3r;anS613F1D•Arcn Umf a.com StjAlpat: Pe, ti -hour +eparsuon wale QK. A;%O, witn regard to me neaaar in the cartbarr4 (ax8 Dvef ma 6' wiQ® DAB iV) NOW190 7 c*ep ny I- o wA%er %n center at seam tnr Lne ext sign an uta top of the neaaer 1 Delieve yey inmcaled SMO neaQ®r was Over5"QQ aRQ tnis w21s not a prooiem. wnen y0&.4 ware out in Rte field. 4 need-twnetning in writing for the inspeapr saying its OR. Please a4vise. { .. 4k etp - � ��-a N Ka'r� 1, t al � '$ -�A,w - � 5 ��e�'TA�I-�- • 0 JCM Inspections 39725 Garanti Lane Suite F [LIE" Palm Desert; CA 92211 INSPECTIONS Phone: 760 -345 -5554 -'Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS /✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD_Architects Paul Koehler Engineering Slump (inches): � , ,,,� SupplieF: • �= , r.��� V\A r Weather: Time Sampled: `\•• 1A Mix Design: 77 lAtml Time in Mixer (min.): I Specified Strength (PSI):,, Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: o Concrete Temperature (F): 1 Truck #: -- Ticket #: ® None r Ambient Air Temperature (F):. r Field ID Markin 1 ( g ' ).� ,t (\- See Below \\ \A Location of Sample: 'A C , , t—, > � t 1 � � � '! , •, n r , -T + , % { / I ` ,•, No Samples Taken 1 r Y �'� r r^ � .�."1! �n �..- n `••' � 1 ... (' "1S� � i'1 l • r `'1 � {� ❑ Description of Work Inspected: t��:) •, . s%\ ,�cr , �� r _ c �� ,, t �r .� Z V r, ie- `.+ - f,,1_, �'1(�_ s i , •F s c.»tgr en r `4�:r•+ .M�• Itt r ..r C• _ ^ f'r•�i 'kms.• '•fro r r• -„r t nrr^1) .6 ,�'1•f^ ! n �:fr,T i Ir :-�'i i.n er. `nr.ff f _ ^ -�^ r .\•P, 1 •\r^ �-, V� (7r - �,., ti �E \� �� �, c•, 't . r,,,t I t. QA E� - \ x V, li , J -! \(, 1 r, t 'moi, 4- /� , I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my abil'ty I have found his work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. /�% Inspector: Jack C. Millin EB,O'Certification No: 0842216-82 Contracior'r'eR/' ese ati e:% ^ r! / I Copy 1 JCM Inspections Copy 2 Project Superintendent „Copy 3Governing Agency Page of J_i `JCM Inspections 39725 Garand Lane Suite F Elm Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Date: Project Address: City: La Quinta, CA Title 24 AWS Q✓ UBC Other: File # D 1.1 App# D 1.4 Shop Other Field LAJ Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback Welding General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Description of Work Inspected: _ ,1 S` � rl !-'> rte, , 1 �� ,�., �u .1 l r Weather: r (n� ` Unreso_ived Items: ®None See Below e t' ± 1. \ t n, n t.)c n r r f A.•� i Process Welder Cert on File Electrode Detail(s) Weld Type Location/Comments Yes No Type Size 4 reby certify that I have inspected all of the above work, unless otherwise noted, and to the best of m �I have found this NY rk_to comply with the approved ns, specifications -applicable building laws. Final report issued at project completion. BO Certification #: 0842216-85 11ns',.!ector. Jack C. M7"t �� 0. C_ y AWS #: 95030691 D Contract6r's�Repr sentative/ �� i 7, Copy'JCM Inspections Copy 2 Project Superintendent r Copy 3 Governing Agency Page of Ehfi 39725 Gar'and Lane Suite F Palm Desert, CA 92211 0==L" INSPECTIONS Phone: 760-345-5554 -'Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Date: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS F✓ UBC Other: La Quinta, CA File # RD 1.1 App# ❑ D 1.4 ❑ Shop Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback Welding ❑Other � Field General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Weather: Description of Work Inspected: r r r , ^ e-_ nti i I. `� �'• �. n k tAa / ,/ Sjn *� ^ -�► 1 Unresolg Items: �! None , ❑ See Below . r•.�f\\ �`jQ, �i `�-/_ �v ..�,• • _ W m \. 6�� �„1 /!� ., .A. :...I �..ir 1 ren .1 / 1 f -� y\ Y,-1.,. j r ., c��n . - is �� �. X 1 •'1 r�r� � iM � � � V/C�P�•�./�/' P . �it % v �.. n ..S!'! r1 f•.{' i rf n ..w f l� / `e> 6 \.Rin ir/ C __ /��'.1 A r,,— 1. nqA,%) +-% rl. ..I `'J f (e.rt Cr)^ r' . •, A t. A , /' AF'. (/ ... ! 11ee ltal i•S, l O t r �r • �. iA k" 1. ri1. A -2,c i_r i • ,.r ` l ! �' v Cert on File Electrode Process Welder Detail(s) Weld Type Location/Comments Yes No Type Size. I n 1, dr r ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I ft e found this�47iuor to comply with the approved building laws. Final ns, specifications -applicable report issued at project completion. / Inspector: Jack C. Millin I•Certification #: 0842216-85 CBpr$ t Contractor/s Re entativel: ! AWS #: 95030691 f{ f- v _X r Copy 1 _JA Inspections Copy 2 Project Superintendent Copy 3/Governing Agency Page 4 of 4 KSL Desert Resorts, Inc. �i • 49-499 Eisenhower Drive Phone: 760-777-4855 tA n La Quinta, CA 92253 Fax: 760-771-4132�AR ~ ( 9,��Tq 13 RF�Q March 6, 2000 City of La Quinta 78-495 Calle Tampico PO Box 1504 —La Quinta, CA 92253- Attn: Danny Crawford Jr. Project: The Greg Norman Course Project #: 8P3160 E Re: Inspection Log Job #: Dear Mr. Crawford: • Thank you for taking the time to send the inspection log for the Clubhouse. It was an evaluation that did not live upp my standard, and I would suspect, not to yours either. I want to take this opportunity to apologize for the number of times you have had to come to the jobsite for inspection only to find that the conditions had not been met. I have met with all concerned parties and we have an understanding of the requirements. We did not mean you any disrespect. I believe it will not happen again, and will do everything I can to ensure that we are performing up to standard. Again, I apologize for the inconvenience and thank you for your patience. Sincerely, -�ACv( Andrea Merrill -M ck Project Manager CC: cc: Jeff Smith, Greg Burkhart Encl.P- ' , �,• nQ._ 191 0 03/30/00 14:39 FAX 760+771+4132 CONST HSL RESORT laO1 KSL Desert Resorts, Inc. 49-499 Eisenhower Driv . e done: 760-777-4$55 La Quinta, CA 92253 Fax: 760-771-4132 March 30, 2000 ! City of La Quinta 78-495 Calle Tampico PO Box 1504 i La Quinta, CA 92253 I Attn: Kirk Kirkland Project: The Greg Norman Course Project*: 8P3160 E Re: Temporary Certificate of Occupancy Job #: Dear Mr. Kirkland: 4.•_ I I I am writing to request that you consider approval of a temporary, certificate of occupancy for the Norman Clubhouse. We will not ask your indulgence in this until we have all life safety issues completed and have attained a substantial completion level. However, as we will not be able to get permanent power from IID until the end of April at the earliest, we would like to move our operations into the clubhouse, while providing power with a 24 hour generator. It is my expectation that we will be ready to move in on or about April 15th. i Please let me hear from youat your earliest convenience. I am available to meet with you at the City offices or the jobsite. Thanks for your assistance, and please contact me if you have questions at 777-4855. Sincerely, Andrea Merrill -Mock Project Manager . CC: Eric Affeldt, Daniel Crawford Encl. _ i March 30, 2000 78-495 CALLE TAMPICO — LA GIUINTA, CALIFORNIA 92253 - (760) 777-7000 FAX (760) 777-7101 TDD (760) 777-1227 KSL Desert Resorts, Inc. 49-499 Eisenhower Drive La Quinta, Ca., 92253 Attn: Ms. Andrea Merrill -Mock - Project Manager Project: The Greg Norman Course Club House Re: Occupancy Separation Wall Dear Ms. Merrill -Mock: An onsite inspection early March identified combustible wood framing penetrating the three hour occupancy separation wall at the (S-3) golf cart storage garage and the (A-3) foyer area. During that onsite inspection, early March, I had requested an architectural detail to address the wood framing penetrations at the occupancy separation wall. To date I have not receive the detail • to review. I have reviewed your faxed information for the use of the SpecSeal Pillows. It is our determination that the SpecSeal Pillows will not provide the minimum fire rated occupancy separation required at this location. The Building Official has determined and approved the following recommendation to address the minimum fire protection required between the S-3 and A-3 occupancies. The 1994 Uniform Building Code allows for a reduction of the approved plan three hour occupancy separation to a two hour occupancy separation (UBC 302.4 exception #1). The occupancy separation may occur at the girder truss located in the golf cart garage and to extend to the roof sheathing. The horizontal area between the girder truss and the masonry wall shall also be part of the two hour assembly. Two hour fire protection assemblies from the National Gypsum Company are provided to address the horizontal and vertical assembly construction required. I have reviewed the above recommendation with both the onsite superintendent and framing foreman this afternoon. If you have questions please call 777-7027, thank you. • Since ly, aniel . ZCraordr. Building Inspector 11 4 MAILING ADDRESS - P.O. BOX 1504 - LA OUINTA, CALIFORNIA 92253 ,, r ,_. DOUBLE LAYER 6 1 hr. FM W9-1 hr. (WP -147) GA WP 3341 7 2 hr. FM W8-2hr. 8 est. Based on 2 hr. FM W8-2 hr. (WP -360) GA • WP 4135 12' Fire -Shield G Wallboard or 1/2• Fire -Shield G Durasan laminated 45 to 1/4' gypsum sound deadening wallboard nailed to both sides 2 x 4 studs, spaced 16' o.c. 5/8' Fire -Shield Gypsum Wallboard base layer nail applied to 40 Two layers 5/8' Fire -Shield Gypsum Wallboard nailed one side to 50 2 x 4 wood studs, 16' o.c. Two layers other side screw applied to Gold Bond Resilient Furring channels spaced 24' o.c. NGC 2321 Based on IVGC 2363 ;r NGC 2368 GOLD BOND QUICK SELECTOR/GENERAL REFERENCE 9 �.. NOTES FOR USE OF QUICK SELECTOR Descriptions in the Quick Selector tables are resumes. For copies of T w The construction systems shown here are representative of the tests and/or for detailed information, consult your Gold Bond } many Gold Bond Drywall partitions and ceilings that are perfor- mance-verified by laboratory tests. For a Fire Resistance representative or local district sales office. KEY TO ABBREVIATIONS: ` given Rating.or Sound Isolation value, simply scan the appropriate columns. Design references by "Based U.L. - Underwriters Laboratories, Inc. nailed on both sides 2 x 4 wood studs, 16' o.c. prefixed on..." are extrap- olations from test data on similar assemblies. In all cases, the r O.S.U. - Building. Research Laboratories. FM W16A-1 hr. variation does not diminish its fire resistive qualities below its The Ohio State University ► assigned rating. F.M. - Factory Mutual Research Corporation _ `r In the drawings, in metal -stud partitions where insulation is shown GA. - Gypsum Association UL j- in half of the partition cavity, the insulation is required for sound O.C. - Owens -Coming Fiberglas Corp. ` = ratings only. Where shown across full cavity, insulation is nailed both sidesx 4 studs, 24' o.c.; -•� required for fire rating. (1�� by g Gei er & Hamme) FM ! In the following Quick Selector, Factory Mutual Design Numbers BBN - Bolt Beranek & Newman - { are the Construction Designations shown in the FM TL - Indicates tests for Gold Bond Building Products- - _ i "Specification Tested Products Guide." Numbers shown in A National Gypsum Division by Riverbank parentheses are FM Design Numbers shown in FM test reports Acoustical Laboratories !n A and on the Factory Mutual labels imprinted on Gold Bond Fire- Shield Wallboards. - - NGC - Gold Bond Building Products, A National - - -x K, . In the following listings, 5/8" Fire -Shield G Gypsum Wallboard may Gypsum Division I` WHI - Warnock -Hersey International, Inc. ` Based on be substituted for 5/8" Fire -Shield in all designs listed for 5/8";.+ ' Fire -Shield. 5/8' Fire -Shield G must be used in designs listed for U. of Cal.` 'University of California _' •, ` . 5/8° Fire -Shield G.� r ` - - ' _ PFS - PFS Corporation ,,: Resilient Furring Channel, spaced 24' o.c. one side only on 2 x 4 } , = ly Based on yam:...__..._4:.•c..::.�'.'-.....�-,.•.,.-.-•..: +.,.s..w--.....7� _..:.ttc-..ss. � --... .....--... >....wal i••:<,.« tr•�� rk.':nC'^^'e';. - . .. --... ,.. - � .. ,. s4 _• ��... -.. QUICK SELECTOR FOR SOUND AND FIRE RATED ASSEMBLIES W16A-1 hr. Wallboard or 5/8' Fire -Shield MR Board nailed direct to studs. Partitions/Wood Framing (load-bearing) GA No. Fire Rating Ref. Design No. - Description STC Test No. i • SINGLE LAYER:. 1 45 min4. UL U317 1/2' Fire -Shield G Gypsum Wallboard WHI 694-0200 5/8' Fire -Shield G Gypsum Wallboard, screw applied to Gold 50 nailed both sides 2 x 4 34 NGC 2161 ^ : : studs, 16' o.c. I FM W1-45 min. WP 3230 DOUBLE LAYER 6 1 hr. FM W9-1 hr. (WP -147) GA WP 3341 7 2 hr. FM W8-2hr. 8 est. Based on 2 hr. FM W8-2 hr. (WP -360) GA • WP 4135 12' Fire -Shield G Wallboard or 1/2• Fire -Shield G Durasan laminated 45 to 1/4' gypsum sound deadening wallboard nailed to both sides 2 x 4 studs, spaced 16' o.c. 5/8' Fire -Shield Gypsum Wallboard base layer nail applied to 40 Two layers 5/8' Fire -Shield Gypsum Wallboard nailed one side to 50 2 x 4 wood studs, 16' o.c. Two layers other side screw applied to Gold Bond Resilient Furring channels spaced 24' o.c. NGC 2321 Based on IVGC 2363 ;r NGC 2368 GOLD BOND QUICK SELECTOR/GENERAL REFERENCE 9 2 1 hr.UL - U305_ 5/8' Fire -Shield Gypsum Wallboard or Fire -Shield MR Board 35 NGC 2403 ` nailed on both sides 2 x 4 wood studs, 16' o.c. FM W16A-1 hr. GA WP 3605 _ `r I' 3 1 hr. - . UL U309- 5/8' Fire Shield Gypsum Wallboard or 5/8' Fire Shield MR Board,'38'.. Ix NGC2404 ` — nailed both sidesx 4 studs, 24' o.c.; -•� FM W16B-1hr. { GA WP 3510 _ :> = SINGLE LAYER (resilient) - -x 4 1 hr. UL Based on 5/8' Fire -Shield Gypsum Wallboard, screw applied to Gold Bond. 43 NGC 2367 U305 Resilient Furring Channel, spaced 24' o.c. one side only on 2 x 4 FM Based on studs spaced 16' o.c. Other side 5/8' Fire -Shield Gypsum W16A-1 hr. Wallboard or 5/8' Fire -Shield MR Board nailed direct to studs. GA WP 3605 5 1 hr. WHI 694-0200 5/8' Fire -Shield G Gypsum Wallboard, screw applied to Gold 50 Based on GA Based on Bond Resilient Furring Channel spaced 24' o.c. one side only, TL 77-138 WP 3230 on 2 x 4 studs spaced 24' o.c. Other side 5/8' Fire -Shield G Gypsum Wallboard screw attached direct to studs. 3' mineral wool (3 pcf) in stud cavity. DOUBLE LAYER 6 1 hr. FM W9-1 hr. (WP -147) GA WP 3341 7 2 hr. FM W8-2hr. 8 est. Based on 2 hr. FM W8-2 hr. (WP -360) GA • WP 4135 12' Fire -Shield G Wallboard or 1/2• Fire -Shield G Durasan laminated 45 to 1/4' gypsum sound deadening wallboard nailed to both sides 2 x 4 studs, spaced 16' o.c. 5/8' Fire -Shield Gypsum Wallboard base layer nail applied to 40 Two layers 5/8' Fire -Shield Gypsum Wallboard nailed one side to 50 2 x 4 wood studs, 16' o.c. Two layers other side screw applied to Gold Bond Resilient Furring channels spaced 24' o.c. NGC 2321 Based on IVGC 2363 ;r NGC 2368 GOLD BOND QUICK SELECTOR/GENERAL REFERENCE 9 NOTES FOR USE OF QUICK SELECTOR The construction systems shown here are representative of the many Gold Bond Drywall partitions and ceilings that are perfor- mance -verified by laboratory tests. For a given Fire Resistance Rating or Sound Isolation value, simply scan the appropriate columns. Design references prefixed by "Based on..." are extrap- olations from test data on similar assemblies. In all cases, the variation does not diminish its fire resistive qualities below its assigned rating. In the drawings, in metal -stud partitions where insulation is shown in half of the partition cavity, the insulation is required for sound ratings only. Where shown across full cavity, insulation is required for fire rating. In the following Quick Selector, Factory Mutual Design Numbers are the Construction Designations shown in the'FM "Specification Tested Products Guide." Numbers shown in parentheses are FM Design Numbers shown in FM test reports and on the Factory Mutual labels imprinted on Gold Bond Fire - Shield Wallboards. In the following listings, 5/8" Fire -Shield G Gypsum Wallboard may be substituted for 5/8" Fire -Shield in all designs listed for 5/8". - Fire -Shield. 5/8" Fire -Shield G must be used in designs listed for 5/8" Fire -Shield G. Descriptions in the Quick Selector tables are resumes. For copies of tests and/or for detailed information, consult your Gold Bond representative or local district sales office. KEY TO ABBREVIATIONS: U.L- Underwriters Laboratories, Inc. O.S.U.- Building Research Laboratories. The Ohio State University F.M. - Factory Mutual Research Corporation GA. - Gypsum Association O.C. - Owens-Corning Fiberglas Corp. (Tests by Geiger & Hamme) BBN - Bolt Beranek & Newman TL - Indicates tests for Gold Bond Building Products-, A National Gypsum Division by Riverbank Acoustical Laboratories NGC - Gold Bond Building Products, A National Gypsum Division WHI - Warnock -Hersey International, Inc. U. of Cal. - University of California PFS - PFS Corporation QUICK SELECTOR FOR SOUND AND FIRE RATED ASSEMBLIES .-. t.:. � :,;R„zia.. y i-.. :- '� '•'� I r. .. _ - ft - .. n � � Partitions/Wood Framing (load-bearing) ..7L .';• •r - QUICK SELECTOR FOR SOUND AND w 09250/GoL e No. fire Rating FIRE RATED ASSEMBLIES Design No. Description STC Test No. - - Buyline,lloo , ' GEN83AL FMFE;a" NOTES FOR USE OF QUICK SELECTOR The construction systems shown here are representative of the many Gold Bond Drywall partitions and ceilings that are perfor- mance -verified by laboratory tests. For a given Fire Resistance Rating or Sound Isolation value, simply scan the appropriate columns. Design references prefixed by "Based on..." are extrap- olations from test data on similar assemblies. In all cases, the variation does not diminish its fire resistive qualities below its assigned rating. In the drawings, in metal -stud partitions where insulation is shown in half of the partition cavity, the insulation is required for sound ratings only. Where shown across full cavity, insulation is required for fire rating. In the following Quick Selector, Factory Mutual Design Numbers are the Construction Designations shown in the'FM "Specification Tested Products Guide." Numbers shown in parentheses are FM Design Numbers shown in FM test reports and on the Factory Mutual labels imprinted on Gold Bond Fire - Shield Wallboards. In the following listings, 5/8" Fire -Shield G Gypsum Wallboard may be substituted for 5/8" Fire -Shield in all designs listed for 5/8". - Fire -Shield. 5/8" Fire -Shield G must be used in designs listed for 5/8" Fire -Shield G. Descriptions in the Quick Selector tables are resumes. For copies of tests and/or for detailed information, consult your Gold Bond representative or local district sales office. KEY TO ABBREVIATIONS: U.L- Underwriters Laboratories, Inc. O.S.U.- Building Research Laboratories. The Ohio State University F.M. - Factory Mutual Research Corporation GA. - Gypsum Association O.C. - Owens-Corning Fiberglas Corp. (Tests by Geiger & Hamme) BBN - Bolt Beranek & Newman TL - Indicates tests for Gold Bond Building Products-, A National Gypsum Division by Riverbank Acoustical Laboratories NGC - Gold Bond Building Products, A National Gypsum Division WHI - Warnock -Hersey International, Inc. U. of Cal. - University of California PFS - PFS Corporation QUICK SELECTOR FOR SOUND AND FIRE RATED ASSEMBLIES Partitions/Wood Framing (load-bearing) No. fire Rating Ref. Design No. Description STC Test No. SINGLE LAYER 1 45 min. UL U317 1/2' Fire -Shield G Gypsum Wallboard nailed both sides 2 x 4 34 NGC 2161 studs, 16' o.c. FM W1-45 min. 2 1 hr. UL _ U3O5 5/8' Fire -Shield Gypsum Wallboard or Fire -Shield MR Board 35 NGC 2403__. nailed on both sides 2 x 4 wood studs, 16' o.c. FM W16A-1 hr. GA WP 3605 - _ .3 1 hr. UL U3O9 5/8' Fire -Shield Gypsum Wallboard or 5/8' Fire -Shield MR Board 38. NGC 2404 nailed both sides 2 x 4 studs, 24' o.c.' FM W16B-1hr.- GA WP 3510 _ '3 SINGLE LAYER (resilient) 4 1 hr. UL Based on U3O5 5/8' Fire -Shield Gypsum Wallboard, screw applied to Gold Bond Resilient Furring Channel, spaced 24' o.c. one side only on 2 x 4 43 NGC 2367 FM Based on studs spaced 16' o.c. Other side 5/8' Fire -Shield Gypsum W16A-1. hr. Wallboard or 5/8' Fire -Shield MR Board nailed direct to studs. GA WP 3605 5 1 hr. WHI 694-0200 5/8' Fire -Shield G Gypsum Wallboard, screw applied to Gold 50 Based on GA Based on Bond Resilient Furring Channel spaced 24' o.c. one side only, TL 77-138 WP 3230 on 2 x 4 studs spaced 24' o.c. Other side 5/8' Fire -Shield G Gypsum Wallboard screw attached direct to studs. 3' mineral wool (3 pcf) in stud cavity. DOUBLE LAYER 6 1 hr. i FM W9-1 hr. 1/2' Fire -Shield G Wallboard or 1/2' Fire -Shield G Durasan laminated 45 NGC 2321 Y (WP -147) to 1/4' gypsum sound deadening wallboard nailed to both sides GA WP 3341 2 x 4 studs, spaced 16' o.c. 2 hr. FM W8-2hr. 5/8' Fire -Shield Gypsum Wallboard base layer nail applied to 40 Based on M, a _ _ _ - - _ . _ . _ GC 2363 — 8 est. Based on Two layers 5/8' Fire -Shield Gypsum Wallboard nailed one side to 50 NGC 2368 2 hr. i FM W8-2 hr. 2 x 4 wood studs, 16' o.c. Two layers other side screw applied to GA (WP 4135) Gold Bond Resilient Furring channels spaced 24' o.c. GOLD BOND QUICK SELECTOR/GENERAL REFERENCE 9 `" JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY • INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City:Title La Quinta, CA 24 AWS Q✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E..Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier*Qr f� � n 1 t c �1 �',t 11�-1�.-�i- ' Time Sampled: Mix Design: Time in Mixer (min.):nt ed Strength (PSI): � r�r•. Specified Water Added @ Jobsite (gals.): D,,r �� r� £ Addmixture: Concrete Temperature (F): Truck #: Ticket #: .— — Ambient Air Temperature (F): --- Field ID Marking: Weather: n�•. lA ri(ia ll Unresolve Items: d None E] See Below Location of Sample: _ _------- ,� © No Samples Taken i Description of Work Inspected: (PA �i , n `rI ,,, � t nlw(s � n "Tl a• fir.<r „r;�"' r`�. � � I t., rt'�.. a . C, r, .. 1�{ 1{ � -�., �--� .`� �-�` �1C� r.��.:T. f �� .(� i. ��\r_rc._ t.f�' �r� i—\��.• A �-- ���. �'� r ��!:rC,,. r..,rr'?'i Q tnit.. r^,.l�... -r-n�� ��'; •.rr- •.r �i' r;; firr:TnAxi el.•.I X1171 \-'c^. C.h\i;+ j: �• 11!'Je !POl'-��.i.wr ;'�,! r`.r r••`f'� Jr : i C I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability t have fdund-t is work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. /J In Jack C. Millin ICBG' ertification No: 0842216-82 Contrac %s.Represent ve: Copy 1 JCM 1 � v 1 pections Copy 2 Project Superintendent, Copy 3 Governing Agency Page of Copy_t�M Inspections Copy 2 Project Superintendent / ` Copy 3 Joverning Agency Page of 7 `JC,M Inspections 39725 Garand Lane Suite F -- Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT n •. �.�.r: Project Name: Project No: Date: Greg Norman Golf Course Clubhouse & Maintenance Building 99-8303 _o(o Project Address: City: Title 24 AWS 0✓ UBC Other: La Quinta, CA File # K] D 1.1 App# ❑ D 1.4 ❑ Shop Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback Welding Other Field General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Weather: Description of Work Inspected: _ Unresolved Items: ® None. ❑ See Below i -• 1 r. n ` t �^... r lC X"� in �� ,,.1/ l r'J 'T"tn.I �C' ^ T c r � n n ^ °" %� X c _. 1 •. -._ �. �1 `` �t /� 1 (� / / . "rt A�l�wr (Vie' l n., �.: •. nL � rx.rfrc� c.+_A xc 4-7, I-+. IA If C.� ` /l'r�.' "JI J'�' n r. it..l�C- i .fir r_ I 03 ti C%r.l 1 n r u. r 1 /:1 .r .. I r .•. � 'C-0 S E1 , n f'Y l.•.0 C` \� ,l )r -c r -..4 F "PI1 .r.•„ C dei_ 1•. , e C n , J t Fite Electrode Process Welder Detail(s) Weld Type Location/Comments , Yes No Type Size I r 1=-•. -,Ci . I,, . - .� r � /lie r t .I / 1 E 1., f .r•, o �� � f1flltre l � � V '•e•.k sem, ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of py ability, I have foun building laws. Final o comply with the approved ns, specifications -applicable report issued at project completion.�� / Inspector: Jack C. Millin ICB Certification #: 0842216-85 Contr cto siRensent�ati e r r AWS #: 95030691 Copy_t�M Inspections Copy 2 Project Superintendent / ` Copy 3 Joverning Agency Page of 7 J.Ga Inspections 39725:Garand Lane -Suite F _ Palm Desert, CA 92211 J INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta; CA Title 24 AWS [✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects. Paul Koehler Engineering Slump (inches): Supplier: r•.�r r. Time Sampled:r . w,= . Mix Design: r `� � j r'U � b'+ Time in Mixer (min.): I Specified Strength (PSI): ` Water Added @ Jobsite (gals.): v n ,i Addmixture: �. Concrete Temperature (F): Truck #: -^— Ticket #: ---^– Ambient Air Temperature (F): y Field ID Marking: Weather: StI,N01 l,)rJrP Unresolved items: Q None r� ❑ See Below Location of Sample: 1 ck� a C+ r 4 �\ r\ c e 5 C.L; r., n s,.\. \ r 4'' !; ❑ No Samples Taken i Description of Work Inspected: trr ��\< C_t°�1t.,\ n� r�,��.i� `?�`.��•'^'r,,\.,,. uY� .� .- � � r r „ r�cc=-�, 3f,- l.( ,r ���• kh+„�. '`` , t•^wC\��1 \.�+�. �r �ra�\.n\.C� 1 m1�!�. P.�9.\; i. c, , ,I)',5 Cr\V\ 1� \tic CnV a 1 ` ..`ice `1 - L1 ^\ � '"�i'.lt• �7r'��;.r�^S iX�'Xl^ �,\. �� �(AA. crnr.p•r f'..:;:n'1 1c S � ►..,f•r r a - _t , ��\ ! tA•i ( ISO rV r ya t I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability II have fou this work to comply with the approved ns, specifications _applicable building laws. Final report issued, at project completion. 7 / Inspector: Jack C. Millin IC.e -82 Cont�a�r''s"R pres�tative:i Copy I JCM Inspections Copy 2 Project Superintendent; J Copy 3 Governing Agency Page I of -- .JCM Inspections -- 39725 Garand Lane Suite F Palm Desert CA' 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: , La Quinta, CA Title 24 AWS R✓ UBC Other: File # ❑ D 1.1 App# F_� D 1.4 Other Client: Sub-Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD"Architects Paul Koehler Engineering Slurrmp (inches): Supplier:n 0 �,��c � vn � to kit Time Sampled: Mix Design: , Time in Mixer (min.): r,t r. c� Specified Strength (PSI):. j r�n a Water Added @ Jobsite (gals.): : Q e c c, y Addmixture: f1., , c- Concrete Temperature (F): .--- Truck #: "` Ticket #: �- Ambient Air Temperature (F): — Field ID Marking: Weather: -;u n;" 1, nr��� •J Unresolved Items: © None F-1See Below Location of Sample: �- _�� ® No Samples Taken Description of Work Inspected: 1 ter -�pR1nfci�v^ �1� �(. `� Wit. \��., .-� ..f n, 0 /'; r h_a C km 11 'r-.y./ � � t� � .-1 r. r Q. f.�'l i m �e A-^ t �,'7/� C!lr�.��`^� f 1 , r1 -nom All— 11,1 r- + \�� e,;e^4` �.�, n.�C,. �h�.,.•1�.. r-s•-�.r�e . G'�i•�n •-, nrr,,,,i rT t��nr.;�.� � ��i.e• _ ' d V hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my bility I have ou d this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. � Inspector: Jack C. Millin %CB10T,10ertification No: 0842216-82 Contract r'�s'RepresentLive: �' �� � Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page of F KSL Desert Resorts, Inc. 49-499 Eisenhower Drive Phone: 760-777-4855 La Quinta, CA 92253 Fax: 760-771-4132 &OJECT: The Greg Norman Course DATE: 3/20/00 TO: City of La Quinta 78-495 Calle Tampico PO Box 1504 La Quinta, CA 92253 ATTN: Danny Crawford Jr. TRANSMITTAL No. 00241 REF: Inspection reports Various inspections WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Letter 9 Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications ❑ Attached ❑ Returned for Corrections 9 Other: Inspection reports 0 Separate Cover Via: Hand delivery ❑ Due Date: ITEM NO. COPIES .DATE ITEM . NUMBER 1 8 3/20/00 REV. NO. DESCRIPTION. marks: Any questions please call Andrea Merrill Mock - 777 4855 CC: Expedition 0 Inspection reports from JCM Inspections dated 2/22/00 - 3/14/00 Signed: Andrea Merrill -Mock STATUS! Y. "'K;V4N-j ql" Sla4den Engineering 6782 Stanton Ave., Suite E, Buena Park, CA 90621 (562)'864-4121 (714) 523�0952 Fax (714) 523-1369 39V7,25 Garand Ln., Suite G, Palm Desert, CA 92211 (760) 772-3893 Fax (760) 772-3895 Date Job'No. FIELD MEMO _t Project Name Ak"-Iel Client: Site Address L 4 Job Phone, Work Done 4 Test Summary / Footings Inspected Test No. Location I 4� Elev. Dry Density Moist % % Relative Compaction Ref. Max pcf Moist % ? liz, C/ 5 A C15 "I Cc, I-1, 10-" k .212-4V(4 '5 Comments A) /Field �Tech. Super. or Agent V 24 hour notice requested to schedule Field Technician. Thank you for the opportunity to be of service. - JCMIns Lane 39725 Garand Larie Suite F _ Palm Desert, PA. 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS F/]UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): -- Supplier:r. }t 4 rrn �c iI: nl�t �� Time Sampled: ------- Mix Design: Time in Mixer (min.):,�—ter . I r� Specified Strength (PSI): Water Added @ Jobsite (gals.): �,�' � �s Addmixture: i1,a{ic Concrete Temperature (F): Truck #:...--. Ticket M "'-- r Ambient Air Temperature (F): Field ID Marking: Weather: Unresolved Items: © None See Below Location of.Sample: �-- - 0 No Samples Taken Description of Work Inspected: ` QLI .� epi\<en f. n ..� r". r n`r{ .J '• f I . i (1� •. •1, n R ..� �r�1� , G C (:-( �'iY V —'10-' y C11 k% e' , .{' C' }.� / Cr, t•. �l .i" l l v�f r•� b1 /1: , r ' fcfi C .[7 r . { r Y ' \-\ r' n .LLt`l. ' .1' f.'`. �. R 1r t� . �, r n .t C' l ' / e� ll f.. w (� f f ♦. /`. (.' ^ .+A t I n {�" 1 :1 r,{ '*..'Y lnf ems_ r f• � *" n I+e-.. ' f I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found thi -work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICB Certification No: 0842216-82 ' Contractor's"Repre,entat' Copy 1 JCM Inspections Copy 2 Project Superintendent Copy\3 Governing Agency Page / of a Insns 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 -'Fax- 760-772-3895 I, INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Greg Norman Golf Course Clubhouse & Maintenance Building Project No: 99-830 Project Address: City:Title La Quinta, CA 24 File # App# AWS ❑✓ UBC Other: ❑ D 1.1 ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: , Structural Engineer: KSL DFD.Architects Paul Koehler Engineering Slump (inches): Supplier: [� Time Sampled: Mix Design: --T j Time in Mixer (min.): �t , . I Specified Strength (PSI): Water Added @ Jobsite (gals.):_ Addmixture: Concrete Temperature (F): _ Truck #: Ticket M Ambient Air Temperature (F): Field ID Marking: Weather: s Unresolved Items: X❑ None See Below Location of Sample:,, No Samples Taken Description of Work Inspected: Snl.`\\� {�,r((''��r.1QfC ...�-.r ni+� '�,r:rn..r�� r�r � 1(•G��L �n..^�n.� ^.t^r•a.C..r�.l.� rt� i-1nc� l f',.>c.�rcLc. r..\ r.C'�.-.• �r���.� '�I .r���Cl_� (`,`'tl� �" �II7� li it%�_s_ C r•-�tTr;.�" ` A 1 I - i •.... _. 1.. .. �'n �i+ e+ J nye. �..n, (nlirr nr � � It. \C��ar;� t� r ��4'T• off..° n1 ' \�c� \ --`+ r13 1 l.` e el )XI, r. e P ',. . �.r • e: SG r'�1 r•' r n �T . hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I ave f y�r/ ns, specifications applicable building laws. Final report issued at project completion. %/J Inspector: Jack C. Millin lC'BO Certification No: 0842216-82 Contrac dr' e'/pr' s ` t tiv/e: i work to comply with the approved Copy 1 JCM Inspections Copy 2 Project Superintendent 6Co/y3 Governing Agency Page of JCM' Inspections - 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT. ' Date: _ oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS UBC Other: File # [__J D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc RobertE. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering - Slump (inches): f , X,, Supplier: �� Time Sampled: :; : r')ty� Mix Design: E c.1A Time in Mixer (min.): r) Specified Strength (PSI): 2 oo0 Water Added @ Jobsite (gals.): Addmixture: Concrete Temperature (F): Truck M Ticket #: ., - Ambient Air Temperature (F):Field ID Marking:" f Weather: Unresolved Items: None See Below . Location of Sample r, .- t�4L r „ • t r•.; r n —,_J2 -Q l.? ra No Samples Taken Description of Work Inspected:_ - w t.�1 . -•� . r o CkC �.:�.r w�¢ c� -moi+'-�'" j y .._p. /" J 1. Y'1p.�•- e- ..,-..'; .• �aY V f' t ter' -r . rr,k a. •�"�+ll ' 1-. i .r t��' �rA..L'Y' "6 �•• 'j 1111P.t.f i. Af l:. ('w�+�i.0 l�.. .i Yk 511!•I (-el fler rJ 1 �J9•.•r MrT eT�t"11 s �i^�c.'2....._ Jrli , 1vxri.C•..�c ._n-.. •,fi'-r_ n.•1_�.. L'r�f*(•:F:r't..0 1 Y f) 7 I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of m% ability I have.toun is-work/to!!l22omply with the approved ns, specifications _applicable building laws. Final report issued at project completion. / i� Inspector: Jack C. Millin ICBG Certification No: 0842216-82 c" Contractor's R /�4sent ive•0. V of Copy 1 JCM Inspections Copy 2 Project Superintendent Copy overning Agency Page —1 of INSPECTIONS JCM Inspections - 39725 Garand Lane Suite F Palm Desert, CA 92211 Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta,'CA• F]Title 24 AWS Q✓ UBC Other: File # F-1 D 1.1 App# D 1.4 QOther Client: KSL Desert Resorts, Inc Sub -Contractor: Robert E. Williams & Sons, Inc. General Contractor: KSL Architect: Structural Engineer: DFD Architects Paul Koehler Engineering Slump (inches): Time Sampled: -..:.a Time in Mixer (min.): Water Added @ Jobsite (gals.): Concrete Temperature (F): �-" Ambient Air Temperature (F): Supplier: � c cr,�� �. ham, :;LM„�:�z�-- Mix Design:�p!� t om. n r, '�v '{ Specified Strength (PSI): «/��� r ^ Addmixture: n Truck #;,. Ticket M ••.., . Field ID Marking; , Weather: t_i n cA 1, ,.w1'fr ht -, f Unresolved Items: None ❑ See Below 'Location of Sample: No Samples Taken Description of Work Inspected: k=A AX is C A -\ i I-. n f+. / � 'C � ALr.^ V_ 1 r , .. rC f' c .Y t�'�f"'• ��` 14 C `r rn'.r ri it _L eel � S► /.sem eS,11) 777- \ t r �. �.. Ct r A �,. G t ��If% �, t.r �: n n .,.. r- r+\ t . I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of myna, ility I have f nd/t i ork to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. // \) Inspector: Jack C. MillinCB,p Certification No: 0842216-82 n •,_ Contractor's'Rep es nta iv , - M Copy 1 JCM Inspections Copy 2 Project Superintendent (, / ` CoJ3/ `l r Governing Agency Page —4 of EPA I I N S P E C T I O� S �JCM Inspections39725 Garand Lane Suite F Palm Desert, CA 92211 Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Date: 3- 7 -1100 Project Address: City: La Quinta, CA Title 24 AWSFV UBC Other: File # © D 1.1 App# D 1.4 E] Shop � Field Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback WeldingQOther��,j General Contractor: KSL Architect: Structural Engineer: DFD:Architects Paul Koehler Engineering Description of Work Inspected: .n . Weather: Unresolved Items: None ❑ See Below Y rr c1 i � c �nr;r� C�-r n!' t'C"'uJ�C 1 �.st� R � 1 1 .•t�c�`o,.�� � i�' r /�. Ci �'�t � (l � :I-�'!',�. � \��.. 14 .d i l tin. �. MS ➢ i -, ire r. Q... a rC snr 1M�.. i^.�•� ", !J®f'.1:�1 C i�h�'DT P..a iilT9l=�1 Si s' t, _"ti(v,r . . 0Q.4 'S'Q.O 011 .. n n � -.4--. i v w. l.,.� S ns• /lLS.. �1 �,Or' Process Welder Cert on File Electrode Details) Weld Type Location/Comments Yes No Type Size' qSo� N yt�lt �A7 X 1C _ .` Ate.• �. ♦ , omply with the approved ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my abilityhave.found I77), ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification #: 0842216-85 AWS. #: 95030691 Contractor's `e reser} ativ, (( Copy 1 JCM Inspections Copy 2 Project Superintendent f C p 3 Gov4 ing Agency Page - of JCM Inspections - - 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT ject Name: Project No: Date: IGregg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24, AWS ❑✓ UBC Other: File # ® D 1.1 App# � D 1.4 Ej Shop Other Field Client: - Sub -Contractor: KSL Desert Resorts, Inc Law Steel General Contractor: Architect:. Structural Engineer: KSL DFD'Architects Paul Koehler Engineering Description of Work Inspected: r Weather: ( _ �, �= �. "� .. ��J nQ. �'i•. r i._..�?. ( unresolvId Items: None E]See Below ti Rh Q c n n.. n. [...- i rn(IN-1a% C.v�111 lr_l 01!. C \ __ _ f � 1 1 lei �lnl! x �`'\J �1� 4 e.• p 44 A A 7:o c- r.., _ ..•: e. lir. G r fJA F:. `clt� 19ud, T i �cc _ n J i f'. .. .. r r A 1 J �' Process Welder Cert on File Electrode Detail(s) Weld Type Location/Comments Yes No Type Size ,rte e" iR • w `` % "`,',jam • µ t A A^.- \ f� n \ �i�'i X71 /'�..n n Sol A "\ n'l Fi C e"'I..� 4 rJti •! ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to'eomply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification #: 0842216-85 AWS #: 95030691 Contractor's Represe tat*ve: 1 �� . Copy 1 JCM Inspections Copy 2 Project Superintendent f'' J// copy 3 (Gove4ing Age, ! Page of SCM' Inspections 39725 Garand Lane. Suite F _ - Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 -- INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Date: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 3 .."7 Project Address: City: La Quinta, CA Title 24 File # App# AWS UBC Other: WD 1.1 E] D 1.4 ❑ Shop [] Field Client: Sub -Contractor: , KSL Desert Resorts, Inc Saddleback WeldingOther General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering Description of Work Inspected: Weather: 6-JONI\� Unresolved Items: ® None ❑ See Below n Z c n ..-, C ►..'7< c J . J �c 1 ° 3 3. C, rfk C ( C r- Y L W0..4 fn� ld F'.`t; i&s' C.or�. 1 � 41 �' G...IeQ�.l �."i'ta 5 �w'7- � c..y .�._ , �\n��,�./ i �]C�S �A i" �, raC Sl `7.t• I' ,. e.��� � t�h:.i n r r^,, , 7 f e» 4 s i,' } - a Process Welder Cert on File Electrode Detail(s) Weld Type Location/Comments Yes No Type Size �Q�n NR�It I J-04 TTA ereby certify that I have inspected all of the above work, unless otherwise noted, and to the bestof my a�bility I have fou d hi work o comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin 116130,Certification #: 0842216-85 �QV\k�'AWS #: 95030691 Contra�or•'s ReprJe entativ Copy 1 JCM Inspections Copy 2 Project Superintendent /d Copy 3//Governing Agency Page of 39725 Inspections 5 GarandGaLane Suite F Palm Desert, CA 92211R_ ]--- -E" INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: 'Z oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS F/]UBC Other: File # , F-1 D 1.1 App# � D 1.4 E] Other Client: Sub -Contractor: 9,L"� C CIL, KSL Desert Resorts, Inc "Ro e6"' W tam's�&on ,'j�c �. �� General Contractor: Architect: Structural Engineer: . KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: Time Sampled: Mix Design: Time in Mixer (min.): Specified'Strength (PSI): Water Added @ Jobsite (gals.): -" `r Addmixture: Concrete Temperature (F): Truck M Ticket M Ambient Air Temperature (F): Field ID Marking: Weather: Unresolved Items:, None E& See Below Location of Sample: © No Samples Taken Description of Work Inspected: C7aC ♦ 1 ! �� c,�,t q� tic,! t�� 0 t �7 •e r'�.. Cw D Q �/, ° c' -.G 1 r��t� �: { ' " C. r _` C ii c� I .9 (1 Vi 1 i'� C V 1. t- •Sd :1+r7 ��� O /i n Cell kA \ O l� f?t r'1 7 F, -ti V �' °' 1. - \ `7 r' t„7 .'7 �1 � I' � NC. Y f :LYS. � r � (..%:r � I't'. �\ •.. C \ �A - C� ��.\S'C.1i'1 �1 �1�:)5 c�\ ��n�C r' ��pt,.),•1 C`�CC�.ti� n�S� �`�c�'Y\:.��Gr��ar hi.n Ct..)f'rC r'�'�l 3 itZr,, d A c7 e��e;w<. WC�ICfh A 001iC� �rOrn ��rl�(•14✓'[e L'-YI !�,:, I hereby certify that I have inspected all of -the above work, unless otherwise noted; and to the best of my abilityd have found Vis work to omply with a approved ns, specifications _applicable building laws. Final report issued at project completion. j Inspector: Jack C. Millin IBO Certification No: 0842216-82 Contractor s epr/ej/se tatiyei'r Copy 1 JCM Inspections Copy 2 Project Superintendent Copy V ming Agency Page of L h1 02/25/00 16:26 FAX 760+771+4132 CONST KSL RESORT Qj(11 i KSL Desert Resorts, Inc. TRANSMITTAL No. 00226 49-499 Eisenhower Drive Phone: 760-777-4855 La Quinta, CA 92253 Fax: 760-771-4132 PROJECT: The Greg Norman Course DATE: 2/25/00 TO: City of La Quinta REF: Structural Field Reports 78-495 Calle Tampico Norman Golf house PO Box 1504 La Quinta, CA 92253 ATTN: Danny Crawford Jr. WE ARE SENDING: SUBMITTED FOR, A M ON TAKEN: ❑ Shop DravAnip Am=yal ❑ Approved as Subrnittcd ❑ Letter ❑ Your Use ❑ Approved ss Noted ❑ Prints ❑ As Re uesied ❑ Returned Aftcr Loan ❑ Chane Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Retumcd ❑ Specifications ❑ Attached ❑ Retumed for Corrections Other. Field Report 0 Sepmte Cover Via: Faxed2/25/D0 ❑ Due Date: ITEM NO. COPIES DATE ITEM NUMBER REV. NO. DESCREMON STATUS 1 1 2/25/00 2/18/00 - Field Report from Paul Koehler Structtn'al Engineering Remarks: If you have any questions please give Andrea Merrill Mock a call at 760-777-4855. CC: Sigoed, j Andrea Merrill -Mock E.rCdjI1M B 1 I 02-25-00 17:20 RECEIVED FROM:760+771+4132 P.01 02/25/00 16:26 FAX 760+771+4132 CONST KSL RESORTp�U6 FER-25-00 FRI 12:26 PM PAULKOERLERENGINEERS FAX MOL 480 922 3739 F. 715/Ub Job Name • CONS • KQEHLER CONSULTING Job N4..'010-44 & Sheet No. AK87 I , STRUCTUPAL By I Date ' a� _ ENGINEERS. INC,4 1 " Vt� rv-c • M1'� .a ... i...1• T�I il•'1!.'r .fir-u�,-..Nwr x1_•rr .Ati�M...� �.. -. ..I � .., ..+ti-1`r.y •u..i�l�...�•��� • , ' •. I I I II ' ' 02-25-00 17:22 RECEIVED FROM:760+771+.4132 P-06 02/25/00 16:26 FAX 760+771+4132 CONST KSL RESORT- 07 FEB -25-00 FRI 1226 Fti MULKOEHLER]rIt[GIMEERS FAX M0. 480'822 3739 F. b/ub .fob NcimeC-32�w PAUL • i' OEHLER i CONSULTING Jab No. 9fo -Sheef No, STRUCTURAL By�6cS - Date o ENGINEERS, INC. i ij i�lGr�i �� Qf-Jt Z .{ . I to ' � j ; , GG it � s lI ' � - ` .I I i I' I - _ • i' If ---- ; -- - ---- - - --t j 02-25-00 17:22 RECEIVED FROM:760+771+4132 P.07 JCM Inspections -- 39725 Garand Lane Suite F Palm Desert, CA.92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Dater oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA E] Title 24 AWS Q✓ UBC Other: File # F-1 D 1.1 App# EJ D 1.4 F] Other - Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering Slump (inches): Supplier: �L r� r() b�. u ~,� Time Sampled: ! U j C, Q Mix Design: �� r If nL Time in Mixer (min.): rte..- Specified Strength (PSI):;�� Water Added @ Jobsite (gals:): t ' c Addmixture: n •R� Concrete Temperature (F): (o c Truck #:-1 r, Ticket #: - Ambient Air Temperature (F): (g S Field ID Marking: Ci z f f�-3 K X l �\ /�� Weather: id UnresolveItems: 4 None E] See Below Location of Sample: 7�, (S n C��� �~ tea/— L-1 E] No Samples Taken Description of Work Inspected: y�'ci" �r ;, , co A_ f 1' "1 n n\f. rr:.wr�e..\ •O't •ka ""{ C1 r- \ G(1 f.3a r••in ,\ Q11A of H , a ,-"�n .l.l mak' nl..�'r7rQ^�k\re,.. Act.F. �\ �c7utC 3+— �i , `, a S n �O'4� r.,. -'i. n. .—c 1 �, �.�. , r r _ ..?,-. -1- 1 _rk{ _A c•., l r:'r.. 3 J nom.. n V.L,iTnr^' We; /t .� � 4-1- �:,\,n'�.c.��•�. n....`�. ".. V , ...�1 t\i h� tt, c: Jam.! r` s M �\ � i : < a..�".,. �.. � !'d r,..i.., < ,n ,. �`, _ �� e C W � i • r�.r . o J 6 I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my abiLity�l have foun Iv=complythe approved ns, specifications _applicable building laws. Final report issued at project completion. / Inspector: Jack C. Millin ICBQ Certification No: 0842216-82 Contractor's,Reprreesentative' Copy 1 JCM Inspections Copy 2 Project Superintendent Copy J Zoverning Agency Page of r �i XM Inspections - 39725 Garand Lane Suite F Palm Desert, CA 92211 I -N S P E C T I O N S Phone: 760-345-5554 .- Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Date: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS ❑✓ UBC Other: File # X D 1.1 App# ❑ D 1.4 ❑ Shop ❑ Other g Field Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback Welding General Contractor: Architect: Structural Engineer: KSL DFD..Architects Paul Koehler Engineering Description of Work Inspected: Weather: \\ � ` �� t �a ' �r (A el I C I) Cm�u ar. s n [ c� llrY• C C1 �" WC('C qac c s ra Unresolved ltef K None ❑ Below Pt3(p See - ,. �C cbs Crlli C',�Ec• ,� s ' .�y., 11See �C'�or•e,+�cn rlQ., ail �0.• �tJ©Tt+� �%a f' il.�� ��:� �.. SSS >TC,�a� St'i;lw. 4�or a,� �. tse� .. awxs+✓e� �� Q (�l.�C./`�,�o(cin / AS l �•• 41 I1 W�� }7 cm 010tt 1 >14 t ! `("�"�/v� 1. V� IT11(c M., .» �r., CZ Okr� h Z \J,I +'.!? ,Q Ah / iDf' Q .-•-•• St- <1�i t ra `r a • }i t (C,[i t,J9 �. P /�1e4�r'�' C�rd.7yuC.�ta.�ll� f� �1 N..it��...W'Y 011 4 wr IrlYn ll.:s^, f)t.,V'l \_,% `l! TtNr w01of"14t Pl ""�• A,, t'_ \ � �!.•�.'� \ >1 F` l�nn� C� t^^�•'1 ir��rr i St��' � -E� �+4ral��l�t^ C\tl ! O.C�`Q� f � C✓1 ' ` U � �. '•�Z`F� � A5 s ! A �e' A3io Q rte.,? . .�\eC [ 'C Fane 1 •. c�,e1 Q � �Q�t.i �� (fly a',� C LJ C.`l�Y c.�± 1 C .O f f � r�. ' 61C:.c�i n.. H �s Q M`.:� 2� » re C... � 't � G / C. ��("✓� rr t k,`�+,.�.i�i. . , i. i A-�,r («Ao,, n �.�i•� .a.c �' ^Pali ii r. n) �... er-.��:4q^. 11"� <'�t. V a.�... J --• 14) Process Welder Cert on File Electrode Detail(s) Weld Type a tom• Locationikommenfs Yes I Nol Type . Size Sri � _`1Dlsb t T Ian c�A ; l� .,,pie._ ,14C.)S"UM uo�iyf ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my abil'ty have found this work to co I with the approved ns, specifications _applicable building laws. Fihal report issued at project completion. l Inspector: Jack C. Millin IC 'O Certification #: 0842216-85 r p G � AWS #: 95030691 Contractor's Repre`fen ative• 'l Copy 1 JCNMasp ions Copy 2 Project Superintendent ; Copy 3169v Hing Agency Page ! of JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 _ INSPECTIONS Phone: 760-345-5554 '- Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date_ C�D oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS ❑✓ UBC Other: File # F -I D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: , Structural Engineer: KSL DFD.`Architects Paul Koehler Engineering Slump (inches)�� nu Supplier:y� n �cma ' 1 `11 �� �l l'Z \ Time Sampled: Mix Design: `c,.�"�-t�\ ll � �,-, RC4 h� ,,�G l�� Time in Mixer (min.): F�,� , �� �S Specified Strength (PSI): ��� I Water. Added @ Jobsite (gals.): f� � Addmixture: �.�oc-cS, (lune_.. Concrete Temperature (F): �-� Truck #: Ticket #: Ambient Air Temperature (F): �,. Field ID Marking:- Weather: u n rNn"%C'Cc1- / � _� G� c Unresolved Items: >T.,,J None E] See Below Location of Sample:�� n \ r N t. \-,A— e�nt I � , L�-Ew✓i�1oC /2 ,R) No Samples Taken Description of Work Insppicted: '_ 044 1 c ... n c X ry 1 ., �' c s. l., e• �r eG1cS i I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my -ability I hav/ and this;fwerk- ply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin' IC 6` 6 tification No: 0842216-82 r� Contrac� is .. epres/1nnttaattive: I NJ Copy 1 JCM Inspections Copy 2 Project Superintendent( 7`CopV3G.verning Agency Page of J KSL Desert Resorts, Inc.TRANSMITTAL CITY Or -1_A 011INTA No. 00219 49-499 Eisenhower Drive Phone: 760-777-4855 FEB 2 4 RECD La Ouinta. CA 92253 Fax: 760-771-4132 PROJECT: The Greg Norman Course TO: City of La Quinta 78-495 Calle Tampico PO Box 1504 La Quinta, CA 92253 ATTN: Danny Crawford Jr. �DATE��2'/i 8%00 SAFETY REF: Inspection reports Greg Norman Clubhouse/ Maintenance Building WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Letter Rf Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications ❑ Attached ❑ Returned for Corrections Other: Inspection reports Ir Separate Cover Via: Mail ❑ Due Date: ITEM NO. -.COPIES DATE _ ITEM _ NUMBER _ - , REV. NO. DESCRIPTION _ STATUS 1 1 2/18/00 Inspection reports 2/9 - 2/18/00 from JCM Inspections marks: Any questions please call Andrea Merrill Mock 760 777 4855 CC: Expedition 1� u Signed: Andrea Merrill -Mock 02!25!00 16:26 FAX 760+771+4132 CONST I{SL RESORT FEB -25--00 FRI 12:21 PK PAULKOEHLERENGINEERS FAX N0. 489 922 3739 • PAUL - KOEHLER SiRUCTUP.& ENQNEM INC. 7170 E_ McDONALD ORIVIE • Split 6 - SC=TMALF AZ SM53 JUCZ p;N 0=4 FAX W7..j QZMM THE FQi1+ WNG WAS NOTM u:5 F. 4/Ub 4y� w AL �� ♦� 7 o f r i�� 1111111M Q;b -::,Ao ara m� 1�i�►�S Co "ixt "ICAL- Aaa� . • � �� r..a ..., �a of -rte St��,.,J � �a �-rrt�... Z�3 . � ►•+� � Fi � � 12 caws -ro .�.. 02-25-00 17:21 RECEIVED FROM:760+771+4132 P-05 pmm .I cnz C WREF %,A c!P Lh,3cA CA"VV IEW '70 A14 - oy P4 Jfi'rS,ID�i wT fit 4y� w AL �� ♦� 7 o f r i�� 1111111M Q;b -::,Ao ara m� 1�i�►�S Co "ixt "ICAL- Aaa� . • � �� r..a ..., �a of -rte St��,.,J � �a �-rrt�... Z�3 . � ►•+� � Fi � � 12 caws -ro .�.. 02-25-00 17:21 RECEIVED FROM:760+771+4132 P-05 02/25/00 16:26 FAX 760+771+4132 CONST KSL RESORT FEB -25-00 FRI 12:20 PM PAULKOERLERENGINEER3 FAX NOS. 480 922 3739 PAUL • KOEHLER emsuLING SlM/�ry .CTMAL .TMS, INC. 7170 F McDONALD DRIVE-- SUWTE 0 • SCOTTSOAI-,E. AZ &MM (460) =-awrr,, FAX (4t10 } SU-3nS 1`nzt reo 1NE ROLLOW4 WAS W;M 04 Y. 3/U6 F-ELD REPO 62-25-00 17:21 RECEIVED FR0M:760t771+4132 P-04 g0454o - M4�T 1+�1 tia►►.aC� +2-c �l .. SAI rte' 1� 7Ffi �x m CALAF. on.n�.olol o� iwr a� i ek-- fit 'WLU-al ^]s� • dr Aa! Phi Rt im a -[i ia►dnl l4...1� �-,J�J'T' I N � 62-25-00 17:21 RECEIVED FR0M:760t771+4132 P-04 AerfrT ER -C rlkali�G HiF66 Adm__ +►� . 1+�1 tia►►.aC� +2-c �l .. SAI rte' 1� 7Ffi �x m eM-", ONC�CYZ ek-- fit 'WLU-al a X16^ '� 1 � ��.l,Q'� ia►dnl l4...1� �-,J�J'T' I N � .,. ._._. . _, ...��_�'L, 'YRAVt P 3o a L l�dl•�- .C�zo�rti' ..5��"?RJ . T.k.S' IS ( j. +�i+s tig W4 uz3 .t pNP�-i C ea 1,a3►•vti1 — Ara[nQV 5 `T.. tJ _S aN S T11n� T73 _T"4 � "�1..� � ��t.'C�'r—� `�:�1^It?��.a �I�c_.....I..._..: �K?��3►.1r�—.. �a-���. A.a 1 �G.' �G71.�►r �L�6 .sb'4T 4) TT � ULAZ� `%n L/ 51 Y� l r, vc of J� l.r�ca 'rims 1 15 A.czWrAe.L.F,. Comm 62-25-00 17:21 RECEIVED FR0M:760t771+4132 P-04 02/25/00 16:26 FAX 760+771+4132 CONST RSL RESORT FEB--26-00'FRI 12.20 PN PAULKOEHLERENGINEERS FAX N0. 480 922 3739 PAUL • KOEHLER CONWL'MG 04ONMM NQ liM R l cnONALD ORNE - SUlW 8 SMTTSDAIE. A2 651.93 {de61 M-sw FAX (480)922 -Wag _�. 'ti;� ' ---- Th)F- FOLLO W4 WAS WT® Copf�S To 03 P. 2/06 F � E L D R- EF' -'O R T C ���1� yrCitJirs+rrl�,� ►M ,t J 51� ��r7 �r�](?1� ��? I l T1E TW nrC.��Ml � C>x�r-+ l T fee/� 'Ira d a AL 02-25-00 17:2® RECEIVED FROM:766+771+4132 P•03 �t,LJN� law -7bAW • e� pts r1Y9ur ♦T GM somsv I C ���1� yrCitJirs+rrl�,� ►M ,t J 51� ��r7 �r�](?1� ��? I l T1E TW nrC.��Ml � C>x�r-+ l T fee/� 'Ira d a AL 02-25-00 17:2® RECEIVED FROM:766+771+4132 P•03 • 0 02/25/00 16:26 FAX 760+771+4132 CONST KSL RESORT 2 FEB -25-00 FRI 12:19 PM PAULKOEHLEREHGINEERS FAX N0, 480 922 P39 r. ZJ1/Ub PAULaKOEHLER cDnsuSting structural engineers, ins. FAA 7170 E. McDonald Drivc. Suite 6 Scottsdale, AZ 8253 13hono: (480) 922-884 - F= (430) 922-3730 o0 TIME: ATTN: FAX NO.: lFWM: 5UBJF-CT: -7ep0 1's z COMIMENT5: Includin-this cavfir l)age,you should have received a tAtaal of pages with thisf me • For problems regarding this rax, please call Taimmy at 480-922-8$54, i 02-25-00 17:20 RECEIVED FROM:760+771+4132 P-02 • PAUL • KOEHLER CONSULTING STRUCTURAL ENGINEERS, INC. 7170 E. McDONALD DRIVE • SUITE 6 • SCOTTSDALE, AZ 85253 /6091 Q99 -RASA CAY mm o99-,rwo THE FOLLOMANG WAS NOTED FDEL DD REPORT UATi_ '�. C'] vCJ 7��/ 1 JOB tib. I] w � PROJECT (23c2vomJ Gosh C otes LOCATION (�q�►rJrA CauF. CONTRACTOR---� --- OWNER `- � —4 -- wEATNER Ca� a TEMP 1 O ° at AM PM at PRESENT AT STE 0SL`'� 1 '"�"� %A UIS►T �� r-�l 1• (eJ '('A;o� o • a. I CMI oF- vz:�>% tvr 47N"- TO Mkc: epa zW" C9t-Jr�,,X a& 7,-eTA1L ZSS 1T M Ac'-"CM-,171 TO Pi P,'- rani #� M tts olv sp+—e. S►l:�c I" Agn�-r tz ALLcf-j X02 :T- E Nmz-'-f - Y71 mol r Ci i�oST A � Csr�� aL,o�x S1R > 1 ".L / 1 - i l—, . - , . - . „ t1�2 ��,•�� � MAY `� 5��4�� w�T-s� Pt,��nor> IBJ �_. ��V I �►..�e� +� 7a� tic^�r- ;2.s t aS-r� � � cry t�►.a i,. d-4 P�1 err StI o� � oe�� ��rcS • C� ust-� �1�1c�L � �;✓�(Z- - n 5 10 %2 1 KI 1 ,jr. - 72-o-ot--1 , �� At,opiG e' -,2r n rr� 5 f,E cLe r 13�r ; � GJ S cyrJw3 i'`� -g-O c'i rar1 ®F C-,11zDg-Z = 1�Lt�SS tNa -100 Qr- "TPe AV till T'VMlt. Z(Vb . A, Hcv►Pie-r--.) COPIES TO C.O P) ri--) SIGNED 9 Vmf I �7 Lpi 0 c � NnJ CP o Z 0 Q CYl Z I` L a Z C Ili r • (a J4 Z O rn2 M 0 1 r i i 10 L L - CP ci 1 y � 91 I �7 Lpi 0 c � NnJ CP o Z 0 Q CYl Z I` L a 0 T ?j m cn m cnR cn II X0 r oym N N N OD En V N IDW Z C Ili r • (a J4 Z O rn2 M 0 n1 10 L L - CP 91 0 T ?j m cn m cnR cn II X0 r oym N N N OD En V N IDW Z C QLAQ ;o r • (a Z O rn2 S m S n1 10 L - CP 91 O �z n LJ PAUL ° KOEHLER CONSULTING STRUCTURAL ENGINEERS. INC. 7170 E. McDONALD DRIVE • SUITE 6 • SCOTTSDALE, AZ 85253 (480) 922-8854 FAX (480) 922-3739 PFD Agc—?f/i n THE FOLLOWING WAS NOTED F�ELD REPORT DATE JOB N0. PROSECT Nae+-�7 C Ca.�E =Anom LA- eptll .Nf - CONTRACTOR ke4-,L owilm 11:*L WATHIM 5 TEMP —7o ' at AM " ° • at PM PRFSENT AT STE JC F SMI Imo+ G� 3 �� 3 T2t.^, ��.,15p2.rD2 r-tA-�l tx� St�F�o�A "1stfd c(= i -E) . o i// c "rlo A w l�W. m C�nJ1MA�•1�� W I Ge�� c�c7� v"t� 4a�J TS v COPIES TO SIGNED 02/18/00 16:08 FAX 760+771+4132 PAUL • KOEHLER CONSULTING STRUCTURAL ENGINEERS, INC. CONST RSL RESORT 1@02 Job Namo:, pg 00,*,f+•) a Job No. Sheet No. By Date 2 i o a c�AST -- --- ter++ �,,,,,,�-,� • .. � 2 � , .: 1_. ; . _;. ` 1 �� �J ���:j�� ..._. JC Inspections 39725 Garand Lane Suite F _ Palm Desert, CA 92211N.M INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building . 99-830 Project Address: City: E]Title 24 AWS E✓ UBC Other: La Quinta, CA File # D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc' Robert E. Williams & Sons, Inc. ❑ Other General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering Slump (inches):.. C30 Supplier: Weather: Time Sampled: O,O pts Mix Design: Time in Mixer (min.): Cam Specified Strength (PSI): 11 Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: Concrete Temperature (F): � Truck #: t � Ticket #: ") you ��� None Ambient Air Temperature (F): Q Field ID Marking: , See Below Location of Sample: Q �.. .' jZ� ,: l J21\% Nln x i , .. !.t 41 E,• iT ( ❑ No Samples Taken Description of Work Inspected: r • v S p enrl C, 1 \ OJh , ,, C t f , R- r n, r. /1f .e e�. /1 t_ n f` (2 ((,�4J . to �r"in t!.. e- n1f Ai ` 5 n - ` C 1n C A, ra.i .. Ca: nr_ ..r\e\/. •r. �,. ..\ r f`,- i '._\ f n,iA,1 ,n,X•„n-' 1 ^n _ '• ' n . 9e9d\ e- n .!'J Com' C 0r�lJ �`:"1 J�.. �\ / •'a . P '' J ;.a f C. , 11 p J .. i.. c C _,i , e r (e n Cti ace- n r.. _\w rf'�`Ka f: �,1 `..e`U tz�ti •C �Y•�� C..1('.•a rC'. n �.�t`.. fE I Tr r 41 Im C �n. n .,CJ \,i....n' , 1•�r:,.J c.:, .�. .0 t ._.r•..'_y •� -- r �'\.aa: - :�.'rr r _ C fI`.� W ti r I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. s^7 A Inspector: Jack C. Millin ICBG e i ication No: 0842216-82 Contractor's Repr/e� e t i e• __ J Copy 1 JCM Inspections V Copy 2 . Project Superintendent Cq6/3 Governing Agency Page 4 of "JCMS Inspections 39725 Garand Lane Suite F _-I Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Faic: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: a_ I y_ oject Name. Project No: Greg Norman Golf Course Clubhouse& Maintenance Building, 99-830 Project Address: City:Title 24 AWS ❑✓ UBC Other: La Quinta, CA File # E]D 1.1 App# 0 D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc.Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Stump (inches):---- Supplier:0r Weather: .Time Sampled:. �— Mix Design: L �1 r r C « �� �JJ•^ t r Time in Mixer (min.):}r. r Specified Strength (PSI): Water Added @ Jobsite (gals.):!N , �, . , „k �� ^� ` c \ Addmixture: n .� Unresolved Items: Concrete Temperature (F): Truck #: Ticket #: None AmbientAirTemperature (F): – -- Field ID Marking: ❑ See Below Location of Sample: ��•�''--�� No Samples Taken Description of Work Inspected:��', rr �c ����cc • T" r,� a'/ t� n c C In(I� 11 C Ct r,,-, -Kray (.ra L. Jrl'1._n (+ ' (X -CC. �(r r r -w.. .:a.�'.� f r^ ri r a i C11 CC f +T I �' n ( 1 .`\lC'r'` rr'rn�^rt(C.l ,.�a�� rC �qrr r�r 1r+•II I1 �� �Li CJ� L1"� (•� ,j. • rNr,l^- v^,�•`�/. C�1CC.Kf''+r,`•ant {nr :r 4 C -..r U(�t+.' ^.. r1nr�' c,'lr•C•;_. �r�:.a\ G�(�rai i't .A ;iC�m�'F r,c.I T \i G r7 `. >i h S '•.�' , \\ `(,.'.. �. 1 F'F\l, C v . ,^ ! ti t »\ r, ) r1 {1 fnJ P S. '-..Ti , •• r n ..� r i G t c W "':tft_� /� r r. `` t1 C rr_ r /1,.-, l 1 =: r V [ �. e^ r .� 1 i �'rae n ' 1 r 4 •E ., �.) .. r r .•. : a.\ h r e_ ri`CSV, A4 , . Y:Q_ •+i•.� lam. J i`.^C- r \ ♦ ,.. 4 r �•+�. .'.`. - �' \T! ... l r. r r. �� I Ir i i.C' n hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved s, specifications _applicable building laws. Final report issued at project completion. Inspecto : Jack C. Millin ICB ertif(cation No: 0842216-82 Contractor's a%pres�e at' Copy 1 JC^_ M Inspections Copy 2 Project Superintendent 6C �y 3 0A Governing Agency Page __L of I CM Inspections 397255, Garand Lane Suite F Palm Desert, CA 92211 I_ INSPECTIONS Phone: 760-345-5554 - Fak: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City.: La Quinta, CA Title 24 AWS [7 UBC Other: File # D 1.1 App# ❑ D 1.4 QOther Client: Sub -Contractor: ' KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. + General Contractor: Architect: Structural Engineer: KSL DFD 'Architects Paul Koehler Engineering Slump (inches): Supplier: Time Sampled: Mix Design: Time in Mixer (min.): Specified Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: ' Concrete Temperature (F): Truck M. Ticket #: Ambient Air Temperature (F): Field ID Marking: Weather: by . , • , - St.i ry.�i. l . lr, r.• Unresolved Items: © None ❑ See Below Location of Sample: No Samples Taken Description of Work Inspected: �n r . � �� r l' . r'C� t 1...: � i _ - , � � r i .!'M .� ; i n... '1� f l� � � � " ! � (•r � , :�: -•� : i \,. Y" , �. . �.�^ c^.. Aim. -1.'I r`' )l..i ��.r r,-.\1 .-.�'^_ .��. _r., ,...vr-\1 Vim,\', '� . , •T -n "C'. ri) .,.r-� 1 (' \^ �a l r .. . •- r : '` i . • n `•1'r- ,,.r• 1 (_ :.�L t j`11 •�N t' ("_ i_ I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved S,specifications _applicable building laws. Final report issued at project completion. Inspector: Jack Millin ICBG Certification. ' o" 6-82 n, C/, X � Reretatve Contractor'sp,sy Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page of —4 KSL Desert Resorts, Inc. TRANSMITTAL .. No. 00213 49-499 Eisenhower Drive Phone: 760-777-4855 La Quinta, CA 92253 Fax: 760-771-4132 &OJECT: The Greg Norman Course DATE: 2/10/00 TO: City of La Quinta 78-495 Calle Tampico PO Box 1504 La Quinta, CA 92253 ATTN: Danny Crawford Jr. REF: Inspection Reports Greg Norman Clubhouse/ Maintenance Building WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as submitted ❑ Letter Rf Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications ❑ Attached ❑ Returned for Corrections Other: Inspection Reports Separate Cover Via: Hand delivered ID Due Date: ,ITEM NO. COPIES-DATE,ITEM _NUMBERREV._NO.ES _DCRIPTION_____ _ STATUS; 1 1 2/10/00 Inspection Reports - 12/20 thru 02/08/99 from JCM Inspection marks: Any questions please call Andrea Merrill Mock 760 777 4855 CC: Expedition 0 Signed: Andrea Merrill -Mock JCM'In'spectioris -- 39725 Garand Lane Suite F ..., Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Falk: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT. Date:a_!o_cc> roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS QUBC Other: File # F-1 D 1.1. App#. F_�D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc., General Contractor: Architect: Structural Engineer: KSL DFD;Architects Paul Koehler Engineering Slump (inches): ----w- Supplier: T-c� pt•c jolt •��C'�r Time Sampled: " Mix Design:—I,-wr Time in Mixer (min.)an,��:r�o r , (•(� Specified Strength (PSI): r (� Water Added @ Jobsite (gals.): A, Def r+,ctv^t�`�, S�cc.� , Addmixture: nit ,� ' Concrete Temperature (F): �- .:. Truck #: _...- Ticket #: -^ ""' Ambient Air Temperature (F): Field ID Marking: Weather: t��ir�2'r Unresolved Items: ® None ❑ See Below Location of Sample: -� No Samples Taken Description of Work Inspected: r° .� \���. C14 c 14 rmlfle,, Ct � 6 • � ��i S! CA Ot �•!S �C:� C��ti ✓l�C \ �<iS� '�. �I.76SC� CSC e�r . I.t� -c �\ c+• tt, r GC. n1C'.._ Gs � et' Cl. �a S' ��P S ��0� _� / o c.c -,c. f, .1r a t.c%rc_ C MdlrS '�;C�C CR e X^r; ., - C tetrl,nc i/nti7e � n a� 61n r n I 1 r -l.. 5 l� • 1-4c' Ci �.1- o / N+�' t4_ �' l i>G i :� J i \kc) uj. A . CM e -C C, �..� �•'�`i'C.�S � .c�rnT G.�iar'C.S�d.l ` y �Jr c�r� cn r.�or c P�• c1�'rr hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. , Inspector: Jack C. Millin ICBO Certification No: 0842216-82 Contractor's Rep'rese`ntative� Copy 1 JCM Inspections Copy 2 Project Superintendent f Copy 3 Governing Agency Page t of 1— 78-495 CALLS TAMPICO — LA OUINTA, CALIFORNIA 92253 - (760) 777-7000 FAX (760) 777-7101 TDD (760) 777-1227 February 9, 2000 Andrea Merrill -Mock KSL Desert Resorts Inc-. 49-499 Eisenhower Dr. La Quinta, CA., 92253 564-4111 x7492 RE: PGA West - Greg Norman Clubhouse Dear Ms. Merrill -Mock: This letter is being provided to address a continuing need to coordinate inspections onsite. The masonry contractor onsite has slot obtained city approval prior to grouting onsite masonry for the fourth time. I have had three prior verbal conversations with the foreman onsite (Dave), that the work shall remain accessible and exposed for inspection until approved by the City Inspector. I understand that there is a Special Inspector on site and would like to emphasize that the special inspector on site is addition to the required inspection not in lieu of. Per the 1994 Uniform Building Code, 108.1 "It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for the inspection. Neither the building official nor the jurisdiction shall be liable for expenses entailed in the removal or replacement of any material required to allow inspection." My intent in this letter is to identify a need to execute prior coordination and conununication for on site inspections. If you have any questions please call 777-7027. Thank you. Sincerely, i niel . Cra ord )r. Building Inspector H dpc cc: Kirk Kirkland; Senior Building Inspector File NAILING ADDRESS - P.O. BOX 1504 - LA QUINTA, CALIFORNIA 92253 - r Ga Inspections I 39725,Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS. [-71UBC Other: La Quinta, CA File # E] D 1.1 App# F-1 D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc. Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSU DFD Architects Paul Koehler Engineering �� Slump (inches): , p,.,:) Supplier: k C 4f' ¢ hN4 1, Ca r wT Weather: Time Sampled: I �.j Mix Design:` tt J •� Time in Mixer (min.): �n I e-r-t4� Specified Strength (PSI): I Water Added @ Jobsite (gals.): Addmixture: „n „ Unresolved Items: Concrete Temperature (F): v 911 Truck #:— r- .Ticket #: None Ambient Air Temperature (F):Field ID Marking: 1 }��(,(� ��� o See Below Location of Sample: A -, Wit, (I,_-% r,4Z, � 0( LI, ❑ No Samples Taken Description of Work Inspected: G, ..y►rr ,, r r 1 N._�' G Ce. O S t• „ tt. r A� c rut C.-W1.U1 �s ✓ r q.. ,ti 0 rH n q e ' Jt.OutSrS 1 C'N_'r^t..4 v C n�.(I i.-.r)e r.i'it'1 nl f c,� S'1rl� u G�C.0 S. ��S.v rsYr X 2'�IMOA C.,` A S' %tell, ra' Y �:sA= e n b •1 •II��. C GO u' P S r St. qK: \ "1 .ate,-� u\ V:)1 1 4 • c v�,� I k t� to 15 n. efh- •• 11 p r '� t a n AL, :\ r c_, iQC*r nk&3 { 10 (VAkf %it'l �U`'/lt fir.,, er- S L101 C'S M w� ri e <+. 1S r�. n 4 h� c es C tt C Arc. \• tGn C 0n: P r nr -•• � C c ` __ \ ' r n ,') IwT 1n .. r�F. \•� C�'` I �r+ \: �.JCt�-S � '7 C.\ C ri � .1 \_i� �� `.J� !1 c,. ct�� . o .. n .n �.. r-• w t nC 0. oIt O•w.1 .7 ( 4? lj nti. l t r hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of ability I have f id thi�erk� comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. /, / (/ / Inspector: Jack C. Millin ICBG C rtion No: 0842216-82 Contractors R �preserit tiver r• � � • r r Copy 1 JCM Inspections Copy 2 Project Superintendent I Copy 3 Governing Agency Page J of INSPECTIONS "JCM Inspections , 39725.Garand Lane Suite F Palm Desert CA 92211 Phone: 7607-345-5554 - Fax: 760-772-3895 J INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building • -" 99-830_ Date: '6 _ pc7 Project Address: City: La Quinta, CA Title 24 AWS File # D 1.1 App# E] D 1.4 Other F✓ UBC Other: Shop Field Client: Sub -Contractor: ' KSL Desert Resorts, Inc Saddleback Welding General Contractor: KSL Architect: Structural Engineer: " DFDArchitects Paul Koehler Engineering Description of Work Inspected: r„ � 1�V�.i r7 ted r �.� )� C)1CCr Weather: Unresolved Items: None See Below t, -l` , r1 {O Y: C�A.cc Vhf tC �nJ oV. A'c�.% TMJ Lk lti1 i . `f' r ") Mi Li tVVNU #N—, n { k of — 4. i rl 4 Cl 1i C) S Cr- r l% It, r r-, • � 1 h e». t Cc o cT ^ te.V.l1 R,k t %.00, , , 5 Nl:-1vo i n ry . 1 r 1 -':k C,i C G.G r n i \\.i7a4-1 C'/1.�.. \ACt 00h 411r' 17St •G �. C. )f` l�`C f�..7.7C' (lf rfl C. Q Process Welder Cert on File i Electrode Detail(s) Weld Type Location/Comments Yes No Type Size `l W 'SR .Sec ,, ai ( V.IiI G rlj�� �{ •- ,I0 r1 ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin Certification M 0842216-85 AWS M 95030691 Contractors re en iv V Copy 1 JCM Inspections Copy 2 Project Superintendent Copy /Governing Agency Page i of JC r ns ns 39725 Garand LaneLane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Datea roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA nTitle 24 AWS Q✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 ❑ Other Client: Sub -Contractor: ' KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD"Architects Paul Koehler Engineering Slump (inches):---- Supplier:( c p Time Sampled: Mix Design: • Time in Mixer (min.): � C, t�"v'. I Specified Strength (PSI): ' k� Water Added @ Jobsite (gals.):V�s r�R ,H�• S,Pct%• Addmixture: Y1L1�t.0 Concrete Temperature (F): _. Truck #: Ticket #: - Ambient Air Temperature (F): "'" Field ID Marking: ^ ^. ,, . Weather: .�.. QUCrCast �Uar,. Unresolved Items: None E] See Below Location of Sample: ' No Samples Taken Description of Work Inspected: ( O !Nvc) iZ� , li a < � �„( ; c-�a Q Vo C-Ahn 0��+ �<.�. 1�\\0l cvOk� We I C Oct Y 'r a U y -t _Jkr.-; taut I k mn 1 t �1a a.li 1�e a�•� . n�J�� Tr` t� , n 11ct t� Q, 0VAio rX, le \R ci`1 U, S C ou Ll - 9, c� S� CVc c'i<.�c�,r cc :.< (AX"A' 1I 1 SIO) . G S SCJ /v�/'' +z",.. C trnnUA �,\��'1r+•,.t ,C�AeY­ 'C..Ap:r..iC' .St%(e.. _\�'e Aa cth,r _N 4 @ y. X Is • cntir r• s '— �0 lkr- P \c ILCmC2 b '�1.1. Co 141 e, AA eon rr.�C v SwQ c�on'n * '-.1 . hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications applicable building laws. Final report issued at project completion. Inspector: J ck C. Millin ICBG C Ffication'No: 0842216-82 Contractor`' -R- en trve� Copy 1 JCM Inspections Copy 2 Project Superintendent( C (y 3 Governing Agency Page of JCM, Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: 4,_3- oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA F -] Title 24 AWS F,/]UBC Other: File # F_� D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier:, (fir c r, �f e \^c1i yl �� Time Sampled: Mix Design: '- Time in Mixer (min.): r1 O r c ", t Specified Strength (PSI):. 1 �jnr7 Water Added@ Jobsite(gals.):Rapor �, �J.c.ccAddmixture: Concrete Temperature (F): Truck #: �> Ticket #: Ambient Air Temperature (F): Field ID Marking: . Weather: Unresolved Items: None ❑ See Below Location of Sample: ® No Samples Taken l� t Description of Work Inspected:,�•- \ 11 a ti 1J 1�� J,nce r,c.,C a� S X 8 X 1 b sd . na C MU4,.cs t` ca•t,rrsc� \ Q G1 \ f rO Z G C.0 V" P:1V b'tet ve-r- C.Q 0, S 0 4P%A f9 r f`pn r. � � S td •F 4 4- Cr' l.J rte. v .S—,_0 c,c !c5� • � l`, S� c-• e� t' e��'•.�co c c..e. r, r....' q_S. �� r c*X"c: � (r D I C:>5 t.J �J I E7 � � ;;� tai '\ CA � r n � f9 C. tJts\� a f_')(. � �c_tCc� r"r nc �•o� � r�r�c_ 5('z•c .� Ccc_,�� r.., tn� n. r. '' 1 c Cl 1 4.. cr�r��uli:l� "0 1�e Jac-.Ya1 cC.O l �T 1 ok_v Itz ocicQS k P .. Seo �. C,c+q- _ I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin IgBq Certification No: 0842216-82 41 Contract r' Re res afive Copy 1 JCM Inspections V l Copy 2 Project Superintendent 3 #dopy 0 � Governing Agency Page _J of JCM Inspections 39725 Garand Lane Suite F _- Palm Desert, CA 92211 _ INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: _ 0 roject Name:. , Project No: Greg Norman Golf Course Clubhouse & Maintenance Building: 99-830 Project Address: City:Title 24 AWS UBC Other: La Quinta, CA File # F-1 D 1.1 App# F_� D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): �� Supplier: ��up,c,r; Weather: Time Sampled: ;t I Li C C$K' , , Mix Design: Time in Mixer (min.): C�� Specified Strength (PSI): ^n Water Added @ Jobsite (gals.): Addmixture: �o'7_:Z_... 3�. Unresolved Items: " .�,I, '_ Concrete Temperature (F): Truck #: Lt �� Ticket #: ""� x(03 p 'I`t ^. . + None %';: i,Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample:F E] No Samples Taken s Description of Work Inspected: c-. it j _ c i.�� CMU �A r,Oe: f�"�'1 �s �17 ­- 011 -VI n 61 6 -P .. 1 n Jnr, l .'l_p T 47 C' Nl l (. -L `..,:. nem," �n ,r ,� ti Fir An' f 1.i r M 1/ C,n)Qll4 N.�/• If_,% 0 4X (T I.)( CVc' 1� m. rn cli "l -C 1 r n i. t, t., r / n n•-� ,�CS`i h lJl. ��. ( nckS. '1 I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I.have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG ertification No: 0842216-82 Contractors '.r sent ve: 0 C. ( ,' Copy 1 JCM Inspections Copy 2 Project. Superintendent LN Governing Agency Page J_ of JC n§ Lanris 39725 Garandr e Lane Suite F Palm, Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA E]Title 24 AWS ❑✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 ❑ Other Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering '1 Slump (inches): `i �� Supplier: �L� •F f,) , Time Sampled:1�,,.,, Il , t♦ a �` Mix Design: 7.�+ Time in Mixer (min.): $r � Specified Strength (PSI):, Water Added @ Jobsite (gals.): Addmizture: Tl�jt10 Concrete Temperature (F): Truck #: Ticket #: L4 c�r fArnbient Air Temperature (F): � Field ID Marking: sr- i to (�' �. Ct{ Weather: 111 � + 11 Y Unresolved Items: 0 None See Below Location of,Sample: `i`f lr�<.n n r u %.b�r,\.'.?.,i ❑ No Samples Taken Description of Work Inspected: V �� ` SNA t , rr�r1±S-�:, ♦1/,!, f ^ �'• 'T,nR- (� 'r'/iA 'fr�.n�:P ('t� (rn9. -�t'1 r�.`t ` (� 1 `vC• C' � C ('1 r 1 . A re v"' i� f7,` 1 v� "`\ w t All �f"�C� Y•�(4 f, //1" nt) -. :" l C'C' L'1 ,n� r \ 1 f� r ♦ )..�.L 1 rI1 C.�'t AO Pete\.° iT [<, t7 1A I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack sp C. Millin I yC�B0,0e tification No: 0842216-80 Contractor's a ;r se • to er 1. C'. 4t�� -�--• ✓ 1 ,•: Copy I JCM Inspections ! � / `1 ' Copy 2 Project Superintendent Copy 3 Governing Agency Page of - - INSPECTIONS JCM�Irispections 39725 Garalid:Lane Suite F Palm Desert, CA 92211 Phone: 760-345-5554 - Fax: 760-772-3895 �Em INSPECTIONS WELDING INSPECTION REPORT - Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Date: Project Address:ti City: La Quinta, CA E]Title 24• AWS File # D 1.1 App# MD1.4 E] Other ❑✓ UBC Other: ❑ Shop Field Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback Welding General Contractor: KSL Architect: Structural Engineer: DFD Architects Paul Koehler Engineering Description of Work Inspected: 1 t �,r-i A- 1 r :>PAA" Weather: Unresol Items: ®None See Below fin L � `c t (� ( c \ � 'Lt A �. U \k •V1 i2 el �C el _ r' n : /i ca . T '(' .•� ` ..� 1 r. 'T F� e��+}S-� rc"1 .t i� 6 C. P S/' C1 / t - \ T ` - 'b f' St-� a - r- r.'F�1 rC. n Op A t• ra G Process Cert on File Electrode Detail(s) Weld Type Location/Comments Yes No Type Size eWelder r` 11Fu i 1104 ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin C • ICB certification #: 0842216-85 .i AWS #: 95030691 Contractor's,? Contractor's,Re 771z to e:% ..._J C/C�py V3Governing \J tCopy 1 JCM Inspections Copy 2 Project Superintendent Agency Page _)_ of L - . ns nens 39725 Garand Lane - Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 = Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: '0 roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS F✓ UBC Other: File # ❑ D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: r. Structural Engineer: KSL DFD:Architects Paul Koehler Engineering Slump (inches): C(• coq Supplier: QCL �''e ;,e �f cz- 1x �/^ Time Sampled:., t ; Mix Design: :Dr rLf C:a t Time in Mixer (min.): Specified Strength (PSI):G1 7 Water Added @ Jobsite (gals.):Addmixture: ��d MG 5�e�:�• nr 11G Concrete Temperature (F): C:) Truck #: .— - Ticket #: T Ambient Air Temperature (F): 1 Field ID Marking: S4 -A 7-" Y3 Y, Weather: c Jl.t.'tne Unresolved Items: © None See Below Location of Sample: �r �\ k, -n' — Wr-- �,s�\; �� e c s "-:, ?p' (�. r.�- �C� �r r'.. ❑ No Samples Taken Description of Work Inspected:' ", L_' c I,,r , .^• ..n.. -�f..•.� �;• Sti,:� n � � A � �f+ct• 1 1 " �n Q f +� P y��r .1. 6 -- F1, ?N e)( C- 1 I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Ins pecto Jack C. Millin IC.B - -Certification No: 0842216-82 •' Contracto 9s 4 s �t tiv y. Copy 1 JCM Inspections Copy 2 Project SuperintendentCopy 3 Governing Agency Page of JGM Inspections 39725 Garanti lane Suite F IL Palm Desert, CA 92211i== L" INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: • La Quintal, CA Title 24 AWS F✓ UBC Other: File # D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering 4 Slump (inches): Supplier: Time Sampled: Mix Design: Time in Mixer (min.): Specified Strength (PSI): Water Added. @ Jobsite (gals.): Addmixture: Concrete Temperature (F): Truck #: Ticket #: Ambient -Air Temperature (F): Field ID Marking: Weather: Unresolved Items: x❑ None See Below Location of Sample: ® No Samples Taken Description of Work Inspected: e ,r — r -c i; Cn t c, , W q,Ce : o Yr.") , t n 1 �; .tt. C,&M, pa), S r A" e� 1� i f C �,C „ e— 11 40, i— ccC /�� •�'Cc'+•G+ \ iC n ec. •'�-r.. i e e� 64I in e.�f \- CAlf•� O r1 'Z"ea of �4 t �S TJ C7 c T cN t 1'G f l 1 q' � - C 1�1c�S e CA n rc� ,. ,.. . r+r "Al -A 1 CC I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin I O r ertification No: 0842216-80 C_ Contractor5s,e ese t five: 4 ✓' Copy I JCM Inspections Copy 2 Project Superintendent vpy 3 Z& Governing Agency Page _J of . 5 Ga Iri§ Lane 39725 Garand Lane Suite F El"4 PalmDesert;CA 92211i_ INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 I N S P E C T I O N S STRUCTURAL MASONRY INSPECTION REPORT..:_, Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA []Title 24 AWS f✓ UBC Other: File # ❑ D 1.1 APp# ❑ D 1.4 Other Client: Sub -Contractor: ' KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering j Slump (inches):--�----- Supplier: iJ.r• raj , f e. h'1�-�,�, �\o Time Sampled: .---------.- Mix Design: Time in Mixer (min.): . ) Specified Strength (PSI): Water Added @ Jobsite (gals.): �•� ; r.� Addmixture: t.�,�� Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature, (F). .----1' Field ID Marking: Weather: l cn A ae Unresolved Items: None See Below Location of Sample: No Samples Taken Description of Work Inspected: C(n- r+r c., 1k.�-`tl ^ �� �1t*lr s•� `J a �n�i �\ f�i Tc(l f �' 1 "ST'S c] +. h• a+1 r - r. J F I 1 (� C:.0 1'^c __ i" tar �r-{" Cl•.l4. 01� ii �r+.�� w••�.� I - CXt1,1 V( C6 k k k' V 1Va f�A'1 6k c A, Ait r"' ' �^' J ('� �.-' �Pf..��• �.�?fr . .., � n' _ cs-N C' eS n•,nr c:r ��t� C"�f?�.if�� � � .� : �, t- �- at:� c � „-, �..R •e r : , ` f+ � n J p e : b-�', � c e R��.' � � r r• r r r .e . c p I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. + Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contrac orsffpr se ti e: ___j Copy 1 JCM Inspections Copy 2 Project Superintendent I Copy 3 u Governing Agency Page J of _V XMInispebtiphs 39725,Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554'- Fax: 760-772-3895 IF"n INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Greg Norman Golf Course. Clubhouse & Maintenance Building Project No: 99-830 Project Address: City: La Quinta, CA Title 24 File # App# AWS UBC Other: F-1 D 1.1 F-] D 1.4 E] Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD'Architects ' Paul Koehler Engineering Slump (inches): Supplier,( Ct, XI c Vh;'7 jet Time Sampled: — -,-- Mix Design: "t', O� a �'�1 e— .. Time in Mixer min.): Specified Strength (PSI),: �`1n , � g ) ( ' � �[]Q Water Added @ Jobsite (gals.): R S �rC f`�T�i� r-%, Addmixture: p,� (te Concrete Temperature (F): Truck #: -"�' Ticket #: "' —" Ambient Air Temperature (F): "rr Field ID Marking: e_ Weather: SGYin t ` Unresolved Items: None E] See Below Location of Sample: © No Samples Taken Description of Work Inspected: ��-� t'4 <. 7. -,f r�t.A c nw i Z.\ r l4r•, -�-o (� Li C.S r,+A � Cl�f S th a"� y ��i( V•' �'1C C�"'L'nl�! �'.�'� Rf �Cn [' �' (` O, i` C S 1 'G.4 4%� �LG.Y'l �' �. < tai iCr (. .(1 f". �`,� (r_ � a � 17 1 t.] rr^> ' r' A nt c S W �' C C �'�t+ D\ �l <'' Ci • � � A . 1 I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin r ICBG C iKation No: 0842216-82 Contractor's ere-s/ee ' ati e� Copy 1 JCM Inspections - Copy 2 Project Superintendent C'C\OJPYVGoverning Agency Page Jof JCM Inspections,- 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 = Fax:160-772-3895 INSPECTIONS MASONRY INSPECTION REPORT . Date: c oject Name: Project No: lojecSTRUCTURAL reg Norman Golf Course Clubhouse & Maintenance Building 99-830 tAddress: City: La Quinta, CA Title 24 AWS F,/, UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 E]Other Client: Sub -Contra_ ctor: ' KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD•Architects Paul Koehler Engineering Slump (inches): ..- Supplier: �,,,. or�.a �Mix`�1�nc Time Sampled: Mix Design: ---I— � Time in Mixer (min.):Specified Strength (PSI): r Water Added Jobsite als.: @ (9 ) �� m� Mnnt,�. st�ac y Addmixture: e Concrete Temperature (F): \ Truck #: --- Ticket #:•--•--'• Ambient Air Temperature (F): ^ ^---- Field ID Marking: --- --- Weather: Unresolved Items: None ❑ See Below Location of Sample: ® No Samples Taken Description of Work Inspected: n AXC- .n-it�c� c1 nr tee., Qk -C 1r, O', ' A r G 14L M14 a of r ({i �f . � I J>LJ C�� v �.S � � l C1 '�"i' �O . r,.•' c B�_ G 6 a ff I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications. -applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICB ertification No: 0842216-82 Contractor's,p en ve: Copy 1 JCM Inspections Copy 2 Project Superintendent Cop �3 Governing Agency Page 401 ` JCM' Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 _ INSPECTIONS Phone: 760-345-5554 - Fix: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA OTitle 24 AWS ❑✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams ,& Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD' Architects Paul Koehler Engineering Slump (inches): Supplier: (71 r- c.,-%Qr c J'A, + �R car Time Sampled: _..... ,_ Mix Design: Time in Mixer (min.):� r '. Specified Strength (PSI): 1 rl i I Water Added @ Jobsite (gals.): h� r, ann :��?t.: Addmixture: n ,� Concrete Temperature (F): —'-" Truck #: --- Ticket M ----�_ Ambient Air Temperature (F): Field ID Marking: Weather: i n rit r . Unresolved Items: �! None See Below Location of Sample: !- No Samples Taken Description of Work Inspected:�(:� e c nC . �nccrwe.T 8 X L C's �, 1�� and C C r.41r. �n�g rc��ur�\,-,S -'tn� a�(C`�'�<>> w�! tai ,V�. o�llL;� b c_o�c�� �-(/ • C.�1 rCC.M^.. T, Dir I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report.issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contractors ep ese ta iv Copy 1 JCM Inspections Copy.2 Project Superintendent ! if I LCo/' Governing Agency Page 4 of M Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page J of JCM Inspections 39725 Garand Lane Suite F is, Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS Q✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# E] D 1.4 Client: Sub-Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. E]Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: Weather: O V C'ltc� Time Sampled: Mix Des' War vim.► Time in Mixer (min.):pest ied Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: Concrete Temperature (F): Truck #: Ticket #: None Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample: ►� eo �,a, No Samples Taken ascription of Work Inspected: v �" 4 G, �. i 12) < < B i` reby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my abi ity have found this work t c mply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin IC O 'fication No: 0842216-80 Contrac is R re en ive: 1 M Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page J of 4 INSPECTIONS )CM Gran Inspections 39725•Garand Lane Suite F Palm Desert, CA 92211 Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Date: Project Address: City: La Quinta, CA RTitle 24 AWS File # YD 1.1 App# D 1.4 Other R✓ UBC Other: Shop Field Client: Sub -Contractor: KSL Desert Resorts, Inc Law Steel General Contractor: KSL Architect: Structural Engineer: DFD 'Architects Paul Koehler Engineering Description of Work Inspected: Weather: 14 c --r nnh U UnresolVdd% Items: a None See Below A � t_ O Q S' �. i �n r\rN01 -41 ' (�(� Al;El r .,. i�' 7�Al t r n n\ ni LC P n TCt G 1 q /d1) CQJ✓ Process Welder Cert on File Electrode Detail(s) Weld Type Location/Comments Yes No Type Size 7 -Ar cS "i{R��nmyny ( �i1`e L. C.mr- • �� gjt�sG •1 der ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICB Certification #: 0842216-85 AWS #: 95030691 Contractor's Rep esee ran1 I At tti .� �r / f J( Copy 1�JCM Inspections Copy 2 Project Superintendent { �� Copy %3' Governing Agency Page 4 of 4— `JCM Inspections . -- 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: _ o� roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA []Title 24 AWS r✓ UBC Other: File # F� D 1.1 App# F� D 1.4 Other Client: Sub-Coritractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: i KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier:;i�f Time Sampled: Mix Design: ,r Time in Mixer (min.): M e, _Q'- : Irl Specified Strength (PSI): v Water Added @ Jobsite (gals.): ac Addmixture: Concrete Temperature (F): - Truck #: Ticket #: Ambient Air Temperature (F): --..� Field ID. Marking: - Weather: 4 le. Unresolved Items: ® None See Below Location of Sample: No Samples Taken Description of Work Inspected: l "iC+ •�`el ttC.. f.,�'ty't O '0b �A, r%:r«�.e C , Q.\'1. 1. 1v/,1 ,� T er^`A. tf;•a_.. I�''s('� tl'`w1��%,� \T. , r ` 3'.. t.lr rG%u\lA �1��1 Go\(.1�I.A_'<1oa<'Sc>cn /J.� tn� %l� V 1 C T•a r` �/�,. `f�C C+..�1M f „ 1 es � 4'�Q... , ` fn r.� f S'� '�a.,, ! n n r C C, C? !`T^ .A t a r f. c C. t.. a.) fk.. S I / c �✓ ne �i A Q\-3It C'% (� iAr nel: O C," lc`rtns IcrOS C6fl. "r hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Certification No: 0842216-82 �w Contractor,srR resentativ . V\/((z Copy 1 JCM Inspections Copy 2 Project Superintendent3 Governing Agency Page --IL of JCM Inspections 39725 Garand Lane Suite F -. _... a Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT ; Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Date: p. fig- o Project Address: City:Title La Quinta, CA 24 AWS 0 UBC File # ® D 1.1 App# D 1.4 Other Other: Shop Field Client: Sub -Contractor: KSL Desert Resorts, Inc Law Steel Geinreral Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Description of Work Inspected: % Weather: SW ill Ct Unresolved Items: ❑ See Below 1(L4� &ani WGl('X��,J r n SA-e'J Cw, tf0 tACx irlNone `' "� i wLa c R�m�.<� trc.a a�ns C �e or, ,� C� 5 t� Q o n r Q �� c b f O ��1F)'� (-e,\{ t 1;4m f' 0 Tc1 r� O• 1'LC�i f�� �' '�\ l� �Il/!!F]CQ/� Cf k3 AALCO 1 E�E 11 't Process Welder Cert on File Electrode Detail(s) Weld Type Location/Comments Yes No Type Size iK1 v n mn �I O 6 ''QA •s 1F� ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin IC O Certification #: 0842216-85 AWS #: 95030691 �a Contracto s �ep a ati I--) Copy 1 JCM Inspections J Copy 2 Project Superintendent Copy 3 MA Governing Agency Page —]of 5 Ga Inspections 39725 Gaeand Lane Suite F Palm IJesert, CA 92211 t INSPECTIONS Phone: 760-345-5554'- Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La 'Quinta, CA. []Title 24 AWS a✓ UBC Other: File # F-11) 1.1 App# D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc.Other General Contractor: Architect: Structural Engineer: KSL DFD. -Architects Paul Koehler Engineering Slump (inches): - --- Supplier:t� Q c ca �Cr•c 11 \�� �1ov�iir'- Time Sampled: Mix Design: az q , Cy ,Dno ,A��` � Time in Mixer (min.): �CRo C \cr; �) � • Specified Strength (PSI): ' c� o � Water. Added @ Jobsite (gals.): e , � Addmixture: �ann� ' Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): "—' Field ID Marking: Weather: ��nr.4', Con J ,r,', Ir Wnr .. Unresolved Items: None F� See Below Location of Sample: . No Samples Taken Dese cription of Work Inspected: ?�-��r-; _)G �V % r CL r-. ` l'A . i' i_l. \ r, ._. �.S /' d SQ (A- C1 - 1 V, V14- r.` CG:.. C'.. O T t�' l"f:C� <. f7� t1 '.a Q... �: ` - r .'1.'1r f O l" , � C Nu T C CS! \.)n G. N1Q Ina l.) cG. ['r,�J(\� C a, h - 1 1A,V' C, r rl t. i "h .� ? r, '.v v C.7 11 F r0 . ev 1 A �e,l 7 \�rni 1 .. , hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Ce Ifica i�n1 No: 0842216-82 Contrac of -i fr R/6'es l Copy 1 JCM Inspections Copy 2 Project Superintendent �,!!! opy 3 Governing Agency Page —I— of! r INSPECTIONS Inspections 3.97255 GarandGLane Suite F Palm. Desert, CA 92211 Phone: 760-345-5554 - Fax: 760-772-3895 -- INSPECTIONS NAILING INSPECTION REPORT Date: Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building ' 99-830 Project Address:_]City: La Quinta, CA Title 24 AWS ✓UBC File # ❑ D 1.1 App# D 1.4 E]Other Other: Client: Sub -Contractor: KSL Desert Resorts, Inc �,� � AeY. 751,E General Contractor: KSL Architect: .; Structural Engineer: DFD Architects i Paul Koehler Engineering p r c n `1,�t,�, 1�.iM<<��C 1 �.9c�4� S'-fic,c� ".tQ �C,�pr�, Sr��uc'c 1'��£r� U•� .�'�1 ��•�, has };3.�. ��® — sza �1,��1�;:, ' Weath r: Sui�n4��o� Unresolved Items: �. None ❑ See Below Description of Work Inspected: CGr;Pct,, a . �: C �si a t. } ter^ nom. ✓lat'��) �' ani ``r • i f r ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin Contractor ep ese at' V e i v, Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page —1 of 5 Gar nspectie'S 39725 Garand Lane Suite F Palm. Desert, CA 92211 t_ INSPECTIONS Phone: 760-345-5554. -.'Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: fes) roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City:. La Quinta, CA Title 24 AWS O✓ UBC Other: File # F-1 D 1.1 App# ( F. -1 D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams•& Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD.Architects Paul Koehler Engineering 1 Slump (inches): Supplier: l- Caretcy"rT't��°" Time Sampled: Mix Design:" `" �' �.. Time in Mixer (min.): n'rc I Specified Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: Concrete Temperature (F): *----- Truck #: .-, Ticket #: """'" Ambient Air Temperature (F): - Field ID Marking: Weather: 1�u.OnJ Wo r— Y Unresolved Items: None See Below Location of Sample: No Samples Taken r 3 Description of Work Inspected: C:t1 r- --e i� 2r••- �r [a nCC . r,�- P5 4 C �.Z 0 L C Cn� rin� �� �1c.... [ e.. A 6 .t^l" n ��G�u>ir@ •1�'11.e.. f /! !>.it: �l!' \C CCS l..c)Gi.S. 4v1 n -,A,- LSI LerDA\ne i 41 I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contractor s� re res atry " R Copy 1 JCM Inspections Copy 2 Project Superintendent ¢ Governing Agency Page 404— - JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building. 99-830 Project Address: City: E]Title 24 AWS F/ UBC Other: La Quinta, CA File # App# ❑ D 1.1 E]D 1.4 Client: Sub -Contractor: �'(Z Qw;,,�(.t�srr-r„ KSL Desert Resorts, Inc -Reb - smote. .Other General Contractor: Architect:. Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: Weather: Time Sampled: Mix -Design: _ Time in Mixer (min.): ___—S pecif ed Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: Concrete Temperature (F): Truck #: Ticket #: 91 None 1` Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample: y �` No Samples Taken Description of Work Inspected: - OXO t^�t�c_•Q�v� �} o� �� �� 1x74'1nrP�k�Ic `lCn 4e3of t p + ".���• !�i �,� �..- 3© c4..b%^ x'61 r t - f'�i �J.; �'n:� � �.lc�rC o,f�l1 X: ^A% �..�n r�� i vJ c s 1_ n pXi. in< <^ f' C,1 "il. ►`nri zr�.r a\%D so.e�'Irn:�r. 11 rz Ilk v I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications -applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO-ertification No: 0842216-82 Contractor p es ativ . Q,a c • t y? a r Copy 1 JCM Inspections Copy 2 Project Superintendent blopy 3 Governing Agency Page of - • 'Gar ns Lane. S - 39725 Garand Lane. Suite F Palm Desert, CA 92211 f INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA ElTitle 24 AWS 0✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD*Architects Paul Koehler Engineering Slump (inches): Supplieror'n'Pr e Nli k !l�ko'�Ge_ Time Sampled: Mix Design:"" CX - Time Time in Mixer (min.):�, �s r , I O Specified Strength (PSI): � Water Added @ Jobsite (gals.): �ON �r r.�l . �s��r( "'. Addmixture: )� Concrete Temperature (F): , , Truck #: Ticket #: Ambient Air Temperature (F): Field ID Marking: ------- Weather: Unresolved Items: R]None See Below Location of Sample: _� No Samples Taken Description of Work Inspected: VJc n t t 0 A 1 t., C M U� -mac cttil 'T �' n c� C ) , I♦a i S� o t V` � _ \'\O (� I' Y a f ` H T .1 r , - 4r. +L. i ')n dim . - C n r, r - , n . ^ C. H. A t so"I V' N -N .01.r'1 (� J / O I C $ r `}/�w" ..le. il.. 'kt 11 ni. r... rf�� f — Kr• l Pn. 1r• \' l r n -T"� T �, n �nr +r1! r�C�(nr�la r.Ie^^a ��1C C � it 1 w' I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG ffifiication No: 0842216-82 Contractofs rprse ativ/e: I-) I . f /V1 /' V I Copy 1 JCM Inspections Copy 2 Project Superintendent (/. S Copy 3 Governing Agency Page —I— of Copy 1 JCM Inspections Copy 2 Project Superintendent 1 Copy 3 Governing Agency Page of • JCM rInsLans 39725'Garand LaneSuite F I_ Palm Desert, dk'92211 INSPECTIONS Phone: 760-345-5554 = Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY -INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City:Title 24 AWS ❑✓ UBC Other: La Quinta, CA File # ❑ D 1.1 APP# ❑ D 1.4 Client: Sub-Contractor: KSL Desert Resorts, Inc Robert E. William's & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering Slump (inches): Supplier: r--- !7 r^ c ,, ?c c Y�l i �1 A, Weather: Time Time Sampled`. Mix Design-; ' r Time in Mixer (min.): r•r (o Specified Strength (PSI): / %o ann Ar Water Added @ Jobsite (gals.) (' Addmixture: P•r P'Non . cQCC'a• Qno Unresolved Items: Concrete Temperature (F):Truck #: -- Ticket #: ^-- .0 None Ambient Air Temperature (F): - "--' Field,ID Marking: E] See Below Location of Sample: No Samples Taken Y' Description of Work Inspected: �-\�- c Ilk u M +!7 •1 l C ��1 1 L. kA 4 i i C14 c l r \ VA1�' S -1� �i. r /)1.`` f �a r �.5" T1't4 1. n ^ �r 0.`. t ( � un o 4n t j A I. N, �. v ..�f �' ,, c t r iT.r znLto.• W1 CP qST^ S" .j. WCA AL N rhe eit#,, A r .'�"�� r �, �• / C' t r -4- . IPA , i, 1 �'wn.r \ n 0 � Li �a� n r1 . li , r1 � � t t--.. Lr ^ r ".Vfy � 1• ,,{{ r ' fb? S 'I r p o to r, ot• ctri'< < bra• n h�reb�certify 1'h2t'f'Fiave inspected al('of tl9e ab�vf ork, FTIesS otherwise noteds and to tfie best of my abjl1y Irhave9ob d'this work to comply the with approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICB Certification No: 0842216-82 Contractof slReeJre Vtive. Copy 1 JCM Inspections Copy 2 Project Superintendent 1 Copy 3 Governing Agency Page of i - JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building ` 99-830 Project Address: City:. La Quinta, CA Title 24 AWS ❑✓ UBC Other: File # ❑ D 1.1 App# F-1 D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): _� Supplier: 1 'ter Time Sampled: ------ Mix Design: 4 Time in Mixer (min.): `_ �- �� Specified Strength (PSI): Water Added @ Jobsite (gals.):�� ,� S aces - Addmixture: n �... Concrete Temperature (F): Truck #: "'- Ticket #:----� Ambient Air Temperature (F): Field ID Marking: Weather: Unresolved Items: X❑ None See Below Location of Sample: ® No Samples Taken Description of Work Inspected: e �; Q` �� o { �.� `1.1(o C (Yt t,i e_ e4/,L._ c_ r'tic,+ � . , •' II �('� t SkV,re c``,ce�\n<151►aSeS C�� i" -io `C\, 4 �� I Ir C\nry.'� Sla\F11 lT j 1` (I b l .�"t'C� (P'e•h�Are.E„- h1r.,, n..�. E �t CY' e G ) b S N'� Cf 4-. lT 9 1 ,C br7 �Oa C\,!"c:a Q CQ�. r i'ef <' (n,t�tr j �1-). a... •'r c. F.nf t7�VClMr. L� G tc.rc - y", c, \1 r� 1 .ec.. I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICB C ification No: 0842216-82 Contracto 5'Re re e_tat1 e - Copy 1 JCM Inspections r % t t 1 Copy 2 Project Superintendent j f Copy 3 M Governing Agency Page 4 of 1— 4 INSPECTIONS JCM Inspections 39725'Garand Lane Suite F Palm DesertCA 92211 Phone: 760-345-5554 - Fax: 760-772-3895 E INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Date: Project Address: City: La Quinta, CA Title 24 AWS File # D 1.1 App# D 1.4 Other R✓ UBC Other: E] Shop Field Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback Welding General Contractor: KSL Architect: Structural Engineer: DFD Architects Paul Koehler Engineering Description of'Work Inspected: Weather - �r1 con( A g;_0,4:a, r r. ai c` ,ap,rr, v,a• Unresolved Items: None See Below C,t.1 1 - rr o r ef - Q G h� ' \ A +t*'� r C:1 - l"1 r�i •t el C �t V. 11{��V �! �) ,i7 Y � • O� C. �A - I -.r1 r . 4d . r. l c _t �C' n �. +� h n � 6. rr :-� \ Sf"n r r, ar• �T., r r.;�Lti . a �.(��� n 1 � 1r pY /'\fir ' ..�",n .. r� �Drri �/�A-k1. T- �1,.. rem. f`t'+\. Q \J�'7�.+°' b1GJ� G °� l•..� V� C• t� /���nr� i �r � � r• F �nC' a.l c r•O1! /A1 rr_,S J.I l d I �• ' l t" l 7 I r ,.O f n• �r�3 • D c J n C 1 TfzO f.)I a.. n.. ,J. "I Q 1�G3 �S ,T� C..!?.�e� �.G�.• 1 /•1 F .•G+. n\J' f._ r ;tii _� l,e IAV RSS C \1 � i r U r.n r1 rd n ®p. 'C .. 't n \. i' (�f Process 'Welder Cert on File Electrode Detail(s) Weld Type Location/Comments Yes No Type . Size 'Sc(s,q N VQt% ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ' ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Certification #: 0842216-85 n Q� AWS #: 95030691 Contractor's r sentatly a I I V, Copy 1 JCM Inspections Copy 2 Project Superintendent Copy /Governing Agency Page —4 of JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax:1760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building' 99-830 Project Address: City: La Quinta, CA E] Title 24 AWS OUBC Other: File # ❑ D 1.1 App# ❑ D 1.4 ❑Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer:, .1 KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: �r c o Q r'c � � 1 1 Time Sampled: Mix Design: Time in Mixer (min.): a ��-o �. c7 Specified Strength (PSI): I AOS Water Added:@ Jobsite (gals.): , p Addmixture: Concrete Temperature (F): Truck #: Ticket #: — Ambient Air Temperature (F): . Field ID Marking: -- Weather• ` Unresolved Items: ❑ None ❑ See Below Location of Sample: No Samples Taken Description of Work Inspected: ( .y r — (� e 1 . `I= r nee, n('' ti x li I'i , i... r� e+ r e �- fS Tn GC•.1 c^ \ �./.�a !f r • �i r, tx t r\r 9. a"n.!' C't,� T f CCS (+ 1 . S .,'r• k Ht t r Lie, ro \ c-/_�1/ J\ , I r• AC,n �c •r �` .. �' i^ ht. \te��' "`�'�4'"., tQ7`tJM C .7 C�['+A A(N 1�5 �?n pS It1Vt+�L`c� r ,r I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG CerEific tion No: 0842216-82 Conttacto� s epr sen ive f J Copy 1 JCM Inspections Copy 2 Project Superintendent Governing Agency Page q of 1 JCM .Inspections - 39725 Garand Lane Suite F IEM 0=1=E" Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 -'Fax: 760-772-3895 INSPECTIONS WELDING INSPECTION REPORT Project Name: Project No: Date: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 27, O<D Project Address: City: E] Title 24 AWS F/ UBC Other: La Quinta, CA File # D 1.1 App# D 1.4 ❑ Shop Client: Sub -Contractor: KSL Desert Resorts, Inc Saddleback Welding Other Field General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Weather: Description of Work Inspected: ®°>� dUnres814d unn V,%Af SSr� (i -<.Q v , C ✓C W CR Items: None ❑ See Below r^ ew�RrnC i%� �j (o S�' cc4 r�� p\� ) .^1 C i'l1 ci ��l t hn.n t ,. o,(;} i Q �iJ e'S'C E1 "T..a o R 3L 5'0 'k ,T c JQ S� �'� r+-� k o.^cam �1 o- tic u `RV C& Vc-'i V-23 �C "4 1 G O O '� rAr�� \t� V,,a�S �TJI � ,L+ ��1'y,•� tiJi `1 �• c�, ��r.C�filftl.i �'EJ'-\tail T1�t"4?✓tcc of 1CtrJ �Cti- 5 �� �r1 G.s (o-K� ,. . . r l k �ipqs All Cert on File Electrode Process • Welder', ' Detail(s) Weld Type Location/Comments Yes No Type Size 4a - z ,\ , ' , a VIA(k ,,��� .o��t o CAW 4.4,a4jl , 110;, , l� Avl c` �r ereby certify that I have inspected all of the above work, -unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. ' Inspector: Jack C. Millin IC Certification #: 0842216-85 Contract �' Re to iv AWS #: 95030691 %--) f V/ /" V t Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page —4 of 5« JCM Inspections 39725 Garand Lane Suite F Palm•Desert, CA 92211 INSPECTIONS Phone: 760-345-5554' - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: :Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA . Title 24 AWS ❑✓ UBC Other: File # D 1.1 - App# F-1 D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc 4ti Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): •-- Supplier: Q c � o Qr c i'vh� ot�n1r` Time Sampled: Mix Design: Time in Mixer (min.): A- •, Specified Strength (PSI): $ v Water Added @ Jobsite (gals.): ( A ��eLs Addmixture: rt a Concrete Temperature (F): Truck #: Ticket #: __-,� Ambient Air Temperature (F): Field ID Marking: Weather: tt Su rkntJt l oke 1 Unresolved Items: None See Below Location of Sample: No Samples Taken Description of Work Inspected: , r i ^ ly. o �� I] `� .�7 1< Ii'< < ►c,.� c Tt' ct C� r. C ?S X 7! ( � S \" c c� t t rt, it 'Rnr '.�i. .r — ',,Jan [, c Ake inn \C%CG. Ct)te.. 1 t'�,Sh, I�k-S �O�UMf\5 Ifti4C"{c�rW j C<!il{Ij , n S"�'r o\. c,c; '� �..c� cc kc. c'ts cr c 'A. �((1 S`10 j G 13 acs a b� �h�. <JiSk't�J /n^c1� .N- -,U .-. I'►Cs.I�� F S oI I.¢�+,,! CC\�c� �t'r� Ore�lC+ S1 Ln •�ICaGCh7 t*.'•il �1dfPr^_i.Q 9 .� f!'1� C()C�C.C'. � od C...�r,�Ii�nil ♦� ". t 1 (� ' (� 1' ,n r r•�1 \ 1A n ... / Jit .. n C._- r ^i r'1 pC •r'Q ` '4 x I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certi#4,c aon No: 0842216-82 Contrac or' epr se ative: - f v v ( Copy 1 JCM Inspections Copy 2 Project Superintendent i � y 3 Governing Agency Page _L of Copy 1 JCM Inspections Copy 2 'Project Superintendent Coey 3 Governing Agency • PageJ of I JC ns a 39725 Garand Lane Suite F _ Palm' Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: t Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City:Title 24 AWS F✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: Weather: C.,00� Time Sampled: Mix Design: I&A .Time in Mixer (min.): t Specified Strength (PSI): /l / J Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: Concrete Temperature (F): Truck #: Ticket #: None XF—]See { Ambient Air Temperature (F): - v Field ID Marking: Below Location of Sample: K01 No Samples Taken Description of Work Inspected: �. .l�_ C �1' n ♦. gni / IR tA.r' UIAS J9 A I hereby certify that I have inspected all of the above work, unless otherwise noted, and,to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG 9 * tion No: 0842216-82 Contractor's Rep e ent iV/ Copy 1 JCM Inspections Copy 2 'Project Superintendent Coey 3 Governing Agency • PageJ of I INSPECTIONS JCM,Insjpections 39725 Garand Lane Suite F Palm desert, CA 92211 Phone: 760-345-5554 - Fax: 760-772-3895 - INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: f roject Name:. Greg Norman Golf Course Clubhouse & Maintenance Building P. ' Project No: 99-830 Project Address: City: La Quinta, CA QTitle 24 File # App# AWS F✓ UBC Other: ❑ D 1.1 F� D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: KSL Architect: DFD Architects Structural Engineer: Paul Koehler Engineering Slump (inches): Time Sampled: Time in Mixer (min.): • Water Added @ Jobsite (gals.): 4 Concrete Temperature (F): T Ambient Air Temperature (F):. i Supplier: Mix Design: Specified Strength (PSI): Addmixture: Truck #: Field ID Marking: • Ticket #: Weather: 4` r o7�,S 1.1) �` Unresolved Items: None See Below . Location of Sample: N.No Samples Taken Description of Work Inspected: f a s l• ��0 I 1. Qr ri rt i v ' n Vk " �,, �, i r r e �. e 1, r. l.1e ! �� i -L � 01 ,. r R. C r .C. +CAr eCG1fr2. ! ht4 c> Gire. s «. .. 0 ' CI„ y hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this wog ito comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Cert* icati No: 0842216-82 Contractor's ep a tativ r ' ` `,/ / q Copy 1 JCM Inspec ions Copy 2 Project Superintendent] / t[j%v Copy 3 !Governing Agency Page —4 of I 4. JCM InspectionsnaS 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345=5554, - Fax: 760-772-3895 INSPECTION S REINFORCED CONCRETE INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building , ' 99-830 Project Address: City: La Quinta, CA Title 24 AWS F✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. General Contractor: ; Architect:.. Structural Engineer: KSL DFD:Architects Paul Koehler Engineering Slump (inches): c7 Supplier: Time Sampled: --' n `A Mix Design: • .` Time in Mixer (min.): IZA n Specified Strength (PSI): Water Added Jobsite (gals.): 6 s @ (9 ) Addmixture: �� Concrete Temperature (F)i4&A Truck #: Ticket #>— lq )Lqj Ambient Air Temperature (F): Field ID Marking:C� Q j„K 1� J Weather: June•/J Unresolved Items: ® None See Below Location of Sample:}� t : _ _ r� , C. J . \A A;" 'J No Samples Taken 'Description of Work Inspected: c .e :�C' lli.�u< i e'. c' 4. GGe.� 1 \.a) SD n ' 11 r, r, c o I :w : c, <' o -A—c r -T—."l rAA n t\ ry?°Y10' CQn P 'k: 4 c C G-iI err �OP �CATti. P 7�1 �•p �\ �. W .�C AQ�,ti ` �l\ r 1�- j (\ hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin O Certification No: 0842216-80 n ��� Contracct%tor'y ep esenta . e: Copy 1 . JCM Inspections Copy 2 Project Superintendent C1�3' Governing Agency Page J of �J JCM Garandons 39725 and Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: I oject Name: Greg Norman Golf Course Clubhouse & Maintenance Building Project No: 99-830 Project Address: City: La Quinta, CA Title 24 AWS , F / UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: KSL DFD'Architects Structural Engineer: Paul Koehler Engineering Slump (inches): Supplier<>h e ca �, `(ti',',� dr q tr t�a - Time Sampled: Mix Design: —�'� (b Time in Mixer (min.):rtcy c 1 O Specified Strength (PSI): t^' Water Added @ Jobsite (gals.):Vk,,. IyNmop Sr., Addmixture: din;�ci Concrete Temperature (F): Truck #: """ Ticket #: Ambient Air Temperature (F): Field ID Marking: --.. Weather: Unreso ved Items: ® None See Below Location of Sample: ® No Samples Taken Description of Work Inspected: •`S' f e R 1. CA ,::J G+ r• C. ^ 1=:.]�.\C.� f <•..!\`'� ` �.+ 14 o% l: r1 a.A4 ..t ter„ .-Q ta; O � N, -vJ- loi' 63 G✓\. �e> r +-. 1"� .nn \C� A . r `:. \"� � �ilA�!/1 ..a^ r •. ieh T.A 174t1i\4SPr1' :i >a ,10�-c?a. �•C.f S G`'e"C2'1e::i:. C7 QeNkA fA C 9 -Val- Ae-" n '\c e- nr r^ "'t, l: f I Cn n... . y i I hereby certify that I have'inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications -applicable building laws. Final report issued at project completion. Inspect r: Jack C. Millin ICBGWeification No: 0842216-82 C _ . 11 Contractor"7// ativ Copy 1 JCM Inspections ` V , Copy 2 Project Superintendent Copy VGoverning'Agency Page _ f :E"JCMIns annsLe39725 Garand arSuite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS ' REINFORCED CONCRETE INSPECTION REPORT Date: �-OO roject Name: ' Project No: Greg Norman'Golf Course Clubhouse & Maintenance Building 99-830 F Project Address: City': []Title 24 AWS [V]UBC Other: La Quinta, CA File # D 1.1 App# D 1.4 Client: , Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. ❑ Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering - Slump (inches): Supplier: Weather: �W4►rr.. Time Sampled: Mix Design: „,,�i Time in Mixer (min.): Specified Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: Concrete Temperature (F): Truck #: Ticket #: rV7 None Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample: -- r No Samples Taken Description of Work Inspected: n 1 �n ., - .. -Ti r, � �l Lt �i•, r��: i r�� � �C �"�” c �'1 � , � f rl.�+ � � . reo� rls��nrtRty.� c r' Og k tin(5 ni ibl '�il� 1 SG l.•i ., n ^•\..ni Ice "N O rH I i' /' O n ec G fi, Y e•.-rr•1', _ t `} n Ab r- y . j 7 { ' i r J r ' �4. I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin I BO Certification. No: 0842216-80 Contraeto:s R" r s to e. Y O1 J Copy 1 JCM Inspections Copy 2 Project Superintendent C/,"_Z/ V Y [ Governing Agency Page 4 of_�_ JCM'InspLane --I 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: « roc.') roJect Name: Project Na Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA []Title 24 AWS aUBC Other: File # ❑ D 1.1 App# ❑ D 1.4 ❑Other Client: Sub-Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches):--------' Supplier:Qr���� Time Sampled:Mix Design:_.f�� Time in Mixer (min.): M n a b Specified Strength (PSI): Water Added @ Jobsite (gals.). ^ eG Addmixture: n ara Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): Field ID Marking: �-�� lex ,•l ( Weather: Unresolved Items: None ❑ See Below Location of Sample: Cru t" e-,�, r rs _ „- 7 No Samples Taken Description of Work Inspected: ^. f c � M, r .. � � S Cl .� Jd r•T} � n. ..1 `�e�l �n �- , . A 14.' U � � �� � . Cn. r P �C n n l.,� e r0 nim , n, l C1 rV (�f n 4 V\f1 L .!r n-._ n C [-vi Jnr 1 l P . C'n l " ► n r ♦ n ' • C n ' �Ihereby certify that I have inspected all of the above work,, unless otherwise noted, and to the best of my ability l have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. / Inspector: Jack C. Millin ICBO Certification No: 0842216-82 Contractors!! en t11re'. �f r Copy J' . JCM Inspections Copy 2 Project Superintendent py 3 Governing Agency f % 1 Page Jof JCM Inspections 39725 Gaarand ,Lane Suite F _ Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 -. Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: --00 oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building. 99-830 Project Address: City: La Quinta, CA ❑Title 24 AWS ❑✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 ❑Other Client: Sub-Contractor: KSL Desert Resorts, Inc G. J. Murphy Const. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): 4.s-ID Supplier: f .. Time Sampled: ) a; .fin �� + Mix Design:A Time in Mixer (min.): 9 O Specified Strength (PSI): sp p �iWater Added @ Jobsite (gals.): 10 Addroixture: © \ t \b ]-'7y t) Concrete Temperature (F): �1 p 1 Truck #: (�� ( Ticket #: t, Ambient Air Temperature (F): t Field ID Marking: S (r !(� 1 (�� Weather: vo ca Unresolved Items: None ElSee Below Location of Sample: LSC c , t Mn �.s „ r 1, ln�! �. f ' .rn i1 n �•o� c f n� C A-, (t r 1 �^�\ tt r � R '� � � .f Fit, - ,\,E:] N \,� NNo Samples Taken Description of Work Inspected: N-ClIC,'t _ ���, f✓ ;{-r f'„� c1Snn r �, 1,� l 47ra" f: f e4ll h P QAC �.' _ ( . 2 InQ �•� nh 1 Plh \ ( — c . � . �' � c� � S5 n rTa k "fin r; c e. r• . 'r r .-ei0 � i 1 C' �. � ( 1 ra� e".- �e-�.-- � n �n t r C fir �. t� Z �11 •e..Q .ni tet- 1.1t..' G,Qf» r.� r�'E _ r r. -C to . h' 1 t," < <" G /w�(`1 t \ r^. ..]. '.7 .3�.r \Ina^ �,f 11 c'Y :l� n,.JI `n J Q_'. A. 1 1', rIe. `} W < < 4 in Thereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG CeUtfiffAcation No: 0842216-80 Contractor's Repfe�sentafi A: .. �� Copy 1 JCM Inspections Copy 2 Project Superintendent / ! Copy�3 Governing Agency Page 4 of L I V JCM Inspections 39725 Garand Lane Suite F . Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 - INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT— Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: 'City: La Quinta, CA E] Title 24 AWS ❑✓ UBC Other: File # F-1 D 1.1 App# 0 D 1.4 Other Client: Sub -Contractor: KSL DesertResorts, Inc G.J. Murphy Const. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): ' Supplier: Time Sampled: Mix Design: Time in Mixer (min.): ' Specified Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): Field ID Marking: l Weather: 11 \ c Unresolved Items: ® None E] See Below Location of Sample: No Samples Taken ' Description of Work Inspected: @ `in V SI o `C h 41t� C r (l'�N k CACI p cN c c\ C 'Cnrcc Pvlcn e�\. C:-t� `S C' �'s�h� �. T c,',. R\1, fC7i' ., %f n' ,?0 ^i :12 AC �. �l�• lin �ri\* �Ifn�l� �C:�1fA.A\�Q� �� P 1\-�(\�C 9001�- \\ hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jnack C. Millin A O Ce ification No: 0842216-80 R \! � Contractor's Re e t�a�. i ___.J/ Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 M Governing Agency Page 4 of JCM Inspections - 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 . -, Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY'INSPECTION REPORT Date: roject Name: ! Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS' r✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 ❑ Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: �c � � 1;�t, p �,.� Time Sampled: �� , Mix Design: n c� Time in Mixer (min.): M �t . f - Specified Strength (PSI): 19 Water Added @ Jobsite (gals.):Unresolved �Ic cS I Addmixture: Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): ^ --- Field ID Marking: Weather: 5.0 r Items: None ❑ See Below Location of Sample: No Samples Taken Description of Work Inspected: r _nC rn L , 1, r,casoc ._ .. _ I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. .r. Inspector: Jack C. Millin IC O e7 ert�ification No: 0842216-82 Contractor's.Re yes/lerita I� Copy 1 JCM Inspections Copy 2 Project Superintendent Copu Governing Agency Page of W a ` J_CM Inspections - 39725 Garand Lane, Suite F Palm Desert, CA 92211 INSPECTIONS `� Phone: 760-345-5554 - Fak: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: /OA-aq-� roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building, 99-830 Project Address: - City: Title 24 AWS ❑✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# F-1 D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc.Other General Contractor: Architect: Structural Engineer: KSL DFD.,Architects Paul Koehler Engineering Slump (inches): Supplier: Weather: Time Sampled: Mix Design: Time in Mixer (min.): Specified Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: Concrete Temperature (F): Truck #: Ticket #: ® None Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample:',- ,4:� No Samples Taken .inti#'ra': i Description of.Work Inspected: Cin _cz b rrt.1 0,�3 t1 (' i1t All "T"e\ .. ` r i. a n� c f t� { ��-•� co u (2 M F !1. Jt Q n 1 J I miT Ctir� . a V r+ � . !"� � � 1 r�.w � n ..� I �.-t � r� � n (� - O �:-1, q .4n ....+ r , 6✓ y�r .if I^ \ f �. X1'1\ \ `. \• r r"n rC.♦ /r'�t, �f A GA 1''1f ��1h.i V)Ji 1 Z ��� i'• ,� C`.!`l nia '1 � �1 _ - -'', �Q � \ r l C. C,,L 'T n1w�t `11� rI .i e•. 1 �;,. t • I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector• Jack C. Millin ICBO ertification No: 0842216-82 Contractor'V1epse a v r i ' J V t Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page _4�of JCM Inspections 39725 Garand Lane Suite F Palm,Desert, CA•92211 l-_ INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 I N S P E C T I O N S STRUCTURAL MASONRY INSPECTION REPORT Date: ja_�9 9� oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: RTitle 24 AWS [✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. E]Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering p i Slump (inches): ��Supplier: 4L1 Q•� i �� Weather: Time Sampled: -� Mix Design:,%, Time in Mixer (min.):Specified Strength (PSI): p��� Water Added @ Jobsite (gals.): f Addmixture: 1�zs� Unresolved Items: � Concrete Temperature (F): —dam Truck #: LoCt- Ticket #:`-�6L)% None Ambient Air Temperature (F):SQ Field ID Marking: E] See Below Location of Sample: ,� ,. 't�t ,;- `Knt, r . '�i,� tl . ti�1 V,A ost QNo Samples Taken l w ear. Description of Work Inspected: ^^ ` f` C . Cn� t Lr nV r.� .° �( R �±Z CL C1t�yn / \ li!r ' , A, A. !� 0E , r < nr c*��- coq S( C��ci�"I CJ,C,, •, C) •�»� Wt�.,c t� .1,{'I ...-� n-` �l .I\n �J1 •.Q. I nC� `C.W+1)C.T+! fP.7 •:Sp �U�{�Ct r1�..'...• 4 _ I•A [/ :�'t•"ri:11\ ¢a s@ SS gypp�•• ` t`'' sr ,. �y y ,- ! �( I r, r ♦. er+ .� nr.) ,r_Ta. �44n lAr.._ F , ' r.a C1. r\ G (A�r f _ .r f A .iX 1 ` MtA 0-.M L)1\"0t0 rN 'Q ('' '6 f;..!,. r. \�7 -� -. r IJ r Ar t • � •, v> 1 .,.1?� r '. , r ' -7 �t n Y sn a °.l; ' f � C `�'t/1•l.. � � r \1 n r C,p -.rent- r\. -.. ..,fr G`M '•(^If...,nt F Ca No�r.n LXT►,(.; �•�%.�., �1���7j ` kXf,, Fi ri113. . . r T y. � "� S, r 4-0 10 LJIEv.% a••� Crt;��.�: i� t. � \IY� Gr; rti �'�I S�C1 C� � � i'A\°r�nr Cv`Sfr\,'1e: hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Ce ification No: 0842216-82, res htativ Cont:07, WMA Copy 1 JCM Inspections Copy 2 Project Superintendent V Copy 3 Governing Agency t.,j' Page A of 4;1, i .w ri JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Lei Quinta, CA Title 24 AWS Q✓ UBC Other: File # ❑ D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches):--....._� Supplier:t e (� �w�ql. Q �� f •e Time Sampled: Mix Design: ` Time in Mixer (min.): O Specified Strength (PSI): Water Addr ed@ Jobsite(gals.): (>t._nrr r►nn�,t .Sncc,�. Addmixture: n o - Concrete Temperature (F): Y Truck M Ticket #: Ambient Air Temperature (F): Field ID Marking: Weather: Sunn./ I Coe' Unresolved Items: None See Below° Location of Sample: ® No Samples Taken ` Description of Work Inspected: ��. Yn�.. T �;Q ! 'i NTP c,� 46 A . r n \ T. A n �.y. QTc , r 1 ' <o t ,� r• . r , o . i i \ .3 oc 1 r �.a . '� �.N_) 0 r 1.e� O -, o /- is ri fL% C"" cJ t t I: .,�.> c n 7 Q.n of 'Tz1, , l 1 h /e) C��rc�•.� Cok"SC,� �. Brei C'i zc nkr.cc,_ Ie n A � f P" n tie, �. C �,! c r' R- ` \ -C- 1.\6 < G AA f �`�1�" 6 �/�1 �/�) \h} .1.1 °i r`, t . . h(' \+1 t it>,r �•p�/.a-.�,\T :.•1 nr, r�.`../ '1 f?\ale !1 C�C. ,0"(1/ I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found - work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. // jf thi Inspector: Jack C. Millin ICBP.,Certification No: 0842216-82 Contractors ese t_i e: ✓J Copy 1 JCM Inspections Copy 2 Project Superintendent , / '�_J Cop/3 L Governing Agency Page of L Gar)n6oeciions 39725and Lane Suite F L]=Em Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: 1,1_ ;n - C?q roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA [—]Title 24 AWS R-/ UBC Other: File # F-1 D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier:o,r Qr C_ Time Sampled: Mix Design: e, C, Time in Mixer (min.): Specified Strength (PSI): I Rbra Water Added @ Jobsite (gals.): Addmixture: Concrete Temperature (F): y Y Truck #: Ticket #: Ambient Air Temperature (F): Field ID Marking: eather: Unresolved Items: Q None E] see Below Location of Sample: No Samples Taken _Description of Work Inspected: <— �0 U. -J S, I le'l J C' 1 on I k 3 f, rnn _c) S^ r 1104 J _y 61hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this wok— o comply with the approved ns, specifications -applicable building laWs. Final report issued at project completion. 7 Inspector: Jack C. Millin ICBG Cerjificatio n* No: 0842216-82 C_ Contractor's,Re re s ti Copy 1 JCIVI Inspections Copy 2 Project Superintendent Copes Governing Agency Page of JCM Inspections -- 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS F/ UBC Other: File # D 1.1 App# ❑ D 1.4 [] Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD•Architects Paul Koehler Engineering Slump (inches): Supplier: M Time Sampled: Mix Design: C_; n -.�- Time in Mixer (min.): M�� M1� •A Specified Strength (PSI): 19,0-0 Water Added @ Jobsite (gals.):Unresolved ♦i�� �e Addmixture: Y) : Concrete Temperature (F):. Truck #: Ticket #: - ---- Ambient Air Temperature (F): Field ID Marking: Weather: �iun�. ? Coot ew r A/ d •.. Unresolved Items: ❑ None ❑ See Below Location of Sample: / No Samples Taken r De'scription of Work Inspected: { t Rrt 4-Cln�� 2 cA. l.'inr C 4_ t r rlfl.� i •r.♦.. �`•� /' <� .. Y I S� I eft .o n '. •in eerLlr 1 / Ar - ' d e 40 t 5 I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications -applicable building laws. Final report issued at project completion. 14 Inspector: Jack C. Millin ICS'( a lf'cation No: 0842216-82 Contractor's Representta i e• jlf v �. Copy 1-71)nspections Copy 2 Project Superintendent' ` Copy 3 `Governing Agency Page _/_ c(_ J Copy 1 JCM Inspections Copy 2 Project Superintendent Cop` 3fGoverning Agency Page of JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 -'Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date:, oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: RTitle 24 AWS Q✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc.Other General Contractor: Architect: Structural Engineer: KSL DFD'. Architects Paul Koehler Engineering Slump (inches): (� Supplier: r r• ,, QC e- Weather: Time Sampled: Mix Design: Time in Mixer (min.): �. �.. ! ® Specified Strength (PSI): 1 r" A, WQ" tit __ Water Added @ Jobsite (gals.): Addmixture: Unresolved Items: Concrete Temperature (F): 5 Truck #: "' Ticket #: ---- None Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample: No Samples Taken Description of Work Inspected: /1 0 J A _ _ t - _ 1' . :t '�� ^'n��'i �o'ac^ UC/ 4r�r1Me_..7�.-' S0 G�P�.'1/ll... Fic�l•^a. Wp/G. +i1�QXl/C�� °i U I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contractor's Rep e' ,ta-tive U J Copy 1 JCM Inspections Copy 2 Project Superintendent Cop` 3fGoverning Agency Page of .JCM Inspections 39725 Garand Lane Suite F J _ Palm Desert, CA 92211 , INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date:,^ oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: []Title 24 AWS F/ UBC Other: La Quinta, CA File # App# ❑ D 1.1 F-] D 1.4 Client: Sub-Contractof: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect:. Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): -- — Supplier: O rc r1 Qrc- IM:'fc9G <sun) Weather: f Time Sampled: --- Mix Design:- n� ' t) f oc51 Time in Mixer (min.):tn^.­ ,1 1 Specified Strength (PSI): (chnd wi e1r .... Water Added @ Jobsite (gals.):. Addmixture: Unresolved Items: Concrete Temperature (F): -_, Truck M .. _ Ticket M ® None Ambient Air Temperature (F): ----- Field ID Marking: ❑ See Below 'Location of Sample: Lai No Samples Taken Description of Work Inspected: i �(% r :.�•^ n _.nt- _ 1 s ' t 2 i.�r.-.�' ted l I, • � w I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at'project completion. Inspector: Jack C. Millin ICBG-'ertification No: 0842216-82 Contractor's``/ pres,(nt tAe� J{% Y Copy 1 JCM Inspections Copy 2 Project Superintendent v` f Copy 3 .% MKI Governing Agency Page 4 of �_ KSL Desert Resorts, Inc. TRANSMITTAL No. 00181 49-499 Eisenhower Drive Phone: 760-777-4855 La Quinta, CA 92253 Fax: 760-771-4132 ROJECT: The Greg Norman Course DATE: 12/20/99 TO: City of La Quinta REF: Inspection Reports 78-495 Calle Tampico Greg Norman Clubhouse/ PO Box 1504 Maintenance Building La Quinta, CA 92253 ATTN: Danny Crawford Jr. WE ARE SENDING: SUBMITTED FOR: ACTION TAKEN: ❑ Shop Drawings ❑ Approval ❑ Approved as Submitted ❑ Letter Your Use ❑ Approved as Noted ❑ Prints ❑ As Requested ❑ Returned After Loan ❑ Change Order ❑ Review and Comment ❑ Resubmit ❑ Plans ❑ Submit ❑ Samples SENT VIA: ❑ Returned ❑ Specifications ❑ Attached ❑ Returned for Corrections W Other: Inspection Reports 2 Separate Cover Via: Hand delivered ❑ Due Date: ITEM NO.—COPIES_DATE —ITEM —NUMBER _ _ __REV. NO. DESCRIPTION_ ___ _ _ ____STATUS,', 1 1 12/20/99 Inspection Reports - 11/22 thru 12/17/99 from JCM Inspection leemarks: Any questions please call Andrea Merrill Mock 760 777 4855 CC: Expedition 0 0 Signed: Andrea Merrill -Mock M JCM Inspections -- 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: _q oject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: ti City: F]Title 24 AWS ❑✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. E]Other General Contractor: Architect: Structural Engineer: KSL i . DFD Architects Paul Koehler Engineering Slump (inches): Supplier:01MC> �C�_�h\l �,�,� C ` v� Weather: - Time Sampled: _ r_ Mix Design:.14 n NA' Time in Mixer (min.): 1 h Specified Strength (PSI): �o t 61 Water Added @ Jobsite (gals.):�� Addmixture: Unresolved Items: �,,,•,�. � I ; Concrete Temperature (F): Truck #: --- Ticket #: _ nj None Ambient Air Temperature (F):' _. Field ID Marking: E] See Below , Location of Sample: No Samples Taken I Description of Work Inspected: C rl r a,fer, ra M , IL p • r s ,., i- r r ..n A r12 15 r '� � A r Oaf Qr f� 1 13 on v \ Q t f•f` rr.. fM1 w I�l„r Gri Cl Iv c if C i1- iI• t 0 C.Mt r Kr— r t.Ivi ' `r A n,r Nt G?n;1 {^ t ` t (� t .�. cS�m an �rf1r. k9 a Q_' 4t, n ti�i >r n„ lr•In ��"' O.n_ �P]C' ` ` ' ! u i o� �r s !� Tf •�. `� Le �i • c7 �s Co Llr'=t;~•-.,. V .r [� I C$ n +nrt V1 r+ hl — 'r It to it ILEAcz � � n 'n�r• r � G t• � t r n � r 1; [ P if�l1 /' G)G t �%% l.t rr+ t! ��OJ !� � y ..ti• r. , t r , I hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I hay" found t i� work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. I npector: Jack C. Millin ICBO a ification No: 0842216-82 t ve:% Contractorvs/'Rep esenLe Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 V I Governing Agency Page __� of . JCM Irispectiolis 39725 Garand Lane Suite F __I. Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: k1 -17_q el roject Name: Project No: Greg Norman Golf Course'Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS F/ UBC Other: File # D 1.1 App# D 1.4 E]Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E: Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): --.-- Supplier: Time Sampled: Mix Design: T a c 1'rCr�.r Time in Mixer (min.): M.,'�tet �� Specified Strength (PSI): �® Water Added @ Jobsite (gals.): [(yy Addmixture: e]t'r n'1 ranhk:.Sr7Gc.� , f,, 4e Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): Field ID Marking:, Weather: 1�liA t, Unresolved Items: Q None ❑ See Below Location of Sample: No Samples Taken Description of Work Inspected: nn man nun• + �e.rr ...� c ><� Y.�b ..r�' ) r.r n, ! .l•o�r t 14- %J y "fiC'1.P c d I' �"1 Q•- i,J�,} �.� � R 2�t e.o nt n x � n� a a t ,'i..l � r CA � JV 4r .� a 2 p .: r p . A: c acq ra I I Ca y S if �. ' 5 r Pn t► e e+n r i e C'ok,l"\-C, `+aStl CO,'% . /0 ea36C an - -� �i 3 i r c1� �Q.Or�e�6 Mf1 � �a�. CkieC. tti JCM Inspections 39725 Garand Lane Suite F Ll= Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION-REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: F]Title 24 AWS F✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: Sub-Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): • c7� Supplier: Weather: 1 Time Sampled: c Mix Design: Time in'Mixer (min.): -1 v Specified Strength (PSI): rr r Water Added @ Jobsite (gals.): I � Addmixture: n� `��� Unresol• ed Items: Concrete Temperature (F): - x Truck #: L"� (, Ticket #: Q None Ambient Air Temperature (F): --I Ll Field ID Marking: ` x?^y (� ` ❑ See Below Location of Sample:�� t .- . , i . 4�t . \Y t_ .� rl ' - :., r� r n `J r� lrt as. \lNo Samples Taken efa'nl Description of Work Inspected: t nn 1 r ^ I-ti 1 A 1 p\\ n Ant An cN r. r a W,,.,,o T tnn�� : I ' r t1 T n It r nrrk41 n'-6c 4 qnr� rt L 1/t' h nr a t o Vt nr 1 n�. Cn,- n... io 1 'n •S �I,A IV\_V1rt 411.4:C.:kr.n I'ne,.:, . ~ J I `' Pr1n T/ 1 G� Cr e. �j l f e -I Q♦ r n CA P a .. ei /.1 i t.p, (•1 r ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO de`rtification No: 0842216-82 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page _L of 1 JCM Inspections -Garand 39725 Lane Suite F _I_ Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT` Date:/,,�_l�_ �0 roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: E]Title 24 AWS [?]UBC Other: La Quinta, CA File # F-1 D 1.1 App# E] D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. Other General Contractor: Architect: Structural Engineer: KSL DFD.Architects Paul Koehler Engineering Slump (inches): 3 ��� Supplier. r , ' Weather: Time Sampled: 1�.. Mix.Design: ` CAr.-, Time in Mixer (min.): Specified Strength (PSI): r Ana J Water Added @.Jobsite (gals.): Addmixture:� Unresolved Items: Concrete Temperature (F): Truck #: (, t_�t.{ Ticket #: ") 0 None Ambient Air Temperature (F): Field ID'Marking: y. J)((,� �> See Below Location of Sample: —69 re v E] No Samples Taken. ,Description of Work Inspected: CCAI 1 nr� •t +tnC �f. wr r.r c c*�... ,r �.' •� .�. �T_ a.. V F G. ,r' f �t f,. e t t n r\''C f1n ' �N r� A 1�\J (1 t {' ,. 041:1_ 1_ r0% 4 CQ fnJ e i Al , Ao hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin, ICBO Certification No: 0842216-80 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page 1 of s JCM Inspections 39725 Garand Lane Suite F ER Palm Desert, CA 92211 I-11 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: :Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: E]Title 24 AWS ❑✓ UBC Other: La Quints, CA File # F-1 D 1.1 App# F-1 D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier. C) �. � Weather: Time Sampled: Mix Design: --r— >>r+ % e) &r— SlJ /1 '.Time in Mixer (min.): M %ICJ Specified Strength (PSI): ) g 0o tl Water Added @ Jobsite (gals.): j' Addmixture: r �.� i��c• MQv+., f . w I�QC$ � f�t j Unresolved Items: Concrete Temperature (F): --- Truck #: Ticket #: © None Ambient Air Temperature (F): Field ID Marking: _ E] See Below Location of Sample: No Samples Taken LP Description of Work Inspected: p r a �f � MCI nn MIA 1 IAL ' _ � , � f � E � C •, �I � r� �° t.r� c* r o t , ` � �. � 31.E �i � `� �- tt �� C/s11 rC —��I CAr f7,1.e�nn 1i'f ©r% 1.111 �.' K 6_. r �t\ 1 ¢ 0 0 r t -A c. . �Gl.l n i+.;I01 4 f /rC Ct`' A �f C? �t O kin Ll A 14 • 't 0.1 /1 1 �. n1 1 c T i .'1 /.\! Q'.a 1 r'A n /•. n< e) �i I /t ^ r f n f 7 ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin IICB Certification No: 0842216-82 Contractor's Representative: i Copy 1 JCM Inspections y Copy 2 Project Superintendent Copy 3 Governing Agency Page / of JCM Inspections 39725 Garand Lane Suite F iL" Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS ,_,REINFORCED CONCRETE INSPECTION REPORT Date:�a, roject Name: Project No: :Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS �✓ UBC Other: File # ❑ D 1.1 App# ❑ D 1.4 E] Other Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): q Supplier: �� ' Time Sampled: `� ', `�?> n Mix Design: Time in Mixer (min.): j p Specified Strength (PSI):_ f e +n Wate'''Added @ Jobsite (gals.): n nvi o Addmixture: ,^ � Concrete Temperature (F): (p� Truck #: L4(v) Ticket #: y' ��1 Ambient Air Temperature (F): q,'7,� Field ID Marking: lc �(��(��/ Weather: Unresolved Items: None ❑ See Below Location of Sample: - :,�+ o, I r 11L c((yy �- � � nj \ ^ �, \ , .�S, CAA ^ r ' YYiU �..�e011, Sn.`i Lt ^-1 til r� JY�•�.� C 1' 1 1 C ('� b c �, ❑ No Samples Taken Description of Work Inspected: Coni 1I ell r)tt, lit--7iI7 �f� Vl. O �(•'ii �.3'�C1 (� . a nn `` Thi ( %n ("nx. n fr i n C'sPt >t a o n� r "4'4°4 (:. rC• -, .'.' rnr-e-a A.-. f.t �f IA (.f c• ll..C- f gin\\,.C(•�/,1�i( flpl 7 int Vf L Fir 1 41 l'�s� ��C7)< < ►`-liC�'i `�4�� `n �9.1V A!n h'1� C-1.f1C.l 0 ' IrP n..* ^f- r't f1 IZQ Qknre ('v,{ (6)i cr ,r p {r '. -- ' o r _-A m c n v%l o R - c- r. C -c r' f F16— r . f' 11kV 111n1r_ jAP j 'rti G.rLA AS 1, c o_� % (.moi, 5`" �- ��^tu r • _ C n�.n` ft . 6 3 1a1J�p14,.c.,Tnrrc-�t-c. C a.�tn��'t nr c%-�t, fico. cr..n�� s;,�•� �'�s s ��� I'��,.c �- �C.tfor �1®�Z+�''.�� V , f hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-80 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page _L of L Y JCM Inspections 39725 Garand Lane Suite F Palm Desert; CA 92211 _ i N s PEoNs Phone: 760-345-554 Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT. Date: roject Name:. Project No: Greg Norman Golf Course Clubhouse & Maintenance Building. 99-830 Project Address:. City: La Quihta, CA Title 24 AWS QUBC Other: File # ❑ D 1.1 App# ❑ D 1.4 Other Client: Sub-Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering x ,. Slump (inches): Supplier �t (�1; X Mo' t�Y` ♦ Time Sampled: Mix Design: r", C� Time in Mixer (min. I esr Specified Strength (PSI): p Water Added @ Jobsite (gals.): � Cir- uvt n u !, �' Cc Addmixture:. Ina Concrete Temperature (F):. Truck #:' "" Ticket #. Ambient Air Temperature (F): Field ID Marking: Su Weather- nS * �,Vj 0�t v\, Unresolved Items: ® None See Below Location of Sample: No Samples Taken Description of Work Inspected:, NZ, C7 . _T\1 11 v : e- NZ rr (, i r^ C.t°\tl(` d A �'•1 v \r,\f.\J.). .` (L L J r,(- F,. / 1 C..1'� al f !xV a• n n :.. n 0. �� �/ Jr: CIS \ter II'� r\ "1 i�I C7 4 1 i- ! . ..-) , t , G r`C�7 r+.,�x, \'DS P^.t ea.��. VCI �'�• C'�, 1.11x �r1 ("x��l •fir, 1.S � �D % �Il'CC..�r� CV-. ,P�, nfr'�C' f C/r,'-1 1 to it CrC!: C, � tC° Geri ( (OW Cc t tite4.i. �( r•y.," cArQ.7. r ' (1 t n rr\ hn.. , ,.4 \ �s, C.. x�arll k'\r, f .r'. _� f rx Y_(=. [.� -,a\�, �, sk^� '-+. r.�e. ��n}f`/�r 1r�`•{t n 11,1 r F nx- •1:'�,•r'�. �•1 12�L..`.'�.\" ,r •>r1C`i�h'1 4i!1c'..CTITS 1."F r-5orx Arr hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO�Certif' Gation No: 0842216-82 Contractor's Representative: r Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page J of 1 _ _ _ INSPECTIONS JCM Inspections 39725 Garand Lane'Suite F Palm Desert, CA 92211 �il__ - L" Phone: 760-345-5554 = Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: roject Name: Greg Norman Golf Course Clubhouse .& Maintenance Building ' Project No: 99-830 Project Address: City: La Quinta, CA Title 24 AWS 0✓ UBC Other: File # F� D 1.1 App# ❑ D 1.4 Other Client: Sub -Contractor: + KSL Desert Resorts, Inc G.J. Murphy Const. General Contractor: KSL Architect: DFD Architects Structural Engineer: Paul Koehler Engineering Slump (inches):Weather: Time Sampled: Time in Mixer (min.): Water Added @ Jobsite (gals.): Concrete Temperature (F): -Ambient Air Temperature (F): Supplier. Mix Design: Specified Strength (PSI): Addmixture: Truck #: Field ID Marking: Ticket #: O v Qrc.(r%�) Cot Unresolved Items: ® None See Below Location of Sample: ® No Samples Taken Description of Work Inspected: S ;� /� ' w { n �+ l .n - i n t 1 ,7 •l .f epi l � {. ♦r, � f t f l Q � ` !� -Q A G' . �k, `^i Ia li rs e- M l! V i 1 I, C. VNr It, \: ,,r oNr mA c . V' -z-Q rr 1. hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspecto : Jack C. Millin ICBO Certification No: 0842216-80 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page A of , Inspections 39725-Garand arand Lane Suite F -I Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 I N S P E C T I O N S STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Buildingg 99-830 Project Address: City: La Quinta, CA Title 24 AWS R✓ UBC Other: File # ❑ D 1.1 App# F_� D 1.4 Ej Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: O t"q Q� c _ Time Sampled: Mix Design:—r-` Time in Mixer (min.): r 1e3 Specified Strength (PSI): . O Water Added @ Jobsite (gals.):, sn.. c,Addmixture: n n f A_<2„• ,. Concrete Temperature (F): Truck #: Ticket Ambient Air Temperature (F): Field ID Marking: ----�. Weather: er c01_�y . Cr�c�1 Unresolved Items: None See Below "'Location of Sample: No Samples Taken Description of Work Inspected: %A p 1 n T ` c c_ Me ` i4 µ i�iL �� �i ctl.t C...VVI i�., cif` ? l' 4Cnt..1r_1., \ r'n.. AS, r \ �:' Y' ���, �n �' e .� U►f1 h1 i1�e5�`1 a. ,�e.k . Ct1<'cl�r, ._ l�`r1-.,. N v . 1 hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Certi icatton No: 0842216-82 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page of JC Inspections 39725 Ga�rand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: I. q_9 roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS ❑✓ UBC Other: File # F_� D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering Slump (inches): .--., SupplierOc C p Time Sampled: Mix Design: n h1�cZcat Time in Mixer (min.):: i �; Specified Strength (PSI): I Water Added @ Jobsite (gals.): Addmixture:�„� Concrete Temperature (F): Truck #: --- Ticket #: ~" '- Ambient Air Temperature (F): Field ID Marking: Weather: r a.- Sun Unresolved Items: None ❑ See Below Location of Sample: No Samples Taken Description of Work Inspected: {` `, CAI, r $ _. (� t `, Ac a b=n C•df �` �'1.f1 r: \ 1l�S .4r C ©/1 �.i[�'il .a .e\7 n n, r•, 5', C,n ` 1 - t-. t \ it 4 e4 A.. r.+. . Cv�\ a n� .. rn n ... t• ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICB&Cectification No: 0842216-82 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page _L of 1 JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 _J. ; INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S REINFORCED CONCRETE INSPECTION REPORT Date: _4B,) roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: E] Title 24 AWS ❑✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: _ Sub-Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. ❑ Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): 4- r Supplier: r o .�.. Weather: Su I,%fie( Time Sampled: Mix Design: fw ldt`L1�tre� Time in Mixer (min.): CM Specified Strength (PSI): Water Added @ Jobsite (gals.)Addmixture: �d»..�.� Unresolved Items: Concrete Temperature (F): Truck #: Ticket #: 1- None Ambient Air Temperature (F): Field ID Marking: t E] see Below Location of Sample: ❑ No Samples Taken r �. C s..• lr r __ ��� I cy Description of Work Inspected: ��„,, r A, (71 \ -� 1 O f C..0 .L 1.70 _ f I H a t e l `+� iU t i C .♦ rA c C �t Ti (t r I r c i t b. i_ n '1 ti. �. ^.. - ' . . Gan , 1 - - __. _•.w r � .., ,�•p rt ' 7 _ 1 r=., w-.' r .. M. f- ra c. C r ,+ o •. r\ et- - r r•�• s, .r r 77 ji hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO:,Certification No: 0842216-80 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page 4 of JCM Inspections 39725 Garand Lane Suite F l Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date:Cl roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA E]Title 24 AWS F,,]UBC Other: File # F-1 D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc.Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering � A Slump (inches): Supplier:(a r 116 9 t _1y" 11-,, Time Sampled: ,- Mix Design: % .., �.. Time in Mixer (min.):�� Specified Strength (PSI): ��� � ,' I �'� Water Added @ Jobsite (gals.): ^nA I'`'' f. C`! 0. 1 a PC_ Addmixture: ry n 1 r, Concrete Temperature (F): Truck #: - Ticket #:- Ambient Air Temperature (F): Field ID Marking: Weather: daalw-- Unresolved Items: ❑W- None EJ See Below 'Location of Sample: , r' No Samples Taken Description of Work Inspected: ryl AA cc ila 0 1`1 3,201 I n r . c- .., ' •�A. .�\C 0 n n .. ( ,. _.-� .v�fk. � � SW I C N V3 an • Qn r . �' ,. C��rc .. XJ C �Lsnr rej.A fi SP -Z-V \Cticx'v. on zy at -AV c\ "o W SO r ,r ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications -applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG"Cert fication No: 0842216-82 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page I of Jim Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTION S STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS [V]UBC Other: La Quinta, CA File # ❑ D 1.1 App# RD 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): ¢� cr+ U C Supplier:c\� ��', A�'c alsC�ca�� -As Weather- eather: Time Sampled: Mix Design: Time in Mixer (min.):G 1 �, Specified Strength (PSI):�� J Water Added @ Jobsite (gals.). . ` � -. • � � `y Addmixture: 1. �l \�� ! -\ Unresolved Items: . Concrete Temperature (F): .I t Truck #: ---- Ticket #: --- None Ambient Air Temperature (F): :1 n Field ID Marking::a4 a ..,� .� Xh� Jl See Below Location of Sample: -- ^ No Samples Taken Description of Work Inspected:. c ,/,`e f`F(ln,r ,� yc�Vt�.r.♦ \��Gr(�..•r•1. r Ia.t�i6 �w `r,...\4 t"�� ne.<._�. > rn`11. C,Y' t r•Il� r (Jk,INN iirrr �.�(I' 1�.' I' ^ c i� r' +7\\\ f LI 1 °� c. .. 7i"+}' RA.le.1 !:t,,,C. 4`("i fi �1 �.• ^ �i�r�� /1 /� `, ..`]� r}•�, (" i illr� r4� 1. �t li I lP, \ � ? t', 1. { l•At ♦ T 1i 7.`\ Tia\' !1. .t1.�1S. "Al f,t'1r nnn�,nJnl, �•4 �- r+, t\lnn: 1'•11-:�tanr t lr T"r+rn i..,�r.:1':'/C.•�r 4��ir r..�s --TT ,hlC hrr•� cs! �i�C� Yil % r'i fin:\.)r-rl le�t�%U r� Truce ii1 C. '. � rn11c"n mal. n � t 4n C,-.\ AL i('.� r, ✓t , f: 1���% rY n . 0/-P e( ' nn c F IL -I' n (n:lrm'•n — `\Q . �: tr� : � i+.".%=a�a� %:., .� r1-, i?'u�rr.l' r; t'.I� 111"A..I.V' n'n 1 1,rr r1/ .rQ• .-.k- rr.r,c- r:;- c .�j1•' r e.. '>,rrr. .n = J'rr� 3 J '1 .; I \ , '� c r�. ,� tJ I • . r�- n' -j. ,�' - r i-•• , r �`� r /� `I� <L( � � rrl«t l aZ ' 1 hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications -applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG of "cation No: 0842216-82 Contractor's Representative: f1 I• Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page I of 1 JCM lnspLa S e 39725 Garand Lane Suite F _____ Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS F UBC Other: File # [_� D 1.1 App# F-] D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): __ Supplier: O, �.a Qr c �1r r�r,tr\r- Time Sampled: "- 1 Mix Design: T c Time in Mixer (min.): }r + I C� Specified Strength (PSI): r ,, Water Added @ Jobsite (gals.): Addmixture: i� r-, Concrete Temperature (F): Truck #: "-`W Ticket #: — Ambient Air Temperature (F): Field ID Marking: Weather: SG.nr� C oo, 1 Unresolved Items: © None ❑ See Below Location of Sample: No Samples Taken Description of Work Inspected: \(;�� C141 ��tc cn•� ...c �`c ce. nti n\ LS J-0 l_,,VAL,, �CC`� C \-� `:.41Ah caai'',tc. �1e♦ t C ��r nr <, t r c^n t i ,...� � n r\ ' i t..C. �." [^ ' i c c • C' c.n, u.,, r r "� �,) to . n lr� . c \ CtN 1`Toe rr',.e .f to_ oeA na o.c C�7_StJ t1" r j f7 In(J ICI r ) 0. .tea\� '�� C •w .� r C` 4.i1 r; r1 . An hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG (:esti .icatlon No: 0842216-82 ar Contractors Representative: J Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 ;YGovernirig'Agency Page of JCM Inspections 39725 Gararid Lane Suite F Palm Desert, CA 92211 L]�Em INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS ✓ UBC Other: File # ❑ D 1.1 App# F-1 D 1.4 ❑ Other Client: Sub-Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: r Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump(inches):Weather: Supplier:©C C0 to 1r`�(ti Time Sampled: --- Mix Design:\_ I.,n.t,,J {'11nr%.r Time in Mixer (min.): ip1 n�� c. r '• / o Specified Strength (PSI):, Water Added @ Jobsite (gals.):�� rr n.Y � Addmixture: ��..t Concrete Temperature (F): --- Truck #: Ticket #: ---- Ambient Air Temperature (F): Field ID Marking: +' nn Ctan� h.i�tr Unresolved Items: © None ❑ See Below Location of Sample: s No Samples Taken Description of Work Inspected: C F ' e, c 6.� r .. n i —•,tea �i ,O •-•.••.� t ••• � ..-.. r..�\ 1 C- P^vu _s. •` C .!`. •i �i i I 1 n1 �..� Q�� @ �i-tt .r n \,. r n i l �•... � �C1� U r' @.S � /t.. `� r 7 �\ Q(} /\� f � ��\.e1C ('_. 1 7rs VA.� � lr r', �' - �(!� n t (i.l! � r'>[�Lp 1'�\nf,n � ¢,.''�( C nn v \ n r ('4 '.� Cn !• ��" y + �/ n C .� to rC M� "I' �n. Il C` 4'� 'r r)tr.\I.r \j 1,nnr Tn.- rr`n- n+ .e hCC- J1 /.. ,.n nrr.� ~ tr'. C31 P,t fllir ts hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin IC B ?rtification No: 0842216-82 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent . Copy 3 Governing Agency Page +_ of JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA.92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: ciq roject Name: Project No: Greg Norman Golf Course Clubhouse& Maintenance Building 99-830 Project Address: City: []Title 24 AWS F✓ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert*E. Williams & Sons, Inc. EjOther General Contractor: Architect: Structural Engineer: KSL DFD.Architects Paul Koehler Engineering Slump (inches): n C., Supplier:G�. Weather: Time Sampled: Mix Design: kpz� Time in Mixer (min.): .--�e3 ' Specified Strength (PSI):Sco.:. �•. ' t , - " Unresdd ve. Items: Water Added @.Jobsite (gals.): Addmixture: Concrete Temperature (F):®. Truck #: ( Ticket #-JL,1gAe)� ® None ZL Ambient Air Temperature (F):.Field ID Marking, -&9m.%,, '• 3)(' X (w See Below aS� Location of Sample: t' , , _ , h r Ce, n r C', e-- f.,_ 0 ' No Samples Taken • Description of Work Inspected: - ,. r �,,^ _ .Y• .,c r : , 1.. . r _ _ A , _ r. , , ;' s / Cie)( I �:/ r*l /� 7 .� /'1 •� 3 C� I C. r. le A.., Ar (rrn :�, -.r ..r 4 Crl�l �• .,.• .r \4)r.,S rr �Q ��• CIA r.s I e . _ r c �. �. I�•../ s.. 1.2. IC ..a• i � E e \ � ? "tr . r I ' I 1. • !'r —.T_ ... ,,. ... s\1 Ll 1 t �. _l ' 7 r'J 1 r�r J t+ hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin 1CROAertification No: 0842216-82 Contractor's N /Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page —1 —Of 4 JCM.Ins Lane Le 39725 Garand Lane Suite F T Palm Desert; CA 922110== L INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS ❑✓ UBC Other: File # ❑ D 1.1 App# E]D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): ;-0 Supplier: C Time Sampled: �;� 3 �i r• Mix Design: � Time in Mixer (min.): C7 Specified Strength (PSI):ged Water Added @ Jobsite (gals.): 3� _ Addmixture: li7, �.,.� •ZY� Concrete Temperature (F): c5rk) Truck #: (I Ticket #: -► 4� j (7 e.' Ambient Air Temperature (F): C Field ID Marking: _ C� �• ` Weather: Unresolved Items: ® None See Below Location of Sample: ( n'� irlo (n No Samples Taken Description of Work Inspected: n e�tG.Cc to.�l k `lt.r.� nr'A ...^"let r,' �1 0, ry r' � 1 : n �\ t_ An c-4 l.�..-,e,c G f7 �` �i 't•r� r n,-.. t2! `rn u .^.1 ,G\- n ., t� r t, ,t' e,_ ti•. � i --�' . �(�� _ (n /%r'��n /�I (1� �,. Cat,. " At.+, ..0 rs,Cb*"1rtf i t r \1l W �..�{`..�.. '1n i ��� ♦ '4`0114ct.[ t n' ll 7 ete:Y v'Ik -r A'0I r lw9P.S t,/ S^+•.... l n kll.d! A. L :.. f e3 M a -.t'• !t',4r 'l' C f !1 , f T-'L'f� l C+.' ` nV c\ c;./, Cc.� cz- C C' ` ( C. y T r t r a^ h. C% r n t� C C C .r . f 4�.' t• �,C' [ l' r R^ ` C t y _ (fit n. e� c, r.�.l (r.nt,. crsnr.r-X e t /� - 1�.ht,r:to ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG -e ' ication No: 0842216-80 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page —1 of JCM Inspections -- 39725 Garand Lane Suite F I, Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date:'50_91 roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: J+ La Quinta, CA E]Title 24 AWS ❑✓ UBC Other: File # ❑ D 1.1 App# D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier:.d,.C4 " Time Sampled: �1.: ( Q Mix Design: -f-u 3c_ a f111 �A_11 Time in Mixer (min.): M� ��..� r• . j t7 Specified Strength (PSI): 9, 4 Water Added @ Jobsite (gals:):P r t�•cr rrneru,\^, Sacc2. Addmixture: ��� t� Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): Field ID Markin �+ 9' - xLl Weather: �U r Ll%f �S}1 Unresolved Items: A None F� see Below Location of Sample: �',i Coir.,�iSnn�� �n�s,�n�� - 1(hc<, ti. (� <�?tir•�� 3�. No Samples Taken Description of Work Inspected: 1 i ,c ,_y_ b X `! I r`. c`yC b� ` v �} \\ �+ Cn .� A o �a1Vc_ In/ r/ /JtA [r ^In LMN,* . 1 f n , .- ,, ... .,� � �.r.. r . i 11 O T D , J. O�n , I W • nee. t' C l [ r ..� t r S. \ca �i N so 11 S n� A hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin rIC rO Certification No: 0842216-82 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Pageof 4 • JCM Inspections 39725'Garand Lane Suite F , Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS 1 STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: ; mak: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS ❑✓ UBC Other: File # F-]D 1.1 App# D 1.4 Other ' Client: Sub-Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): �-�-- l Supplier. C-0 Q( C %"1i �p�C' .Time Sampled: Mix Design: -7y o,,Z— Time in Mixer (min.): �, Specified Strength (PSI): Water Added @ Jobsite (gals.): pt Addmixture: Concrete Temperature (F): ---.,` \ Truck #: Ticket #: Ambient Air Temperature (F): ._.... Field ID Marking:�--.-- Weather: .7V +'i I W cwt Y�� Unresolved Items: None See Below t Location of Sample: ® No Samples Taken Description of Work Inspected: 141J <i1C e [ 0. rn�t ` Tim l�Ji e 1_rJ e s i e a 1r� i7 . C n x r yr e,- \ �ci tt C S ..l ) jj ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 !� e 00- 0 Contractor's Representative: i 1, j _ Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page __� of 4— JCM Inspection's 39725 Garand Lane Suite F �LM_M�. Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: roject Name: Greg Norman Golf Course Clubhouse & Maintenance Building Project No: g; 99-830 Project Address: City: La Quinta, CA Title 24 File # App# AWS ❑✓ UBC Other: ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const.. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: Time Sampled: Mix Design: .�, ... Time in Mixer (min.): Specified Strength (PSI): Water Added @ Jobsite (gals.): s""" Addmixture: Concrete Temperature (F): Truck #: Ticket #: Ambient Air Temperature (F): Field ID Marking: Weather: 14 q nA � iit I a1 .1 Unresolved Items: None E] See Below Location of Sample: r No Samples Taken Description of Work Inspected: �� r -el r^: TccC, ekn4mf'E0. t4j AM.- COnT /�r�nit1 r� 1�i .0 SC�C�A .KL v�7�d 1t, -J' lost S CH A c e �!• hf,VT .,A f ' -4•.. t.,OA,v f3J etc r "r,M 0c,rf;c.�' �t\ C.h t 9A\ Ct c.t Q'1'�r. ��.• - .�O r��n>\j- �,j' eGli�_.+ - s ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG rti kation No: 0842216-80 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page of t JCM Ins Lane 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 i. Project Address: City: Title 24 AWS E✓ UBC Other: La Quinta, CA File # FD 1.1 App# FD 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. F]Other General Contractor: i Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches):Supplier: � •m Weather: Time Sampled: J� Mix Design:tN 11-(_? Time in Mixer (min.):(t^ Specified Strength (PSI): men A -' Water Added @ Jobsite (gals.): �� Addmixtuie: � '�,�._t Unresolved Items: Concrete Temperature (F): +� Truck #: ra>t Ticket #: Cq ® None Ambient Air Temperature (F):Field ID Marking: A* t ,. I E] See Below Location of Sample: i'1 '� o-o,r C. M q J_1 cV"v"NPA 4 Li n.,_I O t r o rn, �' .1t -, No Samples Taken ��t' ! �ic� Yra� nuP t e,e, my r Description of Work Inspected: !+ t+C<.., •n nrk ... ,� �'Y ail , nf4.n t: 1A QN A/1114",I, =./1. , �nVJ4•' �n:� r_ .r. '\ s,n\r rt 1• y. _ Y _ t i 7 ,`y "1� l"•� r r� w•a '! 1'>1:Ci TC "`l�f) y M 1,4 `t' Olt ,> o.. r: ltF' c i �% ' "�•1` c e r• _ /�J ' L 'te r (. n 1 ® l . r '1t�s— `l>_ •� e. 1 1 R i. i f Cw k i rl r• �T �. rte. �. M� ra♦ n :ry - . 41 hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contractor's Representative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Pageof JCM Inspections .. 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: ' wa7� cl roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS ❑✓ UBC Other: La Quinta, CA Fife # F D 1.1 App# F-1 D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier: ®rr�� Pr.r r�►�[ Mn�r Weather: Time Sampled:,, Mix Design: �y T Time in Mixer, (min.),�,i. ,,,, '. Ire Specified Strength (PSI): � ze)0 ` Water Added @ Jobsite (gals.): �r Addmixture: Unresolved Items: ch,ec = A Concrete Temperature (F): Truck #: ��-. ,_,.... Ticket #: None Ambient Air Temperature (F): �Field ID Marking: E] See Below t Location of Sample: No Samples Taken r Description of Work Inspected: I.z e c6 e 4r nrnCfS Or C10 C n �, r•.'• S r3 n o s•1 l 14 -1 e_3...).L1% kfA C G. k iltil P r f.N rr r' _ ,^ n 1. 1 )C ' Ce, a tl ' r C.a AA �.�..G ';`pct l% . r1c r c t `, i• n' �' s W e• !' rte. sem' n hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contractor's Representative: Jr • � ; ,� t sr a'�� V Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page --I— of JCIVI Inspections Garand39725 GaLane Suite F Palm Desert, CA 92211 �_Lm INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: :Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS r✓ UBC Other: La Quinta, CA File # r-1 D 1.1 App# D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): —^—^ Supplier: �r ��y t ����� �� Weather' Time Sampled: Mix Design: moo Time in Mixer (min.):" earl !t f , ) Specified Strength (PSI): C Water Added @ Jobsite (gals.): �� br �„\r^h��� ��._! Addmixture: n e>nC_ Unresolved Items: Concrete Temperature (F):Truck #: ---- Ticket #: —', �® None Ambient Air Temperature (F): '� Field ID Marking: See Below Location of Sample: No Samples Taken Description of Work Inspected: 1,(�T' r^ f l ex kA_C t .+n '� 1 , . 1 { n � C. CIC... � -. r..� � C r' �.. %�, )�� A ♦ ,.. r�--" 6r S [ r, n144 (. `yam aI`' ♦ o f� ` r @ ni �': 1. r� ( ._I. 3 .e. !` Y5., x,-^ r: 1. , r ^`..�ri� ♦ n r' h r T �� .. Ti r n V X it hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications -applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Gel i ication No: 0842216-82 Contractor's Representative: Q G. ' �_. -i, / r /, Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page �_ of JCM Inspections 39725*Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: (�_,,�� roject Name: Project No: Greg Norman Golf Course Clubhouse& Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS n✓ UBC Other: File # [_� D 1.1 App# , ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. General Contractor: Architect: Structural Engineer: KSL DFD Architects ti Paul Koehler Engineering Slump (inches): S�S Supplier.,--*,"DTf` 0(_ Time Sampled: s'�SS �Mix Design: Time in Mixer (min.): (fid Specified Strength (PSI): Water Added @ Jobsite (gals.): Addmixture: Concrete Temperature (F): -"1 1 Truck M t j Ticket #:" �yQ-j Ambient Air Temperature (F): —.(�� Field ID Marking: . �4 (a Y �'�1 te.�� Weather: Unresolved Items: ® None See Below Location of Sample; No Samples Taken Description of Work Inspected: �SflnA ( t .�j C'. r� a�,c'^_��th o CZt r> rprtt t^e. G nr• 1s�tt,�etil� nCo., (n ePto' r).�c r►c.�c+in� Ccslur. r l�t'>Of WocshiCe'�+t"�•�1' cls �1�Ac� ,qknt .)Set P'k o'�.v�cn r"C.s:, r N(;l/1lA (fit'@ tl i �Us�.., l nT�lD twti' ,r r . C 00 r f -N CL.: , Pok" C 7 me r At �t11 S( c�S 0') c in A".— � 1 s i�%i 4�st elk _b1 fit ��"�( �c3 n G 11 ., 1 to o C-nne, •o' Qf c.� ir►,er;S, e ,Q cu. f�n� se$S�' �, �csi } �f e c�f Q ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin I-Eertification No: 0842216-80 . Contractor's Representative: , q Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page of JCM:Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: oject Name: Project No: eg Norman Golf Course Clubhouse & Maintenance Building. �(_f 99-f830 1_�_r oject Address: City: f� La Quinta, CA ,(;.•Title 24//JAWS _]UBC Other: F File # `EI D 1.1 App# F-I D 1.4 Other Client: �t Sub-Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): Supplier:O(C V T1V f�o4— Time a Sampled: Mix Design: Time in Mixer (min.): Cf "(0 Specified Strength (PSI): 2500 Water Added @ Jobsite (gals.): filprr r%Nr%T .%, r , Addmixture: Concrete Temperature (F): Truck #: """ 'Ticket #:' Ambient Air Temperature (F): Field ID Marking: Weather: ;,u 'N A, UNTr. Unresolved Items: None See Below Location of Sample: No Samples Taken Description of Work Inspected: C Q.f 9r0 f •0 c Rt 2 1 .a r or. ��.�C -<r o C %X'% l G (rv\U^S t,, r t' o, U ►^� C� e � �r f T. � �c ,�' •tf Y � c'4 jtil.n'� L.o��F' �c°S � �. � �. On i':,`� � �' ea ve (s)<, c� .� '- i ,q) \C� C�.-�.�,i C X �, �j Y�i,S �rCG( AS o^ �'>�jdr} . �2�Laa,- a• �p� wolf C%CC/J %_Ott hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C.. Millin ICBG Certification No: 0842216-82 Contractor's Repr se entative: Q _—.01 Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page _)__ of 4— - INSPECTIONS JCM-In 39725 Garand -Lane Suite F Palm Desert, CA 92211 LIJE" Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: c roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City:Title .-La Quinta, CA 24 AWS ✓ UBC Other: File # D 1.1 App# D 1.4 E]Other Client: KSL Desert Resorts, Inc Sub -Contractor: G.J. Murphy Const. General Contractor: KSL Architect: Structural Engineer: DFD Architects Paul Koehler Engineering Slump (inches): Time Sampled: Time in Mixer (min.): Water Added @ Jobsite (gals.): Concrete Temperature (F): Ambient Air Temperature (F): Supplier: Mix Design: Specified Strength (PSI): r �-- '" Addmixture: ,. �� Truck #: Ticket #: Field ID Marking: Weather: to I iw Unresolved Items: None Elsee Below Location of Sample: LAO No Samples Taken Description of Work Inspected: c hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG ertification No: 0842216-80 t Contractor's �Re resentative: v , Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page —f- of JCM Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INS PE C T I ON S STRUCTURAL MASONRY INSPECTION REPORT Date: II -I -q9 roject Name: Greg Norman Golf Course Clubhouse & Maintenance Building Project No: 99-830 Project Address: City: La Quinta, CA Title 24 File # App# AWS [;?]UBC Other: [_-] D 1.1 ❑ D 1.4 Other Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): i Supplier:Hca R c ..c r, Time Sampled: Mix Design: Time in Mixer (min.): rl I , Specified Strength (PSI): !G � Water Added @ Jobsite (gals.): N Addmixture: -�-�- See,,. Concrete Temperature (F): �Q Truck #: ,.� Ticket #: Ambient Air Temperature (F): Field ID Marking: n c��' Weather: Unresolved Items: �] None ❑ See Below Location of Sample: fr Al No Samples Taken Description of Work Inspected: RC Q • n n \ SZ `� ��krf it r r,..MAI n n 1� • .c _ f� ^ c� 1 - hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Certification No: 0842216-82 Contractop!6Representativ UUI-L___.. I -S Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page _ of 5 Ga Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date:�,w roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS F/ UBC Other: La Quinta, CA File # ❑ D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. E] Other General Contractor: Architect: Structural Engineer: KSL DFD Architects Paul Koehler Engineering Slump (inches): l.� +S't7 Supplier: �n c ani AP Weather: Time Sampled: 3+, -- Mix Design: S�rh �+.JGtP� Time in Mixer (min.): �� Specified Strength (PSI): Water Added @ Jobsite (gals.): �� Q Addmixture: Q Unresolved Items: Concrete Temperature (F): Truck #: ") (o Ticket #: Ll ❑None Ambient Air Temperature (F):� Field ID Marking: + C�1 ElSee Below Location of Sample: r ,'i SAA n "r --w a n f r, a e 1 n -1.11 N, !f . 12, (E]No Samples Taken T r Description of Work Inspected: C" . \ L.:, A In_ & 4 -,, rte.- Orr- r. tl, 0 r, IL R /t i .I'r1 r •rte CA, n\G i e. r..t C C ., r*�,II� I"i_h' ` k �I ^Q qz 1 hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBO Certification No: 0842216-80 Contractor' Representativ Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page of "JCM.Inspections 39725 Garand Lane Suite F LIM Lm=m Palm Desert, CA 92211 L== INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: I I ,-7 tT9 roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS F7]UBC Other: La Quinta, CA File # App# F-1 D 1.1 F-1 D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. Other General Contractor: Architect: Structural Engineer: KSL DFD{Architects Paul Koehler Engineering Slump (inches): ,,..- Supplieror Co. Qt Q I'`l,=:,,� �c��./ Weather: Time Sampled: Mix Design: " r' Time in Mixer (min.): �� •, I :� Specified Strength (PSI): (, u n .. l�Otrt-•�. Water Added @ Jobsite (gals.): nn C112r?C Q Addmixture: -~""' S r'1 rina ��n 2 Unreso Items: ed Concrete Temperature (F): --- i Truck #: -- Ticket #: --"" ,© None Ambient Air Temperature (F): Field ID Marking: See Below Location of Sample: No Samples Taken Description of Work Inspected: kA, • ��";. r Henn n- .,.._. � .I.v.. 4 e _6 L 0n`�i Q��nt^ `ted 1 tJ . f .Ov'nr -�,11�. �-&o C'Pl"r r X `} 1\01 •T n... /... C� (Ir /{` T. [_I _ \—)CJ k V 1^11P e rt,^ �� A J1. '� n - n /'' [ C . G..' `• S . o C-' l J fJ I �, J el I .D._ k i- 1 n{ r ` l a 3 nr r �. f• n •' n r.• r ' hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contractor'sepresentat7907,, ! WE Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page --tof ' JCM Inspections 39725 Garand Lane Suite F ElL:m Palm Desert, CA 92211 I INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS STRUCTURAL MASONRY INSPECTION REPORT Date: roject Name: Project No: :Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS ❑✓ UBC Other: File # F-1 D 1.1 App#D 1.4 Other Client: Sub -Contractor: " KSL Desert Resorts, Inc Robert E. Williams & Sons, Inc. General Contractor: Architect: Structural Engineer: KSL DFD'Archjtects Paul Koehler Engineering Slump (inches): Supplier: aced QVIZ \h� �'.Vn-�t-�e- Time Sampled:^� Mix Design: '�'N� �` �\ Time in Mixer (min.): it �Specified Strength (PSI): +r Water Added @ Jobsite (gals.): Addmixture: -Concrete Temperature (F): Truck #: Ticket #: --^"'1 Ambient Air Temperature (F): �Field ID Marking: Weather: ,•, �nn.� W�ldir•� Unresolved Items: ❑ None See Below Location of Sample: No Samples Taken Description of Work Inspected: 1C ^ `� C.. Mei S r Q Col K ,n .-, 1-1 n C-0 to r t.Q alt r'rs �4-Q�.n fico _ l n-1 t lio,l rr.rl e u" r• +^ C� p a a ll � o Q i .. n n a- r1 in .r'li S fJ F r O / t1 � � r'•� r� r� � G /� , s'I G.; .�f !1� lis• (O �„\ r t P c \ 0 1 /_.n t V Y i hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-82 Contractor's Representative* r ` Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page J__ of JCM Inspections 39725 Gairand Lane Suite F Palm Desert, CA 92211 INSPECTIONS Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT Date: 1 o roject Name: Project No: :Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: Title 24 AWS ❑✓ UBC Other: La Quinta, CA File # F_� D 1.1 App# ❑ D 1.4 Client: Sub -Contractor: KSL Desert Resorts, Inc G.J. Murphy Const. ❑ Other General Contractor: Architect: Structural Engineer: KSL DFD'Architects Paul Koehler Engineering Slump (inches): Supplier: Weather: Time Sampled: Mix Design: 1'izs� y Time in Mixer (min.):--.rSpecif%d Strength (PSI): n Water Added @ Jobsite (gals.): Addmixture: Unreso ed Items: v Concrete Temperature (F): Truck #: Ticket #: None Ambient Air Temperature (F): Field ID Marking: ❑ See Below Location of Sample: �►�'" No Samples Taken Description of Work Inspected: n "a- c� C h 1b> ' I nQ_, Pi� �tl 'ZS:...'' 'Cf':9 ✓*'t i'/gC^gpA �c �.,lAr�'lSA,i{.i-\1c9�r�1 To, {{: Q` C. � ,-. � f` G,.¢.,. l+•.^, e1 Jr" F ,w •c r n. G C.J4 ' o `~ U C t : 1J N3 (` � . c, 6 : .a � �. 6 C•..•! 1 ax,; p . �_ rgzp 4 ,I ld n(; 1 1-1 1 1 &3 vv �� .� C....1 ��J fJ �� t�L4 n. C R c �GcQ_ t R( r I( C? \: C..r C)" C`0.eV St ^z C. .7 l C� Y�1@r1\ CQ�11?Cc��' f�_ �. 9`l G Cb --CA=b 6 i k, 4C.:C_ � 1 plsz..0. ct As N� �) ��i` (�� ��'� ' 3.\en�.J.�. 1n T� -_ O: -.C� \ r• to 1�7�! � � %11A, A- ,* e+.,•\� C : 'S 1 r � C. l.. - /'1 i •-. S •w s� .n n rr � Yid O, -n okQkf . tel ej S�e9. (i�. c. C t%•Ct-% T, -1 c n0.0 el n cam( t tra ereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICE - e ification No: 0842216-80 t Contractors Representati e: - - <A1 r� Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page 4 of INSPECTIONS JCM.Inspections 39725 Garand Lane Suite F Palm Desert, CA 92211 .Phone: 760-345-5554 - Fax: 760-772-3895 INSPECTIONS REINFORCED CONCRETE INSPECTION REPORT* Date: �9 roject Name: Project No: Greg Norman Golf Course Clubhouse & Maintenance Building 99-830 Project Address: City: La Quinta, CA Title 24 AWS R UBC Other: File # F-1 D 1.1 App# F-] D 1.4 E]Other Client: KSL Desert Resorts, Inc Sub -Contractor: G.J. Murphy Const. General Contractor: KSL Architect: Structural Engineer: DFD,Architects Paul Koehler Engineering Slump (inches): -�S Supplier: Time Sampled: t� ; Mix Design: CIA Time in Mixer (min.): --�.� Specified Strength (PSI): 3e�n Water Added @ Jobsite (gals.): Addmixture: (a Concrete Temperature (F): I Truck #:1� Ticket #: "-J yet "���9 Ambient Air Temperature (F): Field ID Marking: s�tA (p X (a') N' Weather: "yL.4 An. �/,iC7 fy�1 Unresolved Items: ® None See Below 'LocationofSample: No Samples Taken Description of Work Inspected: L c �n t �, r , f 0 rN �Ir cot. eln �rt) tf .4is �� r � 0 1<.GQ..�i ; .; � ��: V 1�r3 � ; �'.- r ; a - ��'c . o � �� ;.� � n,•/. � � r,•_ 1 l stn ti ,asp ��r-a ��t� rz,ruc'e�J .a14 ('ErA( 'P') 4`\avkf) C ^VIC,.0&A 1- tvJ rK-. An e-e)CS:trn•1 1•r t.'S �� �ir f'CAC' l., � �r•.! ,� fl o e hereby certify that I have inspected all of the above work, unless otherwise noted, and to the best of my ability I have found this work to comply with the approved ns, specifications _applicable building laws. Final report issued at project completion. Inspector: Jack C. Millin ICBG Certification No: 0842216-80 Contractor's Rdpresentative: Copy 1 JCM Inspections Copy 2 Project Superintendent Copy 3 Governing Agency Page _L of a