Loading...
BELC2014-1058 Testing During Tract GradingBruce R. Baumann, D.D.S., F.A.G.D. opo � ` o Palm Desert Center for Aesthetic o'� ? & Reconstructive Dentistry c� o GENERAL & AES•I'Iii'rIG •DENTISTRY•�.� cJune 20,'2001 • Tom Beatty Beatty Pacific Development 44-530 San Pablo Suite 203 Palm Desert, CA 92260 Dear Tom. E* :11:: 6:i P � =1� Congratulations on getting your pioperty into escrow. As pi-eviously discussed via telephone I feel it is important to tell your new buyer the following information . concerning the property. 1. Engineers have nraluated die property with test drill cores that indeed revealed the property has debris (trees/shrubs) buried under the surface. The new owner will need to re -compact the foundation site per engineering. s 2. The current transformer location and load capabilities are inadequate for another house of comparable size. The new owner will need to contact IID to see what their 3. -The new owner should be made aware that the HOA regulations state the need to submit house plans by an independent architect for review to the HOA. The purpose is to maintain Tuscan architecture and design features throughout the development. 4. The new owner should be aware that he is buying thei property as is. Coral )Mountain Estates/Baumann developer will not be responsible for any additional costs to make said lot buildable. Sincerely, CITY O F LA Q �J B • 0>.� .� — .�,.�.,� NTA rF3U1LD6N.G & SAFETY DEPT. Bruce R_ Baumann, DDS ED FOR CONSTR CTION N .i ' , Q , 4 �F !2 t 2Z ff B ,i C6 UN 1 j 44239MoAnnep Menue •-Palm Desert, C.492260 /ticm _ae sSZnq G VNE&AG -DEN T I S T R Y- August 7, 2007 to R. Baumann, D.D.S., FJLG.D. alai Desert Center for Aesthetic c Reconrtructnve Dentistry Beaty Pacific Development, lac 44-530 San Pablo Ave. Suite: 203 Palm Desert, CA 92260 S. Dear Tom, I have talked to Mike Homme regarding the information you desire. I• — Debris. buried 'under the surface When construction of the foundation was dome on lot 1, Mike noticed a lot of wooded -debris present just under the sarface. Several test sites were drilled revealing unusual amount of buried de'cr-;s. Phil at Earth Systems did these test drills and according to Mike you were -present when some of those tests were run. The conclusion drawn is that full upper and full lower grading railed to remove the wooded debris and it was buried under the fill dirt that was received from the Lots 1 and 2 had buried debris on it. Lots 3 and 4 appeared clean. There are no written reports that I know of. IX — Transformer- location/load capabilities The transformer location is on the original grading reports by CV Engineering. If you contact David I am sure they still have copies. T�egarding the location of the transformer, Mike told me there was some discussion with IID that they did not understand why the transformers were located where they were. IID said they prefer to have them clo e-zoad. _ITD obviously approved. the plan at some earlier time. CITY OF LA QUINT G&-6AFETl' DEPT. Regarding the size of the transformers that was placed by Ryonand Dy on w minimal in size and can not accommodate two homes Pf large-��e. Mike s/the o ..-�-TviJI,jJ i HTION transformer present was good for a tract home :with 40,00amps, we have use i 1 DATE BY 44239 Monterey Avenue • Palm Desert, CA 92260 i _www palmdesertsm'l .coin • (760) 6�8 3602 �Gf,�iG�vtc/ �✓�'Gr.�r-C - r� ����a'z,"�P/C� —/7-07 L. /Ulf 8000amps for lot I alone. There is no written correspondence from IDD just comments about the above listed. I hope this information helps. Since I Bruce R. Baumann, DDS' I CITY OF LA QUINTA BUILDING & SAFETY DEPT. R -q 'RUCTION fi CONST A j'F -BY z 1 fo 9,,Earth Systems Southwest J November 16, 2005 Homme Construction P.O. Box 258 Palm Desert, California 92261 Attention: Mr. Michael Homme ' Subject: Supplemental Exploratory Test Pits Project. Tract 29963, Lots 2, 3, and 4 Coral Mountain Court La Quints, California 4- `7 of- /( 79-811 B Country Club Dnve . Bermuda Dunes, CA 92203 (760)345-1588 (800) 924-7015 FAX (760) 345-7315 File No-: 08589-08 05-11-795 References: 1. Earth Systems: Southwest, Geotechnical Engineering Report, Proposed 19.2 — Acre Residential Development, Avenue 58, %z Mile West of Madison Street, La Quinta, California, File No.: 08589-01, Document No.: 02-04-792, dated April 261, 2002. 2- Earth Systems Southwest, Interim Report of Testing and Observation during. Gradin„ 4 Lot Subdivision, Traet'29963, La Quinta, California, File No.: 08589- 06, Document No.: 03-09-702, dated August 22, 2003. Dear Mr. Homme: As requested; a representative of Earth Systems Southwest (ESSW) met with Mr. Ed Maloof with Homme •Constiuction•on November 14, 2005. Exploratory test pits were excavat6d to depths of 2 to 4 feet below existing grade. The purpose of the excavations was to determine the extent if any, of deleterious materials. Lot 2 Three exploratory test pits were excavated on this lot as indicated on the attached dra«ing. Pit L11 is located on the south side of the pad; no deleterious materials were encountered in this Pit Pit 02 is located on the west side of the pad; in this pit some Pit 0. is located on the north side of the.pad; only 1 toot ripped out during the digging process. Lot 3 11LDING & SAFETY'DEPT. rAtlns excav Fre-tri it w FOR CONSTRUCTION DATE BY Two exploratory test pits were excavated on. this lot as indicated on the 0L" )e -e 4 -- i< T 1U -17--a7 November 16, 2005 � 2 File No.: 08589•-08 05-11-795 i T3 (t D �ic- - Pit m4 is located on the west side of the pad; no -deleterious materials were encountered in this Pit. Pit :S is Iocated on the east side of the pad; no deleterious materials were encountered in this pit. Lot 4 Three exploratory test pits were excavated on this lot as indicted on the attached drawing. Pit V'r'6 is located on the north side of the pad; no deleterious materials were encountered in this Pit. Pit #7 is located on the .south side of the pad; no deleterious materials were encountered in this pit. Pit r8 is located on the west side of the pad, no deleterious materials were encountered in this pit. Based upon observations during excavations on these lots, it is our opinion that the grading of these pads has essentially met the requirements of the soil repoit and the City of La Quinta. The following recommendations should be followed when construction of these lots has commenced. Lot 2 should be checked carefully along tic western nide to. verify that no debris or other deleterious materials are within the stiucture limits. Lots 3 and 4 should be verified when utility trenches are excavated. Should you have say questions concernivag our report please give us a call and we will be pleased to assisry-o . Sincerely, Q�o�esslo� EARTH SYSTEMS SOUTHWEST Reviewed by Qom° �� S. z. 9�m G !!•1} -#PC c CCF3 /31/ t EXP. 0313t/a{ tn Phillip D. Clanton Craig S. Hill s,, rVjL Senior Technician CE 38234 9?FpF ALtiFOP�`� SER/pdc/csh/ajf Distribution: 4/Hocntne Construction I/RC File 2/BD File CITY CGS LA QUINTA BU LDIN G & SAFE_r; DEPT. dVED FOR CONSTRUCTION DATE BY EARTH SYSTEMS SOUMWEST XC -7P11 r41774 /X Is • is VI�t Y RA 1J U 28") iJ1 He i LOT ' I 1,0 T r 0- ff f U f a I ;E CITYBull nif, XD j i F'l��•i�n�. [v j Tract 29963 Lots9,N,& 4 = Approximate Pit Location ; DATE _____La Quij ta, California _E-azftL— stem Southwest 11116105 File No.: 08589-08 >ke 13 w ye k- ?e O e ije cY /./C-1 am • /a - /7 - 07 C, "Y) Subj: Coral Mountain"Estates Date: 8/13/200710:03:40 AM Pacific Daylight Time From: L[qya@mrcerigj l en_ cn cora To: BEATYPACIFIC aol.com Tom, I spoke with Carlos.Partida regarding the capacity of the existing transformer and he assured me that the existing transformer would be able to provide power to the fixture electrical service at the vacant lot He had indicated that the transformer was sized to handle multiple 400 amp services. Please call me if you have any questions. Ralph Raya MRC Engineering, Inc. 72-880 Fred Waring Drive, Suite C-11 Palm Desert, CA. 92260 T. 760-340-9005 F. 760-340-9100 CITY OF LA QUINTA BUILDING & SAFETY DEPT. O P FO P CONSTRUCTION DATE BY f3u�e � la -17-07 2� cj rs� u.� f- 7'l y Tnperiay. MigmSt I4.2007 America Online: BEATY PACIFIC August 2, 2007 Mr. Bruce Baumann 44239 Monterey Avenue palm Desert, CA. 92260 Coral Mountain Estates Lot 2 Dear Bruce: In regard to your letter to me dated June 20, 2007 that I received on July 24, 2007, I am requesting that you provide me with copies of all engineering reports that you have that reveal that my Lot 2 has debris buried under the surface_ Also, please provide any written information that you have that confirms that the existing transformer location and load capability is inadequate to serve another home of comparable size on my lot I am currently doing additional inve zigation rereardiag both of these matters with Earth Systems and with IID. Thank you. Sincerely, I Thomas R. Beaty CITY OF LA QUANTA BUILDING & SAFETY DEPT. IPROVED FCR CONSTRUCTION DATE BY z � `nunI- fPiY /G-/7-07 ` CORPORATE MINUTES CORAL MO-UNTAIN ESTATES HOMEOWNERS ASSOCIATION ANI UAL MEEMIG: July 24, 2007 LOCATION: 44239 Monterey Avenue, Palm Desert, CA 92260 PRESENT: Bruce Baumann, Janiffer Baumann NOT PRESENT BUT NOTIFIED: Nancy Beatty, Tom Beatty 1. The monthly homeowner's dues per lot will remain at 5500.00 per month. 2. New owners (upon completion ofsale, through escrow) will still be required to pay a one-time fee of 52,500.00 to the homeowners association. The deposit can be made directly to Pacific Western Bank, as are monthly homeowner dues. Having no other business or discussion arise, the meeting was adjourned. mitt d Jan: er aumanr., President Cc: Tom Beatty CITY O LA QUINTA BUILDING & SAFETY DEPT. .a VE® r0�� CONSTRUCTION DATE Z�cc/rnuh� tom/ P-011 /017 ~� MADISON ESTATLS, LLC .�r 74-020 ALESSANDRO, SUITE F PALM DESERT, CALIFORNIA 92260 A . FINAL REPORT OI' TEST NG AND OBSERVATION DURING GIWANG 4 LO'T SUBDIVISION, TRACT 29963 LA QULN'TA, CALM ORNIA !November 21, 200. CITY OF LA QUIN BUILDING & SAFETY DEPT. ?. -10VE® FOR CONSTRUCTION 2005 earth Systems Southwc qt Un uthorized use or copying of chic document is strictl '_ roh�bit��d BY without the expres,r wrimtea conscnt of Earl Systems sou File No.: 08589-06 OS -11-80 /O - r 7 -c, -7 i Earth Systems ti Southwest 79-811B Counny Club Dive Bennuda Dunes, CA 92203 (760)345-1588 (800) 924-7015 FAX (760)345-7315 %Iovern* 21, 2005 .1 File No.: 08589-06 05-11-801 Madison Estates, LLC. 74-020 Allessandro, Suite F Palm Desch, California 92260 Attention: Mr- Tofu Beatty Project: 4 Lot Subdivision, Tract 29963 La Quinta. California Subject: Final Report of Testing and Observations Performed During Grading Reference: I. Earth Systems Southwest, Interim Report of Testing and Observations During Grading Tract- 29963, Lv Quinta, California, .File No.: 08539-01, Document No.: 03-09-702, dated August 22, 2003. 2. Earth Systems Southwest, Geotechnical Engineering Report Update with Revised Grading Recommendations for Tract 30834, La Quinta, California, Document No.: 08589-04, No.: 03-03-756, dated March 21, 2003. 3. Earth System Southwest, Geotechnical Engineering Report for 19.2 Acre Residential Development, La Quinta, California, File No.: 08589-01, Report No-: 02-04-792, dated April 26, 2002. Submitted herewith is a report of testing and intermittent observations performed during the grading on the above referenced project. Grading operations were performed by F & F Grading using conventional heavy equipment. Testing was performed as per authorization. of Mr. Tom Beatty. Test results are presented on the attached test report sheet with their estimated locations plotted on the. accompanying plan. Compaction tests -were performed in accordance with ASTM D 2922-81, Method A or B; and ASTM D 3017-88 Nuclear Density Test Procedures. The maximum density and optimum moisture were detennined iE—t ie�_� �orat -in-acco ce with AST?vf D 1557-91, Method A or C. B�,` LDING & SAFETY DEPT. OF LA QUINTA Test result; are as follows: � APPROVED P R ®�� Soil Description USCS Maximum Density FDPOTStrrf�itcJ Brown silty Sand, fuse grained Sm I DATE 110.0 pcf �CS4l� ---- �- . November 21, 2005 - 2 - File No.: 03559-06 05-11-301 DISCUSSION: Th;:, project is located on the north side of Avenue 58, '/z mile west of Nladison Street. in the Citi- of La Quinta, California. 2. ulnar to this grading, the site consisted of partially graded descri lands. 3. The proposed development will consist of 4 single-stor}• farrrily residence, with accompanying street and utility improvements. 4. The scope of our wurlc -was based on plans and staking by (Nolte. 5. The site wits cleared of any pre-existing vegetation prior to grading optrationg. 6. Building pads to receive 3 feei or more of fill were excavated to a depth of 2 feet below eti:i;ting grade. Building pads with less than 3 feet of fill %vere over excavated to a depth of 3 f, -et below finish made or bottom of footings whichever was greater. The bottom: of the excavations were moisture conditioned and compacted in such a manner as to obtain a minimum of 904',) relative compaction for an additional 12 inches. 7. The pads sat for approximately 10 months awaiting import soils to complete the gradin;. l 5. Fill materials consisting of import soils were placed in relatively thin lifts aid corap:•,ctu; into place. r' l 9. A total of 42 Compaction tests were performed. 10. Test res a in the areas tested. H. The test locations are approximate and % sere determined by pacing and sighting fro, prominent field features. In our work; we have relied on topographic and survey information provided by other. 12. Based upon intermittent observations and testing daring theses grading, operations from .fungi 24, 2004 through July 14, 2001, it is our opinion that the grading has met the intent of thie recorlmclydatiorrs of the referenced Geotechnical Engineering Report Update; as well as the grading ordinances of the City of La Quinta. 13. As used herein, the term "observation' implies only ti"at-�«-ab,ced-tb,;�r zss of work the agreed to be involved with, and performed testn� hicla opinion as to whether the work essentially complies w t � rl► q p h lob rzclurrermaerils?FETY DEPT. PROV- 1 'With any manufactured product, there are. statistical v� natio:=r-art i�t,�� r �� � T n the accuracy of tests used to measure its quality. As compared with nthcr rnimufactured products, field construction usually presents large stati:stiral var_ -r_ •a_is it; unifomrih Z. and in the accuracy of test results used to meast re' -its -qua 4-y—�F�us^t- •it-tI careful observation and testing; it emiot be said that at] parts of the prc+,iucl comply with EARTH S a l'E?SIS SOUTH.`:ti ES f j •� / h �i to r �.,`i i' r, — t fi:' _ /• 7 CC -y s November 21, 2005 -3 - File No.: 08589-06 05-11-801 the job requirements, and the degree of certainty is greater with full-time observation and testing than it is with testing only. Therefore, our opinion based on testing the work means that there .is only a statistically -based probability that the densities obtained comply with the job requirements. 15. We make no warranty, express or implied, except that our services were performed in accordance with engineering principles generally accepted at this time and location. 16. It is recommended that Earth Systems Southwest (E SSW) be provided the opportunity for a general review of any changes to the final design and/or location of the proposed structures in order that earthwork and foundation recommendations may be properly interpreted. If ESSW is not accorded the privilege of making this recommended review, we can assume no responsibility for misinterpretation of our recommendations_ 17. This interim report is issued with the understanding that it is the responsibility of the owner, or of his representative, to insure that the information and recommendations contained herein are called to the attention of the architect and engineers for the project and are incorporated into the plans and specifications for the project. It is also the owner's responsibility; or his representative, to ensure that the necessary steps are taken to see that the general contractor and all subcontractors carry out such recommendations in the field. It is farther understood that the owner or his representative is responsible for submittal of thus report to the appropriate governing, agencies. If there are any questions concerning this report, please do not hesitate*to contact this office. Respectfully submitted,_QoFBssro,,, pDG Phillip D. Clanton Supervisory Technician Gmdingipddcslmlajf Distribution: 4/Madison Estates, LLC. I/RC File 2/BD File ;�'e F3 Le )"e P- -R. v,cc cJ, d Reviewed V !r G / Fy ewe r'�11 1�..os it 1 GE 38234 m FcP. 03131 M'+ i Craig S. Hil s CE 38234 �JF: C 'rrF0O� :01 OF LA Q1116VTq BUILDING & SAF �����N DEPT FDP CONSTRUCTION y b Y) L( YI T TI Y EARTH SYSTE.yts 5oU'THWE.i"'C /b-OP7 REPORT OF RELATIVE COINIPACTIONS JOB NAME: Tract 29963 LOCATION: La Quinta, California ate..-� ....�. , ..:, 1'u=49 JOB NO: 08589-06 REPORT NO: 05-11-801 pace 1 of Z Test No Date Tested Description Elevation %Nfoistur ryDensity Relative Maximum In Place In Place' Compaction Density Grading 10 06/24/04 Per Plan 4.0 BPG 10.2 101.5 92 110.0 11 06/24/04 Per Plan 4.0 BPG 9.6 103.8 94 110.0 12 06/24/04 Per Plan 4.0 BPG 11.2 103.6 94 110.0 13 06/25/04 Per PIan 3.0 BSG 7.5 ' 109.4 99 110.0 14 06/25/04 Per Plan 2.0 BSG 6.7 109.6 99 110.0 15 06/25/04 Per Plan 3.0 BSG 8.1 108.5 98 110.0 16 06/25/04 Per Plan 2.0 BSG 7.9 107.7 98 110.0 17 06/25/04 Per Plan 3.0 BSG 8.0 109.3 99 110.0 18 06/25/04 Per Plan 2.0 BSG 8.2 106.8 97 110.0 19 07/02/04 Per Plan 1.5 BSG 7.6 104.6 95 110.0 20 07/02/04 Per Plan 1.5 BSG 7.0 102.4 93 110.0 21 07/02/04 Per Plan 1.5 BSG 5.6 99.3 90 110-0. 22 07/02/04 Per Plan Curb Level 10.3 101.4 92 110.0 2 r . 07/02/04 Per Plan Curb Level '9.0 99.8 90 110.0 07/02/04 Per Plan Curb Level 10.7 100.3 91 110.0 2: •07/02/04 Per Plan Curb Level 11.0 99.7 90 110.0 26 07/02/04 Per Plan. Curb Level 10.7 103.3 94 110.0 27 0WOVO4 -Per Plau CMB eve . 28 07/02/0.4 Per Elan 1.5 BSG 1.5 100.8 91 110.0 29 07/02/04 Per Plan 1.5 BSG 1:9 102.8 94 110.0 30 07/02/04 Per Plan 1.5 BSG 1.5 100.5 91 110.0 31 07/12/04 Pcr Plan 3.0 BSG 7.6 99.9 90 110.0 32 07/12/04 Per Plan 1.0 BSG 9.0 1003 91 110.0 33 07/12/04 -Per Plan 3.0 BSG 7.2 99.2 90 110.0 34 07/12/04 Per Plan 1.5 BSG 8.1 99.2 90 110.0 35 07/12/04 Per Plan 2.0 BSG 8.7 102.6 93 110.0 36 07/12/04 Pcr Plan 1.0 BSG 6.8 101.5 92 110.0 37 07/12/04 Per Plan 1-.0 BSG 8.8 103.1 93 110.0* 38 07/12/04 Per Plan PG 7.4 100.1 91 110.0 39 -01/12/04 Per Plan PG 9.6--- 102.0 92 110.0 40 07112/04 Per Plan PG 811 C qO0 --.5 3 110.0 41 07/12/04 Per PIan PG 580'LGI100:7p I A QeIj .0 G & %FE A 7-Y DE T, l,v„ .imber 21, 2005 v' ' `'UNST�uCTION ���fiSYSBElY1S SOUTllN Z-T-- ��Yl 1O.47,v 7 REPORT OF RELATIVE COMPACTIONS w JOB NAME: Tract 29963 LOCATION: La Quinta, California Test No, Datc Tested Description Finish Grade 07/14/04 Per Plan 07/14/04 Per Plan 07/14/04 Per Plan 07/14/04 Per Plan 07/14/04 Per Plan 07/14/04 Per Plan 07/14/04 Per Plan 07114/04 Per Plan 07/14/04 Per Plan 07/14/04 Per Plan Elevation BSG = Below Suborade PG = Pad Grade PG PG - PG PG PG PG PG PG PG PG A .. V• f 1• V i V � V i JOB NO: 08589-06, REPORT NO: 05-11-801 page 2 of 2 omoisturcUry Vensitl Relative Maxim= In Place I In Place jCompactionj Density 7.4 106.6 96 110.0 6.1 107.4 97 110.0 7.7 104.5 94 110.0 7.7 100.3 90 110.0 5.9 105.1 95 110.0 8.1 102.3 92 110.0 7.4 105.3 95 110.0 6.5 105.5 95 110.0 6.9 104.6- 94 110.0 8.1 108.5 98 110.0 CITY euizo�� , JINTA APTROVED T DEPT. FOR NSTRUC inn► ------------ 12112005 EARII SYSTEMS SOUTMVEST lL'tl14C� ��3�1��% zyclf i'f un f ?/V /0-0-0-7 is a RACT20119 x&ui,L r.uai /ui/ KI la o L /-L TRkZT t3vt KDfiRY w 1 21 35 / Q pp Q �t u 0 LOQ 4 30 i2 3a Q r ► Q 4d 18 � f 0 = Approximate Test Locatioa t o-17-07 Imo' p�--'-- BUILDING & SA �TY D TA I OWN DATE Tract 29963 ta-QuiR a,. ifomia Earth Systems Southwest 11/21/05 1 File No-: 08589-06