Loading...
04-7071 (OFC) Title 24I TITLE 24 REPORT I Title 24 Report for: J. PAUL OFFICE BLDG #1 Corporate Center La Quinta, Ca 92253 Project Designer: SANTAMARIA AND ASSOCIATES 75-853 Merle Dr. Suite'B' Palm Desert, Ca 92211. (760.) 568-3838 Report Prepared By: R.Krown CEA NR01-99-620 Desert Energy Services P.O. Box 621 Rancho Mirage, CA 92270-0621 (760) 564-2044 Job Number: 4464-1 Date: 10/26/2004 5111 Cafnhmia Assoaarion ofOuilding Energy Comb* CERTIFIED ENERGYANALYST RICHARD F. KROWN ROI -93-204 NR 01-99-620 CITY OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION ; 7-0e>/ 4 03 DAT -(I Z- Br BY --C --4 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. o4 This program developed by EnergySoft, LLC (415) 897-6400. EnergyPro 3.1 By EnergySoft Job Number. 4464-1 User Number. 2366 I TABLE OF CONTENTS I Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -3 Proposed Construction Assembly Form ENV -MM Envelope Mandatory Measures Form MECH-MM Mechanical Mandatory Measures HVAC System Heating and Cooling Loads Summary 1 2 3 12 14 15 17 EnergyPro 3.1 By EnergySoft Job Number. 4464-1 User Number. 2366 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and DATE J. PAUL OFFICE BLDG #1 DATE OF PLANS 10/26/2004 PROJECT ADDRESS 6, 519 sy.Ft. CLIMATE ZONE 15 Corporate Center La Quinta for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with thi NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Building Permit # SANTAMARIA AND ASSOCIATES (760) 568-3838 F] ❑ El 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Desert Energy Services 760 564-2044 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to Ouildigg using ftppformance compliance approach. DOCUMENTATION AUTHOR DATE OF PLANS 10/25/04 BUILDING CONDITIONED FLOOR AREA 6, 519 sy.Ft. CLIMATE ZONE 15 BUILDING TYPE for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with thi NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION ENV. LTG. MECH. NEW CONSTRUCTION E] ADDITION 0 ALTERATION E] EXISTING + ADDITION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to Ouildigg using ftppformance compliance approach. DOCUMENTATION AUTHOR SIGUR DATE R.Krown CEA NR01-99-620 yovid The Principal Designers hereby certify that the proposed bbilging desig represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with thi permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. F] ❑ El 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. F] F1 R 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE SANTAMARIA AND ASSOCIATES LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms PRINCIPAL LIGHTING DESIGNER - NAME 7SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 Require orms PRINCIPAL MECHANICAL DESIGNER - NAME POLAR BARR AIR CONDITIONING SIG T LIC. NO. DAT L A- J IEnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-1 Page:3 of 17 1 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 J. PAUL OFFICE BLDG #1 1 DATE10/26/2004 ANNUAL SOURCE ENERGY'USE SUMMARY kBtu/s ft- r Standard ENERGY COMPONENT Design Space Heating 1.61 Space Cooling 64.29 Indoor Fans 25.54 Heat Rejection 0.00 Pumps & Misr.. 0.00 Domestic Hot Water 5.75 Lighting 35.34 Receptacle 22.69 Process 0.00 TOTALS: 155.22 Percent better than Standard: Proposed Compliance Design Margin 1.56 0.05 59.04 5.25 29.41 -3.87 0.00 0.00 0.00 0.00 5.61 0.14 35.34 0.00 22.69 0.00 0.00 o.00 153.66 1.56 1.0% { 1.0% excluding (� sI°Raafa Space Npetlpp i Sp'°°`°°'°'9 f I 0 10 20 30 40 50 BO ) ksiwsyfr-yr - - hdDo. P°"5 Pumps d M - °HN Receptacle Proea55 ' process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones North 0 deg Conditioned Floor Area 6,519 sqft. Unconditioned Floor Area 145 sqft. Conditioned Footprint Area 6,519 sqft. 1 6 2 Orientation Front Elevation North Left Elevation (East) Rear Elevation South Right Elevation (West) Total Roof Gross Area sqft. sqft. sqft. sqft. sqft. sqft. Glazing Area Glazing sqft. sqft. sqft. sqft. sqft. sgft. Ratio 1,544 540 34.9% 915 164 17.9% 1,341 408 30.4% 765 142 18.6% 4,565 1,253 6,519 [ 0.0% Standard Proposed Lighting Power Density 1.200 W/sgft. 1.200 w/sgft. Prescriptive Env. Heat Loss 1,264 Btu/h 1,289 Btu/h Prescriptive Env. Heat Gain 155,254 Btu/h-F 133,243 Btu/h-F LEEd' Energy A m phere Credit Savings vs. Title 241 1.18% Energy Performance Credit2 0 Points 1, excludes process and receptacle 2. see LEED table &c or 8-d Remarks: Standard Building (Compliance) Run Initiation Time: 10/2610415:49:20 Run Code: 1098830960 EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-1 Page:4 of 17 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME J. PAUL OFFICE BLDG #1 DATE 10/26/2004 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sgft.) Inst. LPD (W/sf)l Port. LPD (W/sf)l Ctrl. Tailored Credits LPD (W/sf)2 (W/sq 3 Proc. Loads (W/sf) HEAT PUMP -1 THRU 6 WHOLE BUILDING Comp Bldg Office 6,519 '1.200 Undefined Zone Unconditioned 145 '0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special �'ustification and documentation submitted. al tam I F;pt,�� IThe Construction Assemblv R-13 Demisino Wall has an Outside Absorutivity of 0.00. I I I The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-1 Page:5 of 17 1 [ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME J. PAUL OFFICE BLDG #1 Area U -Fac. Act. Azm. SHGC DATE 10/26/2004 OPAQUE SURFACES 1 Window 30 0.720 Surface Framing Act. # Type Type Area U -Fac. Azm. Tilt Solar Gains YIN Form 3 Reference Location / Comments 1 lRoof Wood 6.519 0.026 0 0 X I I R-38 Roof R.38 Truss WHOLE BUILDING 2 lWall Wood 1 004 0.065 0 90 X11 IR-19Wall W.19.2x6.16 WHOLE BUILDING 3 lWall Wood 751 0.065 90 90 X I IR-19Wall W.19.2x6.16 WHOLE BUILDING 4 lWall lWood 934 0.065 180 90 X I JR-19Wall W.19.2x6.16 WHOLE BUILDING 5 Wall Wood 623 0.065 270 90 x I JR-19Wall W.19.2x6.16 WHOLE BUILDING 6 Demising Wood 451 0.067 0 90 1 X I R-13 Demising Wall WHOLE BUILDING faces Storage & Electri 0 0.40 NR Site Built Dbl Mtl Low E Rooms) 6 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 7 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 8 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 9 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 10 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 11 Window 30 0.720 1 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 12 Window 30 0.720 1 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 13 Window 60 0.720 1 FENESTRATION SURFACES 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING Site Assembled Glazing Check box if Building is - 100,000 sgft of CFA and - 10,000 sqft vertical glazing then NFRC Certification is required. Fallow NFRC 100 -SB Procedures and submit NFRC Lahel Certifirate Fnrm # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 2 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 3 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 4 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 5 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 6 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 7 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 8 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 9 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 10 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 11 Window 30 0.720 1 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 12 Window 30 0.720 1 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 13 Window 60 0.720 1 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 14 Window 30 0.720 90 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 15 Window 104 0.720 90 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None ' 0.76 10.0 3.0 2.0 0.1 6.0 0.0 2 None 0.76 10.0 3.0 2.0 0.1 0.0 6.0 3 None 0.76 10.0 6.0 2.0 0.1 2.0 2.0 4 None 0.76 10.0 3.0 5.0 0.1 17.0 4.0 5 None 0.76 10.0 3.0 5.0 0.1 4.0 17.0 6 None 0.76 10.0 6.0 5.0 0.1 25.0 7.5 7 None 0.76 8 None 0.76 10.0 3.0 5.0 0.1 17.0 4.0 9 None 0.76 10.0 3.0 5.0 0.1 4.0 17.0 10 None 0.76 10.0 6.0 5.0 0.1 7.5 7.5 11 1 None 0.76 10.0 3.0 2.0 0.1 6.0 0.0 12 None 0.76 10.0 3.0 2.0 0.1 0.0 6.0 13 None 0.76 10.0 6.0 2.0 0.1 2.0 2.0 ; 14 None 0.76 15 None 0.76 Run Initiation Time: 10/26/0415:49:20 Run Code: 1098830960 EnergyPro 3.1 By Energysoft User Number: 2366 Job Number: 4464-1 Page:6 of 17 JENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME DATE J. PAUL OFFICE BLDG #1 10/26/2004 OPAQUE SURFACES Solar Surface Framing Act. Gains # Type Type Area U -Fac. Azm. Tilt Y/N Form 3 Reference Location / Comments FENESTRATION SURFACES Site Assembled Glazing Check box if Building is >= 100,000 sqft of CFA and >= 10,000 sqft vertical glazing then NFRC Certification is required. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 16 Window 30 0.720 90 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 17 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 18 Window 52 0.720 180 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 19 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 20 Window 36 0.720 180 1 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 21 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 22 Window 60 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 23 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 24 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 25 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 26 Window 52 0.720 180 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 27 Window 112 0.720 270 1 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 28 Window 30 0.720 270 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang_ Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 16 None 0.76 17 None 0.76 18 None 0.76 8.0 6.5 2.0 0.1 2.0 2.0 19 1 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 20 None 0.76 8.0 4.5 5.0 0.1 8.5 8.5 21 None 0.76 8.0 4.5 5.0 -0.1 2.0 15.0 22 None 0.76 23 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 24 None 0.76 8.0 4.5 5.0 0.1 8.5 25.0 25 None 0.76 8.0 4.5 5.0 0.1 2.0 15.0 26 None 0.76 8.0 6.5 2.0 0.1 2.0 2.0 27 None 0.76 8.0 14.0 4.0 0.1 2.0 2.0 28 None 0.76 Run Initiation Time: 10/26/0415:49:20 Run Code: 1098830960 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-1 Pagel of 17 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE J. PAUL OFFICE BLDG #1 10/26/2004 SYSTEM FEATURES SYSTEM NAME MECHANICAL SYSTEMS DHW Heater I I HEAT PUMP -1 THRU 6 n/a Programmable Switch n/a Heating & Cooling Required n/a n/a n/a Yes n/a 0.0 kW n/a Constant Volume n/a No n/a No n/a Constant Tem n/a Constant Tem n/a n/a n/a Outside Air Cert. n/a Gravity n/a No Economizer n/a 978 cfm Electric Res Heat Pump 99% 7.00 HSPF n/a Packaged DX n/a 10.0 SEER / 8.6 EER AO SMITH ELJF-06' CARRIER 50HS-060-301- Yes Yes Yes Yes n/a n/a Ducts in Attic 4.2 n/a n/a Ducts in Attic 4.2 n/a No NOTE TO FIELD CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch H: Heating Enter Number of I: Inlet Vanes 0: Occupancy C: Cooling Isolation Zones. P: Variable Pitch VAV MINIMUM POSITION CONTROL? Sensor B: Both V: VFD SIMULTANEOUS HEAT /COOL? Y: Yes M: Manual Timer 0: Other C: Curve N: No PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPA VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM B: Air Balance A: Auto A: Air Enter Outdoor Air C: Outside Air Cert G: Gravity W: Water CFM. M: Out. Air Measure N: Not Required Note: This shall be no D: Demand Control EC: Economizer less than Col. H on N: Natural Control See Section MECH-3. 144e3 NOTES TO FIELD - For -Building Department Use Only Run Initiation Time: 10/26/0415:49:20 Run Code: 1098830960 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-1 Page:8 of 17 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME J. PAUL OFFICE BLDG #1 'El 0/26 CHILLER AND TOWER SUMMARY FAN Efficiency Tons PUMPS BHP Eff. Equipment Name Equipment Type Qty. Tot. Qty GPM BHP Motor Eff. Drive Eff. Pump Control DHW / BOILER SUMMARY Energy Factor or Recovery Efficiency Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input (Gals.) Vol. Ext. R -Val. O SMITH ELJF-06' Storage Elec. Point of Use 4 5,120 6 0.95 n/a n/a CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Tye Qty- Output Aux. kW Eff. Output Sensible Efficiency Economizer Type AIRRIER 50HS-060-- 301- 0 Packaged DX 6 57,000 0.0 7.00 HSPF 57,500 40,25010.0 SEER /8.6 EER No Economizer CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RETURN FAN System Name Fan Type CFM BHP Eff. Motor Drive Constant Volume Blow -Through Motor Drive 77.0% 100.0% none � EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 44641 Page:9 of 17 1 Motor Location CFM BHP Eff. Eff. CFM BHP Eff. Eff. CARRIER 50HS-060-- 301- Constant Volume Blow -Through 2,000 0.75 77.0% 100.0% none ]MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-2 PROJECT NAME J. PAUL OFFICE BLDG #1 DATE 10/26/2004 ZONE TERMINAL SUMMARY VAV TERMINAL BOX TERMINAL FAN BASEBOARD Zone Name Type Qtv. Min. CFM Ratio Reheat Coil CFM BHP Motor Eff. Drive Eff. Type Output Type DeltaT —System EXHAUST FAN SUMMARY EXHAUSTFAN EXHAUSTFAN Room Name Qty. CFM BHP Motor Eff. Drive Eff. Room Name Q CFM BHP Motor Eff. Drive Eff. Run Initiation Time: 10/26/0415:49:20 Run Code: 1098830960 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-1 Page: 10 of 17 MECHANICAL VENTILATION MECH-3 PROJECT NAME J. PAUL OFFICE BLDG #1 DATE 10/26/2004 MECHANICAL VENTILATION RA a© o 0 0© o a a o AREA BASIS OCCUPANCY BASIS REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOORVAV AIR CFM MIN. RATIO TRANS- FER AIR ZONE/SYSTEM COND. AREA (SF) CFM PER SF MIN. CFM (B x C) NO. OF PEOPLE CFM PER PERSON MIN. CFM (ExF) WHOLE BUILDING 6,519 0.15 978 978 978 HEAT PUMP -1 THRU 6 Total 978 978 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). I EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-1 Page:11 of 17 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE J. PAUL OFFICE BLDG #1 1 10/26/2004 SUBTOTAL R -VALUE DESCRIPTION ASSEMBLY NAME R-38 Roof R.38 Truss ASSEMBLY Floor OUTSIDE SURFACE AIR FILM 1 Roofing, Built -Up TYPE Wall (check one) Plywood W G W X Ceiling / Roof 4 NFRAMING MATERIAL Wood 3.73 p z FRAMING % 10% Framing % 7 0.36 15% (16" o.c. Wall) 9 12% (24" o.c. Wall) INSIDE SURFACE AIR FILM 10%(16" o.c. Floor/Ceil.) 40.531 77j5.49 SKETCH OF ASSEMBLY 7%(24" o.c. Floor/Ceil.) SUBTOTAL R -VALUE DESCRIPTION 4MING OUTSIDE SURFACE AIR FILM 1 Roofing, Built -Up 2 Plywood 3 Air Space 4 Insulation, Mineral Fiber, R-38 5 3.73 6 1.43 7 0.36 8 9 INSIDE SURFACE AIR FILM SUBTOTAL R -VALUE THICK- NESS (in.) 4MING ❑ ❑ ® ❑X El 0.170 0.375 0.500 2.500 1.500 0.800 12.375 38.000 11.385 3.73 0.38 SUBTOTAL R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.3301 0.330 0.620 0.620 0.800 12.375 38.000 11.385 3.73 0.38 1.43 3.86 0.36 1.39 0.6101 0.610 40.531 77j5.49 KC KT B 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) [ 0.0247 x 0.90 ] 2.19 0.35 0.77 1.42 0.29 0.41 3.73 0.38 1.43 3.86 0.36 1.39 11.21 TOTAL HC 4.0 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing,members. [ 0.0247 x 0.90 ] + [ 0.0392 X 0.10 1 / Rc 1 - (Fr%/ 100) 1 / Rf Fr%/ 100 ASSEMBLY U -VALUE EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-1 Page:12 of 17 1 PROPOSED CONSTRUCTION ASSEMBLY ENV- NAME NV- NAME J. PAUL OFFICE BLDG #1 W D 0 Fy-- fn R -VALUE Z O CAPACITY (Optional) SKETCH OF ASSEMBLY ASSEMBLY NAME ASSEMBLY TYPE (check one) FRAMING MATERIAL FRAMING % R-13 Demising Wall Floor X Wall Ceiling / Roof Wood 0% DATE 10/26/2004 Framing % 15%(16" o.c. Wall) 12% (24" o.c. Wall) 10%(16" o.c. Floor/Ceil.) 7%(24" o.c. Floor/Cell.) CONSTRUCTION COMPONENTS R -VALUE 'HEAT CAPACITY (Optional) THICK- NESS (in.) CAVITY R -VALUE (Rc,) WOOD FRAME R -VALUE WALL WEIGHT (lbslsf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM ❑ ❑X ❑ ❑ ❑ ❑ ❑ ❑ ❑ — 0.170 — — — 1 Gypsum or Plaster Board 0.625 0.562 2.60 0.26 0.68 2 Insulation, Mineral Fiber, R-13 3.500 12.999 0.181 0.17 0.03 3 Gypsum or Plaster Board 0.500. 0.450 2.08 0.26 0.54 4 5 6 7 8 9 'NOTE: INSIDE SURFACE AIR FILM — 0.680 — — Weight and Specific Heat values for materials penetrated SUBTOTA by wood 14.861 Rc framing include Rf the effects 4 g TOTAL HC members. 1 2 of the framing I� X I + [� X 1 / Rc 1 - (Fr%/ 100) 11 Rf Fr%/100 ASSEMBLY U -VALUE COMMENTS EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-1 Page: 13 of 17 ENVELOPE MANDATORY MEASURES ENV -MM PROJECT NAME DATE J. PAUL OFFICE BLDG #1 1 10/26/2004 DESCRIPTION Designer Enforcement 0 §118(a') Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. a§ 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. rXI § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. a § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and. fire doors). § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. § 118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-1 Page:14 of 17 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME DATE J. PAUL OFFICE BLDG #1 1 10/26/2004 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies ©§111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. § 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: © § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; incorporate an automatic holiday "shut- off' feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or § 122(e)1 B An occupancy sensor to control the operating period of the system; or § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. a§ 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(8) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. ® § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number. 2366. Job Number. 4464-1 Page: 15 of 17 11WECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE J. PAUL OFFICE BLDG #1 __ 10/26/2004 Description Designer Enforcement Ventilation § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or F§ 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or a§ 121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or § 121(f)4 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. FXJ § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. 0 §.113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-1 Page:16 of 17 JHVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #1 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -1 THRU 6 6,519 26.0 OF Outside Air 978 cfm 69.7 °F 66.2°F 66.2°F SYSTEM Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD Supply Fan Heating Coil 12000 cfm COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent I CFM I Sensible 10,637 141,369 13,429 5,045 72,392 0 7,068 3,620 0 0 978 38,969 8,397 978 45,493 0 0 7,068 3,620 194,4741 21,827 125 125 IER 50HS-060-301- 212,594 100,252 224,925 Total Adjusted System Output212,594 100,252 224,925 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Jul 3 pm Jan 12 am Temperatures at Time of Heatina Peak) 83.80F Supply Air Ducts 83.5 of ROOMS 70.0 OF Return Air Ducts < I DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0/77.9OF 77.6/66.2°F 77.6/66.2°F 61.0/60.00F Supply Air Ducts Outside Air O 978 cfm Supply Fan Cooling Coil 61.5 / 60.2 OF 12000 cfm 61.6% R.H. ROOMS 74.6/65.00F 74.0/64.8 OF I �% Retum Air Ducts '4 EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-1 Page: 17 of 17 1 I ._w TITLE 24 REPORT I Title 24 Report for: J. PAUL. OFFI.CE.BLD642- Corporate Center La Quinta, Ca 92253 Project Designer: SANTAMARIA AND ASSOCIATES 75-853 Merle Dr. Suite 'B' Palm Desert, Ca 92211 (760) 568-3838 Report Prepared By: R.Krown CEA NR01-99-620 Desert Energy Services P.O. Box 621 Rancho Mirage, CA 92270-0621 (760) 564-2044 Job Number: ,EM .% Date: 10/26/2004 rr BEC Cal.�?3mia Assoc fwn o1 Budding Energy CorisuQa e CE TIEI,E'D ENERGYANALYST RICHAR0, F. KROWN R -01-93-204 NR:O1=99-620 CITY OF LA QUINTA BUILDING & SAFETY DEPT. ,_APPROVED zWNSl�1�E5 N DATBY 6LS� 7 The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized! by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. /t + 01 This program developed by EnergySoft, LLC (415) 897-6400. EnergyPro 3.1 By EnergySoft Job Number. 4464-2 User Number. 2366 A �� I TABLE OF CONTENTS I Cover Page 1 Table of Contents 2 Nonresidential Performance Title 24 Forms 3 Form ENV -3 Proposed Construction Assembly 19 Form ENV -MM Envelope Mandatory Measures 23 Form MECH-MM Mechanical Mandatory Measures 24 HVAC System Heating and Cooling Loads Summary 26 EnergyPro 3.1 By EnergySoft Job Number. 44642 User Number. 2366 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and DATE J. PAUL OFFICE BLDG #2 DATE OF PLANS 10/26/2004 PROJECT ADDRESS CLIMATE ZONE 15 BUILDING TYPE Corporate Center La Quinta E] HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PRINCIPAL DESIGNER - ENVELOPE TELEPHONE Building Permit # SANTAMARIA AND ASSOCIATES (760) 568-3838 n El D 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Desert Energy Services (760) 564-2044 1 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a ding using the pe�rfoigiance compliance approach. DOCUMENTATION AUTHOR DATE OF PLANS 10/25/04 BUILDING CONDITIONED FLOOR AREA 15, 891 sq.Ft. CLIMATE ZONE 15 BUILDING TYPE ® NONRESIDENTIAL E] HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ❑ ADDITION ❑ ALTERATION EXISTING + ADDITION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to a ding using the pe�rfoigiance compliance approach. DOCUMENTATION AUTHOR SIGN RE DATE R.Krown CEA NR01-99-620 I 1 1 leavw The Principal Designers hereby certify that the proposed buil g design represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with thi permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. n F-] 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. n El D 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. ❑ F] ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE SANTAMARIA AND ASSOCIATES LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms PRINCIPAL LIGHTING DESIGNER- NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 Requir rms PRINCIPAL MECHANICAL DESIGNER - NAME S POLAR BARR AIR CONDITIONING T Q LIC. NO. ZQ DAT Run Initiation Time, 10/26/0413:32:06 Run Code: 1098822726 EnergyPm 3.1 By EnergySoft User Number. 2366 Job Number. 44642 Page:3 of 37 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 J. PAUL OFFICE BLDG #2 DATE10/26/2004 ANNUAL SOURCE ENERGY USE SUMMARY kBtu/s ft- r ENERGY COMPONENT Standard Design Proposed Design Compliance Margin [® Standard M Proposed 0.13 AFens 4.97 -4.00 0.00 Hee, Rejection 0.00 Pernpea"& 0.23 °HW 0.00 Lighting 0.00 Process _ 0 10 20 30 40 50 60 1.32 I stwsQa-yr ( 0.8% excluding process) Space Heating Space Cooling Indoor Fans Heat Rejection Pumps & Misc. Domestic Hot Water Lighting Receptacle Process TOTALS: Percent better than Standard: 2.27 2.13 68.40 63.43 32.96 36.96 0.00 0.00 0.00 0.00 7.82 7.59 35.13 35.13 2063. 20.63 0.00 0.00 167.21 165.89 0.8% BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones North 0 deg Conditioned Floor Area 15,891 sqft. Unconditioned Floor Area 182 sqft. Conditioned Footprint Area 15,076 sqft. 2 17 19 Orientation Front Elevation North Left Elevation (East) Rear Elevation South Right Elevation (West)l Total Roof Gross Area sqft. sqft. sqft. sqft. sqft. sgft.sgft. Glazing Area Glazing sqft. sqft, sqft. sqft . sqft. Ratio 4,763 910 19.1% 1,078 192 17.8% 4,971 964 19.4% 3,614 6061 16.80/c 14,426 2,672 10,151 0.0% Standard Proposed Lighting Power Density 1.193 w/sgft. 1.193 w/sgft. Prescriptive Env. Heat Loss 2,875 Btu/h 2,975 Btum Prescriptive Env. Heat Gain 330,278 etu/h-F 286,329 Btu/h-F LEEDS Energy & Atmosphere Credit Savings vs. Title 24' 0.90% Energy Performance Credit2 o Points 1. excludes prods and roeeptacte 2 see LEED table &c or 84 Remarks: Standard Building (Compliance) Run Initiation Time: 10/26/0413:32:06 Run Code: 1098822726 EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 44642 Page:4 of 37 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 of 3 PERF -1 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 1 10/26/2004 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Area (sgfL) Inst. LPD (W/sf)1 PorL LPD (W/sf)1 Ctrl. Tailored Credits LPD (W/sf)2 (W/sf) 3 Proc. Loads (W/sf) HEAT PUMP -1A & 1B OFFICES Office 1,592 *1.300 Undefined Zone Unconditioned 182 *0.000 HEAT PUMP -2A & 2B OFFICES Office 1,648 *1.300 HEAT PUMP -3 OFFICES Office 1,116 *1.300 HEAT PUMP -4 OFFICES Office 1,240 *1.300 HEAT PUMP -5 OFFICES Office 1,240 *1.300 HEAT PUMP -6 OFFICES Office 1,156 *1.300 HEAT PUMP -7A & 7B LOBBY Lobb Main Entry & Assembl 528 *1.500 TOILET ROOMS Corridor/Restroom/Support 290 *0.600 HALLWAY Corridor/Restroom/Support 1,316 *0.600 UTILITY Electrical & Mechanical 23 *0.700 HEAT PUMP -8A & 8B OFFICES Office 1,043 *1.300 HEAT PUMP -9 OFFICES Office 1,043 *1.300 HEAT PUMP -10 OFFICES Office 1,070 *1.300 HEAT PUMP -11 OFFICES Office 1,070 *1.300 HEAT PUMP -12a & 12B LOBBY Lobby (Main Entry & Assembly) 435 *1.500 TOILETS Corridor/Restroom/Support 290 *0.600 HALLWAY Corridor/Restroom/Support 768 *0.600 UTILITY Electrical & Mechanical 23 *0.700 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the speci�all'ustification and documentation submitted. I Plan I Field The Construction Assembly R-13 Demising Wall has an Outside Absorptivity of 0.00. The Room "Storage & Electrical Rooms" has a Heating Indoor Design Temperature of 32 degrees F. The Room "Storage & Electrical Rooms" has a Cooling Indoor Design Temperature of 115 degrees F. The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp Run Initiation Time: 10/26/0413:32:06 Run Code: 1098822726 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-2 Page:5 of 37 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME J. PAUL OFFICE BLDG #2 Area U -Fac. Act. Azm. SHGC DATE 10/26/2004 OPAQUE SURFACES 1 Window 18 0.720 0 0.40 NR Site Built Dbl Mtl Low E Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains Y/N Form 3 Reference Location / Comments 1 Roof Wood 662 0.026 0 0 X11 I R-38 Roof R.38 Truss OFFICES 2 Wall Wood 248 0.065 0 90 X11 IR-19Wall W.19.2x6.16 OFFICES 3 lWall Wood 105 0.065 45 90 X11 IR-19Wall .19.2x6.16 OFFICES 4 Wall Wood 157 0.065 90 90 X11 JR-19Wall W.19.2x6.16 OFFICES 5 Wall Wood 72 0.065 270 90 X11 I R-19 Wall W.19.2x6.16 OFFICES 6 Roof Wood 718 0.026 0 0 X IF I R-38 Roof R.38 Truss OFFICES 7 Wall Wood 320 0.065 0 90 R-19 Wall W.19.2x6.16 OFFICES 8 Wall Wood 72 0.065 90 90 X11 JR-19Wall W.19.2x6.16 OFFICES 9 Wall Wood 279 0.065 270 90 X11 JR-19Wall W.19.2x6.16 OFFICES 10 lWall Wood 105 0.065 315 90 X11 JR-19Wall W.19.2x6.16 OFFICES 11 Demising Wood 25 0.067 0 90 11 X1 R-13 Demising Wall OFFICES faces Storage & Electrical Rooms 12 Roof Wood 942 0.026 0 0 x1l I R-38 Roof R.38 Truss OFFICES 13 Wall Wood 22 0.065 0 90 x1l JR-19Wall W.19.2x6.16 OFFICES 14 Wall Wood 33 0.065 90 90 x1l JR-19Wall W.19.2x6.16 OFFICES 15 Wall Wood 117 0.065 180 90 X11 JR-19Wall .19.2x6.16 OFFICES 16 Wall Wood 105 1 0.065 225 90 X I I R-19 Wall W.19.2x6.16 OFFICES 17 lWall Wood 235 0.065 270 1 90 & R-19 Wall W.19.2x6.16 OFFICES 18 Demisin Wood 204 0.067 0 10.0 R-13 Demisin Wall OFFICES faces Storage & Electrical Rooms 19 Roof Wood 552 0.026 0 ro-g- R-38 Deck R.38 Truss 1 OFFICES 20 Wall Wood 264 0.065 1800 10.0 R-19 Wall W.19.2x6.16 OFFICES FENESTRATION SURFACES ' 0.76 Site Assembled Glazing Check box if Building is - 100,000 sqft of CFA and - 10,000 sqft vertical glazing then NFRC Certification is required. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 18 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 2 Window 60 0.720 0 0.40 NR Site Built Dbl MU Low E FFICES 3 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 4 Window 65 0.720 0 0.40 NR Site Built Dbl MO Low E DFFICES 5 Window 96 0.720 90 0.40 NR Site Built Dbl Mtl Low E FFICES 6 Window 18 0.720 0 0.40 NR Site Built Dbl MU Low E FFICES 7 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 8 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 9 Window 65 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 10 Window 24 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 11 Window 64 0.720 1 270 0.40 NR Site Built Dbl Mtl Low E FFICES 12 Window 32 0.720 180 0.40 NR Site Built Dbl MO Low E FFICES 13 Window 1 64 0.720 270 0.40 NR Site Built Dbl Mtl Low E FFICES 14 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 15 Window 96 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhand_ Left Fin Len. H t. LExt.RExt. Dist. Len. H t. Right Fin Dist. Len. H t. 1 None 0.76 3.0 3.0 6.0 0.5 99.0 99.0 2 None 0.76 10.0 3.0 9.0 0.5 99.0 99.0 3 None 0.76 10.0 6.0 9.0 0.5 99.0 99.0 4 1 None 0.76 10.0 3.0 5.0 0.1 17.0 4.0 5 None 0.76 8.0 12.0 4.0 0.5 99.0 99.0 6 None 0.76 3.0 3.0 6.0 0.5 99.0 99.0 7 None 0.76 10.0 3.0 9.0 0.5 99.0 99.0 8 None 0.76 10.0 6.0 9.0 0.5 99.0 99.0 9 None 0.76 10.0 3.0 5.0 0.1 17.0 4.0 10 1 None 0.76 10.0 3.0 5.0 0.1 4.0 17.0 11 None 0.76 1 8.0 8.0 4.0 0.5 99.0 99.0 12 None 0.76 13 None 0.76 8.0 8.0 4.0 0.5 99.0 99.0 14 None 0.76 15 None 0.76 8.0 4.0 5.0 0.5 99.0 99.0 Run Initiation Time: 10126/04 13:32:06 Run Code: 1098822726 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 44642 Page:6 of 37 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME J. PAUL OFFICE BLDG #2 Area U -Fac. Act. Am. DATE 10/26/2004 OPAQUE SURFACES Location I Comments 16 Window 36 0.720 180 0.40 NR Site Built Dbl MO Low E Surface Framing # Type Type Act. Area U -Fac. Am. Tilt Solar Gains YIN Form 3 Reference Location I Comments 21 Wall Wood 33 0.065 270 90 X11 IR-19Wall W.19.2x6.16 OFFICES 22 Roof Wood 552 0.026 0 0 X11 I R-38 Deck R.38 Truss 1 OFFICES 23 Wall Wood 33 0.065 90 90 X11 IR-19Wall W.19.2x6.16 OFFICES 24 Wall Wood 264 0.065 180 90 X11 JR-19Wall W.19.2x6.16 OFFICES 25 Demising Wood 451 0.067 0 90 11 x I R-13 Demising Wall OFFICES faces Storage & Electrical Rooms 26 Roof Wood 982 0.026 0 0 X11 I R -W Roof R.38 Truss OFFICES 27 Wall Wood 44 0.065 0 90 x1l JR-19Wall .19.2x6.16 OFFICES 28 Wall Wood 342 0.065 90 90 X11 JR-19Wall W.19.24.16 OFFICES 29 Wall Wood 187 0.065 180 1 90 X I JR-19Wall W.19.2x6.16 OFFICES 30 lWall lWood 105 1 0.065 225 1 90 X JR-19Wall W.19.2x6.16 OFFICES 31 Wall Wood 23 0.065 0 1 90 X IR-19Wall .19.2x6.16 LOBBY 32 Demising Wood 94 0.067 0 90 X I R-13 Demising Wall LOBBY faces Storage & Electrical Rooms 33 Wall Wood 99 0.065 0 90 X JR-19Wall .19.2x6.16 TOILET ROOMS 34 Wall Wood 39 0.065 90 90 x I R-19 Wall W.19.2x6.16 TOILET ROOMS 35 Wall Wood 66 0.065 270 90 x I JR-19Wall W.19.2x6.16 TOILET ROOMS 36 Wall Wood 140 0.065 180 90 x I JR-19Wall W.19.2x6.16 HALLWAY 37 Roof Wood 88 0.026 0 0 X R-38 Roof R.38 Truss OFFICES 38 Roof Wood 955 0.029 0 15 X Tile Roof R-38 Truss Gyp OFFICES 39 lWall Wood 1,424 0.065 0 90 R-19 Wall W.19.2x6.16 OFFICES 40 Wall Wood 1,161 0.065 180 90IF-I-R-19Wall W.19.2x6.16 OFFICES FENESTRATION SURFACES 23 None 0.76 Site Assembled Glazing Check box if Building is - 100,000 sqft of CFA and - 10,000 sqft vertical glazing then NFRC Certification is required. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Am. SHGC Glazing Type Location I Comments 16 Window 36 0.720 180 0.40 NR Site Built Dbl MO Low E YFICES 17 Window 96 0.720 180 0.40 NR Site Built Dbl Mtl Low E DFFICES 18 Window 96 0.720 90 0.40 NR Site Built Dbl Mtl Low E YFICES 19 Window 24 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 20 Window 28 1 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 21 Window 60 0.720 0 0.40 NR Site Built Dbl MU Low E OBBY 22 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E OBBY 23 Window 48 0.720 180 0.40 NR Site Built Dbl MO Low E ALLWAY 24 Window 21 0.720 180 0.40 NR Site Built Dbl Mtl Low E JALLWAY 25 Window 30 0.720 0 0.40 NR Site Built Dbl MO Low E DFFICES 26 Window 30 0.720 1 0 0.40 NR Site Built Dbl Mtl Low E FFICES 27 lWindow 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 28 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 29 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 30 Window 52 0.720 180 0.40 NR Site Built Dbl MO Low E FFICES EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Len. H t. LExt.RExt. Dist. Len. H t. Right Fin Dist. Len. H t. 16 None 0.76 17 None 0.76 8.0 4.0 5.0 0.5 99.0 99.0 18 None 0.76 8.0 12.0 4.0 0.5 99.0 99.0 19 None 0.76 20 None 0.76 8.0 6.5 2.0 0.1 2.0 2.0 21 None D.76 10.0 6.0 8.0 0.5 99.0 99.0 22 None 0.76 10.0 3.0 8.0 0.5 99.0 99.0 23 None 0.76 24 None 0.76 25 None 0.76 10.0 3.0 2.0 0.1 6.0 0.0 26 1 None 0.76 10.0 3.0 2.0 0.1 0.0 6.0 27 None 0.76 10.0 6.0 2.0 0.1 2.0 2.0 28 None 0.76 29 None 0.76 30 None 0.76 8.0 6.5 2.0 0.1 2.0 2.0 Run Initiation Time: 10126/0413:32:06 Run Code,• 1098822726 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 44642 Page:7 of 37 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME J. PAUL OFFICE BLDG #2 Area U -Fac. Act. Am. SHGC DATE 10/26/2004 OPAGUE SURFACES 31 Window 36 -0.720 180 0.40 NR Site Built Dbl MO Low E FFICES Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains YIN Form 3 Reference Location I Comments 41 Wall Wood 611 0.065 270 90 X I IR-19wall .19.2x6.16 OFFICES 42 Roof Wood 88 0.026 0 0 X R-38 Roof R.38 Truss OFFICES 43 Roof Wood 955 0.029 1 0 15 X Tile Roof R-38 Truss Gyp OFFICES 44 Wall Wood 1,424 0.065 0 90 x I IR-19Wall .19.9x6.16 OFFICES 45 Wall Wood 36 0.065 90 90 x I I R-19 Wall W.19.2x6.16 OFFICES 46 Wall Wood 581 0.065 270 90 x I IR-19Wall W.19.2x6.16 OFFICES 47 Demising Wood 27 0.067 0 90 1 x I R-13 Demising Wall OFFICES faces Storage 8 Electrical Rooms 48 Roof Wood 6 0.026 0 0 X11 I R-38 Roof R.38 Truss OFFICES 49 Roof Wood 1,064 0.029 0 15 x I Il-ile Roof R-38 Truss Gyp OFFICES 50 lWall lWood 1,161 0.065 1 180 90 X I JR-119Wall W.19.2x6.16 OFFICES 51 Wall Wood 611 0.065 270 90 X I JR-19Wall .19.2x6.16 OFFICES 52 Roof Wood 8 0.026 0 0 x I I R-38 Roof R.38 Truss OFFICES 53 Roof Wood 1,064 0.029 0 15 x Tile Roof R-38 Truss Gyp OFFICES 54 Wall Wood 288 0.065 180 90 X R-19 Wall W.19.2x6.16 OFFICES 55 Wall Wood 271 0.065 270 90 X I JR-19Wall .19.2x6.16 OFFICES 56 Roof Wood 200 1 0.026 0 0 x I I R-38 Roof R.38 Truss LOBBY 57 lRoof iWood 235 1 0.029 0 15 Tile Roof R-38 Truss Gyp LOBBY 58 Wall ood 36 0.065 0 90 R-19 Wall .19.2x6.16 LOBBY 59 Demisina ood 102 0.067 0 90 x R-13 Demising Wall LOBBY faces Storage & Electrical Rooms 60 lRoof Wood 40 1 0.026 0 0 R-38 Roof R.38 Truss TOILETS FENESTRATION SURFACES 38 None 0.76 Site Assembled Glazing 0 Check box if Building is- 100,000 sgft of CFA and- 10,000 sqft vertical glazing then NFRC Certification is required. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Am. SHGC Glazing Type Location I Comments 31 Window 36 -0.720 180 0.40 NR Site Built Dbl MO Low E FFICES 32 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 33 Window 112 0,720 270 0.40 NR Site Built Dbl MU Low E FFICES 34 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 35 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 36 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E FFICES 37 Window 112 0.720 270 0.40 NR Site Built Dbl Mtl Low E FFICES 38 Window 30 0.720 270 0.40 NR Site Built Dbl MU Low E FFICES 39 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 40 Window 28 0.720 180 0.40 NR Site Built Dbl MO Low E FFICES 41 Window 52 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 42 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 43 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES 44 Window 112 0.720 270 0.40 NR Site Built Dbl Mtl Low E FFICES 45 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E FFICES EXTERIOR SHADING # Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Len. H t. LExt.RExt. Dist. Len. H t. Right Fin Dist. Len. H t. 31 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 32 None 0.76 8.0 4.5 5.0 0.1 8.5 8.5 33 None 0.76 8.0 14.0 4.0 0.1 2.0 2.0 34 None 0.76 10.0 3.0 2.0 0.1 6.0 0.0 35 None 0.76 10.0 3.0 2.0 0.1 0.0 6.0 36 None 0.76 10.0 6.0 2.0 0.1 2.0 2.0 37 None 0.76 8.0 14.0 4.0 0.1 2.0 2.0 38 None 0.76 39 None 0.76 40 None 0.76 41 None 0.76 1 8.0 6.5 2.0 0.1 2.0 2.0 42 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 43 None 0.76 8.0 4.5 5.0 0.1 8.5 8.5 44 None 0.76 8.0 14.0 4.0 0.1 2.0 2.0 45 None 0.76 Run Initiation Time: 0/2610413:32:06 Run Code: 1098822726 EnergyPro 3.1 By Energysoft User Number: 2366 Job Number: 44642 Page:8 of 37 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME J. PAUL OFFICE BLDG #2 Area U -Fac. Act. Am. SHGC DATE 10/26/2004 OPAQUE SURFACES 46 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E DFFICES Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains YIN Form 3 Reference Location I Comments 61 Roof Wood 250 0.029 0 15 Tile Roof R-38 Truss Gyp TOILETS 62 Wall Wood 108 0.065 0 90 IXI JR-19Wall W.19.2x6.16 TOILETS 63 Wall Wood 42 0.065 90 90 X I IR-19Wall W.19.2x6.16 TOILETS 64 Wall Wood 72 0.065 270 90 X I JR-19Waill W.19.2x6.16 TOILETS 65 Roof Wood 231 0.026 0 0 x I I R-38 Roof R.38 Truss HALLWAY 66 Roof Wood 537 0.029 0 15 X I I Tile Roof R-38 Truss Gyp HALLWAY 67 Wall Wood 132 0.065 90 90 x I JR-19Wall W.19.2x6.16 HALLWAY 68 Wall Wood 215 0.065 180 1 90 X I I R-19 Wall W.19.2x6.16 HALLWAY 69 lWall lWood 72 0.065 270 90 x I JR-19Wall .19.2x6.16 HALLWAY 70 Roof Wood 23 0.026 0 0 x I I R-38 Roof R.38 Truss UTILITY EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Len. H t. LExt.RExt. Dist. Len. H t. Right Fin Dist. Len. H t. 46 None 0.76 47 None 0.76 8.0 6.5 2.0 0.1 2.0 2.0 48 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 49 None 0.76 8.0 4.5 5.0 0.1 8.5 8.5 FENESTRATION SURFACES 50 None 0.76 8.0 14.0 Site Assembled Glazing Check box if Building is - 100,000 sgft of CFA and - 10,000 sgftvertical glazing then NFRC Certification is required. Follow NFRC 100 -SR Procedures and submit NFRC Label Certificate Forrn_ # Type Area U -Fac. Act. Am. SHGC Glazing Type Location I Comments 46 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E DFFICES 47 Window 52 0.720 180 0.40 NR Site Built Dbl MO Low E DFACES 48 Window 36 0.720 180 0,40 NR Site Built Dbl Mtl Low E DFFICES 49 Window 36 0720 180 0.40 NR Site Built Dbl Mtl Low E DFRCES 50 Window 112 0.720 270 0.40 1 NR Site Built Dbl Mtl Low E FFICES 51 Window 60 0.720 0 0.40 NR Site Built Dbl MO Low E OBBY 52 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E OBBY 53 Window 7 0.720 180 0.40 NR Site Built Dbl MU Low E JALLWAY EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Len. H t. LExt.RExt. Dist. Len. H t. Right Fin Dist. Len. H t. 46 None 0.76 47 None 0.76 8.0 6.5 2.0 0.1 2.0 2.0 48 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 49 None 0.76 8.0 4.5 5.0 0.1 8.5 8.5 50 None 0.76 8.0 14.0 4.0 0.1 2.0 2.0 51 None 0.76 10.0 3.0 6.0 0.5 99.0 99.0 52 None 0.76 10.0 6.0 6.0 0.5 99.0 99.0 53 None 0.76 Run Initiation Time: 10/26/04 13:32:06 Run Code: 1098822726 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 44642 Page:9 of 37 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 YSTEM FEATURES SYSTEM NAME MECHANICAL SYSTEMS DHW Heater I HEAT PUMP -1A & IB I HEAT PUMP -2A & 2B n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a Electric Res 99% n/a n/a AO SMITH ELJF-06' Yes Yes n/a n/a n/a n/a n/a NOTE TO FIELD Run Initiation Time: 1012610413:32:06 Run Code: 1098822726 EnergyPro 3.1 By Energysoft User Number: 2366 Job Number: 4464-2 Page:10 of 37 CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch 0: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT I COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? B: Air Balance C: Outside Air Cert M: Out Air Measure D: Demand Control N: Natural A: Auto G: Gravity A: Air W: Water N: Not Required EC: Economizer Control See Section 144e3 Enter Outdoor Air CFM. Note: This shall be no less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE NOTES TO FIELD - For Building Department Use Only Run Initiation Time: 1012610413:32:06 Run Code: 1098822726 EnergyPro 3.1 By Energysoft User Number: 2366 Job Number: 4464-2 Page:10 of 37 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 [SYSTEM FEATURES SYSTEM NAME MECHANICAL SYSTEMS HEAT PUMP -3 I I HEAT PUMP -4 I HEAT PUMP -5 Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 167 cfm Heat Pum 7.00 HSPF Packaged DX 10.0 SEER / 8.6 EER CARRIER 50HS-060-301- Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No NOTETO FIELD CODE TABLES: Enter code from table below into columns above. —71 I EneravPro 3.1 By EnerovSoft User Number: 2366 Job Number: 44642 Page: 11 of 37 1 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 YSTEM FEATURES SYSTEM NAME MECHANICAL SYSTEMS HEAT PUMP -6 HEAT PUMP -7A & 7B HEAT PUMP -8A 8 8B Programmable Switch Heating & Cooling Re uired n/a Yes 0.0 kW Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 809 cfm Heat Pum 7.00 HSPF Packaged DX 10.0 SEER / 8.6 EER CARRIER 50HS-060-301- Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 156 cfm Heat Pum 7.00 HSPF Packaged DX 10.0 SEER / 8.2 EER CARRIER 50HS-042-301- Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No NOTE TO FIELD CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? Y: Yes N: No TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD O: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT /COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? B: Air Balance C: Outside Air Cert. M: Out. Air Measure D: Demand Control N: Natural I�eerp►s A: Auto G: Gravity A: Air W: Water N: Not Required EC: Economizer Control See Section Enter Outdoor Air CFM. Note: This shall be no less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILINGIROOF SPACE7 Run Initiation Time: 1012610413:32:06 Run Code: 1098822726 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-2 Page: 12 of 37 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 YSTEM FEATURES SYSTEM NAME - MECHANICAL SYSTEMS HEAT PUMP -9 I HEAT PUMP -10 I HEAT PUMP -11 Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 161 cfm Heat Pum 7.00 HSPF Packaged DX 10.0 SEER / 8.6 EER CARRIER 50HS-060-301- Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 161 cfm Heat Pum 7.00 HSPF Packaged DX 10.0 SEER / 8.6 EER CARRIER 50HS-060--301- Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No NOTE TO FIELD Run Initiation Time: 1012610413:32:06 Run Code: 1098822726 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 44642 Page: 13 of 37 CODE TABLES: Enter code from table below into columns above. HEAT PUMP THERMOSTAT? . Y: Yes N: No TIME CONTROL SETBACK CTRL. ISOLATION ZONES FAN CONTROL ELECTRIC HEAT? S: Prog. Switch O: Occupancy Sensor M: Manual Timer H: Heating C: Cooling B: Both Enter Number of Isolation Zones. I: Inlet Vanes P: Variable Pitch V: VFD 0: Other C: Curve VAV MINIMUM POSITION CONTROL? SIMULTANEOUS HEAT /COOL? HEAT AND COOL SUPPLY RESET? VENTILATION OUTDOOR DAMPER ECONOMIZER O.A. CFM HIGH EFFICIENCY? B: Air Balance C: Outside Air Cert M: Out. Air Measure D: Demand Control N: Natural A: Auto G: Gravity A: Air W: Water N: Not Required EC: Economizer Control See Section 144e3 Enter Outdoor Air CFM. Note: This shall be no less than Col. H on MECH-3. PIPE INSULATION REQUIRED? PIPE/DUCT INSULATION PROTECTED? SEALED DUCTS IN CEILING/ROOF SPACE NOTES TO FIELD - For Building Department Use Only Run Initiation Time: 1012610413:32:06 Run Code: 1098822726 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 44642 Page: 13 of 37 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 YSTEM FEATURES SYSTEM NAME MECHANICAL SYSTEMS HEAT PUMP -12a & 126 Programmable Switch Heating & Cooling Required n/a Yes 0.0 kW Constant Volume No No Constant Tem Constant Tem n/a Air Balance Auto No Economizer 628 cfm Heat Pum 7.00 HSPF Packaged DX 10.0 SEER / 8.6 EER CARRIER 50HS-060-301- Yes Yes Ducts in Attic 4.2 Ducts in Attic 4.2 No CODE TABLES: Enter code from table below into columns above. NOTE TO FIELD EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 44642 Page: 14 of 37 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME J. PAUL OFFICE BLDG #2 DATE 10/26/2004 CHILLER AND TOWER SUMMARY RET RN Efficiency Tons PUMPS Motor Location CFM Equipment Name Equipment Type Qty. Tot Qty GPM BHP Motor Eff. Drive Eff. Pump Control Blow -Through 1,200 0.50 77.0% 100.0% none CARRIER 50HS-060- 301- Constant Volume Blow -Through 2,000 1.00 82.5% 100.0°r6 none CARRIER 50HS-042-- 301- Constant Volume Blow -Through 1,400 0.75 77.0% 100.0% DHW / BOILER SUMMARY Energy Factor or Recovery Efficiency Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input (Gals.) Vol. Ext R -Val. O SMITH ELJF-06' Storage Elec. Point of Use 4 5,120 6 0.95 n/a n/a CENTRAL SYSTEM RATINGS HEATING COOLING System Name System T Output Aux. kW Eff. Output Sensible Efficiency Economizer Type 3RRIER 50HS-036-01 Packaged DX 4 35,400 0.0 6.80 HSPF 35,600 24,92010.1 SEER /8.8 EER No Economizer CARRIER 50HS-060— 301 Packaged DX 11 57,000 0.0 7.00 HSPF 57,500 40,25010.0 SEER /8.6 EER No Economizer CARRIER 50HS-042- 301- Packaged DX 2 40,500 0.0 7.00 HSPF 40,000 28,00010.0 SEER /8.2 EER No Economizer CENTRAL SYSTEM FAN SUMMARY SUPPLY FAN RET RN FA System Name Fan Type Motor Location CFM BHP Motor Eff. Drive Eff. CFM BHP Motor Eff. Drive Eff. CARRIER 50HS-036- 301- Constant Volume Blow -Through 1,200 0.50 77.0% 100.0% none CARRIER 50HS-060- 301- Constant Volume Blow -Through 2,000 1.00 82.5% 100.0°r6 none CARRIER 50HS-042-- 301- Constant Volume Blow -Through 1,400 0.75 77.0% 100.0% I EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Pagel 5 of 37 1 none MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-21 PROJECT NAME DATE 1I J. PAUL OFFICE BLDG #2 10/26/2004 VAV TERMINAL BOX TERMINAL FAN BASEBOARD Min. CFM Reheat Coil Motor Drive System Type 0tv. Ratio Type DeftaT CFM BHP Eff. Eff. Type Output Room Name qty. CFM BHP Motor Eff. Drive Eff. Room Name CFM BHP Motor Eff. Drive Eff. _9y. I EnergyPro 3.1 By EnergySoff User Number: 2366 Job Number: 44642 Page: 16 of 37 1 MECHANICAL VENTILATION MECH-3 PROJECT NAME J. PAUL OFFICE BLDG #2 DATE 10/26/2004 MECHANICAL VENTILATION o © a o 0 0© a D a o AREA BASIS OCCUPANCY BASIS REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOORVAVTRANS. AIR CFM MIN. RATIO FER AIR ZONE/SYSTEM COND. AREA (SF) CFM PER SF MIN. CFM (B x C) NO. OF PEOPLE CFM PER PERSON MIN. CFM (ExF) OFFICES 1,592 0.15 239 239 239 HEAT PUMP -1A & 16 Total 239 239 OFFICES 1,648 0.15 247 247 247 HEAT PUMP -2A & 2B Total 247 247 OFFICES 1,116 0.15 167 167 167 HEAT PUMP -3 Total 167 167 OFFICES 1,240 0.15 186 186 186 HEAT PUMP -4 Total 186 186 OFFICES 1,240 0.15 186 186 186 HEAT PUMP -5 Total 186 186 OFFICES 1,156 0.15 173 173 173 HEAT PUMP -6 Total 173 173 LOBBY 528 1.07 565 565 565 TOILET ROOMS 290 0.15 44 44 44 HALLWAY 1,316 0.15 197 197 197 UTILITY 23 0.15 31 3 3 HEAT PUMP -7A & 7B Totall 809 809 OFFICES 1,043 0.15 156 1561 156 HEAT PUMP -8A & 8B Total 156 1561 1 OFFICES 1,043 0.15 156 156 156 HEAT PUMP -9 Total 156 156 OFFICES 1,070 0.15 160 160 161 HEAT PUMP -10 Total 160 161 OFFICES 1,070 0.15 160 160 161 HEAT PUMP -11 Totall 160 161 LOBBY 435 1.07 4651 1 465 465 TOILETS 290 0.15 44 44 44 HALLWAY —77]7681 0.15 115 115 115 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. I Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). I EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-2 Page: 17 of 37 1 MECHANICAL VENTILATION MECH-3 PROJECT NAME J. PAUL OFFICE BLDG #2 DATE 10/26/2004 MECHANICAL VENTILATION FAI © © FP1 ❑E F❑ © 0 0 D] 0 AREA BASIS OCCUPANCY BASIS REO'D O.A. (MAX OF D OR G) DESIGN OUTDOOR AIR CFM VAV MIN. RATIO RANS- FER AIR ZONE/SYSTEM COND. AREA (SF) CFM PER SF MIN. CFM (B x C) NO. OF PEOPLE CFM PER PERSON MIN. CFM (ExF) UTILITY 23 0.15 3 3 3 HEAT PUMP -12a & 12B Total 628 628 C E I K Minimum Ventilation Rate per Section 121, Table 1-F. Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). I EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-2 Page: 18 of 37 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3! PROJECT NAME DATE J. PAUL OFFICE BLDG #2 1 10/26/2004 W p W � p N F- fn Z O SKETCH OF ASSEMBLY ASSEMBLY NAME ASSEMBLY TYPE (check one) FRAMING MATERIAL FRAMING % R-38 Roof R.38 Truss Floor Wall X Ceiling / Roof Wood 10% Framing % 15%(16" o.c. Wall) 12%(24" o.c. Wall) 10%(16" o.c. Floor/Ceil.) 7%(24" o.c. Floor/Cell.) I EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 44642 Page: 19 of 37 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 1 10/26/2004 COMPONENT DESCRIPTION CAVITY R -VALUE (Re) WOOD FRAME R -VALUE THICK- NESS (in.) DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM ❑ © ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0.26 1 Gypsum or Plaster Board 0.625 2 ASSEMBLY NAME R-13 Demising Wall 3 Gypsum or Plaster Board 0.500 4 ASSEMBLY Floor 0.6801 6 14.86 TYPE (check one) X Wall LU W Ceiling / Roof N FRAMING MATERIAL Wood H p ? FRAMING % ❑❑% Framing % 15% (16" o.c. Wall) 12% (24" o.c. Wall) 10%(16" o.c. Floor/Ceil.) SKETCH OF ASSEMBLY 7%(24" o.c. Floor/Ceil.) SUBTOTA R -VALUE CAVITY R -VALUE (Re) WOOD FRAME R -VALUE THICK- NESS (in.) DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM ❑ © ❑ ❑ ❑ ❑ ❑ ❑ ❑ 0.26 1 Gypsum or Plaster Board 0.625 2 Insulation, Mineral Fiber, R-13 3.500 3 Gypsum or Plaster Board 0.500 4 s 0.6801 6 14.86 7 s 9 INSIDE SURFACE AIR FILM TOTAL HC SUBTOTA R -VALUE CAVITY R -VALUE (Re) WOOD FRAME R -VALUE 0.170 0.562 12.999 0.26 0.450 0.18 0.17 0.03 2.08 0.26 0.54 0.6801 1 14.86 RG M A 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (StulF-Ib) HC (A X B) (Btu/F-sf) 2.601 0.26 0.68 0.18 0.17 0.03 2.08 0.26 0.54 4 9 TOTAL HC 1 2 NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. �0 X � ��❑ X 1 / Re 1 - (Fr%/ 100) 11 Rf Fr%/100 ASSEMBLY U -VALUE I EneruvPro 3.1 By EnergvSoft User Number: 2366 Job Number: 44642 Page:20 of 37 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE , J. PAUL OFFICE BLDG #2 10/26/2004 SUBTOTAI R -VALUE DESCRIPTION ASSEMBLY NAME R-38 Deck (R.38 Truss) (1) ASSEMBLY Floor OUTSIDE SURFACE AIR FILM 1 Flooring, Ceramic Tile TYPE Wall (check one) Cement Mortar W LU W X Ceiling l Roof 4 Plywood FRAMING MATERIAL Wood Air Space 6 Insulation, Mineral Fiber, R-38 7 'O Z FRAMING % 10 % Framing % 3.73 9 15% (16" o.c. Wall) 3.86 INSIDE SURFACE AIR FILM 12% (24" o.c. Wall) 40.57 25.53 10% (16" o.c. Floor/Ceil.) SKETCH OF ASSEMBLY 7%(24" o.c. Floor/Ceil.) SUBTOTAI R -VALUE DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 Flooring, Ceramic Tile 2 Cement Mortar 3 Membrane, Vapor -Seal, 2 Layers Mapped 4 Plywood 5 Air Space 6 Insulation, Mineral Fiber, R-38 7 0.29 8 3.73 9 1.43 3.86 INSIDE SURFACE AIR FILM SUBTOTAI R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.150 0.150 0.100 0.100 0.120 0.120 0.6201 0.620 0.800 12.375 38.000 11.385 0.29 0.41 3.73 0.38 1.43 3.86 0.6101 0.610 40.57 25.53 KG KT USW 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) C0.0246 X 0.90 ] 7.50 0.19 1.42 4.83 0.20 0.97 0.06 0.35 0.02 1.42 0.29 0.41 3.73 0.38 1.43 3.86 0.36 1.39 F-21.41 TOTAL HC 5.6 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. C0.0246 X 0.90 ] + [ 0.0392 x 0.10 1 / Rc 1 - (Fr%/ 100) 1 / Rf Fr%/ 100 ASSEMBLY U -VALUE I EnergvPro 3.1 By EnergvSoft User Number: 2366 Job Number: 44642 Page:21 of 37 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE J. PAUL OFFICE BLDG #2 j 10/26/2004 SUBTOTAI R -VALUE DESCRIPTION ASSEMBLY NAME Tile Roof R-38 Truss Gyp ASSEMBLY Floor OUTSIDE SURFACE AIR FILM �] ❑ 1 TYPE Wall (check one) 2 uJ W X Ceiling /Roof Plywood 4 FRAMING MATERIAL Wppd 5 p Z FRAMING % 10 % Framing % 0.20 7 150/6(16" o.c. Wall) 6 0.36 12%(24" o.c. Wall) 0.6101 10%(16" o.c. Floor/Cell.) 40.47 13.86 SKETCH OF ASSEMBLY 7%(24" o.c. Floor/Ceil.) SUBTOTAI R -VALUE DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM �] ❑ 1 Roofing, Asbestos -Cement Shingles 2 Membrane, Vapor -Permeable Felt 3 Plywood 4 Air Space 5 Insulation, Mineral Fiber, R-38 6 0.20 7 0.02 6 0.36 9 0.6101 INSIDE SURFACE AIR FILM SUBTOTAI R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.2101 0.210 0.060 0.060 0.620 0.620 0.800 0.800 38.0001 11.385 0.41 0.20 0.10 0.02 3.86 0.36 1.39 0.6101 0.610 40.47 13.86 KC KT USW `HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) [ 0.0247 X 0.90 ] 2.50 0.24 0.60 0.06 0.35 0.02 1.42 0.29 0.41 0.20 0.10 0.02 3.86 0.36 1.39 8 TOTAL HC 2.4 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. [ 0.0247 X 0.90 ] + [ 0.0722 X 0.10 1 / Rc 1 - (Fr-/. 1100) 11 Rf Fr%/ 100 ASSEMBLY U -VALUE I EnerovPro 3.1 By EneravSoft User Number: 2366 Job Number: 44642 Page:22 of 37 1 ENVELOPE MANDATORY MEASURES ENV -MM PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 DESCRIPTION Designer Enforcement §i18(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3: a§ 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. 0 § 116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). IAI § 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. 0 §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have Insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 44642 Page:23 of 37 MECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MM PROJECT NAME DATE J. PAUL OFFICE BLDG #2 1 10/26/2004 DESCRIPTION Designer Enforcement Equipment and Systems Efficiencies §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light a§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. F§ 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: 0 § 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different shut- schedules for weekdays and weekends; incorporate an automatic holiday "shut- offfeature that turns off all loads for at least 24 hours, then resumes the normally off" feature scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or § 122(e)l B An occupancy sensor to control the operating period of the system; or § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. Nil 5 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating andlor a setup cooling thermostat setpoint § 122(8) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. �( § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. X § 122(c) Thermostats shall have numeric setpoints in degrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. F§ 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Page:24 of 37 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE J. PAUL OFFICE BLDG #2 1 10/26/2004 Description Designer Enforcement Ventilation § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. § 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. § 121(f)1 Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or FV -1 §121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or § 121(f)4 Another method approved by the Commission. Service Water Heating Systems § 113(b)2 if a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. § 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. 0 § 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per minute. Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallonsicycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallonsicycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Page:25 of 37 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -1A & 1 B 1,592 Number of Systems 2 Heating System Output per System 35,400 Total Output (Btuh) 70,800 Output (Btuh/sgft) 44.5 Cooling System Output per System 35,600 Total Output (Btuh) 71,200 Total Output (Tons) 5.9 Total Output (Stuh/sgft) 44.7 Total Output (sgft/Ton) 268.3 Air System CFM per System 1,200 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.51 Airflow (cfm/Ton) 404.5 Outside Air (%) 10.0 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM Sensiblel Latent CFM I Sensible 1,,610 32,545 3,184 740 27,573 0 1,627 1,379 0 0 239 9,495 4,691 239 11,045 0 0 1,627 1,379 45,294 7,8751 41 376 CARRIER 50HS-036-301- 51,963 9,812 46,563 Total Adjusted System Output 51,963 9,812 46,563 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am to I INU SYS 1 tM I'SYUHKUMt I KIt:S Airstream 1 emperaTures aT I Ime oT rleaTln I'eaK 26.0°F 65.1°F 65.1°F 105.0°F O Supply Air Ducts Outside Air 239 cfm Supply Fan Heating Coil 104.5 OF 2400 cfm ROOMS 70.0 OF 69.5 °F I k Return Air Ducts 4 POOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0/77.9°F 78.4/63.5°F 78.4/63.50F 55.0/53.80F Supply Air Ducts Outside Air 239 cfm Supply Fan Cooling Coil 55.6 / 54.1 OF 2400 cfm 49.0% R.H. ROOMS 74.6/61.6 of 74.0/61.4°F 1% Retum Air Ducts `i EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Page:26 of 37 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -2A & 2B 1,648 Number of Systems 1 2 Heating System Output per System 35,400 Total Output (Btuh) 70,800 Output (Btuh/sgft) 43.0 Cooling System Output per System 35,600 Total Output (Btuh) 71,200 Total Output (Tons) 5.9 Total Output (Btuh/sgft) 43.2 Total Output (sgfUTon) 277.8 Air System CFM per System 1,200 Airflow (cfm) 2,400 Airflow (cfm/sgft) 1.46 Airflow (cfmrron) 404.5 Outside Air (%) 10.3 Outside Air (cfm/sgft) 0.15 Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM I Sensiblel Latent I I CFM I Sensible 1,706 34,496 3,296 450 16,744 0 1,725 837 0 0 247 9,550 4,852 247 11,489 0 0 1,725 837 47,5091 8,1481 CARRIER 50HS-036-301- 52,100 10,055 Total Adjusted System Output (Adjusted for Peak Design Conditions) 1 52,100 10,055 TIME OF SYSTEM PEAK Jul 4 pm I Note: values above given at ARI conditions EATING SYSTEM PSYCHROMETRICS (Airstream Temaeratures at Time of Heatina Peak) 26.0 OF 65.2 OF 65.2oF n 105.OoF Outside Air 247 cfm Supply Fan Heating Coil 2400 cfm 69.7 of k Retum Air Ducts `S 11.0/77.6OF 78.4/63.5OF 78.4/63.6OF 55.0/53.80F 310 Outside Air O �; 247 cfm Supply Fan Cooling Coil 2400 cfm 74.7 / 61.6 ° F h Retum Air Ducts y F--297908 46,563 46,563 Jan 12 am Supply Air Ducts 104.7 of ROOMS 70.0 of Supply Air Ducts 55.7/54.1OF 49.1% R.H. ROOMS 74.0 / 61.4 OF EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Page:27 of 37 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -3 1,116 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 51.1 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Btuh/sgft) 51.5 Total Output (sqf rron) 232.9 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.79 Airflow (cfm/Ton) 417.4 Outside Air (%) 8.4 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions HEATING SYSTEM PSYCHROMETRICS 26.0 OF 66.1 OF 66.1 OF Outside Air 167 cfm 69.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensible Latent CFM I Sensible 1,061 21,453 2,299 230 8,577 0 1,073 429 0 0 167 6,498 3,310 167 7,803 0 0 1,073 429 30,0961 -567019 CARRIER 50HS-060-301- 41,149 8,692 Total Adjusted System Outputx1,149 8,692 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 4 pm 1105.00F Supply Fan Heating Coil 2000 cfm 11.0/77.6OF 77.6/63.10F 311 ot Outside Air O 167 cfm Supply Fan 2000 cfm 74.5/61.5 ° F In Retum Air Ducts 4 77.6/63.10F ll 55.0/53.90F Cooling Coil 37,488 37,488 Jan 12 am Supply Air Ducts 104.8 of ROOMS 70.0 of Supply Air Ducts 55.5/54.1OF 48.9% R.H. ROOMS 74.0 / 61.4 of b Retum Air Ducts EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Page:28 of 37 WAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -4 1,240 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 46.0 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Btuh/sgft) 46.4 Total Output (sgWTon) 258.8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.61 Airflow (cfm/Ton) 417.4 Outside Air (%) 9.3 Outside Air (cfm/sgft) 0.15 Note: values above olven at ARI conditions 26.0 OF 65.8 OF Outside Air 0 186 cfm Supply Fan 2000 cfm 69.8 OF 12.0 / 77.9 OF Outside —�--� 186 cfm 74.5/61.6 O F 65.8 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,076 21,761 2,480 199 7,407 0 1,088 370 0 0 186 7,415 3,664 186 8,675 0 0 1,088 370 31 484 6 144 16 822 CARRIER 50HS-060-301- 41,538 8,221 37,488 Total Adjusted System Output 41,538 8,221 37,x88 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK E Aug 3 pm Jan 12 am 105.0 OF Heating Coil �% Return Air Ducts 4 78.0/63.3OF 78.0/63.40F M 55.0/53.80F Supply Fan 2000 cfm Cooling Coil 1% Return Air Ducts `i Supply Air Ducts 104.8 OF R00M7S71 70.0 OF Supply Air Ducts 55.5 / 54.1 OF 48.9% R.H. ROOMS 74.0 / 61.4 OF I EnemvPro 3.1 By EnemvSoft User Number. 2366 Job Number. 4464-2 Pane:29 of 37 1 1HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -5 1,240 NGINEERING CHECKS SYSTEM LOAD Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 46.0 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Btuh/sgft) 46.4 Total Output (sgftrTon) 258.8 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.61 Airflow (cfm/Ton) 417.4 Outside Air (%) 9.3 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions :ATING SYSTEM PSYCHROME 26.0 OF 65.7 of Outside Air 0 186 cfm Supply Fan 2000 cfm 69.8 of Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,135 22,957 2,480 230 8,560 0 1,148 428 0 0 186 7,409 3,6651 186 8,670 0 0 1,148 428 32,7 6 145 18 085 CARRIER 50HS-060-301- 41,573 8,190 37,488 Total Adjusted System Output 41,573 8,190 37,488 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am -earn Temperatures at Time of Heatina Peak) 65.7 OF 105.0 OF Supply Air Ducts Heating Coil 104.8 of ROOMS 70.0 of �% Return Air Ducts 11 DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0 / 77.9 of 78.1 / 63.3 of 78.1 / 63.4 of 55.0/53.80 O Supply Air Ducts Outside Air it 186 cfm Supply Fan Cooling Coil 55.6 / 54.1 of 0 It 2000 cfm 48.9% R.H. ROOMS 74.6/61.60F 74.0/61.4OF H Retum Air Ducts `i I EnergvPro 3.1 By EnerovSoft User Number. 2366 Job Number: 4464-2 Pape:30 of 37 1 4.VAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -6 1,156 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 49.3 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Stub/sgft) 49.7 Total Output (sqftrron) 241.3 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.73 Airflow (cfmrron) 417.4 Outside Air (%) 8.7 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I COIL HTG. PEAK CFM Sensiblel Latent I CFM Sensible 1,185 23,959 2112 1 302 11,250 0 1,198 562 0 0 173 6,908 3,428 173 8,071 0 0 1,198 562 33,273F 5 740 CARRIER 50HS-060-301- 41,365 8,290 Total Adjusted System Output 41,365 8,290 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK I Aug 3 pm 1-20.4461 37,488 37,488 Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0°F 65.9°F 65.9°F 105.0°F O Supply Air Ducts Outside Air 173 cfm 104.7 OF Supply Fan Heating Coil 2000 cfm ROOMS 70.0 OF 69.7 °F >% Retum Air Ducts `i 12.0/77.9°F 77.8/63.2OF77.8/63.2°F�( 55.0/53.8°F J n■' Outside Air 173 cfm 74.6 / 61.5 ° F Supply Fan Cooling Coil 2000 cfm h Retum Air Ducts `i Supply Air Ducts 55.6/54.1OF 48.9% R.H. ROOMS 74.0 / 61.3 OF EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Page:31 of 37 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -7A & 7B 2,157 Number of Systems 2 Heating System Output per System 57,000 Total Output (Btuh) 114,000 Output (Btuhfsgft) 52.8 Cooling System Output per System 57,500 Total Output (Btuh) 115,000 Total Output (Tons) 9.6 Total Output (Stuhfsgft) 53.3 Total Output (sqf rron) 225.1 Air System CFM per System 2,000 Airflow (cfm) 4,000 Airflow (cfmfsgft) 1.85 Airflow (cfm/Ton) 417.4 Outside Air (%) 20.2 Outside Air (cfmfsgft) 0.38 Note: values above elven at ARI conditions 26.0 OF Outside Air 809 cfm 69.9 of 12.0 / 77.9 of Outside 1 809 cfm 74.5/63.0 ° F 61.0 OF 61.0 OF Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK 1 COIL HTG. PEAK CFM I Sensiblel Latent 11 CFM I Sensible 1,964 39,709 22,909 255 9,510 0 1,985 475 0 0 809 32,328 12,310 809 37,803 0 0 1,985 475 76,0215:7735 220 48 264 CARRIER 50HS-060-301- 87,467 17,037 74,975 Total Adjusted System Output87,467 17,037 74,975 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am Supply Fan Heating Coil 4000 cfm �% Return Air Ducts 4 82.1 / 66.3 OF 82.1/66.40F M 55.0/53.80F Supply Fan Cooling Coil 4000 cfm Of 1% Retum Air Ducts `S Supply Air Ducts 104.9 of ROOMS 70.0 of I Supply Air Ducts 55.5/54.0 OF 54.1% R.H. ROOMS 74.0/62.8OF I I EnemvPro 3.1 By EnerovSoft User Number. 2366 Job Number. 4464-2 Pane:32 of 37 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 . 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -8A & 8B 1,043 Number of Systems 2 Heating System Output per System 40,500 Total Output (Btuh) 81,000 Output (Btuh/sgft) 77.7 Cooling System Output per System 40,000 Total Output (Btuh) 80,000 Total Output (Tons) 6.7 Total Output (Btuh/sgft) 76.7 Total Output (sgft/Ton) 156.4 Air System CFM per System 1,400 Airflow (cfm) 2,800 Airflow (cf nisgft) 2.68 Airflow (cfm/Ton) 420.0 Outside Air (%) 5.6 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,967 39,773 2,086 633 23,595 0 1,989 1,180 0 0 156 6,216 3,148 156 7,260 0 0 11989 1,180 49,974 5-2341 33 215 JER 50HS-042-301- 56,340 12,036 53,272 Total Adjusted System Output56,340 12,036 53,272 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 3 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0°F 67.2°F 67.2°F 105.0°F O Supply Air Ducts Outside Air 156 cfm 104.6 OF Supply Fan Heating Coil 2800 cfm ROOMS 69.6 OF 70.0 °F Retum Air Ducts ' 12.0/77.9°F 76.8/62.5°F 76.8/62.6°F 55.0/53.90lowF Outside Air O 156 cfm Supply Fan Cooling Coil 2800 cfm 74.7/61.5 ° F 3.1 User Number. 2366 Retum Air Ducts Job Number. 44642 Supply Air Ducts 55.7/54.1OF 48.5% R.H. ROOMS 74.0 / 61.2 OF 33 of 37 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -9 1,043 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 54.7 Cooling System Output per System 57,500 Total Output (8tuh) 57,500 Total Output (Tons) 4.8 Total Output (Btuh/sgft) 55.1 Total Output (sgftrron) 217.7 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgR) 1.92 Airflow (cfm/Ton) 417.4 Outside Air (%) 7.8 Outside Air (cfm/sgft) 0.15 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensib 15,586 I CFM I Sensible 1,627 32,905 2,086 418 15,586 0 1,645 779 0 0 156 5,632 3,123 156 7,265 0 0 1,645 779 41,8281 5-2709 24 409 CARRIER 50HS-060-301- 41,319 9,044 37,488 Total Adjusted System Output 41,319 9,044 37,488 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 5 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0°F 66.2°F 66.2°F 105.0°F O Supply Air Ducts Outside Air 156 cfm 104.6 °F Supply Fan Heating Coil 2000 cfm ROOMS 70.0 OF 69.6 °F I 08.6/77.0°F Outside Air _ I 156 cfm 74.8/61.6 ° F k Return Air Ducts 4 77.4 / 63.0 OF 77.4 / 63.0 °F 177.1 55.0/53.90F �D� Supply Fan 2000 cfm Cooling Coil f % Return Air Ducts `i Supply Air Ducts 55.8/54.2°F 48.8% R.H. ROOMS 74.0 / 61.3 OF EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number: 4464-2 Page:34 of 37 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOORAREA HEAT PUMP -10 1,070 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 53.3 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Btuh/sgft) 53.7 Total Output (sgft/Ton) 223.3 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.87 Airflow (cfmrron) 417.4 Outside Air (%) 8.0 Outside Air (cfmrsgft) 0.15 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK I I COIL HTG. PEAK CFM I Sensiblel Latent I I CFM I Sensible 1,652 33,410 2,140 423 15,740 0 Outside Air OSupply 1,671 787 0 0 161 6,181 3,193 161 7,452 0 cfm 0 1,671 787 42,96:8[::::;333 CARRIER 50HS-060-301- 41,437 8,396 Total Adjusted System Outputa1,a37 8,396 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 4 pm 24 766 37,488 37,488 Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0°F 66.1°F 66.1°F 105.0°F Air Ducts Outside Air OSupply 161 cfm 104.6 °F Supply Fan Heating Coil 2000 cfm ROOMS 70.0 OF 69.6 OF Retum Air Ducts f DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 111.0/77.6°F 77.7163.10F 77.7/63.10F 55.0/53.80F Supply Air Ducts Outside Air O 161 cfm Supply Fan Cooling Coil 55.8 / 54.2 of 2000 cfm 48.8% R.H. ROOMS 74.8/61.6°F 74.0/61.3°F Retum Air Ducts EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number: 4464-2 Page:35 of 37 WAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -11 1,070 Number of Systems 1 Heating System Output per System 57,000 Total Output (Btuh) 57,000 Output (Btuh/sgft) 53.3 Cooling System Output per System 57,500 Total Output (Btuh) 57,500 Total Output (Tons) 4.8 Total Output (Stuh/sgft) 53.7 Total Output (sgftlTon) 223.3 Air System CFM per System 2,000 Airflow (cfm) 2,000 Airflow (cfm/sgft) 1.87 Airflow (cf nfTon) 417.4 Outside Air (%) 8.0 Outside Air (cfrWsgft) 0.15 Note: values above aiven at ARI conditions 26.0 OF 66.2 OF Outside Air 161 cfm Supply Fan 2000 cfm 69.7 of 66.2 o F Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,486 30,040 2,f40 329 12,249 0 1,502 612 0 0 16 6,194 3,19 161 7,466 0 0 1,502 612 39 288 5 33 20 940 CARRIER 50HS-060-301- 41,339 8,478 37,488 Total Adjusted System Output41,339 8,478 37,488 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Aug 4 pm I Jan 12 am Heating Coil 11.0 / 77.6 of 77.61 63.1 of Outside Air O 161 cfm Supply Fan 2000 cfm 74.7/61.6 of K Retum Air Ducts 4 at Time of 77.6 / 63.1 of I� 55.0 / 53.8 of Cooling Coil k Retum Air Ducts `i Supply Air Ducts 104.7 of ROOMS 70.0 of Supply Air Ducts 55.7/54.1OF 48.8% R.H. ROOMS 74.0 / 61.3 of I EnemvPro 3.1 By EneravSoft User Number. 2366 Job Number. 4464-2 Paae:36 of 37 1 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE J. PAUL OFFICE BLDG #2 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -12a & 12B 1,516 Number of Systems 2 Heating System Output per System 57,000 Total Output (Btuh) 114,000 Output (Btuh/sgft) 75.2 Cooling System Output per System 57,500 Total Output (Btuh) 115,000 Total Output (Tons) 9.6 Total Output (Stuh/sgft) 75.9 Total Output (sgftrron) 158.1 Air System CFM per System 2,000 Airflow (cfm) 4,000 Airflow (cfm/sgft) 2.64 Airflow (cfm/Ton) 417.4 Outside Air (%) 15.7 Outside Air (cfm/sgft) 0.41 Note: values above given at ARI conditions Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM I Sensiblel Latent CFM I Sensible 1,670 33,774 18,212 218 8,126 0 1,689 406 0 0 628 25,113 10,222 628 29,321 0 0 1,689 406 62,2 28 435 38,2601 CARRIER 50HS-060-301- 84,445 18,328 74,975 Total Adjusted System Output (� 445 18,328 74,975 (Adjusted for Peak Design Conditions) I TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am EATING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Heating Peak 26.0°F 63.0 OF 63.0 OF 105.0°F O Supply Air Ducts Outside Air 628 cfm Supply Fan Heating Coil 104.9 °F 4000 drn ROOMS 70.0 of 69.9 of i% Return Air Ducts 4 DOLING SYSTEM PSYCHROMETRICS Airstream Temperatures at Time of Cooling Peak 112.0/77.90F 80.3/65.3OF 80.3/65.4oF 71 55.0/53.90F Supply Air Ducts Outside Air O 628 cfm Supply Fan Cooling Coil 55.4 / 54.0 OF 4000 cfm 52.8% R.H. ROOMS 74.4/62.6 of 74.0/62.5OF h Return Air Ducts i EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-2 Page:37 of 37 TITLE 24 REPORT Title 24 Report for: J. PAUL OFFICE BLDG 43 Corporate Center La Quinta, Ca 92253 Project Designer: SANTAMARIA AND ASSOCIATES 75-853 Merle Dr. Suite 'B' Palm Desert, Ca 92211 (760) 568-3838 Job Number: 4464-3 Date: 10/26/2004 CIN OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION 07 -- DA The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. It- f— o4 This program developed by EnergySoft, LLC (415) 897-6400. EnergyPro 3.1 By EnergySoft Job Number. 4464-3 User Number. 2366 6/nq y e� J Report Prepared By: �rr R. Krown C EA N R01-99-620 CA Desert Energy Services P.O. Box 621 Rancho Mirage, CA 92270-0621 (760) 564-2044 --;0 . .°'J� "� ,un -.1 ANALYST. ;_;?G-Hi';7D F. KROWN ;�. ;. Nfi 01-9.9-620 Job Number: 4464-3 Date: 10/26/2004 CIN OF LA QUINTA BUILDING & SAFETY DEPT. APPROVED FOR CONSTRUCTION 07 -- DA The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards. It- f— o4 This program developed by EnergySoft, LLC (415) 897-6400. EnergyPro 3.1 By EnergySoft Job Number. 4464-3 User Number. 2366 6/nq y e� J 'l1 TABLE OF CONTENTS Cover Page Table of Contents Nonresidential Performance Title 24 Forms Form ENV -3 Proposed Construction Assembly Form ENV -MM Envelope Mandatory Measures Form MECH-MM Mechanical Mandatory Measures .HVAC System Heating and Cooling Loads Summary 1 2 3 12 14 15 17 EnergyPro 3.1 By EnergySoft Job Number. 4464-3 User Number. 2366 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 1 of 3 PERF -1 PROJECT NAME This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and DATE J. PAUL OFFICE BLDG #3 DATE OF PLANS 10/26/2004 PROJECT ADDRESS 6,497Sq.Ft. ZONE 15 Corporate Center La Quinta ® NONRESIDENTIAL Building Permit # PRINCIPAL DESIGNER - ENVELOPE TELEPHONE ADDITION SANTAMARIA AND ASSOCIATES (760) 568-3838 R 0 ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed DOCUMENTATION AUTHOR TELEPHONE Checked by/Date Desert Energy Services (760) 564-2044 1 Enforcement Agency Use GENERAL INFORMATION This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to ilding using the performance compliance approach. —77CLIMATE DATE OF PLANS 10/25/04 BUILDING CONDITIONED FLOOR AREA 6,497Sq.Ft. ZONE 15 BUILDING TYPE ® NONRESIDENTIAL HIGH RISE RESIDENTIAL HOTELIMOTEL GUEST ROOM PHASE OF CONSTRUCTION ® NEW CONSTRUCTION ADDITION [—] ALTERATION EXISTING + ADDITION STATEMENT OF COMPLIANCE This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6, of the State Building Code. This certificate applies only to ilding using the performance compliance approach. DOCUMENTATION AUTHOR SIG URE DAT R. Krown CEA N R01-99-620 I ttn ,,— /v aje The Principal Designers hereby certify that the proposed b it g design represented in the construction documents and modelled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with thi permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code, Title 24, Part 6. ENV. LTG. MECH. ❑ 1. 1 hereby affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed as a civil engineer, mechanical engineer, electrical engineer or architect. R 0 ❑ 2. 1 affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor preparing documents for work that I have contracted to perform. ❑ R ❑ 3. 1 affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document because it pertains to a structure or type of work described as exempt pusuant to Business and Professions Code Sections 5537, 5538, and 6737.1. (These sections of the Business and Professions Code ae printed in full in the Nonresidential Manual.) ENVELOPE COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures ENV -1 Required Forms PRINCIPAL ENVELOPE DESIGNER - NAME SIGNATURE LIC. NO. DATE SANTAMARIA AND ASSOCIATES LIGHTING COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures Lighting Compliance Not In The Scope Of Required Forms PRINCIPAL LIGHTING DESIGNER - NAME SIGNATURE LIC. NO. DATE MECHANICAL COMPLIANCE Indicate location on plans of Note Block for Mandatory Measures MECH-1 MECH-2 MECH-3 Require orms PRINCIPAL MECHANICAL DESIGNER - NAME LIC. NO. DATE �S�T POLAR BARR AIR CONDITIONING �S. 2-z.- 1 l W�� j EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-3 Page:3 of 17 1 [PERFORMANCE CERTIFICATE OF COMPLIANCE Part 2 of 3 PERF -1 J. PAUL OFFICE BLDG #3 1 DATE 10/26/200 ANNUAL SOURCE ENERGY USE SUMMARY Mu/s ft- r Standard ENERGY COMPONENT Design Space Heating 1.57 Space Cooling 60.91 Indoor Fans 25.35 Heat Rejection 0.00 Pumps & Misc. 0.00 Domestic Hot Water 5.77 Lighting 35.32 Receptacle 22.72 Process 0.00 TOTALS: 151.64 Percent better than Standard: Proposed Compliance Design Margin 1.48 0.09 56.20 4.71 29.51 -4.16 0.00 0.00 0.00 0.00 5.59 0.18 35.32 0.00 22.72 0.00 150.81 0.83 0.5% ( 0.5% excluding io Standard®_ProposedY�-�- s°°`°" -Mg 4�. $peCeCo°'"0 'C r If H°°'"°'°a"" I .s PY1°pSaM1 5C ) # °HM' f "'tft'fl: i 0 10 20 30 40 50 60 MWsgft-yr process) BUILDING COMPLIES GENERAL INFORMATION Building Orientation Number of Stories Number of Systems Number of Zones North 0 deg Conditioned Floor Area 6,497 sqft. Unconditioned Floor Area 145 sqft. Conditioned Footprint Area 6,519 sqft. 1 6 2 Orientation Front Elevation North Left Elevation (East) Rear Elevation South Right Elevation (west) Total Roof Gross Area sqft. sqft. sqft. sqft. sqft. sgft.sgft. Glazing Area Glazing sqft. sqft. sqft. sqft. sqft. 1 Ratio 1,511 540 35.7% 873 0 0.0% 1,308 348 26.6% 723 142 19.6% 4,415 1,030 23.3% 6519 0.0% Standard Proposed Lighting Power Density 1.200 w/sgft. 1.200 w/sgft. Prescriptive Env. Heat Loss 1,160 MUM 1,133 MUM Prescriptive Env. Heat Gain 138,454 Btu/h-F 112,306 Btu/h-F LEEDTm Energy & Atmosphere Credit Savings vs. Title 241 0.64% Energy Performance Credit2 0 Points 1. excludes process and reeeptacla 2. see LEED table tic or8-d Remarks: Standard Building (Compliance) Run Initiation Time: 10/26/0415:46:37 Run Code: 1098830797 EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-3 Page:4 of 17 PERFORMANCE CERTIFICATE OF COMPLIANCE Part 3 Of 3 PERF -1 PROJECT NAME J. PAUL OFFICE BLDG #3 DATE 10/26/2004 ZONE INFORMATION System Name Zone Name Occupancy Type Floor Inst. Port. Area LPD LPD (sgft.) (Wlsf)1 (W/sf)1 Ctrl. Tailored Credits LPD (W/S2 (W/sf) 3 Proc. Loads (W/sf) HEAT PUMP -1 THRU 6 WHOLE BUILDING Comp Bldg Office 6,497 '1.200 Undefined Zone Unconditioned 145 '0.000 Notes: 1. See LTG -1 (items marked with asterisk, see LTG -2 by others) 2. See LTG -3 3. See LTG -4 Items above require special documentation EXCEPTIONAL CONDITIONS COMPLIANCE CHECKLIST The local enforcement agency should pay special attention to the items specified in this checklist. These items require special written justification and documentation, and special verification to be used with the performance approach. The local enforcement agency determines the adequacy of the justification, and may reject a building or design that otherwise complies based on the adequacy of the special 'ustification and documentation submitted. I pl.. I ri.m IThe Construction Assembly R-13 Demising Wall has an Outside Absorptivity of 0.00. I I I The exceptional features listed in this performance approach application have specifically been reviewed. Adequate written justification and documentation for their use have been provided by the applicant. Authorized Signature or Stamp I EnergyPro 3.1 By EnergySoft- User Number: 2366 Job Number: 4464-3 Paoe:5 of 17 1 ENVELOPE COMPLIANCE SUMMARY Performance ENV -1 PROJECT NAME J. PAUL OFFICE BLDG #3 Area U -Fac. Act. Azm. DATE 10/26/2004 OPAQUE SURFACES Location / Comments 1 Window 30 0.720 0 Surface Framing # Type Type Act. Area U -Fac. Azm. Tilt Solar Gains y/N Form 3 Reference Location / Comments 1 Roof Wood 6,519 0.026 0 0 X11 I R-38 Roof R.38 Truss WHOLE BUILDING 2 Wall Wood 972 0.065 0 90 X 11 IR-`19Wall .19.2x6.16 WHOLE BUILDING 3 Wall Wood 873 0.065 90 90 X 11 IR-19Wall .19.2x6.16 WHOLE BUILDING 4 Wall Wood 960 0.065 180 90 X11 JR-19Wall W.19.2x6.16 WHOLE BUILDING 5 Wall Wood 581 0.065 270 90 x1l JR-119Wall W.19.2x6.16 WHOLE BUILDING 6 Demising Wood 451 0.067 0 90 X R-13 Demising Wall WHOLE BUILDING faces Storage & Electri 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 8 Window Rooms) 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 9 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 10 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 11 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E HOLE BUILDING 12 Window 30 0.720 1 0 1 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 13 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 14 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 15 Window 52 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 10.0 3.0 2.0 0.1 6.0 0.0 FENESTRATION SURFACES 2 None 0.76 10.0 3.0 Site Assembled Glazing Check box if Building is - 100,000 sqft of CFA and - 10,000 sqft vertical glazing then NFRC Certification is required. Follow NFRC 100 -SB Procedures and submit NFRC Label Certificate Form. # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 1 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 2 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 3 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 4 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E MHOLE BUILDING 5 lWindow 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E HOLE BUILDING 6 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 7 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 8 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 9 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 10 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 11 Window 30 0.720 0 0.40 NR Site Built Dbl Mtl Low E HOLE BUILDING 12 Window 30 0.720 1 0 1 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 13 Window 60 0.720 0 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 14 Window 28 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 15 Window 52 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 1 None 0.76 10.0 3.0 2.0 0.1 6.0 0.0 2 None 0.76 10.0 3.0 2.0 0.1 0.0 6.0 3 None 0.76 10.0 6.0 2.0 0.1 2.0 2.0 4 None 0.76 10.0 3.0 5.0 0.1 17.0 4.0 5 None 0.76 10.0 3.0 5.0 0.1 4.0 17.0 6 None 0.76 10.0 6.0 5.0 0.1 25.0 7.5 7 None 0.76 8 None 0.76 10.0 3.0 5.0 0.1 17.0 4.0 9 None 0.76 10.0 3.0 5.0 0.1 4.0 17.0 10 None 0.76 10.0 6.0 5.0 0.1 7.5 7.5 11 None 0.76 10.0 3.0 2.0 0.1 6.0 0.0 12 None 0.76 10.0 3.0 2.0 0.1 0.0 6.0 13 None 0.76 10.0 6.0 2.0 0.1 2.0 2.0 14 None 0.76 15 None 0.76 1 8.0 6.5 2.0 0.1 2.0 2.0 Run Initiation Time: 10/26/0415:46:37 Run Code: 1098830797 EnergyPro 3.1 By Energysoft User Number: 2366 Job Number: 4464-3 Page:6 of 17 ENVELOPE COMPLIANCE SUMMARY I Performance ENV -1 PROJECT NAME DATE J. PAUL OFFICE BLDG #3 10/26/2004 OPAQUE SURFACES Solar Surface Framing Act. Gains # Type Type Area U -Fac. Azm. Tilt Y/N Form 3 Reference Location / Comments FENESTRATION SURFACES Site Assembled Glazing 1:1 Check box if Building is - 100,000 sgft of.CFA and >= 10,000 sgft vertical glazing then NFRC Certification is required. Fnllnw NFRC Inn -SR Pmr.Mijrec and cuhmit NFRC I ahel Certificate Form_ # Type Area U -Fac. Act. Azm. SHGC Glazing Type Location / Comments 16 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 17 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 18 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING 19 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 20 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 21 Window 36 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 22 Window 52 0.720 180 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 23 Window 112 0.720 270 0.40 NR Site Built Dbl Mtl Low E NHOLE BUILDING 24 Window 30 0.720 270 0.40 NR Site Built Dbl Mtl Low E WHOLE BUILDING EXTERIOR SHADING ## Exterior Shade Type SHGC Window Hgt. Wd. Overhang Left Fin Right Fin Len. H t. LExt.RExt. Dist. Len. H t. Dist. Len. H t. 16 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 17 None 0.76 8.0 4.5 5.0 0.1 8.5 8.5 18 None 0.76 8.0 4.5 5.0 0.1 2.0 15.0 19 None 0.76 8.0 4.5 5.0 0.1 15.0 2.0 20 None 0.76 8.0 4.5 5.0 0.1 8.5 25.0 21 None 0.76 8.0 4.5 5.0 0.1 2.0 15.0 22 None 0.76 8.0 6.5 2.0 0.1 2.0 2.0 23 None 0.76 8.0 14.0 4.0 0.1 2.0 2.0 24 None 0.76 Run Initiation Time: 10/26/0415:46:37 Run Code: 1098830797 EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-3 Page:7 of 17 CERTIFICATE OF COMPLIANCE Performance MECH-1 PROJECT NAME DATE J. PAUL OFFICE BLDG #3 10/26/2004 SYSTEM FEATURES SYSTEM NAME MECHANICAL SYSTEMS DHW Heater HEAT PUMP -1 THRU 6 n/a Programmable Switch n/a Heating & Cooling Required n/a n/a n/a Yes n/a 0.0 kW n/a Constant Volume n/a No n/a No n/a Constant Tem n/a Constant Tem n/a n/a n/a Outside Air Cert. n/a Gravity n/a No Economizer n/a 975 cfm Electric Res Heat Pum 99% 7.00 HSPF n/a Packaged DX n/a 10.0 SEER / 8.6 EER AO SMITH ELJF-06' CARRIER 50HS-060-301- Yes Yes Yes Yes n/a n/a Ducts in Attic 4.2 n/a n/a Ducts in Attic 4.2 n/a No CODE TABLES: Enter code from table below into columns above. NOTE TO FIELD I EnerayPro 3.1 By EneroySoft User Number: 2366 Job Number: 44643 Paae:8 of 17 1 MECHANICAL EQUIPMENT SUMMARY Part 1 of 2 MECH-2 PROJECT NAME J. PAUL OFFICE BLDG #3 DATE 10/26/2004 CHILLER AND TOWER SUMMARY BHP Efficiency Tons PUMPS I BHP Motor Eff. Equipment Name Equipment Type Qty. Tot. Qty GPM I BHP Motor I Eff. Drive Eff. Pump Control DHW / BOILER SUMMARY Energy Factor or Recovery I Efficiency Standby Loss or Pilot TANK INSUL. System Name System Type Distribution Type Qty Rated Input I (Gals.) Vol. Ext. R -Val. O SMITH ELJF-06` Storage Elec. Point of Use 4 5,120 6 0.95 n/a n/a CENTRAL SYSTEM RATINGS HEATING COOLING System Name System Type Qty. Output Aux. kW Eff. Output Sensible Efficiency Economizer Type 3RRIER 50HS-060-01 Packaged DX 6 57,000 0.0 7.00 HSPF 57,500 40,25010.0 SEER /8.6 EER No Economizer SIIPPI V FON RFTI IRN FAN System Name Fan Dfpe Motor Location CFM BHP Motor Eff. Drive Eff. CFM I BHP Motor Eff. Drive Eff. CARRIER 50HS-060--. 301- Constant Volume Blow -Through 1,900 0.75 77.0% 100.0% none I EnemvPro 3.1 By EnemvSoft User Number. 2366 Job Number. 4464-3 Paae:9 of 17 1 ;-MECHANICAL EQUIPMENT SUMMARY Part 2 of 2 MECH-21 PROJECT NAMEDATE J_ PAUL OFFICE BLDG #3 10/26/2004 TERMINAL SUMMAR VAV TERMINAL BOX Min. CFM Reheat Coil System Type Q. Ratio T e DeltaT Motor Drive Room Name Qtv_ CFM I BHP Eff. Eff. Moto ' Drive CFM I BHP Eff. Eff. I I Type Output EXHAUSTFAN Room Name Q CFM BHP Motor Eff. Drive Eff. I EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-3 Page:10 of 17 1 MECHANICAL VENTILATION MECH-3 PROJECT NAME J. PAUL OFFICE BLDG #3 DATE 10/26/2004 MECHANICAL VENTILATION A] ©© 0 0 0© o a o 0 AREA BASIS OCCUPANCY BASIS REQ'D O.A. (MAX OF D OR G) DESIGN OUTDOOR AIR CFM VAV MIN. RATIO TRANS. FER AIR ZONE/SYSTEM COND. AREA (SF) CFM PER SF MIN. CFM (B x C) NO. OF PEOPLE CFM PER PERSON MIN. CFM (ExF) WHOLE BUILDING 6,497 0.15 975 975 975 HEAT PUMP -1 THRU 6 Total 975 975 C Minimum Ventilation Rate per Section 121, Table 1-F. E Based on Expected Number of Occupants or at least 50% of Chapter 10 1997 UBC Occupant Density. 1 Must be greater than or equal to H, or use Transfer Air. Design Outdoor Air includes ventilation from Supply Air System & Room Exhaust Fans. K Must be greater than or equal to (H minus 1), and, for VAV, greater than or equal to (H -J). I EnergvPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-3 Page:11 of 17 1 PROPOSED CONSTRUCTION ASSEMBLY ENV -3 PROJECT NAME DATE J. PAUL OFFICE BLDG #3 1 10/26/2004 COMPONENT DESCRIPTION DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 Roofing, Built -Up 2 Plywood 3 Air Space 4 Insulation, Mineral Fiber, R-38 5 ASSEMBLY NAME R-38 Roof R.38 Truss 1.43 7 0.36 8 ASSEMBLY Floor INSIDE SURFACE AIR FILM 0.610 40.531 TYPE (check one) Wall W 0 W X Ceiling / Roof NFRAMING MATERIAL Wood p Z FRAMING % 10 % Framing % 15%(16" o.c. Wall) 12% (24" o.c. Wall) 10%(16" o.c. Floor/Ceil.) SKETCH OF ASSEMBLY 7%(24" o.c. Floor/Ceil.) SUBTOTAL R -VALUE DESCRIPTION WOOD FRAME R -VALUE OUTSIDE SURFACE AIR FILM 1 Roofing, Built -Up 2 Plywood 3 Air Space 4 Insulation, Mineral Fiber, R-38 5 3.73 6 1.43 7 0.36 8 9 INSIDE SURFACE AIR FILM SUBTOTAL R -VALUE CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE 0.170 0.170 0.3301 0.330 0.620 0.620 0.800 12.375 38.000 11.385 3.73 0.38 1.43 3.86 0.36 1.39 0.6101 0.610 40.531 25.49 rtc M ASW 'HEAT CAPACITY (Optional) WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-Ib) HC (A X B) (Btu/F-sf) [ 0.0247 X 0.90 -,-I+ 2.19 0.35 0.77 1.42 0.29 0.41 3.73 0.38 1.43 3.86 0.36 1.39 11.21 TOTAL HC 4.0 'NOTE: Weight and Specific Heat values for materials penetrated by wood framing include the effects of the framing members. [ 0.0247 X 0.90 -,-I+ [ 0.0392 X 0.10 11 Rc 1 - (Fr%/ 100) 1 / Rf Fr%/ 100 ASSEMBLY U -VALUE EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-3 Page: 12 of 17 1 11 PROPOSED CONSTRUCTION ASSEMBLY ENV - PROJECT NAME DATE J. PAUL OFFICE BLDG #3 1 10/26/2004 COMPONENT DESCRIPTION a R -VALUE 'HEAT ASSEMBLY NAME R-13 Demising Wall THICK- NESS (in.) CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-lb) ASSEMBLY Floor FRAMING OUTSIDE SURFACE AIR FILM ❑ © ❑ ❑ ❑ ❑ ❑ ❑ ❑ — TYPE (check one) XWall — — 0 W Gypsum or Plaster Board Ceiling I Roof 0.5621 2.60 NFRAMING MATERIAL Wood Insulation, Mineral Fiber, R-13 3.500 12.999 0.18 0.17 0.03 3 O ZFRAMING % ° 0 �o Framing 0.26 0.:,54 4 15%(16" o.c. Wall) 5 12% (24" o.c. Wall) 10%(16" o.c. Floor/Cell.) 6 SKETCH OF ASSEMBLY 7%(24" o.c. Floor/Cell.) CONSTRUCTION COMPONENTS a R -VALUE 'HEAT CAPACITY (Optional) THICK- NESS (in.) CAVITY R -VALUE (Rc) WOOD FRAME R -VALUE WALL WEIGHT (lbs/sf) SPECIFIC HEAT (Btu/F-lb) HC (A X B) (Btu/F-sf) DESCRIPTION FRAMING OUTSIDE SURFACE AIR FILM ❑ © ❑ ❑ ❑ ❑ ❑ ❑ ❑ — 0.170 — — — 1 Gypsum or Plaster Board 0.625 0.5621 2.60 0.26 0.68 2 Insulation, Mineral Fiber, R-13 3.500 12.999 0.18 0.17 0.03 3 Gypsum or Plaster Board 0.500 0.450 2.08 0.26 0.:,54 4 5 6 7 8 9 *NOTE: INSIDE SURFACE AIR FILM — 0.680 14.861 Rc framing include Rt the effects Weight and Specific Heat values for materials penetrated SUBTOTA by wood TOTAL HC members. 1 2 of the framing 1 / Rc 1 - (Fr%/ 100) 1 / Rf Fr%I 100 ASSEMBLY U -VALUE COMMENTS EnergyPro 3.1 By EnergySoft User Number: 2366 Job Number: 4464-3 Page: 13 of 17 ENVELOPE MANDATORY MEASURES ENV -MM PROJECT NAME DATE J. PAUL OFFICE BLDG #3 1 10/26/2004 DESCRIPTION Designer Enforcement FRI §i18(a) Installed Insulating Material shall have been certified by the manufacturer to comply with the California Quality Standards for insulating material, Title 20, Chapter 4, Article 3. X] § 118(c) All Insulating Materials shall be installed in compliance with the flame spread rating and smoke density requirements of Sections 2602 and 707 of Title 24, Part 2. FX § 117(a) All Exterior Joints and openings in the building that are observable sources of air leakage shall be caulked, gasketed, weatherstripped or otherwise sealed. X] §116(b) Site Constructed Doors, Windows and Skylights shall be caulked between the unit and the building, and shall be weatherstripped (except for unframed glass doors and fire doors). F§ 116(a)1 Manufactured Doors and Windows installed shall have air infiltration rates not exceeding those shown in Table Number 1-E. of the Standards. Manufactured fenestration products must be labeled for U -value according to NFRC procedures. IAJ §118(e) Demising Walls in Nonresidential Buildings: The opaque portions of framed demising walls in nonresidential buildings shall have insulation with an installed R -value of no less than R-11 between framing members. EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-3 Page: 14 of 17 •'IMECHANICAL MANDATORY MEASURES Part 1 of 2 MECH-MMI PROJECT NAME DATE J. PAUL OFFICE BLDG #3 1 10/26/2004 DESCRIPTION Desi ner Enforcement Equipment and Systems Efficiencies §111 Any appliance for which there is a California standard established in the Appliance Efficiency Regulations will comply with the applicable standard. § 115(a) Fan type central furnaces shall not have a pilot light. a§ 123 Piping, except that conveying fluids at temperatures between 60 and 105 degrees Fahrenheit, or within HVAC equipment, shall be insulated in accordance with Standards Section 123. § 124 Air handling duct systems shall be installed and insulated in compliance with Sections 601, 603 and 604 of the Uniform Mechanical Code. Controls § 122(e) Each space conditioning system shall be installed with one of the following: a§ 122(e)1A Each space conditioning system serving building types such as offices and manufacturing facilities (and all others not explicitly exempt from the requirements of Section 112 (d)) shall be installed with an automatic time switch with an accessible manual override that allows operation of the system during off -hours for up to 4 hours. The time switch shall be capable of programming different schedules for weekdays and weekends; incorporate an automatic holiday "shut- off" feature that turns off all loads for at least 24 hours, then resumes the normally scheduled operation; and has program backup capabilities that prevent the loss of the device's program and time setting for at least 10 hours if power is interrupted; or Q§ 122(e)1 B An occupancy sensor to control the operating period of the system; or F] § 122(e)1C A 4 -hour timer that can be manually operated to control the operating period of the system. a§ 122(e)2 Each space conditioning system shall be installed with controls that temporarily restart and temporarily operate the system as required to maintain a setback heating and/or a setup cooling thermostat setpoint. § 122(g) Each space conditioning system serving multiple zones with a combined conditioned floor area more than 25,000 square feet shall be provided with isolation zones. Each zone: shall not exceed 25,000 square feet; shall be provided with isolation devices, such as valves or dampers, that allow the supply of heating or cooling to be setback or shut off independently of other isolation areas; and shall be controlled by a time control device as described above. § 122(a&b) Each space conditioning system shall be controlled by an individual thermostat that responds to temperature within the zone. Where used to control heating, the control shall be adjustable down to 55 degrees F or lower. For cooling, the control shall be adjustable up to 85 degrees F or higher. Where used for both heating and cooling, the control shall be capable of providing a deadband of at least 5 degrees F within which the supply of heating and cooling is shut off or reduced to a minimum. § 122(c) Thermostats shall have numeric setpoints iddegrees Fahrenheit (F) and adjustable setpoint stops accessible only to authorized personnel. § 112(b) Heat pumps shall be installed with controls to prevent electric resistance supplementary heater operation when the heating load can be met by the heat pump alone. EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 44643 Page: 15 of 17 MECHANICAL MANDATORY MEASURES Part 2 of 2 MECH-MM PROJECT NAME DATE J. PAUL OFFICE BLDG #3 1 10/26/2004 Description Designer Enforcement Ventilation 0 § 121(e) Controls shall be provided to allow outside air dampers or devices to be operated at the ventilation rates as specified on these plans. ❑ § 122(f) Gravity or automatic dampers interlocked and closed on fan shutdown shall be provided on the outside air intakes and discharges of all space conditioning and exhaust systems. a§ 122(f) All gravity ventilating systems shall be provided with automatic or readily accessible manually operated dampers in all openings to the outside, except for combustion air openings. ❑ § 121(f)l Air Balancing: The system shall be balanced in accordance with the National Environmental Balancing Bureau (NEBB) Procedural Standards (1983), or Associated Air Balance Council (AABC) National Standards (1989); or ❑ § 121(f)2 Outside Air Certification: The system shall provide the minimum outside air as shown on the mechanical drawings, and shall be measured and certified by the installing licensed C-20 mechanical contractor and certified by (1) the design mechanical engineer, (2) the installing licenced C-20 mechanical contractor, or (3) the person with overall responsibility for the design of the ventilation system; or JAI §121(f)3 Outside Air Measurement: The system shall be equipped with a calibrated local or remote device capable of measuring the quantity of outside air on a continuous basis and displaying that quantity on a readily accessible display divice; or E§ 121(04 Another method approved by the Commission. Service Water Heating Systems - El§ 113(b)2 If a circulating hot water system is installed, it shall have a control capable of automatically turning off the circulating pump(s) when hot water is not required. a§ 113(b)3B Lavatories in restrooms of public facilities shall be equipped with controls to limit the outlet temperature to 110 degrees F. a§ 113(b)3C Lavatories in restrooms of public facilities shall be equipped with one of the following: Outlet devices that limit the flow of hot water to a maximum of 0.5 gallons per .minute. „ Foot actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Proximity sensor actuated control valves, and outlet devices that limit the flow of hot water to a maximum of 0.75 gallons per minute. Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.25 gallons/cycle (circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.50 gallons/cycle (non -circulating system). Self-closing valves, and outlet devices that limit the flow of hot water to a maximum of 2.5 gallons per minute, and 0.75 gallons/cycle (foot switches and proximity sensor controls). EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 4464-3 Page:16 of 17 HVAC SYSTEM HEATING AND COOLING LOADS SUMMARY PROJECT NAME DATE • J. PAUL OFFICE BLDG #3 10/26/2004 SYSTEM NAME FLOOR AREA HEAT PUMP -1 THRU 6 6,497 26.0 OF 311� Outside Air 975 cfm 69.7 °F Total Room Loads Return Vented Lighting Return Air Ducts Return Fan Ventilation Supply Fan Supply Air Ducts TOTAL SYSTEM LOAD COIL COOLING PEAK COIL HTG. PEAK CFM ISensiblel Latent I CFM I Sensible 8,528 130,094 13,384 4,317 65,523 0 6,505 3,276 0 0 975 38,855 11,938 975 45,354 0 0 6,505 3,276 181,9W 25 322 117,4291 CARRIER 50HS-060-301- 225,762 82,320 224,925 Total Adjusted System Output 225,762 82,320 224,925 (Adjusted for Peak Design Conditions) TIME OF SYSTEM PEAK Jul 3 pm Jan 12 am 66.0°F 66.0°F 84.5°F Supply Fan Heating Coil 11400 cfm 12.0/77.9°F 77.7/65.2°F Outside Air O 975 cfm Supply Far 11400 cfm 74.5/63.9°F Supply Air Ducts 84.3 OF ROOMS 70.0 OF Return Air Ducts 77.7/65.30F 90 59.1/58.10F Cooling Coil k Retum Air Ducts 4 Supply Air Ducts 59.7/58.3OF 57.4% R.H. ROOMS 74.0 / 63.7 OF EnergyPro 3.1 By EnergySoft User Number. 2366 Job Number. 44643 Page:17 of 17 1